Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
05-17P Earth Filling (2)
TOWN OF SOUTH WINDSOR PLANNING&ZONING COMMISSION APPLICATION FORM Application No: Official Receipt Date: s WV Receipt No: APPLICANT: M/S Town Lin- AssoriatPs, Tnr PROJECT NAME: Evergreen Run ADDRESS: C/O Atty. Tea Oren . P Ruhi nnw OWNER OF RECORD ON LAND RECORDS: M.1-S Tnr m Tina Associa-t:Qs; ADDRESS: CIO Ai-i- Tanrenre P Rubinow., 555-Main St-, MsnC`hester-,-GT- 06049 COMPLETE LOCATION OF PROPERTY: 90 Burkl and Rnad ASSESSOR'S MAP# 27PARCEL# 11 ZONE Gateway Development- NAME, ADDRESS,TEL 8&FAX# OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED: Alan F. Lamson, FLB Archi er rre & Planninc, Tnr 19 Silver Lane, East Hartford, CT 06118 THIS APPLICATION IS FOR: (Check all that apply): ❑ Zone Change to (Public Hearing required and Certified letter to abutters required) ❑ Subdivision/Resubdivision ❑ Open Space Subdivision (Public Hearing Required) ❑ Subdivision ❑ Minor ❑ Major ❑ Resubdivision(Public Hearing Required) ❑ Minor❑ Major ❑ Conditional Approval ❑ Special Exception to Article (Public Hearing, Certified letter to abutters required) ❑ Site Plan of Development ❑ General Plan of Development M(Earth Filling(Sec. 15) and/or Earth Removal(Sec. 14- Public Hearing required) ❑ Regulation Amendment: ❑ Zoning ❑ Subdivision (Attach proposed amendment) ❑ Temporary and Conditional Permit for ❑ Major Home Occupation for ❑ Other (explain in detail) An Applibation Pending sign is required to be posted on the properl. p licati ons prior to being heard by the Commissi JJ1A ,/ h S' a f AyK7 SiOVIC rrc4rop)k M/S Town Line Associates, LLC c/o Atty. Laurence Rubinow 565 Main Street Manchester, CT 06040 Fla February 22, 2005 Planning and Zoning Commission Town of South Windsor 1540 Ellington Road South Windsor, CT 06074 Re: Parcel L M/S Town Line Associates LLC Dear Commission Members: This letter grants permission for Alan Lamson, acting as agent for M/S Town Line Associates LLC, to submit an application for approval of a Site Plan, Earth Filling, and Earth Removal on behalf of M/S Town Line Associates, LLC which is the owner of the property of the subject applications. Very t my yours, i ar ipps Me er, d 4d' cc Alan La Atty. Laurence P. Rubinow P:\Projects\95274.50\Authorization Letter.doc e . UTILITY IMPACT STATEMENT FOR Parcel"L",Northern Hills SOUTH WINDSOR, CONNECTICUT March 9, 2004 Developer: Evergreen Walk Associates, LLC c/o John Finguerra 1109 Rose Lane Virginia Beach, VA 23451 Engineer: Civil and Environmental A Fuss & O'Neill Inc. w, ' 146 Hartford Road Manchester, CT 06040 o 3 a b Project No. 9648 LA48 � � ,tiL °{! (860) 646-2469 ��a0'b°a> °+d�tF ' 1►10 �O FUSS&O'Neill Inc. Consulting Engineers 146 Hartford Road,Manchester,CT 06040-5992 56 Quarry Road,Trumbull,CT 06611 TEL 86o 646-2469 FAX 86o 643-6313 TEL 203 374-3748 FAX 203 374-4391 78 Interstate Drive,West Springfield,MA 01089 1419 Richland Street,Columbia,SC 29201 TEL 413 452-0445 FAX 413 846-0497 TEL 803 376-6034 FAX 803 376-6035 The Foundry Corporate Office Center 610 Lynndale Court-Suite E,Greenville,NC 27858 275 Promenade Street,Suite 350,Providence,RI 02908 TEL 252 355-1370 FAX 252 355-8186 TEL 401 861-3070 FAX 401 861-3076 Fuss&O'Neill Inc. UTILITY IMPACT STATEMENT FOR Parcel"L",Northern Hills SOUTH WINDSOR, CONNECTICUT SECTION PAGE I. INTRODUCTION........................................................................................................1 A. Purpose and Scope............................................................................................1 B. Site Location.....................................................................................................I C. Project Description...........................................................................................1 II. WATER SUPPLY........................................................................................................1 A. Projected Public Water Supply Requirements..................................................I B. Existing Water System......................................................................................2 C. Proposed Improvements ...................................................................................2 D. Conclusion........................................................................................................2 III. SANITARY SEWERS .................................................................................................3 A. Projected Sewage Flows From Proposed Project.............................................3 