HomeMy WebLinkAboutSite Plan of Development (110) TOWN OF SOUTH WINDSOR
PLANNING&ZONING COMMISSION _
APPLICATION FORMre
''
Application No: FEB 17 2006
Official No:
Date: Z 0 sown vu dsor
ir Receipt o: INLAND WETLANDS AGENCY
CONSERVATION GUI'MviISSION
APPLICANT: Dynamic Materials Corporation, c/o Robert Sanborn
PROJECT NAME: AMK WELDING
ADDRESS: 283 Sullivan Avenue, South Windsor, CT 06074
OWNER OF RECORD ON LAND RECORDS: Dynamic Materials Corporation, c/o Robert Sanborn
ADDRESS: 283 Sullivan Avenue, South Windsor, CT 06074
COMPLETE LOCATION OF PROPERTY: 283 Sullivan Avenue
ASSESSOR'S MAP# 121 PARCEL#43 ZONE I
NAME, ADDRESS, TEL&FAX#OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED:
Karen Isherwood, P.E., Design Professionals, Inc., 165 South Satellite Road,South Windsor, CT 06074
Tel. (860)291-8755, Fax(860) 291-8757
THIS APPLICATION IS FOR: (Check all that apply):
T. Zone Change to (Public Hearing required and Certified letter to abutters required)
F_ Subdivisiort/Resubdivision F Open Space Subdivision(Public Hearing Required)
r Subdivision F- Minor F Major
F- Resubdivision(Public Hearing Required) F Minor r... Major
r Conditional Approval
1-- Special Exception to Article (Public Hearing, Certified letter to abutters required
{-w Site Plan ofDevelopment
r- General Plan of Development
Earth Filling(Sec. 15)and/or Earth Removal(Sec. 14-Public Hearing Required)
Regulation Amendment: r- zoning i Subdivision (Attach proposed amendment)
* Temporary and Conditional Permit for
* Major Home Occupation for
1— Other(explain in detail)
An Application Pending sign is required to be posted on the property for all applications ten (10) days
prior to being heard by the Commission.
Signature of Applicant Signature of Prope y Owner
i
I '
i
frd
1
i
Drainage Statement F E B 2 2 2006
AMK Welding
283 Sullivan Ave./CT. Rte. 194
S. Windsor, CT
AMK Welding is proposing a 13,600 S.F. addition onto their existing building on Patria
Road. As part of the proposed expansion, additional parking will be provided. The
development will disturb a small wetland area on the site. It is anticipated that a
minimum of 205 sf of wetlands will be created associated with the construction of the
shallow vegetated swale.
A portion of the developed areas of the site presently drain to 3 on site catch
basinsldrywells. The front two catch basin/drywell structures appear to be connected via
a pipe, and appear to be connected also to the existing storm drainage system within
Patria Road. A smaller portion provides surface runoff southerly to a wetland area on-
site.
The proposed development will result in an increase on the site of approximately 0.54
AC. of impervious coverage. Assuming the increase in drainage area, and using a 5-
minute time of concentration, the peak increase in runoff for a 10-year design storm
would be 1.1 CFS, northerly overland to the storm system within Sullivan Ave. A copy of
this report and site plans have been sent to the Connecticut Department of Transportation
for review. Assuming a 0.8 change in runoff coefficients from existing to developed for
the .35 AC of impervious area, and a 5-minute time of concentration, the peak increase in
runoff for a 10-year design storm on site would be 1.7 CFS.
This larger portion of storm runoff from the site which includes the roof leader(s) for the
building addition will be directed into a shallow vegetated swale and then discharge into
the existing ditch that currently runs southerly into the existing conservation easement.
The gentle slope of the swale will provide for extended contact with vegetation and
mitigate runoff from the site. The swale is immediately adjacent to a large wetland area,
and the runoff will gradually enter this larger wetland area. It is understood that surface
runoff from this site was included in the South Windsor Technologies Industrial
Subdivision Stormwater Management Plan and, therefore, detention is not warranted.
Standard erosion controls have been designed to be used during construction including
silt-fencing down-slope of disturbed areas, and around topsoil stockpiles. Due to the
relatively small-disturbed area, and the gradual grades on the site, erosion is not expected
to be a problem.
SCALE 1:24000
1 0 1 MILE
E_
iy sy 1000 0 1000 2000 3000 4000 5000 6000 7000 FEET
0 ti UNITED STATES 1 •5 0 1 KILOMETER
<o� DEPARTMENT OF THE INTERIOR CONTOUR INTERVAL 10 FEET
01 GEOLOGICAL SURVEY NATIONAL GEODETIC VERTICAL DATUM OF 1929
72°37'30'f THOMPSONV/LLE 8 MI.
` 41052'30!! 698000^•E. 3.2 M/. TO INTER TATE 91 10D 35' 701
1 lei I < o q•. �/ , =Z i �, •Ql,� � � -. L
46380OOm.N
fX
VIP
by $ p 11 o• •`"�
t � f �
ee
f
M 7j O
• :�, I - � o % 1, .,� v- - -
CONIR'• --
94 �00 GO
,`r '•..' u East Windso �; ri o
-Y10
,, >• ;
463684
" n:- ul�� 0 y ��i A� �•�Jhr I ♦, 09
Ede p``\• � �• •1
r/o 0 \ / 0 ,
•
4635
o
o nsrrvelear •pu �
• (Hartf G to Cen ,="�•_ -."` :r---"i- 406
++• •• Cf7stat O —
4634 ROAD CLASSIFICATION
50• Heavy-duty.... Light-duty. :.......
