INLAND WETLAND, WATERCOURSES AND CONSERVATION APPLICATION
LICATION I. DATE RECEIVED ZONE ,j Q
INSTRUCTIONS
1. The application, map and plans must be submitted in triplicate, together with the fee set
forth in the Inland Wetlands, Watercourses and Conservation Regulations, Town of South
Windsor. (See Regulations, Section VI) .
2. The South Windsor Inland Wetlands, Watercourses and Conservation Regulations should be
reviewed with respect to the standards and criteria for application evaluation. (See
Regulations, Sections VIII - X) .
3. The applicant understands that this application is to be considered complete only when all
information and documents required by the Agency have been submitted. (See Regulations
Section VII). Also complete state filing form.
A. APPLICANT'S NAME ZUptvjC/<; S7.G L-t/Gj�q
ADDRESS
PHONE: (HOME) (WORK)_ 5—L — 4�7/
B. LEGAL OWNER'S NAME:
ADDRESS
�i PHONE: (HOME) It (WORK)
(List additional owners, addresses, and phone numbers on back of application) .
tD.
IF THE APPLICANT IS NOT THE OWNER OF THE SUBJECT PROPERTY, A LETTER BY THE PROPERTY
OWNER(S)
AUTHORIZING THE PROPOSED REGULATED ACTIVITY SET FORTH IN THE APPLICATION MUST
ACCOMPANY THIS FORM AND WILL BE PART OF THE APPLICATION.
PROJECT NAME: (if any) 36
1. Contact Person (if further information is needed) . L
E. THE GEOGRAPHICAL LOCATION OF THE PROPERTY WHICH IS TO BE AFFECTED BY THE PROPOSED
REGULATED ACTIVITIES INCLUDING A DESCRIPTION OF THE LAND IN SUFFICIENT DETAIL TO ALLOW
IDENTIFICATION OF THE PROP RTY ON THE INLAND WETLAND AND WATERCOURSES MAP.
All ,`
�i/�i�eXx�� Doi
PAGE 1
F. NAMES OF ALL ABUTTING PROPERTY OWNERS: (USE SEPARATE SHEET IF NECESSARY)
G. HAVE YOU NOTIFIED ALL ABUTTING PROPERTY OWNERS BY CERTIFIED LETTER THAT AN APPLICATION IS
PENDING BEFORE THE AGENCY?.
y�S , **('You are required to supply a copy of the letter with the list of the names of
the abutters) .**
H. PURPOSE AND DESCRIPTION OF ALL PROPOSED REGULATED ACTIVITY(S) INCLUDING AMOUNT AND TYPES
OF FILL AND THE TIME ELEMENT I OLVED:
LJ vlr vL�i� t.�-�lj l
I. A CLASS A-2 MAP OF THE PROPERTY DRAWN TO 1"-40- , SHOWING THE AREA TO BE DEVELOPED, EXTENT
OF THE WETLANDS AND WATERCOURSES AFFECTED, TOPOGRAPH, EXISTING AND PROPOSED ACTIVITIES ANI
NAMES AND LOCATIONS OF ADJACENT PROPERTY OWNERS MUST BE SUBMITTED.
J. ACREAGE OF WETLANDS AND WATERCOURSES TO BE ALTERED: (:52 1 gir
K. ACREAGE OF WETLANDS AND WATERCOURSES TO BE CREATED:
L. LINEAL FEET OF PROPOSED STREAM ALTERATION
M. TOTAL LAND AREA OF PROJECT AND PERCENTAGE WHICH IS WETLANDS: Z5./¢19Z 910/? C /c=�
Zs-/670
N. IDENTIFY ALL OTHER PERMITS OR APPROVALS THAT HAVE BEEN ISSUED, APPLIED FOR, OR REQUIREDjL-/
WITH RESPECT TO THE PROPOSED ACTIVITY SET FORTH IN THIS APPLICATION. (These may include
but not be limited to, local Planning & Zoning, Zoning Board of Appeals, D.E.P. , F.E.M.q.
D.O.T. , The Army Corps of Engineers, and any other State, Local or Federal Permits. )
z it 3c)
0. THE APPLICANT (OR DESIGNATED REPRESENTATIVE) HEREBY ATTESTS THAT A SIGN WILL BE POSTED
THE FOLLOWING LOCATION/S
r
by NAME hclDcJlG SSG l��Eiv1� _
ON OR BEFORE THE F OWING DATE:
SIGNATURE: 9, '
THESE SIGNS MUST BE DISPLAYED CONTINUOUSLY FOR AT LEAST FIVE DAYS PRIOR TO SCHEDULED
MEETING. (See Regulations, Section 6.3a) .
PAGE 2 f
171';
t
THE UNDERSIGNED HEREBY APPLIES FOR THE REGULATED ACTIVITIES LISTED IN PARAGRAPH H ABOVE, FOR
A INLAND WETLAND, WATERCOURSES AND CONSERVATION PERMIT FOR THE PROPERTY DESCRIBED HEREIN AND
CONFIRMS THAT:
1. HE IS FAMILIAR WITH THE CURRENTLY EFFECTIVE -INLAND WETLAND, WATERCOURSES AND CONSERVATION
REGULATIONS OF THE TOWN OF SOUTH WINDSOR.
2. HE/SHE UNDERSTANDS THAT AT ANY TIME DURING THE REVIEW PERIOD, THE AGENCY MAY REQUIRE THE
APPLICANT TO PROVIDE MORE INFORMATION ABOUT THE WETLANDS AND/OR WATERCOURSES IN QUESTION
AND/OR ANY PROPOSED'ACTIVITY.
3. ALL INFORMATION SUBMITTED IN THE APPLICATION FOR REVIEW SHALL BE CONSIDERED FACTUAL, OR IN
THE CASE OF ANTICIPATED ACTIVITY, BINDING. A KNOWING FAILURE OF THE APPLICANT OR ANY OF
HIS/HER AGENTS TO PROVIDE CORRECT INFORMATION, OR PERFORMANCE EXCEEDING THE LEVELS OF
ACTIVITY ANTICIPATED, SHALL BE SUFFICIENT GROUNDS FOR REVOCATION OF ANY PERMIT UNDER THESE
REGULATIONS .
4. BY MAKING THIS APPLICATION, THE APPLICANT GIVES PERMISSION TO THE INLAND WETLAND,
WATERCOURSES AND CONSERVATION COMMISSION MEMBERS AND/OR ITS REPRESENTATIVE TO ENTER THE
PORTIONS OF THE PREMISES WHICH ARE SUBJECT OF THE APPLICATION FOR THE PURPOSE OF
INSPECTION AND INVESTIGATION AND OTHERWISE EVALUATING THE MERITS OF THE APPLICATION BOTH
BEFORE AND AFTER A FINAL DECISION HAS BEEN ISSUED.
Signs a of Applica—nta Date v v / 2
Received and filed at the office of the Planning Department this
day of 19
Signature of Agent Date
*******************************************************************************************
FEE RECEIVED YES_ NO— AMOUNT
DATE RECEIVED by
HEARING DATE HEARING ADV. (1) (2)
PERMIT GRANTED DATE PERMIT DENIED DATE
PAGE 3
TOWN OF SOUTH WINDSOR
INLAND WETLANDS AND WATER COURSES
APPLICATION
THIS APPLICATION, ONCE INFORMATION IS COMPLETE_
INLAND WETLANDS AGENCY ACTION (SEE BACK OF THIS FORM), SHALL BE RECEIVED AT A
APPLICATION NO. y 1�"' REGULARLY SCHEDULED MEETING OF THE AGENCY AT THE
TOWN HALL.
RECEIVED OATS N'a►��1 THIS APPLICATION MUST BE FILED IN TRIPLICATE AT
THE OFFICE OF THE TOWN CLERK OF SOUTH WINDSOR BY
PUBLIC HEARING DATE 12 NOON AT LEAST 14 DAYS PRIOR TO THE FIRST
(if necessary) REGULAR MONTHLY MEETING DATE. THREE SETS OF MA
COMPLETED APPLICATION OR PLANS MUST BE SUBMITTED TO THE TOWN ENGINEER
PERMIT GRANTED OATS AT LEAST 14 DAYS PRIOR TO THE FIRST REGULAR
PERMIT DENIED DATE NTHL MY EETING DATE.
PLEASE PRINT OR TYPE. Sp'nne�S �s
1. APPLICANT�, Cl V- ,VIct 't6l S4 D�TEL NO. ��� S L
ADDRESS PA CITY & STATE czoo-u'� W i v�G�SOr, C
2. OWNER SCA MC as C��(JI')li CLIP TEL NO.
ADDRESS CITY & STATE
3. LOCATION OF PROPERTY
NAMES OF ADJACENT PROPERTY OWNERS
.e,,e sy�e�b t 0 b t'!;,
�o� SIp��NeYs '�-sfu6e-y .
STATE CLEARLY AMC 13HIMY
5. PURPOSES AND DESCRIPTION OF THE PROPOSED ACTIVITY,AND THE TIME ELEMENT INVOLVED:
r�SicQe►n�fu� sc��d�V ►s�av1 , `,���� rookb c�c�Q c �l�bteS
1aecw- p e6mL -Foc- coYns+NC� tom
TTTE14T_ THE APPLICANT UNDERSTANDS THAT THIS APPLICATION IS TO BE CONSIDERED
COMPLETE ONLY WHEN ALL INFORMATION 3 OOCUMENTS REQUIRED BY THE
Az G_ENCY.HAVE BEEN SUBMITTED.
0
o ? 2APP_VAL MAY ALSO 8E NECESSARY FROM THE PLANNING AND ZONING COM-
cn ¢ 11A SSI N.
S z �iN APPLICATION FEE IS REQUIRED. CONSULT THE-SE-GULATIONS
SECTIONS 6.9, 6.9a 'and 6.9b) .
z " SIGN IS REQUIRED. CONSULT THE GULATIONS (ACTION 6.3a) .
z cn
SIGNED:
(Appli t)
CHECKLIST FOR REQUIRED INF ORMAa I ODD
6. APPLIC.�6= HAL5 HAD MAPS AND PLANS CERTIFIED BY SOIL
CONSERVATION SERVICE TO VERIFY COMPL�2E COMPLI.a.NCE
WITH CONNECTICITr GUIDELINES FOR SUIL ER(15I011 AND
SEDDIENT CUN.TROL ( A6 PER F-VIDBOUK, AS AiX&XDEDED,
AND PUBLIC AC+ 83-3 88, AS AMENDED.
DATE OF CERTIFICATION
7. APPLICATIM INFORMATION COMPLIES WITH AGENCY'S
REGULATIONS ( SECTIONS 7.1, a throuc;h' j.
8. ✓ REQUIRED FEE HAS BEEN PAID.
DATE RECEIVED y 'al-47
g. APPLICfi= ( OR DESIGNATED REPRFSEN.TATIVE)HEREBY
ATTESTS THAT A SIGK WILL BE Pt15TED AT THE FOLLOWING
LOCATION(S)
BY ( SAME )
ON OR BEFORE ThE FOLLOWING DATE
SIGNATURE
THIS APPLIC�T ION IS FOUND TO BE COMP LET E AND NOW
QUALIFIES FOR PLACEMENT ON THE AGENCY'S AGENDA:
DATE SIGNATURE
Town Engineer
• 7 Agency Sec'y
01
Agency Chairma .
THIS APPLICATION IS INCOMPLETE BECAUSE OF THE FOLLOWING
UUMBERED ITEMS ( FROM ABOVE ) AS CHECKED BELOW:
1 2 3 4 5
6 7 8 9
1
\ � ry
c ,,
r ) _ (E,
SOIL hEPORT
;awrence Road
South Windsor
wetland soils were delineated on two parcels of
land off Lawrence Road and Cliffwood Drive .
Wrist parcel was inspecte4 June 16 and 17, 1986
Second parcel done March 14,1987
All soils on these two parcels are derived from
red Triassic shale and shadsto ine. They are all topped
with some dark brown silt and very fine sandy loam.
Dominant soil present is the moderately drained
dapping silt loam which has a firm layer at a depth of
or below 26 inches. This layer tends to create a
seasonable high water table .
4h.ere the sloping land levels off the watertable is
higher within the profile causing the soil to be
poorly drained. Poor drainage is ususlly caused by
water remaining within a profile for a longer period
of time . This soil is of the Wilbraham series. This
is the wetland soil type delineated here .
Other soils found are the Narragansett silt loam, a
well drained soil and the Ludlow loam, a poorly
drained soil with a very firm hardpan.
r
Idany uprooted large trees present showing exposed
soil profiles. No two exactly alike.
Lewis W. Ilgen ,
Soil Scientist
A. R. Lombardi Associates
25 Terrace Drive
Vernon, Conn. 06066 `
� r � p a
MAR 18 �gp
"souix tes, In&
A. R. LYtjudlui t� pSvu
Date J Hour A)'—
To
WHI . ,YO. U WERE OUT
From
Of
Phone
Telephoned Returned Call Please Call
Please See Me Will Call Again Important
ssage
C3N L`C 4_0 T /y gt-MA AQ IN G N
/J C Y ' o
w
¢
O
w
¢
w
z
Signed a
-yi Z
103
�i3 q
N
—
'� Co ( co
iL
CO
18 I O C� 'C\r 71 -
\
/ O �
� �1 �;o �,��-✓ 9 to
ow its -1
(v t
Co i
Is
r � �
14
vr
4
Ali4.o 7o— ° J-o-L
�,�.� $,ate-•k<er w��v�sY9.
� B
°ems � ` _eo-.44�- 71� �`
Ci���
VO
L y
ac 6ve 40/C/( �im �� 100"IC41
need sT nGUI ���m��sS,�dr� ,q el o or, va/GC
SOy,M Sr'q
9 1540 SULLIVAN AVENUE SOUTH WINDSOR CONN. 06074
AREA CODE 203/644-2511
SOR•Co
project Name/Location �i�:nntp�'3 �a�•a�e
(N)44 16"
Phone I (wJ 6Y4' /5-5i X'139 j
Contact Person/Owner Lv�w:� Sze%a /�
Address fe G��^P�ce va Sov-7/l, jj(J 1060
You are hereby notified that problems may exist on the above site concerning erosion and
k= -- sedimentation control measures. Although this is a notification based on a routine site
- visit, you are ultimately responsible for inspecting and maintaining the site.
You were contacted on �i /NA/�C'f� 198� and notified of site problem(s) . This
is a confirmation of t'�a� s:-le
_L You should correct the problem(s) immediately (within 48 hours) and notify me that the
situation has been corrected. -iUa -�'of- kcr --�+fie - wc�k--_e?c Ce¢� _e�z� �c•�_ a?ccl:ve 7
� .
y � Erosion and control measures are not properly installed and/or maintained according to
13:f approved plans. Refer to approved plans and correct site as needed. See o6ve3,"o-1 d,-4-t
eaj• e)eedee
_ Erosion and control measures are needed beyond those shown on the plans, contact me
regarding the additional measures.
+l Silt fence(s) and/or haybale(s) are not in place or not properly maintained.
Stockpiles are not protected and/or seeded.
Construction entrance not in according to plan or not functioning adequately.
Need to establish vegetation per plan, either temporary or permanent.
Site lacks protection against possible wind erosion.
'R
Limits of construction have not been established on site, or have been exceeded.
There is an excessive area of disturbance which should be stabilized, limits to area
disturbance may need re-establishment.
_. Detention basin or siltation basins have not been maintained andJor vegetation or
stabilization is insufficient.
// 1 l
G
�. Other concerns nc/ /ham%
This will be filed with your approval/permit for the site. It is your responsibility to
maintain the site and repeated violati_or.s/problems will be forwarded to appropriate
Commissions.
If you have any question regarding this, contact me at 644-2511.
