May 23, 1990
John G. Stewart
Evans & Chisholm, Landscape Architects
4 Beech Street
Farmington, CT 06032
Dear Mr. Stewart:
Re: Application #90-24P - South Windsor High School
At the May 21, 1990 meeting, the Inland Wetlands Agency/Conservation
Commission approved with modifications Application #90-24P - IWA/CC
permit for the construction of an addition to the high school on
property located on the westerly side of Nevers Road and southerly
side of Ayers Road, RR zone, as shown on plans prepared by Kaestle
Boos Associates, project #88073, dated March 23, 1990 and revised
March 30, 1990, April 11, 1990 and April 19, 1990 .
1 . Two blueprint copies of the entire set of plans and this
letter reproduced thereon, must be submitted to this
Commission to be stamped and signed. This must be
completed within 65 days of approval and prior to any
construction activity on the site.
2 . Construction activities shall be subject to the approval of
the Town Engineer.
3 . The application shall indemnify and hold harmless the Town
of South Windsor against any liability which might result
from the proposed operation or use.
4 . The permit is valid for one year and shall expire on May
21, 1991 .
5 . All approvals required must be obtained and submitted prior
to any activity on the site.
6 . A contact person shall be identified directly on the plans .
7 . Silt fence shall be shown at the toe of the slope for the
grades along the westerly line.
8. The definition of clean fill, as found in section 2 . 1t of
the Regulations, shall be included on the plans.
John G. Stewart Page # May 23, 1990
Application #90-24P
9 . Topsoil storage area #2 shall be consolidated in one area
on the east side of the entrance road.
10. Catch basin in paved areas (CB #14, 18, and 21) shown with
hoods shall be replaced with sedimentation structures.
11 . A note shall be added to the plans stating, "dust control
will be maintained throughout the entire duration of the
project and is the responsibility of the Construction
Manager" .
12. The Construction Sequence Schedule (sequence #1 through 8)
and the drawing identifying the areas, as prepared by 0 & G
Industries, Inc. , shall be added to the plans.
13. The plans shall show the temporary turning radius near the
southerly end of the building, near the existing brook.
This shall be done at grade, with no fill of the wetlands
in that area.
14 . A construction entrance shall be shown near the southern
edge of the building at the point where existing paved area
is cut.
15 . The plans shall be revised to indicate the sewer connection
to Nevers Road. This is to be placed in the area of the
existing driveway entrance and shall cross over the
existing 72" pipe.
16 . Temporary Seeding Rates and Dates, figure 6 .1 of the
Connecticut Guidelines for Erosion and Sedimentation
Control, shall be added to the plans . Disturbed areas
shall be stabilized with temporary seed mix.
Very truly yours,
E*zth A. Warren, Vice Chairperson, IWA/CC
EAW/pmm
cc: Jerry C. Iazzetta, Town Engineer
Marcia A. Banach, Director of Planning
John R. Collins, Chief Building Official
Planning & Zoning Commission