HomeMy WebLinkAboutSite Plan - Conservation (197) TOWN OF SOUTH WINDSOR
INLAND WETLANDS. AND WATER C
,,qRSESj
APPLICATION .`��
THIS APPL�ON SHALL BE RECEIV BY THE
i INLAND WETLANDS AGENCY ACTION INLAND WETLANDS AGENCY A44�+TH , Gr61il -
LY SCHEDULED MEETING ON THE SECOND MON-
j APPLICATION NO. DAY OF THE MONTH AT THE TOWN HALL.
RECEIVED DATE THIS APPLICATION MUST BE FILED IN TRIPLICATE
AT THE OFFICE OF THE TOWN CLERK, TOWN OF
PUBLIC HEARING DATE SOUTH WINDSOR, AT LEAST TEN DAYS PRIOR TO
(if necessary) -3p- -S THE REGULAR MEETING DATE.
COMPLETED APPLICATION
A SET OF PLANS MUST BE _SUBMITTED TO THE
PERMIT GRANTED DATE TOWN ENGINEER AT LEAST TEN DAYS PRIOR TO
PERMIT DENIED DATE THE REGULAR MEETING DATE.
PLEASE PRINT.
1. APPLICANT Gerber Scientific, Inc. _ TEL. NO. 644-1551
83 beer Road West CITY & STATE South Windsor, Cr
ADDRESS ^'ends^�-r'r
2. OWNER TEL. NO. same
ADDRES under an option CITY & STATE same
S Ga*T+P
3. LOCATION Of PROPERTY Sout-h side of 4u11 iy n Av nt�r�
NAMES Of ADJACENT PROPERTY OWNERS �� attar-hPr3 nl an
. J
STATE CLEARLY AND BRIEFLY
5. PURPOSES AND DESCRIPTION OF THE PROPOSED ACTIVITY,AND THE TIME ELEMENT INVOLVED:
Industrial Building - Site Plan
ATTENTION: THE APPLICANT UNDERSTANDS THAT THIS APPLICATION IS TO BE CONSIDERED
COMPLETE ONLY WHEN ALL INFORMATION & DOCUMENTS REQUIRED BY THE
AGENCY HAVE BEEN SUBMITTED.
APPROVAL MAY ALSO BE NECESSARY FROM THE PLANNING AND ZONING COM-
MISSION.
f
T.1.16-A�E6`F-aT- THE REGULATIONS.
M� AN APPLICA ION FEE IS RE UIRED.
�y A SIGN IS RE CONSULT THE REGULATIONS.
SIGNED:
(Applicant)
Gerber Scientific, Inc.
(Owner)
Revised 9/20/82
La 31 O
Z
p
LU 1
Y
c.s.
IfYD
SAN.N H
CA
5 _ SULLI VAN
M C.8
YEMINV. TF
IN . 77.96 24" 8
/ T F 84.
24 /
84
1 STORY
z LC
/ ST
u '5 A /
r/
C U L t V A T/E D / F t E L
/
� PAVED `
LIMIT OF
CONSTRUC'
5.5 ACRES±
340' 15
w - �
.0 /
1 � /
/
-BROICEN C.B.
80
1 I
vct`��,
OwN Sfq`�
T-law)vt 0-14C South 2lt
o w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
l�osoR•C�� AREA CODE 203/644-2511
CERTIFIED MAIL September 12 , 1985
Mr. John Decker, Facility Manager
Gerber Scientific, Inc.
83 Gerber Road West —3
South Windsor, Connecticu
Dear Mr. Decker:
At the September 9, 1985 meeting,. the South Windsor Inland
Wetlands Agency approved, with conditions, application No . 350 .
The permit is based upon the plans by consulting engineering
firm of Fuss and O 'Neill .
The following conditions must be adhered to for this permit
to be valid:
1. Construction activities shall be subject to the approval of
the Town Engineer, and shall be bound by the limit of construction
as per plans.
2 . The posting of a $10 , 000 bond must take place prior to any
activities on the site.
3. The application shall indemnify and hold harmless the Town
of South Windsor against any liability which might result from
the proposed operation or use .
