HomeMy WebLinkAbout02-39P Dynamic Materials Corp Site Plan of Dev Tuwiv +ur' wu trs waivL:�;UX
YLANPi1PIG as ZONIAG COMMISSION t o
APPLICATION FORM N,
Application No:
RECEIVE®
Official Receipt Date: _ .
Receipt No: J O L 3 2002
G_30 C V
APPLICANT: Dynamic Materials Corporation, c% Robert C'$ pL }fly Manag
ADDRESS: 283 Sullivan Avenue, P.O. Box 663, South Windsor,.CT 06074
OWNER OF RECORD ON LAND RECORDS: Same
ADDRESS:
COMPLETE LOCATIOlN OF PROPERTY: 283 Sullivan Avenue at Patric Road
43
ASSESSOR'S MAP # 109 PARCEL# 5 ZONE I
NAME, ADDRESS, TEL& FAX # OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED:
Peter R. DeMallie, Principal Design Professionals, Inc., 165 South Satellite Road,
South Windsor CT 06074 Tel- 291-8755, Fax: 291-8757 ~
THIS APPLICATION IS FOR: (Check all that apply):
❑ Zone Change to (Public Hearing required and Certified letter to abutters required)
❑ Subdivision/Resubdivision ❑ Open Space Subdivision (Public Hearing Required)
Q Subdivision ❑ Minor ❑ Major
❑ Resubdivision (Public Hearing Required) ❑ Minor ❑Major
❑ Conditional Approval
❑ Special Exception to Article (Public Hearing, Certified letter to abutters required)
❑ Site Plan of Development
❑ General Plan of Development
❑ Earth Filling(Sec. 15) and/or Earth Removal (Sec. 14 - Public Hearing required)
❑ Regulation Amendment: ❑ Zoning ❑ Subdivision (Attach proposed amendment)
Temporary and Conditional Permit for
❑ Major Home Occupation for
❑ Other (explain in detail)
An Application Pending sign is required to be posted on the property for all applications ten (10) days
prior to being heard by the Commission.
/&4/Acrent_- for Applicant 11 yzx' A en r
ignature of Applicant /77�
Signature of Property Owner
(See reverse side for additional information)
AMK WELDING Site Plan—Appl.#02-39P
Planning Comments
Zoning Data Table
The tables should reflect two front yards and two side yards.
General Comments
• Is there any landscaping proposed for the project?
• Are there any new dumpsters proposed? There are currently several dumpsters on
site that are not screened that need to be addressed.
• Is there a need for an outdoor storage area proposed? If so, it must be screened
from public ways.
DESIGN PROFESSIONALS, INC.
civil engineers • planners . surveyors . gis .gps
Abutter List
AMK Welding
DPI Project No. 02-1650
Mai)/Lot No. Property Owner Mailine,Address
109/6 David Burnett 47 Patria Road
South Windsor, CT 06074
109/8 Sperry Wood Limited Partnership 777 West Prospect Ave, 1-3
West Hartford, CT 06105
165 South Satellite Road, South Windsor,Connecticut 06074
Tel: (860)291-8755 •Fax: (860)291-8757
DESIGN PROFESSIONALS, INC.
civil engineers .planners . surveyors . gis .gps
Transmitted via certified mail
July 3, 2002
Dear Current Abutting Property Owner
Re: AMK Welding DPI Project No. 02,1650
283 Sullivan Avenue
South Windsor, Connecticut
In accordance with regulations of the Planning&Zoning Commission and the Inland
Wetlands Agency,we are required to notify you that an application has been filed on the property
abutting yours and is subject to a hearing(s)by the Planning&Zoning Commission and the Inland
Wetlands Agency. The application and plans are on file with the South Windsor Planning
Department in the Town Hall.
As an abutting property owner you are invited to the hearing(s)to ask questions and/or
give comments,however,you are not required to attend. You may also submit written comments
regarding the application(s)prior to the meeting if you so desire. For further information
regarding the specific date this application will be heard, please contact Kelli Holmes,
Administrative Secretary, Jeffrey Folger, Environmental Planner, or Michele Lipe,Deputy
Planning Director, at the South Windsor Planning Department at 644-2511, ext. 253, 229 or 252,
respectively. Thank you.
Sincerely,
DESIGN PROFESSIONALS, INC.
