Loading...
HomeMy WebLinkAbout05-42P Spec Ex/Site Plan of Development i t Stormwater Management Plan Birch Mountain Earthworks Kimberly Drive South Windsor, Connecticut _aY S i fir°!v �n Y 0 4 •�epptRF �',`p�v kHHY9B1 Prepared by Design Professionals, Inc. 165 South Satellite Road South Windsor, CT 06074 DPI Project No. 05-2140 June 9,2005 Table of Contents: Page# Introduction 1 Existing Conditions I Proposed Development I Off-Site Analysis 1 Peak Runoff control 1 Nonstructural Drainage System 1 Erosion/Sedimentation Control Systems 1 Stormwater Runoff Quality 2 Conveyance System 2 Discharge at the Natural Location 2 Maintenance and Operation 2 Topographic Contour Maps 2 Floodplain Boundaries 2 Drainage Design 3 Storm Drainage Calculations 3 Conclusions 3 Introduction: Birch Mountain Earthworks is proposing to construct a facility on three parcels of land located on the south side of Kimberly Drive adjacent to the Route 5 and Kimberly Drive intersection. Existing Conditions: The three parcels contain a total of 6.06 acres of land. The site is presently wooded and contain some wetland areas. The land generally slopes down from north to south. Proposed Development: The proposed development of the site consists of the construction of a 6,000 S.F. building with associated parking, paved access areas, and gravel storage areas. The three parcels of land are within an existing industrial park, and due to the location of the industrial park within the overall watershed, detention facilities have not been required. Water quality measures are proposed for the site consisting of surface water quality basins to collect runoff from the improved areas. These basins will provide settling areas for sediment, and allow for infiltration of runoff as the soils allow. The basins will treat the first 1"of runoff from the improved areas. Off-Site Analysis: The three parcels of land presently drain to the existing wetlands and watercourses associated with the wetlands, and will continue to do so under developed conditions. Peak Runoff Control: Due to the location of the development within the overall watershed, peak runoff control is not required. Nonstructural Drainage Systems: The site will make use of a number of nonstructural measures to help control the storm-water on the site, and enhance the ability for infiltration of runoff into the soil. The water quality basins will provide for the treatment of the first 1"of runoff from the developed areas. Swales have been integrated into the design where appropriate to control runoff. Erosion/Sedimentation Control Systems: An extensive erosion/sedimentation control plan has been developed as part of the site design. These measures include the following: 1. Installation of silt fence down-slope of disturbed areas. 2. Installation of silt fence around stockpiled materials. 3. Use of the water quality basins as sediment basins during construction. 4. Seeding and mulching disturbed areas as soon as practical during construction. 5. Limiting the areas of disturbance during construction. 6. Installation of construction entrance pads. 7. Maintenance of the above measures. Stormwater Runoff Quality: A number of water quality measures have been integrated into the site design to provide for treatment of the stormwater runoff from the site. The water quality basins will treat runoff from the site via a permanent pool. Conveyance System: The on-site conveyance system consists catch basins, and associated piping that will convey the stormwater runoff to the eastern most water quality basin. The other two water quality basins will collect runoff from overland flow. All three water quality basins have pipes to discharge the runoff from the basins. Discharge at the Natural Location: The site presently drains to the south to the wetlands. Under developed conditions, the site will continue to discharge to the wetlands. Maintenance and Operation: The following maintenance operations will be required to ensure the proper and efficient operation of the Storm Water Quality Basin System. The following maintenance schedule is intended to be a minimum guide, and additional inspections and maintenance measures may be required following large storm events that could cause the deposition of excess debris in the system Pipe Outlet Locations: The pipe outlets and associated riprap should be inspected annually and cleaned of silt and or debris. The riprap should be re- shaped and replenished as required. Catch Basins: The catch basins should be inspected annually. The sumps should be cleaned when the depth of material within the sumps reaches 1'. Basin Outlet: The water quality basin outlets should be inspected twice annually, and all debris and silt should be removed. The discharge point from the outlet system should be inspected also,and all silt and debris should be removed. The riprap at the discharge should be re-arranged and additional stone added as needed. All silt and debris should be disposed of at a suitable location. Water Quality Basins: The water quality basins should be inspected annually. All woody growth that could inhibit proper flow within the basins should be removed. Excess debris that has been deposited within the basins should be removed. Any erosion noted within the basins should be stabilized. Topographic Contour Map: Topographic contour maps have been provided showing the drainage areas for the site. The maps showing the existing and developed conditions are included in the rear of this report. Floodplain Boundaries: A small portion of the site is within the floodplain boundaries. No filling is proposed within the floodplain. . One storm pipe discharge is proposed within the floodplain. Drainage Design: The site has been designed to provide water quality basins to treat the first 1" of runoff from the developed areas, and stable pipe discharge locations for all storm drainage discharges from the basins. The development will drain to three water quality basins. Each basin has been designed to contain the first 1" of runoff from the associated drainage area. The gravel storage yards are assumed to be impervious (100% runoff from impervious areas, and 0 runoff from pervious areas. A summary of the basin designs is as follows: Basin Drainage Volume for Volume Area* 1"of runoff Provided Eastern 10,800 S.F. 900 C.F. 1,000 C.F. Middle 17,450 S.F. 1,450 C.F. 1,450 C.F. Western 50,500 S.F. 4,208 C.F. 4,700 C.F. * Impervious areas only Storm Drainage Calculations: The on-site storm drainage system has been designed for a 10 year design storm utilizing the Rational method. The calculations for the piping size are included herein. Conclusions: The on-site stormwater system with the associated water quality basins will mitigate any potential storm-water quality impacts from the proposed development. 1 JOB esI n SHEET NO OF Wrofessionals, inc. CALCULATED BY p DATE.: 6 9 0 / / ... DESI G N ST 1Wt sC �/ I eivliengineers • planners • surveyors•gis O . FREQU9NC 1 eQm CHECKED BY .... DATE..._.__.._ _..__.._...._.__. tttRstnt x • A c T,c, r Q . Fro+n To AC �ncr. o atin. r r ch p't•,;, S; :Q� V t NOTE 0.jq —4- we- �•8 0. 