Loading...
HomeMy WebLinkAbout05-13W Reg Act Wetlands TOWN OF SOUTH WINDSOR R EC- INLAND WETLANDS, WATERCOURSES AND CONSERVATION APPLICATION Application# O -131n/ Date Received `3- Z -D S F E B 1 5 2005 INSTRUCTIONS 1. Fifteen applications (15) with map and plans (2 copies) shall be submitted together with the fee set forth in the Inland Wetlands, Watercourses and Conservation Regulations, Town of South Windsor. (See Regulations, Section VII-X) 2. The South Windsor Inland Wetlands, Watercourses and Conservation Regulations should be reviewed with respect to the standards and criteria for application Evaluation. (See Regulations, Section VII-X) 3. The applicant understands that this application is to be considered complete only when all information and documents required by the Agency have been submitted. The applicant shall also complete the state filing form. A. Applicant's Name: JMJ Construction Co., Inc. Address: 658 Ellington Road, South Windsor, CT 06074 Phone: (work) (860)282-0628 (fax) (860) 528-7889 B. Legal owner's name: Maxwell& Althea McPherson Address: 914 Ellington Road, South Windsor, CT 06074 Phone(home) Go' a- 753-� (List additional owners, addresses, and phone numbers on back of application) C. If the applicant is not the owner of the subject property, a letter by the owner(s) authorizing the proposed regulated activity set forth in the application must accompany this form and will be part of the application. D. Project Name(if any): n/a 1. Contact Person(if further information is needed) Karen Isherwood, P.E., Design Professionals, Inc., (860)291-8755 Fax(860) 291-8757 E The_geographical_location_of_the_property which is to be affected-by the proposed regulated_ activities including a description of the land in sufficient detail to allow identification of the property on the Inland Wetland and Watercourse Map. Assessor's map#35 Parcel#2 Zone: A-20 V' Names of all abutting property owners from records in Town Clerk's office. (use separate sheet if necessary) See attached. G. Have you notified all abutting property owners (from records in Town Clerk's office) by certified letter that an application is pending before the Agency?Yes. ** (you are required to supply a copy of the letter with the list of the names of the abutters).** H. Purpose and description of all proposed regulated activity(s) including amount of disturbance in square feet and types of fill and the time element involved: Excavate trenches to install storm drainage structures and backfill. Approximately 5,200 sq. ft. (.12 ac.) upland review disturbance and approximately 400 sq. ft. (.009 ac.) wetland disturbance associated with grading activity to banks of Podunk River. I. A class A-2 map of the property drawn to 1" = 40', showing the area to be developed, extent of the wetlands and watercourses affected, topography, existing and proposed activities and names and locations of adjacent property owners must be submitted. T. Amount of regulated area disturbance and types of fill (including wetlands and regulated buffers). .129 acre regulated area disturbance. (See H above.) K. Acreage of wetlands and watercourses in regulated areas to be altered: .009 L. Acreage of wetlands and watercourses to be created: 0 M. Lineal feet of proposed stream alteration: 0 N. Total land area of project and percentage which is wetlands: Total land area= 1.16 acres (based on Town Assessor's map). 49%±wetlands O. Identify all other permits or approvals that have been issued, applied for, or required with respect to the proposed activity set forth in this application. (These may include but not be limited to, local Planning & Zoning, Zoning Board of Appeals, D.E.P., F.E.M.A., D.O.T., The Army Corps of Engineers, and any other State, Local or Federal Permits.) Planning&Zoning, D.O.T. P: The applicant (or designated representative) hereby attests that a sign will be posted at the following location(s): as directed by Town Staff By: Peter DeMallie, Design Professionals, Inc. on or before t following,date: As directed by Town Staff ///,, "i Signature: These signs must be displayed continuously for at least ten (10) days prior to scheduled meeting (see Regulations, Section 7.3a) The undersigned hereby applies for the regulated activities listed in paragraph H above, for an Inland Wetlands, Watercourses and Conservation permit for the property described herein and confirms that: 1. She/he is familiar with the currently effective Inland Wetlands, Watercourses and Conservation Regulations of the Town of South Windsor. 2. She/he understands that at any time during the review period, the Agency may require the applicant to provide more information about the wetlands and/or watercourses in question and/or any proposed activity. 