Loading...
HomeMy WebLinkAbout02-39P Dynamic Materials Corp Site Plan of Dev Tuwiv +ur' wu trs waivL:�;UX YLANPi1PIG as ZONIAG COMMISSION t o APPLICATION FORM N, Application No: RECEIVE® Official Receipt Date: _ . Receipt No: J O L 3 2002 G_30 C V APPLICANT: Dynamic Materials Corporation, c% Robert C'$ pL }fly Manag ADDRESS: 283 Sullivan Avenue, P.O. Box 663, South Windsor,.CT 06074 OWNER OF RECORD ON LAND RECORDS: Same ADDRESS: COMPLETE LOCATIOlN OF PROPERTY: 283 Sullivan Avenue at Patric Road 43 ASSESSOR'S MAP # 109 PARCEL# 5 ZONE I NAME, ADDRESS, TEL& FAX # OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED: Peter R. DeMallie, Principal Design Professionals, Inc., 165 South Satellite Road, South Windsor CT 06074 Tel- 291-8755, Fax: 291-8757 ~ THIS APPLICATION IS FOR: (Check all that apply): ❑ Zone Change to (Public Hearing required and Certified letter to abutters required) ❑ Subdivision/Resubdivision ❑ Open Space Subdivision (Public Hearing Required) Q Subdivision ❑ Minor ❑ Major ❑ Resubdivision (Public Hearing Required) ❑ Minor ❑Major ❑ Conditional Approval ❑ Special Exception to Article (Public Hearing, Certified letter to abutters required) ❑ Site Plan of Development ❑ General Plan of Development ❑ Earth Filling(Sec. 15) and/or Earth Removal (Sec. 14 - Public Hearing required) ❑ Regulation Amendment: ❑ Zoning ❑ Subdivision (Attach proposed amendment) Temporary and Conditional Permit for ❑ Major Home Occupation for ❑ Other (explain in detail) An Application Pending sign is required to be posted on the property for all applications ten (10) days prior to being heard by the Commission. /&4/Acrent_- for Applicant 11 yzx' A en r ignature of Applicant /77� Signature of Property Owner (See reverse side for additional information) AMK WELDING Site Plan—Appl.#02-39P Planning Comments Zoning Data Table The tables should reflect two front yards and two side yards. General Comments • Is there any landscaping proposed for the project? • Are there any new dumpsters proposed? There are currently several dumpsters on site that are not screened that need to be addressed. • Is there a need for an outdoor storage area proposed? If so, it must be screened from public ways. DESIGN PROFESSIONALS, INC. civil engineers • planners . surveyors . gis .gps Abutter List AMK Welding DPI Project No. 02-1650 Mai)/Lot No. Property Owner Mailine,Address 109/6 David Burnett 47 Patria Road South Windsor, CT 06074 109/8 Sperry Wood Limited Partnership 777 West Prospect Ave, 1-3 West Hartford, CT 06105 165 South Satellite Road, South Windsor,Connecticut 06074 Tel: (860)291-8755 •Fax: (860)291-8757 DESIGN PROFESSIONALS, INC. civil engineers .planners . surveyors . gis .gps Transmitted via certified mail July 3, 2002 Dear Current Abutting Property Owner Re: AMK Welding DPI Project No. 02,1650 283 Sullivan Avenue South Windsor, Connecticut In accordance with regulations of the Planning&Zoning Commission and the Inland Wetlands Agency,we are required to notify you that an application has been filed on the property abutting yours and is subject to a hearing(s)by the Planning&Zoning Commission and the Inland Wetlands Agency. The application and plans are on file with the South Windsor Planning Department in the Town Hall. As an abutting property owner you are invited to the hearing(s)to ask questions and/or give comments,however,you are not required to attend. You may also submit written comments regarding the application(s)prior to the meeting if you so desire. For further information regarding the specific date this application will be heard, please contact Kelli Holmes, Administrative Secretary, Jeffrey Folger, Environmental Planner, or Michele Lipe,Deputy Planning Director, at the South Windsor Planning Department at 644-2511, ext. 253, 229 or 252, respectively. Thank you. Sincerely, DESIGN PROFESSIONALS, INC. By: eter R. DeMallie Principal cc: Robert C. Sanborn Jeffrey Folger Marcia Banach Galen B. Semprebon, P.E. 165 South Satellite Road, South Windsor,Connecticut 06074 Tel:(860)291-8755 •Fax:(860)291-8757 C-F!V`D e 8 ,102 �r SOUTH WINUSOk PLANNfNG DEPT. July,3,2002 Town of South Windsor 1540 Sullivan Avenue South Windsor,CT 06074 To Whom It May Concern: Please be advised Peter DeMallie and Design Professionals,Inc. are authorized to act as our agent and sign all land use applications in the building expansion of 283 Sullivan Avenue,South Windsor, CT. Sincerely, Robert Sanborn AMK Welding Division of Dynamic Materials Corp. 283 Sullivan Avenue South Windsor,CT 06074 i 283 Sullivan Avenue South Windsor,CT 06074 Phone 860 289-5634 Fax 860 528-2472 T •a 71u7_o--;Pc_na0 ZulDTOM NWH do* :?