3 o•� I . a , sL4 0, 10 . ----_....._.... ... -_...r_ �V �.. ��3:j C.'fir. b~ � S �'S�Y✓. F��P►:ty � ,.zS � � ���� - v�'7"mac=7� ;� � U 1 � � ,. � S jb tt ,st Lit Sit { ,t tl VOL. 1082PAGE 139 SCHROUL% A A aartaln piece Or parcel of land situated in the Tovn of South Windsor. County of Hartford and State of Connecticut, designated as Lot No. 3 as shovn on A nap or plan entitled 'SUBDIVISION PLAN RESU802VISZON tROPEATY Of ANOAC' CMAR80NHEAU SOUTW WINDSOR, CONNECTICU OWNER-DEVELOPER ANDRE' L. CHARBOBNEAV a ANORS' R. CHARBONNEAU 125 EDNIN ROAD SOUTH WINDSOR, CONNEC3'ICUT PNONE 520-7351 PALMBERG i RUSSO LAND SURVEYORS i PRLTESSIONA16 3 CNGINEERS 15 BARBER POND ROAD Mbffir2ELA CONNECTICUT 242-2775 BY LM SCALE 1' 40' DATE 1-13-07 REV. 02-10-a8'HATER MAIN EASSHcBw MV. 11-11-07 WETLANDS COMMENTS SHEET 2 OF 11 CHECKED WP ND. _ 151301, vhlah sup le on file in :he South N3ndsor Land Records and As Mare pattlaularly bounded and deacribed as follows. all as " Shown an Said WWI MORTEKRLYS by llawerly Drive. 410.43 feet: SASTSRLTs by Lot No. i, 1t2.10 feet; . - SOUTSCALYt BY land NIF International Transport Ina,. 143.73 tests SOUTACASTtRLYs By land N%F International Transport Inc.. asW Roeher. AR pare by eMCh. ►M all 472.30 tests tOUTUMVI BY Land M/F Samtoft. 23S.00 tests wangibYs By Lots mos. 5 A d. SOa.02 feet. '3 e } RECEIVED E4R RECORD Iyj02a, ICj I`�g AT RECORDED IN SOUTH WINDSOR LAND RECORDS VOL 401UPAGE lie BYi.i--- n'Oc`�TOWN CLERK)qSZ r e: mm d) x,< x� j. i i i i . i Volume 650 Page No 180 f 1 " E on 1?J1 QUIT CLAIM DEED - STATUTORY FORMA: ANDRE L. CHARBONNEAU a/k/a ANDRE CHARBONNEAU of the Town of South Windsor, County of Hartford and State of Connecticut ' for LEGAL CONSIDERATION ONLY, NO MONETARY CONSIDERATION grants -` to ' ANDRE K. CHARBONNEAU of the Town of South Windsor, County of y , r Hartford and State of Connecticut with QUIT CLAIM COVENANTS tx ` a one-half (1/2) interest in and to those certain pieces or ".: parcels of land, with the buildings and improvements thereon, situated in the Town of South Windsor, County of Hartford and State of Connecticut, known as Lots 1, 2 and 12 as shown on a certain map or plan entitled: "SUBDIVISION PLAN RESUBDIVISION PROPERTY OF ANDRE' CHARBONNEAU SOUTH WINDSOR, CONNECTICUT J OWNER-DEVELOPER ANDRE' L. CHARBONNEAU & ANDRE' K. CHARBONNEAU 125 EDWIN ROAD SOUTH WINDSOR, CONNECTICUT 125 EDWIN ROAD SOUTH WINDSOR, CONNECTICUT PHONE 528-7551 PALMBERG & RUSSO LAND �I SURVEYORS & PROFESSIONAL ENGINEERS 15 BARBER POND ROAD r BLOOMFIELD, CONNECTICUT 242-2775 BY LM SCALE 1" = 40' DATE 4-13-87 REV. 02-18-88 WATER MAIN EASEMENT REV. 11-18-87 1 WETLANDS COMMENTS SHEET 2 of 11 CHECKED WP NO. 86138", and - Lots 4, 6 through 8, and 11 as shown on a certain map ` entitled: "SUBDIVISION PLAN RESUBDIVISION PROPERTY OF ANDRE' ." CHARBONNEAU SOUTH WINDSOR, CONNECTICUT OWNER-DEVELOPER ANDRE' ` at L. CHARBONNEAU & ANDRE' K. CHARBONNEAU 125 EDWIN ROAD SOUTH _ F :. -. WINDSOR, CONNECTICUT 125 EDWIN ROAD SOUTH WINDSOR, ; CONNECTICUT PHONE 528-7551 PALMBERG & RUSSO LAND SURVEYORS & = ` PROFESSIONAL ENGINEERS 15 BARBER POND ROAD BLOOMFIELD, }< CONNECTICUT 242-2775 BY LM SCALE 1" = 40' DATE 4-13-87 SHEET 3 - ,� of 11 CHECKED WP NO. 86138", which maps are on file in the South Windsor Land Records to which reference may be had. `y �j Subject to the following all as recorded in the South Windsor . ' Land Records: a Water Main Easement in favor of the Connecticut Water Company dated 11/12/84 and recorded in ::': Volume 391, Page 79; a Water Main Easement in favor of the .- Connecticut Water Company dated 11/12/84 and recorded in z rhz Volume 396, Page 289; a Gas Distribution Easement to the P1; Connecticut Light and Power.Company dated 5/10/88 and record in Volume 524, Page 196; an Electrical Distribution Easemento to the Connecticut Light and Power Company dated 5/10/88 an c9 recorded in Volume 524, Page 193; a Drainage Easement along and on to Lot No. 6 as shown on the subdivision map and morel - :- fully set forth in an Easement dated December 22, 1987 and recorded in Volume 531, Page 564; an easement from Andre I ` Charbonneau to the Town of South Windsor dated 1-12-88; a 20 wide sanitary sewer easement as granted by Andre Charbonneau by instrument dated December 20, 1984 and recorded in Volume 394 at Page 133; taxes on the List of October 1, 1991, not yet due and payable; and to all provisions of any state, town or ,5 1:1- [ Y ` 4 k," q. fl`Y. Volume 650 Page N° 181 governmental lawand regulations affecting said premises i and r any and all provsions of any ordinance, municipal regulation or public or private law; and together with the right to pass and repass over Sandra Drive and Kimberly Drive until such ="`' time as the roads are accepted by the Town of South Windsor. yµ 5 Being apart of the same premises conveyed to the Grantor herein by Quit Claim Deed of Society for Savings, a banking corporation, dated September 28, 1983 and recorded in Volume 351, Page 181 of the South Windsor Land Records. r _ IN WITNESS WHEREOF, ANDRE L. CHARBONNEAU has hereunto set his s. hand and seal this 9ch day of June, 1992. Witnessed By: / William E. Grace ANDRE L. CHARBONNEAU a/k/a ANDRE CHARBONNEAU Barbara E. Symington STATE OF CONNECTICUT) ss: South Windsor, June 9 , 1992 COUNTY OF HARTFORD ) _.. Personally Appeared, Andre L. Charbonneau a/k/a Andre ' I Charbonneau, as aforesaid, signer of the foregoing instrument ! and acknowledged the same to be his free act and deed, before i ,r me. w - William E. Grace I z Commissioner of the Superior Court i -� GRANTEES MAILING ADDRESS: t r 83 Windy Hill Drive 9 � I South Windsor, CT 06074 �p < RECENED FOR RECORD a : t AT :::.. RECORDED IN SOUTH WINDSOR ; LAND RECORDS VOl6-fd PAGh'E� " TOWN CLERK 'k i i . 3 r W�..;:r rp: " __ 1 1 3473 VOL. 10 8 2 PAGE 138 TO ALL PEOPLE TO WHOM THESE PRESENTS SHALL COME, GREETING: KNOW YE, THAT PB REAL ESTATE #12, INC., (Releasor) a Connecticut banking corporation with an office and principal place of business in the Town of Bridgeport, County of Fairfield and State of Connecticut, for the consideration of EIGHTY-FIVE THOUSAND ($85,000.00) DOLLARS, received to its full satisfaction of ANDRE L. CHARBONNEAU, (Releasee) of the Town of South Windsor, County of Hartford and State of Connecticut, does remise, release and forever QUITCLAIM unto the said ANDRE L. CHARBONNEAU, and unto his heirs and assigns forever, all the right, title, inter est, cla im and dem and whatsoever as it, the said releasor, i has or ought to have in or to all that certain piece or parcel of m land together ether with the buildings and any other improvements rovements thereon, situated in the Town of South Windsor, County of Hartford and State of Connecticut, known as 55 Kimberly Drive, and more particularly bounded and described on Schedule "A" attached hereto and made a part hereof by reference. TO HAVE AND TO HOLD the premises with all the appurtenances, unto the said releasee, his heirs and assigns forever, so that neither it, the releasor, nor its successors or assigns, nor any other person under it or them shall hereafter have any claim, right .or title in or to the premises, or any part thereof, but therefrom it is and they are by these presents forever barred and =' excluded. IN WITNESS WHEREOF, PEOPLE'S BANK has hereunto set its hand and seal this day of May, 1999. �. Signed, Sealed and Delivered in the presence of: PB REAL ESTATE #12 INC. 14 By L / Its i W � Duly Authorized i - STATE OF CONNECTICUT ) ss: Bridgeport May 17, 1999 COUNTY OF FAIRFIELD ) On this the day of May, 1999, before me, the r�, i undersigned officer, personally appeared re�Qr ,�►]/ �who acknowledged himself\ to be the�re pp2Sde►llof PB Real Estate #12, Inc., a corporation, and that he\s#e) as such officer, being authorized so to do, executed the foregoing instrument for the purposes therein contained by signing the name of the corporation by himselfizne as such officer. IN WITNESS WHEREOF, I hereunto set my hand. CQNVEYANCETAXRECEIVED STATE• �Zi_OCAL• 10, - � TOWN CLERK OF SOUiH WINUSOR NotZpublicA-/� % a !My