Loading...
HomeMy WebLinkAboutSite Plan - Conservation (197) TOWN OF SOUTH WINDSOR INLAND WETLANDS. AND WATER C ,,qRSESj APPLICATION .`�� THIS APPL�ON SHALL BE RECEIV BY THE i INLAND WETLANDS AGENCY ACTION INLAND WETLANDS AGENCY A44�+TH , Gr61il - LY SCHEDULED MEETING ON THE SECOND MON- j APPLICATION NO. DAY OF THE MONTH AT THE TOWN HALL. RECEIVED DATE THIS APPLICATION MUST BE FILED IN TRIPLICATE AT THE OFFICE OF THE TOWN CLERK, TOWN OF PUBLIC HEARING DATE SOUTH WINDSOR, AT LEAST TEN DAYS PRIOR TO (if necessary) -3p- -S THE REGULAR MEETING DATE. COMPLETED APPLICATION A SET OF PLANS MUST BE _SUBMITTED TO THE PERMIT GRANTED DATE TOWN ENGINEER AT LEAST TEN DAYS PRIOR TO PERMIT DENIED DATE THE REGULAR MEETING DATE. PLEASE PRINT. 1. APPLICANT Gerber Scientific, Inc. _ TEL. NO. 644-1551 83 beer Road West CITY & STATE South Windsor, Cr ADDRESS ^'ends^�-r'r 2. OWNER TEL. NO. same ADDRES under an option CITY & STATE same S Ga*T+P 3. LOCATION Of PROPERTY Sout-h side of 4u11 iy n Av nt�r� NAMES Of ADJACENT PROPERTY OWNERS �� attar-hPr3 nl an . J STATE CLEARLY AND BRIEFLY 5. PURPOSES AND DESCRIPTION OF THE PROPOSED ACTIVITY,AND THE TIME ELEMENT INVOLVED: Industrial Building - Site Plan ATTENTION: THE APPLICANT UNDERSTANDS THAT THIS APPLICATION IS TO BE CONSIDERED COMPLETE ONLY WHEN ALL INFORMATION & DOCUMENTS REQUIRED BY THE AGENCY HAVE BEEN SUBMITTED. APPROVAL MAY ALSO BE NECESSARY FROM THE PLANNING AND ZONING COM- MISSION. f T.1.16-A�E6`F-aT- THE REGULATIONS. M� AN APPLICA ION FEE IS RE UIRED. �y A SIGN IS RE CONSULT THE REGULATIONS. SIGNED: (Applicant) Gerber Scientific, Inc. (Owner) Revised 9/20/82 La 31 O Z p LU 1 Y c.s. IfYD SAN.N H CA 5 _ SULLI VAN M C.8 YEMINV. TF IN . 77.96 24" 8 / T F 84. 24 / 84 1 STORY z LC / ST u '5 A / r/ C U L t V A T/E D / F t E L / � PAVED ` LIMIT OF CONSTRUC' 5.5 ACRES± 340' 15 w - � .0 / 1 � / / -BROICEN C.B. 80 1 I vct`��, OwN Sfq`� T-law)vt 0-14C South 2lt o w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 l�osoR•C�� AREA CODE 203/644-2511 CERTIFIED MAIL September 12 , 1985 Mr. John Decker, Facility Manager Gerber Scientific, Inc. 83 Gerber Road West —3 South Windsor, Connecticu Dear Mr. Decker: At the September 9, 1985 meeting,. the South Windsor Inland Wetlands Agency approved, with conditions, application No . 350 . The permit is based upon the plans by consulting engineering firm of Fuss and O 'Neill . The following conditions must be adhered to for this permit to be valid: 1. Construction activities shall be subject to the approval of the Town Engineer, and shall be bound by the limit of construction as per plans. 2 . The posting of a $10 , 000 bond must take place prior to any activities on the site. 3. The application shall indemnify and hold harmless the Town of South Windsor against any liability which might result from the proposed operation or use . 4. The permit is valid for one year and shall expire September 9, 1986 if not initiated and completed within one year from date of approval . Very truly yours , John M. Moran Jr. /.'Chairman, Inland We ands Agency r� JMM/ml cc: Fuss and O 'Neill A. Bowen Davies , Deputy Town Engineer Richard J. Sartor, Town Manager Mayor John J. Mitchell Deputy Mayor Richard Ryan, Liaison-Town Council Robert Arsenault, Director of Public Works Thomas D' Auria, Chief Building Official John J. Shemo , Economic Development