_n zn Rn tnr MEMORANDUM a , r To: Marcia Banach, Director of Planning JUL 1 72002 Jeff Folger, Environmental Planner SOUTHWItVDSOR pLAIVNINGD p) From: Jeffrey B. Doolittle, P.E., Town Engineer Date: 7/17/02911`1 RE: App 02-39P,AMK Welding Site Plan Modification I have reviewed the above modification of a Site Plan for AMK Welding located at 283 Sullivan Avenue and have the following comments. 1. The grading in the parking lot is such that surface flow is directed to the west. Will surface water from the parking lot flow off the west edge of the pavement and then south to the "settling basin"? If so, show a shallow swale in this area. If not, suggest the west edge of pavement be curbed. Please clarify the route of surface flow. 2. Where does water go from the existing CB in the southern part of the parking lot? Show more information for this structure. 3. Where will the roof leaders be located for the proposed addition and where will this water drain? 4. Where will the dumpster pad be located? 5. What is the rectangle with an X through it that is located immediately west of the proposed addition? 6. How will the mitigation area be constructed? Provide details for this. Suggest this area be left a few inches lower than the surrounding ground to detain stormwater. Please call me if you have any questions. PLANNING DEPARTMENT IN-HOUSE REFERRAL FORM TO: Matt Galligan, Fred Shaw, Michael Gantick, Thomas Field,Bill Lanning, Kris Lindstrom, Ray Favreau, Karl Reichle, Mel Stead, John Collins,Bob Deptula,Jeff Doolittle FROM: Marcia A. Banach, AICP, Director of Planning The Planning &Engineering Departments have received.plans for the following project: J Location: ° �1(,�C1, An R1 Site Plan O Subdivision No. Acres 90,5 a 0 Zone T I�J Industrial O Commercial O Residential No. Lots/Units Water: J7 Public O Private Well Sewerage:0 Public O Septic system(s) Project Description: �� ' Future Town-owned property involved? O Yes 7 No O new street(s) O new detention area O new open space/recreation area O active O passive Planning Department notes: Please comment by 7f'`i,� �- and return to the Planning Department. PLANNING DEPARTMENT IN-HOUSE REFERRAL FORM TO: Matt Galligan, Fred Shaw, Michael Gantick, Thomas Field,Bill Lanning, Kris Lindstrom, Ray Favreau, Karl Reichle, Mel Stead, John Collins,Bob Deptula,Jeff Doolittle FROM: Marcia A. Banach, AICP, Director of Planning The Planning &Engineering Departments have received.plans for the following project: G.) - I Location: j Site Plan O Subdivision No. Acres 90,Sa v Zone Industrial 0 Commercial C3 Residential No. Lots/Units Water: J7 Public O Private Well Sewerage:X1 Public O Septic system(s) Project Description:` tt.ci � 1 -c,L Future Town-owned property involved? O Yes q No O new street(s) 0 new detention area O new open space/recreation area O active O passive Planning Department notes: Please comment by ���`1��r and return to the Planning Department. DESIGN PROFESSIONALS, INC. civil engineers .planners . surveyors . gis August 27,2002 Town of South Windsor 1540 Sullivan Ave. South Windsor,Ct 06074 Attn:Mr.Jeff Folger Environmental Planner Re:AMK Welding Dear Jeff We have revised the above referenced plans in response to your comments. Please review the enclosed,and call with any questions or comments,or if you need additional information. Sincerely, Galen Semprebon,P.E. CC: Marcia Banach,Director of Planning v AW 2 72002 SOUTH WINDSOR PLANNING OEPT, September 5, 2002 Certified#70020510000081152260 