HomeMy WebLinkAboutT C (173) TOWN OF SOUTH WINDSOR
PLANNING&ZONING COMMISSION
APPLICATION FORM
Application No: /)-/9p RECEIVED
Official Receipt Date: 0`L
Receipt No: APR 17 2002
SOUTH WINDSOR PLANNING DEPT,
APPLICANT:
PROJECT NAME:
ADDRESS: _-7J-q � Tb h n i i4E Yl 1 ! ,. ) , S !i(,/1 n b so r Ci— 626 0 :�'�l
OWNER OF RECORD ON LAND RECORDS:
ADDRESS: 3 Q C�_ 06 Q ��
COMPLETE LOCATION OF PROPERTY: ('
ASSESSOR'S MAP # PARCEL# ZONE `'
NAME, ADDRESS, TEL & FAX # OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED:
THIS APPLICATION IS FOR: (Check all that apply):
❑ Zone Change to (Public Hearing required and Certified letter to abutters required)
❑ Subdivision/Resubdivision ❑ Open Space Subdivision (Public Hearing Required)
❑ Subdivision ❑ Minor ❑ Major
❑ Resubdivision (Public Hearing Required) ❑ Minor ❑ Major
❑ Conditional Approval
❑ Special Exception to Article (Public Hearing, Certified letter to abutters required)
❑ Site Plan of Development
❑ General Plan of Development
❑ Earth Filling (Sec. 15) and/or Earth Removal (Sec. 14 - Public Hearing Required)
❑ Regulation Amendment ❑ Zoning ❑ Subdivision
(Attach proposed amendment) (Public Hearing Required)
Temporary and Conditional Permit for (Public Hearing Required) w I i✓�'� ���L( lf}°1��-F
rll(-)✓h UP1 I 6 b.eL 1 ADO
❑ Major Home Occupation for (Public Hearing Required)
❑ Other (explain in detail)
An App °cation Pending sign is required to be posted on the property for all applications ten (10) days
prior to being heard by the Commission.
S; ature Signature of Property Owner
61ppio�,, e ppp/
OL,-T 7-
coe*qf i
ee
ele
cat
141
PLANNING DEPARTMENT
IN-HOUSE REFERRAL FORM
TO: Matt Galligan, Fred Shaw, Michael Gantick, Thomas Field,Bill Lanning,Kris Lindstrom,
Ray Favreau, Karl Reichle,Mel Stead,John Collins, Bob Deptula,J4'I)oolittle
FROM: Marcia A. Banach, AICP,Director of Planning
The Planning&Engineering Departments have received plans for the following project:
boa n G' T)Go
Location:
O Site Plan D Subdivision No. Acres Zone
0 Industrial Commercial 0 Residential No. Lots/Units
Water: q'Public 0 Private Well Sewerage: Wublic 0 Septic system(s)
Project Description:
Future Town-owned property involved? 0 Yes a No
O new street(s) 0 new detention area
O new open space/recreation area O active O passive
Planning Department notes:
Please comment by y(30 bo and return to the Planning Department.
6G1n"" 74S ,
Pac In Jeh'c+
-re dkisi, AzAG ax-tress f '9�/es" /�,,-. ARc.
RECEIVED
Ap , 232002
.SOUTH W►NDs0R
ENGINEERING pEPT.
South • •
DepartmentPlanning
Mem
o
To: Nancy Rocheleau, Blondie's Cafe
From: Marcia A. Banach, Director of Planning
CC: Kevin McCann, Chair, Planning and Zoning Commission
Date: 05/15/02
Re: Appl#02-19P, Blondie's Cafe Request for Temporary&Conditional Permit for Outdoor
Entertainment
Please be advised that the application submitted on April 17 does not include sufficient information to
allow adequate staff review or Commission action. The site plan submitted is incomplete as it shows
only the building, with no indications of where the proposed activity will occur, no access or parking
information.There is no information regarding how the proposed outdoor entertainment will occur, such
as (but not limited to) days and hours of operation, patron/crowd control, volume/noise, seating, trash
disposal,food/beverage service,and other relevant information.
This additional information has twice been requested verbally but has not been received as of this date.
The lack of adequate information could delay the public hearing (currently scheduled for May 28)
and/or action on this application,or could result in denial of the application.
Please advise us of your intentions regarding this application.Thank you for your attention to this item.
1540 Sullivan Avenue,South Windsor,CT 06074 PH 860-644-2511,ext.253 Fax 860-644-7280
e-mail banachO-southwindsor.org
0 Page 1
Marcia Banach Blondies Cafe Page 1
From: Sgt. Tom Field
To: Marcia Banach
Date: 5/28/02 4:46PM
Subject: Blondies Cafe
At this time we are opposed to the TEMPORARY/CONDITIONAL permit for out door entertainment for the
following reasons:
The noise levels have not been established by the requesting party, the Town Ordinance#145 NOISE
POLLUTION CONTROL ORDINANCE, is very restrictive and it seems that the music levels would be
above what is allowed.
The drawing supplies shows that the alcohol beverages sold would be inside and then the patrons would
be allowed to wander outside to the fenced area,who is going to control where the customers go after
they purchase the alcohol?
