HomeMy WebLinkAboutSite Plan - Conservation (113) TOWN OF SOUTH WINDSOR
INLAND WETLANDS AND WATER COURSES
APPLJCATION
INLAND WETLANDS AGENCY ACTION THIS APPLICATION, ONCE INFORMATION IS COMPLETE,
(SEE BACK OF THIS FORM), SHALL BE RECEIVED AT A
APPLICATION NO. W REGULARLY SCHEDULED MEETING OF THE AGENCY AT THE
TOWN HALL.
RECEIVED OATE-0
. THIS APPLICATION MUST BE FILED IN TRIPLICATE AT
THE OFFICE OF THE TOWN CLERK OF SOUTH WINDSOR BY
PUBLIC HEARING DATE 12 NOON AT LEAST 14 DAYS PRIOR TO THE FIRST
necessary)
COMPLETED APPLICATION REGULAR MONTHLY MEETING DATE. THREE SETS. OF MAPS
OR PLANS MUST BE SUBMITTED TO THE TOWN ENGINEER
PERMIT GRANTED DATE AT LEAST 14 DAYS PRIOR TO THE FIRST REGULAR
PERMIT DENIED DATE MOLLY MEETING DATE.
PLEASE PRINT OR TYPE.
1. APPLICANT _/)2OW223 fi f}s rms sdc. TEL. NO. 6
C/o K -IceI ca arc_
ADDRESS i7g64 Chino*a,,, P d. CITY & STATE G/J', nAc,9r C�L-
2. OWNER 1//;n c�.c h'�/� /���p.i IC'c�; Lfd. TEL. NO. ti V41 07A
ADDRESS S%m CITY & STATE e
3. LOCATION OF PROPERTY %)Oi1r�hPr�. D .Z1Akon Auv° 11ci .D,.k
{ NAMES OF ADJACENT PROPERTY OWNERS See akiorhpd
' V
STATE CLEARLY AND BRIEFLY
5. PURPOSES AND DESCRIPTION OF THE PROPOSED ACTIVITY,AND THE TIME ELEMENT INVOLVED:
I �
141)r�an �zrmc SuLdiu ,64n � ailrPmoaw
ATTENTION: THE APPLICANT UNDERSTANDS THAT THIS APPLICATION IS TO BE CONSIDERED
COMPLETE ONLY WHEN ALL INFORMATION & DOCUMENTS REQUIRED BY THE
AGENCY.HAVE BEEN SUBMITTED.
APPROVAL MAY ALSO BE NECESSARY FROM THE PLANNING AND ZONING COM-
;;Kar o MISSION.
AN APPLICATION FEE IS
o c, - REQUIRED. CONSULT THE_ZEGULATIONS
-a Q o (SECTIONS 6.9, 6.9a and 6.9b) .
o A SIGN IS REQUIRED. CONSULT REGULATIONS (SECTION 6.
m >
w o o0:: SIGNED: J L
VIP L.L U) a u``'i (AP ca )
�---�
z o
® (Owner)
Revised 8/12/85 ,
CHECKLIST FOR REQUIRED INFORMATION
6. APPLICkNT HAS HAD NA.PS AND PLANS CE.�IFIED BY SOIL
CONSERVATION SERVICE TO VERIFY COMPLETE COMPLIANCE
WITH CONNECTICUT GUIDELINES FOR SUIL EROSION AND
SEDIMENT CUN.TROL ( AS PER H.ktIDBOUK, A6 AIyIENDEDED,
AN.D PUBLIC ACT 83-388, AS AMENDED.
DATE OF CERTIFICATION
7. APPLICATION INFORMATION COMPLIES WITH AGENCY'S
REGULATIONS ( SECTIONS 7.1, a through j.
8- REQUIRED FEE HAS BEEN. PAID.
DATE RECEIVED
g, ✓ APPL:LQUT ( OR DESIGNATED REPRESEN.TATIVE)HEREBY
ATTESTS THAT A► IGN WILL BE PUSTED AT THE FOLLOWING
LOCATION(S) - Or-
BY ( NAME )
ON OR BEFORE ThE FOLLOWING DATE
SIGNATURE
THIS APPLICATION IS FOUND TO BE COMPLETE AND NOW
QUALIFIES FOR PLACEMENT ON THE AGENCY'S AGENDA:
DATE SIGNATURE
Town Engineer
Agency Sec'y
Agency Chairman
THIS APPLICATION IS INCOMPLETE BECAUSE OF THE FOLLOWING
UUMBERED ITEMS ( FROM ABOVE } AS CHECKED BELOW;
1 2 3 4 5
6 7 8 9
_ A .
_ Pi40PERTY ON/NERS �� At
NO. PROPERTY OWERS
MART/N -RoNAL D F. SO UZA
Z BETTY J. F/NAN
�� 3 Fi4A�YC/S D. BURNHAM Ji4,
4 STANL EY h�ELEN ZAL EGOW,5/r1
S JOHN E L OCRE T/A ROSE
lv 71-16MAS R. * 6RC74 F. W,4L LACE
7 WE"SL6 Y ¢ AMR6ERY STiq/CIYLAIYD
8 61'RALD J. % L//VDA h! G6WNEAUL7
9 MARJORME' STi4N70AI
/D W/L L/AM -P X,47 /R//`✓ AIAYES
/l CN4RUS rANN REYNOZ DS
l2^ Fi4ANC/S B R406d RTA DOZAN
/3 JDSEPf7 f SOSAN A, JAN/9A-
/4 16ZIY ¢ JUD/Tip/ WVDL/C11
/5 R/CHARD LAl/RETT.4 MYCRS
/!o RJC/,/i4RD G9Ti�,�ER/NE SOARES
17 FRANC/S P q- TNS-4AM 6. P[UMMER
18 116RVgf`J. ¢ JVNE B. CORM/EAc'
l9 JA0MZ'Z/NE S. ¢ M/LO DAN/SE
ZD JAMES A R 4RDON
21 i/ERA N. REARD ON
22 JOHN 9L MARGARET A'AN/A
23 JOSCRN S, JR. w- PAMELA A. PUSAYAS
Z4 MAUREEN E. B(/Rf-rE
_ Z5 R71/UR Ai4ANC/ONE
Z!o WIZ/AM 6LENS/NSA"I
z ' 27 JAMES S. COhHEN
28 EL LEN F. SHARP
Z9 EDWARD F. Sf/ARid
30 MAROARET T(. BURGESS
4 31 JO#NA. TiqaM.4SENE FERROOCO
r ]i.
t '�
VWVA
�aIo -I
$ Hartford County Soil and Water Conservation District
cl 1101 KENNEDY ROAD + ROOM 105B • WINDSOR, CT 06095 • 688-7725
eptember 25, 1985
TO: Jules E. Page, Page Engineering Inc.
