Loading...
HomeMy WebLinkAboutSite Plan - Conservation (168) r ` OR � � 1986 TOWN OF SOUTH WINDSOt 4VI INLAND WETLANDS AND WATER COURSES - APPLICATION INLAND WETLANDS AGENCY ACTION THIS APPLICATION, ONCE INFORMATION IS COMPLETE,_ (SEE BACK OF THIS FORM), SHALL BE RECEIVED AT A REGULARLY SCHEDULED MEETING OF THE AGENCY AT THE APPLICATION NO. TOWN HALL. RECEIVED DATE 91adyo THIS APPLICATION MUST BE FILED IN TRIPLICATE AT THE OFFICE OF THE TOWN CLERK OF SOUTH WINDSOR BY PUBLIC HEARING DATE 12 NOON AT LEAST 14 DAYS PRIOR TO THE FIRST (if necessary) REGULAR MONTHLY MEETING DATE. THREE SETS OF MAPS COMPLETED APPLICATION OR PLANS MUST BE SUBMITTED TO THE TOWN ENGINEER PERMIT GRANTED DATE AT LEAST 14 DAYS PRIOR TO THE FIRST REGULAR PERMIT DENIED DATE MONTHLY MEETING DATE. PLEASE PRINT OR TYPE. I. APPLICANT Russell and Dawson TEL. NO. 525-4291 ADDRESS 60 Washington Street CITY & STATE Hartford , CT . 06106 2. OWNER Joseph Honek TEL. NO. ADDRESS 45 Kirkside Avenue CITY & STATE Milford , CT . 0646n 3. LOCATION OF PROPERTY Route 5 , South of Strong Rd . & North of Glendale Rd . NAMES OF ADJACENT PROPERTY OWNERS Richard J . Grosso on South Side Florence & Peter Winton on North Side STATE CLEARLY AND BRIEFLY 5. PURPOSES AND DESCRIPTION OF THE PROPOSED ACTIVITY,AND THE TIME ELEMENT INVOLVED: Install storm drain and re-route portion of existing brook . ( SPP nrowj nga X_1 fhrniigh X_A ATTENTION: THE APPLICANT UNDERSTANDS THAT THIS APPLICATION IS TO BE CONSIDERED COMPLETE ONLY WHEN ALL INFORMATION & DOCUMENTS REQUIRED BY THE AGENCY.HAVE BEEN SUBMITTED. APPROVAL MAY ALSO BE NECESSARY FROM THE PLANNING AND ZONING COM- MISSION. 8 AN APPLICATION FEE IS REQUIRED. CONSULT TM2EGULATIONS o 0 (SECTIONS 6.9, 6.9a and 6.9b) . 0 c q A SIGN IS REQUIRED. CONSULT THE REGULATIONS (SECTION 6.3a). 2 `� SIGNED: r P�I2 Ar (Applicant Y; m '� � ~C Owner Revised 8/22/85 CHECKLIST FOR REQUIRED INF ORMl.T I ON 6 . APPLIC.;6NT HA6 HAD MAP6 AND PLN.NS CERTIFIED BY SOIL CONSERVATION SERVICE TO VERIFY COMPLETE COMPLIANCE WITH CONN:ECTICUT GUIDELINES FOR SOIL EROSION AND SEDIMENT CONTROL ( AS PER NT,NDBOUK, AS ANIENDEDED, AND PUBLIC ACT 83-388, AS AMENDED. DATE OF CERTIFICATION 7. APPLICATION INFORMATION COMPLIES WITH AGENCY'S REGULATIONS ( SECTIONS 7.] , a through j. 8. REQUIRED FEE HAS BEEN PAID. DATE RECEIVED 90 APPLICANT ( OR DESIGNATED REPRESENTATIVE)HEREBY ATTESTS THAT A SIGN WILL BE POSTED AT THE FOLLOWING LOCATION(S) BY _( NAME ) ON OR BEFORE ThE FOLLOWING DATE SIGNATURE G,✓ ZV a^ THIS APPLICATION IS FOUND TO BE COMPLETE AND NOW QUALIFIES FOR PLACEMENT ON THE AGENCY'S AGENDA: DATE SIGNATURE Town Engineer Agency Sec'y Agency Chairman THIS APPLICATION IS INCOMPLETE BECAUSE OF THE FOLLOWING NUMBERED ITEMS ( FROM ABOVE ) AS CHECKED BELOW:` 1 2 3 4 5 6 7 8 9 1 { to .�y� ,•:,, +ra �� � ,�� ; /�Pot. ��6q' -e .i. �` Ti• e - ,IF - f iM •►. �,��' It.► .t, r L� f(�,�+Z 4'mil f j i` '` �• - � ' _ to � c"+. � I r Sr� �:• hp�� .f .it � 1' � � / •� I Aly 4 SITE Ce ' 11 ut,owt. `uewe Scale 1 Inch a^ ft.or 2,100 - - S ,I" - fM .N .Z _ .. y `+" Ctmtour uttenml-1 And 2 It Datum is USCbS Datum 2era of CtlMJ'uttes 150,000 it."South and Wen of Las.40 45'4r.641 and Long.72'44'.35'.476 Puy 1947 adjusted values of Geographic Positions for Sheet Cornett subtract 0.037 secomis from latitudes H and Al 0'.254 seconds to lungitt+des to pnuncter shown. • -t— Phase Phase III I LINE aF TbMpOlc.4 FY R5 LOCATION OF [ONSTKUCTLON ENTRANCE PRO Pos6P MH'C�y UUIUIMH r — 9UII.