Loading...
HomeMy WebLinkAbout02-42P Gator Associates SitePlanoDev TUWiv U10,uU111 WLAIJ,ux _ ri ASHIIYG ac ZOOMING COMMISSION APPLICATION FORM �_\ Application No: "Jo Official Receipt Date: �To rT RECEIVE® Receipt No: APPLICANT: Gator Associates, LLC JUL 3 2002 '�-SUR.CV1- ADDRESS: 26 Schweir Road, South Windsor, CT 06074 SOUTH WINDSOR PLANNING DEPT. OWNER OF RECORD ON LAND RECORDS: Same ADDRESS: COMPLETE LOCATION OF PROPERTY: 26 Schweir Road (west side) ASSESSORS MAP # 110 PARCEL# 20 ZONE I NAME, ADDRESS, TEL& FAX # OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED: Peter R. DeMallie, Principal, Design Professionals, Inc. 165 South Satellite Road South Windsor, CT 06074, Tel: 291-8755; Fax 291-8757 THIS APPLICATION IS FOR: (Check all that apply): ❑ Zone Change to (Public Hearing required and Certified letter to abutters required) ❑ Subdivision/Resubdivision ❑ Open Space Subdivision (Public Hearing Re quired) ❑ Subdivision ❑ Minor ❑ Major ❑ F.esubdivision (Public Hearing Required) ❑ Minor ❑Major ❑ Conditional Approval ❑ Special Exception to Article (Public Hearing, Certified letter to abutters required) ® Site Plan of Development ❑ General Plan of Development ❑ Earth Filling (Sec. 15) and/or Earth Removal (Sec. 14 - Public Hearing required) ❑ Regulation Amendment: ❑ Zoning ❑ Subdivision (Attach proposed amendment) Temporary and Conditional Permit for ❑ Major Home Occupation for ❑ Other(explain in detail) An Application Pending sign is required to be posted on the property for all applications ten (10) days prior to being heard by the Commission. - t � f /Acrent for Applicant . A Qnt for"ig�niatureofnt7 C QF mer Signature of Property Owner (See reverse side for additional information) Drainage Statement Advanced Performance Glass 26 Schweir Road S. Windsor, Connecticut Advanced Performance Glass(APG)is proposing to add a 5,000 S.F. addition to their building on Schweir Road. In addition to the building, there will be additional paved areas along the side and to the rear of the building. The developed areas of the site presently drain to two on-site catch basins that discharge to the Schweir Road drainage system. The Schweir Road drainage system drains to the south to the large wetlands area on the proposed S. Windsor Technology park site. The proposed development will add approximately 0.21 AC. of impervious coverage. The rear area of the site has been used in the past for storage, and parts of the area are hard packed earth. Due to the soils on the site and the shallow groundwater, infiltration of runoff into the soils is not possible. Assuming the rear area presently has a runoff coefficient of 0.5 (packed gravel type base), and a proposed runoff coefficient of 0.9 (paved),the additional 0.21 Ac. of impervious coverage will result in an increase in runoff of 0.5 CFS for a 10 year design storm. The proposed 15" pipe on site to be installed at 0.5% slope has sufficient capacity to handle the runoff from the site. There will be an insignificant increase in runoff from the site. The increase in runoff will be mitigated down stream in the large wetlands area that this area drains to. Standard erosion controls have been designed to be used during construction including silt-fencing down-slope of disturbed areas, and around topsoil stockpiles. Due to the relatively small-disturbed area,and the gradual grades on the site, erosion is not expected to be a problem. � gdM�y �e N 47 o"' C E N SIv' N�,,: i :^ ADVAnCED PEREORMAna GLASS,inn. RECEIVED 26 Schweir Road South Windsor, CT 06074 JUL 3 2002 Tel. (860) 290-8453 • Fax (860) 290-8459 SOUTH WINDSOR PLANNING DEPT. April 3, 2002 Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 - To Whom it May Concern: Please be advised that Peter DeMallie and Design Professionals, Inc. are authorized to act as our agent and sign all applications in the building expansion and land use of 26 Schweir Road. Sincerely, Applicant: Advanced Performance Glass, Inc. Thomas Rooke, President Gary Rooke, ice President Owner: Gator Associates, L C Thomas Rooke, Member Gary Rooke, h4ember t , f An Equal Opportunity Employer