HomeMy WebLinkAboutSubdiv - Conservation (9) V
TOWN OF SOUTH WINDSOR
INLAND WETLANDS AND WATER COURSES
APPLICATION
INLAND WETLANDS AGENCY ACTION THIS APPLICATION, ONCE INFORMATION IS COMPLETE,_
(SEE BACK OF THIS FORM), SHALL BE RECEIVED AT A
APPLICATION NO. 66 REGULARLY SCHEDULED MEETING OF THE AGENCY AT THE
TOWN HALL.
RECEIVED DATE W- 14-$7 THIS APPLICATION MUST BE FILED IN TRIPLICATE AT
THE OFFICE OF THE TOWN CLERK OF SOUTH WINDSOR BY
PUBLIC HEARING DATE 12 NOON AT LEAST 14 DAYS PRIOR TO THE FIRST
(if necessary) REGULAR MONTHLY MEETING DATE. THREE SETS OF MAPS
COMPLETED APPLICATION
OR PLANS MUST BE SUBMITTED TO THE TOWN ENGINEER
PERMIT GRANTED DATE AT LEAST 14 DAYS PRIOR TO THE FIRST REGULAR
PERMIT DENIED DATE MONTHLY MEETING DATE.
PLEASE PRINT OR TYPE.
Andre L. Charbonneau
1. APPLICANT Andre K. Charbonneau TEL. NO. 528-8826
ADDRESS 125 Edwin Road CITY & STATE South Windsor, CT 06074
2. OWNER Andre Charbonneau TEL. NO. 528-8826
ADDRESS 125 Edwin Road CITY & STATE South Windsor, CT 06074
3. LOCATION OF PROPERTY Route 5 (John Fitch Blvd.)
NAMES OF ADJACENT PROPERTY OWNERS Northerly - land n/f Szabo
Southerly - land n/f International Transport Inc.
Easterly - Route 5 John Fitch Blvd.
SPE COPY OF MAP ATTACHED
STATE CLEARLY AND BRIEFLY
S. PURPOSES AND DESCRIPTION OF THE PROPOSED ACTIVITY,AND THE TIME ELEMENT INVOLVED:
Development - 11 Lot industrial park subdivision
--
ATTENTIOM THE APPLICANT UNDERSTANDS THAT THIS APPLICATION IS TO BE CONSIDERED
w 4 COMPLETE ONLY WHEN ALL INFORMATION & DOCUMENTS REQUIRED BY THE
Q AGENCY.HAVE BEEN SUBMITTED.
z APPROVAL MAY ALSO BE NECESSARY FROM THE PLANNING AND ZONING COM-
MISSION.
o: � a AN APPLICATION FEE IS REQUIRED. CONSULT THEEGULATIONS
Cn z w (SECTIONS 6.9, 6.9a and 6.9b). •
� z
® ? o A SIGN IS REQUIRED. CONSULT THE REGULATJONS ( 6.3a).
PLEASE DIRECT ALL CORRESPONDENCE AND SIGNED: ,
INQUIRES TO: By (Appiicant)William t�orne
William E. Grace, Esa. Ly C r
rbonneau
479 Suckland Road
(� illiam E. ra Attorney for
South W' d or p�p74 ,
�iv�ead !�/ 2/t35 t� Andre K. Charbonneau
(Owner) William E. Grace, Attorney for
OVER Andre Charbonneau
J
CHECKLIST FOR REQUIRED INFORMATION
E '
6. APPLICANT HAS HAD MAP6 AND PLANS CERTIFIED BY SOIL
CONSERVATION SERVICE TO VERIFY COMPLETE COMPLIANCE
WITH CONNECTICUT GUIDELINES FOR SOIL EROSION AND
SEDIMENT CONTROL ( AS PER HANDSOUK, AS AMENDEDED,
AND PUBLIC ACT 83-388, AS AMENDED.
DATE OF CERTIFICATION
7. APPLICATION INFORMATIOU COMPLIES WITH AGENCY'S
REGULATIONS ( SECTIONS 7.1, a through j.
8. REQUIRED FEE HAS BEEN PAID.
DATE RECEIVED y ' l* %I
9. APPLICANT ( OR DESIGNATED REPRESENTATIVE)HEREBY
ATTESTS THAT A SIGN LL BE POSTED AT THE FOLLOWING
LOCATI (S)
BY W,'I1;am E. (&Mae- ( NAME )
ON OR BEFORE ThE FOLLOWING DATE 19$7'
SIGNATURE ►`�
THIS APPLICATION IS FOUND TO BE COMPLETE AND NOW
QUALIFIES FOR PLACEMENT ON THE AGENCY'S AGENDA:
DATE SIGNATURE
Town Engineer
Agency Sec'y
Agency Chairman
THIS APPLICATION IS INCOMPLETE BECAUSE OF THE FOLLOWING
UUMBERED ITEMS ( FROM ABOVE ) AS CHECKED BELOW;
1 2 3 4 5
6 7 8 9
5
r
s,,
5
O 6
TOTAL (AREA = 0.77 Ac.
L
ILI
7 19
rr
- .M.
,.
R DRIVE ._..,.—�
a
10
10 s 20
12 0 9 21
II 15A
15
��OWN Sfq` -6
ti Towno-P S-Ot'dA ?&
[ 5
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
�fydsOx•cO AREA CODE 203/644-2511
April 27 , 1987 '
Mr . Kevin F. Rennie , Chairman
South Windsor Inland Wetlands Agency/Conservation Commission
1540 Sullivan Avenue
South Windsor , CT 06074
RE: Andre Charbonneau Application Review
Dear Kevin :
The wetlands delineations have come from the Hartford County Soils Survey .
I have been on the site a number of times over the past , and have no
problem as to what has been shown . It is in the Bancroft Brookwater Shed .
This proposal is essentially in two phases . The roads and utilities , and
then the individual site plans . Having seen the site , topsoil for
restoration could become their greatest hardship . The stockpile location
isn ' t shown.
From a public works maintenance viewpoint , access , like in a driveway ,
should -be shown for the culvert at 5+60±- with some thought as to how Lots
2 & 12 will be developed . Water has already been installed through the
site and with about 2 ,000 L .F. of roadway and sanitary sewers their
proposal , it would seem that it could be approved if the Commission
concurred with the following conditions .
1 . Completion and stabilization of the roadway slopes with a
4" minimum of top soil as per the "guidelines" .
2 . Suitable access for town vehicles to the culvert at Lots 2 & 12 .
3 . Modify the plans to show stockpile locations .
4. Modify the plans to include appropriate seed for that site .
Submit the soil sample results .
5 . Indicate on the plans , proposed clearing or working limits
and appropriate protection measures proposed .
