HomeMy WebLinkAbout05-66P Site Plan of Development TOWN OF SOUTH WINDSOR
PLANNING &ZONING COMMISSIONc M
APPLICATION FORM p Application No:
Official Receipt Date:,//-/.
Receipt No: SOUTbEPT,
APPLICANT: 1-4�=It:JtAct
PROJECT NAME:
ADDRESS:_ CAS 46"LX—N—i V 16utA
OWNER OF RECORD ON LAND RECORDS: �1 1V owt, Z L
ADDRESS: < �/ S Ze l( 1 V*,,j
COMPLETE LOCATION OF PROPERTY: C��-- j '�u+•+'^-�y,dty G-�.tLt,F
ASSESSOR'S MAP# 111 PARCEL# A ZONE
NAME,ADDRESS, TEL& FAX# OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED:
THIS APPLICATION IS FOR: (Check all that apply):
❑ Zone Change to (Public Hearing required and Certified letter to abutters required)
❑ Subdivision/Re subdivision ❑ Open Space Subdivision (Public Hearing Required)
❑ Subdivision ❑ Minor ❑ Major
❑ Resubdivision(Public Hearing Required) ❑ Minor❑ Major
❑ Conditional Approval
❑ Special Exception to Article (Public Hearing, Certified letter to abutters required)
Site Plan of Development
❑ General Plan of Development
❑ Earth Filling(Sec. 15) and/or Earth Removal (Sec. 14- Public Hearing required)
❑ Regulation Amendment: ❑ Zoning ❑ Subdivision (Attach proposed amendment)
❑ Temporary and Conditional Permit for
❑ Major Home Occupation for
❑ Other(explain in detail)
An Application Pending sign is required to be posted on the property for all applications ten (10) days
prior to being heard by the Commission.
RECEIVLU
k, , anSigsct
OCT 2 6 2005 Signature of Property Owner
RECEIVED
OCT 2 6 2005
SOUTH WINDSOR I'MING DEPT,
DRAINAGE CALCULATION
FOR
IMPERIAL OIL COMPANY
648 SULLIVAN AVENUE
SOUTH WINDSOR , CONNECTICUT
104 416
PDS ENGINEERING &
CONSTRUCTION, IIV ,�°� ®"�•
•00000•o• cr,G.
107 Old Windsor Road {�¢ o �evp
Bloomfield, Connecticut.06002
0 1
Telephone: (860)242-8586 a �, No 't3422 ooc� o OCT 2 2005
; O E(+iSE®e k SUU7H
FAX(860)242-8587
o
NAL0
iB°° tf1107A6CC
d
f
Cyr car--
4,57
-- —• _ _ _ __ >> _-__— ---_.._._ ��,-'_ .��T�(�® �,.iz� Mow- � �r
- --.-
---- -----------_-- _----_...---- ------ -------- -- — --- -. �_!cam-- -��-
---- ----- ------- ----
C� s� - 81 1-
------------
28
---------------------------
37
(C.30 61, Z-
rwl
Zia
9O - -
cicc>
--
----- -------- CL
--
!`�- ---
It
----_------------._—__t-_.._—
-7F
- ----------
------ -----
-- �-- --
t
640
----------------
------ ------
-----------
------------------
. 7
1 b
. ... C/p
t s
47)
----------
(, Zy i Cs -----------
S'
f
--------------------------------
--- ..
Nm� --
Ns
=t_
lot
o -_.._.j. _ a
oo
4 . 10 CF.
_.
-.
r
a - - ---- -- --- --
----------
- ---------
----- - ----- -
a!
f `7 //1J P♦i � t�� � rbg�=ice_-"-���----
------ ----- --
E
Appl #05-66P, Imperial Oil
Planning Department Report
1. Request for site plan approval for the construction of an 8,192 sf industrial
building at 648 Sullivan Ave., I zone. Maximum impervious coverage allowed
is 65%; 22.8% proposed. Proposed building height is 21 feet; 40 feet allowed.
Lot size is 3.3 ac; minimum lot size allowed is V2 ac. Frontage is 200 ft;
minimum allowed is 100 ft. Front yard setback is 241 feet, 35 feet allowed.