• Medium-duty - Unimproved dirt
to Cem• I �� Interstate Route C3 U.S. Route O State Rout.
o CONNECTICUT
QUADRANGLE LocnnoN MANCHESTER, CONN
��• 41072-G5-TF-024 '
o $ oxt f. ��o Revisions shown in purple and woodland compile bn cooperation
33 o with State of Connecticut agencies from aerial ph :11ographs taken 1982 and other sources. This information not field checked 7963
®o ••;.SOU Map edited 1984 PHOTOREVISED 1984
r �i� '• -
dSOP Purple tint indicates extension of urban areas DMA 6467 1 SE-SERIES V816
to
1650EX
RUNOFF CURVE NUMBER COMPUTATION Version 2.00
Project AMK WELDING User: 2MI Date: 02-10-06
County HARTFORD State: CT Checked: Date:
Subtitle: EXISTING RUNOFF CONDITIONS
-------------------------------------------------------------------------------
Hydrologic soil Group
COVER DESCRIPTION A B C D
Acres (CN)
-------------------------------------------------------------------------------
OTHER AGRICULTURAL LANDS
Woods fair - .73(60) - -
Total Area (by Hydrologic Soil Group) .73
-------------------------------------------------------------------------------
TOTAL DRAINAGE AREA: .73 Acres WEIGHTED CURVE NUMBER: 60*
-------------------------------------------------------------------------------
* - Generated for use by GRAPHIC method
TIME OF CONCENTRATION AND TRAVEL TIME Version 2.00
Project AMK WELDING User: 2MI Date: 02-10-06
County HARTFORD State: CT Checked: Date:
Subtitle: EXISTING RUNOFF CONDITIONS
-------------------------------------------------------------------------------
Flow Type 2 year Length slope surface n Area wp Velocit Time
rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec (hr)
-------------------------------------------------------------------------------
Sheet 3.2 45 .008 H 0.273
Sheet 95 .01 H 0.453
Time of Concentration = 0.73*
--- Sheet Flow surface Codes ---
A smooth surface F Grass, Dense --- shallow concentrated ---
B Fallow (No Res.) G Grass, Burmuda --- surface Codes ---
C Cultivated < 20 % Res. H woods, Light P Paved
D Cultivated > 20 % Res. I Woods, Dense U Unpaved
E Grass-Range, Short ] Range, Natural
* - Generated for use by GRAPHIC method
GRAPHICAL PEAK DISCHARGE METHOD Version 2.00
Project : AMK WELDING User: 2MI Date: 02-10-06
County HARTFORD State: CT Checked: Date:
--- --Subtitle EXISTING RUNOFF CONDITIONS
Data: Drainage Area .73 Acres
Runoff Curve Number . 60 *
Time of Concentration: 0.73 * Hours
Rainfall Type III
Page 1
1650EX
Pond and swamp Area .07 Acres 9.6 % of Drainage Area
l storm Number -----) 1 1 2 1 3 l 4 1 5 1
1----------------- 1------1------1------1------1------1
Frequency (yrs) i 2 i 10 i 25 i 50 i 100
24-Hr Rainfall (in) i 3.2 i 4. 7 i 5.5 i 6.2 i 6.9
Ia/P Ratio 1 0.42 1 0.28 i 0.24 1 0.22 1 0.19 1
Runoff (in) i 0.41 i 1.13 i 1.60 i 2.05 i 2.53
1 unit Peak Discharge 10.348 10.462 10.480 10.492 10.502 1
(cf s/acre/i n) + I I + + +
1 Pond and swamp Factorl 0.72 1 0.72 1 0.72 1 0.72 1 0.72 1
I 5.0% Ponds used I I I I I I
1----------------------1------1------1------1------1------�
1 Peak Discharge (cfs) l 0 1 0 l 0 1 1 1 1 l
* - Value(s) provided from TR-55 system routines
Page Z
1650DVN
RUNOFF CURVE NUMBER COMPUTATION Version 2.00
Project AMK WELDING User: KMI Date: 02-10-06
County HARTFORD State: CT Checked: Date:
Subtitle: DEVELOPED RUNOFF CONDITIONS (NORTH TO SULLIVAN AVE.)
-------------------------------------------------------------------------------
Hydrologic Soil Group
COVER DESCRIPTION A B C D
Acres (CN)
-------------------------------------------------------------------------------
FULLY DEVELOPED URBAN AREAS (Veg Estab.)
open space (Lawns,parks etc.)
Good condition; grass cover > 75% - .03(61) - -
Impervious Areas
Paved parking lots, roofs, driveways - .19(98) - -
Total Area (by Hydrologic Soil Group) .22
-------------------------------------------------------------------------------
TOTAL DRAINAGE AREA: .22 Acres WEIGHTED CURVE NUMBER: 93*
-------------------------------------------------------------------------------
* - Generated for use by GRAPHIC method
TIME OF CONCENTRATION AND TRAVEL TIME Version 2.00
Project AMK WELDING User: KMI Date: 02-10-06
County HARTFORD State: CT Checked: Date:
Subtitle: DEVELOPED RUNOFF CONDITIONS (NORTH TO SULLIVAN AVE.)