�ING `L M" 411 4M e_5 HF_APWALL 1&- 17 tl2 CONNECTING Phase it _t _ L6_RCp PIpG , 1 3 Phase Ad IGETBNTION ". PIA N. �- EXIST• aver'FLOW�,� MA.f,- OUT66T W-/CoNC ENTRRN HC4APWAL,L C_!Up-RAP. �-_ / / -• HEAD WALL Phase �,� 4r RIP.-RAP• IL of pROPosep Phase IV 51 PLAN SCALE: 1"_4,!a° Ccru�,ruc��vr•+ �e�u�ace, i PHASE I P Construction entrance: entrance to the project site to be constructed A first with 1$"-2'k" clean stone. Stone tracking pad to be maintained t at all times during construction. s PHASE II a ; a Construction of retention basin, inlet and outlet: construct retention S basin as shown on plan, including CS No. 1, concrete head wall, overflow manhole and outlet.. Stabilize bank of retention basin, 1 PHASE III Re-route existing brook into retention basin as shown on plan. See specification for stabilizing banks of temporary diversion channel. PHASE IV Construction of relocated brook, head wall, manhole No. 2 and connecting pipe: see specification for stabilizing bottom and banks of brook. Keep water out until good vegetative lining is established. PHASE V Construction of C9 No. 2, manhole No. 1, pipe between CS No. 2 and _manhole No. 1 and manhole No. 2, make final connection. This Phase will complete re-routing of the brook. PHASE VI `,Zackfill temporary diversion channel. Patch retention basin as necessary. -':PHASE VI ;'Clear site for proposed structure, drive and parking area. Strip and P, stockpile topsoil in amounts necessary to complete finish grading of �'all exposed areas requiring topsoil. Temporarily seed area to prevent �ijerosion if it is to remain more than 30 days. ».PHASE VIII # .>MExcavate for proposed building and construct foundation, x_ PHASE'IX :Install underground utilities and sewers as indicated on plan. ,PHASE X _—.----. . - �yy "Upon completion of utility installations, place curb a gse'course on parking nd bituminous lot as shown an plan. PHASE XI Remove temporary structures and erosion control systems including accumulated silt. inisfi grade ail open areas and landscape as per plan. See Drawing _•. _ -2 far additional soil erosion and sedimentation control data and details. �r-»^;` FjQS [W ND SFi1I�tfNT NTR�L NOTES *zoeioa and aedimentakion control work sha1S be done� tin stric ; �g,f:ccnrde4oe with the applicable local state and federal standards for;.:, i .ter- same A' ding-the latest data lrom the U.S. gepartment of Agriculture, i r'3��:FyF •Co rva.Litm Service. r: }vr f��� yi;�rh'+ r �.. •--7 {� 0.',e l'' '- - :cK ' Iy-E perii[heni` iposed fdceeof earth cats and fills shall�be veg . .y i + titad r'tithetwi'ae protected from'frosiolr'• w;:` rim Yb be Joii wi no stoc)tpiliaq oil thin a five font limit of add ' t � F 4F imne :lcgb brash rubbleh rocks, stamps'end vegetable matter which .f••Kt i21 aLnierfere Kith the grading operation or'affect the planned stabil i l i ufrxtil3.areaa:`shall be removed.and-disposed of by approved means:' s ibpsQi l'i'a to be ,tripped and stockpiled in amounts necessary do com-a �^ pleti£'linished grading of all exposed areas requiring topsoil All - AY kplled topsoil-is to be located toward the rear of the lotjand needed to prevent erosion if it is to remain more than 6c ;Any sad sal fill material ie-to be free of brush, rubbish, timber, - +s�fcAs. vegetative matter, and stumps in amounts that will.be detri- '�,.; tel:Lpconstructing stable fills. - - •> �. Eh1L:areas shall be compacted sufficiently for their intended ipilrpoae,and ae required to reduce slipping, erosion or excess satura-� 8 7j3�Aiitirbed areas shall be left with.afneat and finished appearance And.fhpll be protected from erosion. - tif _ 9.:x37►Y2 soil arosioa-and sediment control operations shall be in place !