1750 Ellington Rd
South Windsor CT 06074 `
FROM: Amy M. Parker, District Mgr, Hartford County Conservation Dis ict a;
J. Eric Scherer, Resource Conservationist, USDA S.C.S.
RE: Proposed plans for Morgan Farms, Sullivan Avenue, South Windsor
The following comments/recommendations are based on plans dated 2/1/85.
1) . Proposed grading should be shown on final plans.
2) All erosion and sediment control measures should be on final grading
sheets.
3) A temporary seeding schedule should be implemented for any areas left bare
up to 60 days, and a permanent schedule for those areas left unvegetated
more than 60 days. If seeding is impossible, mulch should be applied at
the rate of 2 tons per acre.
4) A complete set of -stormwater drainage computations should be provided for
both existing and future conditions. Of special concern is the detention
area and corresponding culverts on lot 1.
� F] III rig on lots 6, 7, 8, 9, 14, and 15 should not cause any major '
. detrimental effects to wetlands if filling and grading is kept to the
minimum amount needed for siting of a house and utilities. `
6) Establishment of conservation easements is suggested for all potential
detention areas and associated drainageways and culverts.
7) It would appear that the existing drainageway in the area of lot 50 and the
right-of-way between lots 9 and 10 would need to be relocated based on the
proposed locations of streets and houses. A detailed proposed grading plan
would be needed to adequately assess possible negative Impacts to wetlands
In this area.
8) The proposed plans indicate some regrading within the wetland areas.
Rather than disturb existing wetland areas, it is suggested that regrading
be limited to outlet areas.
9) The accompanying limitations chart should be considered In final
development decisions.
The District is available, upon request, to review revised plans. If you
have any questions, please call .
rye av e a own of South. Windsor
ATTACHMENTS
•
O.N N S ft<
° F `I�Lltl'L �I�, �C3LL 'Z CU/CiZ LLB tl'`L
1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074
SOR.CON� AREA CODE 203/644-2511
January 21, 1986
Harold R. Cummings , Esquire
1665 Ellington Road
South Windsor, Connecticut 06074
Dear Sir:
At its meeting on January 13, 1986 , the Inland Wetlands Agency/
Conservation Commission approved your Application No. 367 , for
Phase I which consists of the road and sewer system for the entire
subdivision plus Lots 1-6 , 48-62. Lots 7-9 are expressly excluded.
This approval is based on plans titled, "Morgan Farms , Zone Change &
Open Space Subdivision, " by Page Engineering Inc. , Sheets 1-13 of 13 ,
dated February 1, 1985 .
The following conditions must be adhered to for this permit to be
valid:
1. Construction activities shall be subject to the approval
of the Town Engineer.
2 . The application shall indemnify and hold harmless the Town
of South Windsor.
3 . The permit is valid for one year and shall expire 1/13/87 .
4 . Entrance pad should be delineated together with a descrip-
tion of material.
5 . Stockpiling, plus seeding per SCS handbook, should be shown.
6 . Significant trees on areas should be located and preserved.
7. Storm sewer outfalls should be adjusted to an area than can
be more readily maintained by the Town. More use of open
swales with appropriate seeding might be more acceptable.
f'
Harold R. Cummings, Esquire
' January 21, 1986
Page 2 .
8 . Recommendations by Amy Parker and Eric Sherer of
SCS, in correspondence of September 25, 1985 , are
incorporated into this approval and are conditions
of this approval .
Very truly yours ,
John M. Moran," Chairman
INLAND WETLANDS AGENCY/
CONSERVATION COMMISSION
JMM/j v
CC: Richard S. Kelley
A.B. Davies, Deputy Town Engineer
Marilyn Burger, Town Clerk
R. J. Sartor, Town Manager
L. Streeter, Council Liaison
R. Gilligan, P&ZC
T. D'Auria, Building Official
P. DeMallie, Director of Planning
K. Brill, EDC
- a2
LAW OFFICES
KUEHN, CAVANAUGH AND CUMMINGS, P. C.
1665 ELLINGTON ROAD
SOUTH WINDSOR, CONN. 06074
(203) 644-3473
OANIEL P. CAVANAUGH
OF COUNSEL
COWARD R. KUEHN
WEST HARTFORD OFFICE:
HAROLD R . CUMMINGS
FRAZIER G. SCOTT 968 FARMINGTON AVENUE
LORRAINE R. PAULHUS - WEST HARTFORD. CONN.06107
RONA C. LYNCH 12031 236-2973
MICHAEL J. LANZA
September 9 , 1986 PLEASE REPLY TO: SOUTH WINOSOR
Mr. John M. Moran, Chairman
Inland Wetlands Agency,/Conservation Commission
1540 Sullivan Avenue
South Windsor, CT 06074
In Re: Windshire Abbey Estates, Ltd. - Morgan Farms Application
#367 - Request to amend approval
Dear Chairman Moran:
It is my understanding that a question has recently arisen as to
the sequence -of events as set forth in the Conservation Plan
Narrative as it was set forth on the map which was approved by
the Commission on January 13 , 1986 .
Attached please find a proposed, revised Construction Plan
Narrative. After having researched the matter , it is my
understanding that the attached proposed Construction Plan
Narrative more nearly conforms to the present policy of the
Conservation Commission with respect to such matters. It is also
my understanding that the requested amendment to the plan as
approved is not a substantive change , but rather is of a
proceedural nature.
I have also requested our engineer, Jules Page to prepare an
amended map which will substitute the attached Narrative for that
which was on the plan approved by your Commission. Therefore, I
would appreciate your scheduling this request to amend our
approval to incorporate the proposed Conservation Plan Narrative
as attached, at the next meeting of your agency. Your cooperation
is greatly appreciated.
