Loading...
HomeMy WebLinkAboutSite Plan - Conservation (257) s _ TOWN OF SOUTH WINDSOR INLAND WETLAND, WATERCOURSES AND CONSERVATION APPLICATION APPLICATION I. J 7 DATE RECEIVED 16 -.-).3—� INSTRUCTIONS v 1. The application, map and plans must be submitted in triplicate. together with the fee set forth in the Inland Wetlands, Watercourses and Conservation Regulations, Town of South Windsor. (See Regulations, Section VI) . The South Windsor Inland Wetlands, Watercourses and Conservation Regulations should be reviewed with respect to the standards and criteria for application evaluation. (See Regulations, Sections VIII - X) . 3. The applicant understands that this application is to be considered complete only when all information and documents required by the Agency have been submitted. (See Regulations Section VII). A. APPLICANT'S NAME Capuano Builders & Developers (Mr. Paul Capuano) ADDRESS 1208 Cromwell Avenue Rocky Hill, CT 06067 PHONE: (HOME) I (WORK) 721-8220 B. LEGAL OWNER'S NAME: Same ADDRESS PHONE: (HOME) (WORK) (List additional owners, addresses, and phone numbers on back of application) . C. IF THE APPLICANT IS NOT THE OWNER OF THE SUBJECT PROPERTY, A LETTER BY THE PROPERTY OWNER(S) AUTHORIZING THE PROPOSED REGULATED ACTIVITY SET FORTH IN THE APPLICATION MUST ACCOMPANY THIS FORM AND WILL BE PART OF THE APPLICATION. D. PROJECT NAME: (if any) Governors Square Business Center (Building o) 1. Contact Person (if further information is needed). Mr. Peter DeMallie, Design Professionals, Inc. 1170 Ellington Road, South Windsor, CT 06074 (203) 291-8755 E. THE GEOGRAPHICAL LOCATION OF THE PROPERTY WHICH IS TO BE AFFECTED BY THE PROPOSED REGULATED ACTIVITIES INCLUDING A DESCRIPTION OF THE LAND IN SUFFICIENT DETAIL TO ALLOW I�DE7i�I I acre Of THE PROPERTY zoned N Property HoperLtyD is eastof Nutmeg Road South and south of Governors Highway. See attached A-2 survey. PAGE 1 F. NAMES OF ALL ABUTTING PROPERTY OWNERS: (USE SEPARATE SHEET IF NECESSARY) See attached sheet. G. HAVE YOU NOTIFIED ALL ABUTTING PROPERTY OWNERS BY CERTIFIED LETTER THAT AN APPLICATION IS PTTDING BEFORE THE AGENCY?. e s **(You are required to supply a copy of the letter with the list of the names of the abutters).** H. PURPOSE AND DESCRIPTION OF ALL PROPOSED REGULATED ACT IVITY(S) INCLUDING AMOUNT AND TYPES OF FILL AND THE TW ELEMENT INVOLVED: Construction or new industrial building and new detention basin for stormwater control. Fill material to be native sand and gravel, and parking lot materials . Work to begin after approval, will take approx. 2 years to complete. Also, construction of cul-de-sac at terminus of Connecticut Avenue. I. A CLASS A-2 MAP OF THE PROPERTY DRAWN TO 10-401 , SHOWING THE AREA TO BE DEVELOPED, EXTENT OF THE WETLANDS AND WATERCOURSES AFFECTED, TOPOGRAPH, EXISTING AND PROPOSED ACTIVITIES AND NAMES AND LOCATIONS OF ADJACENT PROPERTY OWNERS MUST BE SUBMITTED. J. ACREAGE OF WETLANDS AND WATERCOURSES TO BE ALTERED: 1. 7± Ac. K. ACREAGE OF WETLANDS AND WATERCOURSES TO BE CREATED: 1.2± Ac. L. LINEAL FEET OF PROPOSED STREAM ALTERATION N/A M. TOTAL LAND AREA �F PROJECT AND PERCENTAGE WHICH IS WETLANDS: 76 . 7 acre parcel of which 23 .5- acres are wetlands! approximately 30 50 ig site wetlands - N. IDENTIFY ALL OTHER PERMITS OR APPROVALS THAT HAVE BEEN ISSUED, APPLIED FOR, OR REQUIRED WITH RESPECT TO THE PROPOSED ACTIVITY SET FORTH IN THIS APPLICATION. (These may include but not be limited to, local Planning & Zoning, Zoning Board of Appeals, D.E.P. , F.E.M.A., D.O.T. , The Army Corps of Engineers, and any other State, Local or Federal Permits.) Planning & Zoning 10/23/89 0. THE APPLICANT (OR DESIGNATED REPRESENTATIVE) HEREBY ATTESTS THAT A SIGN WILL BE POSTED AT THE FOLLOWING LOCATIONJS Nutmeg Road South, and at Governors Hi hwa .0 s. directed by Town s a Capuano Builders & Developers NAME Paul Capuano ON OR BEFO TH OLLO N ATE: SIGNATURE: THESE SIGNS MUST BE DISPLAYED CONTINUOUSLY FOR AT LEAST FIVE DAYS PRIOR TO SCHEDULED MEETING. (See Regulations, Section 6.3a) . PAGE 2 THE UNDERSIGNED HEREBY APPLIES FOR THE REGULATED ACTIVITIES LISTED IN PARAGRAPH H ABOVE, FOR A INLAND WETLAND, WATERCOURSES AND CONSERVATION PERMIT FOR THE PROPERTY DESCRIBED HEREIN AND CONFIRMS THAT: 1. HE IS FAMILIAR WITH THE CURRENTLY EFFECTIVE -INLAND WETLAND, WATERCOURSES AND CONSERVATION REGULATIONS OF THE TOWN OF SOUTH WINDSOR. 2. HE/SHE UNDERSTANDS THAT AT ANY TIME DURING THE REVIEW PERIOD, THE AGENCY MAY REQUIRE THE PROVIDE MORE INFORMATION ABOUT THE WETLANDS AND/O R WATERCOURSES IN UESTION APPLICANT TO Q AND/OR ANY PROPOSED ACTIVITY. 3. ALL INFORMATION SUBMITTED IN THE APPLICATION FOR REVIEW SHALL BE CONSIDERED FACTUAL, OR IN THE CASE OF ANTICIPATED ACTIVITY, BINDING. A KNOWING FAILURE OF THE APPLICANT OR ANY OF HIS/HER AGENTS TO PROVIDE CORRECT INFORMATION, OR PERFORMANCE EXCEEDING THE LEVELS OF ACTIVITY ANTICIPATED, SHALL BE SUFFICIENT GROUNDS FOR REVOCATION OF ANY PERMIT UNDER THESE REGULATIONS . 4. BY MAKING THIS APPLICATION, THE APPLICANT GIVES PERMISSION TO THE INLAND WETLAND, WATERCOURSES AND CONSERVATION COMMISSION MEMBERS AND/OR ITS REPRESENTATIVE TO ENTER THE PORTIONS OF THE PREMISES WHICH ARE SUBJECT OF THE APPLICATION FOR THE PURPOSE OF INSPECTION AND INVESTIGATION AND OTHERWISE EVALUATING THE MERITS OF THE APPLICATION BOTH BEFO AFTER A FINAL�DCISION HAS BEEN ISSUED. Signa ire of Appl cant Date Received and filed at the office of the Planning Department this day of 19 Signature of Agent Date FEE RECEIVED YES_ NO_ AMOUNT D � DATE RECEIVED by HEARING DATE HEARING ADV. (1) (2) OCT 23 PERMIT GRANTED DATE PERMIT DENIED DATE South Windsor INLAND WETLANDS AGENCY] CONSERVATION C0MAQSS101N PAGE 3 STATEWIDE INLAINJ WETLAND & WATERCOIJASL 'tEPORTING FORM ( See instructions on back) 1 In accordance with the requirements of Section 22a-39-14 of the Regulations of Connecticut State Agencies, this form is to be completed for each action. Completed forms for all reportable actions during a calendar month shall be mailed to the Commissioner by the local agency no later than the 15th day of the month following the month in which the action was taken. ******************************************************************************* I . TOWN: South Windsor 2 . A. LOCATION: (Attach an 82 by 11 inch photocopy at the original scale of the appropriate USGS Quad Map with the project site outlined. B. USGS QUAD MAP NAME OR UNIT: Manchester 3 . APPLICANT'S OR VIOLATOR'S NAME:Capuano Builders & Developers (Mr.Paul Capuand 4 . PROJECT NAME (If any) : Governors Square Business Center 5 . ACTIVITY TYPE CODE (See list of codes in instructions) : . . . . . . . . . . [1,2,9,10a If Type Code is 13 "other," describe the type of activity: 6 . ACTIVITY PURPOSE CODE (See list of codes in instructions) : . . . . . . . . . . . [ D ] 7 . ACREAGE OF WETLANDS AND WATERCOURSES ALTERED (or proposed to be altered) : ( for all agency actions; permits, denials and enforcement) A. Soil type(s) ( If Available) . . . . . . . . . . . . . . . . . . . . . . . . . . . . [ 1. 7 ACRES] B. Only if soil type is not available specify area altered as follows: Swamp. . . . . . . . . . . [ ACRES] Marsh. . . . . . . . . . . [ ACRES] Bog. . . . . . . . . . . . . [ ACRES] Open water. . . . . . [ ACRES] S . ACREAGE OF WETLANDS OR WATERCOURSES CREATED: . . . . . . . . . . . . . . . . [ 1. 2 ACRES] 9 . LINEAR FEET OF STREAM ALTERATION: . . . . . . . . . . . . . . . . . . . . . . . . . . . [ -- FEET] 10 . TOTAL ACREAGE OF PROJECT SITE: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . [ 76 .7 ACRES] ************************************** For Local wetland Agency Use Only * For State Use Only 11 . REPORTING MONTH: * GIS CODE: 12 . PUBLIC HEARING HELD: YES NO * * 13 . ACTION: (Circle only one action) * A. permit issued B. permit denied * * C. permit extension/amendment * * D.- map amendment E. enforcement * * F. jurisdictional ruling * * 14 . AGENT: * DATE RECEIVED Rev. 4489 \I W F I ° Soh �.• `!yl n East Windso l ' r:; Q yI ;\. �� f���- � •,�qv. •� '• �� � � is /G '� a rp - "\ ,, � �•. I� lib so V 90 ®I "raft - 88 fs94glear ly Itute �� Cleypi / ! '• (/ ( �•� (Hert(or Cr rateCen. •' ) �; BO!� ( \ STIR 40 me be �'� ° , .J 51 ti• 6 \ p F J l R R� l� s Q• o \ r, .P- o• A .� Q _r f f r a O - , t J� .''4•. •, _/� III�: �_ �L 1 -i •."SOU}}h-a • � ., _•,♦1 It P(0)lt c� ; AT F ts' / % •ixCla i`('`S � �J l• •f• _• ��r�j'HN� . ' ^�.C'�.,� ,1+�_ 1 �� _ '� �� �/• tr ��` �j,,�� x laypit °••.O ° '•�/^' `�� C p \ (29 -60 • u ham ,, 1•- 1 y° • _�,. �' :7• STREET -- °\ /','���•, C - •---------------------------------------------------------------_---------------- �- - z -- - - , 7. I ' / GovE6sclo a S S 44un'a= OF-TV1,. atJ 9"Oft �2 GQo%m-iD dw2TCrZ Compme"S i 100� i - TE sr 1 rr MON ere R W FL L - Y � (203) 291-8755 � TEST 1�IT , esign wETL�N� 1_IN1= rof essionals, inc, civil engineers • planners - surveyors 1170 ellinaton road (route 30)_ ZntJth winricnr ofi.C6 6'RCP iN & CUT ?5'?Co N v FL=56.-5 -5'RCP 'N & CUT L = 90.21' '=68.61 -5'RCP iN N EXISTING STORM MANHOLE - 5 C/ 5 l FL=65.2 +/- ��� �y.� — �_ hRAHgt�. SEE NOTE _ -- 3-9 `gip` FL=56.93 Lap $ Roj . ., _ ---� =_ �_ ,_- `,• _ - � �`__ jam_ _ �, PROPOSE BASIN TLE STTRUG RE gNIT O E / - SEE ETAIL , ARk��y�_ ICE 2" 64.93 9 x 0J x rrsS►L,T • -� TOTAL R = 20a.0o; - r -7. 200 68 xns x7Z4 ,-.tA-2 , r i 7. --.__ 9 EMS iNG TREE LINE, LEGEND , _ . f IRON PIN TO BE SET EXISTING IRON PIN MONUMENT TO BE SET • EXISTING MONUMENT" ?t EXISTING CATCH BASIN AND PIPE PROPOSED TREE LINE " -- EXISTING SANITARY MANHOLE AND PIPE T `' EXISTING WATER MAIN AND HYDRANT x 2a7-3 EXISTING SPOT GRADE N/F / -7a-- EXISTING CONTOUR AND ELEVAiION x too,". �- PROPOSED CONTOUR AND ELEVATION FR I TO-LAY, Inc. EXISTING UTILITY POLE EXISTING LIGHT / ENO Cu OF INLAND WETLANDS / j MOM Ino-wc. L-ocA'noN ANO No. � (203) 291-8755 PROJECT 7nE esign ♦ GOVERNORS rofessionals, inc. SO-UARE BUSSINESS CENTER encineers Runners • surveyors rniin=cn ^cc -nu:e =,,. ,oucr. minesor. _onnec'.u: ___-y� AFI;AP,O -LCP97S :CJ:-+ 1w.3CR Gaounjg WATE2 L iCvr. i GWT A : o$sS(LvEfl q Z1-8y Aa a� J . 0! /.VFLUFiJGE E•►' or c�,W. �'(9W MoNITVt Wrow �_ MONITOR ,/u{ylt 74 , A-2 A-1 sc Seedy Lo�srr. 70 i rQe wI+TE? lAl > = 3ornQ c.oe.�1C 6$ / _- � _ ..__... i---- -J f_jam- ►�"�_- — _u - _ _ � yv•'N.. Fe. o�i t�et O ro;, . , _ �c� �t Y �'. r Gorw.sfc cr 11;t'• 64 � S do d a►o �rovt( 62 S 01 L� SEC-rIaN ACT s Yj ST I r.3 Er SW/*LF- 1N AR1=A or- PeoPo&ED DyTEN-riON 17-AS)N Scpl�-E: �II310' HMoee /Vote /y►a7 WII 'Ji^ /%nPcvci o/r 30 ' aT /�u� �O rh Ofi1'1f5Os J JT ;e ! � p� J%1/-'c�rG I,f L1. �J ti'1,: Yam:/ , C,lr. 1 a J n A .n ' r �7. rOW L71i~GC I - alSp TG►cv'f . ,.�/e �w /P �it�� Vu✓y ��-:�/.; �n arc c p�i! � ,r•�� lh 1 ; v (203) 291-8755 PROJECT NO--,.9819n LOCAI7UN`Go�. SQ�,�-�� ofesslonals, Inc. mEsTtNa gY. spec CVII 1 i70 lveyots ellin9ton rtoade(route r30). South, wlndeor,�uconnecttcut 06074 OBSERVATION P11' NU. -� LU'I' NO SOIL PROFILE DEPTH -- _F IOU-to DESCRIPTION O y----�-- -- _ To so ---. zo to OrAn we Loam L , o l;,J e. G r,, grown loose -- 7, 8„ Sin�Q ►dnSe Coarse. L-}- brow„ a Pr� s a.n�p LEDGE:/!ate NOTTIdN(h r/on� ---- NOTES• ob, e s WATER—/ 7`G ROOTS` ��i s .�n s in Ceirse s9 st n s .►�� lS fo OBSERVATION PIT NO. 1I-2 LOT NO�nr, de{r� �a.S,�, *2 r SOIL PROFILE DEPTH _ — ------- Ro_O DESCRIPTION ` L�i Or e Irma T�Ie 3 m►rl s9H OA e town sa„ sorr course a �d= " n^------ 0 �v 4r-� /� �irdcyrl S9HA� G� I.1;UGE• ore NOTTI (l• /lox-e WATER:_ /W NOTES• Come q Pr w. aX►' ! 2 ROOTS` -- e (203) 291-8755 PROJEC-r NO_ eelgn LOCA17oN•Gov. SQuA- DATE: ofessionais inc. - -- ' � TESTIriq BY• SKG � fe�•J,r,K, civil en�lneero plonners -----1170 ellington toad (route 30) sutveyots south wlndsor. connecticut 06074 OBSERVATION PIT No. s J Ae oar s ova N LU/I �..�af�P7 SOIL PROFILE DEPTH FROIt TO DESCRIPTION jjjj --- p is �q Pry ------ �4 7-Z 1,01 — 1.1'UGE OTT Nq - — ------- 1,,� aX 1�ATEEt: -o ROOTS NOTES 7�r r s� a off" f �, /J I.fiu ei' 6 c�t°Pio ih S w�-t',e O�SERVATIuN PIT No. LOT No SOIL PROFILE DEPTH FROM TO DESCRIPTION ---- r'�'DgE' HOTTLINq:_ RATER: RooTs• ■ ,:pesign ofessionals, inc. civil engineers • planners • surveyors ■ October 23 , 1989 To Current Abutter: Re: Governor' s Square Business Center Nutmeg Road South South Windsor, Connecticut 06074 Project No. 86-142 Please be advised that our client, Capuano Builders and Developers , has applied to the South Windsor Inland Wetland Agency/Conservation Commission for approval of land development (Buildings E-H, O and other related improvements) . Any questions should be directed to the South Windsor Planning Department at the Town Hall, Telephone No. 644-2511. Thank you. Sincerely, DESIGN PROFESSIONALS, INC. By: phen iancardi Project Planner CC: South Windsor Planning Department Paul Capuano Irwin Hausman, Esq. 1170 Ellington Road (Route 30), South Windsor, CT 06074 0 (203) 291-8755 N/F Abutting Property Owners of Governors Square Business Center Application #89-39P 1, Hill, Robert M. & Judy Ann 16 . Philip, Henry S. & Virginia 39 Barbara Road 74 Edgewood Drive 2 . Luria, Solomon & Edward & Elise 17 . Senger, Victor I . Jr. , & 10 Barbara Road Marilyn M. 3 . Pfav, Daviel J. & Mary Ellen 66 Edgewood Drive 155 Judy Lane 18 . Franklin Distributors, Inc . 4 . Guerra, Arturo & Wolf, Helmar 140 Nutmeg Road South 165 Judy Lane 19, H.J.M. Realty Company 5 , Marryat,Allan F. & Janice E. 45 Connecticut Avenue 175 Judy Lane 20 . Ryan Business Systems, Inc. 6 . Lapenta, Barbara 455 Governors Highway 168 Edgewood Drive 21. Capital Steel of Hartford 7 . Dwyer, David F. & Phyllis A. 121 Connecticut Avenue 160 Edgewood Drive 22 , Carter, Rise, Storrs , Bement 8 . Havenel, John P. Jr. , & Mary Ellen 330 Nutmer Road South 152 Edgewood Drive 23. Frito-Lay, Inc. 9 . Nicholas, Peter G. & Betty D. 160 Nutmeg Road South 144 Edgewood Drive 10, Marlow, Paul R. & Gail A. 124 Edgewood Drive 11. Greenburg, Stanley & Lillian S. 116 Edgewood Drive 12 . Calderon, Rocco S. & Joanne L. 106 Edgewood Drive 13 . Downs, Robert G. & Barbara 98 Edgewood Drive 14 . Horan, Theodore J. & Maureen 88 Edgewood Drive 15 . March, Arline B. 80 Edgewood Drive R Penelope C. Sharp Environmental Consultant 225 Reeds Gap Road East Northford, CT 06472 (203) 484-0134 ENVIRONMENTAL ASSESSMENT for GOVERNOR'S SQUARE NUTMEG ROAD SOUTH SOUTH WINDSOR, CONNECTICUT Prepared By: Penelope C. Sharp December 18, 1989 INTRODUCTION On Tuesday, December 5, 1989, a field investigation was conducted at property known as Governor's Square located at the east side of Nutmeg Road South in South Windsor, Connecticut. The purpose of the field visit was to examine the wetland habitats associated with the swale system and to assess the potential environmental impacts of the proposed development upon the wetlands. Although the undeveloped portions of the Governor's Square property were examined, emphasis was placed upon two areas: 1) The location for proposed Building E, F, G, and H; and 2) The location for proposed Building O. EXISTING CONDITIONS AND SITE PLAN ASSESSMENT Buildings E, F, G, and H are proposed to be constructed on an upland area. South of the proposed building location is an existing swale which is part of an overall system of man-made drainage ditches. The swales have been in place for two growing seasons and currently are characterized by having a diverse mix of wetland plant species. The Swale to the south of the four proposed buildings supports a variety of herbaceous plants including cattail, soft rush, woolgrass, bulrush, goldenrods, purple loosestrife, seedbox and several species of sedge. The development plans include the addition of a detention basin at the eastern terminus of the swale. The basin will be 9, 600 square feet in size. An additional detention area, smaller in size, will be created to the north, east of proposed -2- r Building G. Both detention areas will be planted with a wet meadow mix. It is anticipated that they will develop into wetland habitats capable of performing a number of wetland functions such as flood storage, pollution filtration, and wildlife habitat, particularly for small mammals and songbirds. The creation of the two detention areas will provide an addition of 0.27 acres of wetland to the site. The construction of Building O and its parking area will require the filling of a small area of wetlands and the relocation of an existing drainage ditch. At the southwest corner of the Governor's Square property is a small wooded wetland. Red maples dominate the canopy layer and