HomeMy WebLinkAboutSite Plan - Conservation (153) TOWN OF SOUTH WINDSOR INLAND WETLANDS AND WATER COURSES APPLICATION THIS APPLICATION SHALL BE RECEIVED BY THE INLAND WETLANDS AGENCY ACTION INLAND WETLANDS AGENCY AT THE REGULAR- LY SCHEDULED MEETING ON THE SECOND MON- APPLICATION NO. It Lila �i- DAY OF THE MONTH AT THE TOWN HALL. RECEIVED DATE T ID'O(o THIS APPLICATION MUST BE FILED IN TRIPLICATE AT THE OFFICE OF THE TOWN CLERK. TOWN OF PUBLIC HEARING DATE(if necessary) SOUTH WINDSOR, AT LEAST TEN DAYS PRIOR TO COMPLETED APPLICATION THE REGULAR MEETING DATE. PERMIT GRANTED DATE A SET OF PLANS MUST BE SUBMITTED TO THE TOWN ENGINEER AT LEAST TEN DAYS PRIOR TO PERMIT DENIED DATE THE REGULAR MEETING DATE. PLEASE PRINT. 1. APPLICAtm1T Andover Equities, Inc, TEL. NO. 724-6330 - ADDRESS 22D Andover Drive CITY & STATE W. Hartford, CT 06110 2. OWNER Same as applicant TEL. NO. r ADDRESS CITY & STATE ` 3. LOCATION OF PROPERTY Mill Pond Dr., South Windsor, CT NAMES OF ADJACENT PROPERTY OWNERS Bryerwood Condominiums and Mill on the River Restaurant, n.f: STATE CLEARLY AND BRIEFLY "S. PURPOSES AND DESCRIPTION OF THE PROPOSED ACTIVITY,AND THE TIME ELEMENT INVOLVED: Grading and filling in Phases 5, 6, 7 & 8; Complete playfield area in Phase II. ATTENTION: THE APPLICANT C UNDERSTANDS THAT THIS APPLICATION IS TO BE CONSIDERED COMPLETE ONLY WHEN ALL INFORMATION & DOCUMENTS REQUIRED BY THE AGENCY HAVE BEEN SUBMITTED. h=J } zz z APPROVAL MAY ALSO BE NECESSARY FROM THE PLANNING AND ZONING COM- `p o MISSION. C U g z T.iA►C�Is1�:�►� �4Rii - W AN APPLICATION FEE IS REQUIRED. CONSULT REGULATIONS. ZA SIG_ IS_QUIRED. CO S THE 0 . SIGNED z (Ap !cant ( caner Revised 9/20/82 --- CHECIO= ----FOR. --MQUIRED--_INF ORMAT ION 6. APPLICANT HAS HAD Mr-PS AND PLANS CERTIFIED BY jOIL :CONSERVATION. SERVICE TO VERIFY COMPLETE COMPLL- ICE WITH CONNECTICUT GUIDELINES FOR SOIL EROSION AND SEDDIENT CONTROL ( AS PER F-AIM SOUK, AS Alv&NDEDED, Alm PUBLIC ACr 83-3 88, AS AMENDED. DATE OF CENTIFICATIC. 7. APPLICATION INFORMATION COMPLIES WITH-_ GENCY'S REGULATIONS _(-_SEGTIUI�L� Z.�., --a-thrcu� j. 8. ✓ REQUIRED FEE HAS BEEN PAID. DATE RECEIVED 7'//' 9. APPLIC-AM ( OR DESIGNATED REPRESENTATIVE)HEREBY ATTESTS THAT A SIGN WILL BE POSTED AT THE FOLLOWING LOCAT I ONi(S) BY ON. OR BEFORE ThE FOLLOWING DATE •SIMLUURE e THIS APPLICATION IS FOUND TO BE COMPLETE AND NOW (QUALIFIES FOR PLACEMENT Oki THE AGENCY'S AGENDA: DATE SIGNATURE Town Engineer Agency Sec'y Agency` Chairmh. THIS APPLICATION IS INCOMPLETE BECAUSE OF THE FOLLOWING N.UM.BERED IT EMS ( FROM ABOVE ) AS CHECKED BELOW: 1 2 3 4 5 : 6 7 S 9 " CONNECTICUT GUIDELINES FOR SOIL EROSION AND SEDIMENT CONTROL Honorable William A. O'Neill , Governor of Connecticut Stanley J. Pac, Commissioner of the Department of Environmental Protection THE CONNECTICUT COUNCIL ON SOIL AND WATER CONSERVATION JANUARY 1985 HAY BALE DETAILS 2 - 1".x 1" 3' STAKES 6'EACH BALE SLOOE EXISTING AROUND EMBEDU220 mium - . - ELEVATION IT" WIIN. ell BALES TO BUTT ' TOGETHER B 'at. . off .t'i � W l hj - lox 1o,t ' EACH BALE MH FLOWoil ' �t BALED HAY t 111i o?�o � TI IBA;KS t 18' PLAN ON CENTER .----- TOE OF SLOPE , ° 20- MIN EMBED 6 " OVL-RLAP EDGE'S- ELEVATION PROVIDE ADDITIONAL ° SALES AS REOUIRED 0 BALED HAY _ � i 2 -I" 1 "K 3' STAKES EACH SALE —L.--' s _ i2' ON CE = — NT E Z R fE a PLAN SWALES 9 - SILT FENCE SECTION AT TOE OF SLOPE FABRIC ATTACHED 4%4` WIRE FENCE TO WIRE FENCE W/ STAPLES OR HAG RINGS WOOD OR METAL P06T I I - FA I3glC,ATTACHED I I - TO 4a4 WIRE FENCE t T—i � I N WAY FABRIC 6'* - ( I I I BELOW GROUND U. U SECTION E REV ATIO N • . ` r. •..� q�~l K�/t ����tZ�. ' i. .�•:.