Design Professionals, Inc. Attn: Mr. Peter DeMallie 165 South Satellite Road South Windsor, CT 06074 RE: Appl. #02-39P—AMK Welding—easterly of Patria Road and southerly of Sullivan Avenue(Assessors Map#121 & 109, parcels 43 & 5) I zone Dear Mr. DeMallie: At the September 4, 2002 regular meeting, the Inland Wetlands Agency/Conservation Commission approved application#02-39P—AMK Welding—283 Sullivan Avenue—Inland Wetlnad/Conservation Commission application for the construction of an addition to an existing building and parking lot, stormwater strctures, and associated improvements on property located easterly fo Patria Road and southerly of Sullivan Avenue (Assessor's Map #121 & 109,parcels 43 & 5) I, Industrial zone. This approval is subject to the following conditions: 1. One blueprint copy of the entire set of plans and this letter reproduced thereon, must be submitted to this Commission. This must be completed within 65 days of approval prior to any construction activity on the site. Plans submitted to Planning&Zoning Commission shall be considered having met this requirement. 2. The application shall indemnify and hold harmless the Town of South Windsor against any liability, which might result from the proposed operation or use. 3. The permit is valid for five years and shall expire on September 4, 2007. It is the landowner(s)/applicant(s)responsibility to track expiration dates and notify the Commission of a renewal request at least 65 days prior to expiration. 4. All approvals required must be obtained and submitted prior to any activity on the site. 5. A contact person shall be identified on the plans. 6. The wet meadow area shall be mowed only once a year and will be after September 1. AMK Welding September 5, 2002 Page 2 7. We recommend a bond in the amount of$2,500 be submitted to the Planning&Zoning Commission to ensure compliance with the Erosion and Sedimentation Control Measures. Very truly yours, INLAND WETLANDS AGENCY/ CONSERVATION COMMISSION Elizabeth A. Warren, Chairperson EW:dr cc: Chief Building Official Town Engineer AMK Welding Appl #02-39, AMK Welding Site Plan 9-10-02 Planning Department Report 1. Request for approval for a site plan modification to add approximately 7,000 square feet to their existing building located at 283 Sullivan Ave., I zone. Maximum impervious coverage allowed is 65%, 54.7% proposed. Proposed building height is 19.7 feet; 40 feet allowed. Lot size is 90,520 sf minimum lot size allowed is 20,000 sf. Frontage is 215.8 feet; minimum allowed is 100 feet. Front yard setback is 50 feet, 35 feet allowed. 2. The addition is proposed off the rear of the existing building. The current driveways as they exists will service the new addition. 3. There is currently a variety of things being stored outside the facility. Our understanding is that everything will be brought inside the building with this addition, and that there is no need for any outdoor storage. 4. Parking requirements for the manufacturing use on this property is 29 spaces. The applicant is providing 31 spaces (including two handicap spaces). 5. The new addition will be approximately 2 feet higher than the existing building, and will match the color and materials. The ADRC had the following comments: • Landscaping proposed must be shown on the plans - they suggested the addition of a couple of maple trees along the Patria Road frontage. • Roof hardware should blend in as much as possible — the applicant has proposed a couple of options for his Commission to consider. He has submitted a diagram as to its location and color. • Lighting must be addressed to make sure that the lighting is adequate 6. The plans sow that the only new lighting being added is two fixtures on the building and a note has been added indicating a minimum lighting level at with the full cutoff fixtures. 7. There is no new signage proposed for the site. 8. There are regulated wetlands on the property. The applicant receive IWA/CC approval on 9/5/02, with the recommendation of a $2,500.00 bond and no other unusual approval conditions. 