Very truly yours,
hn E. McCahill
Zoning/Wetlands Enforcement Officer
JEM/pmm
'LETTER OF TRANSMITTAL
taw N $E
PLANNING D:EPARTANT a
TOWN OF SOUTH WINDSOR
1540 SULLIVAN AVE. ti°soe•coN�
SOUTH WINDSOR., CT 06074
( 203 ) 644-2511 Date Z Z S
TO: J Y �zze
S EP 2 g j98.9
well Wto-It -A;,.r *1 �
-tAt f f
WE ARE SENDING YOU:
Q P&Z initial plans a� Q Drainage comps
Q P&Z final plans J Q Bond estimate requests
Q Inland Wetlands plans Q Bond reduction requests
Q Final plans for filing Q Change order form
Other Q Correspondence
Copies App. No. Project
O � inner �S
THESE ARE TRANSMITTED as checked below:
Q For review and comment Q For your file
Q For your use Q Returned with revisions
M As requested
Q Other
Lu�w; 57-2 *q
PLEASE. RETURN/COMMENT BY: 1}J ) b cWJ rd�o
COMMENTS: w) iW Y 157S1 ny 33 j
zleF cn,o u Id 1;tee )5o yK.e e 4t, tki s a-v=s s
Copy to: From: Prq
27 . All flared-ends to have base foundation.
28. Guard rail protection to be provided along inlet at box culvert.
29 . All trees along Lawrence Road within Right of Way will require
posting by Town Tree Warden prior to removal.
C�detention
ere is a structure within the stream channel near the proposed
basin. Developer's engineer is to provide town with a
hydraulic report. Town may require structure to be removed and
channel stabilized.
31 . Lot-to-lot easement should -be carried to streetline along pipe on
Lot #6 .
32. Drainage easement should be shown for headwall stream on Lots 7
and 8.
33 . Coordination of utility installation important. Road underdrains
may be disturbed by service laterals (water, sewer, storm) .
W.P.C.A.
1 . Letter of approval to be filed with plans.
2. Sewer connection not to be made to live sewer in Debbie Drive
until approved by Town.
3. Project served by Vernon. Permits taken out at South Windsor
Tax Collector and Engineering Division. Connection fees must be
pdid in advance.
4 . - Drainage stops must be placed along main sewer lines every 100
ft, 4 ft. from manholes .
SNET/NU
1. Contact utilities for coordination of utilities connection.
Fire Marshal
1. Blasting (if required) to be coordinated with the Fire Marshal.
Connecticut Water Company
1 . Water supply to be coordinated with CWC and Fire Marshal's
Department.
1 y - 1 -� _• ;�.•+ . as �, -_ - 1.
_ t 1
�3
mow
AX
/ I+_�� • �• - w t g -'._rjr •�� ; S,t'.�r•.•+.'"i�-- �'R�f it �_ ice• �-`� -'r. a - - - _
mom 47
100,
Zzv
Ow
0 Woo
�; �..,Y-�'s'n-.r•` .ice V/ +�`.�f- `. .+ $'r. _- - t: _ �� �� �K '*�� '- - ' x t-� •� ,,,r .- i' _.
40001.100,
10
Act
•
,',�"" a ...v-e ., ', • y •..'. +�•r-;�. - ._ - - .•O _ -S - � z. F �i ✓'
/\�.al�r�/Ir��!•r'i+ r ��Y• - •// r _ �E :ay. r - � i.-"i. •- '�•s -'' •� •- '- _. Q
,
� • •� [ //, -' .:•�,/ __ �.•c' _ i• N �• Sri
r f /:�CSLL
:�� •.a(`�,.�-A�� _ - ����„�•� 29.E + �%��.�`� •.. . ,r• - ' Z r. �-�_sE ._ -t1+�ily�=��� ' �• ,� - .St���at. Os� M/i.Ii- -
-;k� !;- rt.:,•,, _ � - i wi r•;y • • �t' '•.''� r•- a i � --„d-...i. •!., '.• � -rig a -' -1 - .
ar
��{k'` ,��. _ !_f�= ���G tifL t:.� �- t�: _ two // n ��c ,? f / '/ � '=7✓✓ _�/�.!S� -
?c:'.� y, �Csl�/1e�a7/off.!er/\� •t�� .;Sly-S�i'Sx/•�r1�1�' % •a � - n � ';,5 ._ j
-- -- ram: _ �� ,F�.,w• N F Q�,CT r{LL iC NC• - -- i- �}:�,ivt��F•. r �� di' ✓,. 'T • �'_ L -
�'" �; REV DATE DESCRIPTION..
DESIGNED -� •' .�
r By MJP r • :•s �.,,,,, � �.,�- ,...�•�► CEO LA S E AT 10 N '-
RV 8s r T O P O
\ ,�vric o� E ss•_ I DATE •�� r,...,�i�.{ .�rs �•�'� �- , .r'. ESTATE
c
`�f ti rS '; t: ''m..rrr w�.•�� DRAWN,;' E si9.� Gov .e�.c cor i6 PI N N'Et� 3 .,.
�� •r.f f BY .� ` s" � .A1NRNG ` RQA R
vor
c + '�` • �.►,. DATE s3 6�`s ;�sra•+E't/N�r_.Ca ` d-d.0 — 1 D - t "
r-?� t,,,d« �• t ? ,► 'i.;.x'' CHECKED t ;� - - UTH:. WI�IOSOR, ; CONNECfi!
e:' 1 i ' tir r f .-x ..• 'cr t ,, a "+
A.R. LOMBARDI ASSOCIATES, INC. JOB
25 Terrace Drive SHEET NO. OF
VERNON, CONNECTICUT 06066
(203) 872-2703 CALCULATED BY DATE _
CHECKED BY DATE_
SCALE
DRAINAGE CALCULATIONS
SPINNER' S ESTATES
r'
\xN FjONIFTWl
� ��
= t
$ TR-55 CURVE NUMBER COMPUTATION VERSION 1 . 11
Project : SPINNER' S ESTATES SUBDIVISION User : MJP Date: 03-16-87
County : HARTFORD State: CT Checked: Date:
Subtitle: EXISTING CONDITIONS D. B. PEAK FLOWS 87-1333 -
_______________________________________________________________________________
Hydrologic Soil Group
COVER DESCRIPTION A B C D
Acres (CN)
_______________________________________________________________________________
FULLY DEVELOPED URBAN AREAS (Veg Estab. )
Residential districts Avg % impery
(by average lot size)
1 acre 20 - 5. 1 (68) - -
OTHER AGRICULTURAL LANDS
Pasture, grassland or range poor - 3. 8(79) - 1 . 5(89)
Woods fair - 20. 3(60) - -
-
'
_ ^ Total Area (by Hydrologic Soil Group) 29. 2 1 . 5
==== ====
-
. ~
TOTAL DRAINAGE AREA: 30. 7 Acres WEIGHTED CURVE NUMBER: 65*
_______________________________________________________________________________
* - Generated for use by GRAPHIC method
'
-
| .
�
�TR_55 Tc and Tt THRU SUBAREA COMpUTATION _ VERSION 1 , 11
Project : SPINNER'S ESTATES SUBDIVISION User : MJP Date: 03-16-87
County : HARTFORD State: CT Checked: Date: --------
Subtitle: 87-1333
_______________________________________________________________________________
, Flow Type 2 year Length Slope Surface n Area Wp Velocity Time
rain ( ft ) ( ft/ft ) code (sq/ft ) ( ft ) ( ft/sec ) (hr )
_______________________________________________________________________________
Sheet 3. 2 300 . 03 I 1 . 276
Shallow Concent ' d 300 . 07 U 0. 020
Open Channel 500 . 05 . 05 2. 0 3. 8 0. 032
Open Channel 1200 . 013 . 04 8 7. 7 0. 077
Time of Concentration = 1 . 40*
=====
--- Sheet Flow Surface Codes ---
A Smooth Surface F Grass, Dense --- Shallow Concentrated ---
B Fallow (No Res. ) G Grass, Burmuda --- Surface Codes ---
C Cultivated < 20 % Res. H Woods, Light P Paved
D Cultivated > 20 % Res. I Woods, Dense U Unpaved
E Grass-Range, Short
' * - Generated for use by GRAPHIC method
� . '
�
. ~
�
-
-
�
�
TR-^55 GRAPHICAL DISCHARGE METHOD VERSION 1 . 11
'
Project : SPINNER' S ESTATES SUBDIVISION User : MJP Date: 03-16-87
County : HARTFORD State: CT Checked: Date:
Subtitle: --------
Data:Data: Drainage Area : 30. 7 * Acres
' Runoff Curve Number : 65 *
Time of Concentration: 1 . 40 * Hours
Rainfall Type : III
Pond and Swamp Area : NONE
=========================================================================
| Storm Number | 1 | 2 | 3 | 4 | 5 6 | 7 |
| ---------------------- | ------ | ------ | ------ | ------ | ------ | ------ | ------ |
| Frequency, (yrs) | 1 | 2 | 5 | 10 | 25 | 50 | 100 |
| | | | | | | | |
| 24-Hr Rainfall (in) | 2. 6 | 3. 2 4. 1 | 4. 7 | 5. 5 | 6. 2 | 6. 9 |
| | | | | | | | |
| Ia/P Ratio | 0. 41 | 0. 34 | 0. 26 | 0. 23 | 0. 20 | 0. 17 | 0. 16 |
| Runoff (in) | 0. 34 | 0. 60 1 1 . 09 | 1 . 46 | 1 . 99 | 2. 50 | 3. 03 |
| Unit Peak Discharge 10. 261 10. 305 10. 337 10. 347 10. 357 10. 364 10. 370 |
| (cfs/acre/in) | | | | | | | |
| Pond and Swamp Factor | 1 . 00 | 1 . 00 | 1 . 00 | 1 . 00 | 1 . 00 | 1 . 00 | 1 . 00 )
| 0. 0% Ponds Used | | | | | | | |
| ---------------------- | ------| ------ ------ | ------ | ------ | ------ | ------ |
� Peak Discharge (cfs) | 3 | 6 11 | 16 | 22 | 28 | 34 |
* - Value(s) provided from TR-55 system routines
\
,
-
TR-55 CURVE NUMBER COMPUTATION VERSION 1 . 11
Project : SPINNER' S ESTATES SUBDIVISION User : MJP Date: 03-16-87
� County : HARTFORD State: CT Checked: Date:
________
. Subtitle: DETENTION BASIN DESIGN FLOWS 86-1333
Subarea : D. B.
_______________________________________________________________________________
Hydrologic Soil Group
COVER DESCRIPTION A B C D
Acres (CN)
_______________________________________________________________________________
FULLY DEVELOPED URBAN AREAS (Veg Estab. )
Residential districts Avg % impery
(by average lot size)
1 acre 20 - 29. 2(68) - 1. 5(84)
�
Total Area (by Hydrologic Soil Group) 29. 2 1 . 5
==== ====
_______________________________________________________________________________
SUBAREA: D. B. TOTAL DRAINAGE AREA: 30. 7 Acres WEIGHTED CURVE NUMBER: 69
_______________________________________________________________________________
' TR-55 Tc and Tt THRU SUBAREA COMPUTATION VERSION 1 . 11
0 ' '
- project : SPINNER'G ESTATES SUBDIVISION User : MJP Date: 03-16-87
County : HARTFORD State: CT Checked: Date: _ ___
Subtitle: DETENTION BASIN DESIGN FLOWS 86-1333
� ------------------------------ Subarea #1 - D. B. ------------------------------
Flow Type 2 year Length Slope Surface n Area Wp Velocity Time
rain ( ft ) ( ft/ft) code (sq/ft ) ( ft ) (ft/sec ) (hr )
_______________________________________________________________________________
Sheet 3. 2 300 . 03 G 0. 777
Shallow Concent ' d 300 .07 U 0. 020
Open Channel 600 . 008 . 0131 . 76 4. 71 0. 031
Open Channel 800 . 01 . 0133. 14 6. 28 0. 031
Time of Concentration = 0. 86*
=====
--- Sheet Flow Surface Codes ---
A Smooth Surface F Grass, Dense --- Shallow Concentrated ---
B Fallow (No Res. ) G Grass, Burmuda --- Surface Codes ---
. C Cultivated < 20 % Res. H Woods, Light P Paved
D Cultivated > 20 % Res. I Woods, Dense U Unpaved
E Grass-Range, Short
-
* - Generated for use by TABULAR method
TR-55 TABULAR DISCHARGE METHOD VERSION 1. 11
^
`
Project : SPINNER' S ESTATES SUBDIVISION User: MJP Date: 03-16-87
County : HARTFORD State: CT Checked: Date:
Subtitle: DETENTION BASIN DESIGN FLOWS 86-1333
' Total watershed area: 0. 048 sq mi Rainfall type: III Frequency: 2 years
-------------------------- Subareas -------------------7------
D. B.
' Area(sq mi ) 0. 05
Rainfall (in) 3. 2
Curve number 69*
Runoff (in) 0. 78
Tc (hrs) 0. 86*
(Used) 0. 75
TimeToOutlet 0. 00
Ia/P 0. 28
� Time Total ------------- Subarea Contribution to Total Flow (cfs) ------------
(hr ) Flow D. B.
{ 11 . 0 0 0
11 . 3 0 0
11 . 6 0 0
11 . 9 0 0
12. 0 0 0
12. 1 0 0
12. 2 1 1
12. 3 1 1
12. 4 3 3
12. 5 5 5
m 12.6 7' 7,
12. 7 9 ' 9
12. 8 11P 11P
13. 0 11 11
13. 2 9 g
$ 13.4 7 7
13.6 5 5 �
13.8 4 4
' 14. 0 4 4
14. 3 3 3
14. 6 3 3
15. 0 2 2
15. 5 2 2
16. 0 2 2
16. 5 2 2
17. 0 1 1
17. 5 1 1
� 18. 0 1 1
19. 0 1 1
20. 0 1 1
' 22. 0 1 1
26. 0 0 0
P - Peak Flow * - value(s) provided from TR-55 system routines
�
TR-55 TABULAR DISCHARGE METHOD VERSION 1 . 11
'
-
Project : SPINNER'S ESTATES SUBDIVISION User: MJP Date: 03-i6-87
County : HARTFORD State: CT Checked: Date:
Subtitle: DETENTION BASIN DESIGN FLOWS 86-1333
' Total watershed area: 0. 048 sq mi Rainfall type: III Frequency: 5 years
-------------------------- Subareas --------------------------
D. B.
' Hrea(sq mi ) 0. 05
Rainfall (in) 4. 1
Curve number 69*
Runoff (in) 1 . 33
Tc (hrs) 0. 86*
(Used) 0. 75
TimeToOutlet 0. 00
Ia/P 0. 22
Time Total ------------- Subarea Contribution to Total Flow (cfs) ------------
(hr ) Flow D. B.
11 . 0 0 0
11 . 3 1 1
11 . 6 1 1
11 . 9 1 1
12. 0 1 1
12. 1 2 2
12. 2 2 2
� 12. 3 4 4
' 12. 4 G. 6
12. 5 10 10
m 12. 6 14 14� .
12. 7 18 '18
12. 8 20P 20P
13. 0 19 19
13. 2 15 15
� 13. 4 11 11
13. 6 8 8
13. 8 7 7
14. 0 6 6
14. 3 5 5
14. 6 4 4
15. 0 4 4
15. 5 3 3
16. 0 3 3
16. 5 2 2
17. 0 2 2
17. 5 2 2
- 18. 0 2 2
19. 0 1 1
20. 0 1 1
� 22. 0 1 1
26. 0 0 0
` P - Peak Flow * - value(s) provided from TR-55 system routines
�
TR-55 TABULAR DISCHARGE METHOD VERSION 1 . 11
Project : SPINNER'S ESTATES SUBDIVISION User : MJP Date: 03-16-87
County : HARTFORD State: CT Checked: Date:
Subtitle: DETENTION BASIN DESIGN FLOWS 86-1333
. ' Total watershed area: 0. 048 sq mi Rainfall type: III Frequency: 10 years �
-------------------------- Subareas ---------- ----------------
D. B.
Area(sq' Area( q mi ) 0. 05
Rainfall (in) 4. 7
Curve number 69*
Runoff (in) 1 .74
Tc (hrs) 0. 86*
(Used) 0. 75
TimeToOutlet 0. 00
Ia/P 0. 19
Time Total ------------- Subarea Contribution to Total Flow (cfs) ------------
(hr ) Flow D. B.
