Loading...
HomeMy WebLinkAboutResubdivision (91) TOWN OF SOUTH WINDSOR PLANNING& ZONING COMMISSION APPLICATION FORM Application No: 01.E- C-50 P Official Receipt Date: -I U -0q Receipt No: RECEIVED APPLICANT: JMJ Construction Co., Inc. SEP 1 0 2004 PROJECT NAME: EMERALD GREEN SOUTH WINDSOR PLAWNG DEPT. ADDRESS: 658 Ellington Road, South Windsor, CT 06074 OWNER OF RECORD ON LAND RECORDS: JMJ Construction, Co., Inc. ADDRESS: 658 Ellington Road, South Windsor, CT 06074 COMPLETE LOCATION OF PROPERTY: R065, R069A& 919 Ellington Road ASSESSOR'S MAP #35 PARCEL#6, 7 & 10 ZONE RR& A-20 NAME, ADDRESS, TEL&FAX#OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED: Karen M. Isherwood, P.E., Design Professionals, Inc., 165 South Satellite Road, South Windsor, CT 06074 Tel. (860)291-8755, Fax(860) 291-8757 THIS APPLICATION IS FOR: (Check all that apply): �` Zone Change to (Public Hearing required and Certified letter to abutters required) F- Subdivision/Resubdivision j Open Space Subdivision(Public Hearing Required) f- Subdivision Minor r Major X Resubdivision(Public Hearing Required) i Minor ;'X Major F_ Conditional Approval Special Exception to Article (Public Hearing Certified letter to abutters r Site Plan of Development J General Plan of F Earth Filling(Sec. 15)and/or Earth Removal(Sec. 14- Public Hearing Required) r� Regulation F Zoning F Subdivision (Attach proposed amendment) t Temporary and Conditional Permit for Major Home Occupation for f- Other(explain in detail) An Application Pending sign is required to be posted on the property for all applications ten (10) days prior to being heard by the Commission. nature o A lica �Si nature of pert wner I � t/P rY (I�W4 Appl #04-58P, Emerald Green Resubdivision Public Hearing 10-26-04 1. f-a-subdi isiamte Ereate-3 flats-with-a-new-publi street inn-EIhjn,gt,one.Th-e-�site-size s�-1-5-acres:- VJTf a,,� ' c< r 3 f� lc {�z„�y hwf� �o�� �JU7 fug 1 1ek ,�. f �f �• 2. Minimum lot size required in an RR zone subdivision is 40,000 sf. The minimum lot size proposed is about 43,600 square feet. Minimum required frontage is 175 feet; minimum proposed is 189 feet. Lot 3 is about 12-acres in .size; the applicant has indicated that he intends to apply for a Senior Residence Development on this lot. 3. Proposed road length exceeds the town's 600' cul-de-sac length requirement, so a Commission waiver would be necessary to approve the length. The subdivision regulations authorize the Commission to grant a waiver of the length requirements if the Commission deems it desirable due to adverse topographic or environmental conditions, difficult site configuration, or if no potential outlet would be available to serve the area, subject to the following conditions: ♦ The commission shall determine that the subject property cannot be reasonably served by any other public street (existing or future) due to site constraints (environmental or topographic), accepted engineering standards, and/or prohibitive cost. ♦ The Commission shall determine that the proposed extension conforms to the goals and objectives of access management. ♦ The Commission shall conclude that the proposed street extension will function as a residential local street, rather than a collector or arterial highway. ♦ Underground utilities must be provided. ♦ Sidewalks must be provided on both sides of the street. 4. n�eereer�neci ta�Unity�lrtxrcl�: 5. There is no open space requirement for this subdivision because there are only three lots. S, A. Lot d -o n 4f- /4�wy k re y 6. The application was approved by IWA/CC on Oct 20, with a $5,000 bond for erosion & sediment control, and a bond for $5,000 for establishment of the stormwater basin. 7. T buses-autoilrgtorrRoadlre existi ing on oadvilbhhrecatd too the subdirsiorrstreet:Sidewalks are shown on one side of the street, but the waiver provision requires sidewalks to be provided on both sides of the street. 8 `Q1P 32 A errra��.�� iQ .,•w� mired. 9. Street trees are shown on b th sides of the new street, but are sporadic until about the midpoint of the `ceps. The proposed detention basin interferes with some of the street trees, which suggests that perhaps the basin needs more room. The property at 658 Ellington Road is also owned by JMJ, so should have regularly-spaced street trees. The applicant may also want to approach the owners of 887 Ellington Road about adding street trees to their property. 1 O.Karl Reichlee, SuDeMntAend nt of Parks has reviewed the proposed street trees and ha� ri,a t c P ^�_�n� rnmmAr�+e; The Town's street tree specs should be a utilized and so reflected on the plans; and he has suggested that the proposed green ash tree be changed to beech trees. If this application is approved, the Planning Dept has no additional approval conditions other than those items already noted. ��')6 l `{ro ✓� - A(rD {?tA"-e_ (d c -1 a U +t r i t �/a C c vt C2� D r/ T tAc,`(!z/ (.41VIC-A- �- rvu� L d C K �' � v(':�; 0 VIP- � CGvt - ✓'•� �) fP � -er IV-e L) re v t-t Lo C t'a. ,des Gwt Ct?/i2-T� G✓i ��� � ff �.. �c�G�- 1'�-- /�vG� ��t9.r��, ot-I �Upore �(e fa D P i fYL fl7 'k'Aj r�-.� a ot Town of South Windsor' s TREE PLANTING SPECIFICATIONS January 2004 1. All trees will be handled by the root ball and not by the trunk of the tree. 2. All rope or twine will be completely removed once the tree has been placed in the planting area,burlap will be rolled down and cut or tucked under the root ball. 3. Any wire baskets will be cut and the upper 2/3 removed after the tree is placed in the planting area. 4. All trees shall be freshly dug within 30 day of delivery to the planting site. 5. All twine,rope or any other objects around the root ball will be removed. 6. A planting area of two times the diameter of the root ball will be excavated. The depth of the excavation shall be two inches less than the overall height of the root ball as measured from the root flair on the trunk to the bottom of the root ball. 7. All excess excavated material will be deposited at an approved site. 8. When back filling trees, growing medium will be worked in to avoid any air pockets. Care must be taken not to compact growing medium excessively. 9. The beginning of the root flair will be set two inches above final grade. 10. Water will be applied as soil conditions dictate. 11. All tree trunks will be will be free from any injury or damage. 12. All trees shall have a single central dominant leader. 13. Trees shall not be staked or guyed unless directed by the Tree Warden. 14. The depth of all mulch shall not exceed more than 2". 15. All tags,ribbons or other markings will be removed. 16. No pruning will be performed unless directed to by the Tree Warden. 17. No fertilizers or water polymers will be applied at planting. DESIGN PROFESSIONALS, INC. civil engineers ♦ planners ♦ surveyors gis ♦ gps ♦ landscape architects Transmitted via certified mail September 7, 2004 Dear Current Abutting Property Owner Re: Application of JMJ Construction Co. Emerald Green/Three Lot Subdivision Ellington Road/Route 30 South Windsor, Connecticut DPI Project No. 1930 In accordance with regulations of the Inland Wetlands Agency and the Planning& Zoning Commission, we are required to notify you that an application has been filed on the property abutting yours and is subject to a hearing(s) by the Inland Wetlands Agency and Planning& Zoning Commission. The applications and plans are on file with the South Windsor Planning Department in the Town Hall. As an abutting property owner you are invited to the hearing(s)to ask questions and/or give comments, however, you are not required to attend. You may also submit written comments regarding the application(s) prior to the meeting if you so desire. For further information regarding the specific date this application will be heard, please contact Kelli Koehler, Administrative Secretary, Michele Lipe, Deputy Planning Director, or Jeffrey Folger, Environmental Planner, at the South Windsor Planning Department at 644-2511, ext. 253, 252 or 229, respectively. Thank you. Sincerely, DESIGN OFESS ONALS, INC. n By. Peter R. DeMallie President 165 South Satellite Road. South Windsor, Connecticut 06074 Tel: (860)291-8755 •Fax: (860)291-8757 Email: dpicivilnaol.com Stormwater Management Plan Emerald Green Subdivision (Church Way) South Windsor, Connecticut RECEIVE® SEP 1 0 2004 SOUTH WINDSOR PLANNING DEPT, 0Im. s e Al Prepared by: Design Professionals,Inc. 165 South Satellite Road South Windsor, CT 06074 DPI Project No. 1452 I September 10, 2004 i Table of Contents: Page# Introduction 1 Proposed Development 1 Off-Site Analysis 1 Peak Runoff control 1 Nonstructural Drainage System 1 Conveyance System 1 Maintenance and Operation 2 Drainage Design 2 On-Site Storm Sewer Calculations 3 Conclusions 3 Appendices Existing Conditions(Unity Church basin 3/21/03-Amendment2) A TR-55 Developed Conditions(Unity Church isolated) B (Existing conditions-to unity basin 1 08-18-04) TR-55 Developed Conditions (Emerald Green Subdivision) C (Proposed Conditions-to basin 1) Detention Basin Reservoir Report(Emerald Green basin) D Detention Basin Routings(Emerald Green basin) E Detention Basin Reservoir Report(Unity Church basin) F Detention Basin Routings(Unity Church basin) G Storm Sewer Calculations H Introduction: The site is located on the east side of Ellington Road(Rt. 30)in South Windsor,Connecticut, and consists of a single parcel of land totaling 13.0 acres, with the intent of purchasing an additional 2.0 acres from the northern abutting property, for a total of 15.0 ac. Portions of the site were used for farming, the remainder being wooded. A large portion of the site drains northerly off site overland, entering into the storm drainage system within Unity Church. Another portion of the site to the east of the proposed development, drains to the north-east off site into Mill Pond. Proposed Development: The proposed development of the site includes the creation of 3 single family house lots involving the construction of approximately 725 if of 26' wide public road, Church Way. The lots will be serviced by public water and sewer. The Storm drainage system proposed for the development includes the installation of storm-sewers within the proposed road, and a detention/Water Quality Basin. The Detention/Water Quality basin will provide full detention of storm flows for storms up to the 100 year design storm, and also provide water quality treatment for the smaller more frequent storm events. The detention basin is designed to discharge directly into the detention basin on the Unity Church site at a rate that when combined with flows generated by the Unity Church site, will not exceed the documented capacity within the Lakewood Condominium storm system. Off-Site Analysis: The site presently drains in two directions. The majority of the site drains northerly into the Unity Church storm system. The eastern side of the site drains to the north east,off site to Mill Pond. The entire area of the proposed development of the site will be within the western watershed draining off site to the Unity detention basin. The proposed detention/Water Quality Basin will be in this area, and discharge via a 6"pipe to the Unity detention basin. Peak Runoff Control: The site has been designed to continue to discharge in the same directions presently with peak flows under developed conditions equal to or less than existing peak discharge rates. Nonstructural Drainage Systems: The site presently drains overland in three directions. Under developed conditions,the drainage to the north-east will continue to be overland with no structural measures utilized. The drainage to the north from the western end of the site will be collected under developed conditions into a storm drainage system and discharge to the proposed Detention/Water Quality Basin. The discharge from the basin will be to the Unity Church detention basin. Conveyance System: The on-site conveyance system consists of a piped stormwater system discharging to the detention/water quality basin. The piped drainage system has been designed to accommodate the runoff from a 10 Yr design storm. The detention/water quality basin has been designed to handle up to a 100 year design storm with full detention. Maintenance and Operation: The following maintenance operations will be required to ensure the proper and efficient operation of the Storm Water System, and Detention/Water Quality Basin. The following maintenance schedule is intended to be a minimum guide, and additional inspections and maintenance measures may be required following large storm events that could cause the deposition of excess debris in the system. Catch Basins: The catch basins shall be inspected annually. The sumps shall be cleaned when the depth of material within the sumps reaches 1'. Basin Outlet: The basin outlet shall be inspected twice yearly. All large woody growth that may affect the flow of water shall be removed. The stone shall be re- arranged and added to as required to maintain the design as per the design plans. Topographic Contour Maps: A Topographic contour map has been provided showing the drainage areas for the site at a scale of 1"=40'. The map showing the developed conditions are included in the rear of this report. Drainage Design: The drainage design of the site has been completed utilizing a number of computer programs and generally accepted design methods. The runoff from the site under developed conditions was developed utilizing the TR-55 computer program. The detention basin was sized using a computer program by Hydrographs called Hydroflow. The program allows for the development of hydrographs representing the developed flows into the basin, and the modeling of the basin with elevation/storage/discharge curves to represent the basin. The program then provides the routing of the hydrograph through the basin, and provides peak discharge and storage information. The storm drainage design involves the construction of one detention/water quality basin. As part of the design calculations, no infiltration was assumed for the basin. The TR-55 analysis for the developed discharge to the existing Unity Church basin is included in appendix B. The approved Unity basin design originally considered a total drainage area of 10.5 acres which included the area from our site. Supporting documentation from the original study is included in appendix A. The drainage area for this study has been reduced to 3.78 acres, isolating the runoff from Unity Church only. The TR-55 analysis for the developed discharge to the proposed detention pond is included in appendix C. The detention basin reservoir report for the Unity Church basin is included in appendix D. The routing of the storm flows for the 2-100 year design storms for the Unity basin are included in appendix E. The detention basin reservoir report for the proposed Emerald Green basin is included in appendix F. The routing of the storm flows for the 2-100 year design storms for the proposed Emerald Green basin are included in appendix G. The following table summarizes the peak flows under developed conditions to the north, through Unity Church basin, and eventually into the Lakewood storm system. Storm Freq. Existing Peak discharge Developed Peak discharge from basin From Unity basin from Unity basin to Lakewood storm system to Lakewood storm system 2 0.99 0.66 10 1.49 1.01 25 1.68 1.19 50 not documented 1.29 100 not documented 1.41 As can be seen from the above, the proposed detention basin provides complete attenuation of the peak flows from the site to levels at or below existing peak flow rates. Once again, the analysis does not take into account any infiltration from the proposed basins on the site, and therefore is extremely conservative. The actual developed discharge rates will be less than calculated. Off-Site Storm Sewer Calculations: The storm sewer has been analyzed for the 10-year design. The design calculations are included in appendix H. Conclusions: By intercepting runoff and providing detention on the subject site, we maintain existing peak flows to the Lakewood storm system. APPENDIX B �TIZ�S�i�30 iao-I K30 RUNOFF CURVE NUMBER COMPUTATION Version 2.00 Project : 1930 jmj-emerald green User: ram Date: County : hartford State: ct Checked: Date: Subtitle: existing conditions - to unity basin 1 08-18-04 ------------------------------------------------------------------------------- Hydrologic Soil Group COVER DESCRIPTION A B C D Acres (CN) ------------------------------------------------------------------------------- FULLY DEVELOPED URBAN AREAS (Veg Estab. ) Open space (Lawns,parks etc. ) Good condition; grass cover > 75% - 2.39 (61) - Impervious Areas Paved parking lots, roofs, driveways - 1.39(98) - Total Area (by Hydrologic Soil Group) 3.78 ------------------------------------------------------------------------------- TOTAL DRAINAGE AREA: 3.78 Acres WEIGHTED CURVE NUMBER: 75* ------------------------------------------------------------------------------- * - Generated for use by GRAPHIC method e TIME OF CONCENTRATION AND TRAVEL TIME Version 2.00 Project 1930 jmj-emerald green User: ram Date: County hartford State: ct Checked: Date: Subtitle: existing conditions - to unity basin 1 08-18-04 ------------------------------------------------------------------------------- Flow Type 2 year Length Slope Surface n Area Wp Velocity Time rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr) ------------------------------------------------------------------------------- Sheet 3.2 35 0.25 e 0.026 Shallow Concent'd 130 .05 p 0.008 Open Channel 300 2 0.042 Time of Concentration = 0.08* --- Sheet Flow Surface Codes --- A Smooth Surface F Grass, Dense --- Shallow Concentrated --- B Fallow (No Res. ) G Grass, Burmuda --- Surface Codes --- C Cultivated < 20 o Res. H Woods, Light P Paved D Cultivated > 20 o Res. I Woods, Dense U Unpaved E Grass-Range, Short J Range, Natural * - Generated for use by GRAPHIC method GRAPHICAL PEAK DISCHARGE METHOD Version 2.00 Project 1930 jmj-emerald green User: ram Date: County : hartford State: ct Checked: Date: Subtitle: existing conditions - to unity basin 108-18-04 Data: Drainage Area 3.78 * Acres Runoff Curve Number 75 * Time of Concentration: 0.08 * Hours Rainfall Type III Pond and Swamp Area NONE ----------------------------------------------------------- ----------------------------------------------------------- 1 Storm Number 1 1 1 2 1 3 1 4 1 5 1 1----------------------1 ------1------1------1------I------I I Frequency (yrs) 1 2 1 10 i 25 I 50 1 100 I I I ! I I I I j 24-Hr Rainfall (in) I 3.2 I 4.7 1 5.5 1 6.2 1 6.9 I I I I I I I I Ia/P Ratio 1 0.21 1 0.14 1 0.12 1 0.11 10.10 1 I ! I I I ! I 1 Used 10.21 1 0.14 10.12 10.11 10.10 1 I I I I I ! I ( Runoff (in) 1 1.09 1 2.21 1 2.86 1 3.45 ( 4.06 1 I I I I I I i Unit Peak Discharge 11.024 ► 1.053 11.062 11.069 11.072 1 1 (cfs/acre/in) I I I I I I I I I I I I I I Pond and Swamp Factorl 1.00 1 1.00 1 1.00 1 1.00 1 1.00 1 I O.oa Ponds Used I I I I I 1 I---------------------- ------1------1------1------1------1 Peak Discharge (cfs) I 4 1 9 1 11 1 14 I 16 ----------------------------------------------------------- ----------------------------------------------------------- * - Value(s) provided from TR-55 system routines APPENDIX C RUNOFF CURVE NUMBER COMPUTATION Version 2.00 Project : 1930-EMERALD GREEN User: RAM Date: County : HARTFORD State: CT Checked: Date: Subtitle: PROPOSED CONDITIONS-TO BASIN 1 ------------------------------------------------------------------------------- Hydrologic Soil Group COVER DESCRIPTION A B C D Acres (CN) ------------------------------------------------------------------------------- FULLY DEVELOPED URBAN AREAS (Veg Estab. ) Open space (Lawns,parks etc. ) Good condition; grass cover > 750 - 5.03 (61) - - Impervious Areas Paved parking lots, roofs, driveways - 1.73(98) - - Total Area (by Hydrologic Soil Group) 6.76 TOTAL DRAINAGE AREA: 6.76 Acres WEIGHTED CURVE NUMBER: 70* ------------------------------------------------------------------------------- * - Generated for use by GRAPHIC method TIME OF CONCENTRATION AND TRAVEL TIME Version 2.00 Project : 1930-EMERALD GREEN User: RAM Date: Countv HARTFORD State: CT Checked: Date: Subtitle: PROPOSED CONDITIONS-TO BASIN 1 ------------------------------------------------------------------------------- Flow Type 2 year Length Slope Surface n Area Wp Velocity Time rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr) ------------------------------------------------------------------------------- Sheet 3.2 35 .02 H 0.155 Sheet 140 .02 E 0.214 Open Channel 870 2 0.121 Time of Concentration = 0.49* --- Sheet Flow Surface Codes --- A Smooth Surface F Grass, Dense --- Shallow Concentrated --- B Fallow (No Res. ) G Grass, Burmuda --- Surface Codes --- C Cultivated < 20 s Res. H Woods, Light P Paved D Cultivated > 20 o Res. I Woods, Dense U Unpaved E Grass-Range, Short J Range, Natural * - Generated for use by GRAPHIC method GRAPHICAL PEAK DISCHARGE METHOD Version 2.00 Project : 1930-EMERALD GREEN User: RAM Date: County : HARTFORD State: CT Checked: Date: Subtitle: PROPOSED CONDITIONS-TO BASIN 1 Data: Drainage Area 6.76 * Acres Runoff Curve Number 70 * Time of Concentration: 0.49 * Hours Rainfall Type III Pond and Swamp Area NONE 1 Storm Number i 1 1 2 1 3 1 4 l 5 ----------------------1------1------1------1------1------i 1 Frequency (yrs) 1 2 l 10 1 25 i 50 l 100 1 I i I I I I I l 24-Hr Rainfall (in) ► 3.2 1 4.7 I 5.5 ) 6.2 1 6.9 I I I I I I I Ia/P Ratio 10.27 ( 0.18 1 0.16 1 0.14 10.12 1 I I I I I I I I Runoff (in) i 0.83 i 1.82 l 2.41 l 2.96 l 3.54 i I I I I I I i Unit Peak Discharge 10.561 10.605 10.619 10.628 10.635 1 l (cfs/acre/in) I I I I I I 1 I I I I I I Pond and Swamp Factorl 1.00 1 1.00 1 1.00 1 1.00 1 1.00 1 I 0.0% Ponds Used I I I I I I 1----------------------1------I------1------1------1------1 i Peak Discharge (cfs) l 3 1 7 1 10 l 13 l 15 l * - Value(s) provided from TR-55 system routines APPENDIX D Reservoir Report Page 1 Reservoir No. 5 - Church St. Pond Hydraflow Hydrographs by Intelisolve Pond Data Pond storage is based on known contour areas. Conic method used. Stage l Storage Table Stage(ft) Elevation(ft) Contour area(sgft) Incr.Storage(cult) Total storage(cult) 0.00 70.00 1,750 0 0 1.00 71.00 2,600 2,161 2,161 2.00 72.00 3,455 3,017 5,178 3.00 73.00 4,435 3,934 9,112 4.00 74.00 5,415 4,916 14,029 5.00 75.00 6,620 6,007 20,036 6.00 76.00 7,825 7,213 27,249 7.00 77.00 9,200 8,502 35,751 8.00 78.00 10,575 9,879 45,630 9.00 79.00 12,110 11,333 56,963 10.00 80.00 13,650 12,871 69,834 Culvert/Orifice Structures Weir Structures [A] IBl [C] [D] [A] [B] [C] [D] Rise in = 5.3 0.0 0.0 0.0 Crest Len ft = 0.00 0.00 0.00 0.00 Span in = 5.3 0.0 0.0 0.0 Chest El.ft = 0.00 0.00 0.00 0.00 No.Barrels = 1 0 0 0 Weir CoefL = 3.33 0.00 0.00 3.33 Invert El.ft = 74.00 0.00 0.00 0.00 Weir Type = -- --- --- --- Length ft = 53.0 0.0 0.0 0.0 Multi-Stage = No No No No Slope% = 0.00 0.00 0.00 0.00 N-Value = .013 .000 .000 .000 Orif.CoefL = 0.60 0.00 0.00 0.00 Multi-Stage = n/a No No No Exfiltration Rate = 0.00 inthrtsgft TaiMNater Elev.= 0.00 ft Note:All outflows have been analyzed under inlet and outlet control. Stage/Storage/Discharge Table Stage Storage Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D EMI Total ft cuft ft cfs cis cis cfs cis cfs cis cis efs cis 0.00 0 70.00 0.00 -- - - - - __ - __ 0.00 1.00 2,161 71.00 0.00 -- --- --- - -- -- - --- 0.00 2.00 5,178 72.00 0.00 - - - -_ __ - - __ 0.00 3.00 9,112 73.00 0.00 - - - - - - - - 0.00 4.00 14,029 74.00 0.00 - - --- - - --- -- -- 0.00 5.00 20,036 75.00 0.36 --- - --- -- - --- -- --- 0.36 6.00 27,249 76.00 0.59 - - - -- - - - - 0.59 7.00 35,751 77.00 0.76 - -- - - -- - - - 0.76 8.00 45,630 78.00 0.90 -- - -- --- -- -- --- -- 0.90 9.00 56,963 79.00 1.02 - __ ___ ___ ___ ___ __ ___ 1.02 10.00 69,834 80.00 1.12 - - --- --- --- --- -- --- 1.12 APPENDIX E Hydrograph Report Page, Hydraflow Hydrograos by Intelisolve Hyd. No. 3 Em. subd.-basin disch. Hydrograph type = Reservoir Peak discharge = 0.20 cfs Storm frequency = 2 yrs Time interval = 2 min Inflow hyd. No. = 1 Reservoir name = Church St. Pond Max. Elevation = 74.29 ft Max. Storage = 15,766 cuft Storage Indication method used. Outflow hydrograph volume=6,276 cult Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D EAU Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 17.37 0.25 74.27 0.18 -- ---- ---- ---- ----- --- ---- --- 0.18 17.40 0.25 74.27 0.18 ----- -- -_- --- ----- ---- --- -- 0.18 17.43 0.24 74.27 0.18 ----- ----- --- ---- ----- ---- --_- ----- 0.18 17.47 0.24 74.28 0.18 --- ----- --- -- -- ---- -- -- 0.18 17.50 0.24 74.28 0.18 --- --- --- ---- --- --- _- --_ 0.18 17.53 0.24 74.28 0.18 ----- ----- --- ----- ----- ----- ----- ----- 0.18 17.57 0.24 74.28 0.18 --- ---- ---- -- --- -- --- --- 0.18 17.60 0.23 74.28 0.19 ----- ----- --- --- --- -- --- --- 0.19 17.63 0.23 74.28 0.19 ----- ---- ---- -- ---- ---- ---- ----- 0.19 17.67 0.23 74.28 0.19 - - -- - -- --- - ---- 0.19 17.70 0.23 74.28 0.19 - -- --- ---- ---- -_ -- ---- 0.19 17.73 0.23 74.28 0.19 ---- ----- ----- ----- ----- --- ---- ----- 0.19 17.77 0.23 74.28 0.19 -- --_ _____ ____ _____ - ___ ____ 0.19 17.80 0.22 74.28 0.19 -- --- ---- ---- ---- -- --- ---- 0.19 17.83 0.22 74.29 0.19 ---- --- --- ----- ---- --- ----- -- 0.19 17.87 0.22 74.29 0.19 -- ----- _- - --- --- --- ---- 0.19 17.90 0.22 74.29 0.19 --- -- --- -- ---- ----- --- --- 0.19 17.93 0.22 74.29 0.19 ----- --- ---- ---- ----- --- ----- -- 0.19 17.97 0.21 74.29 0.19 --- --- ---- ----- --- --- ----- ----- 0.19 18.00 0.21 74.29 0.19 -- - -- ---- -- -- -- -- 0.19 18.03 0.21 74.29 0.19 ----- -- --- --- ---- --- ----- ----- 0.19 18.07 0.21 74.29 0.19 --_ -- - --- --- -- ---- --- 0.19 18.10 0.21 74.29 0.19 ____ -_- 0.19 18.13 0.20 74.29 0.20 ---- ---- ----- ---- ----- ---- ----- ----- 0.20 18.17 0.20 74.29 0.20 ---- -- __- --- ---- --- ----- --- 0.20 18.20 0.20 74.29 0.20 - - --- --- ----- - -- ----- 0.20 18.23 0.20 74.29 0.20 --- --- --- --- ----- -- ---- --- 0.20 18.27 0.20 74.29 0.20 - - ---- -- __- ___ _____ _____ 0.20 18.30 0.20 74.29 0.20 ---- - --_ - _---- ---- ---- --- 0.20 18.33 0.20 74.29 << 0.20 --- ---- ---_ --- -- --- ---- ----- 0.20 << 18.37 0.19 74.29 0.20 ----- -- ---- -- ----- ---- --- --- 0.20 18.40 0.19 74.29 0.20 -- - -- ----- ----- - ---- ----- 0.20 18.43 0.19 74.29 0.20 --- --- -- ---- ---- ---- ----- ----- 0.20 18.47 0.19 74.29 0.20 -- - ----- ----- _--- -- -- -- 0.20 18.50 0.19 74.29 0.20 0.20 18.53 0.19 74.29 0.20 ---- --- ----- ---- --- --- ----- ---- 0.20 18.57 0.19 74.29 0.20 - --- __- - -- ---- - ----- 0.20 18.60 0.19 74.29 0.20 -- -- --- ----- -- --_- --- -- 0.20 Continues on next page... Em.subd.