--� � ��;Y! wrap �. H.. �a ��:•:. r, '' ar.;d' ' 'C.r:•. . tii2•. .. ' ,,;Ste" ....� ;F�i. ,�','.� Y y _ ''•� �� w7•�rI`��'r�" .tQp'. r�_'�1+�..f`rr!�/�i,,, Pr Dr V. �•'G. VLIr��` w V�1� rt Baled hay or straw erosion checks used during highway construc- tion to prevent sediment from entering a catch basin. C 35 Staked Hay Bales tO Radius ` � � III • a � 0 _ o A A o Outlet Pipe fill ' fill fill, — Energy fit/I i �..� / Oissipotor � �� r� Outlet - . Energy Oissipator • � 12 g Pipe a m, Rip Rap Swale oil) still SECTION A -A S tapdard Rip Rap PLUNGE POOL A ( NO SCALE ) 9 N Seedings For Temporary Cover Recommended Species Seeding Rates in lbs. Seeding Dates 1000 .Sq. Ft._ Acre Annual Ryegrass or Mar. 15 to June 15 Perennial Ryegrass 1 1/2 60 Aug. 15 to Oct.. 15 Sudangrass 1/ or Millet 1 40 May 15 to Aug. 15 Winter Rye or Oats 3 120 Aug. 15 to Oct. 15 l/ This is a tall grass and may be undesirable in some locations. l � 27 PERMANENT GRASS AND LEGUME SEEDING SEED MIXTURESt RATES, AND DATES Seed Percent Seeding Special - �1/ Ada tation Mixture 5/ Wt. Seeding Rates in lbs. Dates P 1000 Sq. Ft. Acre - 1 1/2 50 April 1 - June 15 Droughty Areas Ky 31 Tall Fescue 50 Aug. 15 - Sept. 30 Red Fescue 50 80 1 1/2 . 50 April 1 - June 15 Heavy Use Areas Ky 31 Tall Fescue 2/ 20 Aug. 15 - Sept. Annual Ryegrass Red Fescue 4/ 60 1 40 April 1 - June 15 No Mow Areas Droughty Areas Crownvetch 40 1/2 25 April 1 ,- June 15 No Mow Areas Crownvetch 60 Droughty Areas Perennial Ryegrass 40 Reed Canary Grass 80 1 50 April 1 - June 15 Wildlife or Redtop 20 Aug. 15 - Sept. 15 Wet Areas 2 80 April 1 - June 15 High Maintenance Red Fescue 3/ 70 Areas Kentucky Blue grass 20 Aug. 15 - Oct. 15 Perennial Ryegrass 10 1 40 April 1 - June l No Mow Areas Ky 31 Tall Fescue 70 Wet Areas Birdsfoot Trefoil 30 1 These are minimum seeding rates and should be increased i a verse conditions exist. 2/ Straight Ky 31 tall fescue may be used for soccer or football fields (minimum 150 # up to 250# per acre. - 3/ 10 lbs. of birdsfoot trefoil may be added to this mixture. 4/ Ky 31 tall fescue may be used in place of red fescue. :- 5 � May add 5 lbs. of perennial ryegrass for quick fall cover. 9 Perennial ryegrass Lolium perenne ZONES: Warm parts of S; all of 6. 7.8 USES: Fast-growing,short-term stabilizing cover; soil sture(several varieties have been improvement; lawns and pa developed for lawns). ••` 4, - ��. _ _ _ '��-,�-;`r.,r�+�"''`—'W _. in a few months. GROWTH RATE: Produces complete cover �r '. �-fit• .. • ,='` SITE CONDITIONS: Grows in medium-fertility,slightly acid,clayey - 1 � -.��l�a�s- _;ems, _,�,,a.a;x •' f and loamy soils;fair drought tolerance; poor shade tolerance; -- .� ��: � `• �,.�� 1 tolerates somewhat poorly drained soil. Rapid growth rate is the primary conservation value of perennial ryegrass.It grows to a height of t to 2 feet.Many long,narrow - -• , i. ,r. .t ,, eeaves extend from the base of the plant. Establish by drilling seed or by broadcasting seed with mulch early in spring or fall. - t ,• f t �• i N _ Tall fescue g Festuca arundinacea r r J ZONES: 4,5,6,7,8 -_l�: �y�.. :n� .- F_,�,� - - USES: Stabilizing grassed waterways,slopes,and roadbanks; lawns ,� ' ° '�. ltat 1@CfeBlion areas; food tar geese►deaf,and•cotlenlail; stag(Or . `` -Nub' . s °' the"it veflilllile►a�widtEl�r lifer ,�+` _•, �` p t `` tiriift133 ftifg�g ff3t winlet Afgging, grass for conservation in the Northeast. GROWTH RATE: Produces effective ground cover the first year. } - � SITE CONDITIONS: Grows in low-fertility,acid,clayey,loamy,and sandy soils;good drought tolerance;fair shade tolerance;tolerates somewhat poorly drained soil. y Tall fescue is a deep-rooted bunch grass that has stems 