05-73P Site Plan of Development
TOWN OF SOUTH WINDSOR PLANNING & ZONING COMMISSION RZECMEWED APPLICATION FORM DEC 5 - 2005 Application No: 05 - -73f Official Receipt Date: SOUTf��PlhlC:Sv p � 2- / 3-- u� Receipt No: APPLICANT: The Grillo Family Limited Partnership(Dr.Robert M. Grillo) PROJECT NAME: The Grillo Family Limited Partnership ADDRESS: 498 Buckland Road OWNER OF RECORD ON LAND RECORDS: The Grillo Family Limited Partnership ADDRESS: 379 Main Street,South Windsor,CT 06074 COMPLETE LOCATION OF PROPERTY: Eastern side of Buckland Road,approx.700' south of the intersection of Ellington/Oakland Road and Buckland Road/Sullivan Avenue ASSESSOR'S MAP# 51 PARCEL# 12 ZONE GD NAME,ADDRESS,TEL&FAX#OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED: Becky Meyer,Project Engineer,Design Professionals,Inc., 165 South Satellite Road,South Windsor,CT 06074 Tel. (860)291-8755,Fax(860)291-8757 THIS APPLICATION IS FOR: (Check all that apply): - Zone Change to (Public Hearing required and Certified letter to abutters required) r- Subdivision/Resubdivisio J- Open Space Subdivision(Public Hearing Required) F- Subdivision J- Minor - Major Resubdivision(Public Hearing ["Minor r Major r Conditional Approval Special Exception to Article (Public Hearing, Certified letter to abutters i Site Plan of Development r General Plan of r Earth Filling(Sec. 15)and/or Earth Removal(Sec. 14 - Public Hearing Required) µ Regulation f- Zoning i- Subdivision (Attach proposed amendment) I-' Temporary and Conditional Permit for 3 "- Major Home Occupation for - Other(explain in detail) ZAnAAplication Pending sign is required to be posted on the property for all applications ten (10) days prior to being heard by the Commission. —J4 CX1 4 4 ignatur f Applicant SigGture of Property 04ner DESIGN PROFESSIONALS, INC. civil engineers ♦ planners ♦ surveyors gis ♦ gps ♦ landscape architects Transmitted via certified mail December 5, 2005 Dear Current Abutting Property Owner Re: Application of The Grillo Family Limited Partnership 498 Buckland Road South Windsor, Connecticut DPI Project No. 1917 In accordance with regulations of the Planning&Zoning Commission,we are required to notify you that an application has been filed on the property abutting yours and is subject to a hearing(s)by the Planning &Zoning Commission. The applications and plans are on file with the South Windsor Planning Department in the Town Hall. As an abutting property owner you are invited to the hearing(s)to ask questions and/or give comments, however,you are not required to attend. You may also submit written comments regarding the application(s)prior to the meeting if you so desire. For further information regarding the specific date this application will be heard,please contact Michele Lipe, Assistant Planning Director, at the South Windsor Planning Department at 644-2511, ext. 252. Thank you. Sincerely, DESIGN PROFESSIONALS,INC. By: --teco Meyer Project Engineer cc: Marcia Banach Dr. Robert M. Grillo 165 South Satellite Road,South Windsor,Connecticut 06074 Tel:(860)291-8755•Fax:(860)291-8757 Email:dpicivil@aol.com DESIGN PROFESSIONALS, INC. civil engineers ♦ planners ♦ surveyors gis ♦ gps ♦ landscape architects Direct Abutters Grillo Family Limited Partnership 498 Buckland Road DPI Project No. 1917 Map Lot No. Pro a Owner Mailin Address * 51 11 Dennis C. & Sharon E. Platt 97 Box Mountain Drive Vernon, CT 06066 * 51 13 Harold L. Dodd 512 Buckland Road South Windsor, CT 06074 * 51 .32 Metro Realty Group, Ltd. 6 Executive Drive Farmington, CT 06032 165 South Satellite Road,South Windsor,Connecticut 06074 Tel:(860)291-8755 •Fax:(860)291-8757 Email: dpicivil@aol.com 03/10/2004 14:43 8605635258 PATTERSON DENTAL PAGE 01 PATTERSON March 9, 2094 Dear Dr. Grillo, In response to your question on typical dental office parking_ We feel that.one spat per employee and two spots per treatment room are more than adequate. This provides the parking for all stag, the patient in the chair rcc6vfng treatment, plus the next patient to receive treatment. This calculation assumes that YOU can work in two rooms at one time which typically is not the case,due to the down time of room because of disenfection.procedures. Concluding that out of six rooins you will awy.have three to four patients at one time receiving treatment, another three to four waiting for treatment, plug staff_ Traditionally an office this size would have a max of eight employees, so allowing for sixteen parking spots would be snore than adequate. Typically we do about twemY—five offices per year in C©nnecttcut and my experience over the past thirteen years using this calculation is more than adequate. In regard to parking- Sincerely, Mark A. Plancon kquipment Specialist -k-«h, lilt Ct,011fk,7- I:Su 1• K'.[.v•I::v t..\1 it,it(:.,u/r.:::: 05/27/05 14:14 FAX 512- 328 7474 T.H.E. DESIGN, INC. 1guUI/UU1 Total Health eAvironments T.H.E. Design, Inc. 901 South M.P c Expy May 27,2005 Bldg 2,Suite 420 Austin,TX 78746 Dr.Robert Grillo 47 Burnside Avenue general: Fast Hartford,Cr 06108 800.444.4843 conference registration: Dear Dr.Grillo: 888.444.4843 loeallinternationah With over 20 years experience designing dental facilities and more than 2000 dental offices 512.328.7744 designed world wide, T.H.e. Design is the world leader in dental office design. Our fax: experience proves that our recommendation of 1 %a.parking spaces per heatamt room plus 512.328.7474 one parking space per employee is more than a uate. For your c �l y project ffiat equates to 9 patient parking spaces and 9 staff parking spaces plus one handicap for a total email: of 19 spaces required. Your site plan includes-one additional parldng space for a total of 20 info@thede5ign_com spaces. web: 'www hedesign.com We find most local jurisdictions commonly require one space for every 200 net square feet of building area. Based on that rat, your office would need 17 parking spaces. We feel your current design has more than adequate parking for your facilities needs. Sincerely, e/ 6 C.Morris rojcct Manager Fax Enai nt?er--nq 13,,J�;ri-,ns, '9 8 RECEIVED DEC 5 - 2005 Traffic Engineering Solutions, P.C. 193 Lexington Road SOUTH'.NINDSO"\PLAN1N11!,,NVJDEPT, Glastonbury, CT 06033 J MEMORANDUM! DATE: July 26, 2005 TO: Peter DeMallie Design Professionals, Inc. 165 South Satellite Road South Windsor, CT 06074 FROM Bruce Hillson -Traffic Engineering Solutions RE: Grillo Dentist Office As requested, Traffic Engineering Solutions, P.C. has completed this memorandum to address following two items that have been raised by Town Staff during their review of the Dentist Office proposed by Dr. Robert M.Grillo for 498 Buckland Road in South Windsor. • The Intersection Sight Distance from the site driveway. • Traffic volumes. Our July 16, 2004 letter report identified the need to remove two trees just north of the site driveway. One of the trees was identified as likely being removed to construct the site driveway and the second was identified as likely being in front of the abutting property. We have reviewed the latest plans for the proposed Dentist Office and found that one of the trees will in fact be removed during construction of the driveway. A recent field visit by a representative from Design Professionals, Inc. indicates that the second tree has been removed during the past year and only a low tying stump remains. The existing obstructions to the sight distance looking to the north have either been removed or will be removed when the new driveway is constructed. The traffic volumes used for our analyses were taken from the traffic studies completed for the Evergreen Walk and Stop&Shop developments. The traffic volumes that were used were for the 2004 Build conditions for these other two developments. For the analyses we completed for Dr. Grillo's dentist office,we increased the traffic volumes from the Evergreen Walk and Stop&Shop developments by two percent to account for any other background growth that may occur in the area. We would not expect any significant change in operating Levels of Service from those presented in our July 16, 2004 letter, If during review of this memo you have any questions, please call me. Bruce CABUSINESS\ GRILLOSIGHTLINEWEN10072605-DOC i Traffic Engineering Setafient P.C. 193 Lexington Road Glastonbury,CT 06033 (860)657-3579 July 16,2004 Robert M. Grillo,DMD 47 Burnside Avenue East Hartford, CT 06108 Dear Dr. Grillo: Traffic Engineering Solutions has completed a study to determine the operating Level of Service and adequacy of intersection sight distances at the proposed access drive to your proposed 3,158 square foot dentist office at 498 Buckland Road in South Windsor. The following work was included in this study: • Reviewing traffic impact studies prepared by others for the Stop &Shop supermarket and Evergreen Walk developments on Buckland Road in South Windsor to determine the morning and afternoon peak hour traffic volumes for Buckland Road. • Making 24-hour directional machine counts on Buckland Road in the vicinity of the site. The count included a directional speed study to determine the 85th percentile speed of travel in each direction on Buckland Road(85th percentile speed was used to determine the intersection and stopping sight distances for vehicles entering and leaving the site). • Coordinating with Design Professionals,Inc.to have their survey crew obtain Intersection Sight Distances when looking left and right from the proposed site driveway. • Making visual observations of the roadway and land use conditions along Buckland Road in the vicinity of the site. • Determining the number of trips expected to be added to the roadway system by the proposed dentist office. • Using the traffic count information from other traffic studies, completing morning and afternoon peak period