9. Water and sewer are available to the property. Water Pollution Control Authority approval is required. 10.There are showing a new dumpster location (combining the existing dumpster on site) which will be on a concrete pad, screened. 11.If this application is approved, there are no additional modifications requested. t�rlN df� 0 } -0- 0-1 � 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074-2786 ��OSoe•co AREA CODE 860/644-2511 FAX 860/644-3781 CERTIFIED MAIL September 16, 2002 Dynamic Materials Corporation c/o Robert C. Sanborn, General Manager 283 Sullivan Avenue P.O. Box 663 South Windsor, CT 06074 Dear Mr. Sanborn: Re: Appl #02-39P, AMK Welding Site Plan Modification We are pleased to advise you that the Planning &Zoning Commission voted on September 10, 2002 to approve with modifications the above referenced application for a Site Plan of Development. This approval is for the construction of a 7,200 sf addition on property located at 283 Sullivan Avenue, I Zone as shown on plans prepared by Design Professionals, Inc. Job No. 1650, dated June 27, 2002, as revised. This approval is subject to the following modifications: 1. Prior to commencement of any site work, a meeting must be held with Town Staff. 2. No building permit will be issued until the final mylars have been filed in the Town Clerk's office. 3. This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission, including a bond in the amount of$2,500.00. 4. An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 8.1.10 of the Zoning Regulations. 5. Footing drains are required if the building has a basement. 6. Landscape bond in the amount of$1,000.00 required and must be submitted prior to filing of mylars. 7. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 8. WPCA approval is required. 9. If a State Traffic Commission certificate is required, no building permits will be issued until the certificate has been issued (per CGS § 14-311). 10. The building street number must be included on the final plan. 11. Engineering comments dated September 10, 2002, must be addressed to the satisfaction of the Town Engineer. 12. Landscaping plan must reflect two additional maple trees to be planted. Black and white transparent mylars of Sheet#2 with the above modifications, together with three blueprint copies of the entire set of plans must be submitted to this Commission within 30 days to be stamped and signed. The letters of approval of this Commission as well as the Inland Wetlands Agency/Conservation Commission must be reproduced on the mylars. After the mylars have been signed by the Commission, they will be returned to you for filing in the Office of the Town Clerk. After filing these plans, a copy of the receipt must be submitted to the Planning Department. Very truly yours, Kevin McCann, Chairman Planning and Zoning Commission KMcC/kah cc: Town Engineer Chief Building Official Assessor Superintendent of Pollution Control Fire Marshal Design Professionals, Inc. Sep , 6 - 2002 11 :01AM Pelletier Builders Inc No.4310 P. 1/5 Pelletier Builders inc 138 Main Street, Coventry, Conn. 06238 Phone (860) 742-5317 Ext. 122 Fax(860) 742-8734 FAX COVER SHEET DATE: 9/6/02 5 P.AGES TOTAL TO: Michelle PHONE: (860)644-2511 FAX (860) 644-7280 FROM: David Johnson ec:Petear DeMallie,Robert Sanborn RE: AMK Welding, South Windsor, CT MESSAGE Michelle, These drawings show the location and approximate size of the chiller unit that will be mounted on the roof. We are proposing to have the unit painted to match the building after it is in puce to minimize the visual impact. The picture attached to sheet A-2 shows the chiller unit. If you Dave any questions,please do not hesitate to contact me. Thanks, David Jo n Project Manager, Pelletier Builders inc MEMORANDUM SEP 1 u2002 To: Marcia Banach, Director of Planning SOUI'H �Iti1GSU Jeff Folger, Environmental Planner From: Jeffrey B. Doolittle, P.E., Town Engineer Date: 9/10/02 RE: App 02-39P, AMK Welding Site Plan Modification I have reviewed the modified Site Plan for AMK Welding (revised 8/27/02) located at 283 Sullivan Avenue. All of my previous comments have been addressed, however I have the following question. 