HomeMy WebLinkAboutSite Plan - Conservation (169) R
4. 86
TOWN OF SOUTH WINDSOR
INLAND WETLANDS AND WATER COURSES
APPLICATION
INLAND WETLANDS AGENCY ACTION THIS APPLICATION, ONCE INFORMATION IS COMPLETE,
(SEE BACK OF THIS FORM), SHALL BE RECEIVED AT A
APPLICATION NO. 385 REGULARLY SCHEDULED MEETING OF THE AGENCY AT THE
4/8/86 TOWN HALL.
RECEIVED DATE THIS APPLICATION MUST BE FILED IN TRIPLICATE AT
THE OFFICE OF THE TOWN CLERK OF SOUTH WINDSOR BY
PUBLIC HEARING DATE 12 NOON AT LEAST 14 DAYS PRIOR TO THE FIRST
necessary)
COMPLETED APPLICATION REGULAR MONTHLY MEETING DATE. THREE SETS OF MAPS
OR PLANS MUST BE SUBMITTED TO THE TOWN ENGINEER
PERMIT GRANTED DATE AT LEAST 14 DAYS PRIOR TO THE FIRST REGULAR
PERMIT DENIED DATE MONTHLY MEETING DATE.
PLEASE PRINT OR TYPE.
1. APPLICANTJohn and Theresa Samsel 644-2940
TEL. NO.
ADDRESS 419 Buckland Road, CITY & STATE South Windsor, CT
2. OWNER John and Theresa Samsel TEL. NO. 644-2940
ADDRESS 419 Buckland Road CITY & STATE South Windsor, CT
3. LOCATION OF PROPERTY Terry Office Park- 465 Buckland Road. South Windsor
NAMES OF ADJACENT PROPERTY OWNERS Westerly side of Buckland Road
(See Attached Site Plan)
STATE CLEARLY AND BRIEFLY
5. PURPOSES AND DESCRIPTION OF THE PROPOSED ACTIVITY,AND THE TIME ELEMENT INVOLVED:
Site Plan of Development - Building addition -
approximate time to complete - 6 months
z �
LION: THE APPLICANT UNDERSTANDS THAT THIS APPLICATION IS TO BE CONSIDERED
'5 n o COMPLETE ONLY WHEN ALL INFORMATION 3 DOCUMENTS REOUTAED BY THE
z AGENCY.HAVE BEEN SUBMITTED.
� s � ►= APPROVAL MAY ALSO BE NECESSARY FROM THE PLANNING AND ZONING COM-
t� o o a MISSION.
v' < z AN APPLICATION FEE IS REQUIRED. CONSULT THE ,�EGULAT_ IONS
s 0 (SECTIONS 6.9, 6.9a and 6.9b).
A SIGN IS REQUIRED. CONSULT THE REGULATIONS (S 6.3a).
NOTE : Please direct t all SIGNED: A& `
inquiries and notices (Applicant) William E. Grace, for
to : William E. Grace ,John Samsel and Theresa Samsel
25 Oa land Road, South Windsor
Rev ised 8/12/85 644-1528
William E. Grace, for
0M John Samsel and Theresa Samsel (Owners)
j v
f CHECKLIST FOR REQUIRED INFORMATION
3
6. APPLICANT HAS HAD MAPS AND PL&NS CERTIFIED BY SOIL
CONSERVATION SERVICE TO VERIFY COMPLECE COMPLIANCE
WITH CONN:EGTICUT GUIDELINES FOR SOIL EROSION AND
SEDIMENT CONTROL ( AS PER HhuDBOUK, AS AMENDEDED,
AND PUBLIC ACT 83-388, AS AMENDED.
DATE OF CERTIFICATION
7, APPLICATION INFORMATION COMPLIES WITH AGENCY'S
REGULATIONS ( SECTIONS 7.1, a through j.