capacity analyses for the intersection of Buckland Road at the site access drive to determine the operating Levels of Service(LOS)for the future traffic volumes anticipated upon completion of the dentist office. • Comparing the intersection sight distances measured by Design Professionals, Inc. with the Connecticut DOT Guidelines for Intersection Sight Distances for the 85th percentile speeds obtained from other studies. cAbusiness\Gri11osi0TtLine\1trrptdoc Existing Conditions Robert M. Grillo,DMD proposes to rehabilitate and expand the existing single family home located at 498 Buckland Road to create a new 3,158 square foot dentist office for his use. The site is situated along the east side of Buckland road approximately 700 feet south of Ellington Road. Buckland Road in the vicinity of the site is 52 feet wide with two travel lanes in each direction. A double yellow center line separates the two directions of travel and dashed white lines define the two lanes of travel in each direction. Solid white edge lines delineate shoulders along both sides of the road. The posted speed limit on Buckland Road in the vicinity of the site is 40 miles per hour. Buckland Road is straight and flat in the immediate vicinity of the site. South of the site the road goes up a slight hill. A directional machine count and speed study was made on Buckland Road along the site frontage from June 26 through July 6,2004. The traffic count indicates that the daily traffic volume on Buckland Road varies from 15,000 to 15,500 vehicles. The traffic studies prepared for the Evergreen Walk' and the Super Stop&Shop at Town Center2 were used to identify the morning and afternoon peak hour traffic volumes on Buckland Street along the site frontage. The Evergreen Walk study indicates that there would be 1,276 vehicles traveling Buckland Road during the morning peak hour(357 vehicles traveling northbound and 919 vehicles traveling southbound). The Stop&Shop study indicates that there would be 2,031 vehicles traveling Buckland Street during the afternoon peak hour(1,220 vehicles traveling northbound and 811 vehicles traveling southbound). The machine count included a sped study which indicated that the 85t'percentile speed of travel on Buckland Road is 44 miles per hour for both northbound and southbound travel. Trip Generation New trips to the roadway system generated by the proposed 3,158 dentist office were determined from the Institute of Transportation Engineers (ITE)reference, Trip Generation . The ITE reference has established mathematical relationships based on studies of various land uses to determine their trip generation rates. These trip generation relationships have been standardized and published in the Trip Generation reference. The ITE reference provides trip generation information for several related land uses for senior housing including: "Medical-Dental Office Building". The trip generation was based on Land Use Code 720-"Medical-Dental Office Building". The following trip generation relationships were used to determine the number of daily, and morning and afternoon peak hour trips that would be generated b the proposed 3 158 square foot dentist office. The results are p g Y P p q summarized in Table 1. Medical-Dental Office Building Average Weekday Trips 36.13 Trips per 1,000 square feet Morning Peak Hour 2.48 Trips per 000 square feet 79/21 Afternoon Peak Hour Ln(T)=0.93 Ln(X)+ 1.47 27n3 where T is the number of trips and X the building size in 1,000 square feet 'Traffic Impact Report prepared by F.A.Hesketh&Associates,Inc.April 18,2001 2 February 22,2002 traffic analysis submitted to the State Traffic Commission by F.A.Hesketh&Associates,Inc. a Trip Generation 7th Edition published by the Institute of Transportation Engineers,2003 cAbusiness\GrilloSightLineUtript.doc 2 Table 1 - Trip Generation- Senior Housing Trips Entering Trips Leaving Daily 57 57 Morning Peak Hour 6 2 Afternoon Peak Hour 3 9 Table 1 indicates that the proposed 3,158 square foot dentist office will generate new 8 trips during the morning peak hour with 6 vehicles entering the site and 2 vehicles leaving the site. During the afternoon peak hour the dentist office will generate 12 new trips with 3 vehicles entering the site and 9 leaving. The New Trips determined from the equations and shown in Table 1 were used with the analyses completed for this study Capacity Analyses Capacity Analyses were done to determine the anticipated quality of traffic operations at the intersection Buckland Road and the site access drive. Letter designations from A to F are used to represent the Levels of Service(LOS)for the traffic operation at each intersection or roadway, with LOS A representing the best operating conditions and LOS F the worst. The Level of Service for unsignalized intersections with STOP control on the minor street assumes that through and right-turning traffic on the main street is not affected by traffic on the side street(s). Thus,the LOS designation is for the movements on the side street and the left-turn movement from the main street onto the side street. Levels of Service are defined by the average delay per vehicle as indicated below. Unsignalized Intersections Level of Service Avg. DelayNehicle(in Seconds) LOS A < 10.0 LOSB > 10.0 and< 15.0 LOS C > 15.0 and<25.0 LOS D >25.0 and<35.0 LOS E > 35.0 and<50.0 LOS F >50.0 Level-of-service capacity analyses were completed for the 2005 Build conditions for the intersection of Buckland Road at the site access drive. The year 2005 analyses assume a one year buildout to renovate and expand the existing structure to a 3,158 square foot dentist office. The 2005 traffic volumes on Buckland Road were determined by applying a two percent growth factor to the background traffic volumes on Buckland Road to account for growth that may occur in the area. Trips generated by the dentist office were added to the 2005 traffic volumes on Buckland Road assuming that two-thirds of the new trips would travel to and from the south and two-thirds would travel to and from the north on Buckland Road. This approach provides a conservative analysis of the impact from the site trips as the total number of trips assigned to the roadway system represents 133%of the generated trips. The results of the capacity analyses are presented in Table 2. cAbusiness\GriltoSightLine\itnptdoc 3 Table 2: Unsignalized Intersection Capacity Analysis 2005 Build ,r,o . Location Hour Delay LOS 9Quenee Buckland Road at Site Drive S-Bd Left Turn AM 9.1 A 0.01 Veh. W-Bd Site Drive Peak 14.1 B 0.03 Veh. S-Bd Left Turn PM 12.2 B 0.01 Veh. W-Bd Site Drive Peak 40.9 E 0.46 Veh. Delay= Average stopped delay, in seconds,to all vehicles entering the intersection or to vehicles making the specified turn. Table 2 shows that left turns from Buckland Road onto the site access drive will operate at Level of Service(LOS)A during the morning peak hour and LOS B during the afternoon peak hour upon completion of the proposed dentist office. The site drive approach to Buckland Road will operate at LOS B during the morning peak hour and LOS E(41 seconds average delay per vehicle)during the afternoon peak hour. The capacity analyses also provide stacking information for left turns from Buckland Road onto the site drive and on the site drive approach to Buckland Street. The 95`b percentile queue(there is a 95 percent statistical probability that this queue will not be exceeded)for left turns from Buckland road onto the site drive will be virtually non existent during both peak periods and the queue on the site drive will be virtually non existent during the morning peak hour and less than half a vehicle during the afternoon peak hour. Site Access Access to the dentist office will be provided by an access drive located along the east side of Buckland Road at the northerly property line of the site(approximately 700 feet south of Ellington Road. Visual observations were made at the location of the site access drive, and Design Professionals,Inc. (DPI)made intersection sight distance measurements looking left and right from the access drive. DPI measured the Intersection Sight Distances as being at least 700 feet looking north and south from the site drive. The visual observations indicate that the 700 foot Intersection Sight Distances can be achieved in accordance with the 2003 ConnDOT Highway Design Manual (measured at a distance of 15 feet off the edge of road with a 3.5 foot height of eye and height of object)by removing two trees just north of the site driveway(one will likely be removed to allow construction of the drive and the second tree is near the property line and may be on the abutting property)and removing trees and shrubs along the site frontage south of the site drive. The Connecticut DOT presents intersection sight distances(ISD)in their December 2003 Highway Design Manual. Figure 11-2D of the ConnDOT Guidelines presents ISD information for each 5 mph increment for speeds between 20 and 70 mph for four-lane roads. The posted speed limit on Buckland Road in the vicinity of the site is 40 miles per hour(mph). The speed study conducted for Buckland Road at the site frontage found that the 85t'percentile speed(the speed at which 85 percent of all drivers travel at or less than)is 44 mph for both northbound and southbound travel. A summary of available intersection sight distances and distances required by ConnDOT in their Guidelines for Highway Design is presented in Table 3. Obusiness\CmlloSightLine\ltapt.doc 4 Table 3—Comparison of Available and Required Intersection Sight Distances Available Intersection Required Intersection Sight Sight Distance Distance per ConnDOT 2003 Highway Design Manual Looking Left from Site Drive onto >700 Feet 519 Feet Buckland Road Looking Right from Site Drive 700 