3 to 4 feet high. leaves are broad,coarse,and flat.The variety'Ky-31' is most widely used in the Northeast. Establish by drilling or broadcasting seed in spring or early in fall. } f � Ited fescue Festuca rubra ZONES: 3,4,5,6;cool,shady areas in 7 and 8 EACH USES: Fine-textured lawn mixtures;dense sod for stabilizing roadbanks and north-facing slopes. GROWTH RATE: Produces complete cover of attractive,uniform sod in 1 year. SITE CONDITIONS: Grows in medium-fertility,slightly acid,clayey and loamy soils;fair drought tolerance; good shade tolerance; ' t . requires well-drained soil. Red fescue has narrow,bright-green leaves.It spreads by short f. •- "� underground stems to produce a tight sod.Aboveground stems have ,y': •..>s a. ., a reddish tint and grow to a height of 18 inches. Red fescue may turn brown in hot,dry summer weather but recovers in fall. many varieties are available. Establish by seeding on a firm seedbed in ., 4 T 'Zw"t 4 .� ;y yr,,.r`;° r i - •� spring or early in fall. 1 �•;�' ;tom 1Y 1 �j" e� .s -{1�• M.l' e• ! 7 it t R. t i• 7�' ti.�•,. 'n �'�';JZONES: USES: Erosion control along streambanks;twigs and buds eaten by '1 r 1. • `.t'.. •,•���``, `T v to v ,; '�I j`�t',.S'.'� h 5Y grouse,rabbits,beaver.and muskrat. GROVVrH RATE-. provides effective erosion control in 2 to 4 years. SITE CONDMONS: Grows in mediumfertility,slightly acid, clayey�loamy,and sandy soils;poor drought tolerance;good shade tolerance;tolerates poorly drained soil. %; �: lj � ;�,. A��,.'�. / `�•1 v i1� 1`� .' / �"• '• ._fie' purpleosier • . of 10 to IS feet �r, �:�'fi,� .:,`�';. „-,: ,�77{{'i� ii� '��y+;wily +• y,Y'✓ Tbut does not grow that high streambanks.It is a thicket-forming shrub with many I�.� ��.7• ��►��. \� ��- Air smooth.thin,toughbranches.Establish . planting rooted cw unrooted cuttings.Unrooted cuttings should be at least%-inch in diameter and 12 to 113 inches long.At least two-thirds of the cutting should be in the ground when planted. Planted areas should be inspected annually for damage.repaired as required,and protected from livestocIL 'fie >>�1,'.' /�•' t t �'�. '�/•� •1"+�`` '�!, 'ry_ •'�•"" `I «!•i TELEPHONE 236.1520 a OP VecL.J10� CIVIL ENGINEER AND LAND SURVEYOR 51 LORRAINE STREET Aart ord, ConnocUcat 06105 SEDIMENT AND EROSION CONTROL STRAWBRIDGE CONDOMINIUMS PHASES 7 AND 8 SOUTH WINDSOR , CONNECTICUT July 28 , 1986 Ti4�1VNONt ii�•1i�0 jowr V$cIW4# CIVIL ENGINEER AAD LAND SURVEYOR •1 LORRAINt WrRLLT 'Low -k-ad 06105 Page 1 Construction and site preparation for the Strawbridge Condomi- niums, Phases 7 and 8 is to be done according to the following schedule: 1. Mark the trees to be saved; remove only those trees required for construction. 2. Install hay bale checks and filter fabric silt fence as in- dicated on the drawings. 3. Construct Retention Basin #3: (originally part of phases 5&6 ) After limited clearing and grubbing the first step in con- struction of the retention basin will be placement of a line of staked hay bales and filter fabric silt fence along the outlet side of the outlet pipe and the toe of the slope of the future dike. Before the dike is built, a 24" RCP outlet pipe will be laid from Type "C-L" catch basin to a permanent plunge pool. During construction the lower 6" inlet pipe into catch basin will be plugged, so that water will have to pond at least three feet before exiting. This will cause sand and silt to settle out above the inlet. After the slopes of the basin have been brought to final grade, spread topsoil to a minimum depth of 4 and seed as follows : Ky 31 tall fescue and red fescue (50% seed mixture) ; seeding rate of 2 lbs. per 1000 s. f. ; seeding dates April 1 - June 15 & August 15 - September 30. 