HomeMy WebLinkAboutSouth Windsor High Approval Conservation towN af� a Wtll s 1540 SULLIVAN AVENUE SOUTH WINDSOR. CONN. 06074 R-C AREA CODE 203/644-2511 May 23, 1990 John G. Stewart Evans & Chisholm, Landscape Architects 4 Beech Street Farmington, CT 06032 Dear Mr. Stewart: Re: Application #90-24P - South Windsor High School At the May 21, 1990 meeting, the Inland Wetlands Agency/Conservation Commission approved with modifications Application #90-24P - IWA/CC permit for the construction of an addition to the high school on property located on the westerly side of Nevers Road and southerly side of Ayers Road, RR zone, as shown on plans prepared by Kaestle Boos Associates, project #88073, dated March 23, 1990 and revised March 30, 1990, April 11, 1990 and April 19, 1990 . 1 . Two blueprint copies of the entire set of plans and this letter reproduced thereon, must be submitted to this Commission to be stamped and signed. This must be completed within 65 days of approval and prior to any construction activity on the site. 2 . Construction activities shall be subject to the approval of the Town Engineer. 3 . The application shall indemnify and hold harmless the Town of South Windsor against any liability which might result from the proposed operation or use. 4 . The permit is valid for one year and shall expire on May 21, 1991 . 5 . All approvals required must be obtained and submitted prior to any activity on the site. 6 . A contact person shall be identified directly on the plans . 7 . Silt fence shall be shown at the toe of the slope for the grades along the westerly line. 8. The definition of clean fill, as found in section 2 . 1t of the Regulations, shall be included on the plans. John G. Stewart Page # May 23, 1990 Application #90-24P 9 . Topsoil storage area #2 shall be consolidated in one area on the east side of the entrance road. 10. Catch basin in paved areas (CB #14, 18, and 21) shown with hoods shall be replaced with sedimentation structures. 11 . A note shall be added to the plans stating, "dust control will be maintained throughout the entire duration of the project and is the responsibility of the Construction Manager" . 12. The Construction Sequence Schedule (sequence #1 through 8) and the drawing identifying the areas, as prepared by 0 & G Industries, Inc. , shall be added to the plans. 13. The plans shall show the temporary turning radius near the southerly end of the building, near the existing brook. This shall be done at grade, with no fill of the wetlands in that area. 14 . A construction entrance shall be shown near the southern edge of the building at the point where existing paved area is cut. 15 . The plans shall be revised to indicate the sewer connection to Nevers Road. This is to be placed in the area of the existing driveway entrance and shall cross over the existing 72" pipe. 16 . Temporary Seeding Rates and Dates, figure 6 .1 of the Connecticut Guidelines for Erosion and Sedimentation Control, shall be added to the plans . Disturbed areas shall be stabilized with temporary seed mix. Very truly yours, E*zth A. Warren, Vice Chairperson, IWA/CC EAW/pmm cc: Jerry C. Iazzetta, Town Engineer Marcia A. Banach, Director of Planning John R. Collins, Chief Building Official Planning & Zoning Commission