several red oaks are present also. The dominant shrub is sweet pepperbush. Other plant species observed in this wetland area include silky dogwood, wild grape, hay scented fern, lady fern, and tree clubmoss. The wetland is relatively low in species diversity and is intersected by the remains of a deep drainage ditch created some time ago. The fact that the wetland is surrounded by development reduces its value as wildlife habitat, although it does provide an environment for squirrels, songbirds and some other small animals. To the north of the woods is an existing drainage swale which will be partially filled and relocated to become a part of a large detention basin. At present, the swale supports little vegetation. It has steep banks which are eroding slowly and which are too steep to support any substantial vegetation. The proposed -3- detention basin will be 51, 000 square feet in size. It will be planted with rushes, sedges and other marsh/wet meadow plant species. While emergent plants from the nearby swales may eventually colonize the basin, the most reliable means of establishing wetland vegetation is to plant the basin as is proposed by this site plan. Detailed recommendations for the wetland creation, are provided in the next section of this report. It is expected that the new detention area will add over an acre of viable wetland and will offset the loss of wetland which will occur during the construction of Building O. PREPARATION OF DETENTION BASINS The recommendations for the construction of the detention basins are essentially the same for the three areas even though there is a difference in size among them. The largest of the three basins is the one associated with Building O. Once the detention areas have been graded to the desired depth, they should be lined with topsoil. The basin floors should be planted with a mix of rushes (Juncus spp. ) and sedges (Carex spp. ) . Other plants appropriate for the detention basin floor are bulrush (Scirpus sp. ) , woolgrass (Scirpus cyperinus) , and bur-reed (Sparganium sp. ) . I would also recommend that cattails (Typha latifolia) be planted near the outlet of the largest detention area. A wet meadow seed mix should be scattered around the edges of the bottom floor and along the side slopes. Shrubs such as pussy willow (Salix discolor) , northern arrowwood (Viburnum -4- recognitum) , and silky dogwood (Cornus amomum) should be randomly planted around the banks of the large detention area. Following the planting and seeding, all three areas should be mulched. In the two larger basins, a few deep pockets could be dug into the basin floor to ensure adequate water for the growing marsh/wet meadow. Based upon the observed vegetation in the existing drainage swales, it would seem likely that all three proposed detention areas will develop into viable wetland areas which will support diverse communities of wetland plants. All three areas should function to attenuate pollution, store floodwater, and provide habitat for small mammals, songbirds, and water fowl. SUMMARY In reviewing this plan, it is important to consider the fact that there is a balance between wetland disturbance and wetland creation. Detention Basin #k1 on the west side of Nutmeg Road South now supports a diverse assemblage of wetlands plant species and offers desirable wildlife habitat for small mammals, songbirds, and waterfowl. On the project site, between eight to nine acres of good quality, undisturbed wetland have been set -5- t aside for conservation purposes. Under the proposed plan for Buildings E, F, G, H and O there will be no net loss of wetland acreage on the site. Respectfully submitted, Penelope C. Sharp Enclosures Note: Please refer to attached report of Burkhardt Environmental, Inc. for listing of wetland species in various locations on the site. -6- a TNh d� EnAmnm@nuo, Onco 127 Hosley Ave., Branford, CT 06405 203-488-9407 October 29, 1988 Mr. Steve Colbath Design Professionals, Inc. 1170 Ellington Road South Windsor, CT. 06074 Re: Project No. 88-30: Capuano - Nutmeg Road South - South Windsor, -CT. Dear Mr. Colbath: I have enclosed a copy of the letter sent to Mr. Cepusno arding the above site. The enclosed map and following text identifies egecological communities on the site as requested by you end Mr. DeMallie. Boundaries are approximate as information was transferred from the 1"=200' scale to the 1"=100" scale concept plan, which has no topography or significant physical features. Generally, the entire site contains level to slight slopes. Deer tracks and trails ere abundant on the site. Raccoon tracks were observed around the western drainage ditches. A number of song birds were also observed in those ditches and the surrounding fields. Please note that the vegetative species lists are not all inclusive. A - Artificial drainage ditch with unstable sandy banks, and rock riprap banks at the northeastern and. Thick herbaceous growth in the center of the ditch, and diverse vegetation on the banks. Acer rubrum Red maple Cy erus strigosus Umbrella sedge Eupatorium perfoliatum Boneset Juncus effuses Soft rush Populus tremuloides Trembling aspen Prunus serotina Black cherry Rhus typhine Staghorn sumac Rubus spp• Blackberry and raspberry Salix spp. Willow Scirpus c_yperinus Wool-grass Solidago spp. Goldenrod Verbena hastate Blue vervain B - Drainage sweles surrounding Site Two with banks mowed regularly. Some herbaceous wetland species in center of ditches. C - Disturbed field areas vegetated with a number of pioneer species. Trees and shrubs predominant and thick in most areas. Trees primarily sapling size. Area includes eastern berm. 4 2 Acer rubrum Red. maple Alnus spp. Alder Ambrosia artemisiifolis Common ragweed Betula populifolia Gray birch Carex stricter Tussock sedge M rice spp. Wax myrtle Oenothere biennis Evening primrose Ohoclea sensibilis Sensitive fern Phraamites c atm nis Reed Populus tremuloides Trembling aspen Quercus spp. Oak Rhus spp. sumac Salix spp. Willow Scirpus cyperinus Wool-grass Solidemo spp. Goldenrod irea tomentosa Steeplebush D - Primarily upland fields with grasses, some landscaping, abandoned cars, etc. E - Stand of pole size hardwoods, dominated by red maple and red oak, surrounding the drainage ditch. Trail on south bank. Understory very sparse with some scatted ferns. Gray birch also present. F - Woods surrounding a remnant drainage ditch. Overstory dominated by red maples and red oaks. Understory dominated by sweet pepperbush. Acer rubrum Red maple Athyrium Filix-femina Lady fern Betula a_lleghaniensis Yellow birch Clethre alnifolie Sweet pepperbush Corpus stolonifera Red-osier dogwood Dennsteadtis punctilobula Heyscented fern Prunus serotina Black cherry Quercus rubra Red oak Ulmus americans American elm Viburnum recognitm Northern arrowwood Vitis . Grape G - Artificial drainage ditches with well established herbaceous layer and standing water throughout the year. Tadpoles observed. Carex spp. Sedge Cyperus strigosus Umbrella sedge .kncus canadensis Push .kncus effusus Soft rush Eleocharis spp. Spike rush Phragmites com unis Read Polygonum spp. Smartweed Typha latifolia Cattail 3 H - Cattail-reed pocket. Carex stricter Tussock sedge Corns stolonifera Red-osier dogwood Cyperims strigosus Umbrella sedge Onoclee sensibilis Sensitive fern Phregmites communis Reed Scirpus cyperinus Wool-grass Tres tomentosa Stesplebush TYPha letifolie Cattail Verbena hostata Blue vervain I - Old asphalt road and remianto of road. J - Field dominated by herbaceous vegetation. Western portion is wetland dominated by blue vervain, evening primrose, grasses, and goldenrods. Asclepies s rieca Common milkweed Aster app. Aster Cyperus strigosus Umbrella sedge Ju'icus effusus Soft rush Oenothere biennis Evening primrose Phrogmites communis Reed Polygonum lapathifolium Pale smartweed Solidago spp. Goldenrod Verbena hastata Blue vervain K - Field with thick, tangled growth dominated by goldenrods, rose, and blackberry and raspberry. L - Wooded drainage ditches with numerous fallen trees, which separate the cultivated fields. Acer rubrum Red maple Athyrium Filix-femina Lady fern Betula populifolia Gray birch Clethra olnifolia Sweet pepperbush Donnotaedtia puictilobule Hmyscented fern Onoclem sensibilis Sensitive fern Osmundo cirrmwmea Cinnamon fern Prunus serotins Block cherry Querous bicolor Swamp white oak Quercus rubre Red oak Rubus spp• Blackberry and raspberry Vaccinium corymbosun Highbush blueberry Viburnum recognitum Northern arrowwood Vitis spp. Grape 4 M - Woods with more age classes and more diversity of species than N. Acer rubrum Red maple Acer saccharum Sugar maple Ath_ yrium Filix-famine Lady fern Clethre alnifolia Sweet pepperbush Ilex verticillats Winterberry ycopodium spp. Clubmoss Prunus spp. Cherry Quercus albs White oafs Quercus rubre Red oak Quercus velutina Black oak Veccinium corymbosum Highbush blueberry N - Woods bisected by heavily used trail, which continues eastward along southern edge of woods. Red oaks and sweet pepperbush dominant vegetative species. Overstory trees west of trail primarily of one age class, and canopy thicker then east of trail. Dumping and encroachment of rear yards has occurred along the southern portion. Aoer rubrum Red maple Athyrium Filix-femina Lady fern Betule populifolia Gray birch Clethra alnifolia Sweet pepperbush Hamemelis virginiana Witch hazel ycopodium spp. Clubmoss Prunes spp. Cherry Quercus alba White oak Quercus palustris Pin oak Quercus rubra Red oak Vaccinium corymbosum Highbush blueberry Viburnum recognitum Northern arrowwood 0 - Fields under cultivation. Potatoes most recent crops. Please call if you have any questions. Sincerely, Zrg"inia E. Burkhardt tOw M aF,` G O-P SOU& ?1)&U&Ot 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 ��osoR•co�'� AREA CODE 203/644-2511 October 27, 1989 TO: James A. Lombardi, Chairman, Inland Wetlands Agency/Conservation Commission FROM: John E. McCahill, Zoning/Wetlands Enforcement Officer ��jJyl RE: A s 0 DOCUMENTS REVIEWED: Application form, Site Plans for Governor Square Business Center, Building 0 dated 10/4/89, and Stormwater Runoff Analysis by Design Professionals, Inc. COMMENTS: 1 . This is a portion of the area submitted for redesignation of wetlands earlier this year. That application (#87-39P) was withdrawn by the applicant prior to the Public Hearing. 2 . � �� The plans indicate limits of inland wetlands as verified in vk the field. The Certified Soil Scientist should be identified on the plans and a report should be submitted to - substantiate the flagging and redesignations. 3. dog ? The riprap for outlet protection, as shown on the erosion and sedimentation plan, should be shown on the site plans. 4 . The application states, "fill is to be native sand and and gravel" , this should be stated on the plans (clean fill) . 5 . The application states approximately 1 . 7 acres of wetlands will be filled. They also state that approximately 1.2 acres will be created. This "creation" is in the form of a wet meadow detention basin. Much of the area incorporated by the basin already contains an existing swale. 6 . Additional groundwater information is needed for an accurate evaluation of the proposed wet meadow detention basin. 7 . A number of trees will be cut on this site. The proposed t Lombardi Page Three October 27, 1989 Application #89-87P e 5 . The proposed tree line shall be flagged in the field prior to cutting. Stum s shall be chipped on site when possible, P PP remaining stumps shall be removed from the site. K P1• d Existing and proposed spot elevations shall be shown on the ya swale. � a a 7 . '% ,"J) The snow fence, southerly of the proposed detention basin, (shown 1 foot off property line on sheet 7 of 11) shall be relocated to provide protection to the proposed tree line. 8 The sequence of construction shall be modified to provide for clearing and grubbing for the proposed haul road. Also, details for the construction of the haul road shall be provided for the areas where it encroaches on the drainage swales. here are ntpe acres, as shown on the plans, which shall be deeded to the South Windsor Land Conservation Trust. e- 00IV f-J--I c44.A,r, 6j.+ h , (s k. l Ao7t v�{' S40W -(sue )•o' a�'E' 'fU 4b PLAN VIEW ccawAcrm BAa�u I l — _ 4.BACKFILL AND COMPACT _ I U' 1 BFDOE LOOSE STW THE EXCAVATED SO: AS ^ h eeTen>r eALa ro RA oRUTE J J J 1 ,,THE a THE PHILL SIDE 00 A OOM1kwOUS BARIUM, ,J J J �E'NT PFWC �' N 73,400 3. Attach filter fabric to 4. Backfll the trench J i zi the wire fencing and extend and compact the / x 70S It into the trench, excavated aoll. I X744 / • Fitt / IIIr1111IITll 61TI111IIT11 111�111�IT11111r1111IIT11 al Compacted e � co III 1111�IIT1 IIII'II�I) I Sackful / 72'- - BOTTOM OF I ` 71.0 J DKMABE WAY f43't PLAN VIEW x7 llu/l�l/i�f B CONSTRUCTION OF SYNTHETIC TER BARRI / I ///",R)111111�11u 6►1J 111�1 u I NOTE: ELEVATION AT PaBlr A sHolnn BE HIGHER THAN ELEWAVON AT \ POINT B. CROSS SECTION 2 �o BALED HAY OR STRAW INSTALLATION not k Dale N/F FRANKLIN DISTRIBUTORS LEGEND ty • IRON PIN TO BE SET I • EXISTING IRON PIN o MONUMENT TO BE SET I ■ EXISTING MONUMENT j EXISTING CATCH BASIN AND PIPE e OF CT D.O.T. 2r STONE TO BE N/F H.J.M EXISTING SANITARY MANHOLE AND PIPE o PLACED OVER FILTER FABRIC MATERIAL EXISTING WATER MAIN AND HYDRANT °� ox 287.3 EXISTING SPOT GRADE SEE SEDIMENT AND EROSION --70-- EXISTING CONTOUR AND ELEVATION SHEET FOR PAVEMENT wIDTH3 PROPOSED CONTOUR AND ELEVATIONEXISTING UTILITY POLE L---- EXISTING LIGHT THRU STREET EDGE OF PAVEMENT LIMITS OF INLAND WETLANDS =� SILT FENCE _ SNOW FENCE ANTI-TRACKING APRON DETAIL NOT TO WALE 1. UNLESS OTHERWISE NOTED, EXISTING UTILITY REVISIONS LOCATIONS AS SHOWN ARE BASED ON BEST FAND AN IS FOR SEDIMENTATII tg� AVAILABLE INFORMATION. ALL EXISTING UTILITIES JN SHOULD BE FIELD VERIFIED PRIOR TO CONSTRUCTION. OSION CONTROL ONLY / 2. ALL UTILITIES ARE TO BE STAKED IN THE FIELDBY A LICENSED LAND SURVEYOR PRIOR TOTO BE USED ,FOR UTILiTIi Inv. 64.93 BERM 1 J,�i/1 . �--TEMP RIP RAP TOP OF BERM ELEY 60.0 A Lr! T 1V (Tj oA' \ � . TOTAL • -&A 0 = 90'11'39" R = 200.00' T = 200.68' 4 �-_ X 72.6 X 724 ` i SILT FENCE 14 OFF EXISTING TREE LINE- PROPERTY LINE N 74 2 9'29"w M.D.0 COORDINATES SNOW FENCE 1.0' OFF NORTHING EASTING PROPERTY LINE POINT PROPOSED TREE LINE 1 173223.55 188073.99 2 173252.97 188010.56 3 173559.73 188090.21 4 173666.68 187704.78 5 173805.74 187951.62 IV n I/F 6 173687.45 188367.22 STRAW MIL FRITO—LAY, Inc. 1.EXCAVATE A 1RENCN 4' / MW AND 1w wvTN OF A 1 PLACE Two STAKES PER BAIL STRAW GILLS 2 Stople the Wire r -ee+oem rRE OR TWINE 1. Set posts and mesh fencing1/ sTccavata a 6�x6" the end offthe post. upslope tam posts. -STAKE Wire p posts POSTFencin 5' u psloPe T q , for stability X 7 ' and self- / o —PA--STRAM leaning. 95 PLAN VIEW COMPACTm 9ALla1LL '- u tr 4.BAaKFUJ AND COMPACT _ THE EXCAVATED SO4 AS a) �/ 3 BEDBE LoosE STRAW 1 1 1 1 afovw ON TILE L"&L SIDE /ETE}N BALES Ta CREATE 1 CF- T1 PIPING To PRE- ta.l N 173,400 co A CONTINUOUS BARRIER. v J 1 Q zl �� 4. gackfll the tr / X 7os 3. Attach flier foondc to and compact the the Wins fencing excavated soli. 'X 74A it into the trench- I ' V Fit ` ` Fabric " ' Igo IIIPII�IIIT�� IIIf���11�11� �II��ldltl� �►�f�����T�� Compacted IIIIII�II �II�� � 71.0 I , — 143, POTTTWI OF OPAPPM WAY PLAN VIEW B \\ CONSTRUCTION OF SYNTHETIC IRITER BARRI 1 I '`� U. l Iln�/�Iln 1,�1,111,11„Il LI►11111111111 t�, 7f EX. CATCH BASIN EX. CATCH BASIN FL=66 06 36"RCP IN & OUT L= 25'3034 FL=66.76 36"RCP IN do OUT j FL=66.74 18"RCP IN N I R = 200.00" FL=68.61 18"RCP IN N L = 90.21' — J EXISTING STORM MANHOLE Nv TF=72.9 +/— _ I FL=65.8 +/— / �� �� �.`�`� -►S�NITRf2Y-MA HOLE { FL=64.8 +/— ��VZZ-I ., TF=75-4Z CL&P 8 FL=65.2 +/— /�� 3g 95Q�`�Ft=56.93 w FENCE 20,OFF 'I SEE NOTE / / _ _ 3 4 PROPE�T'f�t� 6•3 3p ,6 PROPO ETENTION ET STRUC SILT FENCE / 41t SE AIL _— / TOP OF SLOPE d 02 ? \ \ ALE \ Inv. 64.93 , r� X 0J X 72b X 71A I 5,�1 D 'SC 7� TEMP RIP RAP BERM TOP 1 _ TOP OF BERM ELEV.a 68.0 ��IVTJO TOTAL 90'11'39" R = 200.00' A+S`jN T = 200.68' 4 L = 314.84' ` `� X 7P.6 X 7P-4 : \ ` \` SILT FENCE 14' OFF PROPERTY LINE N74 29 EXISTING TREE LINE—� 29"w ,�,� \ M.D.0 COORDINATES POINT NORTHING FASTING SNOW FENCE IA' OFF \ PROPERTY LINE 1 173223.55 188073.99 PROPOSED TREE LINE 2 173252.97 188010.56 3 173559.73 188090.21 4 173666.68 187704.78 5 173805.74 187951.62 6 173687.45 188367.22 N/F / X AwwE FRITO—LAY, Inc. 1.E]RCANAW A TIENCN 4' ` DEEP AND THE WOM OF A y I PRAa AND STAKE MAW 1 STRAW MIL @ALES.TWO STAKES PER NALL / �RRRortc wRE OR TUNE 2 Staple the wire — � .,.r 1• Sat and mesh fencing 1 3-- + / avate a 8"�5" _ j Seed i,nq,-$chPdtr 1 e All distutherl area not paved or SFDII1ENTAIION AND ERE)S10/J CONTR_S7L NUIES-;. I wndscaped shall br Inamerl with a minimum of topsoil. seed as indicated below. Cnoditinn soil wIkh r I. A)1 er nsinn control me a'sur P, will hn r feftilirer applied at the rate of 300 pounds per acre of '7.5 p'our,d, with lhP "Gufdellne r... •'n�.tr yr tad yr+ .