2. This site has been used in the past by Imperial Oil as a "fuel farm" and has an
established driveway and parking area on site. The requirements of access
management do not appear appropriate for this site as properties to the east and
west are already developed in such a fashion that interconnecting the sites does
not appear feasible.
3. The parking requirement is 19 spaces; 19 spaces have been provided.
4. Three is no free standing sign proposed at this time.
5. Architectural and Design Review Committee reviewed this application on
November 3 and were satisfied with the application as presented.
6. The only site lighting proposed is building lights with full cut-off fixtures, no
parking lot light poles.
7. There is no buffer requirement as this lot does not abut any residential areas.
8. There are no regulated wetlands on the property. This application is pending
with the IWA/CC for conservation approval and will be heard on December 21.
9• . Water Pollution Control
Authority approval is required
IO.There is a dumpster shown on a concrete pad with screening.
11.If this application is approved, Planning Department has no modifications to
request.
U t .�c
U
Ve
MEMORANDUM
TO: TOWN CLERK
FROM: fj�
SUBJECT: DIS/QUALIFICATION DEC 13 2005
DATE:
BY MEANS OF THIS MEMORANDUM,I AM DISQUALIFYING MYSELF FROM ANY/ALL
PARTIQPATION IN MATTERS GONCERNING:
APPLICATION NO.
NAME OF PROJECT
REASON FOR DIS UALIFICATIO 6
l Cam/ d
SIGNATURE OF COMMISSIONER
MEMORANDUM
To: Marcia Banach, Director of Planning
From: Jeffrey B. Doolittle, P.E., Town Engineer
Date: 12/13/05
RE: App 05-66P— Imperial Oil Co Site Plan
I have reviewed the revised proposed site plan for Imperial Oil at 648 Sullivan Avenue,
and I have the following comments:
1. Show the existing storm drainage pipes in Sullivan Avenue
2. The proposed sanitary manhole by the road is required, however this manhole
needs to be located in the ROW or an easement be provided to the Town to
access, inspect and sample from this manhole.
3. A permit from the ConnDOT is required for any work in Sullivan Avenue ROW.
4. The sidewalk in front of the building should be at least 6 feet wide so there is
room to walk along it with cars parked up against it. The car bumpers will extend
over the sidewalk by about 1-2 feet.
5. Will the sidewalk in front of the building have an integral concrete curb? If so
show this on the plan and detail. If not, show curb stops
6. The proposed temporary stockpile area should be relocated so it is farther away
from the building and not in the proposed parking lot where it will probably
interfere with construction of the building and parking lot.
7. The drainage report needs to be updated to include the proposed detention basin
sizing and flows. This report needs to include sections on storm water quality
treatment and operation and maintenance of the stormwater system for this site.
8. The detention basin outlet pipe should be at least 12" diameter with a smaller
orifice for ease of maintenance.
9. The proposed detention basin needs to be sized for storm water quality treatment
and include plants, channels, and stone check dams to extend the detention time
and provide stormwater treatment.
10. The Town has an updated detail for the detention basin outlet structure that
should be used on this site.
/11. WPCA review and approval of this plans is required.
Please call me if you have any questions.
SAWN SF4
t F
m 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074
SOR•CO AREA CODE 860/644-2511
CERTIFIED MAIL#7004 1160 0007 4128 1983
December 19, 2005
H and V LLC
Edward F. Havens
981 Sullivan Avenue
South Windsor, CT 06074
Dear Mr. Havens:
Re: Appl #Appl. 05-66P, Imperial Oil Company Site plans
We are pleased to advise you that the Planning&Zoning Commission voted on December 13, 2005 to approve
with modifications the above referenced application for a Site Plan of Development.
This approval is for the construction of a of a 8,470 sf building on property located at 648 Sullivan Ave.,
Industrial zone, as shown on plans prepared by PDS Engineering and Construction job dated 10/25/2005 as
revised. This approval is subject to the following modifications:
1. Prior to commencement of any site work, a meeting must be held with Town Staff.
2. No building permit will be issued until the final mylars have been filed in the Town Clerk's office.
3. This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation
Commission, including a bond.