--.:;grior to any grading operations and installation of proposed struct- }'..KKkfrea.br Sitilities and shaI2 be left in place until construction is completed:and/or area is-stabilised. -• - - . Ia. .-Where necessary, disturbed areas shall be temporarily seeded and/or "aulched.until proper weather conditions exist for establishment of a - - 7 Dermanent.vegetative.cover.- IS.'--Xl1 grading is to be done on areas that are to be immediately used },fear construction of buildings and parking areas at the same time ' _ i7:eroeioq-control measures are,being installed. - llaximuei aide alopen of-exposed surfaces of earth.tb be 2t1 or-as otherxISO apeaifled by local.aathorities. •}.,.' Straw• y baYee are.to be provided around all proposed inlets upon � tc their-.donstruation to filter rm-off and to prevent siltation of the ator�'i)ikeY;aY stem.Sales are to-be set embedded in the earth a minwo it,K,im:m: _.a, •.� aes *hall.be-placed in.such:$'way on to tightly abut a9jecent baIs and be securely anchored In place 6y re-bar3 or ' ac-2'-stakes driven 1h, -.2•.into the ground. The first stake or •=-';` ^•': =bus's)iall be.driven toward the previously-laid bale. 'Bales are toDe- x,_.4jy,i Zap laced•alter a severe_store or upon noticeable deterioration.;. - Y t;t�N%yaler are!o be placed.as noted.on Plan• A. ; OMI �., itibranc�es Eothe-project site are to be protected by stone track. 1.9.Jng•pads of 1y. -.24" clean stone if indicated on plan. stone.track-H' - ing pad to bit maintained at all times daring the construction period. - - g and,tdpaoiling aliall be dons dnrinq AplSmva da[airar deflned,•:r+ _ logat'standards: Topsoil shall contain at.least 61 orgmnid natter#%, sham be'ground limestone containing at Yeast 85a total•cas onatiq tl°•4'aopplied at arrate of 50 pounds pet 1,000 sq _ft,. for tamN, • '.applications and 135 pounds pet 1,000sq:.ft. for permanent; 2Cj1q.fggtilizer shall be-applied per manufacturers recomnendatiahs �th at..-16sst 140 lb./1000 sq..ft-and shall comely with applicable e - a2 te.fertilizer laws. Grasa' eedahnllbe $ mix of Perennial Ryegraes - r' 1 �•`7.b.i1000 sqe ft., Chewing$ Red.Fbscue 3/8'lb./1000 sq..ft. -and Ren- ,t, n-tgg7iyt:Blueqrasa 3/e lb./1000 sq.-.f Salt hay mulch applied at a rota � pgj7g-to 90 pounds per 1000 sq. ft shall be utilized where necessary - T•�x' and anchored with emulsified asphalt applied at a rate of 0.075 gallons i� r het square yard. , + s 18w2 Sr areas are designated for stabilization with sod, use the same lime >> d•feitilizer required for permanent seeding and work into soil a min- .: of 1 inches. Sod strips are to be laid on the contours with snug \ ;Fi?„�y'even joints.. Roll or tamp sod upon placement to ensure contact with mat io sell:- Peg soil with wood pegs, wore staples or split shingles. :-Haiata'n gptimum moisture for at least 2 (two)-weeks. 17r~IConstru, ion sequence of erosion control measures shall be as follows: A:.- .Place all soil erasion control structures as shown on plan as needed. - • V.'. Remove and stockpile topsoil in areas designated by the Site 'Engineer. Areas disturbed are to be used for immediate construe- - Lion onlye Stabilize all exposed areas by seeding and/or mulching • C... Excavate.for proposed building and construct foundation. D. .install underground utilities and sewers as Yndicated on plan. _ S.. Immediately following installation of storm sewer, place straw bales around each inlet and secure in place with 2" x 2" x 9' - wood stakes or 3/0' re-bars to form a tight enclosure around the inlet. Replace straw bale filter upon noticeable deterioration. F.'