-basin disch. Page 2 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D EAR Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 18.63 0.19 74.29 0.19 - -- - -- --- ---- - - 0.19 18.67 0.19 74.29 0.19 ---- ----- __- -_ 0.19 18.70 0.19 74.29 0.19 ----- ----- ----- ----- --- ----- ----- ----- 0.19 18.73 0.19 74.29 0.19 -- -- -- ---- -_ --- ----- ---- -- 0.19 18.77 0.19 74.29 0.19 --- -_ ---- -- ---- ----- ---- --- 0.19 18.80 0.19 74.29 0.19 ---- --- ---_- ---- --- -- --- ----- 0.19 18.83 0.18 74.29 0.19 ----- - __- _- _- -_ _- -- 0.19 18.87 0.18 74.29 0.19 ---- ----_ - -- --- -- -- -- --- 0.19 18.90 0.18 74.29 0.19 ---- ----- ----- ----- ----- ----- ---- ---- 0.19 18.93 0.18 74.29 0.19 -- ___ _- ___ __- _____ ___ ____ 0.19 18.97 0.18 74.29 0.19 --- ---- - -_ -- -_ --- -- 0.19 19.00 0.18 74.29 0.19 ---- --- ---- --- --- - ---- --- ---- 0.19 19.03 0.18 74.29 0.19 --- - - ----- -- --- --- ---- 0.19 19.07 0.18 74.29 0.19 -- -- -- --_ ---- ----- --- --- 0.19 19.10 0.18 74.29 0.19 ----- ---- ---- ----- ---- --- ----- ---- 0.19 19.13 0.18 74.29 0.19 - - ---- --- ----- -- ---- --- 0.19 19.17 0.18 74.29 0.19 ---- -_ - -- ----- --- -- -- 0.19 19.20 0.18 74.29 0.19 ---- -- --- -- ----- ---- ---- ----- 0.19 19.23 0.18 74.28 0.19 - -- -- - - _- ---- -- ----- 0.19 19.27 0.18 74.28 0.19 --- - -- --- --_ - ---- - 0.19 19.30 0.18 74.28 0.19 ---- ----- ----- ----- ----- ----- ----- ----- 0.19 19.33 0.18 74.28 0.19 --- ---- -- --- ---- ----- --- --- 0.19 19.37 0.18 7428 0.19 -- --- --- --- --- ----- --- --- 0.19 19.40 0.18 74.28 0.19 --- --- ---- ---- --- --- --- ---- 0.19 19.43 0.18 74.28 0.19 -- -- -- -- - ----- ----- ----- 0.19 19.47 0.17 74.28 0.19 --- --- ---- ----- ---- ----- --- --- 0.19 19.50 0.17 74.28 0.19 ---- --- ----- ---- ----- ----- ----- ----- 0.19 19.53 0.17 74.28 0.19 -- --- --- -- ---- ---- -- -- 0.19 19.57 0.17 74.28 0.19 --- -- --- -- --- ---- ---- --- 0.19 19.60 0.17 74.28 0.19 --- --- --- ---- --- --- ---- ---- 0.19 19.63 0.17 74.28 0.19 -- ---- - -- --- ----- --- --- 0.19 19.67 0.17 74.28 0.19 -- -- --- --- -- ---- ----- -- 0.19 19.70 0.17 74.28 0.19 ----- ----- ---- ---_ -- ---- ----- ---- 0.19 19.73 0.17 74.28 0.19 ---- -- ---- -- ---- ----- -- -- 0.19 19.77 0.17 74.28 0.19 --- --- ---- - ----- - --- --- -- 0.19 19.80 0.17 74.28 0.19 --- --- -- -- ----- ---- ----- ---- 0.19 19.83 0.17 74.28 0.19 -- ---- ----- ----- _- --- -- --- 0.19 19.87 0.17 74.28 0.19 -- _-_ _- ___ ____ _- ____ ____ 0.19 19.90 0.17 74.28 0.18 ---- -- ----- -- ----- ----- --- ---- 0.18 19.93 0.17 74.28 0.18 --- - ---- --- -- ----- --- ---- 0.18 19.97 0.17 74.28 0.18 --_ ---- ---_ -- -- -- --- -- 0.18 20.00 0.17 74.28 0.18 ---- _- ____ _- _____ -- _____ __-- 0.18 20.03 0.17 74.28 0.18 ----- --- --- ---- ----- ---- ---- 0.18 20.07 0.16 74.28 0.18 --- - _- -- -- ----_ -- -- 0.18 20.10 0.16 74.28 0.18 --- -- ---- --- ----- ----- ----- --- 0.18 20.13 0.16 74.28 0.18 -- -- _-_ _ ____ --_ __- 0.18 20.17 0.16 74.28 0.18 -- -- ___ _____ _ _____ _- 0.18 20.20 0.16 74.28 0.18 -- ----- ----- ---- --- ---- --- ---- 0.18 20.23 0.16 74.28 0.18 -- --- -- - - -- ---- -- 0.18 20.27 0.16 74.27 0.18 -- --- _- _____ ___ -_ ___ -_ 0.18 20.30 0.16 74.27 0.18 ---- ---- --- ---- ----- --- ----- ---- 0.18 Continues on next page... Em.subd:basin disch. Page 3 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C CIv D Wr A Wr B Wr C Wr D EAU Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 20.33 0.16 74.27 0.18 - - - -- ---- -- --- - 0.18 20.37 0.16 74.27 0.18 ---- --- --- ----- ---- --- -- -- -- 0.18 20.40 0.16 74.27 0.18 ---- ---- ---- ---- ---- ----- ---- --- 0.18 20.43 0.16 74.27 0.18 - --- - ---- --- ---- -- -- 0.18 20.47 0.16 74.27 0.18 ---- -- --- - --- --- - -- -- 0.18 20.50 0.16 74.27 0.18 ----- -- ---- ---- --- --- ---- ---- 0.18 20.53 0.16 74.27 0.18 - -- - -- ---- ---- - - 0.18 20.57 0.16 74.27 0.18 --- --- - -- -- ---- ----- --- 0.18 20.60 0.16 74.27 0.18 -- ---- --- ---- ---- ---- ---- ---- 0.18 20.63 0.16 74.27 0.18 -- -- ___ ___ ____ -__ _- _____ 0.18 ...End Hydrograph Report Pagel Hydraflow Hydrographs by Intelisolve Hyd. No. 3 Em. subd.-basin disch. Hydrograph type = Reservoir Peak discharge = 0.61 cfs Storm frequency = 10 yrs Time interval = 2 min Inflow hyd. No. = 1 Reservoir name = Church St. Pond Max. Elevation = 76.08 ft Max. Storage = 27,927 cuft Storage Indication method used. Outflow hydrograph volume=30,497 cult Hydrograph Discharge Table Time Inflow Elevation Clv A Civ B Clv C CIv D Wr A Wr B Wr C Wr D ExHl Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 13.93 1.21 75.78 0.55 ---- --- ----- ----- ----- ----- ----- --- 0.55 13.97 1.19 75.79 0.55 ----- --- --- ----- --- --- ----- ----- 0.55 14.00 1.18 75.80 0.55 ---- ----- ----- ----- ----- ----- ---- --- 0.55 14.03 1.16 75.81 0.56 - - -- --- ----- ----- ----- -- 0.56 14.07 1.15 75.82 0.56 --- ----- --- ----- --- --- ----- ---- 0.56 14.10 1.13 75.83 0.56 ----- -- --- ----- ----- ---- ---- ---- 0.56 14.13 1.12 75.84 0.56 -- --- --- ---- ---- -_-- ----- --- 0.56 14.17 1.11 75.85 0.56 ---- ----- --- ----- -- ----- ----- ---- 0.56 14.20 1.09 75.85 0.57 ----- ---- --- ----- ---- ---- -- ---- 0.57 14.23 1.08 75.86 0.57 -- -- --- --- ----- --- ----- - 0.57 14.27 1.07 75.87 0.57 --- ----- -- ----- ---- ---- -- ---- 0.57 14.30 1.05 75.88 0.57 ----- ---- ---- ---- ----- ---- ---- ----- 0.57 14.33 1.04 75.89 0.57 - ---- -- ---- --- -- -- -- 0.57 14.37 1.03 75.90 0.57 - -- ---- --- --- ----- --- ----- 0.57 14.40 1.02 75.90 0.58 -- -- --- ---- ---- ---- ---- ----- 0.58 14.43 1.01 75.91 0.58 -- ---- --- --- ----- -- ----- -- 0.58 14.47 1.00 75.92 0.58 ---- -- --- ----- ----- ----- --- ----- 0.58 14.50 0.99 75.92 0.58 ----- --- ---- ----- ----- ---- --- ----- 0.58 14.53 0.98 75.93 0.58 --- -- ----- --- ---- ----- --_- ---- 0.58 14.57 0.98 75.94 0.58 --- _- -- ----- ----- ---- --- ----- 0.58 14.60 0.97 75.94 0.58 -- --- --- --- -- --- ---- -- 0.58 14.63 0.96 75.95 0.58 ----- -- ---- ---- --- - ---- -- 0.58 14.67 0.95 75.96 0.59 --- ----- ----- ----- ----- ---- ----- --- 0.59 14.70 0.95 75.96 0.59 ----- --- ----- ----- ---- ----- ----- ----- 0.59 14.73 0.94 75.97 0.59 -- ---- -- -__ __- --- __-_ _-- 0.59 14.77 0.93 75.97 0.59 -- -_ -- ---- ---- --- ---- ---- 0.59 14.80 0.92 75.98 0.59 -- -- -- -_- --- - - ---- ---- 0.59 14.83 0.92 75.99 0.59 -- --- ----- ----- -- -- -- -- 0.59 14.87 0.91 75.99 0.59 --- ----- ----- --- ---- -- --- ----- 0.59 14.90 0.90 76.00 0.59 ---- ---- -_- --- --- ----- ---- -- 0.59 14.93 0.90 76.00 0.59 -- -- -- --- --- --- -- --- J.59 14.97 0.89 76.00 0.60 ----- -- -- --- --- -- -- -- t 60 15.00 0.88 76.01 0.60 - ----- - --- -- -- --- ----- 0:60 15.03 0.87 76.01 0.60 - ----- - ---_ --- - - --- 0.60 15.07 0.87 76.02 0.60 - --- --- --- ---- ---- -- -- 0.60 15.10 0.86 76.02 0.60 ---- ----- ---- ----- ---- ---- ----- ---- 0.60 15.13 0.85 76.02 0.60 ----- -- ----- - -- - ----- --- 0.60 15.17 0.84 76.03 0.60 -- - ---- ---- -- -- - - 0.60 Continues on next page... Em.subd.-basin&ch. Page 2 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D ExHI Outflow (hrs) ds ft efs cfs cfs cfs cfs cfs cfs cfs cfs cfs 15.20 0.84 76.03 0.60 ---- - -- - - -- -- --- 0.60 15.23 0.83 76.03 0.60 ----- --- --- ---- ----- ---- --- --- 0.60 15.27 0.82 76.04 0.60 ---- ----- ---- ---- ----- ----- ---- ----- 0.60 15.30 0.81 76.04 0.60 --- --- ---- ---- ---- -- ---- ---- 0.60 15.33 0.81 76.04 0.60 - ---- --- ---- - -- ---- --- 0.60 15.37 0.80 76.05 0.60 - --- - --- -- -- ----- ---- 0.60 15.40 0.79 76.05 0.60 ----- ----- -- -- -- -- -- ---- --- 0.60 15.43 0.78 76.05 0.60 ----- ---- --- - ----- ---- ---- --- ---- 0.60 15.47 0.78 76.05 0.60 ----- ----- --- ----- ---- --- ----- ----- 0.60 15.50 0.77 76.06 0.61 -- -- -- ---- ---- -- ---- ---- 0.61 15.53 0.76 76.06 0.61 -- -- -- -- --- --- -- -- 0.61 15.57 0.75 76.06 0.61 --- ---- --- ----- --- ----- -- --- 0.61 15.60 0.75 76.06 0.61 -- - --- - --- ---- -- -- 0.61 15.63 0.74 76.06 0.61 ----- -- ----- ----- --- ---- ----- --- 0.61 15.67 0.73 76.07 0.61 ----- --- ----- ----- ----- ----- ----- ----- 0.61 15.70 0.72 76.07 0.61 -- -- --- ----- ---- ---- ----- ---- 0.61 15.73 0.71 76.07 0.61 --- -- -- --- --- ---- -- ----- 0.61 15.77 0.71 76.07 0.61 --- -- ---- ---- ----- --- ---- -- 0.61 15.80 0.70 76.07 0.61 ---- -- -- --- ----- --- -- ----- 0.61 15.83 0.69 76.07 0.61 ---- -- ---- ----- ----- --- ---- ---- 0.61 15.87 0.68 76.07 0.61 --- ---- ----- ----- ----- ---- ----- ----- 0.61 15.90 0.68 76.08 0.61 ---- --- ----- --- ----- ----- --- --- 0.61 15.93 0.67 76.08 0.61 -- --- -- ---- ---- -- -- - 0.61 15.97 0.66 76.08 0.61 ---- ----- ---- ---- --- ---- --- ---- 0.61 16.00 0.65 76.08 0.61 - -- -- - ---- - - - 0.61 16.03 0.64 76.08 0.61 0.61 16.07 0.64 76.08 0.61 ---- ----- ----- ----- ----- ----- ----- ----- 0.61 16.10 0.63 76.08 0.61 ----- ---- ----- ---- ---- ----- ----- ----- 0.61 16.13 0.62 76.08 0.61 -- -- - --- --- --- ---- - --- 0.61 16.17 0.61 76.08<< 0.61 --- -- ---- ----- -- ---- --- --- 0.61 << 16.20 0.61 76.08 0.61 -- --- --- --- ----- ----- -- -- 0.61 16.23 0.60 76.08 0.61 -- ---- -- - -- ----- ----- ----- ---- 0.61 16.27 0.59 76.08 0.61 --- ---- ----- ----- ----- ----- ---- ---- 0.61 16.30 0.59 76.08 0.61 --- ---- ----- --- ---- --- ---- -- 0.61 16.33 0.58 76.08 0.61 - - --- --- ---- -- -- ----- 0.61 16.37 0.57 76.08 0.61 - ---- ---- ---- --- --- -- ----- 0.61 16.40 0.57 76.08 0.61 ----- -- ---- -- ---- ----- ----- ---- 0.61 16.43 0.56 76.08 0.61 --- --- ----- --- ---- --- ----- ----- 0.61 16.47 0.56 76.08 0.61 --- ---- ---- ----- ---- ----- ---- ---- 0.61 16.50 0.56 76.08 0.61 ---- ___ _____ _-__ __- _-_ _-_ ____ 0.61 16.53 0.55 76.08 0.61 ---- - ----- --- ---- --- --- ----- 0.61 16.57 0.55 76.07 0.61 --- --- ---- ---- -- ----- --- -- 0.61 16.60 0.54 76.07 0.61 - ---- - ---- ---- ----- ----- -- 0.61 16.63 0.54 76.07 0.61 -- _-- ----- ___ ___ ___ _____ -_ 0.61 16.67 0.54 76.07 0.61 --- ---- ---- ---- ---- --- -- ----- 0.61 16.70 0.53 76.07 0.61 -- - - ----- ----- ---- ---- --- 0.61 16.73 0.53 76.07 0.61 ---- - - -- ----- --- ---- -- 0.61 16.77 0.53 76.07 0.61 -- - ----- ----- ---- -- ----- -- 0.61 16.80 0.52 76.07 0.61 - ---- -- - - - - - 0.61 16.83 0.52 76.07 0.61 -- - ---- ----- ----- ----- ---- ---- 0.61 16.87 0.51 76.06 0.61 ----- ---- -- ---- ----- ---- ----- --- 0.61 Continues on next page... Em.subd:basin disch. Page 3 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D EAU Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 16.90 0.51 76.06 0.61 -- -- --- - ---- ----- - ~- 0.61 16.93 0.51 76.06 0.61 0.61 16.97 0.50 76.06 0.61 ---- ---- ----- ----- --- ----- ----- ----- 0.61 17.00 0.50 76.06 0.61 -- ----- ---- ----- ---- --- -~-- ----- 0.61 17.03 0.50 76.06 0.61 -- ---- ----- --- ---- ~-- ----- -- 0.61 17.07 0.49 76.06 0.61 ---- ----- --- --- ---- ~-- ----- --- 0.61 17.10 0.49 76.05 0.60 -- ---- -- -~ - ----- - ~- 0.60 17.13 0.49 76.05 0.60 -- - --- -- ---- ----- ~-~ -- ---- 0.60 17.17 0.48 76.05 0.60 ---- ---- ----- ---- ---- ----- ---- ~--- 0.60 17.20 0.48 76.05 0.60 --- ----- ---- ----- ---- ---- ---~ ~--- 0.60 17.23 0.48 76.05 0.60 --- --- - -- -- --- - - 0.60 17.27 0.47 76.05 0.60 _-- -__ -_ __ _ 0.60 17.30 0.47 76.04 0.60 - -- --- -- --- -- ----- -- 0.60 17.33 0.47 76.04 0.60 - --- ---- ----- ---- ----- ---- ----- 0.60 17.37 0.46 76.04 0.60 ----- ----- ----- --- ---- ---- --- ----- 0.60 17.40 0.46 76.04 0.60 - ----- ----- ---- ---- ---- ---- ----- 0.60 17.43 0.46 76.04 0.60 ---- -- - --- -- --- - ---- 0.60 17.47 0.45 76.03 0.60 -- --- ----- ---- --- -- - --- 0.60 17.50 0.45 76.03 0.60 --- --- ---- -- -- ---- -- --- 0.60 17.53 0.45 76.03 0.60 --- ---- ----- ----- ---- ---- --- ----- 0.60 17.57 0.44 76.03 0.60 ----- ----- ----- ----- --- ---- ----- ----- 0.60 17.60 0.44 76.03 0.60 --- ----- ----- --- --- --- --- ----- 0.60 17.63 0.43 76.02 0.60 - --- ---- ---- ----- --- --- ----- 0.60 17.67 0.43 76.02 0.60 ---- ---- --- -- ---- ---- -- ----- 0.60 17.70 0.43 76.02 0.60 - --- - - --- - -- 0.60 17.73 0.42 76.02 0.60 ---- --- ---- ---- --- --- ---- -- 0.60 17.77 0.42 76.01 0.60 ----- ----- ----- ----- ----- ----- ----- ----- 0.60 17.80 0.42 76.01 0.60 ---- ---- --- - --- --- --- ----- 0.60 17.83 0.41 76.01 0.60 ---- --- -- -- ---- ----- --- -- 0.60 17.87 0.41 76.01 0.60 --- --- --- --- ---- --- --- -- 0.60 17.90 0.41 76.00 0.60 ----- ----- -- -- -- --- - -- 0.60 17.93 0.40 76.00 0.59 ---- ----- ---- --- ---- --- ---- ----- 0.59 17.97 0.40 76.00 0.59 ---- ----- ---- ---- --- --- ---- ----- 0.59 18.00 0.40 75.99 0.59 ---- --- ---- -- ----- ----- --- ---- 0.59 18.03 0.39 75.99 0.59 -- ---- ----- --- --- ----- --- -- . 0.59 18.07 0.39 75.99 0.59 ---- ---- ---- --- ---- --- --- -- 0.59 18.10 0.38 75.98 0.59 -- --- --- --- -- -- - ---- 0.59 18.13 0.38 75.98 0.59 - ----- -- ----- ----- --- -- ----- 0.59 18.17 0.38 75.98 0.59 ----- ----- ---- ----- ---- ---- ---- ----- 0.59 18.20 0.37 75.97 0.59 - --- ---- --- ---- - --- --- 0.59 18.23 0.37 75.97 0.59 -- ----- -- -- --- --- ----- --- 0.59 18.27 0.37 75.97 0.59 --- ---- --- -__ _____ -__ -__ ___ 0.59 18.30 0.37 75.96 0.59 - -- --- - - - -- ---- 0.59 18.33 0.36 75.96 0.59 -- --- ----- ---- --- ----- ----- ----- 0.59 18.37 0.36 75.95 0.59 --- ----- --- ---- ---- --- ----- ----- 0.59 18.40 0.36 75.95 0.59 ---- ----- --- -- - ---- --- ---- 0.59 18.43 0.36 75.95 0.58 - -- -- -- - - ----- -- 0.58 18.47 0.36 75.94 0.58 --- ---- ----- -_- ___ _- _____ _____ 0.58 18.50 0.35 75.94 0.58 -- -- ---- - -- ---- - --- 0.58 18.53 0.35 75.94 0.58 --- --- -- --- -- -- - ----- 0.58 18.57 0.35 75.93 0.58 ----- -- -- ----- ----- ---- ---- ---- 0.58 Continues on next page... Em.subd:basin disch. Page 4 Hydrograph Discharge Table Time Inflow Elevation Civ A Clv B Clv C Clv D Wr A Wr B Wr C Wr D EMI Outflow (hrs) cfs It cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 18.60 0.35 75.93 0.58 - ----- -- - - - - -- 0.58 18.63 0.35 75.92 0.58 ----- -=-- --- ----- ----- ---- ---- -- 0.58 18.67 0.35 75.92 0.58 --- --- ----- ----- ---- ----- ---- ---- 0.58 18.70 0.35 75.92 0.58 - - ----- --- -- ----- --- --- 0.58 18.73 0.35 75.91 0.58 ---- - -- - - -- - -- 0.58 18.77 0.34 75.91 0.58 ----- ---- -- --- -- ----- ---- 0.58 18.80 0.34 75.91 0.58 - - -- - -_- -- --- --- 0.58 18.83 0.34 75.90 0.58 --- - - ---- -- -- ----- --- 0.58 18.87 0.34 75.90 0.57 ----- ----- --- ---- ---- ----- ---- ---- 0.57 18.90 0.34 75.89 0.57 - ---- _- --- --- ----- ----- --- 0.57 18.93 0.34 75.89 0.57 - -- -_ -_ - - ----- -- 0.57 18.97 0.34 75.89 0.57 --- -_ --- -- --- ---- --- ---- 0.57 19.00 0.34 75.88 0.57 ---- ----- -_ --_ - - ---- ---- 0.57 19.03 0.34 75.88 0.57 - -- -- -- ----- --- --- ----- 0.57 19.07 0.34 75.87 0.57 ----- -_-- -- ---- ----- ---- --- ----- 0.57 19.10 0.33 75.87 0.57 ----- --- --- --- ---_ ---- _-- -- 0.57 19.13 0.33 75.87 0.57 -- ---- --- --- -- --- - ---- 0.57 19.17 0.33 75.86 0.57 ----- ___ ___ __- ___ ___ _____ _-_- 0.57 19.20 0.33 75.86 0.57 -- - -- --- ----- --- ---- -- 0.57 19.23 0.33 75.85 0.57 --- - -- ----- ---- ---- --_ ---_ 0.57 19.27 0.33 75.85 0.57 ---- _--- --- ----- ----- _--- --- ----- 0.57 19.30 0.33 75.85 0.56 -_-- -_- -- ---- ---- ----- ---- ----- 0.56 19.33 0.33 75.84 0.56 ----- --- -_-- ---- --- -_-- --- --- 0.56 19.37 0.33 75.84 0.56 ---- ---- --- ---- ---- ----- _-_ _-- 0.56 19.40 0.32 75.83 0.56 0.56 19.43 0.32 75.83 0.56 --- -- ---- --- ----- ---_ ----- ---_ 0.56 19.47 0.32 75.83 0.56 ---- -_-- ----- ----- ----- ---- ---- -_-- 0.56 19.50 0.32 75.82 0.56 ---- ---- ---- --- --- ----- ---- ---- 0.56 19.53 0.32 75.82 0.56 -- _-_ ---- ----- --- - -- --- 0.56 19.57 0.32 75.81 0.56 --- ---- ----- ---- ----- ----- -- ---- 0.56 19.60 0.32 75.81 0.56 - -- --- --_ --- --- _-- _-- 0.56 19.63 0.32 75.81 0.56 _-- ---_ ----- ---- ----- -- --- _-- 0.56 19.67 0.32 75.80 0.56 ---- ---- --- ----- ----- ----- ---- ----- 0.56 19.70 0.32 75.80 0.56 ----- ___ _- ____ ____ -_ ____ -__ 0.56 19.73 0.31 75.80 0.55 --- _--- ---- --- ----- ---- ---- ---- 0.55 19.77 0.31 75.79 0.55 ---- --- --- ---- ---=- -- --- _--_ 0.55 19.80 0.31 75.79 0.55 ---- ---- --_- ----- --_- ----- ---- ---- 0.55 19.83 0.31 75.78 0.55 --- ----- -_ ___ ___-- ___-- -_-- __-_ 0.55 19.87 0.31 75.78 0.55 ---- ----- ---- ---- ----- ----- --- ----- 0.55 19.90 0.31 75.78 0.55 0.55 19.93 0.31 75.77 0.55 --- _--- ----- ----- ---- ----- ----- ---- 0.55 ...End Hydrograph Report Page, Hydraflow"rographs by Intelisolve Hyd. No. 3 Em. subd.-basin disch. Hydrograph type = Reservoir Peak discharge = 0.79 cfs Storm frequency = 25 yrs Time interval = 2 min Inflow hyd. No. = 1 Reservoir name = Church St. Pond Max. Elevation = 77.17 ft Max. Storage = 37,401 cuft Storage Indication method used. Outflow hydrograph volume=45,113 cult Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfll Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 13.40 1.91 76.65 0.71 ----- -- --- --- ----- ---- -- ---- 0.71 13.43 1.87 76.67 0.71 --- ---- --- - --- --- -- - 0.71 13.47 1.84 76.69 0.71 ---- ---- ---- ----- --- --- --- ----- 0.71 13.50 1.81 76.70 0.72 ---- ---- ----- ---- ---- ---- -- - 0.72 13.53 1.78 76.72 0.72 ----- --- ---- ---- ---- ---- ----- --- 0.72 13.57 1.75 76.73 0.72 ----- ----- ----- --- ----- ---- ----- ----- 0.72 13.60 1.73 76.75 0.72 -- --- -- ---- ----- -- -- -- 0.72 13.63 1.71 76.76 0.73 -- ---- --- ---- ---- --- -- --- 0.73 13.67 1.69 76.78 0.73 ---- --- ----- --- ---- ---- ---- --- 0.73 13.70 1.67 76.79 0.73 _--_ -- ---- ---- --- --- --- -- 0.73 13.73 1.65 76.80 0.73 --- -_-- ----- ---- ----- ---- ----- ---- 0.73 13.77 1.63 76.81 0.73 ----- ----- ---- ---- ----- ----- ----- --- 0.73 13.80 1.61 76.83 0.74 ---- - -- - -- ---- - - 0.74 13.83 1.59 76.84 0.74 --- --- --- --- ---- ---- ---- -- 0.74 13.87 1.57 76.85 0.74 --- ----- ---- ---- ---- --- ---- ---- 0.74 13.90 1.56 76.86 0.74 --- --- ---- --- - -- -- 0.74 13.93 1.54 76.87 0.74 --- ---- ----- ---- ----- ---- ---- -- 0.74 13.97 1.52 76.89 0.74 --- ---- ----- ----- ----- ----- ---- --- 0.74 14.00 1.50 76.90 0.75 ----- --_ __-- _-_- _-_- -_ -- _-_ 0.75 14.03 1.48 76.91 0.75 -- --- --- --- ---- -- -- --- 0.75 14.07 1.46 76.92 0.75 --- ---- --- --- ----- --- --- ----- 0.75 14.10 1.44 76.93 0.75 -- ----- --- - ---- ---- -- -- 0.75 14.13 1.42 76.94 0.75 ---- ----- ----- ---- ----- ----- --- ----- 0.75 14.17 1.41 76.95 0.75 ----- ----- ----- ----- ----- ----- ---- --- 0.75 14.20 1.39 76.95 0.75 -- -_- -- --- - ----- -- - 0.75 14.23 1.37 76.96 0.76 --- -- -- -- --- -__ -- --- 0.76 14.27 1.35 76.97 0.76 --- - --- ---- ----- _--- ---- --- 0.76 14.30 1.34 76.98 0.76 ---- - - --- ---- -- -- -- 0.76 14.33 1.32 76.99 0.76 --- __-- -____ _-_ __ _ _- -_ ____ 0.76 14.37 1.31 77.00 0.76 ---_ -- -_ --- -_-- __-- _-- ____ 0.76 14.40 1.30 77.00 0.76 ---- - --- --- -- ---- _- - 0.76 14.43 1.28 77.01 0.76 ---- ----- - -- -- ---- -- -- 0.76 14.47 1.27 77.02 0.76 ----- -- - -- - --- --- - 0.76 14.50 1.26 77.02 0.76 - -- -- - - - - --- 0.76 14.53 1.25 77.03 0.77 -- ----- ---- --- ---- -- _-- -=-- 0.77 14.57 1.24 77.03 0.77 ---- -_ _-- -_-- --- --- ----- --- 0.77 14.60 1.23 77.04 0.77 - - - ___ _____ _____ 0.77 14.63 1.22 77.05 0.77 - ----- -_ __ _ _____ -_ ___ _____ 0_77 Continues on next page... Em.subd:basin disch. Page 2 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D EMI Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 14.67 1.21 77.05 0.77 ----- - - -- - - -- - 0.77 14.70 1.20 77.06 0.77 ---- ---- ----- ---- --- -- -- ---- ---- 0.77 14.73 1.19 77.06 0.77 ---- ----- ---- ----- ----- ----- ---- ---- 0.77 14.77 1.18 77.07 0.77 --- -- --- -_ - -- - ----- 0.77 14.80 1.17 77.07 0.77 ----- --_ --- --_ __-- - - ----- -- 0.77 14.83 1.16 77.08 0.77 --- -- --- ----- ----- - ---- -- 0.77 14.87 1.15 77.08 0.77 ----- -_ ---- - - -- -- ---- -- 0.77 14.90 1.14 77.08 0.77 ---- ---- ---- ----- --- --- ----- ----- 0.77 14.93 1.13 77.09 0.77 ---- --- ---- ---- ----- ---- ----- ----- 0.77 14.97 1.12 77.09 0.78 -- -_ -- --- -- ----- ----- ---- 0.78 15.00 1.12 77.10 0.78 -- --- -- - - --- -- -- 0.78 15.03 1.11 77.10 0.78 --- --_- -_ ____ _- ____ ___ ____ 0.78 15.07 1.10 77.11 0.78 ---- ---- --- --- - --- --- -- 0.78 15.10 1.09 77.11 0.78 ---- ---- ---- ----- ----- ----- ---- ---- 0.78 15.13 1.08 77.11 0.78 --- --- ----- ---- ----- ----- ----- ----- 0.78 15.17 1.07 77.12 0.78 -- -- ---- ----- ---- ----- ----- ---- 0.78 15.20 1.06 77.12 0.78 ----- -- ---- ----- -- -- -- -- 0.78 15.23 1.05 77.12 0.78 -- -- ----- ---- ---- ---- ----- ---- 0.78 15.27 1.04 77.13 0.78 -- ----- ----- --_ --- -- ----- -- 0.78 15.30 1.03 77.13 0.78 ----- --- ---- ---- ---- -_-- ----- ---- 0.78 15.33 1.02 77.13 0.78 ---- ---- ---- ----- ---- ---- ----- ----- 0.78 15.37 1.01 77.14 0.78 -- --_ -- ---- - --- ---- ----- 0.78 15.40 1.00 77.14 0.78 -- -_-- -- -_- -_- ____ ___ _ 0.78 15.43 0.99 77.14 0.78 --- --- ---- ---- -- ----- ---- ---- 0.78 15.47 0.98 77.14 0.78 - - -- - -- -- ---- - 0.78 15.50 0.97 77.15 0.78 --- ----- ----- ---- --- ----- ----- ----- 0.78 15.53 0.96 77.15 0.78 ---- ---- ----- ----- ---- ----- ----- ----- 0.78 15.57 0.95 77.15 0.78 -- --- _-- --- _-- __- ___ _- 0.78 15.60 0.94 77.15 0.78 --- ---- --- ----- --- ---- --- _--- 0.78 15.63 0.93 77.15 0.78 -- ----- ---- ---- ---- --- ---- _--- 0.78 15.67 0.92 77.16 0.78 --- --- ----- ---- --- --- ----- ---- 0.78 15.70 0.91 77.16 0.78 -_-- _-_- _-- ___-_ ___-- _-_- - ___ __-_ 0.78 15.73 0.90 77.16 0.78 ----- --- --- ---- ---- ----- ----- ----- 0.78 15.77 0.89 77.16 0.78 --- --- ---- ---- -_- --- ---- 0.78 15.80 0.88 77.16 0.79 ---- ---- --- -_- ---- ----- ----- ---- 0.79 15.83 0.87 77.16 0.79 --- --- -_- -- ---_ ---- ----- -- 0.79 15.87 0.86 77.16 0.79 ---- --- ---- _---- _-- ----- ---- --- - 0.79 15.90 0.85 77.16 0.79 ---- ---- --- ----- -_-- ----- _--- ---- 0.79 15.93 0.84 77.17 0.79 ----- ---- ----- ---- ----- ---- ----- ----- 0.79 15.97 0.83 77.17 0.79 ---- --- ---_ _____ ___ ___ ____ 0.79 16.00 0.82 77.17 0.79 -_ _- _-- _-_ _-- _-_ 0.79 16.03 0.81 77.17 0.79 --- ---- - -- -- ---- ---- --- 0.79 16.07 0.80 77.17 0.79 0.79 16.10 0.79 77.17 0.79 -- ----- _--- ----- _--- ----- -- -_-- 0.79 16.13 0.78 77.17 << 0.79 ---- --- --- ---- ----- ----- ----- ----- 0.79 << 16.17 0.77 77.17 0.79 -- ----- --- -- _- _--- ----- ----- 0.79 16.20 0.76 77.17 0.79 --- -_ ____ _____ _____ _-_ -_ 0.79 16.23 0.75 77.17 0.79 ----- -- ----- ----- -- --- --_- ---- 0.79 16.27 0.75 77.17 0.79 ---- ----- -- -- ----- ----- ----- ---- 0.79 16.30 0.74 77.17 0.79 --- -__ -- ---- ---- ---- ---- ---- 0.79 16.33 0.73 77.16 0.79 ----- --__ __- __- _--- ----- __-- _-- 0.79 Continues on next page... Em.subd:basin disch. Page 3 Hydrograph Discharge Table Time Inflow Elevation CIv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D EMI Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 16.37 0.72 77.16 0.79 --- ----- -_ ---- --- _- _____ _____ 0.79 16.40 0.72 77.16 0.79 -- ---- ---- ---- ----- ----- ----- ----- 0.79 16.43 0.71 77.16 0.79 -__ ---- --- ----- ----- ----- ---- ---- 0.79 16.47 0.70 77.16 0.79 -- - ---- --- ----- - -- --- --- 0.79 16.50 0.70 77.16 0.78 -_ ___ -- _-_ _-_ __-_ -__-- --- 0.78 16.53 0.69 77.16 0.78 -- --- --_ -_ _-_ -_ __- __-- 0.78 16.57 0.69 77.16 0.78 _- --- - -- - -- -- - -- 0.78 16.60 0.68 77.16 0.78 --- ---_ ---- ---- --- ----- -- --- 0.78 16.63 0.68 77.16 0.78 ----- ---- -- ----- ----- ----- ---- --- 0.78 16.67 0.67 77.15 0.78 -__ _- -_ ___ ___ ____ -- -- 0.78 16.70 0.67 77.15 0.78 --- --- -- -- --- --- --- _--- 0.78 16.73 0.67 77.15 0.78 ----- ---- ----- --_- --- ----- -_- ----- 0.78 16.77 0.66 77.15 0.78 - --- ---- _--- --- ---- -- --- 0.78 16.80 0.66 77.15 0.78 --- ----- --- ----- _--- ---- ----- ----- 0.78 16.83 0.65 77.15 0.78 ----- ----- ----- ----- ----- ----- -_-- --_- 0.78 16.87 0.65 77.15 0.78 ----- -- __-- -_-- _-_ __- __-_ ----- 0.78 16.90 0.64 77.14 0.78 -- --- --- ___ _____ -__ -_ ____ 0.78 16.93 0.64 77.14 0.78 --- --_- ---- ---- --- ---- --- --- 0.78 16.97 0.63 77.14 0.78 --- -_- -- -- -- ----- --- --- 0.78 17.00 0.63 77.14 0.78 ---- ---- ----- -- ---- ---- ---- ---- 0.78 17.03 0.63 77.14 0.78 ----- ----- ----- ----- ---- ---- ---- ----- 0.78 17.07 0.62 77.13 0.78 -- ---- __- -- ---- ---- --- ---- 0.78 17.10 0.62 77.13 0.78 -- --- ---_ --- - _- ----- -- 0.78 17.13 0.61 77.13 0.78 ----- -_-- -__ ---- ----- ----- ---- -- 0.78 17.17 0.61 77.13 0.78 -_ ___ _- _____ -_ _____ ___ _____ 0.78 17.20 0.60 77.13 0.78 --- ----- --- --- ----- ----- ---- --- 0.78 17.23 0.60 77.12 0.78 ---- ----- ----- ----- ---- ---- ----- ----- 0.78 17.27 0.59 77.12 0.78 -_ --- ---- ----- ---- ---- ---- ---- 0.78 17.30 0.59 77.12 0.78 -- ---- -- ----- -- ---- --- --- 0.78 17.33 0.59 77.12 0.78 --- --- ---- ----- ----- ----- ----- ----- 0.78 17.37 0.58 77.12 0.78 --- ---_ -- ---- ---- _- ----- -- 0.78 17.40 0.58 77.11 0.78 --- ----- --- ---- ----- ----- ---- ---- 0.78 17.43 0.57 77.11 0.78 ---_ ---- ----- ---- ----- ---- --- ---- 0.78 17.47 0.57 77.11 0.78 --- _- --- ----- ---- -- ____ _- 0.78 17.50 0.56 77.11 0.78 - - - ----- ---- --- -- -- 0.78 17.53 0.56 77.10 0.78 --_- ---- -- ----- --- _- -- -- 0.78 17.57 0.55 77.10 0.78 -- --- ---- _-_ _____ ____ _____ _- 0.78 17.60 0.55 77.10 0.78 ----- ---- --- ---- ---- --- ----- ---- 0.78 17.63 0.55 77.09 0.78 ----- -- ----- ----- --- ----- --- ---- 0.78 17.67 0.54 77.09 0.77 ---- --_ -__ -_ ____ __- ____ 0.77 17.70 0.54 77.09 0.77 -- --- -- ---- -- -- -- ---- 0.77 17.73 0.53 77.09 0.77 -- ___ _-_ _- __- _____ _____ ___ 0.77 17.77 0.53 77.08 0.77 --- ----- ---- -- ----- -- ----- -- 0.77 17.80 0.52 77.08 0.77 ---- ---- ----- ---- --- ---- --- --- 0.77 17.83 0.52 77.08 0.77 ---- ---- ---- ----- ----- ----- --- ----- 0.77 17.87 0.51 77.07 0.77 -- - - -- --_ - - -_- --- 0.77 17.90 0.51 77.07 0.77 ----- -- --_ ____ _____ ___ ____ _____ 0.77 17.93 0.51 77.07 0.77 ---- - --- --- ----- ---- -- ----- 0.77 17.97 0.50 77.06 0.77 ----- ----- --- ----- -- ---- ----- -- 0.77 18.00 0.50 77.06 0.77 --- ----- --- ----- ---- -- -- ---- 0.77 18.03 0.49 77.06 0.77 ----- ----- ----- -_- -_-- ---- --- ---- 0.77 Continues on next page... Em.subd-basin disch. Page 4 Hydrograph Discharge Table Time Inflow Elevation Clv A CIv B Clv C Clv D Wr A Wr B Wr C Wr D EMI Outflow (hrs) cfs ft cfs eft eft cfs cfs cfs cfs cfs cfs cfs 18.07 0.49 77.05 0.77 ----- ---- - - - -_ - - 0.77 18.10 0.48 77.05 0.77 -- ----- ----- --- --- --_ 0.77 18.13 0.48 77.05 0.77 ----- -- -- ---- ---_ ---- ---- ---- 0.77 18.17 0.47 77.04 0.77 ----- - -- --- -- -- ---- ---_ 0.77 18.20 0.47 77.04 0.77 - ---- - -- - _- - - 0.77 18.23 0.47 77.04 0.77 ----- - - --- -- ---- ----- -- 0.77 18.27 0.46 77.03 0.77 - - - -__ -_ -_ ____ - 0.77 18.30 0.46 77.03 0.77 ----- --- ---- -- -- --_ -_- -- -- 0.77 18.33 0.46 77.03 0.77 -- --- ---- ---- --- --- ----- --- 0.77 18.37 0.45 77.02 0.76 - -- -- --- -- -- ---- ----- 0.76 18.40 0.45 77.02 0.76 - - ---- - --- --- --- -- 0.76 18.43 0.45 77.01 0.76 --- --- -- --- ---- -- ----- ----- 0.76 18.47 0.45 77.01 0.76 - - -- -- - - - -- 0.76 18.50 0.44 77.01 0.76 - ---- -- --- --- ---- -- -- 0.76 18.53 0.44 77.00 0.76 ---- --- ---- ----- ----- ---- -- ----- 0.76 18.57 0.44 77.00 0.76 ----- ___ ____ ___ _____ _- ____ ___ 0.76 18.60 0.44 76.99 0.76 - ----- - -- -- _- - --- 0.76 18.63 0.44 76.99 0.76 -_- --- -- ---- - - --- - 0.76 18.67 0.44 76.98 0.76 -- - ----- --- --- -- - -- 0.76 18.70 0.43 76.98 0.76 --- -- -- --- --- -- ---- ---- 0.76 18.73 0.43 76.98 0.76 -- - --_-- ----- ---- ---- ---- --- 0.76 18.77 0.43 76.97 0.76 - -- ----- ---- - ---- --- --- 0.76 18.80 0.43 76.97 0.76 -- -- ---- ---- --- - ---- -- 0.76 18.83 0.43 76.96 0.76 --- ---- --- ---- --- --- ---- -- 0.76 18.87 0.43 76.96 0.76 - -- - -- - --- --- -- 0.76 18.90 0.43 76.95 0.75 -- ----- --- ----- ----- ---- ---- -- 0.75 18.93 0.43 76.95 0.75 ---- ---- ----- ---- ---- ---- ----- ----- 0.75 18.97 0.42 76.94 0.75 ----- ---- -- --- - --- --- - 0.75 19.00 0.42 76.94 0.75 - --- --- - -- --- ---- -- 0.75 19.03 0.42 76.93 0.75 --- -- ---- ---- ---- --- -- --- 0.75 19.07 0.42 76.93 0.75 - -- ---- -- -- ----- -- -- 0.75 19.10 0.42 76.92 0.75 ----- ---- ---- ---- -- ---- --- --- 0.75 19.13 0.42 76.92 0.75 ----- ---- ----- ---- ----- ---- ----- ----- 0.75 19.17 0.42 76.92 0.75 ----- ---- ___ ____ ____ ___ _- _____ 0.75 19.20 0.42 76.91 0.75 ---- --- ---- --- --- ----- --- -- 0.75 19.23 0.41 76.91 0.75 ---- --- -- - -- ---- - 0.75 19.27 0.41 76.90 0.75 ---- ---- ---- --- ---- _-_ ___ -- 0.75 19.30 0.41 76.90 0.75 ---- --- ---- ---- ----- ---- --- --- 0.75 19.33 0.41 76.89 0.75 ----- ----- ----- ----- ----- ----- ----- ----- 0.75 19.37 0.41 76.89 0.74 --- ---- ---- --- -- ----- -- - 0.74 19.40 0.41 76.88 0.74 --- ---- ----- ---- -- -_- - -- 0.74 19.43 0.41 76.88 0.74 -- ---- --- -- ---- ---- ---- - 0.74 19.47 0.40 76.87 0.74 --- ---- -- --- -- -- ----- ---- 0.74 19.50 0.40 76.87 0.74 -- ----- --- --- ----- ---- -- --- 0.74 19.53 0.40 76.86 0.74 ----- ---- ----- ----- ---- ---- ----- -- 0.74 19.57 0.40 76.86 0.74 - ---- -- - - ----- - 0.74 19.60 0.40 76.85 0.74 - - - ----- ----- --- -- ---- 0.74 19.63 0.40 76.85 0.74 ----- -_ --- --- ---- ----- -- -- 0.74 19.67 0.40 76.84 0.74 -- --- ---- -- --- --- - - 0.74 19.70 0.40 76.84 0.74 ---- ---- ---- ----- ---- --- ---- --- 0.74 19.73 0.39 76.83 0.74 ----- ---- ---- ----- ----- ----- ----- ----- 0.74 Continues on next page... Em.subd.