By:
eter R. DeMallie
Principal
cc: Robert C. Sanborn
Jeffrey Folger
Marcia Banach
Galen B. Semprebon, P.E.
165 South Satellite Road, South Windsor,Connecticut 06074
Tel:(860)291-8755 •Fax:(860)291-8757
C-F!V`D
e 8 ,102
�r SOUTH WINUSOk PLANNfNG DEPT.
July,3,2002
Town of South Windsor
1540 Sullivan Avenue
South Windsor,CT 06074
To Whom It May Concern:
Please be advised Peter DeMallie and Design Professionals,Inc. are authorized to act as our agent
and sign all land use applications in the building expansion of 283 Sullivan Avenue,South
Windsor, CT.
Sincerely,
Robert Sanborn
AMK Welding
Division of Dynamic Materials Corp.
283 Sullivan Avenue
South Windsor,CT 06074
i
283 Sullivan Avenue South Windsor,CT 06074 Phone 860 289-5634 Fax 860 528-2472
T •a 71u7_o--;Pc_na0 ZulDTOM NWH do* :?_n zn Rn tnr
MEMORANDUM a , r
To: Marcia Banach, Director of Planning JUL 1 72002
Jeff Folger, Environmental Planner SOUTHWItVDSOR pLAIVNINGD p)
From: Jeffrey B. Doolittle, P.E., Town Engineer
Date: 7/17/02911`1
RE: App 02-39P,AMK Welding Site Plan Modification
I have reviewed the above modification of a Site Plan for AMK Welding located at 283 Sullivan
Avenue and have the following comments.
1. The grading in the parking lot is such that surface flow is directed to the west. Will surface
water from the parking lot flow off the west edge of the pavement and then south to the
"settling basin"? If so, show a shallow swale in this area. If not, suggest the west edge of
pavement be curbed. Please clarify the route of surface flow.
2. Where does water go from the existing CB in the southern part of the parking lot? Show
more information for this structure.
3. Where will the roof leaders be located for the proposed addition and where will this water
drain?
4. Where will the dumpster pad be located?
5. What is the rectangle with an X through it that is located immediately west of the proposed
addition?
6. How will the mitigation area be constructed? Provide details for this. Suggest this area be
left a few inches lower than the surrounding ground to detain stormwater.
Please call me if you have any questions.
PLANNING DEPARTMENT
IN-HOUSE REFERRAL FORM
TO: Matt Galligan, Fred Shaw, Michael Gantick, Thomas Field,Bill Lanning, Kris Lindstrom,
Ray Favreau, Karl Reichle, Mel Stead, John Collins,Bob Deptula,Jeff Doolittle
FROM: Marcia A. Banach, AICP, Director of Planning
The Planning &Engineering Departments have received.plans for the following project:
J
Location: ° �1(,�C1, An
R1 Site Plan O Subdivision No. Acres 90,5 a 0 Zone T
I�J Industrial O Commercial O Residential No. Lots/Units
Water: J7 Public O Private Well Sewerage:0 Public O Septic system(s)
Project Description: �� '
Future Town-owned property involved? O Yes 7 No
O new street(s) O new detention area
O new open space/recreation area O active O passive
Planning Department notes:
Please comment by 7f'`i,� �- and return to the Planning Department.
PLANNING DEPARTMENT
IN-HOUSE REFERRAL FORM
TO: Matt Galligan, Fred Shaw, Michael Gantick, Thomas Field,Bill Lanning, Kris Lindstrom,
Ray Favreau, Karl Reichle, Mel Stead, John Collins,Bob Deptula,Jeff Doolittle
FROM: Marcia A. Banach, AICP, Director of Planning
The Planning &Engineering Departments have received.plans for the following project:
G.) - I
Location:
j Site Plan O Subdivision No. Acres 90,Sa v Zone
Industrial 0 Commercial C3 Residential No. Lots/Units
Water: J7 Public O Private Well Sewerage:X1 Public O Septic system(s)
Project Description:` tt.ci � 1 -c,L
Future Town-owned property involved? O Yes q No
O new street(s) 0 new detention area
O new open space/recreation area O active O passive
Planning Department notes:
Please comment by ���`1��r and return to the Planning Department.
