Loading...
HomeMy WebLinkAboutSite Plan - Conservation (97) TOWN OF SOUTH WINDSOR INLAND WETLANDS, WATERCOURSES AND CONSERVATION APPLICATION Application# 65`q Date Received OS- INSTRUCTIONS 1. Fifteen applications (15) with map and plans (2 copies) shall be submitted together with the fee set forth in the Inland Wetlands, Watercourses and Conservation Regulations, Town of South Windsor. (See Regulations, Section VII—X) 2. The South Windsor Inland Wetlands, Watercourses and Conservation Regulations should be reviewed with respect to the standards and criteria for application Evaluation. (See Regulations, Section VII—X) 3. The applicant understands that this application is to be considered complete only when all information and documents required by the Agency have been submitted. The applicant shall also complete the state filing form. A. Applicant's Name: Birch Mountain Earthworks, LLC RECEIVED Address: 1265 John Fitch Boulevard, South Windsor, CT 06074 Phone: (home)289.1656 (fax)289.7316 JUN 14 2005 South Windsor INLAND WETLANDS AGENCY B. Legal owner's name: Mack Properties, LLC CONSERVATION COMMISSION Address: 1265 John Fitch Boulevard, South Windsor, CT 06074 Phone: (home)289.1656 (fax)289.7316 (List additional owners, addresses, and phone numbers on back of application) C. If the applicant is not the owner of the subject property, a letter by the owner(s) authorizing the proposed regulated activity set forth in the application must accompany this form and will be part of the application. D. Project Name(if any): Birch Mountain Earthworks 1. Contact Person(if further information is needed) Galen Semprebon, Design Professionals, Inc. 291.8755, fax 291.8757 E. The geographical location of the property which is to be affected by the proposed regulated activities including a description of the land in sufficient detail to allow identification of the property on the Inland Wetland and Watercourse Map. Assessor's map#97 Parcel#16, 17, 18 Zone: I(Industrial) F. Names of all abutting property owners from records in Town Clerk's office. (use separate sheet if necessary) See attached. G. Have you notified all abutting property owners (from records in Town Clerk's office) by certified letter that an application is pending before the Agency? Yes. ** (you are required to supply a copy of the letter with the list of the names of the abutters).** H. Purpose and description of all proposed regulated activity(s) including amount of disturbance in square feet and types of fill and the time element involved: Wetlands Impacts = 200 sq. ft. for installation of riprap at culvert outlets. Total Impact within upland review area= 0.94 ac. For installation of building, paved and gravel yard areas, grading, storm drainage and water quality basins. All fill to be clean fill. Total construction=6 months ± (Phase I). I. A class A-2 map of the property drawn to 1" = 40', showing the area to be developed, extent of the wetlands and watercourses affected, topography, existing and proposed activities and names and locations of adjacent property owners must be submitted. J. Amount of regulated area disturbance and types of fill(including wetlands and regulated buffers). See H above. K. Acreage of wetlands and watercourses in regulated areas to be altered: 200 sq. ft. L. Acreage of wetlands and watercourses to be created: 0 M. Lineal feet of proposed stream alteration: 0 N. Total land area of project and percentage which is wetlands: Site area=6.06 acres Total area of wetlands= 1.29 acres O. Identify all other permits or approvals that have been issued, applied for, or required with respect to the proposed activity set forth in this application. (These may include but not be limited to, local Planning & Zoning, Zoning Board of Appeals, D.E.P., F.E.M.A., D.O.T., The Army Corps of Engineers, and any other State, Local or Federal Permits.): PZC, WPCA, DOT P. The applicant (or designated representative) hereby attests that a sign will be posted at the following location(s): as directed by Town Staff By Name: Peter DeMallie, Design Professionals, Inc. on or before followin date: as directed by Town Staff Signature: �{ These signs must be displayed continuously for at least ten (10) days prior to scheduled meeting (see Regulations, Section 7.3a) The undersigned hereby applies for the regulated activities listed in paragraph H above, for an Inland Wetlands, Watercourses and Conservation permit for the property described herein and confirms that: 1. She/he is familiar with the currently effective Inland Wetlands, Watercourses and Conservation Regulations of the Town of South Windsor. 