Loading...
HomeMy WebLinkAboutSpec Exc/Site Plan of Development (4) TOWN OF SOUTH WINDSOR PLANNING&ZONING COMMISSION o w M se. APPLICATION FORM Application No: "gip -3it P Official Receipt Date: i [Receipt No: APPLICANT: D&L Caron, LLC c o David Caron � st)R Q)�� ADDRESS: 312 Deming Street, South Windsor, CT 06074 =' • OWNER OF RECORD ON LAND RECORDS: same as applicant ADDRESS: COMPLETE LOCATION OF PROPERTY: 195 Commerce Way ASSESSORS MAP # 121 PARCEL #34 ZONE I NAME, ADDRESS, TEL& FAX # OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED: Peter R. DeMallie,Design Professionals, Inc. 165 So. Satellite Rd. South Windsor, CT 06074 Tel: 291-8755 Fax: 291-8757 THIS APPLICATION IS FOR: (Check all that apply): ❑ Zone Change to (Public Hearing required and Certified letter to abutters required) ❑ Subdivision/Resubdivision ❑ Open Space Subdivision (Public Hearing Required) ❑ Subdivision ❑ Minor ❑ Major ❑ Resubdivision (Public Hearing Required) ❑ Minor ❑Major ❑ Conditional Approval Special Exception to Article 6.1.3.5 (Public Hearing, Certified letter to abutters required) ® Site Plan of Development ❑ General Plan of Development ❑ Earth Filling (Sec. 15) and/or Earth Removal (Sec. 14 - Public Hearing required) ❑ Regulation Amendment: ❑Zoning ❑ Subdivision (Attach proposed amendment) Temporary and Conditional Permit for ❑ Major Home Occupation for ❑ Other (explain in detail) An Application Pending sign is required to be posted on the property for all applications ten (10) days prior to being heard by the Commission iff /Acrent for Applicant 'A ent for.Owne S gnature of Applicant rSi ature of Property Owner (See reverse side for additional information) 7.� f TOWN OF SOUTH WINDSOR CHECKLIST REQUIRED INFORMATION SITE PLANS APPLICANT_ D a L C d r e L L a G PROJECT NAME This checklist must be signed by plan preparer (P.E./L.S.) declaring that ail required information is provided. Items 1-7 are required for all applications; items 8-11 required where appropriate. Check mark for each item supplied. 1. On each sheet for plans or maps, title block with the following information: a. Name, address and telephone of applicant b. Name, address and telephone number of Land Surveyor or Professional Engineer. c. Name of Development d. Date when drawings were made. 2. Key Map: An overall map drawn to a scale of 1 inch equals either 100 feet or 200 feet. This map will show the overall design of the Development and surrounding property within 500 feet a. Data block which gives needed zoning information such as percentage of lot coverage, acreage of tract, number of apartment units, parking requirements, etc. b. Outline of buildings. _ c. Layout of streets. d. Surrounding property boundaries-within 500 feet e. Names of abutting property owners. . f. Proposed open spaces and recreation areas. _ g. Driveway cuts on abutting properties and any properties across from proposed site. h. Distance to and name of nearest intersection street. r 3. Architectural Elevations: See attached checklist.for Architecture and Design Review.. (,To )3:Er s vj�7"t-rTi=b c�v.�� i=� S�PIS��►7� cow�� 4. Plot Plan: A layout map of the proposed site drawn to a scale of 1 inch equals 40 feet on either of the following size sheets: (1) 24" x 36" with a 3/4" ruled margin; (2) 18" x 24" with a 1/2" ruled margin, containing the following data: a. Distance and bearings of all boundary lines and acreage of site. Iron pins required at all property angle points and shown on map. b. Proposed streets and street lines with center line station, curve data, and parking spaces.. _ c. Building lines in accordance with zoning regulations. d. Proposed buildings and other structures, including signs, outside lighting, and dumpsters (on concrete pad and screened). e. Easements, noting grantors, grantees, and purpose. �O f. Names of abutting property,owners. g. Monuments will be indicated at comers and-angles of all streets and at all points of curvature and tangency. The monumented points within proposed site shall be coordinated. These coordinates shall appear in tabular form on the plot plan. The accessibility of these CGS points shall be determined by the Town Engineer. Z 14 h. All open space or other common or public land uses shall be indicated. i. A-2 certification; P.E./L.S. seals and signatures. S. Topographic Map: A.map drawn to a scale of 1 inch to 40 feet on sheets not exceeding 24 inches by 36 inches, including ruled margins shall in addition to the requirements of the plot plans show the following: a. All existing and proposed buildings. b. Curb Lines and pavement width, sidewalks. fv- 4,L 4 w) c. Existing and proposed sanitary sewers. d. Existing and proposed water-and-all existing utilities. e. Present wooded area indicated by foliage lines. Any trees to be saved should be shown. f. Existing and proposed contours shall be shown in not less than two-foot intervals, but in cases of relatively level land, the contours shall be one- foot intervals and spot elevations. g . Regulated wetlands and 100-year floodplain or note that none are present. h. Proposed storm drainage system, showing all catch basins, endwalls, manholes, lengths and sizes of pipes and elevations of structures. (Maximum distance between catch basins shall be 300 feet and-minimum size of storm drain lines shall be 15 inches;within Town ROW.). If plan/profile sheet is provided all of this does not need to be shown. Only top of frame elevations and inverts of open discharge pipe shall be shown on this plan. 1/l4 i. Connections of all springs into proposed storm drainage system as needed. 