Loading...
HomeMy WebLinkAboutSite Plan - Conservation (34) ' TOWN OF SOUTH WINDSOR INLAND WETLANDS, WATERCOURSES AND CONSERVATION APPLICATION Application # d to Date Received Q d INSTRUCTIONS 1. Fifteen applications (15) with map and plans (2 copies) shall be submitted together with the fee set forth in the Inland Wetlands, Watercourses and Conservation Regulations, Town of South Windsor. (See Regulations, Section VII - X) 2. The South Windsor Inland Wetlands, Watercourses and Conservation Regulations should be reviewed with respect to the standards and criteria for application ' Evaluation. (See Regulations, Sections VII -X) 3. The applicant understands that this application is to be considered complete only ' when all information and documents required by the Agency have been submitted. The applicant shall also complete the state filing form. ' A. Applicant's Name: The Stop & Shop Supermarket Co. ; Richard S. Kelley Address: PO Box 1942, Boston, MA 02105; 1744 Ellington Road, South Windsor, CT 06074 Phone: (home) N/A (work) 617-770-8706 (fax) 617-770-8945 ' B. Legal owner's name: Richard S. Kelley; Savings Bank of Rockville Address 1744 Ellington Road, South Windsor, CT 06074; 1645 Ellington Road, South in sor, 06071 Phone (home) N/A (work) 860-644-8761 (fax) 860-644-5650 (List additional owners, addresses, and phone numbers on back of application) C. If the applicant is not the owner of the subject property; a letter by the owner(s) authorizing the proposed regulated activity set forth in the application must accompany this form and will be part of the application. ' D. Project Name (if any) Town Center 1. Contact Person (if further information is needed) ' Thomas P. Cody (work) 860-275-8264 (fax) 860-275-8299 E. The geographical location of the property which is to be affected by the proposed regulated activities including a description of the land in sufficient detail to allow ' identification of the property on the Inland Wetland and Watercourse Map. 7 ' Map 151, Parcels 2, 3, 4, 5, 6, 8b, 8d, 9 and portion of lot 16, F.K.A. portion Assessor's map # Parcel #of lots 17 and 48 on Xap 51. one F. Names of all abutting property owners from records in Town Clerk's office (use separate sheet if necessary) See attached. G. Have you notified all abutting property owners (from records in Town Clerk's office) ' by certified letter that an application is pending before the Agency? ** (you are required to supply a copy of the letter with the list of the names of ' the abutters).** ' H. Purpose and description of all proposed regulated activity(s) including amount of disturbance in square feet and types of fill and the time element involved: See attached. I. A class A-2 map of the property drawn to 1" 40', showing the area to be developed, extent of the wetlands and watercourses affected, topography, existing and proposed activities and names and locations of adjacent property owners must ' be submitted. J. Amount of regulated area disturbance and types of fill (including w�tlds d regulated buffers). 0.38 acres 16,600 sf) which consists of 0.03 ac s sf of wetlands and 0.35 acres (15,300 sf) of area within 40' of wetlands. K. Acreage of wetlands and watercourses in regulated areas to be altered: ' 0.03 acres (1,300 sf) L. Acreage of wetlands and watercourses to be created: 6,450 SF (.148 acres) ' M. Lineal feet of proposed stream alteration: N/A N. Total land area of project and percentage which is wetlands: Parcel Area - 24.8 acres (6.2% wetlands) O. Identify all other permits or approvals that have been issued, applied for, or required with respect to the proposed activity set forth in this application. (These may include but not be limited to, local Planning & Zoning, Zoning Board of Appeals, D.E.P., F.E.M.A., D.O.T., The Army Corps of Engineers, and any other ' State, Local or Federal Permits.) 1. Site Development Plan - 2. State Traffic Commission Certificate ' 8 ' P. The applicant (or designated representative) hereby attests that a sin will b P ) Y g e posted at the following location(s) Buckland Road (1) ; Ellington Road (1) B Name Richard S. Kelley Y y ' on or befor a llowing dat June 23, 2000 Signature: r c - These signs must be displayed co nuously for at least ten (10) days prior to ' scheduled meeting (see Regulation Section 7.3a) The undersigned hereby applies for the regulated activities listed in paragraph H above, for a Inland Wetlands, Watercourses and Conservation permit for the property described herein and confirms that: 1. She/he is familiar with the currently effective Inland Wetlands, Watercourses and Conservation Regulations of the Town of South Windsor. r2. She/he understands that at any time during the review period, the Agency may require the applicant to provide more information about the wetlands and/or watercourses in question and/or any proposed activity. r3. All information submitted in the application for review pp a ew shall be considered factual, or in the case of anticipated activity, binding. A knowing failure of the applicant or any of her/his agents to provide correct information, or performance exceeding the levels of activity anticipated, shall be sufficient grounds for revocation of any permit under these regulations. 4. By making this application, the applicant gives permission to the Inland Wetlands, ' Watercourses and Conservation Commission members and/or its representative to enter the portions of the premises which are subject of the application for the purpose of inspection and investigation and otherwise evaluating the merits of the ra li n both b9fore and after a final decision has been issued.X", r Sign re of O ner of Prope ty �' Date 1 Signature of pplicant Date r r r 9 PROPERTY OWNER LIST PROPERTIES WITHIN 500 FEET OF TOWN CENTER MAP/LOT STREET ADDRESS OWNER(S) OWNER ADDRESS 64/1 1407 Sullivan Avenue Town of South Windsor 1540 Sullivan Avenue ' 64/50 1676 Ellington Road Jeffrey Coho 1676 Ellington Road 64/49 1678 Ellington Road Webster Court Associates 191 Franklin Avenue, Hartford, CT 06114 64/48 1700 Ellington Road Nunzio &Vincent Sica& 1700 Ellington Road Gertraud Gaetano ' 64/47 1708 Ellington Road Gary Spelucin 1708 Ellington Road 64/46 1720 Ellington Road Richard S. Kelley 1720 Ellington Road 64/45 1724 Ellington Road Richard S. Kelley 1724 Ellington Road 64/45a 1726 Ellington Road Joseph Rios 1726 Ellington Road 64/43 1736-38 Ellington Road Richard S. Kelley 1736-38 Ellington Road ' 64/42 1744 Ellington Road Richard S. Kelley 1744 Ellington Road 64/44 1742 Ellington Road Richard S. Kelley 1774 Ellington Road 64/35 1559 Sullivan Avenue Richard S. Kelley 1774 Ellington Road ' 64/36 56R Sullivan Avenue Richard S. Kelley 1750 Ellington Road 64/37 29 Community Road Richard S. Kelley 1750 Ellington Road 64/38 19 Community Road Henry& Shirley Wayner 19 Community Road ' 64/39 1776 Ellington Road Town of South Windsor 1540 Sullivan Avenue 64/40 1760 Ellington Road Warren Newberry&Thomas 1760 Ellington Road ' McKenna 64/41 1750 Ellington Road Richard S. Kelley 1774 Ellington Road 64/19 1790 Ellington Road Wapping Community Church 1790 Ellington Road ' 64/20 2086 Ellington Road Wapping Community Church 1790 Ellington Road 64/21 2079 Ellington Road Wapping Community Church 1790 Ellington Road 64/17 30 Oakland Road Ramond Hegweiller 30 Oakland Road ' 64/18 115 Peterson Way Wapping Community Church 115 Peterson Way Inc. Parsonage 51/1 1665 Ellington Road Richard S. Kelley 1774 Ellington Road ' 51/7 1765 Ellington Road BankBoston P.O. Box 1409 MS- 01-31,Boston, MA 02110-1409 51/9 513 Buckland Road SNET 227 Church Street, New Haven, CT 06510 ' 51/10 497 Buckland Road Samsel Properties Partnership c/o Richard Mahoney, 10 N. Main St. W. Hartford, CT ' 06107 HARTI-873218-1 PROPERTY OWNER LIST PROPERTIES WITHIN 500 FEET OF TOWN CENTER ' MAP/LOT STREET ADDRESS OWNER(S) OWNER ADDRESS 51/39 465 Buckland Road Samsel Properties Partnership c/o Richard Mahoney, 10 N. Main St. ' W. Hartford, CT 06107 ' 51/35 and 435 Buckland Road Samsel Properties Partnership c/o Richard Mahoney, 35b 10 N. Main St. W. Hartford, CT ' 06107 51/49 469 Buckland Road Buckland Meadow Associates 469 Buckland Road 469a Buckland Road Carolyn Levine 469a Buckland Road ' 469b Buckland Road Gloria Rubin 469b Buckland Road 469c Buckland Road Marcia Andrus 469c Buckland Road 469d Buckland Road Buckland Meadow Associates 469d Buckland Road 469e Buckland Road Milestone Ventures LLC 469e Buckland Road 469f Buckland Road Milestone Ventures LLC 469f Buckland Road 469g Buckland Road Buckland Meadow Associates 469g Buckland Road ' 51/40 76 DemingStreet Robert Jones&Phyllis 76 Deming Street Y g ' Townsend 51/45 68 Deming Street Joe and Irene Bertrand 68 Deming Street 51/46 60 Deming Street DFV Associates LLC 60 Deming Street 51/47 50 Deming Street Elizabeth Molloy 50 Deming Street ' 51/41 83 Deming Street James Desrocher 83 Deming Street 51/42 75 Deming Street Dave and Nathalie Wisneski 75 Deming Street 51/43 67 Deming Street Pedro Dacruz 67 Deming Street 51/44 47 Deming Street Andrian& Cheryl Kebalo 47 Deming Street 51/32 20R Buckland Road Fred Katten 115 Beverly Road, W. ' Hartford 06119 51111 490 Buckland Road Frank E. Ahearn 830 Placita De La Green Valley, AZ ' 85614 51/12 498 Buckland Road Richard S. Kelley 1774 Ellington Road 51/13 512 Buckland Road Harold L. Dodd 512 Buckland Road ' 51/25 69 Oakland Road Melvin Stein 69 Oakland Road 51/23 41 Oakland Road 41 Oakland Road Associates 41 Oakland Road ' LLC 51/22 35 Oakland Road Nunzio & Gertraud Gaetano 35 Oakland Road 51/10a 491 Buckland Road Samsel Properties Partnership c/o Richard Mahoney 10 N. Main St. W. Hartford, CT 06107 2 PROPERTY OWNER LIST PROPERTIES WITHIN 500 FEET OF TOWN CENTER MAP/LOT STREET ADDRESS OWNER(S) OWNER ADDRESS 51/14 530 Buckland Road Milton in Gibbs &Virginia 530 Buckland Road Flordelis 51115 542 Buckland Road J. Kirby Holcombe 374 Abbe Road Extension ' 51/16 544 Buckland Road Julie Crandall Muller 383 Foster Street 51/17 550 Buckland Road Robert&Brian Smith 1209 John Fitch Blvd. 51/18 5 Oakland Road Robert&Brian Smith 1209 John Fitch Blvd. 51/19 19 Oakland Road J. Kirby Holcombe 374 Abbe Road Extension 51/20 25 Oakland Road South Windsor Medical Arts c/o Raymond Kurker Center 70 Rockledge 50/16 1645 Ellington Road Savings Bank of Rockville 25 Park Street, ' Rockville, P.O. Box 660, Rockville, CT 06066 50/17 850 Clark Street U.S. Postal Service 850 Clark Street 50/13 24L Clark Street Stanley&Viola Waldron 859 Clark Street 50/14 819 Clark Street Frank Russo & Jon Berman 819 Clark Street 50115 861 Clark Street Stanley&Viola Waldron 861a Clark Street 50/32 L019 Clark Street Bruce Kelley 617 Clark Street ' 50/18 7 Deming Street Pete& Lisa Granchelli 7 Deming Street 50/19 17 Deming Street Muhammed&Humera Jamil 17 Deming Street 50/20 25 Deming Street Esther Cotton 25 Deming Street 50/21 33 Deming Street Armand, Lionel &Margaret 