Commission Expires: o 3 Releasees' Mailing Address: DESIGN PROFESSIONALS, INC. civil engineers ♦ planners ♦ surveyors gis ♦ gps ♦ landscape architects Transmitted via certified mail June 14, 2005 Dear Current Abutting Property Owner Re: Application of Birch Mountain Earthworks,LLC Kimberly Drive South Windsor, Connecticut DPI Project No. 2140 In accordance with regulations of the Inland Wetlands Agency and the Planning&Zoning Commission, we are required to notify you that an application has been filed on the property abutting yours and is subject to a hearing(s)by the Inland Wetlands Agency and Planning& Zoning Commission. The applications and plans are on file with the South Windsor Planning Department in the Town Hall. As an abutting property owner you are invited to the hearing(s)to ask questions and/or give comments, however, you are not required to attend. You may also submit written comments regarding the application(s) prior to the meeting if you so desire. For further information regarding the specific date this application will be heard, please contact Michele Lipe,Deputy Planning Director, or Jeffrey Folger, Environmental Planner, at the South Windsor Planning Department at 644-2511, ext. 252 or 229, respectively. Thank you. Sincerel/' 0 DESIGFESSIONALS, INCBy: Pete "-- r . DeMallie President&Principal 165 South Satellite Road,South Windsor,Connecticut 06074 Tel: (860)291-8755•Fax:(860)291-9757 Email:dpicivil@aol.com DESIGN PROFESSIONALS, INC. civil engineers ♦ planners ♦ surveyors gis ♦ gps ♦ landscape architects Direct Abutters Birch Mountain Earthworks, LLC Kimberly Drive DPI Project No. 2140 Ma Lot No. Prove Proverty Owner Mailing Address 96 58 Andre L. &Andre K. Charbonneau 10 Abbe Road 96 59 Andre K. Charbonneau 55 Sandra Drive 96 63 South Windsor Land Conservation PO Box 415 Trust, Inc. East Windsor Hill, CT 06028 97 14 Ralph Mosher 308 Sandstone Drive 97 15 K&B Realty, LLC PO Box 958 Manchester, CT 06040 165 South Satellite Road,South Windsor,Connecticut 06074 Tel: (860)291-8755•Fax:(860)291-8757 Email:dpicivil@aol.com PLANNING DEPARMENT IN-HOUSE REFERRAL FORM DATE: June 15, 2005 TO: Matt Galligan, Fred Shaw, Michael Gantick, Rich Bond, Bill Lanning, Jeff Doolittle Kris Lindstrom, Ray Favreau, Karl Reichle, Mel Stead, Chris Dougan, Bob Deptula Dennis Sheridan FROM: Marcia A. Banach, AICP, Director of Planning The Planning&Engineering Departments have received plans for the following projects: 05-42P, Birch Mountain Earthworks Special Exception and Site Plan Location: Southerly side of Kimberly Drive ® Site Plan ❑ Subdivision No. Acres 3.8 +/- Zone I ® Industrial ® Commercial ❑ Residential No. Lots/Units Water: ® Public ❑ Private Well Sewerage: ® Public ❑ Septic System Project Description: 6,000 sf new facility and associated storage yard Future Town-owned property involved? ❑ Yes ®No ❑ new street(s) ❑ new detention area ❑ new open space/recreation area ❑ active ❑passive Planning Department notes: Please comment by 7/8/05 and return to the Planning Department. Le 1 1 'P_kVD 'Q�P ��"_- !r $ u ( c ye-Vtip i ;k, DESIGN PROFESSIONALS, INC. civil engineers .planners . surveyors . gis June 24,2005 Town of South Windsor 1540 Sullivan Ave. South Windsor,Ct 06074 Attn:Ms.Marcia Banach Town Planner Re:Birch Mountain Earthworks Dear Marcia We are proceeding with preparing a traffic statement for the above referenced project. We are anxious to meet with you,Jeff Folger,and Jeff Doolittle to discuss this project. Please feel free to call with any questions or comments. Sincerely, 1,-A e Galen Semprebon,P.E. Director of Engineering � S 1540 Sullivan Avenue,South Windsor,CT 06074 PH 644-2511 ext 253 Fax 644-7280 South • • Planning Department I:hx To: Karen Isherwood, DPI From: Michele R. Lipe,Asst Director of Planning Fax: Pages: 1 Phone: Date: 7/21/2005 Re: Birch Mountain Earthworks Site Plan CC: ❑ Urgent ❑ For Review ❑Please Comment ❑Please Reply ❑ Please Recycle Planning Dept review comments: 1. All 3 lots must be combined into one lot and the zoning data for that lot must be provided (zoning regulations do not allow parking/storage area without a principle building on site) 2. On 6/16/05 we contact DPI regarding a traffic statement for this project. To date we have not received any traffic information. 3. Outdoor storage area needs to be more defined so the Commission has a better understanding of what that area will look like and how materials will be stored. 4. We are concerned that adequate circulation exists between the parking areas and that the parking spaces shown west of the drive(indicated as un-striped spaces)are able to be utilized as spaces. 5. Outdoor display area that was presented to ADRC on 7/7/05 does not match what is on the site plan. Please incorporate that plan. NOTE: vehicles to be displayed in the front area must be brought to the display location from the interior of the site (can not be brought out into t he street and over the curb as presented to the ADRC) ADRC Comments • Gate detail must be provided • Shrubs must be added along the kicker wall facing out to Kimberly Drive • Storage and display areas must be clarified on the plans to �v MEMORANDUM TO: Marcia Banach, Director of Planning FROM: Joseph J. Perna, Project Engineer , DATE: July 26, 2005 RE: Birch Mountain Earthworks Site Plan P&Z Appl. No. 05-42P At your request, we have reviewed the plans and reports submitted with this application and offer the following comments: 1. The proposed driveway cut for the bulk storage yard on the west side of the site should be shifted over to the west in order to avoid disturbance of the existing streetline monument. 2. The property line angle point 169.82 ft. from the northwest corner of lot no. 3 indicates an iron pin. Is this an existing iron pin or iron pin to be set? 3. The property line angle point 138.22 ft. from the south corner of lot no. 3 should indicate an iron pin to be set on the plans. 4. Coordinates have been provided for the monuments to be set. Please provide coordinates for the existing street monuments as well. 5. The proposed entrance drive to the bulk storage yard on the west side of the site should be constructed with a paved apron. 6. The proposed storm drain pipe that conveys runoff from the water quality basin on lot no. 2 should be shifted to the south to better align the flow direction with the existing 36" culvert and match in with the existing rip-rap outfall. 7. The southerly edge of the paved area by the proposed building on lot no. 1 should be curbed from the proposed dumpster pad to the edge of the gravel area. 8. A rip-rap energy dissipater should be installed at the outfall to the storm drainage system which conveys runoff from lot no. 1. w w. 9. We suggest that an earthen berm be constructed along the south side of the storage areas on lot nos. 1 & 2 and the access roadway that connects them, to control the handling and storage of waste material generated by the Applicants construction activities and to maintain the integrity of the existing slopes. 