0219 j. Location and indications of existing brook channels, and 100-year flood limits. k. A-2 &T 2 Certification; P.E./L.S. seals and signatures. 6. Landscaping plan: 7. Drainage calculations: - Zero Runoff Increase per attached guidelines. N f9 8. Traffic Report: � 9. Plans and Profiles: A plan and profile of the proposed streets drawn on plan/profile paper of scales 1 inch to 40 feet horizontally, and 1 inch to 4 feet vertically on sheets not exceeding 24 inches by 36 inches, including ruled . margins and containing the following: _ a. Layout of streets in sections coordinated by stations with the profile. b. Street plan showing roadways, drainage,sanitary sewer (including house sewer), foundation drains, lot lines, buildings including all utilities with elevations (top frame and inverts), size, type, length, slopes of pipes. c. Sight line at driveway&street intersections. o n' -P L o i is r'Tt d. Profile of roadway showing existing and finished grades. Roadway profile will show all tangent grade and all vertical curve information. tyR. e. Profile will show all catch basins and all drainage lines between catch basins with all invert and top of frame elevations, sizes, lengths and slopes of pipes. fig_ f. Where any storm drainage line discharges into an existing brook sufficient profile of this brook will be shown to determine conditions. A.)'n_ g. CGS datum shall be used on all sites accessible to these controls. The Town Engineer shall, based on standard engineering practices, determine the accessibility of these controls. - h. Profiles shall show all sanitary sewer lines and manholes, including elevations, inverts, top of frame, sizes, lengths, and slopes of pipes. Top of foundation elevations for building shall be shown. . A)a9 10. Open Space Site Improvement Plans: For sites which require or include a provision for open spaces, a.plan which contains data for site improvement may be required. This map shall be drawn to a scale of 1 inch equals 40 feet. VA 11. Sanitary-Report: Where individual sanitary sewage disposal systems are proposed, the final plans shall indude a Sanitary Report certified by a Professional Engineer. The report shall demonstrate the feasibility of the proposed individual systems. ZiaP , _ /o � PLAN PREPAR R (P.E./LS.) DA tE June 23, 1998 y DRAINAGE ANALYSIS D & L CARON, LLC 195 COMMERCE WAY SOUTH.WINDSOR, CONNECTICUT The site is located on the northeast corner of the intersection of Commerce Way and Rye Street. The site was created as part of the Commerce Way industrial subdivision. The western half of the site is fairly flat, and the eastern end of the site has fairly steep grades and consists of Terrace Escarpments. Terrace Escarpments are susceptible to erosion. The site is presently covered by brush and grass on the western end of the site, and is wooded on the eastern end of the site. The entire site is undeveloped. Under existing conditions, the western most portion of the site drains to the west to Commerce Way. The large majority of the site drains to the east under existing conditions to the Terrace Escarpments. The runoff calculations under existing conditions for the runoff to Commerce way utilizing the rational formula are included herein for a 10-year design storm. The drainage area map for existing and developed conditions is also included herein. The proposed development of the site consists of the construction of a small commercial office building with associated parking, and the construction of a gravel yard. The site would be used for the sale of propane. Two large tanks would be enclosed within the fenced in gravel storage yard. It is our understanding that the developed site was originally designed to drain to the existing detention basin that was constructed as part of the creation of this industrial subdivision. We have therefore designed the developed portion of the site to drain to an on-site vegetated swale. This vegetated swale circles around the east and north sides of the proposed development and discharges to a proposed on-site sediment structure that is connected into the Commerce Way subdivision. The vegetated swale has been designed to be fairly flat, and to contain two stone berms. The vegetated swale will enhance the natural infiltration of the runoff from the site without providing a direct discharge to the Terrace Escarpment soils. The runoff calculations under developed conditions for the runoff to Commerce way utilizing the rational formula are included herein for a 10-year design storm. _The calculations do not include any allowance for infiltration, or minor detention within the vegetated swale, and the actual discharge from the site is expected to be substantially,less than calculated herein. E )< S i) Yu L c,.,j Y� l j l v�v.S tv = o � Lf'y AfA AN M. & EL/ZABETN K. LUKAW SsA 9�f - _ / ------ / ® J , 1 ------ ` p.l.ln7 I.P. F.LWt- — F. I33'43'41'\ )_ o° , , A R A� 2 \ ® ,` ' i , 0 I , '�, T�s 90. 