Loading...
HomeMy WebLinkAboutSite Plan - Conservation (167) TOWN OF SOUTH WINDSOR �11�41986 INLAND WETLANDS AND WATER COURSES �. qko APPLICATION INLAND WETLANDS AGENCY ACTION THIS APPLICATION, ONCE INFORMATION IS COMA (SEE BACK OF THIS FORM), SHALL BE RECEIVED AT A ' Q REGULARLY SCHEDULED MEETING OF THE AGENCY AT THE APPLICATION NO. V TOWN HALL. RECEIVED DATE& y c�yl$� THIS APPLICATION MUST BE FILED IN TRIPLICATE AT THE OFFICE OF THE TOWN CLERK OF SOUTH WINDSOR BY PUBLIC HEARING DATE 12 NOON AT LEAST 14 DAYS PRIOR TO THE FIRST (if necessary) REGULAR MONTHLY MEETING DATE. THREE SETS OF MAPS COMPLETED APPLICATION OR PLANS MUST BE SUBMITTED TO THE TOWN ENGINEER PERMIT GRANTED DATE AT LEAST 14 DAYS PRIOR TO THE FIRST REGULAR PERMIT DENIED DATE MONTHLY MEETING DATE. PLEASE PRINT OR TYPE. 1. APPLICANT TEL. NO. 61,92'ROW C/o /YI�APf/NJ/ CL ADDRESS A0 ll 1j,,*c Loy salre 301 CITY & STATE t IAWS&q Cr o(cog5 2. OWNER R144A4- ,D S- leezZ-K TEL. NO. &qll' f9(P / • ADDRESS 111/1/ ELLIit aq?-?t! jolo• CITY & STATE So. ty."yo 'DQ c7 o1o07ef 3. LOCATION OF PROPERTY ,6aKeL.,lW-,0 &A /7-7- .Five �S NAMES OF ADJACENT PROPERTY OWNERS �-L-���i SaC�c/y STATE CLEARLY AND 13RIEFLY 5. PURPOSES AND DESCRIPTION OF THE PROPOSED ACTIVITY,AND THE TIME ELEMENT INVOLVED: SSu6�OvAsiav ocl0��Y �oa�.STRNcT/O�V o1� .�SOo SF Qc'�'Titu.Q/¢�yT' W/Ttt !vl C�iy .O/tA�,VG LoT r ATTENTION: THE APPLICANT UNDERSTANDS THAT THIS APPLICATION IS TO BE CONSIDERED COMPLETE ONLY WHEN ALL INFORMATION & DOCUMENTS REQUIRED BY THE AGENCY.HAVE BEEN SUBMITTED. a APPROVAL MAY ALSO BE NECESSARY FROM THE PLANNING AND ZONING COM- - z w MISSION. co on a 9 AN APPLICATION FEE IS REQUIRED. CONSULT THE-3_EGULATIONS _coo (SECTIONS 6.9, 6.9a and 6.9b). z a A SIGN IS REQUIRED. CONSULT ONS SECTION 6.3a). 4-1 0 o o cr SIGNED: zz li ant) (Owner) Revised 8/12/85 CHECKLIST FOR REQUIRED INFOP ATION 6. APPLICANT HAS HAD RIAP6 AND PLANS CERTIFIED BY SOIL CONSERVATION SERVICE TO VERIFY COMPLETE COMPLIANCE WITH CONNECTICUr GUIDELINES FOR SOIL EROSION AND SEDIMENT CONTkOL ( AS PER H!:iNDBOUK, AS AMENDEDED, AND PUBLIC ACT 83-388, AS AMENDED. DATE OF CERTIFICATION To �.�,dLF .o,8y7taw.y' 7. ✓ APPLICATION INFORMATION COMPLIES WITH AGENCY't REGULATIONS ( SECTIONS 7.10 a through j. 8. ✓ REQUIRED FEE HAS BEEN PAID. DATE RECEIVED 90 APPLICANT ( OR DESIGNATED REPRESENTATIVE)HEREBY t. ATTESTS THAT A SIGN WILL BE PCISTED AT THE FOLLOWING ' LOCATION(S) Ro BY fi?0*Y/A) �'i�QD ( NAME ) ON OR BEFORE ThE FO OWING AR65 SIGNATURE THIS APPLICATION IS FOUND TO BE COMPLETE AND NOW (QUALIFIES FOR PLACEMENT ON THE AGENCY'S AGENDA; DATE SIGNATURE Town Engineer , Agency Sec'y Agency Chairman THIS APPLICATION IS INCOMPLETE BECAUSE OF THE FOLLOWING NUMBERED ITEMS ( FROM ABOVE ) AS CHECKED BELOW: 1 2 3 4 5 6 7 8 9 r- t tr q _ - � _ yr ✓P AO Od�XJ12g ML ��► � ss�j�°1 sod - --- -- - _ _--- i it N ;O �b �a o3°ii'/a"E /s780' 977E 8.4 cs-TYPE 0 91. 