B. Existing Sewerage Facilities.............................................................................3 C. Proposed Improvements ...................................................................................3 D. Conclusion........................................................................................................4 IV. STORM DRAINAGE...................................................................................................4 A. Existing Conditions ..........................................................................................4 B. Proposed Detention and Storm Sewer System .................................................4 C. Conclusion........................................................................................................4 V. OTHER UTILITIES .....................................................................................................5 A. Electric Power...................................................................................................5 B. Gas.........................................................................................:..........................5 C. Telephone .........................................................................................................5 G:\P96\96481\A48(PARCEL L)\UTILITY REPORT PARCEL L 030904.DOC Corres.(HQ) i Fuss&O'Neill Inc. I. INTRODUCTION A. Purpose and Scope This Utility Impact Statement has been prepared in accordance with the most current revisions to the Town of South Windsor Zoning Regulations. Its purpose is to define, in a general way,the projected impact that the proposed land uses and intensities will have on the Town's infrastructure,with particular emphasis on: 1. Water supply and distribution system 2. Storm water drainage 3. Sanitary sewers B. Site Location The development site is located on the east side of Buckland Road,just north of the access drive to the Northern Hills development that includes Lowe's and Target.It is approximately 5.76 acres in size.The western portion of the site near Buckland Road has been used for residential use for at least 40 years. The eastern portion of the site was once part of a larger agricultural parcel and now contains a storm water detention basin which serves the Northern Hills development.On-site existing topographic elevations range from 166 to 184 feet above mean sea level. C. Project Description The proposed Northern Hills project anticipates the development of 27,750 SF of retail space. The utilities necessary to support the proposed development area are all readily available in Buckland Road. The major roadway network that will provide primary access to this project has been reviewed and is further discussed in a separate Traffic Impact Study. II. WATER SUPPLY A. Projected Public Water Supply Requirements Based on the table of uses indicated in Table I and as shown on the Land Use Study, a projection of domestic water requirements was prepared. This projection is detailed in Table 2 and, in general,is self-explanatory. G.\P96V6481\A48(PARCEL L)WILITY REPORT PARCEL L 030904.DOC Corres.(HQ) 1 Fuss&O'Neill Inc. TABLE 2 Peak Daily Peak Hourly Land Use Unit Flow Average Daily Flow(" Flow(2) Description Size(S.F.) (Gal/Day) Flow(Gal) (Gal) (Gal/Min) Retail 27,750 0.10/S.F. 27,750 55,500 1115000 Peak daily flow is 2.0 times the demand for an average day. (2)The peak hour demand is 2.0 times the peak daily rate. In accordance with the usual and customary practice,the tabulated flows must be available for usage at residual pressures in the ranging from a low of 25 pounds per square inch to a maximum of about 110 pounds per square inch. Water requirements for fire protection purposes vary depending on the type of construction but it is safe to assume that a fire flow of 1,000 gpm at a 25 psi minimum residual pressure for up to a three hour period may be required. B. Existing Water System The existing public water system is owned by the Connecticut Water Company (CWC). The system is operated by the CWC Northern Division,with offices at 25 North Road,East Windsor, CT 06088. A 12 inch water main fronts the site on Buckland Road. A fire flow test conducted near the site by the CWC on 7/13/98 at a hydrant on Buckland Road yielded a flow of 1,400 gallons per minute(gpm)with a residual pressure of 50 pounds per square inch(psi). The static pressure was 72 psi at the test elevation of 162 feet above Mean Sea Level (M.S.L.). The finished floor elevation of buildings on the site is anticipated to be no