3. All information submitted in the application for review shall be considered factual, or in the case of anticipated activity, binding. A knowing failure of the applicant or any of her/his agents to provide correct information, or performance exceeding the levels of activity anticipated, shall be sufficient grounds for revocation of any permit under these regulations. 4. By making this application, the applicant gives permission to the Inland Wetlands, Watercourses and Conservation Commission members and/or its representative to enter the portions of the premises which are subject of the application for the purpose of inspection and investigation and otherwise evaluating the merits of the application both before and after a final decision has been issued. .J Signature of Owner of Property Date�/ u s Signature of Ap i Date �- 2/15/2005 SUBJECT PROPERTY OWNERS AUTHORIZATION: We, Maxwell and Althea McPherson, as owners of the property located at 414 Ellington Road, South Windsor CT. 06074 ,hereby authorize the submission of the proposed Land Use application/s by JMJ Construction Co.,Inc. for the Development of Emerald Green &Teaberry Estates. Maxwell McPherson Althea McPherson " DESIGN PROFESSIONALS, INC. civil engineers ♦ planners ♦ surveyors gis ♦ gps ♦ landscape architects Transmitted via certified mail February 15, 2005 Dear Current Abutting Property Owner, Re: Application of JMJ Construction Co. Ellington Road/Route 30 South Windsor, Connecticut DPI Project No. 1930 In accordance with regulations of the Inland Wetlands Agency and Planning&Zoning Commission, we are required to notify you that applications have been filed on the property abutting yours and are subject to hearing(s)by the Inland Wetlands Agency and Planning& Zoning Commission. The applications and plans are on file with the South Windsor Planning Department in the Town Hall. As an abutting property owner you are invited to the hearing(s)to ask questions and/or give comments, however, you are not required to attend. You may also submit written comments regarding the application(s)prior to the meeting if you so desire. For further information regarding the specific date this application will be heard, please contact Michele Lipe, Deputy Planning Director, or Jeffrey Folger,Environmental Planner, at the South Windsor Planning Department at 644-2511, ext. 252 or 229, respectively. Thank you. Sincerely, DESIG7PRSSIONALS, INC. By: , eIer R. De allie President 165 South Satellite Road, South Windsor,Connecticut 06074 Tel: (860)291-8755•Fax: (860)291-8757 Email:dpicivil@aol.com • DESIGN PROFESSIONALS, INC. civil engineers ♦ planners ♦ surveyors gis ♦ gps ♦ landscape architects Direct Abutters JMJ Construction Co., Inc. Ellington Road/Route 30 DPI Project No. 1930 Ma Lot No. Prove Proverty Owner Mailing Address 35 68 RSK-Kellco, Inc. 1744 Ellington Road 35 3 Christopher H. &Kim Marie Rainville 926 Ellington Road 35 1 Debra A. Martin 246 Hilton Drive 165 South Satellite Road,South Windsor,Connecticut 06074 Tel: (860)291-8755•Fax: (860)291-8757 Email:dpicivil@aol.com / , � �,py% ,� LD G" J�( SAD I J I S I O)\( / SC�LE ♦ 1 a 1 ►��e � / • • - � � / / � ► , 1 i , 1 11 i ♦ , / � / / l � l � ` �p / 1 80' REGULATED �O WETLANDS LINE /l 0. 7 / I l Cq pE z 18 CONC. F.E. FL: 46.0± i D 0—YEAR FLOOD PLAIN ' „ t1 )'o P/CEL(ELEVATION"45.5 /��° N 8c. v op �I y��/9��.�• ' ,� r ,9 1 ZD i S=0.57 N PISEE NOTE #5 F� ENcE a 11 WF 11 4 1 TREE � �i s� II LPL r�5` N 4 A 215 o22 F 0 r - 1 1 , PC —C E ' W�#48 , ' 1 1 '� � ' N P,pMH-D TF: 6.0± 2 0/N TF: 5EZ10 1 1 *(1 ): 69.70 s.00, N 11 1 �� �►' 6.0 o 1.P. sssti L(15»IN). 52,7 .. �.. -. S, . 9 40• BUFF� FL(1,8"OUT): 400 / WF#45 r r 1 1 r r , j, , 10' G R A V L ' WF#41 r 1WF#49 r ` r ` /ice ACCESS RIVE ,� ,(SEE DET IL) 4f x J5 4f D -WF#43 CD - _ - - _ /x-1• F: MATCH EX - - - 66 ti . -IS S FL: 70.80 HOPO - - - - o 11 y i HIGHLAND SOILS LLC - SeptemberAM2004 Z005 Karen Isherwood Design Professionals,Inc. Y 165 South Satellite Road South Windsor,CT 06074 RE: EMERALD GREENSUBDIVISION �p05 ELLINGTONROAD SOUTH WINDSOR, CT Dear Karen: The inland wetland boundaries on the above-referenced property were field delineated on May 11,2004. The wetlands were field delineated in accordance with the standards of the National Cooperative Soil Survey and the definition of wetlands as found in the Connecticut General Statutes,Chapter 440, Section 22A-38. I have reviewed the plans prepared by your office and have found the representation of the field delineated wetlands to be substantially correct. The soils in the on-site wetland were identified as belonging to the poorly drained Wilbraham Series. The wetlands developed in a small depression along the edge of a tilled farm field. Surface ponding can be expected in the late winter and early spring in this wetland resource. As with some of the upland soils on this property the soils