� 11 . 0 1 1
� 11 . 3 1 1
11 . 6 1 1
11 . 9 2 2
12. 0 2 2
12. 1 3 3
.' 12. 2 4 4
12. 3 6 6
12. 4 9 9
12. 5 14 14
/ 12. 6 26 20,
12. 7 24 2-4
12. 8 26P 26P
13.0 25 25
13. 2 19 19
13. 4 14 14
TR-55 TABULAR DISCHARGE METHOD VERSION 1 . 11
Project : SPINNER' S ESTATES SUBDIVISION User : MJP Date, 03-16-87
County : HARTFORD State: CT Checked: Date:
Subtitle: DETENTION BASIN DESIGN FLOWS 86-1333
Total watershed area: 0. 048 sq mi Rainfall type: III Frequency: 25 years
-------------------------- Subareas --------------------------
D. B.
Area(sq mi ) 0. 05
Rainfall (in) 5. 5
. Curve number 69*
Runoff (in) 2. 33
Tc (hrs) 0. 86*
' (Used) 0. 75
'
' TR-55 TABULAR DISCHARGE METHOD VERSION 1 . 11
Project : SPINNER' S ESTATES SUBDIVISION User : MJP Date: 03-16-87
County : HARTFORD State: CT Checked: Date:
. Subtitle: DETENTION BASIN DESIGN FLOWS 86-1333
�-------
Total watershed area: 0. 048 sq mi Rainfall type: III Frequency: 25 years
� -------------------------- Subareas ---------------------------
D. B.
Area(sq Area(sq mi ) 0. 05
Rainfall (in) 5. 5
Curve number 69*
Runoff (in) 2. 33
Tc (hrs) 0. 86*
(Used) 0. 75
TimeToOutlet 0. 00
Ia/P 0. 16
Time Total ------------- Subarea Contribution to Total Flow (cfs) ------------
(hr ) Flow D. B.
11 . 0 1 1
_ 11 . 3 2 2
11 . 6 2 2
11 . 9 3 3
' 12. 0 3 3
12. 1 4 4
12. 2 6 6
*
12. 3 9 . 9~
12. 4 14 14
12. 5 20 20
12. 6 28 28
�
12. 7 34 34
12. 8 36P 3 .
13. 0 34 34
13. 2 26 26
13. 4 19 19
13. 6 14 14
13. 8 11 11
14. 0 9 9
14. 3 8 8
14. 6 7 7
15. 0 6 6
15. 5 5 5
16. 0 4 4
-
16. 5 4 4
17. 0 3 3
' 17. 5 3 3
18. 0 3 3
19. 0 2 2
20. 0 2 2
22. 0 1 1
26. 0 0 0
P - Peak Flow * - value(s) provided from TR-55 system routines |
`
TR-55 TABULAR DISCHARGE METHOD VERSION 1 . 11
'
' Project : SPINNER' S ESTATES SUBDIVISION User : MJP Date: 03-16-87
County : HARTFORD State: CT Checked: Date:
� . Subtitle: DETENTION BASIN DESIGN FLOWS 86-1333
[
� Total watershed area: 0. 048 sq mi Rainfall type: III Frequency: 10 years
� -------------------------- Subareas ----------------------------
D. B.
Area(sq mi ) 0. 05
Rainfall (in) 4. 7
Curve number 69*
Runoff (in) 1 . 74
Tc (hrs) 0. 86*
(Used) 0. 75
TimeToOutlet 0. 00
, Ia/P 0. 19
Time Total ------------- Subarea Contribution to Total Flow (cfs) ------------
(hr ) Flow D. B.
11 . 0 1 1
. 11 . 3 1 1 �
11 . 6 1 1 �
�
11 . 9 2 2
' 12. 0 2 2
12. 1 3 3
12. 2 4 4
/
12. 3 6 ' 6~
12. 4 g g
12. 5 14 14
12. 6 20 20
12. 7 24 24
12. 8 26P 26P
13. 0 25 25
13. 2 19 19
13. 4 14 14
13.6 11 11
13.8 9 9
14. 0 7 7
14. 3 6 6
14. 6 5 5
15. 0 5 5
15. 5 4 4
16. 0 3 3
-
16. 5 3 3
17. 0 3 3
' 17. 5 2 2
18. 0 2 2
19. 0 2 2
20. 0 1 1
22. 0 1 1
26. 0 0 0
'
TR-55 TABULAR DISCHARGE METHOD VERSION 1 . 11
' Project : SPINNER' S ESTATES SUBDIVISION User : MJP Date: 03-16-87
County : HARTFORD State: CT Checked: Date:
. Subtitle: DETENTION BASIN DESIGN FLOWS 86�-�-----
33
Total watershed area: 0. 048 sq mi Rainfall type: III Frequency: 50 years
-------------------------- Subareas -------------------
D. B.
Area(sq Area(sq mi ) 0. 05
Rainfall (in) 6. 2
Curve number 69*
� Runoff (in) 2. 87
Tc (hrs) 0. 86*
(Used) 0. 75
TimeToOutlet 0. 00
Ia/P 0. 14
�
Time Total ------------- Subarea Contribution to Total Flow (cfs) ------------
(hr ) Flow D. B.
11 . 0 2 2
. 11 . 3 2 2
11 . 6 3 3
11 . 9 4 4
' 12. 0 5 5
12. 1 6 6
12. 2 a
� '
12. 3 12 12~
12. 4 18 18
12. 5 26 26
12. 6 36 36
12. 7 43 43
12. 8 45P 45P '
13. 0 42 42
13. 2 32 32
13. 4 23 23
13. 6 17 17
13. 8 13 13
14. 0 11 11
14. 3 9 9
14. 6 8 8
15. 0 7 7
15. 5 6 6
16. 0 5 5
'
16. 5 4 4
17. 0 4 4
' 17. 5 3 3
18. 0 3 3
19. 0 2 2
20. 0 2 2
22. 0 2 2
26. 0 0 0
P - Peak Flow * - value(s) provided from TR-55 system routines U
TR-55 TABULAR DISCHARGE METHOD VERSION 1 . 11
' Project : SPINNER' S ESTATES SUBDIVISION User : MJP Date: 03-16-87
County : HARTFORD State: CT Checked: Date:
Subtitle: DETENTION BASIN DESIGN FLOWS ---- --------
. 86-1333
Total watershed area: 0. 048 sq mi Rainfall type: III Frequency: 100 years
-------------------------- Subareas -----------_------________
D. B.
Area(sq mi. ) 0. 05
Rainfall (in) 6. 9
Curve number 69*
Runoff (in) 3. 43
Tc (hrs) 0.86*
(Used) 0. 75
TimeToOutlet 0. 00
Ia/P 0. 13
Time Total ------------- Subarea Contribution to Total Flow (cfs)(hr ) Flow Flow D. B. �
11 . 0 2 2
� . 11 . 3 3 3
11 . 6 4 4
11 . 9 5 5
. 12. 0 6 6
12. 1 8 8
12. 2 10- 10
/
12. 3 15 15°
12. 4 23 23
12. 5 33 33
12. 6 44 44
12. 7 52 52
12. 8 55P 55P '
13. 0 51 51
13. 2 38 38
13. 4 27 27
13. 6 20 20
13. 8 16 16
14. 0 13 13
14. 3 11 11
14. 6 9 9
15. 0 8 8
15. 5 7 7
16. 0 6 6
'
16. 5 5 5
17. 0 4 4
' 17. 5 4 4
18. 0 4 4
19. 0 . 3 3
20. 0 2 2
22. 0 2 2
26. 0 0 0
P - Peak Flow * - value(s) provided from TR-55 system routines ��
STORM DURATION 24 HOURS
STORM FED. 25 YEARS
T-HRS ELEV ACRE-FT INF-CFS OF-CFS
------------------------------------------------
0.0 292.1 0.0 0.1 0.1
0.1 292.1 0.0 1.1 0.3
0.2 292.2 0.0 1.6 0.9
0.3 292.2 0.0 2.1 1.4
0.4 292.3 0.0 2.1 1.8
0.5 292.3 0.0 2.1 1.9
0.6 292.3 0.0 2.1 2.0
0.7 292.3 0.0 2.4 2.1
0.8 292.3 0.0 2.8 2.4
0.9 292.4 0.0 3.1 2.7
1.0 292.4 0.0 3.1 2.9
1.1 292.5 0.0 4.1 3.3
1.2 292.6 0.0 6.1 4.3
1.3 292.8 0.1 9.1 6.2
1.4 293.1 - 0.1 14.1 8.4
1.5 293.3 0.2 '20.1 9.6
1.6 293.7 0.3 28.1 11.6
1.7 294.2 0.5 34.1 14.6
1.8 294.6 0.6 36.1 18.4
1.9 295.0 0.8 35.1 21.7
2.0 295.2 0.9 34.1 23.1
2.1 295.4 0.9 30.1 23.9
2.2 295.4 0.9 26.1 24.3
2.3 295.4 0.9 23.6 24.4
2.4 295.4 0.9 19.1 24.1
2.5 295.3 0.8 17.6 23.5
2.6 295.2 0.7 14.1 22.8
2.7 295.0 0.7 12.6 21.7
2.8 294.8 0.6 11.1 19.9
2.9 294.6 0.5 10.1 18.1
3.0 294.4 0.5 9.1 16.5
MAX. VOLUME STORED= .9 ACRE-FT.
STORM DURATION 24 HOURS
STORM FEA. 50 YEARS
eN NB
wei PI ION ..0 W*F
0
RHNBFF . .unurn
- .w GTR7
T-HRS ELEV ACRE-FT INF-CFS OF-CFS
------------------------------------------------
0.0 292.1 0.0 0.1 0.1
0.1 292.1 0.0 2.1 0.6
0.2 292.2 0.0 2.1 1.5
0.3 293.0 0.1 23.1 7.9
0.4 293.2 0.1 2.4 8.7
0.5 292.9 0.1 2.8 7.1
0.6 292.6 0.0 3.1 4.7
0.7 292.5 0.0 3.4 3.8
0.8 292.5 0.0 3.8 3.7
0.9 292.5 0.0 4.1 3.8
1.0 292.E 0.0 5.1 4.2
1.1 292.7 0.1 6.1 5.0
1.2 292.8 0.1 8.1 6.2
1.3 293.1 0.1 12.1 8.1
1.4 293.2 0.2 18.1 9.1
1.5 293.6 0.3 26.1 10.9
1.6 294.1 0.5 '36.1 13.8
1.7 294.7 0.7 43.1 18.7
1.8 295.2 0.9 45.1 22.7
1.9 295.5 1.0 43.6 24.8
2.0 295.8 1.2 42.1 26.5
2.1 296.0 1.2 37.1 27.7
2.2 296.0 1.3 32.1 28.4
2.3 296.0 1.3 27.6 28.5
2.4 296.0 1.2 23.1 28.2
2.5 296.0 1.1 20.1 27.6
2.6 295.8 1.1 17.1 26.7
2.7 295.7 1.0 15.1 25.7
2.8 295.5 0.9 13.1 24.6
2.9 295.3 0.8 12.1 23.5
3.0 295.1 0.7 11.1 22.3
MAX. VOLUME STORED= 1.4 ACRE-FT.
SPINNER'S ESTATES
STORM DURATION 2 4 HOURS
STORM FEQ. 100 YEARS
GN N8, We
PREWiTATWN
1
.0 iNG"ES
I mo_ife iNGWES
DETENTION BASIN DATA
ELV. DISC-CFS STORAGE
292.0 0.0 0.0
293.0 8.0 0.1
294.0 13.5 0.4
295.0 22.0 0.7
296.0 28.0 1.2
T-HRS ELEV ACRE-FT INF-CFS OF-CFS
------------------------------------------------
0.0 292.1 0.0 0.1 0.1
0.1 292.1 0.0 2.1 0.6
0.2 292.2 0.0 2.6 1.6
0.3 292.3 0.0 r 3.1 2.3
0.4 292.4 0.0 3.4 2.8
0.5 292.5 0.0 3.8 3.3
0.6 292.5 0.0 4.1 3.6
0.7 292.5 0.0 4.4 4.0
0.8 292.6 0.0 4.8 4.3
0.9 292.6 0.0 5.1 4.7
1.0 292.7 0.1 6.1 5.2
1.1 292.8 0.1 8.1 6.3
1.2 293.0" 0.1 10.1 7.9
1.3 293.2 0.1 15.1 9.7
1.4 293.4 0.2 23.1 10.1
1.5 293.9 0.4 33.1 12.7
1.6 294.5 0.6 44.1 17.2
1.7 295.1 019 52.1 22.5
1.0 295.6 1.1 55.1 25.5
1.9 296.0 1.3 53.1 28.2
2.0 296.0 1.5 51.1 30.4
2.1 295.9 1.6 39.6 31.8
2.2 295.9 1.6 38.1 32.5
2.3 295.9 1.6 32.6 32.7
2.4 295.9 1.6 27.1 32.5
2.5 295.9 1.5 23.6 31.8
2.6 296.0 1.4 20.1 30.8
2.7 296.0 1.3 18.1 29.7
2.8 296.0 1.2 16.1 28.5
2.9 295.9 1.1 14.6 27.3
3.0 295.7 1.0 13.1 26.0
MAX. VOLUME STORED= 1.6 ACRE-FT.
STORM DURATION 24 HOURS
STORM FEQ. 10 YEARS
ihe.e.
RUNOFF
T-HRS ELEV ACRE-FT INF-CFS OF-CFS
------------------------------------------------
0.0 292.1 0.0 0.1 0.1
0.1 292.1 0.0 1.1 0.3
1,2 212.1 0,0 1.1 0.8
0.3 292.2 0.0 1.1 0.9
0.4 292.2 0.0 1.1 1.0
0.5 292.2 0.0 1.1 1.0
0.6 292.2 0.0 1.1 1.0
0.7 292.2 0.0 1.3 1.1
0.8 292.2 0.0 1.7 1,3
0.9 292.2 0.0 2.1 1.6
1.0 292.3 0.0 2.1 1.9
1.1 292.3 0.0 3.1 2.3
1.2 292.4 0.0 4.1 3.0
1.3 292.6 0.0 6.1 4.2
1.4 292.9 0.1 9.1 6.2
1.5 293.1 - 0.1 14.1 8.4
1.6 293.3 0.2 120.1 9.6
1.7 293.6 0.3 24.1 11.3
1.8 294.0 0.4 26.1 13.3
1.9 294.3 0.5 25.6 15.5
2.0 294.5 0.6 25.1 17.4
2.1 294.6 0.6 22.1 18.5
2.2 294.7 0.6 19.1118-91
2.3 294.7 0.6 16.6 18.7
2.4 294.6 0.5 14.1 18.1
2.5 294.5 0.5 12.6 17.2
2.6 294.4 0.5 11.1 16.2
2.7 294.2 0.4 10.1 15.1
2.8 294.1 0.4 9.1 14.1
2.9 294.0 0.3 8.1 13.2
3.0 293.8 0.3 7.1 12.4
MAX. VOLUME STORED= .6 ACRE-FT.