4. A landscape bond in the amount of$3,000 is required and must be submitted prior to filing of mylars.
5. All bonds must be in one of the forms described in the enclosed Bond Policy.
6. An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 8.1.11 of the Zoning
Regulations.
7. Footing drains are required if the building has a basement.
8. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of
South Windsor.
9. This approval does not constitute approval of the sanitary sewer, which can only be granted by the Water
Pollution Control Authority.
10. If a State Traffic Commission certificate is required, no building permits will be issued until the certificate
has been issued(per CGS §14-311).
11. The building street number must be included on the final plan.
12. Pavement markings must be maintained in good condition throughout the site drives and parking areas.
13. All free standing signs and/or building signs re
quire uire the issuance
ce of a signpermit before the are erected.
p Y
14. Engineering comments dated 12-13-05 must be addressed to the satisfaction of the Town Engineer.
Black and white transparent mylars of Sheet#C-102 with the above modifications,together with three blueprint
copies of the entire set of plans (including architectural elevations and landscaping plans)must be submitted to
this Commission within 30 days to be stamped and signed. The letters of approval of this Commission as well
as the Inland Wetlands Agency/Conservation Commission must be reproduced on the mylars.
After the mylars have been signed by the Commission, they will be returned to you for filing in the Office of the
Town Clerk. After filing these plans, a copy of the receipt must be submitted to the Planning Department.
Very truly yours,
l
Patrick Kenn , Chairman
Planning and Zoning Commission
PK/bmm
cc: Town Engineer
Chief Building Official
Assessor
Superintendent of Pollution Control
Fire Marshal
Jack Krudwig, PDS Engineering&Construction
.r
tOW N st4
co
C�
-0 014CsOU� V&U&Ot
1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074
NQSOR-CO
�t� TELEPHONE (860) 644-2511
December 23, 2005
Certified#70020460000197444507
PDS Engineering&Construction, Inc.
Attn: Frank Borawski
107 Old Windsor Road
Bloomfield, CT 06002
RE: Appl. #05-66P—Imperial Oil—648 Sullivan Avenue, I zone
Dear Mr. Borawski:
At the December 21, 2005 regular meeting, the Inland Wetlands Agency/Conservation
Commission approved with conditions application#05-66P—Imperial Oil—
Conservation request for a site plan to construct an office building and truck storage
garage on property at 648 Sullivan Avenue, I zone. This approval is subject to the
following conditions:
1. One blueprint copy of the entire set of plans and this letter reproduced thereon,
must be submitted to this Commission. This must be completed within 65 days of
approval prior to any construction activity on the site. Plans submitted to
Planning&Zoning Commission shall be considered having met this requirement.
2. The application shall indemnify and hold harmless the Town of South Windsor
against any liability, which might result from the proposed operation or use.
3. The permit is valid for five years and shall expire on December 21, 2010. It is the
landowner(s)/applicant(s)responsibility to track expiration dates and notify the
Commission of a renewal request at least 65 days prior to expiration.
4. All approvals required must be obtained and submitted prior to any activity on the
site.
5. A contact person shall be identified on the plans.
,tr
Imperial Oil
December 23, 2005 .
Page 2
6. We recommend a bond in the amount of$2,000 be submitted to the Planning&
Zoning Commission to ensure compliance with the erosion and sediment control
measures.
7. A planting plan for the detention basin to be approved by Town staff.
8. The Soil Scientist report to be submitted to the application file.
Very truly yours,
INLAND WETLANDS AGENCY/
CONSERVATION COMMISSION
Elizabe h A. Warren, Chairperson
EW:dr
cc: Chief Building Official
Na SOWN Se
v `�
m 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074
�tj�OsOR-Co AREA CODE 860/644-2511
January 18, 2006
Mr. Ed Havens,Jr.