4. Clear remainder of the site within limits of proposed con- struction of phases '7 & 8. No regrading is allowed within 15 , from southerly and easterly construction limit line as shown on dwg . 21M/A. 5. Strip topsoil and stock pile loam. Seed topsoil in piles not over 10' in heights with maximum side slopes of 2:1. 6 . Cut &fill as required to grade the site. Provide temporary cover for those areas to be exposed in excess of two months. 7 . Install storm sewer systems (to retention basin No . 3 ) • 8 . Install sanitary sewers and appurtenances . 9. Install domestic water, fire protection lines and all appur- tenances. 10. Install base & paving materials in road, drives & parking areas. 11. Loam, fertilize and seed all disturbed areas in accordance with permanent ground cover specifications as noted in "Guidelines for Soil Erosion and Sediment Control" by the .Connecticut Council on Soil and Water Conservation dated January 1985. .j TEaRN0l19 2.14-15aO J 9010 v����� CIVIL ENGINEER AND LAND SURVEYOR 81 LORRAINK STRUT 0610.5 Page 2 12. Building construction: Disturbed areas will be minmum practical for the size and site of the proposed building. Surface waters flowing to the disturbed areas shall be diverted to flow over undis- turbed soil. Locations where flow from the disturbed area concentrates , shall be stabilized by seeding & mulching, i baled hay erosion checks shall be installed f necessary. Post Construction Schedule to minimize Sediment & Erosion: • 1 . Cleaning & removing accumulated silt from plunge pools, re- tention basin and catch basin' s sumps as often as required. • 2. Maintaining all lawns and planted areas with ground cover sufficient to prevent erosion. , 4 � TELEPHONE 236.1520 or �ecke��o�� CIVIL ENGINEER AND LAND SURVEYOR 51 LORRRAINE STREET arf�ord' Connec"tt 0610.5 SEDIMENT AND EROSION CONTROL STRAWBRIDGE CONDOMINIUMS PHASES V and VI SOUTH WINDSOR, CONNECTICUT May 13 , 1985 March 11 1986 ( Phases VII & VIII ) AUG 0 ,. 1986 South Windsor INLAND WETLANDS AGENCYf, CONSERVATION COMMISSION TELEPHONE 236.1520 or Vechelo�� CIVIL ENGINEER AND LAND SURVEYOR 51 /LORRAINE STREET Aalvord, annec"I 0005 Page 1 Construction and site preparation for the Strawbridge Condomi- niums , Phases V & VI is to be done according to the following schedule: 1 . Mark the trees to be saved; remove only those trees required for construction. 2 . Install hay bale checks and filter fabric silt fence as in- dicated on the drawings. 3. Construct Retention Basin #3: After limited clearing and grubbing the first step in con- struction of the retention basin will be placement of a line of staked hay bales and filter fabric silt fence along the outlet side of the outlet pipe and the toe of the slope of the future dike. Before the dike is built, a 24" RCP outlet pipe will be laid from Type "C-L" catch basin to a permanent plunge pool. During construction the lower 6" inlet pipe into catch basin will be plugged, so that water will have to pond at least three feet before exiting. This will cause sand and silt to settle out above the inlet. After the slopes of the basin have been brought to final grade, spread topsoil to a minimum depth of 4" and seed as follows : Ky 31 tall fescue and red. fescue (50% seed mixture) ; seeding rate of 2 lbs . per 1000 s . f. ; seeding dates April 1 - June • 15 & August 15 - September 30. 4. Clear remainder of the site within limits of proposed con- struction of phases V & VI . 5. Strip topsoil and stock pile loam. Seed topsoil in piles not over 10' in heights with maximum side slopes of 2: 1 . 