Loading...
HomeMy WebLinkAboutSite Plan - Conservation (164) TOWN OF SOUTH WINDSOR �� a1 .,, INLAND WVTLANDS AND WATER COURSES APPLICATION INLAND WETLANDS AGENCY ACTION THIS APPLICATION SHALL BE RECEIVED BY THF. INLAND WETLANDS AGENCY AT THE REGULAR- �y�, �y LY SCHEDULED MEETING ON THE SECOND MON- APPLICATION NO,i�' . '_I I DAY OF THE MONTH AT THE TOWN HALL. RECEIVED DATE 155I RID THIS APPLICATION MUST BE FILED IN TRIPLICATE AT THE OFFICE OF THE TOWN CLERK TOWN OF (If necessary) PUBLIC HEARING DATE SOUTH WINDSOR, AT LEAST TEN DAYS PRIOR TO COMPLETED APPLICATION THE REGULAR MEETING DATE. PERMIT GRANTED DATE A SET OF PLANS MUST BE SUBMITTED TO THE TOWN ENGINEER AT LEAST TEN DAYS PRIOR TO PERMIT DENIED DATE THE REGULAR MEETING DATE. PLEASE PRINT. 1. APPLICANT_ , �j nTto��l!/`dre Trio - TEL. NO. . ADDRESS 17W (nlfnnTx,n t�c� CITY & STATE- Sj /�r�S� (7lf 2. OWNER ,r1jars7 S epllrc.J TEL. NO. ADDRESS_ _rrp_ CITY & STATE C� 3. LOCATION OF PROPERTY_( �i� l J NAMES OF ADJACENT PROPERTY OWNERS rl 7Y ri /l rc Ilr n C] c� l _Gam— . �j ��. �hr ��O�i a �ci C �Ci rUI I r J STATE CLEARLY AND BRIEFLY 5. PURPOSES AND DESCRIPTION OF THE PROPOSED ACTIVITY,AND THE TIME ELEMENT INVOLVED: ATTENTION: THE APPLICANT UNDERSTANDS THAT THIS APPLICATION IS TO BE CONSIDERED COMPLETE ONLY WHEN ALL INFORMATION & DOCUMENTS REQUIRED BY THE AGENCY HAVE BEEN SUBMITTED. t® iz-o APPROVAL MAY ALSO BE NECESSARY FROM THE PLANNING AND ZONING COM- ,� m MISSION. 0oQ - z 'I1 -A►fiEM61LA� �rR-A+FEfi�irF{A g AN APPLI CATI ON FEE IS REQ UI RED. CONSULT THE REG ATI ONS. - A SIGN IS_REQUIRED. o o ' CON / GULI S. / n N z N SIGNED: ( C a '1/ I1�-t G'� ✓/� s'�� / z (Applica (Owner) Revised 9/20/82 4 ) . Application #391 - RSK - Shopping Center: •1 . Wetlands are indicated. 2 . Sheet SD5 - The engineer persists in grading or draining into the abutters without protection. Not too clever. 3 . Sheet SD7 - Considering the clearing that was done on the site , it does appear very thin restoration of the open area. 4 . Sheet SD9 : 1) Hay bales in wrong spot. 2) Stock pile? 3) Construction sequence - Spring 1986 - As soon as practical . 4) Same as application #390 . 5) Completion fall 1986 - revise E&S This is a very visible site. The improvements , landscaping outside the pavement area should be done before a C .O. It is nice to have a total picture of what is to happen at Buckland and Ellington, but applications #390 and #391 are separate and should be complete enough to stand on their own. If and when , after the plans are revised and an approval might be granted, a conservation bond of $15 , 000 might be in order.