-basin disch. Page 5 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D EMI Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 19.77 0.39 76.83 0.74 ----- - - - ---- - -- ----- -- 0.74 19.80 0.39 76.82 0.73 ----- -- -- ----- ----- ---- ---- 0.73 19.83 0.39 76.82 0.73 ----- ----- -- -- ---- ----- ---- ----- 0.73 19.87 0.39 76.81 0.73 - - -- --- -- ---- --- ---- 0.73 19.90 0.39 76.81 0.73 -- - ----- - -- ----- - ---- 0.73 19.93 0.39 76.81 0.73 --- -- ---- ---- ---- -- -- --- 0.73 19.97 0.38 76.80 0.73 -- - - - - - - -- 0.73 20.00 0.38 76.80 0.73 -- ---- ----- ----- ---- --- ---- --- 0.73 20.03 0.38 76.79 0.73 ---- --- --- --- ----- ---- ---- ---- 0.73 20.07 0.38 76.79 0.73 -- -- - - ---- --_ --- --- 0.73 20.10 0.38 76.78 0.73 ----- - --- ----- --- -- --- --- 0.73 20.13 0.38 76.78 0.73 --- --- ---- ---- ---- ---- ----- ----- 0.73 20.17 0.38 76.77 0.73 - -- -- -- --- --- --- --- 0.73 20.20 0.37 76.77 0.73 --- - --- ---- ----- ----- --- ---- 0.73 20.23 0.37 76.76 0.73 ----- ----- ---- ----- ---- ----- ---- ---- 0.73 20.27 0.37 76.76 0.72 - --- --- --_ --- ----- ---- ----- 0.72 20.30 0.37 76.75 0.72 ----- - --- ----- --- ---- - -- 0.72 20.33 0.37 76.75 0.72 --- ---- - ----- ----- ---- --- --- 0.72 20.37 0.37 76.74 0.72 -- - ----- -- ---- --- -- - 0.72 20.40 0.37 76.74 0.72 ----- --- ----- ---- ----- ----- ----- --- 0.72 20.43 0.37 76.73 0.72 ----- --- ----- ----- ----- ----- --- ----- 0.72 20.47 0.36 76.73 0.72 - ----- --- ----- ---- ---- ----- --- 0.72 20.50 0.36 76.72 0.72 --- ---- --- - --- ----- -- -- 0.72 20.53 0.36 76.72 0.72 ---- ----- ---- ----- ----- ---- ---- ---- 0.72 20.57 0.36 76.71 0.72 --- -- --- -- - ----- - 0.72 20.60 0.36 76.71 0.72 ----- --- ---- ----- ----- ---- ---- ----- 0.72 20.63 0.36 76.70 0.72 ----- ----- --- ----- ----- ----- ----- ---- 0.72 20.67 0.36 76.70 0.71 --- ---- --- ---- ----- ----- ----- --- 0.71 20.70 0.35 76.69 0.71 - ---- --- ---- ---- ---- ---- ---- 0.71 20.73 0.35 76.69 0.71 -- --- ---- ----- ---- ----- ----- ----- 0.71 20.77 0.35 76.68 0.71 ---- --- --_ --- --- ---- --- ---- 0.71 20.80 0.35 76.68 0.71 ----- ---- ---- ---- ----- ---- ----- ---- 0.71 20.83 0.35 76.67 0.71 ---- --_ -- ----- ----- ----- ----- ----- 0.71 20.87 0.35 76.67 0.71 --- -- ----- ---- ---- --- ----- ----- 0.71 20.90 0.35 76.66 0.71 ----- ---- ----- ---- ----- --- ----- ---- 0.71 20.93 0.35 76.65 0.71 ---- ---- ---- ---- ---- ---- --- ---- 0.71 20.97 0.34 76.65 0.71 -- ----- ----- ---- ---- --- --- -- 0.71 ...End Hydrograph Report Page, Hydraflow Hydrographs by Intelisolve Hyd. No. 3 Em. subd.-basin disch. Hydrograph type = Reservoir Peak discharge = 0.91 cfs Storm frequency = 50 yrs Time interval = 2 min Inflow hyd. No. = 1 Reservoir name = Church St. Pond Max. Elevation = 78.11 ft Max. Storage = 46,829 cuft Storage Indication method used. Outflow hydrograph volume=58,547 cult Hydrograph Discharge Table Time Inflow Elevation CIv A Civ B Civ C Clv D Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 13.17 2.74 77.41 0.82 --- --- ---- ---- ---- - - ----_ -- 0.82 13.20 2.65 77.43 0.82 - - --- - -- --- --- -- - 0.82 13.23 2.57 77.46 0.83 ----- ----- ---- ---- ----- ----- ----- --- 0.83 13.27 2.50 77.48 0.83 - -- -- - ---- -- --- - - 0.83 13.30 2.44 77.50 0.83 --- ---- ----- ---- --- ----- -- -- 0.83 13.33 2.38 77.52 0.83 ---- ---- ----- ----- ----- ---- ----- ----- 0.83 13.37 2.33 77.53 0.84 -- __- ----- ----- ----- ---- ---- --- 0.84 13.40 2.28 77.55 0.84 -- --- ---- -- ---- -- --- ---- 0.84 13.43 2.24 77.57 0.84 ---- ---- ----- ----- ----- ----- --- -- 0.84 13.47 2.19 77.59 0.84 - - ___ - -__ _____ - - 0.84 13.50 2.16 77.60 0.85 - ----- ---- ---- ---- ----- --- ---- 0.85 13.53 2.12 77.62 0.85 ---- ----- ---- ---- ----- ---- ---- ----- 0.85 13.57 2.09 77.63 0.85 ---- -- --- ---- ----- - -- - 0.85 13.60 2.06 77.65 0.85 - --- ----- -- - - -- -- -- _---- 0.85 13.63 2.04 77.66 0.85 ----- -- ---- ----- ----- -- --- ---- 0.85 13.67 2.01 77.68 0.86 ----- --- --- _- - ---- ---- - 0.86 13.70 1.99 77.69 0.86 ----- ---- ---- ----- -- ----- --- ---- 0.86 13.73 1.97 77.70 0.86 ----- --- ---- ---- ---- ---- ----- ----- 0.86 13.77 1.94 77.72 0.86 --- ---- ----- ---- ----- -- -- --- 0.86 13.80 1.92 77.73 0.86 ---- --- --- ---- ---- -- ----- -- 0.86 13.83 1.90 77.74 0.86 --- ---- -- ----- --- --- --- -- 0.86 13.87 1.88 77.76 0.87 ---- _____ ____ _-__ - ____ ____ ___- 0.87 13.90 1.85 77.77 0.87 ---- ----- ----- ----- -- --_ --_ _ 0.87 13.93 1.83 77.78 0.87 ---- ----- ---- ----- ----- ---- ----- -- 0.87 13.97 1.81 77.79 0.87 - ---- ----- ---- -- _- -- -- 0.87 14.00 1.78 77.80 0.87 - -_- ---- ----- -- -_ - -- 0.87 14.03 1.76 77.81 0.87 ---- ---- ----- ----- ---- ----- --- -- 0.87 14.07 1.74 77.82 0.88 - -- -- --- -- -- --- - 0.88 14.10 1.72 77.83 0.88 -- ---- -- ---- ---_ ---- --- --- 0.88 14.13 1.69 77.84 0.88 --- --- ---- --_- ---- --- - ----- 0.88 14.17 1.67 77.85 0.88 - --- ----- ---_ - ---- -- - 0.88 14.20 1.65 77.86 0.88 -- - -- -- -- -- - --- 0.88 14.23 1.63 77.87 0.88 --- ----- ---- ---- -_-- --- ---- - 0.88 14.27 1.61 77.88 0.88 - - -- -- -- - - - 0.88 14.30 1.59 77.89 0.88 -- -- -- --- ---- -_- - =-- 0.88 14.33 1.57 77.90 0.89 -- ---- --- ---- ---- ----- -- ----- 0.89 14.37 1.56 77.91 0.89 - --- - --- - ---- - - 0.89 14.40 1.54 77.92 0.89 - --- ----- ---- --- -- --- ----- 0.89 Continues on next page... Em.subd:basin disch. Page 2 Hydrograph Discharge Table Time Inflow Elevation CIv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfi1 Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 14.43 1.53 77.92 0.89 - - - - - - - - 0.89 14.47 1.51 77.93 0.89 -- ----- ----- ----- ----- ----- ---_ ---- 0.89 14.50 1.50 77.94 0.89 ----- ---- ---- ----- ----- ----- ----- ----- 0.89 14.53 1.48 77.95 0.89 ----- ---- ---- --- ---- --- -_ --- 0.89 14.57 1.47 77.95 0.89 - --- ----- --- ---- -_- -- ----- 0.89 14.60 1.46 77.96 0.89 --- --- ----- ---- ---_ _-- --- ----- 0.89 14.63 1.45 77.97 0.89 -- - - -- ---- ---- --_ - 0.89 14.67 1.44 77.97 0.89 -- ----- ---- --- - ---- ---- ---- 0.89 14.70 1.42 77.98 0.90 ---- ----- --- ----- ----- ----- --- ----- 0.90 14.73 1.41 77.99 0.90 ---- --- - --- ---- -_ -- -- 0.90 14.77 1.40 77.99 0.90 -- ---- _- ----- --- -- -- ----- 0.90 14.80 1.39 78.00 0.90 ----- --- ----- ---- ----- ---- ---- ---_ 0.90 14.83 1.38 78.00 0.90 ---- ---_ -- --- --- ---- _- -- 0.90 14.87 1.37 78.01 0.90 --- ----- --- ----- --_ ---- -- ----- 0.90 14.90 1.36 78.01 0.90 ----- ----- ---_ ----- ----- ----- ----- ----- 0.90 14.93 1.35 78.02 0.90 -- -__ -- -- --- --- -- ----- 0.90 14.97 1.33 78.02 0.90 ----- ---- --- -- ---_ ----- --- - 0.90 15.00 1.32 78.03 0.90 ----- ----- ----- --- ----- ---- _--- ----- 0.90 15.03 1.31 78.03 0.90 ---- --- ---- _-- - --_- ---- ---- 0.90 15.07 1.30 78.04 0.90 --- ---- -- ---- --- -- ---- ---- 0.90 15.10 1.29 78.04 0.90 --_- _-_- ----- ----- ----- ---- ----- ----- 0.90 15.13 1.28 78.04 0.90 -- -- --- ---- -- --- --- --- ---- 0.90 15.17 1.27 78.05 0.90 ---- -- -- -_-- --- -- --- --- 0.90 15.20 1.25 78.05 0.90 ----- ---- ----- ---- ---_ ----- ----- ---- 0.90 15.23 1.24 78.06 0.90 --- -- ---- -- -- ---- --- - 0.90 15.27 1.23 78.06 0.91 ---- -- ---_ _--- --- ---- ---- --- 0.91 15.30 1.22 78.06 0.91 ----- --_- -- ----- ----- ----- ----- ----- 0.91 15.33 1.21 78.07 0.91 ----- ---- --- ___ -_ ____ ____ ____ 0.91 15.37 1.20 78.07 0.91 ---- ---_ --- --- ----- ---- - --- 0.91 15.40 1.18 78.07 0.91 --- ----- ---- --- ---- ----- --- ----- 0.91 15.43 1.17 78.07 0.91 -- - - --- -- - ----- - 0.91 15.47 1.16 78.08 0.91 --- ---- -- --- ----- --- --- --- 0.91 15.50 1.15 78.08 0.91 ----- ---- ----- ---- ---- ----- ----- ---- 0.91 15.53 1.14 78.08 0.91 --- ---- -- -- ----- ----- --- ----- 0.91 15.57 1.13 78.08 0.91 --- --- --- -- -- ----- -- ---- 0.91 15.60 1.11 78.09 0.91 -_-- -- ----- -- ----- ---- ---- ----- 0.91 15.63 1.10 78.09 0.91 ---- ---- -- ----- -- ----- ---- --- 0.91 15.67 1.09 78.09 0.91 --- ---- --- --- --- ----- ---- --- 0.91 15.70 1.08 78.09 0.91 ----- ---- ---- ---- ---- ---- ---- ---- 0.91 15.73 1.07 78.09 0.91 ---- ---- --- - ---- ---- ---- ---- 0.91 15.77 1.06 78.10 0.91 -- ---- ---- ----- --- ---- ---- -- 0.91 15.80 1.04 78.10 0.91 --- -- --- --- ---- -- ---- --- 0.91 15.83 1.03 78.10 0.91 -- - - - - -- ---- - 0.91 15.87 1.02 78.10 0.91 ---- --- ----- --- -- ---- -- --- 0.91 15.90 1.01 78.10 0.91 -- ---- --- -- ---- ---- ---- --- 0.91 15.93 1.00 78.10 0.91 -- --_ -- -- ----- --- - - 0.91 15.97 0.98 78.10 0.91 - -- - - -- - ---- ----- 0.91 16.00 0.97 78.10 0.91 0.91 16.03 0.96 78.10 0.91 - - - - - ----- - - 0.91 16.07 0.95 78.11 0.91 ____ ___ _____ ___ _____ _____ _____ ____ 0.91 16.10 0.94 78.11 0.91 _-- ---- -- ---- ----- ---- ---- ---- 0.91 Continues on next page... Em.subd:basin disch. Page 3 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D WrA Wr B Wr C Wr D Exfi1 Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 16.13 0.92 78.11 0.91 --- -- - -- - ---- --- - 0.91 16.17 0.91 78.11 << 0.91 0.91 << 16.20 0.90 78.11 0.91 -_-- ---- ---- ----- ----- ----- ----- ---_ 0.91 16.23 0.89 78.11 0.91 --- --- -- -_- -- ----- - ----- 0.91 16.27 0.88 78.11 0.91 0.91 16.30 0.87 78.11 0.91 -- ---- - -- ----- --- --- -_ --- 0.91 16.33 0.86 78.10 0.91 -- ---- ----- - - -- --- - 0.91 16.37 0.86 78.10 0.91 ----- ----- --- ----- ---- ---- ----- ----- 0.91 16.40 0.85 78.10 0.91 -- ----- ---- ----- ----- ----- ---- ----- 0.91 16.43 0.84 78.10 0.91 -_ -- ---- ---- --- -- ----- --- 0.91 16.47 0.83 78.10 0.91 -- -- ----- ---- -- -- ---- --- 0.91 16.50 0.83 78.10 0.91 -- ----- ---- ---- ----- --- ---- --- 0.91 16.53 0.82 78.10 0.91 ---- - --- ---- --- --- ---- ---- 0.91 16.57 0.81 78.10 0.91 -- ---- ----- -- ----- ---- ----- ----- 0.91 16.60 0.81 78.10 0.91 ---- ----- ----- ----- ----- ----- --- ----- 0.91 16.63 0.80 78.10 0.91 -- --- --- ----- ----- ---- ---- -_-- 0.91 16.67 0.80 78.10 0.91 ----- ---- - ----- --- ----- --- --- 0.91 16.70 0.79 78.09 0.91 -- -- ----- ---- ---- ---- ----- ----- 0.91 16.73 0.79 78.09 0.91 -_- -- --- ---- --- -- -- --_ --- 0.91 16.77 0.78 78.09 0.91 ---- ---- ---- ---- ----- --- ----- ---- 0.91 16.80 0.78 78.09 0.91 ----- ----- ----- ---- ----- ----- ----- ----- 0.91 16.83 0.77 78.09 0.91 ---- -- -- -- ---- --- --_ ----- 0.91 16.87 0.77 78.09 0.91 _--- --- --- ----- -- ----- --- ----- 0.91 16.90 0.76 78.09 0.91 ----- --_ -- --- -- ----- ---- -- 0.91 16.93 0.75 78.08 0.91 -_ -- --- --- -- ---- ---- --- 0.91 16.97 0.75 78.08 0.91 ----- --- --- ---- ----- ----- --- ---- 0.91 17.00 0.74 78.08 0.91 ----- ----- ----- ----- ----- ----- ----- ----- 0.91 17.03 0.74 78.08 0.91 ----- ----- -__ -_ ___ _____ ___ -_ 0.91 17.07 0.73 78.08 0.91 --- ----- --- -- ---- --- ---- -- 0.91 17.10 0.73 78.08 0.91 -- --- ----- ---- ---- ---- ----- ---- 0.91 17.13 0.72 78.07 0.91 ---- ----- -- ---- -- ---- -- ----- 0.91 17.17 0.72 78.07 0.91 ----- ---- ---- ---- --- ----- ----- ---- 0.91 17.20 0.71 78.07 0.91 ----- ---- ---- ----- ----- ----- ----- ----- 0.91 17.23 0.71 78.07 0.91 --- ---- --- --- -- ---- -- -- 0.91 17.27 0.70 78.07 0.91 -- ----- --- -- ----- ---- ----- --- 0.91 17.30 0.70 78.06 0.91 --- --- ----- --- ---- ---- ----- ---- 0.91 17.33 0.69 78.06 0.91 -- -- --- ----- ----- ---- -- -- 0.91 17.37 0.69 78.06 0.91 ----- ----- --- ----- ----- ----- ----- ---- 0.91 17.40 0.68 78.06 0.90 ---- ---- ---- ----- ----- ---- ----- ----- 0.90 17.43 0.68 78.05 0.90 --- ----- ---- --- --- -_- ---- -- 0.90 17.47 0.67 78.05 0.90 -- ----_ -- ----- --- --- --- ----- 0.90 17.50 0.67 78.05 0.90 --- ----- -- -- ---- --- --- ----- 0.90 17.53 0.66 78.05 0.90 -- - --- --_ -- -- -- -- 0.90 17.57 0.65 78.04 0.90 --- --- -- ---- --- ----- ---- ----- 0.90 17.60 0.65 78.04 0.90 ---- ---- ----- ---- ----- ----- ---- --- 0.90 17.63 0.64 78.04- 0.90 - ---_ ----- ---- -- --- --- -_-- 0.90 17.67 0.64 78.04 0.90 --- -- ----- --- ----- -- -- -- 0.90 17.70 0.63 78.03 0.90 --- - --- ---- ---- --- ---- ---- 0.90 17.73 0.63 78.03 0.90 -- - - -- -- -- ----- - 0.90 17.77 0.62 78.03 0.90 --- ---- --- ---- ----- --- ----- --- 0.90 17.80 0.62 78.02 0.90 --- ----- ---- -- ---- ---- ----- ---- 0.90 Continues on next page... Em.subd.-basin disch. Page 4 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfi1 Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 17.83 0.61 78.02 0.90 ----- --- - -- -- - - - 0.90 17.87 0.61 78.02 0.90 ----- -=-- ---- ----- ----- ----- ---- ---- 0.90 17.90 0.60 78.02 0.90 ---- ----- ----- ----- --- ----- ---- ---- 0.90 17.93 0.60 78.01 0.90 -- -_- ----- ---- --- ---- ----- --- 0.90 17.97 0.59 78.01 0.90 ---- --- --- -- -- -- --- --- 0.90 18.00 0.59 78.01 0.90 ----- --_ -_ ___ ___ _- ____ -_ 0.90 18.03 0.58 78.00 0.90 - --- ----- -- -- -- -- -- 0.90 18.07 0.57 78.00 0.90 --- ----- --- --- ---- ----- ---- ----- 0.90 18.10 0.57 77.99 0.90 --- ---- ---- ----- ----- ----- ----- ---- 0.90 18.13 0.56 77.99 0.90 -- --- --- ----- ---- ----- --- ---- 0.90 18.17 0.56 77.99 0.90 -- ----- ---- -- -- ----- -- ----- 0.90 18.20 0.55 77.98 0.90 ---- ---- ----- ----- ---- ---- --- --- 0.90 18.23 0.55 77.98 0.90 -- -- -- ---- ----- ----- -- -- 0.90 18.27 0.55 77.97 0.89 --- -- ---- ---- --- ---- ----- ----- 0.89 18.30 0.54 77.97 0.89 --- ----- ----- ---- ----- ----- ----- ---- 0.89 18.33 0.54 77.97 0.89 --- --- -_- --- ---- ----- ----- ---- 0.89 18.37 0.54 77.96 0.89 -- - ---- ---- ----- ---- ---- -- 0.89 18.40 0.53 77.96 0.89 --- ---- -- ----- -- ---- ----- -- 0.89 18.43 0.53 77.95 0.89 -- -- -- --- ---- ----- ---- - 0.89 18.47 0.53 77.95 0.89 ---- ---- ---- ---- --- ---- ---- ---- 0.89 18.50 0.52 77.94 0.89 ---- --- ---- ----- ----- ---- ----- --- 0.89 18.53 0.52 77.94 0.89 -- --- ---- ---- --- --- --- -- 0.89 18.57 0.52 77.93 0.89 --- ___ _- ___ -__ ___ -__ __-- 0.89 18.60 0.52 77.93 0.89 --- -- ---- ---- ----- ---- ----- ---- 0.89 18.63 0.52 77.93 0.89 ----- - --- -- - _---_ - - 0.89 18.67 0.51 77.92 0.89 --- --- ----- ---- ----- --- ---- --- 0.89 18.70 0.51 77.92 0.89 ----- ----- ----- ----- ----- ----- ----- ---- 0.89 18.73 0.51 77.91 0.89 --- ---- ----- --- --- --- ----- --- 0.89 18.77 0.51 77.91 0.89 -- -- ----- ---- ---- - --- --- -- 0.89 18.80 0.51 77.90 0.89 ---- --- ---- ---- -- ----- ---- --- 0.89 18.83 0.51 77.90 0.88 --- -- _____ _- __- _- _____ 0.88 18.87 0.50 77.89 0.88 ----- -- ----- --- --- ----- ----- --- 0.88 18.90 0.50 77.89 0.88 ---- --- ---- ----- ---- --- ----- ---- 0.88 18.93 0.50 77.88 0.88 -- --- -- ----- ---- ---- --- -- 0.88 18.97 0.50 77.88 0.88 --_- -- -- -- -- --- ----- ---- 0.88 19.00 0.50 77.87 0.88 0.88 19.03 0.50 77.87 0.88 --- - --- ----- --- --- ---- ----- 0.88 19.07 0.50 77.87 0.88 --- ___ _-_ ___ ____ _-_- ----- ____ 0.88 19.10 0.49 77.86 0.88 ----- ---- ----- ----- ---- ---- ----- ----- 0.88 19.13 0.49 77.86 0.88 -- ----- ----- -_ -- ---- ----- -- 0.88 19.17 0.49 77.85 0.88 ----- -- ----- ----- --- ---- -- --- 0.88 19.20 0.49 77.85 0.88 ----_ -- ----- --- --- -- ---- ----- 0.88 19.23 0.49 77.84 0.88 -- - - -- - -- --- ----- 0.88 19.27 0.49 77.84 0.88 --- --- ---- ----- -- ---- --- ---- 0.88 19.30 0.48 77.83 0.88 ----- ---- ---- ----- ---- ---- ----- ----- 0.88 19.33 0.48 77.83 0.88 --- ---- --- ---- --- -- ___ 0.88 19.37 0.48 77.82 0.88 -- -- ---- ----- ----- -- --- --- 0.88 19.40 0.48 77.82 0.87 ----- --- - ---- --- ----- --- --- 0.87 19.43 0.48 77.81 0.87 - - - - -- ----- -- -- 0.87 19.47 0.48 77.81 0.87 -- --- _____ -_ ___ -__ ____ _-_ 0.87 19.50 0.47 77.80 0.87 ----- --- -- --- ---- ----- ---- ---- 0.87 Continues on next page... Em.subd:basin disch. Page 5 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C CIv D Wr A Wr B Wr C Wr D Ell Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 19.53 0.47 77.80 0.87 - - -- -- - --- -- - 0.87 19.57 0.47 77.79 0.87 ----- ----- --- --- ---- ----- -- -- 0.87 19.60 0.47 77.79 0.87 ----- ----- ---- ---- ---- ----- ----- ----- 0.87 19.63 0.47 77.78 0.87 - --- -- ---- -_ -- - 0.87 19.67 0.47 77.78 0.87 ----- --- -- --- -- -- --- ---- --- 0.87 19.70 0.47 77.77 0.87 ---- ---- -- _-- --- --- ---- -- 0.87 19.73 0.46 77.77 0.87 - ----- --- -- - - _- - 0.87 19.77 0.46 77.76 0.87 ---- --- -- ----- --- ---_ -- -- 0.87 19.80 0.46 77.76 0.87 ---- ----- ----- ----- ----- ----- ----- ----- 0.87 19.83 0.46 77.75 0.87 ---- --- ---- -- -_ -- ----- --- 0.87 19.87 0.46 77.75 0.87 - -- -- --- --- ----- --- --- ---- 0.87 19.90 0.46 77.74 0.87 ---- -- -- --- ----- --- ----- -- 0.87 19.93 0.45 77.74 0.86 -- --- -- ---- ----- --- -- - 0.86 19.97 0.45 77.73 0.86 --- ---- ----- ----- ----- ----- ----- ----- 0.86 20.00 0.45 77.73 0.86 _--- --- ----- ---- ----- ---- ----- ----- 0.86 20.03 0.45 77.72 0.86 --- ----- ----- ---- ----- ----- --- --- 0.86 20.07 0.45 77.72 0.86 -- --- --- --- ---- -- -- -- 0.86 20.10 0.45 77.71 0.86 -- _-_ ---- ---- ---- ---- --- ---- 0.86 20.13 0.44 77.71 0.86 0.86 20.17 0.44 77.70 0.86 - - ---- ---- ----- ---- ---- --- 0.86 20.20 0.44 77.70 0.86 ---- ----- ----- ----- ----- --- ----- ----- 0.86 2023 0.44 77.69 0.86 -- -- ---- ---- -- ----- --- - --- 0.86 20.27 0.44 77.69 0.86 -- --- -- ----- ----- --- --- --- 0.86 20.30 0.44 77.68 0.86 ----- --- --- ---- ----- --_ -- ----- 0.86 20.33 0.44 77.68 0.86 - -- -- ---- --- - -- ----- 0.86 20.37 0.43 77.67 0.86 ---- --- ---- ----- ---- ---- -- ----- 0.86 20.40 0.43 77.67 0.86 ----- ---- ----- ----- ----- ----- ----- ----- 0.86 20.43 0.43 77.66 0.85 ---- ---- - ----- --- ---- ---- ---- 0.85 20.47 0.43 77.66 0.85 -_- -- -- ----- --- --_ -- --- 0.85 20.50 0.43 77.65 0.85 ----- --- --- ---- ----- ---- ---- ---- 0.85 20.53 0.43 77.65 0.85 -- ---- --- ----- -- --- ----- -- 0.85 20.57 0.42 77.64 0.85 --- ----- ---- ----- ----- ----- ---- ----- 0.85 20.60 0.42 77.64 0.85 ----- ---- ---- ----- ----- ----- ----- ----- 0.85 20.63 0.42 77.63 0.85 ----- - - --- ---- ----- ----- --- 0.85 20.67 0.42 77.63 0.85 --- -- ----- ---- ---- ----- --- ---- 0.85 20.70 0.42 77.62 0.85 ----- --- --- ----- --_ -- --- --- 0.85 20.73 0.42 77.62 0.85 ---- -- -_- ----- ----- ---- -- ----- 0.85 20.77 0.41 77.61 0.85 ---- ---- ----- ---- ---- ---- --- ----- 0.85 20.80 0.41 77.61 0.85 ----- --- ---- ----- ---- ----- ---- ---- 0.85 20.83 0.41 77.60 0.85 0.85 20.87 0.41 77.60 0.85 -- ---- --- -- ----- --- ---- ---- 0.85 20.90 0.41 77.59 0.84 0.84 20.93 0.41 77.59 0.84 -- -- ---_ ---- - --- ---- ---- 0.84 20.97 0.40 77.58 0.84 --- ---- -- ---- ---- ----- --- --- 0.84 21.00 0.40 77.57 0.84 ----- --- ----- ---- ---- ----- ----- ---- 0.84 21.03 0.40 77.57 0.84 -- - - - -- ---- --- -- 0.84 21.07 0.40 77.56 0.84 - - -- --- ----- --- ___ _____ 0.84 21.10 0.40 77.56 0.84 - - ---- --- --- -- __- --- 0.84 21.13 0.40 77.55 0.84 - -- - --- -- ---- -- ----- 0.84 21.17 0.39 77.55 0.84 ---- -- -- ---- ---- ----- ---- ---- 0.84 21.20 0.39 77.54 0.84 ----- ---- ---- ----- --_ ---- ---- --- 0.84 Continues on next page... Em.subd:basin disch. Page 6 Hydrograph Discharge Table Time Inflow Elevation Clv A CIv B CIv C CIv D Wr A Wr B Wr C Wr D EAU Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 21.23 0.39 77.54 0.84 -_ _- _- _- 0.84 21.27 0.39 77.53 0.84 --- ----- --- --- - ---- ---- - --- --- 0.84 21.30 0.39 77.53 0.84 --- ----- ---- ----- ----- ----- ---- ----- 0.84 21.33 0.39 77.52 0.84 -- -- ---- _- ---- - ---- --- 0.84 21.37 0.38 77.52 0.83 --- --- -- --- -- -- ---- --- 0.83 21.40 0.38 77.51 0.83 ---- - --- --- -- --- --- --- 0.83 21.43 0.38 77.50 0.83 ----- -- ----- - ----- --- -- ---- 0.83 21.47 0.38 77.50 0.83 -- ---- --- --- -- ---- --- ---- 0.83 21.50 0.38 77.49 0.83 ---- ---- ----- ----- ---- ---- ----- ----- 0.83 21.53 0.38 77.49 0.83 ----- -_ ----- -- - ---- --- --- 0.83 21.57 0.38 77.48 0.83 0.83 21.60 0.37 77.48 0.83 --- ----- ----- -- --_ -- ---- -- 0.83 21.63 0.37 77.47 0.83 - -- --- --- - --- --- - 0.83 21.67 0.37 77.47 0.83 - ---- -- --- ---- ----- ----- ----- 0.83 21.70 0.37 77.46 0.83 ---- --- ----- ---- ----- ----- ----- ----- 0.83 21.73 0.37 77.45 0.83 -- -- --- ---- --- ---- ---- --- 0.83 21.77 0.37 77.45 0.83 -- -- ----- ---- ----- -- - -- --- 0.83 21.80 0.36 77.44 0.82 0.82 21.83 0.36 77.44 0.82 ----- ---- --- --- -- ---- -- -- 0.82 21.87 0.36 77.43 0.82 -- -- --- ----- -- ---- --- --- 0.82 21.90 0.36 77.43 0.82 -- ----- ----- ----- --- ----- ----- ---- 0.82 21.93 0.36 77.42 0.82 0.82 21.97 0.36 77.42 0.82 --- -- - ----- -- -- --- -- 0.82 22.00 0.35 77.41 0.82 --- -- ---- -- ---- --- --- ---- 0.82 ...End Hydrograph Report Page, Hydraflow Hydrographs by Intelisoh e Hyd. No. 3 Em. subd.-basin disch. Hydrograph type = Reservoir Peak discharge = 1.02 cfs Storm frequency = 100 yrs Time interval = 2 min Inflow hyd. No. = 1 Reservoir name = Church St. Pond Max_ Elevation = 79.01 ft Max. Storage = 57,038 cult Storage Indication method used_ Outflow hydrograph volume=72,426 cuft Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfll Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 13.03 3.89 78.14 0.92 --- ---- --- ----- ---- ---- _-- --- 0.92 13.07 3.68 78.17 0.92 -- -- --- --- ---- --- -- ----- 0.92 13.10 3.49 78.20 0.92 ----- ----- ---- --- ----- ----- ---- ----- 0.92 13.13 3.33 78.23 0.93 - --- ---- --- __- -- - 0.93 13.17 3.20 78.25 0.93 --_- ---- ---- ---- --- ----- --- ----- 0.93 13.20 3.09 78.28 0.93 ----- --- ---- ----- --- ----- ----- ----- 0.93 13.23 2.99 78.30 0.93 --_ ---- --- --_ ----- --- ---- ---- 0.93 13.27 2.91 78.32 0.94 --- --- ---- --_ --- --- -- -- 0.94 13.30 2.84 78.34 0.94 ---- -- ---- ----- ----- ---- ---- ----- 0.94 13.33 2.77 78.36 0.94 ----- --- --- ---- ---- -- -_ -- 0.94 13.37 2.71 78.38 0.94 ----- ---- ---- -_ --- ----- ---- --- 0.94 13.40 2.65 78.40 0.95 --- ----- ----- ---- ----- ----- ---- ----- 0.95 13.43 2.60 78.42 0.95 ---- --- -- -- ----- -- --- - 0.95 13.47 2.55 78.43 0.95 --- -- --- ----- --- --- ---- -- 0.95 13.50 2.51 78.45 0.95 --- ----- ----- ---- ---- ---- --- ----- 0.95 13.53 2.47 78A7 0.95 --- ----- -- -- -- ---- - - 0.95 13.57 2.44 78.48 0.96 --- ---- ---- --- ----- ---- --- ----- 0.96 13.60 2.40 78.50 0.96 -- ----- ----- ---- ---- ----- ----- --- 0.96 13.63 2.37 78.51 0.96 -- -_- ----- --- --- ----- --- -- 0.96 13.67 2.34 78.53 0.96 - - --- -- ----- -- -- ---- 0.96 13.70 2.31 78.54 0.96 ---- ----- ---- ----- ----- --- ----- ---- 0.96 13.73 2.29 78.56 0.97 --- --- __- --- ---- ----- -- ----- 0.97 13.77 2.26 78.57 0.97 ---- --- ----- ---- ----- ----- ----- ----- 0.97 13.80 2.23 78.58 0.97 ----- ----- ----- ---- ---- ----- ---- ---- 0.97 13.83 2.21 78.60 0.97 -- -- ---- -- -- ----- ---- -- 0.97 13.87 2.18 78.61 0.97 ---- _- -- --- -- ___ _____ _- 0.97 13.90 2.15 78.62 0.97 -- --- --- ----- --- --- ---- --- 0.97 13.93 2.13 78.63 0.97 ---- -- _-- - - --- -- ---- 0.97 13.97 2.10 78.65 0.98 -- --- --- ----- --_ ___ ___ ____ 0.98 14.00 2.07 78.66 0.98 --- --- ---- --_ --- ---- --- ---- 0.98 14.03 2.05 78.67 0.98 -_ --_ ---- ----- --- - -- ---- 0.98 14.07 2.02 78.68 0.98 ---- - ____ -_ ____ ____ _- ____ 0.98 14.10 1.99 78.69 0.98 -- --- -- --- ---- -- --- 0.98 14.13 1.97 78.70 0.98 ----- -_ _- -- -- ---- ---- ----- 0.98 14.17 1.94 78.71 0.98 --- - -_ ----- --- ---- ----- ---_- 0.98 14.20 1.91 78.72 0.98 ----- ---- --- --- --- ---- ---- --- 0.98 14.23 1.89 78.73 0.99 ---- ----- _--_ - --- - - -- 0.99 14.27 1.87 78.74 0.99 -- --_ _- _____ ___ _____ _____ _____ 0.99 Continues on next page... Em.subd,bmin disch. Page 2 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfi1 Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 14.30 1.85 78.75 0.99 - - - -_ ---- - - --- - 0.99 14.33 1.82 78.76 0.99 ---- --- --- --_- ---- --_- 0.99 14.37 1.81 78.77 0.99 ---- -- -_-- ----- ---- ----- --- _--- 0.99 14.40 1.79 78.78 0.99 - --_ -- --- ----- ---- --- -- 0.99 14.43 1.77 78.79 0.99 - - _-- -_-- ----- -- ----- -- 0.99 14.47 1.75 78.79 0.99 - -- -- ---- --- ---- ----- ----- 0.99 14.50 1.74 78.80 0.99 - - - --- - - - - 0.99 14.53 1.72 78.81 0.99 --- -- -- --- -__ _-_ -_ __- 0.99 14.57 1.71 78.82 1.00 --- --- ----- ----- --- ----- ---- -- 1.00 14.60 1.69 78.82 1.00 - - -- --- --- _- ___ ___ 1.00 14.63 1.68 78.83 1.00 - - -- --- - - - --- 1.00 14.67 1.66 78.84 1.00 ---- -- ----- ---- --- ---- --- --- 1.00 14.70 1.65 78.85 1.00 - --- - --_ - --- --- ---- 1.00 14.73 1.64 78.85 1.00 -- -- ---- ---- -- --- ----- ----- 1.00 14.77 1.62 78.86 1.00 --- -__ ___-- __-- _-_- ----- ----- --- 1.00 14.80 1.61 78.87 1.00 -- -- ----- ---- --- --- ----- --- 1.00 14.83 1.60 78.87 1.00 -- ---- --- ----- --- --- -- - 1.00 14.87 1.58 78.88 1.00 -- -- _- --- ---- ---- --- -- 1.00 14.90 1.57 78.88 1.00 - -- - - - ---- --- - 1.00 14.93 1.56 78.89 1.00 - -- ---- --- ----- ----- ---- ---- 1.00 14.97 1.54 78.90 1.00 --- ----- ----- ----- ----- ----- ----- --- 1.00 15.00 1.53 78.90 1.01 - -- -_-- -- - ---- ----- -- 1.01 15.03 1.52 78.91 1.01 - ----- -- -- ---- ----- ---- -- 1.01 15.07 1.50 78.91 1.01 --- -- ---_ __-_ ____ ____ __ ____ 1.01 15.10 1.49 78.92 1.01 - - --- - -- -- - 1.01 15.13 1.48 78.92 1.01 -- ---- --- -_-- ---- ----- ---- ---- 1.01 15.17 1.46 78.93 1.01 ---- ----- ----- ----- ----- ----- ---- ----- 1.01 15.20 1.45 78.93 1.01 ----- --- -_-- --- ---- ----- ----- -- 1.01 15.23 1.44 78.94 1.01 --- -_-- --- _--- ---- --- --- ----- 1.01 15.27 1.42 78.94 1.01 --- --- _-- ---- --- ----- ----- --- 1.01 15.30 1.41 78.95 1.01 -- --- ---- ---- --- ----- --- - 1.01 15.33 1.40 78.95 1.01 ----- ---- --- ---- --- ----- -- ----- 1.01 15.37 1.38 78.95 1.01 ----- ---- ----- ----- ---- --- --- --- 1.01 15.40 1.37 78.96 1.01 - --- -- ----- ---- -_- ---- -- 1.01 15.43 1.36 78.96 1.01 --- -- ----- ---- ----- ----- ----- ---- 1.01 15.47 1.34 78.97 1.01 - __- -- ----- ----- ----- - ---- 1.01 15.50 1.33 78.97 1.01 -- ----- -_-- --- --- ---- ----- --- 1.01 15.53 1.32 78.97 1.01 ---- _--- ----- ----- ---- ---- ---- -_- 1.01 15.57 1.30 78.97 1.01 ---- ----- ---- ----- ----- ---- ---- ----- 1.01 15.60 1.29 78.98 1.01 ----- --- --- -- ----- ----- ----- -- 1.01 15.63 1.27 78.98 1.01 -- -- -- --- ---- --- ---- - 1.01 15.67 1.26 78.98 1.01 --- --- --- ---- -- --- ---- --- 1.01 15.70 1.25 78.99 1.01 -- - - - -- - -- - 1.01 15.73 1.23 78.99 1.01 -_ -- __-- -- _-- --- ___ __-- 1.01 15.77 1.22 78.99 1.02 --- ---- ---_ __-- -_-- __-_ ___-- _-- 1.02 15.80 1.21 78.99 1.02 --- -- -- -_ -- -- --- -- 1.02 15.83 1.19 78.99 1.02 ---- - -- _- ---- - --- -- 1.02 15.87 1.18 79.00 1.02 - ----- --- ---_- - -- ----- ---- 1.02 15.90 1.16 79.00 1.02 - - - - -- --_ -- - 1.02 15.93 1.15 79.00 1.02 --- --- -- -- -- _-- --- ---- 1.02 15.97 1.14 79.00 1.02 -- ---- ---- ----- -_- ---- -- --- 1.02 Continues on next page... Em.subd:basin disch. Page 3 Hydrograph Discharge Table Time Inflow Elevation Civ A Clv B Civ C Clv D Wr A Wr B Wr C Wr D EMI Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 16.00 1.12 79.00 1.02 - - - - - - - - 1.02 16.03 1.11 79.00 1.02 -- ----- -- -- ----- ----- ---- ---- 1.02 16.07 1.10 79.00 1.02 --- -- _- -- --- ---- ---- ----- 1.02 16.10 1.08 79.00 1.02 - -- ---- -- --- -- -- 1.02 16.13 1.07 79.00 1.02 - --- - - -- ---- ----- --- 1.02 16.17 1.06 79.01 1.02 -- --- --- -- --- --- ----- --- 1.02 16.20 1.04 79.01 1.02 - - - -- --- --- - ---- 1.02 16.23 1.03 79.01 1.02 -- ---- --- ---- ----- -- -_-- ----- 1.02 16.27 1.02 79.01 << 1.02 ----- --- ---- ----- --- ----- --- -- 1.02 << 16.30 1.01 79.01 1.02 -- -- --- -- -- -- -- -- 1.02 16.33 1.00 79.01 1.02 ----- ----- --- ---- -- --- -- -- 1.02 16.37 0.99 79.01 1.02 ---- --- ----- ---- -__- --- --- ---- 1.02 16.40 0.98 79.01 1.02 - ----- --- ----- - -- - -- - 1.02 16.43 0.97 79.00 1.02 - ----- ----- -- --- --- -- --- 1.02 16.47 0.96 79.00 1.02 --- ----- ----- ---- ---- ---- ----- --- 1.02 16.50 0.95 79.00 1.02 --- --- --- --- ---- ----- ---- ----- 1.02 16.53 0.95 79.00 1.02 --- -- - --- -- ---- -- - 1.02 16.57 0.94 79.00 1.02 ----- ----- ---- ---- --- ---- --- --- 1.02 16.60 0.93 79.00 1.02 --- - -- ---- __- __- _- _- 1.02 16.63 0.93 79.00 1.02 -- ----- ---- ----- ---- ----- --- ---- 1.02 16.67 0.92 79.00 1.02 ----- ---- ---- ----- ---- ----- ----- ---- 1.02 16.70 0.91 79.00 1.02 ---- -- ----- ----- --- --- --- ----- 1.02 16.73 0.91 79.00 1.02 -- ---- --- ---- ---- -- --- -- 1.02 16.77 0.90 79.00 1.02 ----- ---- ---- ----- ---- ----- ---- ---- 1.02 16.80 0.90 79.00 1.02 -- -- -- ---- - -- -- - 1.02 16.83 0.89 78.99 1.02 ---- ----- ----- ----- ----- --- ----- ----- 1.02 16.87 0.88 78.99 1.02 ----- ----- ---- ----- ----- ---- ----- ----- 1.02 16.90 0.88 78.99 1.02 _---- -- ---- -- --- ----- ---- ---- 1.02 16.93 0.87 78.99 1.01 -- -- ---- ---- ---- ---- ---- --- 1.01 16.97 0.87 78.99 1.01 --- ---- ---- ---- ---- ----- ----- ---- 1.01 17.00 0.86 78.99 1.01 ---- --- -- ----_ __- ____ _- _____ 1.01 17.03 0.85 78.98 1.01 -- --- ----- ---- --- ----- ---- --- 1.01 17.07 0.85 78.98 1.01 ----- ---- ----- ---- ----- ----- ----- ----- 1.01 17.10 0.84 78.98 1.01 ---- --- ----- -- _- -- ----- ---- 1.01 17.13 0.83 78.98 1.01 ----- ---- ---- ---- ----- ----- ----- --- 1.01 17.17 0.83 78.98 1.01 ----- -- ----- ---- --- ---- ----- --- 1.01 17.20 0.82 78.98 1.01 --_ -- --- ---- -- -- --- -- 1.01 17.23 0.82 78.97 1.01 ---- ----- ---- ----- ---- ---- ----- ----- 1.01 17.27 0.81 78.97 1.01 ---- ---- ---- ----- ---- ---- ----- -- 1.01 17.30 0.80 78.97 1.01 -_- - -- -- --- ---- --- -- 1.01 17.33 0.80 78.97 1.01 ---- -- ---- --- --- --- --- ---- 1.01 17.37 0.79 78.96 1.01 -- --- -- -- --- --- -- -- 1.01 17.40 0.79 78.96 1.01 - - - -- -- -- ---- -- 1.01 17.43 0.78 78.96 1.01 -- -- --- ---- -- ---- --- ---- 1.01 17.47 0.77 78.96 1.01 ---- ----- ---- ----- ---- ----- --- ---- 1.01 17.50 0.77 78.95 1.01 -- - - ---- -- ----- --- 1.01 17.53 0.76 78.95 1.01 - - ---- --- -- -- --- -- 1.01 17.57 0.76 78.95 1.01 ----- ----- ----- ---- ----- ---- ----- ----- 1.01 17.60 0.75 78.95 1.01 ----- ----- - - - ----- ----- -- 1.01 17.63 0.74 78.94 1.01 ---- -- --- ----- --- ---- ----- ---- 1.01 17.67 0.74 78.94 1.01 ---- --- ----- ---- --- ----- ---- ----- 1.01 Continues on next page... Em.subd.