� Drrr 1,000 SQlrite feet u�fr.q 10-10-10 or equivalent. In addition, 'ton thr fonnoctirut Cn,�uril nnnSnl F,I, .i",. ,...I rcn, aa„'r• Pounds or 39 n-O Sr=d1ent i •",tr„t per acre or equivalent of slow release nitrogen may a. Ila hale+ -t,�rl Wnrnf hd used for lopdr Pssin n Y s as shown to C.onsr,vat 9• PP1y ground Il,nestone, (equivalent to SO rtsinq he butted t igl,t I, end to P.,,1 percent calcium plus magnesium oxide) at the rate of 3 tons er -Place two P•' 1'•• ., 3b ......nr 135 pormds.per I,00n sg, ft, p ac,^ nslon r-outrol . '•taLPS Pel bnl,,, nr,asur.�+s •i,n to hr maintai'+ed dur inq t,ur t i ya n,. . ner•`"° y. + I ar eA per coas nan.�_1I¢ge,la CLtio n._f,oytlr.L Cr,nt.r ar for is ,n Seeding r' and e,ns Eon co"l^r+l,.,,r_tilg f, ,nnwiPmentatinn nt all -r•,tlmn„kati dates: Apt 11 IB to June 13 and August 11 to $PF,f m0e, f'i �•r"""Ehi I11 on thrrsa plan. it+r y i,+r I+,r1 •: rmn l.•mnntatinn as wn I lge the fol lowinq ml It tur Pa I1 ar. any n•npnsorf r,an,^ Kentur ky blltegr ass 45.0% P .. n, to thin pion mutt be 1,. „glnen, l• to , af'Pr n•.-rrf 1• tfm Creeping red fescue 4 ,. not i- kr arl I'"'I`•^ In. ,,l�..t�riwn agrnry, 5,07. tnq np�r na tO hr in-i,^clr.1 perennial ryegr ass IO.OY. npe, It i"", .Inns '�'7n l n l; r ,,,•:.,;� pr r,pr.+tr hn t.1.1n,i to o, npl,r nrl . . Aho l ! pound Per at sq• f t. or 4$ pounds rnntr ,, r,,, hr• ,n•I,nn^ihl,r EX. CATCH BASIN. •-hould be applied at a r .Per arras, Wnnr� rI,II+' to swvnl. n,.,.r„,ql- ate nI 500-900 pounds per 00p 1F=74.14 10-20 tans per acre. t ft. n, `'• 1 -r � r r, n rrnl=69.24 18"RCP INN •.._,f u,,.+nr.,l t,nr rnnlr nl mnn.,.,'n; will has .,I Ivd FL=67.79 30"RCP IN E 1Q.mporgry-, Vegetal ive wl,r.coygr m rn. to hr„ pas;=Shin '� Inl for n tiled I i FL=68.94 30"RCP OUT W nt, rb trrl wnnrf chip r,+.rlrl It shall hfs tr Pat nd wi 5.4Pdinq datest March 1 to June •n,'iI final $Pot will per Pnnial ryr grass R.nmlual rypgrass 100 90% 1'.i and August i to Octobe, 1 q� ,Ji„�l and Grtl,Ilivati„+, I 1 to take llbhly I pnund er I,Onl. n '1' i,,,, .-nr,t,nl u,r,s r-N4.94 1,•ty mulch a! 2p1 pP� acr of t. or 4n pounds prtr acre with anrhm r-.1 nnq•t+„r fin,+ if dnrmnr.f , rn ;ball hP instal lrdnos n'der ed by n, th. pi,or En rof I+uhi is W,,,.ks the Pr olect '�. ria vbalrc h, fm .� r�iar ed cn "'At str inq dons not cnmr in cnntar-t .S EXISTING WATER MAIN w i t h f 1, q........I. / l� f'+. ran r r nr t u, ZZ _ , /i G+ per Iodiral ly r lean catch J� jn inq I,tion• basin sump- as t,,equirPd zzz ow '10" _ 0= 891.6'58"a VC x 73A2 ��. 7133 R = 330.00' \ _ 76 ) EX. CATCH BASIN �•y� E TF=76.47 / 5eyuenc® of Cpnatnictir•„ SO, �gM, `~� 7 6 )` ` =69.90 30"RCP IN do OUT 1• Place snow fence a,,-,Ind,property as si I/J(0i C Air i/ 2. place temporary !'ii• raP,lterm at west SANITARY MANHOLE near out let as ah,was (,n,plan t. )nets)' To 76,4X 76.7 ` FL=7.0 3,/ apron. Construct haul r,)id and temporary cro: oil at ••ask end of site. 4• Clear and grul, site. ;t"pa to Ix chic —EXTEND 8" WATER MAIN. � from site, TWIN66.56 ' Q INSTALL 8"x6" 5. strip topso31 at location of proposed 66.56 TEE (M.J.), / at east r•,i,E �� 6 S OUTLET 6" GATE VALVE (M.J.) i stack •,f site as shown on plans. e PRC�TEC (�� LEFT ri I,c with sediment !barrier. .. �- r. 1 ) G; Strip,tbpsoil from area 'of 2" $��CE 1�P ed bit -stockpile near building as shown onpl 6*E)6L.0 �.. v' (BY M.D.C. n9 dinent barriers. u:O'•.� \\ X 75.32 _.-7+------ a _ 7•.Construct.haul.rcae..,to f 6'rC DIP W T \ /- f temporary cross in ass wn oil plans T E MA \ fence along haul road as shown,plens. \ 6'x4�x6' �� Excavate new swalc nortI{of existing s, PRECAST pro osed detention basin. Swale to con: ME PIT .._ ._ - Z /• -culverts to elliptical J at Swale outlet to provi 7e. sediment n ' �,,,y, p�ipc>. Maintain PR�SE FLAghXEND fill It at building TWIN 42'RCP ¢, g 0 with excess material •o _/ \ \ i Bxcavate remaining soil rom\ \ FLU 66.97 N besin U FL— 66.94 S full at site of buildih 6, F, r de / I to be stockpiled atnortt C' H' K •,• �o�'a I \ter t •'verall S s end of site .'•kn::��;k•:.:::•;:::��:.::;{i:`;..:•;.-..: 7J •eQ" REMOVE EXIST. � \ e Pleas. 1Q��i!'ough grade Sul-de-sac t�Y+::":•''i �3 , CURB AS REQUIR ` /` t•lace to ear install ul .f t topsoil at deteri 'on basin a \ 1I q.Jnskal'1 seed and lainti area p . •' �i::;'i�: �. ::--'.`�.�' -- � at detention "- ANTI TRAC ING AP Y)n lAndncape plan. `\ \ 12. ustall site utdlltiesr 'one •. "•=:'.•••_.5ii:;:: .::r:,.:;' 724 3, tall outlet tract bui;l'�: :t:• c.:Y:;� :;rt::.: SANITARY MANHO \ protect; 7F=7 \��6 .� 7*• !'f'lY base course for to sow -, .••.•. 2.59 \ 8 \ .,i�,nve and b! der to site pa, -':'•�_ ••' � anti-tracking apr and tam FL'=61.50 ♦ �\ 15. 1' E�>oil anr'1 seed lawn ar as lxrar'., to :• ' .•v,•:. ` IG. Wn rase . estab7 ish : :ti: \� ty_ 9 is eat " \ r 7` Sn` ba ,grass i_d., site stahi • ::` `' may bt removed., ` '���■ 7 8 l� 7 _ ... - / n,.•or our lnr .,s si ,wn nn i•r au::. iu:a 50'BV\wgCE _./ SANITARY MANHOLE /� 3. Construct haul r rad and 1.cm Drat CO/NO ■ 76. TF=76.04 p y 114f 1k78.7 FL-59.80 excess soil nt •ast r•nd of site. ' 4. Clear and grub 1x site. Stumps tr+ , cl '- �-^�� + ■ ���' from site. S. Strip topsoil at location of propos, -12 - - ■ EXTEND 8" WATER MAIN. at east en.l .rf site as shown on Pla TWIN.F2' RCP. 4 INSTALL 8'X6' TEE (M.J.), stockri Lc with sediment barrier. fC=66.56 0lITLET� 6" GATE VALVE (M.J.) 5: Str.,p CoPsoil from area 'rf proposed ' FL- 6 S PR% (OPEN LEFT) ' tockpile near bui,Idinq ;as shown on ' ■ �' 1-liment barriers. a•i 1 74.85.3 2' SERVICE TAP (BY M.D.C. ! 7--Construct haul-road...to taaiaai,wr.z, t i_'wb•� a X72 -' r temporary crossing as shown o plan: 6'f�LC �i{_� /--�4 ----- n fence along haul road as shown. Excavate new swalc north of existim; �6"COIP W TE MAI \ �� / /' culverts detention bsin. swale to i 6'x4'x6' PRECAST /' ellipticalOI - at swale outlet to provipe sediment ME PIT - - _ --.�2 10 fill at building O with excess mate, • o �� \ ' l / 9•. excavate remaining soil from basin, TWIN 42' RCP e PROP�SE FLA46XEND � �\ � fill at site of buildingk F., r•', c, r -`\ ,-FL- 66.97 N ; I:o be stockpi led at nortrr end of sit / y':. ::,• 'o `e 4 X43A \\\ \( FL- 66.94 S ' 1 „verall S i E plan. 1 ` \ \ \ 10.211'ough grade cul-de-sac a{i•c!a, install ' :fi -'-•' o'a• \' / \ 'Place topsoil at detent'•on basin ar •:xprt E :.,:.. �U I REMOVE EXIST. 1'-•.•. . II. .Install seed and pinntinj at detenti CURB AS REOUIR D. ` \ lo,, 'landscape plan. :�: ••''•:'• " 13 .t \ \ 12. 41-stall site utilities, Construct bu ANTI- TRAC iNG AP�2 11. nr+tall outlet protectioh for storm _ ........... ..,.::..:.I:-. .9 \\ �\ .14. l l,ly base course and bihder to sit,. :...w .. . .... .-.•.• 72.4 � SANITARY MANHOL \\ tthmnve anti-trackinq aprpn and temp, 'i.: .'�-`•i,::•5 ''��'•"���i:::.'-.::::- 1.5. 1'' �^oil and seed lawn 1 �6 TF=72.59 � R `\ �t ar�as, establ '`1ti%'•$.•:::5:•, :�"-'z;.::i �` \ iG. Wu ,ass is established and site FL=61.50 \ F g`J k/S v - ba ,iers may be removed-, 71.9 /! j PCB 2 41 ' 4r . V c PCB 1 i 6 71.5 r 71.6 71.8 , ' 7 71.7 PCB 2)172.1 op : . ���• � PCB , , C i 6 , 71.5 / \ lkllz t \ 71.8 x 7247 71.7 71.5, EXISTMG 20' CL&P EASEMENT 711 00 wit• 00 \ HAUL ROUTE AZ o 4f \ 1 TEMPORARY CRO �70, C, Jp �4f �� \ \ \\ \\\\• /'' /, 2�' 18" RCP SWAL \f4 SnN� �P \ \ �' �,�'♦ MIN. 2.0 COVEi ow i i (203) 291-8755 PROJECT TITLE DRAWING TITLE esign GOVERNORS ♦ !SEDIMENTATION -AND ' QnjT A ID W EROSION CONTROL PLAN \=iear CI•rM t V � 1 .t • , r Cz to f 1 a R "c• • JI B — F -S�e.el .j e• N ° � O 1 •-r E• . 9 a• '. _ t - � rNN � ILI �, .-� l •.�•� o �UUJ (•��(7j ( � •'-ROE a 1 �/� �� (/off<fs•' .e � •.F� •�:. ,1� � J /pl —� • b 8 .�. Z. a - SITE LOCU .. C SCALE 1" - 2000 :. ...:.....:. > > (` prepared for ' CAPUANO DEVELOPERS ROCKY HILL, CONNECTICUT September 25, 1989 ' GOVERNORS SQUARE BUSINESS CENTER 1 STORMWATER RUNOFF ANALYSIS INTRODUCTION The Governors Square Business Center project is on a 76.7 acre rparcel of land in an industrial zone bounded by Governors Highway to the north and Nutmeg Road South to the west. The first phase of the development of this project consists of the construction of five buildings with total floor area of 84,630 sq. ft. , extension of Capitol Avenue by 310 ft. , and the construction of a detention basin. (see ' exhibit 2) ' EXISTING CONDITIONS Existing stormwater runoff flows westerly off of the site through ' a Swale system to an existing detention basin located between Route 5 and Nutmeg Road South. Total drainage area to the basin is 91 .6 acres. ' The detention basin, hereafter referred as basin #1 , is owned and ' maintained by the Town of South Windsor. The outflow structure for basin #1 consists of 2-15 , RCP with a headwall at flowline elevation 62.79. The overflow structure consists of a 40 foot wide grass spillway at elevation 66.2. Located approximately 30 ft. west of the 2-15" RCP 1 is a 60" RCP which turns into a 2.75' wide x 2.9' high box culvert. ' Further to the west is a 60" RCP with wingwalls that carries runoff under Route 5. On private land, approximately 350 ft. west of Route 5, ' there is a 24" CMP cross-culvert at the base of a high berm. Drainage then flows into Newberry Brook and finally the Connecticut River . (see ' exhibits 1 & 3) t There are two sites that a been developed on Governors Square. The first site is located adjacent to the proposed building '0' and the ' second site is located adjacent to the proposed buildings E, F, G, and H (refer to exhibit 1 ) . At the time these buildings were constructed the ' GOVERNORS SQUARE BUSINESS CENTER 2 STORMWATER RUNOFF ANALYSIS overall drainage scheme was determined by the construction of the Swale ' system. PROPOSED DEVELOPMENT ' The proposed development consists of the construction of sites E, F, G, H, and 0. (see exhibit 2) All runoff from this area will be to ' catch basins and storm sewer pipe within the area of development. ' Runoff will then flow via the existing swales to the proposed detention basin #2. Outflow from basin #2 enters the existing basin #1 which ' outflows into the existing drainage system as described above. DRAINAGE ANALYSIS ' The drainage analysis performed was done using the SCS TR-20 ' Computer Program for Project Formulation Hydrology. Storm frequencies analyzed are 2, 10, 50, and 100 year storms. A type III rain ' distribution was used in the analysis. Topography was taken from 100 scale South Windsor Topography maps and from field survey, CGS datum. ' Storage volume in the swale system was used for storage capacity ' of detention basin 4. From the analysis it was found that the water elevation for the 100 year storm was 69.3' . The elevation of the swale ' bottom is approximately 68' and the swales are 4' deep. The storm sewer system has been designed for a 10 year storm. ' Storms larger than a 10 year storm will cause some ponding in parking ' areas. Ponding in parking areas was not considered in the analysis, thus causing the analysis to be conservative since some runoff would be detained there for the larger storms. In order to evaluate impacts of this development downstream the principal design point is the 24" CMP culvert. This is the most ' restrictive point in the overall drainage system downstream of the site. ' GOVERNORS SQUARE BUSINESS CENTER 3 STORMWATER RUNOFF ANALYSIS ' The objective of this analysis is to provide a zero percent increase in ' the peak runoff rate at the 24" CMP culvert. Past disturbance of the soil on this site has changed the soil ' properties. Consequently, the soil types as mapped in the Soil Survey ' for Hartford County handbook are no longer valid. Visual inspection of the site and deep test holes were dug to determine the hydrologic soil ' group of the soils. Soil types were based on the following soil characteristics as presented in Appendix A of the SCS TR-55. ' Hydrologic Soil Group Soil Textures A sand, loamy sand, or sandy loam ' B silt loam or loam ' C sandy clay loam D clay loam, silty clay loam, sandy ' clay, silty clay, or clay Table 1 summarizes the results of the drainage analysis and shows that a better than zero percent increase in runoff has been achieved for i ' the proposed development ' LOCATION: Outflow from existing detention basin #1 . Flowline = 62.79. Top of bank = 69.2 Description I Storm Frequency 1 2 10 50 100 existing outflow 12.4 ; 25.8 46. 54.3 ' elevation 64.7 66.3 66.6 66.7 developed outflow 0. 6. 44.1 elevation 64.4 65.5 66.5 66.6 ' % change in peak outflow -16.9% :-36.0% -22.2% -18.8% Y ' GOVERNORS SQUARE BUSINESS CENTER 4 STORMWATER RUNOFF ANALYSIS ' LOCATION: Outflow from proposed detention basin #2. 76" x 48" RCP culvert ' Flowline = 64.33. Top of bank = 71 .0 Description Storm Frequency ' 2 10 50 100 existing outflow 1`8 ' elevation 65.2 66.1 66.4 66.6 developed outflow 14.9�) C333. 0.55\ elevation 66.3 68.2 69.4 69.5 ' % change in peak outflow -28.8'/. -49.7% -15.0'/, -13.1% LOCATION: Outflow from existing detention basin #3. Flowline = 54.5. Top of bank = 66.5 Description Storm Frequency 2 10 50 100 existing outflow 13.9 C . 44. 9.6 elevation 56.7 58.6 63.5 65.5 developed outflow 22. 35.4 41 .9 ' elevation 56.5 57.9 60.7 62.6 % change in peak ------ outflow -13.7% -15. 1'1 -20.6•/ -15.5% TABLE 1 ' The following pages illustrate the preceding results graphically. 9 GOVERNORS SQUARE BUSINESS CENTER 5 STORMWATER RUNOFF ANALYSIS ' is DUE NT ION BRS I N 1 2 YEAR STORM ' !6 F id 1 0 12 w ' to n 8 c 6 s $ 2 8 8. 12.0 15.8 19.0 21.8 24.8 27. .H 33.8 36,8 Tint in Hours ' -e-Existing outflow --- Proposed outflow 27 DETENTION WIN 1 18 YERR STORM E4 F 21 I o 18 i5 i ' n 12 f 1 � s 1 � 8. .8 12.0 15.8 18.0 21.0 24.0 O .H 33.8 36.0 ' Tire in Hours -a-Existing outflow — Proposed outflow 1 GOVERNORS SQUARE BUSINESS CENTER 6 STORMWATER RUNOFF ANALYSIS 45 BETE R ION BRSIN 1 58 YEAR STORM ' 48 F 35 ' 1 0 38 w ' 25 l n 28 ' c 15 f s !8 i1 5 8 8. 9.8 12.8 15.8 18.8 21.8 24.8 27.8 38.0 33.8 36.8 Tim in Hours ' -a-Existing outf lEw Proposed outflow 54 DETENTION WIN 1 48 100 YEAR STORM F 42 I 0 36 w 38 l n 24 � 1e f s !2 s a 8. 9.8 12.8 15.0 18.0 21.8 24.8 27.8 .8 33.8 36.8 Tine in Hours -a-Existing outflow --- Proposed outf law I , ' GOVERNORS SQUARE BUSINESS CENTER 7 STORMWATER RUNOFF ANALYSIS !8 DETENTION BASIN 2 2 YEAR STORM ' 16 F 14 ' I 0 12 w to i n 8 o fi f s 4 ' 2 8. 12.8 15.8 18.8 21.8 24.8 27.8 .8 33.8 36.8 Tine in Hours ' -e--Existing outflow Proposed outflow ' 27 DE TENT ION BRS I H 2 24 18 YEAR STORM F 21 I o 18 w 15 1 - ' n 12 c s f s 6 3 ' 8 8. 2.0 15.8 18.8 21.8 24.8 27.8 .8 33.8 36.8 ' Tim in Nexus -e-Existing outflow Proposed outflow 1 ' GOVERNORS SQUARE BUSINESS CENTER g STORMWATER RUNOFF ANALYSIS r36 DETENTION M81H 2 58 YEAR STORM ' 3E F 28 r ' 0 24 20 1 n 16 ' c 12 f e r4 1 8. 12.8 15.8 18.0 21.8 24.8 27.8 .8 33.8 36.8 Time in Hours -t-Tsxisfirry oufflow PrWan d ouff law ' 36 DETENTION WIN 2 3E 58 YEAR STORM ' F 28 1 o 24 w 28 i ' n !6 c 12 1 f S 8 4 d lei. ir 12.8 15.8 18.8 8 N. 36.8 ' Tim in Hours �-Rxisfirxj outflow — Proposed ouff low r r ' GOVERNORS SQUARE BUSINESS CENTER q STORMWATER RUNOFF ANALYSIS ' i B DE TENT ION BASIN 3 2 YERR STORM F 14 l v 12 w ' i@ n 9 ' c B f s 4 2 8 e. 2.8 15.8 18.e 21.8 24.8 29.8 90.0 33.8 36.e Tine in Hours ' -*-Existing outflow Proposed outflow ' 29 DETENTION BASIN 3 24 iH YERR STORM ' F 21 1 v 18 15 I - n 12 c 9 f ' s s 3 8 8. .8 12.8 15.6 18.8 21.8 24.0 27.8 N.0 33.8 36.0 ' Tine in Hours -&-Existing outflow -r Proposed outflow ' GOVERNORS SQUARE BUSINESS CENTER 10 STORMWATER RUNOFF ANALYSIS ' 45 DETENTION BRSIH 3 58 YEAR STORM 48 I ' F 35 1 ' 0 3H w 25 1 n 20 ' c 15 f s fH S H ' 8. 9.8 12.8 15.8 18.8 21.8 24.8 27.8 .8 33.8 36.8 Tine in Hours ' -k-Exisfirx3 outflow y- Proposed ouff low 45 DETENTION BRSIH 3 ' 48 188 YEAR SMR11 ' F 35 1 0 38 w 1 25 n 28 ' c 15 f s iH 5 _ ' H 8. 