Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
South Windsor Health Care Center IWACC
TOWN OF SOUTH WINDSOR RECEIVED INLAND WETLANDS, WATERCOURSES AND CONSERVATION APPLIC O �� p3 2002 Application # 612--3 V f Date Received t9 R d.1- South Vvsnasor INLAND WETLANDS AGENCY INSTRUCTIONS CONSERVATION COMMISSION 1. One application (1) with map and plans (2 copies)) shall be submitted together with the fee set forth in the Inland Wetlands, Watercourses and Conservation Regulations, Town of South Windsor. (See Regulations, Section VII -X) . 2. The South Windsor Inland Wetlands, Watercourses and Conservation Regulations should be reviewed with respect to the standards and criteria for application Evaluation. (See Regulations, Sections VII - X) 3. The applicant understands that this application is to be considered complete only when all information and documents required by the Agency have been submitted. The applicant shall also complete the state filing form. A. Applicant's Name: Sarais on ruct-i can Co Tnr Address: 825-E Cromwell Ave. Rocky Hill CT 06067 Phone: (home) (work) (860 )257-8580 (fan) (860 )257-8220 B. Legal owner's name: Wolf-Guerra, LLC Address 989 Ellington Road, South Windsor, CT 06074 Phone (home) (work) 289-7929 (fax) (List additional owners, addresses, and phone numbers on back of application) C. If the applicant is not the owner of the subject property; a letter by the owner(s) authorizing the proposed regulated activity set forth in the application- must accompany this form and will be part of the application. D. Project Name (if any) South Windsor Health Care Center 1. Contact Person (if further information is needed) Patrick Carraher 860-633-8770 Anchor Engineering, Services (work) (fax) 860-633-5971 E. The geographical location of the property which is to be affected by the proposed regulated activities including a description of the land in sufficient detail to allow identification of the property on the Inland Wetland and Watercourse Map. Assessor's map # 38 Parcel # 10 Zone GD 7 F. Names of all abutting property owners from records in Town Clerk's office. (use separate sheet if necessary) see Attached List G. Have you notified all abutting property owners (from records in Town Clerk's office) by certified letter that an application is pending before the Agency? Yes ** (you are required to supply a copy of the letter with the list of the names of the abutters).** -I. .Purpoise and descript;on of all proposed regulated activity(s) including amount of disturbance in square feet and types of fill and the time element involved: Construction of Medical office buildings and associated parking and driveways. I. A class A-2 map of the property drawn to 1" 40', showing the area to be developed, extent of the wetlands and watercourses affected, topography, existing and proposed activities and names and locations of adjacent property owners must be submitted. J. Amount of regulated area disturbance and types of fill (including wetlands and regulated buffers). 5 e A7-r-de_t4 i�� t7p,5 c K. Acreage of wetlands and watercourses in regulated areas to be altered: 3 g t G��s L. Acreage of wetlands and watercourses to be created: _I 1 o M. Lineal feet of proposed stream alteration: None N. Total land area of project and percentage which is wetlands: 11 .73 acres 5.97 Acres Wetlands --------------- - 11 .73 acre site - 50 .9% wetlands O. Identify all other permits or approvals that have been issued, applied for, or required with respect to the proposed activity set forth in this application. (These may include but not be limited to, local Planning & Zoning, Zoning Board of Appeals, D.E.P., F.E.M.A., D.O.T., The Army Corps of Engineers, and any other State, Local or Federal Permits.)Planning + Zoning, Army Corps or Engineers P. The applicant (or designated representative) hereby attests that a sign will be posted at the following location(s) 252 Buckland Road 8 By Applicant Name Sargis Construction Co. Inc on or before the following date As directed by Town staff Signature: These signs must be displayed continuously for at least ten (10) days prior to scheduled meeting (see Regulations, Section 7.3a) The undersigned hereby applies for the regulated activities listed in paragraph H above, for a Inland Wetlands, Watercourses and Conservation permit for the property described herein and confirms that: 1. She/he is familiar with the currently effective Inland Wetlands, Watercourses and Conservation Regulations of the Town of South Windsor. 2. She/he understands that at any time during the review period, the Agency may require the applicant to provide more information about the wetlands and/or watercourses in question and/or any proposed activity. 3. All information submitted in the application for review shall be considered factual, or in the case of anticipated activity, binding. A knowing failure he applicant or any of her/his agents to provide correct information, or performance exceeding the levels of activity anticipated, shall be sufficient grounds for revocation of any permit under these regulations. 4. By making this application, the applicant gives permission to the Inland Wetlands, Watercourses and Conservation Commission members and/or its representative to enter. the portions of the premises which are subject of the application for the purpose of inspection and investig tion and otherwise evaluating the merits of the applic t' n bo b ore and er final decision has been issued. r Signatur of Ow er of Prope Date Signature of App scant Date •/2 - oZ 9 South Windsor Health Care Center 252 Buckland Road South Windsor, CT 06074 INLAND WETLANDS, WATERCOURSES AND CONSERVATION APPLICATION Purpose and description of all proposed regulated activities: The Sargis Construction Company, Inc. in agreement with the site owner, Wolf Guerra, LLC propose to construct a health care center with associated parking and driveways in accordance with the requirements of the Town of South Windsor Planning and Zoning regulations. The total site area is 11.73 acres of which 5.97 acres (50.9%)has been delineated as inland wetland soils. The site has been used for agricultural purposes for many of the preceding years. As a part of this application, the developer proposes to mitigate development impacts to the existing wetlands by restoring the remaining wetlands to a higher value and function than they currently serve under agricultural use. Further the plan proposes to enhance existing wetlands by planting a diverse mix of wetland plant species. And finally the plan proposes to create new wetland areas to further mitigate the impacts to existing wetlands. Wetland delineations and environmental assessments have been prepared by Rema Ecological Services, Inc. Types of fill to be used in the development of parking drives and building areas are bank run gravel, structural fill, processed aggregate road base and bituminous concrete and concrete pavements. The following table outlines the amount of site disturbance to inland wetlands, and the proposed mitigations described above: Total site area = 11.73 acres = 510,958 SF Area of Inland Wetlands = 5.97 acres = 260,053 SF -- -- Area of regulated buffers = 2.22 acres = 96,800 SF Site%wetlands = 50.9 % Area of Wetlands to be altered by development=2.06 acres= 89,733 SF Area of Wetlands to be altered by enhancement= 1.75 acres =76,000 SF Total area of wetlands altered = 3.81 acres= 165,733 SF Area of wetlands to be restored = 2.05 acres= 89,298 SF Area of wetlands to be created = 1.10 acres=48,160 SF Net Wetland loss = 0.96 acres=41,817 SF Net Wetland restored, enhanced and created= 5.01 acres =218,236 SF ceW" sty ' `� !' wys a,—/� .Ci • U 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 '~OSOR-Co TELEPHONE (860) 644-2511 To: Anchor Engineering 75 Nutmeg Lane Glastonbury, CT 06033 From: Jeffrey H. Folger—Environmental Planner/Conservation Officer Date: June 18, 2002 Re: App. #02-34P - Review of the proposed South Windsor Health Center- Plans dated 6/12/02. I have reviewed the proposed plan with the following initial comments: The plans are not certified A-2. A professional engineer and a surveyor should certify them. An anti-tracking pad should be shown on the plans. Perimeter erosion controls are missing from the northern portion of the site associated with the 19,000-sqft building. They should be shown on the plans. A swale is proposed to be constructed along the northern portion of the site. This structure should have erosion controls placed at intervals along the length to prevent erosive cutting of the Swale bottom. Planting details for the swale nee to be submitted for review. The erosion control narrative is obscuring site information on page 5 of the plans. A drainage report has not been submitted for review by the Town Engineer. The project description is incorrect. Please include all proposed buildings shown on the plans. No erosion controls are proposed for the excavation on the eastern portion of the site. Trap hoods should be installed in proposed catch basins to capture floatables entering the storm system. Item#6 on the erosion narrative calls for temporary sediment pools to be installed. None are shown on the plan. } MEMORANDUM To: Jeffrey Folger, Environmental Planner/Conservation Officer CC: Marcia Banach, Director.of Planning From: Jeffrey B. Doolittle, P.E., Town Engineer en Date: 6/26/02 RE: App 02-34P, South Windsor Health Care Center I have reviewed the site plan (dated 6/21/02) for the South Windsor Health Care Center on Buckland Road and I have the following comments. 1. There is not A-2 Certification by a Licensed Surveyor on these plans. ✓2 The number of parking spaces required is not included on the Title Sheet. 3. The following surrounding properties are not listed correctly: 3a. The small parcel on the south west comer of this site does not have the current owners, and this property needs to be incorporated into Lot 1 (the lot line between them removed). There is an abutting property on the south east corner that is not listed. ,3c. The abutting property listed as N/F Johnny&Anne M. Jacques is not current. 3d. The Messiah Evangelical Lutheran Church has two abutting lots on the northern side. The lot lines between all abutting lots should be shown for clarity. �! I do not think Lot 3 will be allowed as it has no street frontage and there is no access easement. 5. On the Landscape plan, many of the plant symbols shown are not listed in the key. -The- tour--elevations should be turned off-on-this-plan. d 6. The Utilities & Drainage Plan does not show any utilities going into this site. The water, sewer, gas, electrical, telephone, cable and any other utilities need to be shown from the street to the buildings. Any off site sewer or drainage work needs to be included. 7. The proposed drainage system does not appear to be complete. Flar6d ends and rip rap plunge pools need to be shown in the detention basins. Why are there two drainage pipes crossing the driveway? The contours in the detention basins are not all labeled: What is the purpose of the small northern most detention basin?\Sggral of the catch basins should be relocated slightly for optimum performance and ease of maintenance. Additional catch basins may be required. CB #4 and #8 look like larger sedimentations structures. What are these structures? Where are the Roo!/Leaders and Foundation Drains and where will they discharge? r r 8. 1 have not received a drainage report or any hydraulic analysis to review so I can not check the sizing of pipes, placement of catch basins or sizing of the detention basins. Why are SNET poles 24, 25, 26 and 27 being moved? What are Note No. 2 and the Area of Taking Map Ref No. 4.? 10.The grading plan needs some revisions such as show contour 157 on the east side of the northerly building andLshow spot grades to verify there are not flat spots to the east of the buildings and in corner's of the parking lot. I believe the maximum grade allowable in HC parking areas is 2% in any direction. 11.Were any test pits or soil borings made on this site. This information needs to be included. 1 . !'strongly recommend underdrains and/or curtain drains be installed on the east side of the parking areas to catch water coming off the hill to the east. These can be piped to the nearest catch basins. 13. 1 have questions about the site layout. Why does the driveway begin at 36 foot width and narrow to 24 foot width? This should be a uniform width. Are all paved areas curbed? There should be a buffer strip or wider walk where there are parking spaces up against walks. What is the rectangle with corner elevations of 158.2, in the pavement to the south of the building on Lot 1? Are the walks concrete or bituminous? Will the sidewalk be flush with the pavement by the HC parking spaces? Will curb stops be provided? All lanes should be at least 24 feet wide. Parking spaces are shown as 9' x 18' which does not meet town standards. 4nclude a note that all construction shall be in conformance with the Town of South Windsor Public Improvement Specifications.4 In general these plans do not appear to be complete. I am available to sit down the Engineer to review my comments on these plans. Please call me (x 245) if you have any-- questions. "OWN 8f, y a sou 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 �OSOR-CONS TELEPHONE (860) 644-2511 To: Anchor Engineering 75 Nutmeg Lane Glastonbury, CT 06033 From: Jeffrey H. Folger—Environmental Planner/Conservation Officer Date: June 27, 2002 Re: App. #02-34P - Review of the proposed South Windsor Health Center- Plans dated 6/12/02. I have reviewed the proposed plan with the following additional comments: To date, we have not received an environmental assessment of the wetlands present, or the proposed mitigation scheme. Details of the proposed planting plan should be provided. These should include seed and plant types and quantities, and planting bed details. The plan shows excavated areas at the toe of the slope on the eastern portion of the site. How will those areas be accessed? What measures will be proposed to minimize disturbance to wetland areas in between? Item #6 of the.Sediment control requirements mentions utilizing temporary sediment pool when de-watering excavations. Please provide a detail of the temporary sediment pool with the appropriate outlet. The soil types shown on the plans are incorrect. Enfield and Tisbury soils are not wetland soils. Temporary and permanent seeding types, rates, and dates need to be shown on the plan. The sequence of construction does not include the installation of the proposed detention basins. These should be installed and stabilized prior to stormwater being diverted into them. This should appear in the sequence narrative. CC. Dir. Of Planning Town Engineer Inland Wetland/Conservation Commission RECEIVED JUL 10 Z002 ' SOUTH WINDSOR PLANNING DEPT, Stormwater Management Report ' for South Windsor Healthcare Center 1 July 2002 1 1 ' Anchor Engineering Services, Inc. 75 Nutmeg Lane Glastonbury, Connecticut 06033 ' Tel: (860) 633-8770 Fax: (860) 633-5971 ' Table of Contents ' A. Project Description B. Existing Drainage System 1 C. Proposed Drainage System ' D. Erosion and Sedimentation Control Plan ' Appendices ' I. Drainage Area Map II. Drainage Computations III. Detention Basin Computations (Pond Pack Report) Project Description Sargis Construction is proposing the subdivision of an 11.73-acre parcel of land located to the East of Buckland Road in South Windsor, Connecticut. The existing ' parcel is in the Gateway Development Zone and will be subdivided to create three separate, conforming lots. Lot 1 is 5.07 acres and will be developed to create the ' South Windsor Healthcare Center. Lot 2 is 4.30 acres with the potential for future ' commercial or industrial development and Lot_3 is'736.acres and will be attached to the abutting property now or formerly of Johnny &Ann A Jacques to the east of the ' existing site. Existing Drainage On-Site drainage is indicative of the existing soil types, which have been determined through test pit observation and available soil type maps of Hartford County. The eastern third of the property consists of steep slopes and relatively ' well-drained soils. The middle third of the existing site is designated as wetland soils, which are poorly drained, and finally the western third of the property ' consists of well-drained soils. Stormwater is handled on site through sheet flow and channel flow to an existing outfall located along Buckland road on the ' western property line of the existing site. The existing outfall is a 24" reinforced concrete flared end which leads to an existing drainage system to the west of the ' property. ' Proposed Drainage The proposed drainage system has been designed in accordance with the Town of South Windsor Regulations, current engineering practices, and the need to meet a zero net increase in stormwater runoff from the site. Drainage structures and pipes have been designed to sufficiently pass a 25-year frequency storm without ' overtopping and the detention basins have been designed to store a 100-year storm event with zero net increase in runoff to the existing drainage system. Drainage has been designed and provided on the proposed site to accommodate ' runoff generated by undeveloped lands, developed areas, and groundwater flows. All stormwater runoff generated.from the undeveloped lands on the east side of Lots t1 and 2 will be diverted to the north by means of grass swales. The swales lead to a 15" reinforced concrete flared end located at the northwest corner of Lot 2. This ' water will then be directed to the existing outfall without the need for treatment, which eliminates extra costs and additional site work necessary with treatment. All ' developed areas such as buildings, sidewalks, paved areas, etc. will be directed through a system of drainage structures, treatment structures, and detention basins. ' Groundwater flows will be intercepted at the east side of the developed areas through underdrains. These underdrains will be connected to the existing drainage system. ' Sediment carried with the first inch of stormwater runoff will be handled in a multiple step process. The two main drainage systems proposed on the site will be ' routed through Vortechnics Stormwater Treatment Systems, which have been designed to accommodate all flows within the system during a 25-year storm event. Any sediment not removed by the Vortechnics System will be directed to a detention basin. Each on-site detention basin has been designed to store the first inch of ' stormwater generated by proposed impervious surfaces before it enters the existing outfall. Therefore, with proper maintenance of the Vortechnics stormwater ' treatment structures and detention basins, sediments generated by the proposed development should not enter the existing drainage system. ' Erosion & Sediment Control Plan The potential impact of the project on the surrounding areas is related to the temporary transport of soils and sediments associated with the construction phases of the project. The impact of the project on the surrounding areas will be controlled ' as follows: 1. All erosion and sediment control measures will be installed at the project site ' prior to construction. ' 2. An Anti-Tracking Apron will be installed at the entrance to the construction site in order to prevent the transport of sediments off the construction site by ' truck and construction equipment traffic. ' 3. An erosion control system will be installed around the construction area as detailed on the site plan. 4. All catch basins within the project area will be protected with hay bales ' throughout the construction period. These hay bales will remain in place until the areas disturbed during the construction phase are stabilized. 5. An erosion control system shall be installed around all on-site stockpiles of ' soil. 6. Dust control measures shall be applied throughout the construction period ' and until all disturbed areas have been stabilized. ...� 'C C d� � � � � � � � � � � � � � � � � � S � ' Appendix 11 1 1 1 1 1 1 PIPE FLOW ANALYSIS -25 YEAR Prepared for: South Windsor Medical Center Location: South Windsor,CT 5/28/02 Z n > C D C m C D -n -n < � m m C D p Z -n N m 0 Do m p r- c z p Z C D T m { N = m 0 _ < = 2 m r- Cn m p Z D z m m -n < D O 3 CO m m m G1 z m 0 n -� _> j z m CA o m m Z m N .- Ul m m D MIN. MIN. MIN. 1 ACRES 1 1 IN./HR. C.F.S. INCHES 1 FEET FT/FT FT/S C.F.S. FT/S .................:id::::::ac:•a::ra:::i_ :<: . . R:.. ?:>? i'<';:?:i;i;: iiE` i25:8:i: :;:::;issi3i`:`;.''i: <t _._.. ......._.: ...... ::::.:.:::.:....::.:::.:::::::::..::, Yard Drain 61.2 6.71 0.30 2.01 YD-bet#2 0.62 61.82 2.01 2.10 4.23 15 160 0.007 4.32 4.68 0.90 3.82 1.132 6.015 CB#1 5.0 0.78 0.90- 0.70 CB#1-CB#2 0.43 5.43 0.70 6.70 06 18 102 0.005 3.98 6.44 0.73 3.64 1.092 0.015 CB#2 5.0 0.36 0.90 0.32 CB#2-CB#3 0.45 5.45 1.03 6.70 - 6.87 24 118 0.005 4.41 13.86 0.50 4.41 1.000 0.015 CB#3 5.0 0.65 0.48 0.31 - . 17 CB#3-CB#4 0.63 5.63 1.34 6 70 - 8.96 24 7 0.005 4.70 13.86 0.65 4.41 1.065 0.015 Roof 5.0 _ 0 33 0 90 0.30 _._• - - - -. Roof-CB#4 0.23 5.23 0.30 6.70 1.99 0.030 5.77 1.81 1.10 5.20 1.111 0.015 CB#4 5.0 0.35 0.90 0.32 --- -Vor#1 0.02 5.64 1.95 6.70 13.07- 24 5 0.005 5.02 13.86 CB#4 0.94 4.41 1.137 0.015 _ . Vor#1-Det#1 13.07 24 20 0.006 5.44 15.19 0.86 4.83 1.125 0.015 Det#1 17.0 0.48 0 30 0.14 - - Det#1_-Det#2 0.27 17.27 2.09 4 40 9.21 24 75 0.005 T 4.71 13.86 0.66 4.41 1.068 0.015 . - --- CB#5 5.0 -Gm 0 90 0 29- _ __ CB#5-CB#6 0.19 5.19 0.29 6 70 1.93 12 35 0.005 3.14 2.18 0.88 2.78 1.129 0.015 CB#6 5.0 0.29 0 90 0.26 - - - - -''CB#6-bet#1 0.12 5.19 0.55 6.70 3.68 15 30 0.007 4.23 4.68 0.79 3.82 1.109 0.015 CB#7 5.0 _ 0.30 0.90 0.27 CB#7-CB#8 1.06 6.06 0.27 6.70 1 81 12 197 0.005 3.11 2.18 0.83 2.78 1.119 0.015 Roof 5.0 0.22 0.90 0.20 - - . Roof-CB#4 0.23 5.00 0.20 6.70 1.33 1 8 75 0.027 5.44 1.72 0.77 4.93 1.103 0.015 CB#8 5.0 0.34 0.90 0.31 . CB#8-Vor#2 0.03 7.11 _ 0.77 6.70 5.19 18 7 0.005 4.06 6.44 0.81 3.64 1.114 0.015 Vor#2-Det#2 i 519 18 41 0.007 4.64 7.62 0.68 4.31 1.076 0.015 Project#424-06 Prepared by: B.J.H. Pagelofl ' Appendix lli 1 1 1 1 1 1 1 1 ' Job File: J:\424\06\POST_BUCKLANDRD REVISED.PPW Rain Dir: D:\HAESTAD\PPKW\RAINFALL\ --------JOB TITLE ----------------- ' South Windsor Health Center Buckland Road South Windsor, Connecticut I S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Table of Contents i ' Table of Contents ********************** MASTER SUMMARY ********************** Watershed. . . . . . . Master Network Summary . . . . . . . . . . . . . 1.01 *************** NETWORK SUMMARIES (DETAILED) *************** Watershed. . . . . . . Dev. .2 Executive Summary (Nodes) . . . . . . . . . . 2.01 ' Executive Summary (Links) . . . . . . . . . . 2.02 Watershed. . . . . . . Dev.25 Executive Summary (Nodes) . . . . . . . . . . 2.03 ' Executive Summary (Links) . . . . . . . . . . 2.04 Watershed. . . . . . . Dev100 Executive Summary (Nodes) . 2.05 Executive Summary (Links) . . . . . . . . . 2.06 Network Calcs Sequence . . . . . . . . . . . . . 2.07 TC CALCULATIONS ********************* LOT 1. . . . . . . . . . . Tc Calcs . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.01 LOT 2 DEVELOPED Tc Calcs . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.03 ' UNDEVELOPED. . . . . Tc Calcs . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.05 CN CALCULATIONS ********************* POSTDEVELOPED. . . Runoff CN-Area . . . . . . . . . . . . . . . . . . . . . 4.01 ******************** RUNOFF HYDROGRAPHS ******************** ' SCS Unit Hyd. Equations . . . . . . . . . . . . 5.01 S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Table of Contents ii Table of Contents (continued) LOT 1 DEV AREA. . Dev. .2 SCS Unit Hyd. Summary . . . . . . . . . . . . . . 5.03 SCS Unit Hyd. (HYG output) . . . . . . . . . 5.04 LOT 1 DEV AREA. . Dev.25 ' SCS Unit Hyd. Summary 5.07 SCS Unit Hyd. (HYG output) 5.08 LOT 1 DEV AREA. . Dev100 SCS Unit Hyd. Summary . . . . . . . . . . . . . . 5.11 SCS Unit Hyd. (HYG output) . . . . . . . . . 5.12 LOT 2 DEV AREA. . Dev. .2 SCS Unit Hyd. Summary . . . . . . . . . . . . . . 5.15 SCS Unit Hyd. (HYG output) . . . . . . . . . 5.16 LOT 2 DEV AREA. . Dev.25 SCS Unit Hyd. Summary . . . . . . . . . . . . . . 5.19 SCS Unit Hyd. (HYG output) . . . . . . . . . 5.20 LOT 2 DEV AREA. . Dev100 SCS Unit Hyd. Summary . . . . . . . . . . . . . . 5.23 SCS Unit Hyd. (HYG output) . . . . . . . . . 5.24 ' UNDEVELOPED. . . . . Dev. .2 SCS Unit Hyd. Summary . . . . . . . . . . . . . . 5.27 SCS Unit Hyd. (HYG output) . . . . . . . . . 5.28 ' UNDEVELOPED. . . . . Dev.25 SCS Unit Hyd. Summary . . . . . . . . . . . . . . 5.30 ' SCS Unit Hyd. (HYG output) . . . . . . . . . 5.31 UNDEVELOPED. . . . . Dev100 SCS Unit Hyd. Summary . . . . . . . . . . . . . . 5.34 SCS Unit Hyd. (HYG output) . . . . . . . . . 5.35 *********************** HYG ADDITION *********************** EXISTING OUTFALL Dev. .2 Node: Addition Summary . . . . . . . . . . . . . 6.01 EXISTING OUTFALL Dev.25 Node: Addition Summary . . . . . . . . . . . . . 