DESIGN PROFESSIONALS, INC.
civil engineers .planners . surveyors . gis
August 27,2002
Town of South Windsor
1540 Sullivan Ave.
South Windsor,Ct 06074
Attn:Mr.Jeff Folger
Environmental Planner
Re:AMK Welding
Dear Jeff
We have revised the above referenced plans in response to your comments.
Please review the enclosed,and call with any questions or comments,or if you need additional information.
Sincerely,
Galen Semprebon,P.E.
CC: Marcia Banach,Director of Planning
v
AW 2 72002
SOUTH WINDSOR PLANNING OEPT,
September 5, 2002
Certified#70020510000081152260
Design Professionals, Inc.
Attn: Mr. Peter DeMallie
165 South Satellite Road
South Windsor, CT 06074
RE: Appl. #02-39P—AMK Welding—easterly of Patria Road and southerly of Sullivan
Avenue(Assessors Map#121 & 109, parcels 43 & 5) I zone
Dear Mr. DeMallie:
At the September 4, 2002 regular meeting, the Inland Wetlands Agency/Conservation
Commission approved application#02-39P—AMK Welding—283 Sullivan Avenue—Inland
Wetlnad/Conservation Commission application for the construction of an addition to an existing
building and parking lot, stormwater strctures, and associated improvements on property located
easterly fo Patria Road and southerly of Sullivan Avenue (Assessor's Map #121 & 109,parcels
43 & 5) I, Industrial zone. This approval is subject to the following conditions:
1. One blueprint copy of the entire set of plans and this letter reproduced thereon, must be
submitted to this Commission. This must be completed within 65 days of approval prior
to any construction activity on the site. Plans submitted to Planning&Zoning
Commission shall be considered having met this requirement.
2. The application shall indemnify and hold harmless the Town of South Windsor against
any liability, which might result from the proposed operation or use.
3. The permit is valid for five years and shall expire on September 4, 2007. It is the
landowner(s)/applicant(s)responsibility to track expiration dates and notify the
Commission of a renewal request at least 65 days prior to expiration.
4. All approvals required must be obtained and submitted prior to any activity on the site.
5. A contact person shall be identified on the plans.
6. The wet meadow area shall be mowed only once a year and will be after September 1.
AMK Welding
September 5, 2002
Page 2
7. We recommend a bond in the amount of$2,500 be submitted to the Planning&Zoning
Commission to ensure compliance with the Erosion and Sedimentation Control
Measures.
Very truly yours,
INLAND WETLANDS AGENCY/
CONSERVATION COMMISSION
Elizabeth A. Warren, Chairperson
EW:dr
cc: Chief Building Official
Town Engineer
AMK Welding
Appl #02-39, AMK Welding Site Plan
9-10-02
Planning Department Report
1. Request for approval for a site plan modification to add approximately 7,000
square feet to their existing building located at 283 Sullivan Ave., I zone.
Maximum impervious coverage allowed is 65%, 54.7% proposed. Proposed
building height is 19.7 feet; 40 feet allowed. Lot size is 90,520 sf minimum lot
size allowed is 20,000 sf. Frontage is 215.8 feet; minimum allowed is 100 feet.
Front yard setback is 50 feet, 35 feet allowed.
2. The addition is proposed off the rear of the existing building. The current
driveways as they exists will service the new addition.
3. There is currently a variety of things being stored outside the facility. Our
understanding is that everything will be brought inside the building with this
addition, and that there is no need for any outdoor storage.
4. Parking requirements for the manufacturing use on this property is 29 spaces.
The applicant is providing 31 spaces (including two handicap spaces).
5. The new addition will be approximately 2 feet higher than the existing building,
and will match the color and materials.
The ADRC had the following comments:
• Landscaping proposed must be shown on the plans - they suggested the
addition of a couple of maple trees along the Patria Road frontage.
• Roof hardware should blend in as much as possible — the applicant has
proposed a couple of options for his Commission to consider. He has
submitted a diagram as to its location and color.
• Lighting must be addressed to make sure that the lighting is adequate
6. The plans sow that the only new lighting being added is two fixtures on the
building and a note has been added indicating a minimum lighting level at with
the full cutoff fixtures.
7. There is no new signage proposed for the site.
8. There are regulated wetlands on the property. The applicant receive IWA/CC
approval on 9/5/02, with the recommendation of a $2,500.00 bond and no other
unusual approval conditions.
9. Water and sewer are available to the property. Water Pollution Control
Authority approval is required.