-------------------------------------------------------------------------------
Flow Type 2 year Length Slope Surface n Area wp Velocit Time
rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec (hr)
-------------------------------------------------------------------------------
sheet 3.2 50 .011 A 0.015
sheet 12 .016 F 0.048
Shallow Concent'd 75 .003 p 0.019
Time of Concentration = 0.08*
--- sheet Flow surface Codes ---
A smooth surface F Grass, Dense --- shallow Concentrated ---
B Fallow (No Res.) G Grass, Burmuda --- surface codes ---
C Cultivated < 20 % Res. H woods, Light P Paved
D Cultivated > 20 % Res. I woods, Dense U Unpaved
E Grass-Range, Short J Range, Natural
* - Generated for use by GRAPHIC method
- �- - GRAPHICAL PEAK DISCHARGE METHOD Version 2.00
Project : AMK WELDING User: KMI Date: 02-10-06
County : HARTFORD State: CT Checked: Date:
Subtitle: DEVELOPED RUNOFF CONDITIONS (NORTH TO SULLIVAN AVE.)
Page 1
1650DVN
Data: Drainage Area .22 * Acres
Runoff curve Number 93 *
Time of concentration: 0.08 * Hours
Rainfall Type III
Pond and swamp Area NONE
-----------------------------------------------------------
-----------------------------------------------------------
storm Number I 1 1 2 1 3 1 4 1 5
----------------------I------I------I------I------I------I
Frequency (yrs) I 2 I 10 I 25 I 50 I 100 .I
24-Hr Rainfall (in) i 3.2 i 4.7 i 5.5 i 6.2 i 6.9
Ia/P Ratio 10.05 10.03 10.03 10.02 10.02
used i 0.10 i 0.10 i 0.10 i 0.10 i 0.10
Runoff (in) ( 2.45 ( 3.90 14.69 15.38 j 6.07
unit Peak Discharge 11.072 11.072 11.072 11.072 11.072 1
(cfs/acre/in) I I I I I I
I Pond and swamp Factor) 1.00 f 1.00 1.00 11.00 1.00 )
I 0.0% Ponds used I I I I I I
----------------------I------I------I------I------I------I
Peak Discharge (cfs) I 1 1 1 1 1 1 1 1 1 1
* - Value(s) provided from TR-55 system routines
0
Page 2
1650DVS
RUNOFF CURVE NUMBER COMPUTATION Version 2.00
Project AMK WELDING User: KMI Date: 02-10-06
County HARTFORD State: CT Checked: Date:
Subtitle: DEVELOPED RUNOFF CONDITIONS (SOUTH TO WETLANDS ON SITE)
-------------------------------------------------------------------------------
Hydrologic Soil Group
COVER DESCRIPTION A B C D
Acres (CN)
-------------------------------------------------------------------------------
FULLY DEVELOPED URBAN AREAS (Veg Estab.)
open space (Lawns,parks etc.)
Good condition; grass cover > 75% - .17(61) - -
Impervious Areas
Paved parking lots, roofs, driveways - .40(98) - -
Total Area (by Hydrologic Soil Group) .57
-------------------------------------------------------------------------------
TOTAL DRAINAGE AREA: .57 Acres WEIGHTED CURVE NUMBER: 87*
-------------------------------------------------------------------------------
* - Generated for use by GRAPHIC method
TIME OF CONCENTRATION AND TRAVEL TIME Version 2.00
Project : AMK WELDING User: KMI Date: 02-10-06
County : HARTFORD State: CT Checked: Date:
subtitle: DEVELOPED RUNOFF CONDITIONS (SOUTH TO WETLANDS ON SITE)
-------------------------------------------------------------------------------
Flow Type 2ryenr Length (ft%ft) surface n Area Wp Velocit Time
a
code (sq/ft) (ft) (ft/sec (hr)
-------------------------------------------------------------------------------
sheet 3.2 70 .01 A 0.020
sheet 25 .026 F 0.071
Open Channel 125 1.71 0.020
Time of concentration = 0.11*
--- sheet Flow surface codes ---
A smooth surface F Grass, Dense --- shallow Concentrated ---
B Fallow (No Res.) G Grass, Burmuda --- surface Codes ---
C Cultivated < 20 % Res. H woods, Light P Paved
D Cultivated > 20 % Res. I woods, Dense u unpaved
E Grass-Range, Short 7 Range, Natural
* - Generated for use by GRAPHIC method
-0 - - GRAPHICAL PEAK DISCHARGE METHOD Version 2.00
Project : AMK WELDING User: KMI Date: 02-10-06
County : HARTFORD State: CT checked: Date:
subtitle: DEVELOPED RUNOFF CONDITIONS (SOUTH TO WETLANDS ON SITE)
Page 1
1650DVS
Data: Drainage Area .57 Acres
Runoff Curve Number 87 *
Time of concentration: 0.11 * Hours
Rainfall Type III
Pond and Swamp Area NONE
storm Number I 1 1 2 1 3 1 4 1 5 1
----------------------I------I------I------I------I------I
I Frequency (yrs) I 2 1 10 I 25 I 50 10-0
I I I I I I I
24-Hr Rainfall (in) I 3.2 I 4.7 I 5.5 I 6.2 I 6.9
Ia/P Ratio + 0.09 + 0.06 + 0.05 + 0.05 0.04 j
used i 0.10 i 0.10 i 0.10 i 0.10 i 0.10
Runoff (in) ) 1.91 ( 3.29 ) 4.04 J 4.71 15.38
unit Peak Discharge 11.016 11.016 11.016 11.016 11.016 1
(cfs/acre/in)
I Pond and swamp Factor) 1.00 ) 1.00 ) 1.00 ) 1.00 ) 1.00 )
I 0.0% Ponds used I I I I I I
----------------------I------)------I------I------I------I
Peak Discharge (cfs) I 1 1 2 ( 2 ( 3 1 3 1
* - Value(s) provided from TR-55 system routines
Page 2
e
X808- - X8c".08--
2. .4 2 �
p3 82.66 � � �S " 82.66 22.. �
r► rr
2.6 k Mv.(24-E)-7a7s / a 2.6 INK(24-E�7a79
�r 2. � (,0 2 � _
83 - - 6 �T"� '.- 6
82.47 \ �� 82.47
\ \
J _ X82. X82.