Feet 519 Feet onto Buckland Road Table 3 shows that the Intersection Sight Distance(ISD)available to drivers looking left and right from the site access drive onto Buckland Road(with the recommended clearing)is greater than the intersection sight distance provided in the ConnDOT reference for vehicles traveling at the 85'h percentile speed of 44 mph in the northbound and souhbound directions on Buckland Road. A second sight distance measured for this study is for Stopped Vehicle Turning Left Across Oncoming Traffic. According to Figure 11-2J of the ConnDOT Guidelines,vehicles turning left from Buckland Road onto the site drive should be able to see 391 feet. The 700+feet available to drivers making this left turn is greater than the distance required by the ConnDOT reference for vehicles approaching from the opposite direction at the 851'percentile speed of 44 mph. The Stopping Sight Distance for vehicles approaching from the rear of the vehicle turning left onto the site access drive should be approximately 349 feet. The available Stopping Sight Distance(700 feet)is greater than the required Stopping Sight Distance. All sight distances available to drivers entering and leaving dentist office drive(with the recommended clearing)are greater than the distances presented in the Connecticut DOT 2003 Highway Design Manual for the prevailing travel speeds on Buckland Road. These sight distances will allow drivers the visibility needed to safely enter and leave the site. Conclusions Robert M. Grillo, DMD proposes to rehabilitate and expand the existing single family home located at 498 Buckland Road to create a new 3,158 square foot dentist office for his use. The site is situated along the east side of Buckland road approximately 700 feet south of Ellington Road. The trip generation information included in the ITE Trip Generation reference for Medical- Dental Office Building was used to determine the number of new trips anticipated from the proposed 3,158 square foot dentist office. The study assumed that the dentist office would be constructed over a period of one year. Capacity analyses were done for the intersection of Buckland Road at its intersection with the site access drive for the 2005 Build conditions. The trips generated by the dentist office were distributed to the roadway system by assuming that two- thirds of the new trips would travel to and from the south and two-thirds would travel to and from the north on Buckland Road. This approach provides a conservative analysis of the impact from the site trips as the total number of trips assigned to the roadway system represents 133%of the generated trips. The capacity analyses found that left turns from Buckland Road onto the site access drive .N411 operate at Level of Service(LOS)A during the morning peak hour and LOS B during the afternoon peak hour upon completion of the proposed dentist office. The site drive approach to cAbusinessl GrilloSightLinAtrrpt.doc 5 Buckland Road will operate at LOS B during the morning peak hour and LOS E(41 seconds average delay per vehicle)during the afternoon peak hour. The capacity analyses also provide stacking information for left turns from Buckland Road onto the site drive and on the site drive approach to Buckland Street. The 95th percentile queue(there is a 95 percent statistical probability that this queue will not be exceeded)for left turns from Buckland road onto the site drive will be virtually non existent during both peak periods and the queue on the site drive will be virtually non existent during the morning peak hour and less than half a vehicle during the afternoon peak hour. Design Professionals, Inc. (DPI)made intersection sight distance measurements looking left and right from the access drive and visual observations by Traffic Engineering Solutions,P.C. indicate that the 700 foot Intersection Sight Distances measured by DPI can be achieved in accordance with the 2003 ConnDOT Highway Design Manual(measured at a distance of 15 feet off the edge of road with a 3.5 foot height of eye and height of object)by removing two trees just north of the site driveway(one will likely be removed to allow construction of the drive and the second tree is near the property line and may be on the abutting property)and removing trees and shrubs along the site frontage south of the site drive. Sight distances for turning left from Buckland Road onto the site and stopping sight distance for vehicles following these left turning vehicles exceed the requirements presented in the ConnDOT Highway Design Manual. Traffic operations at the intersection of Buckland Road at the site access road will be very good Levels of Service A or B for left turns from Buckland Road onto the site access drive and the site drive approach to Buckland Road will operate at LOS B during the morning peak hour and LOS E during the afternoon peak hour with queues of less than half a vehicle during the afternoon peak hour. Adequate sight distances can be provided at the site access drive by clearing trees and vegetation to provide drivers the visibility needed to safely enter and leave the site. No offsite roadway improvements are suggested by this study as a result of the added traffic generated by the proposed dentist office. If during the review of the information included in this letter you have any questions, please call me. Very truly yours, TRAFFIC ENGIN�EiERING S%UTIONS, P.C. ✓�Ge'iL. ' /J, �1��'"-fG=''� Bruce A.Hillson, P.E. cAbusiness\Qi11oSig1tLineVtn-pt.doc 6 APPENDIX EXISTING TRAFFIC VOLUMES Connecticut Counts Inc. Kensington, Connecticut 06037 (860) 828-1693 Site Code:429 498 Buckland Road Station ID: South Windsor, Connecticut Latitude: 0'0.000 Undefined Start 28-Jun-04 Tue Wed Thu Fri Sat Sun Week Average Time Northbou Southbo Northbou Southbo Northbou Southbo Northbou Southbo Northbou Southbo Northbou Southbo Northbou Southbo Northbou Southbo 12:00 ---- ---- AM * 51 28 51 31 67 32 72 36 93 39 89 51 70 36 01:00 32 10 26 22 31 20 42 19 61 20 45 18 40 18 02:00 8 15 35 10 17 17 15 11 39 13 36 15 25 14 03:00 * 4 15 10 23 15 26 11 15 12 14 16 15 11 18 04:00 16 54 12 52 17 54 14 52 16 22 7 13 14 41 05:00 * 44 170 36 169 42 151 45 130 28 54 11 34 34 118 06:00 137 426 153 416 145 397 125 359 55 99 49 66 111 294 07:00 * 255 603 260 677 271 567 248 524 116 185 66 98 203 426 08:00 * 306 562 316 526 288 584 293 526 216 293 135 179 259 445 09:00 * * 296 430 340 477 329 489 331 478 287 448 181 250 294 429 10:00 348 444 378 475 378 464 400 466 370 662 408 507 253 342 362 464 11:00 402 464 420 513 433 469 454 494 473 533 462 546 311 408 422 490 12:00 PM 476 505 512 505 472 528 488 531 539 589 428 496 359 429 468 512 01:00 452 532 459 479 481 524 478 540 508 546 447 437 391 409 459 495 02:00 481 487 507 509 489 488 505 518 528 546 437 401 367 339 473 470 03:00 590 484 618 509 614 661 609 528 585 569 491 393 318 291 546 475 04:00 642 475 651 519 622 531 707 547 638 516 408 380 350 273 574 463 05:00 650 518 676 537 630 534 655 520 587 478 411 393 299 255 558 462 06:00 505 383 547 449 524 446 567 453 446 450 350 381 282 229 460 399 07:00 418 420 423 390 420 397 433 396 418 401 300 352 210 217 375 368 08:00 347 262 377 318 382 282 382 343 377 336 268 322 212 159 335 289 09:00 315 162 299 182 329 177 342 172 309 223 221 237 153 147 281 186 10:00 127 102 142 97 171 105 163 120 199 143 420 130 157 111 197 115 11:00 88 55 74 69 113 59 111 61 130 109 179 98 106 77 114 75 Lane 5841 5293 7232 7864 7297 7858 7516 8026 7303 8141 6153 6259 4403 4425 6685 7102 Day 11134 15096 15155 15542 15444 12412 8828 13787 AM Peak 11:00 11:00 11:00 07:00 11:00 07:00 11:00 08:00 11:00 10:00 11:00 11:00 11:00 11:00 11:00 11:00 Volume 402 464 420_ 603 433 577 454 584 473 552 462 546 _ 311 408 422 490 PM Peak 17:00 13:00 17:00 17:00 17:00 15:00 16:00 16:00 16:00 12:00 15:00 12:00 13:00 12:00 16:00 12:00 Volume 650 532 676 537 630 551 707 547 638 589 491 495 391 429 574 512 Page 1 Connecticut Counts Inc. Kensington, Connecticut 06037 (860) 828-1693 Site Code:429 498 Buckland Road Station ID: South Windsor, Connecticut Latitude: 0' 0.000 Undefined Start 05-Jul-04 Tue Wed Thu Fri Sat Sun Week Average Time Northbou Southbo Northbou Southbo Northbou Southbo Northbou Southbo Northbou Southbo Northbou Southbo Northbou Southbo Northbou Southbo AM 61 32 42 20 * 52 26 01:00 49 24 21 10 * * * * * 35 17 02:00 26 12 9 13 18 12 03:00 10 14 7 11 * * * 8 12 04:00 8 12 10 50 * 9 31 05:00 17 33 48 142 * * 32 88 06:00 38 92 140 389 * * 89 240 07:00 75 123 236 575 * * 156 349 08:00 121 178 296 502 * * 208 340 09:00 151 289 332 479 * * 242 384 10:00 269 408 379 460 * * 324 434 11:00 373 468 422 489 * * 398 478 12:00 PM 384 527 457 556 * * * 420 641 01:00 471 488 475 512 * * * * 473 500 02:00 519 492 * * * 519 492 03:00 6" 441 * * 684 441 04:00 493 380 * * * * * * 493 380 05:00 457 349 * * 457 349 06:00 349 291 * * * 349 291 07:00 298 319 * * * * 298 319 08:00 264 149 * * * 264 149 09:00 203 103 * * * * 203 103 10:00 101 82 * * * * * * 101 82 11:00 61 53 * 61 53 Lane 5362 5359 2874 4207 0 0 0 0 0 0 0 0 0 0 5773 6111 Day 10721 7081 0 0 _ 0 _ 0 0 11884 AM Peak 11:00 11:00 11:00 07:00 11:00 11:00 Volume 373 468 _ 422 575 __ _ _ _ 398 478 PM Peak 15:00 12:00 13:00 12:00 15:00 12:00 Volume 564 527 475 555 ------- 564 541 Comb. 21855 22177 15155 15542 15444 12412 8828 25671 Total ADT ADT 13,683 AADT 13,683 Page 2 Connecticut Counts Inc. Kensington, Connecticut 06037 498 Buckland Road (860) 828-1693 Site Code:429 South Windsor, Connecticut Station ID: Northbound Latitude: 0' 0.000 Undefined Start 0 16 21 26 31 36 41 46 51 56 61 66 71 76 85th 95th Time 15 20_ 25 30 35 __40 45 50 55 60 _ 65 70 _ 75 _ 999 Total Percent Percent 07/06/04 0 0 0 0 10 14 12 5 1 0 0 0 0 0 42 45 49 01:00 0 0 0 1 1 5 9 5 0 0 0 0 0 0 21 47 49 02:00 0 0 0 0 1 4 2 0 2 0 0 0 0 0 