99.0 --- /aa3 I - L7rLe� I I O I Gas 7/I NEW • 1 T°nAs � � ECEC h',e➢oLE cn.o saw 9s.o 4._ C t 4I I '• `-L(6ieenhouse cro /047 \ ♦ \ G _ l /L0.0 r rO 2L9 OLO I��/ l lA�y 09 9y 0 TF= 9d!.7 �/ g., Xnr-985' 0 68 ,2`nY.= 9hi 33 98.0 I 9 9.4 ' .8.TYPE C .°r w n•oe hr._ Can�seaPe�/77�r,a/ o� I SM.N. s R.m:9G¢B 919c Ra a N. -- i— Son.Seri eE // veal vv z ror Hv Tap of,/paon/ T— / - Piop.lnr=9d6 J' SMN / C..r6 7-- I�Gcy� - i e Y9.32 q',/ g8 4g yrm.9R33 /Ipo - Ipl � B!/C/K,L AND ����� ROAD �, � � •- _� DRAINAGE CALCULATIONS Storm Run-off Retention System �s pew Fuss O%1/ell 1C'lvr2S far R.SA- Inc ISCHEDULE OF EVENTS 1, Refer to Erosion Control Notes and initiate all recommendations prior to construction start. 2, Storm Drainage Basin is to be constructed so as to retain all mud and silt caused during construction on site. 3, All excavated materials from foundations and utility trenches are to be stockpiled on site within the straw bale enclosure. See Stockpile of Waste Material notes below. 4, S tone Access Gravel Bed is to be constructed as shown on the Conservation Plan /% " B�o/se/I Sf0/761" 6" I-Aiclf 5, Construction of Building, Parking Area, Curbing etc. as per local codes. 6, Conservation measures are to remain until all areas disturbed during construction have been stabilized. STOCKPILE OF WASTE MATERIAL i 1, Stockpile of waste material in excess of 2,500 cubic yards shall not be allowed on site. z, All stockpiled waste material storage pile bottoms shall be protected by staked straw or hay bales. 3, No stockpiling of waste material shall be in wetlands area or within 50' of any wetlands. ¢, Preconstruction conference with town of South Windsor Planning and Engineering Dept. is required. SE44 7-awn 0-ie S-0� T&� C � ti 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 �NdsoR-CO AREA CODE 203/644-2511 July 16, 1986 Manchester Food Services CERTIFIED MAIL C/O Martin Siddell 10 Univac Lane, Suite 303 Windsor, Ct '-0609 RE: Application #388 - B rger King, located on Buckland Road at the Five Corners. Subd'vision of land by R. Kelley and construction of 3500 s. f. restaurant with 61 car parking lot. Dear Mr. Sidderl:J At the July 14 , 1986 meeting of the South Windsor Inland Wetlands Agency/ Conservation commission, the agency voted to deny application #388 without prejudice for reasons being that this application is no longer active. You may re-apply at any time. Check with the Engineering Department about particulars if you have any questions. Very truly yours, John M. Moran, Jr. , Chi- man Inland Wetlands Agency/ Conservation Commission Town of South Windsor JMM:dlb CC: Richard S. Kelley, RSK-Kellco A. B. Davies , Deputy Town Engineer Planning & Zoning Commission Thomas D'Auria, Building Official Marcia Banach, Director of Planning John Shemo, Economic Development Coordinator Richard Martel, Town Engineer