SERVICE `` -i'' X82. \ . SERVICE ` ` ' FQ CpNo- ' X82. \
' N qC m S H p
EXISTING CONDITIONS
i r i
0.' AC °4 , s/a' IRON /6EV`ELbeED CONDITIONS-SOUTH K'N 0 S t r 3/4' IR
r WOODED: Ct,N=0.10 (Rotional)
/ All / 6N=60 (TR-55/B-so4ls) °'S J J // o-11.51 AC t J 1)J1 V WETLANDS J ,'`` t_ , 82.3 / / r J I /�-` 5
J 2.3
�-35 46 IMPEPMOUS (CN=.90 Ra ' r / /
®� I
I / �/ r • 82.7 r 1 11 CN=98 -55) 82.7
AMI J r 0.16 At + N (CN=.30 Ratio oI/
CN=61 TR
X81. X81.74 / / �` ��1 / // X81. X81.74
X81.65 X81.65 r /
X81A8 .9 cb � J 1J1
� �/ J / .` 80.01.87 k JI
.16 B
�t
J c / /J t 80.0-0
J/ �"► � � -- -- _; `x•8'2.2 J /r � � -_ . .fig .
��
X�6�J >ZB�.C�o
O /44
E1.82 J / �X�81.23 �,81.82 / / �?681. 3
„�1t82.02 \ /1j,ft82.0
81.65 X81.74 81.65 X81.74
DEVMCVM COWBUT00M.
t.UMM ow*r om TIDIED.EUS101C UU M REVISIONS Fox a60 29 8757 Plapa� FBP. SHEET
���s�NM B�«� GRAPHIC SCALE DRAM
�e �a
AVAKD INF�OD%991.ALL E)O TO MMTR 5 40 0 ZD 10 ����� � tI1JUVI^'�WV4,1� 1S
Z ALL U K ie"� "�° "°` rofesslonals, Inc. 1
z ALL U1tir1E5 ARE ro sE SUY�D M 7NE FEtD
BY A UCOISED LAID SLgr&"OR POW W
S PLMUKI KK rH,4D,MIJZS FT BENTS,NE 1 inch = ao dvg onakworf•pUnn.cf . surveyors =3 MLLIVM AVL �►N AM �(,.Af1:ISM OF .
aF / rat NO. DATE DESCRFMAI BY llandsuP� .rtl=wi or. • nne swm WNDSOR
165 South SateN9e Road South tfu�dsor. Connecticut 06074 COIM1BOs0Y1 PFUMOr 6>BS 1 Atl@ t/TO/Ai
Recyclables are ected at curbside and disposed of more fully described in Section
VIII of these specifica ' s. Recyclables include an recyclables acceptable for
disposal at the Hartford C regional recycling cility and any added.to the list of
recyclable materials as contain ' Chapter 446 of the Connecticut General Statutes
and the Regulations of the State of Co ectic epartment of Environmental
Protection in accordance therewith.
Included in this section of the work is all bag leaf c ction involving two (2) Saturdays, .
three(3)packer trucks with sufficie manpower to collect r ' ential bagged leaves at the
curb, and transporting leaves to Town Leaf Composting Site on ess Road.
� on ac or s a co ec yc a es om we m_____
.-es iafions withi Town:
Condominium No. of Units
Chapel Hill 162
Oil Burr Meadow 138
Cinnamon Springs 102
Bryrewood 188
Westage 142
Parkview South 106
Strawbridge 258
Pleasant Hills 123
Plum Ridge 90
Brookside/Ivy Lane 71
Pleasant Valley 128
Mill River 1.90
_._.._._ 1,698
a. Recycldbl CCoIlected—those condominium recyclables to be co cted at the curb shall s
be the same as�i se collected from single-family residential
4. Monthly collection of res' ential and condominium bu 1Cy/non-processible wastes, and
disposal of said wastes at the landfill:
■
III DEFINTION OF TERMS
g■
a. Town—shall mean the Town age nd/or the Director of Public WorWand their
designated agents.
b. Contractor--shall me that firm as indicated the Agreement and shall include its
agents and employeo
■ C. Refuse=shall riiean any item or items that are part of t municipal solid waste
stream, which are not recyclable as hereinafter defined, th accumulate from the
preparation of food. Refuse can be placed in a metal,non ' tle, or plastic container
r having gross weight of less than seventy(70)pounds.
S-2 \.
Barbara Messino- Re: 06 08P AMK WeldingPa e 1
From: Karl Reichle
To: Messino, Barbara
Date: 2/27/06 3:13PM
Subject: Re: 06-08P AMK Welding
No comments at this time
Thank You.
Karl
>>> Barbara Messino 02/27/06 11:59AM >>>
Please respond with comments or no comment.
As always,
Barbara Messino
Planning
Barbara Messino- Re: 06-08P AMK Welding
From: Bob Deptula
To: Messino, Barbara
Date: 2/28/06 10:22AM
Subject: Re: 06-08P AMK Welding
no comments
>>> Barbara Messino 02/27/06 11:59AM >>>
Please respond with comments or no comment.