9 51 52 03:00 0 0 0 0 0 4 2 1 0 0 0 0 0 0 7 42 46 04:00 0 0 0 1 0 6 2 1 0 0 0 0 0 0 10 41 42 05:00 0 1 1 3 4 8 18 11 0 2 0 0 0 0 48 48 50 06:00 0 0 1 3 6 35 56 30 6 3 0 0 0 0 140 48 51 07:00 0 0 1 6 24 75 79 40 8 2 1 0 0 0 236 47 50 08:00 1 0 0 11 41 108 91 33 8 3 0 0 0 0 296 45\ 50 09:00 1 0 2 27 93 130 58 19 1 1 0 0 0 0 332 43 46 10:00 0 1 0 25 106 1" 87 12 2 1 0 1 0 0 379 43 45 11:00 0 1 10 34 136 136 85 17 1 1 1 0 0 0 422 43 45 12 PM 1 1 1 25 141 192 82 12 2 0 0 0 0 0 457 42 45 13:00 0 1 16 36 176 179 53 14 2 0 0 0 0 0 476 40 45 14:00 w w x w w w x w w w w x w x w x w 15:00 x w w w w x w x w w x w x w w w w 16:00 w w x w x w x w w w x w w w w w w 17:00 w x w w x w w w w w w w w x x w w 18:00 w w w w w x w w w x w w w w w w w 19:00 w w x w x w w w w w w w w w w w w 20:00 w w w w w w x w w w w w w w w w w 21:00 22:00 w w x w w w w w x x w w w w w w w 23:00 w w w w w w w w w w x w x w w w w Total 3 5 31 172 738 1040 636 200 33 13 2 1 0 0 2874 _ Percent_ 0.1% 0.2% 1.1% 6.0% 25.7% 36.2% 22.1% _ 7.0% 1.1% 0.5% _0.1% .0.0% _0.0% 0.0% AM Peak 08:00 05:00 11:00 11:00 11:00 10:00 08:00 07:00 07:00 06:00 07:00 10:00 11:00 Volume 1 1 10 34 136 144 91 40 8 3 1 1 422 PM Peak 12:00 12:00 13:00 13:00 13:00 12:00 12:00 13:00 12:00 13:00 Volume 1 1 15 36 175 192 82 14 2 _ 475 Grand 56 54 418 3078 12463 19738 13294 4042 671 123 28 9 3 4 53981 Total Percent 0.1% 0.1% 0.8% 5_.7% 23.1% 36.6% 24.6% 7.5% 1.2% 0.2% 0.1% 0.0% 0.0% 0.0% 15th Percentile: 32 MPH 50th Percentile: 38 MPH 85th Percentile: 44 MPH 95th Percentile: 48 MPH Statistics 10 MPH Pace Speed: 36-45 MPH Number in Pace: 33032 Percent in Pace: 61.2% Number of Vehicles>40 MPH: 18174 Percent of Vehicles>40 MPH: 33.7% Mean Speed(Average): 38 MPH Statistics Mean Speed(Average): 38 MPH 10 MPH Pace Speed: 36-45 MPH Number in Pace: 33032 Percent in Pace: 61.2% Page 9 I Connecticut Counts Inc. Kensington, Connecticut 06037 498 Buckland Road (860) 828-1693 Site Code: 429 South Windsor, Connecticut Station ID: Southbound Latitude: 0' 0.000 Undefined Start 0 16 21 26 31 36 41 46 51 56 61 66 71 76 85th 95th Time 15 20 25 30 35 _ 40 45 50 _ 55 60 65 70 75 999 Total Percent Percent 07/06/04 0 1 0 2 0 7 9 1 0 0 0 0 0 0 20 44 45 01:00 0 0 0 0 2 3 3 1 1 0 0 0 0 0 10 43 50 02:00 0 0 1 0 4 3 4 1 0 0 0 0 0 0 13 43 44 03:00 0 0 0 1 1 5 3 1 0 0 0 0 0 0 11 42 43 04:00 0 0 1 3 4 18 20 4 0 0 0 0 0 0 50 44 46 05:00 0 0 0 0 7 52 60 20 3 0 0 0 0 0 142 46 49 06:00 0 0 0 5 23 124 163 66 7 1 0 0 0 0 389 47 50 07:00 1 1 9 29 99 191 183 57 5 0 0 0 0 0 676 45 48 08:00 2 2 5 23 73 194 149 49 5 0 0 0 0 0 502 45 48 09:00 3 0 10 48 114 164 106 34 0 0 0 0 0 0 479 44 47 10:00 2 0 9 31 130 176 95 16 1 0 0 0 0 0 460 43 45 11:00 1 1 8 49 136 166 97 29 2 0 1 0 0 0 489 43 47 12 PM 1 1 15 58 164 187 108 20 1 0 0 0 0 0 555 43 45 13:00 3 0 6 41 137 184 118 21 2 0 0 0 0 0 512 43 45 14:00 w « w « w « x w w w rt w w rt w x x 15:00 « « x rt « « « rt rt « w rt « w « w rt 16:00 « w « w rt w x w rt « « w w w rt x « 17:00 « x x x w w rt w x « w « x x « « w 18:00 x w rt x w « w rt w w w w w w x w w 19:00 « « rt « « w x « w x rt w w « x w w 20:00 rt x « w x w w w w rt w w x rt rt x « 21:00 « « « w w w rt « w « « « rt « x x x 22:00 x rt x w w w w « w rt rt rt w w w w x 23:00 w « « x rt « « « w x rt « w « « w x Total 13 6 64 290 893 1474 1118 320 27 1 _ 1 _ 0 0 0 4207 Percent 0.3% 0.1% 1.5% 6.9% 21.2% 35.0% 26.6% 7.6% 0.6% 0.0% 0.0% 0.0% 0.0% 0.0% _ AM Peak 09:00 08:00 09:00 11:00 11:00 08:00 07:00 06:00 06:00 06:00 11:00 07:00 Volume 3 2 10 49 135 194 183 66 7 1 1 575 PM Peak 13:00 12:00 12:00 12:00 12:00 12:00 13:00 13:00 13:00 12:00 Volume 3 1 15 58 164 187 118 _ 21 2 555 Grand 136 98 637 3660 12237 20741 15320 4037 455 68 _ 17 2 3 21 57432 Total Percent 0.2% 0.2% 1.1% 6.4% 21.3% 36.1% 26.7% 7.0% 0.8% 0.1% 0.0% 0.0% 0.0% 0.0% 15th Percentile: 32 MPH 50th Percentile: 38 MPH 85th Percentile: 44 MPH 95th Percentile: 48 MPH Statistics 10 MPH Pace Speed: 36-45 MPH Number in Pace: 36061 Percent in Pace: 62.8% Number of Vehicles>40 MPH: 19923 Percent of Vehicles>40 MPH: 34.7% Mean Speed(Average): 38 MPH Statistics Mean Speed(Average): 38 MPH 10 MPH Pace Speed: 36-45 MPH Number in Pace: 36061 Percent in Pace: 62.8% Page 19 UNSIGNALIZED INTERSECTION CAPACITY ANALYSES 2005 BUILD CONDITIONS Two-Way Stop Control Page 1 of 1 TWO-WAY STOP CONTROL SUMMARY General Information Site Information Analyst BAH Intersection Buckland Road at Site Drive Agency/Co. Traffic Engineering Solutions Jurisdiction South Mndsor Date Performed 7116104 Analysis Year 2005 Build Conditions Analysis Time Period AM Peak Project Description Robert M.Grillo Dentist Office East/West Street: Site Access Drive :Forth/South Street: Buddand Road Intersection Orientation: North-South IStudy Period hrs: 0.25 Eehicle Volumes and Ad ustments or Street Northbound Southboundement 1 2 3 4 5 6 L T R L T R me 0 364 4 4 937 0 Peak-Hour Factor PHF 0.90 0.90 0.70 0.70 0.90 0.90 Hourly Flow Rate,HFR 0 404 5 5 1041 0 Percent Heavy Vehicles 0 — — 0 -- -- Median Type Undivided RT Channelized 0 0 Lanes 0 2 0 0 2 0 Configuration T TR LT T U tream Signal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R olume 2 0 2 0 0 0 Peak-Hour Factor PHF 0.70 0.90 0.70 0.90 0.90 0.90 Hourly Flow Rate,HFR 2 1 0 2 0 1 0 1 0 Percent Heavy Vehicles 0 0 0 0 0 0 Percent Grade(%) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 1 0 0 0 onfiguration I I LR IDelay,Queue Len th and Level of Service [Lane oach NB SB Westbound Eastbound ement 1 4 7 8 9 1r) 11 12 Configuration LT LR h) 5 4 )(vph) 1161 400 0.00 0.01 queue length 0.01 0.03 Control Delay 8.1 14.1 LOS A B Approach Delay — — 14.1 Approach LOS — — B Rights Reserved HCS2000- Copyright 0 2003 University of Florida,All Rights Reserved Version 4.Id Version 4.I d file:HC:\WINDOWS\TEMP\u2kAOA6.TMP 7/16/04 Two-Way Stop Control rage I of I TWO-WAY STOP CONTROL SUMMARY General Information Site Information Analyst BAH Intersection Buckland Road at Site Drive Agency/Co. Traffic Engineering Solutions Jurisdiction South Wndsor Date Performed 7116104 Analysis Year 2005 Build Conditions lAnalysis Time Period PM Peak ro'ect Descri tion Robert M.Gdlla Dentist Office East/VI/est Street: Site Access Drive --North/South Street: Bucldand Road Intersection Orientation: North-South Pudy Period hrs: 0.25 ehicle Volumes and Adjustments Ma'or Street Northbound Southbound ovement 1 2 3 4 5 6 L T R L T R olume 0 1244 2 2 827 0 Peak-Hour Factor PHF 0.90 0.90 0.70 0.70 0.90 0.90 Hourly Flow Rate,HFR 0 1382 2 2 1 918 0 Percent Heavy Vehicles 0 — — 0 — — Median Type Undivided RT Channelized 0 0 Lanes 0 2 0 0 2 0 onfiguration T TR LT T Imam Si nal 0 0 Street Westbound Eastbound ment 7 8 9 10 11 12 L T R L T R Volume 6 0 6 0 0 0 Peak-Hour Factor PHF 0.70 0.90 0.70 0.90 0.90 0.90 Hourly Flow Rate, HFR 8 0 8 0 0 0 Percent Heavy Vehicles 0 1 0 1 0 0 1 0 1 0 Percent Grade(%) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 ohfiguration LR elay,Queue Length.and Level of Service pproach NB SB Westbound Eastbound ovement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 2 16 (m)(vph) 501 116 lc 0.00 0.14 %queue length 0.01 0.46 Control Delay 12.2 40.9 LOS B E pproach Delay _ _ 40.9 pproach LOS -- — E Rights Reserved HCS2000- Copyright®2003 University of Florida,All Rights Reserved Version 4.1d Version 4.1d file://C:\WINDOWS\TEMP\u2k92E4.TMP 7/16/04 Certified Mail August 29, 2005 Dr. Robert M. Grillo The Grillo Family-Limited Partnership 379 Main Street South Windsor, CT 06074 Dear Dr. Grillo: Re: Appl#05-38P, Grillo Site Plan We regret to inform you that the Planning and Zoning Commission, at their August 16, 2005 meeting, voted to deny without prejudice, the above referenced application for site plan approval. The reason for the denial was that the site plan did not appear to conform to the condition set by the Zoning Board of Appeals in granting the necessary variances on the property that the plans be substantially similar to the plans submitted to the ZBA. The denial was without prejudice to allow you to resubmit your site plan application either after it to conforms to the condition imposed by the ZBA or after you have received clarification from the ZBA that the current site plan conforms to that condition. The Commission also voted to waive the application fee for a resubmission of a revised application. Very truly yours, Timothy H. Wentzell, Chairman Planning and Zoning Commission THW/rfs cc: Town Engineer Chief Building Official Assessor Superintendent of Pollution Control Fire Marshal Design Professionals, Inc.- Ms. Becky Meyer "Barbara Messino Re. Grillo Site Plan 05 73P Page 1 From: Bob Deptula To: Messino, Barbara Date: 12/6/05 3:16PM Subject: Re: Grillo Site Plan 05-73P no cvomments >>> Barbara Messino 12/06/05 10:44AM >>> Please see attachment Barbara Messino Planning PLANNING DEPARMENT IN-HOUSE REFERRAL FORM DATE: 12/6/05 TO: Matt Galligan, Fred Shaw, Michael Gantick, Rich Bond, Bill Lanning, Jeff Doolittle Kris Lindstrom, Ray Favreau, Karl Reichle, Mel Stead, Chris Dougan, Bob Deptula Dennis Sheridan FROM: Marcia A. Banach, AICP, Director of Planning The Planning&Engineering Departments have received plans for the following projects: App. 05-73P, The Grillo Family Limited Partnership Location: 498 Buckland Road ® Site Plan ❑ Subdivision No. Acres 48,300 sf Zone Gateway Development ❑ Industrial ❑ Commercial ® Residential No. Lots/Units Water: ® Public ❑ Private Well Sewerage: ❑ Public ❑ Septic System Project Description: New dentist office—approx. 