Loading...
HomeMy WebLinkAboutSite Plan of Development (89) TOWN OF SOUTH WINDSOR PLANNING & ZONING COMMISSION APPLICATION FORM Application No: 09 -too P Official Receipt Date: 101 zZ/o 2— Receipt No: APPLICANT: Town of South Windsor PROJECT NAME: Sand/Salt Facility, Burgess Road ADDRESS: 1540 Sullivan Avenue, South Windsor, Ct 06074 OCT 92002 OWNER OF RECORD ON LAND RECORDS: Town of South Windsor ADDRESS: 1540 Sullivan Avenue, South Windsor, Ct 06074 COMPLETE LOCATION OF PROPERTY: Public Works Maintenance Facility, 157 Burgess Road ASSESSOR'S MAP # 74 PARCEL# 16 ZONE RR NAME, ADDRESS, TEL & FAX # OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED: Joseph I Perna, Project Engineer 1540 Sullivan Ave., South Windsor, Ct 06074 (860)644-2511 x240 (fax) 644-7280 Estimated presentation time: N/A THIS APPLICATION IS FOR: (Check all that apply): ❑ Zone Change to (Public Hearing required and Certified letter to abutters required) ❑ Subdivision/Resubdivision ❑ Open Space Subdivision (Public Hearing Required) ❑ Subdivision ❑ Minor ❑ Major ❑ Resubdivision (Public Hearing Required) ❑ Minor ❑ Major ❑ Conditional Approval ❑ Special Exception to Article (Public Hearing, Certified letter to abutters required) ® Site Plan of Development ❑ General Plan of Development ❑ Earth Filling (Sec. 15) and/or Earth Removal (Sec. 14 - Public Hearing Required) ❑ Regulation Amendment ❑ Zoning ❑ Subdivision (Attach proposed amendment) (Public Hearing Required) ❑ Temporary and Conditional Permit for (Public Hearing Required) ❑ In Law apartment/Accessory Apartment (Public Hearing Required) ❑ Major Home Occupation for (Public Hearing Required) ❑ Other (explain in detail) An Application Pending sign is required to be posted on the property for all applications ten (10) days prior to being heard by the Commission. Signature of Applicant Signature of Property Owner towM see 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 soR•co TELEPHONE (860) 644-2511 CERTIFIED MAIL October 22, 2002 Mr. Joseph J. Perna Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 Re: Appl#02-60P, TOSW Sand/Salt Facility We are pleased to advise you that the Planning Department approved your application on October 22, 2002 with modifications for the above referenced application for a Site Plan of Development. This approval is for the construction of a sand and salt shed on property located 157 Burgess Road, RR Zone as shown on plans prepared by the Town of South Windsor, Job No. 02-804, dated August 30, 2002, as revised. This approval is subject to the following modifications: 1. Prior to commencement of any site work, a meeting must be held with Town Staff. 2. No building permit will be issued until the final mylars have been filed in the Town Clerk's office. 3. This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission. 4. An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 8.1.10 of the Zoning Regulations. 5. Footing drains are required if the building has a basement. 6. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 7. The building number must be included on the final plans. Black and white transparent mylars of Sheet#4 with the above modifications, together with three blueprint copies of the entire set of plans must be submitted to this Commission within 30 days to be stamped and signed. The letters of approval of this Commission as well as the Inland Wetlands Agency/Conservation Commission must be reproduced on the mylars. After the mylars have been signed by the Commission, they will be returned to you for filing in the Office of the Town Clerk. After filing these plans, a copy of the receipt must be submitted to the Planning Department. Sincerely, Michele R. Lipe, AICP Planning Department MRL/kah cc: Town Engineer Chief Building Official Assessor Fire Marshall 10w N o7-0-wn ale Cd • U y � 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 SOR•CON�aE' - TELEPHONE (860) 644-2511 ��� RECEIVED �Preconstruction Meeting— Sand/Salt Facility, 159 Burgess Road MAR 17 2003 Contract#02-804 SOUTH WINDSOR PLANNING DEPT. IN ATTENDANCE Joe Perna Town of South Windsor 644-2511 x240 Mel Stead Town of South Windsor 648-6366 Jeff Doolittle Town of South Windsor 644-2511 x245 Bernie Drabek Town of South Windsor 644-2511 803-8880 (cell) Ron Asselin Town of South Windsor 648-6366 Mark Owens Town of South Windsor 648-6366 Michele Lipe Town of South Windsor 644-2511 x252 John Collins Town of South Windsor 644-2511 x233 Jeff Folger Town of South Windsor 644-2511 x229 Ron Gerber Gerber Construction 875-6684 Steve Gerber Gerber Construction 875-6684 Ted Decry Bulk Storage, Inc. (708) 946-9595 Steve Dalena Supreme Industries (860) 485-9006 Vince Krasiesko Supreme Industries (860) 485-0343 The following is a brief summary of points discussed during the meeting: Erosion and Sedimentation Control 1. All erosion and sedimentation control measures are to be in place prior to earth moving operations in each area and maintained/cleaned out during construction. Call Jeffrey Folger, Zoning/Wetlands Enforcement Officer for inspection when measures are in place, prior to commencement of site work or if any problems/concerns arise during construction. 2. All soil stockpile areas to be protected (ringed with haybales or equal). 3. Calcium chloride or water is to be used for dust control as required. Public Works 1. The Engineering Department is to be notified forty-eight (48) hours prior to the start of major construction work with inspections and testing per Specifications for the following: a. After site is staked out b. During excavation and disposal of municipal waste b. All drainage and utility work c. Preparation of subgrade, compaction tests as per Specifications d. Preparation of subbase, six (6) inch lifts, and processed aggregate base e. Placement of bituminous concrete, two (2) courses f. Forming and pouring of foundation/building walls g. Erection of building structure 2. Certification of gravel used as subbase and processed stone for base will be required from an approved testing company. 