4' �g , , TOPSOL - i �` � �• sue" I �B - PRD A 15'19'26 , " FRS/ 350.0 �. h' 3Zy \T = 1, �7 , do MOH. 30 � � � oft % ` 75 ` IV PR OSED `` , FRONT YAR - ♦�- --�! s i/ 1 RY E BUIL G ® ` • I� m f�/ / r i 285�OE AR ------ s 71� ` 25.0 -_ L= 39.3' L .27 i �39.2T . S.M.H. r.X 1• )Gi.Y �'t) S`..�'�L��" DESIGN PROFESSIONALS, INC. civil engineers •planners • surveyors • gis Transmitted via certified mail Dear Current Abutting Property Owner August 10, 2000 Re: D&L Caron, LLC DPI Project No. 99-1233 195 Commerce Way South Windsor, Connecticut In accordance with regulations of the Inland Wetlands Agency and the Planning& Zoning Commission, we are required to notify you that applications have been filed on the property abutting yours and are subject to a hearing or meeting by the Planning& Zoning Commission and the Inland Wetlands Agency. The applications and plans are on file with the South Windsor Planning Department in the Town Hall. As an abutting property owner you are invited to the hearing(s)to ask questions and/or give comments, however,you are not required to attend. You may also submit written comments regarding the application(s)prior to the meeting if you so desire. For further information regarding the specific date this application(s)will be heard,please contact Debbie Wark,Recording Secretary, Michele Lipe,Deputy Planning Director, or Jeff Folger, Environmental Planner at the South Windsor Planning Department at 644- 2511, ext. 253, 252, or 229,respectively. Thank you. Sincerely, DESIGN I'MVESSIONALS, INC. By: Peter e allie Principal cc: David Caron Galen B. Semprebon Richard Adams Jeffrey Folger Marcia Banach 165 South Satellite Road, South Windsor, Connecticut 06074 Tel: (860) 291-8755 • Fax: (860) 291-8757 DESIGN PROFESSIONALS, INC. civil engineers • planners • surveyors • gis August 10,2000 Abutters List IWA/PZC Application Industrial Building 195 Commerce Way 1.) Jan M. &Elizabeth K. Lukasik, 100 Oxford Dr. South Windsor, CT 06074 2.) State of Connecticut, 87 Rye Street, South Windsor, CT 06074 165 South Satellite Road, South Windsor, Connecticut 06074 Tel: (860)291-8755 •Fax: (860) 291-8757 MEMORANDUM To: Marcia A. Banach, Director of Planning From: Jerry C. Iazzetta, P.E., Town Engineer Date: August 24, 2000 Re: D.L. Caron Site Plan 00-34P We have reviewed the drawings dated 6-15-2000 for the proposed D.L. Caron site plan and have the following comments: Drainage Analysis 1. The analysis shows the area for the existing conditions as .364 acres and the developed conditions the area as 2.29 acres. The plans indicate the total parcel area is 3.74 acres. If the total area is 3.74 acres, then predevelopment and post development area should be 3.74 acres and calculations should reflect this. 2. The runoff coefficients used do not show the calculation of how they were determined. 3. The storm drainage pipe design has not been submitted. 4. The design of the swale (capacity) has not been shown. Planimetric Site Plan 1. Plan indicates that there are 2 lots. However there is no identification of the lots nor any indication of acreage of each lot. 2. The proposed driveway is too close to the driveway on N/F Lukasik. 3. Iron pins must be placed at all property corners. Topographic Plan 1. Near the cleanout on the proposed sanitary lateral there are two numbers "+60" and "74.4±". What do they stand for? Details 1. Cleanout and wing wall details are not the Town standard. 2. The temporary pavement patch detail is very difficult to read. It should be made larger and readable. 3. General notes #8 should indicate that all roadway, storm drainage and sanitary sewer construction shall be in accordance with the Town of South Windsor Public Improvement Specifications. The 814A specifications only govern when the Town's specifications do not address an issue. JCl/sfg S:\ENGINEER\Proj.-P&z Wetland Applications\DL Caron\Review 8-24.doc PLANNING DEPARTMENT IN-HOUSE REFERRAL FORM TO: Matt Galligan, ;° Michael Gantick, Thomas Field, Bill Lanning, John Bond, Ray Favreau, Karl Reichle, Mel Stead, John Collins, Bob Deptula, Jerry Iazzetta FROM: Marcia A. Banach, AICP, Director of Planning The Planning & Engineering Departments have received plans for the following project: Location: Citi Lc/ Site Plan O Subdivision No. Acres t Zone L yd Industrial O Commercial O Residential No. Lots/Units Water: /�p Public O Private Well Sewerage: Public O Septic system(s) Project Description: o r-k �/,��r.�,(,vE,� - ✓Jatk cl'V � -(� Future Town-owned property involved? O Yes A No O new street(s) O new detention area O new open space/recreation area O active O passive Planning Department notes: Please comment by 1h /d o and return to the Planning Department. G. DESIGN PROFESSIONALS, INC. civil engineers . planners . surveyors . gis September21,2000 South Windsor Planning and Zoning Commission Town of South Windsor 1540 Sullivan Ave. South Windsor,CT 06074 Attn:Marcia Banach Director of Planning RE:D.L. Caron Site Plan 00-34P, DPI Prot'# 1233 Dear Marcia We are submitting 8 sets of revised plans in response to comments made by Jerry Iazzetta dated 8-24-00,and by Jeff Folger dated 9-13-00. We believe that we have addressed all of the comments satisfactory. Our like numbered responses to the comments are as follows: Jerry Iazzetta's comments: Drainage Analysis 1. The total area of the site is 3.74 acres. Under existing conditions,the entire site except for 0.364 acres drains to the rear(east)of the site to the wetlands. Under proposed conditions,2.29 acres of the site, which includes all of the proposed development drains to the front(to commerce way),and the remaining portion of the site continues to drain to the rear. The total area under developed conditions draining to the rear of the site is less than under existing conditions. The area draining to the rear under developed conditions will remain in a natural undeveloped condition. The drainage report looked at the increase in runoff to the front,and not at the decrease in runoff to the rear of the site. We have prepared an estimate of the decrease in runoff to the rear,which is contained in a drainage addendum. 