DESIGN PROFESSIONALS, INC. RECEIVED civil engineers .planners . surveyors . gis .gps `,'� T�ra�smit�iaMa certified mail SOUTH WIND 0` fNG DEPT. July 3, Dear Current Abutting Property Owner Re: Advanced Performance Glass DPI Project No. 02-1610 26 Schweir Road South Windsor, Connecticut In accordance with regulations of the Planning&Zoning Commission and the Inland Wetlands Agency, we are required to notify you that an application has been filed on the property abutting yours and is subject to a hearing(s)by the Planning&Zoning Commission and the Inland Wetlands Agency. The application and plans are on file with the South Windsor Planning Department in the Town Hall. As an abutting property owner you are invited to the hearing(s)to ask questions and/or give comments, however,you are not required to attend. You may also submit written comments regarding the application(s)prior to the meeting if you so desire. For further information regarding the specific date this application will be heard,please contact Kelli Holmes, Administrative Secretary, Jeffrey Folger, Environmental Planner, or Michele Lipe, Deputy Planning Director, at the South Windsor Planning Department at 644-2511, ext. 253, 229 or 252, respectively. Thank you. Sincerely, DESIGN PROFESSIONALS, INC. r By: 1w—'/a 4, Peter R. De allie Principal cc: Heather Barkyoumb Jeffrey Folger Marcia Banach Galen B. Semprebon, P.E. 165 South Satellite Road, South Windsor, Connecticut 06074 Tel:(860)291-8755 9 Fax: (860)291-8757 DESIGN PROFESSIONALS, INC. RECEIVED civil engineers •planners . surveyors . gis . gps J U L 3 ?0 02 Abutter List SOUTH WINDSOR PLANNING DEPT. Advanced Performance Glass DPI Project No. 02-1610 Mai)/Lot No. Property Owner Mailin Address 110/1 Raymond L. &Barbara M. Hawkes 305 Sullivan Ave. South Windsor, CT 06074 110/19 Michael G. Economos 46 Schweir Road South Windsor,CT 06074 110/21 Theodore F. Srubas, Trustee 1005 Matianuck Ave. Windsot,CT 06095 165 South Satellite Road, South Windsor, Connecticut 06074 Tel: (860)291-8755 •Fax: (860)291-8757 PLANNING DEPARTMENT IN-HOUSE REFERRAL FORM TO: Matt Galligan, Fred Shaw, Michael Gantick, Thomas Field,Bill Lanning, Kris Lindstrom, Ray Favreau, Karl Reichle, Mel Stead, John Collins,Bob Deptula,Jeff Doolittle FROM: Marcia A. Banach, AICP,Director of Planning The Planning&Engineering Departments have received, lans for the following project: WOL q2 P , P Location: ?6 6'Site Plan 0 Subdivision No. Acres Zone ,('Industrial 0 Commercial 0 Residential No. Lots/Units Water: MPublic 0 Private Well Sewerage: Grublic 0 Septic system(s) Project Description: ,UOc) 4� a,r4' Future Town-owned property involved? 0 ANo O new street(s) 0 new detention area 0 new open space/recreation area 0 active 0 passive Planning Department notes: Please comment by and return to the Planning Department. PLANNING DEPARTMENT IN-HOUSE REFERRAL FORM TO: Matt Galligan, Fred Shaw, Michael Gantick, Thomas Field,Bill Lanning, Kris Lindstrom, Ray Favreau, Karl Reichle,Mel Stead, John Collins, Bob Deptula,Jeff Doolittle FROM: Marcia A. Banach, AICP,Director of Planning The Planning &Engineering Departments have received, fans for the following project: *0a- a Location: .2b Site Plan O Subdivision No. Acres Zone jP-Industrial O Commercial O Residential No. Lots/Units Water: MPublic O Private Well Sewerage: tlrublic O Septic system(s) Project Description: Future Town-owned property involved? O A(No O new street(s) O new detention area O new open space/recreation area O active O passive Planning Department notes: Please comment by �� `l�� and return to the Planning Department. +V� �4 Cn h,r-ter;tr PLANNING DEPARTMENT IN-HOUSE REFERRAL FORM TO: Matt Galligan, Fred Shaw, Michael Gantick, Thomas Field,Bill Lanning, Kris Lindstrom, Ray Favreau, Karl Reichle, Mel Stead, John Collins, Bob Deptula, Jeff Doolittle FROM: Marcia A. Banach, AICP, Director of Planning The Planning &Engineering Departments have received. Tans for the following project: Location: 2 Vic{ r ,,,_ 4111cuA 6'Site Plan 0 Subdivision No. Acres Zone ip-Industrial 0 Commercial 0 Residential No. Lots/Units Water: 