6. If approval were to be considered , a bond of $10 ,000 to assure
compliance with their plans might be appropriate .
Very truly yours ,
// �
A . Bowen Davies
Deputy Town Engineer
ABD/jsv
CC : Andre Charbonneau
Michael J . Gantick , Director of Public Works
Richard P . Martel , Town Engineer
Marcia A. Banach , Director of Planning
IWA/CC
J UN
19�7
June 4, 1987 SOU#h Windsor
INLAND WETLANDS AGENCY/
CONSERVATION COMMISSION
Mr. John M. Moran - Member
Inland Wetlands Commission
c/o Town of South Windsor - Town Hall
1540 Sullivan Avenue
South Windsor, Connecticut 06074
Dear Mr. Moran:
I respectfully request postponement of your hearing on
the application of Andre' Charbonneau and Son (for the property
bordering on the westerly side of Route 5 ) from June 8th until
June 22nd. I make this request because as a homeowner residing
on Old Parish Drive I have considerable concern for the
feasibility of this project but will be out of state and unable
to express my concern at said scheduled meeting.
Having used the firm of Palmberg and Russo for my own
business on 31 Edwin Road and having same firm error on our
water runoff which created a problem on our own property and
which we had to correct, I am most concerned that we all use
due diligence in our efforts to insure the proposed site
development as applied for through Inland Wetlands for the
Charbonneau subdivision be vigorously inspected by the
Commission and all parties heard prior to vote.
Should the Commission be unable to postpone hearing this
application on the 8th, then I request that I and any other
concerned residents be allowed to comment at your June 22nd
meeting prior to the Commission acting on this application.
Thank you for your kind attention to this matter.
Sincerely,
(Mrs. ) Barbara Barbour
Resident 5 Old Parish Drive
South Windsor, CT 06074
P.S. I shall be returning to South Windsor on June 14 and
will hope to hear from you then.
. SOWN se"
4 H 7�O�� 07
O
C L
a `
. w
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
flvsoR•co�'� AREA CODE 203/644-2511
July 17 , 1987
Andre L. Charbonneau CERTIFIED MAIL
125 Edwin Road
South Windsor , Ct 06074
Dear Mr . Charbonneau :
Re : Application #466 - 11 lot Industrial Park to be located on
Route 5.
At the June 22 , 1987 meeting of the South Windsor Inland Wetlands
Agency/Conservation Commission they requested that you provide an
on-site study completed by a soil scientist to delineate the wetlands
and soil types on your property for which an application is before
them to subdivision the land into 11 lots . In that assessment we
would like the report to include the affect on the stream which
leaves the property ; the condition of the stream; and the capability
of being able to handle more water . Once we receive your report we
will then have it reviewed by the Soil Conservation Service.
If you should have any questions , please don' t hesitate to call the
Planning Department .
Very truly yours,
,a i^ A411-11%, A
Eliz eth A. Warren, Vice Chairman
Inland Wetlands Agency/
Conservation Commission
CC : A . B. Davies, Deputy Town Engineer
Richard Martel , Town Engineer
Marcia A . Banach, Director of Planning
Louise Evans , Chairman, PZC
Joe Russo, Palmberg & Russo
Attorney William Grace
LAND SURVEYORS & ENGINEERS
15 BARBER POND ROAD • BLOOMFIELD, CONNECTICUT 06002 • TELEPHONE (203) 242-2775
WILLIAM R. PALMBERG, LAND SURVEYOR JOSEPH R. RUSSO, PROFESSIONAL ENGINEER
October 2, 1987
Town of South Windsor
1540 Sullivan Ave.
S. Windsor, CT 06074
Attn: Mr. Bo Davies
RE: Andre Charbonneau
Rt. 5 - Industrial Subdividion
Enclosed please find the Soil report for the above mentioned subdivision and
the follow-up letter of explanation of paragraph four of the original reports
prepared by Mr. Lewis W. I1gen, Soil Scientist.
Please call if you have any questions.
Very Truly Yours,
Joseph R. Russo, P.E.
101 Wenonah Road
Longmeadow, MA 01106
September 23, 1987
Palmberg and husso
Land Surveyors and Professional Engineers
15 Barber Pond Road
Bloomfield, Connecticut 06002
Dear Sirs: Proposed subdivision off US 5
South Windsor
Explanation of the 4th paragraph of soil report
dated August 14 the
What is meant in this paragraph is that there might be
a blockage, due to the recent fill..- to the natural
flow or natural seepage from this very small wetland.
This wetland has not become larger or wetter, just some
flooding on non-wetland soil surrounding the Walpole
sandy loam. Duration of wetness is short,
A simple drain could eliminate this situation without
disturbing the natural wetland.
Lewis W. Ilgen
Soil Scientist
Andre Charbonneau w Sons
General Contractor
125 Edwin Road
South Windsor, CT 06074
t �j
SOIL REPORT
Proposed subdivision
off US Route 5
South k ndsor, CT
The general soil makeup of this 20 acre parcel of land is a
deep clay substrata overlain by a sandy soil material.
The texture of 'the surface soil varies from a fine sandy loam
to a loose loamy course sand. The major soil type is the well
drained Agawam sandy loam. Upon this soil type is a deposit of
unvegetated soil that is a loose sand that has beed disturbed.
This wind deposited soil is called Windsor sand and is very
droughty. Some sand. has been taken from this site.
Along the southern boundary is Bancroft Brook with some small
intermittent drainages coming off this property. These three
drainages are the wetlands designated as such.
To the north�aast boundary is a wetland area. This wetlanJ soil
is Walpole sandy loam, poorly drained. Around this wetland there
has been some filling that could have blocked the natural flow
of water during a wet season. ,l'here is evidence that water has
accumulated on non-wetland soil.
Phis high river terrace is approximately 30 feet abovr- the
Connecticut giver in elevation. Flooding is not a problcm.
Most of the acreage is in forest cover.
Lewis W. Ilgen
Soil Scientist
August 14,1987
Andre Charbonneau Sons
General Contractor
125 Edwin Road
Sout Windsor, CT 06074
OWN St
o
c
.a
w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
llosoe•co� AREA CODE 203/644-2511
October 30 , 1987
Atty. William E. Grace CERTIFIED MAIL
479 Buckland Road
South Windsor, Ct 06074
Dear Atty. Grace:
Re: Application #466 - Charbonneau Industrial Park Subdivision
At the October 19 , 1987 meeting, the South Windsor Inland Wetlands
Agency/Conservation Commission approved with conditions Application
#466 , 11 lot industrial park subdivision for the road layout and
drainage on property located on John Fitch Boulevard, as shown on
plans prepared by Palmberg & Russo, dated 4/13/87 , revised 7/28/87
& 9/1/87 , consisting of 11 pages . The following conditions must
be adhered to for this permit to be valid:
1 . We recommend a bond in the amount of $10 ,000 be submitted
to the Planning & Zoning Commission to ensure compliance
with erosion & sediment control measures .