2. We have prepared a computation of the runoff coefficients,which is contained in the drainage addendum. 3. The piping design calculations have been included in the drainage addendum. 4. The calculation of the swale capacity is included in the drainage addendum. Planimetric Site Plan 1. The intent of the development is to combine the two existing lots into 1 lot. The plans have been revised to more clearly indicate this. 2. The proposed driveway has been moved further away from the Lukasik driveway. 3. The plans have been revised accordingly. Topographic Plan 1. The plans have been revised to clarify this confusion. Details 1. The only town cleanout detail we could find in the town's specifications was for a cleanout that would be buried. The cleanout on this site will be located within a paved area. We have replaced the previous i DESIGN PROFESSIONALS, INC. civil engineers . planners . surveyors . gis detail with a different detail that we believe should be more than adequate for the location. We will alter this detail or replace with a suitable detail as required. The wing wall detail has been revised accordingly. 2. The plans have been revised accordingly. 3. The plans have been revised accordingly. JeffFolger's comments dated 9-13-00 1. Additional silt fence has been added along the curb line on Commerce Way. The layout of the building and some other minor changes have been incorporated into this revision.Please review the enclosed revised plans,and feel free to call with any questions or comments. Sincerely, ff,r-,& Galen Semprebon,P.E. CC:Jerry Iazzetta Enclosures: 165 South Satellite Road, South Wincr,Connecticut 0604 Tel: (860)291-8755 .Fax: (860)291-8757 DRAINAGE ANALYSIS ADDENDUM D & L CARON, LLC 195 COMMERCE WAY SOUTH WINDSOR, CONNECTICUT This addendum is being prepared to address the comments made by Jerry Iazzetta dated 8-24-00. 1. The area of the site to the rear(east end) of the site that will continue to drain to the east into the wetlands under developed conditions will be approximately 1.50 acres. The area will not be developed so the runoff coefficient will be 0.2. For a ten-year design storm with a time of concentration of 10 minutes,the flow to the rear would be 1.41 CFS using the rational method. 2. The runoff coefficient under existing conditions was taken for a well vegetated (grass and brush) condition. The runoff coefficient under developed condition was determined based on a combination of different land coverings. These included the following: Coverage type Area c value (A)(c) Building 1800 S.F. 0.9 1620 Pavement 5700 S.F. 0.9 5130 Gravel surface 34,850 0.9 31,365 Lawn 57,402 0.15 8610 Total 99,752 46,725 Dividing(a x c)by the total area results in a composite c value of 0.47,which is slightly higher than the 0.44 in the original report. A c of 0.47 with a time of concentration of 15 minutes(I=4.0"Ihr)results in a flow Q for a ten year design storm of 4.31 CFS. 3. The storm drainage pipe design has been included with this addendum. 4. The capacity of the swale has been included in this addendum. The maximum velocity of the swale indicated is 3.16 FPS. This does not take into account the stone berms within the swale that will slow this velocity down. The maximum depth of flow within the 1' deep swale for the ten-year design storm is 4.76 inches. n � { i � n n ►� Line Segment .;� w Time to Inlet i i N w Time in Pipe i Accumulated Time QK 1 AI Entering Catch Basin o rn Sum of AI in System N o Rainfall Intensity U ; i Q in System o i W N D Pipe Size A I 1 U �D N Y� I >: o o Length of Pipe o � o Slope •"� ro Average Velocity Z w Full Capacity r r' Headwater C ~ rn, N i •off laan q paXz) -4 ,� .� UM01 f�`Mff AQ pauB-VsaQ 3j�,-oww,n2 _4� a ,.o.,�►�� z��'Y # �aCosa tmp#l .txt Channel Calculator Given Input Data: Shape Trapezoidal Solving for . . . . . . . . . . . . . . . . . . . . . Depth of Flow Flowrate _ . . . . ... . ... _ . _ .... . . .._ . . _ . . 3 .5000 cfs Slope . . . . . . . . . . . . . . . . . . . . . . . . . . . 0. 0013 ft/ft Manning`s n . . . . . . . . . . . . . . . . . . . . . 0. 0075 Height . . . . . . . . . . . . . . . . . . . . . . . . . . 12. 0000 in Bottom width _ _.. ... .-. _ .-..... _ _ . _ _ _ _ . 24 .0000 in Left slope . . . . . . . . . . . . . . . . . . . . . . 0. 5000 ft/ft Right slope . . . . . . . . . . . . . . . . . . . . . 0.5000 ft/ft Computed Results: Depth . . . . . . . . . . . . . . . . . . . . . . . . . . . 4.7625 in Velocity . . . . . . . . . . . . . . . . . . . . . . . . 