Sincerely yours ,
Harold R. Cummings
Conservation Plan Narrative
All activities will be in accordance with secticn and page ref-
erences of Connecticut.
Guidelines of soil erosion and sediment control.
1. Gravel entrance/exit pad will be installed at entrance.
2. All storm water discharge areas to be protected by hay
bales and/or fabric filters.
3. No disturbance in wetland areas except for the installation
of storm drainage and grading of lots 6, 7, 8, 9, and 15.
4. Stabilization of disturbed areas will be accomplished within
six months of disturbance in the following manner:
A. Temporary vegetative cover as needed shall be as follows :
Annual ryegrass shall be annlied at the rate of 40 pounds
Der acre between March 1, - June 15, or August I, -
October 1.
B. Permanent vegetative cover shall be in accordance with
section 6 pages 6 - 5 through 6 - 8 with rates as follows :
In wetland areas item 5 figure 6 - 3. Near dwellings and
lots item 1 figure 6 - 3.
S. Improvements to detention area will be established prior to a11 -
ot6r earth moving activities.
6. Tree protection in accordance with pages 6 - 39.
7. All non-structural erosion control measures such as mulching,
dust control, silt curtains, etc, in accordance with chapter 7.
8. Ditch along north property line will be improved and stabilized
at start of construction in Phase II.
9. Swales downstream of storm drainage outlets 1 & 2 will be im-
proved and stabilized at start of construction.
10. Hay bales at catch basins see page 7 - 32.
11. Sequence of events:
A. Construction shall start approximately October 1_985 or
March 1986 and will continue for approximately 12 months.
B. Start improvements to detention areas and install gravel
entrance pad as road is rough graded.
C. Install sanitary sewer..
D. Install storm drainage with pipe outlet protection
installed first.
E. Building construction may begin as defined in section
2.6.b. of Town Subdivision Regulations, after com-
pletion of 11 - A, B, C, D.
F. All excess earth to be removed from site and begin
rough grading.
G. Install other utilities.
H. Fill and grade road to subgrade. Bring road to grade
with approved gravel and pave road with binder coat.
I. Fill and grade lots with approved material.
J. Construct sidewalks and driveways.
K. Finish roads and grade lots with appropriate seeding
as defined above.
L. Remove all temporary erosion control devices only
after disturbed areas have been paved or seeded with
grass or other landscaping.
�4owN aE��
CA fp
70- .Wn
L
s
1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074
OR-co AREA CODE 203/644-25n
November 6 , 1986
Mr. Richard Kelley
RSK-Kellco
1744 Ellington Road
South Windsor, Ct 06074
RE: Morgan Farms and Lakewood Subdivision
Dear Mr. Kelley:
The growing season is .now behind us , so winter erosion and
sedimentation measures are in order.
A tour of Morgan Farms and Lakewood indicated few protective
efforts thus far. Please commence appropriate off-season mulching,
netting, silt fencing, etc. , as required, to the satisfaction of
the Deputy Town Engineer Bo Davies , of all disturbed areas and
stockpiles .
Your cooperation will be appreciated.
Sincerely,
AA _00M
OF M. Moran, Jr. , Chairnfan
Inland Wetlands Agency/
Conservation Commission
Town of South Windsor
CC: A. B. Davies , Deputy Town Engineer
Harold Cummings , Attorney
Richard Martel, Town Engineer
Marcia Banach, Director of Planning
IWA/CC File
EROSION AND SEDIMENT CONTROLS
WINTER SHUTDOWN / ALL YEAR ROUND
CONSTRUCTION SITES
I . Problems
A. Lack of controls
1 . Failure to protect slopes
2. Failure to stabilize areas of concentrated flows
(drainage ways on slopes)
3 . Failure to anticipate control failures and provide
backup systems ( sedimentation basins or holes)
B. Improper installation ( including wrong control for need)
C. Improper placement
D. Inadequate maintenance
E. Failure to recognize construction sequencing
II . Avoid Problems
A. Before construction starts
1. Have E&S plan including identification of measures
indicated in recognition of construction sequence
2. Review plan and site conditions and identify, if changes
are needed.
3 . Identify resource needing protection
(wetlands/watersourses, existing roadways, etc. )
B. During construction
1 . Monitor controls and resource being protected at least
after every storm
2. Determine if failures are caused by improper
installation, placement or inadequacy of control for site
conditions
3 . Make modifications and repairs quickly
C. 3-4 months before winter
1. Review construction sequence to occure before winter
2. Set priorities to maximize early slope stabilization
options ( seeding and mulching Sept. to Oct. ) .
3 . Minimize size of working areas needed for winter
D. Just before freeze conditions or winter shutdown.
1. Check condition and modify, if necessary, all diversion
berms and temporary down drains
2. Install diversion berms on haul roads to be abandon
during winter with with provisions to handle runoff (rip
rap or other channel lining)
3 . Clean all ced_mentation basins or holes
4 . Inspect all Di:her controls and make repairs as necessary
E. When first thaw occurs check all controls and make repairs
( this usually happens sometime in February) .
III . When problems cccur consider trying new approaches
particularily when repeats of the samF+
CO/YS�i41/AT/ON PLAN
9C T/!//TIES /N ACC0.4DANCE W/Ti1 C T.
L/NES FOR SO/L CROS/ON ¢ EROS/ON
NO O/STURBANCS' //V WETLAND OR
W.4TERCOUi4SES ARE.oL,4NlVE-D AWO 077VCR .
D/5T41RB,9NCE Of' z,4mo ma BE XEPT TO .
A M/N/MUM. \
STAB/L/ZAT/ON tW/LL BE ACC OMhL/SHE-D
. AS SOON AS �°OSS1464C
DO7ENT/ON ArQEAS !N/LL BE ES TABG/SEED
RR/OR TD ALL 0711Ei4 EARTit/ MO{///VG ,9C7/V/7/ES.
ALL D/SC//ARGE AREAS TO BE PROTEC TB D W/7'11
11,4YB4LES A/YD/OR FABR/C
RRS'CAST CE-L LI1AR BLD.CXS TO BE /NSTAL L ED -
/N ACCORDANCE W/TH SAGE 8'/41 OF CT. N rRCG
GU/DEL/NES le-OR SO/C CROSIO/V ¢ EROS/ON C O
TEMPORARY SLORE'DRA/NS AT SELECTED L G CAT/ONS
.WHERE /yECESSA�4Y /N ACC OR/D SO�G EROS aNA¢ SOS/OiV CON T.404.