6. Cut & fill as required to grade the site. Provide temporary cover for those areas to be exposed in excess of two months . '7 . Install storm sewer systems ( to retention basins No ' s 2 & 3) . 8 . Install sanitary sewers and appurtenances. 9, Install domestic water, fire protection lines and all appur- tenances. 10. Install base & paving materials in road, drives & parking areas. 11. Loam, fertilize and seed all disturbed areas in accordance with permanent ground cover specifications as noted in "Guidelines for Soil Erosion and Sediment Control" by the Connecticut Council on Soil and Water Conservation dated January 1985. TELEPHONE 236.1520 irr CIVIL ENGINEER AND LAND SURVEYOR 51 LORRAINE STREET .hta�f�o�c� C.onneclicuf 0610.5 Page 2 12 . Building construction: Disturbed areas will be minmum practical for the size and site of the proposed building. Surface waters flowing, to the disturbed areas shall be diverted to flow over undis- turbed soil. Locations where flow from the disturbed area concentrates , shall be stabilized by seeding & mulching, baled hay erosion checks shall be installed if necessary. The ponding problem which exists by building No. 16 (Bry- rewood Condominium project) to be resolved in conjunction with grading along the rear of building No. 19 (Strawbridge Condominiums) . Post Construction Schedule to minimize Sediment & Erosion: 1 . Cleaning &removing accumulated silt from plunge pools;, re- tention basins and catch basin' s sumps as often as required. 2. Maintaining all lawns and planted areas with ground cover sufficient to prevent erosion. HARDING, SBARGE, SVONKIN & DRONEY, P. C. COUNSELLORS AT LAW PRESTON F.HARDING CORPORATE CENTER WEST ARNOLD SBARGE MARK J.SVON KIN 433 SOUTH MAIN STREET JOHN F.DRONEY,JR. WEST HARTFORD,CONNECTICUT 06110-1670 DAVID M.ROTH _ MICHELE PARROTTA THOMAS J.FARRELL 203 561-3250 JEFFREY S.WINER TELECOPIER(203)561-1099 GEORGE E.WELCH• GEORGE M.HYMAN *ALSO ADMITTED IN FL August 18, 1986 (1924.1985) ALLAN HUTENSKY OF COUNSEL HAND DELIVERED Inland Wetlands Commission Town of South Windsor Town Hall 1540 Sullivan Avenue South Windsor, CT 06074 Attention: Debbie Re: Strawbridge Condominium Dear Debbie: The material delivered to you for the above Inland Wetland Application on Friday included the Conservation Plan for Phases 7 and 8 only. Although you already have the Conservation Plans for the earlier phases, I am hereby resubmitting three (3) copies of those plans so they may also be deemed to be part of our Applicaton. The report submitted to you on Friday should be deemed to apply to the Conservation Plans delivered to you herewith. Please acknowledge receipt of this material by signing the attached copy of this letter. Very truly y urs, AS:dl Arnold Sbarge Enclosures Received on August 18, 1986 three (3) copies of Conservation Plan for earlier phases for Strawbridge Cond min um. C F ��ty) C = T W/ [� olle Scwbll ?d&U&0_t U S 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 sOR•cO AREA CODE 203/644-2511 August 29 , 1986 Mr. John M. Moran, Jr. , Chairman Inland Wetlands Agency/Conservation Commission 1540 Sullivan Avenue South Windsor, Connecticut 06074 RE: Application #403 STRAWBRIDGE CONDOMINIUM Dear John: This application is for the final phases of the Strawbridge site. There have been a number of modifications or improve- ments since the initial proposal. Primarily, the buildings and/or limits of construction have been moved back or away from the top of the slope. Recommendations from staff would include, but not limited to: 1. Modify the sediment and erosion control narrative to accommodate Phases VII & VIII . 2 . Assume wintertime construction. Provide appropriate Erosion & Soil Regulations. 