2 . - Completion and stabilization of the roadway slopes with
a 4" minimum of top soil as per the "guidelines" .
3 . Suitable access for town vehicles to the culvert at
Lots 2 & 12 .
4 . Modify the plans to show stockpile locations .
5 . Modify the plans to include appropriate seed for that
site . Submit the soil sample results.
6 . Indicate_on the plans, proposed clearing or working limits
and appropriate protection measures proposed.
7 . Three (3) blueprint copies of the approved map with all
modifications must be submitted to the Wetlands Department
for Town Staff review prior to any work on the site.
- 1
t
r
To: Atty. William Grace
Re: Charbonneau Industrial Park Subdivision
October 30 , 1987
Page 2
8. Construction activities shall be subject to the approval
of the Town Engineer.
9 . The application shall indemnify and hold harmless the
Town of South Windsor against any liability which might
result from the proposed operation or use.
10 . The permit is valid for one year and shall expire on
October 19 , 1988 .
Very truly yours ,
E fiz th A. Warren, Vice-Chairman
Inldlid Wetlands Agency/
Conservation Commission
Town of South Windsor
KFR:dlb
CC: A. B. Davies, Deputy Town Engineer
Engineering Department
Marcia A. Banach, Director of Planning
Michael Gantick, Director of Public Works
Thomas D'Auria, Building Official
Louise Evans , Chairman, PZC
Palmberg & Russo
Andre Charbonneau
1
S 0.NN xeq
O �
C
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
floSOR•co TX, AREA CODE 203/644-2511
November 18 , 1987
Atty. William E . Grace
479 Buckland Road
South Windsor , CT 06074
re: #1255 - Charbonneau Resubdivision
Property at Route 5 (John Fitch Boulevard)
Dear Atty. Grace :
Please be advised that the Planning and Zoning Commission voted at its
November 17 , 1987 meeting to approve the above-referenced application fora
resubdivision of land , based on plans prepared by Palmberg & Russo dated
April 13, 1987 , Drawings #1 through 11 of 11 , Project No. 86138, subject
to the `following conditions and modifications:
1 . All Deeds for open space and roadways; and Easements for conservation
purposes , drainage or utilities , that may be required in connection
with the approval of this subdivision , must be submitted to this
Commission prior to filing the mylars and issuance of building
permits . All deeds must be in accordance with the policy for
accepting deeds and easements and must be approved by the Engineering
Department and Town Attorney. The deeds for the roadways and open
space will be held in escrow until completion of the subdivision and
then referred to the Town Council for acceptance .
2 . Concrete sidewalks, built to Town specifications , shall be installed
on one side of interior streets ( the north or east side as
applicable) .
3. Drainage for this subdivision is subject to the approval of the Town
Engineer.
4. If , for any reason , finished grading and other site work is not
completed, the Town Engineering Department shall determine the amount
of a cash bond to ensure final grading and site work, "This cash bond
must be submitted prior to issuance of a Certificate of Occupancy.
5. All lots must be connected to the Town of South Windsor sanitary sewer
system and are subject to the approval of the Water Pollution Control
Authority.
Atty. William E. Grace - 2 - November 18, 1987
6 . Water shall be supplied to this subdivision by Connecticut Water Co.
7 . Street lighting shall be installed at intersections and on cul-de-sacs
in accordance with the policy established by the Town Manager .
8. Street names and locations of fire hydrants are subject to the
approval of the Fire Marshal of the Town of South Windsor . Street
names and supporting posts shall be installed by the developer in
conformance with the standards of the Town of South Windsor, at no
expense to the Town.
9. Quantity estimates must be submitted to the Town Engineer for the
purpose of determining subdivision bonding, and all bonds shall be
posted prior to filing the plans .
In the event the Commission votes to accept a Letter of Credit for a
one year term, in lieu of a surety bond, said Letter of Credit must be
renewed on a yearly basis until completion of the development. If a
new Letter of Credit has not been received within 30 days before the
expiration date, the Commission may, at its option , call the Letter of
Credit it is holding .
10. A drainage assessment fee in the amount of $600 shall be submitted to
this Commission.
11 . A liability insurance policy shall be submitted to this Commission
naming the Town of South Windsor as an insured , with a combined single
limit for bodily injury and/or property damage in the amount of
$1 , 000, 000.
12 . No building permits will be issued until all conditions of approval
have been complied with, and the final plans have been filed in the
Town Clerk' s Office .
13 . This approval is subject to the conditions of approval of the Inland
Wetlands Agency/Conservation Commission .
14. Prior to commencement of any site work, a meeting must be held with
Town Staff . Revised plans are required one week prior to scheduling
the pre-construction meeting with Town Staff .
15 . Building lines must be coincident with easements and out of the flood
plain .
16 . All easements must be shown on plot plan .
17 . Traffic signs must be located by Town Traffic Authority and shown on
plan .
18. A deceleration lane and an acceleration lane are required on Route 5,
subject to ConnDOT approval .
Atty. William E . Grace - 3 - November 18, 1987
19. A snow fence must be established one hundred feet from the west
property boundary, with no disturbance beyond the snow fence . The 100
feet was derived from the current 50-foot buffer requirement plus the
current 25-foot rear yard setback and the additional 25-feet of
non-disturbance volunteered by the applicant to the Commission . Snow
fencing should also be erected along the top of the bank on the south
property boundary to ensure no disturbance of the bank".
20. The Commission will expect that all possible impact mitigation
measures will be employed for lots bordering the residential district
to the west of this subdivision , at such time that site plans are
submitted to the Commission for its approval .
21 . The buffer lines shown on the plan must be removed.
22. The abandoned vehicle on Lot 3 must be removed , and any other trash as
well .
23. If drainage tiles are encountered during construction , they must be
reconnected to preserve their function.
24. On Sheets 2 and 3 , show grantees of easements .
25. On Sheets 4 and 5:
- The drainage easement on Lot 12 must be in favor of the Town and
extend to at least the end of the pipe ; and
- The cul-de-sac on the southerly side must be shown as temporary.
26. On Sheet 6:
- Need profile of the proposed sanitary sewer along Lot 7 ;
- Need 15' more sanitary sewer easement along Lot 7 ;
- Clay stops will be required along the length of the sanitary sewers ;
and
- Extra-heavy-duty PVC will be required for any fills over 15 ' in
depth.