8•/SZ OF C7. GU/DUNES FO
TRE'L" PROTECT/ON /N ACCORDANCE W/TH PAGE'
G-39 OF CT. GU/DEL/NES FOr4 S0I4 eROS/ON ¢Z-90SION C/'iVTRC6
ALL /YON•STiQUCTURAG EROS/ON CONTROC
MEASURES SUC -I AS Ml/L CoWNG DUST CONTROL
SIG T CURT/ANS S'rC. //1/ ACCOR,0,4NCE W/Tiy CI-1AP7ER
7 OF C T. GU/DEL//YES fOR SO/L EROS/ON % 4fR0. ION CCNTFrC C
GRAt/EL E"NTiQANCE/F�i'/T PAD WI L BE INSTALL
AT ENTRANCE.
L EGZND
.0AIS'L L/NG NUMBER
PHASE L/NE'
- - - - - 1
SPACE SUBDIVISION IN AN A - 20 ZONE"
Conse-.vation Plan Narrative
All activities will be in accordance with section and page ref-
erences of Connecticut.
"GUIDELINES FOR SOIL EROSION LIPID SEDIMENT CONTROL."
1. Gravel entrance/exit pad will be installed at entrance.
2. All storm water discharge areas to be protected by hay
bales and/or fabric filters.
' 3. No disturbance in wetland areas except for the installation
of storm drainage and grading of lots 6, 7, 8, 9, and 15.
4. Stabilization of disturbed areas will be accomplished within
six months of disturbance in the following manner:
A. Temporary vegetative cover as needed shall be as follows:
Annual ryegrass shall be applied at the rate of 40 pounds
per acre between March 1. - June 15, or August 1S, -
October 1S.
a. Permanent vegetative cover shall be in accordance with
section 6 pages 6 - S through 6 - 8 with rates as follows:
�,. In wetland areas item 5 figure 6 - 3. Near dwellings and
lots item 1 figure 6 3.
3. Improvements to detention area will be established prior to all
other harth mow, S activities.
6. Tree protection in accordance with pages 6 - 39
T. All non-structural erosion control measures such as mulching,
dust control, silt curtains, etc, in accordance with chapter 7.
3. Ditch along north property line will be improved and stabilized
at start of construction in Phase II.
9. Swales downstream of storm drainage outlets 1 6 2 will be im-
proved and stabilized at start of construction.
10. Hay bales at catch basins see page 7 - 32.
11. Sequence of events:
A. Construction shall start approximately October 198S or
March 1986 and will continue for approximately 12 months.
B. Start improvements to detention areas and install gravel
entrance pad as road is rough graded.
C. Install sanitary sewer.
a D. Install storm drainage with pipe outict.protection
installed first.
E. Building construction may begin as defined in section
2.6.b. of Town Subdivision Regulations, after com-
nieetion of 11 - A, B, C, D.
F. A!1 excess earth to be removed from site and begin
rough grading.
G. Install other utilities.
H. Fill and grade road to subgrade. Bring road to grade
with approved gravel and pave road with binder coat.
I. Fill and grade lots with approved material.
J. Construct sidewalks and driveways.
K. Finish roads and grade lots with appropriate seeding
as defined above.
L. Remove all temporary erosion control devices only
E. TREE PROTECTION (TP)
1. DEFINITION
The protection of desirable trees from mechanical and other injury
during construction.
2. PURPOSE
To ensure the survival of desirable trees where they will be
effective for erosion and sediment control , watershed protection,
landscape beautification, dust and pollution control , noise
reduction, shade and other environmental benefits while the land is
being developed.
3. APPLICABILITY
To areas with desirable tree growth and subject to land disturbing
activities.
4. PLANNING CONSIDERATIONS
Development often takes place on tracts of forested land. Building
sites are often selected because of the presence of mature trees.
Intensive planning and care is necessary to protect desirable trees
in the interval between buying the property and completing
construction. It takes 20 to 30 years for newly planted trees to
provide the benefits of mature trees. Trees may perform the follow-
ing functions on a site:
a. Stabilize the soil and prevent erosion.
b. Decrease storm water runoff through canopy interception and
root zone absorption.
C. Moderate temperature changes and provide shade.
d. Moderate the effects of sun and wind.
e. Provide visual buffers and screen out noise.
f. Filter pollutants from the air, and produce oxygen.
g. Provide habitat for small animals and birds.
h. Preserve and increase property values.
i . Provide desirable aesthetic values.
5. STRESSES OF CONSTRUCTION
Construction activities expose trees to a variety of stresses or
conditions which may injure or kill a tree. An understanding of
these stresses is helpful in planning for tree protection.
6-39
6. SELECTING TREES TO BE RETAINED
a. The proper development of a wooded site requires completion of
a plan for tree preservation before clearing and construction
begins. Trees should be identified by species, and located on
a plan map, either as stands or as individuals, depending on
the density and value of the trees.
b. Consider trees with a long life span, the oaks, hickories,
beech and maples. Trees should be healthy, of good visual form
and free of rotted or broken limbs. Younger trees should be
given preference over older trees which may be declining in
growth.
7. INSTALLATION REQUIREMENTS
a. Groups of trees and individual trees selected for retention
shall be accurately located on the plan and designated as
"tree(s) to be saved." Individual specimens that are not part
of a tree group shall also have their species and diameter
noted on the plan.
b. The limits of clearing shall be located outside the drip line
of any tree to be retained, and in no case closer than
five feet to the trunk of such a tree (Figure 6-13).
Figure 6-13 - Construction Activities and Tree Protection
Drip Line
Protective Device
t
Limits of Clearing
and Grading
Proposed Grading
Mi n.' 5'
Source: Virginia Soil and Water Conservation Commission 1980,
Virginia Erosion and Sediment Control Handbook.