9.8 12.8 15.8 18.8 21.8 24.8 27.18­98.8 33.8 36.8 ' Tine in Houra -e-Ex isf ing outf lum y-- Proposed autf low The following schematic drawings represent the runoff analysis performed. ,Refer to exhibits 1 & 2 for structure locations. ' GOVERNORS SQUARE BUSINESS CENTER 11 STORMWATER RUNOFF ANALYSIS .0 err C3 z1 S� a Struct 4- — Existing 2-4-2" RCP at entrance to bldg. 'N' Struct 4 ' Struct 2 — 76" x 48" RCP at Struct 2 natK Nutmeg Road South C)� Struct 1 — Existing Town detention tK basin #1 ' Struct 1 �°3a;1 Struct 3 Existing 24" CMP �q. ' Struct 3 LEGEND 0.029 Drainage area—sq. mi. ' 60.0(1.01) Runoff Curve Number(Time of conc.) ALTERNATE 1 - EXISTING RUNOFF CONDITIONS ' 0 O Struct 1, 3, 4 — Some as alternate O Struct 4 '1 Struct 2 — Proposed detention basir ' 1)18" RCP Struct 2 ��,, 2)14' wide rectangular wE Struct 1 �g ' LEGEND Struct 3 o.D29 Drainage area—sq. mi. 60.0(1.01) Runoff Curve Number(Time of conc.) ALTERNATE 2 - PROPOSED DEVELOPMENT CONDITIONS I ' 12 Overall Drainage Map Basin #3 Drainage Area x83 _ • •_ Gym ;° _ �'�•\ � �o qy � � _'� Basin #1 •`�= 'o t ��� _A Drainage Area o Lb .� •� overnors Square :�'• ��1 4 Business center -17 1 , ._ �• Scale: 1" = 2000 ' i M L M X I H 1.691 X L't�9 6'69 b 99 W � � 09 -r-I U) M t'zs + 6'89 9'69 X s X Odra 91L t X 89 O 69� Sj 9'69 X� J ww w w w w w w ww ■w w■ w■ . ■w � w �■ w ■w w ■w APPENDIX A TR-20 LISTING AND INPUT DATA 9 i LIST OF INPUT DATA FOR TR-20 HYDROLOGY****************** JOB TR-20 SUMMARY NOPLOTS TITLE 001 CAPUANO RUNOFF ANALYSIS - GOVERNORS SQUARE, S. WINDSOR TITLE SITES E, F, G, H, AND 0. ' 5 RAINFL 7 0.20 8 0.0 0.002 0.004 0.006 0.008 8 0.010 0.012 0.014 0.016 0.018 8 0.020 0.022 0.024 0.027 0.029 8 0.031 0.034 0.036 0.038 0.041 8 0.043 0.046 0.049 0.051 0.054 8 0.057 0.060 0.063 0.066 0.069 8 0.072 0.075 0.079 0.082 0.085 8 0.089 0.093 0.097 0.103 0.109 B 0. 115 0. 121 0. 127 0. 134 0. 140 8 0. 148 0. 155 0. 163 0.171 0.180 8 0.189 0. 199 0.210 0.222 0.235 8 0.250 0.266 0.287 0.312 0.363 8 0.500 0.638 0.689 0.714 0.734 8 0.751 0.766 0.779 0.790 0.801 B 0.811 0.821 0.829 0.838 0.845 8 0.853 0.860 0.867 0.874 0.880 8 0.886 0.892 0.898 0.903 0.908 8 0.911 0.915 0.919 0.922 0.925 8 0.929 0.932 0.935 0.938 0.941 ' 8 0.944 0.946 0.949 0.952 0.955 8 0.957 0.960 0.962 0.965 0.967 8 0.969 0.972 0.974 0.976 0.978 ' 8 0.981 0.983 0.985 0.987 0.989 8 0.991 0.993 0.995 0.997 0.999 8 1 .000 1 .000 1.000 1 .000 1 .000 9 ENDTBL ' 3 STRUCT 01 8 62.79 0.0 0.0 8 63.0 0.8 0.001 ' 8 64.0 7.6 0. 16 8 65.0 14.2 0.97 8 66.0 18.8 2.64 8 66.2 19.6 3.05 8 66.3 24. 1 3.26 8 66.5 38.6 3.70 8 66.8 61 .6 4.39 ' 8 67.0 67.4 4.87 8 68.0 77.0 7.48 9 ENDTBL ' 3 STRUCT 02 8 64.33 0.0 0.0 8 65.0 8.4 0.004 ' 8 66.0 27.B 0.027 8 67.0 62.0 0.127 8 68.0 101.6 0.361 8 69.0 140.4 0.738 ' 8 70.0 181 .6 1.268 9 ENDTBL 3 STRUCT 03 8 54.5 0.0 0.0 8 56.0 8.5 0.04 8 58.0 23.5 0.26 2 ' B 62.0 40.0 1.42 8 64.0 46.0 2.49 8 66.0 51 .0 3.94 8 66.2 52.0 4.03 8 66.5 69.3 4.36 9 ENDTBL ' 3 STRUCT 04 8 67.0 0.0 0.0 B 68.0 27.8 0.418 B 69.0 42.0 2.505 8 70.0 88.0 7.096 9 ENDTBL ' 6 RUNOFF 1 04 5 0.099 66.0 1 .51 6 RESVOR 2 04 5 6 6 RUNOFF 1 02 7 0.010 63.0 0.36 6 ADDHYD 4 02 6 7 5 6 RESVOR 2 02 5 6 6 RUNOFF 1 01 7 0.034 74.0 0.56 6 ADDHYD 4 01 6 7 5 ' 6 RESVOR 2 01 5 7 6 RUNOFF 1 03 5 0.029 60.0 1 .01 6 ADDHYD 4 03 7 5 6 ' 6 RESVOR 2 03 6 7 ENDATA 7 INCREM 6 0. 1 7 COMPUT 7 04 03 3.2 1 .0 7 2 01 02 ' ENDCMP 1 7 COMPUT 7 04 03 4.7 1 .0 7 2 01 10 ENDCMP 1 7 COMPUT 7 04 03 6.2 1 .0 7 2 01 50 ENDCMP 1 7 COMPUT 7 04 03 6.9 1 .0 7 2 01 99 ENDCMP 1 3 STRUCT 02 8 64.33 0.0 0.0 8 65.0 1 .7 0.045 ' 8 66.0 7. 1 0.714 8 67.0 11 .2 2.017 8 68.0 14.5 3.457 8 69.0 17.0 4.971 8 70.0 63.2 6.558 9 ENDTBL 3 STRUCT 04 B 67.0 0.0 0.0 8 68.0 27.8 0.418 8 69.0 37.6 2.505 ' 8 69.3 45.0 3.620 8 70.0 80.0 7.096 9 ENDTBL ' 7 ALTER 3 6 RUNOFF 1 04 5 0.099 69.0 1 .51 7 ALTER 3 6 RUNOFF 1 02 7 0.010 78.0 0. 14 ' 7 LIST 7 INCREM 6 0. 1 7 COMPUT 7 04 03 3.2 1 .0 7 2 02 02 ENDCMP 1 " ' 7 COMPUT 7 04 03 4.7 1 .0 7 2 02 10 ENDCMP 1 7 COMPUT 7 04 03 6.2 1 .0 3 ' ENDCMP 1 7 COMPUT 7 04 03 6.9 1 .0 7 2 02 99 ENDCMP 1 ENDJOB 2 ****** * * *** * * **END OF 80-80 LIST* * * ** * * ** * ** STANDARD CONTROL INSTRUCTIONS 6 RUNOFF 1 4 5 .0990 69.0000 1 .51000 0 0 0 0 1 6 RESVOR 2 4 5 6 .0000 0 0 0 0 0 1 ' 6 RUNOFF 1 2 7 .0100 78.0000 . 14000 0 0 0 0 1 6 ADDHYD 4 2675 00000 1 6 RESVOR 2 2 5 6 .0000 0 0 0 0 1 1 ' 6 RUNOFF 1 1 7 .0340 74.0000 .56000 0 0 0 0 1 6 ADDHYD 4 1 675 00000 1 6 RESVOR 2 1 5 7 .0000 0 0 0 0 1 1 ' 6 RUNOFF 1 3 5 .0290 60.0000 1.01000 0 0 0 0 1 6 ADDHYD 4 3756 000001 6 RESVOR 2 3 6 7 .0000 0 0 0 0 1 1 ' ENDATA ' SUMMARY TABLE 1 - SELECTED RESULTS OF STANDARD AND EXECUTIVE CONTROL INSTRUCTIONS IN THE ORDER PERFORMED (A STAR(*) AFTER THE PEAK DISCHARGE TIME AND RATE (CFS) VALUES INDICATES A FLAT TOP HYDROGRAPH A QUESTION MARK.(?) INDICATES A HYDROGRAPH WITH PEAK AS LAST POINT.) ' SECTION/ STANDARD RAIN ANTEC MAIN PRECIPITATION PEAK DISCHARGE STRUCTURE CONTROL DRAINAGE TABLE MOIST TIME ------------------------- RUNOFF -------------------------------------- ' ID OPERATION AREA i COND INCREM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE (S9 MI) (HR) (HR) (IN) (HR) (IN) (FT) (HR) (CFS) (CSM) ALTERNATE 1 STORM 2 STRUCTURE 4 RUNOFF .10 7 2 .10 .0 3.20 24.00 .64 --- 13.24 11.76 118.8 STRUCTURE 4 RESVOR .10 7 2 .10 .0 3.20 24.00 .64 67.41 13.44 11.34 114.5 ' STRUCTURE 2 RUNOFF .01 7 2 .10 .0 3.20 24.00 .52 --- 12.38 1.94 194.0 STRUCTURE 2 ADDHYD .11 7 2 .10 .0 3.20 24.00 .63 65.18 13.43 11.82 108.4 STRUCTURE 2 RESVOR .11 7 2 .10 .0 3.20 24.00 .63 65.18 13.44 11.81 108.4 STRUCTURE. 1 RUNOFF .03 7 2 .10 .0 3.20 24.00 1.04 --- 12.44 13.55 398.4 STRUCTURE 1 ADDHYD .14 7 2 .10 .0 3.20 24.00 .73 65.66 12.50 17.25 120.7 STRUCTURE' 1 RESVOR .14 7 2 .10 .0 3.20 24.00 .73 64.72 13.92 12.38 96.6 STRUCTURE 3 RUNOFF .03 7 2 .10 .0 3.20 24.00 .41 --- 12.93 2.28 78.7 STRUCTURE 3 ADDHYD .17 7 2 .10 .0 3.20 24.00 .67 56.69 13.74 13.70 77.6 ' STRUCTURE 3 RESVOR .17 7 2 .10 .0 3.20 24.00 .67 56.69 13.92 13.64 79.3 1 ' 4 SUMMARY TABLE 1 - SELECTED RESULTS OF STANDARD AND EXECUTIVE CONTROL INSTRUCTIONS IN THE ORDER PERFORMED (A STAR(fl AFTER THE PEAK DISCHARGE TIME AND RATE (CFS) VALUES INDICATES A FLAT TOP HYDROGRAPH A QUESTION MARK(?) INDICATES A HYDROGRAPH WITH PEAK AS LAST POINT.) SECTION/ STANDARD RAIN ANTEC MAIN PRECIPITATION PEAK DISCHARGE ' STRUCTURE CONTROL DRAINAGE TABLE MOIST TIME ------------------------- RUNOFF -------------------------------------- ID OPERATION AREA # COND INCREM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE PATE (99 MI) (HR) (HR) (IN) (HRI (IN) (FT) (HR) (CFS) (CSM) ALTERNATE i STORM 10 ' STRUCTURE 4 RUNOFF .10 7 2 .10 .0 4.70 24.00 1.53 --- 13.14 32.17 325.0 STRUCTURE 4 RESVOR .10 7 2 .10 .0 4.70 24.00 1.53 68.05 13.49 28.53 288.2 STRUCTURE 2 RUNOFF .01 7 2 .10 .0 4.70 24.00 1.32 --- 12.33 5.96 595.6 STRUCTURE 2 ADDHYD .11 7 2 .10 .0 4.70 24.00 1.51 66.05 13.41 29.61 271.7 ' STRUCTURE 2 RESVOR .11 7 2 .10 .0 4.70 24.00 1.51 66.05 13.44 29.61 271.7 STRUCTURE 1 RUNOFF .03 7 2 .10 .0 4.70 24.00 2.13 --- 12.42 28.96 851.0 STRUCTURE 1 ADDHYD .14 7 2 .10 .0 4.70 24.00 1.65 66.55 12.49 42.07 294.2 STRUCTURE 1 RESVOR .14 7 2 .10 .0 4.70 24.00 1.65 66.32 14.16 25.77 180.2 STRUCTURE 3 RUNOFF .03 7 2 .10 .0 4.70 24.00 1.13 --- 12.80 B.37 288.8 ' STRUCTURE 3 ADDHYD .17 7 2 .10 .0 4.70 24.00 1.57 59.09 14.13 28.67 166.7 STRUCTURE 3 RESVOR .17 7 2 .10 .0 4.70 24.00 1.57 58.63 14.48 26.51 154.1 ' ALTERNATE 1 STORM 50 STRUCTURE 4 RUNOFF .10 7 2 .10 .0 6.20 24.00 2.59 --- 13.10 57.00 575.8 STRUCTURE 4 RESVOR .10 7 2 .10 .0 6.20 24.00 2.59 68.75 13.79 38.41 387.9 ' STRUCTURE 2 RUNOFF .01 7 2 .10 .0 6.20 24.00 2.32 --- 12.31 10.88 1087.6 STRUCTURE 2 ADDHYD .11 7 2 .10 .0 6.20 24.00 2.56 66.35 13.76 39.85 365.6 STRUCTURE 2 RESVOR .11 7 2 .10 .0 6.20 24.00 2.56 66.35 13.BO 39.84 365.5 ' STRUCTURE 1 RUNOFF .03 7 2 .10 .0 6.20 24.00 3.35 --- 12.41 45.79 1352.6 STRUCTURE i ADDHYD .14 7 2 .10 .0 6.20 24.00 2.75 67.50 12.47 72.16 504.6 STRUCTURE 1 RESVOR .14 7 2 .10 .0 6.20 24.00 2.75 66_60 13.87 46.49 325.1 STRUCTURE 3 RUNOFF .03 7 2 .10 .0 6.20 24.00 2.05 12.76 16.55 570.8 STRUCTURE 3 ADDHYD .17 7 2 .10 .0 6.20 24.00 2.63 66.23 13.42 53.80 312.8 ' STRUCTURE 3 RESVOR .17 7 2 .10 .0 6.20 24.00 2.63 63.52 14.91 44.55 259.0 ALTERNATE 1 STORM 99 STRUCTURE 4 RUNOFF .10 7 2 .10 .0 6.90 24.00 3.13 --- 13.07 69.50 702.0 ' STRUCTURE 4 RESVOR .10 7 2 .10 .0 6.90 24.00 3.13 69.06 13.02 44.90 453.6 STRUCTURE 2 RUNOFF .01 7 2 .10 .0 6.90 24.00 2.82 --- 12.31 13.37 1336.9 STRUCTURE 2 ADDHYD .11 7 2 .10 .0 6.90 24.00 3.10 66.55 13.81 46.59 427.4 STRUCTURE 2 RESVOR .11 7 2 .10 .0 6.90 24.00 3.10 66.55 13.04 46.57 427.3 STRUCTURE 1 RUNOFF .03 7 2 .10 .0 6.90 24.00 3.95 --- 12.41 54.23 1594.9 ' STRUCTURE 1 ADDHYD .14 7 2 .10 .0 6.90 24.00 3.30 69.03 12.47 B6.89 607.7 STRUCTURE 1 RESVOR .14 7 2 .10 .0 6.90 24.00 3.30 66.71 13.85 54.34 380.0 STRUCTURE 3 RUNOFF .03 7 2 .10 .0 6.90 24.00 2.53 --- 12.75 20.83 718.2 STRUCTURE 3 ADDHYD .17 7 2 .10 .0 6.90 24.00 3.17 66.48 13.04 67.91 394.8 STRUCTURE 3 RESVOR .17 7 2 .10 .0 6.90 24.00 3.17 65.45 15.09 49.63 288.6 Y 5 ' SUMMARY TABLE 1 - SELECT ED RESULTS OF STANDARD AND Ef(fCUTIVE CONTROL INSTRUCTIONS IN THE ORDER PERFORMED ' (A STAR(*) AFTER THE PEAK DISCHARGE TIME AND RATE (CF5) VALUES INDICATES A FLAT TOP HYDROGRAPH A QUESTION MARK(?) INDICATES A HYDROGRAPH WITH PEAK AS LAST POINT.) SECTION/ STANDARD RAIN ANTEC MAIN PRECIPITATION PEAK DISCHARGE ' STRUCTURE CONTROL DRAINAGE TABLE MOIST TIME ------------------------- RUNOFF -------------------------------------- ID OPERATION AREA (1 COND INCREM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE (So MI) (HR) (HR) (IN) (HR) (IN) (FT) (HR) (CFS) (CSM) ALTERNATE 2 STORM 2 ' STRUCTURE 4 RUNOFF ,10 7 2 .10 .0 3.20 24.00 .78 --- 13.20 15.23 153.8 STRUCTURE 4 RESVOR .10 7 2 .10 .0 3.20 24.00 .78 67.53 13.39 14.65 148.0 STRUCTURE 2 RUNOFF .01 7 2 .10 .0 3.20 24.00 1.27 --- 12.1E 7.34 734.1 ' STRUCTURE 2 ADDHYD .11 7 2 .10 .0 3.20 24.00 .82 68.42 13.37 15.54 142.6 STRUCTURE 2 RESVOR .11 7 2 .10 .0 3.20 24.00 .82 66.32 14.60 8.42 77.3 ' STRUCTURE 1 RUNOFF .03 7 2 .10 .0 3.20 24.00 1.04 --- 12.44 13.55 398.4 STRUCTURE 1 ADDHYD .14 7 2 .10 .0 3.20 24.00 .07 65.50 12.45 16.51 115.5 STRUCTURE 1 RESVOR .14 7 2 .10 .0 3.20 24.00 .89 64.40 14.67 10.27 71.8 STRUCTURE 3 RUNOFF .03 7 2 .10 ,0 3.20 24.00 .41 --- 12.93 2.28 79.7 ' STRUCTURE 3 ADDHYD .17 7 2 .10 .0 3.20 24.00 ,BO 56.49 12.99 12.14 70.6 STRUCTURE 3 RESVOR .17 7 2 .10 .0 3.20 24.00 .00 56.46 13.23 11.95 69.5 ' ALTERNATE 2 STORM 10 STRUCTURE 4 RUNOFF .10 7 2 .10 .0 4.70 24.00 1.74 --- 13.12 37.66 380.4 ' STRUCTURE 4 RESVOR .10 7 2 .10 .0 4.70 24.00 1.74 68_19 13.62 29.69 299.9 STRUCTURE 2 RUNOFF .01 7 2 .10 .0 4.70 24.00 2.45 12.17 14.07 1407.3 STRUCTURE 2 ADDHYD .11 7 2 .10 .0 4.70 24.00 1.81 69.30 13.50 31.02 284.6 STRUCTURE 2 RESVOR .11 7 2 .10 .0 4.70 24.00 1.81 68.15 14.95 14.B7 136.4 ' STRUCTURE 1 RUNOFF .03 7 2 .10 .0 4.70 24.00 2.13 --- 12.42 28.96 B51.8 STRUCTURE 1 ADDHYD .14 7 2 .10 .0 4.70 24.00 1.B8 66.45 12.44 35.19 246.1 ' STRUCTURE 1 RESVOR .14 7 2 .10 .0 4.70 24.00 1.88 65.50 16.28 16.49 115.3 STRUCTURE 3 RUNOFF .03 7 2 .10 .0 4.70 24.00 1.13 12.80 8.37 288.8 STRUCTURE 3 ADDHYD .17 7 2 .10 .0 4.70 24.00 1.76 57.97 12.95 23.30 135.5 STRUCTURE 3 RESVOR .17 7 2 .10 10 4.70 24.00 1.76 57.87 13.07 22.54 131.1 ALTERNATE 2 STORM 50 STRUCTURE 4 RUNOFF .10 7 2 .10 .0 6.20 24.00 2.87 --- 13.09 63.94 645.8 ' STRUCTURE 4 RESVOR .10 7 2 .10 .0 6.20 24.00 2.97 69_04 13.90 38.69 390.7 STRUCTURE 2 RUNOFF .01 7 2 .10 .0 6.20 24.00 3.75 12.17 21.10 2118.1 STRUCTURE 2 ADDHYD .11 7 2 .10 .0 6.20 24.00 2.95 69.51 13.95 40.50 371.5 ' STRUCTURE 2 RESVOR .11 7 2 .10 .0 6.20 24.00 2.95 69.36 15.29 33.52 307.5 STRUCTURE 1 RUNOFF .03 7 2 .10 .0 6.20 24.00 3.35 --- 12.41 45.99 1352.6 ' STRUCTURE I ADDHYD .14 7 2 .10 .0 6.20 24.00 3.05 66.71 12.42 54.61 301.9 STRUCTURE i RESVOR .14 7 2 .10 .0 6.20 24.00 3.05 66.47 15.76 36.16 252.9 STRUCTURE 3 RUNOFF .03 7 2 .10 .0 6.20 24.00 2.05 --- 12.76 16.55 570.8 STRUCTURE 3 ADDHYD .17 7 2 .10 .0 6.20 24.00 2.88 61.67 15.72 38.84 225.8 ' STRUCTURE 3 RESVOR .17 7 2 ,)0 .0 6.20 24.00 2.88 60.68 16.34 35.39 205.8 6 SUMMARY TABLE i - SELECTED RESULTS OF STANDARD AND EXECUTIVE CONTROL INSTRUCTIONS IN THE ORDER PERFORMED ' (A STARf*) AFTER THE PEAK DISCHARGE TIME AND RATE (CFS) VALUES INDICATES A FLAT TOP HYDROGRAPH A AUESTION MARK(?) INDICATES A HYDROGRAPH WITH PEAK AS LAST POINT.1 SECTION/ STANDARD RAIN ANTEC MAIN PRECIPITATION PEAK DISCHARGE ' STRUCTURE CONTROL DRAINAGE TABLE MOIST TIME ------------------------- RUNOFF -------------------------------------- ID OPERATION AREA I COND INCREM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE (SB MI) (HR) (HR) (IN) (HR) (IN) (FT) (HR) (CFS) (CSM) ALTERNATE 2 STORM 99 STRUCTURE 4 RUNOFF .10 7 2 .10 .0 6.90 24.00 3.43 --- 13.OB 76.97 777.5 STRUCTURE 4 RESVOR .10 7 2 .10 .0 6.90 24.00 3.43 69.30 13.92 44.94 454.0 STRUCTURE 2 RUNOFF .01 7 2 .10 .0 6.90 24.00 4.38 --- 12.17 24.55 2455.0 ' STRUCTURE 2 ADDHYD .11 7 2 .10 .0 6.90 24.00 3.52 69.65 13.08 46.97 430.9 STRUCTURE 2 RESVOR .11 7 2 .10 .0 6.90 24.00 3.52 69.51 14.92 40.52 371.7 ' STRUCTURE 1 RUNOFF .03 7 2 .10 .0 6.90 24.00 3.95 --- 12.41 54.23 1594.9 STRUCTURE i ADDHYD .14 7 2 .10 .0 6.90 24.00 3.62 66,B8 12.42 63.93 447.1 STRUCTURE 1 RESVOR .14 7 2 .10 .0 6.90 24.00 3.62 66.57 15.33 44.07 309.2 ' STRUCTURE 3 RUNOFF .03 7 2 .10 .0 6,90 24.00 2.53 --- 12.75 20.93 718.2 STRUCTURE 3 ADDHYD .17 7 2 .10 .0 6.90 24.00 3.44 64.64 15.27 47.60 276.7 STRUCTURE 3 RESVOR .17 7 2 .10 .0 6.90 24.00 3.44 62.64 16.39 41.91 243.6 SUMMARY TABLE 3 - DISCHARGE (CFS) AT XSECTIONS AND STRUCTURES FOR ALL STORMS AND ALTERNATES ' XSECTION/ DRAINAGE STRUCTURE AREA STORM NUMBERS.......... ID (SA MI! 2 10 50 99 ' STRUCTURE 4 .10 ALTERNATE 1 11.34 29.53 39.41 44.90 ' ALTERNATE 2 14.65 29.69 39.68 44.94 STRUCTURE 3 .17 ALTERNATE 1 13.64 26.51 44.55 49.63 ' ALTERNATE 2 11.95 22.54 35.39 41.91 STRUCTURE 2 .11 ALTERNATE 1 11.B1 29.61 39.B4 46.57 ALTERNATE 2 8.42 14.87 33.52 40.52 ' STRUCTURE 1 .14 ALTERNATE 1 12.38 25.77 46.49 54.34 ALTERNATE 2 10.27 16.49 36.16 44.07 END OF 1 JOBS IN THIS RUN ' APPENDIX B CALCULATIONS I 1 DETENTION BASIN 1 STAGE-STORAGE CALCULATIONS BY AVERAGE END AREA ' Elev. Area Height Volume Sum volume ft. ft2 ft. ft3 ft3 Ac. ft. 62.79 0.0 0.0 0.0 0.0 0.21 63.0 38.0 4 4 0.0001 ' 1 .0 64.0 13,830 6,934 6,938 0.16 1.0 65.0 56,970 35,400 42,338 0.97 1 .0 66.0 87,950 72,460 114,798 2.64 0.2 ' 66.2 91 ,740 17,969 132,767 3.05 0. 1 66.3 93,635 9,269 142,036 3.26 ' 0.2 66.5 97,425 19, 106 161 , 142 3.70 0.3 66.8 103, 110 30,080 191,222 4.39 ' 67.0 106,900 0.2 21 ,001 212,223 4.87 1 .0 ' 68.0 120,000 113,450 325,673 7.48 STAGE-DISCHARGE CALCULATIONS ' Basin 1 structures 1) 2 - 15" RCP with headwall , flowline = 62.79 ' 2) Emergency spillway, 40 ft. wide, elev. = 66.2 or 3) 2.75' W. x 2.90' H. box culvert, flowline = 61 .47 whichever is less between 2 and 3. ' 2 - 15" RCP Elev. Headl Inlet Outlet Head2 Outlet2 Head3 Outlet3 Total ft. ft. Control Control ft. cfs ft. cfs IL_c!! ' 62.79 0.0 0.0 - - - - - 0.0 63.0 0.21 0.8 - - - - - 0.8 64.0 1.21 7.6 _ _ _ _ _ 7.6 65.0 2.21 14.2 14.2 66.0 3.21 - 18.8 - - - - 18.8 ' 66.2 3.41 - 19.6 0.0 0.0 _ _ 19.6 66.3 3.51 20.0 0.1 4. 1 24. 1 66.5 3.71 - 17.2 0.3 21 .4 - - 38.6 66.8 4.01 - 0.0 0.6 61.6 - - 61 .6 68.0 5.21 - - 11 .8 - 6.5 77.0 77.0 ' 2 ' Formulas used for spillway discharge: Q = 3.2 x W x H1 .5 + 2.558 x H2.5 x TAN(A) WHERE: W = width of spillway = 40 ft. ' H = head A = angle of sides from vertical = 71.5 Discharge calculations: Water elevation (WE)= 63.0' ' QRCP = 0.8 cfs ( inlet control nomograph - estimated) Headwater depth a box culvert (HW) = < 1 .0' Elevation difference between 2-15" RCP outlet and box inlet = 62.50' - 61 .47' = 1 .03' Tail water depth (TW) = HW 1.03' _ < 0.0' *Twin 15" RCP flows under inlet control ' WE = 64.0' QRCP = 7.6 cfs ( inlet control ) HW = 1.04' ' TW = 1 .04' - 1.03' = 0.01 ' *Twin 15" RCP flows under inlet control . WE = 65.0' QRCP = 14.2 cfs (inlet control ) HW = 1 .6' TW = 1 .6' - 1 .03' = 0.6' ' From culvert computations, H = 1 .34' Q = 7.2 cfs x 2 = 14.4 cfs (outlet control nomograph) *Twin 15" RCP flows under inlet control WE = 66.0' QRCP = 19.0 cfs (inlet control ) HW = 1 .94' ' TW = 1 .94' - 1 .03' = 0.91 ' From culvert computations, H = 2.26' Q = 9.4 cfs x 2 = 18.8 cfs (outlet control nomograph) HW = 1 .94' *Twin 15" RCP flows under outlet control ' WE = 66.2'QRCP = 20.0 cfs ( inlet control ) HW = 2.00' TW = 2.00' - 1 .03' = 0.97' ' From culvert computations, H = 2.44' Q = 9.8 cfs x 2 = 19.6 cfs (outlet control nomograph) HW = 2.00' ' *Twin 15" RCP flows under outlet control 3 ' WE = 66.3' QRCP = 20.2 cfs ( inlet control ) ' QSPILL = 128 x 0.11 .5 + 7.674 x 0. 