As always,
Barbara Messino
Planning
PLANNING DEPARMENT
IN-HOUSE REFERRAL FORM
DATE: 2/27/06
TO: Matt Galligan, Fred Shaw, Michael Gantick, Rich Bond, Bill Lanning, Jeff Doolittle
Kris Lindstrom, Ray Favreau, Karl Reichle, Mel Stead, Chris Dougan, Bob Deptula
Dennis Sheridan
FROM: Marcia A. Banach, AICP, Director of Planning
The Planning&Engineering Departments have received plans for the following projects:
06-08P, AMK Welding Site Plan Modification
Location: 283 Sullivan Ave.
® Site Plan ❑ Subdivision No. Acres 5+ac Zone I
® Industrial ® Commercial ❑ Residential No. Lots/Units
Water: ® Public ❑ Private Well Sewerage: ® Public ❑ Septic System
Project Description: 13,600 sf addition
Future Town-owned property involved? ❑Yes ®No
❑ new street(s) ❑ new detention area
❑ new open space/recreation area ❑ active ❑passive
Planning Department notes:
Please comment by 3/17/06 and return to the Planning Department.
� rs� 21 ,7�0 En i/9TY� J
g
DESIGN PROFESSIONALS, INC.
civil engineers .planners . surveyors . gis
March 15,2006
Town of South Windsor
1540 Sullivan Ave.
South Windsor,Ct 06074
Attn:Ms.Marcia Banach,Director of Planning,Town of South Windsor
Re: Appl#06-08P;AMK Welding Addition Site Plan
We are submitting revised sets of plans in response to town staff review comments. Specifically our responses to like
numbered comments from Mr.Jeffrey Doolittle's memo dated March 8,2006,are as follows:
1. Monitoring wells have been identified and noted to be removed.
2. A 10'grading easement along the Patria Road frontage has been provided and identified.
3. A catch basin with trap hood structure have been added to the plans/details.
4. The roof leader has been more clearly identified.
5. We anticipate no negative impacts due to the increase in peak runoff associated with the proposed
building addition and pavement to either the state's storm system in Sullivan Avenue which is a relatively
new system of pipes,24"in diameter,flowing westerly within Sullivan Avenue,or to the neighboring
property to the south via the extension of the existing drainage channel. The state has received our plans
for review and any additional request for information will be automatically forwarded to your department
for review as well.The drainage channel flowing south through the abutter,will continue to flow through
a protective conservation easement,then through to the site of the future South Windsor Technologies
Center which has a designed pipe system to receive this flow.
6. A storm water maintenance plan has been added to the plans.
7. Additional pavement has been provided as requested by the Fire Marshal.
8. An access easement in favor of the Town of South Windsor has been added to the plans.
9. We understand WPCA review is required for this application.
Plans previously submitted with a 3/9/06 revision date addressed comments offered by Jeffrey Folger,dated March 7"',
as follows:
1. (3/16/06 revision)The Fire Marshal's request for vehicle access was addressed subsequently with
additional pavement.
2. The grass swale will be receiving primarily clean runoff associated with sheet flow from grass areas from
the rear and side of the building and only a very small area of pavement,limited to the occasional use of
the large loading area to be used for receiving oversized shipments to the proposed manufacturing area.
The proposed swale as depicted flowing at a slope of 0.5%should provide a residence time of
approximately 28 minutes. (3/16/06 revision)Water quality for northerly flow to the piped system within
Sullivan Avenue will be achieved by providing a catch basin structure with a 2'sump and trap hood.
3. This site was originally a part of the much larger South Windsor Technologies Industrial Park
subdivision. An additional 1.3f acres of mitigation creation was approved by the IWACC and the Army
Corps of Engineers as banking to allow for what was considered unavoidable wetlands disturbance
associated with the future development of the individual sites. (3-16-06 revision)We are proposing 0.10
ac.(1:1)of wetlands creation as mitigation to be located on-site as an extension of previous mitigation
(2:1).
4. The location of the approved conservation easement over this lot was based on protecting the majority of
wetlands on site,however allowing for development to the area up front.Many years have passed since
this project was originally flagged,and upon John Ianni reflagging the site,we found the new wetland line
to be more prohibitive.Our intention is to develop the site as intended while avoiding the conservation
easement.
5. Information regarding the soils on this site are essentially the same as originally reported in the
"Wetlands Report Submitted to the South Windsor Inland Wetlands Agency/Conservation Commission
South Windsor Technologies Center",dated December 17,2001,submitted by Connecticut Ecosystems
LLC. The specific area of this application is portrayed as the wetland swamp located to the north of
Wetland Area 1.Excerpts from this report have been submitted as requested.
6. I refer once again to the original report submitted for the industrial subdivision to identify the functions
and values associated with the wetlands. I believe that the five principal functions listed for Wetland 1,
including ground water recharge,floodflow alteration,sediment/toxicant retention,nutrient removal and
wildlife habitat will not be impacted beyond what was originally intended with the approval. The
application is limited in scope to a building addition and the wetlands will continue to receive overland
flow.
Please review the enclosedkanall th any questions or comments,or if you need additional information.
Sincerely, !
Karen Isherw ,P.E.
165 South Satellite Road, South Windsor, Connecticut 06074
Tel: (860) 291-8755 .Fax: (860)291-8757
Appl #06-08, AMK Welding Site Plan
3-28-06
Planning Department Report
l. or ap
Maximum impervious coverage allowed is 65%, 40.8%.proposed. Proposed
building height is 19.7 feet; 40 feet allowed. ,
s• . Frontage is 411 feet; minimum allowed is 100 feet.
Front yard setback is 50 feet, 35 feet allowed.
_2• . There are no new
curb cuts proposed; the existing driveways on Sullivan Avenue and Patria Road
will service the new addition.