Will there be enough parking?
A concern over pedestrian and vehicle flow?
Lighting in the parking area and wooded area?
Will there be alcohol sold in the fenced area?
These are some of our concerns and they are why we are opposed to the out door entertainment proposal
as presented.
Sergeant E. Thomas Field
South Windsor Poilice Services
Traffic Unit Manager
860-648-6211
flelda-southwindsor.org
CC: Gary Tyler; Gerry Lewis
Appl #02-19P, Blondies Cafe
Public Hearing, 5-28-02
Planning Department Report
1. Request for Temporary and Conditional Permit approval for outside
entertainment from June 1 to October 1, 2002 at Blondies Cafe, 729 John Fitch
Blvd, GC zone.
2. Temporary and Conditional Permits may be granted by the Commission for a
use which is not specified elsewhere in the regulations for a period not to
exceed two years. Such approval may be given if, in the judgment of the
Commission, the public convenience and welfare will be substantially served,
and the appropriate use of neighboring property will not be substantially or
permanently injured, and traffic and other hazards will not result from such
use."
is
4 i s r �i
5.1, outdoor storage of stuff? �G ) _ 4e
"
6. Parking requirements d -irtternalac.cas&. s
e
9�/
1 O.Noise regulations: Town noise ordinance provisions
11.Signage: will there be additional temporary signage? Limited to 3-15 day
periods
12.South Windsor Police Department r fo UL-� d '
13.Approval modifications
l D D 1 .(�.a _� , (-J f (:/ �r/E �j�/ d ,rj )
7 i�L� f�
far K� . p ? Y��b� ov-'?� �..-e_n"_ � l
<h, c //W K
i
4S�
"4y
-I-vla
r
0
Lei
S
f
i,•
1
R
use/ Gar' to� t.
f
' i
DWYER, SHERIDAN AND FITZGERALD, LLC
ATTORNEYS AT LAW
100 SYCAMORE STREET
POST OFFICE BOX 537
J.PATRICK DWYER GLASTONBURY,CONNECTICUT 06033-0537 TELEPHONE
THOMAS P.SHERIDAN (8(30) 659-2625
TIMOTHY J.FITZGERALD
DANIEL D.DWYER
FAX
(860) E57--9338
October 7, 2003 REC " �_ n I
I
OCT 10 2003
Certified Mail,Return Receipt Requested
TOWN OF SOUTH W NDSOR
Matthew B. Galligan, Town Manager
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT 06074
Re: South Windsor Technologies Center
Patria Road and Schweir Road
South Windsor, Connecticut
Dear Mr. Galligan:
I represent South Windsor Technologies Center, LLC, the developer of property located
off of Patria Road and Schweir Road in the Town of South Windsor, comprising of
approximately 80 acres. The proposed 80-acre industrial park has received approvals from the
various boards and commissions in the Town of South Windsor to include the South Windsor
Planning and Zoning Commission and Inland Wetland Commission.
The 80-acre industrial park will feature 38 building lots with full utilities including fiber-
optic cable for data communications and telecommunications, natural gas, public sanitary sewer,
and public water: All cable utilities will be underground. The park will include frontage on
Route 194, as well as extensions of Schweir Road(1,550 feet) and Patria Road (2,000 feet). The
new streets will have an extra width of 30 feet and enlarged cul de sacs to accommodate
commercial vehicles. Some of the lots have the potential for rail service. The entire parcel is in
the South Windsor industrial zone. The anticipated uses are manufacturing, research and
development,professional office, industrial processing and distribution.
The developer is South Windsor Technologies Center, LLC, a South Windsor based
company.
Site engineering, planning and land surveying was performed by Design Professionals,
Inc., a fifteen-person consulting firm based in South Windsor.
DWYER, SHERIDAN AND FITZGERALD
I
n
The infrastructure for the development's first phase is expected to Commence during the
winter of 2003-2004. The developer and design team anticipate numerous lot consolidations and
project 15-20 buildings being constructed, with build out completed in 2009-2010. The
anticipated infrastructure cost for Phase One is One Million Two Hundred Thousand
($1,200,000.00) Dollars, and the estimated infrastructure cost for Phase Two is Eight Hundred
Thousand($800,000.00) Dollars.
Please accept this letter as a request by the developer for consideration under the Town's
Road Construction Utility Extension .and Improvement Assistance Program. It is my
understanding that the program presently in place in South Windsor, subject to approval by the
Town Council and Economic Development Commission, can provide for a tax abatement
program for a period of seven (7) years, allowing the developer to offset its infrastructure costs
by delaying the implementation of tax increases on the approved building lots.
If there is anything else that you would need from my client in order to begin
consideration of this project for the Road Construction Utility Extension and Improvement
Assistance Program,please let me know and I will be more than happy to accommodate you.
Very truly/yours
THOMAS P. SHERIDAN
TPS/ds
cc: South Windsor Technologies Center, LLC
Peter DeMallie,Design Professionals, Inc.
dww/Diane/RealEstate/Cmn/S W TwhCtr/Gall igan.dm