3,158 sf Future Town-owned property involved? ❑ Yes ® No ❑new street(s) ❑ new detention area ❑ new open space/recreation area ❑ active ❑passive Planning Department notes: Please comment by 12/23/05 and return to the Planning Department. December 15, 2005 CERTIFIED # 70020460000197444460 Design Professionals, Inc. Attn: Peter DeMallie 165 South Satellite Road South Windsor, CT 06074 RE; Application#2664-05—The Grillo Family Limited Partnership, 498 Buckland Road, Buckland Gateway Development zone Dear Mr. DeMallie: At the meeting of the South Windsor Zoning Board of Appeals held on December 1, 2005, the Board approved with conditions your request for modifications to the four variances granted previously with appl. #2613-04—to allow construction of a dental office on property located at 498 Buckland Road, Buckland Gateway Development zone. The Board concluded the hardships and conditions on each request to be as follows: A 13' variance to section 10.2 to allow a side yard of 12' (25' required): Hardship: 1) The placement of the original structure conformed at the time it was built and the re- zoning of the property to the Buckland gateway zone requires larger setbacks. 2) The property line is not perpendicular to the structure, making the expansion encroach further into the side yard. 3) The two government takings for road widening have created the existing structure to become significantly nonconforming, making it difficult to use the property in conformance with the Town's comprehensive plan. Conditions: 1) Approval is based on the updated plans prepared by Design Professionals, Inc., last revision date of 7/1/2005. 2) The use is subject to site plan approval by the Planning &Zoning Commission. 3) The use is subject to an approved use in the zoning regulations. Grillo Family Limited Partnership December 15, 2005 Page 2 A modification to allow a 27.1' variance to section 10.2 to allow the front yard setback of the new structure to remain at 37.9'. Hardship: 1) The placement of the original structure conformed at the time it was built and the re- zoning of the property to the Buckland gateway zone requires larger setbacks. 2) The property line is not perpendicular to the structure, making the expansion encroach further into the side yard. 3) The two governmental takings for road widening have created the existing structure to become significantly nonconforming, making It difficult to use the property in conformance with the Town's comprehensive plan. Conditions: 1) Approval is based on the updated plans prepared by Design Professionals, Inc., last revision date of 7/1/2005. 2) The use is subject to site plan approval by the Planning & Zoning Commission. 3) The use is subject to an approved use in the zoning regulations. A modification to allow a 27.1' variance to section 10.2 to allow the front yard setback of the new structure to remain at 37.9'. Hardship: 1) The placement of the original structure conformed at the time it was built and the re- zoning of the property to the Buckland gateway zone requires larger setbacks. 2) The two government takings for road widening have created the existing structure to become significantly nonconforming, making it difficult to use the property in conformance with the Town's comprehensive plan. Conditions: 1) Approval is based on the updated plans prepared by Design Professionals, Inc., last revision date of 7/1/2005. 2) The use is subject to site plan approval by the Planning & Zoning Commission. 3) The use is subject to a permitted use in the zoning regulations. A variance to section 3.10.3 to allow expansion of a nonconforming structure and an 8.7' variance to section 10.2 to allow 56.3' setback for proposed addition are both variances that are no longer necessary due to the changes in the plan. An new building, or y g, alteration/additions to existing buildings, requires a building permit prior to start of construction. y. v Grillo Family Limited Partnership December 15, 2005 Page 3 These actions are effective upon your filing the enclosed form in the Town Clerk's Office at your own expense. Very truly yours, Stephen Wagner, Chairperson Zoning Board of Appeals SW:dr cc: Building Department Dec 05 05 04: 07p Design Professionals 860-291 -8757 p. l Design Professionals, Inc. 165 South Satellite Road South Windsor, CT 06074 Tel. 860 291-8755 Fax 860 291-8757 www.designpmfessiona(siri mm To: l ch d e Lipe From: Bo C:KU �LA P.t' Fax: �L.I u - �Z�p Pages: `i 1 nd . CoV er Phone: Date: 1,1 1 S I b s Res l_t O CQ 0 Urgent ❑ For Review 0 Please Comment C]Please Reply ❑Please Recycle •Comments: A- ct Che-d i s It faro art `�11 tKt CoYY\Mt' SS-JCYt VO�Cd tD Wcc e, P P 1 i rx-h o t� -f�e' -{ v a-V Yu did Ih S� C�Cuvvt-al iuio W I i � �t n : C+ntl�Cj . Dec 05 05 04: 07p Design Professionals 860-291 -8757 p. 3 ui?e / 7,ZC.►c T/u 6v-dlo Fa-n4'�1 b m 1 fed f l201-r`ze S Pe-f C-r Of l/12L�ll�� ?'U )�j _ff y p,per ad 4qk Su ek, la h C/ A AZY . MEMORANDUM TO: Marcia Banach, Director of Planning FROM: Jeff Doolittle, P.E., Town Engineer Joseph J. Perna, Project Engineer DATE: January 12, 2006 RE: Appl. No. 05-73P - Grillo Site Plan We have reviewed the site plan for the Grillo Family Limited Partnership located at 498 Buckland Road and offer the following comments: 1. Plans call for a new sanitary sewer connection. Our records indicate that house #498 was connected to the sanitary sewer on 4/12/79. This sanitary sewer lateral needs to be shown and should continue to be used if possible. If it can not be used it needs to be disconnected and capped at the street line. Note 9 regarding the existing septic system on sheet 2A needs to be changed. 2. Provide inverts for the proposed foundation drain connecting to the existing catch basin on Buckland Road. 3. The sidewalk extension on the north side of the proposed driveway should be constructed as a handicap ramp. 4. WPCA review and approval is needed for this application Please let us know if you have any questions. DESIGN PROFESSIONALS, INC. civil engineers .planners . surveyors . gis gis.gps .landscape architects �e January 18,2006 Marcia Banach,Director of Planning JAN 1 8Zoos Town of South Windsor SOU I I I 1540 Sullivan Ave. IN 'USU-�•r South Windsor,CT 06074 Re: The Grillo Family Limited Partnership 498 Buckland Road South Windsor,Connecticut Dear Marcia, We have enclosed nine(9)sets of revised plans for the above referenced project. The plans have been revised to address comments from Jeff Doolittle and Joseph Perna dated January 12,2006. Our responses to each like numbered comment are as follows: 1.The approximate location of the existing sanitary sewer lateral has been shown on the plans.Note 9 regarding an existing septic system has been removed from sheet 2A. 2.Inverts for the existing catch basin in Buckland Road have been added along with the approximate location of the existing roof leader.A proposed 2"PVC sump pump line has been added to the plans for the foundation drain. 3.A handicap ramp has been indicated on the proposed sidewalk to the north of the entrance drive. 4.A WPCA application will be submitted. Please call with any questions or comments. Sincerely, &4� Becky Meyer Project Engineer Cc: Galen Semprebon,P.E. Dr.Robert M.Grillo Jeff Doolittle,P.E. 165 South Satellite Road, South Windsor, Connecticut 06074 Tel: (860)291-8755 •Fax: (860)291-8757 a. Appl #05-73P, Grillo Family Limited Partnership January 24, 2006 Planning Department Report l. Request for site plan approval to convert an existing residence into a dental office at 498 Buckland Road, Gateway zone. This applicant was in front of the Commission in July of 2005 and the application was denied because the site plan did not appear to conform to the condition set by the Zoning Board of Appeals in granting the necessary variances on the property that the plans be substantially similar to the plans submitted to the ZBA. The applicant has subsequently reapplied to the ZBA and was granted the necessary variances to move forward with this application in December 2005. A copy of the ZBA letter has been provided. 2. Several variances have been granted on this property. In April 2004, ZBA granted variances to allow a 12' side yard rather than the 25' required in the gateway zone. In December 2005; the ZBA and to allow a 37.9 front yard setback for all structures on the property (65' required). 3. Maximum impervious coverage allowed is 60%, 35% proposed. Proposed building height is 18 feet; 30 feet allowed. Lot size is 48,300 sq ft; minimum lot size allowed is 3 acres. The Gateway zone specifically acknowledges existing undersized lots and notes that they are legally nonconforming. Frontage is 184 feet; minimum allowed is 200 feet. 4. This application is subject to the requirements of Section 3A, access management, as well as the access management requirements of Gateway Zone section 5.8.2.e, which states: "Access management will be required on all sites, in order to reduce the number of driveway cuts onto Buckland Road and mitigate the deterioration of traffic flow generally caused by driveways on arterial streets. Access management techniques will include shared driveways (or provisions for future shared driveways for the first site in an area); interior service drives; and other techniques included in South Windsor's access management program." It is critical that provisions be made for interconnections to both the north and south properties so that in the future, these properties can be interconnected and share a single driveway. The site plan reflects this provision by showing an area of future connection to the north and south. If this application is approved, there needs to be an approval condition requiring that this site be interconnected with the two abutting properties when the properties receive site plan approval in the future. i A The Police Department strongly recommends that a shared driveway be utilized to serve the subject site and abutting sites. Sgt. Bond also reminds us of the left- turn prohibition at CVS and suggests that full access be granted only if a common driveway is established. 