33 Deming Street Soucy 50/22 43 Deming Street Lionel &Margaret Soucy 43 Deming Street ' 50/23 3R Deming Street Art &Kate Soucy 17 Deming Street 50/24 778 Clark Street Cynthia Siena 778 Clark Street 50/25 770 Clark Street Francis &Norma Pajot 770 Clark Street 27/15 151 Buckland Road Catholic Cemeteries 700 Middletown Association of the Archdiocese Avenue,North Haven, ' of Hartford CT 06473 63/7 1610 Ellington Road 1610 Ellington Road 1610 Ellington Road Associates ' 63/11 L076B Ellington Road South Windsor Land c/o Shepard Conservation Trust, Inc. Box 415, East Windsor Hill, Ct ' 06082 3 ' APPLICATION OF RICHARD S. KELLEY AND THE STOP & SHOP SUPERMARKET COMPANY ' TOWN CENTER ELLINGTON ROAD AND BUCKLAND ROAD ' DESCRIPTION OF PROPOSED REGULATED ACTIVITY ' This application seeks approval of modifications to the existing storm water detention basin at the Town Center. The existing basin includes man-made wetlands. The footprint of the ' basin will be expanded from 0.55 acres(24,000 s.f.)to 0.69 acres(30,090 s.f.), which will create 0.148 acres (6,450 s.f.) of new wetlands. In the process of doing this work, approximately 0.03 acres (1,300 s.f.) of wetlands within the basin will be disturbed, and approximately 0.35 acres ' (15,300 s.f.) of area outside of the wetlands,but within 40 feet of the wetlands, will be disturbed. Details of the proposed work are shown on the plan set included with this application. This application also seeks certification of a conservation plan for the Town Center project pursuant to Zoning Regulations section 8.1.7. Details of the proposed soil erosion prevention and sedimentation control plans are outlined in the plan set included with this ' application. II ' HARTI-875150-1 ROBINSON & COLE LLP LAW OFFICES HARTFORD • STAMFORD • GREENWICH • NEW YORK • ,BOOSSTON www.rc.com a' r i► 280 Trumbull Street y 1r� Hartford,CT 06103-3597 860-275-8200 ` Fax 860-275-8299 iUIN rt o SOUth V/ff,dSnr 0 Thomas75-8 64 Cody INLAND WETLANDS AGkr,,lc;Yf tcody@rc.com CONSERVATION COMM5a1OW Via Certified Mail Return Receipt Requested June 19, 2000 Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 Re: Application of Richard S. Kelley and The Stop and Shop Supermarket Company South Windsor Town Center Southwest Corner of Ellington Road and Buckland Road Dear Property Owner: In accordance with Sections 7.3b and 10.6 of the Town of South Windsor Inland Wetland/Watercourse and Conservation Regulations,we hereby notify you that an application has been filed regarding the above property(including Lots 2, 3, 4, 5, 6, 8b, 8d and 9 on Assessor's Map#51 and a portion of Lot 16 on Assessor's Map #50, formerly known as a portion of Lot 17 on Map#50 and a portion of Lot 48 on Map#51) and will be the subject of a hearing by the Inland Wetlands Agency/Conservation Commission on July 5, 2000 at 7:30 p.m. at the South Windsor Town Hall, 1540 Sullivan Avenue, South Windsor. The application and plans are on file with the South Windsor Planning Department. You may attend the hearing to ask questions and/or give comments. You may also submit written comments regarding the application prior to the hearing if you so desire. For further information,please contact Jeff Folger,the Zoning/Wetlands Enforcement Officer at the Planning Department, 644-2511, ext. 253. Sincerely, Thomas P. Cody, Esq. Agent for the Applicants HARTI-875087-1 REMA E5;P�Q0 CAL SERVICES, LLC REPORT DATE:_-1*dL25,20-0.Q_.—_ ��s PAGE I OF 3 19 Foster Street South Wit101- INLAND�JVSER Manchester,CT ONSER wETLAN;)S AcENFJIONE: (860)649-7362 VATlO(y COMMISSION ON-SITE SOIL INVESTIGATION REPORT PROJECT NAME& SITE LOCATION: RES .Job No.: _ _.003aF5WN1 _. Field Investigation --- gation Date(s): ..__Ll&Q_a. Field investigation Method(s): EmuthC1d50r..Gt2ly3P [�U .. ® Spade and Auger _-... _ ❑ Backhoe Test Pits ❑ Other:.._... REPORT PREPARED FOR: Field Conditions: -` DeSiga.Pr�,ona15_inr.. -, - _ 'Weather- 1�.5.auth-�li�.Road _ •��`�'S_ _ . ...-- Soil Moisture: rate. _ South Windr7or.CT 2EQ1A .. _. Snow Depthe:_M_. _----_ Frost Depth: n/a _ Purpose of Investigation: ® Wetland Delineation/Flagging in Field ❑ Wetland Mapping on Sketch Plan or Topographic Plan ❑ High Intensity Soil Mapping by Soil Scientist ® Medium Intensity Soil Mapping from SCS Soil Survey Maps ❑ Other: _ Base Map Source:±Jartord Chun �uruey 1A6 ) Wetland Boundary Marker Series: > 5-1_t;Q , K F- ���_tt6 and � to �1:5�32� General Site Description/Comments: The._proo�devela triCn r ai in Inr � wes�Cif_ @uc�land Rrad,.. Thr_ rriainri � ated �� � h of E1lingtnn Road and --`—�—t.�L.of.thr�if�c�onsis1� rrf an exi�ting_shopnin,�.�ola�a.. Ihe �.�of.the�e revierrcd fQr lily r•e ���JQcated.' f in h we.5tern on ion and.Gori5i5t Af _wn exi5'Glnn d .-�ntiOn n�nd_an Ltd1dCYC.lOped area in the 5outhw� �rn nortionQfS .study area T��oilS�cvEre idenLifieA and c ak ands undLaL�rbed up any__d At otland tinil vo 5.,. �..a5 f�cinfa .t,5t t � ��turbecl_��nlanr�nwetland r,i1 types wderivedfram g�yrinc�i,rv�raLifie� an ..�I_t a ennc.�i The. « • -T—�--�.__ 50115.IdG�'!'GiPi�d a5 u t G9" cnn5i�r_of.She mnilerateb.-�1Ldrainr-� Fimr;d�soil 5eni .a ( � an�h�lldorChP�(i1D_l�di5t If��yp t�[pe"_SAi�cce-rru�ev d ati the_�,rbed t5 u�L�-,��The�1ana'_ An� (A�-SQil�and. undiat�,rb d �hr�u�oil..5.erieh�.�k). ._.T};e eguiatsd a�aa" a_.y ,with_sh " �i _ran i pf ty� ade_deGen Ian Dpnd5.1f1rdt�d inlhannrLhyve�trrn pnrcinn of the.SiS�`5doreQvr-r" lZ ,ndevelnn.d_arr-a lea d in thr, gash m StPTrtjon of the-site rnn i�t$ m��^I� af_disturb d f�'e�tf:�J and Shrub/ rr,�h Wet�nd comm�,ni in he...�etrtion and_a_mix of wet.meadow.and 5hri�b/ .rub in t�a5tem�On...Tprity�he_.wetlBnd bnundaR f�IIQy„ h � PAGE 2 of 3 DATE: 4/ Sinn ON-SITE SOIL INVESTIGATION REPORT (CONTINUED) PROJECT NAME& SITE LO(`ATION; t�dsor..5hopping Csnt<er._ _... SOIL MAP Uiv><T_s .._ ...�_..._�_._._.-�_.. Wetland Soils AQuentS (Ac)_ This soil map unit conylyty of often found on landscapes, which have been poorlyberned and ve poorly unit occurs where two or more feet of the original Soil Pryor P oil drained disturbed land areas. They are moot J prior filling and/or excavation activities. In general,this soil map are characterized by a seasonal to prolonged high ground water tabeen filled Over,graded or excavated. The Aquenr� wetland vegetation. A,fuent'5arc recently formed soils that have an aquic moisture re ime. A ble and either Support or are capable of 5upperting yeem iS associated with a re,�ucing soil environment that i5 virtually free of dissolved o 9 n ac�uic moisture regime o the water or by wat<°.r of the capillary fringe. The key feature i5 the presence of a ground watch soil 5atura� l y to the Soil Surface for a period of fourteen days or longer during the rowing season. a at or very near Shaker fine Sand I y loam (5h), The Shaker Series consist over clayeylac s 5 of des o u tnne 5rdimenty_ Th P poorly drained Soils formed in a coarse-loamy mange terraces. Typically, these Soils have are nearly level to moderately 5tce ly slo in a very dark grayish brown fine Sandy loam surface layer 6 inches thick, The eubsoe f3oils on glacial e from is to 25 inches i5 light brownish gray, mottled sandy loam. The substratum from 25 yellowish brown, mottle,y;Ity clay. This 5011 was formerly mapped in Connecticut a Swanton, to 6O inches is dark Upland Soils Udorthents (Ud). This sail mapping unit consists of well drained to moder cutting,i'illing,or grading. The areas either have had two feet or more of the uppelr part of tl drairlcd he original PoiCrem v been alteredy more than two feet of fill material on top of the original soil UdorChe ,or Made (_and soils can be found Parent material but are typically fluvial on facial till o or have 9 it plains and outwash plains and stream terraces. on any Soil Elmridge very fine sandy loamcor (El). This soil was formerly mapped in Connecti I crier t5 of deep, moderately well drained soils formed in a coarse-loamy mantle over clayey lacuytrine s cut as Elmwood. The Elmridge 5er;es dcrivrd mainly from Triassic rocks. They terraces- Typically,t.he:Pe Sails have a very dark g ayilshlb ow moderatel y edrmem s I y steeply sloping soils on glacial lacu5trine from 6 to 25 inches iy dark yellowish brown, mottled fine Sandy loam. The 5 bSt atum from 25me sandy loam surface layer 6 to thick. The yubyo;l I brown, mottled,silty clay. to 6p inches is olive. ' ------------ Pr0jcM,onnllsoilreport9.doc PACT+3 of 3 ' DATE: ON-SITE SOIL INVESTIGATION REPORT (CONTINUED) PROJECT NAME& SITE LOCATION: South Wind�p,�51�op�itlg�Cn r Ellingtotl_�Qa��S_Qtrt;h Wind�r�r C`T SOIL Al"UNITS See previous page 1 l 1 I Any accompanying Soil lags and soil maps, and the on-site soil investigation narrative are in accordance with the taxonomic classification of the National Cooperative Soil Survey of the USDA Natural Resource Conservation Service, and with the Connecticut Soil Legend (DEP Bulletin No.5, 1983). Jurisdictional wetland boundaries were delineated pursuant to the Connecticut General Statutes (CGS Sections 22a-36 to 22a45), as amended. The site investigation was conducted andior reviewed by the undersigned Registered Soil Scicntist(s) [registered with the Society of Soil Scientists of Southern New England (SSSSNE)in accordance with the standards of the Federal Office of personnel Management]. Respectfully submitted, R.2MA ECOLOGICAL SF.RVICFS,LLC CC% CJ George T.Logan,MS Registered Soil Scientist Certified Professional Wetland Scientist(No.581) pmjeus\conn\\s0i1report9.duc PIPE CULVERT ANALYSIS COMPUTATION OF CULVERT PERFORMANCE CURVE June 2, 2000 Stop & Shop Town Center PCB4 TO PDMH1 PROGRAM INPUT DATA: DESCRIPTION VALUE -------------------------------------------------------------------- Culvert Diameter (feet) ................................. 2.00 FHWA Chart Number (1,2 or 3)............................ 1 Scale Number on Chart (Type of Culvert Entrance)........ 1 Manning`s Roughness Coefficient (n-value) ............... 0.0100 Entrance Loss Coefficient of Culvert Opening............ 0.50 Culvert Length (feet) ................................... 110.0 Culvert Slope (feet per foot).......... 0.0050 ................. PROGRAM RESULTS: Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet Rate Depth Inlet Outlet Depth Depth Outlet Velocity (cfs) (ft) Control Control (ft) (ft) (ft) (fps) -------------------------------------------------------------------- 17.4 3.98 2.59 4.53 1.40 1.50 2.00 5.54 PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986 Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092 (713) 895-8322. All Rights Reserved. PIPE CULVERT ANALYSIS COMPUTATION OF CULVERT PERFORMANCE CURVE June 2, 2000 Stop & Shop Town Center PCBS TO PCB4 PROGRAM INPUT DATA: DESCRIPTION VALUE -------------------------------------------------------------------- Culvert Diameter (feet) ................................. 2.00 FHWA Chart Number (1,2 or 3) ............................ I Scale Number on Chart (Type of Culvert Entrance) ........ 1 Manning`s Roughness Coefficient (n-value)............... 0.0100 Entrance Loss Coefficient of Culvert Opening............ 0.50 Culvert Length (feet) ................................... 116.0 Culvert Slope (feet per foot) ...........................--- - 0.0050 --------------------- PROGRAM RESULTS: Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet Rate Depth Inlet Outlet Depth Depth Outlet Velocity (cfs) (ft) Control Control (ft) (ft) (ft) (fps) 12.3 4.43 1.95 4.41 1.11 1.26 2.00 3.92 l PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986 Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092 (713) 895-8322. All Rights Reserved. PIPE CULVERT ANALYSIS COMPUTATION OF CULVERT PERFORMANCE CURVE June 2, 2000 Stop & Shop Town Center PCB6 TO PCBS PROGRAM INPUT DATA: DESCRIPTION VALUE -------------------------------------------------------------------- Culvert Diameter (feet) ................................. 1.50 FHWA Chart Number (1,2 or 3) ............................ 1 Scale Number on Chart (Type of Culvert Entrance) ........ 1 Manning`s Roughness Coefficient (n-value) ............... 0.0100 Entrance Loss Coefficient of Culvert Opening........... 0.50 Culvert Length (feet) ................................... 131.0 Culvert Slope (feet per foot) ........................... 0.0100 PROGRAM RESULTS: Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet Rate Depth Inlet Outlet Depth Depth Outlet Velocity (cfs) (ft) Control Control (ft) (ft) (ft) (fps) - - ----------------------------------------------- 6.1 4.31 1.47 3.53 0.70 0.95 1.50 3.43 PIPfi CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986 Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092 (713) 895-8322. All Rights Reserved. l PIPE CULVERT ANALYSIS COMPUTATION OF CULVERT PERFORMANCE CURVE June 2, 2000 Stop & Shop Town Center PCB7 TO PCB6 PROGRAM INPUT DATA: DESCRIPTION VALUE -------------------------------------------------------------------- Culvert Diameter (feet) ................................. 1.00 FHWA Chart Number (1,2 or 3) ............................ 1 Scale Number on Chart (Type of Culvert Entrance)........ 1 Manning`s Roughness Coefficient (n-value) ............... 0.0100 Entrance Loss Coefficient of Culvert Opening............ 0.50 Culvert Length (feet) ................................... 38.0 Culvert Slope (feet per foot) ........................... 0.0100 PROGRAM RESULTS: Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet Rate Depth Inlet Outlet Depth Depth Outlet Velocity (cfs) (ft) Control Control (ft) (ft) (ft) (fps) 0.5 3.43 0.36 3.06 0.21 0.27 1.00 0.59 PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986 Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092 (713) 895-8322. All Rights Reserved. PIPE CULVERT ANALYSIS COMPUTATION OF CULVERT PERFORMANCE CURVE June 2, 2000 Stop & Shop Town Center PCB8 TO PCB6 ----------- PROGRAM INPUT DATA: DESCRIPTION VALUE -------------------------------------------------------------------- Culvert Diameter (feet)................................. 1.25 FHWA Chart Number (1,2 or 3) ............................ 1 Scale Number on Chart (Type of Culvert Entrance) ........ 1 Manning`s Roughness Coefficient (n-value) ............... 0.0100 . Entrance Loss Coefficient of Culvert Opening............ 0.50 Culvert Length (feet)................................... 40.0 Culvert Slope (feet per foot) .—._................... 0.0100 PROGRAM RESULTS: Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet Rate Depth Inlet Outlet Depth Depth Outlet Velocity (cfs) (ft) Control Control (ft) (ft) -(ft) (fps) 2.2 2.96 0.86 2.66 0.44 0.60 1.25 1.82 PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986 Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092 (713) 895-8322. All Rights Reserved. PIPE CULVERT ANALYSIS COMPUTATION OF CULVERT PERFORMANCE CURVE June 2, 2000 Stop & Shop Town Center ECB5 TO PCB8 PROGRAM INPUT DATA: DESCRIPTION VALUE -------------------------------------------------------------------- Culvert Diameter (feet) ................................. 1.25 fFHWA Chart Number (1,2 or 3) ............................ 1 Scale Number on Chart (Type of Culvert Entrance) ........ 1 Manning`s Roughness Coefficient (n-value) ............... 0.0100 Entrance Loss Coefficient of Culvert Opening........... 0.50 Culvert Length (feet) ................................... 36.0 Culvert Slope (feet per foot) ............................ 0.0530 PROGRAM RESULTS: r Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet I Rate Depth Inlet Outlet Depth Depth Outlet Velocity (cfs) (ft) Control Control (ft) (ft) (ft) (fps) -------------------------------------------------------------------- 1.8 2.56 0.77 0.72 0.26 0.54 0.26 10.01 PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986 Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092 (713) 895-8322. All Rights Reserved. PIPE CULVERT ANALYSIS COMPUTATION OF CULVERT PERFORMANCE CURVE June 2, 2000 Stop & Shop Town Center PDMH2 TO ECBS PROGRAM INPUT DATA: DESCRIPTION VALUE ----------------------------------------------------------- Culvert Diameter (feet) ................................. 1.25 FHWA Chart Number (1,2 or 3) ............................ 1 Scale Number on Chart (Type of Culvert Entrance) ........ I Manning`s Roughness Coefficient (n-value)............... 0.0100 Entrance Loss Coefficient of Culvert Opening............ 0.50 Culvert Length (feet) ................................... 201.0 Culvert Slope (feet per foot) ........................... 0.0110 PROGRAM RESULTS: Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet Rate Depth Inlet Outlet Depth Depth Outlet Velocity (cfs) (ft) Control Control (ft) (ft) (ft) (fps) ---------------------------------------------------------- 1.8 0.67 . 0.77 -1.17 0.39 0.54 0.39 5.68 PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986 Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092 (713) 895-8322. All Rights Reserved. PIPE CULVERT ANALYSIS COMPUTATION OF CULVERT PERFORMANCE CURVE June 2, 2000 Stop & Shop Town Center PCB9 TO PDMH2 PROGRAM INPUT DATA: DESCRIPTION VALUE -------------------------------------------------------------------- Culvert Diameter (feet) ................................. 1.25 FHWA Chart Number (1,2 or 3) ............................ 1 Scale Number on Chart (Type of Culvert Entrance) ........ 1 Manning`s Roughness Coefficient (n-value) ............... 0.0100 Entrance Loss Coefficient of Culvert Opening............ 0.50 Culvert Length (feet) ................................... 24.0 Culvert Slope (feet per foot) ........................... 0.0100 I PROGRAM RESULTS: Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet Rate Depth Inlet Outlet Depth Depth Outlet Velocity (cfs) (ft) Control Control (ft) (ft) (ft) (fps) -------------------------------------------------------------------- 1.8 0.67 0.77 0.72 0.40 0.54 0.40 5.49 PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986 Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092 (713) 895-8322. All Rights Reserved. PIPE CULVERT ANALYSIS COMPUTATION OF CULVERT PERFORMANCE CURVE June 2, 2000 Stop & Shop Town Center PDMH3 TO OUTLET PROGRAM INPUT DATA: DESCRIPTION VALUE -------------------------------------------------------------------- Culvert Diameter (feet) ................................. 1.25 FHWA Chart Number (1,2 or 3) ............................ 1 Scale Number on Chart (Type of Culvert Entrance) ........ 1 Manning`s Roughness Coefficient (n-value) ............... 0.0100 Entrance Loss Coefficient of Culvert Opening............ 0.50 Culvert Length (feet) ................................... 160.0 Culvert Slope (feet per foot) ........................... 0.0040 PROGRAM RESULTS: Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet Rate Depth Inlet Outlet Depth Depth Outlet Velocity (cfs) (ft) Control Control (ft) (ft) (ft) (fps) ---------------------------------------------- --------- ------------- 2.5 4.15 0.91 3.74 0.60 0.63 1.25 2.00 PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986 Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092 (713) 895-8322. All Rights Reserved. PIPE CULVERT ANALYSIS COMPUTATION OF CULVERT PERFORMANCE CURVE June 2, 2000 Stop & Shop Town Center PDMH4 TO PDMH3 PROGRAM INPUT DATA: DESCRIPTION VALUE -------------------------------------------------------------------- Culvert Diameter (feet) ................................. 1.25 FHWA Chart Number (1,2 or 3) ............................ 1 Scale Number on Chart (Type of Culvert Entrance) ........ 1 i Manning`s Roughness Coefficient (n-value) ............... 0.0100 Entrance Loss Coefficient of Culvert opening............ 0.50 Culvert Length (feet)........ ........................... 284.0 Culvert Slope (feet per foot) ........................... 0.0040 PROGRAM RESULTS: Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet Rate Depth Inlet Outlet Depth Depth Outlet Velocity (cfs) (ft) Control Control (ft) (ft) (ft) (fps) ----------------- --------------------------------------------- 2.5 3.74 0.91 2.94 0.60 0.63 1.25 2.00 l PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986 Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092 (713) 895-8322. All Rights Reserved. PIPE CULVERT ANALYSIS COMPUTATION OF CULVERT PERFORMANCE CURVE June 2, 2000 Stop & Shop Town Center PDMH5 TO PDMH4 PROGRAM INPUT DATA: DESCRIPTION VALUE Culvert Diameter (feet) ................................. 1.25 FHWA Chart Number (1,2 or 3) ............................ 1 Scale Number on Chart (Type of Culvert Entrance) ........ 1 Manning`s Roughness Coefficient (n-value) ............... 0.0100 Entrance Loss Coefficient of Culvert Opening............ 0.50 Culvert Length (feet) ........................... ........ 227.0 Culvert Slope (feet per foot) ........................... 0.0040 PROGRAM RESULTS: Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet Rate Depth Inlet Outlet Depth Depth Outlet Velocity (cfs) (ft) Control Control (ft) (ft) (ft) (fps) -------------------------------------------------------------------- 2.5 2.94 0.91 2.32 0.60 0.63 1.25 2.00 PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright 0)1986 Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092 (713) 895-8322. All Rights Reserved. PIPE CULVERT ANALYSIS COMPUTATION OF CULVERT PERFORMANCE CURVE June 2, 2000 Stop & Shop Town Center VORT TO PDMH5 4 PROGRAM INPUT DATA: V DESCRIPTION VALUE -------------------------------------------------------------------- Culvert Diameter (feet)................................ 1.25 FHWA Chart Number (1,2 or 3) .......................... 1 Scale Number on Chart (Type of Culvert Entrance) ........ 1 Manning`s Roughness Coefficient (n-value) ............... 0.0100 Entrance Loss Coefficient of Culvert Opening............ 