higher than 175 feet above M.S.L. Therefore, the normal operating pressure for the site would be expected to be about 66 psi. At that elevation, the fire flow is expected to be about 1,400 gpm at a residual pressure of 40 psi. C. Proposed Improvements The source of water for the project will be a 6 or 8 inch lateral traversing the site with services to each building from that line in order to distribute the required domestic supply and fire flows. D. Conclusion In conclusion, it is our opinion that the existing and proposed water facilities will be adequate to provide water service for domestic and fire fighting purposes in the quantities and pressures required to support the development proposed herein. G:\P96\96481\A48(PARCEL L)\UTILITY REPORT PARCEL L 030904.DOC Comes.(HQ) 2 Fuss&O'Neill Inc. III. SANITARY SEWERS A. Projected Sewage Flows from Proposed Project This General Plan of Development proposes the construction of 27,750 SF of retail space on this parcel. It is anticipated that sewage will be generated from this project in the following amounts: TABLE 3 Typical Land Use Unit Flow Average Daily Description Size(S.F.) (Gal/Day) Flow(Gal) Retail 27,750 0.10/S.F. 27,750 (')All units of flow were estimated from data generated by Fuss& ONeill for similar types of establishments/uses. (2)Including restaurants TABLE 4 Contributing Peak Design Sewage Average Daily Peak Daily Area(Acres) Peak Infiltration Flow Source Flow(Gal) Flow(t)(Gal) 5.76 Ac x 60% (2)Flow(Gal) (gal/day) Project Site 27,750 138,750 3.46 13,460 142,210 (1)Peaking Factor for domestic sewage flow is 5 times the average flow as determined from Figure 2-6 of"Wastewater Engineering"by Metcalf&Eddy,Inc.,copyright 1972. This is based on a total average flow of 27,750 gal/day and an equivalent population of 370. (2)peak Infiltration=acreage x 1000 gallons/day B. Existing Sewerage Facilities The Evergreen Walk site lies within the wasteshed area of the Clark Street sewage pump station. Gravity sewer service can be provided to the site by an extension of a sewer from the system now under construction at Evergreen Walk. A gravity main in the Tamarack Avenue was approved up to the site as part of the Expo Final Development Plan. C. Proposed Improvements The sewer that is currently under construction up to the site will be extended to serve the proposed buildings. G.\P96\96481\A48(PARCEL L)\UTILITY REPORT PARCEL L 030%4.DOC Comes.(HQ) 3 Fuss&O'Neill Inc. D. Conclusion The quantity of sewage to be discharged from the retail use proposed in the preliminary development plan can be adequately served by the existing and proposed Town of South Windsor sewerage facilities. IV. STORM DRAINAGE A. Existing Conditions The proposed project is situated on a parcel of land containing 5.76 acres east of Buckland Road.All of the storm water runoff from the site discharges to Plum Gulley Brook. B. Proposed Detention and Storm Sewer System In order to minimize environmental damage and the possibility of increased runoff overloading downstream drainage facilities, storm water best management practices (BMPs) will be utilized both during and after construction. A series of sedimentation and detention basins will be constructed to control sediment and peak storm flows. Infiltration of storm water will be utilized where geologic conditions permit. Storm water from the developed portion of the site can be discharged to an extension of the storm water system to be constructed on Tamarack Avenue for the Evergreen Walk project. A storm sewer system in Tamarack Avenue was approved with an extension across Buckland Road to the site as part of the Expo Final Development Plan.The on-site system will be connected to this extension. Storm water detention will be provided in Detention Basin #1 which was approved as part of the Expo Final Development Plan.This site was included in those storm water calculations. During construction, erosion control measures will be installed to minimize erosion and sedimentation. Haybale erosion checks and silt fence will be installed where needed. Temporary sedimentation basins will be constructed when needed. All erosion control measures will be constructed in accordance with the requirements of the latest edition of Connecticut "Guidelines for Soil Erosion and Sediment Control". C. Conclusion The quantity and quality of storm water to be discharged from the retail use proposed in the preliminary development plan can be adequately served by the storm water transmission and detention facilities currently under construction as part of the Evergreen Walk project. G:\P96\96481\A48(PARCEL L)\UTILITY REPORT PARCEL L 030904.DOC Comes.