-Upon completion of utility installations, place curb and bitum- inous base courseon parking lot as.shown on plan. G---•.Remove�alI temporary structures and erosion control systems in- eluding accumulated silt- Finish grade grade all open areas and landscape as required. ; 1 i United States Soil r Department of Conservation 1101 Kennedy Rd, Rm 105B Agriculture Service Windsor CT 06095 Phone 688-7725 April 8, 1986 TO: Amy M. Parker, District Mgr Hartford County Soil & Water Conservation District FROM: J. Eric Scherer, Resource Conservatjo s� USDA Soil Conservation Service FOR: Sudhakar Nagardeoiekar Russell & Dawson 60 Washington St Hartford CT 06106 RE: Site Plans for Connecticut Driveshaft Co., Inc. South Windsor On April 2, 1986, a site visit was made to review a proposed development located on US Rte 5 in South Windsor between Strong Road and Glendale Road. Site plans, dated 3/5/86 were also reviewed. The purpose of the review was to determine the most appropriate siting of a drainageway that flows from Route 5 across the property in a western direction.- Existing Situation A 30 inch CMP is outletted from Route onto the property. Presently the CMP Is blocked with debris for the most part. A 3 to 4 foot open ditch picks up water from the CMP and flows across the property towards the west. The present road drainage system would be greatly improved by upgrading the whole system. Considerations in upgrading the system should include: improved road drainage; improved safety along road; improved maintenance of road and drainage system; aesthetics. RECOMMENDATIONS - Replace the existing open ditch with CMP or RCP as dictated by town engineer. Size of pipe would depend upon town requirements. - Suggest a surface inlet be installed on Route 5 shoulder to facilitate intake of road surface water. - Continue the pipe to proposed culvert crossing of driveway. Install a plunge pool at this outlet. - An Erosion and Sediment Control Plan should be developed for this site that includes, but is not limited to the following: - Construction and control measure sequence - Seeding recommendation - Construction entrance pad and detail Details of plunge pool , ditch and other control measures Retention basin details CC: Marcia Banach, Asst Town Planner CC: Richard Martell, Town Engineer 0 The Soil Conservation Service Vis an agency of the Department of Agriculture 1101 Kennedy Rd., Rm 105B United States Soil Windsor CT 06095 } Department of Conservation 5 Agriculture Service Phone: 688-7725 May 1 , 1986 TO: Amy M. Parker, District Manager Htfd County Sol [ & Water Conservation District FOR: Sudhakar V. Nagardeolekar Russell and Dawson Architecture & Engineeri FROM: J. Eric Scherer, Resource Conservationist USDA-Soil Conservation Service RE: Site Plan Review Connecticut Driveshaft South Windsor CT 06074 On April 2, 1986 a site visit was made to review plans for "Connecticut Driveshaft" on Route 5 in South Windsor, CT. Site plans, dated 4/3/86 and 4/15/86, were reviewed. This review is supplemental to an earlier review from this office dated 4/8/86. The Soil Erosion and Sediment Control Plan overall appears correct and should adequately address site needs. The following comments are offered and should be Incorporated