10. Provide details of a rip-rap energy dissipater and RCP flared end from the Town of South Windsor's Public Improvement Specifications on the Detail Sheet. Please let us know if you have any questions regarding this application. DESIGN PROFESSIONALS, INC. ILIG 005 2005 TN hr;�i;)� ,R�i ;,,s,;,lh, E FT civil engineers .planners . surveyors . gis August 2,2005 Town of South Windsor 1540 Sullivan Ave. South Windsor,Ct 06074 Attn:Ms.Marcia Banach Town Planner Re:Birch Mountain Earthworks Dear Marcia We are enclosing 9 sets of revised plans for the above referenced project. The plans have been revised to address Planning,ADRC,and Engineering comments in addition to Inland Wetland approval conditions. The specific revisions to address the comments are as follows: Planning Dept.comments dated 7/21/05: 1. Our clients would like to keep lot#3 as a separate lot. We believe based on the zoning regulations,that this is allowed,and that lot#3 does not need to be combined With the possibility of changes in the regulations,we believe it is in our client's best interests not to combine lot#3 into lots 1 and 2,which based on our application,lots 1 and 2 will be combined. 2. We have enclosed a traffic statement for this project. 3. We have provided on the landscape plan,a layout for storage of materials within the storage yard on lot #3. 4. The 8 parking spaces as shown are for compliance purposes. This area is specified for storage of trucks and equipment. The intent of this area is for the storage of equipment for the Birch Mountain Earthworks landscape business. The only parking within this area will be for the employees of the company,and not for public parking for visitors to the building. 5. The outline of the display area as presented to ADRC is shown on the plan.The display spaces have been shown to comply with the town regulations for setback etc. We have also indicated on the plan that these spaces are to be accessed via the internal parking area and over the lawn. ADRC comments 1. A gate detail has been included on sheet 6. 2. Shrubs have been added along the kicker wall. 3. Storage and display areas have been clarified on the plans. J Inland Wetlands Approval Conditions: 1. Clay liner has been added to the bio-filter areas. 2. A berm has been added along the south side of the interior roadway. 3. A pre-settling area has been added to the western bio-filter area. Engineering comments dated July 26,2005 1. The western driveway cut has been shifted as requested. 2. The iron pin has been added to the plans. 3. The iron pin has been added to the plans. 4. The coordinates for the 3 existing monuments have been added to the plans. 5. A paved apron has been indicated for the western entrance drive. 6. The pipe for the water quality basin on lot#2 has been shifted as requested. We have discussed this revision with Jeff Folger to ensure that this change would not affect the wetlands approval. 7. The southerly side of the pavement has been indicated to be curbed. This was the original intent. 8. A riprap energy dissipater has been indicated for the outfall on lot#1. 9. An earthen berm has been indicated along the south side of lots 2 and 3. 10. The appropriate details have been added to the design plans. Please review the enclosed,and feel free to call with any questions or comments. Sincerely, `Galen Semprebon,JP.�E Director of Engineering Enclosures: 165 South Satellite Road, South Windsor, Connecticut 06074 Tel: (860)291-8755 • Fax: (860) 291-8757 AUG 0 2005 SOUTH a'�4!pS l.Al�`I i ti'G D p7, TRAFFIC STATEMENT BIRCH MOUNTAIN EARTHWORKS KIIABERLY DRIVE SOUTH WINDSOR, CONNECTICUT Birch Mountain Earthworks is proposing to construct a facility on three parcels of land located on the south side of Kimberly Drive adjacent to the Route 5 and Kimberly Drive intersection. The three parcels contain a total of 6.06 acres of land and are presently undeveloped. The proposed development of the site consists of the construction of a 6,000 S.F. building with associated parking, paved access areas, and gravel storage areas. The site will have access to Kimberly drive via two driveways. The site will be used for a number of purposes including as a business office with a showroom, yard for storage and maintenance of landscape equipment, and a storage yard for landscape products. Developing traffic generation rates for a use of this type is difficult due to the type of use. Standard generation rates as contained in the ITE Trip Generation manual do not apply for a use of this type. The site will have in general,two separate uses;the operation of the landscape business out of the site, and the sale of the landscape services from the site. As we understand the use of the site,the sale of the services is not expected to be a major component of the use of the site. All services are performed off site at the business and home locations. For customers who want to see samples of materials etc,they can come to the site to the showroom and see different material samples. In addition,people traveling along Route 5 who are interested in having landscape work done at their homes and businesses can stop in and discuss this work. Birch Mountain Earthworks does not have a showroom presently, and does not meet with customers at their site presently. The closest information regarding projections of traffic for this type of use in the ITE Trip Generation manual appears to be for a Nursery(Garden Center). The use of the site will be significantly different than a Nursery or Garden Center. The main purpose of the showroom area is to sell the landscape services of the company, and not for retail sales of merchandise. There may be minor sales of retail products in support of previous clients such as replacement top caps for retaining walls should one crack or fall and break. There would be no retail bulk sales and loading of materials contained within the outside storage areas. This material would only be loaded onto the Birch Mountain Earthworks trucks for use. Using the Nursery(Garden Center) generation rates per employee and assuming that only 1 employee would be on-site for sales,the Showroom and on-site sales of contracting services would generate the following: Showroom Trips Weekday A.M. Peak Hour P.M. Peak Hour Generation rate 22.173 0.750 2.387 Vehicle Trips 22 1 2 The Birch Mountain Earthworks landscape business will consist of the storage of the landscape trucks and materials at the site. During the normal course of business,the employees will arrive at the site and leave their personal vehicles at the site for the day. The company vehicles will be loaded with the necessary materials, and travel to the location or locations for work on that particular day. Additional landscape material may be needed from the site during the course of the day. Birch Mountain Earthworks presently has 4 full time employees and 6 seasonal employees. Assuming all employees arrive at during the peak hour and 9 employees leave during the peak hour, (1 employee stays in the office), and all employees drive separate vehicles from the site for the business,there would be a total of 19 vehicle trips during the A.M. and P.M.peak hours. During the course of the day,there may be additional vehicle trips to pick up material, material deliveries etc. We would not expect these additional vehicle trips to average over 1-2 additional trips per hour. Over the course of the day, an additional 10 vehicle trips would be expected. A summary of the total vehicle trips for the business and showroom trips are as follows: Total Vehicle Trips Weekday A.M. Peak Hour P.M. Peak Hour Vehicle Trips 70 20 21 The above estimates are believed to be conservative. Many of the employees are expected to arrive for work prior to the peak hour of traffic on the roadway system, and in many cases, workers will travel to job sites together in vehicles. The sight lines for both access drives for reviewed for adequacy. From the eastern site drive(Lot 1),the eastern sight distance extends to the intersection of Kimberly Drive and Route 5. The sight distance in the western direction for the eastern site drive is over 500'. From the western site