(HQ) 4 a _W Fuss&O'Neill Inc. V. OTHER UTILITIES A. Electric Power Past discussions with officials of Connecticut Light and Power indicate that no major problems exist relative to the supply of power to the proposed site.New service to the site will be underground. B. Gas Yankee Gas has a main in Buckland Road that is adequate to serve the proposed development. Recent discussions with Yankee Gas personnel indicated that there were no difficulties in extending gas service to the development. C. Telephone The Southern New England Telephone Company will be able to serve the telephone needs of the proposed development. G:\P96\96481\A48(PARCEL L)\UTILrrY REPORT PARCEL L 030904.DOC Corres.(HQ) 5 MEMORANDUM To: Marcia Banach, Director of Planning 0 From: Jeffrey B. Doolittle, P.E., Town Engineer Yam' M4R Date: 3/31/05 - "'` soUiH .� �� RE: App 05-17P, Evergreen Run Excavation Plan I have reviewed the above application to excavate on property at 90 Buckland Road (known as Evergreen Run)and I have the following comments: 1. How will this excavation and filling fit with the current plans for future use of this site? Will material be removed from or added to this site? 2. Show the anti tracking pad starting at the curb. 3. The proposed temporary detention basin should be moved east so all grading and disturbance is behind the street line for Buckland Road. 4. Show silt fence or some other containment around the temporary detention basin. 5. Replace the outlet CB in the temporary detention basin with a perforated riser pipe wrapped in filter fabric and surrounded with a stone berm to prevent sediment, silt and fines from flowing downstream from this site. 6. Will this temporary detention basin remain or be removed for future site use? 7. The swale leading to the detention basin can be made wider and more gradual to reduce the amount of cut needed for its construction. 8. All areas that are disturbed on this site will have to be cleaned up and stabilized by seeding as soon as the grading is complete, and no later than the beginning of October, even if grading is not complete. 9. Install a catch basin in the gutter of Buckland Road over the existing storm drain line and correct the road slope to drain a puddle that forms at the end of Northern Hills Drive in the right turn lane. Please let me know if you have any questions. y Hesketh 6 Creamery Brook• East Granby, CT 06026 F. A. Hesketh & Associates, Inc. March 3, 2004 Mr. John Finguerra M/S Townline Associates, LLC 1109 Rose Lane Virginia Beach, VA 23451 RE: "Parcel L" Buckland Road South Windsor, CT Our File: 94010.00 Dear Mr. Finguerra, This report documents the traffic impact related to the proposed 27,750 s.f. retail development for M/S Townline Associates, LLC. The development will be located on the property just north of the property on which Lowe's Home Improvement store is currently situated, as shown in Figure 1 on the Location Map. The conceptual site plan prepared by FLB Architecture & Planning, Inc. and dated 01/08/04 indicates that there will be two separate buildings, one near the north side of the site and the other close to the south property line. A parking lot providing 111 spaces is placed between the buildings. Access to the site will be through one driveway approaching Buckland Road, which will permit only right turn movements into and out of the site. It is anticipated that the proposed development will be constructed and o�erating under normal conditions by the design year of 2005. Background trafficvolumes for 2004 were taken from the Combined Traffic volumes for the approved Evergreen Walk project. They indicate that during the afternoon peak hour, 2564 vehicles are anticipated adjacent to the site, with 1,299 vehicles traveling northbound and 1,265 vehicles traveling southbound on Buckland Road. During the Saturday peak shopping hour, a total of 2,369 vehicles are anticipated, with 1,129 northbound vehicles and 1,240 southbound vehicles A growth factor to accommodate an increase in ambient traffic was applied in order to determine what the 2005 background traffic volumes will be on Buckland Road. The 1% growth factor approved for the area results in volumes of 1,310 vehicles northbound and ,276-tehioles southbetrnd-during-the-afternoorrpeak hour Thee-resulti background traffic for the Saturday peak hour is 1,157 northbound vehicles and 1,250 southbound vehicles. ITE's Trip Generation was utilized to