6.05 ' EXISTING OUTFALL Dev100 Node: Addition Summary . . . . . . . . . . . . . 6.09 S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Table of Contents ' Table of Contents (continued) *********************** TIME VS.ELEV *********************** DETENT 1&2 OUT Dev. .2 Time-Elev . . . . . . . . . . . . . . . . . . . . . . . . . . 7.01 DETENT 1&2 OUT Dev.25 Time-Elev . . . . . . . . . . . . . . . . . . . . . . . . . . 7.04 DETENT 1&2 OUT Dev100 Time-Elev . . . . . . . . . . . . . . . . . . . . . . . . . . 7.07 TIME VS.VOL *********************** ' DETENT 1&2 OUT Dev. .2 Time vs. Volume . . . . . . . . . . . . . . . . . . . . 8.01 ' DETENT 1&2 OUT Dev.25 Time vs. Volume . . . . . . . . . . . . . . . . . . . . 8.04 DETENT 1&2 OUT Dev100 Time vs. Volume . . . . . . . . . . . . . . . . . . . . 8.07 POND VOLUMES *********************** ' DETENT 2. . . . . . . . Vol: Elev-Area . . . . . . . . . . . . . . . . . . . . . 9.01 ******************** OUTLET STRUCTURES ********************* ' PR 1. . . . . . . . . . . . Outlet Input Data . . . . . . . . . . . . . . . . . 10.01 Individual Outlet Curves . . . . . . . . . . 10.03 Composite Rating Curve . . . . . . . . . . . . 10.05 *********************** POND ROUTING *********************** DETENT 1&2. . . . . . Pond E-V-Q Table . . . . . . . . . . . . . . . . . . 11.01 ' S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44: 57 Date: 07/01/2002 ' Table of Contents iv rTable of Contents (continued) DETENT 1&2 IN Dev. .2 rNode: Pond Inflow Summary . . . . . . . . . 11.02 r r r r r r r r r r r r r r rS/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44: 57 Date: 07/01/2002 r ' Type. . . . Master Network Summary Page 1.01 Name. . . . Watershed File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW ' MASTER DESIGN STORM SUMMARY Default Network Design Storm File, ID CT24HOUR.RNQ HARTFORD ' Total Depth Rainfall Return Event in Type RNF File RNF ID ------------ ------ ---------------- -------- ---------------- Dev. .2 3.2000 Synthetic Curve SCSTYPES TypeIII 24hr Dev. .5 4.1000 Synthetic Curve SCSTYPES TypeIII 24hr Dev.10 4.7000 Synthetic Curve SCSTYPES TypeIII 24hr ' Dev.25 5.5000 Synthetic Curve SCSTYPES TypeIII 24hr Dev.50 6.2000 Synthetic Curve SCSTYPES TypeIII 24hr Dev100 6.9000 Synthetic Curve SCSTYPES TypeIII 24hr ' MASTER NETWORK SUMMARY SCS Unit Hydrograph Method ' (*Node=Outfall; +Node=Diversion; ) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) ' Max ' Storage Return HYG Vol Qpeak Qpeak Max WSEL Pond Node ID Type Event ac-ft Trun hrs cfs ft ac-ft ----------------- ---- ------ ---------- -- --------- -------- -------- ----------- ' DETENT 1&2 IN POND 2 1.170 12.1000 12.60 DETENT 1&2 IN POND 5 1.523 12.1000 16.21 ' DETENT 1&2 IN POND 10 1.759 12.1000 18.62 DETENT 1&2 IN POND 25 2.074 12.1000 21.82 DETENT 1&2 IN POND 50 2.350 12.1000 24.62 DETENT 1&2 IN POND 100 2.626 12.1000 27.42 ' DETENT 1&2 OUT POND 2 1.170 12.4000 3.94 150.04 .314 DETENT 1&2 OUT POND 5 1.523 12.3500 6.13 150.34 .396 ' DETENT 1&2 OUT POND 10 1.759 12,3000 7.55 150.53 .452 DETENT 1&2 OUT POND 25 2.074 12.3000 9.51 150.76 .522 DETENT 1&2 OUT POND 50 2.350 12.3000 11.18 150.95 .585 DETENT 1&2 OUT POND 100 2.625 12.3000 12.43 151.14 .649 ' *EXISTING OUTFALL JCT 2 2.239 12.7000 9.23 *EXISTING OUTFALL JCT 5 3.047 12.5500 13.32 *EXISTING OUTFALL JCT 10 3.594 12.5500 16.04 ' *EXISTING OUTFALL JCT 25 4.330 12.5500 19.65 *EXISTING OUTFALL JCT 50 4.979 12.5500 22.81 *EXISTING OUTFALL JCT 100 5.631 12. 5500 26.14 S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . Master Network Summary Page 1.02 Name. . . . Watershed File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW MASTER NETWORK SUMMARY SCS Unit Hydrograph Method ' (*Node=Outfall; +Node=Diversion; ) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Max Storage Return HYG Vol Qpeak Qpeak Max WSEL Pond Node ID Type Event ac-ft Trun hrs cfs ft ac-ft ----------------- ---- ------ ---------- -- --------- -------- -------- ----------- LOT 1 DEV AREA AREA 2 .730 12.1000 7.86 LOT 1 DEV AREA AREA 5 .950 12.1000 10.11 LOT 1 DEV AREA AREA 10 1.097 12.1000 11.61 ' LOT 1 DEV AREA AREA 25 1.294 12.1000 13.61 LOT 1 DEV AREA AREA 50 1.466 12.1000 15.35 LOT 1 DEV AREA AREA 100 1.637 12.1000 17.10 ' LOT 2 DEV AREA AREA 2 .440 12.1000 4.74 LOT 2 DEV AREA AREA 5 .573 12.1000 6.10 LOT 2 DEV AREA AREA 10 .662 12.1000 7.01 LOT 2 DEV AREA AREA 25 .781 12.1000 8.21 ' LOT 2 DEV AREA AREA 50 .884 12.1000 9.26 LOT 2 DEV AREA AREA 100 .988 12.1000 10.32 ' UNDEVELOPED AREA 2 1.069 12.7000 5.82 UNDEVELOPED AREA 5 1.523 12.7000 8.25 UNDEVELOPED AREA 10 1.834 12.7000 9.89 UNDEVELOPED AREA 25 2.256 12.7000 12.08 ' UNDEVELOPED AREA 50 2.629 12.7000 14.00 UNDEVELOPED AREA 100 3.005 12.7000 15.92 ' S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . Executive Summary (Nodes) Page 2.01 Name. . . . Watershed Event: 2 yr File. . . . J: \424\06\POST_BUCKLANDRD REVISED.PPW Storm. . . TypeIII 24hr Tag: Dev. .2 NETWORK SUMMARY -- NODES (True.= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left & Rt) ' DEFAULT Design Storm File, ID = CT24HOUR.RNQ HARTFORD ' Storm Tag Name =-Dev__2 - ---------------------------------- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 2 yr ' Total Rainfall Depth= 3.2000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs ' Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs HYG Vol Qpeak Qpeak Max WSEL Node ID Type ac-ft Trun. hrs cfs ft ----------------- ---- ---------- -- --------- -------- --------- DETENT 1&2 IN POND 1.170 12.1000 12.60 DETENT 1&2 OUT POND 1.170 12.4000 3.94 150.04 Outfall EXISTING OUTFALL JCT 2.239 12.7000 9.23 ' LOT 1 DEV AREA AREA .730 12.1000 7.86 LOT 2 DEV AREA AREA .440 12.1000 4.74 UNDEVELOPED AREA 1.069 12.7000 5.82 ' S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 1 ' Type. . . . Executive Summary (Links) Page 2.02 Name. . . . Watershed Event: 2 yr File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW Storm. . . TypeIII 24hr Tag: Dev. .2 NETWORK SUMMARY -- LINKS (UN=Upstream Node; DL=DNstream End of Link; DN=DNstream Node) ' (Trun.= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left & Rt) DEFAULT Design Storm File,ID = CT24HOUR.RNQ HARTFORD ' Storm TagName ------=-Dev. .2 - - --------------------------------------------- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr ' Storm Frequency = 2 yr Total Rainfall Depth= 3.2000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs HYG Vol Peak Time Peak Q ' Link ID Type ----ac_ft--Trun. hrs ---cfs-- End Points --- ------- ---------------- DET TO EX OUT PONDrt UN 1.170 12.1000 12.60 DETENT 1&2 IN DET TO EX OUT 1.170 12.4000 3.94 DETENT 1&2 OUT DL 1.170 12.4000 3.94 DN 2.239 12.7000 9.23 EXISTING OUTFALL LOT 1 TO DET 1 ADD UN .730 12.1000 7.86 LOT 1 DEV AREA DL .730 12.1000 7.86 DN 1 .170 12.1000 12.60 DETENT 1&2 IN LOT 2 TO DET 2 ADD UN .440 12.1000 4.74 LOT 2 DEV AREA DL .440 12.1000 4.74 DN 1.170 12.1000 12.60 DETENT 1&2 IN ' UNDEV TO EX OUT ADD UN 1.069 12.7000 5.82 UNDEVELOPED DL 1.069 12.7000 5.82 DN 2.239 12.7000 9.23 EXISTING OUTFALL S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 Type. . . . Executive Summary (Nodes) Page 2.03 Name. . . . Watershed Event: 25 yr File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW Storm. . . TypeIII 24hr Tag: Dev.25 NETWORK SUMMARY -- NODES (Trun.= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left & Rt) ' DEFAULT Design Storm File, ID = CT24HOUR.RNQ HARTFORD ' Storm Tag Name ------=-Dev.25 ---------------------------------------- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 25 yr Total Rainfall Depth= 5.5000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs ' Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs HYG Vol Qpeak Qpeak Max WSEL Node ID Type ac-ft Trun. hrs cfs ft ----------------- ---- ---------- -- --------- -------- --------- DETENT 1&2 IN POND 2.074 12.1000 21.82 DETENT 1&2 OUT POND 2.074 12.3000 9.51 150.76 Outfall EXISTING OUTFALL JCT 4.330 12.5500 19.65 LOT 1 DEV AREA AREA 1.294 12.1000 13.61 LOT 2 DEV AREA AREA .781 12.1000 8.21 UNDEVELOPED AREA 2.256 12.7000 12.08 S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . Executive Summary (Links) Page 2.04 Name. . . . Watershed Event: 25 yr File. . . . J:\424\06\POST BUCKLANDRD REVISED.PPW Storm. . . TypeIII 24hr Tag: Dev.25 NETWORK SUMMARY -- LINKS (UN=Upstream Node; DL=DNstream End of Link; DN=DNstream Node) ' (Trun.= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left & Rt) DEFAULT Design Storm File,ID = CT24HOUR.RNQ HARTFORD 1 Storm Tag Name = Dev.25 -------------------------------------------------------------------- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 25 yr Total Rainfall Depth= 5.5000 in Duration Multiplier = 1 ' Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs HYG Vol Peak Time Peak Q ' Link ID--------- Type ----ac-ft Trun. hrs cfs End Points --- ------- -------- ---------------- DET TO EX OUT PONDrt UN 2.074 12.1000 21.82 DETENT 1&2 IN DET TO EX OUT 2.074 12.3000 9.51 DETENT 1&2 OUT DL 2.074 12.3000 9.51 DN 4.330 12.5500 19.65 EXISTING OUTFALL ' LOT 1 TO DET 1 ADD UN 1.294 12.1000 13.61 LOT 1 DEV AREA DL 1.294 12.1000 13.61 DN 2.074 12.1000 21.82 DETENT 1&2 IN ' LOT 2 TO DET 2 ADD UN .781 12.1000 8.21 LOT 2 DEV AREA DL .781 12.1000 8.21 DN 2.074 12.1000 21.82 DETENT 1&2 IN ' UNDEV TO EX OUT ADD UN 2.256 12.7000 12.08 UNDEVELOPED DL 2.256 12.7000 12.08 DN 4.330 12.5500 19.65 EXISTING OUTFALL ' S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . Executive Summary (Nodes) Page 2.05 Name. . . . Watershed Event: 100 yr File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW Storm. . . TypeIII 24hr Tag: Dev100 ' NETWORK SUMMARY -- NODES (Trun.= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left & Rt) DEFAULT Design Storm File, ID = CT24HOUR.RNQ HARTFORD ' Storm Tag Name = Dev100 -------------------------------------------------------------------- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr ' Storm Frequency = 100 yr Total Rainfall Depth= 6.9000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs ' Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs HYG Vol Qpeak Qpeak Max WSEL Node ID Type ac-ft Trun. hrs cfs ft ----------------- ---- ---------- -- --------- -------- --------- DETENT 1&2 IN POND 2.626 12.1000 27.42 DETENT 1&2 OUT POND 2.625 12.3000 12.43 151.14 Outfall EXISTING OUTFALL JCT 1,131 12*1100 26.14 LOT 1 DEV AREA AREA 1.637 12.1000 17.10 LOT 2 DEV AREA AREA .988 12.1000 10.32 UNDEVELOPED AREA 3.005 12.7000 15.92 S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 i Type. . . . Executive Summary (Links) Page 2.06 Name. . . . Watershed Event: 100 yr File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW Storm. . . TypeIII 24hr Tag: Dev100 NETWORK SUMMARY -- LINKS (UN=Upstream Node; DL=DNstream End of Link; DN=DNstream Node) ' (Trun.= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left & Rt) DEFAULT Design Storm File,ID = CT24HOUR.RNQ HARTFORD ' Storm Tag Name = Dev100 -------------------------------------------------------------------- Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeIII 24hr Storm Frequency = 100 yr Total Rainfall Depth= 6.9000 in Duration Multiplier = 1 ' Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs HYG Vol Peak Time Peak Q ' Link ID ----- Type ----ac_ft Trun. hrs cfs End Points DET TO EX OUT PONDrt UN 2.626 12.1000 27.42 DETENT 1&2 IN ' DET TO EX OUT 2.625 12.3000 12.43 DETENT 1&2 OUT DL 2.625 12.3000 12.43 DN 5.631 12.5500 26.14 EXISTING OUTFALL ' LOT 1 TO DET 1 ADD UN 1.637 12.1000 17.10 LOT 1 DEV AREA DL 1.637 12.1000 17.10 DN 2.626 12.1000 27.42 DETENT 1&2 IN ' LOT 2 TO DET 2 ADD UN .988 12.1000 10.32 LOT 2 DEV AREA DL .988 12.1000 10.32 DN 2.626 12.1000 27.42 DETENT 1&2 IN ' UNDEV TO EX OUT ADD UN 3.005 12.7000 15.92 UNDEVELOPED DL 3.005 12.7000 15.92 DN 5.631 12.5500 26.14 EXISTING OUTFALL S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . Network Calcs Sequence Page 2.07 Name. . . . Watershed Event: 100 yr File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW Storm. . . TypeIII 24hr Tag: Dev100 NETWORK RUNOFF NODE SEQUENCE ' Runoff Data Apply to Node Receiving Link SCS UH Undeveloped Subarea UNDEVELOPED Add Hyd UNDEVELOPED ' SCS UH Lot 1 Dev Area Subarea LOT 1 DEV AREA Add Hyd LOT 1 DEV AREA SCS UH Lot 2 Dev Area Subarea LOT 2 DEV AREA Add Hyd LOT 2 DEV AREA ' S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . Network Calcs Sequence Page 2.08 Name. . . . Watershed Event: 100 yr File. . . . J:\424\06\POST BUCKLANDRD REVISED.PPW ' Storm. . . TypeIII 24hr Tag: Dev100 NETWORK ROUTING SEQUENCE Link Operation UPstream Node DNstream Node Add Hyd LOT 2 TO DET 2 Subarea LOT 2 DEV AREA Pond DETENT 1&2 IN ' Add Hyd LOT 1 TO DET 1 Subarea LOT 1 DEV AREA Pond DETENT 1&2 IN POND ROUTE TOTAL OUTFLOW. . . Total Pond Outflow Pond DETENT 1&2 IN Outflow DETENT 1&2 OUT SET POND ROUTING LINK TO TOTAL POND OUTFLOW. . . Outlet DET TO EX OUT Outflow DETENT 1&2 OUT Jct EXISTING OUTFALL ' Add Hyd UNDEV TO EX OUT Subarea UNDEVELOPED Jct EXISTING OUTFALL ' S/N: E21101S06A8D Anchor Engineering Services, Inc. PondPack Ver. 7.S (76S) Compute Time: 10:44:S7 Date: 07/01/2002 Type. . . . Tc Calcs Page 3.01 Name. . . . LOT 1 ' File. . . . J: \424\06\POST_BUCKLANDRD REVISED.PPW Title. . . Lot 1 Time of Concentration ' TIME OF CONCENTRATION CALCULATOR Lot 1 Time of Concentration ------------------------------------------------------------------------ ' Segment #1: Tc: TR-55 Sheet Description: Developed Area Mannings n .0110 ' Hydraulic Length 500.00 ft 2yr, 24hr P 2.5000 in Slope .030000 ft/ft ' Avg.Velocity 1.97 ft/sec Segment #1 Time: .0704 hrs ------------------------------------------------------------------------ Total Tc: .0704 hrs ' Calculated Tc < Min.Tc: Use Minimum Tc. . . ' _Use_Tc_= _0833_hrs _ S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . Tc Calcs Page 3.02 Name. . . . LOT 1 File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW Title. . . Lot 1 Time of Concentration ------------------------------------------------------------------------ ' Tc Equations used. . . ------------------------------------------------------------------------ ' SCS TR-55 Sheet Flow Tc = ( .007 * ((n * Lf)**0.8)) / ((P**.5) * (Sf**.4)) Where: Tc = Time of concentration, hrs n = Mannings n Lf = Flow length, ft ' P = 2yr, 24hr Rain depth, inches Sf = Slope, % ' S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . Tc Calcs Page 3.03 Name. . . . LOT 2 DEVELOPED File. . . . 1:1424106\POST_BUCKLANDRD REVISED.PPW . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . TIME OF CONCENTRATION CALCULATOR ----------------------------------------------------------------------- Segment #1: Tc: TR-55 Sheet ' Description: Lot 2 Time of Concentration Mannings n .0110 Hydraulic Length 400.00 ft ' 2yr, 24hr P 2.5000 in Slope .030000 ft/ft Avg.Velocity 1.89 ft/sec ' Segment #1 Time: .0589 hrs -------------------------------------------------------------- ' Total Tc 0589 hrs Calculated Tc < Min.Tc: Use Minimum Tc. . . Use Tc = .0833 hrs S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 Type. . . . Tc Calcs Page 3.04 Name. . . . LOT 2 DEVELOPED ' File. . . . 1:1424\06\POST_BUCKLANDRD REVISED.PPW ------------------------------------------------------------------------ Tc Equations used. . . ------------------------------------------------------------------------ ___= SCS TR-11 Sheet Flow ' Tc = ( .007 * ((n * Lf)**0.8)) / ((P**.5) * (Sf**.4))_______________ ' Where: Tc = Time of concentration, hrs n = Mannings n Lf = Flow length, ft P = 2yr, 24hr Rain depth, inches Sf = Slope, % S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . Tc Calcs Page 3.05 Name. . . . UNDEVELOPED 1 File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . TIME OF CONCENTRATION CALCULATOR ------------------------------------------------------------------------ Segment 41: Tc: TR-55 Channel ' Description: Diversion Swale Flow Area 6.0000 sq.ft Wetted Perimeter 6.00 ft ' Hydraulic Radius 1.00 ft Slope .024000 ft/ft Mannings n .4000 Hydraulic Length 760,00 ft ' Avg.Velocity .58. ft/sec ' Segment #1-Time_-----_3658-hrs ------------------------------------------------- ---- Segment #2: Tc: TR-55 Sheet Description: Sheet Flow - Bottom of Hill Mannings n .4000 Hydraulic Length 50,00 ft ' 2yr, 24hr P 2.5000 in Slope .078000 ft/ft Avg.Velocity .10 ft/sec Segment #2 Time: .1349 hrs ------------------------------------------------------------------------ ' Segment #3: Tc: TR-SS Sheet Description: Sheet flow down hill ' Mannings n .4000 Hydraulic Length 120.00 ft 2yr, 24hr P 2.5000 in Shope .164000 ft/ft Avg.Velocity .17 ft/sec Segment #3 Time hrs ' ----------------------------------------- - ------------ S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . Tc Calcs Page 3.06 Name. . . . UNDEVELOPED File. . . . 1:14141061POIT_BUCKLANDRD REVISED.PPW Segment #4: Tc: TR-55 Sheet Description: Top of Hill ' Mannings n .4000 Hydraulic Length 150.00 ft 2yr, 24hr P 2.5000 in ' Slope .080000 ft/ft Avg.Velocity .13 ft/sec ' -----------------------------------------Segment hrs -#4-Time: ----------- --- Total Tc: 1.0244 hrs S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7. 5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . Tc Calcs Page 3.07 Name. . . . UNDEVELOPED File. . . .-J:\424\06\POST_BUCKLANDRD REVISED.PPW ------- ----------------------------------------------------------------- Tc Equations used. . . ------------------------------------------------------------------------ ___= SCS TR-11 Sheet Flow ' Tc = ( .007 * ((n * Lf)**0.8)) / ((P**.5) * (Sf**.4)) Where: Tc = Time of concentration, hrs n = Mannings n Lf = Flow length, ft P = 2yr, 24hr Rain depth, inches ' Sf = Slope, % SCS Channel Flow ' R = Aq / Wp V = (1.49 * (R**(2/3)) * (Sf**-0.5)) / n Tc = (Lf / V) / (3600sec/hr) Where: R = Hydraulic radius Aq = Flow area, sq.ft. Wp = Wetted perimeter, ft V = Velocity, ft/sec ' Sf = Slope, ft/ft n = Mannings n Tc = Time of concentration, hrs Lf = Flow length, ft S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44: 57 Date: 07/01/2002 1 Type. . . . Runoff CN-Area Page 4.01 Name. . . . POSTDEVELOPED File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW 1 RUNOFF CURVE NUMBER DATA ----------------------------------------------------- Impervious 1 Area Adjustment Adjusted Soil/Surface Description CN acres %C %UC CN -------------------------------- ---- --------- ----- ----- ------ Undeveloped Area 87 6.700 87.00 1 COMPOSITE AREA & WEIGHTED CN ---> 6.700 87.00 (87) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 i 1 i i 1 1 1 S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 i ' Type. . . . SCS Unit Hyd. Equations Page 5.01 Name. . . . File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW ' SCS UNIT HYDROGRAPH METHOD (Computational Notes) 1 DEFINITION OF TERMS: ------------------------------------------------ At = Total area (acres) : At = Ai+Ap Ai = Impervious area (acres) Ap = Pervious area (acres) ' CNi = Runoff curve number for impervious area CNp = Runoff curve number for pervious area fLoss = f loss constant infiltration (depth/time) dt = Computational increment (duration of unit excess rainfall) Default dt is smallest value of 0.1333Tc, rtm, and th (Smallest dt is then adjusted to match up with Tp) UDdt = User specified override computational main time increment (only used if UDdt is => .1333Tc) D(t) = Point on distribution curve (fraction of P) for time step t K = 2 / (1 + (Tr/Tp)) : default K = 0.75: (for Tr/Tp = 1.67) Ks = Hydrograph shape factor = Unit Conversions * K: _ ((lhr/3600sec) * (1ft/12in) * ((5280ft)**2/sq.mi)) * K Default Ks = 645.333 * 0.75 = 484 ' Lag = Lag time from center of excess runoff (dt) to Tp: Lag = 0.6Tc P = Total precipitation depth, inches ' Pa(t) = Accumulated rainfall at time step t Pi(t) = Incremental rainfall at time step t qp = Peak discharge (cfs) for tin. runoff, for 1hr, for 1 sq.mi . _ (Ks * A * Q) / Tp (where Q = tin. runoff, A=sq.mi . ) ' Qu(t) = Unit hydrograph ordinate (cfs) at time step t Q(t) = Final hydrograph ordinate (cfs) at time step t Rai(t)= Accumulated runoff (inches) at time step t for impervious area Rap(t)= Accumulated runoff (inches) at time step t for pervious area Rii(t)= Incremental runoff (inches) at time step t for impervious area Rip(t)= Incremental runoff (inches) at time step t for pervious area R(t) = Incremental weighted total runoff (inches) Rtm = Time increment for rainfall table ( .RNF file) Si = S for impervious area: Si = (1000/CNi) - 10_ Sp = S for pervious area: Sp (1000/CNp) - 10 t = Time step (row) number Tc = Time of concentration Tb = Time (hrs) of entire unit hydrograph: Tb = Tp + Tr Tp = Time (hrs) to peak of a unit hydrograph: Tp = (dt/2) + Lag Tr = Time (hrs) of receding limb of unit hydrograph: Tr = ratio of Tp S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . SCS Unit Hyd. Equations Page 5.02 Name. . . . File. . . . J:\424\06\POST—BUCKLANDRD REVISED.PPW ' SCS UNIT HYDROGRAPH METHOD (Computational Notes) ' PRECIPITATION: ----------------------------------------------------------- Column (1) : Time for time step t Column (2) : D(t) = Point on distribution curve for time step t Column (3) : Pi(t) = Pa(t) - Pa(t-1) : Col. (4) - Preceding Col. (4) Column (4) : Pa(t) = D(t) x P: Col. (2) x P PERVIOUS AREA RUNOFF (using SCS Runoff CN Method) ------------------------ Column (5) : Rap(t) = Accumulated pervious runoff for time step t If (Pa(t) is <= 0.25p) then use: Rap(t) = 0.0 ' If (Pa(t) is > 0.25p) then use: Rap(t) = (Col. (4)-0.2Sp)**2 / (Col. (4)+0.8Sp) ' Column (6) : Rip(t) = Incremental pervious runoff for time step t Rip(t) = Rap(t) Rap(t-1) Rip(t) = Col. (5) for current row - Col. (5) for preceding row. IMPERVIOUS AREA RUNOFF --------------------------------------------------- Column (7 & 8) . . . Did not specify to use impervious areas . ' INCREMENTAL WEIGHTED RUNOFF: --------------------------------------------- Column (9) : R(t) = (Ap/At) x Rip(t) + (Ai/At) x Rii(t) R(t) = (Ap/At) x Col. (6) + (Ai/At) x Col. (8) SCS UNIT HYDROGRAPH METHOD: ---------------------------------------------- ' Column (10) : Q(t) is computed with the SCS unit hydrograph method using R() and Qu() . S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 Type. . . . SCS Unit Hyd. Summary Page 5.03 Name. . . . LOT 1 DEV AREA Tag: Dev. .2 Event: 2 yr File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW Title. . . Lot 1 Developed Area ' Storm. . . TypeIII 24hr Tag: Dev. .2 SCS UNIT HYDROGRAPH METHOD ' STORM EVENT: 2 year storm Duration = 24.0000 hrs Rain Depth = 3.2000 in Rain Dir = D:\HAESTAD\PPKW\RAINFALL\ ' Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\424\06\ HYG File - ID =' POST_BUC.HYG - LOT 1 DEV AREA Dev. . 2 Tc (Min. Tc) = .0833 hrs Drainage Area = 2.950 acres Runoff CN= 98 Computational Time Increment = 01111 hrs Computed Peak Time = 12.0952 hrs Computed Peak Flow = 7.86 cfs ' Time Increment for HYG File = .0500 hrs Peak Time, Interpolated Output = 12.1000 hrs ' Peak Flow, Interpolated Output = 7.86 cfs DRAINAGE AREA ------------------- ID:None Selected CN = 98 Area = 2.950 acres ' S = .2041 in 0.25 = .0408 in ' Cumulative Runoff - - - 2.9675 in .730 ac-ft HYG Volume. . . .730 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .08330 hrs (ID: Lot 1) Computational Incr, Tm = .01111 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) ' Unit peak, qp = 40.13 cfs Unit peak time Tp = .05553 hrs Unit receding limb, Tr = .22213 hrs Total unit time, Tb = .27767 hrs S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . SCS Unit Hyd. (HYG output) Page 5.04 Name. . . . LOT 1 DEV AREA Tag: Dev. .2 Event: 2 yr File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW Title. . . Lot 1 Developed Area Storm. . . TypeIII 24hr Tag: Dev. .2 SCS UNIT HYDROGRAPH METHOD ' STORM EVENT: 2 year storm Duration = 24.0000 hrs Rain Depth = 3.2000 in Rain Dir = D:\HAESTAD\PPKW\RAINFALL\ ' Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\424\06\ HYG File - ID = POST_BUC.HYG - LOT 1 DEV AREA Dev. .2 Tc (Min. TO .0833 hrs Drainage Area = 2.950 acres Runoff CN= 98 Calc. Increment= .01111 hrs Out. Incr.