27 . The water line presently in place must be protected during
construction.
28. A slight shifting of the storm drainage structures is needed to
maintain 300' maximum separation.
Black and white transparent mylars of Sheet #2 and 3 with the above
modifications , together with three blueprint copies of the entire set of
plans , must be submitted to this Commission to be stamped and signed. The
letters of approval of this Commission, as well as the Inland Wetlands
Agency/Conservation Commission , must be reproduced on the mylars .
Atty. William E. Grace - 4 - November 18, 1987
After the mylars have been signed by the Commission, they will be
returned to you for filing in the Office of the Town Clerk within
90 days. After filing these plans, a copy of the receipt must be
submitted to the Planning Department.
Yours very truly,
PLANNING & ZONING COMMISSION
By: ';:01
Ra and Hallowell, Jr.
Chairman
:rt
cc: Andre Charbonneau
M. Gantick, Director of Public Works
F. Shaw, W.P.C.A.
T. D'Auria, Building Official
E. Belleville, Assessor
W. Lanning, Fire Marshal M. Banach, Director of Planning
Inland Wetlands Agency/Conservation Commission
Engineering
PZC File
Beck 0 Eldergill Attorneys At Law
447 CENTER STREET, MANCHESTER, CONNECTICUT 06040, PHONE 203-646-5606 BRUCE S. BECK
203-742-0882 KATHLEEN ELDERGILL
December 28 , 1987 JOANN PAUL
` DENNIS P. WMAHON
jj��
RY Ft
Inland Wetlandsx-
A gency/Conservation Commission
Town of South Windsor
Town Hall ,_,. 4{
South Windsor, CT 06074
South
Gentlemen: INLAW Wt-i`ANDS AGENCr,,
s. WNSMAT" QQM1U1SSI.Q,;
This office represents Karen Bowers and Rally, an organization con-
sisting of a number of homeowners living on and around Old Parish
Drive in South Windsor. My client' s property either abuts or is in
the close vicinity of property located on Route 5 , South Windsor,
owned by Andre Charbonneau.
On October 19 , 1987 you granted an inland wetlands permit for work
done on the subject property. As you are probably aware, that permit
is the subject of an appeal by my clients to the Superior Court .
Although this appeal is still pending and my clients realize that
there is no present stay of the permit which was granted, there are
some violations of the Inland Wetlands Act and Regulations which must
be addressed.
Prior to the granting of the permit, it is our information that
Mr. Charbonneau, or someone acting on his behalf, drained a one to
three acre pond that was located on the property. Although this pond
was brought to your attention on June 22 , 1987 , Mr. Charbonneau was
apparently never given any permission to drain the pond. As far as
the minutes of the Inland Wetlands hearing was concerned, it appears
that the only permission he was given was to remove the berm that was
artificially increasing the size of the pond on his property. My
clients do not feel that Mr. Charbonneau was ever given permission to
drain the pond completely or otherwise eliminate its presence.
We also understand that Mr. Charbonneau has not complied with con-
ditions 5 and 6 of the Inland Wetlands permit, and that he has com-
menced work beyond the boundaries specified in his plans and the
limitations set forth in the Inland Wetlands permit.
We would like to have a hearing on this as soon as possible and for
the Commission to take appropriate action to enforce both its regula-
tions and the Connecticut Inland Wetlands Act .
Sincerel
s
ruce S . Beck o 198T
BSB/gq d$01
cc : Karen Bowers ���th 1H AGENGY�
Rally ,,LAND WETLAND
i ION COMMp$IQN
CERTIFIED MAIL - RETURN RECEIPT REQUESTED ""J° '
t0 sf�
O
C =
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
S4R.co AREA CODE 203/644-2511
December 30, 1987
Mr. Andre Charbonneau
Edwin Road
South Windsor, CT 06074
Dear Mr. Charbonneau:
Subject: Erosion Control
Charbonneau Industrial Park
Please be advised that it has come to my attention that earth
moving activities have commenced at the subject site prior to
the installation of appropriate erosion and sedimentation control
measures. Pursuant to the pre-construction meeting it was em-
phasized that the appropriate erosion and sedimentation control
measures were to be in place prior to any earth moving work.
By this letter be advised that the appropriate measures are to
be implemented before any further earth moving work is to continue.
Additionally, as discussed during the pre-construction meeting, the
anti-tracking pad at the intersection of Route 5 was to be installed
so as to provide adequate tractionfor vehicles entering Route 5 from
the project site. Although the material used will probably be
adequate (with periodic maintenance) to minimize tracking, the
material appears to be very loose near the entrance of Route 5 and
is subject to spin-outs by vehicles.
Should you have any questions regarding the above matters, please
contact this office.
Very truly yours,
Michael J. ntick
Director of Public Works
MJG/jsv
cc: Marcia A. Banach, Director of Planning
Lester A. Braddock, Sr. Engineering Inspector
A. Bowen Davies, Deputy Town Engineer
Engineering Department File
011H 84r.44
P
1 0
.4 U 7 wn OP Soad di•
0 1540 SULLIVAN AVENUE - SOUTH WINDSOR, CONN. 06074
OR-C AREA CODE 203/644-2511
January 21 , 1988
Mr. Richard Sartor, Town Manager
Town of South Windsor
1540 Sullivan Avenue
r
South Windsor, Ct. 06074
v
11
P-1
Dear Mr. Sartor:
RE: Charbonneau industrial site , Route 5
(Application #466)
At our IWA/CC meeting of January 11 , 1988, we discussed
how to deal with the request by Attorney Beck (see his letter of
December 28, attached) that the IWA/CC hold a hearing to
investigate alleged permit violations.
The Agency agreed to invite Mr. Beck and Mr . Charbonneau to a
future IWA/CC meeting to discuss this matter in a fact—finding
hearing . We also agreed that Town Attorney Ralph Alexander
should be consulted as to proper procedure; since a suit is
currently pending .
In my consultation (January 14) with Mr . Alexander, he suggested
that we handle it as we normally would (no special public
hearing) . Additionally, he urged that we ask Town Staff to look
into the allegations and to write a report on findings, either
individually or collectively, so as to provide the Agency with
professional input to supplement the findings of individual
Agency members.
To that end I have requested that Bo Davies , Deputy Town
Engineer, (Advisor to our Agency) undertake this effort singley
or in concert with other Town Staff members .
Sincerely,
John M. Moran, Jr .