drive(Lot 3), in the western direction,the sight distance extends to the intersection of Kimberly drive and Sandra Drive. For the western site drive, the eastern sight distance is presently obscured by vegetation along the frontage of the site, and extends only approximately 250'. The site plans have been revised to note that the existing vegetation needs to be cleared to provide adequate sight distance of 350' min. (Stopping sight distance for 40 mph design speed). DESIGN PROFESSIONALS, INC. AUG a 06 2005 civil engineers •planners . surveyors . gis IDI-I NINHNG[DE"T. August 2,2005 Town of South Windsor 1540 Sullivan Ave. South Windsor,Ct 06074 Attn:Ms.Marcia Banach Town Planner Re:Birch Mountain Earthworks Dear Marcia We are enclosing 9 sets of revised plans for the above referenced project. The plans have been revised to address Planning,ADRC,and Engineering comments in addition to Inland Wetland approval conditions. The specific revisions to address the comments are as follows: Planning Dept.comments dated 7/21/05: 1. Our clients would like to keep lot#3 as a separate lot. We believe based on the zoning regulations,that this is allowed,and that lot#3 does not need to be combined. With the possibility of changes in the regulations,we believe it is in our client's best interests not to combine lot#3 into lots I and 2,which based on our application,lots I and 2 will be combined. 2. We have enclosed a traffic statement for this project. 3. We have provided on the landscape plan,a layout for storage of materials within the storage yard on lot #3. 4. The 8 parking spaces as shown are for compliance purposes. This area is specified for storage of trucks and equipment. The intent of this area is for the storage of equipment for the Birch Mountain Earthworks landscape business. The only parking within this area will be for the employees of the company,and not for public parking for visitors to the building. 5. The outline of the display area as presented to ADRC is shown on the plan.The display spaces have been shown to comply with the town regulations for setback etc. We have also indicated on the plan that these spaces are to be accessed via the internal parking area and over the lawn. ADRC comments 1. A gate detail has been included on sheet 6. 2. Shrubs have been added along the kicker wall. 3. Storage and display areas have been clarified on the plans. Inland Wetlands Approval Conditions: 1. Clay liner has been added to the bio-filter areas. 2. A berm has been added along the south side of the interior roadway. 3. A pre-settling area has been added to the western bio-filter area. Engineering comments dated July 26,2005 1. The western driveway cut has been shifted as requested. 2. The iron pin has been added to the plans. 3. The iron pin has been added to the plans. 4. The coordinates for the 3 existing monuments have been added to the plans. 5. A paved apron has been indicated for the western entrance drive. 6. The pipe for the water quality basin on lot#2 has been shifted as requested. We have discussed this revision with Jeff Folger to ensure that this change would not affect the wetlands approval. 7. The southerly side of the pavement has been indicated to be curbed. This was the original intent. 8. A riprap energy dissipater has been indicated for the outfall on lot#1. 9. An earthen berm has been indicated along the south side of lots 2 and 3. 10. The appropriate details have been added to the design plans. Please review the enclosed,and feel free to call with any questions or comments. Sincerely, 'Galan Semprebon,P.E Director of Engineering Enclosures: 165 South Satellite Road, South Windsor, Connecticut 06074 Tel: (860) 291-8755 • Fax: (860) 291-8757 DESIGN PROFESSIONALS, INC. RED EIV civil engineers •planners • surveyors . gis AUG 1 I Z005 August 11,2005 SOUTH 1A11NDSOR,r!ANNNIC;DF.Fr, Town of South Windsor 1540 Sullivan Ave. South Windsor,Ct 06074 Attn:Ms.Marcia Banach Town Planner Re:Birch Mountain Earthworks Dear Marcia In response to a recent telephone conversation with Michele,we are enclosing the following: 1. 9 copies of revised sheet 3 of 6 showing proposed lighting for project. 2. 9 copies of clients sketch on front landscaping area. Please review the enclosed,and feel free to call with any questions or comments. Sincerely, /.J ebon -- Galen Sempr ,P.E. Director of Engineering Enclosures: MEMORANDUM TO: Michele Lipe, Assistant Director of Planning FROM: Joseph J. Perna, Project Engineer ° DATE: August 15, 2005 9 RE: Birch Mountain Earthworks Site Plan P&Z Appl. No. 05-42P We have reviewed the revised plans and reports submitted for this application. All Engineering Department comments enumerated in our July 26, 2005 memorandum have been addressed and we have no further comments regarding this application. c - ti Appl #05-37P, Birch Mountain Earthworks 8/16/05 Planning Department Report 1. Request for special exception and site plan approval for approval of a 6,000 sf facility located on the southerly side of Kimberly Drive, westerly side of John Fitch Boulevard, I zone. The proposal includes a 1,800 sf area for a showroom and office area and a 4,200 sf shop area. They have indicated a note that there is the possible expansion to include 1,800 sf additional warehouse area on the second floor. 2. The zoning data block has identified criteria for two separate lots, however the applicant has indicated that the lots will all be combined. Lot size is 6+; minimum lot size allowed is 20,000 sf. Frontage is in excess of 870 feet; minimum allowed is 100 feet. Front yard setback is 46.5 feet with a 10' overhang, 35 feet allowed. 3. Maximum impervious coverage allowed is 65% allowed. The applicant will need to calculate that based on the combined lot proposal and add it to the plans. 4. Proposed building height has been given as something less than 40 feet; 40 feet allowed. 5. Two driveways are proposed along Kimberly Drive to access the site. Parking requirements based on uses (retail, office and warehouse) is 15 spaces; 15 spaces have been provided. 6. The special exception proposed is to section 6.1.3.2 which is for "yards for storage of and sales of lumber, building materials, and construction equipment." 7. The Special Exception criteria include: • The goals and objectives of the Plan of Development are met; • Adverse traffic impacts are not created; • Negative impacts on property values are not created; • The land is physically suited for the proposed use; • Adverse environmental impacts are not created; • There is a balance between neighborhood acceptance and community needs; • Present and proposed utilities, streets, drainage system, and other improvements have adequate capacity to accommodate the proposed use • Historic factors are adequately protected; and • The overall physical appearance of the proposed development is compatible with surrounding development and the Commission's goals for the neighborhood/corridor. 8. The Architectural and Design Review Committee reviewed the plans on July 7th with the following comments: • Gate detail must be provided • Shrubs must be added along the kicker wall facing out to Kimberly Drive • Storage and display areas must be clarified on the plans 9. The applicant is proposing a display area in the front of the building for which they have provided a separate colored plan. They have also included two display spaces, between the building and the road, for vehicle surplus equipment for sale and/or rental equipment. There is a note on the plans that this area should be accessed from the interior of the site (can not be brought out into the street and over the curb as presented to the ADRC). IO.There are two storage areas shown on the site. The first area, shown on what is lot 2, is for the storage of trucks and equipment used in commercial business and short term storage of pallets containing landscape products. 