981 Sullivan Avenue
South Windsor, CT 06074
RE: Imperial Oil, 648 Sullivan Avenue
Approval to connect to the Town sewer system
Dear Mr. Havens,Jr.:
The South Windsor Water Pollution Control Authority, at its regular meeting of January 10, 2006,
gave approval for the connection to the Town's sewerage system to the proposed new Imperial
Oil facility located at 648 Sullivan Avenue, South Windsor, CT and as more specifically shown on
plans entitled"Imperial Oil Company, South Windsor, Connecticut', Prepared by PDS Engineering
&Construction, Inc, Bloomfield, CT; Drawing #: C-102, Drawing Title: Site grading &Utility Plan,
Dated: 10-25-05, 12-2-05, 12-12-05, and 12-21-05; also Drawing #: C-104, Drawing Title: Site
Plan Details, Dated: 10-25-05, 12-12-05, and 12-21-05.,and subject to the following conditions:
1. Oil and grit separator must be provided according to DEP and Town regulations.
2. Permit must.be obtained from the State of Connecticut Department of Environmental Protection.
3. Technical approval of the Town Engineering Department.
4.. Payment of a connection charge in the amount of$3,108 at time of connection.
5. Final Authority approval and,acceptance of the sanitary sewerage connection will be given once
the sewer line has been installed and inspected by the Town staff, and based upon the written
verification of the Town staff that said sanitary sewer line was installed in substantial
conformance with the design plans approved by the Authority, and meeting all Town regulations
and appropriate technical specifications relating to sanitary sewer construction.
This approval letter must be superimposed on the final approval plans.
Very truly yours,
Joseph J. Carino, Chairman
Water Pollution Control Authority
JC:ead
Cc Michael J. Gantick, Director of Public Works
Jeff Doolittle,Town Engineer
Marcia Banach, Director of Planning
Chris Dougan, Chief Building Inspector
BOND TRANSMITTAL
DATE: '13010�,
APPLICANT NAME t
t�l rim{ 0v� ► �1 �t � �� (
ADDRESS _ 921 'so! 12\ v� La v
6"�lq Wivtdsar &T
PROJECT LOCATION/ADDRESS_X(oS ,SUIT h ^� LOT
SUBDIVISIONanR n'ck-k ( ?l �
P&Z OR IWA/CC APPLICATION NUMBER c)-q-cod
D00.DO
AMOUNT OF BOND 006 -
CHECK NUMBER 15g(a
DEPARTMENT h
SUBMITTED BY A i
NAME
DATE
RECEIVED BY FINAN E
DATE
SUB ACCOUNT NUMBER
HAPlanning Department\Holmes\forms\BONDTRANSNUTAL08-27-ol.doc
BOND TRANSMITTAL
DATE: '13010b
APPLICANT NAMEd i '/m f
ADDRESS solltop q
PROJECT LOCATION/ADDRESS g�S S�►I!vu h
LOT
SUBDIVISIO Na �L"AIl < \
P&Z OR IWA/CC APPLICATION NUMBER S-
000.03
AMOUNT OF BOND
CHECK NUMBER 19 9
DEPARTMENT h (1
SUBMITTED BY
NAME
DATE
RECEIVED BY FI NA I
DATE
SUB ACCOUNT NUMBER Cl✓CJ f G
HAPb mmg DeP�'nmt\N°Lnes\forms\BOND TRANSMITTAL 08-27-0I.doc
SOWN S fq
xF 01Ps
� * U
m �
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074
�080R-CO TELEPHONE (860) 644-2511
February 9, 2006
Mr. Ed Havens, Jr.