12.5 = 4.1 cfs Q = 20.2 cfs + 4. 1 cfs = 24.3 cfs HW = 2.26' TW = 2.26' - 1 .03' = 1 .23' From culvert computations, H = 2.54' Q = 10.0cfs x 2 = 20.0cfs HW = 2.26' *Twin 15" RCP flows under outlet control WE = 66.5' QRCP = 21.0 cfs ( inlet control ) ' QSPILL = 128 x 0.31.5 + 7.674 x 0.32.5 = 21 .4 cfs Q = 21 .0 cfs + 21 .4 cfs = 42.4 cfs HW = 3.19' ' TW = 3. 19' - 1.03' = 2. 16' From culvert computations, H = 1 .83' Q = 8.5 cfs x 2 = 17.0 ' HW = 3. 13' TW = 3. 13' - 1.03' = 2. 10' From culvert computations, H = 1.89' Q = 8.6cfs x 2 = 17.2cfs ' HW = 3.13' *Twin 15" RCP flows under outlet control WE = 67.0' QRCP = 22.0 cfs ( inlet control ) QSPILL = 128 x 0.81 .5 + 7.674 x 0.82.5 = 96.0 cfs Q = 22.0 cfs + 96.0 cfs = 118.0 cfs ' HW = 12.8' or elev. = 61 .47 + 12.8' = 74.27' 74.27' > WE = 67.0 so box culvert controls outflow ' Find elevation at which WE = elevation of head water. try WE = 66.8' QRCP = 0.0 cfs (submerged) QSPILL = 128 x 0.61 .5 + 7.674 x 0.62.5 = 61 .6 cfs HW = 4.96' or elevation = 66.4' OK WE 67.0_ HW/D = 1 .91 QBOX = 67.4 cfs ' WE 68.0' HW/D = 2.25 QBOX = 77.0 cfs r �-- rr r■ r� r rr rr • ■r � rr rr rl rr rr �r rr __fir r� PROJECT: g f}51 A/ 1 PREPARED BY:- fl A- TOWN • '" W"^dam" CULVERT COMPUTATIONS CHECKED BY: ROUTE DATE: HYDROLOGIC AND CHANNEL INFORMATION SKETCH o"A�'uv.1 j;�pY-\ 2-/5/� EL. STATION: AHWj w j TWI =__ E ? 79 go= o.vo6 TW CZ TW2= L:Al EL 'S 0� =DESIGN DISCHARGE,FREO.- -YR. MEAN STREAM VELOCITY=_` C2=CHE.KftfHA-"E.FRCQm YlL MAX. STREAM VELOCITY=_ HEADWATER COMPUTATION CULVERT z DESCRIPTION 0 Sn INLETCONT. OUTLET CONTROL HW=H+ho-LSD ~� to COST COMMENTS (ENTRANC[ TYPE) G C TW • HW K H � d +D hc HW �> WE=65•p -7• l IS" 0•5 l.34 /,as l./5 O.6 /.IS �.Z G�c7,Z c�,c, wF- 6d• 0 9.5 15`' O'S z•Z6 !.Z J.Z3 0•9/ /123 311- 0.= 9•`3- c Z,Z6 •Z3 3•Z q 1Z8 tNt 1 66Z /a.o ls'' a,5 z.4i . o.ryi l,zg 3.9-• Q� q,? �5 ° 'S Z 44 1'zs /,zS I o•ql !,2,5 3•g- 4, 9,g W�= 6�•3 !d,/ o,5 7• ).2S• /.Z-s /.Z3 /,2 j 3. 0, Io.o c SUMMARY Ik RECOMMENDATIONS: -n PROJECT:Covers J3j�S/N / PREPARED BY:-- TOWN CULVERT COMPUTATIONS CHECKED BY: ROUTE:--- DATE:-- HYDROLOGIC AND CHANNEL INFORMATION SKETCH EL STATION: AHW= QI a TV, :_ E TW2=_ L= EL DESIGN DISCHARGE,FREA. YR. MEAN STREAM VELOCITY s__ Q2-CHF. K H FIL MAX. STREAM VELOCITY=� CULVERT HEADWATER COMPUTATION = _ DESCRIPTION 0 gM INLET CONT. OUTLET CONTROL HW=H+h LS ~ o- o 9 _ -' COST COMMENTS (ENTRANCZ TYPE) HW Ke H • do +D TW ho HW o WC= /O.b IS" o'S Z.S /.25 1•Z5 ),23 1-25 3.5 vu� - 66 5 Jo5 !S" 0�5 /• 83 13 J•Z8 Z,it Z, 6 3.7 4=8, 5 c� O,5 b99 /,/S I.Z . Z.ID Z./o 3� 4=9.:6 SUMMARY Ek RECOMMENDATIONS: 6 • Ltd Basin #1 2-15" RCP w/Headwall flowline = 62. 79 ' 180 10,000 CHART 2 _. 168 8,000 EXAMPLE (2) (3) 156 6 000 0•t2 Inches (3.3 r•eq 6. 6. ' 0.120 cfs 144 5,000 5. 4,000 �* Nw 6 5. 132 o felt • 120 3 4.000 (l) 2.5 e.e 5'. 4. 2,000 (2) 2.1 7.4 ' 108 (3) 2.2 7.7 4. 3. "o In r•.t 3• 96 1.000 3' ' 800 600 // 2' -2.- - 500 / ' t2 400 / 2. N ; v300 j/ 1.5 1.5 ' Z N Z 60 IL 200 1.5 z / W. c 54 / a � v i W 48 /W I00 Z // Q: 80 = Q U /2 v 60 W I.0 1.0 ' o 0 5o HW SCALE ENTRANCE I.0 It 40 0 TYPE Ir W W .9 ' W 36 30 (1) Square edge 'filth 3 .9 .9 w hoodwall O Q 33 euTI.ET rr-x- . C 20 V .. Groove end ' Q ILI 30 FL(3) = .8 .8 (3) 0 ve endue SECTION .8 27 projecting 1 ' 24 8 .7 .7' To use scale (2)or (3)project 2 1 5 horizontally to scale (i),then 4 use straight Inclined line through .' 0 and 0 scales,or reverse as .6 illustrated, .6 .6 Q=3 .8 15 'S .5 12 HEADWATER DEPTH FOR F HEADWATER SCALES 283 CONCRETE PIPE CULVERTS BUREAU OF PUBLIC ROADS JAN.Igfl! REVISED MAY1964 WITH INLET CONTROL 5-22 ( 7 Basin #1 Headwater depths for basin elevations r 2. 75 ' wide x 2.9 ' high box culvert CHART 1 12 ' 11 soo (1) (2) (3) 500 10 EXAMPLE e 9 10 400 Wet' Box 0+75coo' —. 8 0/B 15cfs/ff. - 7 — 8 9 300 inlet 0 fee mw 6 eel D 6 7 . 5 6 f3 f 11 1.75 3.5 5 ' 200 (2) t. .e - q- - 5 (3) 2.05 05 4.1 1 4 7 4 3 ' 3 6 O 100 3 O U. 80 or 1� 2— -- W 3 2 5 a - 60 = - 2 - �- 50 ' W 2 40 / - -- � = 1.5 1.5 m W. z a O\ 30 o = i, 1n x � � C 20/ or m 3 F - 1.0 3 9 I.O I:0 _ •'W Angle of i _ O _ wingwoll ~ Q 10 Flors —► W 8 9 9 W O t� g 66,3 Iz ' w '�- C3 6 66.Z 3 'e o�78 o O HW SCALE WI W p,69 ' 2 a 4 FLARE ��,(> or (1) t�s�0 0' to 75' - 3 -- --- (2) 90•on ' (3) 0*(ON lens.ons �r56 2 of sides) To use stole (2)or( ,then II — - _-- - horitonlelly to scale(1► then use straight inclined line through .4 I 0 and 0 scales,or reverse as illuslrofed. ' - .8 .4 4 - .6 - 1 •5 .30 .35 .35 ' HEADWATER DEPTH FOR BOX CULVERTS BUREAU OF PUBLIC ROADS JAN 1963 WITH INLET CONTROL 5-21 8. Basin #1 • Flow calculations for 2-25" RCP under outlet control CHART 9 2000 Slope so— T .4 10 0 0 i = SUBMERGED OUTLET CULVERT FLOWING FULL J HW.No IhO-LSo .5 Boo 120 For outlet crown not Submerged, Compute HW by 6 molhods described in IM design procedure 600 -108 .8 - 500 96 �.09n 1.0 400 84 300 72 66 ' 60 t%- OO Fyc w rn r tL 9 cw7 54 O J H=Z.`rA- ' 100 z ....-42 - FA Q W 10 W 4 80 = x ' O z o 36 a° 5 tn 60 W 3 35 0 00 too 6 � ►- a t w 30 -40 a 50° f 8 0 27 i we e O 30 0 - 10 24 20 21 8 20 15 5 12 5 4 1 HEAD FOR CONCRETE PIPE CULVERTS ' FLOWING FULL BUREAU OF PUBLIC ROADS JAN 1963 n = 0.0 1" 1 ' S-32 1 9 Basin #1 Flow rate calculations for 2 . 75 ' wide x 2. 9 ' high box culvert CHART 1 12 11 600 500 10 EXAMPLE 8 9 10 400 We 2' Doe 0 r 75 crs _ 7 _ 8 0/9 a 1505/fl. 7 — 6 - 9 300 Inlet !LW HIN o her 6 6 7 5 6 (I) 1.75 3.5 6 5 200 (2) 1.90 3.8 4 5 (3) 2.05 4.1 4 3 3 6 p 100 3 O I.S. 80 2 _ W 2� 0 60 = - - 2 In F v 50 1,5 40 i UL GO / = 1.5 Z 4 Q�� LL O I, Ox O 20/ m 3 1- 1.0 W 0. Z O 9 -- --1.0 1.0 W Angle of 0 Winawoll ~ W 0: 10 Flare —► WCL .9 9 = Q O 8 z ' L 6 N W W Q LL 6 3 _ O _ 5 O o HW SCALE WINGWALL w 7 T 2 a 4 D FLARE _ .6 Cr (1) 30•to Tr - 3 -- -- (2) 90'and 15• 1 131 O'(go lensrons ,5 2 of sides.) ' To use scale (2)or(31 Project - horlsonlally to scale Ill,then use Of aighl inclined line through .4 1 D and 0 scales,or reverse as Illustrated. 8 .4 - 4 .6 —- 1 •5 L .30 .35 .35 ' HEADWATER DEPTH FOR BOX CULVERTS BUREAU OF PVOIIG ROADS JAN 1963 WITH INLET CONTROL 5-21 9 1 ' 10 ' TR-55 CURVE NUMBER COMPUTATION VERSION 1101 Project : GOVERNORS SQUARE User: DA Date: 10-13-89 County : HARTFORD State: CT Checked: Date: Subtitle: Sites E, F, G, H, and 0 Subarea : 1 ------------------------------------------------------------------------------- ' Hydrologic Soil Group COVER DESCRIPTION A B C D Acres (CN) ------------------------------------------------------------------------------- FULLY DEVELOPED URBAN AREAS (Veg Estab. ) Open space (Lawns,parks etc. ) Good condition; grass cover > 75% - 8.1 (61 ) - - Impervious Areas Paved parking lots, roofs, driveways 6.7(98) - - - OTHER AGRICULTURAL LANDS Brush - brush, weed, grass mix fair - 2.0(56) 1.8(70) 1 .8(77) Woods good - 1.0(55) 0.2(70) - Total Area (by Hydrologic Soil Group) 6.7 11 . 1 ---2 -1.8 ------------------------------------------------------------------------------- SUBAREA: 1______TOTAL_DRAINAGE AREA: 21 .6 Acres WEIGHTEDCURVENUMBER_ --74 --------- -------------------------- ----- - - ' TR-55 Tc and Tt THRU SUBAREA COMPUTATION VERSION 1. 11 Project : GOVERNORS SQUARE User: DA Date: 10-13-89 County : HARTFORD State: CT Checked: Date: Subtitle: Sites E, F, G, H, and 0 -------------------------------- Subarea #1 - 1 ------------------------------- ' Flow Type 2 year Length Slope Surface n Area Wp Velocity Time rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr) ------------------------------------------------------------------------------- Sheet 3.2 100 0.01 H 0.472 Shallow Concent'd 200 0.01 U 0.034 Open Channel 1500 .005 .0123.5 4.7 0.058 Time of Concentration = 0.56* --- Sheet Flow Surface Codes --- A Smooth Surface F Grass, Dense ___ Shallow Concentrated _-_ B Fallow (No Res. ) G Grass, Bermuda Surface Codes C Cultivated < 20 % Res. H Woods, Light P Paved ' D Cultivated > 20 % Res. I Woods, Dense U Unpaved E Grass-Range, Short ' DETENTION BASIN 2 STAGE-STORAGE CALCULATIONS BY AVERAGE END AREA EXISTING SWALE STORAGE Elev. Area Height Volume Sum volume ft. ft2 ft. ft3 ft3 Ac. ft. ' 64.33 0.0 0.0 0.0 0.0 0.67 65.0 574 192 192 0.004 1 .0 66.0 1,431 1 ,002 1 , 194 0.027 1 .0 ' 67.0 7,266 4,349 5,543 0. 127 1.0 68.0 13,102 10, 184 15,727 0.361 1 .0 69.0 19,759 16,430 32,157 0.738 1 .0 ' 70.0 26,416 23,087 55,244 1 .268 STAGE-DISCHARGE CALCULATIONS ' Existing basin 1 structure 1) 76" x 48" RCP, FLOWLINE = 64.33 Elev. Head Outflow ft. ft. cfs 64.33 0.0 0.0 ' 65.0 1 .67 8.4 66.0 2.67 27.8 67.0 3.67 62.0 ' 68.0 4.67 101 .6 69.0 5.67 140.4 70.0 6.67 181 .6 1 12 STAGE-STORAGE CALCULATIONS BY AVERAGE END AREA PROPOSED BASIN 2 STORAGE ' Elev. Area Height Volume Sum volume ft. ft2 ft. ft3 ft3 Ac. ft. ' 64.33 0.0 0.0 0.0 0.0 0.67 65.0 5,870 1 ,966 1,966 0.045 1.0 66.0 52,412 29,141 31 ,107 0.714 1 .0 67.0 61, 112 56,762 87,869 2.017 ' 68.0 64,345 1 .0 62,729 150,598 3.457 1.0 ' 69.0 67,538 65,942 216,540 4.971 1 .0 70.0 70,730 69, 134 285,674 6.558 ' STAGE-DISCHARGE CALCULATIONS Proposed basin 2 structures ' 1 ) 18" RCP, FLOWLINE = 64.33 - 2) 14' WIDE RECT. WEIR, FLOWLINE 69.0 Elev. Headl Outflowl Head2 Outflow2 Total ft. ft. cfs ft. cfs cfs 64.33 0.0 0.0 - - 0.0 ' 65.0 1 .67 1 .7 - - 1 .7 66.0 2.67 7. 1 - - 7. 1 67.0 3.67 11 .2 - - 11 .2 ' 68.0 4.67 14.5 - - 14.5 69.0 5.67 17.0 0.0 0.0 17.0 70.0 6.67 19.0 1 .0 44.2 63.2 ' Discharge calculations: ' OWEIR = 3.2 x (L - 0.2 x H) x H1 .5 9 (203) 291-9755 Ur o ve T Yip( S JOB - e sg n SHEET NO. , OF ' rofessionals, ince CALCULATED SV- I�A DATE..... cIVII engineers • plennen • surveyors CHECKED BY GATE ' 1170 el nq n rood (routi 30j, south Windsor. connscticut 00074 '- , SCALE ..- ..... .. . .1............IF.... . ..._.. ...6. '' . ...._.. ..._..._' !._A . ....._..._ ........_. ._.._.i............_ ...._i. ......! ..... ..,...........�............ .._.._.. ._....._. en ! - ! . . .......... .......... ........._i........._.... .i 6 __. ... _..._ ...._ ...... ..... ... .. ...... ...........�....... ,...... _ ...................... . ! I _..._ f ..............................._..... .....__..._._......._........_.......... ........._.�............:............ ..... ..... ...._... ...........L.... t...... ...... ........ . ........ ....... .i........._.._._..._.. ..... _..._ ..... _.. _.._. 1._ .:�... -...... .... : j ............1.................. �.........._�..._..._......... ..... . ..._. .. .._.. (...... i............. ..__.....__............._...........................I......_................... ................_.....+...........�_....... ��......._.._......... I ! � t I 1 ................... ............ ...... ._ .... ...... ... ..... ..... .............! ..... ! `...._. : .... ...... ................... .........t.............F.... ...`.......... .. ... .... i ...... ' ....................:..........................:..._.......�......_...�........................... ...... i ..... ..... .........�.....'......I. i ....�... ... ... ............. _..... ' ,..... ..... ...i. ...................... ..........r............. ..........i...................... _................. I i.... I ... ...,.... 4 , ; ...I.... ....I.... i... i k.... �... ` ( I �. I I mot- �. ...� ..........�. i.. L...... ... �q. .. I . ;_ ' ................................_:...._.....L.........._i....._...... I i f !................... ..... ..... ...... I ..... ..... ...... ..... �� ..... ... t I , ... i.... j I........................... l.... !. L............_................... i _.+.... I... I f i .....:.... 1 ..... .... . .......... ... ...... ! i : I __...�.... . ....... .......... ...... ..... ... ..... I i I I : : i I ..... ........ :......... :. ............... I ............. _.. I ........'........ : ........._.................. ; ... t i i .. I .. .......... i ...... ....... ........................................L.............. ........'._...........,. i ! ' i l......... _................ f ....... .:.... ....... ....:.... I ; 1 .........................!......:_..i..._........i............ ....................._!...........:.. .. I I I 3.... .. _..... ! I I I i , i i ; i i i I . L.. ... E.... i.� ....... ........_...... ..... y.... ....,... :... . .........i ill � �' � ....i.... I.... (...._.......• I ......... ... .. I, ...L..........L............:.............:._.. ...;............ �__......__... ...................................... ."... l............i........ i .... ,l.. ... ........�.. i + I _._........ ............:........._. ................ ....... .......... ....... i... ...: I i I ' ..........3.....................................�...................... ..... .. ....�... .. ..... ! I ........_.!._._................_!�.. ................I..............�................._. I......._............. i ! . �.... I �....... ........._. ..... ............. .................I...........1 ... ... ..___................_ I ...........................s...... _ ..._ .... }.... b.: . ! ...._.............._.. .._._ .......... ....... ....._.?......._.1.._.............. _._.................._...._..... _ ._ ...,...............-_ 1.-. 1........ �...._ _.�_........_._._.__�_ _._........_... .._(...._.._........._.................................. ..._. .._......I...... ........._._....._.......:_......._. ..._.. ........__...._...._...1..............._............._.........._........_ ... .._.. .__...: .._ ... ___.._....._.._.__.: ._.:.. .._..__ _.._...._.....___...._ _. .__ _....._. --- ........ .......... ........._ ... ................_... ........ _._.. _.. .. ..._...._._....._._.. ........ ...._. ..................._..........._.........._.._ _..... i �I 1 1 � if 1 14 Proposed Basin #2 Flow rate calculations for 18" RCP I80 10,000 CHART 2 - 168 8,000 EXAMPLE (2) (3) 156 0.42 inches (3.5 foot) 6' 5,000 O.120 of• 6 14a 5. 4,000 ,w• Nw 6 5. 132 D felt 3,000 5. 4. 120 1t1 i.S e.e 4. (2) 2.1 7,4 2,000 (3) 2.2 7.7 4• 108 3. e0 In reef 3• 96 1,000 3' 800 84 -—' --' 600 / 2' 2- 500 0 72 400 �� 3 2. N 300 �m 1.5 1.5 Z 60 u 20o / AQA t7 1.5 z / % b W. 0 54 0 SAL �` a 1u 48 W 100 v 1 b Z Cat: 80 �i b —J ' v 42 v 60 W 1.0 1.0 U.O Q 50 CA ENTRANCE 10 W or 40 TYPE W W' 36 .9 f— a ea• with 3 '9 3 ) sd•W sadwall .9 Q33 T,�� �- Q 721 � Croer• end■ithC (� hoodwall = .8 30 Gre ve @ aCue SECTION .8 .8 projecting ` 2 10 7- 2a .7 6 To use scale (2)or(3)project 21 5 horisontally to scale(1).then ' 4 use straight inclined line through D and 0 scales,or reverse as 6 3 illustrated, .6 .6 .y' g E :•' 2 15 a V. 6So .5 .5 .5 1.0 12 HEAD R' DEPTH FOR HEADWATER SCALES 283 CONCRETE 131PE CULVERTS REVISED MAY t964 WITH INLET CONTROL BUREAU OF PUBLIC ROADS JAN.1963 w 5-22 �' l ' 15 ' TR-55 CURVE NUMBER COMPUTATION VERSION 1151 Project : GOVERNORS SQARE User: DA Date: 10-13-89 County : HARTFORD State: CT Checked: _ Date: ' Subtitle: Sites E, F, G, H, and 0 i - Subarea : 2-ex ------------------------------------------------------------------------------- ' Hydrologic Soil Group COVER DESCRIPTION A B C D Acres (CN) FULLY DEVELOPED URBAN AREAS (Veg Estab. ) Impervious Areas Paved parking lots, roofs, driveways 0.9(98) - - - ' OTHER AGRICULTURAL LANDS Brush - brush, weed, grass mix fair - 2.7(56) - 0.6(77) ' Woods good - 2.5(55) - - ' Total Area (by Hydrologic Soil Group) .9 5.2 .6 SUBAREA: 2-ex TOTAL DRAINAGE AREA: b.7 Acres WEIGHTED CURVE NUMBER:63 ------------------------------------------------------------------------------- TR-55 CURVE NUMBER COMPUTATION VERSION 1 . 11 ' Project : GOVERNORS SQARE User: DA-- Date: 10-13-B9 County : HARTFORD State: CT Checked: Date: Subtitle: Sites E, F, G, H, and 0 Subarea : 2-pr ------------------------------------------------------------------------------- Hydrologic Soil Group COVER DESCRIPTION A B C D ' Acres (CN) ------------------------------------------------------------------------------- FULLY DEVELOPED URBAN AREAS (Veg Estab. ) ' Open space (Lawns,parks etc. ) - - - Good condition; grass cover > 75% 1 .7(61 ) Impervious Areas ' Paved parking lots, roofs, driveways 3.0(98) - - - OTHER AGRICULTURAL LANDS ' Brush - brush, weed, grass mix good - - 1.6(65) - Woods - grass combination good - 0.4(58) - - ' Total Area (by Hydrologic Soil Group) 3 2. 