2. She/he understands that at any time during the review period, the Agency may require the applicant to provide more information about the wetlands and/or watercourses in question and/or any proposed activity. 3. All information submitted in the application for review shall be considered factual, or in the case of anticipated activity, binding. A knowing failure of the applicant or any of her/his agents to provide correct information, or performance exceeding the levels of activity anticipated, shall be sufficient grounds for revocation of any permit under these regulations. 4. By making this application, the applicant gives permission to the Inland Wetlands, Watercourses and Conservation Commission members and/or its representative to enter the portions of the premises which are subject of the application for the purpose of inspection and investigation and otherwise pvaluating the merits of the application both before and after a final decision has been issued. Signaturek6 Ownel of operty Date Signature Applic t Date 6, 109-.14 108-19 109-13 108-37 Q 108-36 108-38 7-3 9 Q 97-19 97-20 LA 96-61 q J p W �IMBERL Y a s7-4 � 97-2 W � 96-58 97-18 U H 0 96-60 97- 7 L L- D 97-5 z 97-16 = 96-59 p � O O LO 97-15 Q 0 0 � 97-7 U LU N 96-63 k' zo 00 97-14 iH o 00 ocl:: N� N 0 96-12 97-13 97-10 97-11 DESIGN PROFESSIONALS, INC. civil engineers ♦ planners ♦ surveyors gis ♦ gps ♦ landscape architects Transmitted via cdkVe1d maid:_,r; ny SOutth Winds r C9 All�l l*A*M : MMt531pP, Dear Current Abutting Property Owner Re: Application of Birch Mountain Earthworks, LLC Kimberly Drive South Windsor, Connecticut DPI Project No. 2140 In accordance with regulations of the Inland Wetlands Agency and the Planning&Zoning Commission, we are required to notify you that an application has been filed on the property abutting yours and is subject to a hearing(s)by the Inland Wetlands Agency and Planning& Zoning Commission. The applications and plans are on file with the South Windsor Planning Department in the Town Hall. As an abutting property owner you are invited to the hearing(s)to ask questions and/or give comments, however, you are not required to attend. You may also submit written comments regarding the application(s) prior to the meeting if you so desire. For further information regarding the specific date this application will be heard, please contact Michele Lipe, Deputy Planning Director, or Jeffrey Folger, Environmental Planner, at the South Windsor Planning Department at 644-2511, ext. 252 or 229, respectively. Thank you. Sincerely, DESIGN OFESSIONALS, INC. By: , Peter k DeMallie President&Principal 165 South Satellite Road, South Windsor,Connecticut 06074 Tel: (860)291-8755•Fax: (860)291-8757 Email: dpicivil@aol.com DESIGN PROFESSIONALS, INC. civil engineers ♦ planners ♦ surveyors gis ♦ gps ♦ landscape architects rr7 Direct Abutters JUN I Birch Mountain Earthworks, LLC [` Kimberly Drive INLAND M th windSOr CONSERVATION COMM,,,, DPI Project No. 2140 Maip Lot No. Property Owner Maflin2 Address 96 58 Andre L. &Andre K. Charbonneau 10 Abbe Road 96 59 Andre K. Charbonneau 55 Sandra Drive 96 63 South Windsor Land Conservation PO Box 415 Trust, Inc. East Windsor Hill, CT 06028 97 14 Ralph Mosher 308 Sandstone Drive 97 15 K&B Realty, LLC PO Box 958 Manchester, CT 06040 165 South Satellite Road, South Windsor,Connecticut 06074 Tel: (860)291-8755•Fax: (860)291-8757 Email: dpicivil@aol.com Stormwater Management Plan RE Birch Mountain Earthworks I Kimberly Drive South Windsor, Connecticut JUN 1 4 2�� South Wfndsc: INLAND WETLANDS AC CONSERVATION CO%1;'. :. �31 � SrrAtgtrry.. 