of the Wilbraham Series overlay a compact glacial till. Similar soils were noted just oil site and are associated with seeps along a terrace escarpment. Upland soils on the property were identified as belonging to the excessively drained Manchester Series,the well drained Broadbrook Series and the moderately well drained Rainbow Series. If you have any questions,or require additional information,please call me at(860) 742-5868. Very truly yours, ohn P.Ianni Professional Soil Scientist CPESC J cAdocuments and settings\highland soi1s\1et2004\102.doc P.O. Box 337,Storrs,Connecticut 06268 (860) 742-5868 lofessionals, Inc. DESIGN STORM-Lo-)19- DATE Z115tQ-5 DESIGED By 1116E���11111 �11111 � I� �I�IIIIIIIII IIIII m ofessionals. Inc. DESIGN STORM--Q—)'9- DATE 211510-,5 DESIGED BY-Lffinl—CHECKED BY t�wN 8f� V&U&ot 9 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 OR.CO' TELEPHONE (860) 644-2511 To: Design Professionals 165 So. Satellite Road South Windsor, CT 06074 From: Jeffrey H. Folger—Environmental Planner/Conservation Officer Date: February 22, 2004 Re: App. #05-j4P -Review of the proposed Teaberry Estates SRD western storm outfall—Plans dated 2/15/04. I have reviewed the plan with the followin initial comments: proposed P g Erosion controls must be placed west of the proposed energy dissipater. A soil scientist report is needed to comment on both upland and wetland soils on the site. Due to the highly erodable nature of the soils on the site and sensitive wetland and watercourse 1" immediately adjacent to the work site, a detailed construction narrative and detailed construction sequence must be submitted illustrating how the structure will be installed in the slope. Erosion control matting is required to assist in stabilizing the slope after installation of the drainage structures. Detailed illustrations of the location and installation procedure must be provided. The work and disturbance must occur within the corridor designated by the location of the pipe structure to minimize disturbance to the slope. A sediment foreba sh ould ould be incorporated into the design of the basin. Stone check Y rP gn dams should also be incorporated to slow the velocity of water through the basin and increase residence time to foster infiltration. 0- 9" cc. Town Engineer _.Director of Planning __ - -- --- - - - Mar 02 05 01 : 06p Design Professionals 860-291-8757 p. 1 DESIGN PROFESSIONALS, INC. civil enters♦planners + surveyors landscape architects giro • gps Marcia Banach,Director of Planning March 2, 2005 Jeffrey Folger,Environmental Planner Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 RE: Emerald Green and Teaberry Estates Ellington Road/Route 30 South Windsor, Connecticut Dear Marcia&Jeff, On behalf of my client,JMJ Construction Co., Inc., and pursuant to the above-referenced applications, I hereby grant to the Planning&Zoning Commission an extension of the time within which to schedule a public hearing not to exceed 35 days, and to the Inland Wetlands Agency a similar extension not to exceed 15 days. Please advise if additional extensions are necessary. Respectfully submitted, DESIGN PROFESSIONALS INC. By: Peter R. DeMallie Principal CC: Atherton Ryan,Esq. JMJ Construction Co., Inc. Karen M. Isherwood,P.E. Richard L. Boston,R.L.A. 165 South Satellite Road,South Windsor,Coiuiecticut 06074 Tel:(860)291-8755.Fax:(860)29:1-8757 Email:dpicivil@aol.cora MEMORANDUM To: Marcia Banach, Director of Planning Cc: Jeff Folger, Environmental Planner/Conservation Officer From: Jeffrey B. Doolittle, P.E., Town Engineer MAR 1 2005 Date: 3/16/05 RE: App 05-02P, Emerald Green Subdivision App 05-03P, Teaberry Senior Residence Development App 05-13W— Emerald Green/Teaberry SRD Drainage The proposed drainage plan for the Emerald Green Subdivision and Teaberry Estates SRD off Ellington Road has been reviewed and {public works has the following comments about the stormwater drainage system. In reference to the proposed ourfall by the Podunk River: 1. The proposed drainage discharge and easement on the west side of Ellington Road is not satisfactory to the Town for several reasons. There is a fence across the easement in two places that blocks access to the drainage structures and outlet. The standard Town drainage easement prohibits fences and other structures from being placed in the easement area. The easement area is too steep to allow maintenance vehicles to access to the drainage structures and outlet from the street. The outlet location will likely cause erosion of the bank and will be subject to siltation and clogging because the discharge is directed upstream and is on the outside corner of a sharp bend in the Podunk River. The drainage outfall is proposed down a steep slope consisting of highly erodable soils as is evident by ground water breaking out at the toe of the slope and several eroded gulleys in the area. The applicant needs to look for a better location for this drainage line and discharge. We suggest an existing eroded gulley to the south of the proposed location. This could be filled and graded to repair the erosion and allow for access for maintenance as part of the pipe installation. 