STORM DURATION 24 HOURS
STORM FE9. 5 YEARS
T-HRS ELEV ACRE-FT INF-CFS OF-CFS
------------------------------------------------
0.0 292.1 0.0 0.1 0.1
0.1 292.1 0.0 1.1 0.3
0.2 292.1 0.0 1.1 0.8
0.3 292.2 0.0 1.1 0.9
0.4 292.2 0.0 1.1 1.0
0.5 292.2 0.0 1.1 1.0
0.6 292.2 0.0 1.1 1.0
0.7 292.2 0.0 1.1 1.0
0.0 292.2 0.0 1.1 1.0
_ 0.9 292.2 0.0 1.1 1.0
1.0 292.2 0.0 2.1 1.3
1.1 292.3 0.0 2.1 1.8
1.2 292.4 0.0 4.1 2.5
1.3 292.5 0.0 6.1 4.0
I 1.4 292.8 0.1 10.1 6.4
1.5 293.1 0.1 14.1 8.4
1.6 293.3 0.2 18.1 9.5
1.7 293.6 0.3 20.1 10.9
1.8 293.8 0.3 19.1 12.1
1.9 294.0 0.4 19.1 13.1
2.0 294.1 0.4 17.6 13.9
2.1 294.1 0.4 15.1 14.
2.2 294.1 0.4 13.1 14.3
2.3 294.1 0.4 11.1 13.9
2.4 294.0 0.4 9.6 13.3
2.5 293.9 0.3 8.1 12.7
2.6 293.8 0.3 7.6 12.0
2.7 293.6 0.2 7.1 11.3
2.0 293.5 0.2 6.6 10.7
2.9 293.4 0.2 6.1 10.1
3.0 293.3 0.1 6.1 9.5
MAX. VOLUME STORED= .4 ACRE-FT.
STORM DURATION 24 HOURS
STORM FEA, 2 YEARS
BN NO. ------M40--_
T-HRS ELEV ACRE-FT INF-CFS OF-CFS
------------------------------------------------
0.0 292.1 0.0 0.1 0.1
0.1 292.1 0.0 1.1 0.3
0.2 292.1 0.0 1.1 0.8
0.3 292.2 0.0 3.1 1.5
0.4 292.4 0.0 5.1 3.0
0.5 292.6 0.1 7.1 4.8
0.6 292.9 0.1 9.1 6.7
0.7 293.1 0.1 11.1 B.2
0.8 293.1 0.1 11.1 8.6
0.9 293.2 0.1 11.1 9.9
1.0 293.3 0.1 10.1 9.2
1.1 293.3 0,1 9.1 9.2
1.2 293.2 0.1 8.1 9.1
1.3 293.2 0.1 7.1 8.9
1.4 293.1 0.1 6.1 8.6
1.5 293.1 _ 0.1 5.1 8.1
1.6 292.8 0.1 .4.1 6.4
1.7 292.7 0.0 4.1 5.0
1.B 292.6 0.0 4.1 4.4
1.9 292.6 0.0 4.1 4.2
MAX. VOLUME STORED= .1 ACRE-FT.
x
A.R. LOMBARDI ASSOCIATES, INC. J°B`Soi�rlFr
25 Terrace Drive SHEET NO. OF
VERNON, CONNECTICUT 06066
(203) 872-2703 CALCULATED BY DATE _
CHECKED BY DATE_
SCALE
�j
1 20
�,M
A.R. LOMBARDI ASSOCIATES, INC. JOg✓. � SJS
25 Terrace Drive SHEET NO. OF
VERNON, CONNECTICUT 06066
(203) 872.2703 CALCULATED BY DATE _
CHECKED BY DATE_
SCALE
TTr17"/1 Ni S7�c�R/JcS f
lIc't - r= r
25Z O o
Z� s a 4S 9 2
lam. 6 , E, 'L T4
It O
29C. 20 / , 22
y _
3 TITLE
'SIGN STORM FREQUENCY /O years
COMPUTED 8Y DATE
Run Increment Total T. C. I (,�
w" ToPIP
A C A A x C min, r cFs L S: mrlm, uied d D V fi NOTES
f.5 �;� � �o 0
Qr 1�34 % _ /.o Z Zq 5
2G ,�'/ G.
.5- •20 3, o 6 - --
-----
�--.e r 22. s moo, 4 2 •o
6 .
zfa,::> %'/,�2d` 21
G r , � ,s D,�3 ,2Z ' 24
G 31 A�
r a urL E .3 ✓1' 2 L1 2 4 O
3 3 2 ..- l� -/
O�/ �.i — ••�_
3 , 2 .8 9 3�,_ 2.G; 2� 6 v Gr 2 3 a�' �•
�f
50 Y 1` •� ••��.......►wwrem.r�aoeod a.
19-6-1�3.3 TITLE .. - sravrE s
,SIGN STORM FREQUENCY:/p• year: COMPUTED 9Y
lun Increment Tool T.C. DATE
r°n+ To A C A A x C min, ir</hr cf�
7,loa S: minim. used d D -Val,
NOTES
is o 2 b 4. 0
f l2 tab 2 •
4•• 4 24 ay /sIA
a /i r-01-410 2 7
' - 35
T
113
. __ ....
,a r o0z � / 2 O.8 � G. Z.S — �
`8a ii�zo 4
T L#z9 4D.2 •_ -
2,6-
ZA 1, 23 J C,6 7 wr —'
6_ I
.........
i
'- • .
-------
-------
SOIL REPORT
;awrence Road
South Windsor
,inland soils were delineated on two parcels of
land off Lawrence Road and Cliffwood Drive .
Wrist parcel was inspected June 16 and 17, 1986
Second parcel done March 14,1987
All soils on these two parcels are derived from
red Triassic shale and skadstone. They are all topped
with some dark brown silt and very fine sandy loam.
Dominant soil present is the moderately drained
dapping silt loam which has a farm layer at a depth of
or below 26 inches. This layer tends to create a
seasonable high water table .
'dhere the sloping land levels off the watertable is
higher within the profile causing the soil to be
poorly drained. Poor drainage is ususlly caused by
water remaining within a profile for a longer period
of time . This soil is of the Wilbraham series . This
is the wetland soil type delineated here .
Other soils found are the Narragansett silt loam, a
well drained soil and the Ludlow loam, a poorly
drained soil with a very firm hardpan.
Many uprooted large trees present showing exposed
soil profiles . No two exactly alike.
Lewis W. Ilgen
Soil Scientist
A. R. Lombardi Associates
25 Terrace Drive
Vernon, Conn. 06066 `
L
MAR 18
A. R. Luw1 iU'I IIJJYYi,;tes, Ine.
r �t0WN 8 4(
O A F 70-W.4-1 �S
ti
1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074
�l�osOR,co AREA CODE 203/644-2511
April 28 , 1987
Mr . Kevin F. Rennie , Chairman
South Windsor Inland Wetlands Agency/Conservation Commission
1540 Sullivan Avenue
South Windsor , Connecticut 06074
RE: Spinners Estates , Subdivision Review
Dear Kevin :
The plans indicate the wetlands boundary , as per the Hartford County Soils
Survey , and as per a soil scientist employed by A . R . Lombardi Assoc . , I
am assuming . Other than I would like it so designated , and the WsA
changed to a WrA, it is substantially as shown , about one fifth of the
site is wetlands .
The Wilbraham soil , is a poorly drained silty soil that has a slow to very
slow runoff characteristic . The Wapping Soil has a moderate runoff
problem, absorbs water slowly and erodes easily , even on gentle slopes .
If an approval were to be granted to build in the wetlands , the grading
and placement of the houses on Lots 8, 11 , 15 and 16 could become
important . As far as other work in the wetlands , I would like a
modification in the outlet of the detention basin , but that can be worked
out . I would also like to see in the field , the location of the 48" pipe
on Lots 7 , 12 , and 13 . The inlet will not be as shown, that is not a
wetlands problem.
The proposal for the 20 lots as shown , if developed as shown , should not
have a serious impact on the area with respect to the conservation
aspects . It appears that the developer will install the road and
utilities and possibly not be the builder . If an approval were to be
granted , I would recommend the following conditions :
1 . Limit the roadway to basically a 70' width , except for drainage .
It limits the disturbed area to be restored .
2 . Modify the responsibility for the maintenance of the permanent
erosion control measures to after acceptance by the town .
3. As stated , house construction after loaming and seeding of
disturbed areas and individual erosion control plans .
Mr . Kevin F . Rennie April 30 , 1987
RE: Spinners Estates Subdivision Review
Page 2 .
4 . Three sets of modified plans to be submitted prior to any
site work.
5 . A bond in the amount of $25 , 000 submitted prior to any
sitework to assure compliance with the plans . An
explanation might be in order . Building permits will not be
issued until the plans are on file and they indicate that this
would happen after the pavement is down . All of the site work
could be done before filing the plans .
The narrative on Sheet 13 of 13 appears to cover all the points required.
I would encourage the Commission to look at them. They provide a logical
sequence that an excavator could follow that should limit their exposure
and impact on the environment .
Very truly yours ,
A . Bowen Davies
Deputy Town Engineer
ABD/jsv
CC: Spinners Estates
Michael J. Gantick , Director of Public Works
Richard P . Martel , Town Engineer
Marcia A. Banach , Director of Planning
IWA/CC
PAUL W. SMITH
ATTO R N EY AT LAW
P.O. BOX 338
36 MAIN STREET
WINDSOR LOCKS, CT ❑6096 (203) 627-051 3
June 22 , 1987
Mr. Kevin F. Rennie , Chairman
South Windsor Inland Wetlands Agency
Town Hall
1540 Sullivan Avenue
South Windsor, CT 06074
RE: Ludwick and Marion Szeluga
Spinners Estates
Dear Chairman Rennie :
I respectfully request that the above application of Mr. and
Mrs. Ludwick Szeluga be scheduled for your meeting date of
Monday, July 13 , 1987. The reason for this request is I will
be out of town prior to this date.
Thank you for your consideration in this matter.
Sincerely yours ,
Paul W. Smith
ss
ENVIROTEon LABORATORY
TESTING & CONSULTING
77 COOK HILL ROAD • WINDROR. CONNECTICUT 06095 -
MARYELLEN DiLUZ10
TELEPHONE - -
(203) 688-7249
July 2, 1987
Ludwick Szeluga
96 Lawrence Road
South Windsor, Ct. 06074
Dear Sir;
We have the following to report on the sample submitted to this
laboratory on June 29 , 1987 .
Mark : Water sample collected from a stream that
does through -
woods and afield on acreage off. Lawrence Load, South
Windsor, Ct.'' This is a grab sample taken on June
27 , 1987
Sample Numbers
17270 . ----
17271
BACTERIOLOGICAL iEXAMINATIOPd ( #1 ) ( #3)
Number of Conform. Organisms
per 100 %Ills (filter membrane) 1000 670
izNote that the #1 sample was taken from upstream and #3 was taken
downstream.
Both of the above samlpes exhibited nigh forc-iis of Coliform
bacteria. This water is not safe for recreational use. If there
are any questions we would be pleased to discuss them with you.
8
Very truly yours,
EnviroTech Laboratory
'A° IV ' �
Maryellen DiLuzio
cc : one enclosed
8f44 /vim
dtAd&A
C � T-own. o-P S-otdA ti
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
r�oS0Q.c0 � AREA CODE 203/644-2511
1
• October 5 , 1987
Mr. & Mrs. Ludwig Szeluga CERTIFIED MAIL
96 Lawrence Road
South Windsor, Ct 06074
Dear Mr. & Mrs . Szeluga:
Re: Application #472 - Spinner' s Estates Subdivision
At the September 28, 1987 meeting, the South Windsor Inland Wetlands
Agency/Conservation Commission approved with conditions application
#472 , a 20 lot residential subdivision to be located on Lawrence Road,
as shown on plans prepared by A. R. Lombardi Associates , dated March,
1987, consisting of 13 pages . The following conditions must be
adhered to for this. permit to be valid:
1. We recommend a bond in the amount of $25, 000 be submitted
to the Planning & Zoning Commission to ensure compliance
with erosion & sediment control measures.
2 . The developer will coordinate -work with the Town to correct
the water problems on Mr. Hildebrand' s property on
Cliffwood Drive.
3 . Limit the roadway to a 70 ' width swath, except for drainage.
4. Modify the responsibility for the maintenance of the permanent
erosion control measures to after acceptance of the Town.
5 . House construction after loaming and seeding of disturbed
areas and individual erosion control plans .
6 . Three (3) sets of modified plans must be submitted to the
Wetlands Department for Town staff review prior to any site
work.
7 . Building permits will not be issued until the plans are on
file and pavement is done. All of the site work could be
done before filing the plans.
8 . The developer must submit a draft Conservation Easement to
this commission for approval for all lots with wetlands
that would advise the homeowners that no filling, clearing,
building, excavation, etc. , will be allowed in a wetland
area and so noted on the plot plan.
To: Mr. & Mrs. Ludwig Szeluga
, Re: Spinner' s Estates - Application #472
October 5 , 1987
Page 2
A
9. Construction activities shall be subject to the approval
of the Town Engineer.
10 . The application shall indemnify and hold harmless the Town
of South Windsor against any liability which might result
from the proposed operation or use.
11. The permit is valid for one year and shall expire on
September 28 , 1988 .
Very truly yours,
r
K vin F. Renilie, Chairman
Inland Wetlands Agency/
Conservation Commission
Town of South Windsor
KFR:dlb
CC: A. B. Davies , Deputy Town Engineer
Michael Gantick, Public Works Director
Marcia Banach, Director of Planning
Thomas D'Auria, Building Official
Louise Evans, Chairman, PZC
A. R. Lombardi Associates
Attorney Paul Smith
Engineering Department
ANIEL�N-DED COPY
S 0*1N SF7
1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
�►osoR•coc'� AREA CODE 203/644-2511
November 2 , 1987
Mr. & Mrs . Ludwig Szeluga CERTIFIED MAIL
96 Lawrence Road
South Windsor , Ct 06074
Dear Mr. & Mrs . Szeluga:
Re: Application #472 - Spinner' s Estates Subdivision
At the September 28 , 1987 meeting, the South Windsor Inland Wetlands
Agency/Conservation Commission approved with conditions application
#472 , a 20 lot residential subdivision to be located on Lawrence Road,
as shown on plans prepared by A. R. Lombardi Associates, dated March,
1987 , consisting of 13 pages . The following conditions must be
adhered to for this permit to be valid:
1 . We recommend a bond in the amount of $25 , 000 be submitted
to the Planning & Zoning Commission to ensure compliance
with erosion & sediment control measures.
2 . The developer will coordinate work with the Town to correct
the water problems on Mr. Hildebrand' s property on
Cliffwood Drive.
3 . Limit the roadway to a 70 ' width swath, except for drainage.
4 . Modify the responsibility for the maintenance of the permanent
erosion control measures to after acceptance of the Town.
5 . House construction after loaming and seeding of disturbed
areas and individual erosion control plans .
6 . Three (3) sets of modified plans must be submitted to the
Wetlands Department for Town staff review prior to any site
work.
7 . Building permits will not be issued until the plans are on
file and pavement is done . All of the site work could be
done before filing the plans.
8 . The developer must place conservation easements on each lot
with wetlands . A copy of the drafted proposed easement
must be submitted to this commission for approval. The
easement should advise the homeowner that no filling,
clearing, building, excavation, etc. will be allowed in a
wetlands area and so noted on the plot plan.
ended copy
To: Mr. & Mrs . ,Ludwig Szeluga
Re: Spinner ' s Estates - Application #472
November 2 , 1987
Page 2
9 . Construction activities shall be subject to the approval
of the Town Engineer.
10 . The application shall indemnify and hold harmless the Town
of South Windsor against any liability which might result
from the proposed operation or use.
11 . The permit is valid for one year and shall expire on
September 28 , 1988 .