-basin disch. Page 4 Hydrograph Discharge Table - Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D EAl Outflow (hrs) eft ft ds ds ds cfs cfs cfs ds cfs cfs cfs 17.70 0.73 78.94 1.01 ---- - --- - - - -- - 1.01 17.73 0.72 78.94 1.01 ----- -=--- ----- ----- ---- ----- ----- ---- 1.01 17.77 0.72 78.93 1.01 ----- ---- ----- ----- ---- ---- ----- ----- 1.01 17.80 0.71 78.93 1.01 --- --- --- --- ---- --- --- -- 1.01 17.83 0.71 78.93 1.01 -- -- ---- ----- ---_ -- ---- -- 1.01 17.87 0.70 78.92 1.01 -- -- ---- ---- --- ----- ---- --- 1.01 17.90 0.69 78.92 1.01 -_ _____ _____ ___ _____ -_ _-_ __- 1.01 17.93 0.69 78.92 1.01 ---- --- ---- ---- ----- --- --- ---- 1.01 17.97 0.68 78.91 1.01 ----- ----- ---- ----- ----- ---- ---- ----- 1.01 18.00 0.67 78.91 1.01 -- --- ---- ---- --- -- ---- --- 1.01 18.03 0.67 78.91 1.01 ----- --- --- --- --- -- -- --- 1.01 18.07 0.66 78.90 1.01 --- ---- ---- ----- --- ----- ---- ----- 1.01 18.10 0.66 78.90 1.00 1.00 18.13 0.65 78.89 1.00 -- --- --- ----- ---- ---- ---- ---- 1.00 18.17 0.64 78.89 1.00 ----- ----- ----- ----- ----- --- ----- ----- 1.00 18.20 0.64 78.89 1.00 -- __- ----- ---- ---- ----- ----- ---- 1.00 18.23 0.63 78.88 1.00 -- -- ----- ----- --- -- ----- --- 1.00 18.27 0.63 78.88 1.00 ---- ---- -- -- ---- -- ---- ----- 1.00 18.30 0.62 78.88 1.00 ----- -- ---- ---- --- ----- --_ -- 1.00 18.33 0.62 78.87 1.00 ----- ----- ---- --- --- ---- ---- ----- 1.00 18.37 0.62 78.87 1.00 ----- ----- ---- ---- ---- ---- ----- ---- 1.00 18.40 0.61 78.86 1.00 -- ----- ---- -- _-- ---- ----- ----- 1.00 18.43 0.61 78.86 1.00 --- --- --- ---- -- -- ---- --- 1.00 18.47 0.61 78.85 1.00 ---- -- ----- ---- ----- -- ----- --- 1.00 18.50 0.60 78.85 1.00 --- - ----- ---- - -- -- - -- 1.00 18.53 0.60 78.85 1.00 ---- ----- ----- ---- ----- ---- ----- ----- 1.00 18.57 0.60 78.84 1.00 --- ----- ----- ----- ----- ----- ----- -_-- 1.00 18.60 0.60 78.84 1.00 ----- ----- ---- ---- ---- --- --- ---- 1.00 18.63 0.59 78.83 1.00 --- --- ---_ _- _- ___ __- ___ 1.00 18.67 0.59 78.83 1.00 ----- ----- -_-- ---- ----- --- ---- ----- 1.00 18.70 0.59 78.83 1.00 1.00 18.73 0.59 78.82 1.00 -- --- ---- --- ----- ---- ----- ---- 1.00 18.77 0.59 78.82 1.00 ---- --- ----- ---- --- ---- ---- ---- 1.00 18.80 0.59 78.81 0.99 --- --- ---- ---- --- --- ---- --- 0.99 18.83 0.58 78.81 0.99 ----- --- ---- ---. --- --- ----- --- 0.99 18.87 0.58 78.80 0.99 -- --- --- --- ----- -- ---- --- 0.99 18.90 0.58 78.80 0.99 -- -- ----- -_ _---- -- ---- -- 0.99 18.93 0.58 78.79 0.99 ---_ __- -_ ___ ----- 0.99 18.97 0.58 78.79 0.99 ---- --- --- ----- ----- ---- ----- ----- 0.99 19.00 0.57 78.79 0.99 --- ----- ---- --- ---- ----- ----- ---- 0.99 19.03 0.57 78.78 0.99 ----- ---- --- --- --- ----- - -- 0.99 19.07 0.57 78.78 0.99 ---- --- ---- --- --- -- ---- -- 0.99 19.10 0.57 78.77 0.99 - ----- ---- - --- --- - - 0.99 19.13 0.57 78.77 0.99 ---- ---- ---- --- ---- --- ----- ----- 0.99 19.17 0.57 78.76 0.99 ----- ---- ----- ---- ---- ----- ---- ----- 0.99 19.20 0.56 78.76 0.99 -- --- --- ---- ---- -- -- 0.99 19.23 0.56 78.75 0.99 ----- -- --- ----- -- ----- -- -- 0.99 19.27 0.56 78.75 0.99 ----- ---- ---- --- -- -_- -- --- 0.99 19.30 0.56 78.75 0.99 - - -- ----_ - - ---- ----- 0.99 19.33 0.56 78.74 0.99 ---- --_ -- ---- --- -- --- ---- 0.99 19.37 0.55 78.74 0.99 ----- ---- -- -__ ____ _____ _- -- 0.99 Continues on next page... Em.subd-basin disch. Page 5 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D EAU Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 19.40 0.55 78.73 0.99 - -- - - -- - - ---- 0.99 19.43 0.55 78.73 0.99 ---- -=--- ----- --- ----- ---- --- --- 0.99 19.47 0.55 78.72 0.98 ----- ---- ----- ---- ----- ----- ---- --- 0.98 19.50 0.55 78.72 0.98 -_ -- - --- -- ---- -- --- 0.98 19.53 0.55 78.71 0.98 - --- ---- -- -- --- -- ---- 0.98 19.57 0.54 78.71 0.98 ---- -- - -- ---- ----- --- --- 0.98 19.60 0.54 78.70 0.98 - - -- - - ---- ---- -- 0.98 19.63 0.54 78.70 0.98 ----- --- --- -- --- ----- -- --- 0.98 19.67 0.54 78.69 0.98 -- --- ----- --- ----- ----- ----- --- 0.98 19.70 0.54 78.69 0.98 --- - --- --- --- --- -- -- 0.98 19.73 0.53 78.69 0.98 - -- ----- -- -- -- - -- 0.98 19.77 0.53 78.68 0.98 ---- ---- ----- --- _--- --- ----- ---- 0.98 19.80 0.53 78.68 0.98 - -_ ____ _- - ___ - -__ 0.98 19.83 0.53 78.67 0.98 --- ---- ---- ---- ---- ----- ----- ----- 0.98 19.87 0.53 78.67 0.98 ---- ---- ----- --- ----- ----- ----- ----- 0.98 19.90 0.52 78.66 0.98 ----- --- --- ---- ---- ---- ---- ----- 0.98 19.93 0.52 78.66 0.98 -- -- -- --- -- --- ---- -- 0.98 19.97 0.52 78.65 0.98 --- ----- -- --- --- ----- --- --- 0.98 20.00 0.52 78.65 0.98 -_ - --- - --- ----- ---- -- 0.98 20.03 0.52 78.64 0.98 ---- ---- --- ---- ----- ----- ---- ----- 0.98 20.07 0.52 78.64 0.97 ----- ----- ----- ----- ----- ----- ----- ----- 0.97 20.10 0.51 78.63 0.97 -- ---- --- --- ---- ----- ----- ----- 0.97 20.13 0.51 78.63 0.97 ---- --- --- ---- ---- ---- --- ---- 0.97 20.17 0.51 78.62 0.97 ----- ---- ---- ---- ---- ----- --- ----- 0.97 20.20 0.51 78.62 0.97 - --- -- -- -- -- - - 0.97 20.23 0.51 78.61 0.97 ----- --- ---- ---- ----- ---- ---- ----- 0.97 20.27 0.50 78.61 0.97 ----- ----- ----- ----- ----- ----- ---- ----- 0.97 20.30 0.50 78.60 0.97 --_ --- --- ---- - ----- ---- ----- 0.97 20.33 0.50 78.60 0.97 --- --- ---- ---- ---- ---- -- ----- 0.97 20.37 0.50 78.59 0.97 ---- ---- ---- ---- ---- ----- ----- --- 0.97 20.40 0.50 78.59 0.97 -- -- ----- ---- --- ----- ---- ---- 0.97 20.43 0.50 78.58 0.97 ---- ---- ----- ----- ----- ---- ---- ---- 0.97 20.47 0.49 78.58 0.97 ---- ---- --- ----- ----- ---- ----- ----- 0.97 20.50 0.49 78.57 0.97 --- ----- ----- ----- ---- ---- --- --- 0.97 20.53 0.49 78.57 0.97 ---- ----- -- ----- ----- ----- ---- ----- 0.97 20.57 0.49 78.56 0.97 ----- ---- --- --- --- ----- -- --- 0.97 20.60 0.49 78.56 0.97 ----_ -_ ---- ---- ---- ----- ----- --- 0.97 20.63 0.48 78.55 0.96 ----- ----- -- ----- ---- ----- ---- --- 0.96 20.67 0.48 78.55 0.96 ---- ---- ----- ----- ---- ----- ----- ----- 0.96 20.70 0.48 78.54 0.96 --- --- ---- ----- -- ---- --- --- 0.96 20.73 0.48 78.54 0.96 ---- --- ----- --- ---- ----- ---- -- 0.96 20.77 0.48 78.53 0.96 --- --- ---- ---- ----- ---- ----- -- 0.96 20.80 0.47 78.53 0.96 ---- -- --_ - _- -_ ___ - 0.96 20.83 0.47 78.52 0.96 --- -- ----- ---- ----- ---- ---- ---- 0.96 20.87 0.47 78.52 0.96 ----- ----- ----- ----- ----- ----- ----- ----- 0.96 20.90 0.47 78.51 0.96 --- -- -- _---- ----- ----- -- -- 0.96 20.93 0.47 78.51 0.96 - -- -- --- -- -- -- ----- 0.96 20.97 0.47 78.50 0.96 ----- -- -- ---- ---- ---- --- --- 0.96 21.00 0.46 78.50 0.96 -- - _- _- ____ -_ -_ ____ 0.96 21.03 0.46 78.49 0.96 ----- --- --- ----- ----- ---- --- --- 0.96 21.07 0.46 78.49 0.96 ---- ---- ----- ----- ---- ----- ---- ----- 0.96 Continues on next page... Em.subd:basin disch. Page 6 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D EMI Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 21.10 0.46 78.48 0.96 - - - -- -- -- ----- - 0.96 21.13 0.46 78.47 0.96 ---- -=--- ---- ----- ----- ----- --- --- 0.96 21.17 0.45 78.47 0.96 ----- ----- ----- ----- ----- ----- ---- ----- 0.96 21.20 0.45 78.46 0.95 ---- -_ -_ --- -_ _-_ -- 0.95 21.23 0.45 78.46 0.95 - - _-- -- _--- - -- --- 0.95 21.27 0.45 78.45 0.95 ---- -- -- --- ---- --- - --- 0.95 21.30 0.45 78.45 0.95 -- - - - -- -- -- 0.95 21.33 0.44 78.44 0.95 ---- ----- --- ---- --- --- ----- -- 0.95 21.37 0.44 78.44 0.95 ---- -- ----- --- ---- --- ----- ---- 0.95 21.40 0.44 78.43 0.95 - - --- --- ----- --- ----- -- 0.95 21.43 0.44 78.43 0.95 - -- -- -- --- - - -- 0.95 21.47 0.44 78.42 0.95 ----- -_-- -- ---- -- --- ---- -- 0.95 21.50 0.44 78.42 0.95 - --- - -_ _- - --- ---- 0.95 21.53 0.43 78.41 0.95 -- -- - ---- --- -- --- ---- 0.95 21.57 0.43 78.41 0.95 -- --- --- ----- ----- ----- --- ----- 0.95 21.60 0.43 78.40 0.95 - -- - --- ---- ---- ---- ----- 0.95 21.63 0.43 78.39 0.95 - -- -- - - ---- ----- -- 0.95 21.67 0.43 78.39 0.95 -- --- --- ----- ---- ----- ----- --- 0.95 21.70 0.42 78.38 0.94 --_- - - - ----- - _- _- 0.94 21.73 0.42 78.38 0.94 -- - -- ---- ----- -- -_-- ---- 0.94 21.77 0.42 78.37 0.94 ---- ---- ---- ----- ----- ---- ----- ----- 0.94 21.80 0.42 78.37 0.94 ---- -- -- --_ _-_ --_ ___ ___ 0.94 21.83 0.42 78.36 0.94 ---- _-- --- --- --- - _---- --- 0.94 21.87 0.41 78.36 0.94 ----- --- ---- -_--- --_ -_ _-- ___ 0.94 21.90 0.41 78.35 0.94 -- - -- - - - - ---- - 0.94 21.93 0.41 78.34 0.94 -- --- _-__ ----- ----- _-_ __-- __-_ 0.94 21.97 0.41 78.34 0.94 ---- ----- ----- ----- ----- ----- ---- ---- 0.94 22.00 0.41 78.33 0.94 _--- --_ ----- ----- ---- --- --- _-- 0.94 22.03 0.41 78.33 0.94 -- --- ----- --_ _- -_ -_ _- 0_94 22.07 0.42 78.32 0.94 --- ---_ -_-- ___-- _-_- __-_ -_-- _-- 0.94 22.10 0.43 78.32 0.94 --_- -- --- _--- _--- --- --- --- 0.94 22.13 0.43 78.31 0.94 ----- ---- ----- ----- ---- ----- ---- -- 0.94 22.17 0.44 78.31 0.94 _--- ---- -- --_- ----- ---- ----- -_-- 0.94 22.20 0.45 78.30 0.93 -_-- ---- ----- ----- ----- ---- -_ ---- 0.93 22.23 0.46 78.30 0.93 ---- --- ---- ----_ -- ---- ---- ---- 0.93 22.27 0.47 78.29 0.93 ---- -- ----- -_-- --- -- ---- _- 0.93 22.30 0.48 78.29 0.93 --- -- -__ ___ - _- __- -____ 0.93 22.33 0.47 78.28 0.93 -_-- --- ---- ----- ---- ----- ----- ---- 0.93 22.37 0.47 78.28 0.93 ---- ----- ----- ----- ----- ----- ----- --__ 0.93 22.40 0.46 78.27 0.93 --- ----- -_- -_-- ____- __-- _- __- 0.93 22.43 0.46 78.27 0.93 ---- --- ---- --- --- --_ ___ _-- 0.93 22.47 0.45 78.26 0.93 -_- --- --- ---- ---- -- ---_ ----- 0.93 22.50 0.45 78.26 0.93 -- - ----- _- - -- --- ---- 0.93 22.53 0.44 78.25 0.93 _--- _- -- --- ---- ---- --- --- 0.93 22.57 0.44 78.25 0.93 --- ----- --- ---- --_- ----- ---- ---- 0.93 22.60 0.43 78.24 0.93 --- ----- -- -- --- ---- -- . -_ 0.93 22.63 0.43 78.23 0.93 -- --- -- - -- --_ -- -- 0.93 22.67 0.42 78.23 0.93 ----- -_-- _- ---- --- ----- -- ---- 0.93 22.70 0.42 78.22 0.93 -- ----- - - - --- --- - 0.93 22.73 0.41 78.22 0.92 ---- ---_- -- -- --_- ---- ---- -- 0.92 22.77 0.40 78.21 0.92 ---- ----- --- -_-- -_ ---- ---- ---- 0.92 Continues on next page... Em.subd-basin disch. Page 7 Hydrograph Discharge Table Time Inflow Elevation Clv A Civ B Clv C Clv D Wr A Wr B Wr C Wr D Exfi1 Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 22.80 0.40 78.21 0.92 - - -- - - --- - - 0.92 22.83 0.40 78.20 0.92 --- -=-- ---- --- --- ---- ---- --- 0.92 22.87 0.39 78.20 0.92 ----- ----- ----- ----- ----- ----- ----- ---- 0.92 22.90 0.39 78.19 0.92 --- - -- - --- ----- -- --- 0.92 22.93 0.39 78.19 0.92 ----- _- --- ---- -- ---- -- - 0.92 22.97 0.39 78.18 0.92 ---- --- --- ----- --- ---- --- ---- 0.92 23.00 0.39 78.17 0.92 - -- ---- -- -- ----- - - 0.92 23.03 0.39 78.17 0.92 --- ----- --- ---- ---- ---- ---- --- 0.92 23.07 0.39 78.16 0.92 --- -- ----- ---- ----- ----- - --- ----- 0.92 23.10 0.38 78.16 0.92 -- -- -- --- ---- ---- ---- -- 0.92 23.13 0.38 78.15 0.92 ---- --- --- _- -- -- ---- - 0.92 23.17 0.38 78.15 0.92 -- ---- ----- ---- --- ---- ---- ----- 0.92 23.20 0.38 78.14 0.92 0.92 ...End APPENDIX F Reservoir Report Page 1 Reservoir No. 4 - pond-"-03 Hydraflow Hydrographs by Intelisolve Pond Data Pond storage is based on known contour areas. Conic method used. Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cult) 0.00 74.00 3,670 0 0 1.00 75.00 7,000 5,246 5,246 2.00 76.00 10,070 8,488 13,733 3.00 77.00 13,800 11,885 25,618 4.00 78.00 18,000 15,852 41,470 Culvert/Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise in = 12.0 6.0 0.0 0.0 Crest Len It = 0.00 0.00 0.00 0.00 Span in = 12.0 6.0 0.0 0.0 Crest El.ft = 0.00 0.00 0.00 0.00 No.Barrels = 1 1 0 0 Weir Coeff. = 3.33 0.00 0.00 0.00 Invert El.It = 74.00 74.00 0.00 0.00 Weir Type = --- - - -- Length ft = 55.0 0.5 0.0 0.0 Multi-Stage = No No No No Slope% = 0.72 1.00 0.00 0.00 N-Value = .013 .013 .000 .000 Orif.Coeff. = 0.60 0.60 0.00 0.00 Multi-Stage = n/a Yes No No EAItration Rate = 3.19 in/hr/sgft Tailwater Elev.= 0.00 ft Note:All outflows have been analyzed under inlet and outlet control. Stage/Storage/Discharge Table Stage Storage Elevation Clv A CIv B Clv C Clv D Wr A Wr B Wr C Wr D Exi'l1 Total It cult ft cis ds cis cfs cis cfs cfs cis cis cfs 0.00 0 74.00 0.00 0.00 -- -- - -- -- - 0.000 0.00 1.00 5,246 75.00 0.74 0.72 --- -- - --- --- --- 0.517 1.24 2.00 13,733 76.00 1.14 1.14 - - - - - -- 0.744 1.88 3.00 25,618 77.00 1.48 1.45 - --- - - - - 1.019 2.47 4.00 41,470 78.00 1.75 1.71 -- - --- - -- --- 1.329 3.04 APPENDIX G Hydrograph Report Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 5 Unity basinto lakewood Hydrograph type = Reservoir Peak discharge = 1.08 cfs Storm frequency = 2 yrs Time interval = 2 min Inflow hyd. No. = 4 Reservoir name = pond-5-8-03 Max. Elevation = 74.86 ft Max. Storage = 4,492 cuft Storage Indication method used. Outflow hydrograph volume=20,339 cuft Hydrograph Discharge Table Time Inflow Elevation Civ A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Outflow (hm) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 12.33 1.85 74.81 0.63 0.62 ----- ----- ----- ----- ----- ---- 0.419 1.04 12.37 1.70 74.83 0.64 0.63 ----- ----- ----- ----- ----- ----- 0.428 1.05 12.40 1.55 74.84 0.65 0.63 ----- ----- ----- ----- ----- ----- 0.435 1.07 12.43 1.39 74.85 0.65 0.64 ----- ---- ----- ----- ---- ----- 0.439 1.08 12.47 1.22 74.85 0.65 0.64 ----- ----- ----- ----- ----- ----- 0.442 1.08 12.50 1.05 74.86 << 0.66 0.64 ----- ----- ----- ----- ----- ----- 0.443 1.08 << 12.53 0.90 74.85 0.65 0.64 ----- ----- ----- ----- ----- ----- 0.441 1.08 12.57 0.79 74.85 0.65 0.64 ----- ----- ----- ----- ----- ----- 0.438 1.08 12.60 0.73 74.84 0.65 0.63 ----- ----- ----- ----- ----- ----- 0.435 1.07 12.63 0.70 74.83 0.64 0.63 __-_ _____ 0.431 1.06 12.67 0.68 74.82 0.64 0.62 ----- ----- ----- ----- ----- ----- 0.426 1.05 12.70 0.67 74.82 0.63 0.62 ----- ----- ----- ----- ----- ----- 0.422 1.04 12.73 0.65 74.81 0.63 0.61 ----- ----- ----- ----- ----- ----- 0.417 1.03 ...End Hydrograph Report Pagel Hydraflow Hydrographs by Intelisolve Hyd. No. 5 Unity basinto lakewood Hydrograph type = Reservoir Peak discharge = 1.66 cfs Storm frequency = 10 yrs Time interval = 2 min Inflow hyd. No. = 4 Reservoir name = pond-5-8-03 Max. Elevation = 75.63 ft Max. Storage = 10,575 cuft Storage Indication method used. Outflow hydrograph volume=58,875 cuft Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 12.30 3.83 75.51 0.95 0.95 ----- ----- ----- ----- ----- ----- 0.633 1.58 12.33 3.55 75.54 0.97 0.96 ---- ----- ----- ----- ----- ----- 0.640 1.60 12.37 3.25 75.57 0.98 0.98 ----- ----- ----- ----- ----- ----- 0.645 1.62 12.40 2.94 75.59 0.99 0.99 ---- ----- ----- ---- --- ---- 0.650 1.64 12.43 2.63 75.60 1.00 0.99 ----- ----- ----- ----- ----- ----- 0.654 1.65 12.47 2.31 75.62 1.00 1.00 ----- ----- ----- ----- ----- ----- 0.656 1.65 12.50 2.00 75.62 1.01 1.00 ----- ----- ----- ----- ----- ---- 0.658 1.66 12.53 1.81 75.63 1.01 1.00 ---- ----- ----- ----- ----- ----- 0.659 1.66 12.57 1.74 75.63 << 1.01 1.00 ----- ----- ----- ----- ----- ----- 0.659 1.66 << 12.60 1.49 75.63 1.01 1.00 ---- ----- --- ---- ----- ----- 0.659 1.66 12.63 1.51 75.62 1.01 1.00 ----- ----- ----- ----- ----- ----- 0.659 1.66 12.67 1.53 75.62 1.01 1.00 ----- ----- ----- ----- ----- ----- 0.658 1.66 12.70 1.54 75.62 1.01 1.00 ----- ----- ----- ----- ----- ----- 0.658 1.66 12.73 1.54 75.62 1.01 1.00 --- ----- ----- ----- ----- ----- 0.657 1.66 12.77 1.53 75.62 1.00 1.00 ----- ----- ----- ----- ----- ----- 0.657 1.65 12.80 1.51 75.62 1.00 1.00 --- --- --- ----- ---- ----- 0.657 1.65 12.83 1.50 75.61 1.00 1.00 ----- ----- ----- ----- ----- ----- 0.656 1.65 12.87 1.48 75.61 1.00 1.00 ----- ----- ----- ----- ----- ----- 0.656 1.65 12.90 1.45 75.61 1.00 0.99 ----- ----- ----- ----- ----- ----- 0.655 1.65 12.93 1.43 75.61 1.00 0.99 ----- ----- ----- ----- ----- ----- 0.654 1.65 12.97 1.40 75.60 0.99 0.99 ----- ----- ----- ----- ----- ----- 0.654 1.65 13.00 1.38 75.60 0.99 0.99 ----- --- ----- ----- ---- ---- 0.653 1.64 13.03 1.35 75.60 0.99 0.99 ----- ----- ----- ----- ----- ----- 0.652 1.64 13.07 1.33 75.59 0.99 0.99 ----- ----- ----- ----- ----- ----- 0.651 1.64 13.10 1.33 75.59 0.99 0.99 ----- ----- ----- ----- ----- ---- 0.650 1.64 13.13 1.32 75.58 0.98 0.98 ---- ----- ---- ----- ----- ----- 0.649 1.63 13.17 1.32 75.58 0.98 0.98 ----- ----- ----- ----- ----- ----- 0.648 1.63 13.20 1.31 75.57 0.98 0.98 ----- --- ----- ----- ----- ----- 0.647 1.63 13.23 1.31 75.57 0.98 0.98 ----- ----- ----- ----- ----- ----- 0.646 1.62 13.27 1.31 75.56 0.98 0.98 ----- ----- ----- ----- ----- ----- 0.645 1.62 13.30 1.30 75.56 0.97 0.97 ----- ---- ----- ----- ----- ----- 0.644 1.62 13.33 1.30 75.56 0.97 0.97 ----- ---- ----- ----- ----- ----- 0.643 1.61 13.37 1.29 75.55 0.97 0.97 ----- ----- ----- ----- ----- ----- 0.642 1.61 13.40 1.29 75.55 0.97 0.97 --- --- ---- ----- ----- ----- 0.641 1.61 13.43 1.28 75.54 0.97 0.96 ----- ----- ----- ----- ----- ----- 0.640 1.60 13.47 1.28 75.54 0.96 0.96 ----- ----- ----- ----- ----- ----- 0.639 1.60 13.50 1.27 75.53 0.96 0.96 ----- ----- ----- ----- ----- ----- 0.638 1.60 13.53 1.27 75.53 0.96 0.96 ----- ----- ----- ----- ----- ----- 0.637 1.60 Continues on next page... Unity basinto lakewood Page 2 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D EMI Outflow (hrs) cfs ft eft cfs cfs cfs cfs cfs cfs cfs cfs cfs 13.57 1.26 75.52 0.96 0.96 ----- ---- ----- ----- ----- ----- 0.636 1.59 13.60 1.26 75.52 0.95 0.95 ----- ----- ----- ----- ----- ----- 0.635 1.59 13.63 1.25 75.51 0.95 0.95 ----- ----- ----- ----- ----- ----- 0.634 1.59 13.67 1.24 75.51 0.95 0.95 ----- ----- ----- ----- ---- ----- 0.632 1.58 13.70 1.24 75.50 0.95 0.95 ----- ----- ----- ----- ----- ----- 0.631 1.58 ...End Hydrograph Report Page 7 Hydraflow Hydrographs by Intelisolve Hyd. No. 5 Unity basinto lakewood Hydrograph type = Reservoir Peak discharge = 1.94 cfs Storm frequency = 25 yrs Time interval = 2 min Inflow hyd. No. = 4 Reservoir name = pond-5-8-03 Max. Elevation = 76.09 ft Max. Storage = 14,760 cult Storage Indication method used. Outflow hydrograph volume=81,857 cuft Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfll Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 12.33 4.51 75.95 1.13 1.12 ----- --- ----- ----- ----- ----- 0.732 1.85 12.37 4.29 75.98 1.14 1.13 ----- ----- ---- ----- ----- ----- 0.740 1.87 12.40 3.84 76.01 1.15 1.14 ----- ----- ----- ----- ----- ----- 0.747 1.89 12.43 3.56 76.03 1.16 1.15 -- ----- ----- ---- ---- ---- 0.752 1.90 12.47 3.24 76.04 1.17 1.15 ----- ----- ----- ----- ---- ----- 0.756 1.91 12.50 2.88 76.06 1.17 1.16 ----- ----- ----- ----- ----- ----- 0.759 1.92 12.53 2.55 76.06 1.18 1.16 ----- ----- ----- ----- ----- ----- 0.761 1.92 12.57 2.32 76.07 1.18 1.16 ----- ----- ----- ----- ----- ----- 0.763 1.93 12.60 2.21 76.07 1.18 1.16 ----- ----- ----- ----- ----- ----- 0.764 1.93 12.63 2.17 76.08 1.18 1.16 ---- ---- ---- ----- ---- ----- 0.764 1.93 12.67 2.15 76.08 1.18 1.17 ----- ----- ----- ----- ----- ----- 0.765 1.93 12.70 2.13 76.08 1.19 1.17 ----- ----- ----- ----- ----- ----- 0.766 1.93 12.73 2.11 76.08 1.19 1.17 ----- ----- ----- ----- ----- ----- 0.766 1.93 12.77 2.08 76.08 1.19 1.17 ----- ----- ---- ----- ----- ----- 0.767 1.93 12.80 2.05 76.08 1.19 1.17 ----- ----- ----- ----- ----- ----- 0.767 1.93 12.83 2.01 76.09 1.19 1.17 ----- ----- ----- ---- ----- ----- 0.767 1.94 12.87 1.98 76.09 1.19 1.17 ----- ----- ----- ---- ----- ----- 0.767 1.94 12.90 1.95 76.09<< 1.19 1.17 ----- ----- ----- ----- ----- ----- 0.767 1.94 << 12.93 1.91 76.09 1.19 1.17 ----- ----- ----- ----- ----- ----- 0.767 1.94 12.97 1.87 76.09 1.19 1.17 --- ---- ----- ----- ----- ----- 0.767 1.94 13.00 1.83 76.08 1.19 1.17 ----- ----- ----- ----- ----- ----- 0.767 1.94 13.03 1.80 76.08 1.19 1.17 ---- ----- --- ---- ----- ---- 0.767 1.93 13.07 1.77 76.08 1.19 1.17 ----- ----- ----- ----- ----- ----- 0.766 1.93 13.10 1.76 76.08 1.19 1.17 ----- ----- ----- ----- ----- ----- 0.766 1.93 13.13 1.75 76.08 1.19 1.17 ----- ----- ----- ----- ----- ----- 0.765 1.93 13.17 1.74 76.08 1.18 1.17 ----- ----- ----- ----- ----- ---- 0.765 1.93 13.20 1.73 76.07 1.18 1.16 ----- ----- ----- ----- ----- ----- 0.764 1.93 13.23 1.73 76.07 1.18 1.16 0.764 1.93 13.27 1.72 76.07 1.18 1.16 ----- ----- ----- ----- ----- ----- 0.763 1.93 13.30 1.71 76.07 1.18 1.16 ----- ----- ----- ---- ----- ----- 0.763 1.93 13.33 1.70 76.07 1.18 1.16 ----- ----- ----- ----- ----- ----- 0.762 1.92 13.37 1.70 76.06 1.18 1.16 ---- ---- ----- ----- ----- ----- 0.761 1.92 13.40 1.69 76.06 1.18 1.16 ----- ----- ---- ----- ----- ----- 0.761 1.92 13.43 1.68 76.06 1.17 1.16 --- ----- ---- ----- ----- ----- 0.760 1.92 13.47 1.67 76.06 1.17 1.16 ----- ----- ----- ----- ----- ----- 0.759 1.92 13.50 1.66 76.05 1.17 1.16 ----- ----- ----- ----- ----- ----- 0.759 1.92 13.53 1.65 76.05 1.17 1.16 ----- ----- ---- ----- ----- ----- 0.758 1.91 13.57 1.64 76.05 1.17 1.16 ----- ----- ----- ----- ----- ----- 0.757 1.91 Continues on next page... Unity basinto lakewwd Page 2 Hydrograph Discharge Table Time Inflow Elevation Clv A Civ B Clv C Clv D Wr A Wr B Wr C Wr D ExHI Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 13.60 1.63 76.05 1.17 1.15 ---- ----- ---- ----- ----- --- 0.756 1.91 13.63 1.63 76.04 1.16 1.15 ----- ----- ----- ----- ----- ----- 0.756 1.91 13.67 1.62 76.04 1.16 1.15 ----- ----- ----- ----- ----- ----- 0.755 1.91 13.70 1.61 76.04 1.16 1.15 ----- ----- ----- ----- ----- ---- 0.754 1.91 13.73 1.60 76.03 1.16 1.15 ----- ----- ----- ----- ----- ----- 0.753 1.90 13.77 1.59 76.03 1.16 1.15 ----- ----- ---- ----- ----- ----- 0.752 1.90 13.80 1.58 76.03 1.16 1.15 0.751 1.90 13.83 1.57 76.03 1.15 1.15 ----- ----- ----- ----- ----- ----- 0.751 1.90 13.87 1.56 76.02 1.15 1.15 ----- ----- ----- ----- ----- ----- 0.750 1.90 13.90 1.55 76.02 1.15 1.15 ----- ----- ----- ----- ----- ----- 0.749 1.89 13.93 1.54 76.01 1.15 1.14 ----- ----- ----- ----- ----- ----- 0.748 1.89 13.97 1.53 76.01 1.15 1.14 ----- ----- ----- ----- ----- ----- 0.747 1.89 14.00 1.52 76.01 1.14 1.14 ---- -- ____ ____ ____ ___ 0.746 1.89 14.03 1.51 76.00 1.14 1.14 ----- ----- ----- ----- ----- ----- 0.745 1.88 14.07 1.50 76.00 1.14 1.14 ----- ----- ----- ----- ----- ----- 0.744 1.88 14.10 1.50 75.99 1.14 1.14 ----- ----- ----- ----- ----- ----- 0.742 1.88 14.13 1.49 75.99 1.14 1.13 ----- ----- ----- ----- ----- ---- 0.741 1.88 14.17 1.49 75.98 1.14 1.13 ----- ----- ----- ----- ----- ----- 0.740 1.87 14.20 1.48 75.98 1.14 1.13 --- ----- ---- ----- ----- ----- 0.739 1.87 14.23 1.48 75.97 1.14 1.13 ----- ----- ----- ----- ----- ----- 0.737 1.87 14.27 1.48 75.97 1.14 1.13 ----- ----- ----- ----- ----- ----- 0.736 1.86 14.30 1.47 75.96 1.13 1.12 ----- ----- ----- ----- ----- ----- 0.735 1.86 14.33 1.47 75.96 1.13 1.12 ----- ----- ----- ----- ----- ----- 0.734 1.86 14.37 1.46 75.95 1.13 1.12 ----- ----- ----- ----- ----- ----- 0.732 1.85 14.40 1.46 75.95 1.13 1.12 ----- --_ ____ ___ ____ _____ 0.731 1.85 14.43 1.45 75.94 1.13 1.12 ----- ----- ----- ----- ----- ----- 0.730 1.85 14.47 1.45 75.93 1.13 1.12 ----- ----- ----- ----- ----- ----- 0.729 1.84 14.50 1.45 75.93 1.13 1.11 ----- ----- ----- ----- ----- ----- 0.727 1.84 ...End Hydrograph Report Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 5 Unity basinto lakewood Hydrograph type = Reservoir Peak discharge = 2.14 cfs Storm frequency = 50 yrs Time interval = 2 min Inflow hyd. No. = 4 Reservoir name = pond-5-8-03 Max. Elevation = 76.43 ft Max. Storage = 18,830 cuft Storage Indication method used. Outflow hydrograph volume=102,871 cuft Hydrograph Discharge Table Time Inflow Elevation Civ A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfl Outflow (hrs) cfs It cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 12.37 5.24 76.27 1.25 1.23 ----- ----- ----- ----- ----- ----- 0.818 2.05 12.40 4.84 76.30 1.27 1.24 ---- ----- ---- ----- ----- ----- 0.827 2.07 12.43 4.41 76.33 1.27 1.25 ----- ----- ----- ----- ----- ----- 0.834 2.08 12.47 3.98 76.35 1.27 1.26 ---- ---- _--- ----- ----- ---- 0.840 2.10 12.50 3.53 76.37 1.27 1.26 ----- ----- ----- ----- ----- ----- 0.844 2.11 12.53 3.11 76.38 1.27 1.27 ----- ----- ----- ----- ----- ----- 0.848 2.11 12.57 2.82 76.39 1.27 1.27 ----- ----- ----- ----- ----- ----- 0.850 2.12 12.60 2.68 76.39 1.27 1.27 ---- ---- ----- ----- ----- ----- 0.852 2.12 12.63 2.62 76.40 1.27 1.27 ----- ----- ----- ----- ----- ----- 0.853 2.13 12.67 2.59 76.40 1.28 1.27 - ---- ---- --- --- ---- 0.854 2.13 12.70 2.56 76.41 1.28 1.28 ----- ----- ---- ----- ----- ----- 0.856 2.13 12.73 2.52 76.41 1.28 1.28 ----- ----- ----- ----- ----- ----- 0.857 2.13 12.77 2.49 76.41 1.28 1.28 ----- ----- ----- ----- ----- ----- 0.858 2.14 12.80 2.45 76.42 1.29 1.28 ----- ----- ----- ----- ----- ----- 0.859 2.14 12.83 2.41 76.42 1.29 1.28 ----- ----- ----- ----- ----- ----- 0.860 2.14 12.87 2.36 76.42 1.29 1.28 --- ---- ---- --- ---- ----- 0.860 2.14 12.90 2.32 76.43 1.29 1.28 ----- ----- ----- ----- ----- ----- 0.861 2.14 12.93 2.27 76.43 1.29 1.28 ----- ----- ----- ----- ----- ----- 0.861 2.14 12.97 2.23 76.43 1.29 1.28 ----- ----- ---- ----- ----- ----- 0.862 2.14 13.00 2.18 76.43 1.29 1.28 ----- ----- ---- ----- ----- ----- 0.862 2.14 13.03 2.13 76.43 << 1.29 1.28 ----- ----- ---- ---- ----- ----- 0.862 2.14<< 13.07 2.10 76.43 1.29 1.28 ---- ---- ----- --- --- ----- 0.862 2.14 13.10 2.08 76.43 1.29 1.28 ----- ----- ----- ----- ----- ----- 0.861 2.14 13.13 2.07 76.43 1.29 1.28 ----- ----- ----- ----- ----- ----- 0.861 2.14 13.17 2.06 76.43 1.29 1.28 ----- ----- ----- ----- ----- ----- 0.861 2.14 13.20 2.05 76.43 1.29 1.28 ----- ----- ----- ----- ----- ----- 0.861 2.14 13.23 2.04 76.42 1.29 1.28 ----- ----- ----- ----- ----- ----- 0.861 2.14 13.27 2.03 76.42 1.29 1.28 ----- ----- ----- --- ----- --- 0.860 2.14 13.30 2.02 76.42 1.29 1.28 ----- ----- ----- ----- ----- ----- 0.860 2.14 13.33 2.01 76.42 1.29 1.28 ----- ----- ----- ----- ----- ----- 0.860 2.14 13.37 2.00 76.42 1.29 1.28 ----- ----- ----- ----- ----- ----- 0.859 2.14 13.40 1.99 76.42 1.29 1.28 ----- ---- ----- ----- ----- ----- 0.859 2.14 13.43 1.98 76.42 1.28 1.28 ----- ----- ----- ----- ----- ----- 0.858 2.14 13.47 1.97 76.42 1.28 1.28 ---- ----- ---- ---- ----- ----- 0.858 2.14 13.50 1.96 76.41 1.28 1.28 ---- ----- ----- ----- ----- ----- 0.858 2.14 13.53 1.95 76.41 1.28 1.28 ----- ----- ----- ----- ----- ----- 0.857 2.13 13.57 1.93 76.41 1.28 1.28 ----- ----- ----- ----- ----- ----- 0.856 2.13 13.60 1.92 76.41 1.28 1.28 ----- ----- ----- ----- ----- ----- 0.856 2.13 Continues on next page... Unity basinto lakewwd Page 2 Hydrograph Discharge Table Time Inflow Elevation Civ A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 13.63 1.91 76.41 1.28 1.28 -- ----- ----- --- -- --- 0.855 2.13 13.67 1.90 76.40 1.28 1.27 ----- ----- ----- ----- ----- ----- 0.855 2.13 13.70 1.89 76.40 1.27 1.27 ----- ----- ----- ----- ----- ----- 0.854 2.13 13.73 1.88 76.40 1.27 1.27 ----- ----- ----- ----- ----- ---- 0.853 2.13 13.77 1.86 76.40 1.27 1.27 ---- ----- ----- ----- ----- ----- 0.853 2.13 13.80 1.85 76.39 1.27 1.27 ----- ----- ----- ----- ----- ----- 0.852 2.12 13.83 1.84 76.39 1.27 1.27 ---- --- ----- ---- ----- ---- 0.851 2.12 13.87 1.83 76.39 1.27 1.27 ----- ----- ----- ----- ----- ----- 0.850 2.12 13.90 1.82 76.38 1.27 1.27 ----- ----- ----- ----- ----- ----- 0.849 2.12 13.93 1.80 76.38 1.27 1.27 ----- ----- ----- ----- ----- ----- 0.849 2.12 13.97 1.79 76.38 1.27 1.27 ----- ----- ----- ---- ----- ----- 0.848 2.11 14.00 1.78 76.37 1.27 1.27 ----- ----- ----- ----- ----- ----- 0.847 2.11 14.03 1.77 76.37 1.27 1.26 --- ---- ----- ---- ----- ---- 0.846 2.11 14.07 1.76 76.37 1.27 1.26 ---- ----- ----- ----- ----- ----- 0.845 2.11 14.10 1.75 76.36 1.27 1.26 ----- ----- ----- ----- ----- ----- 0.844 2.11 14.13 1.75 76.36 1.27 1.26 ---- ----- ----- ----- ----- ----- 0.843 2.10 14.17 1.74 76.36 1.27 1.26 ----- ----- ----- ----- ----- ---- 0.842 2.10 14.20 1.74 76.35 1.27 1.26 ----- ----- ----- ----- ----- ----- 0.841 2.10 14.23 1.73 76.35 1.27 1.26 ----- --- ---- ----- ---- ---- 0.840 2.10 14.27 1.73 76.35 1.27 1.26 ----- ---- ----- ----- ----- ----- 0.839 2.09 14.30 1.72 76.34 1.27 1.25 ----- ----- ----- ----- ----- ----- 0.838 2.09 14.33 1.71 76.34 1.27 1.25 ----- ----- ----- ----- ---- ----- 0.837 2.09 14.37 1.71 76.33 1.27 1.25 ----- ---- ----- ----- ----- ----- 0.836 2.09 14.40 1.70 76.33 1.27 1.25 ----- ----- ----- ----- ----- ----- 0.835 2.09 14.43 1.70 76.33 1.27 1.25 --- ----- ----- ---- -- --- 0.834 2.08 14.47 1.69 76.32 1.27 1.25 ----- ----- ----- ----- ----- ----- 0.833 2.08 14.50 1.69 76.32 1.27 1.25 ----- ----- ----- ----- ----- ----- 0.832 2.08 14.53 1.68 76.32 1.27 1.25 ----- ----- ----- ----- ----- ----- 0.830 2.08 14.57 1.68 76.31 1.27 1.24 ----- ----- ----- ----- ---- ----- 0.829 2.07 14.60 1.67 76.31 1.27 1.24 ----- ----- ----- ----- ----- ----- 0.828 2.07 14.63 1.66 76.30 1.27 1.24 --- ---- --- --- ----- ---- 0.827 2.07 14.67 1.66 76.30 1.27 1.24 ----- ----- ----- ----- ----- ----- 0.826 2.07 14.70 1.65 76.29 1.26 1.24 ----- ----- ----- ----- ----- ----- 0.825 2.06 14.73 1.65 76.29 1.26 1.24 ----- ----- ----- ----- ----- ---- 0.824 2.06 14.77 1.64 76.29 1.26 1.24 ---- ----- ----- ----- ----- ----- 0.823 2.06 14.80 1.64 76.28 1.26 1.23 ----- ----- ----- ----- ----- ----- 0.821 2.06 14.83 1.63 76.28 1.25 1.23 ---- ----- ---- ----- ---- --- 0.820 2.05 14.87 1.62 76.27 1.25 1.23 ----- ----- ----- ----- ----- ---- 0.819 2.05 14.90 1.62 76.27 1.25 1.23 ----- ----- ----- ----- ----- ----- 0.818 2.05 14.93 1.61 76.27 1.25 1.23 ----- ----- ----- ----- ----- ----- 0.817 2.05 14.97 1.60 76.26 1.24 1.23 ----- ---- ----- ----- ---- ---- 0.815 2.04 15.00 1.60 76.26 1.24 1.23 ----- ----- ---- ----- ----- ----- 0.814 2.04 15.03 1.59 76.25 1.24 1.22 ----- --- ---- ---- --- ---- 0.813 2.04 ...End Hydrograph Report Pagel Hydraflow Hydrographs by Intelisolve Hyd. No. 5 Unity basinto lakewood Hydrograph type = Reservoir Peak discharge = 2.35 cfs Storm frequency = 100 yrs Time interval = 2 min Inflow hyd. No. = 4 Reservoir name = pond-5-8-03 Max. Elevation = 76.78 ft Max. Storage = 23,062 cuft Storage Indication method used. Outflow hydrograph volume=124,497 cult Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Civ C Clv D Wr A Wr B Wr C Wr D Exfll Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 12.40 5.69 76.61 1.34 1.34 ----- ----- ----- ----- ----- ----- 0.911 2.25 12.43 5.17 76.64 1.37 1.35 ----- ----- ----- ----- ---- ---- 0.920 2.27 12.47 4.65 76.67 1.39 1.36 ----- ----- ----- ----- ----- ----- 0.927 2.28 12.50 4.12 76.69 1.40 1.36 ----- ----- ---- ----- ----- ----- 0.933 2.29 12.53 3.63 76.70 1.41 1.37 ----- ----- ----- ----- ----- ----- 0.938 2.30 12.57 3.29 76.72 1.41 1.37 ----- ----- ----- ----- ----- ----- 0.941 2.31 12.60 3.11 76.73 1.41 1.37 ----- ----- ----- ----- ----- ----- 0.943 2.32 12.63 3.04 76.73 1.41 1.37 ----- ----- ----- ----- ----- ----- 0.945 2.32 12.67 3.00 76.74 1.41 1.38 ----- ----- ----- ----- ----- ----- 0.947 2.32 12.70 2.96 76.75 1.41 1.38 ----- ----- ----- ----- ----- ----- 0.94.9 2.33 12.73 2.91 76.75 1.41 1.38 ----- ----- ----- ----- ----- ----- 0.951 2.33 12.77 2.86 76.76 1.41 1.38 ----- ----- ----- ----- ----- ----- 0.952 2.34 12.80 2.82 76.76 1.41 1.38 ----- ----- ----- ----- ----- ----- 0.954 2.34 12.83 2.77 76.77 1.41 1.39 ----- ----- ----- ---- ----- ---- 0.955 2.34 12.87 2.71 76.77 1.41 1.39 ----- ----- ----- ----- ----- ----- 0.956 2.34 12.90 2.66 76.78 1.41 1.39 ----- ----- ----- ----- ----- ----- 0.957 2.35 12.93 2.61 76.78 1.41 1.39 ----- ----- ----- ----- ----- ----- 0.958 2.35 12.97 2.55 76.78 1.41 1.39 ----- ----- ----- ----- ----- ----- 0.959 2.35 13.00 2.50 76.78 1.41 1.39 ----- ----- ----- ----- ----- ----- 0.959 2.35 13.03 2.45 76.78 1.41 1.39 ----- ----- ----- ----- ----- ----- 0.959 2.35 13.07 2.41 76.78 1.41 1.39 ----- ----- ----- ----- ----- ----- 0.960 2.35 13.10 2.38 76.78 1.41 1.39 ---- ---- ----- ----- ----- ----- 0.960 2.35 13.13 2.37 76.78 1.41 1.39 ----- ----- ----- ----- ----- ----- 0.960 2.35 13.17 2.36 76.78 << 1.41 1.39 ----- ----- ----- ----- ----- ----- 0.960 2.35 << 13.20 2.34 76.78 1.41 1.39 ----- ----- ----- ----- ----- ----- 0.960 2.35 13.23 2.33 76.78 1.41 1.39 ---- ----- ----- ----- ---- ---- 0.960 2.35 13.27 2.32 76.78 1.41 1.39 ----- ----- ----- ----- ----- ----- 0.960 2.35 13.30 2.31 76.78 1.41 1.39 ----- ----- ----- ----- ----- ----- 0.960 2.35 13.33 2.29 76.78 1.41 1.39 ----- ----- ----- ----- ----- ----- 0.959 2.35 13.37 2.28 76.78 1.41 1.39 ----- ----- ----- ----- ----- ----- 0.959 2.35 13.40 2.27 76.78 1.41 1.39 ----- ----- ----- ----- ----- ----- 0.959 2.35 13.43 2.26 76.78 1.41 1.39 ----- ----- ----- ----- ----- ----- 0.959 2.35 13.47 2.24 76.78 1.41 1.39 ----- ----- ----- ----- ----- ----- 0.959 2.35 13.50 2.23 76.78 1.41 1.39 ----- ----- ----- ----- ----- ----- 0.958 2.35 13.53 2.22 76.78 1.41 1.39 ----- ----- ----- ----- ----- ----- 0.958 2.35 13.57 2.20 76.78 1.41 1.39 ----- ----- ----- ----- ----- ----- 0.957 2.35 13.60 2.19 76.77 1.41 1.39 ----- ----- ----- ----- ----- ----- 0.957 2.35 13.63 2.17 76.77 1.41 1.39 ----- ----- ----- ----- ----- ----- 0.957 2.34 Continues on next page... Unity basinto lakewoW Page 2 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 13.67 2.16 76.77 1.41 1.39 ---- --- ---- ----- ---- ----- 0.956 2.34 13.70 2.15 76.77 1.41 1.39 ----- ----- ----- ----- ----- ----- 0.956 2.34 13.73 2.13 76.77 1.41 1.39 ----- ----- ----- ----- ----- ----- 0.955 2.34 13.77 2.12 76.77 1.41 1.39 ----- ----- ----- ----- ----- ----- 0.954 2.34 13.80 2.10 76.76 1.41 1.38 ----- ---- ----- ----- ----- ----- 0.954 2.34 13.83 2.09 76.76 1.41 1.38 ----- ----- ----- ----- ----- ----- 0.953 2.34 13.87 2.08 76.76 1.41 1.38 ----- ----- ---- ----- --- ----- 0.952 2.34 13.90 2.06 76.76 1.41 1.38 ----- ----- ----- ----- ----- ----- 0.952 2.33 13.93 2.05 76.75 1.41 1.38 ----- ----- ----- ----- ----- ----- 0.951 2.33 13.97 2.03 76.75 1.41 1.38 ----- ----- ----- ----- ----- ----- 0.950 2.33 14.00 2.02 76.75 1.41 1.38 ---- --- ----- ----- ----- --- 0.949 2.33 14.03 2.00 76.74 1.41 1.38 ----- ----- ----- ----- ----- ----- 0.948 2.33 14.07 1.99 76.74 1.41 1.38 ----- ----- ---- --- ---- ----- 0.947 2.32 14.10 1.98 76.74 1.41 1.38 ----- ----- ----- ----- ----- ----- 0.946 2.32 14.13 1.98 76.73 1.41 1.38 ----- ----- ----- ----- ----- ----- 0.946 2.32 14.17 1.97 76.73 1.41 1.37 ----- ----- ----- ----- ----- ----- 0.945 2.32 14.20 1.97 76.73 1.41 1.37 ---- ----- ----- ----- ----- ---- 0.944 2.32 14.23 1.96 76.72 1.41 1.37 ----- ----- ---- ----- ----- ----- 0.943 2.31 14.27 1.95 76.72 1.41 1.37 ----- ----- --- ----- ----- ---- 0.942 2.31 14.30 1.95 76.72 1.41 1.37 ----- ----- ----- ----- ----- ----- 0.941 2.31 14.33 1.94 76.71 1.41 1.37 ----- ----- ----- ----- ----- ----- 0.940 2.31 14.37 1.93 76.71 1.41 1.37 ----- ----- ----- ----- ----- ----- 0.939 2.31 14.40 1.93 76.70 1.41 1.37 ----- ----- ----- ----- ----- ----- 0.938 2.30 14.43 1.92 76.70 1.41 1.36 ---- ----- ---- ----- ----- ----- 0.936 2.30 14.47 1.91 76.70 1.41 1.36 ----- ---- ----- ----- ----- ----- 0.935 2.30 14.50 1.91 76.69 1.40 1.36 ----- ----- ----- ----- ----- ----- 0.934 2.30 14.53 1.90 76.69 1.40 1.36 ----- ----- ----- ----- ---- ----- 0.933 2.29 14.57 1.89 76.68 1.40 1.36 ----- ----- ----- ----- ----- ----- 0.932 2.29 14.60 1.89 76.68 1.39 1.36 ----- ----- ----- ----- ----- ----- 0.931 2.29 14.63 1.88 76.68 1.39 1.36 --- ----- ----- ---- ----- ---- 0.930 2.29 14.67 1.87 76.67 1.39 1.36 ----- ---- ---- ---- ---- ----- 0.929 2.29 14.70 1.87 76.67 1.39 1.36 ----- ----- ----- ----- ----- ----- 0.928 2.28 14.73 1.86 76.66 1.38 1.35 ----- ----- ----- ---- ----- ----- 0.926 2.28 14.77 1.85 76.66 1.38 1.35 ----- ----- ----- ----- ----- ----- 0.925 2.28 14.80 1.85 76.66 1.38 1.35 ----- ---- ----- ----- ---- ----- 0.924 2.28 14.83 1.84 76.65 1.37 1.35 ----- ----- ----- ----- ----- ----- 0.923 2.27 14.87 1.83 76.65 1.37 1.35 ----- --- ---- ----- ----- ----- 0.922 2.27 14.90 1.82 76.64 1.37 1.35 ----- ----- ----- ----- ----- ----- 0.920 2.27 14.93 1.82 76.64 1.36 1.35 ---- ---- ----- ----- ----- ----- 0.919 2.27 14.97 1.81 76.63 1.36 1.35 ----- ----- ---- ----- ----- ---- 0.918 2.26 15.00 1.80 76.63 1.36 1.35 ----- ----- ----- ----- ----- ----- 0.917 2.26 15.03 1.80 76.62 1.35 1.34 ---- ----- ----- ----- ----- ----- 0.915 2.26 15.07 1.79 76.62 1.35 1.34 ---- ----- ---- ----- ----- ---- 0.914 2.26 15.10 1.78 76.61 1.35 1.34 ----- ----- ----- ----- ----- ----- 0.913 2.25 15.13 1.78 76.61 1.34 1.34 ---- ----- ----- ----- ----- ---- 0.911 2.25 15.17 1.77 76.60 1.34 1.34 ----- ----- ----- ----- ----- ----- 0.910 2.25 15.20 1.76 76.60 1.34 1.34 ----- ----- ----- ----- ----- ----- 0.909 2.25 15.23 1.75 76.59 1.34 1.34 ----- ----- ----- ---- ----- ----- 0.907 2.24 15.27 1.75 76.59 1.34 1.33 ----- ----- ----- ----- ---- ----- 0.906 2.24 15.30 1.74 76.58 1.34 1.33 ----- ----- ----- ----- ----- ----- 0.905 2.24 15.33 1.73 76.58 1.34 1.33 ----- ----- ----- ----- ----- ----- 0.903 2.23 Continues on next page... APPENDIX H Hydrograph Summary Report Pagel Hyd. Hydrograph Peak Time Time to Volume Inflow Maximum Maximum Hydrograph No. type flow interval peak hyd(s) elevation storage description (origin) (cfs) (min) (min) (cult) (ft) (cult) 1 SCS Runoff 3.49 2 744 20,320 -- -- --- Emerald sub(Church St.)storm 2 SCS Runoff 4.52 2 724 14,072 — — Unity Church-site isolated 3 Reservoir 0.20 2 1100 6,276 1 74.29 15,766 Em.subd:basin disch. 4 Combine 4.52 2 724 20,348 2,3 -- --- Unity Storm+Emerald Discharge 5 Reservoir 1.08 2 750 20,339 4 74.86 4,492 Unity basinto lakewood Proj. file: 1930-SUB.gpw Return Period: 2 yr Run date: 09-10-2004 Hydraflow Hydrographs by Intelisolve Hydrograph Summary Report Pagel Hyd. Hydrograph Peak Time Time to Volume Inflow Maximum Maximum Hydrograph No. type flow interval peak hyd(s) elevation storage description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 8.29 2 742 44,581 - ----- ---- Emerald sub(Church St.)storm 2 SCS Runoff 9.47 2 724 28,407 — -- ---- Unity Church-site isolated 3 Reservoir 0.61 2 970 30,497 1 76.08 27,927 Em.subd:basin disch. 4 Combine 9.47 2 724 58,904 2,3 -- -—- Unity Storm+Emeraki Discharge 5 Reservoir 1.66 2 754 58,875 4 75.63 10,575 Unity basinto lakewood Proj. fife: 1930-SUB.gpw Return Period: 10 yr Run date: 09-10-2004 Hydraflow Hydrographs by Intelisolve Hydrograph Summary Report Pagel Hyd. Hydrograph Peak Time Time to Volume Inflow Maximum Maximum Hydrograph No. type flow interval peak hyd(s) elevation storage description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 11.17 2 740 59,244 — ----- ----- Emerald sub(Church St.)storm 2 SCS Runoff 12.32 2 724 36,798 — Unity Church-site isolated 3 Reservoir 0.79 2 968 45,113 1 77.17 37,401 Em.subd:basin disch. 4 Combine 12.32 2 724 81,910 2,3 Unity Storm+Emerald Discharge 5 Reservoir 1.94 2 774 81,857 4 76.09 14,760 Unity basinto lakewood Proj. file: 1930-SUB.gpw Return Period: 25 yr Run date: 09-10-2004 Hydraflow Hydrographs by Intelisolve Hydrograph Summary Report Pagel Hyd. Hydrograph Peak Time Time to Volume Inflow Maximum Maximum Hydrograph No. type flow interval peak hyd(s) elevation storage description (origin) (cfs) (min) (min) (cult) (ft) (cuft) 1 SCS Runoff 13.83 2 740 72,751 -- --- --- Emerald sub(Church St.)storm 2 SCS Runoff 14.87 2 724 44,420 — ---- -- Unity Church-site isolated 3 Reservoir 0.91 2 970 58,547 1 78.11 46,829 Em.subd:basin disch. 4 Combine 14.87 2 724 102,967 2,3 --- Unity Storm+Emerald Discharge 5 Reservoir 2.14 2 782 102,871 4 76.43 18,830 Unity basinto lakewood Proj. file: 1930-SUB.gpw Return Period: 50 yr Run date: 09-10-2004 Hydraflow Hydrographs by Intelisolve Hydrograph Summary Report Pagel Hyd. Hydrograph Peak Time Time to Volume Inflow Maximum Maximum Hydrograph No. type flow interval peak hyd(s) elevation storage description (origin) (cfs) (min) (min) (cult) (ft) (cult) 1 SCS Runoff 16.57 2 740 86,756 --- ---- ---- Emerald sub(Church St.)storm 2 SCS Runoff 17.47 2 724 52,246 — --- ---- Unity Church-site isolated 3 Reservoir 1.02 2 976 72,426 1 79.01 57,038 Em.subd:basin disch. 4 Combine 17.47 2 724 124,672 2,3 -- Unity Storm+Emerald Discharge 5 Reservoir 2.35 2 790 124,497 4 76.78 23,062 Unity basinto lakewood -T Proj. file: 1930-SUB.gpw Return Period: 100 yr Run date: 09-10-2004 Hydraflow Hydrographs by Intelisolve E Kelli Koehler RE Appl 04 58P, Emerald Green Resubdivision Page 1 From: "William Lanning"<WLanning@southwindsorfire.org> To: "Kelli Koehler"<koehle@southwindsor.org> Date: 9/20/04 8:01AM Subject: RE:Appl 04-58P, Emerald Green Resubdivision -----Original Message----- From: Kelli Koehler[mailto:koehle@southwindsor.org] Sent: Monday, September 13, 2004 3:58 PM To: Bob Deptula; Jeff Doolittle; Chris Dougan; Ray Favreau; Matt Galligan; Mike Gantick; Kristian Lindstrom; Sgt. Rich Bond; Karl Reichle; Fred Shaw; Dennis Sheridan; Melvin Stead; William Lanning Subject:Appl 04-58P, Emerald Green Resubdivision Please respond with comments -Thanks- Kelli Kelli Koehler Administriative Secretary No Comment on this application. Wm. R. Lanning MEMORANDUM To: Marcia Banach, Director of Planning Cc: Jeff Folger, Environmental Planner/Conservation Officer OCT 14 2004 From: Jeffrey B. Doolittle, P.E., Town Engineer SOUTH WINDSOR PLANNING DEPT. Date: 10/14/04 RE: App 04-58P, Emerald Green Subdivision 9P 1 have reviewed the proposed Site Plan for the Emerald Green Subdivision off Ellington Road and I have the following comments: 1. The disposition of Parcel A located to the west of Lot 1 needs to be labeled on the plot plan and topographic plan. 2. The elevations of the houses on Lots 1 and 2 appear to be unnecessarily high. This is especially true for Lot 2 and results in a driveway grade greater than 10%. This driveway will need an alternate pulloff area with this grade. I suggest these houses be lowered 3. Address lot-to-lot drainage between lots 3, 2, 1 and the existing lot at 887 Ellington Road by including yard drains, underdrains and drainage swales as necessary to collect the surface water and direct it into the storm drainage system before it crosses the lot boundaries. 4. It appears that the detention basin is part of Lot 3. Please confirm this and state who will be responsible for the maintenance of this basin. 5. Why is the inlet elevation to the detention basin 4 feet lower than the outlet elevation? This will result in the basin having water up to 4 feet deep at times. Suggest the inlet and outlet elevations be changed to reduce the potential depth of water ponding in this detention basin. 6. The drainage report is not complete. Appendix A, is missing and Appendix H does not appear to be as listed in the Table of Contents. Pipe flow calculations, a gutter flow analysis and headwater analysis need to be completed and submitted as part of the drainage report for this subdivsion. 7. Add a note specifying galvanized frames and grates for the catch basins. 8. There should be a structure/stub for future connection to the storm drainage system just as there is a stub for a future connection to the sanitary sewer. Additional catch basins are needed in the cul-de-sac. 9. Show the proposed sewer main all the way to the existing manhole in Ellington Road. 10. Why is the slope of the sewer main less than the minimum slope of 0.5%? 11. Provide sewer laterals for the existing houses on adjacent properties at 887, 658, and 909 Ellington Road. 12. Why is the sewer main so deep upstream of MH3? This main could be much shallower and/or have a steeper slope than 2%. 13. Will the proposed sewer or storm drain system affect existing shallow wells on adjacent properties? There should be provisions made to connect these properties to the public water system. 14. Why are utilities shown for Unity Church from the proposed road when their approved plan shows utilities coming directly from Ellington Road and an on-site septic system? 15. Show any potential impacts and/or proposed improvements to the two existing lots adjacent to the proposed road, 887 and 658 Ellington Road. This should include utilities, access, clearing, grading, lighting, etc. 16. WPCA review and approval is required for this site. 17. A permit is required from the ConnDOT for the construction of this new road off Ellington Road. Please call me(x 245)if you have any questions. MCCOY REVELEY & McCOY, LLC FE 310 HARTFORD TURNPIKE VERNON,CONNECTICUT 06066 Atherton B.Ryan TEL:(860)875-3375 N O V 0 5 2004 Counsel FAX:(860)872-3862 Email:AthertonRyan®sbcglobal.net �;��fi November 3, 2004 Lawrence C. Malick,Esq. Law Office of Matthew N.Pearlstein 10 Waterside Drive, Suite 303 Farmington, CT 06032 RE: Lakewood of South Windsor,Inc.—Unity Church of Hartford,Inc. JMJ Construction Company,Inc. Dear Larry: This will confirm our several conversations regarding the drainage issues among the above three parties. First, I want to reiterate my request of you that a meeting be arranged among all three entities prior to the continued subdivision hearing on November 23`a. We would like to attempt to find a middle ground acceptable to all three parties so that we can resolve our issues and not have a public hearing issue before the Planning & Zoning Commission. As I told you, my schedule is difficult since I will be away from November 6th until November 18th. I will be in the office on November 19th and would be happy to meet that day, or Saturday, November 20th , or Monday, November 22na. If it is better to meet sooner than that, please do so and while no one will be there from my office, there will be representatives of JMJ available. Such a meeting should be coordinated with Peter DeMallie of Design Professionals, Inc. which is the design engineer for both JMJ and Unity Church. His telephone number is 860-291-8755. Secondly, JMJ did offer to pay the bill of Buck & Buck to do the engineering review on behalf of Lakewood. That offer remains outstanding regardless of the opinion and advice rendered by Buck & Buck. However, we will need both a bill from Buck & Buck for that work as well as a copy of his report. It would certainly be advantageous to have such a report prior to any joint meeting. I assume it is essential from Lakewood's standpoint to have that report prior to November 23`a W.Malkk-L.dot Third, in view of the legal issues raised by your initial letter, the issues that Paul Ottoway has raised before the Wetland Commission and the Planning & Zoning Commission at their respective public hearings, as well as the basic issues which JMJ must address as a landowner, I was requested to and have prepared a Memorandum of Law on that issue. I have provided this Memorandum to the South Windsor Town Attorney, as well as the Town Planner and Town Engineer, for their review prior to any further hearings. You and all others should know where we're coming from. I am providing Unity's lawyer with a copy of this transmittal and enclosures. Very truly yours, K t G� ATHER ON B. RYAN ABR:mg Enclosures cc: Donald W. Doeg,Esq. Barry Guliano,Town Attorney / Marcia Banach,Town Planner Jeffrey Doolittle,Town Engineer John Shaw, Esq. (w/encis) W.IMalick-L.dot MOCOY REVELEY & McCOY, LLC 310 HARTFORD TURNPIKE NOVU � Lu VERNON,CONNECTICUT 06066 Atherton B.Ryan TEL:(860)875.3375 S�JI{1111'lil)SU� �'t �i`�'+ii J_PI. Counsel FAX:(860)872.3862 Email:AthertonRyati®sbcglobal.net November 3, 2004 Barry Guliano,Esq. Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 RE: Emerald Green Subdivision Application—South Windsor Dear Barry: I represent JMJ Construction Company, Inc. in connection with their application before the South Windsor Planning & Zoning Commission for approval of a three-lot subdivision called "Emerald Green". The hearing began on October 26th and has been continued to November 23, 2004. I understood from staff comments at that public hearing that essentially two questions concerning proposed drainage in that subdivision would be posed to you. In connection with that application there is a proposed new road to be dedicated as a public street. The two questions in essence are as follows: 1. Whether the Town has the right to discharge road drainage to a private drainage system and if so is there any special documentation required; and 2. Whether the Commission can not approve a subdivision application if a downstream property owner objects on the basis that the upstream owner (applicant) does not have a deeded easement to discharge surface water or storm water into the downstream owner's drainage system. W.•Vuliano-1tr.dot L I have been aware of the issues and have prepared the enclosed Memorandum for your review and understanding of my position. I anticipate presenting this Memorandum to the Commission at the continued hearing. Although there is ongoing discussion between the applicant and the downstream owner (Lakewood of South Windsor, Inc.), I do not expect the discussions to result in the grant of a deeded easement. Rather, the discussions will resolve any technical engineering issues to conclude that there will be no unreasonable burden or damage to the Lakewood Drainage system. If you would like to discuss this or need any further information from me, I would be pleased to provide it to you. Very truly yours, P ATHERTON B. RYAN ABR:mg Enclosures cc: Marcia Banach,Town Planner(with enclosures) V Jeffrey Doolittle,Town Engineer(with enclosures) Peter DeMallie,Design Professionals(with enclosures) JMJ Construction Company,Inc. John Shaw, Esq. W.IGuliano-ltr.dot DESIGN PROFESSIONALS, INC. RECEIVED civil engineers ♦ planners ♦ surveyors N 0 V 2 2 2004 landscape architects ♦ gis ♦ gps SOUTH WINDSOR PLANNfNG DEPT. November 17, 2004 Ms. Marcia Banach, Director of Planning Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 RE: Emerald Green Subdivision DPI Proj. No. 04-1930 JMJ Construction Co. South Windsor, Connecticut Dear Marcia, On behalf of our client, JMJ Construction Co., we grant the Town of South Windsor a 35- day extension for closing the public hearing for the above-referenced project. Respectfully submitted, DESIGN PROFESSIONALS INC. By: eter R. DeMa e Principal cc: JMJ Construction Co. Atherton Ryan, Esq. Karen M. Isherwood, P.E. Rebecca A. Meyer, Project Engineer 165 South Satellite Road,South Windsor,Connecticut 06074 Tel: (860)291-8755 •Fax: (860)291-8757 Email: dpicivil@aol.com Lakewood of South Windsor c/o G&W Management,Inc. 102 Pitkin Street, P.O. Box 280928 RECEIVED East Hartford, CT 06128-0928 N O V 2 2 2004 November 18,2004 SOUTH WINDSOR PLANNING DRPT, To: Planning&Zoning Commission Reference: Proposed"Emerald Green" Subdivision by JMJ At the P&Z meeting on October 26t,", Lakewood Association opposed the above planned development on a number of issues. The primary reason,however,was the illegal granting of an easement by the Unity Church to JMJ. This would allow the discharge of water into Unity detention basin,thus into Lakewood's closed storm water system. At the time of the P&Z meeting our engineering consultant had not had the opportunity to review all the data regarding the design of JMJ's storm water drainage system as all relevant information had not been provided by Design Professionals. Our engineering consultant,Buck and Buck,have now completed their report. I have attached a copy to allow you time to review this prior to the next presentation by JMJ/Design Professionals which we understand will be at the P&Z meeting on December l4th. This report confirms that the burden on the Lakewood system will be significantly increased. Therefore our position objecting to the drainage system proposed by JMJ has not changed. In addition to the confirmation of this increase burden on our system, Buck and Buck have raised a number of issues regarding the design of JMJ's storm water system. The most important point raised is that all the data supplied by Design Professionals is not valid as they are based on a basin outlet of 74 which is incorrect as the Unity Church system will cause the level to be 75.5. This would also result in the depth of water in the detention basin increasing from 4feet to 5.5 feet. A number of other concerns have also been highlighted in this report. We believe that this design is detrimental to both the Unity Church and Lakewood, and that a viable option is available; JMJ could run a storm water drainage pipe down Ellington Road to the Podunk River. We realize this will be a more expensive option for JMJ,but would remove all the problems and objections associated with trying to drain the water through two private drainage systems. The Lakewood storm water system is a private system maintained by on owners reserve fund and was never intended to subsidize a for-profit organization, such as JMJ, or a Town road. We thank you for your time in reviewing the attached information. I will be available with other Lakewood Association members to answer any questions you might have when P&Z next have a public meeting to review the Emerald Green project. Res spectfully,, Paul Otterway ,F Lakewood Board President Cc: Marcia Banach&Jeffrey Doolittle BUCK & BUCK, LLC ENGINEERS 98 WADSWORTH STREET, HARTFORD, CONNECTICUT 06106 TELEPHONE 860-527-2677 FAX 860-527-7100 JAMES A.THOMPSON HENRY WOLCOTT BUCK 19J1-1965 LAWRENCE F.BUCK ROBINSON D.BUCK 19J5.19S9 WILLIAM B.ASTON ROBINSON W.BUCK Comm. 200312-1 November 12, 2004 Mr. Paul Otterway, President Lakewood of South Windsor 26 Pintail Circle South Windsor, CT 06074 Reference: Proposed Subdivision "Emerald Greens" South Windsor, CT Dear Mr. Otterway, I have completed my review of the plans and drainage computations for the subject subdivision. The plans and computations were submitted by Design Professionals Inc. (DPI) on October 27, 2004. 1 have also spoken with you and with Lorna Mutty of Lakewood about this project. I have the following comments. COMMENTS ON THE PROJECT 1. The project is dependent on a storm drainage easement and right to discharge granted by Unity Church to JMJ Construction. Do the drainage rights granted by Lakewood to Unity Church give the church the right to allow others (JMJ) to discharge onto the Unity Church property and then onto Lakewood? This issue must be resolved by attorneys. 2. 1 understand that the easement to Unity Church includes the provision to the general effect that there be no additional burden on the Lakewood storm drainage system. The proposed project will include paving about 1-1/3 acres of land south of the church property. This will result in an increase in the volume of runoff which must pass through the Lakewood drainage system. The increased runoff from the Emerald Greens property will range from a 54% increase for a 100-year storm to a 146% increase for a 2-year storm. 3. Church Way is proposed as a Town Road. Is the Town of South Windsor willing to accept a road where the storm drainage will flow across two intervening properties, and through piping systems on the Unity Church and Lakewood properties, where the Town has no easements and no rights to maintain the systems? 4. It appears likely that the detention pond will contain several feet of standing water much of the time. What measures will be taken to control mosquito breeding? BUCK&BUCK, LLC ENGINEERS TO Mr. Paul Otterway PAGE 2 DATE November 12, 2004 . comm. 200312-2 COMMENTS ON THE PLANS 1. Drawing 5A shows the outlet from the detention pond to be a 6" RCP. The detail on Drawing 9 shows the outlet to be a 12" RCP from a catch basin with a 6" orifice and a trash rack. a. Is 6" RCP available? b. The discrepancy between the plan and the detail should be clarified. 2. An earlier Drawing L1 showed wetlands ptanting on the°bottom of the detention pond. The latest drawing shows the area to be seeded with low maintenance grass. The clear assumption is that the bottom of the basin will be dry most of the time. Do the actual soil conditions at the elevation of the bottom of the basin justify that assumption? 3. The plans do not show the development of the Age Restricted Community proposed for Parcel 3 of the subdivision. The drainage computations account for the land area and impervious surface of that development, as shown on the plan ZBA PLAN, dated 8/11/04, furnished to me by Lorna Mutty. When plans for that development are prepared, they should be compared to the ZBA PLAN to verify that the drainage area and area of impervious surface is not increased. 4. The plan indicates that the detention basin is on Parcel 3, the site of the proposed age-restricted community. Will the age-restricted community accept perpetual maintenance of the.detention basin? What recourse is available if the age-restricted community fails in its maintenance obligation? Who will maintain the detention basin if the age-restricted community is not approved or, if approved, is not built? Since the detention basin is integral to the storm drainage system, a secure procedure and funding should be in place to provide perpetual maintenance. COMMENTS ON THE COMPUTATIONS 1. I concur with the computation of drainage areas and runoff curve numbers. I believe that the computed Time of Concentration is too tong; however, the presence of a large detention basin with a small outlet makes the system independent of small variations in the time of concentration. 