Chairman
IWA/CC
JMM,JR/pmm
S-jjN at
O "
U Town o-P Sptdli ?A:ad4ot
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
SOR-CONS AREA CODE 203/644-2511
RICHARD J. SARTOR
Town Manager
February 1, 1988
Mr. John Moran, Chairman
Inland-Wetlands/Conservation Commission
Town of South Windsor
South Windsor, Connecticut
Dear Mr. Moran:
On January 29, I received your letter in which you ask for a
staff review of allegations made by Mr. Beck in his letter
of December 28, 1987 . Pursuant to this request, I have
instructed Director of Planning Marcia Panach (assisted by
Director of Public Works Michael Gantick) to review the
letter and pprepare a report. I am sure that Mr. Davies '
input will be considered in the report.
Although we have not yet had sufficient time since Town
Council approval to fill the new position of a Zoning/
Inland-Wetlands Enforcement Officer, when the position is
realized the Officer will, of course, be part of the
Planning Department staff (under the direction of Ms .
Banach) , and will be responsible for providing staff
assistance to IWA/CC. Expertise needed from other sources
will be coordinated by the Director, or Ms . Lipe, as
required.
The requested report will be presented to you as soon as it
can be completed. If I may be of further assistance, please
contact me.
Very ly your ,
o anal r
RJS:prb CT
cc: Marcia Banach, Director of Planning
Michael Gantick, Director of Public Works
�10.NN SE,<�
Tiov� oP scrtct/i
x 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074
���osoe•co �w AREA CODE 203/644-2511
February 5, 1988
John M. Moran, Chairman
Inland Wetlands/Conservation Commission
Town of South Windsor
1540 Sullivan Ave.
South Windsor, CT 06074
Dear Mr. Moran:
In response to Mr. Sartor's letter of 02/01/88, the following is
a progress report of the IWA/CC permit for App. #466 Charbonneau
Resubdivision addressing the concerns raised in Attorney Beck's
letter of 12/28/87 . The items that would involve the inspection
or review by town staff include the pond and approval conditions
five and six of the Inland Wetlands permit.
The pond is contained within the area of the roadway construction
as shown on the approved plans; therefore its existence would be
eliminated. The approved plan shows that the pond will be
drained as well as drainage of the wet area. The plan also calls
for an earth excavation of over two feet in the pond area.
With respect to approval condition #5, the soil sampling will be
required immediately prior to stablization of the site; there is
a note on the modified plans (sheets 2 & 10 of 11 ) indicating
this will be done. The clearing or working limits (approval
condition #6 ) has also been shown on sheets 8 & 9 of the
modified plans .
The plans were revised through 11/18/87 to include the Inland
Wetlands comments and were submitted to the Town on 12/11/87
consistent with item 7 in the Inland Wetlands Agency/Conservation
Commission letter of approval of 10/30/87 .
On January 8, 1988, town staff met on-site with Douglas Cooper of
DEP's Inland Wetlands Unit, at his request. At the conclusion of
the site inspection, Mr. Cooper indicated that he did not see any
reason for DEP to become involved.
It would appear that as of 12/28/87, the applicant was in compliance with the conditions of approval on the permit.
Very Truly Yours,
zh"�� 6 awzlla—
Marcia Banach
Director of Planning
CC!
Richard J. Sartor, Town Manager
Michael A. Gantick, Director of Public Works
Bowen A. Davies, Deputy Town Engineer
Michele R. Lipe, Assistant Planner
i
`OwM Sf,
G r Town O-P SatdA V,1601�
e �
a .v,
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
rNdSOR-CO AREA CODE 203/644-2511
Attorney William E. Grace
479 Buckland Road
South Windsor, CT 06074
Dear Attorney Grace:
Please be advised that the Planning and Zoning Commission voted
on February 16, 1988, to approve the above-referenced site plan
of development for an addition to an existing industrial building
located on Sullivan Avenue. This approval is based on plans
prepared by Palmberg and Russo, . dated 10-30-87 , revised through
1-27-88, sheets 1-3 of 3, subject to the following:
1. Prior to commencement of any site work, a meeting must be
held with Town Staff .
2 . No building permits will be issued until the final plans
have been filed in the Town Clerk's Office.
3 . This approval is subject to the conditions of approval of
the Inland Wetlands Agency/Conservation Commission.
4. An as-built plan will be required prior to issuance of a
Certificate of Occupancy per Section 4. 13 . 10 of the
Zoning Regulations .
5 . A landscape bond in the amount of $2000 is required and
must be submitted prior to filing of mylars .
6 . Drainage is subject to Town Engineer's approval.
7 . Signage for the site must conform to zoning regulations .
Black and white transparent mylars of Sheet #1 with this letter
and the Inland Wetlands Agency/Conservation Commission approval
letter reproduced thereon, together with three blueprint copies
of the entire plan, must be submitted to this - Commission to be
stamped and signed. After signing, the mylars will be returned
i
to you and must be filed in the Town Clerk's Office within 90
days . After filing these plans, a copy of the receipt must be
submitted to the Planning Department.
Very truly yours,
PLANNING AND ZONING COMMISSION
David H. Sorenson
Vice Chairman
cc: M. Gantick, Director of Public Works
F. Shaw, Supt. of Pollution Control
T. D'Auria, Building Official
E. Belleville, Assessor
W. Lanning, Fire Marshall
M. Banach, Director of Planning
Inland Wetlands Agency/Conservation Commission
A. Charbonneau
�SpgIM Sf+`�
y T-0 olle s-cam 7()&U&O-t
o
wc,
1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
�NpS.pR Coa AREA CODE 203/644-2511
March 4, 1988
Andre Charbonneau & Sons
Edwin Road
South Windsor, CT 06074
Gentlemen:
RE: Sedimentation and Erosion Controls
We are approaching the transition period between winter erosion and
sedimentation measures and the onset of the planting season.
Potential for erosion and sedimentation Problems incr
ease with the spring
thaw and rain season Thi
s is a reminder h Y that ALL E & S measures
s res should
be in place and working according to your plans.
Please field check all working sites to ensure that everything is in
ord
er.
er.
Members of the Agency as well as Town staff will be visiting sites in
progress during the next several weeks. If problem areas are observed you
will be notified.
Your `cooperation in this regard will be appreciated.
Yours very truly,
Y
JS
'John M. Moran, Jr.
Chairman
Inland Wetlands Agency/
Conservation Commission
JMMJr. /pmm
i
�SowN gf 4,
F 7111W."M �soi� ?A
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
a.coN AREA CODE 203/644-2511
March 31 , 1988
Attorney Bruce Beck
Beck & Eldergill
447 Center Street
Manchester , CT 06040 � 0
RE: Charbonneau Industrial Park, Route 5 , South Windsor
Dear Mr . Beck:
At our March 14, 1988 Inland Wetlands Agency/Conservation Commission
meeting we discussed alleged permit violations on this site . It was the
view of the Agency that at this time no violations were believed to be
evident which would require action by the Agency.