1
3. T par ' g re ent fo offi and mane cturin se� .th s`pxd 'erty'
i 61 a es he p ant is iding 63 sp�ncludi �3 Mica '
ces) ,
4. The new addition will be approximately 3 feet higher than the existing building.
The applicant is proposing a new color for the addition and portico and
indicated that they will re-side the existing building around the corner and
rebuild the existing portico to match the new entrance.
5. The ADRC reviewed the plans on 3/16/06 and were satisfied with the plans as
presented. It is my understanding that HVAC equipment on the side of the
existing building is to be removed and roof-mounted, but will not be visible
from Sullivan Avenue.
6. The plans show that new lighting to be added consists of wall paks that will be
added to the building.
7. There is no new signage proposed for the site.
8. There are regulated wetlands on the property. The applicant is pending with the
IWA/CC and a public hearing is scheduled for April 5 (the previous IWA/CC
hearing had to be postponed due to lack of quorum). This Commission will not
be able to act on this application until after the April 5 IWA/CC meeting.
9• y serve e prope y.
ei�t�apprav�-i �-fir-��e we eeti�rrprop�s�l.
i
r
10. he ire Marshal ha eview d this r posal has quested the exten'�ion �
Vtlhlti�idin
a ea o th ea e ly s' e o the uil 'ng o protv�'.de acc .s's to4he rear
. he a scan s sho n he dri ay exfensionn the�plan.
11.If this application is approved, there are no additional modifications requested.
2
10*1 Sf4
co
a O-Pso� ?d
6 �
1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074
f°soa•co`'� TELEPHONE (860) 644-2511
April 13,2006
AMK Welding
283 Sullivan Avenue
South Windsor, CT 06074
Dear Mr. Sanborn:
Re: Preconstruction Meeting—Appl#06-08P,AMK Welding, site plan of development for 13,600 sq
ft building addition on 4+/- acres at 283 Sullivan Avenue, I zone
April 12,2006
IN ATTENDANCE
Michele Lipe Towri of South Windsor 644-2511 extension.252
Jeff Doolittle Town of South Windsor extension 245
Jeff Folger Town of South Windsor extension 229
Harold A. Wiegard AMK Welding 283 Sullivan Avenue
Peter P. Bauer Pellitier Builders 18 Hallik Lane, Somers, CT 06071
Karen Isherwood Design Professionals, Inc. 165 So. Satellite Road
The following is a brief summary of points discussed during the meeting:
Erosion and Sedimentation Control
1. All erosion and sedimentation control measures are to be in place prior to earth moving operations in
each area and maintained/cleaned out during construction. Call Jeffrey Folger,Environmental Planner
for inspection when measures are in place,prior to commencement of site work or if any
problems/concerns arise during construction.
2. All topsoil stockpile areas to be protected(ringed with haybales or equal).
3. Duringconstruction of the road/driveway a crushed stone tracking ad is to be installed and
Y gp
maintained to minimize tracking of dirt/gravel on to Patria Road. Calcium chloride or water is to be
used for dust control as required.
Public Works
1. Three complete sets of approved/revised plans to be provided to Town prior to start of construction.
They will be stamped by the Planning Department along with plans developer needs. Only approved
plans are to be used on the job site.
2. The Engineering Department is to be notified forty-eight(48)hours prior to the start of major
construction work with inspections and testing per Developers Checklist for the following:
a. After site is staked out
b. All drainage work
C. Preparation of subgrade, compaction tests as per Developer's checklist
d. Preparation of subbase, six(6)inch lifts
e. Placement of bituminous concrete,two (2)inch layers minimum
3. Certification of gravel used as subbase and processed stone for base will be required from an approved
testing company.
4. Certification of all products used-- storm pipe, structures,pavement, etc., shall be presented to the
Town Engineer prior to installation.
5. No subgrade formation/base in frozen ground/snow. Same for pipe/structure installation.
6. As built plans are to include horizontal and vertical location of all underdrains, footing drains, and
sanitary sewers and house service laterals located as per revised as-built checklist.
7. All pipe and structures to be backfilled with free draining material, compacted in maximum one foot
lifts with approved compaction equipment or approved equal if deep trench is encountered. Any pipe
or structure work requires inspection prior to backfilling.
8. Any problems and/or questions regarding construction of this project will be directed to Eric Kemp,
Pellitier Builders in the field at phone#742-5317 extension 111.
9. All filling to be done in accordance with Department of Transportation specifications. To be
compacted in maximum lifts and tested as necessary.
10.Job meetings will be held as needed, and can be called by the developer or Town.
11. Seventy-two (72)hours' notice needed for certificate of occupancy inspection.
12.Any proposed changes are to be presented to the Engineering or Planning Department prior to
implementation on change order form in quadruplicate with 4 copies of the drawing. Town will
attempt to turn around within 24 hours.
13.Normal hours of operation 7:00 a.m.—5:00 p.m.,no work on Sunday.
14.DOT permit needed for all work within state road. Copy must be given to the Engineering
Department.
15.No paving after October 15 or before April 15 without written approval from Director of Public
Works.
16.A Drain layers permit is needed prior to installation of the sewer lateral.
17. The conservation easement must be monumented prior to C.O.
18. Sanitary lateral locations should be tied down to existing structures and shown on the progress as-
builts.
19. During construction of individual sanitary sewer laterals,the contractor shall prepare an as-built
sketch on standard form provided by the Engineering Department. This form should be submitted to
the design engineer/surveyor for their use in preparing the as-built plan. The Engineering Department
suggests that the contractor also show locations of foundation drains and water laterals on this form.