= .0500 hrs ' HYG Volume = .730 ac-ft HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .0500 hrs ' ---hrs--- i ----Time-on-left-represents time for first value in each row. --------------------------------------------- 1.3500 .00 .00 .00 .00 .01 ' 1.6000 .01 .01 .01 .01 .01 1.8500 .01 .01 .02 .02 .02 2.1000 .02 .02 .02 .02 .02 2.3500 .1 .03 .03 .03 .03 .03 ' 2.6000 1 .03 .03 .03 .04 .04 2.8500 1 .04 .04 .04 .04 .04 3.1000 .04 .04 .05 .05 .05 3.3500 .05 .05 .05 .05 .05 ' 3.6000 .06 .06 .06 .06 .06 3.8500 .06 .06 .06 .07 .07 4.1000 .07 .07 .07 .07 .07 4.3500 .07 .07 .08 .08 .08 4.6000 .08 .08 .08 .08 .08 4.8500 .08 .09 .09 .09 .09 5.1000 .09 .09 .09 .09 .09 5.3500 .10 .10 .10 .10 .10 5.6000 .10 .10 .10 .10 .11 5.8500 .11 .11 .11 .11 .11 6.1000 .11 .12 .12 .12 .12 ' 6.3500 .12 .13 .13 .13 .13 6.6000 .14 .14 .14 .14 .15 6.8500 .15 .15 .15 .16 .16 ' 7.1000 .16 .16 .17 .17 .17 7.3500 .17 .18 .18 .18 .18 7.6000 .19 .19 .19 .19 .20 7.8500 .20 .20 .20 .21 .21 8.1000 .21 .22 .22 .23 .24 8.3500 .24 .25 .25 .26 .26 8.6000 .27 .27 .28 .28 .29 8.8500 .30 .30 .31 .31 .32 S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44: 57 Date: 07/01/2002 ' Type. . . . SCS Unit Hyd. (HYG output) Page 5.05 Name. . . . LOT 1 DEV AREA Tag: Dev. .2 Event: 2 yr File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW Title. . . Lot 1 Developed Area ' Storm. . . TypeIII 24hr Tag: Dev. .2 HYDROGRAPH ORDINATES (cfs) ' Time Output Time increment = .OSOO hrs hrs Time on left represents time for first value in each row. --------- -------------------------------------------------------------- 9.1000 .32 .33 .33 .34 .35 ' 9.3500 .35 .36 .36 .37 .37 9.6000 .38 .39 .39 .40 .40 9.8500 .41 .41 .42 .43 .43 10.1000 .44 .45 .46 .48 .49 10.3500 .50 .51 .52 .53 .54 10.6000 .56 .57 .58 .59 .60 10.8500 .61 .63 .64 .65 .67 ' 11.1000 .70 .74 .78 .82 .86 11.3500 .91 .95 .99 1.04 1.22 11.6000 1.43 1.79 2.19 2.60 3.02 11.8500 3.43 3.86 5.41 7.26 7.75 ' 12.1000 7.86 6.45 4.62 3.85 3.35 12.3500 2.92 2.50 2.09 1.67 1.40 12.6000 1.16 1.06 1.01 .97 .92 ' 12.8500 .88 .83 .79 .75 .72 13.1000 .69 .67 .66 .65 .64 13.3500 .63 .61 .60 .59 .58 13.6000 .57 .56 .55 .54 .52 13.8500 .51 .50 .49 .48 .47 14.1000 .46 .45 .45 .44 .44 14.3500 .43 .43 .42 .42 .41 14.6000 .41 .40 .39 .39 .38 ' 14.8500 .38 .37 .37 .36 .36 15.1000 .35 .35 .34 .34 .33 15.3500 .32 .32 .31 .31 .30 ' 15.6000 .30 .29 .29 .28 .28 15.8500 .27 .26 .26 .25 .25 16.1000 .25 .24 .24 .24 .24 16.3500 .23 .23 .23 .23 .22 ' 16.6000 .22 .22 .22 .21 .21 16.8500 .21 .21 .20 .20 .20 17.1000 .20 .20 .19 .19 .19 17.3500 .19 .18 .18 .18 .18 ' 17.6000 .17 .17 .17 .17 .16 17.8500 .16 .16 .16 .15 .15 18.1000 .15 .15 .15 .15 .15 ' 18.3500 .15 .15 .15 .15 .14 18.6000 .14 .14 .14 .14 .14 18.8500 .14 .14 .14 .14 .14 19.1000 .14 .14 .14 .13 .13 ' 19.3500 .13 .13 .13 .13 .13 19.6000 .13 .13 .13 .13 .13 19.8500 .13 .13 .12 .12 .12 20.1000 .12 .12 .12 .12 .12 20.3500 .12 .12 .12 . 12 .12 ' S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . SCS Unit Hyd. (HYG output) Page 5.06 Name. . . . LOT 1 DEV AREA Tag: Dev. .2 Event: 2 yr File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW ' Title. . . Lot 1 Developed Area Storm. . . TypeIII 24hr Tag: Dev. .2 HYDROGRAPH ORDINATES (cfs) ' Time Output Time increment = .0500 hrs hrs Time on left represents time for first value in each row. -------------------------------------------------------------- 20.6000 .12 .12 .12 .12 .12 ' 20.8500 .11 .11 .11 .11 .11 21.1000 .11 .11 .11 .11 .11 21.3500 .11 .11 .11 .11 .11 ' 21.6000 .11 .11 .11 .11 .11 21.8500 .10 .10 .10 .10 .10 22.1000 .10 .10 .10 .10 .10 22.3500 .10 .10 .10 .10 .10 ' 22.6000 .10 .10 .10 .09 .09 22.8500 .09 .09 .09 .09 .09 23.1000 .09 .09 .09 .09 .09 23.3500 .09 .09 .09 .09 .09 ' 23.6000 .09 .09 .08 .08 .08 23.8500 .08 .08 .08 .08 .05 24.1000 .01 .00 .00 ' S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . SCS Unit Hyd. Summary Page 5.07 Name. . . . LOT 1 DEV AREA Tag: Dev.25 Event: 25 yr File. . . . J: \424\06\POST_BUCKLANDRD REVISED.PPW ' Storm. . . TypeIII 24hr Tag: Dev.25 SCS UNIT HYDROGRAPH METHOD ' STORM EVENT: 25 year storm Duration = 24.0000 hrs Rain Depth = 5.5000 in Rain Dir = D:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr ' Unit Hyd Type = Default Curvilinear HYG Dir = J:\424\06\ HYG File - ID = POST_BUC.HYG - LOT 1 DEV AREA Dev.25 ' Tc (Min. TO = .0833 hrs Drainage Area = 2.950 acres Runoff CN= 98 ' Computational Time Increment 01111 hrs Computed Peak Time 12.0952 hrs Computed Peak Flow = 13.62 cfs ' Time Increment for HYG File = .0500 hrs Peak Time, Interpolated Output = 12.1000 hrs Peak Flow, Interpolated Output = 13.61 cfs ' DRAINAGE AREA ------------------- ID:None Selected CN 98 Area = 2.950 acres S = .2041 in ' 0.2S = .0408 in Cumulative Runoff ------------------- ' 5.2625 in 1.294 ac-ft ' HYG Volume. . . 1.294 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .08330 hrs (ID: Lot 1) Computational Incr, Tm = .01111 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) ' Unit peak, qp = 40.13 cfs Unit peak time Tp = .05553 hrs Unit receding limb, Tr = .22213 hrs ' Total unit time, Tb = .27767 hrs S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44: 57 Date: 07/01/2002 ' Type. . . . SCS Unit Hyd. (HYG output) Page 5.08 Name. . . . LOT 1 DEV AREA Tag: Dev.25 Event: 25 yr File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW Storm. . . TypeIII 241r Tag: Dev.25 ' SCS UNIT HYDROGRAPH METHOD ' STORM EVENT: 25 year storm Duration = 24.0000 hrs Rain Depth = 5.5000 in Rain Dir = D:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J: \424\06\ HYG File - ID = POST_BUC.HYG - LOT 1 DEV AREA Dev.25 Tc (Min. Tc) = .0833 hrs ' Drainage Area = 2.950 acres Runoff CN= 98 Calc.Increment= .01111 hrs Out.Incr .= .0500 hrs HYG Volume = 1.294 ac-ft ' HYDROGRAPH ORDINATES (cfs) Time 1 Output Time increment = .0500 hrs hrs 1 Time on left represents time for first value in each row. ----- I -------------------------------------------------------------- --- 8000- 1 .00 .00 .01 .01 .02 1.0500 I .02 .02 .03 .03 .03 ' 1.3000 1 .04 .04 .04 .04 .05 1.5500 I .05 .05 .05 .06 .06 1.8000 1 .06 .06 .07 .07 .07 2.0500 1 .07 .07 .08 .08 .08 ' 2.3000 I .08 .09 .09 .09 .09 2.5500 1 .09 .10 .10 .10 .10 2.8000 I .11 .11 .11 .11 .11 3.0500 1 .12 .12 .12 .12 .12 ' 3.3000 I .13 .13 .13 .13 .14 3.5500 1 .14 .14 .14 .14 .15 3.8000 1 .15 .15 .15 .15 .15 ' 4.0500 I .16 .16 .16 .16 .16 4.3000 I .17 .17 .17 .17 .17 4.5500 I .18 .18 .18 .18 .18 4.8000 1 .18 .19 .19 .19 .19 ' 5.0500 1 .19 .19 .20 .20 .20 5.3000 I .20 .20 .20 .21 .21 5.5500 1 .21 .21 .21 .22 .22 5.8000 I .22 .22 .22 .22 .22 ' 6.0500 1 .23 .23 .23 .24 .24 6.3000 I .25 .25 .25 .26 .26 6.5500 1 .27 .27 .28 .28 .28 ' 6.8000 I .29 .29 .30 .30 .30 7.0500 1 .31 .31 .32 .32 .33 7.3000 I .33 .34 .34 .34 .35 7.5500 I .35 .36 .36 .37 .37 ' 7.8000 I .37 .38 .38 .39 .39 8.0500 1 .40 .40 .41 .42 .43 8.3000 ( .44 .45 .46 .47 .48 8.5500 1 .49 .50 .51 .52 .53 ' S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . SCS Unit Hyd. (HYG output) Page 5.09 Name. . . . LOT 1 DEV AREA Tag: Dev.25 Event: 25 yr File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW ' Storm. . . TypeIII 24hr Tag: Dev.25 HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .0500 hrs hrs __-Time_on_left represents time for first value in each row. 8.8000 � .54 _____ _-----_-_ ______-_- . ---------.54 .55 56 .57 ' 9.0500 .58 .59 .60 .61 .62 9.3000 .63 .64 .65 .66 .67 9.5500 .68 .69 .70 .71 .72 9.8000 .73 .74 .75 .76 .77 10.0500 .78 .79 .81 .83 .85 10.3000 .87 .89 .91 .93 .95 10.5500 .97 .99 1.01 1.03 1.05 10.8000 1.07 1.09 1.11 1.13 1.15 ' 11.0500 1.19 1.23 1.30 1.37 1.45 11.3000 1.52 1.60 1.67 1.75 1.83 11.5500 2.14 2.52 3.14 3.84 4.55 11.8000 5.27 5.98 6.72 9.41 12.61 12.0500 13.44 13.61 11.16 8.00 6.66 12.3000 5.79 5.04 4.32 3.61 2.89 12.5500 2.41 2.00 1.84 1.75 1.67 ' 12.8000 1.59 1.52 1.44 1.37 1.29 13.0500 1.24 1.19 1.16 1.14 1.12 13.3000 1.10 1.08 1.06 1.04 1.02 13.5500 1.00 .98 .96 .94 .92 13.8000 .90 .88 .87 .85 .83 14.0500 .81 .80 .78 .78 .77 14.3000 .76 .75 .74 .73 .72 14.5500 .71 .70 .69 .68 .67 14.8000 .66 .65 .64 .63 .63 15.0500 .62 .61 .60 .59 58 15.3000 .57 .56 .55 .54 .53 15.5500 .52 .51 .50 .49 .48 15.8000 .47 .47 .46 .45 .44 16.0500 .43 .42 .42 .41 .41 16.3000 .41 .40 .40 .39 .39 ' 16.5500 .39 .38 .38 .37 .37 16.8000 .36 .36 .36 .35 .35 17.0500 .34 .34 .34 .33 .33 ' 17.3000 .32 .32 .32 .31 .31 17.5500 .30 .30 .30 .29 .29 17.8000 .28 .28 .28 .27 .27 18.0500 .26 .26 .26 .26 .26 18.3000 .26 .25 .25 .25 .25 18.5500 .25 .25 .25 .25 .24 18.8000 .24 .24 .24 .24 .24 19.0500 .24 .24 .23 .23 .23 ' 19.3000 .23 .23 .23 .23 .23 19.5500 .22 .22 .22 .22 .22 19.8000 .22 .22 .22 .22 .21 1 20.0500 ( .21 .21 .21 .21 .21 20.3000 .21 .21 .21 .21 .20 ' S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . SCS Unit Hyd. (HYG output) Page 5.10 Name. . . . LOT 1 DEV AREA Tag: Dev.25 Event: 25 yr File. . . . J:\424\06\POST BUCKLANDRD REVISED.PPW Storm. . . TypeIII 24hr Tag: Dev.25 HYDROGRAPH ORDINATES (cfs) Time I Output Time increment = .0500 hrs ' hrsi---- - Timeon-left-represents-time-for first value in each row. ----------------------------- 20.5500 I .20 .20 .20 .20 .20 20.8000 I .20 .20 .20 .20 .20 21.0500 I .19 .19 .19 .19 .19 21.3000 I .19 .19 .19 .19 .19 21.5500 I .18 .18 .18 .18 .18 21.8000 I .18 .18 .18 .18 .18 ' 22.0500 I .18 .18 .17 .17 .17 22.3000 I .17 .17 .17 .17 .17 22.5500 I .17 .17 .17 .16 .16 ' 22.8000 I .16 .16 .16 .16 .16 23.0500 I .16 .16 .16 .16 .15 23.3000 I .15 .15 .15 .15 .15 23.5500 I .15 .15 .15 .15 .14 23.8000 I .14 .14 .14 .14 .14 24.0500 I .09 .02 .00 .00 r t S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 Type. . . . SCS Unit Hyd. Summary Page 5.11 Name. . . . LOT 1 DEV AREA Tag: Dev100 Event: 100 yr File. . . . J: \424\06\POST_BUCKLANDRD REVISED.PPW Storm. . . TypeIII 24hr Tag: Dev100 SCS UNIT HYDROGRAPH METHOD STORM EVENT: 100 year storm Duration = 24.0000 hrs Rain Depth = 6.9000 in Rain Dir = D: \HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr ' Unit Hyd Type = Default Curvilinear HYG Dir = J:\424\06\ HYG File - ID = POST_BUC.HYG - LOT 1 DEV AREA Dev100 ' Tc (Min. TO _ .0833 hrs Drainage Area = 2.950 acres Runoff CN= 98 Computational Time Increment = 01111 hrs ' Computed Peak Time = 12.0952 hrs Computed Peak Flow = 17.12 cfs Time Increment for HYG File = .0500 hrs Peak Time, Interpolated Output = 12.1000 hrs Peak Flow, Interpolated Output = 17.10 cfs DRAINAGE AREA ------------------- ID:None Selected CN 98 Area = 2.950 acres S = .2041 in ' 0.25 = .0408 in Cumulative Runoff ------------------- 6.6610 in 1.637 ac-ft ' HYG Volume. . . 1.637 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .08330 hrs (ID: Lot 1) Computational Incr, Tm = .01111 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) 1 Unit peak, qp = 40.13 cfs Unit peak time Tp = .05553 hrs Unit receding limb, Tr = .22213 hrs Total unit time, Tb = .27767 hrs S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 Type. . . . SCS Unit Hyd. (HYG output) Page 5.12 ' Name. . . . LOT 1 DEV AREA Tag: Dev100 Event: 100 yr File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW Storm. . . TypeIII 24hr Tag: Dev100 ' SCS UNIT HYDROGRAPH METHOD STORM EVENT: 100 year storm Duration = 24.0000 hrs Rain Depth = 6.9000 in Rain Dir = D:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\424\06\ HYG File - ID = POST_BUC.HYG - LOT 1 DEV AREA Dev100 Tc (Min. TO = .0833 hrs ' Drainage Area = 2.950 acres Runoff CN= 98 Calc. Increment= .01111 hrs Out.Incr.= .0500 hrs HYG Volume = 1.637 ac-ft HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .0500 hrs hrs Time on left represents time for first value in each row. --------- I -------------------------------------------------------------- .6000 .00 .00 .01 .01 .02 .8500 .02 .03 .04 .04 .05 1.1000 .05 .05 .06 .06 .07 1.3500 .07 .07 .08 .08 .08 1.6000 .09 .09 .09 .10 .10 1.8500 .10 .10 .11 .11 .11 ' 2.1000 .11 .12 .12 .12 .12 2.3500 ( .13 .13 .13 .14 .14 2.6000 .14 .14 .15 .15 .15 2.8500 .16 .16 .16 .16 .17 3.1000 .17 .17 .17 .18 .18 3.3500 .18 .18 .19 .19 .19 3.6000 .19 .19 .20 .20 .20 3.8500 .20 .21 .21 .21 .21 4.1000 .22 .22 .22 .22 .23 4.3500 .23 .23 .23 .23 .24 4.6000 .24 .24 .24 .24 .25 4.8500 .25 .25 .25 .25 .26 5.1000 .26 .26 .26 .26 .27 5.3500 .27 .27 .27 .28 .28 5.6000 .28 .28 .28 .28 .29 5.8500 .29 .29 .29 .29 .30 6.1000 .30 .31 .31 .32 .32 6.3500 .33 .33 .34 .34 .35 6.6000 .35 .36 .36 .37 .37 6.8500 .38 .39 .39 .39 .40 7.1000 .41 .41 .42 .42 .43 7.3500 .43 .44 .44 .45 .45 7.6000 .46 .46 .47 .48 .48 7.8500 .49 .49 .50 .50 .51 8.1000 .52 .53 .54 .55 .56 8.3500 ( .58 .59 .60 .61 .62 S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 Type. . . . SCS Unit Hyd. (HYG output) Page 5.13 Name. . . . LOT 1 DEV AREA Tag: Dev100 Event: 100 yr File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW Storm. . . TypeIII 24hr Tag: Dev100 HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .0500 hrs hrs ____Time-on left represents time for first value in each row. 8.6000 .63 .65 .66 .67 .68 8.8500 .69 .71 .72 .73 .74 ' 9.1000 .75 .77 .78 .79 .80 9.3500 ( .81 .83 .84 .85 .86 9.6000 .87 .89 .90 .91 .92 ' 9.8500 .93 .95 .96 .97 .99 10.1000 1.01 1.03 1.05 1.08 1.10 10.3500 1.13 1.15 1.18 1.20 1.23 10.6000 1.25 1.27 1.30 1.32 1.35 10.8500 1.37 1.40 1.42 1.45 1.50 11.1000 1.56 1.64 1.73 1.83 1.92 11.3500 2.01 2.11 2.20 2.30 2.69 11.6000 3.17 3.96 4.84 5.73 6.63 11.8500 7.53 8.46 11.83 15.85 16.89 12.1000 17.10 14.01 10.05 8.36 7.28 12.3500 6.33 5.43 4.53 3.63 3.03 ' 12.6000 2.51 2.31 2.19 2.09 2.00 12.8500 1.90 1.81 1.71 1.62 1.55 13.1000 1.49 1.46 1.43 1.41 1.38 13.3500 1.36 1.33 1.31 1.28 1.26 ' 13.6000 ( 1.23 1.21 1.18 1.16 1.14 13.8500 1.11 1.09 1.06 1.04 1.02 14.1000 1.00 .98 .97 .96 .95 14.3500 .94 .93 .91 .90 .89 14.6000 .88 .87 .85 .84 .83 14.8500 .82 .81 .80 .78 .77 15.1000 .76 .75 .74 .73 .71 15.3500 .70 .69 .68 .67 .65 15.6000 .64 .63 .62 .61 .60 15.8500 .58 .57 .56 .55 .54 16.1000 .53 .52 .52 .51 .51 16.3500 .50 .50 .49 .49 .48 16.6000 .48 .47 .47 .46 .46 16.8500 .45 .45 .44 .44 .43 17.1000 .43 .42 .42 .41 .41 17.3500 .40 .40 .39 .39 .38 17.6000 38 .37 .37 .36 .35 17.8500 .35 .35 .34 .33 .33 18.1000 .33 .33 .32 .32 .32 18.3500 .32 .32 .32 .31 .31 18.6000 .31 .31 .31 .31 .31 18.8500 .30 .30 .30 .30 .30 1 19.1000 .30 .29 .29 .29 .29 19.3500 .29 .29 .29 .28 .28 19.6000 .28 .28 .28 .28 .28 ' 19.8500 .27 .27 .27 .27 .27 20.1000 ( .27 .26 .26 .26 .26 S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . SCS Unit Hyd. (HYG output) Page 5.14 Name. . . . LOT 1 DEV AREA Tag: Dev100 Event: 100 yr File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW ' Storm. . . TypeIII 24hr Tag: Dev100 HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .0500 hrs ' hrs ____ _ _Timeonleft represents time for first value in each row. 20.3500 .26 .26 .26 .26 .26 20.6000 .25 .25 .25 .25 .25 ' 20.8500 .25 .25 .25 .25 .24 21.1000 .24 .24 .24 .24 .24 21.3500 .24 .24 .23 .23 .23 ' 21.6000 .23 .23 .23 .23 .23 21.8500 .23 .22 .22 .22 .22 22.1000 .22 .22 .22 .22 .21 22.3500 .21 .21 .21 .21 .21 ' 22.6000 .21 .21 .21 .20 .20 22.8500 .20 .20 .20 .20 .20 23.1000 .20 .19 .19 .19 .19 23.3500 .19 .19 .19 .19 .19 23.6000 .18 .18 .18 .18 .18 23.8500 .18 .18 .18 .18 .11 24.1000 .03 .01 .00 .00 S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7. 5 (765) Compute Time: 10:44: 57 Date: 07/01/2002 ' Type. . . . SCS Unit Hyd. Summary Page 5.15 Name. . . . LOT 2 DEV AREA Tag: Dev. .2 Event: 2 yr File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW ' Title. . . Lot 2 Developed Area Storm. . . TypeIII 24hr Tag: Dev. .2 SCS UNIT HYDROGRAPH METHOD rSTORM EVENT: 2 year storm Duration = 24.0000 hrs Rain Depth = 3.2000 in Rain Dir = D:\HAESTAD\PPKW\RAINFALL\ ' Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\424\06\ ' HYG File - ID = POST_BUC.HYG - LOT 2 DEV AREA Dev. .2 Tc (Min. Tc) .0833 hrs Drainage Area = 1.780 acres Runoff CN= 98 Computational Time Increment = 01111 hrs Computed Peak Time = 12.0952 hrs Computed Peak Flow = 4.75 cfs ' Time Increment for HYG File = .0500 hrs Peak Time, Interpolated Output = 12.1000 hrs ' Peak_Flow,_Interpolated_Output_= 4_74_cfs DRAINAGE AREA ------------------- ID:None Selected CN = 98 Area = 1.780 acres S = .2041 in 0.2S = .0408 in ' Cumulative Runoff- - - 2.9675 in .440 ac-ft HYG Volume. . . .440 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .08330 hrs (ID: LOT 2 DEVELOPED) Computational Incr, Tm = .01111 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 24.21 cfs Unit peak time Tp = .05553 hrs Unit receding limb, Tr = .22213 hrs ' Total unit time, Tb = .27767 hrs i S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . SCS Unit Hyd. (HYG output) Page 5.16 Name. . . . LOT 2 DEV AREA Tag: Dev. .2 Event: 2 yr File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW Title. . . Lot 2 Developed Area Storm. . . TypeIII 24hr Tag: Dev. .2 SCS UNIT HYDROGRAPH METHOD ' STORM EVENT: 2 year storm Duration = 24.0000 hrs Rain Depth = 3.2000 in Rain Dir = D:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\424\06\ HYG File - ID = POST_BUC.HYG - LOT 2 DEV AREA Dev. .2 Tc (Min. Tc) = .0833 hrs Drainage Area = 1.780 acres Runoff CN= 98 Calc.Increment= .01111 hrs Out. Incr.= .0500 hrs ' HYG Volume = .440 ac-ft HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .0500 hrs ---hrs - -- i----Time-on left represents time for first value in each row. ----------------------------------------------------- 1.3500 .00 .00 .00 .00 .00 ' 1.6000 .00 .01 .01 .01 .01 1.8500 .01 .01 .01 .01 .01 2.1000 ( .01 .01 .01 .01 .01 2.3500 . E .02 .02 .02 .02 .02 ' 2.6000 .02 .02 .02 .02 .02 2.8500 .02 .02 .02 .02 .03 3.1000 .03 .03 .03 .03 .03 3.3500 .03 .03 .03 .03 .03 1 3.6000 .03 .03 .04 .04 .04 3.8500 .04 .04 .04 .04 .04 4.1000 .04 .04 .04 .04 .04 4.3500 .04 .04 .05 .05 .05 4.6000 .05 .05 .05 .05 .05 4.8500 .05 .05 .05 .05 .05 5.1000 .05 .06 .06 .06 .06 5.3500 .06 .06 .06 .06 .06 5.6000 .06 .06 .06 .06 .06 5.8500 .06 .07 .07 .07 .07 6.1000 .07 .07 .07 .07 .07 6.3500 .08 .08 .08 .08 .08 6.6000 .08 .08 .09 .09 .09 6.8500 .09 .09 .09 .09 .10 ' 7.1000 .10 .10 .10 .10 .10 7.3500 .10 .11 .11 .11 .11 7.6000 .11 .11 .12 .12 .12 7.8500 .12 .12 .12 .12 .13 ' 8.1000 .13 .13 .14 .14 .14 8.3500 .15 .15 .15 .16 .16 8.6000 .16 .16 .17 .17 .17 8.8500 .18 .18 .18 .19 .19 r S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . SCS Unit Hyd. (HYG output) Page 5.17 Name. . . . LOT 2 DEV AREA Tag: Dev. .2 Event: 2 yr File. . . . J: \424\06\POST_BUCKLANDRD REVISED.PPW ' Title. . . Lot 2 Developed Area Storm. . . TypeIII 24hr Tag: Dev. .2 HYDROGRAPH ORDINATES (cfs) ' Time Output Time increment = .0500 hrs hrs Time on left represents time for first value in each row. --------- -------------------------------------------------------------- 9.1000 .20 .20 .20 .21 .21 9.3500 .21 .22 .22 .22 .23 9.6000 .23 .23 .24 .24 .24 9.8500 .25 .25 .25 .26 .26 10.1000 .27 .27 .28 .29 .29 10.3500 .30 .31 .31 .32 .33 10.6000 .34 .34 .35 .36 .36 10.8500 .37 .38 .38 .39 .41 11.1000 .42 .44 .47 .50 .52 11.3500 .55 .57 .60 .63 .73 11.6000 .87 1.08 1.32 1.57 1.82 ' 11.8500 2.07 2.33 3.26 4.38 4.68 12.1000 4.74 3.89 2.79 2.32 2.02 12.3500 1.76 1.51 1.26 1.01 .84 12.6000 .70 .64 .61 .58 .56 ' 12.8500 .53 .50 .48 .45 .43 13.1000 .42 .41 .40 .39 .38 13.3500 .38 .37 .36 .36 .35 13.6000 .34 .34 .33 .32 .32 13.8500 .31 .30 .30 .29 .28 14.1000 .28 .27 .27 .27 .26 14.3500 .26 .26 .25 .25 .25 14.6000 .24 .24 .24 .24 .23 14.8500 .23 .23 .22 .22 .22 15.1000 .21 .21 .21 .20 .20 15.3500 .20 .19 .19 .19 .18 15.6000 .18 .18 .17 .17 .17 15.8500 .16 .16 .16 .15 .15 16.1000 .15 .15 .14 .14 .14 16.3500 .14 .14 .14 .14 .13 16.6000 .13 .13 .13 .13 .13 16.8500 .13 .13 .12 .12 .12 17.1000 .12 .12 .12 .11 .11 17.3500 .11 .11 .11 .11 .11 17.6000 .10 .10 .10 .10 .10 17.8500 .10 .10 .09 .09 .09 18.1000 .09 .09 .09 .09 .09 18.3500 .09 .09 .09 .09 .09 18.6000 .09 .09 .09 .09 .09 18.8500 .08 .08 .08 .08 .08 19.1000 .08 .08 .08 .08 .08 ' 19.3500 .08 .08 .08 .08 .08 19.6000 .08 .08 .08 .08 .08 19.8500 .08 .08 .08 .08 .07 20. 1000 .07 .07 .07 .07 .07 20.3500 .07 .07 .07 .07 .07 ' S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . SCS Unit Hyd. (HYG output) Page 5.18 Name. . . . LOT 2 DEV AREA Tag: Dev. .2 Event: 2 yr File. . . . J:\424\06\POST BUCKLANDRD REVISED.PPW Title. . . Lot 2 Developed Area Storm. . . TypeIII 24hr Tag: Dev. .2 HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .0500 hrs hrs Time on left represents time for first value in each row. --------- -------------------------------------------------------------- ' 20.6000 .07 .07 .07 .07 .07 20.8500 .07 .07 .07 .07 .07 21.1000 .07 .07 .07 .07 .07 21.3500 .07 .07 .07 .06 .06 ' 21.6000 .06 .06 .06 .06 .06 21.8500 .06 .06 .06 .06 .06 22.1000 .06 .06 .06 .06 .06 22.3500 .06 .06 .06 .06 .06 ' 22.6000 .06 .06 .06 .06 .06 22.8500 .06 .06 .06 .06 .06 23.1000 .05 .05 .05 .05 .05 23.3500 .05 .05 .05 .05 .05 23.6000 .05 .05 .05 .05 .05 23.8500 .05 .05 .05 .05 .03 24.1000 .01 .00 .00 S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . SCS Unit Hyd. Summary Page 5.19 Name. . . . LOT 2 DEV AREA Tag: Dev.25 Event: 25 yr File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW ' Storm. . . TypeIII 24hr Tag: Dev.25 SCS UNIT HYDROGRAPH METHOD STORM EVENT: 25 year storm Duration = 24.0000 hrs Rain Depth = 5.5000 in Rain Dir = D:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\424\06\ HYG File - ID = POST_BUC.HYG - LOT 2 DEV AREA Dev.25 ' Tc (Min. Tc) = .0833 hrs Drainage Area = 1.780 acres Runoff CN= 98 -------------------------------------------- -------------------------------------------- Computational Time Increment .01111 hrs Computed Peak Time 12.0952 hrs Computed Peak Flow = 8.22 cfs Time Increment for HYG File = .0500 hrs Peak Time, Interpolated Output = 12.1000 hrs Peak Flow, Interpolated Output = 8.21 cfs DRAINAGE AREA ------------------- ' ID:None Selected CN 98 Area = 1.780 acres ' S = .2041 in 0.2S = .0408 in Cumulative Runoff ------------------- 5.2625 in .781 ac-ft ' HYG Volume. . . .781 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** ' Time Concentration, Tc = .08330 hrs (ID: LOT 2 DEVELOPED) Computational Incr, Tm = .01111 hrs = 0.20000 Tp ' Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333 , K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) ' Unit peak, qp = 24.21 cfs Unit peak time Tp = .05553 hrs Unit receding limb, Tr = .22213 hrs Total unit time, Tb = .27767 hrs ' S/N: E21101506A8D Anchor Engineering Services, Inc. g g PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . SCS Unit Hyd. (HYG output) Page 5.20 Name. . . . LOT 2 DEV AREA Tag: Dev.25 Event: 25 yr File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW ' Storm. . . TypeIII 24hr Tag: Dev.25 SCS UNIT HYDROGRAPH METHOD STORM EVENT: 25 year storm Duration = 24.0000 hrs Rain Depth = 5.5000 in Rain Dir = D:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\424\06\ HYG File - ID = POST_BUC.HYG - LOT 2 DEV AREA Dev.25 ' Tc (Min. Tc) = .0833 hrs Drainage Area = 1.780 acres Runoff CN= 98 Calc. Increment= .01111 hrs Out. Incr .= .0500 hrs HYG Volume = .781 ac-ft HYDROGRAPH ORDINATES (cfs) Time I Output Time increment = .0500 hrs ' --- hrs--- I - Time on left represents time for first value in each row. I p .8000 I .00 .00 .00 .01 .01 1.0500 i .01 .01 .02 .02 .02 ' 1.3000 I .02 .02 .03 .03 .03 1.5500 I .03 .03 .03 .03 .04 1.8000 I .04 .04 .04 .04 .04 ' 2.0500 .I .04 .04 .05 .05 .05 2.3000 I .05 .05 .OS .05 .06 2.5500 I .06 .06 .06 .06 .06 2.8000 I .06 .07 .07 .07 .07 ' 3.0500 I .07 .07 .07 .07 .08 3.3000 I .08 .08 .08 .08 .08 3.5500 I .08 .08 .09 .09 .09 3.8000 I .09 .09 .09 .09 .09 ' 4.0500 I .09 .10 .10 .10 .10 4.3000 I .10 .10 .10 .10 .10 4.5500 I .11 .11 .11 .11 .11 ' 4.8000 I .11 .11 .11 .11 .12 5.0500 I .12 .12 .12 .12 .12 5.3000 I .12 .12 .12 .12 .13 5.5500 I .13 .13 .13 .13 .13 ' 5.8000 I .13 .13 .13 .13 .14 6.0500 I .14 .14 .14 .14 .15 6.3000 I .15 .15 .15 .16 .16 6.5500 I .16 .16 .17 .17 .17 ' 6.8000 I .17 .18 .18 .18 .18 7.0500 I .19 .19 .19 .19 .20 7.3000 I .20 .20 .20 .21 .21 7.5500 I .21 .21 .22 .22 .22 7.8000 I .23 .23 .23 .23 .24 8.0500 I .24 .24 .25 .25 .26 8.3000 I .27 .27 .28 .28 .29 ' 8.5500 I .29 .30 .31 .31 .32 ' S/N: E21101506A8D Anchor Engineering Services, Inc. g g PondPack Ver. 7.5 (765) Compute Time: 10:44: 57 Date: 07/01/2002 ' Type. . . . SCS Unit Hyd. (HYG output) Page 5.21 Name. . . . LOT 2 DEV AREA Tag: Dev.25 Event: 25 yr File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW ' Storm. . . TypeIII 24hr Tag: Dev.25 HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .0500 hrs ' ---hrs-- --Time-on-left represents time for first value in each row. - i - -------------------------------------------------- 8.8000 .32 .33 .33 .34 .35 9.0500 ( .35 .36 .36 .37 .37 9.3000 .38 .39 .39 .40 .40 9.5500 .41 .42 .42 .43 .43 9.8000 .44 .44 .45 .46 .46 10.0500 ( .47 .48 .49 .50 .51 ' 10.3000 .53 .54 .55 .56 .57 10.5500 .58 .60 .61 .62 .63 10.8000 .64 .66 .67 .68 .69 ' 11.0500 .72 .74 .78 .83 .87 11.3000 .92 .96 1.01 1 .05 1.10 11.5500 1.29 1.52 1.90 2.32 2.75 ' 11.8000 3.18 3.61 4.06 5.68 7.61 12.0500 8.11 8.21 6.73 4.83 4.02 12.3000 3.50 3.04 2.61 2.18 1.74 12.5500 1.46 1.21 1.11 1.05 1.01 12.8000 .96 .91 .87 .82 .78 13.0500 .75 .72 .70 .69 .68 13.3000 .66 .65 .64 .63 .62 13.5500 .60 .59 .58 .57 .56 13.8000 .55 .53 .52 .51 .50 14.0500 .49 .48 .47 .47 .46 14.3000 .46 .45 .45 .44 .43 ' 14.5500 .43 .42 .42 .41 .41 14.8000 .40 .39 .39 .38 .38 15.0500 .37 .37 .36 .35 .35 15.3000 .34 .34 .33 .33 .32 ' 15.5500 .31 .31 .30 .30 .29 15.8000 .29 .28 .27 .27 .26 16.0500 .26 .26 .25 .25 .25 16.3000 .25 .24 .24 .24 .24 ' 16.5500 .23 .23 .23 .23 .22 16.8000 .22 .22 .22 .21 .21 17.0500 .21 .21 .20 .20 .20 17.3000 .20 .19 .19 .19 .19 17.5500 .18 .18 .18 .18 .17 17.8000 .17 .17 .17 .16 .16 18.0500 .16 .16 .16 .16 .16 ' 18.3000 .15 .15 .15 .15 .15 18.5500 .15 .15 .15 .15 .15 18.8000 ( .15 .15 .15 .14 .14 19.0500 .14 .14 .14 .14 .14 19.3000 .14 .14 .14 .14 .14 19.5500 .14 .14 .13 .13 .13 19.8000 .13 .13 .13 .13 .13 ' 20.0500 .13 .13 .13 .13 .13 20.3000 .13 .12 .12 .12 .12 ' S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44: 57 Date: 07/01/2002 ' Type. . . . SCS Unit Hyd. (HYG output) Page 5.22 Name. . . . LOT 2 DEV AREA Tag: Dev.25 Event: 25 yr File. . . . J: \424\06\POST_BUCKLANDRD REVISED.PPW ' Storm. . . TypeIII 24hr Tag: Dev.25 HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .0500 hrs ' ---hrs i ----Time-on left represents time for first value in each row. --- --------------------------------------------------- 20.5500 .12 .12 .12 .12 .12 20.8000 .12 .12 .12 .12 .12 ' 21.0500 .12 .12 .12 .12 .12 21.3000 .11 .11 .11 . 