1. What is the status of the monitoring well shown where the proposed addition will be built? Is this being used for active monitoring? What will happen to this monitoring well before the proposed addition is constructed? Will it be decommissioned and abandoned or removed? Provide a note on the plan regarding the future of this monitoring well. Please call me if you have any questions. �40YIN af4 Tiown Ole • 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 soR-co TELEPHONE (860) 644-2511 October 11, 2002 Dynamic Materials Corporation c/o Robert C. Sanborn, General Manager 283 Sullivan Avenue P. O. Box 663 South Windsor, CT 06074 Re: Preconstruction Meeting—Appl 02-39P AMK Welding Dear Mr. Sanborn: IN ATTENDANCE Arron Peterson Pelletier Builders Inc. (860) 742-5317 x331 Robert C. Sanborn AMK Welding (860) 289-5634 Galen Semprebon Design Professionals (860) 291-8755 Peter R. DeMallie Design Professionals (860) 291-8755 Judy A. Schuler Design Professionals (860) 291-8755 Michele Lipe TOSW (860) 644-2511 x252 Tom Field Police Department (860) 642-6211 Jeff Doolittle TOSW (860) 644-2511 x245 Jeff Folger TOSW (860) 644-2511 x229 The following is a brief summary of points discussed during the meeting: Erosion and Sedimentation Control 1. All erosion and sedimentation control measures are to be in place prior to earth moving operations in each area and maintained/cleaned out during construction. Call Jeffrey Folger, Zoning/Wetlands Enforcement Officer for inspection when measures are in place, prior to commencement of site work or if any problems/concerns arise during construction. 2. All topsoil stockpile areas to be protected(ringed with haybales or equal). 3. During construction of the road/driveway a crushed stone tracking pad is to be installed and maintained to minimize tracking of dirt/gravel on to Sullivan Avenue and Patria Road. Calcium chloride or water is to be used for dust control as required. f. rr i 7 Public Works 1. Three complete sets of approved/revised plans to be provided to Town prior to start of construction. They will be stamped by the Planning Department along with plans developer needs. Only approved plans are to be used on the job site. 2. The Engineering Department is to be notified forty-eight (48) hours prior to the start of major construction work with . inspections and testing per Developers Checklist (requested, required) for the following: a. After site is staked out b. All drainage work c. Preparation of subgrade, compaction tests as per Developer's checklist d. Preparation of subbase, six (6) inch lifts e. Placement of bituminous concrete, two (2) inch layers maximum 3. Certification of gravel used as subbase and processed stone for base will be required from an approved testing company. 4. Certification of all products used -- storm pipe, structures, pavement, etc., shall be presented to the Town Engineer prior to installation. 5. Two (2)weeks' notice must be given prior to placing the finish pavement course. This is to allow for inspection and correction measures (if necessary) of the infrastructure, prior to final pavement. 6. No subgrade formation/base in frozen ground/snow. Same for pipe/structure installation. 7. As built plans are to include horizontal and vertical location of all underdrains, footing drains, and sanitary sewers and house service laterals located as per revised as-built checklist. 8. All pipe and structures to be backfilled with free draining material, compacted in maximum one foot lifts with approved compaction equipment or approved equal if deep trench is encountered. Any pipe or structure work requires inspection prior to backfilling. 9. Any problems and/or questions regarding construction of this project will be directed to Arron Peterson with Pelletier Builders, Inc,.in the field at phone#(860) 208-6402. 