4. The permit is valid for one year and shall expire
September 9, 1986 if not initiated and completed within one
year from date of approval .
Very truly yours ,
John M. Moran Jr.
/.'Chairman, Inland We ands Agency
r�
JMM/ml
cc: Fuss and O 'Neill
A. Bowen Davies , Deputy Town Engineer
Richard J. Sartor, Town Manager
Mayor John J. Mitchell
Deputy Mayor Richard Ryan, Liaison-Town Council
Robert Arsenault, Director of Public Works
Thomas D' Auria, Chief Building Official
John J. Shemo , Economic Development Coordinator
Rick Martel, Town Engineer
Jacqueline Smith, Town Clerk
Peter DeMallie, Director of Planning
Robert Gilligan, Chairman, PZC
pwN BF,t�
O Y 70WI-2,
6
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
SOR•CO AREA CODE 203/644-2511
March 14 , 1986
Mr. John Decker
Gerber Scientific, Inc.
83 Gerber Road West
South Windsor, Ct. 06074
Dear Sir:
Re: App. #1105 - Site Plan of Development
Please be advised that the Planning & Zoning Commission voted on
March llth to approve the landscape plan prepared by Fuss & O'Neill,
dated 1/27/86 , revised 2/25/86 , Proj . No. 85-350-A, for your site
on the south side of Sullivan Avenue.
The $25 ,000 bond which has been required to ensure erosion and
sedimentation control measures will also cover completion of landscaping.
The Commission further voted to accept a Letter of Credit, subject to
the Town Attorney' s approval, in lieu of a surety bond. The Letter of
Credit must be for a one year term, and must be renewed on a yearly
basis until completion of the development. If a new Letter of
Credit has not been received within 30 days before the expiration date,
the Commission may, at its option, call the Letter of Credit it is
holding.
The bond should be submitted to the Planning & Zoning Commission prior
to filing the mylars.
This letter must be reproduced on the mylars, as well as our
approval letter dated February 18 , 1986 , and the approval letter
from the Inland Wetlands Agency/Conservation Commission.
Yours very truly,
PLANNING & ZONING COMMISSION
vg By: C>{2,�. •(, �L_t ,4-u�,�t
Robert F.Gi igan, C airman
CC: R. Martel, Town Engineer
P. DeMallie, Planning Director
Inland Wetlands Agency/Conservation Commission V
J. Shemo, Economic Development Coordinator
Gerber Scientific, Inc.
P.O. Box 305
Hartford, CT 06141-0305
Tel.(203)644-1551
TWX 710-427-2218
March 31, 1986
Mr. Robert F. Gilligan
Chairman
Planning & Zoning Commission
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT 06074
Re: Gerber Scientific, Inc. , - Application #1105 - Site Plan of
Development - Also Application #370 Site Plan Modification
Inland/Wetland and Conservation Commission
Dear Chairman Gilligan,
y
As defined in your letter of approval dated 14 March 1986 for the above
referred site plan and the Inland/Wetlands Agency/Conservation Commission
letter of approval dated 19 March 1986, enclosed please find Gerber
Scientific, Inc. Surety Bond for the sum of $25,000. This is as directed
issued in behalf of the Town of South Windsor to cover erosion and sedi-
mentation control measures and to include Landscaping as per plans
submitted to the commission.
A contract is being awarded to Orlando Annulli and Sons, Inc. of
Manchester, CT to perform as General Contractor for Gerber. They will be
meeting with the Town building department to resolve required schedules
and obtain required permits. It is anticipated work will commence as soon
as the schedules and permits can be obtained.
Very truly yours,
John L. Decker
Facilities Manager
JLD:kh
Encl.
cc: Guy Mitchell, Fuss & O'Neill
A. B. Davies, Deputy Town Engineer
OR.-Me,rtelj, Town Engineer
John, '.' Morai Jr. , Chairman
Thomas D'Auria, Building Official
Peter DeMallie, Director of Planning
John Shemo, Economic Development Comm.
Gary Bennett, Gerber Scientific, Inc.
Stanley Leven, Gerber Scientific, Inc.
Robert Maerz, Gerber Scientific Instrument Co.