3.1566 fps Flow area . . . . . . . . . . . . . . . . . . . . . . . 1 . 1088 ft2 Flow perimeter . . . . . . . . . . . . . . . . . . 45.2987 in Hydraulic radius . . . . . . . . . . . . . . . . 3.5247 in Top width . . . . . . . . . . . . . . . . . . . . . . . 43. 0501 in Area . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4.0.000. ft2 Perimeter . . . . . . . . . . . . . . . . . . . . . . . 77.. 6656 in Percent full . . . . . . . . . . . . . . . . . . . . 39. 6878 % Critical Information Critical depth . . . . . . . . . . . . . . . . . . 4.7654 in Critical slope . . . . . . . . . . . . . . . . . . 0. 0013 ft/ft Critical velocity . . . . . . . . . . . . . . . 3. 1542 fps Critical area . . . . . . . . . . . . . . . . . . . 1. 1096 ft2 Critical perimeter . . . . . . . . . . . . . . 45.3115 in Critical hydraulic radius . . . . . . . 3. 5264 in Critical top width . . . . . . . . . . . . . . 43. 0616 in Specific energy . . . . . . . . . . . . . . . . . 0.5517 ft Minimum energy . . . . . . . . . . . . . . . . . . 0.5957 ft Froude number . . . . . . . . . . . . . . . . . . . 1 . 0010 Flow condition . . . . Supercritical Page 1 MEMORANDUM To: Marcia A. Banach, Director of Planning From: Jerry C. Iazzetta, P.E., Town Engineer Date: September 26, 2000 Re: D.L. Caron Site Plan 00-34P We have reviewed.the revised drawings dated 9-21-2000 received 9-23-2000 for the proposed D.L. Caron site plan and have the following comments: Planimetric Site Plan 1. The proposed driveway is too close to the driveway on N/F Lukasik. Topographic Plan 1. Near the cleanout on the proposed sanitary lateral there are two numbers "+00" and "74.4±". What do they stand for? 2. The sanitary lateral is not identified as to size, type of pipe, slope, inverts at building and at existing lateral. Details 1. A wing wall detail is required. JCl/sfg \\TOWN_HALL\VOL2\ENGINEER\Proj. -P&Z Wetland Applications\DL Caron\Review 9-26,doc i Star Gas Site Plan 9-26-00 1. Ap 1' do or sp is exc 1 n and s' Ian a oval an ' du ial b d' o th sale f opan , app xi at y , 0 a p� y on no gl. -WAy, wp-ster-ly-side- �fi��,y��t; 2. ��- zoif�aa o,� tel t-3 �7 Proposed building coverage is 1%; 50% allowed. Proposed impervious coverage is 27.7%; 65% allowed. The required number of parking spaces based on the proposed use is 8; 10 spaces have been provided. It appears that all other zoning requirements have been met. W ete n uetTrh-bufding-treight should b nAow iir -r-r -data tr&le;rats parr-�lIess n-4�0-feet." y� 0 -dtful'. /'ra y 3. The -e r e is a special exception use under section 6.1.3.5. Special Exception criteria for this use include: ♦ The goals and objectives of the Plan of Development are met; ♦ Adverse traffic impacts are not created; ♦ Negative impacts on property values are not created; ♦ The land is physically suited for its proposed use; ♦ Adverse environmental impacts are not created; ♦ There is a balance between neighborhood acceptance and community need; ♦ Present and proposed utilities, streets, drainage system, and other improvements have adequate capacity to accommodate the proposed use; ♦ Historic factors are adequately protected; and ♦ The overall physical appearance of the development is compatible with surrounding development and the Commission's goals for the neighborhood. 4. There are no regulated wetlands impacted by this proposal. The applicant received conservation approval from the IWA/CC on 9/20/00 with the recommendation of a $1,000 bond. 5. There is public water and public sewer available to the site. WPCA approval is required. 6. The Architecture and Design Review Committee reviewed the site plan on September 7 and was very pleased with the proposed architecture of the building and the landscaping. They had the following recommendations: • Cut-off wall packs should be used on the building, with review by town staff. • Signage should be reviewed when submitted. • Propane tanks are screened with a row of white pines along the western boundary. A variety of evergreen trees should be used rather than all white pines. • All mechanical equipment should be located toward the rear of the building. 7. There is a dumpster shown on the plans, on a concrete pad and screened by the proposed chain link fence around the site perimeter. 8. If this application is approved, in addition to the already-noted comments, the planning department requests that the tree line on the topographic plan be completed' a4 2-,u.,a J � i �towM sf+<� Ce T11W.'m o-PSouth ?A;F-7,4,1140t 9 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 AREA CODE 860 /644-2511 R•CO�� September 26, 2000 Certified #P462498116 D & L Caron 195 Commerce Way South Windsor, CT 06074 RE: Appl. #00-34P, D & L Caron To Whom It May Concern: At the September 20, 2000 regular meeting, the Inland Wetlands Agency/Conservation Commission approved application #00-34P - D 8v L Caron LLC, 195 Commerce Way- Conservation application for the construction of a 1800 sq. ft. industrial building, parking, a storage yard, drainage, and associated improvements on property located northerly of Commerce Way and westerly of Rte Street (Assessor's ma' #121, 122, parcel #34, 16) I zone. (Assessor's map #60, parcel #10). This approval is subject to the following conditions: 1. One blueprint copy of the entire set of plans and this letter reproduced thereon, must be submitted to this Commission. This must be completed within 65 days of approval prior to any construction activity on the site. Plans submitted to Planning & Zoning Commission shall be considered having met this requirement. 