0.50 Culvert Length (feet)................................... 51.0 Culvert Slope (feet per foot) ........................... 0.0040 PROGRAM RESULTS: Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet Rate Depth Inlet Outlet Depth Depth Outlet Velocity (cfs) (ft) Control Control (ft) (ft) (ft) (fps) -------------------------------------------------------------------- 2.5 2.32 0.91 2.25 0.60 0.63 1.25 2.00 -------------------------------------------------------------------- -------------------------------------------------------------------- PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986 Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092 (713) 895-8322. All Rights Reserved. I 1 i { PIPE CULVERT ANALYSIS COMPUTATION OF CULVERT PERFORMANCE CURVE June 2, 2000 l/ Stop & Shop Town Center PCB10 TO VORT PROGRAM INPUT DATA: DESCRIPTION VALUE -------------------------------------------------------------------- Culvert Diameter (feet) ................................. 1.25 FHWA Chart Number (1,2 or 3)............................ 1 Scale Number on Chart (Type of Culvert Entrance) ........ 1 Manning`s Roughness Coefficient (n-value) ............... 0.0100 Entrance Loss Coefficient of Culvert Opening............ 0.50 Culvert Length (feet) ................................... 10.0 Culvert Slope (feet per foot) ........................... 0.0100 PROGRAM RESULTS: Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet Rate Depth Inlet Outlet Depth Depth Outlet Velocity (cfs) (ft) Control Control (ft) (ft) (ft) (fps) -------------------------------------------------------------------- 2.5 2.25 0.91 2.25 0.46 0.63 1.25 2.00 PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986 Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092 (713) 895-8322. All Rights Reserved. PIPE CULVERT ANALYSIS COMPUTATION OF CULVERT PERFORMANCE CURVE June 2, 2000 Stop & Shop Town Center PDMH6 TO PCB10 PROGRAM INPUT DATA: DESCRIPTION VALUE Culvert Diameter (feet) ................................. 1.00 FHWA Chart Number (1,2 or 3)............................ 1 Scale Number on Chart (Type of Culvert Entrance) ........ 1 Manning`s Roughness Coefficient (n-value) ............... 0.0100 Entrance Loss Coefficient of Culvert Opening............ 0.50 Culvert Length (feet)................................... 63.0 Culvert Slope (feet per foot) ........................... 0.0040 PROGRAM RESULTS: Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet Rate Depth Inlet Outlet Depth Depth Outlet Velocity (cfs) (ft) Control Control (ft) (ft) (ft) (fps) ( s) -------------------------------------------------------------------- 1.4 2.25 0.74 2.13 0.49 0.50 1.00 1.81 PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986 Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092 (713) 895-8322. All Rights Reserved. l J1 PIPE CULVERT ANALYSIS COMPUTATION OF CULVERT PERFORMANCE CURVE June 2, 2000 Stop & Shop Town Center PCB11 TO PDMH6 PROGRAM INPUT DATA: DESCRIPTION VALUE -------------------------------------------------------------------- Culvert Diameter (feet) ................................. 1.00 FHWA Chart Number (1,2 or 3) ............................ 1 Scale Number on Chart (Type of Culvert Entrance) ........ 1 Manning`s Roughness Coefficient (n-value) ............... 0.0100 Entrance Loss Coefficient of Culvert Opening............ 0.50 Culvert Length (feet) ................................... 116.0 Culvert Slope (feet per foot) ........................... 0.0040 PROGRAM RESULTS: Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet Rate Depth Inlet Outlet Depth Depth Outlet Velocity (cfs) (ft) Control Control (ft) (ft) (ft) (fps) -- - 1.3 2.13 0.69 1.82 0.46 0.48 1.00 1.64 PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986 Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092 (713) 895-8322. All Rights Reserved. 1 PIPE CULVERT ANALYSIS COMPUTATION OF CULVERT PERFORMANCE CURVE June 2, 2000 Stop & Shop Town Center ROOF TO PDMH 6 PROGRAM INPUT DATA: DESCRIPTION VALUE -------------------------------------------------------------------- Culvert Diameter (feet)................................. 0.50 FHWA Chart Number (1,2 or 3)............................ 1 Scale Number on Chart (Type of Culvert Entrance) ........ 1 Manning`s Roughness Coefficient (n-value) ............... 0.0100 Entrance Loss Coefficient of Culvert Opening............ 0.50 Culvert Length (feet)................................... 36.0 Culvert Slope (feet per foot)........................... 0.0100 PROGRAM RESULTS: Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet Rate Depth Inlet Outlet Depth Depth Outlet Velocity (cfs) (ft) Control Control (ft) (ft) (ft) (fps) ----------------------------------------------------------------- 0.1 2.13 0.23 1.77 0.14 0.16 0.50 0.61 PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986 Dodson & Associates Inc. 7015 W. Tidwell, dwell, #107, Houston, TX 77092 (713) 895-8322. All Rights Reserved. PIPE CULVERT ANALYSIS COMPUTATION OF CULVERT PERFORMANCE CURVE June 2, 2000 Stop & Shop Town Center PDMH7 TO PCB11 PROGRAM INPUT DATA: DESCRIPTION VALUE -------------------------------------------------------------------- Culvert Diameter (feet) ................................. 1.00 FHWA Chart Number (1,2 or 3) .......... 1 Scale Number on Chart (Type of Culvert Entrance) ........ 1 Manning`s Roughness Coefficient (n-value) ............... 0.0100 Entrance Loss Coefficient of Culvert Opening............ 0.50 Culvert Length (feet)................................... 95.0 Culvert Slope (feet per foot) ........................... 0.0040 PROGRAM RESULTS: Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet Rate Depth Inlet Outlet Depth Depth Outlet Velocity (cfs) (ft) Control Control (ft) (ft) (ft) (fps) 0.1 1.82 0.23 1.44 0.15 0.17 1.00 0.19 PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986 Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092 (713) 895-8322. All Rights Reserved. 1 PIPE CULVERT ANALYSIS COMPUTATION OF CULVERT PERFORMANCE CURVE June 2, 2000 Stop & Shop Town Center ROOF TO PDMH7 PROGRAM INPUT DATA: DESCRIPTION VALUE -------------------------------------------------------------------- Culvert Diameter (feet) ................................. 0.50 FHWA Chart Number (1,2 or 3) ............................ 1 Scale Number on Chart (Type of Culvert Entrance) ........ 1 Manning`s Roughness Coefficient (n-value) ............... 0.0100 Entrance Loss Coefficient of Culvert Opening............ 0.50 Culvert Length (feet) ................................... 26.0 Culvert Slope (feet per foot) ........................... 0.0100 PROGRAM RESULTS: Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet Rate Depth Inlet Outlet Depth Depth Outlet Velocity (cfs) (ft) Control Control (ft) (ft) (ft) (fps) 0.1 1.19 0.31 0.95 0.15 0.22 0.50 0.76 PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986 Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092 (713) 895-8322. All Rights Reserved. j 1 1 1 APPLEDORE ENGINEERING,INC. Stop &Shop Supermarket 600 STATE STREET,SUITE D Town Shopping Center PORTSMOUTH,NEW HAMPSHIRE 03801 South Windsor, Connecticut STRUCTURE: CTDOT -TYPE A GRATE CALCULATED BY: SES (PERIMETER=9.2 FT, OPEN AREA 3.55 SF) DATE: 5/7/00 ORIFICE FLOW: Q=CA(2gh)^.5 Q=CAPACITY(CFS) C=WEIR DISCHARGE COEFFICIENT A= FREE OPEN AREA(SF) C= 0.6 g=32.2 FT/SEC^2 A= 3.55 FEET h= HEAD(FT) WEIR FLOW: Q=(2/3)CwP(h)^1.5(2g)^.5 Q=CAPACITY(CFS) Cw=WEIR DISCHARGE COEFFICIENT B=WIDTH(FT) Cw= 0.6 g=32.2 FT/SEC^2 B= 9.2 FEET h= HEAD(FT) ELEVATION (FT) Oo CFS h(FT) Ow CFS 0.00 0.00 0.0 0.00 0.10 5.41 0.1 0.93 0.2 7.64 0.2 2.64 0.3 9.36 0.3 4.85 � APPENDIX B : Miscellaneous � Calculations 1 1 1 1 1 1 1 1 i 1 r APPLEDORE ENGINEERING,INC. Stop&Shop Supermarket 600 STATE STREET,SUITE D East Main Street PORTSMOUTH,NEW HAMPSHIRE 03801 Clinton, Connecticut STRUCTURE: CTDOT-TYPE A GRATE CALCULATED BY: SES (PERIMETER =9.2 FT, OPEN AREA 3.55 SF) DATE: 3/10/00 _ ORIFICE FLOW:Q=CA(2gh)^.5 Q=CAPACITY(CFS) C=WEIR DISCHARGE COEFFICIENT A=FREE OPEN AREA(SF) C= 0.6 g=32.2 FT/SEC^2 A= 3.55 FEET h=HEAD(FT) WEIR FLOW: Q=(2/3)CwP(h)^1.5(2g)^.5 Q=CAPACITY(CFS) Cw=WEIR DISCHARGE COEFFICIENT B=WIDTH(FT) Cw= 0.6 g=32.2 FT/SEC^2 B= 9.2 FEET h= HEAD(FT) ELEVATION(FT) Oo CFS h (FT) Ow CFS 0.00 0.00 0.0 0.00 0.10 5.41 0.1 0.93 0.2 7.64 0.2 2.64 0.3 9.36 0.3 4.85 r 1 r r r r r r r r Figure 9-9 - Runoff Curve Numbers (CN) HYDROLOGIC SOIL GROUP LAND USE DESCRIPTION _ A B C D Cultivated landt/: vithout conservation treatment T2 81 -88 91 vith conservation treatment 62 71 78 81 Pasture or range land: poor condition 68 79 86 89 good condition 39 61 74 80 Meadov: good condition 30 58 71 78 Wood or Forest land: thin stand, poor cover, no mulch 45 66 T7 83 good covert/ 25 55 70 77 iOpen Spaces, lavers, parka, golf courses, cemeteries, etc. good condition:- grass cover on 75% or more of the area 19 61 74 80 fair condition:.grass cover on 50% to 75% of the area 49 69 79 84 Commercial and business areas (85% impervious) 89 92 94 95 Industrial districts (T2% impervious). 81 88 91 93 Residential:!/ Average lot size Average % Impervious`/ 1/8 acre or less 65 7T 85 90 92 1/4 acre t 38 61 75 83 87 1/3 acre 30 57 T2 81 86 1/2 acre 25 54 70 80 85 1 acre 20 51 68 79 84 Paved parking lots, roofs, driveways, etc.!/ 98 98 - 98 98 -Streets and roads: paved with curbs and storm severs!/ 98 98 98 98 gravel 76 85 89 91 dirt 72 82 8T 89 For a more detailed description of agricultural land use curve numbers refer to National Engineering Handbook, Section 4, Hydrology, Chapter 9, Aug. 1972. t/ Good cover is protected from grazing and litter and brush cover soil. s/ Curve numbers are computed assuming the runoff from the house and driveway is directed towards the street vith a minimum of roof vater directed to laves where additional infiltration could occur. 1/ The remaining pervious areas (lavn) are considered to be in good pasture condition for these curve numbers. !