10.There are showing a new dumpster location (combining the existing dumpster
on site) which will be on a concrete pad, screened.
11.If this application is approved, there are no additional modifications requested.
t�rlN df�
0
} -0- 0-1 �
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074-2786
��OSoe•co AREA CODE 860/644-2511
FAX 860/644-3781
CERTIFIED MAIL
September 16, 2002
Dynamic Materials Corporation
c/o Robert C. Sanborn, General Manager
283 Sullivan Avenue
P.O. Box 663
South Windsor, CT 06074
Dear Mr. Sanborn:
Re: Appl #02-39P, AMK Welding Site Plan Modification
We are pleased to advise you that the Planning &Zoning Commission voted on September 10, 2002 to approve
with modifications the above referenced application for a Site Plan of Development. This approval is for the
construction of a 7,200 sf addition on property located at 283 Sullivan Avenue, I Zone as shown on plans
prepared by Design Professionals, Inc. Job No. 1650, dated June 27, 2002, as revised. This approval is subject
to the following modifications:
1. Prior to commencement of any site work, a meeting must be held with Town Staff.
2. No building permit will be issued until the final mylars have been filed in the Town Clerk's office.
3. This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation
Commission, including a bond in the amount of$2,500.00.
4. An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 8.1.10 of the Zoning
Regulations.
5. Footing drains are required if the building has a basement.
6. Landscape bond in the amount of$1,000.00 required and must be submitted prior to filing of mylars.
7. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of
South Windsor.
8. WPCA approval is required.
9. If a State Traffic Commission certificate is required, no building permits will be issued until the certificate
has been issued (per CGS § 14-311).
10. The building street number must be included on the final plan.
11. Engineering comments dated September 10, 2002, must be addressed to the satisfaction of the Town
Engineer.
12. Landscaping plan must reflect two additional maple trees to be planted.
Black and white transparent mylars of Sheet#2 with the above modifications, together with three blueprint
copies of the entire set of plans must be submitted to this Commission within 30 days to be stamped and signed.
The letters of approval of this Commission as well as the Inland Wetlands Agency/Conservation Commission
must be reproduced on the mylars.
After the mylars have been signed by the Commission, they will be returned to you for filing in the Office of the
Town Clerk. After filing these plans, a copy of the receipt must be submitted to the Planning Department.
Very truly yours,
Kevin McCann, Chairman
Planning and Zoning Commission
KMcC/kah
cc: Town Engineer
Chief Building Official
Assessor
Superintendent of Pollution Control
Fire Marshal
Design Professionals, Inc.
Sep , 6 - 2002 11 :01AM Pelletier Builders Inc No.4310 P. 1/5
Pelletier Builders inc
138 Main Street, Coventry, Conn. 06238
Phone (860) 742-5317 Ext. 122 Fax(860) 742-8734
FAX COVER SHEET
DATE: 9/6/02 5 P.AGES TOTAL
TO: Michelle PHONE: (860)644-2511
FAX (860) 644-7280
FROM: David Johnson ec:Petear DeMallie,Robert Sanborn
RE: AMK Welding, South Windsor, CT
MESSAGE
Michelle,
These drawings show the location and approximate size of the chiller unit that will be mounted on
the roof. We are proposing to have the unit painted to match the building after it is in puce to
minimize the visual impact. The picture attached to sheet A-2 shows the chiller unit.
If you Dave any questions,please do not hesitate to contact me.
Thanks,
David Jo n
Project Manager, Pelletier Builders inc
MEMORANDUM SEP 1 u2002
To: Marcia Banach, Director of Planning SOUI'H �Iti1GSU
Jeff Folger, Environmental Planner
From: Jeffrey B. Doolittle, P.E., Town Engineer
Date: 9/10/02
RE: App 02-39P, AMK Welding Site Plan Modification
I have reviewed the modified Site Plan for AMK Welding (revised 8/27/02) located at 283 Sullivan
Avenue. All of my previous comments have been addressed, however I have the following
question.
1. What is the status of the monitoring well shown where the proposed addition will be built? Is
this being used for active monitoring? What will happen to this monitoring well before the
proposed addition is constructed? Will it be decommissioned and abandoned or removed?
Provide a note on the plan regarding the future of this monitoring well.
Please call me if you have any questions.