determine the traffic generation anticipated for the proposed retail development. The attached computations indicate that a total of 269 Civil &Traffic Engineers• Surveyors • Planners• Landscape Architects Tel 860.653.8000 9 Fax 860.844.8600 • email mail@fahesketh.com Mr. John Finguerra March 3, 2004 Page 2 trips can be expected during the p.m. peak hour, with 129 entering trips and 140 exiting trips. The anticipated Saturday peak hour volumes include 195 entering trips and 181 exiting trips for 376 trips overall. The site generated volumes were added to the background traffic volumes resulting in the combined traffic volumes in Figure 3. Analysis of the intersection of the site driveway and Buckland Road was accomplished with the use of SMCHRO, a Trafficware program based on the methods described in the Highway Capacity Manual to analyze roadway networks and intersections. Unsignalized intersections are rated on a movement-by-movement basis, calculating the delay vehicles performing a given movement can expect to experience. The delay is translated into a level of service (LOS), which is on a scale of A to F with the highest LOS A providing the shortest delays and the lowest LOS F having the longest delays. The results of the analysis indicate that vehicles exiting the site will experience LOS C during the p.m. peak hour and LOS D during the Saturday peak hour. It is our opinion that the 27,750 s.f. retail development proposed for the location east of Buckland Road and north of the Northern Hills retail site will not have a significant impact on the existing roadway network. The proposed driveway is designed appropriately with respect to existing roadway geometry and sight lines. We are prepared to present our findings to the appropriate Town and State agencies, as required. Very truly yours, F. A sket &A ociates, Inc. e Mitchell, P .E. Manager of Transportation Engineering TA94010\parce1 L\jfi n3024A.doc Street Atlas USAO 2004 } Figure 1 : Location Map : Manchester, CT s _ n930 - rpA{- R�KLAI o `South Win- or 330 r - !ff D v g� L.: 15RD SECT m v T 77 U 5M TM ST o c6� Y v - CR©CDR •R _ PAV1C10N NtONPt KE OOD'DR 3 r 4V OO. lan' m rnp f _ ti Art LLd —i m i T'� ` G BOLL 9 r t�+�' L KYVO 0 S7 � - 't iat vtlte. ��' 8R6 Ra'. T`,�•,34p � o � o£, e NE S k� c�` c� LE T � OLTON � o � 4iITNEY f2'- # Y I Irn sT r TN Scale 1:25,000 ©2003 Del-orme.Street Atlas USAO 2004. www.delorme.com MN(14.7-M a zoo .ao 00o eoo ,000 '" 4 1"=2,083.3 ft Data Zoom 13-0 Parcel L, M-I84 Associates, Buckland Road, Manchester Summary of Trip Generation Calculation For 27.75 T.G.L.A. of Shopping Center March 02, 2004 Average Standard Adjustment Driveway Rate Deviation Factor Volume Avg. Weekday 2-Way Volume 106.36 0.00 1.00 2952 7-9 AM Peak Hour Enter 1.59 0.00 1.00 44 7-9 AM Peak Hour Exit 1.02 0.00 1.00 28 7-9 AM Peak Hour Total 2.61 0.00 1.00 73 4-6 PM Peak Hour Enter 4.65 0.00 1.00 129 4-6 PM Peak Hour Exit 5.03 0.00 1.00 140 4-6 PM Peak Hour Total 9.68 0.00 1.00 269 Saturday 2-Way Volume 148.47 0.00 1.00 4120 Saturday Peak Hour Enter 7.05 0.00 1.00 196 Saturday Peak Hour Exit 6.51 0.00 1.00 181 Saturday Peak Hour Total 13.56 0.00 1.00 376 Note: A zero indicates no data available. The above rates were calculated from these equations: 24-Hr. 2-Way Volume: LN(T) _ .65LN(X) + 5.83, R^2 = 0.78 7-9 AM Peak Hr. Total: LN(T) _ .6LN(X) + 2.29 RA2 = 0.52 , 0.61 Enter, 0.39 Exit 4-6 PM Peak Hr. Total: LN(T) _ .66LN(X) + 3.4 RA2 = 0.81 0.48 Enter, 0.52 Exit AM Gen Pk Hr. Total: 0 RA2 = 0 , 0 Enter, 0 Exit PM Gen Pk Hr. Total: 0 RA2 = 0 , 0 Enter, 0 Exit Sat. 2-Way Volume: LN(T) _ .63LN(X) + 6.23, RA2 = 0.82 Sat. Pk Hr. Total: LN(T) _ .65LN(X) + 3.77 RA2 = 0.84 , 0.52 Enter, 0.48 Exit Sun. 2-Way Volume: T = 15.63 (X) + 4214.46, RA2 = 0.52 Sun. Pk Hr. Total: 0 RA2 = 0 0 Enter, 0 Exit Source: Institute of Transportation Engineers Trip Generation, 7th Edition, 2003. TRIP GENERATION BY MICROTRANS a HCM Unsignalized Intersection Capacity Analysis 2005 Combined Traffic PM Peak 1: Buckland Road & Site Drive Parcel L, South Windsor, CT 31 Lane Configurations tt tT t Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Pedestrians Walking Speed (ft/s) Right turn flare (veh) Median storage veh) pX, platoon unblocked vC1, stage 1 conf vol vCu, unblocked vol 1564 2262 782 tC,2 stage(s) p0 queue free% 100 100 55 Volume Left 0 0 0 0 0 cSH 1700 1700 1700 1700 337 Queue Length (ft) 0 0 0 0 56 Lane LOS C Approach LOS, C Average Delay 1.1 Analysis Period (min) 15 3/2/2004 F.A. Hesketh &Associates, Inc. Synchro 6 Report H:\HCSDATA\1994\94010\parcel