14 4i a z E✓J s�'d m�i, V t�HNH>o1��� Prepared by Design Professionals,Inc. 165 South Satellite Road South Windsor, CT 06074 DPI Project No. 05-2140 June 9,2005 Table of Contents: Page# Introduction 1 Existing Conditions 1 Proposed Development 1 Off-Site Analysis 1 Peak Runoff control 1 Nonstructural Drainage System 1 Erosion/Sedimentation Control Systems 1 Stormwater Runoff Quality 2 Conveyance System 2 Discharge at the Natural Location 2 Maintenance and Operation 2 Topographic Contour Maps 2 Floodplain Boundaries 2 Drainage Design 3 Storm Drainage Calculations 3 Conclusions 3 Introduction: Birch Mountain Earthworks is proposing to construct a facility on three parcels of land located on the south side of Kimberly Drive adjacent to the Route 5 and Kimberly Drive intersection. Existing Conditions: The three parcels contain a total of 6.06 acres of land. The site is presently wooded and contain some wetland areas. The land generally slopes down from north to south. Proposed Development: The proposed development of the site consists of the construction of a 6,000 S.F. building with associated parking, paved access areas, and gravel storage areas. The three parcels of land are within an existing industrial park, and due to the location of the industrial park within the overall watershed, detention facilities have not been required. Water quality measures are proposed for the site consisting of surface water quality basins to collect runoff from the improved areas. These basins will provide settling areas for sediment, and allow for infiltration of runoff as the soils allow. The basins will treat the first 1"of runoff from the improved areas. Off-Site Analysis: The three parcels of land presently drain to the existing wetlands and watercourses associated with the wetlands, and will continue to do so under developed conditions. Peak Runoff Control: Due to the location of the development within the overall watershed, peak runoff control is not required. Nonstructural Drainage Systems: The site will make use of a number of nonstructural measures to help control the storm-water on the site, and enhance the ability for infiltration of runoff into the soil. The water quality basins will provide for the treatment of the first 1"of runoff from the developed areas. Swales have been integrated into the design where appropriate to control runoff. Erosion/Sedimentation Control Systems: An extensive erosion/sedimentation control plan has been developed as part of the site design. These measures include the following: 1. Installation of silt fence down-slope of disturbed areas. 2. Installation of silt fence around stockpiled materials. 3. Use of the water quality basins as sediment basins during construction. 4. Seeding and mulching disturbed areas as soon as practical during construction. 5. Limiting the areas of disturbance during construction. 6. Installation of construction entrance pads. 7. Maintenance of the above measures. Stormwater Runoff Quality: A number of water quality measures have been integrated into the site design to provide for treatment of the stormwater runoff from the site. The water quality basins will treat runoff from the site via a permanent pool. Conveyance System: The on-site conveyance system consists catch basins, and associated piping that will convey the stormwater runoff to the eastern most water quality basin. The other two water quality basins will collect runoff from overland flow. All three water quality basins have pipes to discharge the runoff from the basins. Discharge at the Natural Location: The site presently drains to the south to the wetlands. Under developed conditions,the site will continue to discharge to the wetlands. Maintenance and Operation: The following maintenance operations will be required to ensure the proper and efficient operation of the Storm Water Quality Basin System. The following maintenance schedule is intended to be a minimum guide, and additional inspections and maintenance measures may be required following large storm events that could cause the deposition of excess debris in the system. Pipe Outlet Locations: The pipe outlets and associated riprap should be inspected annually and cleaned of silt and or debris. The riprap should be re- shaped and replenished as required. Catch Basins: The catch basins should be inspected annually. The sumps should be cleaned when the depth of material within the sumps reaches 1'. Basin Outlet: The water quality basin outlets should be inspected twice annually, and all debris and silt should be removed. The discharge point from the outlet system should be inspected also, and all silt and debris should be removed. The riprap at the discharge should be re-arranged and additional stone added as needed. All silt and debris should be disposed of at a suitable location. Water Quality Basins: The water quality basins should be