Furthermore , it is our understanding that a letter will be forthcoming
from the Army Corps of Engineers regarding the possible necessity for
individual permits . Apparently, the Corps will allow no filling or
excavation on any of the individual lots having wetlands .
Meanwhile the Agency will continue to monitor closely all activities on
the site . We anticipate full cooperation and permit compliance . If we
may be of assistance , please contact me or Deputy Town Engineers , Bo
Davies .
Very truly yours ,
L"?✓j' 6� ,%'e'er9J �airmanohn J. Moran , Jr .
Inland Wetlands Agency/
Conservation Commission
JJMJr. /pmm
cc : Andre Charbonneau & Sons
A .B . Davies , Deputy Town Engineer
DEPARTMENT 01- THE ARMY
NEW ENGLAND DIVISION, CORPS OF ENGINEERS p�
424 TRAPELO ROAD
WALTHAM, MASSACHUSETTS 02254-9149 MA R
REPLY TO ao MAR t t988 1 6 1988 N
__- ATTENTION OF
�nDEPT Wl�
V
Regulatory Branch 5
CENED-OD-R-10-87-2231
Mr. Andre Charbonneau
125 Edwin Rd.
South Windsor, CT 06074
Dear Mr. Charbonneau:
This is in response to your request for a Department of the
Army permit to fill approximately 0.70 acres in conjunction with
the construction of an access road to the proposed Andre
Charbonneau Industrial Park on Rt. 5 in South Windsor,
Connecticut.
That work is permitted under Title 33 Code of Federal
Regulations, Part 330.5 (a) (26) and (14) Nationwide Permits, as
published in the November 13, 1986 Federal Register, and does not
require further processing.
This authorization is made in accordance with the plans
attached hereto entitled, "Resubdivision Property of Andre
Charbonneau South Windsor, Connecticut" in 3 sheets dated "2/88"
and subject to the attached conditions.
Any additional fill placed in the waterway or wetlands to
facilitate construction of this activity and development of lots
will require an individual permit.
This verification that the work is permitted by a Nationwide
permit is valid only for a period of two (2) years from the date
of this letter. If work is not commenced or under contract by
that date you must request a new verification to determine
whether this Nationwide permit has been modified, suspended or
revoked.
Note that these conditions require the use of other practical
alternatives to avoid or minimize the discharge of dredged or
fill material into waters and wetlands of the United States.
S
Before you begin work, you are required to obtain any
necessary State and/or local permits, and other necessary Federal
permits.
Should you have any questions concerning this matter, please
contact Stephen DiLorenzo at 617-647-8152 or use our toll-free
number 1-800-343-4789 or 1-800-362-4367 if calling within
Massachusetts.
Sincerely,
Stephen D. DiLorenzo
Chief, Evaluation Unit
Regulatory Branch
Operations Division
Attachment
Copy furnished:
Barbara Barbour
5 Old Parish Drive
South Windsor, CT 06074
Bowen Davies, Dep. Town Engineer
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT. 06074
�S0,0
N 8E.44
rA
0,P soa& V.
9
� 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074
SOR•co��`` AREA CODE 203/644-2511
August 16, 1988
William Grace
479 Buckland Road
South Windsor, CT 06074
RE: Application #466 - Charbonneau 11 lot industrial
park subidivision
Gentlemen:
This is a reminder that the permit with the Inland Wetlands
Agency/Conservation Commission, Application #466 will expire on
Octobd'r 19, 1988.
The agency requires a letter requesting extension together with a
fee of $25. 00. This should be submitted at least 45 days prior
to the expiration date of the permit. If work has been completed
or will be completed by the expiration date, we would appreciate
you contacting Phyllis Mann at 644-2511, Ext. 253,, to advise her
of work status.
If you have any questions, please don' t hesitate to contact
Phyllis or Mr. Bo Davies, Deputy Town Engineer.
vexy truly( yours,
M. Moran, Jr. Chairma
Inland Wetlands Agency/
Conservation Commission
JMMJr. /pmm
cc: A.B. Davies, Deputy Town Engineer
Enclosure
o
F Tillwvn o-P Sot,& ? .
c U
9 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
e•Co���v AREA CODE 203/644-2511
August 16, 1988
William Grace
479 Buckland Road
South Windsor, CT 06074
RE: Application #466 - Charbonneau 11 lot industrial
park subdivision
Gentlemen:
•
Section 4. 13. 6 of the Zoning Regulations, Conservation Plan (a
copy enclosed) establishes the criteria for such a plan and a
method of monitoring its application. A permit for your proposal
was granted, with a bond as assurance of compliance with its
sedimentation and erosion control measures. To assist in the
review process by the Inland Wetlands Agency/Conservation
Commission, whether for a permit extension or specific inquiry
request, the provisions for verification through progress reports
by the developer' s/applicant' s Engineer demonstrating that each
Erosion and Sedimentation control measure has been installed and
maintained, in accordance with the approved plan shall be
required.
It is requested that this verification report be submitted at
least two weeks before the regular meeting of the IWA/CC to
permit time for the Commissioners to evaluate your project
controls.
Very truly yours,
A. Bowen Davies
Deputy Town Engineer
ABD/pmm
CASEY, HALPERN, GRACE & ❑OMBROWSKI, P.C.
ATTORNEYS AT LAW
479 SUCKLAND ROAD
SOUTH WINDSOR,CONNECTICUT 06074
(203]B44-1528
JOHN M.CASEY 185 SILAS DEANE HIGHWAY
KENNETH S.HALPERN WETHERSFIELD,CT 06109
WILLIAM E.GRACE (203]563-2634
JOHN W.DOMBROWSKI,JR.
APRIL C.TEVERIS
August 19, 1988
Inland Wetlands Agency/Conservation
Commission
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT 06074
RE: APPLICATION #466 - Charbonneau 11 Lot Industrial Subdivision
John Fitch Boulevard (Route 5) , South Windsor
The Owner, Andre L. Charbonneau and Applicants, Andre L. Charbonneau
and Andre K. Charbonneau hereby request and extension to the above
application for the development of an 11 Lot subdivision located on
John Fitch Boulevard.
Attached is a check in the amount of $25.00 to cover the cost
of the extension fee.
ANDRE L. CHARBONNEAU
ANDRE K. CH !U
ava, -' 00�*
By William E. Grace
Attorney for Owner and Applicants
WEG/att
enc. (check # 1872)
r + r 9
l 0,1iN $E4<
1
y r
o �
a � /�0►'ZU12 O-P S-0tZ& ?/ .