Imperial Oil
981 Sullivan Avenue
South Windsor, CT 06074
Dear Mr. Havens:
Re: Preconstruction Meeting—Appl#05-66P, Imperial Oil Site Plan
IN ATTENDANCE
Michele Lipe Town of South Windsor, 1540 Sullivan Ave., South Windsor, CT 06074
Bernie Drabek Town of South Windsor, 1540 Sullivan Ave., South Windsor, CT 06074
Serafino Calafiore PDS, 107 Old Windsor Rd, Bloomfield, CT 06002
Ed Havens, Jr. Imperial Oil, 981 Sullivan Ave., South Windsor, CT 06074
Jeff Doolittle Town of South Windsor, 1540 Sullivan Ave., South Windsor, CT 06074
Mike Vedovato Imperial Oil, 981 Sullivan Ave., South Windsor, CT 06074
Jack Krudwig PDS, 107 Old Windsor Rd, Bloomfield, CT 06002
Bill Vedovato Imperial Oil, 981 Sullivan Ave.,South Windsor, CT 06074
The following is a brief summary of points discussed during the meeting:
Erosion and Sedimentation Control
1. All erosion and sedimentation control measures are to be in place prior to earth moving op erations in
each area and maintained/cleaned out during construction. Call Jeffrey Folger, Environmental Planner
for inspection when measures are in place,prior to commencement of site work or if any
problems/concerns arise during construction.
2. All topsoil stockpile areas to be protected(ringed with haybales or equal).
3. During construction of the road/driveway a crushed stone tracking pad is to be installed and
maintained to minimize tracking of dirt/gravel on to Sullivan Avenue. Calcium chloride or water is to
be used for dust control as required.
4. The planting plan for the detention basin needs to be approved by the wetlands officer.
Public Works
1. Three complete sets of approved/revised plans to be provided to Town prior to start of construction.
They will be stamped by the Planning Department along with plans developer needs. Only approved
plans are to be used on the job site.
2. Show 2 clean-outs on the sanitary sewer lateral, show relocation of and/or easement for monitoring
manhole on sanitary sewer lateral, label concrete curb on plan, verify/fix detail for oil/grit separator.
3. The Engineering Department is to be notified forty-eight(48)hours prior to the start of major
construction work with inspections and testing per Developers Checklist for the following:
a. After site is staked out
b. All drainage work
C. Preparation of subgrade, compaction tests as per Developer's checklist
d. Preparation of subbase, six(6) inch lifts
e. Placement of bituminous concrete,two (2)inch layers minimum
4. Certification of gravel used as subbase and processed stone for base will be required from an approved
testing company.
5. A drain layers permit is needed prior to installation of sewer lateral. The connection fee is due at the
time the permit is requested.
6. Certification of all products used-- storm pipe, structures,pavement, etc., shall be presented to the
Town Engineer prior to installation.
7. No sub-grade formation/base in frozen ground/snow. Same for pipe/structure installation.
8. As built plans are to include horizontal and vertical location of all underdrains, footing drains, and
sanitary sewers and house service laterals located as per revised as-built checklist.
9. All pipe and structures to be backfilled with free draining material, compacted in maximum one foot
lifts with approved compaction equipment or approved equal if deep trench is encountered. Any pipe
or structure work requires inspection prior to backfilling.
10. Any problems and/or questions regarding construction of this project will be directed to Serafino
Calafiore, PDS in the field at phone#202-3461.
11.All filling to be done in accordance with Department of Transportation specifications. T 0 be
compacted in maximum lifts and tested as necessary.
12. Job meetings will be held as needed, and can be called by the developer or Town.
13. Seventy-two (72)hours' notice needed for certificate of occupancy inspection.
14.Any proposed changes are to be presented to the Engineering or Planning Department prior to
implementation on change order form in quadruplicate with 4 copies of the drawing. Town will
attempt to turn around within 24 hours.
15.Normal hours of operation 7:00 a.m.—5:00 p.m.,no work on Sunday.
16. DOT permit needed for all work within state road. Copy must be given to the Engineering
Department.
17.No paving after October 15 or before April 15 without written approval from Director of Public
Works.
18. Extra care must be taken when compacting around structures such as catch basins and manholes.
These spots often-become problem areas in the future due to settling,therefore,the town
staff/inspectors will be requesting additional compaction tests in these areas.
19. Sanitary lateral locations should be tied down to existing structures and shown on the progress as-
builts.
20. During construction of individual sanitary sewer laterals,the contractor shall prepare an as-built
sketch on standard form provided by the Engineering Department. This form should be submitted to
the design engineer/surveyor for their use in preparing the as-built plan. The Engineering Department
suggests that the contractor also show locations of foundation drains and water laterals on this form.