2. There need to be underdrains and outlets designed and built along side of the proposed stormwater discharge line to handle the groundwater and prevent erosion along the drainage line. Construction details need to be included for the outlet rip rap plunge pool/level spreader. 3. The proposed drainage manholes in Ellington Road should be moved to the curb line and changed to catch basins to catch stormwater runoff in the road. There is a long flat area in Ellington Road in this location that often has many large puddles. 4. The drainage analysis included in the latest Stormwater Management Report needs to be clarified. It appears that some of the water currently draining to the eastern part of the site is being routed to the western detention basin which may or may not be beneficial. The discussion refers to the detention basins designed for Unity_ Church but the current application does not include a-connection to the Unity Church basins. These items and possibly others need to be better explained. We have also reviewed the proposed drainage easement on existing Town open space for the Teabeny Estates SRD off Ellington Road and we have the following comments: 5. The easement needs to extend past the end of the pipe to the end of the constructed drainage way. 6. It appears that an easement is needed from the downstream property owner to construct and maintain the drainage channel and or pipe on their property as well as the Town property. 7. The pipe should be extended to the bottom of the slope or further documentation provided that the proposed stone lined channel will not erode or the flow cause erosion. Details are needed for the proposed stone lined channel. 8. The Teaberry Estates SRD homeowners association should establish a fund for future maintenance of this pipe and drainage way. Please call me(x 245)if you have any questions. tpNM aE4 o To� O-P Sou� ?A;141� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 °R.c°� TELEPHONE (860) 644-2511 April 12, 2005 Certified #70042510000398029448 Design Professionals, Inc. 165 South Satellite Road South Windsor, CT 06074 RE: Appl. #05-13W— Emerald Green/Teaberry Senior Residence Development Drainage Dear Ms. Isherwood: At the April 6, 2005 regular meeting, the Inland Wetlands Agency/Conservation Commission approved application#05-13W—Emerald Green/Teaberry Senior Residence Development Drainage—914 Ellington Road — Inland Wetland/Conservation Commission application for regulated activities in connection with the construction storm drainage structures for a three lot subdivision, and a 25-lot Senior Residence Development(SRD), on property located westerly of Ellington Road and northerly of Riverview Drive. Rural Residential Zone. This approval is subject to the following conditions: 1. One blueprint copy of the entire set of plans and this letter reproduced thereon, must be submitted to this Commission. This must be completed within 65 days of approval prior to any construction activity on the site. Plans submitted to Planning &Zoning Commission shall be considered having met this requirement. 2. The application shall indemnify and hold harmless the Town of South Windsor against any liability, which might result from the proposed operation or use. 3. The permit is valid for five years and shall expire on April 6, 2010. It is the landowner(s)/applicant(s) responsibility to track expiration dates and notify the Commission of a renewal request at least 65 days prior to expiration. 4. All approvals required must be obtained and submitted prior to any activity on the site. 5. A contact person shall be identified on the plans. 6. We recommend a bond in the amount of$25,000 be submitted to the Planning & Zoning Commission to ensure successful installation of the storm drainage pipe. Emerald Green/Teaberry Senior Residence Development Drainage April 12, 2005 Page 2 7. The Town of South Windsor shall accept and be liable for the repair and maintenance of said drainage. 8. The existing conservation easement shall be modified to exclude the drainage easement. Boundaries shall be field determined and approved by Town staff and submitted to IWA/CC for final approval. 9. A shrub planting plan shall be submitted for the stabilization of the drainage slope. The plan to be reviewed and approved by Town staff, Very truly yours, P la"'- Philip Forzley, Vice Chairperson INLAND WETLANDS AGENCY/ CONSERVATION COMMISSION PF:dr cc: Chief Building Official