6-41
Chapter 7
NONSTRUCTURAL MEASURES
PAGES
A. TEMPORARY MULCHING (MU) . .. . . . .. . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-1
Figure 7-1 - Organic Mulch Materials and
Application Rates . . . . . . . . . . . . . . . . . . . . . . . . . . 7-3
Figure 7-2 - Detail for Installation of Jute Netting . . . . 7-6
Figure 7-3 - Mulch Anchoring Guide . . . . . .. . . . . . . . .. . . .. . . 7-7
B. PERMANENT MULCHING (PM) . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-9
C. DUST CONTROL (DC) ... . . . . . . . .. . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . 7-11
D. TOPSOILING (TO) . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . ... . .. . . . 7-13
E. LAND GRADING (LG) . ... . . . . . . . . . . . . . .. . . ... . . . 0. . . . . . . . . . . . . . . . 7-17
Figure 7-4 - Typical Section of a Slope . . . . . . . .. . . .. . . . . 7-19
Figure 7-5 - Determining Slope 7-22
Figure 7-6 - Reverse Slope Bench 7-23
F. SEDIMENT BARRIERS (ST) . . . . . . . . . . . .0 . . . . . . . . .. . . .. . . 0 . . .. . . . . . 7-25
Figure 7-7 - Placement and Construction of a
Straw Bale Barrier 7-31
Figure 7-8 - Catch Basins . . .. .. . . . . . ... . .. . . . . . . . . . . . . . . 7-32
Figure 7-9 - Placement and Construction of a
Synthetic Filter Barrier 7-33
G. SILT CURTAIN (SI) . ... . . . . . . . . . . . .. .. .. .. .. . . .. .. . . . . . . . .... . . 7-35
P
Chapter 7 - NONSTRUCTURAL MEASURES
A. TEMPORARY MULCHING (MU)
1. DEFINITION
Application of plant residues or other suitable materials to the
soil surface.
2. PURPOSE
To prevent erosion by protecting the exposed soil surface and to aid
in the growth of vegetation by conserving available moisture, con-
trolling weeds, and providing protection against extreme heat and
cold.
3. APPLICABILITY
a. Areas which have been temporarily or permanently seeded shall
be mulched immediately following seeding. Mulch Anchoring will
be used on slopes greater than 3 percent and concentrated flow
areas such as diversion and waterway channels.
b. Areas which cannot be seeded within the seeding dates should be
mulched to provide temporary protection to the soil surface.
An organic mulch other than wood fiber alone shall be used, and
the area then seeded as soon as seeding dates permit.
C. Mulch shall be used when tree, shrub, and ground cover plantings
do not provide adequate erosion protection.
4. PLANNING CONSIDERATIONS
Mulches are applied to the soil surface to protect the soil and to
promote plant growth. A surface mulch is the most effective and
quickest means of controlling runoff and erosion on disturbed land.
Mulches can protect the infiltration rate of the soil , conserve soil
moisture, prevent soil compaction, modify soil temperatures, and
provide a suitable microclimate for seed germination.
Organic mulches, such as straw, hay, wood chips, bark, and wood
fiber are effective and economical . Hay mulch contains seeds which
may not be desirable in some applications, lawns, for example.
Netting and mats have been developed for erosion control . They may
be used by themselves. Nettings and mats are effective in critical
areas such as waterways and diversions. They may also be used in
critical areas to hold other mulches to the soil surface.
Chemical soil stabilizers or soil binders are less effective as
mulches when used alone. These materials are useful to bind or
anchor organic mulches to the soil surface.
7-1
Figure 7-8 - Catch Basins
2x4 wooden stakes driven
min. of 12 inches into
the ground - a►
w5jo t 5EQae, SITKU5ulke
Filter fabric ., = ^ r•' Wooden lateral
cross braces
tucked
,• - ��,;�:;��: as needed U. � ,� � '' , ?- ` ,��}' •� :..,
into
grade s Flow ; _-`
- LaW
Flow
•af' � Rl .4
i
•F'
A•.t.3- .Wit;
4-r-
N k ..wsr
Catch Basin `� {- 11 •1 ti
N c 4 X 0
Z. 2.
TH
0 X W R
It
Silt Fence Installation at Ay �acH e�aLa .
Catch Basins
Hay Bale Installation at Catch Basins
Rt G IA
T 1
�L
CA= US
Basins on sloping roads SEDIMENT CONTROL
should not be ringed. Sales
or silt fence should be placed
in a configuration to contain \
flows without "end TUBS."
Contiinments should be up slops _
of basin.
long running sediment
. control systems should
} O --- _ \ _ have `brings" to prevent
sediment from running
parallel with the system.
5 Spacing as required.
�..
` - �'�` ,� �EDIME►�'r silt fence subjected to
\ ' heavy loads can be reinforce
with farm fence and or snow
p ' fence.
Source: U.S. Department of Agriculture, Soil Conservation Service, Storrs,
Connecticut.
7-32
MEMORANDUM
TO: A. B. Davies
RE: BUILDING PERMITS - MORGAN FARMS
As a result of our meeting with Dick Kelley yesterday, he has
contacted Louise Evans. She has called me this afternoon and
we discussed the sequencing of construction as it relates to
the approved plans.
She agrees that the sequencing, as given on the plans, could
be modified to the presently accepted sequencing as per the
regulations.
Mr. Kelley is required to present a modified plan to reflect
this decision. Until this plan has been submitted we will allow
. building permits to be issued as per our standard practice.
Lj
Richard P. Martel
Town Engineer
RPM/jsv
FXSK_KLEO INC.
• Developers 1744 Ellington Road
• Builders South Windsor, CT 06074
• Property
Managers Tel: 203-644-8761 / 644-8140
December 19, 1986
Mr. Kevin Rennie, Chairman
Inland - Wetlands Commission
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT 06074
Dear Mr. Rennie:
I respectfully request your Commission extend the permit for
Morgan Farms - Sullivan Avenue that is due to .expire January 13, 1987.
The subdivision is actively in pursuit of phase I completion. I
believe the Commission will find all activities within your approval.
However, there is one concern I would like to address with the Commission,
and ask I might be placed on the agenda. The narrative on the accepted
site division plan did not properly reflect activity as it should have.
I have submitted a revision of this activity and wish to present such
to the Commission. Please find the enclosed material on this subject.
Thank you for your consideration.