Coordinator Rick Martel, Town Engineer Jacqueline Smith, Town Clerk Peter DeMallie, Director of Planning Robert Gilligan, Chairman, PZC pwN BF,t� O Y 70WI-2, 6 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 SOR•CO AREA CODE 203/644-2511 March 14 , 1986 Mr. John Decker Gerber Scientific, Inc. 83 Gerber Road West South Windsor, Ct. 06074 Dear Sir: Re: App. #1105 - Site Plan of Development Please be advised that the Planning & Zoning Commission voted on March llth to approve the landscape plan prepared by Fuss & O'Neill, dated 1/27/86 , revised 2/25/86 , Proj . No. 85-350-A, for your site on the south side of Sullivan Avenue. The $25 ,000 bond which has been required to ensure erosion and sedimentation control measures will also cover completion of landscaping. The Commission further voted to accept a Letter of Credit, subject to the Town Attorney' s approval, in lieu of a surety bond. The Letter of Credit must be for a one year term, and must be renewed on a yearly basis until completion of the development. If a new Letter of Credit has not been received within 30 days before the expiration date, the Commission may, at its option, call the Letter of Credit it is holding. The bond should be submitted to the Planning & Zoning Commission prior to filing the mylars. This letter must be reproduced on the mylars, as well as our approval letter dated February 18 , 1986 , and the approval letter from the Inland Wetlands Agency/Conservation Commission. Yours very truly, PLANNING & ZONING COMMISSION vg By: C>{2,�. •(, �L_t ,4-u�,�t Robert F.Gi igan, C airman CC: R. Martel, Town Engineer P. DeMallie, Planning Director Inland Wetlands Agency/Conservation Commission V J. Shemo, Economic Development Coordinator Gerber Scientific, Inc. P.O. Box 305 Hartford, CT 06141-0305 Tel.(203)644-1551 TWX 710-427-2218 March 31, 1986 Mr. Robert F. Gilligan Chairman Planning & Zoning Commission Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 Re: Gerber Scientific, Inc. , - Application #1105 - Site Plan of Development - Also Application #370 Site Plan Modification Inland/Wetland and Conservation Commission Dear Chairman Gilligan, y As defined in your letter of approval dated 14 March 1986 for the above referred site plan and the Inland/Wetlands Agency/Conservation Commission letter of approval dated 19 March 1986, enclosed please find Gerber Scientific, Inc. Surety Bond for the sum of $25,000. This is as directed issued in behalf of the Town of South Windsor to cover erosion and sedi- mentation control measures and to include Landscaping as per plans submitted to the commission. A contract is being awarded to Orlando Annulli and Sons, Inc. of Manchester, CT to perform as General Contractor for Gerber. They will be meeting with the Town building department to resolve required schedules and obtain required permits. It is anticipated work will commence as soon as the schedules and permits can be obtained. Very truly yours, John L. Decker Facilities Manager JLD:kh Encl. cc: Guy Mitchell, Fuss & O'Neill A. B. Davies, Deputy Town Engineer OR.­-Me,rtelj, Town Engineer John, '.' Morai Jr. , Chairman Thomas D'Auria, Building Official Peter DeMallie, Director of Planning John Shemo, Economic Development Comm. Gary Bennett, Gerber Scientific, Inc. Stanley Leven, Gerber Scientific, Inc. Robert Maerz, Gerber Scientific Instrument Co.