10. Job meetings will be held as needed, and can be called by the developer or Town. 11. Forty-eight-(48) hours' notice needed for certificate of occupancy inspection. f 12. Any proposed changes are to be presented to the Engineering or Planning Department prior to implementation on change order form in quadruplicate with 4 copies of the drawing. Town will attempt to turn around within 24 hours. 13. Normal hours of operation 7:00 a.m.—5:00 p.m., no work on Sunday. 14. No paving after October 15 or before April 15 without written approval from Director of Public Works. 15. A drain layers permit must be taken from the Town of South Windsor Engineering Department prior to working on the sanitary sewer laterals/connections. 16. Sanitary lateral locations should be tied down to existing structures and shown on the as- builts. Planning Department 1. Landscaping is to be installed in accordance with the approved landscaping plan. If there are changes required, contact the Planning Dept. Additional landscaping installed on one part of a site will not preclude planting all of the remaining items shown on the landscaping plan. 2. Mylar must be filed after WPCA approval is granted. 3. WPCA approval is required. SNET/NU 1. Contact utilities for coordination of utilities connection. Fire Marshal 1. Blasting (if required) to be coordinated with the Fire Marshal. Police Services 1. Emergency phone numbers for the duration of the construction must be provided to Police Services on a company letterhead. If the developer occupies or owns the building after construction emergency numbers must be provided to Police Services. 2. All buildings located on property that abuts a public highway must be numbered and visible from the street. All numbering shall comply with Town Ordinance 6-800 through 6-802. Barns, garages, and outbuildings, which are located on the same premises as a numbered structure, are excluded.. 3. Erect temporary sign on the site during construction identifying the project. 4. If an alarm is to be installed contact Police Services. Building Department 1. Plan review with Building Official/Fire Marshal required prior to application for building permit. Coordinate with Chief Building.Official. Sincerely, /��" Michele R. Lipe, AICP Assistant Director of Planning MRL/kah cc: Karl Reichle,Public Works Mel Stead,Public Works John R. Collins, Chief Building Official Fred Shaw, Superintendent of Pollution Control CL&P SNET a N O 0 } O 5 N 1 CD \ \ CD Q iPELLETIER BUILDERS, inc. COMMERCIAL&iNDUSTRkAL CONTRACTOR t�0, DATE;w 138 MAIN STREET COVENTRY, CT 06238 0 TEL. (860)742-5317 FAX. (860)742-8734 DR,4WN FQR www.pel Ierierbu i Ide rs.oom : -o AM WELDING SOUTH 1NINDSQR, CT SG,4 �-�' DATE:NONE q-5-02 17E N 8Y: DYVG. TITLE: K05A Ex 15TI N6 AND NEkq mmmm� vE o A � PLAN �= ��■ "� wwl I � A >. f ' • .�:� �..�....Vic,;. + � w����! ♦ �.r W lk ik --- - _ r PELLETIER BUILDERS, inc. • r COMMERCIAL • i'138 MAIN STREET COVENTRY,CT ! 06238 _ :6f :. ! www Ipellerierbuitders.com PRAV4N FOR; AM K WELDI N G SOUTH ! i ' C7. TITLE: r • EX15TIN6 AND NEN ELEVATIONS. mnmrxi UP 11 BEER 1p IYpII IINIIIIIIOINNINpH�yI�pINpp� III III�YtlIIIMI ......... — 111n Ilul _ KMDERM � Sep . 6 . 2002`11 : 02AM'Pelletier Builders Inc No ,4310—P , 5/5—�--- n EASTIN6 MUWINs OF RELa M CIIAINI.INIC iqaIGe ENCLO JM FLOOR PLAN %AL i NOW J�► � ~ ��w/ [� �sV I�I G CW • 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 OR.CO TELEPHONE (860) 644-2511 November 15,2002 E' U V 2 2 0-2 Design Professionals,Inc. P 165 South Satellite Road South Windsor,CT 06074 Attn: Galen Semprebon RE: AMK Welding 283 Sullivan Avenue, South Windsor, CT Dear Mr. Semprebon: The South Windsor Water Pollution Control Authority,at its regular meeting of November 6,2002,gave approval for the connection of an additional lateral to the Town's sewerage system of a commercial building at 283 Sullivan Avenue,South Windsor,CT as more specifically shown on plans entitled "Topographic Plan—AMK Welding"prepared by Design Professionals,CT,Project No. 1650,dated 6-27- 02,with revisions dated 7-29-02, 8-19-02, 8-27-02, 10-04-02 and subject to the following conditions: 1. A minimum slope of 1%is required for the new connection. 