2. The application shall indemnify and hold harmless the Town of South Windsor against any liability, which might result from the proposed operation or use. 3. The permit is valid for five years and shall expire on September 20, 2005. It is the landowner(s)/applicant(s) responsibility to track expiration dates and notify the Commission of a renewal request at least 65 days prior to expiration. D & L Caron LLC September 26, 2000 Page 2 4. All approvals required must be obtained and submitted prior to any activity on the site. 5. A contact person shall be identified on the plans. 6. We recommend a bond in the amount of$1,000 be submitted to the Planning & Zoning Commission to ensure compliance with the Erosion and Sedimentation Control Measures and establishment of the stormwater swale for one growing season. Very truly yours, Eliz eth Warren, Chairperson INLA D WETLANDS AGENCY/ CONSERVATION COMMISSION EW:dr cc: Chief Building Official Town Engineer PLANNING DEPARTMENT TRANSMITTAL DATE: TO: WE ARE SENDING YOU: O PZC initial plans ,! 'Drainage computations ICI PZC revised Plans O Bond estimate request O PZC Final plans for review O Bond reduction request O PZC Final plans for filing O Correspondence O IWA/CC plans O Other NO.OF COPIES _ APPLICATION NUMBER PROJECT/APPLICANT Qd" 3 0 3 P � L THESE ITEMS ARE TRANSMITTED: O For your files AT,For review and comment - - O For your use O As requested O Other PLEASE RETURNICON vffi BY: CO S. r,.�j o� OCT 6 2000 !' SOUTH WIVDSOR From: ,,opy to: rA 9 ` 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 OR-Co�' AREA CODE 860 / 644-2511 CERTIFIED MAIL October 10, 2000 D&L Caron, LLC 312 Deming Street South Windsor, CT 06074 Dear Madam/Sir: Re: Appl #00-34P, Star Gas Special Exception and Site Plan We are pleased to advise you that the Planning & Zoning Commission voted on September 26, 2000, to approve with modifications the above referenced application for a Site Plan of Development and your request for a Special Exception to Section 6.1.3.5. This approval is for the construction of a facility for the sale propane on the northerly side of Commerce Way and the westerly side of Rye St., I zone as shown on plans prepared by Design Professionals, Inc, Job No. 20-1233, dated 6/27/00, as revised. This approval is subject to the following modifications: 1. Prior to commencement of any site work, a meeting must be held with Town Staff. 2. No building permit will be issued until the final mylars have been filed in the Town Clerk's office. 3. This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission, including a bond in the amount of$1,000. 4. An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 8.1.10 of the Zoning Regulations. 5. Landscape bond in the amount of$2,000 is required and must be submitted prior to filing of mylars. 6. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 7. WPCA approval is required. 8. Engineering comments of 9/26/00 must be addressed to the satisfaction of the Town Engineer. The driveway must be moved 10 feet in the southerly direction. 9. The actual building height must be included in the data table. 10. Existing and proposed tree line must be completed on sheet 3. 11.Architectural Design Review Board recommendations to be incorporated in final plans. - All mechanical equipment to be located toward rear of building; - A variety of evergreens should be incorporated along the western boundary and the screening trees should be extended to complete the gap between the new treeline and the proposed plantings; - Building lighting to be full cut off wall pak lighting, subject to town staff review; and - Applicant to return to ADRC for review of signage details when design is completed. Black and white transparent mylars of Sheet 2 with the above modifications, together with three blueprint copies of the entire set of plans must be submitted to this Commission within 30 days to be stamped and signed. The letters of approval of this Commission as well as the Inland Wetlands Agency/Conservation Commission must be reproduced on the mylars. After the mylars have been signed by the Commission, they will be returned to you for filing in the Office of the Town Clerk. After filing these plans, a copy of the receipt must be submitted to the Planning Department. The attached Special Exception form must be completed and filed in the Town Clerk's office. The special exception will take effect upon filing. Sincerely, Walter J. Mealy, Chairman Planning and Zoning Commission WJM/dlw Enclosures cc: Town Engineer Chief Building Official Assessor Superintendent of Pollution Control Fire Marshal v t� O • 1540 SULLIVAN AVENUE•SOUTH WINDSOR,CT 06074-2786 AREA CODE 860/644-2 5 1 1 October 13,2000 FAX 860/644-3781 Design Professionals,Inc.165 South SatelliteYYY South Windsor � 06074 OCT t ,� Attn: Galen Semprebon,P.E. RE: Approval to connect Star Gas,195 CbUft ,;7#Way,South Windsor,CT 06074 off pr Dear Mr.Semprebon: The South Windsor Water Pollution Control Authority,at its regular meeting of October 3,2000,gave approval for the connection to the Town's sewerage system of a commercial building at 195 Commerce Way,South Windsor,CT,as more specifically shown on plans entitled"D&L Caron,LLC,Site Development Plan for 195 Commerce Way",prepared by Design Professionals,Inc., 165 South Satellite Road,South Windsor,CT,Project No.20-1233,Drawing No(s). 