5. A sidewalk has been shown along the Buckland Road frontage as required by the Gateway Zone regulations. Staff note that sidewalks are being introduced along Buckland Road at each opportunity; e.g., a sidewalk for Berry Patch senior housing is coming down to Buckland Road and will travel along Buckland Road frontage to cross at the Stop & Shop/Terry Office Park traffic light. 6. The parking requirement for this use is 26 spaces. The applicant is requesting a waiver to allow 22 spaces. The Commission will want to consider whether you agree that 22 spaces is adequate now and in the future, since there is no room for expansion of the parking lot. We do note that future interconnection to the sites north and south could provide possibilities for shared parking in the future. 7. Architectural and Design Review Committee reviewed this application on June 16. They were satisfied with the architecture and landscaping. ADRC was concerned that a sidewalk is being required because there are no sidewalks to the immediate north or south at present, and ADRC thought the sidewalk was too close to Buckland Road for safety. 8. Proposed lighting includes decorative, full cutoff fixtures on 14-foot poles. 9. There is a retaining wall along the south boundary that will need to be reconfigured in the future when the interconnection to the south is constructed. 10.The proposed sign is a very tasteful 4' high illuminated monument sign. We do remind the applicant that when lighting the monument sign, care will be needed to ensure that the lighting conforms with zoning requirements. 11.There are regulated wetlands on the site. IWA/CC approved the application on July 6 with no unusual approval conditions and two $5,000 bonds for erosion and sediment control, and for detention basin establishment. 12.Public water and sewer are available. Water Pollution Control Authority approval is required. 13.There is a dumpster shown on a concrete pad with screening. 14.If this application is approved, staff request an approval modification requiring the driveway interconnections at such time as site plans are approved and construction occurs on the abutting sites. 2 sow ?d �� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 sox co`'`� TELEPHONE (860) 644-2511 CERTIFIED MAIL#70041160 0007 4128 2294 February 6, 2006 The Grillo Family Limited Partnership 379 Main Street South Windsor, CT 06074 Dear Dr. Robert M. Grillo: Re: Appl#05-73P, The Grillo Family Limited Partnership We are pleased to advise you that the Planning&Zoning Commission voted on January 24, 2006 to approve with modifications the above-referenced application to approve the Site Plan of Development for property located at 498 Buckland Road, Gateway development zone. This approval is subject to the following modifications: 1. Prior to commencement of any site work, a meeting must be held with Town Staff. 2. No building permit will be issued until the final mylars have been filed in the Town Clerk's office. 3. This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission,including a bond in the amount of$5,000 for erosion&sediment control, and a bond in the amount of$5,000 for detention basin establishment. 4. An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 8.1.11 of the Zoning Regulations. 5. Footing drains are required if the building has a basement. 6. A landscape bond in the amount of 2 000 i required $ s u ed and must be submitted prior to filing of m lars. p � � p g Y 7. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 8. This approval does not constitute approval of the sanitary sewer,which can only be granted by the Water Pollution Control Authority. 9. Pavement markings must be maintained in good condition throughout the site drives and parking areas. 10. The Town Engineer's review comments dated January 12, 2006, must be addressed to the Town Engineer's satisfaction. 11. Parking waiver of 4 spaces with the maximum of five operatories to be equipped under this approval. Additional operatories require further approval from this Commission 12. This approval is for an office of general dentistry, only. 13. At such time as a site plan is approved for the property to the north and/or to the south interconnections p p Y , shall be constructed in the areas shown on the subject site plan OR as agreed by the two property owners and further approved b pp y the Planning and Zoning Commission. After the interconnections are constructed, the driveway for 498 Buckland Road shall then serve as the primary site access drive for the northern and southern abutting properties. Failure to construct the driveway interconnections shall be construed as a zoning violation and shall be pursued via the remedies available to the Town for zoning violations. 14. In accordance with the provisions of Section 3.A, the applicants shall enter into and file on the land records a joint access agreement that includes at a minimum the following: • An easement allowing cross access to and from the other properties served by the access drive; • An agreement that remaining access rights along Buckland Road are dedicated to the Town of South Windsor Black and white transparent mylars of Sheet# 3 with the above modifications, together with three blueprint copies of the entire set of plans must be submitted to this Commission within 30 days to be stamped and signed. The letters of approval of this Commission as well as the Inland Wetlands Agency/Conservation Commission must be reproduced on the mylars. After the mylars have been signed by the Commission,they will be returned to you for filing in the Office of the Town Clerk. After filing these plans, a copy of the receipt must be submitted to the Planning Department. Sincerely, Patrick Kennedy, Chairman Planning&Zoning Commission PK/bmm cc: Zoning/Wetlands Enforcement Officer Chief Building Official Assessor Fire Marshal Town Engineer Becky Meyer, Design Professionals 40W N St <� 7-0� /y�/JSou� /�//�V/ {/� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 soR•co AREA CODE 860/644-2511 February 16, 2006 Becky Meyer, Project Engineer Design Professionals, Inc. 165 South Satellite Road South Windsor, CT 06074 Re: The Grillo Family Limited Partnership 498 Buckland Road, South Windsor, CT Dear Ms. Meyer: The South Windsor Water Pollution Control Authority, at its regular meeting of February 7, 2006, gave approval to the application of The Grillo Family Limited Partnership to change property located at 498 Buckland Road from residential use to a commercial use; as more specifically shown on plans entitled "The Grillo Family Limited Partnership, Site Plan, 498 Buckland Road, South Windsor, Connecticut", Prepared by Design Professionals, Inc., South Windsor, CT,Job. No.: 1917, Sheet No.: 2/6"Property Survey", Dated 02/26/04, with revision date 1/17/06, and subject to the following conditions: 1. Payment of outstanding unbilled sewer user charges in the amount of $3,000.00, and sewer assessment fees equally the difference between residential and commercial rates. 2. The connection fee will be$2,164 (difference between commercial and residential rates). 3. Technical approval of the Town Engineering Department. 4. Final Authority approval and acceptance of the sanitary sewerage connection will be given once the sewer line has been installed and inspected by the Town staff, and based upon the written verification of the Town staff that said sanitary sewer line was installed in substantial conformance with the design plans approved by the Authority, and meeting all Town regulations and appropriate technical specifications relating to sanitary sewer construction. This approval letter must be superimposed on the final approval plans. Very truly yours, / Joseph J. Carino, Chairman Water Pollution Control Authority JC:ead Cc: Michael J. Gantick, Director of Public Works Jeff Doolittle,Town Engineer ✓Marcia Banach, Director of Planning Chris Dougan, Chief Building Inspector SOWo�WN Sf4 E a 4 O-Psa� ?d m � 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 Soe•CO TELEPHONE (860) 644-2511 February 27, 2006 The Grillo Family Limited Partnership 379 Main Street South Windsor, CT 06074 Dear Dr. Grillo: Re: Preconstruction Meeting—Appl#05-73P, Grillo Site Plan IN ATTENDANCE Michele Lipe Town of South Windsor Bernie Drabek Town of South Windsor Walter Summers Town of South Windsor Becky Meyer Design Professionals, 165 S. Satellite Road, South Windsor, CT 06074 Jeff Doolittle Town of South Windsor Bob Grillo Grillo Family Limited Partnership, 379 Main Street, South Windsor, CT 06074 Jim Slater J&H Slater Construction, 75 Commerce Way, South Windsor, CT 06074 The following is a brief summary of points discussed during the meeting: Erosion and Sedimentation Control 1. All erosion and sedimentation control measures are to be in place prior to earth moving operations in each area and maintained/cleaned out during construction. Call Jeffrey Folger, Environmental Planner for inspection when measures are in place,prior to commencement of site work or if any problems/concerns arise during construction. 2. All topsoil stockpile areas to be protected(ringed with haybales or equal). 3. During construction of the road/driveway a crushed stone tracking pad is to be installed and maintained to minimize tracking of dirt/gravel on to Buckland Road. Calcium chloride or water is to be used for dust control as required. Public Works 1. Three complete sets of approved/revised plans to be provided to Town prior to start of construction. They will be stamped by the Planning Department along with plans developer needs. Only approved plans are to be used on the job site. 2. The Engineering Department is to be notified forty-eight(48)hours prior to the start of major construction work with inspections and testing per Developers Checklist for the following: a. After site is staked out b. All drainage work c. Preparation of subbase, six(6)inch lifts d. Placement of bituminous concrete,two (2)inch layers minimum 3. Certification of gravel used as subbase and processed stone for base will be required from an approved testing company. 