Very truly yours ,
CQ/M�
KevinnFF. Rennie, Chairman
Inland Wetlands Agency/
Conservation Commission
Town of South Windsor
KFR:dlb
CC: A. B. Davies , Deputy Town Engineer
Michael Gantick, Public Works Director
Marcia Banach, Director of Planning
Thomas D'Auria, Building Official
Louise Evans, Chairman, PZC
A. R. Lombardi Associates
Attorney Paul Smith
Engineering Department
1
t�wN 8�,( /''►
C U0-1
y slot�
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
soa•Cor� AREA CODE 203/644-2511
July 15, 1988
Atty. Paul W. Smith
P. 0. Box 338
Windsor Locks, CT 06096
re: Appl . #88-30P, Spinner's Estates Subdivision
Gentlemen:
We are pleased to advise that the Planning and Zoning Commission
voted at its July 12, 1988 meeting to approve the captioned
application for a 21 lot subdivision in accordance with Drawings
1 through 13 dated March, 1987 , last revised 3/7/88, prepared by
Lombardi Associates, Project No. 86-1333 and with the following
modifications :
1 . All deeds for open space and roadways; and Easements for
conservation purposes, drainage or utilities, that may be
required in connection with the approval of this
subdivision, must be submitted to this Commission prior to
filing the mylars and issuance of building permits . All
deeds must be in accordance with the policy for accepting
deeds and easements and must be approved by the Engineering
Department and Town Attorney. The deeds for the roadways
and open space will be held in escrow until completion of
the subdivision and then referred to the Town Council for
acceptance.
2 . Concrete sidewalks, built to Town specifications, shall be
installed on both sides of all new streets.
3 . Footing drains are required for each house. Prior to the
building of any structure on a lot, a topographic map,
drawn to a scale of 1" = 401 , shall be submitted for each
lot in the subdivision, showing proposed contours,
elevations and the location of the footing drains . No
building permits will be issued until the proposed
contours, floor elevations and"-location of footing drains
have been approved by the Town Engineer.
4 . Drainage for this subdivision is subject to the approval of
the Town Engineer.
i
4.:
Atty. Paul Smith -2- July 15, 1988
5 . If, for any reason, finished grading and other site work is
not completed, the Town Engineer shall determine the amount
of a cash bond to ensure final grading and site work. This
cash bond must be submitted prior to issuance of a
Certificate of Occupancy.
6 . All lots shall be serviced by the Town of South Windsor
sanitary sewer system and are subject to the approval of
the Water Pollution Control Authority.
7 . Water shall be supplied to this subdivision by Connecticut
Water Company.
8 . Street lighting shall be installed on streets, at
intersections, and on cul-de-sacs in accordance with the
policy established by the Town Manager. Street lighting is
to be coordinated with the Chief of Police.
9 . Street names and locations of fire hydrants are subject to
the approval of the Fire Marshal of the Town of South
Windsor. Street names and supporting posts shall be
installed by the developer in conformance with the
standards of the Town of South Windsor, at no expense to
the Town.
10 . Quantity estimates must be submitted to the Town Engineer
for the purpose of determining subdivision bonding, and all
bonds shall be posted prior to filing the plans .
If the developer chooses to submit a Letter of Credit for a
one year term, in lieu of a surety bond, said Letter of
Credit must be renewed on a yearly basis until completion
of the development. If a new Letter of Credit has not been
received within 30 days before the expiration date, the
Commission may, at its option, call the Letter of Credit it
is holding.
11 . A drainage assessment fee in the amount of $1050 shall be
submitted to this Commission.
12 . A liability insurance policy shall be submitted to this
Commission naming the Town of South Windsor as an insured,
with a combined single limit for bodily injury and/or
property damage in the amount of $1,000,000 .
13 . This application -is--subject_to the conditions of approval
of the Inland Wetlands Agency/Conservation Commission.
14 . Prior to commencement of any site work, a meeting must be
held with Town Staff .
Atty. Paul Smith -3- July 15, 1988
A
15 . All plans used in the field by the developer must bear the
and authorized _signature of the Town of South
Windsor.
16 . No building permits will be issued until all modifications
have been complied with, and the final plans have been
filed in the Town Clerk's Office.
17 . During or prior to acceptance of the detention basin by the
Town, should the proposed system show indications of not
functioning properly, alternative construction methods will
be required.
Black and white transparent mylars of Sheets # 1 2 and 3 with
P Y r r
the above modifications, together with three blueprint copies of
the entire set of plans, must be submitted to this Commission
within 30 days to be stamped and signed. The letters of approval
of thiq Commission, as well as the Inland Wetlands
Agency/Conservation Commission, must be reproduced on the mylars .
After the mylars have been signed by the Commission, they will be
returned to you for filing in the Office of the Town Clerk within '
90 days . After filing these plans, a copy of the receipt must be
submitted to the Planning Department.
Very truly yours,
PLANNING AND ZONING COMMISSION
WI
Raymond F. Hallowell, Jr.
Chairman
cc: M. Gantick, Director of Public Works
F. Shaw, Supt. of Pollution Control
J. Collins, Chief Building Official
E. Belleville, Assessor
W. Lanning, Fire Marshal
M. Banach, Planning Director
Registrar of Voters
Inland Wetlands Agency/Conservation Commission
..., PZC File
Architect/Engineer
Applicant
pp-
PAU L W. SMITH
ATTO R N EY AT LAW D
P.O. BOX 33B
36 MAIN STREET
WINDSOR LOCKS, CONNECTICUT 06096
(203) 627-051 3
Jul 25 , 1988 South Windsor
y INLAiwp WETLANDS AGENCY/
CON6Ei?VATION COMMISSION.
Mr. John M. Moran, Jr. , Chairman
Inland.Wetlands Agency/
Conservation Commission
Town of South Windsor
1540 Sullivan Avenue AI =C 1` V
South Windsor, CT 06074 `
RE: APPLICATION #472
SPINNER' S ESTATES SUBDIVISION
Dear Chairman Moran:
The above captioned Inland Wetlands Conservation Commission
permit will expire on September 28, 1988. On behalf of my
clients , Ludwick and Marion Szeluga, I respectfully request
an extension of time for this permit.
As of the date of this letter, no work has been performed
under the permit , as we have only recently received subdivision
approval from the Planning and Zoning Commission.
For this reason, I do not believe it will be necessary to
provide the Commission with an engineer' s verification report.
We have enclosed a check in the amount of $25. 00 to cover
the filing fee.
Please contact me when this matter will be heard by the
Commission, so that I may attend the meeting.
Sincerely yours ,
Paul W. Smith
pl
Enclosure
.O "CONSULTING.ENVIRONMENTAL ENGINEERS"
25 Terrace Drive
ASSOCIATES, I N C Vernon, Connecticut 06066
Telephone(2031 872-2703
A.Richard Lombardi,P.E.,President
July 26, 1988
Town of South Windsor
Conservation Commission
1570 Sullivan Avenue JUL 28 1988
South Windsor, CT 06074
South Windsor
Attn: Phyllis Mann INLAND WETLANDS AGENCY(
CONSERVATION COMMISSION
Re: Spinner's Estates
Application #472
ARL Project #86-1333
Dear Ms. Mann:
Please be advised that the construction of the above referenced
project has not yet started. It is anticipated that work will be
initiated on the project prior to August 15, 1988. We hereby request a
one (1) year extension of time for this project. Thank you for your
consideration.
Very truly yours,
A.R. LOMBARDI ASSOCIATES, INC.
A. Richard Lombardi, P.E.
President
ARL:sab
WASTEWATER •WATER SUPPLY • HAZARDOUS WASTES •WATER RESOURCES• GEOHYDROLOGY
SITE PLANNING •DRAINAGE •ENVIRONMENTAL IMPACT ASSESSMENT• SURVEYING
i
C r 711W.Z."n �S-O-UA ?A�U�
cli
C �
9 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
SOR•CO AREA CODE 203/644-2511
September 28, 1988
Ludwig & Marion Szeluga
96 Lawrence Road
South Windsor, CT 06074
Re: Application #472- Spinners Estates
Dear Sir:
At the September 26, 1988 meeting, the South Windsor Inland
Wetlands Agency/Conservation Commission approved a one year
extension of Application #472 with all original conditions.
The application becomes effective September 29, 1988 and expires
September 29, 1989.
V truly yours,.
ohn M. Moran, Jr. , Chairm ��✓
Inland Wetlands Agency/
Conservation Commission
JMMJr. /pmm
cc:John E. McCahill, Zoning/Wetlands Enforcement Officer
Marcia A. Banach, Director of Planning
Michael Gantick, Director of Public Works
John R. Collins, Chief Building Official
Raymond Hallowell, Chairman, PZC
I
I
APPENDIX A
Henry Souther Laboratories, Inc.
24 TOBEY ROAD, BLOOMFIELD, CONN. 06002
TE L (203) 242-6291
FIELD INSPECTION
CLIENT: A R. Lombardi Associates DATE: March 2. 1989
PROJECT: Spinners Run Job #86-1333 H SL#: 33,663
INSPECTOR: Clay Coriul o
COMPACTION REPORT
Location/ Maximum In-Place % Moisture % Relative
Elevation Dry Density Densit Content Compaction
1 . Station 200 + 00 centerline
Depth to test: 9.0' 126.7 118.8 12.6 93. 7
2. Station 300 + 55 centerline
Depth to test: 4.0' 127.4 117.4 12.6 92.2
3. Station 500 + 00 centerline
Depth to test: 3.0' 125.6 112.3 15.7 89.4
4. Station 700 + 65 centerline
Depth to test: 4.0' 128.0 124.1 10.2 97.0
5. Station 900 + 00 centerline
Depth to test: 4.0' 126.8 122.2 11 .0 93.4
6. Station 1000 + 00 centerline
Depth to test: 3.0' 129.6 120. 7 11 .4 93. 1
7. Station 1200 + 00 centerline
Depth to test: 4.0' 126.6 115.6 10.5 91 .3
8. Station 1200 + 00 centerline
Depth to test: 13.0' 126.6 121 .8 23.7 96.2
9. Station 1400 + 00 centerline
Depth to test: -8.0' 123.8 117.8 14.1 95.2
10. Station 16 + 00
Depth to test: 8.0' 125.8 116.0 14.7 92.2
11 . Station 18 + 00
Depth to test: 6.0' 125.8 112.2 9.6 89.2
The above test results are based on several proctors.
Very truly yours,
HENRY SOUTHER LABORATORIES, INC. A. Report must not be reproduced except in
full with the approval of the Laboratory.
yf B. Test report relates only to the soil
tested.
Hugh J. Scully, P. E.
Division Manager
Building Materials Laboratory & Engineering
HJS:sjk
2 - Client
A.R. Lombardi Associates, Inc. Henry Souther Laboratories, Inc.
25 Terrace Drive 24 Tobey Road '
Vernon, CT 06066 Bloomfield, CT 06002
2 Client
March 3, I989
Re: Spinners Kun :Jb3i"#86=1333
Source: Station 1 �n
Max imuM Dens,,i ty7 12a.'8: lbs./f t.3
Opt imur� Moisture. 6;.3 . .
Test Method:�!. ASTM'_D-155� C
Del ivered'-bye Clay Cor ju-lo
A. Report must not be reproduced except in full
with the approval of the Laboratory.
B. Test report relates-only to the soil tested.
REVIEWED: - --- -- --
Hugh , Scully;: R;
Division Manager -
Building.-Ida borator-;r---- aWveerin
HJS:sb
- - - -- !:
125
rz�
124
,
123
0 122
121
120 ���•
119
118
2 3 4 5 6 7 8 9 10 11
A.R. Lombardi Associates, Inic. Henry Souther Laboratories,; Inc.
25 Terrace Drive 24 Tobey Road
Vernon, Cr 06066 Bloomfield, Cr 06002.
2 - Client: :.:.. -..
March 3, 1989
Re: Spinners Run. Job #86-1333
Source: • Top. of:subbase::3O0+55
Maximum Density 127..4
Optimum Moisture 7. 1%
Test Method. ASTM Di-1557 C
Delivered by Clay_Corju o
A. Report must not_be reproduced except in full
with the approval of the Laboratory.
B. Test report relates- only to the. soil tested.
REVIEWED:
Hugh . -S ullu �. i
Division Manageri
�uikding_-Materials=. .. -- -- ----- - - - --
i ,. Eirgineitg ;.
--
-� }: ` "
77
- 127
126
125
124
Q 123
122
121
120
119
4
118
t 117
t I
116
1-15
3 4 5 6 7 8 9 10 11 12 13
I K4r'tTC'M1DC (Y1Ai'TFl\TT /°/\ 11Ci A '2Z A71-11 T nF% A'2/,1.n
HENRY _ SOUTHER LABORATORIES INC
24 Tobey Road • Bloomfield, CT • 06002 • (203) 242.6291
ENGINEERS - LABORATORIES
A. RICHARO LOMBAROI.PE
EslabhshnA 1898
HUGH J SCULLS. PE W V
THOMAS O LEE FAX 203.286.0634
BRLX---E W. BREhER, Ph.D.
ACCREDITED LAI3(1RATCRY
March 6, 1989
A.R. Lombardi Associates, Inc.
25 Terrace Drive
Vernon, CT 06066
Reference: Spinners Run Job #86-1333
HSL# 33,672-A
Gentlemen:
The following is the result of the requested sieve test completed on sample number 3437:
SIEVE TEST WASHED Specifications
Sieve Size % Passing Grading A Grading B Grading C
Percent passing by weight
5" 100 — 100 —
3-1/2" 100 100 90 - 100 —
1-1/2" 100 55 - 100 55 - 95 100
3/4" 96.6 — — 45 - 80
1/4" 89.2 25 - 60 25 - 60 25 - 60
#10 83.7 15 - 45 15 - 45 15 - 45
#,40 74.2 5 - 25 5 - 25 5 - 25
#100 54.3 0 - 10 0 - 10 0 - 10
#200 38.1 0 - 5 0 - 5 0 - 5
Source: Station 1800 + 00
Delivered by Clay Corjulo Test Method: ASTM D-422
Very truly yours, A. Report must not be reproduced except in
full with the approval of the Laboratory
HENRY SOUTHER LABORATORIES, INC. B. Test report relates only to the soil
tested.
Hugh Sc lly, P.E
Division Manager
Building Materials Laboratory & Engineering
HJS:sb
2 - Client
A.R. Lombardi Associaaes; -I :` : � = HenrySouther Laboratories, Inc.
25 Terrace Drive i ::: .; :: : 24 Tobey Road
Vernon, CT 06066 ; Bloomfield, CT 06002
2 — Client
March , i9f3�
-rpm _1W -; 8fi=1333'
_Sources. ..Static:AG + 65
Max, C�ens ty ;12 0! lbs. /ft.3
- V: e..
Vest Mkhad.,::A�i D-1557 . C
Del iveres�15y-Clay"Coriulo
A. Report must not be reproduced except in full
with the approVal*of the Laboratory.
B. Test report. relates only to the soil tested.
REVENED: - -.
Division,Manager._ ..--
128 Building Materials Laboratory & Engineering _
FUS:sb
126-
__ _-. ..._ - - -
w123 - -�---- { -- - - - = - -- - - - -
CL' I i
•
Q 122 1
121
/ t
120
�r
i l
119
118
1 2 3 4 5 6 7 8 9 10 11
w%tcTlmv i-mrrCwtm /0/\ lrer A 'N� i» n . . It— . i
A.R. Lombardi Associates, lk_c;j-'.► - �;; :i nr Souther Laboratories,
i...... ._�.._.,....! _. � Y a oriel, Inc.
..25 Terrace Drive - +---•--__,._._----�___-:_ 24 Tobey Road
Vernon, CT' 06066 i Bloomfield, Cr 06002
2 -. Client
March 6, 19$5_
Re:. Sojntier�_RW 'Jbb 48 --1333
Source '::Sto 16h 1 t
-Max'1M=-DonsityL1210-4�.:1b�-:/fit_,,_._
Optimum Mbiswre 5..�+% i
Test Meth6d:; -AS7M D�-=I557 C
Delivered byClay Coraulo
A. Report must not-be -reproduced except in full
with the approval: of the Laboratory.
B. Test report relates only to the soil tested.
REVIEWED;
Hughc lly}_PE. =
Divis ion:Manager
Building-*a-teria neeri - --
: . � :... . g- ng-:-- -- -- -
HJS:sb + _
a
129
o�
127
--,-: ;- -
126 .