21. For lawn establishment,town staff will be requiring erosion control measures to be installed prior to
the issue of the certificate of occupancy to ensure soil stabilization.
Planning Department
1. Landscaping is to be installed in accordance with the approved landscaping plan. If there are changes
required, contact the Planning Dept. Additional landscaping installed on one part of a site will not
preclude planting all of the remaining items shown on the landscaping plan.
2. Mylar must be signed and filed prior to issuance of building permits.
3. A sign permit is required for all building and free standing signage.
SNET/NU
1. Contact utilities for coordination of utilities connection.
Fire Marshal
1. Blasting(if required)to be coordinated with the Fire Marshal.
Police Services
1. Emergency phone numbers for the duration of the construction must be provided to Police Services on
a company letterhead. If the developer occupies or owns the building after construction emergency
numbers must be provided to Police Services.
2. All buildings located on property that abuts a public highway must be numbered and visible from the
street. All numbering shall comply with Town Ordinance 6-800 through 6-802.
3. Barns, garages, and outbuildings, which are located on the same premises as a numbered structure, are
excluded.
4. Erect temporary sign on the site during construction identifying the project.
5. If an alarm is to be installed contact Police Services.
Building Department
1. Plan review with Building Official/Fire Marshal required prior to application for building permit.
Coordinate with Chief Building Official.
Sincerely,
Michele R. Lipe,AICP
Assistant Director of Planning
MRL/bm
cc: Jeffrey Doolittle, Town Engineer
Bernie Drabek, Engineering Inspector
Karl Reichle, Public Works
Mel Stead, Public Works
Christopher Dougan, Chief Building Official
Fred Shaw, Superintendent of Pollution Control
Serafino Calafiore, PDS
Jack Krudwig, PDS
PDS ENGINEERING & CONSTRUCTION, INC. F.A rE
,.. T
11
July 26, 2006 JUL 2 8 2066
SOUTE{IN E GOR PLANNEE,I+°j 01771,
Town of South Windsor
Planning and Zoning Department
Town Hall
South Windsor, CT. 06074
Attn: Michele Lipe
Re:
Exterior Lighting
Imperial Oil
648 Sullivan Ave.
South Windsor, CT.
Michele,
Per your request, I am forwarding this letter to confirm that all requirements for exterior lighting
have been completed as per approved plans submitted prior to construction.
Please advise of an further questions regarding this matter.
Y rs 1
i
Ser 1 o C lore
Pro' t a ger
i
I
107 Old Windsor Road, Bloomfield, Connecticut 06002 • Tel: (860) 242-8586 Fax: (860) 242-8587 • www.pdsec.com
0�, VU
-�pVIN Sf4
�sou.� ?d
O I _
R.
a
s �
� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074
R CO TELEPHONE (860) 644-2511
October 12,2006
Mr.Ed Havens,Jr.
981 Sullivan Avenue
South Windsor,CT 06074
RE: Imperial Oil, 648 Sullivan Avenue
Approval to connect to the Town sewer system
Dear Mr.Havens,Jr.:
The South Windsor Water Pollution Control Authority, at its regular meeting of October 3, 2006,
approved the use of a private water meter at 648 Sullivan Avenue, which may be used to measure the
amount of water that .is not discharged to the sewer. This figure will be subtracted from the water
company's.consumption report to indirectly measure the sewer discharge and will serve as the basis for
calculating a sewer user charge,and is subject to the following conditions:
1. Town must inspect and approve meter installations,meeting all Town regulations and
appropriate technical specifications relating to sanitary sewer construction.
2. Applicant needs to read these meters not less that once a month,maintain a log of meter
readings,have the meters maintained,and make sure they are accurately recording flow.
3. The applicant shall allow the Town to inspect meter log following reasonable notice.
4. The applicant shall submit to the Town in January of each year a written meter report on
company letterhead for the proceeding calendar year.
This approval letter must be superimposed on the final approval plans.