2Public 0 Private Well Sewerage: r=Wublic 0 Septic system(s) Project Description: �, oUy 4�z C � Future Town-owned property involved? O No O new street(s) 0 new detention area O new open space/recreation area 0 active 0 passive Planning Department notes: Please comment by + `l�� and return to the Planning Department. SOON se4 �i u TIG�� 07 s 1540 SULLIVAN AVENUE• SOUTH WINDSOR,CT 06074-2786 OR.CO AREA CODE 860/644-2511 FAX 860/644-3781 CERTIFIED MAIL August 7, 2002 Mr. Thomas Rooke Gator Associates, LLC 26 Schweir Road South Windsor, CT 06074 Dear Mr. Rooke: Re: Appl#02-42P,Advanced Performance Addition We are pleased to advise you that your application for a site plan amendment has been approved with modifications. This approval is for the construction of a 5,000 square foot addition on property located at 26 Schweir Road, I Zone as shown on plans prepared by Design Professionals Inc., Job No. 1610, dated 5/l/502, as revised. This approval is subject to the following modifications: 1. Prior to commencement of any site work, a meeting must be held with Town Staff. 2. No building permit will be issued until the final mylars have been filed in the Town Clerk's office. 3. An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 8.1.10 of the Zoning Regulations. 4. WPCA approval is not required. 5. Screening of the outdoor storage is required. 6. Dumpsters must be located out of the side yards and are required to be placed on a concrete pad and screened. 7. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. Black and white transparent mylars of Sheet#2 with the above modifications, together with three blueprint copies of the entire set of plans must be submitted to this Commission within 30 days to be stamped and signed. The letter of approval of this Commission must be reproduced on the mylars. After the mylars have been signed by the Commission,they will be returned to you for filing in the Office of the Town Clerk. After filing these plans, a copy of the receipt must be submitted to the Planning Department. Sincerely, Kevin McCann, Chairman Planning and Zoning Commission KMcC/kah cc: Town Engineer Chief Building Official Assessor Superintendent of Pollution Control Fire Marshal Design Professionals, Inc. • r `.. SOy'N 8t4` _ A � n01 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CT 06074 Soe.00 TELEPHONE (860) 644-2511 September 17, 2002 Peter DeMallie Design Professional, Inc. 165 South Satellite Road South Windsor, CT 06074 Re:Preconstruction Meeting—App102-42P, Advanced Performance Glass IN ATTENDANCE Jeff Doolittle TOSW (860) 644-2511 x245 Gary D. Rooke APG (860) 883-4790 Rob Straliss AP (860) 290-2453 Karen Isherwood DPI (860) 291-8755 Jeff Folger TOSW (860) 644-2511 x229 Peter DeMallie DPI (860) 291-8755 Dear Mr. DeMallie: The following is a brief summary of points discussed during the meeting: Erosion and Sedimentation Control 1. All erosion and sedimentation control measures are to be in place prior to earth moving operations in each area and maintained/cleaned out during construction. Call Jeffrey Folger, Zoning/Wetlands Enforcement Officer for inspection when measures are in place, prior to commencement of site work or if any problems/concerns arise during construction. 2. All topsoil stockpile areas to be protected (ringed with haybales or equal). 3. During construction of the parking area and building addition, dust and gravel shall not be trucked out on to the roadway. Any dirt/gravel that is tracked out to the road will be swept up daily. Public Works 1. Three complete sets of approved/revised plans to be provided to Town prior to start of construction. They will be stamped by the Planning Department along with plans developer needs. Only approved plans are to be used on the job site. 2. The Engineering Department is to be notified forty-eight (48) hours prior to the start of major construction work with inspections and testing per Developers Checklist (requested, required) for the following: a. After site is staked out b. All drainage work c. Preparation of subgrade, compaction tests as per Developer's checklist d. Preparation of subbase, six (6) inch lifts e. Placement of bituminous concrete, two (2) inch layers maximum 3. Certification of gravel used as subbase and processed stone for base will be required from an approved testing company. 