L\synchroPM.sy7 Page 1 r HCM Unsignalized Intersection Capacity Analysis 2005 Combined Traffic Saturday Peak 1: Buckland Road & Site Drive Parcel L, South Windsor, CT Lane Configurations + T+ Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Pedestrians Walking Speed (ft/s) Right turn flare(veh) Median storage veh) pX, platoon unblocked vC1, stage 1 conf vol vCu, unblocked vol 1448 2121 724 tC, 2 stage(s) p0 queue free% 100 100 47 Volume Left 0 0 0 0 0 cSH 1700 1700 1700 1700 368 Queue Length (ft) 0 0 0 0 75 Lane LOS D Approach LOS D Average Delay 1.6 Analysis Period (min) 15 3/2/2004 F.A. Hesketh &Associates, Inc. Synchro 6 Report H:\HCSDATA\1994\94010\parcel L\synchroSAT.sy7 Pagel PLANNING DEPARTMENT TRANSMITTAL DATE: 31t L p TO: J-e ` a 60 ���'% RECEIVED MAR 12 2004 WE ARE SENDING YOU: SOUTH W ENGINEERINGNG DEP DEPT. 0 PZC initial plans 0 Drainage computations O PZC revised plans 0 Bond estimate request O PZC Final plans for review 0 Bond reduction request 0 PZC Final plans for filing 0 Correspondence O IWA/CC plans Other. ���[c n1 f0 /"-J e-j rf (rev d_c4d..ai- NO.OF COPIES APPLICATION NUMBER PROJECT/APPLICANT d� r T A(-f0 C L L d- THESE ITEMS ARE TRANSMITTED: ` For review and comment 0 For your files O For your use O As requested O Other PLEASE RETURN/COMMENT BY: COMMENTS: rL i v c e✓- c1 i Vk �amr, T Copy to: From: �� ; Planning Department- 10/98 j i E � E E � _ G ,,� � . . , . . ( i ;� 4 g d i t F f tow N sf� Papsiot� ?d&U&Ot 6 � 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 SOR-CO TELEPHONE (860) 644-2511 7004 1160 0002 1059 5412 March 7, 2005 CERTIFIED MAIL Town Clerk Town of Manchester 41 Center Street Manchester, CT 06040 Re: Notice to Adjoining Municipalities Dear Madam/Sir: In accordance with Connecticut General Statutes concerning notification to municipalities regarding Planning&Zoning Commission applications that could affect the abutting town, we hereby notify you of the.application submitted by M/S Town Line Associates, Inc. (App105-17P). The applicant requests an excavation permit to create development pad on 90 Buckland Road, South Windsor, CT 06074. This application is tentatively scheduled to be heard by the Planning&Zoning Commission on April 12, 2005, at 7:30 p.m. in the Council Chambers of the Town Hall. If you have any question,please feel free to contact the Planning Department at 644-2511, ext. 253. Very truly yours, Michele R. Lipe, AICP Assistant Director of Planning MRL/kak -rR Fuss&O'Neill Inc. Consulting Engineers Other Offices: Trumbull,Connecticut Poughkeepsie,New York 146 Hartford Road,Manchester,CT 06040 North Palm Beach,Florida Greenville,North Carolina TEL e6o 646-2469 FAX 860 533-5143 West Springfield,Massachusetts Providence,Rhode Island INTERNET:www.fussandoneill.com Albany,New York Columbia,South Carolina April 4,2005 Mr. Alan Lamson FLB Architecture &Planning APR - 4 2005 19 Silver Lane East Hartford, CT 06118 u PLANNING Re:. Evergreen Run Excavation Plans -IWCC Application#05-179 Response to Jeffrey Doolittle Comments Dated March 31, 2005 90 Buckland Road, South Windsor, Connecticut_ Dear Mr. Lamson: The following:is in response to the comments received from Mr. Jeffrey Doolittle, .P.E., South Windsor Town Engineer, dated March 31, 2005 for the above referenced application. .Mr. Folger's comments are first and our response follows in italics. 1. How will this excavation and filling fit with the current plans for future use of this site? Will material be removed from or added to this site? Approximately 1,600 cy of material will be removed from the site. The site is being graded to an elevation suitable for potential future development of the site. 2. Show the anti tracking pad starting at the curb. Revised Sheet CG.1.1.shows the anti tracking pad starting at the curb. 3. " The proposed temporary detention basin should be moved east so all grading and disturbance is behind the street line for Buckland Road. All grading and disturbance is behind the streetline of Buckland Road. 4. Show silt fence or some other containment around the temporary detention basin. Silt fence is shown around the temporary detention basin. F.\P96\96481 W48(Parcel L)Vesponse to doolittle comments March 31 05.doc Corres.(HQ) gDo Fuss&O'Neill Inc. Consulting Engineers Mr. Alan Lamson April 4, 2005 Page 2 5. Replace the outlet CB in the temporary detention basin with a perforated riser pipe wrapped in filter fabric and surrounded with a stone berm to prevent sediment, silt and fines from flowing downstream from this site. The outlet catch basin in the temporary detention basin has been replaced with a perforated riser pipe surrounded in stone as shown on revised Sheet CG.1.1. 