3. If approval is granted, a Conservation Bond of $10,000 is suggested to assure compliance with their conservation plans. Very truly yours, s A. B. Davies Deputy Town Engineer ABD/j sv CC: Strawbridge Condominium Mr. Michael Gantick, Director of Public Works Ms. Marcia Banach, Director of Planning Mr. Richard Martel, Town Engineer IWA/CC File ✓ �tO•MN $F,`� U 9 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 soe•c AREA CODE 203/644-2511 September 19 , 1986 Steve Krohn CERTIFIED MAIL Andover Equities , Inc. 22D Andover Drive West Hartford, Ct 06110 RE: Application #403 - Strawbridge Condominium Dear Mr. Krohn: At the September 15, 1986 meeting, the South Windsor Inland Wetlands Agency/Conservation Commission approved with conditions application #403; grading & filling in Phases 5 & 6; proposed plans for Phase 7 & 8; completion of the playfield area in Phase II. The following conditions must be adhered to for this permit to be valid. 1. The Sediment & Erosion Control plan by Igor Vechesloff, • dated 7/28/86 to be revised to include winter erosion & sediment measures. 2 . Additional erosion control measures may be required on the outflow from retention basin #3 if deemed necessary by the Town Engineer. 3 . A bond in the amount of $25 ,000 to ensure compliance with the Conservation Plan has already been submitted to the Planning & Zoning Commission of which $10 ,000 covers the Inland Wetlands/Conservation permit for application #403 . 4 . Construction activities shall be subject to the approval of the Town Engineer. 5. The application shall indemnify and hold harmless the Town of South Windsor against any liability which might result from the proposed operation or use. 6 . The permit is valid for one year and shall expire September 15 , 1987 . Very truly yours, J hn M. Moran, Jr. , Chairman Inland Wetlands Agency/ Conservation Commission CC: A.B. Davies, Deputy Town Engineer Town of South Windsor Richard Martel, Town Engineer Louise Evans, PZC Chairman Thomas D'Auria, Building Official John Shemo, Economic Development Coordinator Marcia Banach, Director of Planning Arnold Sbarge, Attorney MirhaPl (7.antick. Director of Public Works Igor Vechesloff, Engineer O F v S 7-awn' O-P So� qdztz� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 �f�osOR CO AREA CODE 203/644-2511 March 10 , 1987 Andover Equities Inc . 22D Andover Drive West Hartford , Ct 06110 Attn : Steve Krohn Dear Mr . Krohn: RE: Strawbridge Condominium The South Windsor Inland Wetlands Agency/Conservation Commission is alarmed by recent developments at Strawbridge . In particular we are deeply disturbed by the failure of retention basin number 3 . Furthermore , the construction site to the north of that basin betrays" • an abandonment of care in carrying on construction activities . Therefore , I request , on behalf of the commission , that you appear at our March 16th meeting to explain recent events on the site . Very truly' yours , Kevin F . Rennie , Chairman Inland Wetlands Agency/ Conservation Commission Town of South Windsor KFR: dlb CC : A . B. Davies , Deputy Town Engineer Richard Martel , Town Engineer Marcia Banach ,Director of Planning Michael Gantick , Director of Public Works Louise Evans , Chairman , Planning & Zoning Commission Attorney Arnold Sbarge AtowM st�<� _��. v -y�1'� r/� W '6ArV ii m ` 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 c, �j�dsoR•corc AREA CODE 203/644-2511 M E M O R A N D U M March 18 , 1987 . TO: Kevin F. Rennie, Chairman, Inland Wetland Agency/Conservation Comm. RE: Strawbridge on site meeting of 3/17/8'7 A brief summary of items discussed with respect to the sedimentation and control measures to be implemented. Present were: Terry Supple , Strawbridge Arnold Sbarge, Esq. & Associate Donald Kasheta, Kasheta Farms , Inc. Edward Kasheta, Kasheta Farms , Inc. Kevin Rennie, Town of South Windsor, IWA/CC Betty Warren, Town of South Windsor, IWA/CC Bo Davies , Town of South Windsor, Public Works 1. Strawbridge is responsible for the implementation of the erosion and soil controls . . 