4. A drain layers permit is needed to disconnect the existing sanitary lateral. 5. A separate drain layer permit is needed to reconnect the sanitary sewer lateral if it is done at a later time. 6. Certification of all products used-- storm pipe, structures,pavement, etc., shall be presented to the Town Engineer prior to installation. 7. No sub-grade formation/base in frozen ground/snow. Same for pipe/structure installation. 8. As built plans are to include horizontal and vertical location of all underdrains, footing drains, and sanitary sewers and house service laterals located as per revised as-built checklist. 9. All pipe and structures to be backfilled with free draining material, compacted in maximum one foot lifts with approved compaction equipment or approved equal if deep trench is encountered. Any pipe or structure work requires inspection prior to backfilling. 10. Any problems and/or questions regarding construction of this project will be directed to Jim Slater in the field at phone#528-5252. 11. All filling to be done in accordance with Department of Transportation specifications. To be compacted in maximum lifts and tested as necessary. 12. Job meetings will be held as needed, and can be called by the developer or Town. 13. Seventy-two (72)hours' notice needed for certificate of occupancy inspection. 14.Any proposed changes are to be presented to the Engineering or Planning Department prior to implementation on change order form in quadruplicate with 4 copies of the drawing. Town will attempt to turn around within 24 hours. 15.Normal hours of operation 7:00 a.m.—5:00 p.m., no work on Sunday. 16.No paving after October 15 or before April 15 without written approval from Director of Public Works. 17. Sanitary lateral locations should be tied down to existing structures and shown on the progress as- builts. 18. For concrete sidewalks, 8"depth with reinforcements is required at driveway crossings. If the sidewalk is constructed before lot developments,the locations must be indicated on the as-built plans. If a proposed driveway location is moved,the sidewalk must be removed to the nearest expansion joint and rebuilt to the proper depth with reinforcement. 19. A quantity estimate is needed to bond the sidewalk. 20. During construction of individual sanitary sewer laterals, the contractor shall prepare an as-built sketch on standard form provided by the Engineering Department. This form should be submitted to the design engineer/surveyor for their use in preparing the as-built plan. The Engineering Department suggests that the contractor also show locations of foundation drains and water laterals on this form. 21. During construction for individual house lots, lot to lot drainage must be addressed with drainage swales as necessary. For lawn establishment,town staff will be requiring erosion control measures to be installed prior to the issue of the certificate of occupancy to ensure soil stabilization. A detailed erosion control plan must be implemented and depicted on the plot plan for review prior to the issuance of the building permit—most particularly on lots with extensive grading. Planning_Department 1. Landscaping is to be installed in accordance with the approved landscaping plan. If there are changes required, contact the Planning Dept. Additional landscaping installed on one part of a site will not preclude planting all of the remaining items shown on the landscaping plan. 2. Mylar must be signed and filed prior to issuance of building permits. 3. A sign permit is required for all building and free standing signage. SNET/NU 1. Contact utilities for coordination of utilities connection. Fire Marshal 1. Blasting(if required) to be coordinated with the Fire Marshal. Police Services 1. Emergency phone numbers for the duration of the construction must be provided to Police Services on a company letterhead. If the developer occupies or owns the building after construction emergency numbers must be provided to Police Services. 2. All buildings located on property that abuts a public highway must be numbered and visible from the street. All numbering shall comply with Town Ordinance 6-800 through 6-802. 3. Barns, garages, and outbuildings,which are located on the same premises as a numbered structure, are excluded. 4. Erect temporary sign on the site during construction identifying the project. 5. If an alarm is to be installed contact Police Services. Building Department 1. Plan review with Building Official/Fire Marshal required prior to application for building permit. Coordinate with Chief Building Official. Sincerely, / -;t Michele R. Lipe,AICP Assistant Director of Planning MRL/bm cc: Jeffrey Doolittle, Town Engineer Bernie Drabek, Engineering Inspector Walter Summers, Fire Marshal Karl Reichle, Public Works Mel Stead, Public Works Christopher Dougan, Chief Building Official Fred Shaw, Superintendent of Pollution Control TOWN OF SOUTH WINDSOR STAFF�SITE CHANGE FOR SITE & SUBDIVISION GENERAL: CHANGE ORDER CONTACT PERSON C Phone No. M�JC2� Address Site Name�� 'to � mI�U LAd PhY yY K] P&Z No. Owner _ 9- tr i (4,n WO Phone No. -04i c�, Contractor`�(T� Sk(AW r fY-%C4Y1A(�hf0jn� Signature of Owner _ ` r Date: (A I� 11 Signature of Design g Date: (a CHANGE: (Describe location n nature of charge. Include Four (4 ) copies of plan/profile of Change. ) ® 4-tY"V- 1AA- I �?git mv and-a ' — Ct Reason for Change: (Why is change required) o k. r nav ann w h APPROVAL . (As Required_ ) F S Dir. Of Planning Date: f �rj 1aJ. l Town Engineer Date: Dir. of Public Wor' s Date: Other: Date: STAFF COMMENTS: White - Town Engineer Yellow - Applicant Pink - Director of Planning Goldenrod - Engineering Department AF'F:i'7,:(-.)',. 335-VM .LJ . DRIPLINE 30" OAK 1,) E. ADJUST LANDSCAPE PLANTINGS N/F 50* V-NOTCH 4 LF OVERIFIL HAR.OLD L ODD 4-CE AND 30 LF AT 0.6% N8 39' 'PE fi"Mh" _4 3 AK -TO -CS 15.6' TO F CE OF CURB ROOTS 30" OAK ` -347-PT 2', OUTER NMI RADIUS D DRAI 0 Q YELLOW PAINT S IPIN ... 91.1 9 s PC (RELOCATE PER CHANG ER) cs 5 TOE TR -H /NIPAD -HE WF 5C6L)e, I 1/2"-BITUMINOUS CONCRETE, CLASS I WIDTH VARIES 1 1/2" SURFACE COURSE-BITUMINOUS CONCRETE, CLASS 2 GRADE PER 1-1/2" TOPOGRAPHIC PLAN i.f Y I M Cf 11111=1 p AWKUT M IXI (Un " _ ,__ _%N 12" PROCESSED 4" DEPTH AFTER COMPACTION GRAVEL BASE PLACED IN TWO COURSES BITUMINOUS CONCRETE PAVEMENT SECTION N.T.S. •`� TOWN OF SOUTH WINDSOR STAFF SITE CHANGE FOR SITE & SUBDIVISION GENERAL: CHANGE ORDER CONTACT PERSON Phone No. Address ' �r{tom (ZCtF , �1_ , r i Site Name ►'La�kC rt i 1 �L, 1 it,�"= !'� f-ii ; I: P&Z No. t Owner i1 0\ Phone No ;'` - ( 'tt_� Contractor ` Signature of Owner Z I/Z/-W Date: Signature of Design Engr. Date: CHANGE: (Describe location and nature of change. Include Four (4 ) copies of plan/profile of Change. ) 16'j ,'�'. , Reason for Change: (Why is change required) � .1. i11h1�� l�-� ( t- <t1Ly� ti� r tJC��I /� �1 �1L- i�i � stT ► )T APPROVALS: (As Required) Date:Dir. Of Planning ,��.-L- ��t.i.U;i.r�i Town Engineer :. e Date: Dir. of Public Works Date: Other: Date: STAFF COMMENTS: White - Town Engineer Yellow - Applicant Pink - Director of Planning Goldenrod - Engineering Department I I TOWN OF SOUTH WINDSOR STAFF SITE CHANGE FOR SITE & SUBDIVISION GENERAL: CHANGE ORDER CONTACT PERSON Phone No. Address c.ISI[ ,'C7�— Site Name i)lf- t'.clz�)ir- ti�h),��, =js,�ki� .'`�1� ►� P&Z No. Owner 'Ti-, k(,j;--C 2T 1-y jZi 1)r Phone No. r; _ C r Contractor E ►z.VtL � ��I- 15( � i Signature of Owner r Date:_ _ Signature of Design Engr. Date: CHANGE: (Describe location and nature of change. Include Four (4 ) copies of plan/profile of Change. ) j t o),<J, i', ,►��� 1 ' �i ,i �,�rr c � x, 1 �,,f ��' C f•�IJr ��t' 4�ai � }1T�� F.i✓!'�7wiT,t+ !`..r i t a 11C (7rfn E ITPj -7C 1 i K Reason for Change: (Why is change required) li AIM C, Z-tl:_? CXCC" t `' i4ilb 414,1 tT tJ P4 ( _ -1-t r�li fill"t i�)�: - i! !1f^ '�;�' uwtlL �'+l �i��t�tir)'b r}T�'•/"e�"i �j� � ;C iyt►C� APPROVALS: (As Requited) j / 1 ' Dir. Of Planning ? � t_�<_r _[i_ Date: Town Engineer Date: r • � j Dir. of Public Works Date: Other: Date: STAFF COMMENTS: _ IA I 1 A White - Town Engineer Yellow - Applicant I Pink - Director of Planning Goldenrod - Engineering Department WFJ I r RECEIVED TOWN OF SOUTH WINDSOR SEP 1 2006 STAFF SITE CHANGE FOR SITE & SUBDIVISION SOUTH WINDSORPLANNMDEPT. GENERAL: / L. CHANGE ORDER CONTACT PERSON—l )(4,'A't ,-�et\\�j • Phone No. Address 7 Site Name-Ac ; iI — P&Z No. j Owner e p Phone No. ,!�;n, b(oSq Contractor 00b T Signature of Owner Date: T2A3o ` per Signature of Design Engr. Date: CHANGE: (Describe location and nature of change. Include Four (4 ) copies of plan/profile of Change. ) A-�'0 to P-,F An Fc40A_L S+r� ti 4 hr -fpiola� Reason for Change: (Why is change required) APPROVALS: (As R , ired) S �Dir. Of Planning Date: O Town Engineer Date: Dir. of Public Works Date: Other: Date: STAFF COMMENTS: IV I White - Town Engineer Yellow - Applicant Pink - Director of Planning Goldenrod - Engineering Department L LUMINAIRE N • "4: ACCESSORIES 11 (SPECIFY AS SUFFIX Iili CAST ALUMINUM CONSTRUCTION. LUMINAIRE TO LUMINAIRE NO.) PROVIDED WITH ACRYLIC, POLYCARBONATE OR CLEAR LENS INTERNAL IL LOUVER —3e WIDE ANGLE LOUVER SYSTEM OPT 18"X401/2" a I I —2, PRISMATIC GLASS a QLt REFRACTOR PG-111 TYPE III PG-V V TYPE GLASS LCSC CHIMNEY GCC CLEAR OR 3/4 FROSTED GCF 3" LD.—�•I Imo— —�� TWIN REFLECTOR TR—V SYSTEM TYPE V -3'- STANDARD DIFFUSER: OPAL SMOOTH ACRYLIC 18-X40%" —2a— OPTIONS: CLEAR SMOOTH ACRYLIC................. ..CA CLEAR TEXTURED ACRYLIC.................. OPAL SMOOTH POLYCARBONATE.........WP CLEAR TEMPERED CONVEX GLASS LENS....CCG CLEAR TEMPERED GLASS LENS.............CG LCSC-CCG (+ REFLECTOR OPTIONS U TYPE ill(HORIZONTAL LAMP)............. 