125 ;._ �. : _► . : .: ; .
124
123 f
122 �f
121 l
120
i
119 /
118
2 3 G 5 6 7 H 9
MOPMIRF CONTFNT (%) 1TCTA T1 r,71—r T nh
_ HENRY _SOUTHER LABORATORIES INC
24 Tobey Road • Bloomfield, CT • 06002 • (203) 242-6291
ENGINEERS LABORATORIES
A. RICNARO LOMBARDL PE, ENaU6sneci 1898
HUGH J SCULLY.PE. FAX 203.286.0634
THOMAS O LEE
BRU LE W. BREWR, Ph.D. ACCREDITED LABC RATC RY
March 7, 1989
A.R. Lombardi Associates, Inc.
25 Terrace Drive
Vernon, CT 06066
Reference: Spinners Run Job #86-1333
HSL# 33,672-D
Gentlemen:
The following is the result of the requested sieve test completed on sample number 3443:
SIEVE TEST WASHED Specifications
Sieve Size % Passing Grading A Grading B Grading C
f Percent passing by weight
i
5 100 - 100 =
3-1/2" 100 100 90 - 100
1-1/2" 100 55 - 100 55 - 95 100
3/4" 95.1 - - 45 - 80
1/4" 84.8 25 - 60 25 - 60 25 - 60
#10 79.5 15 - 45 15 - 45 15 - 45
#40 70.0 5 - 25 5 - 25 5 - 25
#100 50.0 0 - 10 0 - 10 0 - 10
#200 34.4 0 - 5 0 - 5 0 - 5
Source: Station 700 + 65
Delivered by Clay Corjulo Test Method: ASTM D-422
Very truly yours, A. Report must not be reproduced except
full with the approval of the Laborz
HENRY SOUTHER LABORATORIES, INC. B. Test report relates only to the soil
tested.
Hugh Scully, P.E.
Division Manager
Building Materials Laboratory & Engineering
HJS:sb
2 - Client
A.R. Lombardi Associates, .Inc. : . Henry Souther Laboratories, Inc.
25 Terrace Drive . 24 Tobey Road
Vernon, CT .06066 Bloomfield, CT 06002
2 - Client
March 7, 1989
Re: . Spinners�Riin .lob: #88-1333
+ Source: 8 to ion TO+.00
*?;i" ' �s�-.t-y::�2�.8: 1bs./ft.3
Optimum Moisture 7.:0%'
Test Ftethod:;-AV - D- -'57- --- -
_ .. C
Delivered by'Clay 0or3ulo
A. Report must not be reproduced.except in full
with the.approval of the Laboratory.
B. Test report rebates only to the soil tested.
I REVIEWED:
I - -
Division jmA*h . r
! Building:,Ma:ter -a- s Laboratory &->£nuineerzng
HJS:.s1i
f.
- - -- - t- .... ....
. . -
f - - -- -=- - - --- =
t !
z 125
ca 124
n 123 -
- 122
121
120
119
118
117
116 1
. 115
3 4 5 6 7 8 9 10 11
KYWC"10F rAWrrC�rr
HENRY SOUTHER LABORATORIES INC
24 Tobey Road • Bloomfield, CT • 06002 • (203) 242-6291
ENGINEERS - LABORATORIES
A. RICHARD LOMBARDI.PE Iv'
Established 1898
HUGH J SCULLY• PE
THOMAS D LEE FAX 203.286.0634
BRUCE W. BREMER, Ph.D. ACCREDITED LAB(,RATCRY
March 8, 1989
A.R. Lombardi Associates, Inc.
25 Terrace Drive
Vernon, CT 06066
Reference: Spinners Run Job #86-1333
HSL# 33,672-E
Gentlemen:
The following is the result of the requested sieve test completed on sample number 3445:
SIEVE TEST WASHED
Specifications
Sieve Size % Passing Grading A Grading B Grading C
Percent passing by weight
5" 100 - 100 -
3-1/2" 100 100 90 - 100 -
1-1/2" 82.8 55 - 100 55 - 95 100
3/4" 78.2 - - 45 - 80
1/4" 71.5 25 - 60 25 - 60 25 - 60
#10 67.4 15 - 45 15 - 45 15 - 45
#40 59.1 5 - 25 5 - 25 5 - 25
#100 40.9 0 - 10 0 - 10 0 - 10
#200 28.3 0 - 5 0 - 5 0 - 5
Source: Station 1600 + 00
Delivered by Clay Corjulo Test Method: ASTM D-422
Very truly yours, A. Report must not be reproduced except in
full with the approval of the Laboratory
HENRY SOUTHLR LABORATORIES, INC. B. Test report relates only to the soil
tested.
Hugh J. Scu ely, P.E.
Division Manager
Building Materials Laboratory & Engineering
HJS:sb
2 - Client
A.R. Lombardi Associates, Inc. Henry Southier Laboratories, Inc.
25 Terrace Drive 24 Tobey Road
Vernon, CT 06066 Bloomfield, CT 06002
I2.7., Client
jMarch-8', 1989.
Re: - Spinners.-Run--Job #86�-1333
Source: Station. 900 + .00.
Maximum Density 126i.8 lbs./ft.3
i 0ptimum: l+loisture--?-,M-------:_
Test Method: ; ASTM.D�1557; C
Delivered-by-Clay Cor'ulo
I � � 3
A. Report must not be reproduced except in full
with the approval of the Laboratory.
B. Test report relates only to the soil tested.
REVIEWED; - ------
J - _
Hugh a1 ,-- — —_
Division Mina ^—
f BuiIdicig Nlsiteria3 s: Laboratory &: Engineering
HJS sb -
:,.::
-1-26 -- —-;- -- _ . j ._ — - -- --
-- ;- 1 L ! 1•'
-
^ ! l + I t i
— - --
122
121
120
119
118
117
2 3 4 5 6 7 8 9 10 11
MnTIMIRF CONTENT (°L) NgTA ZZ A71-ir Tnl-% $Z/!/!R
HENRY SOUTHER LABORATORIES INC
Lk 24 Tobey Road • Bloomfield, Cr • 06002 • (203) 242-6291
A. RICHARD LOMBARDI,PE. ENGINEERS- LABORATORIES
HUGH J. SCULLY.PE Esfabhshed 1898 VIVt
THGMAS O LEE FAX 203.286.0634
BRUCE W. 8tElrElt, Ph.D. ACCREDITED LABCRATCRY
March 9, 1989
A.R. Lombardi Associates, Inc.
25 Terrace Drive
Vernon, Cr 06066
Reference: Spinners Run Job #,86-1333
HSL#' 33,672-F
Gent Ierien:
The following is the result of the requested sieve test completed on sample number 3447
SIEVE TEST WASHED Specifications
Sieve Size % Passing Grading A Grading B Grading C
Percent passim by weight
1-1/2" 92.9 55 - 100 55 - 95 100
3/4" 90.8 — — 45 - 80
1/4" 84.1 25 - 60 25 - 60 25 - 60
#10 78.9 15 - 45 15 - 45 15 - 45
#40 68.5 5 - 25 5 - 25 5 - 25
#100 46.5 0 - 10 0 - 10 0 - 10
#200 31.1 0 - 5 0 - 5 0 - 5
Source: Station 900 + 00
Delivered by Clay Coriulo Test Method: ASTM D-422
Very truly yours, A. Report must not be reproduced except
full with the approval of the Labora
HENRY SOUTHER LABORATORIES, INC. B. Test report relates only to the soil
tested.
Hugh J. Scully, P.E.
Division Manager
Building Materials Laboratory & Engineering
HJS:sb
2 - Client
A.R.-Lombardi As.$ociatas, .InC;:::.:....: _: :__ i - He�rjr:Souther:Laboratories, Inc.
25 Terrace Drive ; 2CTobey load
Vernon; CT 06066 --- :_.__.'_—,.._..7 :Bi-4amffield;--CT, 06002-
is
2 - Client
. _ ..... . .
Re: Spinrieri� Run J6b:#96"1333 i
Scx�rce; 3 .. .
Maximum. Dens.ity:123:8 :Tbs./€t. .
Optimum Moisure::b:32
I Test-Method;
Delivered by'Cli- Lorjulq
A. Report must not be reproduced except in full
with the approval of the Laboratory.
! B. Test report -relates-only to the soil tested.
REVIEWED: --
Hugh u 1 l y p • ; ._ -- i
Division Maoa.
i Building;Materials: Ijil t4ry::& Engineering
- HJS sb-— i ; —_ - --- -- -"- --—
I i
-1
;.._..... ..
- ——
-77
0 123 - ! . —
122 _:__ --- - - --- - --- - ---
i
121 -
120 l
i•
1.19
118
1 2 3 4 5 6 7 8
MOISTURE C TFENT (%) HSL# 33,671-C Lab #3450
HENRY SOUTHER LABORATORIES INC
24 Tobey Road • Bloomfield, CT • 06002 • (203) 242-6291
A. RICHARO LOMBAROI. RE
ENGINEERS • LABORATORIES ^ V
n� n A
W
HUGH J SCULLY.PE. Established 1898
THOMAS O LEE FAX 203-286.0634
BRUCE W. BREKR, Ph.D. ACCREDITED LAB(PATCRY
March 13, 1989
A.R. Lombardi Associates, Inc.
25 Terrace Drive
Vernon, CT 06066
Reference: Spinners Run Job #86-1333
HSL# 33,672-H
Gentlemen:
The following is the result of the requested sieve test completed on sample number 3453:
SIEVE TEST WASHED Specifications
Sieve Size % Passing Grading A Grading B Grading C
Percent passing by weight
3/4„ 95.6 — — 45 - 80
1/4" 85.4 25 - 60 25 - 60 25 - 60
#10 79.5 15 - 45 15 - 45 15 - 45
#40 69.6 5 - 25 5 - 25 5 - 25
#100 48.7 0 - 10 0 - 10 0 - 10
#200 33.5 0 - 5 0 - 5 0 - 5
i
Source: Station 500 + 00
Delivered by Clay Corjulo Test Method: ASTM D-422
Very truly yours, A. Report must not be reproduced except in
full with the approval of the Laboratory.
HENRY SOUTHER LABORATORIES,INC. B. Test report relates only to the soil tested.
p'iv
�i
Hugh SP.
Division Manager
Building Materials Laboratory & Engineering
HJS:sb
2 - Client
I
I
A.R. Lombardi Associates, ,nc Henry Souther Laboratories, Inc.
25 Terrace Drive 24 Tobey Road
Vernon, CT 06066 Bloomfield, CT 06002
f 2 - Client
March 141 1989 a�dQ
Re: Spinners .Run Job #86-1333 ACCREDITED
Station 1200+00 3 LABORATORY
Maximum Density 126.6 lbs./ft.
Opt imum_Moist,ure-b_71:._ -_- --
Test M�thgd; :ASTM-:D-155,..:C
_ ..-.__nel.-iveied:�h I -It Tj
:� -- --=---}-=--- ' -- - -_
A. Report ;i:ivat:- o lie: re x uc -X ept:i in
u'ith._ttie_a
B. Test: report: elate. l�Y to t-he:soil !tested
77-77-
MT -- --- --.REV
777-7
..
---------4
....... .
w
N
H
w '126
o
125
124
123
122 ;
121
120
119
118
117
116 . ......... .......
;
2 3 4 S 7 8 9 10 11
MOISTURE CONTENT (%) HSL# 33,671-1 Lab #3452
0 "
HENRY SOUTHER LABORATORIES INC
4 Tobey Road • Bloomfield. CT • 06002 • (203) 242.6291
A RICHARO LOMBARDI PE ENGINEERS - LABORATORIES
. W o
HUGH J SCULLY.PE EstabNshep 1898
THOMAS 0 LEE FAX 203.286.0634
BRLJLE W. BREKR, Ph.D. ACCREDITED LABMTLRY
March 15, 1989
A.R. Lombardi Associates, Inc.
25 Terrace Drive
Vernon, CT 06066
Reference: Spinners Run Job #86-1333
HSL# 33,672-J
Gentlemen:
The following is the result of the requested sieve test completed on sample number 3455:
SIEVE TEST WASHED Specifications
Sieve Size % Passing Grading A Grading B Grading C
Percent passing by weight
5" 100 - 100 -
3-1/2" 100 100 90 - 100 -
1-1/2" 100 55 - 100 55 - 95 100
3/4" 89.3 - - 45 - 80
1/4" 83.0 25 - 60 25 - 60 25 - 60
#10 78.7 15 - 45 15 - 45 15 - 45
#40 70.8 5 - 25 5 - 25 5 - 25
#100 51 .8 0 - 10 0 - 10 0 - 10
#200 37.1 0 - 5 0 - 5 0 - 5
Source: Station 200 + 00
Delivered by Clay Corjulo Test Method: ASTM D-422
Very truly yours, A. Report must not be reproduced except in full
with the approval of the Laboratory.
HENRY SOUTHER LABORATORIES, INC. B. Test report relates only to the soil tested.
�Y'-a I
�Ljdlt
Hugh J. Scully, P.E.
Division Manager
Building Materials Laboratory & Engineering
HJS:sb
2 - Client
A.R. Lombardi Asswiates, Inc. Henry Souther Laboratories Inc.
25 Terrace Drive 24 Tobey Road
Vernon, CT 06066- . ----- - Bloomfield, CT 06002
2 - Client
March 15,1989'
r\nRe: Spanners Run Job #,R6-1333 N a
Source:. :tat'ion 500+00 3 ACCREU(TED
Maximum: Density 125:.6 lbs./ft.
Optimum Moisture, 6:Eli LABORATORY
Test:Merhodi ' AS1M =:
r Deliver6d$by- lay+C ri�iloj�.�;
A: .Report must:nnt:.:be_' md>aced...except..in _ful l
with. thg:appr val__o the:;�abbr'atory.
M - 8---Testzeporr r- :y:: - -
<., ! 0:: a soil -'tested:
REVIWED: ., _; '..
-- -
:: »;_ ;
H h � ,
r -f- - -,
_ -
- -
-... - _
.. 125 -- ---
124
0 123 -
Q 122
121
120
' t
119 -
118
117
116
115
114
1 2 3 4 5 6 _ $ : �+ IQ 1 12
MOISTURE CONTENT M HSL#, 33,671-J Lab #3454
A.R. Lombardi Ass c' tes, Inc. Elenry Souther Laboratories, Inc.
25 Terrace Drive 24 Tobey Road
Vernon, CT 06066 Blocmfield, CT 06002
2 - Client
March 16, 1989 f�dQQ
Re: Spinners Run Job #86-1333 ACCREDITED
Source: Station 200+00 3 LABORATORY
Maximum Density 126.7 lbs./ft
Optimum Moisture 5.8%
Test Method: ASTMD-1557 D
_ !..... Delivered by�Clay,�or'uI�_:__�_._._. :.:._:_: _
A. Report mus re'pr aced except ih full
1caithhe.a royal of:it :Labo_ratory.
N B. ;Test report re-lat: s_onl to .the soil tested.
77
RE IEWED:
i
D1. isi6n' Ma.I a L _' ._�_ :: I
_. __ _LL
I Bu l xn^�der. a boast &_. �n riig ---- -- I
—
HJB:sb:
_... - ._.. - -
.- --
...
U '
a
2 126 -
W
C�
125 - -
124 _
123
122
121
3 4 5 6 7 8 9 10
MOISTURE CONTENT (%) HSL# 33,671-11 Lab #3456
s
Soils Testing Program
Spinners Estates Subdivision
Lawrence Rd. , South Windsor, CT
ARL Project #86-1333
March 20, 1989
INTRODUCTION
A soil testing program has been performed as per the request of the
Town of South Windsor in 10 locations on the Spinners Estates Subdivision
Road. At each location, a sieve analysis, in-situ density, and proctor test
was conducted on the native subgrade material. The results of these tests
have been included for reference in Appendix A. The station numbers on
all the testing were increased by a factor of 100, so station 300+55 on
the test results is actually station 3+55 on the plans.