11 .11 21.5500 .11 .11 .11 .11 .11 21.8000 .11 .11 .11 .11 .11 22.0500 .11 .11 .11 .10 .10 22.3000 .10 .10 .10 .10 .10 22.5500 .10 .10 .10 .10 .10 ' 22.8000 .10 .10 .10 .10 .10 23.0500 .09 .09 .09 .09 .09 23.3000 .09 .09 .09 .09 .09 23.5500 .09 .09 .09 .09 .09 23.8000 .09 .09 .09 .08 .08 24.0500 .05 .01 .00 .00 ' S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 1.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 Type. . . . SCS Unit Hyd. Summary Page 5.23 Name. . . . LOT 2 DEV AREA Tag: Dev100 Event: 100 yr File. . . . J:\424\06\POST BUCKLANDRD REVISED.PPW ' Storm. . . TypeIII 24hr Tag: Dev100 SCS UNIT HYDROGRAPH METHOD ' STORM EVENT: 100 year storm Duration = 24.0000 hrs Rain Depth = 6.9000 in Rain Dir = D:\HAESTAD\PPKW\RAINFALL\ ' Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\424\06\ HYG File - ID = POST_BUC.HYG - LOT 2 DEV AREA Dev100 Tc (Min. Tc) = .0833 hrs Drainage Area = 1.780 acres Runoff CN= 98 Computational Time Increment .01111 hrs Computed Peak Time 12.0952 hrs Computed Peak Flow = 10.33 cfs ' Time Increment for HYG File = OSOO hrs Peak Time, Interpolated Output = 12.1000 hrs Peak Flow, Interpolated Output = 10.32 cfs ' DRAINAGE AREA ------------------- ID:None Selected CN 98 Area = 1.780 acres ' S = .2041 in 0.2S = .0408 in Cumulative Runoff ------------------- 6.6610 in .988 ac-ft ' HYG Volume. . . .988 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** ' Time Concentration, Tc = .08330 hrs (ID: LOT 2 DEVELOPED) Computational Incr , Tm = .01111 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 24.21 cfs Unit peak time Tp = .05553 hrs Unit receding limb, Tr = .22213 hrs Total unit time, Tb = .27767 hrs ' S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver . 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 Type. . . . SCS Unit Hyd. (HYG output) Page 5.24 Name. . . . LOT 2 DEV AREA Tag: Dev100 Event: 100 yr File. . . . J: \424\06\POST_BUCKLANDRD REVISED.PPW Storm. . . TypeIII 24hr Tag: Dev100 SCS UNIT HYDROGRAPH METHOD ' STORM EVENT: 100 year storm Duration = 24.0000 hrs Rain Depth = 6.9000 in Rain Dir = D:\HAESTAD\PPKW\RAINFALL\ ' Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\424\06\ HYG File - ID = POST_BUC.HYG - LOT 2 DEV AREA Dev100 Tc (Min. Tc) = .0833 hrs Drainage Area = 1.780 acres Runoff CN= 98 Calc.Increment= .01111 hrs Out.Incr.= .0500 hrs HYG Volume = .988 ac-ft ' HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .0500 hrs ---hrs--- i ---- - -Timeonleft represents time for first value in each row. .6500 .00 .00 .01 .01 .01 .9000 .02 .02 .02 .03 .03 ' 1.1500 .03 .04 .04 .04 .04 1.4000 .04 .05 .05 .05 .05 1.6500 .05 .06 .06 .06 .06 1.9000 .06 .06 .07 .07 .07 2.1500 .07 .07 .07 .08 .08 2.4000 .08 .08 .08 .08 .09 2.6500 .09 .09 .09 .09 .09 ' 2.9000 .10 .10 .10 .10 .10 3.1500 .10 .10 .11 .11 .11 3.4000 .11 .11 .11 .11 .12 3.6500 .12 .12 .12 .12 .12 3.9000 .12 .13 .13 .13 .13 4.1500 .13 .13 .13 .14 .14 4.4000 .14 .14 .14 .14 .14 4.6500 .14 .15 .15 .15 .15 4.9000 .15 .15 .15 .15 .16 5.1500 .16 .16 .16 .16 .16 5.4000 .16 .16 .17 .17 .17 ' 5.6500 ( .17 .17 .17 .17 .17 5.9000 .18 .18 .18 .18 .18 6.1500 .18 .19 .19 .19 .20 6.4000 .20 .20 .21 .21 .21 ' 6.6500 .22 .22 .22 .23 .23 6.9000 .23 .24 .24 .24 .25 7.1500 .25 .25 .25 . 26 .26 7.4000 .26 .27 .27 .27 .28 7.6500 . 28 .28 .29 .29 .29 7.9000 .30 .30 .30 .31 .31 8.1500 .32 .33 .33 .34 .35 ' 8.4000 .35 .36 .37 .38 .38 1 ' S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 Type. . . . SCS Unit Hyd. (HYG output) Page 5.25 Name. . . . LOT 2 DEV AREA Tag: Dev100 Event: 100 yr File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW ' Storm. . . TypeIII 24hr Tag: Dev100 HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .0500 hrs ---hrs- Time on left represents time for first value in each row. -- ------------------- ------------------------------------------ 8.6500 .39 .40 .40 .41 .42 8.9000 .43 .43 .44 .45 .46 9.1500 .46 .47 .48 .48 .49 9.4000 .50 .51 .51 .52 .53 9.6500 .53 .54 .55 .56 .56 9.9000 .57 .58 .59 .60 .61 10.1500 .62 .64 .6'5 .66 .68 10.4000 .69 .71 .72 .74 .75 10.6500 .77 .78 .80 .81 .83 10.9000 .84 .86 .87 .90 .94 11.1500 .99 1.05 1.10 1.16 1.22 11.4000 1.27 1.33 1.39 1.63 1.91 ' 11.6500 2.39 2.92 3.46 4.00 4.54 11.9000 5.10 7.14 9.56 10.19 10.32 12.1500 8.46 6.06 5.04 4.39 3.82 12.4000 3.28 2.73 2.19 1.83 1.51 ' 12.6500 1.39 1.32 1.26 1.21 1.15 12.9000 1.09 1.03 .98 .94 .90 13.1500 .88 .86 .85 .83 .82 13.4000 .80 .79 .77 .76 .74 13.6500 .73 .71 .70 .68 .67 13.9000 ( .66 .64 .63 .61 .60 14.1500 .59 .59 .58 .57 .57 14.4000 .56 .55 .54 .54 .53 14.6500 .52 .52 .51 .50 .49 14.9000 .49 .48 .47 .47 .46 15.1500 .45 .45 .44 .43 .42 15.4000 .42 .41 .40 .39 .39 15.6500 .38 .37 .37 .36 .35 15.9000 .35 .34 .33 .33 .32 ' 16.1500 .32 .31 .31 .31 .30 16.4000 .30 .30 .30 .29 .29 16.6500 .29 .28 .28 .28 .27 16.9000 .27 .27 .26 .26 .26 17.1500 .25 .25 .25 .25 .24 17.4000 .24 .24 .23 .23 .23 17.6500 .22 .22 .22 .21 .21 17.9000 .21 .21 .20 .20 .20 18.1500 .20 .20 .19 .19 .19 18.4000 .19 .19 .19 .19 .19 18.6500 .19 .19 .19 .18 .18 18.9000 .18 .18 .18 .18 .18 19.1500 .18 .18 .18 .17 .17 19.4000 .17 .17 .17 .17 .17 19.6500 .17 .17 .17 .17 .16 19.9000 .16 .16 .16 .16 .16 20.1500 .16 .16 .16 .16 .16 t S/N: E21101506A8D Anchor Engineering Services Inc. g g PondPack Ver . 7.5 (765) Compute Time: 10:44: 57 Date: 07/01/2002 ' Type. . . . SCS Unit Hyd. (HYG output) Page 5.26 Name. . . . LOT 2 DEV AREA Tag: Dev100 Event: 100 yr File. . . . J:\424\06\POST BUCKLANDRD REVISED.PPW Storm. . . TypeIII 24hr Tag: Dev100 HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .0500 hrs ' - --hrs--- i ----Time-on-left represents time for first value in each row. ------------------------------------------------- 20.4000 .16 .16 .15 .15 .15 20.6500 .15 .15 .15 .15 .15 20.9000 .15 .15 .15 .15 .15 21.1500 .15 .14 .14 .14 .14 21,4000 14 .14 .14 .14 .14 ' 21.6500 .14 .14 .14 .14 .14 21.9000 .14 .13 .13 .13 .13 22.1500 .13 .13 .13 .13 .13 22.4000 .13 .13 .13 .13 .13 22.6500 .13 .12 .12 .12 .12 22.9000 .12 .12 .12 .12 .12 23.1500 .12 .12 .12 .12 .12 ' 23.4000 .12 .11 .11 .11 .11 23.6500 .11 .11 .11 .11 .11 23.9000 .11 .11 .11 .07 .02 24.1500 .00 .00 S/N: E21101506A8D Anchor Engineering Services Inc. g g PondPack Ver. 7.5 (765) Compute Time: 10:44: 57 Date: 07/01/2002 ' Type. . . . SCS Unit Hyd. Summary Page 5.27 Name. . . . UNDEVELOPED Tag: Dev. .2 Event: 2 yr File. . . . J: \424\06\POST_BUCKLANDRD REVISED.PPW ' Storm. . . TypeIII 24hr Tag: Dev. .2 SCS UNIT HYDROGRAPH METHOD ' STORM EVENT: 2 year storm Duration = 24.0000 hrs Rain Depth = 3.2000 in Rain Dir = D: \HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\424\06\ HYG File - ID = POST_BUC.HYG - UNDEVELOPED Dev. .2 ' Tc = 1.0244 hrs Drainage Area = 6.700 acres Runoff CN= 87 Computational Time Increment 13658 hrs Computed Peak Time 12.7020 hrs Computed Peak Flow = 5.82 cfs Time Increment for HYG File = .0500 hrs Peak Time, Interpolated Output = 12.7000 hrs Peak Flow, Interpolated Output = 5.82 cfs DRAINAGE AREA ------------------- ID:postDEVELOPED CN 87 Area = 6.700 acres S = 1.4943 in 0.2S = .2989 in Cumulative Runoff 1.9149 in 1.069 ac-ft HYG Volume. . . 1.069 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** 1 Time Concentration, Tc = 1.02436 hrs (ID: Undeveloped) Computational Incr, Tm = .13658 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) 1 Unit peak, qp = 7.41 cfs Unit peak time Tp = .68290 hrs Unit receding limb, Tr = 2.73161 hrs Total unit time, Tb = 3.41452 hrs S/N: E21101506A8D Anchor Engineering Services, Inc. Pondlack Ver . 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 Type. . . . SCS Unit Hyd. (HYG output) Page 5.28 Name. . . . UNDEVELOPED Tag: Dev. .2 Event: 2 yr File. . . . J:\424\06\POST BUCKLANDRD REVISED.PPW ' Storm. . . TypeIII 24hr Tag: Dev. .2 SCS UNIT HYDROGRAPH METHOD STORM EVENT: 2 year storm Duration = 24.0000 hrs Rain Depth = 3.2000 in Rain Dir = D: \HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\424\06\ HYG File - ID = POST_BUC.HYG - UNDEVELOPED Dev. .2 Tc = 1.0244 hrs Drainage Area = 6.700 acres Runoff CN= 87 Calc.Increment= .13658 hrs Out. Incr .= .0500 hrs HYG Volume = 1.069 ac-ft HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .OSOO hrs hrs i ---- - - - - - - Timeonleft represents time forfirstvalueineach row_- 7.5000 .00 .00 .00 .00 .00 7.7500 .00 .00 .01 .01 .01 8.0000 .01 .01 .01 .02 .02 8.2500 .02 .02 .02 .03 .03 8.5000 .03 .04 .04 .04 .05 8.7500 .05 .05 .06 .06 .06 9.0000 .07 .07 .08 .08 .09 9.2500 .09 .10 .10 .11 .11 9.5000 .12 .13 .13 .14 .15 9.7500 .15 .16 .17 .17 .18 10.0000 .19 .20 .21 .21 .22 10.2500 .23 .24 .25 .26 .27 10.5000 .28 .29 .30 .31 .32 10.7500 .34 .35 .36 .38 .39 11.0000 .41 .42 .44 .46 .47 11.2500 .49 .51 .53 .56 .58 11.5000 .61 .65 .68 .73 .78 11.7500 .84 .93 1.03 1.15 1.34 12.0000 1.53 1.79 2.10 2.41 2.83 12.2500 3. 25 3.68 4.11 4.54 4.91 12.5000 5.20 5.49 5.64 5.73 5.82 12.7500 5.73 5.63 5.51 5.28 5.06 13.0000 4.81 4.54 4.26 4.01 3.76 13.2500 3.51 3.30 3.10 2.90 2.74 13.5000 2.58 2.43 2.31 2.18 2.07 13.7500 1.97 1.88 1.80 1.72 1.65 14.0000 1. 58 1.52 1.47 1.42 1.37 14.2500 1.33 1.28 1.24 1.21 1.17 14.5000 1.14 1.11 1.08 1 .06 1.03 14.7500 1.01 .99 .97 .95 .93 15.0000 .91 .90 .88 .86 .85 15.2500 .83 .82 .81 .79 .78 S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7. 5 (765) Compute Time: 10:44:57 Date: 07/01/2002 Type. . . . SCS Unit Hyd. (HYG output) Page 5.29 Name. . . . UNDEVELOPED Tag: Dev. .2 Event: 2 yr File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW Storm. . . TypeIII 24hr Tag: Dev. .2 HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .0500 hrs - --hrs--- i --- Time-on left represents time for first value in each row. --------------------------------------------------- 15.5000 .77 .76 .74 .73 .72 ' 15.7500 .71 .70 .69 .68 .67 16.0000 .66 .65 .64 .62 .61 16.2500 .60 .59 .58 .57 .56 16.5000 .56 .55 .54 . 53 .52 16.7500 .51 .51 .50 .49 .49 17.0000 .48 .47 .47 .46 .46 17.2500 .45 .45 .44 .44 .43 17.5000 .43 .42 .42 .41 .41 17.7500 .40 .40 .39 .39 .38 18.0000 .38 .37 .37 .36 .36 18.2500 .35 .35 .35 .34 .34 18.5000 .33 .33 .33 .32 .32 18.7500 .32 .31 .31 .31 .31 19.0000 .30 .30 .30 .30 .30 19.2500 .29 .29 .29 .29 .29 19.5000 .28 .28 .28 .28 .28 19.7500 .28 .28 .27 .27 .27 20.0000 .27 .27 .27 .27 .26 20.2500 .26 .26 .26 . 26 .26 20.5000 .26 .25 .25 .25 .25 20.7500 .25 .25 .25 .25 .24 21.0000 .24 .24 .24 . 24 .24 21.2500 .24 .24 .24 .23 .23 21.5000 . 23 .23 .23 . 23 .23 21.7500 .23 .23 .22 .22 .22 22.0000 .22 . 22 .22 .22 .22 ' 22.2500 .22 .22 .21 .21 .21 22.5000 .21 .21 .21 .21 .21 22.7500 .21 .21 .20 .20 .20 23.0000 .20 . 20 .20 .20 .20 23.2500 .20 .19 .19 .19 .19 23.5000 .19 .19 .19 .19 .19 23.7500 .19 .18 .18 .18 .18 24.0000 .18 .18 .18 .17 .17 24.2500 .16 .16 .15 .15 .14 24.5000 .13 .12 .11 .10 .09 24.7500 .08 .07 .07 .06 .05 25.0000 .05 .04 .04 .03 .03 25.2500 .03 .02 .02 .02 .02 25.5000 .01 .01 .01 .01 .01 25.7500 .01 .01 .01 .01 .00 26.0000 .00 .00 .00 .00 .00 26.2500 .00 .00 .00 .00 .00 26.5000 .00 .00 S/N: E21101506A8D Anchor Engineering r g g Services ,ices , Inc. Pon1lack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 Type. . . . SCS Unit Hyd. Summary Page 5.30 Name. . . . UNDEVELOPED Tag: Dev.25 Event: 25 yr File. . . . J: \424\06\POST_BUCKLANDRD REVISED.PPW Storm. . . TypeIII 24hr Tag: Dev.25 SCS UNIT HYDROGRAPH METHOD STORM EVENT: 25 year storm Duration = 24.0000 hrs Rain Depth = 5.5000 in Rain Dir = D:\HAESTAD\PPKW\RAINFALL\ ' Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\424\06\ HYG File - ID = POST_BUC.HYG - UNDEVELOPED Dev.25 Tc = 1.0244 hrs Drainage Area = 6.700 acres Runoff CN= 87 -------------------------------------------- -------------------------------------------- ' Computational Time Increment .13658 hrs Computed Peak Time 12.7020 hrs Computed Peak Flow = 12.09 cfs Time Increment for HYG File = .0500 hrs Peak Time, Interpolated Output = 12.7000 hrs Peak Flow, Interpolated Output = 12.08 cfs DRAINAGE AREA ------------------- ' ID:postDEVELOPED CN 87 Area = 6.700 acres S = 1.4943 in 0.25 = .2989 in Cumulative Runoff ------------------- 4.0404 in 2.256 ac-ft HYG Volume. . . 2.256 ac-ft (area under HYG curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = 1.02436 hrs (ID: Undeveloped) Computational Incr, Tm = .13658 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) 1 Unit peak, qp = 7.41 cfs Unit peak time Tp = .68290 hrs Unit receding limb, Tr = 2.73161 hrs Total unit time, Tb = 3.41452 hrs ' S/N: E21101506A8D Anchor Engineering Services, Inc. g g PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 Type. . . . SCS Unit Hyd. (HYG output) Page 5.31 Name. . . . UNDEVELOPED Tag: Dev.25 Event: 25 yr File. . . . 1:14241011POST_BUCKLANDRD REVISED.PPW ' Storm. . . TypeIII 24hr Tag: Dev.25 SCS UNIT HYDROGRAPH METHOD ' STORM EVENT: 25 year storm Duration = 24.0000 hrs Rain Depth = 5.5000 in Rain Dir = D:\HAESTAD\PPKW\RAINFALL\ ' Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\424\06\ HYG File - ID = POST_BUC.HYG - UNDEVELOPED Dev.25 ' Tc = 1.0244 hrs Drainage Area = 6.700 acres Runoff CN= 87 Calc.Increment= .13658 hrs Out.Incr.= .0500 hrs ' HYG Volume = 2.256 ac-ft HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .0500 hrs ' hrs ---Time-on-left-represents-time-for-first value-in-each-row_ - 5.2000 .00 .00 .00 00 .00 5.4500 .00 .01 .01 .01 .01 ' 5.7000 .01 .01 .02 .02 .02 5.9500 .02 .02 .03 .03 .03 6.2000 .04 .04 .04 .04 .05 6.4500 .05 .05 .06 .06 .06 6.7000 .07 .07 .07 .08 .08 6.9500 .09 .09 .10 .10 .10 7.2000 ( .11 .11 .12 .12 .13 7.4500 .14 .14 .15 .15 .16 7.7000 .16 .17 .18 .18 .19 7.9500 .19 .20 .21 .21 .22 8.2000 .23 .24 .24 .25 .26 8.4500 .27 .28 .28 .29 .30 8.7000 .31 .32 .33 .35 .36 8.9500 .37 .38 .39 .41 .42 9.2000 .43 .45 .46 .48 .49 9.4500 .51 .52 .54 .55 .57 9.7000 .59 .60 .62 .64 .66 9.9500 .67 .69 .71 .73 .75 10.2000 .77 .79 .81 .83 .85 10.4500 .87 .90 .92 .95 .97 10.7000 1.00 1.03 1.06 1.09 1.12 10.9500 1.15 1.18 1.22 1.25 1.29 11.2000 1.33 1.37 1.42 1.46 1.52 11.4500 1.57 1.63 1.71 1.78 1.89 11.7000 2.01 2.13 2.34 2.55 2.82 11.9500 3.22 3.63 4.18 4.84 5.49 12.2000 6.34 7.21 8.07 8.93 9.78 12.4500 10.50 11.05 11.59 11.84 11.96 12.7000 12.08 11.86 11.61 11.31 10.81 ' 12.9500 10.31 9.77 9.19 8.61 8.08 S/N: E21101506A8D Anchor Engineering Services, Inc. ' PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . SCS Unit Hyd. (HYG output) Page 5.32 Name. . . . UNDEVELOPED Tag: Dev.25 Event: 25 yr File. . . . J: \424\06\POST_BUCKLANDRD REVISED.PPW Storm. . . TypeIII 24hr Tag: Dev.25 HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .0500 hrs ' - --hrs--- i - Time on left represents time for first value in each row. --------------------------------------------------------- 13.2000 7.56 7.04 6.61 6.18 5.79 ' 13.4500 5.45 5.11 4.82 4.55 4.29 13.7000 4.08 3.88 3.68 3.52 3.35 13.9500 3.21 3.08 2.95 2.84 2.74 14.2000 2.64 2.55 2.47 2.39 2.32 ' 14.4500 2.25 2.19 2.13 2.07 2.02 14.7000 1.97 1.93 1.88 1.84 1.80 14.9500 1.77 1.73 1.70 1.67 1.64 15.2000 1.61 1.58 1.55 1.52 1.49 15.4500 1.47 1.45 1.42 1.40 1.38 15.7000 1.36 1.34 1.32 1.29 1.27 15.9500 1.25 1.23 1.21 1.19 1.17 16.2000 1.15 1.13 1.11 1.10 1.08 16.4500 1.06 1.04 1.03 1.01 .99 16.7000 .98 .96 .95 .94 .92 16.9500 .91 .90 .89 .88 .87 ' 17.2000 .86 .85 .84 .83 .82 17.4500 .81 .80 .79 .78 .77 17.7000 .76 .75 .74 .73 .72 I 17.9500 .71 .70 .70 .69 .68 18.2000 .67 .66 .65 .64 .64 18.4500 .63 .62 .61 .61 .60 18.7000 .59 .59 .58 .58 .57 ' 18.9500 .57 .56 .56 .56 .55 19.2000 .55 .55 .54 .54 .54 19.4500 .53 .53 .53 .52 .52 19.7000 .52 .51 .51 .51 .51 ' 19.9500 .50 .50 .50 .50 .49 20.2000 .49 .49 .48 .48 .48 20.4500 .48 .47 .47 .47 .47 20.7000 .46 .46 .46 .46 .46 20.9500 .45 .45 .45 .45 .44 21.2000 .44 .44 .44 .44 .43 21.4500 .43 .43 .43 .43 .42 1 21.7000 .42 .42 .42 .42 .41 21.9500 .41 .41 .41 .41 .40 22.2000 .40 .40 .40 .40 .40 22.4500 .39 .39 .39 .39 .39 ' 22.7000 .38 .38 .38 .38 .38 22.9500 .37 .37 .37 .37 .37 23. 2000 .36 .36 .36 .36 .36 ' 23.4500 .35 .35 .35 .35 .35 23.7000 .34 .34 .34 .34 .34 23.9500 33 .33 .33 .32 .32 24.2000 .31 .30 .30 .28 .27 ' 24.4500 .26 .24 .22 .20 .19 24.7000 .17 .15 .14 .12 .11 ' S/N: E21101506A8D Anchor Engineering Services Inc. g g Pondlack Ver. 7.5 (765) Compute Time: 10:44: 57 Date: 07/01/2002 ' Type. . . . SCS Unit Hyd. (HYG output) Page 5.33 Name. . . . UNDEVELOPED Tag: Dev.25 Event: 25 yr File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW ' Storm. . . TypeIII 24hr Tag: Dev.25 HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .0500 hrs ' - --hrs--- i ---- -Timeon-left represents time for first value in each row. ---------------------------------------------- 24.9500 .10 .08 .08 .07 .06 ' 25.2000 .05 .05 .04 .04 .03 25.4500 .03 .03 .02 .02 .02 25.7000 .02 .01 .01 .01 .01 25.9500 .01 .01 .01 .01 .01 ' 26.2000 .00 .00 .00 .00 .00 26.4500 .00 .00 .00 .00 .00 26.7000 .00 .00 ' S/N: E21101506A8D Anchor Engineering Services Inc. g g PondPack Ver. 7.5 (765) Compute Time: 10:44: 57 Date: 07/01/2002 Type. . . . SCS Unit Hyd. Summary Page 5.34 Name. . . . UNDEVELOPED Tag: Dev100 Event: 100 yr File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW Storm. . . TypeIII 24hr Tag: Dev100 SCS UNIT HYDROGRAPH METHOD ' STORM EVENT: 100 year storm Duration = 24.0000 hrs Rain Depth = 6.9000 in Rain Dir = D:\HAESTAD\PPKW\RAINFALL\ ' Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J: \424\06\ HYG File - ID = POST_BUC.HYG - UNDEVELOPED Dev100 ' Tc = 1.0244 hrs Drainage Area = 6.700 acres Runoff CN= 87 Computational Time Increment = 13658 hrs Computed Peak Time = 12.7020 hrs Computed Peak Flow = 15.92 cfs ' Time Increment for HYG File = .0500 hrs Peak Time, Interpolated Output = 12.7000 hrs Peak Flow, Interpolated Output = 15.92 cfs DRAINAGE AREA ------------------- ID:postDEVELOPED CN 87 Area = 6.700 acres ' S = 1.4943 in 0.2S = .2989 in Cumulative Runoff 5.3827 in 3.005 ac-ft ' HYG Volume. . . 3.005 ac-ft (area under HYG. curve) ***** UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = 1.02436 hrs (ID: Undeveloped) Computational Incr, Tm = .13658 hrs = 0.20000 Tp ' Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) ' Unit peak, qp = 7.41 cfs Unit peak time Tp = .68290 hrs Unit receding limb, Tr = 2.73161 hrs ' Total unit time, Tb = 3.41452 hrs S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 Type. . . . SCS Unit Hyd. (HYG output) Page 5.35 Name. . . . UNDEVELOPED Tag: Dev100 Event: 100 yr File. . . . 1:14141011POST_BUCKLANDRD REVISED.PPW Storm. . . TypeIII 24hr Tag: Dev100 SCS UNIT HYDROGRAPH METHOD STORM EVENT: 100 year storm Duration = 24.0000 hrs Rain Depth = 6.9000 in Rain Dir = D:\HAESTAD\PPKW\RAINFALL\ ' Rain File -ID = SCSTYPES.RNF - TypeIII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = J:\424\06\ HYG File - ID = POST_BUC.HYG - UNDEVELOPED Dev100 Tc = 1.0244 hrs Drainage Area = 6.700 acres Runoff CN= 87 Calc.Increment= .13658 hrs Out.Incr.= .0500 hrs HYG Volume = 3.005 ac-ft HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .0500 hrs ' hrs i ---- -Timeon left represents time for first value in each row. 4.3500 .00 .00 .00 .00 .00 4.6000 .00 .01 .01 .01 .01 ' 4.8500 .01 .02 .02 .02 .02 5.1000 .03 .03 .03 .04 .04 5.3500 .04 .05 .05 .05 .06 5.6000 .06 .07 .07 .07 .08 5.8500 .08 .09 .09 .09 .10 6.1000 .10 .11 .11 .12 .12 6.3500 .12 .13 .13 .14 .14 ' 6.6000 .15 .15 .16 .17 .17 6.8500 .18 .18 .19 .20 .20 7.1000 .21 .22 .22 .23 .24 7.3500 .25 .25 .26 .27 .28 7.6000 .29 .30 .30 .31 .32 7.8500 .33 .34 .35 .36 .37 8.1000 .38 .39 .40 .41 .42 ' 8.3500 .43 .44 .45 .47 .48 8.6000 .49 .50 .52 .53 .55 8.8500 .57 .58 .60 .62 .63 9.1000 .65 .67 .69 .71 .73 9.3500 .75 .77 .79 .81 .84 9.6000 .86 .88 .90 .93 .95 9.8500 .97 1.00 1.02 1.05 1 .07 ' 10.1000 1.10 1.12 1.15 1.17 1.20 10.3500 1.23 1.26 1.29 1.32 1.35 10.6000 1.39 1.42 1.46 1.50 1.54 10.8500 1.58 1.62 1.66 1 .71 1.75 ' 11.1000 1.80 1.85 1.90 1.96 2.01 11.3500 2.07 2.15 2.22 2.30 2.40 11.6000 2.50 2.64 2.80 2.97 3.24 11.8500 3.52 3.89 4.42 4.96 5.69 ' 12.1000 6.56 7.42 8.53 9.67 10.80 S/N: E21101506A8D Anchor Engineering Services, Inc. ' Pondlack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . SCS Unit Hyd. (HYG output) Page 5.36 Name. . . . UNDEVELOPED Tag: Dev100 Event: 100 yr File. . . . 1:14141061POIT_BUCKLANDRD REVISED.PPW Storm. . . TypeIII 24hr Tag: Dev100 HYDROGRAPH ORDINATES (cfs) ' Time Output Time increment = .0500 hrs - --hrs---i ----Time- -on left represents time for first value in each row. ------------------------------------------------ 12.3500 11.91 13.01 13.94 14.64 15.33 ' 12.6000 15.64 15.78 15.92 15.60 15.26 12.8500 14.85 14.18 13.51 12.79 12.03 13.1000 11.26 10.55 9.86 9.18 8.62 13.3500 8.06 7.53 7.09 6.65 6.26 13.6000 5.92 5.57 5.29 5.02 4.76 ' 13.8500 4.55 4.34 4.15 3.98 3.82 14.1000 3.67 3.54 3.41 3.30 3.19 ' 14.3500 3.08 2.99 2.90 2.82 2.74 14.6000 2.67 2.60 2.54 2.48 2.42 14.8500 2.37 2.32 2.27 2.23 2.18 15.1000 2.14 2.10 2.06 2.02 1.98 15.3500 1.95 1.92 1.88 1.85 1.82 15.6000 1.80 1.77 1.74 1.71 1.69 15.8500 1.66 1.63 1.61 1.58 1.55 16.1000 1.53 1 .50 1.48 1.45 1.43 16.3500 1.40 1.38 1.36 1.33 1.31 16.6000 1.29 1.27 1.25 1.23 1.22 16.8500 1.20 1.18 1.17 1.15 1.14 ' 17.1000 ) 1.12 1.11 1.10 1.08 1.07 17.3500 1.06 1.04 1.03 1.02 1.01 17.6000 .99 .98 .97 .96 .95 17.8500 .94 .92 .91 .90 .89 ' 18.1000 .88 .87 .86 .84 .83 18.3500 .82 .81 .80 .79 .78 18.6000 .78 .77 .76 .7S .75 18.8500 .74 .73 .73 .72 .72 ' 19.1000 .71 .71 .70 .70 .69 19.3500 .69 .68 .68 .68 .67 19.6000 .67 .66 .66 .66 .65 19.8500 .65 .65 .64 .64 .64 20.1000 .63 .63 .63 .62 .62 20.3500 .62 .61 .61 .61 .60 20.6000 .60 .60 .59 .59 .59 20.8500 .58 .58 .58 .58 .57 21.1000 .57 .57 .57 .56 .56 21.3500 .56 .56 .55 .55 .55 21.6000 .54 .54 .54 .54 .53 21.8500 .53 .53 .53 .52 .52 22.1000 .52 .52 .51 .51 .51 22.3500 ( .51 .50 .50 . 