9 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
soR•c�� AREA CODE 203/644-2511
September 13, 1988
Attorney William Grace
479 Buckland Road
South Windsor, CT 06074
RE: Application #466 - Charbonneau 11 lot industrial park
subdivision
Dear Sir:
Enclosed please find receipt #125 for a check issued to us for
permit extension on Application #466 .
The South Windsor Inland Wetlands Agency/Conservation Commission
will review your request for a permit extension at the next
meeting. scheduled September 19, 1988. You presence is not
required. You will be notified in writing of their decision.
If you- should have any questions, please don't hesitate to
contact me at 644-2511, Ext. 253 .
Very truly yours,
Phyllis Mann
Secretary
Inland Wetlands Agency/
Conservation Commission
PM
Enclosure
� a LAND SURVEYORS & ENGINEERS
15 BARBER POND ROAD • BLOOMFIELD, CONNECTICUT 06002 • TELEPHONE (203) 242-2775
WILLIAM R. PALMBERG, LAND SURVEYOR JOSEPH R. RUSSO, PROFESSIONAL ENGINEER
October 10, 1988
South Windsor Town Hall
1540 Sullivan Avenue
South Windsor, CT 06074
Attn: Inland Wetlands Commission
RE: Andre Charbonneau Subdivision
Route 5
Gentlemen:
At your request, our staff visited the Andre Charbonneau subdivision
located on route 5. From our observation all the permanent soil and
erosion control is in place. - The rest of the site in our opinion has
been stabilized and the construction soil and erosion control measures
are still in place.
Sincerely yours,
Jeffrey L. Herz
JLH:jmd
S OwN Sf,
G �
U
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
SOR-C� AREA CODE 203/644-2511
October 19, 1988
Attorney William Grace
479 Buckland Road
South Windsor, CT 06074
Re: Application #466- Charbonneau, 11 lot industrial park
subdivision
Dear Sir:
At the October 17, 1988 meeting, the South Windsor Inland
Wetlands Agency/Conservation Commission approved a one year _
extension of Application #466 with all original conditions.
The application becomes effective October 19, 1988 and expires
October 19, 1989.
Very truly yours,
/A
)ohn M. Moran, Jr. , Chair an
Inland Wetlands Agency/
Conservation Commission
JMMJr. /pmm
cc:John E. McCahill, Zoning/Wetlands Enforcement Officer
Marcia A. Banach, Director of Planning
Michael Gantick, Director of Public Works
John R. Collins, Chief Building Official
Raymond Hallowell, Chairman, PZC
1-.
<0wN SC4(
y is
. � 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074
oR•co�'2w AREA CODE 203/644-2511
Project Name/Location Lod 11ACJv.SJy,-, t°nrk Appl.1
Contact Person/Owner Andre CAC4-60.Iaeay� Phone # 5'Z '7:-55
Address Iz5 ��v✓!� �o�� .Sc� W' sur C% bL-0��
You are hereby notified that problems may exist on the above site concerning erosion and
sedimentation control measures. Although this is a notification based on a routine site
visit, you are ultimately responsible for inspecting and maintaining the site.
You were contacted on and notified of site problem(s) . This
is a confirmation of that call.
You should correct the problem(s) immediately (within 48 hours) and notify me that the
situation has been corrected.
Erosion and control measures are not properly installed and/or maintained according to
approved plans. Refer to approved plans and correct site as needed See de4-c.;( - c
C,e— rv,f a+- -Gated en8 ov4If-+ •
Erosion and control measures are needed beyond those shown on the plans, contact me
regarding the additional measures.
Silt fence(s)- and/or haybale(s) are not in place or not properly maintained.
X Stockpiles are not protected and/or seeded, 0n40 k;vhbe��y Drive,
Construction entrance d��''•
receded w-F- e•ii-m,%ce to st-ocKe ►e- • -
Need to establish vegetation per plan, either temporary or permanent.
X Site lacks protection against possible wind erosion) 5eecl s(o fes cola^g road 0-- ikr
66-^o�.n!5 iA ce4ty red _ +Z fsoi t -
_ Limits of construction have not been established on site, or have been exceeded.
There is an excessive area of disturbance which should be stabilized, limits to area of
disturbance may need re-establishment.
_. Detention basin or siltation basins have not been maintained and/or vegetation or
stabilization is insufficient.
Other concerns =wh/cc_ rc�c:� Cc^�;�ic�fi Z S�r��;l izE - i'&.cway Slow . 4-� Fo,oSOi� j.
This will be filed with your approval/permit for the site. It is your responsibility to
maintain the site and repeated violations/problems will be forwarded to appropriate
Commissions.
If you have any question regarding this, contact me at 644-2511.
Very trul y yo`Z, - /
ohn E. McCahill-,y� r
Zoning/Wetlands Enforcement Officer
JEM/pmm
C ~ Town V J S-0ad, ? •
s 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 MM
AREA CODE 203/644-2511 r #/ 198�
Project Name/Location C&,&,m¢nu . //!sf Appl. # �66
Contact Person/Owner Phone # ss8—4 Ss/
Address /ZS CT c6o�`f
You are hereby notified that problems may exist on the above site concerning erosion-and-
sedimentation control measures. Although this is a notification based on a-,routine-.site
visit,,; you'are ultimately responsible for inspecting and maintaining the site
You were contacted -on and notified of sitefproblem(s) a' This
F his s confirmation of`,that call.
,. This is the.,second notification of site problems as indicated. = ouY Y66 Id correct .the
problems immediately (within 48 hours.), and notify me that_the;situation°has been
rcorrected._ , If`you fail to do this an order will be issued.-to cease and desist ;all_
activity on; the site. This correspondence will be filed with your. approval/ emit for
the-":-site: , se4 %+q,:l
Erosion and control measures are .prof installed and/or maintained accordag to
„=,approved planes sta' �taced e.�d O�rF k+ Procc4�en ,
y
Erosion and control measures are not properly installed and. ntainedtac ding to
approved plan. Refer to approved plans and correct site as needed.��=� f .,
,.
Erosion and control measures are needed beyond those shown on 'the plsas, cont> ct`me
regarding the additional measures. rX�
Silt fences(s) and/or haybales(s), are not in place or not properly maintained
ZC Stockpiles are not protected and/or seeded "ML34 ,1S 04+0 k;n.buly
Construction entrance not in according to plan or not functioning adequateljr' .