20. During construction for individual lots, lot to lot drainage must be addressed with drainage swales as
necessary. For lawn establishment,town staff will be requiring erosion control measures to be
installed prior to the issue of the certificate of occupancy to ensure soil stabilization. A detailed
erosion control plan must be implemented and depicted on the plot plan for review prior to the
issuance of the building permit—most particularly on lots with extensive grading.
Planning_Department
1. Landscaping is to be installed in accordance with the approved landscaping plan. If there are changes
required, contact the Planning Dept. Additional landscaping installed on one part of a site will not
preclude planting all of the remaining items shown on the landscaping plan.
2. Mylar must be signed and filed prior to issuance of building permits.
3. A sign permit is required for all building and free standing signage
SNET/NU
1. Contact utilities for coordination of utilities connection.
Fire Marshal
1. Blasting(if required)to be coordinated with the Fire Marshal.
Police Services
1. Emergency phone numbers for the duration of the construction must be provided to Police Services on
a company letterhead. If the developer occupies or owns the building after construction emergency
numbers must be provided to Police Services.
2. All buildings located on property that abuts a public highway must be numbered and visible from the
street. All numbering shall comply with Town Ordinance 6-800 through 6-802.
3. Barns, garages, and outbuildings,which are located on the same premises as a numbered structure, are
excluded.
4. Erect temporary sign on the site during construction identifying the project.
5. If an alarm is to be installed contact Police Services.
Building Department
1. Plan review with Building Official/Fire Marshal required prior to application for building permit.
Coordinate with Chief Building Official.
Sincerely,
Michele R. Lipe, AICP
Assistant Director of Planning
MRL/
cc: Je ey Doolittle, Town Engineer
Bernie Drabek, Engineering Inspector
Karl Reichle,Public Works
Mel Stead,Public Works
Christopher Dougan, Chief Building Official
Fred Shaw, Superintendent of Pollution Control
Walter Summers,Fire Marshal
CL&P
SBC/SNET
App
10*N Sf4
CO . x F �.
O-P so� ?d&U&Ot
9 �
1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074
f�OSOR.co TELEPHONE (860) 644-2511
CERTIFIED MAIL 7004 2510 0003 9803 1038 April 19,2006
Robert Sanborn
AMK Welding
283 Sullivan Avenue
South Windsor, CT 06074
Dear Mr. Sanborn:
Re: Appl.#06-0.8P,AMK Welding, site plan'of development for 13,600 sq ft building addition on 4+/- acres at
283 Sullivan Avenue, I zone
We are pleased to advise you that the Planning&Zoning Commission voted on April 11,2006 to approve with
modifications the above referenced application for a Site Plan of Development.
This approval is for the construction of a 13,600 square foot building addition on property located at 283
Sullivan Avenue, I zone ass own on pans prepar y esign Protessionals,Job No. 1650 amide -Fe ruary I-0;
2006, as revised,. This approval is subject to the following modifications: .
1. Prior to commencement of any site work, a meeting must be held with Town Staff.
.2. No building permit will be issued until the final mylars have been filed in the Town Clerk's office.
3. This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation
Commission,including a bond in the amount of$3,000 for erosion&sediment control, and a bond in the
amount of$5,000 for wetlands mitigation.
4. A landscape bond in the amount of$2,000 is required.and must be submitted prior to filing of mylars.
5. All bonds must be in one of the forms described in the enclosed Bond Policy.
6. . An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 8.1.11 of the Zoning
Regulations.
7. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of
South Windsor.
8._ This approval does not constitute approval of the sanitary sewer,which can only be granted by the Water
Pollution Control Authority.
9. The building street number must be included on the final plan.
10. Pavement markings must be maintained in good condition throughout the site drives and parking areas.
11. All-free standing signs and/or building signs require the issuance of a sign permit before they are erected.
Black and white transparent mylars of Sheet#2 with the above modifications,together with three blueprint
copies of the entire set of plans (including architectural elevations and landscaping plans)must be submitted to
this Commission within 30 days to be stamped and signed. The letters of approval of this Commission as well
as the Inland Wetlands Agency/Conservation Commission must be reproduced on the mylars.
After the mylars have been signed by the Commission, they will be returned to you for filing in the Office of the
Town Clerk. After filing these plans, a copy of the receipt must be submitted to the Planning Department.
Sincerely,
atrick Kennedy, Chai an
Planning and Zoning Commission
PK/bmm
cc: Town Engineer
Chief Building Official
Assessor
Superintendent of Pollution Control
---
Design Professionals
t�W N Sf4 ®
To� O-P S-0� V&U,419�t
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
April 12,200 SOR•co` AREA CODE 860/644-2511
Karen Isherwood Project Engineer
J bn
Design Professionals,Inc.
165 South Satellite Road
South Windsor,CT 06074
Re: AMK Welding
283 Sullivan Avenue
South Windsor,CT
Dear Ms.Isherwood:
The South Windsor Water Pollution Control Authority, at its regular meeting of April 4, 2006, gave approval
for the connection to the Town's sewerage system for commercial property located at 283 Sullivan Avenue;as
more specifically shown on plans entitled"AMK Welding, Division of Dynamic Materials Corporation., Site
Plan, 283 Sullivan Avenue, South Windsor, Connecticut; Prepared by Design Professionals, Inc., South
Windsor, CT; Job No.: 1650,.Drawing No.: Jobs/1650/1650-2.DWG, Sheet No.:. 2/4, Dated 2-10-06 with
Revision Dates: 3-9-06, 3-16-06; also Drawing No.: Jobs/1650/1650-3.DWG , Sheet No.: 3/4, Dated 1-31-06
with Revision Date: 3-9-06";and subject to the following conditions:
1. An easement must be submitted and approved by the Town Attorney permitting the Town access to the
property for manhole monitoring purposes.