6. Will this temporary detention basin remain or be removed for future site use? The temporary detention basin will be removed. 7. The swale leading to the detention basin can be made wider and more gradual to reduce the amount of cut needed for its construction. The swale leading to the detention basin is as gradual as it can be to ensure stormwater flow into the basin. 8. All areas that are disturbed on this site will have to be cleaned up and stabilized by seeding as soon as the grading is complete, and no later than the beginning of October, even if grading is not complete. No response required. 9. Install a catch basin in the gutter of Buckland Road over the existing storm drain line and correct the road slope to drain a puddle that forms at the end of Northern Hills Drive in the right turn lane. A catch basin has been added in the gutter of Buckland Road as shown on. revised Sheet CG.1.1. If you have any questions please call me at 646-2469 ext. 5269. Sincerely, —o� Michelle Carlson,P.E. Associate c: Jeffrey Folger, South Windsor Environmental Planner Marcia Banach, South Windsor Planner F:\P96V6481\A48(Parcel L)\response to doolittle comments March 31 05.doc Cones.-(HQ) PF Appl #05-17P, Evergreen Run Earth Removal Permit Public Hearing 4-12-05 Planning Department Report 1.CR: ava g-radin"ppro-val under-SocAtion-Y5 olti—e-zoning reg�ulations a uc an 6,-GD z�ri�I The purpose of a land filling permit is to conserve and preserve water storage areas by helping to maintain groundwater levels and stream flow, to secure safety from flood dangers, and to control any fill operations that may create safety or health hazards to the public or adjacent property owners. A land filling permit may be issued by the Commission for a period not to exceed one year. 2. The land filling regulations require that the plan provide for proper drainage during and after completion; and that no bank exceed a slope of 2:1. The Commission may require safety measures to protect vehicular and pedestrian traffic, such as pavement of access roads to reduce dust and relieve traffic problems. 3. A site plan of development will be required before any further construction is permitted on the site. 4. The proposed operation will be accessed solely from the Target/Lowe's access drive; no entrance is proposed on Buckland Road. The Town of Manchester was notified of this pending application. 5. C app uire ica ' as-heard by I on pn , 6. If this application is approved, the Planning Dept has no requested approval modifications. V- v-rte-.4'af liP J a a Tj ilJ t w ' - l r a— o r i4u�c ate( � �• � ' SC4ti t�wM r �0 �07'e u • 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 Soe-co TELEPHONE (860) 644-2511 April 20, 2005 CERTIFIED MAIL Mr. Alan Lamson FLB Architecture&Planning, Inc. 19 Silver Lane East Hartford, CT 06118 Re: Appl#05-17P, Evergreen Run Filling Permit Dear Mr. Lamson: We are pleased to advise you that the Planning&Zoning Commission voted on April 19, 2005 to approve with modifications the above referenced application for an Earth Filling Permit. This approval is for earth filling to create a building pad at 90 Buckland Road, GD zone, as shown on plans prepared by Fuss & O'Neill, Inc., Job No. 96-481A48, dated April 2, 2005, as revised. This approval is subject to the following modifications: 1. Prior to commencement of any site work, a meeting must be held with Town Staff. 2. This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission, including a bond in the amount of$15,000 to ensure compliance with erosion&sediment control measures. 3. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 4. The Town Engineer's review comments dated March 31, 2005,must be addressed to the Town Engineer's satisfaction. 5. The site must be stabilized no later than the beginning of October 2005. Sincerely, Timothy H. Wentzell, Chairrhan end-Zoning-Commi�sion THW/kak cc: Town Engineer Chief Building Official Assessor Superintendent of Pollution Control Fire Marshal t 0'NN sF� �i ,emu -0� O-P siot� ?d&U&Ot 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 ��Osoe.co TELEPHONE (860) 644-2511 May 3, 2005 Mr. Gary Clark Spazzarini Construction 50 Post Office Road Enfield, CT 06082 Re:Preconstruction Meeting on 4/27/05-App105-17P, Evergreen Run Excavation Dear Mr. Clark: IN ATTENDANCE Jeff Doolittle TOSW 1540 Sullivan Avenue 860 644-2511 x245 Michelle Carlson Fuss &O'Neill 146 Hartford Road Manchester 860 644-2469 x5269 Jeff Folger TOSW 1540 Sullivan Avenue 860 644-2511 x229 Gary Clark Spazzarini Construction 50 Post Office Road, Enfield 860 539-4501 The following is a brief summary of points discussed during the meeting: Erosion and Sedimentation Control 1. All erosion and sedimentation control measures-are to be in place prior to earth moving_operations in each area and maintained/cleaned out during construction. Call Jeffrey Folger, Zoning/Wetlands Enforcement Officer for inspection when measures are in place, prior to commencement of site work or - ' if any problems/concerns arise during construction. 