Very truly yours,
i C e P
J seph J. Carino,Chairman
Water Pollution Control Authority
JC:ead
Cc: Michael J.Gantick,Director of Public Works
Jeff Doolittle,Town Engineer
,/Marcia Banach,Director of Planning
Chris Dougan,Chief Building Inspector
Ube
b S '
BOND RELEASE TRANSMITTAL
DATE:
APPLICANT NAME
ADDRESS
PROJECT LOCATION/ADDRESSc�Q LOT
P&Z OR 'WA/CC APPLICATION NUMBER bS
SUB ACCOUNT NUMBER L)o o Q
ORIGINAL BOND AMOUNT 4,0 0 U - `fit oo
v�
Please release the bond indicated above as all of the required
work has been completed.
NAME DATE
387 - //a6 / O7 BY
CHECK # ISSUED DATE
H.\Planning Depatment\H01mes\f0rms\B0ND RELEASE TRANSNMAL 08-27-Ol.doc
- T-N/7
10 N SEq
'A
a Town �Sotd �
o
C e U
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074
R'C° TELEPHONE (860) 644 2511
May 30, 2007
Mr. Eddie Havens Jr.
Imperial Plumbing&Oil Co.
981 Sullivan Avenue
South Windsor, CT 06074
Dear Mr. Havens:
Re: Appl# 05-66P, Imperial Oil
This is to advise you that the Planning and Zoning Commission voted on 5/22/07 to release the
landscaping bond for the above-referenced project in the amount of$3,000.
A check will be sent to you by the Town of South Windsor. If you have any further questions contact the
Planning Department at 644-2511, ext. 252. Thank you.
Very truly yours,
PLANNING&ZONING COMMISSION
Patrick Kennedy, ChairmanC
PK/mda
cc: Town Engineer
BOND RELEASE TRANSMITTAL
DATE: a D
APPLICANT NAME Im CtAfjC �V (, 60.
ADDRESS V U V /1_ _
wiv-icYCc�✓ � (7�„ y� �
PROJECT LOCATION/ADDRESSA Cj S�j 1 VQ N Lt . LOT
P&Z OR IWA/CC APPLICATION NUMBER C05- (06 P
SUB ACCOUNT NUMBER 5 o Q o t ?
ORIGINAL BOND AMOUNT 3. 0 0 U
Please release the bond indicated above as all of the required
work has been completed.
)2ZL�, J�a� 1D �
NAME DATE
BY
CHECK # ISSUED DATE
H:\Mming Department\Holmes\forms\BONDRELEASE TRANSNUTTAL08-27-0f.doc
�0%q N Sf4
C
� U
S �
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074
°sox-coy' TELEPHONE (860) 644-2511
January 25, 2007
Imperial Oil
Mr. Eddie Havens, Jr.
981 Sullivan Avenue
South Windsor, CT 06074
Dear Mr. Havens:
Re: Appl 05-66P, Imperial Oil—IWA/CC bond
This is to advise you that the Planning and Zoning Commission voted on January 23, 2007 to release the
landscaping bond for the above-referenced project in the amount of$1,000.
A check will be sent to you from the Town of South Windsor releasing your bond in the above referenced
amount.
Very truly yours,
PL. NNING&ZONING COMMISSION
`v
Patrick Kennedy, Chairman
- PK/jsv
cc: Town Engineer
981 Sullivan Avenue Sotulh Winelsor, Connecticut 06074-0875
eriia Post Office Box 875
i (860) 644•-2538 • FAX (1360) 644-6709
C�
C /�
August 29, 2006
Mr. Jeff Folger RECEIVED
Town of South Windsor
Planning Department JAN 0 6 2006
1540 Sullivan Ave .
Solit.-Al Willdnor, (T. . 06074 SOUTH WINDSOR PLANNING DEPT,
Dear Mr. Folger,
We .are requesting a release of our errosion bond. We look
forward to hearing from your office.
Sincerely,
Vo
Eddie Havens, Jr.
IMPERIAL PLUMBING & OIL CO.
d
-�eat ln 9 RECEIVED
Plu-m-Aing
FER 21 1UU1
Fuel Oil SOUTH WINDSC
ENGINEERING EWP•
(7I'h,rwvq#1I-202162 SI-10236;