�40YIN af4
Tiown Ole
• 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074
soR-co TELEPHONE (860) 644-2511
October 11, 2002
Dynamic Materials Corporation
c/o Robert C. Sanborn, General Manager
283 Sullivan Avenue
P. O. Box 663
South Windsor, CT 06074
Re: Preconstruction Meeting—Appl 02-39P AMK Welding
Dear Mr. Sanborn:
IN ATTENDANCE
Arron Peterson Pelletier Builders Inc. (860) 742-5317 x331
Robert C. Sanborn AMK Welding (860) 289-5634
Galen Semprebon Design Professionals (860) 291-8755
Peter R. DeMallie Design Professionals (860) 291-8755
Judy A. Schuler Design Professionals (860) 291-8755
Michele Lipe TOSW (860) 644-2511 x252
Tom Field Police Department (860) 642-6211
Jeff Doolittle TOSW (860) 644-2511 x245
Jeff Folger TOSW (860) 644-2511 x229
The following is a brief summary of points discussed during the meeting:
Erosion and Sedimentation Control
1. All erosion and sedimentation control measures are to be in place prior to earth moving
operations in each area and maintained/cleaned out during construction. Call Jeffrey
Folger, Zoning/Wetlands Enforcement Officer for inspection when measures are in place,
prior to commencement of site work or if any problems/concerns arise during
construction.
2. All topsoil stockpile areas to be protected(ringed with haybales or equal).
3. During construction of the road/driveway a crushed stone tracking pad is to be installed
and maintained to minimize tracking of dirt/gravel on to Sullivan Avenue and Patria
Road. Calcium chloride or water is to be used for dust control as required.
f. rr i
7
Public Works
1. Three complete sets of approved/revised plans to be provided to Town prior to start of
construction. They will be stamped by the Planning Department along with plans
developer needs. Only approved plans are to be used on the job site.
2. The Engineering Department is to be notified forty-eight (48) hours prior to the start of
major construction work with . inspections and testing per Developers Checklist
(requested, required) for the following:
a. After site is staked out
b. All drainage work
c. Preparation of subgrade, compaction tests as per Developer's checklist
d. Preparation of subbase, six (6) inch lifts
e. Placement of bituminous concrete, two (2) inch layers maximum
3. Certification of gravel used as subbase and processed stone for base will be required from
an approved testing company.
4. Certification of all products used -- storm pipe, structures, pavement, etc., shall be
presented to the Town Engineer prior to installation.
5. Two (2)weeks' notice must be given prior to placing the finish pavement course. This is to
allow for inspection and correction measures (if necessary) of the infrastructure, prior to
final pavement.
6. No subgrade formation/base in frozen ground/snow. Same for pipe/structure installation.
7. As built plans are to include horizontal and vertical location of all underdrains, footing
drains, and sanitary sewers and house service laterals located as per revised as-built
checklist.
8. All pipe and structures to be backfilled with free draining material, compacted in maximum
one foot lifts with approved compaction equipment or approved equal if deep trench is
encountered. Any pipe or structure work requires inspection prior to backfilling.
9. Any problems and/or questions regarding construction of this project will be directed to
Arron Peterson with Pelletier Builders, Inc,.in the field at phone#(860) 208-6402.
10. Job meetings will be held as needed, and can be called by the developer or Town.
11. Forty-eight-(48) hours' notice needed for certificate of occupancy inspection.
f
12. Any proposed changes are to be presented to the Engineering or Planning Department prior
to implementation on change order form in quadruplicate with 4 copies of the drawing.
Town will attempt to turn around within 24 hours.
13. Normal hours of operation 7:00 a.m.—5:00 p.m., no work on Sunday.
14. No paving after October 15 or before April 15 without written approval from Director of
Public Works.
15. A drain layers permit must be taken from the Town of South Windsor Engineering
Department prior to working on the sanitary sewer laterals/connections.
16. Sanitary lateral locations should be tied down to existing structures and shown on the as-
builts.
Planning Department
1. Landscaping is to be installed in accordance with the approved landscaping plan. If there
are changes required, contact the Planning Dept. Additional landscaping installed on one
part of a site will not preclude planting all of the remaining items shown on the
landscaping plan.