3" I.D.-� I-f- — TYPE III(VERTICAL LAMP)............. ..VR-I11 TYPE V-SO(HORIZONTAL LAMP)... . BALLASTS ARE H.P.F./C.W.A_ AUTOTRANSFORMER, TYPE V-SO(VERTICAL LAMP)....... R-V-SQ -20'STARTING TEMPERATURE HOUSE SIDE SHIELD 90....................HS90* HIGH FOR 135*................HS135* METAL PRESSURE MERCURY FLUOR. 1807................HS180' HALIDE SODIUM VAPOR INC. LAMPS CONSULT PHOTO CELL+VOLTAGE SOW. SOW. 50W. TO FACTORY tr 70W. 70W. 75W. 200W. (EXAMPLE: PC120V).........................PC+V 100W. 100w. 100w. e "175w• 150w• 175W O Uskdfcw SINGLE FUSE 277V. SF \ 250W.• 250W.• 250W.* UL wet (120V.r )..................... •250 W. AVAILABLE IN VERTICAL LAMP ONLY DOUBLE FUSE(208V.,240V.,480V.)..........DF M VMST AVENW 0.PALMDALF_CA UW1 aw sun valley FAX(166; RECEIVED The Lighting Tradition LIGHTING www.sunvaUeyfhting.com LC-1 SEP 1 2006 SOUTH WINDSOR PLANNING DEPT. 9T M19mmIff a x ROUND EXTRUDED FROM 6063 ALLOY ALUMINUM. HEAT N TREATED TO PRODUCE A T6 TEMPER. cf) to a a a a a 0 0 0 v Y 1030 1040 1050 1090 (STRAI ALUMINUM SHAFTS) SHAFT WALL TH KNESS .125 O .188 ENGINEERED TO PROJECT REQUIREMENTS POLES PROVIDED WITH TENON TOP POST TOP(PT): 2 7/a'O.D.X 3' MULTIPLE LUMINAIRES: 2 7/a'O.D.X 6" sun valle �AVE(661 Pei m F.CA 93551 FAX t6611 The Lighting Tradition LIGHTING ""°"r sunv3de Hng.Corn S-1 BASE O BASE ONE PIECE CORROSION RESISTANT, DURABLE CAST ALUMINUM CONSTRUCTION. MINIMUM .225 WALL THICKNESS. BASE CONSISTS OF A SMOOTH BOTTOM SECTION STEPPING UP TO 33 " HIGH HEXAGONAL SHAPED TOP SECTION . TOP SECTION IS FURNISHED WITH LARGE CONTOURED HAND HOLE . HAND HOLE COVER SUPPLIEDw WITH TAMPER RESISTANT `` HARDWARE. GROUNDING LUG PROVIDED INSIDE BASE OPPOSITE HAND HOLE. ANCHORAGE 40 tt NOM. A 3/4" CAST ALUMINUM ANCHOR RING IS WELDED I " ABOVE BOTTOM OF BASE TO ACCEPT (4) FULLY GALVANIZED ANCHOR BOLTS. EACH BOLT SUPPLIED WITH TWO NUTS AND TWO - WASHERS . ANCHORAGE IS FASTENED THROUGH HAND HOLE. .1911�1 FINISH NOM. ELECTROSTATICALLY APPLIED BAKED ON TEXTURED ACRYLIC ENAMEL. (SEE PAGE 5 FOR OPTIONAL FINISH AND COLOR SELECTION) sun va I l e 660 WEST AVENUE 0,3-2000 LE,CA , FAX(661)M2= The Lighting Tradition LIGHTING www•sunvaitayfighting.com E"S u.n't S BOND TRANSMITTAL DATE: 2- 1 Z3 )07 APPLICANT NAME ADDRESS 7- ti(.t�► -_ PROJECT LOCATION/ADDRESS LOT SUBDIVISION-Q A A In wvl K�" P&Z OR IWA/CC APPLICATION NUMBER c� AMOUNT OF BO _ed o0o, CHECK NUMBER oC V qj- DEPARTMENT Pi i SUBMITTED BY 21 L 3 ) -7 NAME DATE RECEIVED BY FINANCE �. ,,� �f - a `a 8 f 07 NAME ` DATE SUB ACCOUNT NUMBER SO O /a E \\townhall-dc\voll\Planniag Department\Messino\Fonns\Pmmtks-Bonds\BOND TRANSMITTAL 08-27-01.doc l Dr. Robert M. Grillo Dentistry for the Quality Conscious RECEIVED 1 South Windsor Town Hall SOUTH WINDSOR PLANNING DEPT. Marcia Bannon, Building Dept 1540 Ellington Road South Windsor, CT 06074 September 13, 2007 Dear Marcia, I request that you release all bond money being held for the building at 498 Buckland Road. Sincerely, / d Robert,11. Grillo, D.M.D. 498 Buckland Road,South Windsor,CT 06074 • 860-648-2848/Fax:860-648-2893 Member of American&Connecticut Dental Associations L.D.Pankey Alumni Association Member of the Academy of Cosmetic Dentistry C�Op 10 N Sf4 C O x F /-OZI�'L ioaC1/ W fi ti 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 l�OSOR'co TELEPHONE (860) 644-2511 September 27, 2007 Dr. Robert M. Grillo 498 Buckland Road South Windsor CT 06074 Dear Dr. Grillo: Re: Appl# 05-73P, Grillo Site This is to advise you that the Planning and Zoning Commission voted on 9/26/07 to release the IWA bond for$5,000 and the E & S bond for$5,000 for the above-referenced project. A check will be sent to you by the Town of South Windsor. If you have any further questions contact the Planning Department at 644-2511, ext. 252. Thank you. Very truly yours, PLANNING&ZONING COMMISSION 0 X Patrick Kennedy, Chairman PK/dma cc: Town Engineer � ��; BOND RELEASE TRANSMITTAL DATE: CONTRACTOR/DEVELOPER ©y NAME & ADDRESS PROJECT LOCATION/ADDRESS14q F VCk �c��d LOT P&Z' OR -IAA/CC APPLICATION NUMBER n Lj - SUB ACCOUNT NUMBER �j pp ORIGINAL BOND AMOUNT ta,,()C)O W D�0 ai Please release the bond indicated above as all of the required work has been completed. NAME DATE LO-7 7 /0 9/ W07 By CHECK. # ISSUED DATE S:\ENGINEER\FORMS\Office Forms\BOND RELEASE TRANSMITTAL.doc BOND RELEASE TRANSMITTAL DATE: CONTRACTOR/DEVELOPER 1 NAME & ADDRESS " A 1 PROJECT LOCATION/ADDRESS�91 8 LOT P&Z' OR .IWA/CC APPLICATION NUMBER OS-13? G"' I t o t SUB ACCOUNT NUMBER d L) i c�S ORIGINAL BOND AMOUNT `65 o Oct 'sJ 4 ,p D o 40 00 Please release the bond indicated above as all of the required work has been completed. NAIrlE DATE CHECK # ISSUED DATE S:\ENGINEER\FORMS\Office Forms\BOND RELEASE TRANSMITTAL.doc q�W N SF4 ® ` `F1 �i m � 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 r�Osox•co TELEPHONE (860) 644-2511 March 2, 2017 Dr. Robert M. Grillo,D.M.D. The Grillo Family Limited Partnership 498 Buckland Road South Windsor, CT 06074 Re: Appl. 05-73P, Grillo Family Limited Partnership Landscape Bond Release Dear Dr. Grillo: This is to advise you that the Planning and Zoning Commission voted on February 28, 2017 to release the following bond as follows: App1.05-73P, Grillo Dental Office $2,000 Landscape Bond reduced by$2,000 to leave a balance of-0- An updated W-9 form is required by the bank. Please find the enclosed Form W-9 (Rev.12-2014) to complete for Dr. Robert Grillo and return to us by person, mail, or email as soon as possible. A check then will be mailed to you from the Town of South Windsor. If you have any further questions, please contact the Planning Department at 860-644-2511, ext. 253. Thank you. Sincerely, Bart Pacekonis,Acting Chairman PLANNING&ZONING COMMISSION Enclosure BP/llz cc: Jeff Doolittle, Town Engineer Jeff Folger, Senior Environmental Planner BOLD RELEASE TRANSMITTAL DATE: March 1, 2017 APPLICANT NAME Dr. Robert Grillo ADDRESS 498 Buckland Road South Windsor, CT 06074 PROJECT LOCATION/ADDRESS LOT 498 Buckland Road P&Z OR IWA/CC APPLICATION NUMBER Appl.. 04-98P / 05-73P MUNIS APPLICATION NUMBER N/A SUB ACCOUNT NUMBER 500099 (a y o1cl ORIGINAL BOND AMOUNT $ 12,000 Landscape Bond, $10,000 released on 9/27/2006 CHECK NUMBER Please Release $ 2, 000 (remaining amount) Please release the bond indicated above as all of the required work has been completed. Lauren L Zaram6o Warch 1, 2017 NAME DATE 0 0 7 L1 0-1 ` I 7 BY CHECK # ISSUED DATE W:\Planning Admin\PZC\Bonds\2017 Bonds\05-73P GrilloDentalOffice Landscape BondReleaseTrans.doe SOVICIO N Sfq 0Wo� aps-au& m . � �� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 r�°soIt-co`'� TELEPHONE(860) 644-2511 APR lI March 2, 2017N� '°1'4NN/NG D�pl Dr. Robert M. Grillo, D.M.D. The Grillo Family Limited Partnership 498 Buckland Road South Windsor, CT 06074 Re: Appl. 05-73P, Grillo Family Limited Partnership Landscape Bond Release Dear Dr. Grillo: This is to advise you that the Planning and Zoning Commission voted on February 28, 2017 to release the following bond as follows: Appl.05-73P, Grillo Dental Office $2,000 Landsca ep Bond reduced by$2,000 to leave a balance of-0- An updated W-9 form is required by the bank. Please find the enclosed Form W-9 (Rev.12-2014) to complete for Dr. Robert Grillo and return to us by person, mail, or email as soon as possible. A check then will be mailed to you from the Town of South Windsor. If you have any further questions, please contact the Planning Department at 860-644-2511, ext. 253. Thank you. Sincerely, Bart Pacekonis,Acting Chairman PLANNING&ZONING COMMISSION Enclosure BP/llz cc: Jeff Doolittle, Town Engineer Jeff Folger, Senior Environmental Planner Form W-9 Request for Taxpayer Give Form to the (Rev.December2014) Identification Number and Certification requester.Do not - Department of the Treasury send to the IRS. Internal Revenue Service 1 Name as shown on your income tAx return).N e is required onAbLs line;do not leave this line blank. Y ` ni 2 Business name/disregarded entity name,if different from above m 0 3'Check appropriate box for federal tax classification;check only one of the following seven boxes: 4 Exemptions(codes apply only to Individual/sole proprietor or ElC Corporation ❑S Corporation ❑ Partnership ❑Trust/estate certain entities,not individuals;see instructions on page 3): ID c single-member LLC Exempt payee code(if any) ❑Limited liability company.Enter the tax classification(C=C corporation,S=S corporation,P=partnership)► L n Exemption from FATCA reporting p 2 Note.For a single-member LLC that is disregarded,do not check LLC;check the appropriate box in the line above for the tax classification of the single-member owner. code(if any) p� ❑Other(sea instructions)► (Appffwto accounts nvIntalnedoutaldeMeU.S.) v !E 5 Address number;str t,and apt.or suite no.) Requester's name and address(optional) d Q 6 Ci state,and ZIP cc a 7 List account number(s)here(optional) Taxpayer Identification Number(TIN) Enter your TIN in the appropriate box.The TIN provided must-match tha_---- BOND RELEASE TRANSMITTAL DATE:October 11,2018 APPLICANT NAME Dr. Robert Grillo ADDRESS 498 Buckland Road South Windsor, CT 06074 PROJECT LOCATION/ADDRESS LOT 498 Buckland Road P&Z OR IWA/CC APPLICATION NUMBER Appl. 05-73P MUNIS APPLICATION NUMBER N/A SUB ACCOUNT NUMBER 500125 ( ,3$6 l ORIGINAL BOND AMOUNT $ 25,000 reduced by $4,000 for a balance of $21,000 CHECK NUMBER not indicated Please Release $ 21,000 Please release the bond indicated above as all of the required work has been completed. Lauren L Zaramdo _ 10111118 NAME DATE 038 BY r _ 9"a CHECK # ISSUED DATE WAPlanning Admin\PZC\Bonds\2018 Bonds\05-73P Grillo BondReleaseTrans.doc