1 1 .6 ------------------------------------------------------------------------------- SUBAREA: 2-pr TOTAL DRAINAGE AREA: 6.7 Acres WEIGHTED CURVE NUMBER:78 -------------6,----------------------------------------------------------------- ' 16 ------------------------------ Subarea #2 - 2-ex ------------------------------ ' Flow Type 2 year Length Slope Surface n Area Wp Velocity Time ----rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr) Sheet 3.2 50 0.02 h 0.206 ' Shallow Concent 'd 250 .016 u 0.034 Open Channel 600 .003 .04 6.75 12.2 0. 121 Time of Concentration = 0.36* ------------------------------ Subarea #6 - 2-pr ------------------------------ ' Flow Type 2 year Length Slope Surface n Area Wp Velocity Time rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr) ------------------------------------------------------------------------------- - , Sheet 3.2 60 .01 a 0.018 Open Channel 860 .0066 .0356 14. 1 0. 122 Time of Concentration = 0. 14* --- Sheet Flow Surface Codes --- A Smooth Surface F Grass, Dense --- Shallow Concentrated --- B Fallow (No Res. ) G Grass, Burmuda --- Surface Codes --- C Cultivated < 20 % Res. H Woods, Light P Paved D Cultivated > 20 % Res. I Woods, Dense U Unpaved ' E Grass-Range, Short w 17 ' DETENTION BASIN 3 STAGE-STORAGE CALCULATIONS BY AVERAGE END AREA ' Elev. Area Height Volume Sum volume ft. ft2 ft. ft3 ft3 Ac. ft. ' 54.5 0.0 0.0 0.0 0.0 1.5 56.0 2,362 1,772 1,772 0.04 2.0 5B.0 7,212 9,574 11 ,346 0.26 2.0 ' 60.0 11,745 1B,957 30,303 0.70 2.0 62.0 19,957 31 ,702 62,005 1 .42 2.0 64.0 26,357 46,314 108,319 2.49 2.0 66.0 36,892 63,249 171 ,568 3.94 0. 1 66.1 41 ,469 3,918 175,486 4.03 0.3 66.4 55,200 14,500 189,986 4.36 STAGE-DISCHARGE CALCULATIONS Basin 3 structures 1 ) 24" CMP, FLOWLINE = 54.53 2) FLOW OVER CULVERT BIRM, FLOWLINE = 66.1 Elev. Headl Outflowl Head2 Outflow2 Total ft. ft. cfs ft. cfs IL cfs ' 54.5 0.0 0.0 _ - 0.0 56.0 1 .5 8.5 8.5 58.0 3.5 23.5 - - 23.5 ' 60.0 5.5 33.0 _ _ 33.0 62.0 7.5 40.0 40.0 64.0 9.5 46.0 - - 46.0 ' 66.0 11 .5 51 .0 - - 51 .0 66.2 11 .6 52.0 0.0 0.0 52.0 66.5 11 .9 52.5 0.3 16.8 69.3 ' Formulas used for spillway discharge: 0 = 3.2 x W x H1 .5 + 2.558 x H2.5 x TAN(A) WHERE: W = width of spillway = 20 ft. ' H = head A = angle of sides from vertical = 88.8 9 18 Basin #3 Flow rate calculations for 24" CMP CHART 5 18O 10,000 ' 168 8,000 EXAMPLE 156 76,000 0.36 inches(3.0 test 6. �2? 5,000 0-96 cfs (3) ' 144 4,000 ww" S, 6. "w 132 3,000 0 (feel) Igo u► I.B' s.. � a..-- .--`-- --- W 2 000 (2) 2.1 6.3 �� 5. 4 13) 2.2 6.6 108 4' J a J 40 in feet !% 3• 4. U - 96 1.000 e�Lti.=66.5 �bti ----- 3- - 800 3. ea � s00 G 0 2. 00 N 72 coo�lev,=66.a � b�� 4 �,- ---. 2— 2. w 300 `� ----- - -- v ' Z 60 v 200 a — 1.5 1.5 Z W 54 v W ' w too S�O a o - — � 48 a e \ ,: 42 N 0 F 1.0 I.0 0 W 1.0 II— 36 NW SCALE ENTRANCE w W D TYPE � 33 20 a .9 (1) Nsodwall .8 .8 30 (2) Mitered to conform W V / to slops ------ ---- '8 0 2 — 10 P��U`- Sd r rojecling T 0 8 .7 z rn 6 - 5 To use seole(2)or(3) project 21 4 horizontally to scale (1),thenuse straight inclined line through .6 3 0 and 0 scales, or reverse as 6 18 illustrated. 2 1.0 .5 ' L 12 HEADWATER DEPTH FOR C. M. PIPE CULVERTS WITH INLET CONTROL BUREAU OF PUBLIC ROAOS JAN.1963 , S-25 ' 19 TR-55 CURVE NUMBER COMPUTATION VERSION 1 . 11 ' Project : GOVERNORS SQUARE User:-DA- Date:-10-13-89 County : HARTFORD State: CT Checked: Date: Subtitle: Sites E, F, G, H, and 0 Subarea 3 Hydrologic Soil Group COVER DESCRIPTION A B C D ' Acres (CN) ------------------------------------------------------------------------------- FULLY DEVELOPED URBAN AREAS (Veg Estab. ) ' Open space (Lawns,parks etc. ) - - Good condition; grass cover > 75% 1 .4(39) 2.3(61 ) Impervious Areas ' Paved parking lots, roofs, driveways 3.0(98) - - - OTHER AGRICULTURAL LANDS ' Brush - brush, weed, grass mix good - 2.3(48) 2.3(65) - Woods good 1 .4(30) 5.9(55) - - ' Total Area (by Hydrologic Soil Group) 5.8 10.5 2.3 ' SUBAREA_ 3-_----TOTAL- - - DRAINAGEAREA_ 18_ - ------6Acres WEIGHTED- -CURVENUMBER:60 - - ' TR-55 Tc and Tt THRU SUBAREA COMPUTATION VERSION 1 . 11 Project : GOVERNORS SQUARE User: DA Date: 10-13-89 County : HARTFORD State: CT Checked: Date: Subtitle: Sites E, F, G, H, and 0 -------------------------------- Subarea 03 - 3 ------------------------------- Flow Type 2 year Length Slope Surface n Area Wp Velocity Time rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr) ------------------------------------------------------------------------------- Sheet 3.2 200 .005 f 0.721 ' Shallow Concent 'd 1300 .008 u 0.250 Open Channel 550 .014 .03 1 2 0.041 ' Time of Concentration = 1 .01* --- Sheet Flow Surface Codes --- A Smooth Surface F Grass, Dense --- Shallow Concentrated --- B Fallow (No Res. ) G Grass, Bermuda Surface Codes C Cultivated < 20 % Res. H Woods, Light P Paved D Cultivated > 20 % Res. I Woods, Dense U Unpaved E Grass-Range, Short ' ao ' DETENTION BASIN 4 STAGE-STORAGE CALCULATIONS BY AVERAGE END AREA ' EXISTING AND PROPOSED SWALE STORAGE Elev. Area Height Volume Sum volume ft. ft2 ft. ft3 ft3 Ac. ft. 67.0 0.0 0.0 0.0 0.0 1 .0 ' 68.0 36,411 18,206 18,206 0.418 1 .0 69.0 145,443 90,927 109,133 2.505 ' 0.3 69.3 161 ,798 48,539 157,672 3.620 0.7 70.0 254,475 151,420 309,092 7.096 STAGE-DISCHARGE CALCULATIONS ' Basin 4 structure -existing conditions 1 ) 2 - 42" RCP, FLOWLINE = 67.0 Elev. Head Outflow ft. ft. cfs 67.0 0.0 0:0 ' 68.0 1 .0 27.8 69.0 2.0 42.0 70.0 3.0 88.0 Basin 4 structure - developed conditions ' 1) 2 - 42" RCP, FLOWLINE = 67.0 Elev. Head Outflow ft. ft. cfs ' 67.0 0.0 0.0 68.0 1 .0 27.8 inlet control ' 69.0 2.0 37.6 outlet control 69.3 2.3 45.0 outlet control 70.0 3.0 80.0 outlet control Discharge calculations: At elevation 68.0 - 0 = C x (PI x D2 / 4) x (2 x 32.2 x H) 1 .5 ' C = 0.18 Inlet control was used for remaining elevations for the existing condition. ' Outlet control was used in proposed condition. Basin,2 exhibited a tailwater influence on the outflow. tl� ti 21 Basin #4 Flow rate calculations for 2-42" RCP ISO I0,000 CHART 2 -. 168 8,000 EXAMPLE (() (2) (3) 156 0.42 inches 13.S feel) - 6' 6,000 6, 000 0•l20 efe 144 5. 4,000 �e Nw 6• 5. 132 B feat 3,000 5• 4. 120 tl) 2.s e.e 4• (21 2.1 7.4 2,000 (3) 2.2 7.7 4, 108 3. e0 in feet 3 96 1,000 3. 800 . 600 500 / 72 400 2. N 3 x 300 1.5 1.5 2 N Z 60 u 200 1.5 Z U 0 54 o tl i 48 /�W 100 z > 80 J Q = // 0 60 a 1.0 1.0 U. W 0 U) 50 HW SCLE ENTRANCE o I.0 W CK YPE �Typ�� W .9W 36 30 (�A � t < .9 W headwall Q 33 ec7Tle-r ltx,µ C.a, 20 121 Groove end .ilk Q ' headwall = .8 8 30 FLARiDkmo SEcnaN .8 (3) Creove end 27 projecting to e 24 e v �6 •7 7 .7 s To use seeb (2) or( reject 21 5 horisontelly to seats(1). an 4 use straight Inclined line thr h 0 and O scales,or reverse as .6 3 illustrated. 6 .6 IB • ' 2 15 1 .5 .5 .5 C` 12 HEADWATER DEPTH FOR HEADWATER SCALES 253 CONCRETE PIPE CULVERTS REVISED MAY1964 WITH INLET CONTROL BUREAU OF PUBLIC ROADS JAN.I963 5-22 ( PROJECT: .. PREPARED BY: TOWN • s W'11d�,— CULVERT COMPUTATIONS CHECKED BY: ROUTE: DATE: ^, HYDROLOGIC AND CHANNEL INFORMATION SKETCH csz/cs, 4Qr 2_4z" i�cp EL STATION: QI s=._. TWI = E 7. s, TW TWZ= o �L6 T 0� =DESIGN DISCHARGE,FREO.__..,__YR. MEAN STREAM VELOCITY=�,,� 0 = H K H F = MAX. STREAM VELOCITY: CULVERT HEADWATER COMPUTATION i DESCRIPTION Q S&M INLET CANTT, OUTLET CONTROL HW=H+h LS ~ o' o _ !1 5 COST COMMENTS (ENTMNCi TYPE) HW Ke H - do +D• TW ho HW C aced-e-v�d -zo .qZ" �� 1.q a. 5 ),4 2.4$ /,acj. ?.z5 -Z,z:s 69.ZS Z25 4t" •3g Z v o,$ _ i5 I, 2.95 I. !o �.45 2.30 7.30 w C`= 69.3.0 ZS '}2 ' .6z ��2, 0 5 .Zo /.5 •50 t.16 -. .50 :Z>.40 Z•4-0 wE= 69.94 30 4Z .6S Z 4 0,s ..31 /.7 2,60 I.Z7 -2.6o a= = 6961 35 q2 ' .15 2,6 0.5 /6 1?-165 /.38 z,d5 2,.719 Z.74 wt '9-0 4Z " .8( • $ o.5' - 5 7 2,6 Z 75 1.4c7 z.75 3.oZ 3,o Z w E VT -A-5 `�'�' '87' 3.p o.s .�Z Z /• Z, b56 Z, ?o�oZ $0 3.2Z, 3.L2. SUMMARY 8 RECOMMENDATIONS : -n N N Basin #4 23 • Headwater depth determination as shown on Page 23 CHART 9 .ti 2000 \ -.+" .3 "W I no u —tR�nRc;ntc• .4 Z yr Slop* So 1000 i j SUBMERGED OUTLET CULVERT FLOWIN FULL 5 "W•".ho-LSo 800 120 For ouftel crown not submerged.c put* by 6 melhods d*ec.ibed in the deign roced 600 108 :8 500 96 �.oyA 1.0 400 g4 300 72 / 66 - bo f f- N 200 60 - \0o F4c� U 2 ILL tj- 54 -110 O W 48—. —_ _ wt os O t� z 3 z (N -- 100 z 00 E'J Q o'�o .. z 00 w 4 80 z 2 .5010 A00 5 v .. 60 n r 33 a00' 500 6 w 30 00 >< 0 27 5 i �• 6 o T* -10 24 s I -20 - 21 ' 18 20 10 t5 - 8 6 12 5 ' 4 . HEAD FOR ' CONCRETE PIPE CULVERTS FLOWING FULL BUREAU OF PUBLIC ROADS JAN 1963 n = 0.0 12 ' ' 5-32 t ' (203) 291-0755 J09 Governor' s Sauare 24 e s i g n SHEET NO. 1 OF l rofessionais, inc. CALCULATED BY DA DATE 10/3/89 ' 10/23/89 clvll engineers • plennen • eUrveyorr CHECKED BY DATE 1170 ellington road (routs 30). south wIndeor• connecticut 00074 1 BCA-- 1.... l._...._I ...................1_.......... .........I......_._I. ...._.I............ ......_I...........1......_. _ !_._.I........................ ... I I i 1 1_..._._I.._.. BkSiN 4 I i a...........!_..........!..._._... ............!........................_+.........__,............!_.......... _..... _..._..........._.. ..... ...... ...... .......;._........_............:..................................._.. ........................... _.. I j Ot tflor� cIkrvb for 1 :42 ' cPi uAde' I i ! I F ............l..............c............o............. .,..........................:.........................„..........,. _... ..... ..... _.._. .... ...... ...... ..... ..... ..... _.... ...... ......_ _... ............_.....:....._..._..-......_.............................. ... ... ... i a de elop�d 1co di i6nsi: EReifeI too Ixhib t 1L ._.. E ff {r „._....... .............._....._.....�...........__...........j...._.....,.,................._........:......._............_...,......... ..........F..._..... _..._ ..... .._ __. '__. ..___ - _._.. ..........;......_.....,...._._...j....._.....t.. :........... ..... ...... ..._ .... .. ,__ ._., . 1 i � E I _ I I I I } I f I for iocatlon. ! i �... ..............„... ._...._........... _s.... _ i _...........................:............. ............!.............,............. :............_;.............,............. ..... ..... .._ ..... ..._ _... ...... ..._.................. ..... ..... .... ...... ...... .... __..............:. 1 ' ( E i I I 1 � I ! I I _ I{ { ! ! ; I 1 I ' ! I I '• � ' !' i ' 1 { � E i I 1 � i i 1 i S '• i { i .. , ! i i [ i ! 1 ! ! r . ! I i ....:..... ! ! ...........i..............:......................... ... .. ` ` i i I ! ....... .......... ! ' t.... .. .......................................a..............,...............-...................._.........._............_........................_.._................................!.._...._....».... .. .. .. _ ......................f ..... i f ! i i I ........._..._.......................:_.........,................i..........._.:._...........:............: ! E ...... ...... ...... ..................... ..... ...... ..... ..... ...... ...... ...... ............... ...... ..... ._.. _.. i i ! .......................�._.... . ! .........................`........ ' ` . ..... _............................................».........................................:............__.........................t............................i............i........ ..... ..... ..... ...... ...... ...... ...... .. ... .........i.............h........ ...... .... .. I i .....:.... I ! ! i i ! ; i I ............................_.........................:..........................:........................................ i ..... ...... ...... ...... ...... ...... ..... ..... ...... ..... ... ........................................... ..... .... ..... ..... , , I i { ................. I i i.... i i ........................,............:............._............................•..........................1._........................1.........................._..:. :...... ..... _...... ...... ...... ...... ...... ..... ..... ..... ...... ...... ... _ I .....................r............:.........._..:...._....................' :.............:._......._.i.............�.............i........... `.............:.............�............_• ......i..._.................._..!.........._.........._... ...._ ..... ..... i !............. ,.............,....... ....t...........................:...._..._...,......_..... ! ! i I ! 1 I I f i 1.. i I f I 1 i ! i I I 1 i ! � 1 : ! ! _....................._...._............................_......._.........;...._........ ....._....,........._..a..............I.............s......... ..... ..... .... ..... i ...... ...... ...._ ..... ... .... ......... .... E ! , II . ............. ........._..�.._.,.:. _......._........... ...._........... ...._._r......................._......_........;......_.. ... _ ._.... ......_._.........._.„........_._..._....._. _......__.__..._................:.........._._..... ....... ........ - ! r...__. I ! ! I I I I I I I I ( I i M I I ................ .............. i E I i f l....._...... 1. ..........................t _._..._........._.—.:...__.._:.. ........ ....._.._.i............ ........_....._.......•. ..._...-. .._......................._..:......... ......... ... ...i.... I I I I I I I I . _._,__... _:.._.__... __._._...... _._._.__.._........1................_........�..__..._..._......................_..........1..............._._...._........... .... _._.. _ ..... ...... .._._.1._..__...............::�...._..........._....:....__...i.........._:.....- - __....._.:_._.. _:.__.._.,. _..._..__........._._ ........_.._.. ;....._.__.........._........._... ... .........I....._. - --.. ...... .._. ...._ ....... ....••. •..._. ....... 1 1 + , ..._..........................._...................__........__._.�.__....._._...... ....................._.... ......_.....___.�__ ._._. ............__ ..__.._.__._...._......_........ . .. ._. _. _ �. _ ._..; ._►.........._. ( I 1.. �__ _. _ 1 __ ._.._._I_..__....�......._...._ -� ,.1._. I._.._�___.._..__.___....._. ._ _ _ .._I_. _.L....... _.. _.. ... __ .... ._.__ ... ........ ... ...........:...._... 1......._._........_...�..........._�__........................_..........._..._ _. ._. _..I C 1 o 2 4 t Ava!table from Im- Inc.Groton.Maas.01450 It ' 25 ' TR-55 CURVE NUMBER COMPUTATION VERSION 1271 Project : GOVERNORS SQUARE User: DA Date: 10-13-89 ' County : HARTFORD State: CT Checked: Date: Subtitle: Sites E, F, G, H, and 0 Subarea : 4-ex --------------------------------------------------------------- Hydrologic Soil Group COVER DESCRIPTION A B C D Acres (CN) FULLY DEVELOPED URBAN AREAS (Veg Estab. ) - Open space (Lawns,parks etc. ) ' Good condition; grass cover > 75% - 8.2('61 ) 2.5(74) - Impervious Areas Paved parking lots, roofs, driveways 5.9(98) ' OTHER AGRICULTURAL LANDS Brush - brush, weed, grass mix fair 0.6(35) 21 .7(56) 8.4(70) 5.3(77) ' Woods good - 3.9(55) 6.8(70) - ' Total Area (byHydrologic Soil Group) Y6.5 33.8 17`7 -5.3 - - - ------------------------------------------------------ SUBAREA: 4-ex TOTAL DRAINAGE AREA: 63.3 Acres WEIGHTED CURVE NUMBER:66 ------------------------------------------------------------------------------- TR-55 CURVE NUMBER COMPUTATION VERSION 1 . 11 Project : GOVERNORS SQUARE User: DA Date: 10-13-89 County : HARTFORD State: CT Checked: Date: Subtitle: Sites E, F, G, H, and 0 ' Subarea : 4-pr --------------------------------------------------------------------- Hydrologic Soil Group ' COVER DESCRIPTION A B C D Acres (CN) --------------------------------------------------------------------------- FULLY DEVELOPED URBAN AREAS (Veg Estab. ) Open space (Lawns,parks etc. ) Good condition; grass cover > 75% - 9.2(61 ) 2.5(74) - ' Impervious Areas Paved parking lots, roofs, driveways 9.9(98) - - - ' OTHER AGRICULTURAL LANDS Brush - brush, weed, grass mix fair 0.6(35) 16.7(56) 8.4(70) 5.3(77) ' Woods good - 3.9(55) 6.8(70) - Total- Area (by Hydrologic Soil Group) 10.5 29.8 17.7 5.3 --- ------ ------------------------------------------ ---- -SUBAREA------: 4--pr TOTAL------DRAINAGE---------AREA: 63.3 Acres WEIGHTED CURVE NUMBER•69 ------------------------------------------------------------------------------- 1 , 26 .' 