Need to establish vegetation per plan, either temporary or permanent:
Site -lacks protection against possible wind erosion �•cV01f and seed a1 coact
P g P _ �
Limits of..construction have not.._been established on site, or- have been. exceeded
There is an excessive area .0 disturbance which should be stabilized,-limits tto area of
disturbance may need-
t
Detention basin(s)- and/or siltation ,basin(s) have not been maintained and/or vegetation
_ -or stabilization is insufficient: A:
Other concerns:-mw4l&, RooroV& 14,00 0 2� S�t;zc carC GIJKV Sic frt` -wosoil .
n ce `hc�.d ed a+ er"n c L 40
s-FVck g:ie_
Ifyouu have any quion regarding this, contact me at 644-2511.
g i
--Very—truly.-yours,
_ �55 k
f hn E: McCahill; Zoning/Wetlands
Enforcement Officer - � 4
R
•' P
PMM
zp tit
o•NN Sf,`�
O-P sc ?d&U&O-t c �
U
s o 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
k6p�sO..R-C AREA CODE 203/644-2511
August 15, 1989
Attorney William Grace
479 Buckland Road
South Windsor, CT 06074
Dear Attorney Grace:
Re:Application #466 - Charbonneau Industrial Subdivision
Route 5
This is a reminder that Application #466 for permit and one year
extension will expire on October 19, 1989 .
A new application will be required in accordance with Section VI
and VII of the regulations if you plan to extend your project
beyond- the above expiration date, along with the required fee of
$25 . 00 for a single family house and all others $100. 00 . This must
be submitted at least 30 days prior to the expiration date of the
permit}.
To assist in the review process by the IWA/CC a report by the
developers )/applicant(s ) Engineer demonstrating that erosion and j
sedimentation control measures have been installed and maintained,
in accordance with the approved plan, shall be required. Section
4 . 13 . 6 of the Zoning Regulations (a copy enclosed) , establishes the
criteria for a conservation plan and a method of monitoring its
application. This verification report must also be submitted at
least thirty days before the expiration date of the permit to allow
time for Commissioners to evaluate your project controls .
If work has been completed or will be completed by the expiration
date, a letter from the engineer of the project will be warranted
as to the status of the application.
If you have any questions, please contact Phyllis Mann, Secretary,
or John E. McCahill, Zoning/Wetlands. Enforcement Officer at 644-
2511, Ext 253 .
Very truly yo4rs,
mes Lombardi, Vice-Chai.Z
�an
Inland Wetlands Agency/
Conservation Commission
JL/pmm
Enclosure
Raid& LAND SURVEYORS & ENGINEERS
15 BARBER POND ROAD • BLOOMFIELD, CONNECTICUT 06002 • TELEPHONE (203) 242-2775
WILLIAM R. PALMBERG, LAND SURVEYOR JOSEPH R. RUSSO, PROFESSIONAL ENGINEER
IPSIVEJ
AUG 30 1989
South Windsor
INLAND WETLANDS AGENCY/
CONSERVATION COMMISSION
August 28, 1989
Inland Wetlands Agency
Conservation Commission
Town of South Windsor
1540 Sullivan Ave.
So. Windsor, Ct. 06074
Att: Mr. John McCahill
RE: Application #466 Charbonneau - Industrial Park Rt. 5 So. Windsor
Gentlemen:
Our staff has reviewed the construction progress on the above mentioned
project. It is our opinion that the portion of the project that relates to
the wetlands permit, has been completed. We therefore do not feel that
renewal of the wetlands application will be necessary.
Please advise if there are any other items that require our attention.
Sincerely,
Josep R. Russo, P.E.-L.S.
Palmberg & Russo
cc: Atty. William Grace
;Va6x & R"44 LAND SURVEYORS & ENGINEERS
15 BARBER POND ROAD • BLOOMFIELD, CONNECTICUT 06002 • TELEPHONE (203) 242-2775
WILLIAM R. PALMBERG, LAND SURVEYOR JOSEPH R. RUSSO, PROFESSIONAL ENGINEER
October 13, 1989 n/'T 1539
South Windsor
INLAND WETLANDS AGENOY/
CONSERVATION COMMISSION
Town of South Windsor
Inland Wetlands Commission
1540 Sullivan Avenue
South Windsor, CT 06074
Re: Charbonneau Project, Industrial Subdivision Route 5, Wetlands Bond
Application# 4b6.
Gentlemen:
We have reviewed the work completed on the above mentioned-;s-ite and it
is our opinion that the site is stabilized with regard to the conservation
measures put in place during the construction of the project.
Based on the above, we therefor feel that the Wetlands bond of $10,000.00
is no longer required.
�If- there are any questions regarding this project, please call our office,
Phone number 242-2775.
Very truly yours,
Josepti R. Russo, P.E. & L.S.
Palmberg & Russo
JRR/bah
c..c. Atty. William Grace
File
;P46ft&T 9
f/i �i�i�GV'
LAND SURVEYORS & ENGINEERS
15 BARBER POND ROAD • BLOOMFIELD,CONNECTICUT 06002 • TELEPHONE(203)242-2775
WILLIAM R..PALMBERG, LAND SURVEYOR JOSEPH R. RUSSO, PROFESSIONAL ENGINEER
\August 28, 1989
Inland Wetlands Agency
Conservation Commission
Town of South Windsor
1540 Sullivan Ave.
So. Windsor, Ct. 06074
Att: Mr. John McCahill
RE: Application #466 Charbonneau - Industrial Park Rt. 5 So. Windsor
Gentlemen:
M
Our staff has-reviewed the construction progress on the above mentioned
project. It is our opinion that the portion of the project that relates to
the wetlands permit, has been completed. We therefore do not feel that
renewal of the wetlands application will be necessary.
Please advise if there are any other items that require our attention. "
Sincerely,
PJoRusso, P.E.-L.S.
Palmberg & Russo }
a
cc: Atty. William Grace
f Y
z,s x
CASEY & GRACE
ATTORNEYS AT LAW "
,f 47S BUCKLANO ROAD 0O.T 26 1989
1� yiq 0� SOUTH WINOSOR,CONNECTICUT 06074 W
\� } (203]644-152B South Windsor
INLAND WETLANDS AUN@P
N � CONSERVATION COMM166100
JOHN M.CASEY TELECOPIER(203)644-1520
WILLIAM E.GRACE
October 13, 1989
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT 06074
INLAND WETLANDS AGENCY/CONSERVATION COMMISSION
RE: Application #466
Charbonneau Industrial Park
Subdivision
Dear Commissioners:
On behalf of the Owner/Applicant of the above applicaiton we
hereby request that the bond in the amount of $10,000.00 be released.
* Enclosed is a letter dated August 28, 1989 from the engineering
firm of Palmberg & Russo stating the completion of the project in
respect to the compliance with the erosion and sediment control
measures.
Very truly yours
William E. Grace
WEG/ls
CC: A. L. Charbonneau
Enclosure
1
i