Sincerely,
Richard S. Kelley
CC Deputy Engineer, A. Bowen Davies
Town Planner, Marsha Banach
Atty Harold Cummings
�tpwN St44
0-1
1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074
soe•co�' AREA CODE 203/644-2511
January 5 , 1987
Mr. Kevin F. Rennie, Chairman
South Windsor Inland Wetlands Agency/Conservation Commission
1540 Sullivan Avenue
South Windsor, Connecticut 06074
RE: MORGAN FARMS
Application Review
Dear Kevin:
The "Morgan Farms" subdivision has been under construction since
June of this year, and to hear it as a new application at this time
does require some explanation. The change in the sequence came about
in August and technically has a minor impact on the site .
There does appear to be a contradiction between their conservation
plan narrative "all activities shall be in accordance with ---
Connecticut guidelines for soil erosion and sediment control" , and
what is reality in the field. The "guidelines" is a "what is the
problem and how to prevent it or correct it book" . Under section 3 . 3
site planning, 6 . select erosion and sediment control measures , en-
courages preservation of existing vegetation and early restoration
and seeding. Attention to specific uses of these measures and their
timely application is important in minimizing erosion from wind or
water or the capture of the suspended sediment before it leaves the
site.
A drive thru the site can assist the commission in evaluating the
quality and quantity of their erosion and sediment control. In
summary, most of the building permits for the 28 lots in Phase I
have been issued and been roughly graded. Any of the disturbed area
has no protection as per chapter 7 of the guidelines. The sediment
from the area east of Morgan Farms Drive can be deposited into the
storm system just by the nature of their operation and by any storm
runoff. Once it is in the system, the flushing it into the swamp is
a matter of time.
Their tree protection is not per the guidelines 6-39 ,41 their catch-
basin protection is not per the guidelines 7-32 . Their stormwater
discharge areas are not protected by hay bales and/or fabric filters.
Item 2 in their narrative, Item 4 stabilization of disturbed areas---
hasn't been done.
Mr. Kevin F. Rennie
Morgan Farms Application Review
January 5 , 1987
Page 2 .
Our concern is siltation on and off the site. Their efforts to
comply with their plan has not been acceptable.
A recommendation might include:
1. A modification of Item 1 of the Planning & Zoning approval
to provide for no excavation will be permitted in Phase II
until the soil erosion and sediment controls in Phase I are
done subject to commission approval.
2 . Any plan for Phase II be submitted for review and an approval.
Modifications should include, stabilization within one month
and a typical erosion & soil per lot.
3 . The approval could be granted with the above modifications
if the commission is so inclined.
Included in this report are copies of data that might assist you in
your review.
Very truly yours ,
A. owen Davies
Deputy Town Engineer
ABD/jsv
CC: Morgan Farms
Mr. Michael J. Gantick, Director of Public Works
Mr. Richard P. Martel, Town Engineer
Ms . Marcia A. Banach, Director of Planning
IWA/CC File
f
d 4
N'
!F
1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074
ftosox,co AREA CODE 203/644-2511
January 27, 1987
Harold R. Cummings, Esquire CERTIFIED MAIL
1665 Ellington Road
South Windsor, Ct 06074
Dear Attorney Cummings:
RE: Application # 443 - Morgan Farms Subdivision
At the January 26, 1987 meeting, the South Windsor Inland Wetlands
Agency/Conservation Commission approved Application #443, for Phase I
of Morgan Farms, which consists of lots 1-6, 48-62, expressly
excluding lots 7-9, with the original conditions to apply being as
follows:
1. Entrance pad should be delineated together with a
description of material .
2. Stockpiling, plus seeding per SCS handbook, should be shown.
3 . Significant trees on areas should be located and preserved.
4. Storm sewer outfalls should be adjusted to an area than can
be more readily maintained by the Town. More use of open
swales with appropriate seeding might be more acceptable.
5. Recommendations by Amy Parker and Eric Sherer of SCS, in
correspondence of September 25, 1985, are incorporated into
this approval and are conditions of this approval.
6. A new set of plans showing revision date must be
s"',nitted.
7. Construction activities shall be subject to the approval of
the Town Engineer.
8. The application shall indemnify and hold harmless the Town
of South Windsor against any liability which might result
from the proposed operation or use.
p .
TO: Harold Cummings
RE: Morgan Farms
9 . The permit is valid for one year and shall expire on
January 26, 1988 .
Very truly yours,
AM!am WaAk�,
Elizalbeth Warren, Vice Chairman
Inland Wetlands Agency/
Conservation Commission
CC. A. B. Davies, Deputy Town Engineer
Richard Martel, Town Engineer
Marcia A. Banach, Director of Planning
Michael Gantick, Director of Public Works
Louise Evans, Chairman, Planning & Zoning Commission
Thomas D'Auria, Building Official
Mr. Richard Kelley, RSK-Kellco
- 0*1N 8f,`�
r Titwon o-P SptdA ?d
e �
a
s F 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
�dsoR•co�' AREA CODE 203/644-2511
February 9, 1987
Mr. Kevin F. Rennie, Chairman
South Windsor Inland Wetlands Agency/Conservation Commission
1540 Sullivan Avenue
South Windsor, Connecticut 06074
RE: MORGAN FARMS, E & S PUNCH LIST
Dear Kevin:
To avoid a time consuming back and forth routine to resolve procedures
or measures of implementing a proper Erosion and Sedimentation control
"punch list" , ,and to perhaps avoid a "cadillac" approach, I consider
it important that the commission should indicate to "Morgan Farms" what
are problems .and for them to pick the control that they intend to use.
The basic requirements as indicated in the guidelines is to have a plan
that minimizes erosion and sedimentation during construction, is stabil-
ized and protected from erosion when completed and does not cause off
site deposit of sediment.
A one item summary of the "Morgan Farms" problem is to prevent or inter-
cept the silt and sediment runoff from being introduced into the water-
course in the open space inbetween lots 9 & 10. The "guidelines" encourage
a minimum of earth movement and soil exposure by maintaining the estab-
lished vegetative cover. As indicated on January 26, 1987 IWA/CC meeting
24 of the 24 lots are under construction and a number of families have
already moved in. In general, there are about 14 acres of roofs, pavement
and unprotected earth subject to the spring rains and the runoff effects.
With May as about the earliest that any vegetative cover could be estab-
lished, there is a need for a measures check list from "Morgan Farms" as
to what they will do and when, to preserve downstream and the. health,
safety and welfare in the area consistent with the "guidelines" .
Again, the Town is not" in the developing business and should not prescribe
measures to be used; we can approve or deny them.