28 ------------------------------ Subarea #4 - 4-existing and proposed ----------- ' Flow-Type ---2-year ---Length -- Slope Surface n Area Wp Velocity Time rain (ft) (ft/ft) code (sq/ft)- (ft) (ft/sec) (hr) --------------------- --------------------- Sheet 3.2 150 .01 h 0.653 ' Shallow Concent'd 550 .003 u 0.173 Open Channel 2750 .002 .04 6.75 12.2 0.680 Time of Concentration = 1.51* --- Sheet Flow Surface Codes --- A Smooth Surface F Grass, Dense --- Shallow Concentrated --- B Fallow (No Res. ) G Grass, Bermuda --- Surface Codes --- ' C Cultivated < 20 % Res. H Woods, Light P Paved D Cultivated > 20 % Res. I Woods, Dense U Unpaved E Grass-Range, Short 1 t Ertviron men tacl Alan agernent Counselors, Ine. r 165 Oak Ridge / Berlin, QT 06037 203-828-0787 1 � i GROUNDWATER CONDITIONS OF THE PARKCENTRE DEVELOPMENT, SOUTH WINDSOR, CONNECTICUT Submitted by: Leon J. Gorski, Ph.D. , President D. Reed Ostrander, Ph. D. , Executive Consultant Charles Wm. Dimmick, Ph. D. , Executive Consultant D March 9, 1.982 Windsor South NCYI AG� INN RVA00 NGoMM15St0� Emtl'otitttL'ttl[ll � i Evaluations I t'a lcr-Rc sou rc cs Land Use Import slnlc•rruvris Prc-Irlaimirr5r a GROUNDWATER CONDITIONS PARKCENTRE DEVELOPMENT, SOUTH WINDSOR, CONNECTICUT Introduction The Parkcentre Development is an industrial park complex in South Windsor borddred on the west by John Fitch Boulevard (U.S. Route 5) , on .the north by Governor ' s Highway, and on the south by South Satellite Road. To the east is a residential development called Pleasant Valley Estates. Both the industrial park and the residential development have a history of high groundwater problems. EMC, Inc . was asked to investigate the groundwater situation in and near the industrial park and to determine what effect, if any, the activities in the park, past and future, might have on the ground- water in the adjacent residential area. This report was prepared by Dr. Charles Wm. Dimmick, a Certified Professional Geologist, whose background and credentials are attached to this report for informational purposes. Materials used in prepar- ing this report include boring data obtained by Engineering Services, Inc. , Glastonbury, Connecticut _(Clarence Welti) in September of 1967 and by Geotechnical Consultants, Inc. (on contract to Purcell Asso- ciates, Glastonbury) in June, 1976. Pertinent data from the boring logs is included in Table I and test hole locations are shown on the accompanying map entitled, "Groundwater Study of the Parkcentre Development. " Geology-and Soils The entire area is underlain by old lake bed silts and varved clays on top of which are 12 to 20 feet of alluvial and glacial 2 . outwash sands. The top of the varved clays is remarkably flat (about 3 ft. variation in elevation) and the variation of sand thickness is mainly a reflection of surface topography. The soils I which have developed are a reflection of topography and depth to groundwater. All of the soils show presence of a seasonal high water table. Where this seasonal high water table isJRm re than_a foot below the surface, Sudbury and rLnti-rit fine sandy loams have developed. Where the seasonal high water table was historically at or almost at the surface, Walpole fine sandy.__LQams developed; and where the water table stayed high year-round, the very poorly drained Scarboro loams developed. Long use of the land for agricultural pur- poses included partial drainage of the wetter areas, but this has not changed the basic soil characteristics. Recent construction activi- ties have involved massive redistribution of the surficial materials over much of the site, making it difficult to determine in the field what the original soil conditions were. Thus, for this report, we have depended on the February 1962 Soil Survey of Hartford County, Connecticut and the "South Windsor Inland Wetlands and Watercourses" map of Match 1974 for pre-construction conditions. Groundwater Conditions Inspection of soil and topographic maps reveals that ground- water would have been very near the surface, predevelopment, on both the industrial site and the adjacent residential site during the wet seasons. Much of both areas are underlain by poorly drained and very poorly drained wetland soils. Groundwater would be at its highest 3. elevation (about 78 ft. ) just north of the playground N.W. of Edgewood Drive, with* the water table sloping to the south, east, and west. Within the residential development, the groundwater would be highest (75-76 ft. ) just west of the north-west section of Judy Lane, sloping to both east and west. The water table mounds under Barbara Road, sloping away in all directions , and slopes both north and south from the lots lying on the south side Of Judy Lane. Originally, the slope of the water table to the west was more to the southwest and was very gentle, about one foot vertical for every 300 foot horizontal, or a slope of 0. 34%. Two man-made constructions have changed the picture. The first was the digging of the old farm ditch which lies on the border between the industrial park and the residential area. This lowered the wet season water table as much as three feet in the vicinity of the ditch and Newberry Road. Except for those homes within 200 feet of the ditch, it would not have had a significant effect on water levels within the residential area. The second change was the excavation of the area between the old ditch and Newberry Road and the construction of a new ditch. This has dramatically lowered the wet season water table on the industrial site, in some places by as much as six feet; but the effects would probably not be noticed in the residential area except for a Plightlowering of water levels in the backyards of the two homes just south of the playground. In summary, none of the activities on the industrial site have raised the water table on the adjacent residential area, nor have 4 . they contributed to a significant lowering of the water table more ; than 200 feet from the actual construction. Groundwater Fluctuations Both the wetland and non-wetland soils in this area are subject to dramatic seasonal and longer-term changes in groundwater level. It is not unusual to find an area of Walpole soils with water at the surface in early April and the depth to the water table six feet down in late August. Both shorter-term and longer-term fluctuations are also common. Standpipes placed on the Par kcentre site by Palm- berg and Russo show the water table rising one and one-half feet in a week after a period of heavy rainfall and dropping one-tenth of a foot per day thereafter. On a longer term, groundwater levels were very low throughout Connecticut from 1957 to 1964, were very high in the mid-1970' s and dropped dramatically again in late 1980 through August of 1981. At the time of this report, groundwater conditions are close to normal. The problem with these fluctuations is that they are of the same order of magnitude or larger than the changes due to construction and thus would mask the effects of construction. Future Construction Plans for the Parkcentre site include partial filling of the area previously excavated As long as there are underdrains placed under the fill and the fill is mostly free-draining material, there should be no significant adverse effect on water table levels. Table 1 Testhole Data used for parkceptr�':j5tudy Ground Ground water E1evat oll Hole No. elevation elevation of caY "Dat'a:.drilled W-3 74 70 61 . 5 9/l/67 W-4 72. 5 68 . 5 58 . 5 9/l/67 W-5 72 . 5 69 58 . 5 9/1/67 W-7 77. 5 72 61. 5 9/5/67 PV-2 (1) 73 69. 5 58* 6/24/76 PV-4 75 71. E 61 6/23/76 PV-101 74 70. 5 ?** 6/24/76 PV-102 (2) 72 66 59 6/24/76 Holes with numbers starting with W were drilled '�y Engineering Services, Inc. (Now Clarence Welti Associates Inc. ) Holes with numbers starting with PV were drilled by Geotechnical Consultants Inc. for Purcell Associates. * Hole stopped at 15 ' without reaching clay. ** 10-foot hole depth (1) Two feet of fill; original soil level 71 ft. elevation; wetland soil type. (2) Four feet of fill; original soil level 68 ft. elevation; wetland soil type. Water levels in September 1967 were preceded by two months of relatively dry weather, but heavy rain August 26th - 27th. Water levels in June 1976 were preceded by a normal spring with no early drought. ';1 Name : Charles Willian Din►nick Present Status: Associate Professor of Geology Central Connecticut State College New Britain, Connecticut Associate Consultant Environmental Management Counselors Berlin, Connecticut Education: B. S. - Colorado School of Mines, 1962 - Geological Engineering Geology/Biology M.S. - University of Florida , 1964 - Geolo Ph. D. - Tulane University, 1969 - Paleontology Experience : College Instructor of courses in Geologic Field Methods , Physical and Historical Geology, Geonorphology, Geochronology, Seismology, Astrogeology, Cosmogony, Minerology, Oceanography and Environmental Geology Geologic Engineer - Mobil Oil Company, New Orleans District Office - Well-log interpretation and computer prograruning of subsurface geologic information, 1965 Recipient of grant for advanced study, Tulane University - National Science Foundation Primary research interests include hydraulics in relation to' inland and tidal wetlands in pre and post development conditions, soils determinations regarding inland wetlands and identification of soil/plant associations, Engineering water retention systems and erosion and sedimentation control methodology for application to land and marine development procedures Associate Consultant of Environmental Management Counselors with primary responsibility in wetland soils identification , geological c interpretation and engineering appraisal .T Envii-orturell CalAfarta entent CqurtFSCiQF- s, Inc. 165 Oak Ridge / Berlin, CT 06037 203-828-0787.', 01 .. i.THE ENVIRONMENTAL MANAGEMENT COUNSELORS~" PROFESSIONAL BACKGROUND y N _ Environmental _ t 7 u.ei lIl CT tlOTl •. S .It'ater Resources Land Use Impact Statonenfs Pre-plo►ining ENVIRONMENTAL MANAGEMENT COUNSELORS Environmental Management Counselors ( EMC ) was founded in 1973 as a direct result of a federally funded project designed to pro- ,vide scientific expertise to Connecticut ' s towns and cities wrestling with application of newly created inland wetland and watercourse regulations ( P . A . 155 , Connecticut General Statutes ) . A consortium of biologists , ecologists , geologists , soil scientists , and hydrol- ogists applied their various skills to facilitate and coordinate environmental decision-making at the community level . The task was accomplished by advising the various community conservation and wet- land agencies involved . At the end of the 12-month funding period , requests for assistance continued and resulted in the formation of a private firm - Environmental Management Counselors . EMC provides comprehensive services in the development of a complete site analysis including mapping of site characteristics , engineering evaluation , special feature delineation , geological analysis and aquatic studies , each of which are appropriately documented as a matter of procedure for each site investigation . The following is a sample list of applicable projects that have been undertaken by EMC staff consultants in recent years : 1 . Environmental Impact Evaluation of Industrial Development Activities Adjacent to Tidal Wetlands , Fairhaven , Connecticut . 2 . Evaluation of Environmental Implications of Residential Develop- ment on the Tulip Tree Properties of Darien , Connecticut . 3 . Environmental Evaluation of the Development of the Carriage Hill Shopping Center on the Post Road , Westport , Connecticut. - 2 - • 4 . The Environmental Implications of the Erection of Condominiums in Shelton , Connecticut. 5. Environmental Evaluation of Gorham ' s Island as a Potential Develop- ment Site, Westport, Connecticut. 6 . An Evaluation of the Environmental Impact of Proposed Pier and Pilings on the Five Mile River, Darien , Connecticut. 7 . An Evaluation of the Environmental Impact of Proposed Construction of the Glenbrook Pump Station , Darien , Connecticut. 8. A Review of the Potential Environmental Impact of the Development of Connecticut Park Raceway , Wolcott , Connecticut. 9 . An Environmental Study of Alternative Methods for Supplying New York City with Potable Water in the Year 2020, Connecticut, New Jersey, and New York Segments . 10 . Preliminary Evaluation of the Environmental Impact of a Proposed Recreational Facility in the Lordship Area of Stratford , Connecticut 11 . An Evaluation of the Environmental Impact of the Laurel Park Greyhound Raceway , Stratford , Connecticut . 12 . An Evaluation of the Environmental Impact of Proposed Pier and Moorings at Noroton Bay, Darien , Connecticut. 13 . An Environmental Evaluation of Site Development Plans of the Tobacco Farms Company for the Suffield , Connecticut Conservation Commission , Suffield , Connecticut. A 14 . An Analysis of Greensfarms Road Properties for Potential Develop- ment as Light Industrial -and Residential Areas , Westport , Connecticut. 15.. Site Analysis and Characterization for Location of Union Carbide Corporate Headquarters , Danbury/Ridgefield, Connecticut. 16. Wetlands Analysis for Proposed Greyhound Racing Facility , Thomaston, Connecticut . 17 . An Evaluation of Site Characteristics , Wetlands Delineation , and Erosion and Sedimentation Control Plan for Darien Dinner Theater, Darien , Connecticut. 18 . Tidal Wetlands and Site Analysis of Location of Island Creek Condominium, Fairfield , Connecticut. 19 . Inland Wetlands Delineation and Engineering of Retention Ponds for Park North Condominium, Fairfield , Connecticut. 20 . Review and Analysis of Inland Wetlands for Brighton Park Subdivision , Westport, Connecticut. 21 . Planning and Inland Wetlands Delineation and Drainage Study for Stoneridge Subdivision , Fairfield , Connecticut. 22. An Evaluation of Beach Erosion for Lordship , Stratford , Connecticut. ) 23 . Flood Potential Analysis and Site Development for Subdivision on the Noroton River , Darien, Connecticut. 24 . Inland Wetlands Delineation and Retention Pond Design for Hedge Brook Estates , Stamford , Connecticut. 25 . Water Quality and Wetlands Analysis for Brook Apartments , Seymour, Connecticut. _ 26 . Water Quality and Tidal Wetlands Evaluation for Schiavone, Inc . Scrap Metal Reclamation Co. , North Haven , Connecticut. 27 . Retention Pond Design and Inland Wetland Delineation for Sheep hill Condominium, Riverside , Connecticut. 28 • Wetlands Delineation Study, Town of Southington , Connecticut. 29 . Wetlands Delineation Study, City of New Britain , Connecticut. 30 . Site Planning and Inland Wetlands Delineation for Pepperbush Subdivision , Darien , Connecticut. 31 . Comprehensive Vegetational Analysis of Great Meadows for Stratford Land and Improvement Company, Stratford , Connecticut. 32. Tidal Wetland Delineation for Bridgeport - Airport, Bridgeport, Connecticut. 33. Wetland Impact , Sound Emission Control and Projected Watercourse Utilization Plan for Route 72 Construction , Town of Plainville , Connecticut . 34 . Review of I-291 Environmental Impact Statement for I-291 No Committee , Newington and Rocky Hill , Connecticut. 35 . Additions and Alterations to St. Paul 's Episcopal Church , Darien , . Connecticut . 36. United States Postal Facility, Stamford , Connecticut . EIS. - 5 - 37 . New Haven Terminal Company Assesment Areas Associated With Petroleum Storage Facilfty, East Have , Connecticut. 38 . Environmental Evaluation - Water Quality and Biological Analysis Regarding Armonk , N. Y . Land Fill Proposal . 39 . Review of Connecticut Route b6 - Impact on Hubbard Park and Environs, Meriden , Connecticut. 40 . Analysis of Stebbin ' s Brook Waters, Ensign-Bickford Properties , Simsbury, Connecticut. 41 . Environmental Analysis - Darien United Methodist Church Property , Darien , Connecticut. 42 . D 'Addario Industries - Hoyt Farms Development , New Canaan , Connecticut. 43. Bunker Ramo; A Study of Potential Development Adjacent .to Present Corporate Facilities , Trumbull , Connecticut. 44 . E. R . Strait Marina Expansion - Environmental Analysis of Dredging and Jetty Installation , Westport , Connecticut. 