2. The Emerald Green detention basin discharges into the southwest corner of the Unity Church detention basin. The Emerald Greens detention basin outlet is at elevation 74.0. The Unity Church detention basin outlet is at elevation 75.5. There is very little storage in the Unity Church basin between elevation 74.0 and 75.5. The computations should be re-done to reflect the fact that the Emerald Greens detention basin outlet pipe will be backwatered to elevation 75.5, and that there will be essentially no effective storage in the Emerald Greens detention basin below elevation 75.5. 3. The Unity Church detention basin analysis assumes an exfiltration rate of 3.19 inches per hour (6.4 feet per day). Provide substantiation for this value. BUCK&BUCK,LLC ENGINEERS TO Mr. Paul Otterway PAGE 3 DATE November 12, 2004 COW 200312-2 Thank you for calling on us for this review. If you have any questions, please feel free to call. Sincerely yours, Buck & Buck, LLC Lawrence F. Buck, PE L FB/W:\Lfb\W I NWORD6\LETTERS\200312-2L1.doc Lakewood of South Windsor c/o G&W Management, Inc. 102 Pitkin Street, P.O. Box 280928 East Hartford, CT 06128-0928 November 18,2004 To: Planning&Zoning Commission Reference: Proposed"Emerald Green" Subdivision by JMJ At the P&Z meeting on October 26a', Lakewood Association opposed the above planned development on a number of issues. The primary reason,however,was the illegal granting of an easement by the Unity Church to JMJ. This would allow the discharge of water into Unity detention basin,thus into Lakewood's closed storm water system. At the time of the P&Z meeting our engineering consultant had not had the opportunity to review all the data regarding the design of JMJ's storm water drainage system as all relevant information had not been provided by Design Professionals. Our engineering consultant, Buck and Buck,have now completed their report. I have attached a copy to allow you time to review this prior to the next presentation by JMJ/Design Professionals which we understand will be at the P&Z meeting on December 14th. This report confirms that the burden on the Lakewood system will be significantly increased. Therefore our position objecting to the drainage system proposed by JMJ has not changed. In addition to the confirmation of this increase burden on our system, Buck and Buck have raised a number of issues regarding the design of JMJ's storm water system. The most important point raised is that all the data supplied by Design Professionals is not valid as they are based on a basin outlet of 74 which is incorrect as the Unity Church system will cause the level to be 75.5. This would also result in the depth of water in the detention basin increasing from 4feet to 5.5 feet. A number of other concerns have also been highlighted in this report. We believe that this design is detrimental to both the Unity Church and Lakewood, and that a viable option is available; JMJ could run a storm water drainage pipe down Ellington Road to the Podunk River. We realize this will be a more expensive option for JMJ,but would remove all the problems and objections associated with trying to drain the water through two private drainage systems. The Lakewood storm water system is a private system maintained by on owners reserve fund and was never intended to subsidize a for-profit organization_, such as JMJ, or a Town road. We thank you for your time in reviewing the attached information. I will be available with other Lakewood Association members to answer any questions you might have when P&Z next have a public meeting to review the Emerald Green project. Respectfully, Paul Otterway Lakewood Board President Cc: Marcia Banach&Jeffrey Doolittle Lakewood of South Windsor Nov 17 2004 Ellington Road < South Windsor, CT 06074 Deanna Hawver 85 Swan Nest South Windsor, CT 06074 November 12, 2004 To: Planning and Zoning Town of South Windsor Re: Proposed JMJ plan for Emerald Green development As a homeowner at the Lakewood of South Windsor community, I wish to advise you of my objection to the proposed additional drainage into the Lakewood storm drain system from the detention basins of Unity Church. The easement legally agreed to with the Unity Church does not allow for any additional burden to our system. Sincerely, FRI E C E �"S F D NOV 17 2004 Lakewood of South Windsor Ellington Road SOUTH�h�I�;USGP,PLATING DEFT. South Windsor, CT 06074 Elaine Bursack 85 Belknap Road West Hartford, CT 06117 November 12, 2004 To: Planning and Zoning Town of South Windsor Re: Proposed JMJ plan for Emerald Green development As a homeowner at the Lakewood of South Windsor community, I wish to advise you of my objection to the proposed additional drainage into the Lakewood storm drain system from the detention basins of Unity Church. The easement legally agreed to with the Unity Church does not allow for any additional burden to our system. Sincerely, Lakewood of South Windsor Ellington Road South Windsor, CT 06074 Important Notice Lakewood needs your help in fighting an easement illegally given by the Unity Church to JMJ Construction.This easement allows JMJ to run all its surface water from the proposed Emerald Green development into the Unity Church detention basins and thus into Lakewood's piped underground drainage system. In April 2004 Lakewood granted The Unity Church an easement to drain their storm water into our system and thus into the Podunk. Our easement was specific in that it stated that no changes could be made to the drainage system without the approval of the Lakewood Community and that any changes could not increase the burden on our drainage system. The Unity Church has,without any consultation with Lakewood,given an easement to JMJ Construction to discharge water directly into their detention basin and thus into the Lakewood system. A letter from our attorney has been sent to Unity Church,JMJ Construction, and Design Professionals(all parties involved)advising them that the easement was given illegally and would be fought by Lakewood. To date we have had no formal response to this letter and JMJ has proceeded to seek approval for the Emerald Green project from the Town of South Windsor. The Lakewood Board attended both the Wetlands and Planning and Zoning public meetings at town hall. At both meetings we presented our arguments regarding the legality of the easement and that Lakewood has not agreed to any easement with JMJ.This resulted in the Wetlands Commission approving the project with the.provision that the easement problem be brought to a satisfactory agreement. The Planning and Zoning expressed their concern about the easement and told JMJ and Design Professionals that they had brought their application before the commission too early. A new date of Nov. 23rd at 7:30 was set for a second review of the project. This would give JMJ and Design Professionals a chance to address the problems with their plans. We are currently trying to set up a meeting with the Unity-Church to try to resolve this problem. It is our hope that.they will withdraw their easement with JMJ however, if they will not,we have three options: 1.Allow the water to be drained through our system. 2. Fight the easement through the courts. 3. Get the Planning and Zoning to reject the plans. Options 1 &2 will end up costing Lakewood money either in additional maintenance on our drainage system or attorney fees to contest the easement through the courts. The best way to fight this it to get Planning and Zoning to reject it now. This will require Lakewood to raise as many objections as possible. To this end,we ask that you sign and return the attached letter objecting to the easement so that we can present them at the next meeting. If possible, attend the Planning and Zoning meeting on Nov 23`d at 7:30 to reinforce our commitment to fight this easement. Please sign and return the enclosed letter to G& W Management. If you have any questions please call me at home 289-6562. Sincerely, Paul Otterway,President for the Lakewood Board Lakewood Of South Windsor, Ellington Road, South Windsor From: Chris and Julie Hart 4 Mallard Place South Windsor, CT 06074 RECEIVE® To: NOV 2 2 2004 Planning and Zoning Town Of South Windsor SOUTH WINDSOR PLANNING DEPT, November 20, 2004 RE: Proposed JMJ plan for Emerald Green development Dear Planning and Zoning Committee Members, We regret that a personal commitment prevents us from speaking with you in person. As homeowners in the Lakewood community, we wish to advise you of our objection to the proposed additional drainage into the Lakewood storm drain system, via the detention basins of Unity Church. Our house is among those closest to the Unity Church property and we have long been concerned with the possibility of flooding of the Unity site, which is uphill of our property. Our worst fears were realized when, on September 18th, 2004, our yard was flooded due to runoff from the Unity Church site. We have attached for your review, pictures of the standing water that covered our yard and accumulated against our home's foundation on that date. We would like to point out that the easement legally agreed to by Lakewood and Unity church does not allow for any additional burden on Lakewood's storm drain system. We fear that granting an easement to JMJ for Emerald Green's drainage system has considerable potential for overwhelming both Unity Church's and Lakewood's drainage systems, resulting in flooding of our property and that of our neighbors. In light of these facts and concerns, we ask that you to deny JMJ's request for an easement. Sincerely, Chris Hart Julie Hart cc: Lakewood Board of Directors Law Office of RE CEV 1 MATTHEW N. PERLSTEIN 10 WATERSIDE DRIVE,SUITE 303 NOV 2 9 2004 FARMINGTON,CT 06032 TELEPHONE(860)677-2177 FACSIMILE(860)677-1147 SC�h'CN�,�((l��G r'Lt,PliyilivG p �1. MATTHEW N.PERLSTEIN OF COUNSEL SCOTT J.SANDLER LAWRENCE C.MALICK* *ALSO ADMITTED IN COLORADO November 22, 2004 Atherton B. Ryan, Esq. McCoy Reveley&McCoy, LLC 310 Hartford Turnpike Vernon, CT 06066 Re: Lakewood of South Windsor, Inc. -Unity Church of Hartford, Inc. Our File#294-000-B-1 Dear Attorney Ryan: This letter will respond to your letter of November 3, 2004 and your"Legal Proposition" contained therein. I would make the following three comments: 1. Burdening of the Lakewood Drainage System. Our position on this issue is, and has been from the outset, that Unity may not, under Connecticut law, use the drainage easement granted to it by Lakewood for the benefit of a third party, nor may it or the third party unreasonably increase the burden on the easement. See, for example,Lichteig v Churinetz, 9 Conn.App. 406, 519 A.2d 99 (1986), Carbone v Vigliotti, 2 Conn. 216, 610 A.2d 565 (1992), Ezikovich v Linden, 30 Conn.App.1, 618 A.2d 570 (1993), Curtin v Franchetti, 156 Conn. 387, 242 A.2d 725 (1968) and Abington Limited Partnership v Talcott Mountain Science Center for Student Involvement, Inc., et al., 567 A.2d 732 (1994). Any granting of use of its easement by Unity to JMJ for its sole benefit is clearly an outright breach of the law in this matter, and it would unquestionably surcharge the Lakewood underground drainage system with an unreasonable burden. The report by Buck & Buck, LLC indicates that the increase in volume of the runoff which would pass through the Lakewood system from the JMJ project would \\Server\data\FILES\294\000\B-I\atty ryan Itr.wpd Law Office of MATTHEW N. PERLSTEIN Atherton B. Ryan, Esq. November 22, 2004 Page 2 range from fifty-four percent (54%) for a 100-year storm to one hundred and forty-six percent (146%) for a two-year storm. Moreover, there appears to be a major problem with whether or not the Unity drainage basin can handle the increased runoff from JMJ, and this may result in an overflow of the drainage basin which will then flow down upon the Lakewood property. 2. The Grant of Easement to Unity by Lakewood Was Personal To Unity. The easement granted to Unity Church was personal to Unity only. It was not a mere impersonal grant of an easement by deed. The easement was granted pursuant to, and as an integral part of, an agreement specifically with Unity to accomplish the particular objectives in the preamble of that agreement. Moreover the grant was subject to other personal rights, obligations and requirements as set f.,.lvL i in t1_ia._at agrecillciix, 0lM,11 1.. a6 moLut_c.. vtv,>ti:g,..a,.tio u of vT..u.:aL_y +to,. pi'vide >1a,.u...U0%,u...Y.u:,.i.r,.` over the easement, to repair and maintain the drainage system after the easement was constructed and in place, to modify the agreement only in writing (which Lakewood has not been asked to do), to indemnify Lakewood for damage arising from the performance of Unity's continuing obligations under the agreement and to submit to mediation and arbitration in the event of a dispute between the parties. In addition, Unity's easement was subject to the volume and flow specifications as set forth in the engineering plans upon which it was based. Because of the personal nature of the grant of this easement, Lakewood does not intend to stand idly by while a huge surcharge of water is added to its private system, the financial and maintenance consequences of which are not yet fully lanown, on the basis that this is simply a grant of an"impersonal assignment" of its right to a third party. Under the circumstances by which this agreement was created, the intention of the parties at the time it was entered into, and the mutual and continuing obligations of the parties thereunder,we do not believe that any court will conclude, as you have suggested, that the grant of the easement was impersonal and that Unity has the right unilaterally to assign the use to a third party. \\Server\data\FILES\294\000\B-I\atty ryan Itr.wpd Law Office of MATTHEW N. PERLSTEIN Atherton B. Ryan, Esq. November 22, 2004 Page 3 3. Upstream Landowner Has No Absolute Right to Discharge Increased Water Flow into Lakewood Private Underground Drainage System Simply Because it Is Downstream. Regardless of the cases you have cited with regard to the right of an upstream own1er to discharge Storm water in reasonable amounts onto downstream properties, we believe the facts of this situation give rise to a different conclusion. First, as we have noted above, we do not believe that the increased flow resulting from the development of the Emerald Green subdivision will be reasonable in its impact on the Lakewood underground drainage system. Second, in the absence of an easement from Lakewood, the upstream landowner certainly has no right to direct its increased flow of water resulting from development into and through Lakewood's private drainage system. That drainage system is a capital +to +1.e T 1>0.�, 7 +..1.,,;I+ A *A -,-1—+1 0 iiuprv`v'eiiieiiL L tal i"I��Vvvvu prvpei�j vutlt, uuu pulu iv. v.y Luv u--F— vi uv Lakewood planned community, and now maintained at the cost and expense of the Lakewood Homeowners Association. The system was designed to absorb natural runoff water from upstream properties based on natural flows from those properties in their undeveloped states. The system was never intended nor designed to accommodate upstream development by a third party. The fact that JMJ may and will save considerable development costs by tapping into the Lakewood drainage systems does not, in and of itself, give it the right to direct its increased water flow into that system. In the absence of a grant or condemnation of an easement,we do not believe that a court will allow JMJ to discharge its increased runoff water into a private system and piggyback its development costs onto someone else. In a nutshell, that summarizes our position in this matter. Our client continues to work directly with Unity and has not expressed an interest in getting together with all parties at this point. Perhaps that may be appropriate down the road, but as direct negotiations are in progress, \\Server\data\FILES\294\000\B-1\atty ryan Itr.wpd 5 J h Law Office of MATTHEW N. PERLSTEIN Atherton B. Ryan, Esq. November 22, 2004 Page 4 we do not think it will be helpful to get the attorneys and the engineers involved. I am copying the Town Attorney, the Town Planner and the Town Engineer on this letter so that they too may have a clearer understanding of Lakewood's position. I believe our client has informed Unity of our position in its direct discussions. ve,-y tr ly yo„rs, LAW OFFICE OF MATTHEW N. PERLSTEIN Lawrence C. Malick LCM:j lc cc: Barry Guliano, Town Attorney Marcia Benach, Town Planner Jeffrey Doolittle, Town Engineer Paul Otterway, President (w/encls) \\Server\data\FILES\294\000\B-1\atty ryan ltr.wpd South • • Planning Department Me o To: Barry Guliano, Town Attorney From: Marcia A. Banach, Director of Planning CC: Tim Wentzell, Chair, PZC; Jeff Doolittle,Town Engineer Date: 11/24/04 Re: Emerald Green Resubdivision Application The Planning and Zoning Commission requests your assistance with a drainage rights issue that has arisen in connection with a pending application for a three-lot resubdivision. There is an existing drainage easement between Lakewood condominium association and Unity Church on Ellington Road. JMJ Construction Co. is asking PZC to approve his subdivision application, which includes a drainage easement from Unity Church to JMJ, thus providing to JMJ access into Lakewood's private drainage system. The drainage area would also include a new Town-owned road. Lakewood has indicated its opposition to this plan and to the introduction of a third party's stormwater runoff into Lakewood's private system without approval and permission from Lakewood. PZC thus has several questions that need your opinion. 1. Does the existing drainage easement between Lakewood and Unity Church allow Unity Church to grant a drainage easement to JMJ and the Town without Lakewood's express permission? 2. If the natural drainage pattern on JMJ's land flows toward Unity Church, and thus into Lakewood's storm drainage system, does this give JMJ the right to pipe that same stormwater runoff and introduce it into Lakewood's piped drainage system? If so, what documentation if any is required from Lakewood? 3. Can (and should)the PZC deny the application if Lakewood does not grant an easement to JMJ for the stormwater drainage to flow from the proposed 3-lot resubdivision into Lakewood's system? 1540 Sullivan Avenue,South Windsor,CT 06074 PH 860-644-2511,ext.253 Fax 860-644-7280 e-mail banach(Qsouthwindsonorg 0 Page 1 r � Jeff Doolittle and I would be happy to meet with you to further discuss this issue. The PZC has continued the public hearing on this item until December 14. Thank you for your assistance. 0 Page 2 DESIGN PROFESSIONALS, INC. DEC 15 2004 civil engineers ♦ planners ♦ surveyors landscape architects ♦ gis ♦ gps ;I,'i „'�.. Alt:" December 14, 2004 Ms. Marcia Banach, Director of Planning Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 RE: Subdivision Application 04-58P DPI Proj. No. 1930 JMJ Construction Co., Inc. Emerald Green Ellington Road South Windsor, Connecticut Dear Marcia, On behalf of our client, JMJ Construction Co., Inc., we hereby withdraw the above- referenced subdivision application. Thank you. Respectfully submitted, DESIGN PROFESSIONALS INC. By: Peter R. DeMalhe Principal CC: Jean Marc Jacques, JMJ Construction Co., Inc. Atherton Ryan, Esq. Karen Isherwood, P.E., Project Manager George Menut, Unity Church Paul Otterway, Lakewood 165 South Satellite Road, South Windsor,Connecticut 06074 Tel: (860)291-8755•Fax: (860)291-8757 Email:dpicivil@aol.com A f MEMORANDUM TO:- Marcia A. Banach Director of Planning FROM: Barry D. Guliano Town Attorney DATE: December 14, 2004 RE: Emerald Green Resubdivision Application By your memorandum to me dated November 24, 2004, you have requested my legal opinion regarding several questions that apply to the above-captioned application. I have also received letters from the attorney representing the applicant, Atherton B. Ryan, and the attorney representing Lakewood, Lawrence C. Malick, in which they have argued their respective positions. Before answering the three specific questions you have posed, it is my strong recommendation that the Planning and Zoning Commission not a- ove, either with or without conditions, the current application until a determination is made by agreement, by a court or by some other means, that the anticipated drainage may properly be allowed to flow onto abutting properties and/or into the Lakewood drainage system. The issues raised by both the applicant and Lakewood are not frivolous, and a legal conclusion as to which party would prevail in court would depend upon all of the facts and circumstances in this case as they are proven to a court. The issue is so "fact-specific" and the factors so voluminous that it should not be the Town's function to investigate all of the relevant circumstances to determine whether the drainage would be allowed or not. Even if the Town was able to completely research such a claim, there would be the significant chance that a court would subsequently find those facts differently and reach a contradictory conclusion. For this reason, I would strongly recommend against an approval of the application with conditions (i.e., that the applicant provide proof of its right to drain onto abutting properties and/or into the Lakewood system) because the ultimate determination of drainage rights is likely to be made by a court after it hears all of the factual evidence necessary. If the court's ruling is different than the approach taken by the Commission, the court's ruling would take precedence. This would create a very confusing, difficult and untenable situation. For the same reason, I would strongly recommend against approving the application without conditions, or �as it currently stands, because it is likely to result in litigation, where a court may make a contradictory finding as to the right to drain water onto abutting properties. My strong recommendation would be to deny the application until such time as the applicant can come forward with evidence of either an agreement, a court decision, or some similar documentation that establishes its right to drain onto abutting properties. The applicant may also wish to withdraw this application and re-file under different circumstances. I will now address the three specific questions you have raised. 1. Does the existing drainage easement between Lakewood and the Unity Church allow Unity Church to grant a drainage easement to JMJ and the Town without Lakewood's express permission? If a drainage easement is required at all, then the applicant (and the Commission) must recognize that there is no absolute property right for the applicant to drain onto abutting property in all circumstances. Otherwise, no easement would be required. If it is required in the present case, as it appears to be, Unity Church may use its property in 2 any way that it sees fit as long as it does not interfere with or overburden the drainage easement that has been granted to it by Lakewood. The act by Unity Church of granting an easement on its property is not necessarily prohibited,but it would be prohibited if that easement created an overburdening in any way of the easement already granted to Unity by Lakewood. This last issue is a question which depends greatly upon the facts of each situation and should be ultimately determined by a court or by agreement of the parties, rather than by the Commission. It is my opinion from the facts that have been presented to me that the answer to question#1 is "no." Unity Church would not be allowed to grant a drainage easement to JMJ or the Town unless it could be established that the easement does not in any way increase or otherwise overburden the easement which already exists between Lakewood and Unity Church. Since the issue of "overburdening" is not entirely clear, I would strongly recommend that the Commission not approve this application until that issue has been decided either by the parties or the courts. 2. If the natural drainage pattern on JMJ's land flows toward Unity Church, and thus into Lakewood's storm drainage system, does this give JMJ the right to pipe that same storm water runoff and introduce it into Lakewood's piped drainage system? If so, what documentation, if any, is required from Lakewood? Once again, the answer to your question depends strongly upon the facts which are proven in each situation. The Connecticut courts have adopted a "Reasonableness of Use Rule," which was described by the Connecticut Supreme Court in the following: Generally, under the rules of reasonable use, the landowner, in dealing with surface water, is entitled to take only such steps as are reasonable, in light of all circumstances of relative advantage to the 3 actor and disadvantage to the adjoining landowners, as well as social utility. (emphasis added) Page Motor Company, Inc. v. George P. Baker, 182 Conn. 484. The court went on to state that the Reasonableness of Use Rule has the virtue of flexibility, since the issue of reasonableness became a question of fact to be determined in each case under a consideration of all relevant circumstances, including such factors as to the amount of harm caused, its forseeability, the purpose or motive with which the act was done, and the consideration whether the utility of the use of land outweighed the gravity of the harm resulting. (emphasis added) Applying this analysis to the present situation, JMJ would only have the right to introduce storm water runoff into the Lakewood's piped drainage system if it can convince a court that the Reasonableness of Use Rule applies in this case. Since that Rule is a question of fact to be determined on a case-by-case basis considering all relevant circumstances, it is one best left to the court, rather than the Town predicting which way a court would rule. In my opinion, the documentation required from Lakewood would either be an easement agreement or some sort of court order or judgment determining that JMJ has the right to drain storm water into the Lakewood system. 3. Can (and should) the PZC deny the application if Lakewood does not grant an easement to JMJ for the storm water to flow from the proposed 3-lot resubdivision into Lakewood's system. The PZC should deny the application, in my opinion, if Lakewood does not grant an easement to JMJ for the storm water drainage or if evidence is not produced of a court judgment or some other irrefutable evidence that JMJ has the right to drain into the Lakewood system. I have seen none of the above documentation, nor do I believe any 4 such documentation has been provided to the PZC. Therefore, it is my strong recommendation that the application be denied unless or until such evidence is provided. BDG/mpg cc: Timothy Wentzell, Chairperson, Planning &Zoning Commission Jeff Doolittle,Town Engineer 5 A. r,aY - _ .nn a�w ,.}1W. ✓+p3.�w•'1'"'.i�'.iWi9i•M;r�. ..-... - �i �' �LS"L"�^�+•� .yam •^r.