50 .50 ' 22.6000 .49 .49 .49 .49 .48 22.8500 .48 .48 .48 .47 .47 23.1000 .47 .47 .46 .46 .46 23.3500 .46 .45 .45 .45 .45 ' 23.6000 .44 .44 .44 .44 .43 23.8500 .43 .43 .43 .42 .42 S/N: E21101506A8D Anchor Engineering Services, Inc. ' PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 Type. . . . SCS Unit Hyd. (HYG output) Page 5.37 Name. . . . UNDEVELOPED Tag: Dev100 Event: 100 yr File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW Storm. . . TypeIII 24hr Tag: Dev100 HYDROGRAPH ORDINATES (cfs) ' Time Output Time increment = .0500 hrs - --hrs--- i ----Time-on left represents time for first value in each row. ----------------------------------------------------- 24.1000 .41 .41 .40 .39 .38 24.3500 .36 .34 .33 .30 .28 24.6000 .26 .24 .22 .20 .18 24.8500 .16 .14 .12 .11 .10 25.1000 .09 .07 .07 .06 .05 ' 25.3500 .05 .04 .04 .03 .03 25.6000 .03 .02 .02 .02 .02 25.8500 .01 .01 .01 .01 .01 26.1000 .01 .01 .01 .00 .00 26.3500 .00 .00 .00 .00 .00 26.6000 .00 .00 .00 .00 .00 ' S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 Type. . . . Node: Addition Summary Page 6.01 Name. . . . EXISTING OUTFALL Event: 2 yr File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW Storm. . . TypeIII 24hr Tag: Dev. .2 SUMMARY FOR HYDROGRAPH ADDITION at Node: EXISTING OUTFALL ' HYG Directory: J: \424\06\ Upstream-Link-ID--Upstream-Node-ID---HYG-file-----HYG-ID-----------HYG-tag DET TO EX OUT DETENT 1&2 IN POST_BUC.HYG DET TO EX OUT Dev. .2 ' UNDEV_TO_EX_OUT UNDEVELOPED POST_BUC_HYG UNDEVELOPED Dev__2_ ' INFLOWS T0: EXISTING OUTFACE ---------------------------------------- Volume Peak Time Peak Flow HYG file HYG ID HYG tag ac-ft hrs cfs POST_BUC.HYG DET TO EX OUT Dev. .2 1.170 12.4000 3.94 POST_BUC.HYG UNDEVELOPED Dev. .2 1.069 12.7000 5.82 ' TOTAL FLOW INTO: EXISTING OUTFALL ---------------------------------------- Volume Peak Time Peak Flow cft fs HYG file HYG ID --------HYG-tag-----a------------hrs c--------- ----- POST_BUC.HYG EXISTING OUTFALL Dev. .2 2.239 12.7000 9.23 ' S/N: E21101506A8D Anchor Engineering Services Inc. g g PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . Node: Addition Summary Page 6.02 Name. . . . EXISTING OUTFALL Event: 2 yr File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW Storm. . . TypeIII 24hr Tag: Dev. .2 TOTAL NODE INFLOW. . . ' HYG file = J:\424\06\POST_BUC.HYG HYG ID = EXISTING OUTFALL HYG Tag = Dev. .2 ----------------------------------- Peak Discharge = 9.23 cfs Time to Peak = 12.7000 hrs HYG Volume = 2.239 ac-ft ----------------------------------- HYDROGRAPH ORDINATES cfs Time Output Time increment = .OSOO hrs - --hrs--- I ----Time-on-left represents time for first value in each row. -------------------------------------------------- 1.4000 .00 .00 .00 .00 .01 1.6500 .01 .01 .01 .01 .02 1.9000 .02 .02 .02 .02 .02 2.1500 .03 .03 .03 .03 .03 2.4000 .04 .04 .04 .04 .04 ' 2.6500 .05 .05 .OS .05 .05 2.9000 .06 .06 .06 .06 .06 3.1500 .07 .07 .07 .07 .07 3.4000 .08 .08 .08 .08 .08 3.6500 .08 .09 .09 .09 .09 3.9000 .09 .10 .10 .10 .10 4.1500 .10 .11 .11 .11 .11 4.4000 .11 .12 .12 .12 .12 ' 4.6500 .12 .12 .13 .13 .13 4.9000 .13 .13 .14 .14 .14 5.1500 .14 .14 .14 .15 .15 ' 5.4000 .15 .15 .15 .15 .16 5.6500 .16 .16 .16 .16 .17 5.9000 .17 .17 .17 .17 .17 6.1500 .18 .18 .18 .19 .19 ' 6.4000 .19 .20 .20 .20 .21 6.6500 .21 .21 .22 .22 .22 6.9000 .23 .23 .24 .24 .24 7.1500 .25 .25 .26 .26 .26 7.4000 .27 .27 .28 .28 .29 7.6500 .29 .30 .30 .31 .31 7.9000 .32 .32 .33 .33 .34 ' 8.1500 .35 .36 .36 .37 .38 8.4000 .39 .41 .42 .43 .44 8.6500 .45 .46 .47 .49 .50 8.9000 .51 .53 .54 .55 .57 ' 9.1500 .58 .59 .61 .62 .64 9.4000 .65 .67 .68 .70 .71 S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 Type. . . . Node: Addition Summary Page 6.03 Name. . . . EXISTING OUTFALL Event: 2 yr File. . . . J: \424\06\POST_BUCKLANDRD REVISED.PPW ' Storm. . . TypeIII 24hr Tag: Dev. .2 HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .OSOO hrs ' - --hrs--- i ----Time-on left represents time for first value in each row. ---------------------------------------------------- 9.6500 .73 .74 .76 .78 .79 9.9000 .81 .82 .84 .86 .88 10.1500 .89 .91 .92 .94 .96 10.4000 .98 1.00 1.02 1.05 1.07 10.6500 1.09 1.12 1.15 1.18 1.21 10.9000 1.23 1.27 1.30 1.33 1.37 11.1500 ( 1.41 1.45 1.50 1.56 1.62 11.4000 1.68 1.75 1.83 1.92 2.05 11.6500 2.22 2.45 2.60 2.81 3.04 ' 11.9000 3.33 3.68 4.05 4.54 5.01 12.1500 5.61 6.27 6.84 7.45 8.01 12.4000 8.49 8.83 9.03 9.18 9.22 ' 12.6500 9.23 9.23 9.07 8.89 8.69 12.9000 8.38 8.08 7.76 7.46 7.16 13.1500 6.87 6.59 6.32 6.08 5.85 13.4000 5.61 5.41 5.21 5.02 4.86 ' 13.6500 4.69 4.55 4.41 4.28 4.16 13.9000 4.05 3.94 3.82 3.70 3.59 14.1500 3.48 3.37 3.27 3.18 3.09 ' 14.4000 3.01 2.92 2.85 2.76 2.63 14.6500 ( 2.51 2.40 2.30 2.21 2.13 14.9000 2.05 1.98 1.91 1.85 1.80 15.1500 1.74 1.69 1.65 1.60 1.56 ' 15.4000 1.52 1.49 1.45 1.40 1.35 15.6500 1.30 1.27 1.23 1.20 1.17 15.9000 1.15 1.12 1.10 1.08 1.06 16.1500 1.04 1.02 1.01 .99 .98 ' 16.4000 .96 .95 .93 .92 .91 16.6500 .89 .88 .87 .86 .85 16.9000 .84 .83 .82 .81 .80 ' 17.1500 .79 .78 .77 .76 .75 17.4000 .74 .73 .73 .72 .71 17.6500 .70 .69 .68 .67 .66 17.9000 .66 .65 .64 .63 .62 ' 18.1500 .61 .61 .60 .59 .59 18.4000 .58 .58 .57 .57 .56 18.6500 .56 .55 .55 .54 .54 18.9000 .54 .53 .53 .53 .52 ' 19.1500 .52 .52 .51 .51 .51 19.4000 .50 .50 .50 .50 .49 19.6500 .49 .49 .49 .48 .48 ' 19.9000 .48 .47 .47 .47 .47 20.1500 ( .46 .46 .46 .46 .46 20.4000 .45 .45 .45 .45 .44 20.6500 .44 .44 .44 .44 .43 20.9000 .43 .43 .43 .43 .42 21.1500 .42 .42 .42 .42 .41 S/N: E21101506A8D Anchor Engineering Services Inc. g g PondPack Ver. 7.5 (765) Compute Time: 10:44: 57 Date: 07/01/2002 ' Type. . . . Node: Addition Summary Page 6.04 Name. . . . EXISTING OUTFALL Event: 2 yr File. . . . J: \424\06\POST_BUCKLANDRD REVISED.PPW ' Storm. . . TypeIII 24hr Tag: Dev. .2 HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .0500 hrs ' ---hrs--- i --Time-on left represents time for first value in each row. --------------------------------------------------- 21.4000 .41 .41 .41 .41 .40 ' 21.6500 .40 .40 .40 .40 .40 21.9000 .39 .39 .39 .39 .39 22.1500 .38 .38 .38 .38 .38 22.4000 .37 .37 .37 .37 .37 ' 22.6500 .36 .36 .36 .36 .36 22.9000 .36 .35 .35 .35 .35 23.1500 .35 .34 .34 .34 .34 23.4000 .34 .33 .33 .33 .33 ' 23.6500 .33 .32 .32 .32 .32 23.9000 .32 .31 .31 .30 .28 24.1500 .26 .23 .21 .19 .18 24.4000 .16 .15 .14 .13 .12 24.6500 .11 .09 .09 .07 .07 24.9000 .06 .05 .05 .04 .04 25.1500 .03 .03 .03 .02 .02 ' 25.4000 .02 .02 .01 .01 .01 25.6500 .01 .01 .01 .01 .01 25.9000 .01 .00 .00 .00 .00 26.1500 .00 .00 .00 .00 .00 ' 26.4000 .00 .00 .00 .00 S/N: E21101506A8D Anchor Engineering Services, Inc. g g PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . Node: Addition Summary Page 6.05 Name. . . . EXISTING OUTFALL Event: 25 yr File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW Storm. . . TypeIII 24hr Tag: Dev.25 SUMMARY FOR HYDROGRAPH ADDITION at Node: EXISTING OUTFALL ' HYG Directory: J:\424\06\ Upstream Link ID Upstream Node ID HYG file HYG-ID-----------HYG-tag DET TO EX OUT DETENT 1&2 IN POST_BUC.HYG DET TO EX OUT Dev.25 UNDEV TO EX OUT UNDEVELOPED POST_BUC.HYG UNDEVELOPED Dev.25 ------------------------------------------------------------------------- ' INFLOWS T0: EXISTING OUTFACE ---------------------------------------- Volume Peak Time Peak Flow HYG file HYG ID HYG tag ac-ft hrs cfs -------------------------------------------------------------------------- POST BUC.HYG DET TO EX OUT Dev.25 2.074 12.3000 9.51 POST_BUC.HYG UNDEVELOPED Dev.25 2.256 12.7000 12.08 ' TOTAL FLOW INTO: EXISTING OUTFALL ---------------------------------------- Volume Peak Time Peak Flow HYG file HYG ID HYG tag ac-ft hrs cfs ---------------------------------------------------------------------- POST_BUC.HYG---- EXISTING OUTFALL Dev.25 4.330 12.5500 19.65 S/N: E21101506A8D Anchor Engineering Services Inc. g g PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 Type. . . . Node: Addition Summary Page 6.06 Name. . . . EXISTING OUTFALL Event: 25 yr File. . . . J:\424\06\POST BUCKLANDRD REVISED.PPW Storm. . . TypeIII 24hr Tag: Dev.25 TOTAL NODE INFLOW. . . ' HYG file = J:\424\06\POST_BUC.HYG HYG ID = EXISTING OUTFALL HYG Tag = Dev.25 ----------------------------------- Peak Discharge = 19.65 cfs Time to Peak = 12.5500 hrs HYG Volume = 4.330 ac-ft ----------------------------------- HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .0500 hrs - --hrs--- i ----Time-on-left represents time for first value in each row. -------------------------------------------------- .8000 ( .00 .00 .00 .01 .01 ' 1.0500 .01 .02 .02 .03 .04 1.3000 .04 .05 .05 .06 .06 1.5500 .06 .07 .07 .08 .08 1.8000 .09 .09 .09 .10 .10 ' 2.0500 .10 .11 .11 .11 .12 2.3000 .12 .12 .13 .13 .14 2.5500 .14 .14 .15 .15 .15 2.8000 .16 .16 .16 .17 .17 3.0500 .18 .18 .18 .19 .19 3.3000 .19 .20 .20 .20 .21 3.5500 .21 .21 .22 .22 .22 ' 3.8000 .22 .23 .23 .23 .24 4.0500 .24 .24 .25 .25 .25 4.3000 .26 .26 .26 .26 .27 4.5500 .27 .27 .28 .28 .28 ' 4.8000 ( .29 .29 .29 .29 .30 5.0500 .30 .30 .31 .31 .31 5.3000 .32 .32 .32 .33 .33 ' 5.5500 .33 .34 .34 .35 .35 5.8000 .36 .36 .37 .37 .38 6.0500 .38 .39 .39 .40 .41 6.3000 .42 .43 .43 .44 .45 ' 6.5500 .46 .47 .48 .49 .50 6.8000 .51 .52 .54 .55 .56 7.0500 .57 .58 .59 .60 .61 7.3000 .63 .64 .65 .66 .68 ' 7.5500 .69 .70 .71 .73 .74 7.8000 .75 .76 .78 .79 .80 8.0500 .82 .83 .85 .87 .89 8.3000 .91 .93 .94 .96 .97 8. 5500 .99 1.01 1.03 1.05 1.07 8.8000 1.09 1.11 1.13 1.16 1.18 S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . Node: Addition Summary Page 6.07 Name. . . . EXISTING OUTFALL Event: 25 yr File. . . . J: \424\06\POST BUCKLANDRD REVISED.PPW Storm. . . TypeIII 24hr Tag: Dev.25 HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .0500 hrs ' hrs i ----Time-on left represents time for first value in each row. --------- ---------------------------------------------------- 9.0500 1.21 1.24 1.26 1.29 1.32 ' 9.3000 ( 1.35 1.37 1.40 1.43 1.46 9.5500 1.49 1.52 1.55 1.59 1.62 9.8000 1.65 1.68 1.71 1.75 1.78 10.0500 1.81 1.85 1.89 1.92 1.96 ' 10.3000 2.00 2.05 2.09 2.14 2.19 10.5500 2.24 2.29 2.34 2.40 2.45 10.8000 2.51 2.57 2.63 2.69 2.75 11.0500 2.82 2.89 2.96 3.02 3.09 11.3000 3.16 3.24 3.33 3.42 3.53 11.5500 3.65 3.80 4.02 4.28 4.51 11.8000 4.85 5.20 5.63 6.22 7.29 ' 12.0500 9.61 11.92 13.93 15.51 16.66 12.3000 ( 17.58 18.35 19.00 19.41 19.56 12.5500 19.65 19.42 19.07 18.76 18.13 12.8000 17.51 16.86 16.04 15.23 14.41 ' 13.0500 13.56 12.74 11.97 11.24 10.60 13.3000 10.10 9.59 9.12 8.71 8.30 13.5500 7.94 7.61 7.28 7.03 6.80 ' 13.8000 :1 6.58 6.39 6.21 6.04 5.89 14.0500 5.73 5.60 5.46 5.33 5.21 14.3000 5.09 4.98 4.88 4.78 4.68 14.5500 4.59 4.50 4.42 4.34 4.26 14.8000 4.19 4.12 4.04 3.95 3.86 15.0500 3.78 3.70 3.63 3.55 3.48 15.3000 3.41 3.34 3.28 3.22 3.15 15.5500 3.10 2.99 2.89 2.79 2.70 ' 15.8000 ( 2.62 2.54 2.47 2.40 2.33 16.0500 2.27 2.21 2.16 2.10 2.05 16.3000 2.01 1.96 1.92 1.88 1.84 16.5500 1.81 1.78 1.74 1.71 1.68 16.8000 1.66 1.63 1.61 1.57 1.53 17.0500 1.50 1.47 1.45 1.43 1.41 17.3000 1.39 1.37 1.35 1.33 1.31 17.5500 1.30 1.28 1.26 1.25 1.23 17.8000 1.22 1.20 1.19 1.17 1.15 18.0500 ( 1.14 1.12 1.11 1.10 1.08 18.3000 1.07 1.06 1.05 1.04 1 .03 ' 18.5500 1.02 1.01 1.00 1.00 .99 18.8000 .98 .97 .97 .96 .95 19.0500 .95 .94 .94 .93 .92 ' 19.3000 .92 .91 .91 .90 .90 19.5500 .89 .89 .88 .88 .87 19.8000 .87 .86 .86 .86 .85 20.0500 .85 .84 .84 .83 .83 ' 20.3000 .82 .82 .82 .81 .81 20.5500 .80 .80 .80 .79 .79 S/N: E21101506A8D Anchor Engineering Services Inc. g g PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 Type. . . . Node: Addition Summary Page 6.08 Name. . . . EXISTING OUTFALL Event: 25 yr File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW ' Storm. . . TypeIII 24hr Tag: Dev. 25 HYDROGRAPH ORDINATES (cfs) ' Time Output Time increment = .0500 hrs - --hrs--- i ---- -Timeon left represents time for first value in each row. ---------------------------------------------------- 20.8000 .78 .78 .78 .77 .77 ' 21.0500 .77 .76 .76 .76 .75 21.3000 .75 .74 .74 .74 .73 21.5500 .73 .73 .72 .72 .72 21.8000 .71 .71 .71 .70 .70 ' 22.0500 .70 .69 .69 .69 .68 22.3000 .68 .68 .67 .67 .66 22.5500 .66 .66 .66 .65 .65 22.8000 .64 .64 .64 .63 .63 ' 23.0500 .63 .62 .62 .62 .61 23.3000 .61 .61 .60 .60 .60 23.5500 .59 .59 .59 .58 .58 ' 23.8000 .58 .57 .57 .56 .56 24.0500 .55 .51 .46 .42 .38 24.3000 .35 .33 .30 .28 .26 24.5500 .23 .21 .19 .17 .16 ' 24.8000 .14 .12 .11 .10 .08 25.0500 .08 .07 .06 .05 .05 25.3000 .04 .04 .03 .03 .03 ' 25.5500 .02 .02 .02 .02 .01 25.8000 .01 .01 .01 .01 .01 26.0500 .01 .01 .01 .00 .00 26.3000 .00 .00 .00 .00 .00 ' 26.5500 .00 .00 .00 .00 .00 S/N: E21101506A8D Anchor Engineering g g Services, Inc. Pondlack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . Node: Addition Summary Page 6.09 Name. . . . EXISTING OUTFALL Event: 100 yr File. . . . J: \424\06\POST_BUCKLANDRD REVISED.PPW Storm. . . TypeIII 24hr Tag: Dev100 SUMMARY FOR HYDROGRAPH ADDITION ' at Node: EXISTING OUTFALL HYG Directory: J:\424\06\ Upstream Link ID Upstream Node ID HYG file HYG ID-----------HYG-tag ------------------------------------------------------ DET TO EX OUT DETENT 1&2 IN POST_BUC.HYG DET TO EX OUT Dev100 UNDEV-TO-EX-OUT ---UNDEVELOPED --------POST_BUC_HYG--UNDEVELOPED -----Dev10O- INFLOWS T0: EXISTING OUTFACE ----------------------------- ----------- Volume Peak Time Peak Flow HYG file HYG ID HYG tag ac-ft hrs cfs ' POST_BUC.HYG DET TO EX OUT Dev100 2.625 12.3000 12.43 POST BUC.HYG UNDEVELOPED Dev100 3.005 12.7000 15.92 ' TOTAL FLOW INTO: EXISTING OUTFALL ---------------------------------------- Volume Peak Time Peak Flow HYG file : HYG ID HYG tagac_ -------- ---------fthrscfs- ----- - -- POST BUC.HYG EXISTING OUTFALL Dev100 5.631 12.5500 26.14 ' S/N: E21101506A8D Anchor Engineering Services Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44: 57 Date: 07/01/2002 ' Type. . . . Node: Addition Summary Page 6.10 Name. . . . EXISTING OUTFALL Event: 100 yr File. . . . J: \424\06\POST_BUCKLANDRD REVISED.PPW Storm. . . TypeIII 24hr Tag: Dev100 TOTAL NODE INFLOW. . . ' HYG file = J:\424\06\POST_BUC.HYG HYG ID = EXISTING OUTFALL HYG Tag = Dev100 ----------------------------------- Peak Discharge = 26.14 cfs Time to Peak = 12.5500 hrs HYG Volume = 5.631 ac-ft ----------------------------------- HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .0500 hrs ' - --hrs--- i ----Time on left represents time for first value in each row. --------------------------------------------------------- .6500 .00 .00 .01 .01 .02 ' .9000 .02 .03 .04 .05 .OS 1.1500 .06 .07 .08 .08 .09 1.4000 .10 .10 .11 .12 .12 1.6500 .13 .13 .14 .14 .15 1.9000 .15 .16 .16 .16 .17 2.1500 .17 .18 .18 .18 .19 2.4000 .19 .20 .20 .21 .21 2.6500 .22 .22 .23 .23 .23 2.9000 .24 .24 .25 .25 .26 3.1500 .26 .26 .27 .27 .28 3.4000 .28 .28 .29 .29 .30 ' 3.6500 .30 .30 .31 .31 .31 3.9000 .32 .32 .33 .33 .33 4.1500 .34 .34 .34 .35 .35 4.4000 .36 .36 .36 .37 .37 ' 4.6500 .38 .38 .39 .39 .40 4.9000 .41 .41 .42 .42 .43 5.1500 .44 .44 .45 .46 .46 ' 5.4000 .47 .48 .48 .49 .50 5.6500 .51 .51 .52 .53 .53 5.9000 .54 .55 .56 .56 .57 6.1500 .58 .59 .60 .61 .62 ' 6.4000 .64 .65 .66 .67 .69 6.6500 .70 .71 .73 .74 .76 6.9000 ( .77 .79 .80 .82 .83 7.1500 .85 .86 .88 .90 .91 ' 7.4000 .93 .94 .95 .97 .98 7.6500 .99 1.01 1.02 1.04 1.05 7.9000 1.07 1.08 1.10 1.12 1.13 ' 8.1500 1.15 1.17 1.19 1.22 1.24 8.4000 1.26 1.29 1.31 1.34 1.37 8.6500 1.40 1.43 1.46 1.49 1.52 S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . Node: Addition Summary Page 6.11 Name. . . . EXISTING OUTFALL Event: 100 yr File. . . . J:\424\06\POST BUCKLANDRD REVISED.PPW Storm. . . TypeIII 24hr Tag: Dev100 HYDROGRAPH ORDINATES (cfs) ' Time -----Output-Time-increment = .0500 hrs - --hrs--- i ----Time-on left represents time for first value in each row. ------------------------------- 8.9000 1.56 1.59 1.63 1.66 1.70 ' 9.1500 1.74 1.77 1 .81 1.85 1.89 9.4000 1.93 1.97 2.01 2.05 2.09 9.6500 2.13 2.17 2.21 2.25 2.30 9.9000 2.34 2.38 2.43 2.47 2.52 ' 10.1500 2.56 2.61 2.66 2.72 2.77 10.4000 2.83 2.89 2.96 3.02 3.07 10.6500 3.12 3.17 3.23 3.28 3.34 10.9000 3.40 3.47 3.53 3.60 3.67 ' 11.1500 3.75 3.83 3.93 4.03 4.14 11.4000 4.26 4.39 4.54 4.69 4.85 11.6500 5.07 5.34 5.64 6.06 6.48 ' 11.9000 7.26 8.79 11.15 13.98 16.86 12.1500 ( 19.19 20.79 22.09 23.23 24.24 12.4000 25.15 25.82 26.10 26.14 25.77 12.6500 25.24 24.75 23.86 22.99 22.09 ' 12.9000 20.98 19.91 18.81 17.69 16.59 13.1500 15.58 14.61 13.68 12.88 12.11 13.4000 11.39 10.77 10.22 9.77 9.36 13.6500 .E 8.95 8.61 8.27 7.95 7.68 13.9000 ( 7.41 7.16 6.94 6.75 6.59 14.1500 6.43 6.28 6.15 6.01 5.89 14.4000 5.78 5.66 5.56 5.45 5.35 ' 14.6500 5.25 5.16 5.07 4.98 4.90 14.9000 4.82 4.75 4.67 4.60 4.53 15.1500 4.46 4.40 4.33 4.27 4.19 15.4000 4.11 4.03 3.96 3.88 3.81 ' 15.6500 3.74 3.67 3.60 3 .54 3.47 15.9000 3.41 3.35 3.28 3.22 3.11 16.1500 3.01 2.92 2.83 2.75 2.67 ' 16.4000 2.60 2.53 2.47 2.41 2.36 16.6500 2.30 2.26 2.21 2.17 2.13 16.9000 2.09 2.05 2.02 1 .99 1.96 17.1500 1.93 1.90 1.87 1.84 1.82 ' 17.4000 1.79 1.77 1.74 1 .72 1.70 17.6500 ( 1.67 1.65 1.62 1.58 1.55 17.9000 1.53 1.50 1.48 1.46 1.43 18.1500 1.41 1.40 1.38 1.36 1.35 ' 18.4000 1.34 1.32 1.31 1.30 1.29 18.6500 1.27 1.26 1.25 1.24 1.24 18.9000 1.23 1.22 1.21 1 .20 1.19 ' 19.1500 1.19 1.18 1.17 1.17 1.16 19.4000 1.15 1.15 1.14 1.13 1.13 19.6500 1.12 1.11 1.11 1 .10 1.10 19.9000 1.09 1.08 1.08 1.07 1.07 ' 20.1500 1.06 1.06 1.05 1.04 1.04 20.4000 1.03 1.03 1.02 1 .02 1.01 ' S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . Node: Addition Summary Page 6.12 Name. . . . EXISTING OUTFALL Event: 100 yr File. . . . 1: 1424106110ST_BUCKLANDRD REVISED.PPW Storm. . . TypeIII 24hr Tag: Dev100 HYDROGRAPH ORDINATES (cfs) ' ---Time Output Time increment = .0500 hrs hrs--- i ----Time-on left represents time for first value in each row. ----------------------------------------------------- 20.6500 1.01 1.00 1.00 .99 .99 ' 20.9000 .98 .98 .98 .97 .97 21.1500 .96 .96 .95 .95 .94 21.4000 .94 .94 .93 .93 .92 21.6500 .92 .91 .91 .90 .90 21.9000 .90 .89 .89 .88 .88 22.1500 .87 .87 .86 .86 .86 22.4000 .85 .85 .84 .84 .83 22.6500 .83 .83 .82 .82 .81 22.9000 .81 .80 .80 .80 .79 23.1500 .79 .78 .78 .77 .77 23.4000 .76 .76 .76 .75 .75 23.6500 .74 .74 .73 .73 .73 23.9000 .72 .72 .71 .69 .64 24.1500 .59 .53 .49 .45 .42 24.4000 .38 .36 .33 .30 .27 24.6500 .25 .22 .20 .18 .16 24.9000 .14 .12 .11 .10 .09 25.1500 .07 .07 .06 .05 .05 ' 25.4000 .04 .04 .03 .03 .03 25.6500 ( .02 .02 .02 .02 .01 25.9000 .01 .01 .01 .01 .01 26.1500 .01 .01 .00 .00 .00 ' 26.4000 .00 .00 .00 .00 .00 26.6500 .00 .00 .00 .00 S/N: E21101506A8D Anchor Engineering Services, Inc. ' PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . Time-Elev Page 7.01 Name. . . . DETENT 1&2 OUT Tag: Dev. .2 Event: 2 yr File. . . . J:\424\06\POST BUCKLANDRD REVISED.PPW ' Storm. . . TypeIII 24hr Tag: Dev. .2 TIME vs. ELEVATION (ft) Time Output Time increment = .0500 hrs hrs Time on left represents time for first value in each row. --------- -------------------------------------------------------------- 1.3500 147.50 147.50 147.50 147.50 147.50 1.6000 147.50 147.51 147.51 147.51 147.51 1.8500 147.51 147.51 147.51 147.52 147.52 2.1000 147.52 147.52 147.52 147.52 147.52 ' 2.3500 147.53 147.53 147.53 147.53 147.53 2.6000 147.53 147.53 147.54 147.54 147.54 2.8500 147.54 147.54 147.54 147.54 147.55 ' 3.1000 147.55 147.55 147.55 147.55 147.55 3.3500 147.55 147.56 147.56 147.56 147.56 3.6000 147.56 147.56 147.56 147.57 147.57 3.8500 147.57 147.57 147.57 147.57 147.57 4.1000 147.58 147.58 147.58 147.58 147.58 4.3500 147.58 147.58 147.58 147.59 147.59 4.6000 147.59 147.59 147.59 147.59 147.59 4.8500 147.60 147.60 147.60 147.60 147.60 ' 5.1000 147.60 147.60 147.61 147.61 147.61 5.3500 147.61 147.61 147.61 147.61 147.61 5.6000 147.62 147.62 147.62 147.62 147.62 ' 5.8500 ,E 147.62 147.62 147.62 147.63 147.63 6.1000 147.63 147.63 147.63 147.63 147.64 6.3500 147.64 147.64 147.64 147.65 147.65 6.6000 147.65 147.65 147.66 147.66 147.66 ' 6.8500 147.67 147.67 147.67 147.67 147.68 7.1000 147.68 147.68 147.69 147.69 147.69 7.3500 147.70 147.70 147.70 147.70 147.71 7.6000 147.71 147.71 147.72 147.72 147.72 7.8500 147.73 147.73 147.73 147.73 147.74 8.1000 147.74 147.74 147.75 147.75 147.76 8.3500 147.77 147.77 147.78 147.78 147.79 ' 8.6000 147.80 147.80 147.81 147.81 147.82 8.8500 147.83 147.83 147.84 147.85 147.85 9.1000 147.86 147.87 147.87 147.88 147.89 9.3500 147.89 147.90 147.91 147.91 147.92 ' 9.6000 ( 147.93 147.93 147.94 147.95 147.95 9.8500 147.96 147.97 147.97 147.98 147.99 10.1000 148.00 148.00 148.00 148.01 148.01 10.3500 148.02 148.02 148.03 148.03 148.04 10.6000 148.05 148.05 148.06 148.07 148.07 10.8500 148.08 148.09 148.10 148.11 148.12 11.1000 148.13 148.14 148.15 148.17 148.18 11.3500 148.20 148.23 148.25 148.27 148.30 11.6000 148.35 148.41 148.50 148.58 148.67 11.8500 148.78 148.92 149.07 149.26 149.49 12.1000 149.69 149.84 149.93 149.99 150.02 ' 12.3500 150.04 150.04 150.04 150.03 150.01 S/N: E21101506A8D Anchor Engineering Services, Inc. Pon1lack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 Type. . . . Time-Elev Page 7.02 Name. . . . DETENT 1&2 OUT Tag: Dev. .2 Event: 2 yr File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW ' Storm. . . TypeIII 24hr Tag: Dev. .2 TIME vs. ELEVATION (ft) Time Output Time increment = .0500 hrs hrs Time on left represents time for first value in each row. --------- -------------------------------------------------------------- ' 12.6000 149.98 149.95 149.92 149.89 149.86 12.8500 149.83 149.80 149.77 149.74 149.71 13.1000 149.67 149.64 149.60 149.57 149.53 13.3500 149.50 149.45 149.41 149.37 149.33 ' 13.6000 149.29 149.25 149.21 149.17 149.13 13.8500 149.09 149.05 149.02 148.97 148.92 14.1000 148.87 148.82 148.77 148.73 148.69 ' 14.3500 148.64 148.60 148.57 148.53 148.49 14.6000 148.44 148.39 148.35 148.31 148.27 14.8500 148.24 148.21 148.19 148.16 148.14 15.1000 148.12 148.10 148.08 148.07 148.05 ' 15.3500 148.04 148.03 148.02 148.00 147.98 15.6000 147.95 147.92 147.90 147.88 147.87 15.8500 147.86 147.85 147.84 147.83 147.82 16.1000 147.81 147.81 147.80 147.80 147.79 16.3500 147.79 147.78 147.78 147.78 147.77 16.6000 147.77 147.77 147.77 147.76 147.76 16.8500 147.76 147.75 147.75 147.75 147.75 17.1000 147.74 147.74 147.74 147.73 147.73 17.3500 147.73 147.73 147.72 147.72 147.72 17.6000 147.71 147.71 147.71 147.71 147.70 17.8500 147.70 147.70 147.70 147.69 147.69 ' 18.1000 147.69 147.68 147.68 147.68 147.68 18.3500 147.68 147.68 147.68 147.68 147.67 18.6000 147.67 147.67 147.67 147.67 147.67 18.8500 147.67 147.67 147.67 147.67 147.67 ' 19.1000 147.66 147.66 147.66 147.66 147.66 19.3500 147.66 147.66 147.66 147.66 147.66 19.6000 147.66 147.66 147.65 147.65 147.65 ' 19.8500 147.65 147.65 147.65 147.65 147.65 20.1000 147.65 147.65 147.65 147.65 147.65 20.3500 147.64 147.64 147.64 147.64 147.64 20.6000 147.64 147.64 147.64 147.64 147.64 ' 20.8500 147.64 147.64 147.64 147.64 147.64 21.1000 147.63 147.63 147.63 147.63 147.63 21.3500 147.63 147.63 147.63 147.63 147.63 21.6000 147.63 147.63 147.63 147.63 147.63 ' 21.8500 ( 147.63 147.62 147.62 147.62 147.62 22.1000 147.62 147.62 147.62 147.62 147.62 22.3500 147.62 147.62 147.62 147.62 147.62 ' 22.6000 147.62 147.62 147.61 147.61 147.61 22.8500 147.61 147.61 147.61 147.61 147.61 23.1000 147.61 147.61 147.61 147.61 147.61 23.3500 147.61 147.61 147.61 147.60 147.60 ' 23.6000 147.60 147.60 147.60 147.60 147.60 23.8500 147.60 147.60 147.60 147.60 147.59 S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 1 Type. . . . Time-Elev Page 7.03 Name. . . . DETENT 1&2 OUT Tag: Dev. .2 Event: 2 yr File. . . . 1:14241061POIT_BUCKLANDRD REVISED.PPW 1 Storm. . . TypeIII 24hr Tag: Dev. .2 TIME vs. ELEVATION (ft) 1 Time Output Time increment = .0500 hrs hrs Time on left represents time for first value in each row. --------- -------------------------------------------------------------- 1 24.1000 147.58 147.56 147.55 147.53 147.53 24.3500 147.52 147.51 147.51 147.51 147.51 24.6000 147.50 147.50 147.50 147.50 1 1 1 1 1 1 i 1 i i 1 1 1 S/N: E21101506A8D Anchor Engineering Services, Inc. 1 Pondlack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . Time-Elev Page 7.04 Name. . . . DETENT 1&2 OUT Tag: Dev.25 Event: 25 yr File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW ' Storm. . . TypeIII 24hr Tag: Dev.25 TIME vs. ELEVATION (ft) ' Time Output Time increment = .0500 hrs hrs Time on left represents time for first value in each row. --------- -------------------------------------------------------------- .7500 147.50 147.50 147.50 147.50 147.50 1.0000 147.51 147.51 147.51 147.52 147.52 1.2500 147.53 147.53 147.53 147.54 147.54 1 .5000 147.54 147.55 147.55 147.55 147.56 ' 1.7500 147.56 147.56 147.57 147.57 147.57 2.0000 147.57 147.58 147.58 147.58 147.58 2.2500 ( 147.59 147.59 147.59 147.59 147.60 2.5000 147.60 147.60 147.61 147.61 147.61 2.7500 147.61 147.62 147.62 147.62 147.62 3.0000 147.63 147.63 147.63 147.63 147.64 3.2500 147.64 147.64 147.64 147.65 147.65 ' 3.5000 147.65 147.65 147.66 147.66 147.66 3.7500 147.66 147.67 147.67 147.67 147.67 4.0000 147.68 147.68 147.68 147.68 147.68 4.2500 147.69 147.69 147.69 147.69 147.70 4.5000 147.70 147.70 147.70 147.70 147.71 4.7500 147.71 147.71 147.71 147.71 147.72 5.0000 147.72 147.72 147.72 147.73 147.73 5.2500 147.73 147.73 147.73 147.74 147.74 ' 5.5000 147.74 147.74 147.74 147.75 147.75 5.7500 147.75 147.75 147.75 147.76 147.76 6.0000 147.76 147.76 147.76 147.77 147.77 ' 6.2500 147.77 147.78 147.78 147.79 147.79 6.5000 147.79 147.80 147.80 147.81 147.81 6.7500 147.82 147.82 147.83 147.83 147.84 7.0000 147.84 147.85 147.85 147.86 147.86 7.2500 147.87 147.87 147.88 147.88 147.89 7.5000 147.89 147.90 147.90 147.91 147.91 7.7500 147.92 147.92 147.93 147.93 147.94 8.0000 147.95 147.95 147.96 147.96 147.97 ' 8.2500 147.98 147.99 148.00 148.00 148.01 8.5000 148.01 148.01 148.02 148.02 148.03 8.7500 148.03 148.04 148.04 148.05 148.06 ' 9.0000 148.06 148.07 148.08 148.08 148.09 9.2500 148.10 148.10 148.11 148.12 148.12 9.5000 148.13 148.14 148.15 148.15 148.16 9.7500 148.17 148.18 148.18 148.19 148.20 ' 10.0000 148.21 148.21 148.22 148.23 148.24 10.2500 148.25 148.26 148.27 148.28 148.30 10.5000 148.31 148.32 148.34 148.35 148.36 10.7500 148.38 148.39 148.40 148.42 148.43 ' 11.0000 148.45 148.46 148.48 148.50 148.52 11.2500 148.54 148.56 148.59 148.62 148.65 11.5000 148.68 148.73 148.79 148.88 149.00 11.7500 149.11 149.24 149.40 149.57 149.76 S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . Time-Elev Page 7.05 Name. . . . DETENT 1&2 OUT Tag: Dev.25 Event: 25 yr File. . . . J: \424\06\POST_BUCKLANDRD REVISED.PPW ' Storm. . . TypeIII 24hr Tag: Dev.25 TIME vs. ELEVATION (ft) ' Time Output Time increment = .0500 hrs hrs Time on left represents time for first value in each row. --------- -------------------------------------------------------------- 12.0000 150.01 150.25 150.48 150.64 150.72 12.2500 150.75 150.76 150.75 150.72 150.69 12.5000 150.64 150.59 150.54 150.48 150.42 12.7500 150.36 150.31 150.27 150.22 150.18 13.0000 150.14 150.10 150.07 150.04 150.01 13.2500 149.98 149.95 149.92 149.89 149.86 13.5000 149.84 149.81 149.79 149.76 149.73 13.7500 149.71 149.68 149.65 149.62 149.59 ' 14.0000 149.56 149.53 149.50 149.47 149.43 14.2500 149.40 149.36 149.33 149.29 149.26 14.5000 149.23 149.19 149.16 149.13 149.10 ' 14.7500 149.07 149.03 149.00 148.96 148.92 15.0000 ( 148.88 148.84 148.80 148.76 148.73 15.2500 148.69 148.66 148.63 148.59 148.56 15.5000 148.53 148.50 148.46 148.42 148.38 ' 15.7500 148.35 148.32 148.29 148.26 148.24 16.0000 148.21 148.19 148.17 148.15 148.14 16.2500 148.12 148.11 148.10 148.08 148.07 16.5000 148.06 148.05 148.04 148.04 148.03 16.7500 148.02 148.01 148.01 148.00 147.98 17.0000 147.97 147.95 147.94 147.93 147.92 17.2500 147.91 147.91 147.90 147.89 147.89 ' 17.5000 147.88 147.88 147.87 147.87 147.86 17.7500 147.86 147.85 147.85 147.84 147.84 18.0000 147.83 147.83 147.82 147.82 147.82 18.2500 147.81 147.81 147.81 147.81 147.80 18.5000 147.80 147.80 147.80 147.80 147.80 18.7500 147.79 147.79 147.79 147.79 147.79 19.0000 147.79 147.79 147.78 147.78 147.78 ' 19.2500 ( 147.78 147.78 147.78 147.78 147.77 19.5000 147.77 147.77 147.77 147.77 147.77 19.7500 147.77 147.76 147.76 147.76 147.76 20.0000 147.76 147.76 147.75 147.75 147.75 ' 20.2500 147.75 147.75 147.75 147.75 147.75 20.5000 ( 147.75 147.74 