2. Mylar must be filed after WPCA approval is granted.
3. WPCA approval is required.
SNET/NU
1. Contact utilities for coordination of utilities connection.
Fire Marshal
1. Blasting (if required) to be coordinated with the Fire Marshal.
Police Services
1. Emergency phone numbers for the duration of the construction must be provided to Police
Services on a company letterhead. If the developer occupies or owns the building after
construction emergency numbers must be provided to Police Services.
2. All buildings located on property that abuts a public highway must be numbered and
visible from the street. All numbering shall comply with Town Ordinance 6-800 through
6-802.
Barns, garages, and outbuildings, which are located on the same premises as a numbered
structure, are excluded..
3. Erect temporary sign on the site during construction identifying the project.
4. If an alarm is to be installed contact Police Services.
Building Department
1. Plan review with Building Official/Fire Marshal required prior to application for building
permit. Coordinate with Chief Building.Official.
Sincerely,
/��"
Michele R. Lipe, AICP
Assistant Director of Planning
MRL/kah
cc: Karl Reichle,Public Works
Mel Stead,Public Works
John R. Collins, Chief Building Official
Fred Shaw, Superintendent of Pollution Control
CL&P
SNET
a
N
O
0
}
O
5 N
1
CD
\ \ CD
Q
iPELLETIER BUILDERS, inc.
COMMERCIAL&iNDUSTRkAL CONTRACTOR t�0, DATE;w
138 MAIN STREET COVENTRY, CT 06238 0
TEL. (860)742-5317 FAX. (860)742-8734
DR,4WN FQR www.pel Ierierbu i Ide rs.oom
: -o
AM WELDING
SOUTH 1NINDSQR, CT
SG,4
�-�' DATE:NONE q-5-02 17E
N 8Y: DYVG. TITLE:
K05A Ex 15TI N6 AND NEkq mmmm� vE o
A � PLAN
�=
��■ "�
wwl
I � A >. f ' •
.�:� �..�....Vic,;. + � w����! ♦ �.r
W
lk
ik --- -
_ r
PELLETIER BUILDERS, inc.
•
r
COMMERCIAL • i'138 MAIN STREET COVENTRY,CT !
06238 _
:6f :. !
www
Ipellerierbuitders.com
PRAV4N FOR;
AM K
WELDI N G
SOUTH ! i '
C7. TITLE:
r • EX15TIN6 AND NEN ELEVATIONS.
mnmrxi
UP 11 BEER
1p
IYpII IINIIIIIIOINNINpH�yI�pINpp�
III III�YtlIIIMI .........
— 111n Ilul _ KMDERM �
Sep . 6 . 2002`11 : 02AM'Pelletier Builders Inc No ,4310—P , 5/5—�---
n EASTIN6 MUWINs
OF RELa
M
CIIAINI.INIC
iqaIGe ENCLO JM
FLOOR PLAN
%AL i NOW J�►
� ~ ��w/ [� �sV I�I G CW •
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074
OR.CO TELEPHONE (860) 644-2511
November 15,2002 E' U V 2 2 0-2
Design Professionals,Inc. P
165 South Satellite Road
South Windsor,CT 06074
Attn: Galen Semprebon
RE: AMK Welding
283 Sullivan Avenue, South Windsor, CT
Dear Mr. Semprebon:
The South Windsor Water Pollution Control Authority,at its regular meeting of November 6,2002,gave
approval for the connection of an additional lateral to the Town's sewerage system of a commercial
building at 283 Sullivan Avenue,South Windsor,CT as more specifically shown on plans entitled
"Topographic Plan—AMK Welding"prepared by Design Professionals,CT,Project No. 1650,dated 6-27-
02,with revisions dated 7-29-02, 8-19-02, 8-27-02, 10-04-02 and subject to the following conditions:
1. A minimum slope of 1%is required for the new connection.
2. Technical approval of the Town Engineering Department.
2. Final Authority approval and acceptance of the sanitary sewerage connection will be given once
the sewer line has been installed and inspected by the Town staff,and based upon the written
verification of the Town staff that said sanitary sewer line was installed in substantial conformance
with the design plans previously approved by the Authority,and meeting all Town regulations and
appropriate technical specifications relating to sanitary sewer construction.
This approval letter must be superimposed on the final approval plans.
Very truly yours,
�GYit-�iv�0
Josdfh J.Carino, Chairman
Water Pollution Control Authority
JJC:dd
Cc: Matthew Galligan,Town Manager
Michael J.Gantick,Director of Public Works
Jeff Doolittle,Town Engineer
Marcia Banach,Director of Planning
John Collins,Chief Building Inspector
Dynamic Materials Corp.