inspected annually. All woody growth that could inhibit proper flow within the basins should be removed. Excess debris that has been deposited within the basins should be removed. Any erosion noted within the basins should be stabilized. Topographic Contour Map: Topographic contour maps have been provided showing the drainage areas for the site. The maps showing the existing and developed conditions are included in the rear of this report. Floodplain Boundaries: A small portion of the site is within the floodplain boundaries. No filling is proposed within the floodplain. . One storm pipe discharge is proposed within the floodplain. Drainage Design: The site has been designed to provide water quality basins to treat the first 1" of runoff from the developed areas, and stable pipe discharge locations for all storm drainage discharges from the basins. The development will drain to three water quality basins. Each basin has been designed to contain the first 1" of runoff from the associated drainage area. The gravel storage yards are assumed to be impervious (100% runoff from impervious areas, and 0 runoff from pervious areas. A summary of the basin designs is as follows: Basin Drainage Volume for Volume Area* 1"of runoff Provided Eastern 10,800 S.F. 900 C.F. 1,000 C.F. Middle 17,450 S.F. 1,450 C.F. 1,450 C.F. Western 50,500 S.F. 4,208 C.F. 4,700 C.F. * Impervious areas only Storm Drainage Calculations: The on-site storm drainage system has been designed for a 10 year design storm utilizing the Rational method. The calculations for the piping size are included herein. Conclusions: The on-site stormwater system with the associated water quality basins will mitigate any potential storm-water quality impacts from the proposed development. JOB esign SHEf.t NO ! or rofessionals, inc. CALCULATEDE3v Gns „ATE., DESIGN STORM FR OU91SICY QQ� I olvllenglneers • planners surveyors gis CHECKED BY .... DATE Rvn Increment A x G �.C. 1 Q r emmm� From To /1 C Incr. o Min. 1 r ch Dt.�i: S: :.Qs V L t NOTE O. 10 0 0.3 CISL::Z_ 3'g12 L 0, 03 or 30 15 Ll S' j.2,2 ., .. r • �...r..�.ter.... ...... � ++r ��� �r� YL � c S �cs✓,9 �,531z. ASO r. %!t '_ (��?,e 5�`G} `•,` i3 :Ss R. j i:. . i r+ is ,S: Jun 16 05 01 : 40p Design Professionals 860-291 -8757 p. 2 RECEIVED am!; JUN 16 2005 HIGHLAND SOILSLLc INLANSouth Windsor INLAND AG D WETLANDS AGENCY CONSERVATION COMMISSION June 9,2005 Mr.Peter DeMallie Design Professionals,Inc. 165 South Satellite Road South Windsor,CT 06074 CAS-l-%a p RE. MA CK PR OPER TIES,LLC KIMBERLYDRIVE SOUTH*7NDSOR,CT Dear Peter. The inland wetland boundaries on the above-referenced property were field delineated on May 4,2005. The wetlands were field delineated in accordance with the standards of the National Cooperative Soil Survey and the definition of wetlands as found in the Connecticut General Statutes,Chapter 440,Section 22A-38. I have reviewed the plans prepared by your office and have found the representation of the field delineated wetlands to be substantially correct. The upland soils on the property were identified as belonging to the excessively drained Windsor Series and the well drained Agawam Series. Areas within the uplands had been previously disturbed by filling and grading activities. The majority of the on-site wetlands are associated with Bancroft Brook and contain poorly drained soils of the Rippowatn Series and very poorly drained soils of the Saco Series. The isolated wetland in the center of the properly contained poorly drained soils of the Raypol Series. If you have any questions,or require additional:information,please call me at(860) 742-5868. Ve trul yours, John P.Ianni Professional Soil Scientist CPESC cAdocoments and settings\highland soi1s\1et2005\102.doc P.O.Box 337,Storrs,Connecticut 06268 (860)7A2-5868 MEMORANDUM To: South Windsor Inland Wetland/Conservation Commission. From: Jeffrey H. Folger—Environmental Planner/Conservation Officer Date: June 23, 2005 Re: Appl. 05-42P Review of the proposed Birch Mountain Earthworks site plan at Kimberly Drive. Plans dated 06/13/05 The project is to create an industrial building and raw material storage yard on three lots within an existing industrial subdivision. Stormwater is proposed to be discharged into three biofilters and then discharged to the adjacent wetlands. Proposed wetland disturbance is estimated at 200 sgft, and