2. This connection charge will be the minimum commercial charge in effect at the time of connection.
3. Technical approval of the Town Engineering Department.
4. Final Authority approval and acceptance of the sanitary sewerage connection will be given once the
sewer line has been installed and inspected by the Town staff,and based upon the written verification of
the Town staff that said sanitary sewer line was installed in substantial conformance with the design
plans approved by the Authority, and'meeting all Town regulations and appropriate technical
specifications relating to sanitary sewer construction.
This approval letter must be superimposed on the final approval plans.
Very truly yours,
Joseph J. Carino,Chairman
Water Pollution Control Authority
JC:ead
Cc: Michael J.Gantick,Director of Public Works
Jeff Doolittle,Town Engineer
Marcia Banach,Director of Planning
Chris Dougan,Chief Building Inspector
Robert C. Sanborn,Applicant
06
BOND TRANSMITTAL
DATE• y/19 Id
APPLICANT NAME k i
ADDRESS cl
)s 3 sv I l( a 1l Art
J�'An w i h�Ste✓
PROJECT LOCATION/ADDRESS SU vn LOT
SUBDIVISION
P&Z OR IWA/CC APPLICATION NUMBER_ (�(„_n (�
a DO lamolsu,�
AMOUNT OF BOND -#) a ao s
3,00u.
CHECK NUMBER `l 15 1
DEPARTMENT r J G-vj n( o
SUBMITTED BY E t � ' �
DATE
RECEIVED BY FINANCE 4/,Lo /06
NAME
DATE
SUB ACCOUNT NUMBER 606 lo-7
\\tovm lldc\vo11\Plannmg Department\Mewmo\For=\Permds-Bonds\BOND TRANSMITTAL 08-27-01.doc
TOWN OF SOUTH WINDSOR
STAFF SITE CHANGE
FOR SITE & SUBDIVISION
-
GENERAL:
CHANGE ORDER CONTACT PERSON k1V aJ /S PJEI • D Phone No.ZU-13755
Address 0)y 2S Sai ? V&jxjf-/-Ye,
Site Name 6At- waJ) ,A)6--�r 2-g3 jULL)V&J A P&Z No. a,,-06P
Owner J)y*A•m IC ffi(�7'F_�ahz ( a P (DI V"OF) Phone No.2-9 q Zd-
Contractor
Signature of Owner Date:
Signature of Design End• ^ ' J Date: 1�Q
U
CHANGE: (Describe location and nature of change. Include
Four (4 ) copies of plan/profile of Change. )
L,m,ngjP (Itge t(jj6 pft.Krn/(r- ZMD CLf t S At sus
-ELC-VA i r vN5 OF P"ar►C:A)r
Reason for Change: (Why is change required)
f IN 121eo r tE- A L Ili- f (_ttff 7 HAA) •Fi N ISA F'/_ QP
APPROVALS: (As Require )
Dir. Of Planning . Date: llzI06
Town Engineer r ,, �. rcz ' J Date:
Dir.. of Public Wc/rks Date:
Other:
Date:
STAFF COMMENTS:
White - Town Engineer Yellow -'Applicant
Pink - Director of Planning Goldenrod - Engineering Department
�+ n
TOWN OF SOUTH WINDSOR
STAFF SITE CHANGE
FOR SITE & SUBDIVISION
CHANGE ORDER CONTACT PERSON —)� 1 r J'"J" ' Phone No.
Address �' ~ >v ? v 11yA J---
Site Name �� `,r P&Z No 0(r'C��f
Owner 1`, ✓� r.-i, t M tit i ' ! i. V j? Phone No.
Contractor
Signature of Owner Date:
Signature of Design Engr. Date:
CHANGE: (Describe location and nature of change. Include
Four (4) copies of plan/profile of Change. )
Reason for Change: (Why is change required)
APPROVALS: (As Required)
Dir.. Of Planning (1 .. Date:
Town Engineer Date:
Dir. of Public Works Date:
Other: Date:
STAFF COMMENTS:
White - Town Engineer Yellow - Applicant
Pink - Director of Planning
EX
SNX-
�01$ EXIST. CB
INV. 6278.94
SiORkiiYO. ,,,�� \ INV. 79
1 X8365 0% . j1r
�' l
W
T\ \
44' 4 02 EXIST. CB �� \
ARGON GAS 0 C �� END T• TF=82.74
TANK 0LU �
M INV.(12"N)=79.72
N 0 OF 3.t X83,19 X82.9
HANG l>.00 /, c era M
ame
EXISTING ,/�JU /�7�
BUILDING ��C;!�n�`�2 �' X83.35 / 3/4" IRC
FF 84.04
F k/SnN p00R 3�� W IT. /T
F e4 09 BU!(0/NG a $ '
App/nON /Xg31
pFQ 00 O�RyFAO 2.0
� 0OOR J
83.0 �/c rno
p o /
g29 Fp Doop BIT.PANE
1>
Q00, �^O 82.0� /
(�2 81.6
o/y
ONSERVATION EASEMENT AREA %
IN VAVOR OF THE TOWN OF
N SOUTH WINDSOR
AREA = 1.17f AC.
i
i
y
/ N/F
" RAYMOND L do
CLARA M. HAWKES
ham'
N/F 9s.
AVID BURNETT