HomeMy WebLinkAboutResubdivision (93) S �T PLANNING AND ZONING COMMISSION
APPLICATION FOR
Application No. : -S'aP
Date Received: 6 ,a9. JUN 27 1988
AeodmpaVPublic Hearing by :
Receipt No. : _ South Windsor
Planning & Zoning CommissiOfl
APPLICANT:
ADDRESS : TELEPHONE: 4
OWNER OF RECORD ON LAND RECORDS : ��,fi�(�
ADDRESS : 4141--
COMPLETE LOCATION OF PROPERTY:
ZONE: o
NAME, ADDRESS, & TELEPHONE NUMBER OF PERSON TO WHO INQUIRIES SHOULD BE
DIRECTED:
TELEPHONE:
LL"THIS APPLIC TION IS FOR: (Check one of the following)
1 . Zone Change to (Public Hearing required) .
2 . Subdivision .
3. Open Space Subdivision (Public Hearing required) .
4. Resubdivision (Public Hearing required) . yj
S. Special Exception to Article
(Public Hearing Required) .
6. Site Plan of Development.
7. Earth Filling [Section 101 and/or Earth Removal [Section 91
(Public Hearing Required) .
8. General Plan of Development.
9. Regulation Amendment : Zoning Subdivision ,
_10. Other (explain in detail) :
CONSULT PLANNING DEPARTMENT FOR FEE SCHEDULE. THIS APPLICATION MUST BE
SIGNED. BY THE APPLICANT AND OWNER OF THE PROPERTY AND SUBMITTED IN_
TRIPLICATE WITH ALL MAPS AND DOCUMENTS REQUIRED ON ATTACHED CHECKL1
�z
Applicant Owner
July 19, 1988
To: Planning and Zoning Commission
From: Raymond F. Hallowell, Jr.
By means of this letter, I am disqualifying myself from all
discussion / decision / action regarding Appl. #88-52P, Pulford
Resubdivision.
Rjdymond F. Hallowell, Jr.
max-
44
C �
71aut o-P sout.�i
9 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
R•c AREA CODE 203/644-2511
July 21, 1988
Ms . Viola M. Pulford
544 Deming Street
South Windsor, CT 06074
re: Appl. #88-52P, Pulford 2-Lot Resubdivision
544-552 Deming Street
Dear Ms . Pulford:
We are pleased to advise that the Planning and Zoning Commission
voted on July 19, 1988 to approve the captioned application for a
2-lot Resubdivision in accordance with Drawing 1 of 1 dated 7-7-
88 prepared by Pudeler Engineering, Project No. SW-2, and with
the following modifications :
1 . Footing drains are required for each house. Prior to the
building of any structure on a lot, a topographic map,
drawn to a scale of 1" = 401 , shall be submitted for each
lot in the subdivision, showing proposed contours,
elevations and the location of the footing drains . No
building permits will be issued until the proposed
contours, floor elevations and location of footing drains
have been approved by the Town Engineer.
2 . Drainage for this subdivision is subject to the approval of
the Town Engineer.
3 . If, for any reason, finished grading and other site work is
not completed, the Town Engineer shall determine the amount
of a cash bond to ensure final grading and site work. This
cash bond must be submitted prior to issuance of a
Certificate of Occupancy.
4 . All lots shall be serviced by the Town of South Windsor
sanitary sewer system and are subject to the approval of
the Water Pollution Control Authority.
5 . A drainage assessment fee in the amount of $100 shall be
submitted to this Commission.
6 . All plans used in the field by the developer must bear the
stamp and authorized signature of the Town of South
Windsor.
PD
.;
Ms . Viola M. Pulford -2- July 21, 1988
7 . No building permits will be issued until all modifications
have been complied with, and the final plans have been
filed in the Town Clerk's Office.
8 . Map should be labeled Resubdivision.
9 . Key map should be completed as specified in our
regulations .
10 . Proposed grading, elevation of new house plus driveway,
well, and outlet of footing drain should be shown.
11 . Zoning data should be included on map.
12 . Prior to issuance of a building permit, the well must be
dug and must test potable.
13 . Turnaround driveway is required.
Black and white transparent mylars of Sheet #1 with the above
modifications, together with three blueprint copies of the entire
set of plans, must be submitted to this Commission within 30 days
to be stamped and signed. The letters of approval of this
Commission, as well as the Inland Wetlands Agency/Conservation
Commission, must be reproduced on the mylars .
After the mylars have been signed by the Commission, they will be
returned to you for filing in the Office of the Town Clerk within
90 days. After filing these plans, a copy of the receipt must be
submitted to the Planning Department.
Very truly yours,
PLANNING AND ZONING COMMISSION
David H. Sorenson
Vice Chairman
cc: M. Gantick, Director of Public Works
F. Shaw, Supt. of Pollution Control
J. Collins, Chief Building Official
E. Belleville, Assessor
W. Lanning, Fire Marshal
M. Banach, Planning Director
Registrar of Voters
Inland Wetlands Agency/Conservation Commission
-�+ PZC File
Architect/Engineer
Applicant
4-Aemo from
TOWN OF SOUTH WINDSOR
TOWN HALL
SOUTH WINDSOR. CONN.06074
TO Town Treasurer
Town of South Windsor DATE
1540 Sullivan Avenue
South Windsor , Ct . 06074
L -i
SUBJECT: Drainage Assessment Fees - Planning and Zoning Commission
FO L D- ,mil
(l"
Enclosed is a check in the amount of $ 56� which is
the drainage assessment fee collected for Application No.
Uq-0, - v
Please deposit it in the proper account . Thank you .
BY
PLAN NG & ZONING COMMISSION
VIOLA M. PULFORD
544 DEMING ST.
SOUTH WINDSOR, CT 06074 976
4011
` 1 9 51-7008/2111 1
PAY TO THE _
ORDER OF ��(J
- DOLLARS
a>~En FIRST FEDERAL SAVINGS
1
AND LOAN ASSOCIATION OF EAST HARTFORD
EASTn MA RTFORD.CONNECTI-v 0610�
MEMO 1
1: 211170 &0: 03 40 1782811' 0976