Very truly yours,
A. Bowen Davies
Deputy Town Engineer
ABD/jsv
CC: Morgan Farms
Michael J. Gantick, Director of Public Works
Richard P. Martel, Town Engineer
Marcia A. Banach, Director of Planning
IWA/CC File
1 SOW N Seq A
� T
O-P s-ate
o w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
�J►dsOR'-CO � AREA CODE 203/644-2511
February 20, 1987
Mr. Kevin F. Rennie, Chairman
Inland Wetlands Agency/Conservation Commission
1540 Sullivan Avenue
South Windsor, Connecticut 06074
RE: Morgan Farms Subdivision
Dear Kevin:
As a part of my report, I was asked to include the enclosed.
At a meeting with the developer this week, they asked for a
clarification of the approval granted January 26 , 1987 in
which "the road and sewer system for the entire subdivison"
was deleted.
Very truly yours,
A. Bowen Davies
Deputy Town Engineer
ABD/jsv
CC: Morgan Farms
Michael J. Gantick, Director of Public Works
Richard P. Martel, Town Engineer
Marcia A. Banach, Director of Planning
IWA/CC File
O*N SEq
•� C
-o- , �s-��A ?A
G
wc� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
lN�soe•coN
AREA CODE 203/644-2511
December 15 , 1987
Morgan Farms
1744 Ellington Rd .
So . Windsor , CT 06074
Attention: Richard Kelley
RE : Morgan Farms
Dear Mr . Kelley ,
This is a reminder that the permit with the Inland Wetlands Agency/
Conservation Commission, Application #453 will expire on Jan . 26 , 1988 .
The agency xequires a letter requesting extension together with a fee
of $25 . 00 . This should be submitted at least 30 days prior to the
expiration date of the permit . If work has been completed or will be
completed by the expiration date , we would appreciate you contacting
the Inland Wetlands Agency/Conservation Commision' s secretary at
644-2511 Ext . 253 to advise of work status .
If you have any questions , please don ' t hesitate to contact Michele
Lipe or Mr . Davies , Deputy Town Engineer .
Very truly yours ,
Kevin Rennie
Inland Wetland Agency/Chairman
Conservation Commission
CC :
A. B . Davies , Deputy Town Engineer
Town Engineer
Michael Gantick, Director of Public Works
Marcia Banach , Director of Planning
3't4
y r 7,owt-t aP Sicwt 'L
O
e ?&adAot
o �(1 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
soa•ca� AREA CODE 203/644-2511
CERTIFIED MAIL
January 12, 1988
Richard S. Kelley
1744 Ellington Road
South Windsor, CT 06074
RE: Morgan Farms Permit Extension - Application 453
Dear Mr. Kelley:
At the January 11, 1988 meeting, the South Windsor Inland Wetland Conser-
vation Commission approved a one-year extension for the above mentioned
application.
The extension becomes effective January 26, 1988 with an expiration date
of January 26, 1989.
Very truly yours,
John M. Moran, Chairman
Inland Wetlands Agency/
Conservation Commission
Town of South Windsor
JMM
cc: A.B. Davies, Deputy Town Engineer
Richard Martel, Town Engineer
Planning & Zoning Commission
Marcia Banach, Director of Planning
Joyn Shemo, Economic Development Coordinator
Thomas D'Auria, Building Official
R5K-KELLCU INC.
• Developers
• Builders 1744 Ellington Road
• Property South Windsor, CT 06074
Managers Tel: 203-644-8761 / 644-8140
December 15, 1987
Town of South Windsor
Attorney Kevin Rennie
Inland Wetland Agency/Chairman
Conservation Commission
1540 Sullivan Avenue
South Windsor, CT 06074
RE: Morgan Farms
Dear Kevin:
Thank you for the reminder permit/application #453 will expire
January 26; 1988.
Please be advised construction is progressing very satisfactorily
at Morgan Farms. We request the permit on Morgan Farms to be extended
for a period of one more year. Enclosed you will find the required
$25.00 fee payment.
Sin erely,
ILA
Richard S. Kelley
Soutkl
F 11 1
ItAt AND W E'Cl.
We Build Our Reputation
10VIN srg4
� U
�.
ala
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
AREA CODE 203/644-2511 f r
GSOR•CO 0
November 9, 1988
RSK-Kellco
1744 Ellington Road
South Windsor, CT 06074
RE: Application # - Morgan Farms
Dear Sir:
This is a reminder that the permit with the Inland Wetlands
Agency/Conservation Commission, Application #443, will expire on
January 26 , 1989 .
The Agency requires a letter requesting extension together with a
fee of $25 . 0a. This should be submitted at least 45 days prior to
the expiration date of the permit. If work has been finished or
will be finished by the expiration date, please have an engineer
send a letter stating work is completed according to the approved
plan.
In the event that you are requesting an extension, Section 4 . 13 . 6
of the Zoning Regulations, Conservation Plan (a copy enclosed)
establishes the criteria for such a plan and a method of monitoring
its application. A permit for your proposal was granted, with a
bond as assurance of compliance with its sedimentation and erosion
control measures . To assist in the review process by the IWA/CC,
whether for a permit extension or specific inquiry request, the
provisions for verification through progress reports by the
developer's/applicant's Engineer demonstrating that each Erosion
and Sedimentation control measure has been installed and
maintained, in accordance with the approved plan shall be required.
It is requested that this verification report be submitted thirty
days before the regular meeting of the IWA/CC, January 9, 1939 , to
permit time for the Commissioners to evaluate your project
controls .
If you have any questions, please contact Phyllis Mann or John
McCahill, Zoning/Wetlands Enforcement Officer. (644-2511 Ext. 253 )
/V y truly yours,
hn M. Moran, Jr. , Chairm: /rY�
Inland Wetlands Agency/
Conservation Commission
JMMJr. /pmm
Enclosure
R5K-KELLE01NC.
• Developers
• Builders 1744 Ellington Road
• Property South Windsor, CT 06074
Managers Tel: 203-644-8761 / 644-8140
January 9, 1989 South Windsor
INLAND WETLANDS AG,_nICY/
CONSERVATION G0W..M1sSjo!,i
Inlands Wetlands Agency/
Conservation Commission
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT. 06074
RE: Application #443 - Morgan Farms
This is to request an extension of the above named application.