2 . Kasheta Farms Inc. shall be their agents to install and maintain all the erosion & soil controls . 3. Other than the house keeping grading, the initial item to be f built and stabilized will be the retention basin #3 in accord- ance with the approved plans. 14 . The next in importance was to remove by hand the majority of the silt in the water courses within 100 ' of the Mill Pond. 5. Regrade the area in front of the buildings to restrict vehicles to this area and to control the runoff in this area. 6. The area between the rear of the buildings and the snow fence and/or berm shall be protected from vehicle traffic and from roof and surface runoff. Special care will be given to where it starts down the slope. This refers to Phases 5 , 6 , 7 & 8 . 7 . The silt fences and hay bale berms shall be checked for failures and possible replacement. 8. Kasheta Farms indicated that they would maintain the erosion & soil controls especially prior to a rain forcast and start the loaming and seeding early in April. Again, this is a brief summary of what I believe to be happening on the site now. A. Bowen Davies , Deputy Town Engr. ANDOVER EQJUITIES, INC. 22D ANDOVER DRIVE WEST HARTFORD, CT. 06110 203 - 724-6330 August 17, 1987 Hand Deliver Mr Kevin Rennie Chairman Inland Wetlands Agency/ Conservation Commission Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 Re: Application #403 - Strawbridge - Grading & Filling in Phases 5, 6, 7 & 8, Playfield area in Phase II Dear Mr. Rennie: Enclosed please find a check made payable to the Town of South Windsor in the amount of $25.00 for an extension of one year commencing September 15, 1987 on the above-referenced property. If you have any questions, please give me a call at the above number. Very truly yours, Steven R. Krohn Vice President/Finance Encl. y t0•"N 8F� t� C � U F ,� wo 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONK. 06074 rtosoR,co�� AREA CODE 203/644-2511 October 2, 1987 Andover Equities , Inc. CERTIFIED MAIL 22D Andover Drive West Hartford, Ct 06110 Attn: Steven R. Krohn Dear Mr. Krohn: Re: Application #403 - Strawbridge - Permit Extension for Phase 7 & 8 & Playfield At the September 21 , 1987 meeting, the South Windsor Inland Wetlands Agency/Conservation Commission approved a one-year extension for the above mentioned application. The extension becomes effective September 21 , 1987 with an expiration date of September 21 , 1988 . All original conditions of this permit apply. Vy t uly yours j , I v!'— in F. Reniiie, Chairman Inland Wetlands Agency/ Conservation Commission KFR:dlb CC: A. B. Davies, Deputy Town Engineer Engineering Department Marcia Banach, Director of Planning Michael Gantick, Public Works Director Thomas D'Auria, Building Official Louise Evans , Chairman, PZC r 7 An '� c }'`& s•Frard... �` �x .�.. y.`.R✓x'� � 3 � �Ck ,ss r � " � ,�h >g- r� - ,t�F '?i: �,,� - � '' ,yK,. I Al sa � �, ,�����;" ��-i ��"� � 3 SOUTH V1C,�NbS�(1l�,� ►�<b�0�'A . " �� "�_ � ,` yt �: .ct .� $, -�<:. � �z"F �^ i�•..^,."�ii.� a `` � �;" �,rr,. sY � - 1> 'i. ,e � � � 2w h �1 "�`h�iab � '1 -� c �r ..,Es` �-s a • a,R �v`�3- .�2 } s; Y OLD+ ly or Alt i F:I,$ 't 5 5 r :' i� e T a r••.� -� `� e.- _ r3 .y, i•:.� •m. s _ ,z v� Y.