/ In some varmer climates of the country a curve number of 95 maty be used. Source: U.S. Department of Agriculture, Soil Conservation Service, Urban Hydrology for Small Watersheds, Technical Release Number 55, Washington, D.C. 9-14 Figure 9-8 - Connecticut Soils and Hydrologic Soil Groups ACTON (SUTTON) B ENFIELD, B NELLIS B SC10 _ g ADRIAN D (SHALLOW) NINIGRET B SCITICO C AGAWAM B (HAVEN) OCCUM B - SHAPLEIGH C/D ALLUVIAL LAND C FARMINGTON C ONDAWA (OCCUM) B (HOLLIS) (RIPPOWAM) FREDON C PALMS D STOCKBRIDGE C AMENIA B GEORGIA B PAWCATUCK D SUDBURY B AU GRES A GENESEE B PAXTON C SUNCOOK A (PIPESTONE) (HAMLIN) PAXTON, C SUNDERLAND C/D BELGRADE (SC10) B GLOUCESTER, A (REDDISH SUBSTRATUM) (HOLYOKE) BELGRADE VARIANT B (SANDY LOAM) (PAXTON) SUTTON B (SC10) (HD CO.) GLOUCESTER, B PEAT AND MUCK D SWANTON C BERLIN C _(FINE SANDY LOAM) (CARLISLE) (SHAKER) BERMUDIAN, B (SUTTON) PEAT AND MUCK, D TEEL B ' (SANDY LOAM) GRANBY D (SHALLOW) TERRACE ESCARPMENTS A (OCCUM) GROTON A PEATS AND MUCKS D (HINCKLEY) BERMUDIAN, B HADLEY B (CARLISLE) TERRACE ESCARPMENTS, C (SILT LOAM) HAMLIN B PEATS AND MUCKS, D (CLAY) (BOXFORD) (HADLEY) HARTFORD A (SHALLOW) (PALMS) TERRACE ESCARPMENTS, C BERNARDSTON C HARTLAND B PENWOOD A (SAND AND CLAY) BIDDEFORD D (UNADILLA) PIPESTONE A (MELROSE) (MAYBID) HAVEN B RODUNK B TERRACE ESCARPMENTS, A BIDDEFORD VARIANT D HERO B (POOTATUCK) (SAND AND GRAVEL) (MAYBID) (HD CO.) HINCKLEY A PODUNK VARIANT B (HINCKLEY) BIRCHWOOD C HOLLIS C/D (NH CO.) TISBURY B BIRDSALL D HOLYOKE C/D POOTATUCK B UNADILLA B BOWMANSVILLE C IPSWICH D POOTATUCK VARIANT B WALLINGTON C (RIPPOWAM) JAFFREY A (NL CO.) (RAYNHAM) BOXFORD C (H►NCKLEY) POQUONOCK C WALLINGTON VARIANT C BRANFORD B KENDAIA C RAINBOW C (RAYNHAM) BRIMFIELD C/D LEICESTER C RAYNHAM C (HD CO.) BROADBROOK C LIMERICK C RAYPOL C WALPOLE C BROOKFIELD B LIMERICK VARIANT C RIDGEBURY C WAPPING B BUXTON (BOXFORD) C (NL CO.) RIPPOWAM C WAREHAM C CANTON B LUDLOW C ROWLAND B WAREHAM VARIANT C CARLISLE D LYONS D (POOTATUCK) (WAREHAM) (LD CO.) CHARLTON B MANCHESTER A RUMNEY C . WATCHAUG B CHESHIRE B MAYBID D (RIPPOWAM) WESTBROOK D COPAKE B MELROSE C RUMNEY VARIANT C WETHERSFIELD C DEERFIELD B MENLO D (NH CO.) WHATELY D DOVER (NELLIS) B MERRIMAC, B RUMNEY VARIANT C WHITMAN D EEL (TEEL) B (FINE SANDY LOAM) (MX CO.) WILBRAHAM C ELLINGTON B (AGAWAM) SACO D WINDSOR A ELMRIDGE C MERRIMAC, A SCANTIC C WINOOSKI B ELMWOOD C (SANDY LOAM) (SCITICO) WOODBRIDGE C ' (ELMRIDGE) MONTAUK C SCANTIC VARIANT C WOODBRIDGE C ENFIELD B MUCK (SHALLOW) D (SCITICO) (REDDISH SUBSTRATUM) (ERODED) (PALMS) (HD CO.) (WOODBRIDGE) (HAVEN) NARRAGANSETT B SACARBORO D YALESVILLE C Source: U.S. Department of Agriculture, Soil Conservation Service, Storrs, Connecticut. 9-13 Figure 9-6 - Storm Distribution Regions (Northeast States) , is � - Z. = r'� CL CL NJ LAJ LU tn Z Z h O s V N cc J_ CO p • ! N O (A JD p O - t 0 �. V � 1 EZ i� Source: U.S. Department of Agriculture, Soil Conservation Service, Peak Flow Estimating Techniques From TR-55, Technical Note 32, 1984. Northeast National Technical Center. 9-9 Figure 9-10 - Rainfall Frequency Values for Connecticut With 24-Hour Storm Duration Inches of Rainfall FREQUENCY 1-YR. 2-YR. 5-YR. 10-YR. 25-YR. 50-YR. 100-YR. Connecticut Fairfield 2.7 3.3 4.3 5.0 5.7 6.4 7.2 Hartford 2.6 3.2 4. 1 4.7 5.5 6.2 6.9 Litchfield 2.6 3.2 4.1 4.7 5.5 6.2 7.0 Middlesex 2.7 3.3 4.2 5.0 5.6 6.3 7.1 New Haven 2.7 3.3 4.2 5.0 5.6 6.3 7.1 New London 2.7 3.4 4.3 5.0 5.7 6.3 7.1 Tolland 2.6 3.2 4.1 4.8 5.5 6.2 6.9 Windham 2.6 3.2 4.2 4.8 5.5 6.2 6.9 Source: U.S. Department of- Commerce and Weather Bureau, T.P. 40, May 1961. i 1 1 1 I 1 9-15 ' June 14, 2000 Elizabeth Warren, Chairwoman South Windsor Inland Wetlands Agency 1540 Sullivan Avenue South Windsor, CT 06074 ' Re: Application By Richard S. Kelley and The Stop & Shop Supermarket Company for Inland Wetlands Permit and Certification of Conservation Plan Dear Chairwoman Warren and Members of the Inland Wetlands Agency: This letter is to confirm that the Savings Bank of Rockville, owner of property located at 1645 Ellington Road, South Windsor(the"Property'), hereby consents to and authorizes the application by Richard S. Kelley and The Stop & Shop Supermarket Company for an Inland ' Wetlands Permit and Conservation Plan Certification for the Property. Sincerely, SAVINGS BANK OF ROCKVILLE Tie cc: The Stop & Shop Supermarket Company Richard S. Kelley 1 CONNECTICUT DEPARTMENT OF ENVIRONMENTAL PROTECTION Statewide Inland Wetlands &Watercourses Activity Reporting Form In accordance with the requirements of Section 22a-39-14 of the Regulations of Connecticut State Agencies,this form is to be completed for each action taken ' by an inland wetlands agency established pursuant to Section 22a42 of the Connecticut General Statutes. Use a separate form to report each action taken by the agency. It is recommended that this form be made part of the application package. Inland wetlands agencies are responsible for verifying that the ' information provided below is accurate and that it reflects the&11 action of the agency. 1. TOWN IN WHICH THE ACTION IS OCCURRING: SOUTH WINDSOR Does this project cross municipal boundaries? Yes No R If so,please list the other towns in which the action is occurring: N/A 2. LOCATION: USGS Quad Map name: Manchester AND Number: 38 Attach a clean 8 1/2"x I I"original scale photocopy of the USGS Quad Map with,in red ink, the boundary of the project site outlined (where possible)or the project site pinpointed with an arrow. Do not circle the "general vicinity"of the site. In the lower right-hand comer of each USGS Quad Map there is an identifying name,write the name from the corresponding map in the space provided above. Quad numbers are found on the Connecticut Town and Quadrangle Index Map (the directory to all USGS Quad Maps). Please provide the number in the space provided above. Do not attach a co of the National Wetlands Inventory Map. ' PY rY P Do Not attach a copy of the Connecticut Town and Quadrangle Index Map. 3. NAME OF APPLICANT,VIOLATOR OR PETITIONER: Richard S. Kelley and The Stop and Shop Supermarket Company Supply the name of the person applying for a permit,petitioner for a map amendment or jurisdictional ruling,or recipient of the enforcement action. 4. NAME FOR PROJECT SITE: TOWN CENTER ' Supply the name given to the project,or the name by which the project site is generally known. Briefly describe the project: Expansion/redevelopment of existing commercial shopping center. ' 5. ACTIVITY TYPE CODE: 2 1 10 12 , Provide the code or codes which best characterize the activity being reported. A maximum of 4 codes maybe entered. For example, locating a driveway in a buffer/upland review area would be code "9"and code"12"(code "7"is not used). The construction of a house in the buffet/upland review area would most likely be codes"2"for excavation,"9"for driveway construction,and "12"for buffer/upland review area. Construction of a parking lot in a buffer/upland review area may be codes"1", "7","10",and "12". 1 . . . Filling 7 . . . . Culverting(not for roadways) 2 . . . Excavation 8 . . . . Underground Utilities (no other activities) 3 . . . Land Clearing/Grubbing(no other activity) 9 . . . . Roadway/Driveway Construction 4 . . . Stream Channelization 10 . . . Drainage Improvements 5 . . . Stream Stabilization 11 . . . Pond Dredging/Dam Construction 6 . . . Stream Clearance (removal of debris only) 12 . . . Activity in Buffer/Upland Review Area ' 6. ACTIVITY PURPOSE CODE: D Enter only one code letter which best characterizes the activity. ALL STATE AGENCY PROJECTS MUST ONLY CODE "N".' A . . . Residential Improvement by Homeowner I . . . Storm Water/Flood Control B . . . New Residential Development for Single Family Units J . . . Erosion/Sedimentation Control C . . . New Residential Development for Multi-Family/Condos K . . . Recreation/Boating/Navigation ' D . . . Commercial/Industrial Uses L . . . Routine Maintenance E . . . Municipal Project M . . Map Amendment F . . . Utility Company Project 'N. . . State Agency Project ' G . . . Agriculture,Forestry or Conservation P . . . Other H . . . Wetland Restoration,Enhancement,Creation REVISED 1/98 ' 7. AREA OF WETLANDS AND/OR WATERCOURSES ALTERED: Include areas that are altered or are proposed to be altered,temporary or permanent,for all agency permits,denials,amendments, and enforcement actions. Remember,these figures represent only the acreage altered,not the total acreage of wetlands or watercourses on the site. Figures should be provided by the applicant in the application. Provide all information in acreage including those areas less than one acre. To convert from square feet to acres,divide square feet by the number 43,560. Enter a zero if there is no alteration. Open water body altered refers to lakes,ponds or similar bodies of water that are filled or dredged. Stream alterations are to be reported in linear feet and include the total length of the river,brook,stream or other watercourse directly altered as a result of the action taken by the agency. Include any culverting(roadway,etc.),channel improvements,rip rap installation,relocation or dredging. ' A. Wetland Area Altered: 0.03 ACRES B. Open Water Body Area Altered: 0 ACRES ' C. Stream Alteration: 0 LINEAR FEET ' 8. BUFFER/UPLAND REVIEW AREA ALTERED: 0.35 ACRES Buffer or upland review areas are those areas adjacent to wetlands or watercourses where activities are regulated by the local agency. Report the acreage of upland review areas that are altered or are proposed to be altered,temporary or permanent,for all agency permits,denials,amendments,and enforcement actions;or for agent approval pursuant to 22a-42a(c)(2), For example,a 2 acre project site may have an activity occurring in 1 acre of buffer/upland review area and 0.25 acres of wetlands. Therefore,0.25 acres will be reported on line 7A and 1 acre on line S. 9. AREA OF WETLANDS AND/OR WATERCOURSES RESTORED,ENHANCED OR CREATED : 0.148 ACRES Mitigation measures may be considered as a condition of issuing a permit for an activity. Report areas that are,or are proposed to be,restored,enhanced or created for all agency permits,denials,amendments,and enforcement actions. Restored or enhanced applies to previously existing wetlands or watercourses. For example,a wetland area filled two years ago is proposed to be restored by removing the existing fill. Created applies to an upland area which is converted into wetlands or watercourses. FOR MUNICIPAL AGENCY USE ONLY FOR STATE USE ONLY ' THE INLAND WETLANDS AGENCY MUST ENSURE THAT THE INFORMATION DATE RECEIVED: PROVIDED BELOW IS ACCURATE AND THAT IT REFLECTS THE FINAL ACTION OF THE AGENCY. COMPLETED FORMS FOR ACTIONS TAKEN DURING A CALENDAR MONTH SMALL BE MAILED SY THE AGENCY TO THE DEP NO LATER THAN THE I STH DAY OF THE FOLLOWING MONTH. MAIL REPORTING FORMS TO: Inland Water Resources Division, DEP, ' 79 Elm Street, Hartford, CT. 06106 QUESTIONS MAY of DIRECTED To THE WETLANDS MANAGEMENT GIS CODE#: SECTION AT(aGO) 424-301 9. NAME/TfTLE OF PERSON COMPLETING THIS FORM: FILE # (SAME As ouAD #): I (PRINT) I (SIGNATURE) FORM COMPLETED: YES NO j I DATE ACTION WAS TAKEN: MONTH YEAR WAS A PUBLIC HEARING HELD? Yes No IF "NO". DATE MAILED TO TOWN: ACTION TAKEN: Dorm LeTrem DATE RETURNED TO DEP: ' A. PERMIT GRANTED BY AGENCY B. PERMIT DENIED MY AGENCY C. PERMIT EXTENDED/AMENDED OY AGENCY D. AGENT APPROVAL PURSUANT TO 22a-42a(c)(2) E. APPEAL OF AGENT APPROVAL PURSUANT To 22a-42a(c)(2) F. MAP AMENDMENT(AMENDMENT TO THE OFFICIAL TOWN I WETLANDS MAP, NOT A PROJECT SITE MAP) ' G. ENFORCEMENT NOTICE/ORDER H. JURISDICTIONAL RULING (I.E.: ACTIVITIES "PERMITTED AS OF RIGHT" OR ACTIVITIES CONSIDERED NON-REGULATED) REVISED 1/98 ROBINSON & COLELLP ' Elizabeth Warren, Chairwoman June 15, 2000 Page 2 7. Drainage study prepared by Appledore Engineering, Inc. (attached separately). ' 8. Wetland soils investigation prepared by Rema Ecological Services (attached separately). 