4. Certification of all products used -- storm pipe, structures, pavement, etc., shall be presented to the Town Engineer prior to installation. 5. Two (2) weeks' notice must be given prior to placing the finish pavement course. This is to allow for inspection and correction measures (if necessary) of the infrastructure,prior to final pavement. 6. Applicant/developer should be aware that the inspection of the infrastructure improvements may result in the replacement of structure tops and/or structures prior to final paving if found to be deficient. 7. No subgrade formationibase in frozen ground/snow. Same for pipe/structure installation. 9. As built plans are to include horizontal and vertical location of all underdrains, footing drains, storm drainage, and sanitary sewers and house service laterals located as per revised as-built checklist. 10. All pipe and structures to be backfilled with free draining material, compacted in maximum one foot lifts with approved compaction equipment or approved equal if deep trench is encountered. Any pipe or structure work requires inspection prior to backfilling. 11. Any problems and/or questions regarding construction of this project will be directed to Gary Rooke in the field at phone number(860) 883-4790. 12. All filling to be done in accordance with Department of Transportation specifications. To be compacted in maximum lifts and tested as necessary. 113. Job meetings will be held as needed, and can be called by the developer or Town. 14 Forty-eight-(48) hours' notice needed for certificate of occupancy inspection. 15. Any proposed changes are to be presented to the Engineering or Planning Department prior to implementation on change order form in quadruplicate with 4 copies of the drawing. Town will attempt to turn around within 24 hours. 16. Normal hours of operation 7:00 a.m. —5:00 p.m., no work on Sunday. 18. No paving after October 15 or before April 15 without written approval from Director of Public Works. 19. Extra care must be taken when compacting around structures such as catch basins and manholes. These spots often become problem areas in the future due to settling, therefore, the town staff/inspectors will be requesting additional compaction tests in these areas. Planning Department 1. Landscaping is to be installed in accordance with the approved landscaping plan. If there are changes required, contact the Planning Dept. Additional landscaping installed on one part of a site will not preclude planting all of the remaining items shown on the landscaping plan. 2. Mylar must be submitted and signed prior to issuance of building permits. 3. Outdoor storage must be screened from public view. SNET/NU 1. Contact utilities for coordination of utilities connection. Fire Marshal 1. Blasting (if required) to be coordinated with the Fire Marshal. Police Services 1. Emergency phone numbers for the duration of the construction must be provided to Police Services on a company letterhead. If the developer occupies or owns the building after construction emergency numbers must be provided to Police Services. 2. All buildings located on property that abuts a public highway must be numbered and visible from the street. All numbering shall comply with Town Ordinance 6-800 through 6-802. Barns, garages, and outbuildings, which are located on the same premises as a numbered structure, are excluded. 3. Erect temporary sign on the site during construction identifying the project. 4. If an alarm is to be installed contact Police Services. Building Department 1. Plan review with Building Official/Fire Marshal required prior to application for building permit. Coordinate with Chief Building Official. Sincerely, Jeffrey Doolittle, P.E. Town Engineer JD/kh cc: Attendance Karl Reichle, Public Works Mel Stead, Public Works John R. Collins, Chief Building Official Fred Shaw, Superintendent of Pollution Control