147.74 147.74 147.74 20.7500 147.74 147.74 147.74 147.74 147.74 21.0000 147.73 147.73 147.73 147.73 147.73 ' 21.2500 147.73 147.73 147.73 147.73 147.72 21.5000 147.72 147.72 147.72 147.72 147.72 21.7500 147.72 147.72 147.72 147.72 147.71 ' 22.0000 147.71 147.71 147.71 147.71 147.71 22.2500 147.71 147.71 147.70 147.70 147.70 22.5000 147.70 147.70 147.70 147.70 147.70 22.7500 147.70 147.70 147.69 147.69 147.69 23.0000 147.69 147.69 147.69 147.69 147.69 23.2500 147.69 147.68 147.68 147.68 147.68 ' S/N: E21101506A8D Anchor Engineering Services Inc. g g PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . Time-Elev Page 7.06 Name. . . . DETENT 1&2 OUT Tag: Dev.25 Event: 25 yr File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW ' Storm. . . TypeIII 24hr Tag: Dev.25 TIME vs. ELEVATION (ft) ' Time Output Time increment = .0500 hrs hrs ( Time on left represents time for first value in each row. --------- -------------------------------------------------------------- ' 23.5000 147.68 147.68 147.68 147.68 147.68 23.7500 147.67 147.67 147.67 147.67 147.67 24.0000 147.67 147.66 147.64 147.61 147.58 24.2500 147.56 147.54 147.53 147.52 147.52 24.5000 147.51 147.51 147.51 147.51 147.50 24.7500 ( 147.50 147.50 147.50 ' S/N: E21101506A8D Anchor Engineering Services Inc. g g PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 1 Type. . . . Time-Elev Page 7.07 Name. . . . DETENT 1&2 OUT Tag: Dev100 Event: 100 yr File. . . . J:\424\06\POST BUCKLANDRD REVISED.PPW Storm. . . TypeIII 24hr Tag: Dev100 TIME vs. ELEVATION (ft) Time Output Time increment = .0500 hrs hrs Time on left represents time for first value in each row. --------- -------------------------------------------------------------- ' .6000 147.50 147.50 147.50 147.50 147.51 .8500 147.51 147.52 147.52 147.53 147.53 1.1000 147.54 147.55 147.55 147.56 147.56 1.3500 147.57 147.57 147.58 147.58 147.58 ' 1.6000 147.59 147.59 147.60 147.60 147.60 1.8500 147.61 147.61 147.61 147.62 147.62 2.1000 147.62 147.63 147.63 147.63 147.64 2.3500 { 147.64 147.64 147.65 147.65 147.65 ' 2.6000 147.66 147.66 147.66 147.67 147.67 2.8500 147.67 147.68 147.68 147.68 147.68 3.1000 ( 147.69 147.69 147.69 147.70 147.70 ' 3.3500 147.70 147.71 147.71 147.71 147.72 3.6000 ( 147.72 147.72 147.72 147.73 147.73 3.8500 147.73 147.73 147.74 147.74 147.74 4.1000 147.75 147.75 147.75 147.75 147.76 4.3500 147.76 147.76 147.76 147.77 147.77 4.6000 147.77 147.77 147.78 147.78 147.78 4.8500 147.78 147.79 147.79 147.79 147.79 5.1000 147.80 147.80 147.80 147.80 147.81 ' 5.3500 147.81 147.81 147.81 147.82 147.82 5.6000 147.82 147.82 147.83 147.83 147.83 5.8500 147.83 147.84 147.84 147.84 147.84 ' 6.1000 147.85 147.85 147.85 147.86 147.86 6.3500 147.87 147.87 147.88 147.88 147.89 6.6000 147.90 147.90 147.91 147.91 147.92 6.8500 147.93 147.93 147.94 147.95 147.95 7.1000 ( 147.96 147.96 147.97 147.98 147.98 7.3500 147.99 148.00 148.00 148.00 148.00 7.6000 148.01 148.01 148.01 148.02 148.02 7.8500 148.02 148.02 148.03 148.03 148.04 8.1000 148.04 148.04 148.05 148.05 148.06 8.3500 148.07 148.07 148.08 148.09 148.09 8.6000 148.10 148.11 148.12 148.12 148.13 8.8500 148.14 148.15 148.16 148.17 148.18 9.1000 148.19 148.19 148.20 148.21 148.22 9.3500 148.23 148.24 148.25 148.26 148.27 9.6000 148.28 148.29 148.30 148.31 148.32 ' 9.8500 148.33 148.34 148.34 148.35 148.36 10.1000 148.37 148.39 148.40 148.41 148.42 10.3500 148.44 148.45 148.47 148.48 148.50 10.6000 148.51 148.52 148.53 148.55 148.56 ' 10.8500 148.58 148.59 148.61 148.63 148.65 11.1000 148.67 148.69 148.72 148.75 148.79 11.3500 148.83 148.87 148.92 148.97 149.02 ' 11.6000 149.08 149.16 149.27 149.42 149.58 ' S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . Time-Elev Page 7.08 Name. . . . DETENT 1&2 OUT Tag: Dev100 Event: 100 yr File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW Storm. . . TypeIII 24hr Tag: Dev100 TIME vs. ELEVATION (ft) ' Time Output Time increment = .0500 hrs hrs Time on left represents time for first value in each row. --------- -------------------------------------------------------------- ' 11.8500 149.74 149.91 150.10 150.35 150.62 12.1000 150.85 151.02 151.11 151.13 151.14 12.3500 151.12 151.09 151.04 150.98 150.91 12.6000 150.83 150.75 150.68 150.62 150.55 ' 12.8500 150.50 150.44 150.38 150.33 150.28 13.1000 150.24 150.19 150.16 150.12 150.09 13,3500 150.06 150.03 150.01 149.98 149.96 13.6000 149.93 149.91 149.88 149.86 149.84 ' 13.8500 149.81 149.79 149.77 149.75 149.72 14.1000 149.69 149.67 149.64 149.62 149.59 14.3500 149.57 149.54 149.51 149.49 149.45 ' 14.6000 149.42 149.39 149.36 149.33 149.30 14.8500 149.27 149.24 149.21 149.18 149.15 15.1000 149.12 149.09 149.06 149.03 149.01 15.3500 148.97 148.93 148.89 148.86 148.82 ' 15.6000 148.78 148.75 148.72 148.68 148.65 15.8500 148.62 148.59 148.56 148.53 148.50 16.1000 148.46 148.42 148.38 148.35 148.32 16.3500 148.30 148.27 148.25 148.23 148.21 16.6000 148.19 148.18 148.16 148.15 148.14 16.8500 148.13 148.12 148.11 148.10 148.09 17.1000 148.08 148.07 148.06 148.06 148.05 ' 17.3500 148.04 148.04 148.03 148.02 148.02 17.6000 148.01 148.01 148.00 147.99 147.97 17.8500 147.96 147.95 147.93 147.93 147.92 18.1000 147.91 147.90 147.90 147.89 147.89 18.3500 147.89 147.88 147.88 147.88 147.88 18.6000 147.88 147.87 147.87 147.87 147.87 18.8500 147.87 147.86 147.86 147.86 147.86 ' 19.1000 147.86 147.85 147.85 147.85 147.85 19.3500 147.85 147.85 147.84 147.84 147.84 19.6000 147.84 147.84 147.83 147.83 147.83 19.8500 147.83 147.83 147.83 147.82 147.82 ' 20.1000 147.82 147.82 147.82 147.82 147.81 20.3500 147.81 147.81 147.81 147.81 147.81 20.6000 147.81 147.80 147.80 147.80 147.80 20.8500 147.80 147.80 147.80 147.79 147.79 ' 21.1000 147.79 147.79 147.79 147.79 147.79 21.3500 147.78 147.78 147.78 147.78 147.78 21.6000 147.78 147.78 147.78 147.77 147.77 21.8500 147.77 147.77 147.77 147.77 147.77 ' 22.1000 147.76 147.76 147.76 147.76 147.76 22.3500 147.76 147.76 147.75 147.75 147.75 22.6000 147.75 147.75 147.75 147.75 147.75 ' 22.8500 ( 147.74 147.74 147.74 147.74 147.74 23.1000 147.74 147.74 147.73 147.73 147.73 ' S/N: E21101506A8D Anchor Engineering Services, g g e vices, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . Time-Elev Page 7.09 Name. . . . DETENT 1&2 OUT Tag: Dev100 Event: 100 yr File. . . . J: \424\06\POST BUCKLANDRD REVISED.PPW Storm. . . TypeIII 24hr Tag: Dev100 TIME vs. ELEVATION (ft) Time Output Time increment = .0500 hrs hrs Time on left represents time for first value in each row. --------- -------------------------------------------------------------- ' 23.3500 147.73 147.73 147.73 147.73 147.72 23.6000 147.72 147.72 147.72 147.72 147.72 23.8500 147.72 147.72 147.71 147.71 147.70 24.1000 147.67 147.63 147.60 147.57 147.56 ' 24.3500 147.54 147.53 147.52 147.52 147.51 24.6000 147.51 147.51 147.51 147.50 147.50 24.8500 147.50 ' S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . Time vs. Volume Page 8.01 Name. . . . DETENT 1&2 OUT Tag: Dev. .2 Event: 2 yr File. . . . J:\424\06\POST BUCKLANDRD REVISED.PPW ' Storm. . . TypeIII 24hr Tag: Dev. .2 TIME vs. VOLUME (ac-ft) Time Output Time increment = .0500 hrs hrs Time on left represents time for first value in each row. --------- -------------------------------------------------------------- ' 1.3500 .000 .000 .000 .000 .000 1.6000 .000 .000 .000 .000 .000 1.8500 .000 .000 .000 .000 .000 2.1000 .000 .000 .000 .000 .000 ' 2.3500 .000 .000 .000 .000 .000 2.6000 .000 .000 .000 .000 .000 2.8500 .000 .000 .000 .000 .000 ' 3.1000 .000 .000 .000 .000 .000 3.3500 .000 .000 .000 .000 .000 3.6000 .000 000 .000 .000 .000 3.8500 .000 .000 .000 .000 .000 4.1000 .000 .000 .000 .000 .000 4.3500 .000 .000 .000 .000 .000 4.6000 .000 .000 .000 .000 .000 4.8500 .000 .000 .000 .000 .000 ' 5.1000 .000 .000 .000 .000 .000 5.3500 .000 .000 .000 .000 .000 5.6000 .000 .000 .000 .000 .000 5.8500 .000 .000 .000 .000 .000 6.1000 .000 .000 .000 .000 .000 6.3500 .000 .000 .000 .000 .000 6.6000 .000 .000 .000 .000 .000 ' 6.8500 .000 .000 .000 .000 .000 7.1000 .000 .000 .000 .001 .001 7.3500 .001 .001 .001 .001 .001 7.6000 .001 .001 .001 .001 .001 ' 7.8500 .001 .001 .001 .001 .001 8.1000 .001 .001 .001 .001 .001 8.3500 ( .001 .002 .002 .002 .002 ' 8.6000 .002 .002 .002 .002 .003 8.8500 .003 .003 .003 .003 .003 9.1000 .004 .004 .004 .004 .004 9.3500 .005 .005 .005 .005 .006 ' 9.6000 .006 .006 .007 .007 .007 9.8500 .007 .008 .008 .008 .009 10.1000 .009 .010 .010 .010 .010 10.3500 .010 .011 .011 .011 .012 ' 10.6000 .012 .013 .013 .014 .014 10.8500 .014 .015 .016 .016 .017 11.1000 .017 .018 .019 .020 .021 11.3500 .023 .024 .026 .028 .030 11.6000 .034 .039 .047 .054 .064 11.8500 .077 .094 .115 .146 .188 12.1000 ( .227 .262 .285 .299 .307 ' 12.3500 .312 .314 .313 .309 .304 S/N: E21101506A8D Anchor Engineering Services Inc. g g PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 Type. . . . Time vs. Volume Page 8.02 Name. . . . DETENT 1&2 OUT Tag: Dev. .2 Event: 2 yr File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW ' Storm. . . TypeIII 24hr Tag: Dev. .2 TIME vs. VOLUME (ac-ft) ' Time Output Time increment = .0500 hrs hrs Time on left represents time for first value in each row. --------- -------------------------------------------------------------- ' 12.6000 .298 .290 .283 .275 .268 12.8500 .260 .253 .246 .239 .232 13.1000 .224 .216 .209 .202 .195 13.3500 .188 .180 .172 .164 .157 13.6000 .150 .143 .137 .130 .124 13.8500 .118 .113 .108 .101 .094 14.1000 .088 .082 .076 .071 .066 14.3500 .062 .057 .053 .050 .046 ' 14.6000 .041 .037 .034 .031 .028 14.8500 .025 .023 .021 .020 .018 15.1000 .017 .016 .015 .014 .013 ' 15.3500 .012 .011 .010 .010 .008 15.6000 .007 .006 .005 .004 .004 15.8500 .004 .003 .003 .003 .003 16.1000 .002 .002 .002 .002 .002 ' 16.3500 .002 .002 .002 .002 .002 16.6000 .002 .001 .001 .001 .001 16.8500 .001 .001 .001 .001 .001 17.1000 1 .001 .001 .001 .001 .001 17.3500 .001 .001 .001 .001 .001 17.6000 .001 .001 .001 .001 .001 17.8500 .001 .001 .001 .001 .001 18.1000 .001 .000 .000 .000 .000 18.3500 ( .000 .000 .000 .000 .000 18.6000 .000 .000 .000 .000 .000 18.8500 .000 .000 .000 .000 .000 ' 19.1000 .000 .000 .000 .000 .000 19.3500 ( .000 .000 .000 .000 .000 19.6000 .000 .000 .000 .000 .000 ' 19.8500 .000 .000 .000 .000 .000 20.1000 .000 .000 .000 .000 .000 20.3500 .000 .000 .000 .000 .000 20.6000 .000 .000 .000 .000 .000 ' 20.8500 .000 .000 .000 .000 .000 21.1000 1 .000 .000 .000 .000 .000 21.3500 .000 .000 .000 .000 .000 21.6000 ( .000 .000 .000 .000 .000 ' 21.8500 .000 .000 .000 .000 .000 22.1000 .000 .000 .000 .000 .000 22.3500 .000 .000 .000 .000 .000 ' 22.6000 .000 .000 .000 .000 .000 22.8500 1 .000 .000 .000 .000 .000 23.1000 .000 .000 .000 .000 .000 23.3500 .000 .000 .000 .000 .000 ' 23.6000 .000 .000 .000 .000 .000 23.8500 .000 .000 .000 .000 .000 ' S/N: E21101506A8D Anchor Engineering Services, Inc. g g PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . Time vs. Volume Page 8.03 Name. . . . DETENT 1&2 OUT Tag: Dev. .2 Event: 2 yr File. . . . J:\424\06\POST BUCKLANDRD REVISED.PPW Storm. . . TypeIII 24hr Tag: Dev. .2 TIME vs. VOLUME (ac-ft) Time Output Time increment = .0500 hrs hrs Time on left represents time for first value in each row. --------- -------------------------------------------------------------- ' 24.1000 .000 .000 .000 .000 .000 24.3500 .000 .000 .000 .000 .000 24.6000 .000 .000 .000 .000 ' 5/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 1.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . Time vs. Volume Page 8.04 Name. . . . DETENT 1&2 OUT Tag: Dev.25 Event: 25 yr File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW Storm. . . TypeIII 24hr Tag: Dev.25 TIME vs. VOLUME (ac-ft) Time Output Time increment = .0500 hrs hrs Time on left represents time for first value in each row. --------- -------------------------------------------------------------- ' .7500 .000 .000 .000 .000 .000 1.0000 .000 .000 .000 .000 .000 1.2500 .000 .000 .000 .000 .000 1.5000 .000 .000 .000 .000 .000 ' 1.7500 .000 .000 .000 .000 .000 2.0000 .000 .000 .000 .000 .000 2.2500 .000 .000 .000 .000 .000 2.5000 .000 .000 .000 .000 .000 ' 2.7500 ( .000 .000 .000 .000 .000 3.0000 .000 .000 .000 .000 .000 3.2500 .000 .000 .000 .000 .000 ' 3.5000 .000 .000 .000 .000 .000 3.7500 .000 .000 .000 .000 .000 4.0000 .000 .000 .000 .000 .000 4.2500 .000 .001 .001 .001 .001 4.5000 .001 .001 .001 .001 .001 4.7500 .001 .001 .001 .001 .001 5.0000 .001 .001 .001 .001 .001 5.2500 ,� .001 .001 .001 .001 .001 5.5000 .001 .001 .001 .001 .001 5.7500 .001 .001 .001 .001 .001 6.0000 .001 .001 .001 .001 .001 6.2500 .002 .002 .002 .002 .002 6.5000 .002 .002 .Ou .002 .002 6.7500 .002 .003 .003 .003 .003 7.0000 .003 .003 .003 .004 .004 7.2500 .004 .004 .004 .004 .004 7.5000 .005 .005 .005 .005 .005 7.7500 .006 .006 .006 .006 .007 8.0000 ( .007 .007 .007 .008 .008 8.2500 .008 .009 .009 .010 .010 8.5000 .010 .010 .011 .011 .011 8.7500 .011 .012 .012 .013 .013 9.0000 .013 .014 .014 .015 .015 9.2500 .015 .016 .016 .017 .017 9.5000 .018 .018 .019 .019 .020 9.7500 .020 .021 .021 .022 .022 10.0000 .023 .023 .024 .025 .025 10.2500 .026 .027 .028 .029 .030 10.5000 .031 .032 .033 .034 .035 10.7500 .036 .037 .038 .040 .041 ' 11.0000 .042 .044 .045 .047 .049 11.2500 .051 .053 .056 .059 .062 11.5000 .066 .071 .078 .089 .105 ' 11 .7500 .121 .142 .170 .202 .244 1 S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . Time vs. Volume Page 8.05 Name. . . . DETENT 1&2 OUT Tag: Dev.25 Event: 25 yr File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW ' Storm. . . TypeIII 24hr Tag: Dev.25 TIME vs. VOLUME (ac-ft) ' Time Output Time increment = .0500 hrs hrs Time on left represents time for first value in each row. --------- -------------------------------------------------------------- 12.0000 .304 .369 .435 .483 .509 12.2500 .520 .522 .518 .511 .500 12.5000 .486 .470 .453 .436 .418 12.7500 .402 .387 .374 .361 .350 ' 13.0000 .339 .329 .320 .312 .304 13.2500 .297 .289 .282 .275 .268 13.5000 .262 .256 .250 .244 .238 13.7500 .232 .225 .219 .213 .207 ' 14.0000 .201 .195 .190 .183 .176 14.2500 .169 .163 .157 .151 .145 14.5000 .140 .134 .129 .124 .119 14.7500 .115 .110 .106 .100 .095 15.0000 ( .089 .084 .080 .075 .071 15.2500 .067 .063 .060 .056 .053 15.5000 .050 .047 .043 .040 .036 ' 15.7500 .034 .031 .029 .027 .025 16.0000 .023 .022 .020 .019 .018 16.2500 .017 .016 .015 .015 .014 16.5000 .013 .013 .012 .012 .011 16.7500 .011 .010 .010 .010 .009 17.0000 .008 .007 .006 .006 .006 17.2500 .005 .005 .005 .005 .004 17.5000 .004 .004 .004 .004 .004 17.7500 .003 .003 .003 .003 .003 18.0000 .003 .003 .003 .002 .002 18.2500 .002 .002 .002 .002 .002 18.5000 .002 .002 .002 .002 .002 18.7500 .002 .002 .002 .002 .002 19.0000 .002 .002 .002 .002 .002 19.2500 .002 .002 .002 .002 .002 ' 19.5000 .002 .002 .001 .001 .001 19.7500 .001 .001 .001 .001 .001 20.0000 .001 .001 .001 .001 .001 20.2500 .001 .001 .001 .001 .001 20.5000 .001 .001 .001 .001 .001 20.7500 .001 .001 .001 .001 .001 21.0000 .001 .001 .001 .001 .001 21.2500 .001 .001 .001 .001 .001 21.5000 .001 .001 .001 .001 .001 21.7500 .001 .001 .001 .001 .001 22.0000 .001 .001 .001 .001 .001 22.2500 .001 .001 .001 .001 .001 22.5000 .001 .001 .001 .001 .001 22.7500 .001 .001 .001 .001 .001 23.0000 .001 .001 .001 .001 .000 23.2500 .000 .000 .000 .000 .000 S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44: 57 Date: 07/01/2002 Type. . . . Time vs. Volume Page 8.06 Name. . . . DETENT 1&2 OUT Tag: Dev.25 Event: 25 yr File. . . . J:\424\06\POST BUCKLANDRD REVISED.PPW Storm. . . TypeIII 24hr Tag: Dev.25 TIME vs. VOLUME (ac-ft) ' Time Output Time increment = .0500 hrs hrs Time on left represents time for first value in each row. --------- -------------------------------------------------------------- 23.5000 .000 .000 .000 .000 .000 23.7500 .000 .000 .000 .000 .000 24.0000 .000 .000 .000 .000 .000 24.2500 .000 .000 .000 .000 .000 24.5000 .000 .000 .000 .000 .000 24.7500 .000 .000 .000 i S/N: E21101506A8D Anchor Engineering Services Inc. g g PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . Time vs. Volume Page 8.07 Name. . . . DETENT 1&2 OUT Tag: Dev100 Event: 100 yr File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW Storm. . . TypeIII 24hr Tag: Dev100 TIME vs. VOLUME (ac-ft) Time Output Time increment = .0500 hrs hrs Time on left represents time for first value in each row. --------- -------------------------------------------------------------- 6000 .000 .000 .000 .000 .000 8500 .000 .000 .000 .000 .000 1.1000 .000 .000 .000 .000 .000 1.3500 .000 .000 .000 .000 .000 1.6000 .000 .000 .000 .000 .000 1.8500 .000 .000 .000 .000 .000 2.1000 .000 .000 .000 .000 .000 2.3500 .000 .000 .000 .000 .000 2.6000 .000 .000 .000 .000 .000 2.8500 .000 .000 .000 .000 .000 3.1000 .001 .001 .001 .001 .001 3.3500 .001 .001 .001 .001 .001 3.6000 .001 .001 .001 .001 .001 3.8500 .001 .001 .001 .001 .001 4.1000 .001 .001 .001 .001 .001 4.3500 .001 .001 .001 .001 .002 4.6000 .002 .002 .002 .002 .002 4.8500 .002 .002 .002 .002 .002 5.1000 .002 .002 .002 .002 .002 5.3500 .002 .002 .002 .002 .002 5.6000 .003 .003 .003 .003 .003 5.8500 .003 .003 .003 .003 .003 ' 6.1000 .003 .003 .003 .003 .004 6.3500 .004 .004 .004 .004 .005 6.6000 .005 .005 .005 .005 .006 6.8500 .006 .006 .006 .007 .007 7.1000 .007 .008 .008 .008 .009 7.3500 .009 .009 .010 .010 .010 7.6000 .010 .010 .010 .010 .011 7.8500 .011 .011 .011 .011 .012 8.1000 .012 .012 .012 .013 .013 8.3500 .013 .014 .014 .015 .015 8.6000 .016 .016 .017 .017 .018 8.8500 .018 .019 .020 .020 .021 9.1000 .021 .022 .023 .023 .024 9.3500 .025 .025 .026 .027 .027 9.6000 .028 .029 .030 .030 .031 9.8500 .032 .033 .033 .034 .035 10.1000 .036 .037 .038 .039 .040 10.3500 .041 .043 .044 .045 .047 10.6000 .048 .049 .050 .052 .053 10.8500 .055 .056 .058 .060 .062 11.1000 .064 .067 .070 .073 .078 11.3500 .082 .088 .094 .101 .108 11.6000 .117 .129 .148 .173 .204 j S/N: E21101506A8D Anchor Engineering Services Inc. g g PondPack Ver. 7.5 (765) Compute Time: 10:44: 57 Date: 07/01/2002 ' Type. . . . Time vs. Volume Page 8.08 Name. . . . DETENT 1&2 OUT Tag: Dev100 Event: 100 yr File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW Storm. . . TypeIII 24hr Tag: Dev100 TIME vs. VOLUME (ac-ft) Time Output Time increment = .OSOO hrs hrs Time on left represents time for first value in each row. --------- -------------------------------------------------------------- 11.8500 .240 .279 .329 .399 .477 12.1000 .551 .610 .639 .649 .649 12.3500 .643 .632 .616 .596 .570 12.6000 .545 .520 .497 .477 .458 12.8500 .441 .423 .407 .392 .378 13.1000 .365 .354 .343 .334 .326 13.3500 .318 .311 .304 .298 .291 13.6000 .285 .279 .273 .267 .261 13.8500 .256 .251 .246 .240 .235 14.1000 .229 .223 .218 .212 .207 14.3500 .202 .197 .192 .186 .180 14.6000 .174 .168 .163 .157 .152 14.8500 .147 .142 .137 .132 .128 15.1000 .123 .119 .114 .110 .106 15.3500 .101 .096 .091 .086 .082 15.6000 ( .077 .073 .069 .066 .062 15.8500 .059 .056 .053 .050 .047 16.1000 .043 .040 .037 .034 .032 16.3500 .030 .028 .026 .025 .023 16.6000 .022 .021 .020 .019 .018 16.8500 .017 .017 .016 .015 .015 17.1000 .014 .014 .013 .013 .012 17.3500 .012 .012 .011 .011 .011 17.6000 .010 .010 .010 .009 .008 17.8500 .007 .007 .006 .006 .006 18.1000 .005 .005 .005 .005 .005 .� 18.3500 .004 .004 .004 .004 .004 18.6000 .004 .004 .004 .004 .004 18.8500 .004 .004 .004 .004 .004 19.1000 .003 .003 .003 .003 .003 19.3500 .003 .003 .003 .003 .003 19.6000 .003 .003 .003 .003 .003 19.8500 .003 .003 .003 .003 .003 ' 20.1000 .003 .002 .002 .002 .002 20.3500 .002 .002 .002 .002 .002 20.6000 .002 .002 .002 .002 .002 20.8500 .002 .002 .002 .002 .002 21.1000 .002 .002 .002 .002 .002 21.3500 .002 .002 .002 .002 .002 21.6000 .002 .002 .002 .002 .002 21.8500 .002 .002 .001 .001 .001 22.1000 .001 .001 .001 .001 .001 22.3500 .001 .001 .001 .001 .001 22.6000 .001 .001 .001 .001 .001 ' 22.8500 .001 .001 .001 .001 .001 23.1000 .001 .001 .001 .001 .001 S/N: E21101506A8D Anchor Engineering Services Inc. g g PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . Time vs. Volume Page 8.09 Name. . . . DETENT 1&2 OUT Tag: Dev100 Event: 100 yr Fite. . . . 1:14241011POIT_IlCKIANDRD REVISED.PPW Storm. . . TypeIII 24hr Tag: Dev100 TIME vs. VOLUME (ac-ft) Time Output Time increment = .0500 hrs hrs Time on left represents time for first value in each row. --------- -------------------------------------------------------------- 23.3500 .001 .001 .001 .001 .001 23.6000 .001 .001 .001 .001 .001 23.8500 .001 .001 .001 .001 .001 24.1000 .000 .000 .000 .000 .000 24.3500 ( .000 .000 .000 .000 .000 24.6000 .000 .000 .000 .000 .000 24.8500 .000 t 1 1 1 1 1 1 S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7. 5 (765) Compute Time: 10:44:57 Date: 07/01/2002 rType. . . . Vol: Elev-Area Page 9.01 Name. . . . DETENT 2 r File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW Title. . . Detention Pond #2 r Elevation Planimeter Area Al+A2+sgr(A1*A2) Volume Volume Sum (ft) (sq. in) (sq.ft) (sq.ft) (ac-ft) (ac-ft) ------------------------------------------------------------------------ 147.50 _____ 0 0 .000 .000 148.00 2500 2500 .010 .010 150.00 ----- 11300 19115 .293 .302 152.00 ----- 19000 44953 .688 .990 r POND VOLUME EQUATIONS ' * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2-EL1) * (Areal + Area2 + sq.rt. (Area1*Area2)) where: EL1, EL2 = Lower and upper elevations of the increment Areal,Area2 = Areas computed for EL1, EL2, respectively Volume = Incremental volume between EL1 and EL2 r r r r r r r r r r r S/N: E21101SO6A8D Anchor Engineering Services, Inc. PondPack Ver. 7. 5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . Outlet Input Data Page 10.01 Name. . . . PR 1 File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW REQUESTED POND WS ELEVATIONS: Min. Elev.= 147.50 ft Increment = .50 ft Max. Elev.= 152.00 ft ********************************************** OUTLET CONNECTIVITY ********************************************** --> Forward Flow Only (UpStream to DnStream) <--- Reverse Flow Only (DnStream to UpStream) <---> Forward and Reverse Both Allowed ' Structure No. Outfall E1, ft --E2,-ft ---- --- - Orifice-Circular S2 ---> TW 149.750 152.000 Orifice-Circular 11 ---> TW 147,500 112,000 TW SETUP, DS Channel S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . Outlet Input Data Page 10.02 Name. . . . PR 1 File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW OUTLET STRUCTURE INPUT DATA Structure ID = S2 Structure Type = Orifice-Circular ------------------------------------ # of Openings = 2 Invert Elev. 149.75 ft Diameter 1.2500 ft Orifice Coeff. _ .500 Structure ID = S1 Structure Type = Orifice-Circular ------------------------------------ # of Openings = 1 Invert Elev. = 147.50 ft Diameter .8333 ft Orifice Coeff. .500 Structure ID = TW Structure Type = TW SETUP, DS Channel ------------------------------------ FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES. . . Maximum Iterations= 30 Min. TW tolerance = .01 ft Max. TW tolerance = .01 ft ' Min. HW tolerance = .01 ft Max. HW tolerance = .01 ft Min. Q tolerance = .10 cfs Max. Q tolerance = .10 cfs r S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7. 5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . Individual Outlet Curves Page 10.03 Name. . . . PR 1 File. . . . J: \424\06\POST_BUCKLANDRD REVISED.PPW RATING TABLE FOR ONE OUTLET TYPE Structure ID = 52 (Orifice-Circular) -------------------------------------- Upstream ID = (Pond Water Surface) DNstream ID = TW (Pond Outfall) NUMBER OF OPENINGS = 2 EACH FLOW = SUM OF OPENINGS x FLOW FOR ONE OPENING WS Elev,Device-Q Tail Water ---------Notes WS Elev. Q TW Elev Converge ft cfs ft +/-ft Computation Messages -------- ------- -------- ----- -------------------------- 147.50 .00 Free Outfall HW & TW below invert 148.00 .00 Free Outfall HW & TW below invert 148,50 .00 Free Outfall HW & TW below invert 149.00 .00 Free Outfall HW & TW below invert 149.50 .00 Free Outfall HW & TW below invert 149.75 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 150.00 .46 Free Outfall CRIT.DEPTH CONTROL Vh= .065ft Dcr= .185ft CRIT.DEPTH 150.50 3.74 Free Outfall CRIT.DEPTH CONTROL Vh= .207ft Dcr= .544ft CRIT.DEPTH 151.00 7.78 Free Outfall H =.63 151.50 10.44 Free Outfall H =1.13 152.00 12.55 Free Outfall H =1.63 1 1 1 r 1 1 r r S/N: E21101506A8D Anchor Engineering Services, Inc. ' PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 Type. . . . Individual Outlet Curves Page 10.04 Name. . . . PR 1 File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW ' RATING TABLE FOR ONE OUTLET TYPE Structure ID = S1 (Orifice-Circular) -------------------------------------- Upstream ID = (Pond Water Surface) DNstream ID = TW (Pond Outfall) WS Elev,Device Q Tail Water Notes --------- WS Elev. Q TW Elev Converge --- --- -- - - ft--- cfs - ft +/-ft ComputationMessages----- 147.50 .00 Free Outfall Upstream HW & DNstream TW < Inv.El 148.00 .68 Free Outfall CRIT.DEPTH CONTROL Vh= .138ft Dcr= .363ft CRIT.DEPTH 148.50 1.67 Free Outfall H =.58 149.00 2.28 Free Outfall H =1.08 149.50 2.75 Free Outfall H =1.58 149.75 2.96 Free Outfall H =1.83 150.00 3.16 Free Outfall H =2.08 150.50 3.52 Free Outfall H =2.58 151.00 3,84 Free Outfall H =3.08 151.50 4.14 Free Outfall H =3.58 152.00 4.42 Free Outfall H =4.08 1 r r r r r r 1 S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 Type. . . . Composite Rating Curve Page 10.05 Name. . . . PR 1 File. . . . J: \424\06\POST_BUCKLANDRD REVISED.PPW ' ***** COMPOSITE OUTFLOW SUMMARY **** WS Elev, Total Q Notes ---------------- -------- Converge ------------------------- Elev. Q TW Elev Error ft cfs ft +/-ft Contributing Structures -------- ------- -------- ----- -------------------------- ' 147.50 .00 Free Outfall None contributing 148.00 .68 Free Outfall S1 148.50 1.67 Free Outfall 51 149.00 2.28 Free Outfall S1 149.50 2.75 Free Outfall 51 149.75 2.96 Free Outfall S1 150.00 3.62 Free Outfall 52 +S1 150.50 7.26 Free Outfall S2 +S1 151.00 11.62 Free Outfall S2 +51 151.50 14.58 Free Outfall S2 +S1 152.00 16.97 Free Outfall S2 +S1 S/N: E21101506A8D Anchor Engineering Services, Inc. PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . Pond E-V-Q Table Page 11.01 Name. . . . DETENT 1&2 File. . . . J: \424\06\POST_BUCKLANDRD REVISED.PPW ' LEVEL POOL ROUTING DATA ' HYG Dir = 1:\424\061 Inflow HYG file = POST BUC.HYG - DETENT 1&2 IN Dev. .2 Outflow HYG file = POST BUC.HYG - DETENT 1&2 OUT Dev. . 