9. Plan set including the following sheets (attached separately): a. Cover Sheet b. Existing Conditions C. Site Plan d. Landscape Plan e. Utilities Plan ' f. Grading, Drainage and Conservation Plan g. Erosion Control Notes and Details h. Details ' Although the applicants do not believe that the activities proposed in this application constitute a significant activity, the applicants respectfully suggest that a public hearing would be in the public interest. Therefore, a public hearing is requested at the Commission's regular meeting of July 5, 2000. Notice will be sent to all property owners within 500 feet of the subject property advising them of this public hearing date. We look forward to presenting this application to you. ' Very truly yours, 7-Z� ' ' Thomas P. Cody TPC/so Enclosures cc: Richard S. Kelley Anthony A. Colavolpe, The Stop & Shop Supermarket Company r ATTACHMENT TO INLAND WETLANDS, WATERCOURSES AND CONSERVATION APPLICATION OF THE STOP & SHOP SUPERMARKET COMPANY RICHARD S. KELLEY B. Legal Owners' Names: 1. Richard S. Kelley 1744 Ellington Road South Windsor, CT 06074 Phone: 860-644-8761 Fax: 860-644-5650 ' 2. South Windsor Senior Living Properties, Inc. C/o Summerville Healthcare Group, Inc. 5285 Shawnee Road, Suite 401 Alexandria, VA 22312 3. Savings Bank of Rockville 1645 Ellington Road South Windsor, CT 06074 E. Property Involved in the Application Lots 2, 3, 4, 5, 6, 8b, 8d and 9 on Assessor's Map#51 and a portion of Lot 16 on Assessor's Map#50 (formerly known as a portion of Lot 17 on Assessor's Map #50 and a portion of Lot 48 on Assessor's Map#51). J. Amount of Regulated Area Disturbance The amount of wetland area disturbance will be 0.48 acres (20,957 s.f.), which consists of 0.03 acres (1,300 s.f.) of area within wetlands and 0.45 acres (19,657 s.f.) of area within 40 feet of wetlands. The amount of watercourse area disturbance is 0.52 acres (22,560 s.f.), all of which will be outside of any regulated watercourses, but will be within 80 feet of a watercourse. MAP/LOT STREET ADDRESS Name 64/1 1407 Sullivan Avenue Town of South Windsor 1540 Sullivan A ress enue 64/50 1676 Ellington Road Jeffre Coho South Windsor, CT 06074 Y 1676 Ellington Road South 64/49 1678 Ellington Road Webster Court Associates 191 Franklin Ave u sor, CT�6074 6114 64/48 1700 Ellington Road Nunzio &Vincent Sica& 1 Hartford, Ellington Road Gertraud Gaetano South Windsor, CT 06074 64/47 1708 Ellington Road Gary Spelucin 1708 Ellington Road ' 64/46 1720 Ellington Road Richard S. Kelle South Windsor, CT 06074 Y 1720 Ellington Road 64/45 1724 Ellington Road Richard S. Kelle South Windsor, CT 06074 Y 1724 Ellington Road 64/45a 1726 Ellington Road Jose h Rios South Windsor, CT 06074 p 1726 Ellington Road 64/43 1736-38 Ellington Road Richard S. Kelle South Windsor, CT 06074 Y 1736-38 Ellington Road ' 64/42 1744 Ellington Road Richard S. Kelle South Windsor, CT 06074 Y 1744 Ellington Road 64/44 1742 Ellington Road Richard S. KelleySouth Windsor, 06074 1774 Ellington South d 64/35 1559 Sullivan Avenue Richard S. Kelle South Windsor, CT 06074 Y 1774 Ellington Road 64/3 5 56R Sullivan Avenue Richard S. Kelle South Windsor, CT 06074 Y 1750 Ellington Road 64/37 29 Community Road Richard S. Kelle South Windsor, CT 06074 Y 1750 Ellington Road 64/38 19 Community Road He & Shirleya South Windsor, CT 06074 mY y yner 19 Community Road ' 64/39 1776 Ellington Road Town of South Windsor South S rods r, CT n 06074 1540 ue 64/40 1760 Ellington RSouth indsor, CT 0 oad Warren Newberry& 1760 Ell ngton Road 6074 ' Thomas McKenna South Windsor, CT 06074 64/41 1750 Ellington Road Richard S. Kelley 1774 Ellington Road 64/19 1790 Ellington Road Wa i Communi South Windsor, CT 06074 PPn g ty 1790 Ellington Road Church South Windsor, CT 06074 ' 64/20 2086 Ellington Road Wapping Community 1790 Ellington Road Church South Windsor, CT 06074 64/21 2079 Ellington Road Wapping Community 1790 Ellington Road Church South Windsor, CT 06074 HARTI-875094-1 ' MAP/LOT STREET ADDRESS Name Address 64/17 30 Oakland Road Ramond Hegweiller 30 Oakland Road South Windsor, CT 06074 64/18 115 Peterson Way Wapping Community 115 Peterson Way Church Inc. Parsonage South Windsor, CT 06074 ' 5111 1665 Ellington Road Richard S. Kelley 1774 Ellington Road South Windsor, CT 06074 51/7 1765 Ellington Road Sovereign Bank P.O. Box 14115 Redding,PA 19612-4115 51/9 513 Buckland Road SNET 227 Church Street New Haven, CT 06510 ' 51110 497 Buckland Road Samsel Properties c/o Richard Mahoney Partnership 10 N. Main St. W. Hartford, CT 06107 51/39 465 Buckland Road Samsel Properties c/o Richard Mahoney Partnership 10 N. Main St. W. Hartford, CT 06107 51/35 and 435 Buckland Road Samsel Properties c/o Richard Mahoney 35b Partnership 10 N. Main St. W. Hartford, CT 06107 51/49 469 Buckland Road Buckland Meadow 469 Buckland Road Associates South Windsor, CT 06074 469a Buckland Road Carolyn Levine 469a Buckland Road South Windsor, CT 06074 469b Buckland Road Gloria Rubin 469b Buckland Road South Windsor, CT 06074 469c Buckland Road Marcia Andrus 469c Buckland Road South Windsor, CT 06074 469d Buckland Road Buckland Meadow 469d Buckland Road Associates South Windsor, CT 06074 469e Buckland Road Milestone Ventures LLC 469e Buckland Road South Windsor, CT 06074 469f Buckland Road Milestone Ventures LLC 469f Buckland Road South Windsor, CT 06074 ' 4699 Buckland Road Buckland Meadow 469g Buckland Road Associates South Windsor, CT 06074 51/40 76 Deming Street Robert Jones &Phyllis 76 Deming Street Townsend South Windsor, CT 06074 51/45 68 Deming Street Joe and Irene Bertrand 68 Deming Street South Windsor, CT 06074 51/46 60 Deming Street DFV Associates LLC 60 Deming Street South Windsor, CT 06074 51/47 50 Deming Street Elizabeth Molloy 50 Deming Street South Windsor, CT 06074 ' 2 MAP/LOT STREET ADDRESS Name 51/41 83 Demin Street Address g James Desrocher 83 Deming Street 51/42 75 Deming Street Dave and Nathalie South Windsor, CT 06074 75 Deming Street Wisneski South Windsor, CT 06074 51/43 67 Deming Street' Pedro Dacruz 67 Deming Street 51/44 47 DemingStreet South Windsor, CT 06074 Andrian& Cheryl Kebalo 47 Deming Street ' 51/32 20R Buckland Road Fred Katten South Windsor, CT 06074 115 Beverly Road 51/11 4 uckland Road Frank E. Ahearn W Hartford 06119 ' 830 Placita De La 51/12 498 Buckland Road Richard S. Kelley Green Valley,AZ 85614 Y 1774 Ellington Road ' 51/13 512 Buckland Road Harold L. Dodd South Windsor, CT 06074 512 Buckland Road 51/25 69 Oakland Road South Windsor, CT 06074 ' Melvin Stein 69 Oakland Road . 51/23 41 Oakland Road South Windsor, CT 06074 41 Oakland Road 41 Oakland Road Associates LLC South Windsor, CT 06074 51/22 35 Oakland Road Nunzio & Gertraud 35 Oakland Road Gaetano South Windsor, CT 06074 51/l0a 491 Buckland Road Samsel Properties c/o Richard Mahoney Partnership 10 N. Main St. 51/14 530 Buckland Road Milton Ervin Gibbs & W. Hartford, CT 06107 530 Buckland Road Virginia Flordelis South Windsor, CT 06074 51/15 542 Buckland Road J. Kirby Holcombe 374 Abbe Road Extension 51/16 544 Buckland Road Julie Cr South Windsor, CT 06074 Crandall Muller 383 Foster Street ' 51/17 550 Buck land Road Robert&Brian Smith South Windsor, CT 6074 I2U9 Fitch Blvd. 51/18' 5 Oakland Road South Windsor, CT 06074 Robert&Brian Smith 1209 John Fitch Blvd. 51/19 19 Oakland Road South Windsor, CT 06074 J. Kirby Holcombe 374 Abbe Road Extension ' South Windsor, CT 06074 51/20 25 Oakland Road South Windsor Medical c/o Raymond Kurker Arts Center 70 Rockledge South Windsor, 50/16 1645 Ellington Road Savings Bank of Rockville 25 Park Stre t,Koc6074 e P.O. Box 660 Rockville, CT 06066 3 1 ' MAP/LOT STREET ADDRESS Name Address 50/17 850 Clark Street U.S. Postal Service 850 Clark Street South Windsor, CT 06074 50/13 24L Clark Street Stanley&Viola Waldron 859 Clark Street South Windsor, CT 06074 50/14 819 Clark Street Frank Russo &Jon Berman 819 Clark Street South Windsor, CT 06074 50115 861 Clark Street Stanley&Viola Waldron 861a Clark Street South Windsor, CT 06074 50/32 L019 Clark Street Bruce Kelley 617 Clark Street South Windsor, CT 06074 I50/18 7 Deming Street Pete&Lisa Granchelli 7 Deming Street South Windsor, CT 06074 50/19 17 Deming Street Muhammed&Humera 17 Deming Street Jamil South Windsor, CT 06074 50/20 25 Deming Street Esther Cotton 25 Deming Street South Windsor, CT 06074 50/21 33 Deming Street Armand,Lionel & 33 Deming Street Margaret Soucy South Windsor, CT 06074 50/22 43 Deming Street Lionel &Margaret Soucy 43 Deming Street South Windsor, CT 06074 50/23 3R Deming Street Art&Kate Soucy 17 Deming Street ISouth Windsor, CT 06074 50/24 778 Clark Street Cynthia Siena 778 Clark Street South Windsor, CT 06074 50/25 770 Clark Street Francis&Norma Pajot 770 Clark Street South Windsor, CT 06074 27/15 151 Buckland Road Catholic Cemeteries 700 Middletown Avenue Association of the North Haven, CT 06473 Archdiocese of Hartford 63/7 1610 Ellington Road 1610 Ellington Road 1610 Ellington Road Associates South Windsor, CT 06074 63/11 L076B Ellington Road South Windsor Land c/o Shepard Conservation Trust, Inc. Box 415 East Windsor Hill, Ct 06082 51/33 432 Buckland Road Village at Buckland Court 432 Buckland Road South Windsor, CT 06074 51/34 419 Buckland Road Cannon& Company 419 Buckland Road South Windsor, CT 06074 51/35 435 Buckland Road Samsel Properties 10 N. Main Street Partnership W. Hartford, CT 06107 c/o Richard Mahoney 51/36 152 Deming Street Samsel Properties 10 N. Main Street Partnership W. Hartford, CT 06107 c/o Richard Mahoney 4 , I APPLICATION OF RICHARD S. KELLEY AND THE STOP& SHOP SUPERMARKET COMPANY TOWN CENTER ELLINGTON ROAD AND BUCKLAND ROAD DESCRIPTION OF PROPOSED REGULATED ACTIVITY This application seeks approval of three different areas of work in conjunction with the Town Center project, located at the southwest corner of Ellington Road and Buckland Road: 1. The existing stormwater detention basin, which includes man-made wetlands, will be expanded from 0.55 acres (24,000 s.f.)to 0.69 acres (30,090 s.f.). This will create 0.148 acres (6,450 s.f.) of new wetlands. In the process of doing this work, approximately 0.03 acres (1,300 s.f.) of wetlands within the basin will be disturbed, and approximately 0.35 acres (15,300 s.f.) of area outside of the wetlands, but within 40 feet of the wetlands,will be disturbed. 2. A new stormwater drainage pipe will be installed around the rear of the Town Center to convey stormwater to the detention basin. In the process of doing this work, approximately 0.10 acres (4,357 s.f.) of area outside of the wetlands, but within 40 feet of the wetlands, will be disturbed. 