into the plans. Comments -- Remove those details on sheet X.2 that no longer pertain to Erosion and Sediment Control plan ( ie. details E and F). -- Remove Erosion and Sediment Note 2 and Note 17 from the plans (sheet X.2). -- Indicate in Note 4 on sheet X.2 who will be responsible for approval of disposing of "'bulky wastes". -- In Note 6 on sheet X.2 eliminate portion of statement that indicates any "bulky waste" will be included in fill material . -- In Note 10 and Note 15 on sheet X.2 where on sheet X.4 dates for seeding can be found. -- Note 14 on sheet X.2 should state that the stone tracking pad J.& required and show location on site plan. - In Note 16 reword sentence to read "if time restraints become limited then sod will be used in lieu of permanent seeding." O The Soil Conservation Service Vis an agency of the Department of Agriculture �A to•NN Sf 4,07 '6 y O :) 7-U- Wt1_ 0-14?Sotd C U o � 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 + l�dSOR- 0 AREA CODE 203/644-2511 May 20 , 1986 CERTIFIED MAIL Russell and Dawson 60 Washington Street Hartford, Ct 06106 Attn: Sudhakar Nagerdeolekar RE: Connecticut Driveshaft Co. Inc. - Application #387 Dear Mr. Nagerdeolekar: • At the May 12 , 1986 meeting, the South Windsor Inland Wetlands Agency/ Conservation Commission approved with conditions application #387 . The following conditions must be adhered to for this permit to be valid. 1 . All of Hartford County Soil and Water Conservation Districts suggestions must be incorporated into the plans . 2 . We recommend a bond in the amount of $5, 000 be submitted to Planning and Zoning Commission to ensure compliance with erosion and sedimentation control measures. 3 . Construction activities shall be subject to the approval of the Town Engineer. 4 . The application shall indemnify and hold harmless the Town of South Windsor against any liability which might result from the proposed operation of use. 5 . The permit is valid for one year and shall expire May 12, 1987 . Very truly yours, John M. Moran, Jr. , airman Inland Wetlands Ag / Conservation Commi ion Town of South Windsor DLB CC: Joseph Honek, Owner Marcia Banach, Acting Director of Planning A. B. Davies , Deputy Town Engineer Richard Martel, Town Engineer Thomas D'Auria, Building Official Robert Gilligan, Chairman, Planning and Zoning Commission John. Shemo, Economic Development Coordinator CT -Drive to( . 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 R•c� AREA CODE 203/644-2511 June 18 , 1986 Mr. Joseph Honek Connecticut Driveshaft Co. Inc. C/O Russell and Dawson 60 Washington Street Hartford, Ct 06106 RE: Connecticut Driveshaft Building in South Windsor Dear Mr. Honek: I took the liberty of asking Mitchell Excavating to not do any more digging on the site until the conditions of approval imposed by Planning and Zoning Commission have been complied with such as : #5 prior to commencement of site work, a meeting must be held with Town Staff. Considering the cooperation of the designers and the effort that went into the proposal, this excavation work seemed inconsistent with our past exposure to this site. A pre-job meeting has been scheduled for 6/23/86 at 9: 00 at the Town Hall. Very truly yours, A. B. Davies , Deputy Town Engineer ABD:dlb CC: Richard Martel, Town Engineer Marcia Banach, Acting Director of Planning Planning & Zoning Commission Sudhakar Nagerodeolekar Mitchell Excavators , Inc. CONNECTICUT DRIVESHAFT CO., INC. 470 NAUGATUCK AVE.-P.O. BOX 2-188 DEVON- MILFORD,CT.06460.