�'� I- .. .. - � _ , Ed A' VIEW OF JMJ'PROPOSr=D EMERALD GREEN 4(YNSTRUCTI:ON: VIEWf=Dr - FROM LAKEWOOD ACROSS UNITY CHURCH SITE a VOL. 6 Q 5 PAGE 61 STORM WATER DRAINAGE EASEMENT AGREEMENT THIS STOFt WATER DRAINAGE EASEMENT AGREEMENT(the"Agreement-) �0 8 is entered into this•s90 day of 1�l fib! 2004, Windsor, Inc. (the"Association"),whose address is Lakewood of South Windsor,olnc.of South Mr. Bryan Palmer, G&W Management, Inc., 102 Pitkin Street, P.O.Box 280928,East Hartford,CT 06128-0829 and Unity Church of Hartford,Inc. ("Unity"),whose address is 730 Farmington Ave.,West Hartford, CT 06119. PREAMBLE a. The Association is the association of unit owners of Lakewood, a planned unit development("Lakewood")and the owner of the common elements of the development,including the roadways and sewer,water and other utility lines. Pursuant to the governing documents for the development,the Association has the authority to grant easements over and in the common elements. b. Unity owns property which is contiguous with Lakewood property. The F. topography of the Unity property is configured in such a way that storm g water drains onto Lakewood property. This agreement's purpose is to ease surface drainage from Unity to Lakewood by allowing connection to Lakewood's existing storm drainage system. C. There are two surface water drains which are designed to handle storm water runoff at Lakewood located at 26 Pintail Circle and 34 Goose Nest, and at the corner of Mallard Place(the"Drains"). if the storm water } drainage from the Unity property could flow to the Drains,any existing problems could be eliminated. ,ORD d. The Association desires to grant easements to Unity across certain .10" M common elements and limited common elements at Lakewood from the Unity property to the Drains for the purpose of installing a pipeline drainage �oy. T system(the"Drainage System"),and to that end the parties have entered into-the following Agreement on the terms and conditions and for the mutual considerations set forth below. 4 jft TERMS AND CONDITIONS 1. Consideration of the Association. _ The Association hereby grants to Unity the utility easements described on Exhibit A,attached hereto and incorporated herein by reference,for the Purpose of constructing and installing Drainage System,as more specifically set forth below,to carry storm water runoff from the Unity property to the Drains. Said easement is hereby conveyed with quit claim covenants and without warranty of any kind. b 2. Consideration of Uni In consideration for the grant of the easements by the Association, Unity s agrees as follows: ;i CONVEYANCE TAX RECEIVED z t STATES LOCALS No.'� TOWN CLERK OP SOUTH WIIVDSOR f r VOL. 16 0 5 PAGE 62 a. Unity shall be responsible for and pay all costs, including attorney fees and engineering fees,incurred by the Association related to the preparation of this Agreement and the deeds, surveying of the easements and review of the construction plans and any other costs incidental to the construction and installation of the Drainage System. b. Unity shall not unreasonably alter the existing system of"swales"or the topography of its property or the Lakewood property in the �* course of installing the Drainage System without the prior written consent of the Association and its engineers. Excluded from this f' requirement are minor changes in topography on Unity property which must be made during construction to accommodate unanticipated problems provided,however, even such minor changes must be approved verbally in advance by the Association. and its engineers in advance of the work. C. Unity shall provide landscaping,including earthwork and vegetation, as buffering between the Unity property and the Lakewood property #„ at locations and to such an extent as the parties shall agree as the construction of the Drainage System proceeds and landscaping _ requirements become apparent. Unity has previously obtained approval for tentative landscaping on the project from the South Windsor Planning and Zoning Commission pursuant to Landscaping Change Order drawings approved on April 22,2003. The landscaping to be done pursuant to this paragraph shall be in addition to the landscaping set forth in the change order. Unity s intends to restore both easement locations to their prior condition as much as practicable,and, in addition,to verbally arrange for agreement with the Association on such other buffering landscaping that may be necessary to enhance the privacy of Lakewood from the activities of Unity Church. d. Unity agrees to repair,at its sole cost and expense,any damage to lawns, trees,shrubs or utility lines or roads within the Lakewood fix, property which is caused by the construction of the Drainage System and to provide such repair to the satisfaction of the Association by mutual verbal agreement. 3. Location and Size of Drainage Pipes - Prior to the commencement of any construction,the parties must agree as to the size of the pipes and the exact location thereof within the easements. Failure to reach agreement as to these matters will terminate this Agreement,and the Association shall not be obligated to grant the 1 easements,and this Agreement shall become null and void. .4 Road Excavation. "Al - It is the intention and contemplation of the parties that only grassy open areas at Lakewood will be excavated,tom up,or otherwise disturbed except as may be necessary on roadways within the development at or near the 2 ling�attorn VOL16 U 5 PAGE 63 I related to the Drains where the Drainage System must be connected. While Unity will be ig of the liable for the disruption or damage to all Lakewood property pursuant to ny other costs Paragraph 2.d. above, Unity agrees to make every effort to minimize all rinage disruptions to the Lakewood property. In the event the presence of existing utility lines at Lakewood prevents the installation of the underground pipes f"swales" or by Unity within the designated grassy areas,so that roads within the in the in development must be excavated,then any design changes must be reviewed and approved by the Association and its engineers prior to the )r written commencement of construction work on any such roadways. from this epertY 5. Construction and installation Work to be Performed by J&H Slater Construction Comoany. nor s°ciation The parties agree that all work on the project shall be performed by or under the supervision of J&H Slater Construction Company, the original contractor for the developer of Lakewood. egetation, property 6. Engineering Reviews. 'as the edThe engineering firm for the Association shall be Buck&Buck Engineering, and the engineering firm for Unity shall be Design Professionals, Inc. Any )uth reference herein to the engineers shall be to those companies. No Iscaping easement shall be granted and no construction work begun until all engineering plans have been agreed to and signed off on by both engineers and by both parties. ity Ition as 7. Eligible Mortgagee Approval. �apfng Pursuant to subsection 15.4C of the Declaration of Lakewood,the )m the Association may grant easements across the common elements with the approval of eighty percent(80%)of all Eligible Mortgagees as defined in the Declaration. The Association has obtained this approval. le to f 8. Scope of Agreement. ,stem 5Y The subject matter of this Agreement is limited to the storm drainage easements and the Drainage System to be constructed therein. It specifically excludes a previous request of Unity for a sewerline connection between Unity's sewerline and that of the Association. That request was denied by the Association,and it is not revived by this Agreement. �s ts. 9. Government Approvals. All plans for the grant of the easements and the construction of the Drainage System as well as for any additional landscaping pursuant to paragraph 2.c. are subject to the approval of the appropriate departments of the Town of South Windsor. It shall be the responsibility of Unity and its engineers,at Unity's sole cost and expense,to ensure that all required governmental approvals have been obtained prior to commencement of t construction of the Drainage System or any additional landscaping. 3 a] Yot. 1605PA6E 64 x„ 10: Mediation and Arbitration. } a. If a dispute arises out of or relates to this Agreement,or breach thereof,and if said dispute cannot be settled through direct 3 discussions,the parties agree to first endeavor to settle the dispute in an amicable manner by non-binding mediation under the Construction Industry Mediation Rules of the American Arbitration Association,before having recourse to arbitration or a judicial forum. b. Should mediation not produce a satisfactory result,the dispute shall E be submitted for arbitration in accordance with the rules of the American Arbitration Association. If the American Arbitration Association establishes special rules for common interest a community disputes,such rule shall apply. If the American Arbitration Association ceases to exist or declines to accept the submission,some other organization engaged in conducting Y arbitration or alternative dispute resolution in Connecticut will accept n� the submission,the dispute shall be submitted to such other organization. All issues submitted to arbitration under the provisions of this section shalt be decided by a single arbitrator. Judgment 31 upon the award rendered by the arbitrator may be entered in any 4 court having jurisdiction hereof. Both parties would be responsible for their own costs associated with mediation and/or arbitration. Repair and Maintenance of Draine System After Completion. ag 5 4 Unity shalt be responsible OR for all costs of inspection, maintenance and repair of the pipelines following their installation,as well as for the costs of any damage which may result to Lakewood property as a result of any A breakdown in the pipeline or repair work which disrupts Lakewood property. Unity shall have a right of access to its pipelines along the easements granted herein for the purposes of inspecting,maintaining and repairing the pipelines. 12. Failure of Unity to Make Repair or Restoration. r 3 In the event Unity fails to restore Lakewood property to the Association's ,F= � satisfaction during construction of the Drainage System or following any - subsequent repairs,the Association shall have the right to have the restoration completed and Unity shall be responsible for the costs thereof. 13. Modification. This Agreement may be amended or modified only in writing. 14. Recording _and Inurement. M EN This Agreement and any modifications hereto shall be recorded in the Land Records of the Town of South.Windsor and shall inure to the benefit of and be bonding upon the parties hereto,their successors and/or assigns. y, - 4 a - s j VOL. 16 0 5 PAGE 6 5 16. Fees and Costs Upon Termination Notwithstanding anything to the contrary herein,in the event this Agreement is terminated, Unity shall remain responsible to pay the Association any _ fees or costs incurred by it prior to the termination. �y 16. Entire Agreement This document constitutes the entire agreement between the parties and may be modified only in writing. 33 _ 17. Indemnification and Insurance a. Unity shall indemnify and hold harmless the Association and unit owners from all liability for damages or injuries to the extent it is responsible arising from the performance of its duties or that of its agents hereunder in installing and maintaining the Drainage System or the failure to perform such duties. b. Unity shall purchase or ensure that its contractors and subcontractors purchase and maintain in full force and effect throughout the term of this agreement Worker's Compensation insurance as required by the laws of the State of Connecticut and liability insurance covering injury to persons and property within the boundaries of the Lakewood planned unit development in an amount at least equal to the statutory limits set by the State. To an extent possible and practical,the insurance policies shall name the Association as additional insured,and Unity shall provide the Association with a Certificate of Insurance within 10 days of the commencement of the work on the Delivery System. Y [signature page follows] 5 x s Mfl- VOL. 16 0 5 PAGE 66 ................. IN WITNESS WHEREOF,the parties have affixed their signatures on the dates set forth below. LAKEWOOD OF SOUTH WINDSOR, INC. FS �i'grJL ti7 . t�T L' U/A`� B lit c.t Pvu-Sl-p e>eT ost�++ t oRc rrrl _. Title:Pitv.��pew i Duly Authorized ` UNITY CHURCH OF HARTFORD, INC. • I�T�/GK �i?D5$� B � N e: �l� /�I.� T' e: Duly Au hon�'z�ed STATE OF CONNECTICUT) at %tjk GJ��cdsor COUNTY OFrf�a,r� ) On this the day of 2004,before me,the undersigned officer, personally �: a peared aRL-�03 A. arg-f6a , known to me(or satisfactorily proven)to be the • r�s Q�kt- of LakewocYd of South Windsor, Inc.,a Connecticut corporation,and acknowledged that he/she executed the foregoing instrument for the purposes therein contained as his/her free act and deed and the free act and deed of said corporation. In Witness Whereof 1 hereunto set my hand. 5Notary Public/My Commission Expires: ° aS Commissioner of the Superior Court P , Al s 1 z 6 _ 3 3j N¢ f{ 0 - 4 VOL. 16 0 5 PAGE 67 STATE OF CONNECTICUT) atai- ' COUNTYOFiH6Lrf"(-ov4 ) On this the 3r'4day of 2004, before me,the undersigned officer, personally appeared ok v, QT?Af , known to me(or satisfactorily proven)to be the A P(cs� a•.�o{ oars of Unity Church of Hartford, Inc.,and acknowledged that he/she executed the foregoing instrument for the purposes therein contained as his/her free act and deed { and the free act and deed of Unity Church of Hartford, inc. In Witness Whereof I hereunto set my hand. rNotary Public/My Commission Expires: Commissioner of the Superior Court 4 • ry u �.s 7 f MEMORANDUM OF LAW RIGHT OF UPSTREAM LANDOWNER TO DISCHARGE SURFACE WATER THROUGH DOWNSTREAM PROPERTY NOV 0 5 2004 RE: JMJ CONSTRUCTION,INC.'S APPLICATION FOR SUBDIVISION APPROVAL ENTITLED"EMERALD GREEN SUBDIVISION" LEGAL PROPOSITION: JMJ CONSTRUCTION, INC. has the right to discharge surface water from its proposed Emerald Green Subdivision to the Unity Church of Hartford, Inc. ("Unity") property lying downstream by virtue of its agreements with Unity and thence to the Lakewood of South Windsor, Inc. ("Lakewood") property, by virtue of the Unity Drainage Easement granted by Lakewood and by virtue of the Reasonableness of Use Rule. FACTS 1. JMJ's Emerald Green is a proposed 3-lot subdivision on a total of 13 acres located on the east side of Ellington Road. Unity is developing its lot for its church situated immediately north of and adjacent to JMJ's property. Lakewood is a common interest community situated immediately north of and downstream of the Unity property. 2. The natural flow of surface waters is south to north from land lying southerly and easterly of the JMJ property across the JMJ property through the Unity and Lakewood properties to the Podunk River. 3. An easement was granted by Lakewood to Unity which provided Unity the right to improve certain drainage facilities on the Lakewood property and to discharge its surface water into the Lakewood drainage system. A copy of that easement document as recorded in the South Windsor Land Records is attached for reference. 4. JMJ's Emerald Green Subdivision will discharge surface waters to the Unity property by mutual agreement with approved drainage and detention basins such that peak flows from the Unity property will be less than as designed and approved for Unity and is now designed to the 100-year storm standard such that the discharge to Lakewood will be fully handled by the existing drainage facilities within the Lakewood property. W.I LITIGATEVMJ-Memorandum.doc 0 5. There will be no damage to the Lakewood drainage system or any Lakewood property by reason of the upstream discharges from either the Unity property or Emerald Green property. Lakewood's chairman testified before the Planning & Zoning Commission that the only damage would be possible increased wear and tear on its drainage system which might require an earlier replacement of portions of the system. LAW I. AN UPLAND LANDOWNER MAY DISCHARGE SURFACT WATER ONTO A DOWNSTREAM LANDOWNER PROVIDED THE DEVELOPMENT OF THE UPLAND IS REASONABLE AND THE HARM CAUSED THE DOWNSTREAM LANDOWNER IS NOT UNREASONABLE. (A) Common Enemy Doctrine: Prior to 1980 the law with respect to surface waters was referred to as the "Common Enemy Doctrine" which was set forth in Connecticut in the case of Tidewater Oil Sales Corporation vs. Shimelman, 114 Conn. 182, 158A.229 (1932). The Court stated the rule as follows: "...an owner of land has the right to occupy and use it as he sees fit generally speaking by changing its surface or erecting structures upon it, despite the fact that such a use will cause surface water falling upon it or naturally flowing over it from adjacent lands to accumulate upon the latter or to pass over them in changed direction or quantity." The Tidewater Court later amplified its description of the rule as follows: "A landowner is under no duty to receive upon his land surface water from the adjacent properties,but in the use of improvement of it he may repel such water at his boundary. On the other hand, he incurs no liability by reason of the fact that surface water falling or running onto his land flows thence to the property of others in its natural manner. But he may not use or improve his land in such a way as to increase the total volume of surface water which flows from it to adjacent property, or as to discharge it or any part of it upon such property in a manner different in volume or course from its natural flow, to the substantial damage of the owners of that property". W.•VffIGATEVMJ-Memorandum.dm In that case the downstream owner improved his property by raising the elevation two feet above the elevation of the upstream property. When the upstream owner complained that the downstream owner had blocked and destroyed the natural drainage across the downstream property, the court found for the downstream owner based on the above rules. However, it found for the upstream owner with respect to that drainage which the downstream owner, by virtue of raising his elevation directed back onto property of the upstream owner, since that was a change in the natural drainage flow. (B) Reasonableness of Use Rule: In 1980 the Court in Page Motor Companp, Inc. v. George P. Baker, et al 182 Conn. 484 upheld a trial Court fording that the Penn Central Railroad had no liability for permitting a drainage structure under its railroad to become clogged as the result of which an upstream owner suffered damage from unusually heavy rain. The Court upheld the finding of the trial Court that the plaintiff had not proved any acts by the defendants that had caused its damage. It found that the trial Court's recitation of the Common Enemy Doctrine to be a correct statement of the prior law as set forth in Tidewater, but that it was time "to alleviate the harshness of that doctrine". The Court stated that "...the inflexibility of the old rule should be modified so as to allow some reasonable latitude". It then adopted what has come to be called the"Reasonableness of Use Rule"recognizing that it was doing so by way of dictum. It stated the rule as follows: "Generally, under the rules of reasonable use, the landowner, in dealing with surface water, is entitled to take only such steps as are reasonable, in light of all circumstances of relative advantage to the actor and disadvantage to the adjoining landowners, as well as social utility". After studying the development of the Reasonableness of Use Rule in New Hampshire and New Jersey the Court further approved that rule, "...which was said to have the particular virtue of flexibility, since the issue of reasonableness became a question of fact to be determined in each case under a consideration of all relevant circumstances, including such factors as to the amount of harm caused, its forseability, the purpose or motive with which the act was done, and the consideration whether the utility of the use of land outweighed the gravity of the harm resulting". In 1981 the Appellate Division of the Superior Court set aside a judgment in favor of the downstream owner who had erected a house and placed large boulders at the property line and raised the elevation of her land blocking the natural flow of water from the plaintiffs property because it was decided under the Common Enemy Doctrine and should now be reconsidered in light of the Court's adoption of the Reasonableness of Use Rule Smitk et al vs. Rosen,37 Conn. Supp. 634. W.I LITIGATE UMJ-Memorandum d x • 0 In 1982 the Court upheld a judgment in favor of the upstream landowner against the downstream owner who raised the level of its downstream property causing flooding of the plaintiff's upstream property. This decision was upheld applying the Reasonableness of Use Rule. Ferri vs Pyramid Construction Company, 186 Conn. 682. In 1983 the Court upheld a judgment for the downstream owner under the Reasonableness of Use Rule. In that case the downstream owner purchased the lowest lot in what became a larger subdivision. The lot was subject to a Drainage Easement through a ditch which was initially 2-feet wide and approximately 2-inches deep. Thereafter the developer and town approved a development of upstream property into a number of building lots which increased the surface water flow across plaintiff's property expanding the ditch to approximately 8-feet wide and 2-6" deep and estimated to have increased the flow by more than 40%. That Court approved the Reasonableness of Use Rule set forth in Page, supra, and applied the same general rationale to the meaning of a Drainage Easement. In that case the trier found against the defendant and found the additional drainage was an unreasonable burden upon the plaintiff. Peterson vs. Oxford, 189 Conn. 740,459 Atlantic 2°d 100. In 1999 Judge Lavine denied a temporary injunction requested by a downstream owner against the development of upstream property. In that case the plaintiff owned a farm on the east side of East Street in Suffield (between East Street and the Connecticut River) while defendant sought to develop and obtain subdivison approval for an 8-lot subdivision on the opposite side of East Street. Drainage from the subdivision was collected in a detention basin and discharged under East Street through a Connecticut DOT drainage culvert which had been in place for at least 27 years. The Court there restated the Reasonableness of Use Rule but denied the injunction because of the additional proof required for a temporary injunction and the fact that the plaintiff had not been able to prove that all of the damage resulted from the subdivision development since other road drainage contributed to the surface flow and plaintiff had re-directed the natural flow of water on his property. Bielonko Trustee vs. Blanchette Builders, Inc., 1999 WL68650. II. THE EASEMENT GRANTED BY LAKEWOOD TO UNITY IS NEITHER PERSONAL TO UNITY NOR DOES IT PROHIBIT ACCEPTING FLOW ORIGINATING ON THE UPLANDS ABOVE UNITY. A review of the easement document recorded in the South Windsor Land Records in Volume 1605 at Page 61, et seq, by its terms in paragraph 14 thereof"shall inure to the benefit of and be bonding (sic) upon the parties hereto, their successors and/or assigns". That is the standard language of limitation making this a permanent easement and not personal. The principal purpose of the easement is set forth in preamble (d) to be the installation of a pipeline drainage system. Thereafter, the terms and conditions of the easement, paragraphs 1, 2, 3, 4, 5, 6, 11 and 12 address the design, construction and maintenance of the system on the Lakewood property. Nowhere in the document is there an attempt to specify or limit the flow or velocity of the water or the drainage area. W.TMGAMMT Mvwran&m.doc All of the surface water drainage proposed to flow through the Lakewood property as the result of the Emerald Green Development has in the past flowed through the Unity property and Lakewood property and will continue to do so. The drainage system designs and improvements are planned under engineering standards promulgated by Connecticut DOT and the South Windsor subdivision regulations so as to control the flow of surface water and not cause damage to the downstream property. Whether the design in fact accomplishes that purpose in compliance with the aforesaid design standards is an appropriate consideration for the Planning & Zoning Commission. Assuming the Commission finds compliance with those standards, then the system and subdivision should be approved. Even if the Lakewood Easement should be considered personal, based upon the Reasonableness of Use Rule set forth by the Supreme Court in Page, supra, JMJ through its Emerald Green Development is entitled to have the surface water flow to Unity and on through the Lakewood property so long as it does not unreasonably damage the Lakewood property. The design is intended not to increase the burden but to control the flow so that the existing system in Lakewood would handle the flow even for a 100-year storm. III. UPON ACCEPTANCE BY THE TOWN OF SOUTH WINDSOR OF THE ROAD PROPOSED IN THE SUBDIVISION, THE TOWN WILL HAVE THE RIGHT TO DISCHARGE ROAD DRAINAGE TO THE DETENTION BASIN ON THE EMERALD GREEN PROPERTY AND FLOW THE WATER DOWNSTREAM THROUGH UNITY AND LAKEWOOD. Road Drainage from proposed Church Way will discharge to the detention basin within the Emerald Green Subdivision and flow thence through the Unity property and on through the Lakewood property to the river. The anticipated flow has been calculated and provided for within the design of the detention basin as part of the subdivision development. The Town's right to discharge to the subdivision detention basin will be assured either by the grant of easements in connection with the grant of the fee title to the road and/or ownership of the detention basin. The Town will further be an assignee of the subdivider's easement rights to discharge to Unity. The Town drainage flow through Unity into the Lakewood property has the same legal rights as in the above analysis with respect to the upland discharge to the downstream Lakewood property based upon the Reasonableness of Use Rule. In addition, the Town has the benefit of Connecticut General Statute Section 13a- 138 which permits drainage through any person's land so far as necessary to drain water from its road and compliance with the Drainage Manual of Connecticut DOT, Revised Many, 2002, a copy of which is attached. W.WIGATEVMJ-Memorandum.d x CONCLUSION The proposed 3-lot residential subdivision is the use contemplated by and permitted by the existing zoning regulations and is therefore a reasonable development of the upland property. JMJ Construction, Inc. will present persuasive evidence that the natural flow of water from its proposed subdivision property flows through the Unity property and the Lakewood property either in its natural course or utilizing the drainage facilities previously constructed within the Lakewood property; that the design for the proposed subdivision will so control the flow of water that no unreasonable damage will be sustained by Lakewood; and that the design complies with both DOT designs standards and the South Windsor Subdivision Regulations. Assuming the Planning & Zoning Commission is persuaded and makes those findings, then it must apply the Reasonableness of Use Rule set forth by the Connecticut courts and not fail to approve this subdivision on the basis of objection from the downstream landowner. The Planning & Zoning Commission should not be and is not the arbiter of property issues between nearby property owners. If the design meets the town regulations, it must approve the subdivision. In this case JMJ is providing a detailed analysis of its engineering design as well as its legal rights to demonstrate compliance with all of those rules. Respectfully Submitted JMJ CONSTRUCTION, INC. By 321e=' = Atherton B. Ryan,Its Attorney 310 Hartford Turnpike Vernon, CT 06066 Juris#52498—Tel.#860-875-3375 Fax#860-872-3862 W.I LITIGATEVMJ-Memorandum.dm VOL. 1 S O 5 PACE 61 , <, :_ . Yt x ST RM WATER DEW `N�EASEMENT AGFtEEMEN'T 0084 THIS STOFW WATER DRAjbiAGE EASEMENT AGREEMENT(the'Agreement") 3 N, is entered into this-sit day of JVI AV _ _ .2004,by and between Lakewood of South ly Y Windsor, Inc. (the"Association"),whose address is Lakewood of South Windsor,Inc.,Go Mr. Bryan Palmer, G&W Management, Inc., 102 Pitkin Street,P.O.Box 2W928,East Hartford,CT 06128-0829 and Unity Church of Hartford Inc. ("Un' 730 Farmington Ave.,West Hartford,CT 06119. )�whose address is # � x PREAMBLE r t . aF a. The ...