11.The storage yard shown on lot 3 is for bulk storage of mulch, landscape stone, and landscape materials such as patio blocks and retaining wall units. The landscape plan shows a possible layout for storage on site. 12.Along Kimberly Drive, a small berm is proposed and it will be planted with white pines, 15' feet on center, to screen the parking areas. 13.Lighting proposed includes wall paks on the building with cutoff fixtures, fc. 14.They are proposing a 24 sf free standing sign and a building sign, approximately 60 sf on the side of the building facing out to John Fitch Boulevard. Designs of the signs have been submitted. 15.There are regulated wetlands on the property. The applicant received approval from the IWA/CC on July 6, 2005 recommending a bond in the amount of $5,000 to ensure compliance with the erosion and sediment control measures and a bond in the amount of$5,000 to ensure installation and establishment of the water quality structures. Other conditions include: The biofilter areas must incorporate a clay liner to maintain hydrology; a berm must be constructed along the south side of the interior roadway to maintain the integrity of the slope; and a pre-settling area must be constructed prior to the western biofilter to trap surface sediments. 16.There are public water and sewer available to the site. Water Pollution Control Authority approval is required. 17.There is a dumpster shown on the southwesterly side of the building on a concrete pad. The detail show that it will be screened by landscaping, however that is not reflected on the landscape plan. Is that the intent or will this area be fenced? 18.If this application is approved, the planning department has no additional modifications to request. C;a.�,l�-�r�t,� bc I� C.�& � f V 64- -- -- ILL-4� O/btl � A wv � rn � BOND TRANSMITTAL DATE: 10 S APPLICANT NAME �(,Z��y> o i< ADDRESS Ade-4944efit V e PROJECT LOCATION/ADDRESS DA . ye_ LOT S �1 1e P&Z OR IWA/CC APPLICATION NUMBER 05- y a-jc> AMOUNT OF BOND ( CHECK NUMBER_ 9 15 DEPARTMENT C,k V,Y1 i n SUBMITTED BY�72�C,&.t6 1 -,-,41A NAME DATE F RECEIVED BY FINAN Q 6s DATE SUB ACCOUNT NUMBER 606n 91 HAPlanning Department\Holmes\fonns\BOND TRANSMITTAL 08-27-Ol.doc yak SOWN Sf4 715i,� 0 14C 5 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 o � l�oSOR•ca AREA CODE 860/644-2511 September 19, 2005 C)5--Liar Design Professionals, Inc. 165 South Satellite Road South Windsor, CT 06074 Attn: Galen B. Semprebron Re: Birch Mountain Earthworks, LLC Kimberly Drive, South Windsor, CT Dear Mr. Semprebron: The South Windsor Water Pollution Control Authority, at its regular meeting of September 6, 2005, gave approval for the connection to the Town's sewerage system for Birch Mountain Earthworks, LLC., Kimberly Drive, South Windsor, CT as more specifically shown on plans entitled "Birch Mountain Earthworks, LLC., Site Plan/Special Permit, Kimberly Drive, South Windsor, CT", Prepared by Design Professionals, Inc., South Windsor, CT; Job No. 2140, Drawing No. JOBS/2140/2140-4.DWG., Sheet No. 4/6 "Topographic Plan", Dated 6/13/05, with revision dates: 6/30/05, 8/01/05; and subject to the following conditions: 1. Approval of the Planning and Zoning Commission. 2. Technical approval of the Town Engineering Department. 3. Final Authority approval and acceptance of the sanitary sewerage connection will be given once the sewer line has been installed and inspected by the Town staff, and based upon the written verification of the Town staff that said sanitary sewer line was installed in substantial conformance with the design plans approved by the Authority, and meeting all Town regulations and appropriate technical specifications relating to sanitary sewer construction. 4. The sewer connection charge will be$5,283.60. This approval letter must be superimposed on the final approval plans. Very truly yours, lseph J.Carino, Chairman Water Pollution Control Authority JC:ead Cc: Michael J. Gantick, Director of Public Works Jeffrey Doolittle, Town Engineer /Marcia Banach, Director of Planning Christopher Dougan, Chief Building Inspector F � SOW N S. co n F -O-u'/ ` �V-V miA ?dt� C s w`' 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 soR-CO TELEPHONE(860) 644-2511 September 20, 2005 CERTIFIED MAIL Mr. Daren Rokicki Birch Mountain Earthworks 1265 John Fitch Boulevard South Windsor, CT 06074 Re: Appl#05-42P, Birch Mountain Earthworks Site Plan and Special Exception 6.1.3.2 Dear Mr. Rokicki: We are pleased to advise you that the Planning&Zoning Commission voted on September 13, 2005 to approve with modifications the above referenced application for a Site Plan of Development and Special Exception 6.1.3.2. This approval is for the construction of a new facility and associated storage yard on property located 11, 23 and 55 Kimberly Drive, Industrial zone as shown on plans prepared by Design Professionals, Inc., Job No. 2140 dated 6/13/05, as revised. This approval is subject to the following modifications: 1. Prior to commencement of any site work, a meeting must be held with Town Staff. 2. No building permit will be issued until the final mylars have been filed in the Town Clerk's office. 3. This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission,including a bond in the amount of$10,000. 4. An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 8.1.11 of the Zoning Regulations. 5. Footing drains are required if the building has a basement. 6. A landscape bond in the amount of$5,000. is required and must be submitted prior to filing of mylars. 7. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 8. This approval does not constitute approval of the sanitary sewer, which can only be granted by the Water Pollution Control Authority. 9. If a State Traffic Commission certificate is required, no building permit will be issued until the certificate has been issued (pet CGS #14-311). 10. The building street number must be included on the final plan. 11. Pavement markings must be maintained in good condition throughout the site drives and parking areas. 12. Zoning data table should reflect the zoning for the property as a combined lot. 13. Equipment to be offered for rent and/or sale in the approved display area is limited to two pieces with a maximum of 10,000 pounds each. Black and white transparent mylars of Sheet#3 with the above modifications, together with three blueprint copies of the entire set of plans (including architectural elevations and landscaping plans)must be submitted to this Commission within 30 days to be stamped and signed. The letters of approval of this Commission as well as the Inland Wetlands Agency/Conservation Commission must be reproduced on the mylars. After the mylars have been signed by the Commission, they will be returned to you for filing in the Office of the Town Clerk. After filing these plans, a copy of the receipt must be submitted to the Planning Department. The attached Special Exception form must be completed and filed in the Town Clerk's office. The special exception will take effect upon filing. Sincerely, Timothy H. Wentzell, Chairman Planning and Zoning Commission THW/rfs cc: Town Engineer Chief Building Official Assessor Superintendent of Pollution Control Fire Marshal I,Z imothy H. Wentzell, Chairman of the South Windsor Planning&Zoning Commission, hereby