3. Certification of all products used -- storm pipe, structures, pavement, etc., shall be presented to the Town Engineer prior to installation. 4. No subgrade formation/base in frozen ground/snow. Same for pipe/structure installation. 5. All pipe and structures to be backfilled with free draining material, compacted in maximum one foot lifts with approved compaction equipment or approved equal if deep trench is encountered. Any pipe or structure work requires inspection prior to backfilling. 6. Any problems and/or questions regarding construction of this project will be directed to Steve Dalena in the field at phone #(860) 601-2518. Mel Stead will be the point person for the Town on the jobsite. 7. All filling to be done in accordance with technical specifications. To be compacted in maximum lifts and tested as necessary. 8. Job meetings will be held as needed, and can be called by the Contractor or Town. 9. Seventy two - (72) hours' notice needed for certificate of occupancy inspection. 10. Any proposed changes are to be presented to the Engineering or Planning Department prior to implementation on change order form in quadruplicate with 4 copies of the drawing. Town will attempt to turn around within 24 hours. 16. Normal hours of operation 7:00 a.m. — 5:00 p.m., Monday through Saturday, Sunday from 9:00 a.m. — 5:00 p.m. Note: South Windsor Police Department will respond to any noise complaints. 17. No paving after October 15 or before April 15 without written approval from Director of Public Works. 18. Extra care must be taken when compacting around the building foundation and walls. These spots may become problem areas in the future due to settling, therefore, the town staff/inspectors will be requesting compaction tests in these areas. Planning Department 1. Michele Lipe will coordinate with Karl Reichle for plantings around the new building. SNET/NU(CL&P) 1. Contact utilities for coordination of utilities connection. CL&P-Don Schaefer(871-3442). Police Services 1. Emergency phone numbers for the duration of the construction must be provided to Police Services on a company letterhead. 3. Erect temporary sign on the site during construction identifying the project. 4. If an alarm is to be installed contact Police Services. Building Department 1. Plan review with Building Official/Fire Marshal required prior to application for building permit. Coordinate with Chief Building Official. 2. All truss plans and specifications, foundation plans, etc. submitted for review require seal and live signature of Design Engineer. 3. Statement of Special Inspections must be filled out and signed by the Design Engineer and submitted with the Building Permit Application. The statement shall identify the special inspector and testing labs used. Shop drawings to be reviewed and approved by Design Engineer should be noted as well. 4. 24 hour notice required for inspection requests. Miscellaneous 1. Ron Gerber requested a clarification on the excavation of unsuitable material and depth of footings as Specifications called for placement of concrete footings to undisturbed soil. It was agreed that the excavation for footings shall be made to good bearing soil and structural (granular) fill placed to the bottom of the foundation elevation provided that proper compaction is met. Ted Deery stated that the bearing soil must support 3000 psf. 2. Refuse material will be measured in place by taking the difference in elevation between the top of the refuse material, and the bottom of the refuse layer in the accepted trench or building excavation. Unsuitable material encountered below the refuse layer must be removed but will not be measured for payment as it is covered under Earth Excavation. Measurements will be taken for placement of the compacted granular fill. Payment will be per cubic yards of granular fill placed. 6 3. Ron Gerber questioned whether the existing overburden material excavated in the building area may be used for fill if it met the specifications. Ted Deery stated that the Town may not want to put back material contaminated with salt. Mel stated that the material may be stockpiled onsite for street services use. 4. A tentative start date for construction was set for either April 7th or 14`h depending on the weather. A Notice To Proceed will be sent to Supreme in advance of the date. Steve Dalena will coordinate with Mel for location of the job trailer and staging area. 5. The Health and Safety Plan was briefly discussed. Steve D. stated that any individual entering the site must check in at the job trailer and sign the compliance agreement. 6. As-built requirements were discussed. Joe Perna referred to the Division 1 General Requirements, page D1-3. 7. Vince reviewed the list of subcontractors for the project. He will provide a final list to the Town prior to start of construction. 8. Any existing trees located in the trash relocation area to be removed must be marked 10 days prior to removal by the Town Tree Warden. Mel or Joe will coordinate with Karl Reichle. 9. Submission of Schedule of Values was discussed. The standard AIA form is acceptable for Application of Progress Payments. Vince K. and Joe P. will coordinate. Vince questioned amount of retainage as described in the General Contract. Jeff Doolittle will check with the Town Attorney. 10. Vince submitted a preliminary Project Schedule for review. Respectfully submitted, oseph J. Perna Project Engineer cc: See Attendance List