•,%� � ��'� Association is the association of unit owners of Lakewood,a planned unit development("Lakewood")and the owner of the common elements of the development,including the roadways and sewer,water and other utility _ lines. Pursuant to the governing documents for the development,the Association has the authority to grant easements over and n the common elements. w b. Unity owns property which is contiguous with Lakewood property. The :�- a �• : topography of the Unityt property is configured in such a way that stator , , water drains onto Lakewood property. This agreement's purpose is to ease ; surface drainage from Unity to Lakewood by allowing connection to 4,. Lakewood's existing storm drainage system. i C. There are two surface water drains which are designed to handle storm { = water runoff at Lakewood located at 26 Pintail Circle and 34 Goose Nest, and at the comer of Mallard Place(the"Drains"). It the storm water drainage from the Unity property could flow to the Drains,any existing Problems could be eliminated. d - d• The Association desires to grant easements to Unity across certain s , common elements and limited common elements at Lakewood from the Unity Property to the Drains for the purpose of installing a pipeline drainagez t system (the"Drainage )�e S ter" and to that end the parties have entered Into the following Agreement on the terms and conditions and for the mutual considerations set forth below. TERMS AND CONDITIONS y 1. Consideration of ha a4� atlon �,"t The Association hereby grants to Unity the utility easements described on =r> Exhibit A,attached hereto and Inc orporated herein by reference,for the Purpose of constructing and installing Drainage System,as more specifically set forth below,to carry storm water runoff from the Unity ,� 'r property to the Drains. Said easement is hereby conveyed with quit claim covenants and without warranty of any kind. + 2. t Consideration of Unity In consideration for the grant of the easements by the Association,Unity agrees as follows: CONVEYANCE TAX RECENEp ; 1 t STATE LOCALS -Nob( _..._..._ TOWN CLM or:soutrr WINnsoa i 4 41 w.t��b y,�•."�ia ry. t r�:Y �PN.;�',�4t:r'�L'.ic•..:i�J --...`--.... ...a.._."""i.'i�:.a..-uc�a_2`..... :A t rt k 1605PAsE 62 s a. Unity shaft be responsible for and pay aft costs,including attomey fees and engineering fees,incurred by the Association related to the <ti Preparation of this Agreement and the deeds,surveying of the easements and review of the construction plans and any other costs incidental to the construction and installation of the Drainage System. b. Unity shall not unreasonably alter the existing system of"swales"or the topography of its property or the Lakewood property in the course of installing the Drainage System without the prior written consent of the Association and its engineers. Excluded from this requirement are minor changes In topography on Unity property ' which must be made during construction to accommodate unanticipated problems provided,however,even such minor {' changes must be approved verbally in advance by the Association and Its engineers in advance of the work. ,; C. Unity shall provide landscaping,Including earthwork and vegetation, as buffering between the Unity ;`}• ty property and the Lakewood property ' = ` at(coati"ysin' ons and to such an extent as the parties shall agree as the '; 3 r s• construction of the Drainage System proceeds and landscaping requirements become apparent. Unity has previously obtained approval for tentative landscaping on the project from the South r Windsor Planning and Zoning Commission pursuant to Landscaping Change Order drawings approved on April 22,2003. The landscaping to be done pursuant to this paragraph shall be in �i addition to the landscaping set forth in the change order. Unity intends to restore both easement locations to their prior condition as b=:;•<;4'_ much as practicable,and,In addition,to verbally arrange for agreement with the Association on such other buffering landscaping , that may be necessary to enhance the privacy of Lakewood from the ul activities of Unity Church. y: d. Unity agrees to repair,at Its sole cost and .' lawns, trees,shrubs or utility lines or roads within Lakewood property which is caused by the construction of the Drainage Provide such System F' repair to the satisfaction of the Association by mutual verbal n T agreement. .t 3. Location and Size of Drainage Rfoes 8s Prior to the commencement of any construction,the parties must agree as to the size of the Pipes and the exact location thereof within the easements. Failure to reach agreement as to these matters will terminate this Agreement,and the Association shall not be obligated to grant the t easements,and this Agreement shall become null and void. Y� 4. Road Excavation '1 It Is the Intention and contemplation of the parties that only grassy open areas at Lakewood will be excavated,tom up,or otherwise disturbed except '';` s as may be necessary on roadways within the development at or near the Drains where the Orainag tem must be connected. While Unity will be '` } liable for the disruption or 11page to all Lakewood property pursuant to m r �ii't cY Paragraph 2.d. above UntTigrees to make every effort to minimize all • � 4 .. disruptions to the Lakewood property. In the event the presence of existing �:a'•)k k utility lines at Lakewood prevents the installation of the underground pipes by Unity within the designated grassy areas,so that roads within the y sr � a' Lakewood development must be excavated,then any design changes must be reviewed and approved by the Association and its engineers prior to the � :� : commencement of construction work on any such roadways. 5. Construction and Installation Work the Performed by AH Slater Construction Company. The parties agree that all work on the project shall be performed by or under the supervision of J&H Slater Construction Company,the original contractor for the developer of Lakewood. , §q 6. Engineering Reviews. The engineering firm for the Association shall be Suck&Suck Engineering, and the engineering firm for Unity shag be Design Professionals,Inc. Any reference herein to the engineers sha!l be to those companies. No r easement shall be granted and no construction work begun until a s : m 3; � � engineering plans have been agreed to and signed off on by both engineers and by both parties.22. 7. Eliaible Mortgagee Aooroval. Pursuant to subsection 15.4C of the Declaration of Lakewood the 1 48 : Association may grant easements across the common elements with the approval of eighty Percent(8096)of all Eligible Mortgagees as defined in the �.,`�• •• a. ' Declaration. The Association has obtained this approval. 1' 8. Scope of Agreement. < c' s- The subject matter of this Agreement is limited to the storm drainage easements and the Drainage System to be constructed therein. it specifically excludes a previous request of Unity for a sewertine connections x between Unity's sewedine and that of the Association. That request was denied by the Association,and it is not revived by this Agreement. S of X;r Yr fli ..b 9. Government Ag ro L yals. ��:� rflu Ali plans for the grant of the easements and the construction of the Drainage System as well as for any additional landscaping pursuant to paragraph 2.c.are subject to the approval of the appropriate departments of # � the Town of South Windsor. It shall be the responsibility of Unity and its engineers,at Unity's sole cost and expense,to ensure that all required governmental approvals have been obtained prior to commencement of 3 k�: construction of the Drainage System or any additional landscaping. . �.}- 3 Val J--'M O. 11'- KN 1 va. 16 O eJ PAGE 64 10. Mediation and Arbitration. a. If a dispute arises out of or relates to this Agreement,or breach thereof,and if said dispute cannot be settled through direct discussions,the parties agree to first endeavor m settle the dispute in an amicable manner by non-binding mediation under the Construction Industry Mediation Rules of the American Arbitration Association,before having recourse to arbitration or a judicial forum. b. Should mediation not produce a satisfactory result,the dispute shall be submitted for arbitration in accordance with the rules of the American Arbitration Association. If the American Arbitration Association establishes special rules for common interest r community disputes,such rule shall apply. If the American s: Arbitration Association ceases to exist or declines to accept the ' submission,some other organization engaged in conducting arbitration or alternative dispute resolution in Connecticut will accept .r the submission,the dispute shag be submitted to such other organization. All issues submitted to arbitration under the provisions of this section shall be decided by a single arbitrator. Judgment '. upon the award rendered by the arbitrator may be entered in any court having jurisdiction her8ot. Both parties would be responsible for their own costs associated with mediation and/or arbitration. 11. Repair and Maintenance of Drainage System After Completion I Unity shaft be responsible for all costs of inspection,maintenance and repair t of the pipelines following their installation, as well as for the costs of any «� damage which may result to Lakewood property as a result of any breakdown in the pipeline or repair work which disrupts Lakewood property. Unity shall have a right of access to its pipelines along the easements granted herein for the purposes of inspecting,maintaining and repaiffng the k pipelines. 12. Failure of Unity to Make Regajrr or Restoration. In the event Unity fails to restore Lakewood property to the Association's ->r satisfaction during construction of the Drainage System or following any subsequent repairs,the Association shall have the right to have the restoration completed and UMty shag be responsible for the costs thereof. 13. ModWication. This Agreement may be amended or modified only in writing. 14. Recordin-and Inurement. This Agreement and any modifications hereto shall be recorded in the Land Records of the Town of South Windsor and shall inure to the benefit of and be bonding upon the parties hereto,their successors and/or assigns. 4 VUL. svv0Mat vu fx . 15. Fees and Costs Uoon T�&atlon • :4 ` Notwithstanding anything to the contrary herein,in the event this Agreementqii Is terminated,Unity shall remain responsible to pay the Association any fees or costs incurred by it prior to the termination. 16. Entire Agreement. parties and $ This document constitutes the entire agreement betweenthe may be modified only in writing. �` 17. Indemnification and insurence. d ' Y � „_` a. Unity shall indemnify and hold harmless the Association and unit f YR p owners from all liability for damages or injuries to the extent it Is responsible arising from the performance of its duties or that of its agents hereunder In installing and maintaining the Drainage System ; or the failure to perform such duties. a s; }� k fiYRrt= tid�• � b. Unity shall purchase or ensure that its contractors and subcontractors purchase and maintain in full force and effect ,•r ,��,f��,.. throughout the term of this agreement Worker's Compensation insurance as required by the laws of the State of Connecticut and liability insurance covering injury to persons and property within the boundaries of the Lakewood planned unit development in an amount �Z-4, at least equal to the statutory limits set by the State. To an extent ;r+ possible and practical,the insurance policies shall name the Association as additional insured,and Unity shall provide the Association with a Certificate of Insurance within 10 days of the commencement of the work on the Delivery System. ' t (signature page foblows] tta s h ZU •, ^a t ti Y �Pt 9 s� r.r 10 t°Z x Fh .4 h � t 0.1 .l�a •t1 tom•• ` 1 i•P t voL. 1605PAsE 66 r IN WITNESS WHEREOF,the parties have affixed their signatures on the dates set forth below. LAKEWOOD OF SOUTH WINDSOR,INC. vt c.� P�SI.0 eke r osaA►+ oac rr Tits:f-h�S i oa T Duly Authorized UNITY CHURCH OF HARTFORD, y*, < INC. Duly Au horized ri .p STATE OF CONNECTICUT) Id, ' >, ) sJ k: COUNTY OF f r ) 3' 2004,before me,the undersigned officer,personally ? On this the day of ( coven to be the a red ,known to me(or satisfactorily proven) f of Lak of South Windsor,Inc.,a Connecticut corporation,and res s therein ' a acknowledged that he/she executed the foregoing instrument for the purpose contained as his/her free act and deed and the free act and deed of said corporation. J In Witness Whereof I hereunto set my hand. f Notary PublWW Commission Expires:- ;•: Commissioner of the Superior Court �3 4 ,e VOL. 16 U 5 PAGE o t g= 194 K. STATE OF CONNECTICUT) �L`�� �Frw, at Wt ar . COUNTY OF�Lrffp On this the day of 4,20o4,before me,the undersigned officer,personally a geared otin ,known to me(or satisfactorily proven)to be theF.f ,� < Pnespdo..a of Unity Church of Hartford, Inc.,and acknowledged that he/she executed the foregoing instrument for the purposes therein contained as his/her free act and deed �`wFlr and the free act and deed of Unity Church of Hartford, Inc. r In Witness Whereof 1 hereunto set my hand. rt . �5 . . iota4: b1I p., uc/My mmission Expires: F ,.,_... sioner of Superior Court _.- . AA M } 3 '•; '.'A."'t't• P. YF... '. .�s • r l��.a�txt-. 7 i kr :x ,'.�js`Y• {S ec-:'VL ..... ... . .<. .....-_N_✓J.._�.._.n�•:,..�...f. !...LY�y::.,w ny.._��.e_.uma._s_ra.i.-a_P°a.\_.0..a.�._...a_.�.....,.4_ w_....._ ....._w_..-u... .. .. _.. .. .. .. ks or ! -............._ 1 q to __ ... _.......__ '1 0ra 1r- :....,.... 1 O 1 ON wwwr 1 !a r �� •Yrr•Iwrrrr.rrr� Il/� a rwa.a�Wa.r�Ya j a wwn.gwUw�r•1wa•rr .IRp MApf<tlitp.RNION w N 1 • "�S'i: .raw Lots t0 ' wrwwrr • .a�reaaraw ��r t 1+ tax ! t Qlad !� 3 Baum?* mm •w rsww�w�n• •a�..w.r•w•r.wr•rww..r�.r.wr _ ��• � w� �• • i a _ •nw.r.w. 1r71Mw �, vwrs ��... ' rrr.r• T • a,���' S'7,X A. •�Y`- :;.-g" a�"�'»k. R .��,;�� .MSS .5 t VL. J.V V V 1 nVV V V .,; g.;_ -re m.-pie •_• 4k'bit—A Legal Description Drainage Easements With Rights To Discharge i In Favor Of Unity Church, 919 Ellington Road,South Windsor('Grantee")DPI Project No. 1452 ;;T ' s s Beginning at a point,said point being the southwest corner of the easement,said point also being 112.12 feet,along a bearing of N680 15'16"W to an existing iron pin located at the northwest property comer of the Grantee's property;thence, N059 33'39"E,through property now or formerly of Lakewood Condominium,a distance of 75.06 feet to a point; ,:;, . thence, N71°55'59"E through property now or formerly of Lakewood Condominium,a distance of 149.65 feet to a point,thence, S18 04 01 E through Po ' ug property now or formerly of Lakewood Condominium,a distance of 20.00 feet to a point;thence,S71°55'59"W tz r through property now or formerly of Lakewood Condominium,a distance of 136.57 feet to4 a point;thence,S05°33'39"W through property now or formerly of Lakewood rx Condominium,a distance of 68.17 feet to a point;thence,N65°21'20"W along property c1.P now or formerly of Lakewood Condominium,a distance of 7.45 feet to a point;thence, y N680 15'16"W along property now or formally of Lakewood Condominium,a distance of 13.49 feet to a point,said point being the point and place of beginning. 4r4 �e Beginning at a point,said point beingthe southeast corner of the easement,said point also being 46.00 feet,along a bearing of S670 21'49"E an existing iron pin located along the northerly property line of the Grantee's property,thence,N6r 21'49"W along property now or formerly of Lakewood Condominium,a distance of 20.00 feet to a point;thence, N22°38'11"E through property now or formerly of Lakewood Condominium,a distance of 9 ' 32.00 feet to a point;thence,S670 21'49"E through property now or formerly of Lakewood Condominium,a distance of 20.00 feet to a point;thence,S2r 38'1101W through property now or formerly of Lakewood Condominium,a distance of 32.00 feet to a point,said point being the point and place of beginning. RECEIVED FOR RECORD: ° DATE 'f1ME��..�. 3 TAa 8 .WH CLAM.iouTM MnNO .4' .:'eel' J.=...�iR r�>••. -_ � _ x � 3 � Y 6 3 � S _ j . !.• �` _ __ _ �`c, z - _�,.- � � r _ �� : � -. :- :� ��� ' �'. 'a�s�:..c_ i _ t 1�.���P - �r�. Cry L 9 r � j _8 �` .'yam..;- •.r _"+',d/�v�- _ .`�j„ R�- � -1F ,__ �' _� �.. -ice -_ - {. � _ _ ♦. _ v ..� �. ` _a-. - �.. _� .�' ��. l _ � � � 1 6 � � 1 _ � � , i CONNECTICUT DEPARTMENT OF TRANSPORTATION r DRAINAGE MANUAL i i C li'• e P! Prepared by the OFFICE OF ENGINEERING iI BUREAU OF ENGINEERING & HIGHWAY OPERATIONS Ei 11 DIVISION OF DESIGN SERVICES HYDRAULICS AND DRAINAGE SECTION I� OCTOBER 2000 includes May 2002 revisions i PREFACE a � h e: The American Association of State Highway and Transportation Officials (AASHTO) Task a Force on Hydrology and Hydraulics Model Drainage Manual serves as a basis for this manual. The Connecticut Department of Transportation(ConnDOT)Bureau of Engineering and Highway Operations,Division of Design Services,Hydraulics and Drainage Section has modified the Model Drainage Manual to apply specific principles that are applicable to Connecticut's resources. The ConnDOT Hydraulics and Drainage Section has incorporated many other references and their numerous years of experience into this comprehensive drainage manual to provide guidance on roadway drainage. The objectives of drainage design are to provide thorough investigation and planning, adequate design, construction and durability of ConnDOT facilities while also providing for the safety of the travelling public and adjacent property owners;-to minimize any undesirable effects which might be caused by the construction and maintenance of the ` facility; and to achieve an optimum balance .between risk of damage to the facility and the cost of construction. Each of these objectives contains within it the implication of certain judgements and decisions which must be.made by the designer. j This manual contains the design criteria to form a framework for achieving the goals i listed above. It is the responsibility of the designer to develop the required hydrologic and hydraulic data for any given project or site. Using this base data, the best overall solution must be tailored to the situation when a particular design may require decisions involvingconflicting value judgements such as economics vs. environmental g j g considerations. The need for proper field site investigations, collection of data, analysis of data, and exercise of judgement are the foundations of good drainage design that will enable proper use of the criteria set forth.in this manual. It is with this goal in mind that this drainage manual has been prepared. it is i I M Leal Aspects 2 5 1 2.5 State Water Rules 2.5.1 Basic Concepts Two major rules have been developed by the courts regarding the disposition of surface waters. One is known as the.civil law rule of.natural drainage. The other is re ferred to as the e common enemy.doctrine. Modification of both rules has tended-to bring them somewhat closer together,and in some cases the original rule has been replaced by compromise rule known as the reasonable use pile. Much of the law regarding stream waters is founded on a common law maxim that states "water runs and ought to run.as it is by natural law accustomed to run." Thus; as a general rule, any interference with the flow of a natural watercourse to the injury or damage of another will result in liability. This interference,may involve augmentation, obstruction and detention, or diversion of a. stream. However,there are qualifications. In common law,_flood waters are.treated,as a "common enemy'of all people,lands and property attacked or threatened by them. In ground water law, the "English Rule," which is analogous to the common enemy rule in surface water law, is based on the doctrine of absolute ownership of water beneath the property by the landowner. 2.5.2 Surface Waters The civil law.rule_is based upon the perpetuation of natural drainage. (The rule places a natural easement or servitude upon the lower land for the drainage of surface water in its natural course and the natural flow o e water cannot-be obstructed by the servient owner to the detriment of the dominant owner.QThe owner of upper lands has an easement over lower lands for drainage of surface waters. These natural drainage conditions can be altered by an upper prop 'etor provided the water is not directed`in such a manner or quantity to do more harm than formerly. " Under.the common enemy doctrine, surface water is regarded as"a common enemy which each property owner may fight off or control as .they will or is able, either by retention, diversion, repulsion, or altered transmission. Thus, there is not cause of action even if some injury occurs causing damage. _In most jurisdictions_, this doctrine has been subject to a limitation that one must use their land so as not to unreasonably or-unnecessarily damage the prop erty of others. Under the reasonable use rule, each property owner can legally make reasonable use of their land, even though the flow of surface waters is altered thereby and causes some harm to others. However, liability attaches-when-their harmful interference with the flow of surface water.is "unreasonable." Whether a Iandowner's use is unreasonable is determined by a nuisance-type' balancing test.' The analysis'involves several questions. • Was there reasonable necessity for the actor to alter the drainage to make use of their land? • Was the alteration done in a reasonable manner? • Does the utility of the actor's conduct reasonably outweigh thg gravity of harm to.others? 2.5.3 Stream Waters Where natural watercourses are unquestioned in fact and in permanence and stability, there is little difficulty in application of the reasonable use rule. Highways cross channels on bridges or culverts,usually with some constriction of the width of the channel and obstruction by substructure October 2000 ConnDOT Drainage Manual 2.5-2 i within the channel; both cause backwater upstream and acceleration of flow downstreana ^ small as to be tolerable b adjoining.owners,or there may be changes in regime must be so sma Y of any injuries or damages suffered. waters from highways are often en discharged.into the most convenient watercourse_;_ right is unquestioned if those waters were naturally tributary to the watercourse and unchall the watercourse has adequate capacity. However, if all or part of the surface waters h diverted from another watershed to a small watercourse, any lower owner may compiy'. recover for ensuing damage. V 2.5.4 Flood Waters - IIII,1 Considering a common enemy permits all affected landowners including p._'" tors flood waters as Y ro of highways, to -act in any reasonable way to protect themselves and their property fr common enemy. They may obstruct its flow from entering their land, backing or diverting onto lands of another without penalty, by gravity or pumping, by diverting dikes or ditches, any other reasonable means. " has frequently been applied, and liability can result Again, the test of"reasonableness j unnecessary damage is caused. Ordinarily, the highway designer should make provis overflow in areas where it is foreseeable that it will occur. There is a definite risk of liability waters are impounded on an upper owner or, worse yet, are diverted into an area where they not otherwise have gone. Merely to label waters as "flood waters" does not mean that they- disregarded. .._ � ded. sonable Use Rule"„ g The "English Rule' has been modified by the "Rea which states in that each landawneris restrieted-te&-reasonable exercise of their own right and a reasonable their property in view of the similar right of their neighbors. - The key word is "reasonable." While thin may be interpreted somewhat differently from l utilize subsurface water on . _case, it can generally be taken to mean that a la ndowner can F property for the benefit of agriculture, manufacturing, irrigation, etc. pursuant to the reas� '.'' development of their property although such action may interfere with the underground water However,it does generally preclude the withdrawal of neighboring proprietors. un derground Y a for distribution or sale for uses not connected with any beneficial ownership or enjoyment of ' land from whence they were taken. A further interpretation of "reasonable" in relation to highway construction would view tl ;; excavation of a deep "cut section" that intercepts or diverts underground water to the detriment adjacent property owners as unreasonable. There are also cases where highway construction permitted the introduction of surface contamination into subsurface waters and thus incurred~ liability for resulting damages. { _.;.... 1 October 2090 ConnDOT Drainage Manual _... i � i ! I Le al A cts 2.6-3 • State's right to outlet highway drainage—The State has the well-established right to outlet highway drainage into a natural watercouse within the Jughway right-of-way,provided such a watercourse is the'eventual natural recipient of the collected runoff. This right is not impaired. even though the State, in the performance of its governmental duties,. increased the rate or quantity.of water discharged from highway by changing the runoff characteristics of areas being drained or by installing pipe and other drainage facilities. The right is impaired only if the State increases the size of the drainage area from which the runoff is collected. If the natural drainage area is exceeded, then deeded drainage rights must be acquired from all owners adversely affected by the diversion. Should the State make drainage improvements within an existing drainage area draining to a watercourse,which results in an increased rate of flow causing an existing pipe on private property to be of inadequate capacity,the State is not obligated for improvements necessary on private property. The State also has the right to increase the size of a culvert conducting a watercourse under a state highway without acquiring drainage rights. The State must also conform to all applicable environmental laws, some of which are noted in Section 2.6.5. Generally,what is important for highway designers to keep in mind in the matter of water rights is that proposed work in the vicinity of a stream should not impair either the quality or quantity of flow of any water rights to the stream. 2.6.5 Environmental Law C A In addition to Federal laws which affect designs with regard to pollution, dredging and filling, . Connecticut has several statutes pertaining to these aspects as well as flooding,dams and wetlands.The present statutes are as follows and are under the jurisdiction of the ConnDEP. t 0 • Inland Wetland and Watercourse-CGS 22a-36 to 45 This statute and regulations cover all inland wetlands and watercourses in the state. The wetlands are defined by soil type and the watercourses are defined as'any body of water, t standing or flowing,natural or artificial. Any impacts on wetlands or watercourses require a permit. However, if an activity requires a tidal wetlands or structure and dredging permit, then the ConnDOT is exempt from the inland wetland and watercourses process. I ° • Stream Channel Encroachment Lines-CGS 22a-342 to 349 The State has established encroachment lines along major flood prone rivers. Any encroachment or activity riverward of these lines regardless of elevation requires a permit. • Water Diversion—CGS 22a-365 to 378 A diversion is any withdrawal, alteration,modification or diminution of the volume of water that would occur at a point at any given moment. Wells or well systems wthdrawuig`more than 50,000 gallons per day, stream relocation, stream channelization, stream bypass and storm drainage system collecting surface water runoff from areas of 100 acres or more in size;and dams and.impoundments are among the activities requiring permits. However, any DOT highway project is exempt from this permit process if other permits are required from D.E.P. October 2000 ConnDOT Drainage Manual jQN 2005 TOWN OF SOUTH WINDSOR SOUTH WINDSOR PLANNING DEPT. STAFF SITE' CHANGE FOR SITE & S,UAbIVISION GENERAL:. ` CHANGE 'ORDER CONTACT PERSON n Phone No Adores s;: A . Site Name.' p&Z No. r" Owner Phone No. Contractor'` ` Signature: of Owne Dates Signature of Design En Date: CHANGE: (Describe location a d at, , of change. include Four �4 ) copies of- plan/profile:of Change. ) 'y r i v �nJ. Reason: for: Change (Why is change' require:,) d 06 ' .> �41A t.. COS 71 y - 4 Nff r ttt a APPROVALS: (As Required) Dix. .Of Pl:annl,ng �. a.B�.. .. Date: Town Engineer Date: Dir. of Public Works Date: a y Other: Q .,." Date; STAFF COMMENTSjj r i White - Town Engineer Yellow. - Applicants. Pink - Director ,of Planning Goldenrod -Engi ai* Depa ent- F