certify that on September 13, 2005, the Planning and Zoning Commission granted to Birch Mountain Earthworks a Special Exception to Article 6.1.3.2 of the Zoning Regulations to construct a new facility and associated storage yard on property located at 11, 23 & 55 Kimberly Drive as shown on plans prepared by Design Professionals, Inc. Project No. 2410. Assessor's Map and Parcel Number: Map#97 Parcel # 16, 17, 18 More particularly bounded and described as follows: Legal Description Lot 1 September 20, 2005 Mack Properties DPI Proj. #05-2140 Beginning at a point—said point being the northwest corner of the parcel herein described, said point also being 157.00 feet at a bearing of S67°43'08"E from a concrete monument on the southerly side of Kimberly Drive; thence S22°16'52"W, along Lot 2, a distance of 166.61 feet to a point;thence S6711'32"17-,along property now or formerly of K&B Realty, LLC, a distance of 252.49 feet to a C'B'D monument; thence S68020'23"E, along property now or formerly of K&B Realty, a distance of 15.74 feet to a point; thence along a curve to the left having a central jingle of 1°38'08" and a radius of 5644.65 feet, along the westerly highway line of John Fitch Boulevard, a distance of 161.12 feet to a point, said curve is further subtended by a chord having a bearing of NY I2'25"E and a distance of 161.11 feet; thence along a curve to the left having a central angle of 70°06'27" and a radius of25.00 feet, ,along the southerly street line of Kimberly Drive, a distance of 30.59 feet to a point; thence N67°43'08"W, along the southerly street line of Kimberly Drive, a distance of 192.06 feet to a point, said point being the point and place of beginning. Legal Description Lot 2 September 20, 2005 Mack Properties DPI Proj. #05-2140 Beginning at a concrete monument in the southerly street line of Kimberly Drive; thence along a curve to the left having a central angle of 4015'29" and a radius of 1158.12 feet, along the southerly street line of Kimberly Drive, a distance of 86.07 feet to a point; thence S22°16'52"W, along Lot 3, a distance of 161.181eet to a point; thence S67011'32"E along property now or formerly of K&B Realty, LLC, a distance of 243.00 feet to a point;thence N22116'52"E, along Lot 1; a distance of 166.61 feet to a point; thence N67043'08"W, along the southerly highway line of Kimberly Drive, 157.00 feet to a concrete monument, said monument being the point and place of beginning. A certain piece or parcel of land situated in the Town of Lot: 3 South Wlndlar. County of Hartford and State of Connecticut, otsfgnated as Lot No. 3 as shown on a nap or plan entitled 'SUBDIVISION PLAN RESUBDIVISION PROPIATr Of ANDRE' CbARBONNSAV LOUTH WINDSOR, CONNECTICU OIINER-DEVELOPER ANDRI' L. CHARaONMEAD i ANDRS' X. CHARSONNEAU 125 CDNIN ROAD SOUTH NINDSOR. CONNECT:CUT PHONE 520-7351 PALMBERG A RUSSO LAND SURVIYORS i PROFESSIDNAJ� ENGINEERS 1S BARSEA FOND ROAD 8LOOMtIILP CONNECTICUT 242-2773 1Y Lit SCALE 1' a 40' DATL 1-13-17 REV. 02-11-68' WATER MAIN CASSMCST RSV. 21-11-17 WETLANDS COMMENTS SHEET 2 Or 11 CHSCXSo wP N0. 161314, which sup is on file in :he South Windsor Land Records sad As more particularly bounded and deXcLibed as follows. all ss ahown on said Mwo YOATRULT& 8y Ximerly Drive. 410.43 feet; t"TIRLYf 8y Lot go. i, i91.11 teat: XOVT8SRLTt by land NIP 1ntern4t10n4l Transport Inc., 145.73; feet; SOU:N£ASTr=s sy larid wr International Transport 1nC.0 aad ROshek. lq part by each. to all 472.3E fettt t SOUTH=If or Laud N/f 8aacroft. 205.00 testf wmtXLYt 1r Lots Out. 3 8 1, 304.82 feet. OWNER OF RECORD: Dated at South Windsor, Connecticut this,:96 ",day of : :x� t:.� t��� �,� , 20 In accordance with CGS Section 8-3d Timothy H. Wentzell,Chairman Planning&Zoning Commission Received for record this day of , 19_, at South Windsor, Connecticut ATTEST: 10 N Sf4 V&U&Ot 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 °SOR•CO TELEPHONE (860) 644-2511 September 27, 2005 Mr. Daren Rokicki Birch Mountain Earthworks _1265 John Fitch Boulevard South Windsor, CT 06074 - -Re: Preconstruction Meeting-—A pp #05-42P, Birch Mountain Earthworks Site Plan and Special -- - - - -------- — pp Exception 6.1.3.2 Dear Mr. Rokicki: IN ATTENDANCE Jeff Doolittle TOSW 1540 Sullivan Ave. 860-644-2511.x 245 Michele Lipe TOSW 1540 Sullivan Ave. 860-644-2511 x 252 Jeff Folger TOSW .1540 Sullivan Ave. 860-644-2511 x 229 Bernie Drabek TOSW 1540 Sullivan Ave. 860-644-2511 x 241 Mel*Stead TOSW 1540 Sullivan Ave. 860-648-6366 Ernie Babineao Orland Annulli&Sons,Inc. P.O.Box 610,Manchester,CT 860-644-2427 Daren Rokicki Birch Mountain Earthworks 1265 John Fitch Blvd. 860-289-1656 Mather Clarke Birch Mountain Earthworks 1265 John Fitch Blvd. 860-289-1656 Galen Semprebon Design Professionals,Inc. 165 S. Satellite Road 860-291-8755 The following is a brieff-summmmary of points discussed during the meeting: Erosion and Sedimentation Control 1. All erosion and sedimentation control measures are to be in place prior to earth moving operations in each area and maintained/cleaned out during construction. Call Jeffrey Folger, Environmental Planner for inspection when measures are in place,prior to commencement of site work or if any problems/concerns arise during construction. 2. All topsoil stockpile areas to be protected(ringed with haybales or equal). 3. During construction of the road/driveway a crushed stone tracking pad is to be installed and maintained to minimize tracking of dirt/gravel on to Kimberly Drive. Calcium chloride or water is to be used for dust control as required. Public Works 1. Three complete sets of approved/revised plans to be provided to Town prior to start of construction. They will be stamped by the Planning Department along with plans developer needs. Only approved plans are to be used on the job site. 2. The Engineering Department is to be notified forty-eight(48)hours prior to the start of major construction work with inspections and testing per Developers Checklist(requested,required) for the following: After site is-staked-out b. All drainage work C. Preparation of subgrade, compaction tests as per Developer's checklist d. Preparation of subbase, six (6)inch lifts e. Placement of bituminous concrete,two (2)inch layers maximum 3. Certification of gravel used as subbase and processed stone for base will be required from an approved testing company. 4. Certification of all products used-- storm pipe, structures,pavement, etc., shall be presented to the Town Engineer prior to installation. 5. No subgrade formation/base in frozen ground/snow. Same for pipe/structure installation. 6. As built plans are to include horizontal and vertical location of all underdrains, footing drains, and sanitary sewers and house service laterals located as per revised as-built checklist. 7. All pipe and structures to be backfilled with free draining material, compacted in maximum one foot lifts with approved compaction equipment or approved equal if deep trench is encountered. Any pipe or structure work requires inspection prior to backfilling. 8. Any problems and/or questions regarding construction of this project will be directed to Daren Rikicki at 558-9357 or Mather Clarke at 558-9906. 9. All filling to be done in accordance with Department of Transportation specifications. To be compacted in maximum lifts and tested as necessary. 10. Job meetings will be held as needed, and can be called by the developer or Town. 11. Seventy-two(72)hours' notice needed for certificate of occupancy inspection. 