2 Pond Node Data = DETENT 1&2 Pond Volume Data = DETENT 2 Pond Outlet Data = PR 1 ' No Infiltration INITIAL CONDITIONS ---------------------------------- Starting WS Elev 147.50 ft Starting Volume .000 ac-ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment = .0500 hrs Elevation Outflow Storage Area Infilt. Q Total 2S/t + 0 ft cfs ac-ft sq.ft cfs cfs cfs ------------------------------------------------------------------------------ 147.50 .00 .000 0 .00 .00 .00 148.00 .68 .010 2500 .00 .68 5.31 148.50 1.67 .047 4106 .00 1.67 24.47 149.00 2.28 .105 6108 .00 2.28 53.26 149.50 2.75 .189 8506 .00 2.75 94.14 149.75 2.96 .241 9853 .00 2.96 119.83 150.00 3.62 .302 11300 .00 3.62 149.84 150.50 7.26 .442 13038 .00 7.26 221 .03 ' 151.00 11.62 .602 14901 .00 11.62 302.95 151.50 14.58 .784 16888 .00 14.58 394.15 152.00 16.97 .990 19000 .00 16.97 496.17 ' S/N: E21101506A8D Anchor Engineering Services, Inc. g g PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . Node: Pond Inflow Summary Page 11.02 Name. . . . DETENT 1&2 IN Event: 2 yr File. . . . J: \424\06\POST_BUCKLANDRD REVISED.PPW Storm. . . TypeIII 24hr Tag: Dev. .2 SUMMARY FOR HYDROGRAPH ADDITION at Node: DETENT 1&2 IN ' HYG Directory: J:\424\06\ Upstream Link ID Upstream Node ID HYG file HYG ID-----------HYG-tag - ----------------------------------------------------- LOT 2 TO DET 2 LOT 2 DEV AREA POST BUC.HYG LOT 2 DEV AREA Dev. .2 ' LOT-I-TO-DET-1----LOT-I-DEV-AREA -----POST_BUC_HYG--LOT-I-DEV-AREA --Dev__2- INFLOWS T0: DETENT 1&2 IN ----------------------- ----------------- Volume Peak Time Peak Flow HYG file HYG ID HYG tag ac-ft hrs cfs POST_BUC.HYG LOT 2 DEV AREA Dev. .2 .440 12.1000 4.74 POST BUC.HYG LOT 1 DEV AREA Dev. .2 .730 12.1000 7.86 ' TOTAL FLOW INTO: DETENT 1&2 IN ---------------------------------------- Volume Peak Time Peak Flow HYG file HYG ID ------HYG-tag-----ac_ft--------hrs cfs --------- ---- POST_BUC.HYG DETENT 1&2 IN Dev. .2 1.170 12.1000 12.60 ' S/N: E21101506A8D Anchor Engineering Services, Inc. g g PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . Node: Pond Inflow Summary Page 11.03 Name. . . . DETENT 1&2 IN Event: 2 yr File. . . . J: \424\06\POST_BUCKLANDRD REVISED.PPW Storm. . . TypeIII 24hr Tag: Dev. .2 TOTAL NODE INFLOW. . . ' HYG file = J:\424\06\POST BUC.HYG HYG ID = DETENT 1&2 IN HYG Tag = Dev. .2 ----------------------------------- Peak Discharge = 12.60 cfs Time to Peak = 12.1000 hrs HYG Volume = 1.170 ac-ft ----------------------------------- HYDROGRAPH ORDINATES (cfs) ' Time Output Time increment = .0500 hrs - --hrs--- i ----Time-on-left represents time for first value in each row. ---------------------------------------------- 1.3500 .00 .00 .01 .01 .01 1.6000 .01 .01 .02 .02 .02 1.8500 .02 .02 .03 .03 .03 2.1000 .03 .03 .03 .04 .04 2.3500 .04 .04 .04 .05 .05 ' 2.6000 .05 .05 .05 .06 .06 2.8500 .06 .06 .06 .07 .07 3.1000 .07 .07 .07 .08 .08 3.3500 .08 .08 .08 .09 .09 3.6000 .09 .09 .09 .10 .10 3.8500 .10 .10 .10 .10 .11 4.1000 ( .11 .11 .11 .11 .12 ' 4.3500 .12 .12 .12 .12 .13 4.6000 .13 .13 .13 .13 .13 4.8500 .14 .14 .14 .14 .14 5.1000 .15 .15 .15 .15 .15 ' 5.3500 .15 .16 .16 .16 .16 5.6000 .16 .16 .17 .17 .17 5.8500 .17 .17 .17 .18 .18 ' 6.1000 .18 .18 .19 .19 .20 6.3500 .20 .20 .21 .21 .21 6.6000 .22 .22 .23 .23 .23 6.8500 .24 .24 .25 .25 .25 7.1000 .26 .26 .27 .27 .27 7.3500 .28 .28 .29 .29 .29 7.6000 .30 .30 .31 .31 .31 7.8500 .32 .32 .33 .33 .34 ' 8.1000 .34 .35 .36 .37 .38 8.3500 .39 .39 .40 .41 .42 8.6000 .43 .44 .45 .46 .46 8.8500 .47 .48 .49 .50 .51 9.1000 .52 .53 .54 .55 .55 9.3500 .56 .57 .58 .59 .60 S/N: E21101506A8D Anchor EngineeringInc. Services, PondPack Ver. 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 Type. . . . Node: Pond Inflow Summary Page 11.04 Name. . . . DETENT 1&2 IN Event: 2 yr File. . . . J: \424\06\POST_BUCKLANDRD REVISED.PPW ' Storm. . . TypeIII 24hr Tag: Dev. .2 HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .0500 hrs ' - --hrs--- i ----Time-on left represents time for first value in each row. --------------------------------------------------- 9.6000 .61 .62 .63 .64 .65 ' 9.8500 .66 .66 .67 .68 .70 10.1000 .71 .73 .74 .76 .78 10.3500 .80 .82 .84 .85 .87 10.6000 .89 .91 .93 .95 .96 10.8500 .98 1.00 1.02 1.04 1.08 11.1000 1.12 1.18 1.25 1.32 1.39 11.3500 1.45 1.52 1.59 1.67 1.95 ' 11.6000 2.30 2.88 3.52 4.17 4.84 11.8500 5.50 6.19 8.67 11.64 12.42 12.1000 12.60 10.33 7.42 6.17 5.38 12.3500 4.68 4.01 3.35 2.68 2.24 12.6000 1.86 1.71 1.62 1.55 1.48 12.8500 1.41 1.34 1.27 1.20 1.15 13.1000 1.10 1.08 1.06 1.04 1.02 13.3500 1.00 .99 .97 .95 .93 13.6000 .91 .89 .88 .86 .84 13.8500 .82 .80 .79 .77 .75 14.1000 .74 .73 .72 .71 .70 14.3500 .69 .69 .68 .67 .66 14.6000 .65 .64 .63 .62 .62 14.8500 .61 .60 .59 . 58 .57 15.1000 .56 .55 .55 . 54 .53 15.3500 .52 .51 .50 .49 .48 15.6000 .48 .47 .46 .45 .44 15.8500 ( .43 .42 .42 .41 .40 16.1000 .39 .39 .38 .38 .38 16.3500 .37 .37 .37 .36 .36 16.6000 .35 .35 .35 .34 .34 16.8500 .34 .33 .33 .32 .32 ' 17.1000 .32 .31 .31 .30 .30 17.3500 .30 .29 .29 .29 .28 17.6000 .28 .27 .27 . 27 .26 17.8500 ( .26 .26 .25 .25 .24 ' 18.1000 ( .24 .24 .24 .24 .24 18.3500 ( .24 .24 .23 .23 .23 18.6000 .23 .23 .23 .23 .23 18.8500 .23 .22 .22 .22 .22 ' 19.1000 .22 .22 .22 .22 .21 19.3500 .21 .21 .21 .21 .21 19.6000 .21 .21 .21 .20 .20 ' 19.8500 .20 .20 .20 .20 .20 20.1000 .20 .20 .20 .19 .19 20.3500 .19 .19 .19 .19 .19 20.6000 .19 .19 .19 .19 .19 ' 20.8500 .18 .18 .18 .18 .18 21.1000 .18 .18 .18 . 18 .18 S/N: E21101506A8D Anchor Engineering Services, Inc. g g PondPack Ver . 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 ' Type. . . . Node: Pond Inflow Summary Page 11.05 Name. . . . DETENT 1&2 IN Event: 2 yr File. . . . J:\424\06\POST_BUCKLANDRD REVISED.PPW ' Storm. . . TypeIII 24hr Tag: Dev. .2 HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .0500 hrs hrs ____ _Timeon left represents time for first value in each row. 21.3500 .18 .18 .17 .17 .17 21.6000 .17 .17 .17 .17 .17 21.8500 .17 .17 .17 .16 .16 22.1000 .16 .16 .16 .16 .16 22.3500 .16 .16 .16 .16 .16 22.6000 .16 .15 .15 .15 .15 22.8500 .15 .15 .15 .15 .15 23.1000 .14 .14 .14 .14 .14 23.3500 .14 .14 .14 .14 .14 ' 23.6000 .14 .14 .14 .13 .13 23.8500 .13 .13 .13 .13 .08 24.1000 .02 .00 .00 S/N: E21101506A8D Anchor Engineering Services, Inc. g g PonlPack Ver . 7.5 (765) Compute Time: 10:44:57 Date: 07/01/2002 s MEMORANDUM To: Jeffrey Folger, Environmental Planner/Conservation Officer CC: Marcia Banach, Director of Planning From: Jeffrey B. Doolittle, P.E., Town Engineer Date: 7/18/02 RE: App 02-34P, South Windsor Health Care Center I have reviewed the revised site plan (dated 7/11/02) for the South Windsor Health Care Center on Buckland Road and I have the following comments. 1. There is still no A-2 Cerfification by a Licensed Surveyor on these plans. 2. The small parcel on the south west comer of this site does not have the current owners, and this property needs to be incorporated into Lot 1 (the lot line between them removed). 3. The Messiah Evangelical Lutheran Church has two abutting lots on the northern side. The lot lines between all abutting lots should be shown for clarity. 4. On the Landscape plan, many of the plant symbols shown are not listed in the key. 5. The Utilities & Drainage Plan needs to include the gas, electrical, telephone, cable and any other utilities from the street to the buildings. Where will the sewer line go from this site as there is not any existing sewers in this portion of Buckland Road? Any off site sewer or drainage work needs to be shown. 6. On the proposed drainage system: Can the two drainage pipes crossing the driveway be combined? What is the purpose of the small northern most detention basin? Several of the catch basins should be relocated slightly for optimum performance and ease of maintenance. Additional catch basins may be required. Where are the Foundation Drains and where will they discharge? 7. With regard to the Stormwater Management Report: The disposition of the eastern 2.36 acres as stated under the Project Description (last sentence) does not agree with a note on the Sheet 1 of these- plans. A more thorough description of the flow path for stormwater from the eastern portion of these lots is necessary. The description in the Proposed Drainage section and contours on the plan are not clear. Draining of additional stormwater to adjacent properties that are not part of this site plan will not be allowed without specific easements and provisions to handle these flows. Provide a table comparing existing flows and post development flows from this site for various storm events. The roof leader that drains to CB 4 appears to be undersized. No flows are included for the area of the large detention basin to the north of the driveway. Additional tables and descriptions are required to explain the design flows to and from the detention basins and the required storage volume for various storm events. The computer program printouts need further clarification and explanation. Will there be standing water in the proposed detention basins? How will these be maintained so they present an attractive frontage to this development? A gutter flow analysis should be done to determine if any of the catch basins (especially in the driveway) require double inlet grates. 8. The grading plan needs some spot grades to verify there are not flat spots to the east of the buildings and in corners of the parking lot. I believe the maximum grade allowable in HC parking areas is 2% in any direction. 9. Were any test pits or soil borings made on this site. This information needs to be included. 10. 1 have questions about the site layout. Why does the driveway begin at 36 foot width and narrow to 24 foot width? This should be a uniform width. Are all paved areas curbed? There should be a buffer strip or wider walk where there are parking spaces up against walks. What is the rectangle with corner elevations of 158.2, in the pavement to the south of the building on Lot 1? Are the walks concrete or bituminous? Will the sidewalk be flush with the pavement by the HC parking spaces? Will curb stops be provided? All lanes should be at least 24 feet wide. Parking spaces are shown as 9' x 18' which does not meet town standards. Please call me (x 245) if you have any questions. ,n 1 a I I! ✓ryFAQV4'�cc2 I O AT CH tOTAL D AINAGE AREA �'• ^:. 4,99300 SO. FT. a 146 r 4 SO• O t t.46 eACRES h x I \ iwv'i 7l � \ .rr, i.f .N • • \ w K.O \ I Vf \ iI Nib GR OCt Ise 1 \\ CN�NOA C I � \\ • • `"+� _ 1 � � J ! \11't` % r3 zap Vag I 1 Vf ^ `ss'— _- � . � � �� 1 • j'— _ T f ,1 ESPE a• uu ov. 09 / 1 I 0. SO• �T , t a 5 s• SF '�•j9 I rA � � � I 1 0• / I cis ..� , o• ,, CA BAS i ,� r J � 2 T $0• F T• I v 5 AC S Li S6 Is ?G ' ;,F�' :` j ( r s NOT RE�EABEO Fit COMTRl1CTION Q ••o•.r w�.«rw s«.�os•c+ ►•�. +s■r•nq tw 6ws•e•wet• MOfI 4a qM*W41M ru NN°su4th ORAIw►GE AREA YAP s a am vom .IcK`cm a w Wolf-Guerra, LLC 989 Ellington Road South Windsor, CT 06074 June 11, 2002 Inland Wetlands, Watercourses and Conservation Commission Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 Re: Proposed South Windsor Health Care Center, 252 Buckland Road Dear Commission Members: Wolf-Guerra, LLC, as the owner of 252 Buckland Road, authorizes the Sargis Construction Company to submit the attached inland wetland application for the proposed regulated activities. Si cerely, Ielmar polf South Windsor Health Care Center 252 Buckland Road South Windsor, CT 06074 Map: 38, Lot: 9; 14 Rear Buckland Road Map: 38, Lot: 10; 252 Buckland Road Owners: Wolf& Guerra, LLC 989 Ellington Road South Windsor, CT 06074 Abutting Property Owners Map Lot Parcel Address Owners Address 27 5 240 Buckland Road Arlene C. Croteau 240 Buckland Road South Windsor, CT 06074 27 6 99 Ridge Road Helmar&Beverly Wolf 99 Ridge Road South Windsor, CT 06074 27 15 151 Buckland Road Evergreen Walk, LLC 231 Central Ave. White Plains, NY 10606 38 7 296 Buckland Road Messiah Evangelical 296 Buckland Road South Windsor, CT 06074 38 8 296 Buckland Road Messiah Evangelical 296 Buckland Road South Windsor, CT 06074 38 11 251 Buckland Road Bradford L. Wright 235 Buckland Road South Windsor, CT 06074 38 12 235 Buckland Road Bradford L. Wright 235 Buckland Road South Windsor, CT 06074 38 19 58 Sele Road Bruce R. &J. Linda Cutler 58 Sele Drive South Windsor, CT 06074 Map 39 Lot 60 67 Ridge Road Johnny&Ann M. Jacques 67 Ridge Road South Windsor, CT 06074 June 5, 2002 CERTIFIED MAIL Bruce R. &J. Linda Cutler 58 Sele Drive South Windsor, CT 06074 Dear Property Owner: Re: South Windsor Health Care Center, 252 Buckland Road, South Windsor, CT 06074 In accordance with Section 7.3b of the "Town of South Windsor Inland Wetlands Watercourses, and Conservation Regulations",we are required to notify you that an application has been filed on the property abutting yours and is subject to a hearing by the Inland Wetlands Agency/Conservation Commission. The application and plans are on file with the South Windsor Planning Department. As an abutting property owner your are invited to the hearing to ask questions and/or give comments,however, you are not required to attend. You may also submit written comments regarding the application prior to the hearing if you so desire. For further information regarding the specific date this will be hear please contact Jeff Folger, the Zoning/Wetlands Enforcement Officer at the Planning Department, 644-2511, ext. 253. Sincerely, Patrick Carraher Director of Site Planning JA424\06\notification IWC Letter.doc 1 \ t\ 1 LEGEND � rr� • r.rwlr.. r LMM" GUINN ASSOCIATES .YI.O rtMM. N.NM. u.~ r "� h • � r..r...r � MIMr. ' ,rarr..r •NY. ;. • 1. 11` f N # \ a` •.Tr KEY TO SHEETS is •Nr.f rrr.H r .• - Mya r «a �—r'• Town of$, 1.Mmo$O. N1L OI M10M.I.r......N,NN JL_ ,.111 n 01 M r S aN • 'fl • •f •NY, f••r � �NY LEGEND �••ar►'Kr n•ttct V P • •«r ��19�r ♦,. w. ..w.•... sw O "~''� / •:.r `' .v.� e 9 144AL •wr .moo..»». n„.»«I ~ f twr 61 ofta� Ns r� �< ♦ ` y If �i `. ••ar. `• n per/ 14 q . t3a.a •a .,,, \. t • • / It : .. lNY ' / •f �� ff • *.aft IT 'a•M • 41 a .N•• �e ^' `�� OUINN ASSOCIATES •Nr.! IY ., ♦ �. It Nr1 ` LIti •t•/tY ` lrr / t0r` w0.1»•r,.\rwa.ava.•. t Il .,. • t./•rll•r / ••.r j 4 1 J J I / • •Mr v I N�rl „ N �/ KEY TO SHEETS -- A y � L \ A l 1 �� .. I� t� ]• 1a w I •+ i ...r.. �O s R 32 C ��/ 3B ♦� a 'y INr 1• uar y / n IT 3 ryh y)' •. ��� `ems // • r N Tf• ' i — zo IYIt M r.•.a•...rl-r•K.N.N.N .».•V _.M__ �N LEGEND l j •MY. ``.� �.MO K•IR.1 703tir1 4•� Tv r N•a ! „ \ � frRlrwru ITMI ' r y lltK 7s Is Ia d wT7K .A w7lY• rcr��N!• w ♦ 4 4 3 wl7K Q A 17 eta Lit M _ GUINN ASSOCIATES NDIIl1uR,TKNNsnvu.. y h L[sK ,I•N �r �... KEY TO SHEETS 1 N.wK Nr� R Tww w R rr.r r•rnrr•r w• v=0!/OYTN TNMO[ON Mf[N pftl MNT.YlIICN 10,rlM r•••.•tR.R� aNt[T N or1q Table 1: Seed Mix 1* for Retention Basin Lower slopes (Zone A) (Retention Basin Floor Seeding for Wildlife and Plant Diveristy *) Common Name Scientific Name Percentage Creeping Bent grass A rostis sto%nifera 25% Meadwo Foxtail A/o ecurus ratensis 25 Purple-stemmed aster Aster punice15 1% Tickseed sunflower Bidens aristosa 3% Vir inia Wild Rye E/ mus vir inicus 25% Rattlesnake Grass 61 ceria conadensis 2% Fowl manna grass 61 ceria striato 2% Rice Cut rass Leersia orymides 4% Square Stem Monkeyf lower Mimu/us rin ens 1% Green Bulrush Scir us atrovirens 2% Wool Grass Scir us cyper&us 1% Small-seeded bulrush Scir us microcar us 1% Many-leaved Bulrush Scir us polyphyllus 1% Rough-leaved goldenrod 50A o patula 1% Giant Bur-reed Spar anium eucar um 4% Blue vervain Verbena hastato 2% RES,LLC—APPENDIX 1:Planting Materials Tables for Stormwater Basins, Wetland Creation&Habitat Enhancement, 250 Buckland Road,South Windsor, CT Table 1: Seed Mix 1* for Retention Basin Lower slopes (Zone B1) (Retention Basin Floor Seeding for Wildlife and Plant Diveristy *) Common Name Scientific Name Percentage Creeping Bent grass A rostis stolonifera 25% Meadwo Foxtail Alo ecurus ratensis 25% Purple-stemmed aster Aster puniceus 1% Tickseed sunflower Sidens aristoso 3% Virginia Wild Rye El mus vir inicus 25% Rattlesnake Grass 61 ceria conadensis 2% Fowl manna grass 61 ceria s trio ta 2% Rice Cut grass Leersia oryzoides 4% Square Stem Monkeyf lower Mimulus rin ens 1% Green Bulrush Scir us atrovirens 2% Wool Grass Scir us cyperinus 1% Small-seeded bulrush Scir us microcar us 1% Many-leaved Bulrush Scir us polyphyllus 1% Rough-leaved goldenrod Solids o patula 1% Giant Bur-reed S ar ani'um eucar um 4% Blue vervain Verbena hastata 2% RES,LLC—APPENDIX 1:Planting Materials Tables for Stormwater Basins, Wetland Creation&Habitat Enhancement, 250 Buckland Road, South Windsor, CT Table 2: Seed Mix 2 for Enhanced Wetlands (Zone B2,lower Zone Q (OBL-FACW Food& Cover Wetland Mix*) Common Name Scientific Name Percentage Swamp milkweed Ascle ias incarnate 10% Purple-stemmed aster Aster pqniceus 1% Nodding Bur-marigold Bidens cernua 2% Bearded sedge Carex comosa 5% Fringed sedge Carex crinita 2% Three way sedge Dulichium arundinaceum 2% Virginia wild rye El mus vir inicus 30% Rattlesnake grass 61 ceria canadensis 2% American manna grass 61 ceria grandis 2% Fowl manna grass 61 ceria striates 3% Soft rush Acus effusus 2% Leersia oryzoides Rice cut grass 10% Sensitive fern Onoclea sensibilis 7% Tearthumb Pol onum arifolium 5% Wool grass Scir us cyperinus 6% Lesser burreed S ar anium americanum 6% Giant burreed S ar anium eurycarpum 6% NOTES: `The OBL- FACW Food&Cover Wetland Mix is available at Ernst Conservation Seeds,Inc.of Meadville,PA. Add 10 pounds per acre of fast-germinating winter rye for prompt soil stabilization. RES,LLC—APPENDIX 1:Planting Materials Tables for Stormwater Basins, Wetland Creation&Habitat Enhancement, 250 Buckland Road,South Windsor, CT Table 3: Seed Mix 3 , FACW Wetland Meadow Mix for Wetland Basin Lower and Mid Slopes (Zone C,D) and wet meadow enhancement areas Common Name Scientific Name Percentage New England Aster Aster novae-an liae 1 Lurid sedge Carex lurido 4%* Bristlebract sedge Carex tribuloides 2% Fox sedge Carex vu/ inoidea 19% Virginia wild rye El mus vir inicus 20% Joe- a-weed _ Eu atoreade/phus macu/atum 3% Soneset Eu otorium perfoliatum 4% Geum lacineatum Rou h ovens 1% Rattlesnake grass 6/ ceria conadensis 2% Fowl meadow grass 6/ ceria striata 5% Sneezeweed Helenium autumnale 5 Softrush Auncus effusus 2% Deerton uegrass* Panicum clandestinum 3% Dark green bulrush Scir us atrovirens 5 Golden ra wort Senecio aureus 2% Rough goldenrod So/ido o ru osa 5% Verbesina alterniflora Win stem 7% Blue vervain Verbeno hastato 5% New York Ironweed Vernonia noveboracensis 5% Golden Alexanders Zizio aurea 1 NOTES Table 10 has information on planting zones."The FACW Wetland Meadow Mix(minus out-of range species) is available from Ernst Conservation Seeds, Inc. of Meadville,PA. Seed at a rate of 25 lbs/acre. Add 10 pounds per acre of winter rye for prompt soil stabilization. RES,LLC—APPENDIX 1:Planting Materials Tables for Stormwater Basins, Wetland Creation&Habitat Enhancement, 250 Buckland Road, South Windsor, CT Table 4: Seed Mix 4* for Upper Basin Slopes and Upland slopes (Upper Zone D, Zone E) (Northeastern U.S. Roadside Native Seed Mix* Common Name Scientific Name Percentage Eastern Columbine A ui/e is conadensis 0.5% Red milkweed Ascle ids incarnate 1% Common milkweed Asc% lass riaca 1.5% Butterf ly milkweed Asc% ids tuberosa 0.5% Smooth blue aster Aster/aevis 1% New England aster Aster novae-an lice 2% Heath aster Aster ericoides 3% Partridge Pea Chomaecrista fasciculato 8% Showy tick-trefoil Desmodium canadense 1% Boneset Eu atoreum perfoliatum 2% Ox-eye Sunflower He%o sis helianthoides 2% Bush clover Les edeza ca itata 1% Wild blue lupine Lu inus erennis 5% Bee balm Monarda fistu/osd 0.5% Beard tongue Penstemon digitalis 1% Black-eyed Susan Rudbeckia hirta 4% Ohio s iderwort Tradescantia ohiensis 1% Blue vervain Verbena hastata 2% Win stem Verbesina alterniflora 4% Perennial Grasses Little bluestem Andro o aon sco arius 15% Side-oats grama Routeloua curti endula 10% Riverbank Wild rye E/ mus vir inicus 10% Indian grass Sor hostrum nutans 15% NOTES: *Available from Ernst Conservation Seeds, Inc. of Meadville, PA. This mix is customized with deletion of several out-of-range species. Seed at a rate of 15 lbs/acre. Add 10 pounds per acre of fast-germinating winter rye for prompt soil stabilization. RES,LLC—APPENDIX 1:Planting Materials Tables for Stormwater Basins, Wetland Creation&Habitat Enhancement, 250 Buckland Road, South Windsor, CT Table 5: Shrub seeds for hedgerow edges (Zones C,D,E) Add to Seed Mix 3 (wetlands) or Seed Mix 4 (uplands) in a 1:1 ratio (by volume) Common Name Scientific Name Percentage Speckled alder Alnus incona 57. Black chokeberry Aronia melanocar a 10% Gray dogwood Cornus amomum 10% Silky dogwood Cornus amomum 10% Winterberry holly Ilex verticillata 10% Choke cherry Prunus vir iniona 10% Common blackberry Rubus alle heniensis 2.57. Sta horn sumac Rhus typhina 10% Salix sericea Silky willow 2.571, Elderberry Sambucus americana 10% Nannyberry Viburnum lento o 10% Arrowwood Viburnum dentatum 10% NOTES: *Seeds are available individually from Ernst Conservation Seeds. For seeding along hedgerows where multiflora rosa has been removed,they are to be mixed in a one to one ration(by volume)with the Northeastern Roadside Native Seed Mix.. Seed at a rate of 35 lbs/acre. Add 10 pounds per acre of fast-germinating winter rye for prompt soil stabilization. RES,LLC—APPENDIX 1:Planting Materials Tables for Stormwater Basins, Wetland Creation&Habitat Enhancement, 250 Buckland Road, South Windsor, CT 4 Table 6: Medium to Large-Sized Tree Saplings for Stormwater Wetlands,for Zone C,over elevation 34.50 feet Plant Minimum Minimum Planted Hydrozone Proposed Notes Code Common Name Scientific Name Installed Spacing Form Numbers Size SB Serviceberry Amelanchier 18-24" 15' O.C. Potted ZONE E 7 Likes sun to semishade; or Shadblow canadensis height plant prefers well drained soils; attracts at least 36 vertebratespecies FP Green ash Fraxinus 18-24" 15' O.C. Potted ZONES it Likes sun to semishade; pennsylvanica height plant C,D,E prefers moist soils; attracts at least 12 vertebrate species EL Eastern larch Larix laricina 18-24" 15' O.C. Potted ZONE E 9 Prefers sun and height plant tolerates moist to dry soils. Provides winter I cover. Attracts at least 1 13 vertebratespecies. TP Tupelo Alyssa 18-24" 160C. Potted ZONES 5 A tree of swamps did sylvatica height plant B,C,� bottomlands; prefers sun. Fruits eaten by many birds& mammals. PO Pin Oak Quercus 18-24" 15' O.C. Potted ZONES 7 Likes sun to semishade; palustris height plant B,C,D prefers moist soils; attracts at least 20 animal species RES,LLC—APPENDIX 1:Planting Materials Tables for Stormwater Basins, Wetland Creation&Habitat Enhancement, 250 Buckland Road, South Windsor, CT Table 7: Medium to Large-Sized Deciduous Shrubs for wetlands and moist soils Plant Common Scientific Minimum Spacing Planted Hydrozone Proposed Notes Code Name Name Installed Form Numbers Size HN Hazlenut Cory/us 18" -24" 8'-10' Potted ZONE E 17 Tolerates shade well. americana O.C. plant Excellent source of cover. & browse. Nuts a food source for roduents. WB Common Ilex 18" -24" 6'-8' O.C. Potted ZONES 20 Likes sun and semishade; winterberry verticillato plant B,C,r) prefers moist to wet, rich soil; attracts at least 25 vertebratespecies ML Mountain Kalmia 18" -24" 6-8' O.C. Potted ZONE E 5 Likes sun to shade. laurel latifolia plant Important as winter cover and browse,and as nectar source. PW Pussy willow Salix discolor 18" -24" 6-10' Potted ZONES 13 Likes sun to semishade; O.C. Plant B,C,D prefers moist soil; supports over 28 insects,& insect- gleaning birds.Good browse. SS Shining Salixsericea 18-24" 6'-10' Potted ZONES it Willow O.C. Plant B,C,l) NB Nannyberry Viburnum 18" -24" 8'-10' Potted ZONES C,D 12 Likes sun to semishade; lentago O.C. plant prefers well drained soils; attracts at least 37 vertebratespecies BB Highbush Vaccinium 18" -24" 6-10' Potted ZONES C,D 17 Likes