2. Technical approval of the Town Engineering Department. 2. Final Authority approval and acceptance of the sanitary sewerage connection will be given once the sewer line has been installed and inspected by the Town staff,and based upon the written verification of the Town staff that said sanitary sewer line was installed in substantial conformance with the design plans previously approved by the Authority,and meeting all Town regulations and appropriate technical specifications relating to sanitary sewer construction. This approval letter must be superimposed on the final approval plans. Very truly yours, �GYit-�iv�0 Josdfh J.Carino, Chairman Water Pollution Control Authority JJC:dd Cc: Matthew Galligan,Town Manager Michael J.Gantick,Director of Public Works Jeff Doolittle,Town Engineer Marcia Banach,Director of Planning John Collins,Chief Building Inspector Dynamic Materials Corp. BOND RELEASE TRANSMITTAL DATE:_ 4 10�- APPLICANT NAME }' tti Ira✓ Y, 04-- ADDRESS r PROJECT LOCATION/ADDRESS �g �U } �t t� /Ayc LOT P&Z OR IWA/CC APPLICATION NUMBERO� —�ot P SUB ACCOUNT NUMBER ORIGINAL BOND AMOUNT Sy✓J . Please release the bond indicated above as all of the required work has been completed. NAME DATE �305 CHECK # ISSUED DATE H:\Planning Depm1ment\Ho1mes\forms\B0ND RELEASE TRANSNHTTAL 08-27-0I.dec BOND RELEASE TRANSMITTAL DATE• �I I�s APPLICANT NAME 6,�- a ADDRESS a2 3 A,, &ifq--, S ,, c--, 0� a� y PROJECT LOCATION/ADDRESS , LOT �C P&Z OR IWA/CC APPLICATION NUMBER SUB ACCOUNT NUMBER So O ORIGINAL BOND AMOUNT 600, Please release the bond indicated above as all of the required . work has been completed. NAME DATE' 3o(, $r a 1 a S BY — CHECK # ISSUED DATE H:\Planning Depactment\Holmes\forms\BOND RELEASE TRANSMITTAL 08-27-01.doe q0*N SF4 co 7_0�E' afi 01P slou � m � wC, 1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074 Sox co TELEPHONE (860) 644 2511 August 2, 2005 Mr. Robert Sanborn AMK Welding 283 Sullivan Ave. South Windsor, CT 06074 Re: Appl# 02-39P, AMK Welding Dear Mr. Sanborn: This is to "advise-you that the Planning and Zoning Commission voted on July 26, 2005 to release the landscaping bond for the above-referenced project in the amount of$2,500. The Commission has also voted to release the landscaping bond in the amount of$1,000. A check will be sent to you from .the'Town of South Windsor. If you have any further questions please contact the Planning Department at 644-2511, ext. 253. Thank you. Sincerely, Timothy�HWntzell, Chairman Planning and Zoning Commission THW/rfs cc: Town Engineer RECEIVED C AMK Welding JUL 8 2005 GROUPE SNPE SOUTH WINDSOR PLANNING DEPT. July 5, 2005 Town Hall 1540 Sullivan Avenue South Windsor, CT 06074 Attention: Town Planner, Town of South Windsor, 03_'J�l P Please close out escrow account 941773291000024 for$2500.00 and 941773291000025 for $1000.00. Please include any accrued interest made payable to AMK Welding. Sincerely, Robert Sanborn General Manager 283 Sullivan Avenue South Windsor, CT 06074 ■ Phone 860 289-5634 Fax 860 528-2472 TOWN OF SOUTH WINDSOR STAFF SITE CHANGE FOR SITE & SUBDIVISION GENERAL: CHANGE ORDER CONTACT PERSON Galen SaWebon, P.*B* Phone No. 860-291 755 Address Design Professionals, Inc, 165 g.Satellite RkSouth WirAwr, CT 06074 � Site Name P&Z No. 02-39P Owner ANK Welding Phone No. 2 9 5634 Contractor Pelletier ftilders Signature of Owner Date: ` ` Signature of Design Engr. ;- Date: f " CHANGE: (Describe location and nature of change. Include Four (4 ) copies of plan/profile of Change. ) Eliminate curb on south side of additional paved area. Reason for Change: (Why is change required) Cab not needed to oontrol storm runoff. Not installing curb helped in transition of 9rddes betwom parwent and natural grade and w*tlanft APPROVALS: (As Re uire ) Dir. Of Planning Date: NO Town Engineer Datel Dir. of Public W" rks Date: Other: Date �E r STAFF CO E TS: _✓` .,�",�, �iSn W�' f� r A s f � 3` t;.u, �� S"r'-�^e ai�,/,t�•� +C.-�u^5 White Town Engineer Yellow - Applicant Pink Director of Planning Goldenrod - Engineering Department