45 . The Conyers Farm Development, Greenwich , , CT and North Castle , NY_ Coordination of Environmental Impact Analysis 46. Saltwater Intrusion Study- Westport, Connecticut 47. Gorham Island-Study of Possible Groundwater Pollution and Saltwater Intrusion , Westport, Connecticut 48. Groundwater Protection Study. Route 77, Guilford , Connecticut �- 49 . Groundwater Study, Burr Meadow Project- South Windsor, Connecticut 50 . Hydrogeological Study Former Famous Artists School Property in Westport, Connecticut PRINCIPAL PERSONNEL Name: Charles Willian Dimmick Present Status: . Associate Professor of Geology. Central Connecticut State College New Britain, Connecticut Associate Consultant Environmental Management Counselors Berlin, Connecticut Education: B. S. - Colorado School of Mines , 1962 - Geological Engineering M. S. - University of Florida, 1964 - Geology/Biology Ph:D. - Tulane University, 1969 - Paleontology Experience: College Instructor of courses in Geologic Field Methods, Physical " and Historical Geology, Geonortihology, Geochronology, Seismology, Astrogeology, Cosmogony, Minerology, Oceanography and Environmental Geology Geologic Engineer - Mobil Oil Company, New Orleans District Office - Well-log interpretation and computer- programming of subsurface geologic information, 1965 Recipient of grant for advanced study, Tulane University - National Science Foundation . Primary research interests include hydraulics in relation t_o•- inland and tidal wetlands in pre and post development conditions; soils determinations regarding inland wetlands and identification of soil/plant associations, Engineering water retention systems and erosion and sedimentation control methodology for application to land and marine development procedures Associate Consultant of Environmental Management Counselors with primary responsibility in wetland soils identification, geological interpretation and engineering appraisal �;� �r�viF•anrJterJiatl l�r�cijt rberJtenf Courtaelar€�, Me. 165 Oak Ridge / Berlin, CT 06037 203-828-0787 THE EMC COUNSELORS Executive Consultant Leon J. Gorski , Ph. D. : Environmental Scientist/Environmental Management Specialist , President EMC Inc. Dr. Gorski holds advanced degrees in Environmental Science from the University of Connecticut . and is the Project Manager for EMC' s environmental studies. His previous experience includes ecological research in the United States , Central and South America and the development of environmental management techniques for use in guiding development practices. As Executive Consultant, he coordinates all aspects of each project to provide maximum attention to the client' s interests. He is responsible for the design of each evaluation and oversees the method of presentation to responsible agencies. Associate Consultant Darl Reed Ostrander, Ph.D. : Water Quality/Wetlands Specialist and Botanist Dr. Ostrander holds advanced degrees from the University of Michigan and the University of Connecticut. Primary consultive responsibilities : Wetland identification utilizing vegetation, nutrient movement in wetland environments, wetland restoration , water quality investigations and interpretation. Associate Consultant Charles Wm Dimmick, Ph.D. : Environmental Engineer and Certified Professional Geologist Dr. Dimmick holds a geological engineering degree from the Colorado School of Mines and advanced degrees from the University of Florida and Tulane University. His previous experience includes oil well exploration and operation, seismology, minerology , oceanology and hydrology. Primary consultive responsibilities : Hydrologic studies , drainage computation and retention system design, geological feature delineation and engineering evaluations. Eni•ironrncrrtal ErefIrtatiorts 147a ter Resources Land Use Impact Stateincnts Pre-planning - F Town O-P s-outA ?A C � 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 r�osoeTO�� AREA CODE 203/644-2511 December 19, 1.989 TO: James Lombardi, Chairman, Inland Wetland Agency/Conservation Commission FROM: John E. McCahill, Zoning/Wetlands Enforcement Officer RE: Application #89-87P, Governors Square Business Center Building 0 Please accept this as a follow-up to my letter dated October 23, 1989 . Consideration has been given to doc•ur.ents, co:._respondence, and plans submitted up to this date. IF APPROVAL IS CONSIDERED, SUGGESTED APPROVAL CONDITIONS INCLUDE: 1. Additional groundwater information shall be submitted prior to excavation of the area for the proposed wet meadow detention basin to verify that the basin can be constructed in accordance with the plans . 2. The proposed tree line shall be flagged in the field prior to cutting. Stumps shall be chipped on site when possible, remaining stumps shall be removed from the site. 3. The snow fence, southerly of the proposed detention basin, (shown 1 foot off property line on sheet 7 of 11 ) shall be relocated to provide protection to ;:he proposed tree line. The note that reads, "snow fence 1 .0' off property line" , shall be removed from the plans . 4 . The temporary crossings for the haul -road shall be removed, and the areas restored to their original conditions, prior to the release of the erosion and sedimentation bond. 5 . The enhancement of the proposed detention basin shall be detailed on the plans in accordance wi-ch the recommendations in the report from Penelope C. Sharp, Environmental Consultant. .(OWN Sf7 C r T�0�� O-P Sou V&M&ot Q 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 4 �w Ox.co AREA CODE 203/644-2511 January 5, 1990 Capuano Builders and Developers Paul Capuano 1208 Cromwell Avenue Rocky Hill, CT 06067 - Dear Mr. Capuano: Re: Application #89-86P, Governors Square, Buildings E,F,G & H Application #89-87P, Governors Square, Building 0 Due to the number of pending applications, and the additional information- submitted relative to your application,_ the Inland ____,_ __ Wetlands Agency/Conservation Commission is asking the applicant, for the agenda items referenced above, to request a 65 day extension of the time to act on the application. We have enclosed a standard form for your convenience. Please send us this request as soon as possible. We appreciate your cooperation. Very truly yours, J es A. Lombardi, Chairman / Inland Wetlands Agency/ Conservation Commission JAL/pmm Enclosure cc: Wetlands File i ,?esigoofessionals, nc, civil engineers • planners • surveyors ■ January 8, 1990 Is T"-. oath os P� James A. Lombardi , Chairman, Inland Wetlands NpWE��,NOOMM\�'�oN Agency/Conservation Commission 1N �►0 Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 RE: Capuano/Governor 's Square Application #89-87P Dear Mr. Lombardi, At the last meeting of the IWA/CC, the wetlands commission requested more information regarding the expected viabiltiy of the proposed• wetland creation area at detention basina #2, and the anticipated impacts of the proposed swale system on the ground water table. Design Professionals has been conducting some tesing in this regard during the design process. Hopefully, we may answer your questions to your satisfaction. observation wells were installed at the site of the proposed detention. basin #2 on September 14, 1989. . The groundwater level was monitored at these locations, as well as the depth of water in the nearby Swale. The purpose of these observations was to assess the impact of the excavation of the basin on the groundwater, and to anticipate the performance of the basin as a wetland. Permeability testing was also conducted. The observation period took place at the end of summer, when the water table typically begins to rise. It was found that the groundwater is being introduced into the swale, althogh during dry periods the reverse may be true. The swale has a large influence only on the area immediately adjoining its banks. The fringe area, roughly from 30' out to about 150' , experiences a slight to negligible lowering of the ground water table. 1170 Ellington Road (Route 30), South Windsor, CT 06074 0 (203) 291-8755 January B, 1990 The swale system under study has not been noted to have been dry during the the study period. No one familiar with these swales can remember them to be dry at any time since the swales were constructed. It has been recommended to the owners by Design Professionals to constuct the proposed detention basin down to a level at or below the elevation of the bottom of the swale. This will take advantage of a fairly reliable source of water for the wetland species. Sjnrel , Steven R. Colbath Engineering Manager ■ 0esign rofeersionals, inc. surveyors civil engineers * planners a 1170 Ellington Road Route 30 South Windsor CT 06074 203 291-8755 v �tOwM se, H J has 2f�oSOR.c 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 AREA CODE 203/644-2511 Paul Capuano January 10, 1990 Capuano Builders 1208 Cromwell Avenue eVelopers Rocky Hill, CT 06067 Dear Mr. Capuano: Re: Application #89-87P - Governors Square Business Building p Center At the January�' 8- 1990 meeting, the Inland Wetlands Y/Conservation Commission Application #89_87P _ IWA/CC approved with modifications industrial building on Permit for the construction of an Governors Highway Property located on the southerly shown o plans and easterly side of- y side of revised Prepared by Design Nutmeg Road South August 18, 1989 gn Professionals dated may IP Zone; as , Job #86-142. Y 9, 1989 and 1' Two blue ' letter print copies of the entire set of reproduced thereon, must be submittedato and this Commission . This must be approval prior to m completed within 65 this y construction activitydays sof ite. 2• Construction on the site. the To activities shall be subject to Town Engineer. the approval of 3 • The application shall indemnif of South Windsor against an i and hold harmless the To from the proposed operation oruse.. Y which might resultn Abilit 4 • The permit is x January valid for one year and shall e rY 8, 1991. expire on 5' We recommend a submitted to bond in the amount of compliance the Planning and Zoning $101000. 00 to be with the Erosion and Sedimentation Control to Measures. ensure Control 6. All approvals required must be obtained an to any activity on the site. d submitted prior 7' A contact Person shall be identified directly on the Plans. Mr. Paul Capuano Page Two January 10-, 1990 Application #89-87P 8. Additional groundwater information shall be submitted prior to excavation of the area for the proposed wet meadow detention basin to verify that the basin can be constructed in accordance with the plans. 9 . The proposed tree line shall be flagged in the field prior to cutting. . Stumps shall be chipped on site when possible, remaining stumps shall be removed from the site. 10. The snow fence, southerly of the proposed detention basin, (shown l foot off property line on sheet 7 of 11) shall be relocated to provide protection to the proposed tree line. The note that reads, "snow fence 1.0' off property line" , shall be removed from the plans. 11 . The temporary crossings for the haul road shall be removed, and the areas restored to their original conditions, prior to the release of the erosion and sedimentation bond. 12 . The enhancement of the proposed detention basin shall be detailed on the plans in accordance with the recommendations in the report from Penelope C. Sharp, Environmental Consultant. Very trulyyours, 61 , ames A. Lombardi, Chairman Inland Wetlands Agency/ Conservation Commission JAL/pmm cc: Jerry C. Iazzetta, Town Engineer Marcia A.Banach, Director of Planning John R. Collins, Chief Building Official Planning & Zoning Commission Design Professionals, Inc. r Town �s-qutA ?d - �� 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 OR-Co�'� AREA CODE 203/644-2511 February 4, 1990 Jim LeClair - Design Professionals 1170 Ellington Road South Windsor., 'CT 06074 Dear Mr. LeClair: Re: Application #89-87P, Governor's Square - Building 0 I have reviewed the proposed changes to the cul-de-sac as shown on sheet 9 of 11, latest revision date 2/2/90. The area Of wetlands impact has been shifted and reduced by approximately 0.01 acres. This would not appear to be a change which would require resubmittal to the Inland Wetlands Agency/Conservation Commission. The final plans, as approved by the Planning & Zoning Commission, should be submitted to the Inland Wetlands Agency/Conservation Commission with all appropriate changes indicated in the approval letter dated January 10, 1990. If I can be of further assistance, feel free to call me at 644-2511 . Very truly yours, John E. McCahill Zoning/Wetlands Enforcement Officer JEM/pmm cc: Planning & Zoning Commission Paul Capuano 7r SQw N aE4 C 70� O-P �• ��� • P`"` 1540 SULLIVAN AVENUE. • SOUTH WINDSOR, CONN. 06074 4soR-coy' AREA CODE 203/644-2511 30 March 1990 Mr. Peter DeMallie Design Professionals, Inc. 1170 Ellington Road South Windsor, CT 06074 Dear Mr. DeMallie: ' re: Appl. #89-87P, Governor's Square Building 0 Southerly of Governor's Hwy. ; easterly of Nutmeg Rd. So. We are pleased to advise that the Planning and Zoning Commission voted on March 27, 1990 to approve the above-referenced application for a site plan of development in accordance with Drawings #1-11 dated 10-23-89 (last rev. 11/10/89 and 2/05/90) prepared by Design Professionals, Inc. , Proj . #86-142; Architectural drawings dated • 3/24/90 prepared by John Eberle; Landscaping plan dated 3/9/90 prepared by CR3; and with the following modifications: 1 • Prior to commencement of any site work, a meeting must be held with Town Staff. 2• No building permits will be issued until the final mylars have been filed in the Town Clerk's Office. 3 • This application is subject to the conditions of /approval of the Inland Wetlands Agency/Conservation Commission, including a bond in the amount of $10,000. 4• An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 4.13.10 of the Zoning Regulations . 5 • Footing drains are required if the building has a basement. 6 • A landscape bond in the amount of $10,000 is required and must be submitted prior to filing of mylars . 7 • All plans used in the field -by the developer must bear the stamp and authorized signature of the Town of South Windsor. 8 • Operation & Maintenance Plan must be submitted by the applicant and approved by the Engineering Department. Mr. Peter DeMallie -2- 30 March 1990 9 . Demonstrate that the buffer meets the requirements of Section 5 .4c (showing buffer as projected at 5 years and at maturity) . Black and white transparent mylars of Sheets #2 and 4 with the above modifications, together with four blueprint copies of the entire set of plans, must be submitted to this Commission within 30 days to be stamped and signed. The letters of approval of this Commission, as well as the Inland Wetlands Agency/Conservation Commission, must be reproduced on the mylars . After the mylars have been signed by the Commission, they will be returned to you for filing in the Office of the Town Clerk within 90 days . After filing these plans, a copy of the receipt must be submitted to the Planning Department. Very truly yours, PLANNING AND ZONING COMMISSION ALouia C. Evans Chairman cc: .land Wetlands Agency/Conservation Commission M. Banach, Planning Director J. Collins, Chief Building Official J. Iazzetta, Town Engineer F. Shaw, Supt. of Pollution Control E. Belleville, Assessor W. Lanning, Fire Marshal Registrar of Voters Engineer Applicant PZC File ■ ,:pesigoofessionals, inc, civil engineers • planners 0 surveyors December 12, 1990 ■ Phyllis M. Mann Recording Secretary, IWA/CC 1540 Sullivan Avenue South Windsor, CT 06074 Dear Mrs. Mann Re: Governors Squa n ss Center Applications # 89-87P and # 89-86P Building O & � s Id Our client, Capuano Builders and Developers, requests placement on the January 14, 1991 agenda of the IWA/CC, for renewal of IWA/CC permits granted January 8, 1990. A $50.00 check is enclosed for renewal of applications # 89-87P and #89-86P (required fee of $25.00 per application) . No activity, except for tree clearing in the area of Building 'O' has commenced, hence we will not plan on attending the 1/14/91 meeting, unless -requested otherwise. Thank you. - Sincerely, Stephen R. Biancardi Design Professionals, Inc. CC,. Paul Capuano Irwin S. Hausman 1170 Ellington Road (Route 30), South Windsor, CT 06074 0 (203) 291-8755 �t�pN Sf F Tim O-Psa� V&UzAat U s f� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 R•co AREA CODE 203/644-2511 January 30, 1991 Stephen R. Biancardi Design Professionals, Inc. 441 C Governor's Highway South Windsor, CT 06074 Dear Mr. Biancardi: Re: Application 89-87P - Governor's Square Business Center Building O . At the January 28, 1991 meeting, the South Windsor Inland Wetlands Agency/Conservation Commission approved a one year extension of Application #89-87P with all original and standard conditions. Application #89-87P becomes effective January 8, 1991 and expires on January 8, 1992. LVery;txr, y yours, Phyllis . Mann, Recording Secretary Inland Allands Agency/ Conservation Commission cc: Marcia A. Banach, Director of Planning John R. Collins, Chief Building Official Planning & Zoning Commission Jerry Iazzetta, Town Engineer \ Enclosure