8. REQUIRED FEE HAS BEEN PAID.
DATE RECEIVED
9. APPLICANT ( OR DESIGNATED REPRESENTATIVE)HEREBY
ATTESTS THAT A SIGN WILL BE POSTED AT THE FOLLOWING
LOCATION(S)
BY ( NAME )
ON OR BEFORE ThE FOLLOWING DATE
SIGNATURE
THIS APPLICATION; IS FOUND TO BE COMPLETE AND NOW
QUALIFIES FOR PLACEMENT ON THE AGENCY'S AGENDA:
DATE SIGNATURE
Town: Zngineer
Agency Seely
Agency Chairman
THIS APPLICATION IS INCOMPLETE BECAUSE OF THE FOLLOWING
NUMBERED ITEMS ( FROM ABOVE ) AS CHECKED BELOW:
1 2 3 4 5
6 7 8 9
May 14, 1987 Vol
INZAr o c N1,0dSor
�RygJd�y ODS qG��c�
Kevin Rennie, Chairman SSt�
Inland Wetlands Agency/
Conservation Commission
1540 Sullivan Avenue
South Windsor, Conn. 06074
RE: Application #385
Terry Office Park Addition
Dear Kevin:
This is to inform you that John Samsel, Jr.
would like to extend application #385
for one year re: Terry Office Park
Addition.
Enclosed please find check #1433 for
$25. 00.
Very Truly yours,
1 c`
Theresa Samsel
Enc. one Check
F
co
G UotdA ?dz41d'4-0't
9 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
��ydsoe•co��� AREA CODE 203/644-2511
June 20 , 1986
William E. Grac uire CERTIFIED MAIL
25 Oakla
SC
ndsor, Ct 06074 /
J
Rlication #385 - Ter y Office Park - John & Theresa Samsel,
kland Road - Building Addition
Dorney Grace:
At the June 16 , 1986 meeting, the South Windsor Inland Wetlands Agency/
Conservation Commission approved with conditions , application #385 .
The following conditions must be adhered to for this permit to be
valid:
1 . Erosion and Sedimentation Control Measures must be shown on
the plan and must be in place prior to the start of construc-
tion.
' 2 . We recommend a bond in the amount of $1 , 000 be submitted to
Planning & Zoning Commission to ensure compliance with the
Erosion and Sedimentation Control Measures .
3 . Construction activities shall be subject to the approval
of the Town Engineer.
4 . The application shall indemnify and hold harmless the Town
of South Windsor against any liability which might result
from the proposed operation or use.
5 . The permit is valid for one year and shall expire June 16 ,
1987 .
Very truly yours,
John M. Moran, Jr. ,� irman
Inland Wetlands AggpQ /
Conservation Commission
Town of South Windsor
JMM:dlb
CC: A. B. Davies , Deputy Town Engineer
Richard Martel , Town Engineer
Robert Gilligan, Planning & Zoning Commission
Thomas D 'Auria, Building Official
Marcia Banach, Acting Director of Planning
Mr. & Mrs . John Samsel
John Shemo , Economic Development Coordinator
VITT 7- A
�ov'M 8E�
a
9 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
Soe•co AREA CODE 203/644-2511
,
June 22 , 1987
Mr . & Mrs . John Samsel
Buckland Road
South Windsor , Ct 06074
Dear Mr . Samsel :
RE: Permit Extension - Application #385 - Terry Office Park Addition
At the June 8, 1987 meeting , the South Windsor Inland Wetlands
Agency/Conservation Commission approved a one-year extension for the
above mentioned application.
The extension becomes effective June 16, 1987 with an expiration date
of June 16, 1988 . All original conditions of this permit apply.
Very truly yours ,
pC lll�lir•
Kevin F. Rennie , Chairman
Inland Wetlands Agency/
Conservation Commission
Town of South Windsor
KFR : dlb
CC : A . B . Davies , Deputy Town Engineer
Louise Evans , Chairman , PZC
Thomas D' Auria , Building Official
Marcia Banach , Director of Planning
Richard Martel , Town Engineer
Attorney William Grace