(203)877-2716 June 26, 1986 0V Mr. John M. Moran, Jr.. 9 Chairman ; Inland Wetland Agency/ Conservation Commission Town of South Windsor 1540 Sullivan Avenue • South Windsor, Conn 06074 tp "0!'t Dear Mr. Moran: Enclosed please find a check (no. 782260) in the amount of $5,000. This check is to be held to insure compliance with erosion and sedimentation control measures, and to be returned to me upon your receipt of my bond (approximately three (3) weeks). If there are any further questions please call me on 1/800-972-9782. Sincerely, CONNECTICUT DRIVESHAFT, INC. Vl p �. Joseph A. Honek CYn , President JAH:gb ' encl: 1 �tOwN SF�< 'N G' 0LIJf2 OLLU2 CC�'Lt�c�-C3� 9 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 �J�dsOR-CO'�w AREA CODE 203/644-2511 July 16 , 1986 Joseph Honek Connecticut Driveshaft Co. , Inc 60 Washington Street Hartford, Ct 06106 RE: South Windsor Site Dear Mr. Honek: Within the past week, we have been contacted by your abutter to the north, Mr. Peter Winton, concerning storm water run-off from his land into yours. It is my understanding that a pipe is proposed. He has contacted the excavator to have it done reasonably soon. From the Town' s point of view, it is a good proposal in that it provides a logical outlet for the surface drainage and the timing is appropriate. If you have any questions , I can be contacted at 644-2511 Ext. 244. Very truly yours, A. B. Davies Deputy Town Engineer ABD:dlb CC: Richard Martel, Town Engineer Marcia Banaeh, Director of Planning Peter Winton - la-75 JZVkn (7N4r-k Mitchell Excavating - ctO 6wZk jie1j Dr S„v ... -nmunnUNatser. ak- C-0mran'V.-Mc. March 16, 1987 Louise Evans, Chairman Planning & Zoning Commission Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 Re: Connecticut Driveshaft Bond #6022123-Permit for Sitework-John Fitch Blvd. Bond #6022124-Permit to Ensure Compliance with Erosion & Sedimentation Control Measures Dear Ms. Evans: This is to request that the above-captioned bonds in favor of the Town of South Windsor be released for cancellation by the Hartford Accident and Indemnitv Company. Please either forward the original bonds to me or issue a letter on behalf of the P & Z releasing the bonds as of an effective date of or prior to 5/12/87. If you have any questions or comments, please feel free to contact me at 563-8111, Extension 193. Thank you. Very truly yours, "A Debra S. Peiffer Bond Assistant dsp Ck the WAETSQN I All �Cjzcup - 1 CONNECTICUT =DR1 INC. 470 NAUGATUCK AVE. • P.O. BOX 2-188 DEVON.MILFORD,CT.06460. (203)877-2716 April 13 , 1987 Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 Attn : Ms. Debbie Delisi RE : Application #387 Dear Ms . Delisi : Attahced please find our check in the amount of $25. 00 to cover the extension of above subject application for a period of one year . Above application expires on May 12 , 1987. Please advise if other documents or letters are required for the extension to be granted. Thank you, CONNECTICUT DRIVESHAFT INC. A. D. Bua V. P . Marketing /es Enc: COS check # 24572 r �O'MN a 4 A 70-ulov, O-P SotdA ?dzfU&0t a�yV 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 soeT AREA CODE 203/644-2511 May 22 , 1987 Connecticut Driveshaft CERTIFIED MAIL 470 Naugatuck Avenue P .O. Box 2-188 Devon Milford , Ct 06460 Attn: A . 