TESTING RESULTS
Table 1 summarizes the testing results for each station. The maximum
dry density (ASTM D-1557) ranges from a low of 123.8 lbs/cf at station
14+00 to a high of 129.6 lbs/cf at station 10+00. The optimum moisture
ranges from 5.4% at station 10+00 to 7.1% at station 3+55. The existing
compaction (in-situ density) of the soil ranges from 89.2% to 97.0%.
The filter requirements for the soil were checked to insure that the
12" min. processed gravel subbase will act as a natural filter, and there
won't be any contamination of the road subbase. Using the Ct. DOT
gradation B for the subbase, each soil sieve sample was compared utilizing
the filter design criteria and found to be acceptable where D15 (filter) <
5D85 (soil) and D15 (filter) > 5 D15 (soil). (Soil) refers to the native
soil, and (filter) refers to the gradation B gravel. D15 is the grain
size where 15% is finer, and D85 is the grain size where 85% is finer.
The plot of the grain size distribution for the Ct. DOT gradation B along
with the range of sieve analysis are included as figure 1.
In reviewing the suitability of the native soil for use as the
impervious core for the detention basin, the high percentage passing the
200 sieve was noted. With 30-35% passing the number 200 sieve, the
material will be suitable impervious with adequate compaction.
y n
South
W //yyam�
ETLAND ((
114LP T►ON COM
CONSERVA
CONCLUSION
From the testing performed, we conclude the following:
1. The native material is suitable for the subgrade provided the
moisture is carefully controlled & adequate drainage & frost2 'lz�
protection is provided, and it is proof rolled to 95% density �x.)�����
prior to placement of the subgrade.
2. The gravel subbase to conform to Ct. DOT gradation B will L C E,, vc�y4
function as a filter with the native subgrade. titcz�
3. The native material can be used for trench backfill as long as the `
moisture content is carefully controlled, and the soil is
compacted to 95% dry density.
4. The native material with 95% compaction will function as a
sufficient impervious core for the detention basin.
7 rt ,
Table I
Moisture Range Filter Req.
Sta Maximum Dry Density Optimum Moisture for 95% Density (per sieve analysis)
(lbs cf) Content
2+00 126.7 5.8% 3% - 10%(+) ok
3+55 127.4 7.1% 3.5% - 11% ok
5+00 125.6 6.8% 4.0% - 11.5% ok
7+65 128.0 6.5% 2.5% - 10% ok
9+00 126.8 7.0% 4.0% - 10.5% ok
10+00 129.6 5.4% 3.5% - 10%(+) ok
12+00 126.6 6.7% 4.0% - ll%(+) ok
14+00 123.8 6.3% 1.0% - ll%(+) ok
16+00 125.8 7.0% 4.5% - 11% ok
18+00 125.8 6.3% 3.0% - ll%(+) ok
GRAIN SM OISTRHPJTION Data Sheet 6
Project -gJvmr-as fi,�T RTit;s Job. No.
Location of Project Boring No. Sample No.
Description of Soil Depth of Sample
Tested By. Date of Testing
Gravel Sand
Coarse to Fine Silt Clay
medium
U.S. standard sieve sizes
100
I
I
Pis
eo
A t
H I I ITA
, I I
1
ao I I I
.o
I � I
I I I
20
a °'s
I
0 g 8
C o
Grain diameter, mm
Visual soil description
f
Y Soil classification:
System
Flvut3E 1
g R L o s a a a s "CONSULTING ENVIRONMENTAL ENGINEERS"
25 Terrace Drive
ASSOCIATES, I N C Vernon, Connecticut 06066
Telephone 1203)872-2703
A. Richard Lombardi,P.E.,President
James C.Sommers,L.S.,Vice President T—May 18, 198
Mr. Jerry Iazzetta t MAY 2
Town Engineer 31989
Town of South Windsor ay
Town Hall
1540 Sullivan Avenue j
South Windsor, CT 06074IMPFF--M- ,mow,
Dear Mr. Iazzetta:
In response to our meeting on April 20, 1989 we have prepared an
outline for soils testing for the Spinners Estates Subdivision.
The testing program as outlined is the minimum number and spacing of
tests that we recommend. The tests will be conducted by an independent
laboratory (Henry Souther Laboratories), and we will supply you with a
copy of the results.
Our office will make periodic site visits to help keep abreast of the
work at the site. Should site conditions cause the towns inspector to
question whether the construction is being done to the prescribed
standards, than we recommend that the town inspector contact the person
responsible for overseeing construction (i.e. Mr. Szeluga) , and reach
agreement on additional testing to allay the town inspector's concerns.
If it is felt necessary, then it is up to Mr. Szeluga to contact us (the
Design Engineer) for input.
In response to the SCS comments from a conversation dated 3/27, we
propose the following:
1. Should any dewatering be necessary, the pump discharges shall be
directed into the detention basin via the 30" storm sewer piping.
"`f 2. The topsoil has been removed within the roadway. During final
compaction of the subgrade, any yielding materials will be
removed. Testing at that stage will insure that the subgrade is
/a> proof-rolled to 95% dry density. Any muck will be discovered
at this stage, removed and replaced with suitable material.
WASTEWATER •WATER SUPPLY • HAZARDOUS WASTES • WATER RESOURCES• GEOHYDROLOGY
SITE PLANNING •DRAINAGE •ENVIRONMENTAL IMPACT ASSESSMENT• SURVEYING
Y
Mr. Jerry Iazzetta
May 18, 1989
Page 2
2a. We have reviewed the possible need for stabilization fabric and
feel it would not be of substantial benefit in this case. The
road foundation will act as a natural filter. Another
justification of filter fabric is for structural support. For
the filter fabric to reinforce, it must undergo a minimum 10-30%
deformation of its maximum elongation. The pavement will not
tolerate the deformations required for the filter fabric to gain
reinforcing strength.
3. For the construction testing, we propose the following:
A. For the testing of the backfill in trenches we propose that
all work be performed during dry weather, and that in place
density testing be performed at various lifts in trenches at
intervals of approximately 100 ft.
B. For the testing of the existing subgrade after proof-
rolling, we recommend that a total of 6-7 in place density
tests be taken spaced about 300 ft. apart.
C. For the testing of the 12" gravel subbase, we recommend 6-7
in place density tests spaced about 300 ft. apart.
D. For the installation of the 6" crushed stone base, we
recommend that all work shall conform to the State of
Connecticut standard specifications for roads, bridges, and
incidental construction Form 814, with a minimum of six
passes made by the compacting equipment.
4. For the detention basin berm, we recommend that in place density
testing be accomplished daily by a laboratory technician during
the construction of the berm.
5. We will provide standard proctor tests for the dam. The
moisture content for the soil will be maintained between -1% and
+3% of optimum for construction.
1
Mr. Jerry Iazzetta
May 18, 1989
Page- 3
6. An SCS engineer can review the foundation and subgrade. It will
be up to the town's inspector to notify the SCS in a timely
fashion for their review. We trust that any comment from the
SCS will be received promptly and not unreasonably hinder progress
on the road work.
Minor construction work has resumed during the drier times on the
subdivision. This work is centered in the detention basin, and storm
piping within the easement to the detention basin. The excavation in the
vicinity of the sanitary manhole at station 11+10 will also be filled and
stabilized.
If you have any additional questions or concerns, please feel free to
call.
Sincerely,
A.R. LOMBARDI ASSOCIATES, INC.
�� 2�
Galen B. Semprebon
GBS/kc
<0w N a
c �
a
1540 SULLIVAN AVENUE SOUTH WINDSOR. CONN. 06074
R-co� AREA CODE 203/644-2511
July 5, 1989
MEMORANDUM ---
TO: Jerry Iazzetta, Town Engineer
FROM: John E. McCahill, Zoning/Wetlands Enforcement Officer ��I►�
RE: Spinner's Estates
The Planning Department recently received a call from the resident of
88 Debbie Drive (Rachel Lorenson, 644-9061) . She expressed concern
with the sewer access on Debbie Drive and stated that her house
shakes when trucks go by. This would appear to be as a result of the
temporary pavement over the area where sewer work was accomplished.
In addition, she has concern with the sections of sidewalk that are
broken or lifted. Apparently one person has fallen off a bicycle as
a result of the sidewalk problems that exist.
The property owner who lives adjacent to the sewer access also came
in recently to question the status of the work. He feels that, since
work has been idle for some time, the area should be restored.
These would appear to be areas more directly related to activity
supervised by the Engineering Department. As both the Planning
Department and Engineering have not been contacted regarding a
schedule of activities for the site, perhaps the problems should be
investigated to ascertain the extent of the problems and whether or
not they warrant attention by the developer. f.
i'
r
a
UZI
Ire
17
ot
if
711
� � r
GY9- 9aG �
a �
.i SOWN
y 7111W.1'11'n 0-Ye V&?�
1540 SULLIVAN AVENUE - SOUTH WINDSOR, CONN. 06074
TO AREA CODE 203/644-2511
!'1'OgpRN
July 11 , 1989
Mr. Ludwick Szeluga
96 Lawrence Road
South Windsor, CT 06074
RE: Spinners Estates
Dear Mr. Szeluga:
Several months have passed since any work has been done on the
sewer access on Debbie Drive. We have had several complaints
concerning the lack of repair work done to the broken sidewalk,
etc. (See attached memo from Mr. McCahill)
The sidewalk, street, and lot grading must be repaired or
restored immediately to prevent this safety hazard from hurting
someone. If this repair work is not completed by July 25, 1989,
we will be forced to take stronger measures to have this work
completed.
Very truly yours,
I
er C. Ia z a
o ngine
1
JCl/jsv
cc: Michael J. Gantick, Director of Public Works
Lester A. Braddock, Sr. Engr. Inspector
John McCahill, Zoning Enforcement Officer
Marcia A. Banach, Director of Planning
s
August 7, 1989
TO: Neighbors of Spinners Estates
SUBJECT: Inland Wetlands
This is to inform you that a renewal
application is being filed for a permit from the
Inland Wetlands Agency/Conservation Commission
by Mr. L. Szeluga, the developer of Spinners Estates.
Any questions should be directed to the
Town Planning Dept.
s
David W. Sadownick etal, 9 Cliffwood Drive
Wilber L. Anderson etal, 23 Cliffwood Dr.
Eliazabeth S. Reynolds, 33 Cliffwood Drive
Roger C. Hildebrand etal, 43 Cliffwood Drive
Alan R. Gudrian etal, 59 Cliffwood Drive
Carold M. Brown Cochren, 74 Lawrence Road
Alan & Patricia Witkin, 64 Lawrence Road
Nelson Jacques etal, 55 Debby Drive
Jeffery L. Briggs, 61. Debby Drive
Michele L. D`Angelos, 73 Debby Drive
Nancy Sangiovanni, 77 Debby Drive
Daniel J. Thibodeau, 85 Debby Drive
Kin Chee & Yin Pang Shum, 19 Natsisky Farm Road
Wayne O & Susan M. Earle, 25 Natsisky Farm Road
Sharon B. & Robert A. Kehmna, 39 Natsisky Farm Road
Kein M. & Kathleen A. Comeau, 47 Natsisky Farm Road
John G. & Theresa F. Athas, 55 Natsisky Farm Road
Elizabeth C. & Ronald A. Merker, 63 Natsisky Farm Road
Burt R. & Linda J. Sindler, 75 Natsisky Farm Road
Irene E. Guay, Lawrence Road (150 - 2) 137 Rosemary Lane, So. Windsor
Dart Hill Realty, 626 Ellington Road
t L o B a a a = "CONSULTING ENVIRONMENTAL ENGINEERS'
IR 25 Terrace Drive
ASSOCIATES, I N Ci. Vernon, Connecticut 06066
Telephone(203)872-2703
A.Richard Lombardi,P.E., President
James C.Sommers,L.S.,Vice President
August 10, 1989
RECEIVED
Ms. Marcia Banach AUG 14 1989
Planning & Zoning Commission
Town of South Windsor SO. WINDSOR PLANNING DEPT.
1540 Sullivan Ave.
S. Windsor, CT 06074
Re: Eton
ARL Project #86-1333
Dear Ms. Banach:
A site inspection was made at the Spinners Estates Subdivision on
August 3, 1989 for the express purpose of reviewing the adequacy of the
erosion control measures as installed.
1. The construction entrance off of Lawrence Road has been
installed and appears to be functioning.
2. The diversion dikes on the subdivision road at stations 3+60 and
6+85 have been installed. The diversion dike at station 6+85
was graded down somewhat to allow vehicles to traverse it. It
still functions to divert run-off off of the subdivision roadway
and therefore was found to be adequate.
3. Stockpiled material has been located in the area of lots #16 and
#17. Staked haybales are preventing silt from the stockpiles
from entering the wetlands.
4. The erosion control fence has been installed along the edge of
the roadway through the wetlands from station 7+40 to station
10+20.
In the vicinity of station 11+00, the erosion control fencing
has been removed due to construction activities. This does not
appear to prevent a problem inasmuch as the roadway is lower than
the surrounding areas. Also, any run-off from this area tends
to run to the detention basin which is presently acting as a
sediment basin.
5. The erosion control fence has been installed around the
detention basin area to protect the adjacent stream. The basin
is presently under construction, and additional erosion fencing
not shown on the plans has been installed near the basin outlet
to add an extra measure of protection.
WASTEWATER•WATER SUPPLY •HAZARDOUS WASTES • WATER RESOURCES• GEOHYDROLOGY
SITE PLANNING •DRAINAGE •ENVIRONMENTAL IMPACT ASSESSMENT• SURVEYING
♦ c F
M '
t
Ms. Marcia Banach
August 10, 1989
Page 2
6. The endwalls on the culvert crossing under the gravel access
drive were under construction during the site visit. The
erosion control fence on the downstream side was in place and
functioning. The erosion control fence on the upstream side was
removed for construction. This does not present any potential
environmental problems. Once the installation is complete and
the surrounding areas stabilized, any silt that has washed into
the cross culverts will need to be removed and disposed of.
7. The erosion control fencing has been installed along the
wetlands on lot #11, and appears to be functioning adequately.
8. The erosion control fencing along the box culvert has not been
installed due to the lack of construction in this area. Prior to
the start of construction on the box culvert and the re-grading
within the stream area, all erosion control fencing shown will
need to be installed.
9. The developer has installed some additional erosion control
fencing within the Right-of-Way on both sides of the stream to
add an additional degree of protection for the stream.
The review of the site for erosion control has revealed no apparent
erosion problems. Minor variations from the approved plan were noted, but
those appeared not to create any potential environmental problems. It
appears that the intent of the erosion control plan has been met, and that
additional measures have been added as necessary to protect the
environment.
If you have any questions or comments, please feel free to call.
Sincerely,
A.R. LOMBARDI ASSOCIATES INC.
4ec Z
A. Richard I;ombardi, P.E.
President
ARL:GBS/kc
cc: Mr. Ludwick Szeluga
SOWN 8f4
tCID
w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
S R.CO ' AREA CODE 203/644-2511
September 22, 1989
Ludwick Szeluga
96 Lawrence Road
South Windsor, CT 06074
Dear Mr. Szeluga:
Re: Application #87-472 - Spinners Estates
At the September 18, 1989 meeting, the South Windsor Inland Wetlands
Agency/Conservation Commission approved a one year extension of
Application #87-472 with all original conditions .
In addition to the original conditions you are also required to
contact John McCahill, Zoning/Wetlands Enforcement Officer (644-2511,
x229) immediately upon approval notification. This is to re-confirm
the contact person for the site and establish a site visit with that
person to verify all erosion and sedimentation control measures are
in place according to the plan.
Application #87-472 becomes effective September 22, 1989 and expires
on September 22, 1990 .