12. Any proposed changes are to be presented to the Engineering or Planning Department prior to implementation on change order form in quadruplicate with 4 copies of the drawing. Town will attempt to turn around within 24 hours. 13. Normal hours of operation 7:00 a.m. —5:00 p.m., no work on Sunday. 14. DOT permit needed for all work within state road. Copy must be given to the Engineering Department. 15. No paving after October 15 or before April 15 without written approval from Director of Public Works. 16. A street cut permit is needed for the installation of the 2 driveways. 17. A drain layers permit is required for installation of the sewer lateral. 18. Extra care must be taken when compacting around structures such as catch basins and manholes. These spots often become problem areas in the future due to settling, therefore, the town staff/inspectors will be requesting additional compaction tests in these areas. 19. Sanitary lateral locations should be tied down to existing structures and shown on the progress as- builts. 20. During construction of individual sanitary sewer house laterals,the contractor shall prepare an as-built sketch on standard form provided by the Engineering Department. This form should be submitted to the design engineer/surveyor for their use in preparing the as-built plan. The Engineering Department suggests that the contractor also show locations of foundation drains and water laterals on this form. Planning Department 1. Landscaping is to be installed in accordance with the approved landscaping plan. If there are changes required, contact the Planning Dept. Additional landscaping installed on one part of a site will not preclude planting all of the remaining items shown on the landscaping plan. 2. A erosion and sedimentation bond in the amount of$10,000 is required to be posted prior to any earth moving. 3. A landscape bond in the amount of$5,000 is required to be posted prior to the filing of mylars. 4. The mylar must be filed in the office of the town clerk prior to the issuance of the building permit. SNET/NU 1. Contact utilities for coordination of utilities connection. Fire Marshal 1. Blasting(if required) to be coordinated with the Fire Marshal. -r r. Police Services 1• Emergency phone numbers for the duration of the construction must be Provided a company letterhead. If the developer occupies or owns the building afterc ntra bionicmergency Services on numbers must be provided to Police Services. e 2. All buildings located on property that abuts a public highwa street. All numbering shall comply with Town Ordinance 6-800 y m through(,ust be numbered and visible from the 2. 3. Barns, garages, and outbuildings, which are located on the same premises a -- -- excluded. s a numbered structure, are 4. Erect temporary sign- - -- - - gn on the site during construction identifying the project. 5. If an alarm is to be installed contact Police Services. Building Department 1. Plan review with Building Official/Fire Marshal required ' Coordinate with Chief Building Official. q Prior to application for building permit. Sincerely, Michele R. Lipe,AICP Assistant Director of Planning MRL/rfs cc: Jeffrey Doolittle, Town Engineer Bernie Drabek, Engineering Inspector Karl Reichle,Public Works Mel Stead, Public Works Christopher Dougan, Chief Building Official Fred. Shaw, Superintendent of Pollution Control CL&P SNET Design Professionals, Inc. Orlando Annulli & Sons, Inc. E j' TOWN OF SOUTH: WINDSOR .; ;° ;STAFF SITE CHANGE :+ FOR &ITE & SUBDIVISLON GENERAL: Phone No. .�11�' � � y CHANGE'ORDER CONTACT PERSON j � g /� AddressDt� n fr fs ofta S 111 1 G. i1•�f �T `T Site Name a P&Z .No. Owner Phone No-No- 20q (p Contractor. v Mo U Q( 5Ar+ 6rK Signature of Owner •. �.� r! Date: 1 }f o d Signature of Design Engr. Date: — 3 CHANGE: (Describe location and nature of change. `Include Four �4 ) copies of plan/profile of Change. ) x Qrld rv� ire ens �rI tAl1 ay Kin ,c Reason for Change: ;(Why is change requiredCM velitcILS. I r r u-M cs icier rid a l a r� a n d n m r> v verin � - v hi iPPROVALS: (his Require j Dir. Of Planning Date fflY' ; . Town Engineer Date: ' Dir. of Public orks h Date: Other: Date zE STAFF COMMENTS: White Town Engineer Yellow - Applicant Pink - Director of Planning Goldenrod !Engineering Department y. f ' f TOWN OF SOUTH WINDSOR Mil u. STAFF SITE CHANGE FOR SITE & SUBDIVISION GENERAL: CHANGE ORDER CONTACT PERSON ( Phone No.Z'11�a F` Address 1cladnq Site Name _ P&Z No. 0 5—42. MACK �,Y mom Owner �YDU�Y-h LL`; Phone No. Contractor: Signature of` Owner Dates Signature of Design gr. _ Date CHANGE: (Describe location and nature o change. Include Four (41) 'copies of plan/profile of Change. )Ob �t o Er Red ;for Change: (Why is change re fired) APPROVALS: (As-_Require - pit. Of. Planning Date: 13d ) (o E- Town Engineer c} Date: 3/3u /al Dr.. of Public W ks Date: Other« Date: STAFF COMMENTS b ' White' : Town Engineer Yellow �. Applicant Pink - Director of Planning Goldenrod -- Engineering Department 08/18/2008 11:00 8606466057 BIRCH MNTN EARTHWRKS PAGE 01 I i I i i I i To Whom It May Concern.: i i Please release our bond in the amount of$l 5,000:�lus earned interest to Daren Rokicki. Property: Birch Mountain Earthworks, LLC I I Kimberly Drive South Windsor, CT 60074 860-289-1.656 i The bond was to be held until our final layer of ptvement was installed which has been done. Thank you, Daren Rokicki, Member Birch. Mountain Earthworks, LLC o C V y � 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 f�OS°R•G° TELEPHONE (860) 644 2511 September 11, 2008 Birch Mountain Earthworks, LLC 11 Kimberly Drive South Windsor CT 06074 Dear Mr. Rokicki: Re: Appl#05-42P, Birch Mountain Earthworks This is to advise you that the Planning and Zoning Commission voted on September 9, 2008 to release the Landscaping bond for the above-referenced project in the amount of$5,000. A check will be sent to you by the Town of South Windsor. If you have any further questions contact the Planning Department at 644-2511,ext. 252. Thank you. Very truly yours, PLANNING&ZONING COMMISSION Patrick Kennedy, Chairman PK/ma cc: Town Engineer BOND RELEASE TRANSMITTAL DATE : CONTRACTOR/DEVELOPER NAME & ADDRESS 30 2 (1 f� a✓tVf o� Q1/3 PROJECT LOCATION/ADDRESSbV&k Min LOT P&Z' OR .IAA/CC APPLICATION NUMBER * 05 4a SUB ACCOUNT NUMBER S Q U o 9 i ORIGINAL BOND AMOUNT_ /5 DUU Y rev `f'� Jl?� vod Please release the bond indicated above as all of the required work has been completed. NAME DATE L13 ° _ 9/c y o Q , CHECK. # ISSUED DATE BY �� ✓� C�� e'L S:\ENGINEER\FORMS\Office Forms\BOND RELEASE TRANSMITTAL.doc BOND RELEASE TRANSMITTAL DATE: CONTRACTOR/DEVELOPER �/�� NAME & ADDRESS PROJECT LOCATION/ADDRESS 3tr LOT P&Z' OR .IWA/CC APPLICATION NUMBER SUB ACCOUNT NUMBER ORIGINAL BOND AMOUNT )Ut 0 U o «CL2-1 Please release the bond indicated above as all of the required work has been completed. eu 10r�o$ NAME DATE CHECK # ISSUED DATE S:\ENGINEER\FORMS\Office Forms\BOND RELEASE TRANSMITTAL.doc i t � ) � u J C6 - 074CSOU� V&U&ot O J 5 t. 1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074 r�OSOB•CO TELEPHONE (860) 644-2511 November 3, 2008 Birch Mountain Earthworks,LLC 11 Kimberly Drive South Windsor CT 06074 Dear Mr. Ro 'eki " Re: A 1#05-42P, Bi ch Mountain Earthworks This is to you that the Planning and Zoning Commission voted on October 28, 2008 to release the IWA/CC bond for the above-referenced project in the amount of$10,000. A check will be sent to you by the Town of South Windsor. If you have any further questions contact the Planning Department at 644-2511,ext. 252. Thank you. Very truly yours, PLANNING&ZONING COMMISSION 4A - ko—OJ5 Patrick Kennedy, Chairman PK/ma cc: Town Engineer