disturbance within the URA is estimated at 40,900 sqft. Site: The site is located in the Bancroft Brook watershed. The site is comprised of two lots totaling 6.06 acres. Currently the site is a mid-successional mixed hardwood forest with pole-sized(2-10")trees on the site. The understory is moderate with a diverse shrub and sapling component. The site was cleared in the not so distant past. The site slopes to the south. A tributary of Bancroft Brook and its associated flood plain occupy the southern portion of the lots. This area is bordered by low(10 foot)terraces to the north between the wetlands and the upland portion of the site. The wetlands would be characterized as forested wetlands. They are a part of the wetland corridor along Bancroft Brook that stretches from Route 5 to Main Street. Major functions of this wetland system are flood storage, nutrient and sediment assimilation and trapping, ground water discharge,wildlife habitat, and stormwater routing. Detention was not planned for the subdivision and is not planned on the site, due to the location on the watershed. Stormwater quality is proposed to be addressed by creating three biofilters to accept runoff from the site. Based on test pit data, lining the basins with clay is recommended to insure adequate hydrology to support wetland vegetation. Impacts: The soils listed on the site report are Windsor(BxB) 3 to 8% slope and Agawam(AgA) 0 to 3% slopes. These soils have an erosion potential listed as low. Perimeter controls appear to be adequate to contain sediments from construction activities. Two thirds of the site is proposed to have a gravel travel surface on it. There is a concern that the southern edge , where it borders the top of the slope will become unstable over time due to drifting traffic patterns. I have asked the applicant to propose a solution that will anticipate and prevent gravel material and equipment from impacting the slope. �t�WN 8tq r 7DWn 01 � .Ci ► U S !� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 SOR-CO� TELEPHONE (860) 644-2511 July 21, 2005 Certified # 70020460000197444248 Design Professionals, Inc. 165 South Satellite Road South Windsor, CT 06074 RE: Appl. #05-4213 — Birch Mountain Earthworks Dear Ms. Schuler: At the July 6, 2005 regular meeting, the Inland Wetlands Agency/Conservation Commission approved application #05-42P— Birch Mountain Earthworks — Lots 1-3 Kimberly Drive — IWA/CC application for the construction of an industrial building, grading, utilities, and associated improvements on property located south of Kimberly Drive and east of Sandra Drive. I, Industrial zone. This approval is subject to the following conditions: 1. One blueprint copy of the entire set of plans and this letter reproduced thereon, must be submitted to this Commission. This must be completed within 65 days of approval prior to any construction activity on the site. Plans submitted to Planning & Zoning Commission shall be considered having met this requirement. 2. The application shall indemnify and hold harmless the Town of South Windsor against any liability, which might result from the proposed operation or use. 3. The permit is valid for five years and shall expire on July 6, 2010. It is the landowner(s)/applicant(s) responsibility to track expiration dates and notify the Commission of a renewal request at least 65 days prior to expiration. 4. All approvals required must be obtained and submitted prior to any activity on the site. 5. A contact person shall be identified on the plans. 6. We recommend a bond in the amount of$5,000 be submitted to the Planning & Zoning Commission to ensure compliance with the erosion and sediment control measures. Birch Mountain Earthworks July 21, 2005 Page 2 7. We recommend a bond in the amount of$5,000 be submitted to the Planning & Zoning Commission to ensure installation and establishment of the water quality structures. 8. The biofilter areas must incorporate a clay liner to maintain hydrology. 9. A berm must be constructed along the south side of the interior roadway to maintain the integrity of the slope. 10. A pre-settling area must be constructed prior to the western biofilter to trap surface sediments. Very truly yours, c az�- ,�C�r Elizabeth Warren, Chairperson INLAND WETLANDS AGENCY/ CONSERVATION COMMISSION EW:dr cc: Chief Building Official Birch Mountain Earthworks, LLC