3. Certain improvements will be made within the existing right-of-way ri ht-of-wa of Buckland Road to P accommodate a new traffic signal at the entrance to Terry Office Park, which is near the Plum Gulley watercourse. In the process of doing this work, approximately 0.52 acres (22,560 s.f.) of area outside of the watercourse, but within 80 feet of the watercourse, will ' be disturbed. Details of the proposed work are shown on the plan set included with this application. This application also seeks certification of a conservation plan for the Town Center project pursuant to Zoning Regulations section 8.1.7. Details of the proposed soil erosion prevention and sedimentation control plans are outlined in the plan set included with this application. HARTI-875150-2 ROBINSON & COLE LLP LAW OFFICES HARTFORD • STAMFORD • GREENWICH • NEW YORK • BOSTON 280 Trumbull Street Hartford,CT 06103-3597 860-275-8200 Fax 860-275-8299 Thomas P. Cody 860-275-8264 tcody c@i rc.com June 21, 2000 Via Hand Delivery Elizabeth Warren, Chairwoman South Windsor Inland Wetlands Agency 1540 Sullivan Avenue South Windsor, CT 06074 Re: Application By Richard S. Kelley and The Stop & Shop Supermarket Company for Inland Wetlands Permit and Certification of Conservation Plan Dear Chairwoman Warren and Members of the Inland Wetlands Agency: This is to confirm that notice has been sent by certified mail, return receipt requested, to all owners of property within 500 feet of the project, informing them of both the filing of the application and that a public hearing regarding the application will beheld on July 5, 2000. Enclosed with this letter are the following materials: 1. List of property owners within 500 feet of the project. 2. Sample letter sent to all property owners. 3. Certified Mail receipts, evidencing the mailing of letters to all property owners on June 19, 2000 4. Photocopies of all certified mail receipts. Very truly yours, —/tuze-� Thomas P. Cody TPC/fb Enclosures cc: Richard S. Kelley Anthony A. Colavolpe, The Stop & Shop Supermarket Company t MAP/LOT STREET ADDRESS Name Address 64/1 1407 Sullivan Avenue Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 64/50 1676 Ellington Road Jeffrey Coho 1676 Ellington Road South Windsor, CT 06074 64/49 1678 Ellington Road Webster Court Associates 191 Franklin Avenue Hartford, CT 06114 64/48 1700 Ellington Road Nunzio & Vincent Sica& 1700 Ellington Road Gertraud Gaetano South Windsor, CT 06074 64/47 1768 Ellington Road Gary Spelucin 1708 Ellington Road South Windsor, CT 06074 64/46 1720 Ellington Road Richard S. Kelley 1720 Ellington Road South Windsor, CT 06074 64/45 1724 Ellington Road Richard S. Kelley 1724 Ellington Road South Windsor, CT 06074 64/45a 1726 Ellington Road Joseph Rios 1726 Ellington Road South Windsor, CT 06074 64/43 1736-38 Ellington Road Richard S. Kelley 1736-38 Ellington Road South Windsor, CT 06074 64/42 1744 Ellington Road Richard S. Kelley 1744 Ellington Road South Windsor, CT 06074 64/44 1742 Ellington Road Richard S. Kelley 1774 Ellington Road South Windsor, CT 06074 64/35 1559 Sullivan Avenue Richard S. Kelley 1774 Ellington Road South Windsor, CT 06074 64/36 56R Sullivan Avenue Richard S. Kelley 1750 Ellington Road South Windsor, CT 06074 64/37 29 Community Road Richard S. Kelley 1750 Ellington Road South Windsor, CT 06074 64/38 19 Community Road Henry & Shirley Wayner 19 Community Road South Windsor, CT 06074 64/39 1776 Ellington Road Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 64/40 1760 Ellington Road Warren Newberry & 1760 Ellington Road Thomas McKenna South Windsor, CT 06074 64/41 1750 Ellington Road Richard S. Kelley 1774 Ellington Road South Windsor, CT 06074 64/19 1790 Ellington Road Wapping Community 1790 Ellington Road Church South Windsor, CT 06074 64/20 2086 Ellington Road Wapping Community 1790 Ellington Road Church South Windsor, CT 06074 64/21 2079 Ellington Road Wapping Community 1790 Ellington Road 64/21 -ro Church South Windsor, CT 06074 HARTI-875094-1 MAP/LOT STREET ADDRESS Name Address 64/17 30 Oakland Road Ramond Hegweiller 30 Oakland Road South Windsor, CT 06074 64/18 115 Peterson Way Wapping Community 115 Peterson Way Church Inc. Parsonage South Windsor, CT 06074 51/1 1665 Ellington Road Richard S. Kelley 1774 Ellington Road South Windsor, CT 06074 51/7 1765 Ellington Road Sovereign Bank P.O. Box 14115 Redding, PA 19612-4115 51/9 513 Buckland Road SNET 227 Church Street New Haven, CT 06510 51/10 497 Buckland Road Samsel Properties c/o Richard Mahoney Partnership 10 N. Main St. W. Hartford, CT 06107 51/39 465 Buckland Road Samsel Properties c/o Richard Mahoney Partnership 10 N. Main St. W. Hartford, CT 06107 51/35 and 435 Buckland Road Samsel Properties c/o Richard Mahoney 35b Partnership 10 N. Main St. W. Hartford, CT 06107 51/49 469 Buckland Road Buckland Meadow 469 Buckland Road Associates South Windsor, CT 06074 469a Buckland Road Carolyn Levine 469a Buckland Road South Windsor, CT 06074 469b Buckland Road Gloria Rubin 469b Buckland Road South Windsor, CT 06074 469c Buckland Road Marcia Andrus 469c Buckland Road South Windsor, CT 06074 469d Buckland Road Buckland Meadow 469d Buckland Road Associates South Windsor, CT 06074 469e Buckland Road Milestone Ventures LLC 469e Buckland Road South Windsor, CT 06074 469f Buckland Road Milestone Ventures LLC 469f Buckland Road South Windsor, CT 06074 4699 Buckland Road Buckland Meadow 469g Buckland Road Associates South Windsor, CT 06074 51/40 76 Deming Street Robert Jones & Phyllis 76 Deming Street Townsend South Windsor, CT 06074 51/45 68 Deming Street Joe and Irene Bertrand 68 Deming Street South Windsor, CT 06074 51/46 60 Deming Street DFV Associates LLC 60 Deming Street South Windsor, CT 06074 51/47 50 Deming Street Elizabeth Molloy 50 Deming Street South Windsor, CT 06074 2 MAP/LOT STREET ADDRESS Name Address 51/41 83 Deming Street James Desrocher 83 Deming Street South Windsor, CT 06074 51/42 75 Deming Street Dave and Nathalie 75 Deming Street Wisneski South Windsor, CT 06074 51/43 67 Deming Street Pedro Dacruz 67 Deming Street South Windsor, CT 06074 51/44 47 Deming Street Andrian & Cheryl Kebalo 47 Deming Street South Windsor, CT 06074 51/32 20R Buckland Road Fred Katten 115 Beverly Road W. Hartford 06119 51111 490 Buckland Road Frank E. Ahearn 830 Placita De La Green Valley, AZ 85614 51/12 498 Buckland Road Richard S. Kelley 1774 Ellington Road South Windsor, CT 06074 51/13 512 Buckland Road Harold L. Dodd 512 Buckland Road South Windsor, CT 06074 51/25 69 Oakland Road Melvin Stein 69 Oakland Road South Windsor, CT 06074 51/23 41 Oakland Road 41 Oakland Road 41 Oakland Road Associates LLC South Windsor, CT 06074 51/22 35 Oakland Road Nunzio & Gertraud 35 Oakland Road Gaetano South Windsor, CT 06074 51/10a 491 Buckland Road Samsel Properties c/o Richard Mahoney Partnership 10 N. Main St. W. Hartford, CT 06107 51/14 530 Buckland Road Milton Ervin Gibbs & 530 Buckland Road Virginia Flordelis South Windsor, CT 06074 51/15 542 Buckland Road J. Kirby Holcombe 374 Abbe Road Extension South Windsor, CT 06074 51/16 544 Buckland Road Julie Crandall Muller 383 Foster Street South Windsor, CT 06074 51/17 550 Buckland Road Robert&Brian Smith 1209 John Fitch Blvd. South Windsor, CT 06074 51/18 5 Oakland Road Robert&Brian Smith 1209 John Fitch Blvd. South Windsor, CT 06074 51/19 19 Oakland Road J. Kirby Holcombe 374 Abbe Road Extension South Windsor, CT 06074 51/20 25 Oakland Road South Windsor Medical c/o Raymond Kurker Arts Center 70 Rockledge South Windsor, CT 06074 50/16 1645 Ellington Road Savings Bank of Rockville 25 Park Street, Rockville P.O. Box 660 Rockville, CT 06066 3 MAP/LOT STREET ADDRESS Name Address 50/17 850 Clark Street U.S. Postal Service 850 Clark Street South Windsor, CT 06074 50/13 24L Clark Street Stanley &Viola Waldron 859 Clark Street South Windsor, CT 06074 50/14 819 Clark Street Frank Russo & Jon Berman 819 Clark Street South Windsor, CT 06074 50115 861 Clark Street Stanley & Viola Waldron 861 a Clark Street South Windsor, CT 06074 50/32 LO19 Clark Street Bruce Kelley 617 Clark Street South Windsor, CT 06074 50/18 7 Deming Street Pete & Lisa Granchelli 7 Deming Street South Windsor, CT 06074 50/19 17 Deming Street Muhammed& Humera 17 Deming Street Jamil South Windsor, CT 06074 50/20 25 Deming Street Esther Cotton 25 Deming Street South Windsor, CT 06074 50/21 33 Deming Street Armand, Lionel & 33 Deming Street Margaret Soucy South Windsor, CT 06074 50/22 43 Deming Street Lionel & Margaret Soucy 43 Deming Street South Windsor, CT 06074 50/23 3R Deming Street Art &Kate Soucy 17 Deming Street South Windsor, CT 06074 50/24 778 Clark Street Cynthia Siena 778 Clark Street South Windsor, CT 06074 50/25 770 Clark Street Francis &Norma Pajot 770 Clark Street South Windsor, CT 06074 27/15 151 Buckland Road Catholic Cemeteries 700 Middletown Avenue Association of the North Haven, CT 06473 Archdiocese of Hartford 63/7 1610 Ellington Road 1610 Ellington Road 1610 Ellington Road Associates South Windsor, CT 06074 63/11 L076B Ellington Road South Windsor Land c/o Shepard Conservation Trust, Inc. Box 415 East Windsor Hill, Ct 06082 51/33 432 Buckland Road Village at Buckland Court 432 Buckland Road South Windsor, CT 06074 51/34 419 Buckland Road Carmon& Company 419 Buckland Road South Windsor, CT 06074 51/35 435 Buckland Road Samsel Properties 10 N. Main Street Partnership W. Hartford, CT 06107 c/o Richard Mahoney 51/36 152 Deming Street Samsel Properties 10 N. Main Street Partnership W. Hartford, CT 06107 c/o Richard Mahoney 4 MAP/LOT STREET ADDRESS Name Address 51/37 130 Deming Street Gary & Jean Grilli 80 Berle Road South Windsor, CT 06074 51/38/1 112a Deming Street Steven Hershcopf 112 Deming Street, Unit A South Windsor, CT 06074 51/38/2 112b Deming Street Wayne Gerlt 970 Foster Street South Windsor, CT 06074 51/38/3 112c Deming Street Wayne Gerlt 970 Foster Street South Windsor, CT 06074 52/92 205 Oakland Road John& Donald Dzen 245 Niederwerfer Road South Windsor, CT 06074 38/1 395 Buckland Road John J. Woodcock III 395 Buckland Road South Windsor, CT 06074 38/2 240 Deming Street Calvary Church of the 400 Buckland Road Assemblies South Windsor, CT 06074 38/5 350 Buckland Road RSK-Kellco Inc. 1744 Ellington Road South Windsor, CT 06074 5 STOP & SHOP SUPERMARKET South Windsor, CONNECTICUT TABLE OF CONTENTS 1.0 Summary Site Location Map (USGS) SCS Soils Survey 2.0 Project Description 3.0 Calculation Methods 4.0 Pre-Development Condition Pre-Development Watershed Plan 5.0 Post-Development Condition Post-Development Watershed Plan 6.0 Structural Analysis Subcatchment Plan 7.0 Best Management Practices Appendix A: Supporting Calculations Pp pP g Pre,Development Calculations Post-Development Calculations Post-Development On-site Structure Analysis Appendix B: Miscellaneous Calculations Appendix C: Charts, Etc. 1.0 - SUMMARY The drainage study was completed to assess the pre- and post-development runoff rates for the proposed development for the 2-year, 10-year, 25-year and the 100-year storm events. In addition a capacity analysis was completed for the drainage infrastructure to evaluate operation during the 25-year storm event. Lastly, Best Management Practices were developed to formulate a plan that assures stormwater quality both during and after construction. The following summarizes the findings from the study. 