0 . Bua Dear Mr . Bua: Re: Permit Extension for Application #387 At the May 18, 1987 meeting, the South Windsor Inland Wetlands Agency/Conservation Commission approved a one-year extension for the above mentioned application . The extension becomes effective May 12 , 1987 with an expiration date of May 12 , 1988. All original conditions of this permit apply. Very truly yours , vin F . ennie , Chairman Inland Wetlands Agency/ Conservation Commission Town of South Windsor CC: A .B . Davies , Deputy Town Engineer Richard Martel , Town Engineer Marcia Banach, Director of Planning Michael Gantick, Director of Public Works Thomas D' Auria, _Building Official Louise Evans , Chairman , PZC 4WONNECTICUT 0RIVESHAFT ►NC. 470 NAUGATUCK AVE.•P.O.BOX 2-188•MILFORD,CT 06460•(203)877-2716 366 CHAPEL ROAD SOUTH WINDSOR,CT 06074•(203)282-9015 27A SOUTH COMMONS ROAD•WATERBURY,CT 06704•(203)753-5762 981h MILL PLAIN ROAD•DANBURY,CT 06811 •(203)797.1888 April 12, 1988 Phyllis Mann Town of South Windsor 1540 Sullivan Ave. South Windsor, CT 06074 Dear Ms. Mann: Re: Applicationik 387 Attached please find our check in the amount of `&25.00 to cover the extension of the above subject spplication for a period of one year. Above application expires on 5/13/88, as mentioned in your letter of 4/4/88 to Russell 6 Dawson. f Thank you jslo APR 12 15db Sincerely, $4NJth W.iidsdr Connecticut Driveshaft, Inc. INLAND VvE9v�`FjdS AGEN&/ ICOWERVA1Ij1V COMMISSION Al Bua, Vice President Marketing a co U 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 a•co� AREA CODE 203/644-2511 April 28, 1988 Mr. Al Bua, Vice President of Marketing Connecticut Drive Shaft 366 Chapel Road South Windsor, CT 06074 RE: APPLICATION #387 CONNECTICUT DRIVESHAFT, INC. JOHN FITCH BLVD. Gentlemen: Section 4 . 13 . 6 of the Zoning Regulations, Conservation Plan (a copy enclosed) establishes the criteria for such a plan and a method of monitoring its application. A permit for your proposal was granted, with a bond as assurance of compliance with its sedimentation and erosion control measures. To assist in the review process by the Inland Wetlands Agency/Conservation Commission, whether for a permit extension or specific inquiry request, the provisions for verification through progress reports by the developer's/applicant's Engineer demonstrating that each Erosion and Sedimentation control measure has been installed and maintained, in accordance with the approved plan shall be required. It is requested that this verification report be submitted at least two weeks before the regular meeting of the IWA/CC to permit time for the Commissioners to evaluate your project controls . Very truly yours, A. Bowen Davies _ Deputy Town Engineer ABD/jsv Enclosure cc: John M. Moran, Jr. , Chairman, IWA/CC Michael J. Gantick, Director of Public Works Marcia A. Banach, Director of Planning IWA/CC ✓ PZC 10'q N SE•,( Tiov� o .i 9 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 c, soe•co�'�� AREA CODE 203/644-2511 May 19, 1988 CERTIFIED MAIL Connecticut Driveshaft Company c/o Russell & Dawson 60 Washington Street Hartford, CT 06106 RE: Application #387 Gentlemen: At the May 9, 1988 meeting, the South Windsor Inland Wetlands Agency/Conservation Commission approved a one year extension of Application #387 with all original conditions . The application becomes effective May 14,1988 and expires May 14, 1989 . Very truly yours, John M. Moran, Jr. , Chairman Inland Wetlands Agency/ Conservation Commission JMMJr. /pmm cc: A.B. Davies, Deputy Town Engineer Marcia A. Banach, Director of Planning Michael Gantick, Director of Public Works John R. Collins, Chief Building Official Raymond Hallowell, Chairman, Planning & Zoning rNl-