Very truly yours,
r
ames Lombardi, Acting C airman
Inland Wetlands Agency/
Conservation Commission
JL/pmm
cc:John E. McCahill, Zoning/Wetlands Enforcement Officer
Marcia A. Banach, Director of Planning
John R. Collins, Chief Building Official
Raymond Hallowell, Chairman, PZC
Jerry Iazzetta, Town Engineer
Enclosure
4QMM ,<
LETTER OR TRANSMITTAL � °f �
y
G
PLANNING DEPARTMENT s
TOWN OF SOUTH WINDSOR
1540 SULLIVAN AVE. SOR'`°���
SOUTH WINDSOR, CT 06074
(203) 644-2511 Date
TO: «k CA-5 r o
Driu2-
�tr��. lAlMe�dw CT'
WE ARE SENDING YOU:
0 P&Z initial plans Q Drainage comps
P&Z final plans Bond estimate requests
Inland Wetlands plans Q Bond reduction requests
O Final plans for filing 0 Change order form
i Other Co op Access r; Ix+s = Correspondence
Copies App. No. Project
IES s
Law reA c e- RoaA
v i
-` THESE ARE TRANSMITTED as checked below:
O For review and comment O For your file
0 For your use 0 Returned with revisions
0 As requested
W Other For v ovr ► -�irrnna• �+�.
PLEASE RETURN/COMMENT BY:
COMMENTS:
``► (ccss c\�vc -�-o Sann«s Es-I•itc
(1a�- CoMpl��e Z Spolk w �M�. SLeI„�a a�� ce��e��-ee� l,c 1i+►ti� Vo-
!�ti S►4e wvcke s Ts A1ro reg:'• -h,- s--d'ewa)k a"] c)14., 01 he cam:
Copy to: From: �"?��
1
d
ti 2
i C
Q C
ol
alai,
z
W \ /
�: - i ♦
c � y 1 5� �♦ �l �> �� ..r� 1 -1 f �r 4 �/
vle
40
\♦ ., PLC :. \ ,,,��jtt i S .•� 4 .'.� ty I{� .•./ l"
� �10w" Tau� O-P Saa� Vzh�
G �
m 1540 SULLIVAN AVENUE - SOUTH WINDSOR. CONN. 06074
k��csoR•co AREA CODE 203/644-2511 NOV• 9 Igg�j
Project Name/Location S:d7Ahe.r3 C3k-A,f— q6 Lawrtnce. Appl.1__S-,- y?Z
40 6`l 'f Is S-/ X v3p/
Contact Person/Owner Ladwr,- Sm tI-gcs-,__ Phone # 10 6Y* 4$40
Address QL Lawrence �Zosri . SoA W7,4So4- T- 06014-
You are hereby notified that problems may exist on the above site concerning erosion and
sedimentation'control"measures. Although this is a notification based on a routine site
visit, you are ultimately responsible for inspecting and maintaining the site.
You were contacted on /yavta � 9f /999 /2.o v and notified of site problem s) . This
is a confirmation of that call.
X You should correct the problem(s) immediately (within 48 hours) and notify me that the
situation has been corrected.
_ Erosion and control measures are not properly installed and/or maintained according to
approved plans. Refer to approved plans and correct site as needed.
Erosion and control measures are needed beyond those shown on the plans, contact me
regarding the additional measures.
Silt fence(s) and/or haybale(s) are not in place or not properly maintained.
Stockpiles are not protected and/or seeded.
Construction entrance not in according to plan or not functioning adequately.
Need to establish vegetation per plan, either temporary or permanent.
Site lacks protection against possible wind erosion.
Limits of construction have not been established on site, or have been exceeded.
There is an excessive area of disturbance which should be stabilized, limits to area of
disturbance may need re-establishment.
Detention basin or siltation basins have not been maintained and/or vegetation or
stabilization is insufficient. 11
n1vddl wcJcr uic,S�,;N C1o;ens'}rean� Ctnc� o�-F S% 1 kt� c.cc S2U
Other concerns C reto s wV4,Ci% ,n-tp —medre,-k A44e- 4 vi • Set- OL4e,c( M"s
This will be filed with your approval/permit for the site. It is your responsibility to
maintain the site and repeated violations/problems will be forwarded to appropriate
Commissions.
If you have any question regarding this, contact me at 644-2511.
Very truly yours,
� 07 c
cJrohn E. McCahill
Zoning/Wetlands Enforcement Officer
JEM/pmm
rsrv.✓, sEwE.0 'coo/✓ F�e -� ,',. � / / , � "-,
sa/r z90. 49 I
- -� . � ! �:o: - ATE-NTio/✓ \ i• I
�. t.•gNiEL /, 7?�//t9�GL.nE.4C/ f :.` :Qr ���ZJra¢.GJ r 3 �� - _ ` k7 '� ,�
hop
per/ �" y„Cv�✓CL-��it�_ 7^tj a _/�/
r�G.3- -gyp i//v/ ' :'O � OTC p/SCE EL `2gte` i
ve
y- / F , E�rrEi✓ 6 �r�
i' ��C T�Ti'���� C i N✓Al
DESIGNED REV DATE DESCRIPTION
—�-•�.•✓ \ �\ � '.�S' �.� E.c�sEi+-�E"iv7- BY � /.� �a..�.. cr/.,..,...c.,-rs i� /t•B7 �+ �
mot \ i .�.Qro,c o� r�v� ro...-• - DATE s"�� 5� •,- V ON .
76c ra..i..- C� .,../. -r-r ?•iG.E'F' - A
DRAWN E r S f p� I '
BY i'rrs = �` �9.�,� ,one •E/.: c o i�v
Ff
NNc�G �Li--�-30
T,c-3o-�.7'9
': l •iC� •o• :� �`FN• /gyp /J
Jr.,
16
It
_ - 1 V: -- - ,�f-o 1 gel•
W
• 1 � 1, +VIi Q /�
1 F
to err %
1 ,I
Ap
XII 1 1t /
196
EAR EME/V T /N
NOTE FOR LOT 12: � +�. E.✓os✓, s«
INFORMATION ON SUBSURFACE CONDITIONS
MUST-BE SUBMITTED TO TOWN BUILDING -
OFFICIAL PRIOR TO ISSUANCE OF BUILDING
PERMIT.
LUDWICK SZELUGA
96 Lawrence Rd AUG 19g
So. Windsor, Ct.
South Windsor
PkDrAinj A ;4onirig OmmissigA
August 1, 1990
James Lombardi, Qhairman, I_ WA/CC. .
Town of South Windsor
1540 Sullivan Avenue
South Windsor, Co 06074
RE:- Applicat' n #87-472 - pinners Estate
Dear Sir:
I am requesting an extension of my Inland Wetland Permit #87-472
for Spinners Estate.
Very Truly yours, .
Ludwick Szeluga
LS;m
Encl. Ck #226 $25.00
Under separate cover Engineer's report is forthcoming.
1W.1K f
A I L o u 8 a AD I "ENVIRONMENTAL ENGINEERING CONSULTANTS"
ASSOCIATES, I N C 25 Terrace Drive
Vernon;Connecticut 06066
Telephone(203)872-2703
Fax(203)872-7163
A.Richard Lombardi,P.E.,President
James C.Sommers,L.B.,Associate
Thomas B.Nicholson,P.E.,Associate
James G.Thompson,Associate
August 14, 1990 RECEIVED
AUG 17 W
Ms. Marcia Banach WINDSOR PLANNING p
Planning & Zoning Commission
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT 06074
Re: Spinners Estates Subdivision
ARL Project No. 86-1333
Dear Ms. Banach:
A site inspection was made at the Spinners Estates Subdivision on
August 7, 1990, for the express purpose of reviewing the adequacy of the
erosion control measures as installed. The construction of the
subdivision roadway, drainage and sanitary sewer are basically complete.
The detention basins have been completed and stabilized. Along both sides
of the road there is a 20-25 foot wide disturbed area that has not been
fully stabilized yet. As soon as the weather moderates from the extreme
summer temperatures, these areas are to be loamed and seeded. Haybales
are in position along the roadway to protect the wetlands from silt laden
runoff. In addition, haybales are in position at the headwall of the box
culvert to prevent silt from entering.
The review of the site for erosion control has revealed no apparent
erosion problems. We expect the final stabilization of the site to be
completed early this fall.
If you have any questions or comments, please feel free to call.
Very truly yours,
A.R. LOMBARDI ASSOCIATES, INC.
C:
A. Richard Lombardi, P.E.
President
ARL/GBS:mkm
cc: Mr. Ludwick Szeluga
WASTEWATER*WATER SUPPLYOHAZARDOUS WASTESeWATER RESOURCESOSOLID WASTE MANAGEMENT
SITE PLANNING ODRAINAGEeENVIRONMENTAL IMPACT ASSESSMENTOSURVEYING
(0M" dt4
tR
sapso� wj'�
1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
~osot•co�' AREA CODE 203/644-2511
September 18, 1990
Ludwig & Marion Szeluga
96 Lawrence Road
South Windsor, CT 06074
Dear Mr. & Mrs. Szeluga:
Re: Application 87-472 - Spinners Estates
At the September 17, 1990 meeting, the South Windsor Inland
Wetlands Agency/Conservation Commission approved a one year
extension of Application #87-472 with all original conditions.
Application #87-472 becomes effective September 21, 1990 and
expires on September 21, 1990.
V truly yours,
mes A. Lombardi, Chairman-
Inland Wetlands Agency/
Conservation Commission
JAL/pmm
cc: Marcia A. Banach, Director of Planning
John R. Collins, Chief Building Official
Planning & Zoning Commission
Jerry Iazzetta, Town Engineer
Enclosure
JUL 1 1991
June 28, . 1991
South Kndsor
INLAND WETLANDS AGENCY/
Mr. Ludwick Szeluga CONSERVATION COMMISSION
96 Lawrence Rd.
So. Windsor, Connecticut 06074
Attention : Ms. Marcia Banach
Planning & Zoning Commission
Town of South Windsor
1540 Sullivan Avenue
South Windsor, Ct. 06074
Re : Spinners Estates Subdivision: P & Z #88-30P
Inland Wetlands Application #87-472
Dear Ms. Banach :
I am requesting that my Inland Wetlands Permit #87-472 be extended
for Spinners Estates Subdivision P & Z #88-30P, for which a check
in the amount of $25.00 is enclosed.
The Extension is necessary because all the lots in the subdivision
have not had homes constructed on them.
No changes are anticipated. The original conditions should apply.
Sincerely yours,
Ludwick Szeluga
LS :m _.
Encl.
Lombardi
Associates, Inc. p psayt
A.Richard Lombardi,P.E.,President
James C.Sommers,L.S.,Associate
James G.Thompson,P.E.,Associate JUL 9 1991
July 8, 1991
South Windsor
INLAND WETLANDS AGENCY/
Ms. Marcia Banach CONSERVATION COMMISSION
Planning and Zoning Commission
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT 06074
Re: Spinners Estates Subdivision
ARL Project No. 86-1333
Dear Ms. Banach:
A site inspection was made at the Spinners Estates Subdivision on
June 25, 1991 for the express purpose of reviewing the adequacy of the
erosion control measures. The construction of the subdivision roadway,
drainage and sanitary sewer are complete except for the installation of
the final course of pavement. This work will not require any additional
erosion control measures. In addition, the disturbed areas adjacent to
the roadways and in and around the detention basins have also been planted
and are basically stabilized. Therefore, there are few, if any, erosion
control measures required presently. As additional lots are developed,
suitable erosion control measures should be installed to help prevent silt
from being washed into the wetlands or the storm drainage system.
The review of the site for erosion control has revealed no apparent
erosion problems.
If you have any questions or comments, please feel free to call.
Very truly yours,
A.R. LOMBARDI ASSOCIATES, INC.
i
A. Richard ombardi, P.E.
President
ARL/GBS:mkm
cc: Mr. Ludwick Szeluga
25 Terrace Drive • Vernon, Connecticut 06066 • (203)872-2703 • Fax (203)872-7163
Wastewater • Water Supply • Hazardous Wastes • Environmental Assessment • Civil Engineering • Surveying
Printed on recycled paper
1 �to'MN st�`�
70� O-P siou� V&U140t
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
��tipsoq co��,w AREA CODE 203/644-2511
July 16, 1991
Ludwick Szeluga
96 Lawrence Road
South Windsor, Ct 06074
Dear Mr. Szeluga:
Re-- Application #87-412 - Spinners Estates
At the July 15, 1991 meeting, the South Windsor Inland Wetlands
Agency/Conservation Commission approved a three year extension of
Application #87-472 with all original and standard conditions.
Application #87-472 becomes effective September 21, 1991 and
expires on September 21, 1994.
,-?.z7uly yours,
. M. Mann, Recording Secretary
Inland Wetlands Agency/
Conservation Commission
cc Marcia A. Banach, Director of Planning
Planning & Zoning Commission
Jerry Iazzetta, Town Engineer
Enclosure
�towM af,`�
U 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074
soe•co� AREA CODE 203/644-2511
April 15, 1992
Planning & Zoning Commission
1540 Sullivan Avenue
South Windsor, CT 06074
Dear Madam/Sir:
Re: Bonds
At the April 13, 1992 meeting of the Inland Wetlands Agency/
Conservation Commission, it was voted to reduce the following bonds:
Application #86-533, Ridgefield IV, reduce amount of bond from
$15,000. 00 to $5000 .00
s � + ram bond
rom�S25,,�007�0010 $5000 . 00
It was also voted to release the following bonds:
Application #89-07P, J.F.I. Lots 9 and 10, release the bond in
the amount of $5000.00
Application #87-416, Victorian Woods, release the bond in the
amount of $2500.00
Very truly yours,
Elizabeth A. Warren, Chairperson
IWA/CC
EAW/pmm
cc: Director of Planning
Town Engineer
G
u
7ialvn, alesotdA vi�.
m . 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
AREA CODE 203/644-2511 /d�21�g3
sOR.Co
Project Name/Location 5ezw /E2'S EsT,*TEc Appl. $7-'/?2
C 91-/03,0)
Contact Person/Owner. LUOWIGK 57-CLVCrA Phone # 6y5+ /6yG
Address 9(, t Ftw( ew c6 ye-a"
You are hereby notified that problems may exist on the above site concerning erosion and
sedimentation control measures. Although this is a notification based on a routine site
visit, you are ultimately responsible for inspecting and maintaining the site.
You were contacted on and notified of site problem(s) . This
is a confirmation of that call.
You should correct the problem(s) immediately (within 48 hours) and notify me that the
situation has been corrected.
Erosion and control measures are not properly installed and/or maintained according to
approved plans. Refer to approved plans and correct site as needed.
Erosion and control measures are needed beyond those shown on the plans, contact me
regarding the additional measures.
Silt fence(s) and/or haybale(s) are not in vlace or not properly maintained.
`--* ToR V-= L T►+*T 14AS jCL�VTLY
Stockpiles are not protected and/or seeded. dtEN ft tt,t OV LoT 4%3 .
Construction entrance not in according to plan or not functioning adequately.
Need to establish vegetation per plan, either temporary or permanent.
Site lacks protection against possible wind erosion.
X Limits of construction have not been established on site, or have been exceeded.
L**r *} 13)
There is an excessive area of disturbance which should be stabilized, limits to area of
disturbance may need re-establishment.
Detention basin or siltation basins have not been maintained and/or vegetation or
stabilization is insufficient.
X Other concerns-+L0AO.S OF �°!'R. �5ZLL "PE S �J � RcGVL41-0 ►�?t
F•ZLL SWIVLO 166' ftt0VE0 . C LoT -A 1-6
This will be filed with your approval/permit for the site. It is your responsibility to
maintain the site and repeated violations/problems will be forwarded to appropriate
Commissions.
If you have any question regarding this, contact me at 644-2511.
� CAP`f 'ia � Tom �c3�tr"'�7t ery tru Royr�
-� $} •y�Z o n E. McCahill