1233-2, 1233-3 dated 6-15-00,revised 9- 18-00 and subject to the following conditions: 1. Technical approval of the Town Engineering Department. 2. Final Authority approval and acceptance of the sanitary sewerage connection will be given once the sewer line has been installed and inspected by the Town staff,and based upon the written verification of the Town staff that said sanitary sewer line was installed in substantial conformance with the design plans previously approved by the Authority,and meeting all Town regulations and appropriate technical specifications relating to sanitary sewer construction. This approval letter must be superimposed on the final approval plans. Very truly yours, o dson, Water Pollution Control Authority TH:dd CC: Matthew Galligan,Town Manager Michael J.Gantick,Director of Public Works Jerry Iazzetta,Town Engineer Marcia Banach,Director of Planning John Collins,Chief Building Inspector David Caron �tppN Sf�<� co Tawn o-P S-0-U641 V 1 �' G 1540 SULLIVAN AVENUE • .SOUTH WINDSOR, CONN. 06074 6 SOR•c `v .AREA CODE 860 /644-2511 October 23, 2000 D&L'Caron, LLC 312 Deming Street South Windsor, CT 06074 Dear Mr. Caron: Re:Preconstruction Meeting—Appl 00-34P, DL Caron Site Plan(Star Gas) IN ATTENDANCE See Attached The following is a brief summary of points discussed during the meeting: Erosion and Sedimentation Control 1. All erosion and sedimentation control measures are to be in place prior to earth moving operations in each area and maintained/cleaned out during construction. Call Jeffrey Folger, Zoning/Wetlands Enforcement Officer for inspection when measures are in place, prior to commencement of site work or if any problems/concerns arise during construction. 2. All topsoil stockpile areas to be protected(ringed with haybales or equal). 3. During construction of the road/driveway a crushed stone tracking pad is to be installed and maintained to minimize tracking of dirt/gravel on to Commerce Way. Calcium chloride or water is to be used for dust control as required. Public Works 1. Three complete sets of approved/revised plans to be provided to Town prior to start of construction. They will be stamped by the Planning Department along with plans developer needs. Only approved plans are to be used on the job site. 2. The Engineering Department is to be notified forty-eight (48) hours prior to the start of major construction work with inspections and testing per Developers Checklist (requested, required) for the following: a. After site is staked out b. All drainage work c. Preparation of subgrade, compaction tests as per Developer's checklist d: Preparation of subbase, six(6) inch lifts e. Placement of bituminous concrete, two (2) inch layers maximum 3. Certification of gravel used as subbase and processed stone for base will be required from an approved testing company. 4. Certification of all products used-- storm pipe, structures,pavement, etc., shall be presented to the Town Engineer prior to installation. 5. No subgrade formation/base in frozen ground/snow. Same for pipe/structure installation. 6. As built plans are to include horizontal and vertical location of all underdrains, footing drains, and sanitary sewers located as per revised as-built checklist. 10. All pipe and structures to be.backfilled with free draining material, compacted in maximum one foot lifts with approved compaction equipment or approved equal if deep trench is encountered. Any pipe or - structure work requires inspection prior to backfilling. 11. Any problems and/or questions regarding construction of this project will be directed to Tim in the field at phone#291-1840. 12. All filling to be done in accordance with Department of Transportation specifications. To be compacted in maximum lifts and tested as necessary. 13. Job meetings will be held as needed, and can be called by the developer or Town. 14 Forty-eight(48)hours' notice needed for certificate of occupancy inspection. 15. Any proposed changes are to be presented to the Engineering or Planning Department prior to implementation on change order form in quadruplicate with 4 copies of the drawing. Town will attempt to turn around within 24 hours. 16. Normal hours of operation 7:00 a.m.—5:00 p.m., no work on Sunday. 17. No paving after October 15 or before April 15 without written approval from Director of Public Works. 18. Street excavation and drain layer permits will be required. Planning Department 1. Landscaping is to be installed in accordance with the approved landscaping plan. If there are changes required, contact the Planning Dept. Additional landscaping installed on one part of a site will not preclude planting all of the remaining items shown on the landscaping plan. 2. A $2,000 landscape bond and $1,000 Inland Wetlands Agency/Conservation bond must be posted prior to the issuance of filing of mylars. 