BOND RELEASE TRANSMITTAL
DATE:_ 4 10�-
APPLICANT NAME }' tti Ira✓ Y, 04--
ADDRESS
r
PROJECT LOCATION/ADDRESS �g �U } �t t� /Ayc LOT
P&Z OR IWA/CC APPLICATION NUMBERO� —�ot P
SUB ACCOUNT NUMBER
ORIGINAL BOND AMOUNT Sy✓J .
Please release the bond indicated above as all of the required
work has been completed.
NAME DATE
�305
CHECK # ISSUED DATE
H:\Planning Depm1ment\Ho1mes\forms\B0ND RELEASE TRANSNHTTAL 08-27-0I.dec
BOND RELEASE TRANSMITTAL
DATE• �I I�s
APPLICANT NAME 6,�- a
ADDRESS a2 3 A,,
&ifq--, S ,, c--, 0� a� y
PROJECT LOCATION/ADDRESS , LOT
�C
P&Z OR IWA/CC APPLICATION NUMBER
SUB ACCOUNT NUMBER So O
ORIGINAL BOND AMOUNT 600,
Please release the bond indicated above as all of the required
. work has been completed.
NAME DATE'
3o(, $r a 1 a S BY —
CHECK # ISSUED DATE
H:\Planning Depactment\Holmes\forms\BOND RELEASE TRANSMITTAL 08-27-01.doe
q0*N SF4
co
7_0�E'
afi 01P slou �
m �
wC, 1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074
Sox co TELEPHONE (860) 644 2511
August 2, 2005
Mr. Robert Sanborn
AMK Welding
283 Sullivan Ave.
South Windsor, CT 06074
Re: Appl# 02-39P, AMK Welding
Dear Mr. Sanborn:
This is to "advise-you that the Planning and Zoning Commission voted on July 26, 2005 to release the
landscaping bond for the above-referenced project in the amount of$2,500. The Commission has also
voted to release the landscaping bond in the amount of$1,000.
A check will be sent to you from .the'Town of South Windsor. If you have any further questions please
contact the Planning Department at 644-2511, ext. 253. Thank you.
Sincerely,
Timothy�HWntzell, Chairman
Planning and Zoning Commission
THW/rfs
cc: Town Engineer
RECEIVED
C AMK Welding JUL 8 2005
GROUPE SNPE SOUTH WINDSOR PLANNING DEPT.
July 5, 2005
Town Hall
1540 Sullivan Avenue
South Windsor, CT 06074
Attention: Town Planner, Town of South Windsor, 03_'J�l P
Please close out escrow account 941773291000024 for$2500.00 and 941773291000025 for
$1000.00. Please include any accrued interest made payable to AMK Welding.
Sincerely,
Robert Sanborn
General Manager
283 Sullivan Avenue South Windsor, CT 06074 ■ Phone 860 289-5634 Fax 860 528-2472
TOWN OF SOUTH WINDSOR
STAFF SITE CHANGE
FOR SITE & SUBDIVISION
GENERAL:
CHANGE ORDER CONTACT PERSON Galen SaWebon, P.*B* Phone No. 860-291 755
Address Design Professionals, Inc, 165 g.Satellite RkSouth WirAwr, CT 06074 �
Site Name P&Z No. 02-39P
Owner ANK Welding Phone No. 2 9 5634
Contractor Pelletier ftilders
Signature of Owner Date: ` `
Signature of Design Engr. ;- Date: f "
CHANGE: (Describe location and nature of change. Include
Four (4 ) copies of plan/profile of Change. )
Eliminate curb on south side of additional paved area.
Reason for Change: (Why is change required)
Cab not needed to oontrol storm runoff. Not installing curb helped in transition
of 9rddes betwom parwent and natural grade and w*tlanft
APPROVALS: (As Re uire )
Dir. Of Planning Date: NO
Town Engineer Datel
Dir. of Public W" rks Date:
Other: Date �E r
STAFF CO E TS: _✓`
.,�",�, �iSn W�' f� r A s f � 3` t;.u, �� S"r'-�^e ai�,/,t�•� +C.-�u^5
White Town Engineer Yellow - Applicant
Pink Director of Planning Goldenrod - Engineering Department