I am enclosing the necessary statements from the engineering
firm of Torres Engineering, Inc. and a check for $25 to cover the
fee.
At this time, however, I am requesting reduction of the bond
covering this application from $20,000 to $5,000.
Thank you for your consideration.
Sincerely,
O.'wi
Carol S. Kelley
ck
We Build Our Reputation
TETORRES ENGINEERING INC.
January 10 , 1989
j
��AI Y 9
South VV'indsor
INLAND WETLANDS AGENCY/
Inland Wetlands Agency/Conservation Commission CONSERVATION COMMISSION-
Town of South Windsor
1540 Sullivan Avenue
South Windsor, Ct 06074
Att: Mr. John M. Morgan, Jr. , Chairman
Re: Application #443 -- Morgan Farms
Gentlemen:
Our firm has reviewed the approved plans for Morgan Farms. We have walked
the project and found the work to be complete and in compliance with the
said plans except for cleaning and maintenance of the plunge pool between
Lots 9 and 10.
In order to complete this task we hereby respectfully request an extension
of the permit referenced above, on behalf of RSK Kellco.
Thank you for your prompt attention to this matter.
Very truly yours,
Ozzie orres P.E. , President
Torres Engineering, Inc.
cc: RSK Kellco
OT/mat
75 KITTS LANE, NEWINGTON, CT 061 11-3935 (203) 666-5390
Tout o-P Sout,�i V&U&ot
y 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
SOR•Co�'�w AREA CODE 203/64.4-2511
January 25, 1989
RSK-Kellco
1744 Ellington Road
South Windsor, CT 06074
Re: Application #443 - Morgan Farms
Dear Madam/Sir:
At the January 23, 1989 meeting, the South Windsor Inland Wetlands
Agency/Conservation Commission approved a one year extension of
Application-#443 with all original conditions.
In addition to the original conditions you are also required to
contact John McCahill, Zoning/Wetlands Enforcement Officer (644-
2511, x229) immediately upon approval notification. This is to
reverify the contact person for the site and establish a site visit
with that person to verify all erosion and sedimentation control
measures are in place according to the plan.
The application becomes effective January 23, 1989 and expires
January 23, 1990.
Very truly yours,
,'John M. Moran, Jr. , Chai n
Inland Wetlands Agency/
Conservation Commission
JMMJr. /pmm
cc:John E. McCahill, Zoning/Wetlands Enforcement Officer
Marcia A. Banach, Director of Planning
Michael Gantick, Director of Public Works
John R. Collins, Chief Building Official
Raymond Hallowell, Chairman, PZC
tpwN SE,`
0-leSa� 04
G U
a
m 1540 SULLIVAN AVENUE - SOUTH WINDSOR, CONN. 06074
soe•coN AREA CODE 203/644-2511
November 16, 1989
RSK-Kell-co
1744 Ellington Road
South Windsor, -CT 06074
Dear Madam/Sir:
Re: Application #443 - Morgan Farms, continuation of #367
This is a reminder that. Application #443 for permit and one year
extension will expire on January 26, 1990 .
A new application will be required in accordance with Section VI
and VII of the regulations if you plan to extend your project
beyond the above expiration date, along with the required fee of
$25 . 00 for a single family house and all others $100 . 00 . The
complete application and fee must be submitted at least 14 working
days prior to the first regular monthly meeting date of the Agency.
" To assist in the review process by the IWA/CC a report by the
developers )/applicant(s ) Engineer demonstrating that erosion and
sedimentation control measures have been installed and maintained,
in accordance with the approved plan, shall be required. Section
4 . 13 . 6 of the Zoning Regulations (a copy enclosed) , establishes the
criteria for a conservation plan and a method of monitoring its
application. This verification report must also be submitted with
the application to allow time for Commissioners to evaluate your
project controls .
If work has been completed or will be completed by the expiration
date, a letter from the engineer of the project will be warranted
as to the status of the application.
If you have any questions, please contact Phyllis Mann, Secretary,
or John E. McCahill, Zoning/Wetlands Enforcement Officer at 644-
2511, Ext 253 .
V truly yours,
James A. Lombardi, Chairm
Inland Wetlands Agency/
Conservation Commission
JAL/pmm
Enclosure
' E= I�
RSK KELLCO INC.
• Developers 1744 Ellington Road
• Builders
e Property South Windsor, CT 06074
Managers Tel: 203-644-8761 / 644-8140
1 pt,
JAN ;G 1990
South Windsor
January 11, 1990 INLAND WETLANDS AGENCY/
CONSERVATION COMMISStOI
Mr. James Lombardi
Chairman
Inland Wetlands Agency
Town of South Windsor
1540 Sullivan Avenue
South Windsor, Ct. 06074
RE: Application #443/367
Dear Sir: .
I am submitting a letter from Ozzie Torrez, P.E. regarding the
status of the above application. That permit covered Section I of
the Morgan Farms subdivision which we believe is complete according
to the requirements of our letters of approval. Therefore, we feel
that further extension of that permit is unnecessary.
Sincerely,
Carol S. Kelle
CSK:ks
We Build Our Reputation
TETORRES ENGINEERING, INC.
January 11, 1990 9Pr___%3Wrr
JAN 1;� 1990
South Windsor
INLAND WETLANDS A(s)=NCyl
CO"SMATION commisSION
Mr. James A. Lombardi, Chairman
Inland Wetlands Agency/Conservation Commission
Town of South Windsor
1540 Sullivan Avenue
South Windsor, Ct 06074
Re : Morgan Farms
South Windsor, Ct
Application #443
Our No: 86081
Dear Mr. Lombardi:
Our firm has reviewed the approved plans for Morgan Farms. We have walked
the project and found that all outlet points of the storm systems are
stabilized and maintained in accordance with the approved Erosion and
Sediment Control Measures and Conservation Plan. We feel that the
approved plan has been followed and the project is complete in that
respect. All proposed vegetation and landscaping has been estabilished
and is thriving.
No further extension of the permit for application #443 will be required.
Very truly yours,
Ozzie Torres P.E. , President
Torres Engineering, Inc.
cc: RSK-KELLCO
OT/mat
101 FENN ROAD, NEWINGTON, CT 061 1 1-2249 (203) 666-5390