2. All topsoil stockpile.areas to be protected(ringed with haybales or equal). -3. During construction of the road/driveway a crushed stone tracking pad is to be installed and maintained to minimize tracking of dirt/gravel on to Buckland Road and Northern Hills/Lowes Driveway Calcium chloride or water is to be used for dust control as required. Public Works compl_ete_sets-of_-appro_ved/revised_plans-to-be-pr-ovided-to Town-pri r-to--start f-construction. They will be stamped by the Planning Department along with plans developer needs. Only approved plans are to be used on the job site. 2. The Engineering Department is to be notified forty-eight (48) hours prior to the start of major construction work with inspections and testing per Developers Checklist (requested, required) for the following: a. After site is staked out b. All drainage work 3. A drain layers permit is needed for any work on the sanitary sewer lateral. 4. As built plans are to include horizontal and vertical location of all underdrains, footing drains, and sanitary sewers and house service laterals located as per revised as-built checklist. 5. All pipe and structures to be backfilled with free draining material, compacted in maximum one foot lifts with approved compaction equipment or approved equal if deep trench is encountered. Any pipe or structure work requires inspection prior to backfilling. 6. Any problems and/or questions regarding construction of this project will be directed to Gary Clark in the field at phone#539-4501. 7. All filling to be done in accordance with Department of Transportation specifications. To be compacted in maximum lifts and tested as necessary. 8. Job meetings will be held as needed, and can be called by the developer or Town. 9. Any proposed changes are to be presented to the Engineering or Planning Department prior to implementation on change order form in quadruplicate with 4 copies of the drawing. Town will attempt to turn around within 24 hours. 10. Normal hours of operation 7:00 a.m.—5:00 p.m., no work on Sunday. 11. Sanitary lateral locations should be tied down to existing structures and shown on the progress as-builts. 12. During construction of individual sanitary sewer house laterals, the contractor shall prepare an as-built sketch on standard form provided by the Engineering Department. This form should be submitted to the design engineer/surveyor for their use in preparing the as-built plan. The Engineering Department suggests that the contractor also show locations of foundation drains and water laterals on this form. Planning Department 1. An erosion and sedimentation bond in the amount of$15,000.00 must be submitted prior to any site work. SNET/NU 1. Contact utilities for coordination of utilities connection. Fire Marshal 1. Blastin (if required)o be coordinated i h e Fire Marshal. Police Services ion o e construction mus e prove e o o ice Services-on a company letterhead. If the developer occupies or owns the building after construction emergency numbers must be provided to Police Services. 2. All buildings located on property that abuts a public highway must be numbered and visible from the street. All numbering shall comply with Town Ordinance 6-800 through 6-802. Barns, garages, and outbuildings, which are located on the same premises as a numbered structure, are excluded. 3. Erect temporary sign on the site during construction identifying the project. 4. If an alarm is to be installed contact Police Services. Building Department 1. Plan review with Building Official/Fire Marshal required prior to application for building permit. Coordinate with Chief Building Official. Sincerely, eeffrevyDoolittle Town Engineer JBD/kak cc: Michele Lipe,Assistant Director of Planning Karl Reichle, Public Works Mel Stead, Public Works Christopher J. Dougan, Chief Building Official Fred Shaw, Superintendent of Pollution Control Alan Lamson Michelle Carlson