3. Mylar to go on file prior to the issuance of building permits. SNET/NU 1. Contact utilities for coordination of utilities connection. Fire Marshal 1. Blasting(if required)to be coordinated with the Fire Marshal. Police Services 1. Emergency phone numbers for the duration of the construction must be provided to Police Services on a company letterhead. If the developer occupies or owns the building after construction emergency g Y numbers must be provided to Police Services. 2. All buildings located on property that abuts a public highway must be numbered and visible from the street. All numbering shall comply with Town Ordinance 6-800 through 6-802. Barns, garages, and outbuildings, which are located on the same premises as a numbered structure, are excluded. 3. Erect temporary sign on the site during construction identifying the project. 4. If an alarm is to be installed contact Police Services. Building Department 1. Plan review with Building Official/Fire Marshal required prior to application for building permit. Coordinate with Chief Building Official. Sincerely, Michele R. Lipe,AICP Assistant Director of Planning MRL/dlw cc: Jerry C. Iazzetta, Town Engineer Karl Reichle, Public Works Mel Stead, Public Works John R. Collins, Chief Building Official Z�& � Vo /,J ¢/.?4/0a go- : gowsv 0( S" /Vw -v 94z& vs.a. t l``e,&&P z sa&uvi�6et :ctry tQ- t�. S73 RECEIVE® APR 2 4 2002 SOUTH WINDSOR PLANNING DEPT, (�r1M 8�4 Ci • u S � 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 SOR•co TELEPHONE (860) 644-2511 June 14, 2002 Mr. David Caron D &L Caron, LLC 312 Deming Street South Windsor, CT 06074 Re: Appl #00-34P, Stargas Dear Mr. Caron: This is to advise you that the Planning and Zoning Commission voted on June 4, 2002, to deny your request for the reduction of the landscaping bond for the above referenced project. The reason for denial is a significant number of items need to be corrected or completed. Once these items have been completed please contact the Planning Department for release of the bond. Sincerely, / G Kevin McCann, Chairman Planning and Zoning Commission KMcC/kah cc: Jeff Doolittle, Town Engineer David A.Caron RECEIVED P. O.Box 1149 OCT 2 2002 South Windsor, CT 06074 Attention: Michelle SOUTH WIOS4R Re: Star Gas, Inc. (195 Commerce Way) We planted the additional trees and we are requesting a site inspection to release the landscaping bond. Any questions,please call me at 573-1406. S' cerely, A avid A. Caron tC'N" SN T10 Wn 0 1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074 OR-Co TELEPHONE (860) 644-2511 October 17, 2002 Mr. David Caron D &L Caron, LLC 312 Deming Street South Windsor, CT 06074 Dear Mr. Caron: Re: Appl#00-34P, Star Gas This is to advise you that the Planning and Zoning Commission voted on October 8, 2002 to release the landscaping bond for the above-referenced project in the amount of$2,000. Advance arrangements should be made to pick up the bond to ensure that the necessary contact person(s) will be available. If you have any further questions contact the Planning Department at 644-2511, ext. 252. Thank you. Sincerely, Kevin McCann, Chairman PLANNING&ZONING COMMISSION KMcC/kah cc: Town Engineer BOND RELEASE TRANSMITTAL DATE: APPLICANT NAME . L ADDRESS 3 u D-e-rn, in� PROJECT LOCATION/ADDRESS �Y11���i,�sc_ (it,tA LOT P&Z OR IWA/CC APPLICATION NUMBER = 3 y SUB ACCOUNT NUMBER 5 V 0 U V ORIGINAL BOND AMOUNT—,*3,,()( � C, M d- cC,6 ' /c c, above as all of the Please release the bond indicatedrequired work has been completed. /2-3)oZ NAME AS5+ 0Iv �6 x DATE kd-kJoZ BY CHECK # ISSUED DATE C.`.Docmnencs and Settmgs-Achnuusuafor-Local Senuigs,Temp'BOND RELEASE TRANSMITTAL 082'01.doe •.� .,.,ay i _ :"1T:t." ' 'PtD!z!fRR` ;ic F ,Y�H•'`�q.:�.._:T+®+•.. n►. r, ._ 7 _ TOWN OF SOUTH WINDSOR STAFF SITE CHANGE FOR SITE & 7SUBDIVISION R GENERAL: r' CHANGE ORDER CONTACT PERSON e �`�- phone No. $-/d ►C.� Address Site Name rtes P&Z No. Owner r9v +r'A 4.1,Al - Ph one No Contractor Signature of Owner Date:-� — Signature of Design gr. Dater CHANGE: (Describe to tion and nature of change. Include Four (4 ) copies of plan/profile of Change. ) �l.�ra);e,l'y�_!'�t�sra .��.s 3'�` A.v�r� 2 rJ � 3 c► t.r n Ai, e !�'.,/fit n'r tit ��►7 iretll� ��—.�,c�.atv� �"'�M ��„L"' /trI/ ��+ _�1�ttAt_-�+� Reason for Change: (Why is change required) APPROVALS: (As Required) Dir. Of Planning U ,44 Date: Town Engineer Date: Dir. of Public Works Date Other• Date: STAFF•COMMENTS: " ( 1 White - Town Engineer Yellow - Applicant Pink - Director of Planning Goldenrod - Engineering Department - 1 / o/ 1 1 � 1 12 ,X\ t, 4 Y R \\ �ibr 4 P \1 \ O 1 s SEA/ i C- wo 47 4.1 Cl s` t. TOWN OF SOUTH WINDSOR STAFF SITE CHANGE FOR SITE & SUBDIVISION GENERAL: . CHANGE ORDER CONTACT PERSONi , R.X. 'Phone No. Address �195 tit 16W Site Name P&Z No. Owner 1L. t� Cti. L.L.C. Phone No. Contractor Signature ofLign Date: Signature of ngr. Date /15CHANGE: (Describon andnature of change. Include Four ( of plan/profile of Change. ) Aft twin 30,000 . AA- tarim am 1.21 mks. Mltit�'Y1�1sa -4y 514", Reason for Change: (Why is change required) Aivai xis hanks ��as ui aMM Md 10AW njj: d 14'a"itla' , MNS'iN = jk= h1'ft sjm'►•h of gninn nod=d suamtJon 40 3 to* t APPROVALS: (As 'Require )' Dir. Of Planning Date: / Town Engineer bate: c Dir. of Public Wor}Es Date 1 , Other: Date: STAFF COMMENTS: White - Town Engineer Yellow Applicant Pink - Director of Planning Goldenrod Engineering Department