full sun and tolerates blueberry corymbosum O.C. plant partial shade; prefers acid, moist to wet soils; attracts at least 37 birdspecies RES,LLC—APPENDIX 1:Planting Materials Tables for Stormwater Basins, Wetland Creation&Habitat Enhancement, 250 Buckland Road, South Windsor, CT , Table 9: Live Pro a ules for Pro osed Replacement & Enhancement Wetland ones A, B, and C Plant Code Maximum Planted Hydrozone Proposed Common Scientific Spacing Form Numbers Name Name FS Fringed sedge Carex 3.0' O.C. Live ZONE B 41 crinita propagule or whole plant TH Turtlehead Chelone 3.0' O.C. Live ZONE C 16 glabra propagule or whole plant BI Blue flag iris Iris 1.5' O.C. Live ZONE B, 57 versicolor propagule C or whole plant SM Swamp Asclepias 2.0' O.C. Live ZONE C 28 milkweed incarnate propagule or whole plant MF Monkeyf lower Mimulus 2.0'OC Live ZONE B 38 ringens propagule or whole plant RES,LLC—APPENDIX 1:Planting Materials Tables for Stormwater Basins, Wetland Creation&Habitat Enhancement, 250 Buckland Road, South Windsor, CT FB Fowl Poa 2'OC Live ZONE B,C 57 Live Bluegrass palustris propagule propagule or whole or whole plant plant PW Pickerelweed Pontederia 3.0' O.C. Live ZONE A 48 Live cordata propagules propagule or whole s or whole plant plant AH Arrowhead Sagitaria 3'OC Live ZONE A 68 Live latifolia propagule propagule or whole or whole plant plant RES,LLC—APPENDIX 1:Planting Materials Tables for Stormwater Basins, Wetland Creation&Habitat Enhancement, 250 Buckland Road, South Windsor, CT SOWN af, C T19146W Ole S'Otd-A ld&lAd4i�� .1 * U 9 ,t 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 SOR•co TELEPHONE (860) 644-2511 To: Anchor Engineering 75 Nutmeg Lane Glastonbury, CT 06033 From: Jeffrey H. Folger—Environmental Planner/Conservation Officer Date: June 18, 2002 Re: App. #02-34P - Review of the proposed South Windsor Health Center - Plans dated 6/12/02. I have reviewed the proposed plan with the following initial comments: Lk') The plans are not certified A-2. A professional engineer and a surveyor should certify them. anti-tracking pad should be shown on the plans. ,,Wrimeter erosion controls are missing from the northern portion of the site associated with the 19,000-sqft building. They should be shown on the plans. A swale is proposed to be constructed along the northern portion of the site. This structure NOD should have erosion controls placed at intervals along the length to prevent erosive cutting of the swale bottom. Planting details for the swale need to be submitted for review. /The erosion control narrative is obscuring site information on page 5 of the plans. A drainage report has not been submitted for review by the Town Engineer. ,,The project description is incorrect. Please include all proposed buildings shown on the plans. Ao erosion controls are proposed for the excavation on the eastern portion of the site. tP Trap hoods should be installed in proposed catch basins to capture floatables entering the storm system. y Item #6 on the erosion narrative calls for temporary sediment pools to be installed. None are �N shown on the plan. �f1?'D 1 Erosion controls should be installed east of the detention basins to prevent sediment migration into finished basins. Replace the proposed type II sediment structure with a more efficient structure (Baysaver, �Vortecs, etc). v Sediment foreba s need to be installed in the detention basin to capture and contain sediment. Y p An operations and maintenance schedule needs to be developed that will address periodic removal of sediments. The Upland Review Area shown on the plans is incorrect. The distance from wetlands should be Cls�° eighty (80) feet. This needs to be changed on the plans. The applicant is responsible to demonstrate that the proposed plan represents the most feasible and prudent alternative to disturbing the wetland. N Compensatory mitigation (wetland creation) does not equal the net wetland loss. cc. Dir. Of Planning Town Engineer Inland Wetland/Conservation Commission MEMORANDUM To: Jeffrey Folger, Environmental Planner/Conservation Officer CC: Marcia Banach, Director of Planning RECEIVED From: Jeffrey B. Doolittle, P.E., Town Engineer ��'5� Date: 6/26/02 JUN 2 8 2002 RE: App 02-34P, South Windsor Health Care Center South Windso r CO SNo E N co Mr slotj I have reviewed the site plan (dated 6/21/02) for the South Windsor Health Care Center on Buckland Road and I have the.following comments. 1. There is not A-2 Cerfification by a Licensed Surveyor on these plans. 2. The number of parking spaces required is not included on the Title Sheet. 3. The following surrounding properties are not listed correctly: 3a. The small parcel on the south west corner of this site does not have the current owners, and this property needs to be incorporated into Lot 1 (the lot line between them removed). 3b. There is an abutting property on the south east corner that is not listed. 3c. The abutting property listed as N/F Johnny&Anne M. Jacques is not current. 3d. The Messiah Evangelical Lutheran Church has two abutting lots on the northern side. The lot lines between all abutting lots should be shown for clarity. 4. 1 do not think Lot.3 will be allowed as it has no street frontage and there is no access easement. 5. On the Landscape plan, many of the plant symbols shown are not listed in the key. The contour elevations should be turned off on this plan. 6. The Utilities & Drainage Plan does not show any utilities going into this site. The water, sewer, gas, electrical, telephone, cable and any other utilities need to be shown from the street to the buildings. Any off site sewer or drainage work needs to be included. 7. The proposed drainage system does not appear to be complete. Flared ends and rip rap plunge pools need to be shown in the detention basins. Why are there two drainage pipes crossing the driveway? The contours in the detention basins are not all labeled. What is the purpose of the small northern most detention basin? Several of the catch basins should be relocated slightly for optimum performance and ease of maintenance. Additional catch basins may be required. CB #4 and #8 look like larger sedimentation structures. What are these structures? Where are the Roof Leaders and Foundation Drains and where will they discharge? 4 8. 1 have not received a drainage report or any hydraulic analysis to review so I can not check the sizing of pipes, placement of catch basins or sizing of the detention basins. 9. Why are SNET poles 24, 25, 26 and 27 being moved? What are Note No. 2 and the Area of Taking Map Ref No. 4.? 10.The grading plan needs some revisions such as show contour 157 on the east side of the northerly building and show spot grades to verify there are not flat spots to the east of the buildings and in corners of the parking lot. I believe the maximum grade allowable in HC parking areas is 2% in any direction. 11.Were any test pits or soil borings made on this site. This information needs to be included. 12. 1 strongly recommend underdrains and/or curtain drains be installed on the east side of the parking areas to catch water coming off the hill to the east. These can be piped to the nearest catch basins. 1.3. 1 have questions about the site layout. Why does the driveway begin at 36 foot width and narrow to 24 foot width? This should be a uniform width. Are all paved areas curbed? There should be a buffer strip or wider walk where there are parking spaces up against walks. What is the rectangle with corner elevations of 158.2, in the pavement to the south of the building on Lot 1? Are the walks concrete or bituminous? Will the sidewalk be flush with the pavement by the HC parking spaces? Will curb stops be provided? All lanes should be at least 24 feet wide. Parking spaces are shown as 9' x 18' which does not meet town standards. Include a note that all construction shall be in conformance with the Town of South Windsor Public Improvement Specifications. In general these plans do not appear to be complete. I am available to sit down the Engineer to review my comments on these plans. Please call me (x 245) if you have any questions. MEMORANDUM To: South Windsor Inland Wetland/Conservation Commission. From: Jeffrey H.H Fol er Zoning/Wetland Enforcement Officer g - Date: June 27, 2000 Re: Review of the ro p posed South Windsor Health Care Center Site plan. Plans dated 06/12/02. The project is to create a three-lot subdivision and two office buildings and parking for 223 P J g P g spaces on approximately 11.75 acres. Proposed regulated activities include filling approximately 2.06 acres of wetland, approximately 2.22 acres.of regulated upland review area. Site: The site is located in the Podunk River watershed and Plum Gully Brook sub-watershed. The parcel is comprised of 11.75 acres. Drainage flows east to west to a culvert that goes under Buckland Road and discharges on the property to the west. Currently the site is a combination of early to mid successional forest on the eastern slope(1/4 of the site) and former cultivated fields extending to Buckland Road. Three linear hedgerows break up the fields perpendicular to the road. Historically, the site has been intensively farmed. Hydrology on the site appears to be the result of groundwater breaking out from the eastern ridge causing the center half of the property to be seasonally saturated. The hedgerows appear to be associated with historical drainage ditches. Currently the center hedgerow does contain a watercourse. Two areas containing wetland soils occur on the site. The central `/2 of the site is mapped as wetlands and there is a watercourse with associated wetlands located in the northeast corner of the site also. These wetlands are a part of a larger wetland band that extends north to south from Deming Road to the Manchester town line. The vegetation on the parcels in this band range from thick successional shrub to wet meadow. The second wetland area occurs in the northeast corner of the site and is in the form of a perennial brook that flows to the northwest toward Sele Drive. No development is proposed in this area, although it is shown as a lot on the plan. The central wetland would be categorized as a disturbed site due to past agriculture activities. The hedgerows exhibit shrub and some mature tree growth. The past-cultivated areas (4-5 years ago) are quickly reverting back to a wetland ecosystem. Sedges and rushes (early colonizers) are flourishing among remnant hay grass species. Major functions of this wetland would be stormwater conveyance, groundwater recharge, and wildlife habitat, with nutrient assimilation, and sediment retention as lesser values. Wildlife habitat values for this wetland area by itself would be considered moderate due to the diverse mixture of habitat types present on the property. Past agricultural use has retarded the succession of wetland plants in the open areas, however many wetland species are re-colonizing the area. The wetland area of the parcel to the north is comprised of a heavy stand of shrub growth, primarily dogwood and red maple. Although a virtual monoculture, the wildlife food and cover value would be considered moderate to high on these northern parcels. The proximity of these parcels to the subject parcel would tend to increase the value.of the subject parcel and any potential enhancement of the subject parcel's present flora. Impacts: Erosion and sedimentation: The soils onsite are identified by the Hartford County Soil Survey as Tisbury Silt Loam(TsA) 0- 3% slopes,Narragansett Silt Loam(NaB) 3-8% slopes, Tisbury Silt Loam(TsB) 3-8% slopes, and Walpole Loam(WcA) 0-3% slopes. The Narragansett soils are shown to occur on the eastern slopes. The current plan shows the soils on the site as being Enfield Silt Loam (EsA) 0-3% slopes, Enfield Silt Loam(EsB) 3-8% slopes, Tisbury Silt Loam(TsB) 3-8% slopes, and Enfield Silt Loam (EsQ 8-15% slopes. None of these soils are considered a wetland soil. I have asked the applicant to review this portion of the plan. Erosion potential of the Enfield soils is listed as high. The neighboring properties to the west and Plum Gully Brook are in a position to be impacted by migrating sediments. Perimeter controls and an anti-tracking pad have been proposed. With proper maintenance these controls will be effective in preventing the migration of most of the sediment generated by construction activities. However the silty material present in the soil will remain in suspension longer than the proposed structures are capable of retaining and will be discharged offsite. Additional temporary retention is necessary to minimize impacts to Plum Gully Brook during construction. The current plans need to be modified to address anticipated water flow onto the site from upslope during the initial phases of construction. Stormwater Management: Stormwater quantity and quality impacts are proposed to be managed by a catchbasin system draining to two wet bottom detention basins. Proper sizing of the basins has not been determined due to the lack of a submitted drainage report by the applicant. It is recommended that trap 4 hoods be installed in the catchbasins to intercept and contain floatables (including hydrocarbons). It has also been recommended that the gross particle separator(a type II sediment chamber) be replaced by a more efficient structure. Detailed plans have been requested pertaining the sizing and interior features of the basins. Wildlife habitat: The hedgerows presently offer favorable roosting and cover sites as well as limited food value. Numerous wildlife trails are present heading from hedgerow to hedgerow. It is also apparent that the wooded slope area on the eastern portion of the parcel is utilized by wildlife, and there are signs that wildlife travel from the wooded slope area to the wetland area. The wooded slope area is a part of a continuous wooded ridge that runs from this site south to Buckland Hills Drive. The wildlife value in the open areas has increased over the last few years due to the colonization of wet meadow plant species in former cultivated fields. A large quantity of"edge"habitat currently exists at the interface of the fields and the hedgerows and forest. Mitigation: The current plans show the proposed regulated area disturbances to be mitigated by altering and enhancing the wetland areas to the east of the rear parking areas. Four shallow marsh areas are proposed to be excavated on the site. Two immediately east of the proposed parking lots, and two in the eastern portion of the site at the toe of the slope and planted with wetland plants. The previously cultivated open areas are proposed to be enhanced by re-planting the areas with a more diverse wet meadow seed mix. Although the plans do not specify this, conversations with the applicant indicate that this will be done by plowing up the existing areas and re-seeding. This might have been appropriate five years ago when the fields were recently disturbed, but given the level of re-colonization by wet meadow plant species,this plan will unnecessarily disturb wetland areas that are well along in the successional process. An acceptable alternative that would minimize large-scale disturbance would be to mow strips in the fall and drill the seed in the fields. The installation of the marsh areas and enhancement plantings has the potential of increasing the habitat diversity and the opportunity for increasing the number species of wildlife to utilize the property. A plant type key is absent from the plans so I cannot determine what is proposed to be planted in the mitigation areas. The applicant has stated that wetland creation proposed equals 1.1 acres or 48,160 sqft. My estimation of the wetland proposed to be created that is not directly related to.the detention basins along Buckland Road is 7,000 sqft. The applicant's estimation of the net wetland loss after mitigation is .96 acres. A`tOW M 8f7 v <� co .a ~ Ww Ole siou V&U&Ot 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 ~OsoR.co` TELEPHONE (860) 644-2511 To: Anchor Engineering 75 Nutmeg Lane Glastonbury, CT 06033 From: Jeffrey H. Folger—Environmental Planner/Conservation Officer Date: June 27, 2002 Re: App. #02-34P - Review of the proposed South Windsor Health Center - Plans dated 6/12/02. I have reviewed the proposed plan with the following additional comments: To date, we have not received an environmental assessment of the wetlands present, or the �e0 proposed mitigation scheme. Details of the proposed planting plan should be provided. These should include seed and plant types and quantities, and planting bed details. The plan shows excavated areas at the toe of the slope on the eastern portion of the site. How atk° will those areas be accessed? What measures will be proposed to minimize disturbance to wetland areas in between? Item#6 of the Sediment control requirements mentions utilizing temporary sediment pool when de-watering excavations. Please provide a detail of the temporary sediment pool with the appropriate outlet. ./ The soil types shown on the plans are incorrect. Enfield and Tisbury soils are not wetland soils. Temporary and permanent seeding types, rates, and dates need to be shown on the plan. The sequence of construction does not include the installation of the proposed detention basins. These should be installed and stabilized prior to stormwater being diverted into them. This should appear in the sequence narrative. CC. Dir. Of Planning Town Engineer Inland Wetland/Conservation Commission MEMORANDUM To: Jeffrey Folger, Environmental Planner/Conservation Officer RECEIVED CC: Marcia Banach, Director of Planning From: Jeffrey B. Doolittle, P.E., Town Engineer ;fin JUL 1 8 2002 Date: 7/18/02 /_ 80ual k°,raSO� INLAND WETLANDS AGENCY RE: App 02-34P, South Windsor Health Care Center CONSERVATION COb!MISS!Ohl I have reviewed the revised site plan (dated 7/11/02) for the South Windsor Health Care Center on Buckland Road and I have the following comments. 1. There is still no A-2 Cerfification by a Licensed Surveyor on these plans. 2. The small parcel on the south west comer of this site does not have the current owners, and this property needs to be incorporated into Lot 1 (the lot line between them removed). 3. The Messiah Evangelical Lutheran Church has two abutting lots on the northern side. The lot lines between all abutting lots should be shown for clarity. 4. On the Landscape plan, many of the plant symbols shown are not listed in the key. 5. The Utilities & Drainage Plan needs to include the gas, electrical, telephone, cable and any other utilities from the street to the buildings. Where will the sewer line go from this site as there is not any existing sewers in this portion of Buckland Road? Any off site sewer or drainage work needs to be shown. 6. On the proposed drainage system: Can the two drainage pipes crossing the driveway be combined? What is the purpose of the small northern most detention basin? Several of the catch basins should be relocated slightly for optimum performance and ease of maintenance. Additional catch basins may be required. Where are the Foundation Drains and where will they discharge? 7. With regard to the Stormwater Management Report: The disposition of the eastern 2.36 acres as stated under the Project Description (last sentence) does not agree with a note on the Sheet 1 of these plans. A more thorough description of the flow path for stormwater from the eastern portion of these lots is necessary. The description in the Proposed Drainage section and contours on the plan are not clear. Draining of additional stormwater to adjacent properties that are not part of this site plan will not be allowed without specific easements and provisions to handle these flows. Provide a table comparing existing flows and post development flows from this site for various storm events. The roof leader that drains to CB 4 appears to be undersized. No flows are included for the area of the large detention basin to the north of the driveway. Additional tables and descriptions are required to explain the design flows to and from the detention basins and the required storage volume for various storm events. The computer program printouts need further clarification and explanation. Will there be standing water in the proposed detention basins? How will these be maintained so they present an attractive frontage to this development? A gutter flow analysis should be done to determine if any of the catch basins (especially in the driveway) require double inlet grates. 8. The grading plan needs some spot grades to verify there are not flat spots to the east of the buildings and in corners of the parking lot. I believe the maximum grade allowable in HC parking areas is 2% in any direction. 9. Were any test pits or soil borings made on this site. This information needs to be included. 10. 1 have questions about the site layout. Why does the driveway begin at 36 foot width and narrow to 24 foot width? This should be a uniform width. Are all paved areas curbed? There should be a buffer strip or wider walk where there are parking spaces up against walks. What is the rectangle with comer elevations of 158.2, in the pavement to the south of the building on Lot 1? Are the walks concrete or bituminous? Will the sidewalk be flush with the pavement by the HC parking spaces? Will curb stops be provided? All lanes should be at least 24 feet wide. Parking spaces are shown as 9' x 18' which does not meet town standards. Please call me (x 245) if you have any questions. MEMORANDUM To: South Windsor Inland Wetland/Conservation Commission. From: Jeffrey H. Folger- Zoning/Wetland Enforcement Officer Date: July 19, 2002 ' Re: Review of the outstanding items not addressed in the 7/11/02 revision of the proposed South Windsor Health Care Center Site plan. Plans dated 07/11/02. The following outstanding items have not been addressed The plans are not certified A-2. A swale is proposed to be constructed along the northern portion of the site. This structure should have erosion controls placed at intervals along the length to prevent erosive cutting of the swale bottom. Planting details for the swale need to be submitted for review. Trap hoods should be installed in proposed catch basins to capture floatables entering the storm system. Erosion controls should be installed east of the detention basins to prevent sediment migration into finished basins. An operations and maintenance schedule needs to be developed that will address periodic removal of sediments. Compensatory mitigation (wetland creation) does not equal the net wetland loss. To date, we have not received an environmental assessment of the wetlands present, or the proposed mitigation scheme. Details of the proposed planting plan should be provided. These should include seed and plant types and quantities, and planting bed details. The plan shows excavated areas at the toe of the slope on the eastern portion of the site. How will those areas be accessed? What measures will be proposed to minimize disturbance to wetland areas in between? The sequence of construction does not include the installation of the proposed detention basins. These should be installed and stabilized prior to stormwater being diverted into them. This should appear in the sequence narrative. tOwN S�7 t� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 soR.co�'�� TELEPHONE (860) 644-2511 October 23, 2002 CERTIFIED #70020510000081 152178 Sargis Construction Co., Inc. 825-E Cromwell Avenue Rocky Hill, CT 06067 Re: Appl. #02-3413 - South Windsor Health Care Center, Gateway Development zone To Whom It May Concern: We regret to inform you that the Inland Wetland/Conservation Commission, at its October 16, 2002, meeting denied your request for an application to construct two health care office buildings, parking lots, stormwater structures, and associated improvements on property located easterly of Buckland Road (Assessor's map #52, parcel #92), GD, Gateway Development zone. The Commission's stated reasons for denial included the application was incomplete, the additional information requested was never given to the Commission. Town staff comments were never fully addressed, and the Commission's comments were never addressed. Sincerely, t E z e A. Warren, Chairperson EA /dr cc: Anchor Engineering Services Wolf-Guerra, LLC • i i 3 T f IFAV sm- 1 All t .- a•..�. � .�Yk.,,� tit �. < Wit; ; 11���L1 o I. L _ N I co 0 65L N/ I .1 Tes L 8 S � '' •' J ' ..� •�. 1 �� "'.j � ' 1` O �� � is• r'� ' M All 1 d ._�. _. ,-.. _ k . ' Y i _ ,x. .jm 111111111111111111, v O �' ...._., .._._.. _....._. _ ........ V, COCD LO Z CD • Wetland Creation and Stormwater Renovation Area —Lot 1 N \South Windsor Health Care Center 252 Buckland Road South Windsor, CT 06074 � r Y/".1.��/^' r^• i�Y �r r�1•��lr�• y��•l�_�r� �i_.��r ���-�� _�`,_�.,r 1' -���,-Y• � Y S�� 1� Y Y y' � �^{ � 3 . RI RSIM- Ar • � � �`_� a �� ten[ ./J�f�f } \ 'a;Wt _Y RM 4. g, �,,.. 40 Tim Wetland Enhancement & Creation Areas —Lot 1 C \South Windsor Health Care Center 252 Buckland Road ` South Windsor, CT 06074