1.1 - Pre- and Post-Development Flow Comparison: The pre and post-development wa tershed areas have been analyzed at the point of discharge. Subcatchment areas were varied between pre- and post-development conditions to reflect the actual drainage patterns while the overall watershed area analyzed remained constant. Table 1 compares pre and post-development peak runoff rates during all storm events analyzed for each watershed. As detailed in table 1 there is a minor reduction in the post-development runoff rate from the pre-development condition which is attributed to an increase in detention volume provided to mitigate the increased flows resulting from the development. 1.2 - Structure Analysis The drainage pipes were analyzed for inlet and outlet control for the 25-year storm event. In addition, the drainage system was analyzed using a conservative tailwater condition of the peak detention pond elevation for the design storm event. As depicted in the structure analysis section of this report, the drainage system is anticipated to operate without ponding and flooding during the 25-year design storm event. 1.3 - Best Management Practices Best Management Practices have been incorporated into the drainage design which provide for temporary erosion control measures during the construction process, permanent erosion control measures after construction is complete and stormwater treatment devices. Temporary measures are fully depicted in the site plans on the detail sheet entitled "Erosion Control Notes & Details". Temporary measures include silt fence barriers, inlet protection barriers in each of the catchbasins during construction until the site has been stabilized and provisions for stabilization of inactive areas. Permanent erosion control measures include turf establishment on all disturbed areas which have not been paved. Stormwater treatment devices will consist of 4 foot sumps and hoods in all proposed catchbasins and a Vortechnics treatment unit to treat storm water runoff from the supermarket loading area. Stormwater will be further treated in an on-site vegetated stormwater detention basin prior to being released off-site. Stop&Shop Supermarket Summary Ellington Road/Buckland Road South Windsor, Connecticut TABLE 1 COMPARISON OF PRE-AND POST-DEVELOPMENT PEAK FLOWS (cfs) 2-Year Storm 10-Year 25-Year 100-Year Storm Event Storm Event Storm Event Event Location Pre Post Pre Post Pre Post Pre Post Watershed#1 1.9 1.4 3.6 2.6 4.2 3.1 5.6 4.1 Watershed#2 0.3 0.3 0.6 0.6 0.8 0.8 1.1 1.1 Watershed#3 8.4 8.2 17.5 15.0 28.6 f 26.3 47.0 j 46.8 Stop &Shop Supermarket Summary Ellington Road/Buckland Road South Windsor,Connecticut f y t.; •.i, : , to- , , • , 5 t '#., SITE rt)mi n�;'.� i.'•�' A1dw i ram• _ _ I H ,f �'. �. it I AT Appledore SITE LOCATION MAP 00Engineering Inc. Town Center Ellington Road/Buckland Road 600 State Street,Suite D South Windsor, Connecticut Portsmouth, New Hampshire 03801 SOURCE: USGS, MANCHESTER QUADRANGLE (803)433-8818 aelCappledomeng.00m SCALE: 1:24,000 1397L000S.DWG 4.0 - PRE-DEVELOPMENT CONDITION: The pre-development condition is characterized by three (3) watershed areas. These watersheds are depicted upon the attached plan entitled "Pre-Development Watershed Plan". Table 2 summarizes the watershed characteristics and Table 3 summarizes the estimated peak runoff rates for the 2-year, 10-year, 25-year and 100-year Type III storm events. The composite runoff rates for each is also included in Table 3 representing all runoff from both watersheds. The appendix to this Drainage Study fully documents these computations. TABLE 2 PREDEVELOPMENT WATERSHED CHARACTERISTICS WATERSHED AREA TIME OF CONCENTRATION (MIN) NUMBER (ACRES) CN 1 1.42 79.8 1.8 2 0.36 74.6 12.0 1 3 17.92 88.9 31.2 TABLE 3 PRE-DEVELOPMENT RUNOFF CHARACTERISTICS (PEAK RATE) STORM EVENT WATERSHED 2YR 10YR 25YR 100YR NUMBER (cfs) (cfs) (cfs) (cfs) 1 1.9 3.6 4.2 5.6 2 0.3 0.6 0.8 1.1 3 8.4 17.5 28.6 47.0 Stop&Shop Supermarket Summary Ellington Road/Buckland Road South Windsor, Connecticut 5.0 - POST-DEVELOPMENT CONDITION The post-development condition is characterized by three (3) watershed areas similar to the pre-development condition. The post-development analysis will allow for a direct comparison between the pre- and post-development peak runoff rates to assess the impact of the project. Areas that are identified as reserve parking were considered impervious for the post development condition. Watershed areas are depicted upon the attached plan entitled 'Post-Development Watershed Plan". Table 4 summarizes the characteristics of the three (3) post-development watershed areas. Table 5 summarizes the peak runoff rates for the 2-year, 10-year, 25-year and 100-year storm events for each watershed area. The Appendix to this drainage study fully documents the computations for these peak runoff rates. TABLE 4 POST-DEVELOPMENT WATERSHED CHARACTERISTICS WATERSHED AREA TIME OF CONCENTRATION (MIN) NUMBER (ACRES) CN 1 1.02 82.3 1.8 2 0.36 74.6 12.0 3 18.36 91.8 23.4 TABLE 5 POST-DEVELOPMENT RUNOFF CHARACTERISTICS (PEAK RATE) STORM EVENT WATERSHED 2YR 10YR 25YR 100YR NUMBER (cfs) (cfs) (cfs) (cfs) 1 1.4 2.6 3.1 4.1 2 0.3 0.6 0.8 1.1 i 3 8.2 15.0 26.3 46.8 Stop&Shop Supermarket Summary Ellington Road/Buckland Road South Windsor, Connecticut 6.0 - STRUCTURE ANALYSIS The drainage pipes were analyzed for capacity using the 25-year, type III storm event. A separate model depicting subcatchment areas for each of the catchbasins was created. For purposes of this study a tail water condition of the peak pond elevation was assumed for the outlet pipes. The drainage system is anticipated to operate without ponding or flooding on site during the 25-year storm event. Table 6 summarizes the subcatchment area characteristics and the peak runoff rate expected for all structures during the 25-year storm. Table 7 details the results of the capacity analysis for individual catchbasins and associated drainline. TABLE 6 SUBCATCHMENT AREAS CHARACTERISTICS SUBCATCHMENT AREA CN Q25 NUMBER (ACRES) (cfs) 1 0.34 95.6 2.90 2 0.86 94.7 2.90 3 0.72 95.7 2.44 4 0.66 96.8 2.26 5 1.73 94.5 5.95 6 0.36 95.2 1.20 7 0.13 98.0 0.46 8 0.10 96.4 0.35 9 0.53 94.8 1.85 10 0.30 98.0 1.04 11 0.33 98.0 1.14 12 0.04 98.0 0.12 13 0.75 98.0 2.56 14 0.05 98.0 0.15 15 0.67 98.0 2.28 16 1.15 95.6 4.04 17 0.18 88.9 0.55 18 2.11 85.6 6.24 19 3.35 87.1 10.07 Stop&Shop Supermarket Summary Ellington Road/Buckland Road South Windsor, Connecticut Table 7 SUMMARY OF STRUCTURE PERFORMANCE 25-Year Storm STRUCTURE TOP OF FRAME WATER SURFACE NUMBER ELEVATION ELEVATION PCB 1 92.0 89.54 PCB 2 93.7 91.99 PCB 3 94.0 91.93 PCB 4 94.0 92.89 PCB 5 94.0 93.45 PCB 6 95.1 94.03 PCB 7 94.7 94.04 PCB 8 96.0 93.66 PCB 9 99.4 96.30 PCB 10 90.9 89.26 PCB 11 90.9 89.56 ECB 1 89.0 89.85 EC132 92.3 89.35 ECB3 94.6 90.24 ECB4 93.5 91.06 EC135 97.4 93.76 PDMH1 95.0 91.79 PDMH2 100.2 95.96 PDMH3 93.5 88.38 PDMH4 93.5 88.73 PDMH5 93.0 89.02 PDMH6 91.6 89.40 PDMH 7 91.9 89.56 Stop &Shop Supermarket Summary Ellington Road/Buckland Road South Windsor, Connecticut 7.0 - BEST MANAGEMENT PRACTICES Best management practices for this project include temporary erosion control measures, permanent erosion control measures and pollution control devices. Temporary erosion control measures, which will be enacted during construction, are fully detailed on the Site Plans in the detail sheet entitled "Erosion Control Notes and Details" and numbered as Sheet C-10. These measures include construction sequencing, inlet baskets, silt fences, and provisions for stabilization of inactive areas. Permanent erosion control measures include turf establishment or pavement of all disturbed areas. Pollution control devices include 4' foot sumps and outlet hoods in all proposed catchbasins. Sumps are provided to capture sediments from stormwater runoff and outlet hoods will contain floatable contaminants including oils, grease, and trash within the catchbasin. Additionally, a Vortechnic stormwater treatment unit will be provided at the rear of the supermarket to treat stormwater runoff from the supermarket loading area. Runoff from the closed drainage system is run through a stormwater detention basin which is vegetated. This structure further removes contaminates in the runoff prior to off-site discharge. Stop&Shop Supermarket Summary Ellington Road/Buckland Road South Windsor, Connecticut t 1 1 1 1 1 1 1 � Pre-Development Calculations 1 � 1 t 1 i 1 1 1 1 1 * * TR 20 SIN * HMVersion 3.40 TR 20 * Date 5/29/** * * Time 9:57:02 Project Formulation Hydrology * Input file 1397PRE.IN * Output file 1397PRE.OUT xxxxxxx xxxxxx xxxxx xxxxx x x x x x x xx x x x x x x x x xxxxxx x x x x x x x x x x x x x x x xx x x x x xxxxxxx xxxxx Full Microcomputer Implementation by Haestad Methods, Inc. 37 Brookside Road * Waterbury, Connecticut 06708 * (203) 755-1666 B TR-20 SUMMARY TITLE CPre-DEVELOPMENT p, Town Shopping Center TLE CONDITIONS RAINFL 8 0.0 .0025 .005 .0075 .010 .0125 .015 .0175 .020 .023 .026 .0285 .031 .034 .037 8 ..040 .043 .0465 .050 .0535 8 .057 .0605 .064 .068 .072 .076 .080 .084 .089 .094 .100 .107 .115 .122 .130 8 .139 .148 .157 .167 .178 ' .189 .202 .216 .231 .250 .271 .298 .345 .500 .655 �T Ta 8 .702 .729 .751 .769 .785 / �-rr .798 .811 .823 .834 .844 0 .853 .862 .870 .878 .886 .893 .900 .906 .911 .916 8 .920 .924 .928 .932 .936 .940 .944 .9475 .951 .954 .957 .960 .963 .966 .969 8 .972 .975 .978 .981 .9835 .986 .9885 .991 .9935 .996 .998 1.000 1.00 1.00 1.00 ENDTBL Ch3TF)CUS �°ClI_. 3 STRUCT 01 83.2 0.0 0.00 84.0 1.00 0.14 8 86.0 7.80 0.95 87.5 10.5 1.70 pal-�Y1(s� �J�$►N 88.0 21.5 1.97 8 88.5 41.9 2.26 89.0 67.6 2.56 ENDTBL "JL_Ste„ .�C�. in- RUNOFF 1 001 1 0.00222330 79.8 0.030 6 RUNOFF 1 002 2 0.00055688 74.6 0.200 -�, ��.��� � RUNOFF 1 003 3 0.02800000 88.9 0.520 �,�,$i., .3 RESVOR 2 01 3 7 0W-r -s- \C,0 NN$lt- IZC7�^!'\jof_ 6 ADDHYD 4 101 2 7 6 ENDATA INCREM 6 .05 COMPUT 7 001 101 0.0 3.2 1.0 7 2 01 2 ENDCMP 1 COMPUT 7 001 101 0.0 4.7 1.0 7 2 01 10 $rt�P-V1- ENDCMP 1 7 COMPUT 7 001 101 0.0 5.5 1.0 7 2 01 25 ENDCMP 1 COMPUT 7 001 101 0.0 6.9 1.0 7 2 01 99QJM1-- ENDCMP 1 ENDJOB 2 I TR20 XEQ 6/01/** Stop & Shop, Town Shopping Center JOB 1 SUMMARY REV 09/01/83 Pre-DEVELOPMENT CONDITIONS I PAGE 5 IMARY TABLE 1 - SELECTED RESULTS OF STANDARD AND EXECUTIVE CONTROL INSTRUCTIONS IN THE ORDER PERFORMED (A STAR(*) AFTER THE PEAK DISCHARGE TIME AND RATE (CFS) VALUES INDICATES A FLAT TOP HYDROGRAPH A QUESTION MARK(?) INDICATES A HYDROGRAPH WITH PEAK AS LAST POINT.) ICTION/ STANDARD RAIN ANTEC MAIN PRECIPITATION PEAK DISCHARGE STRUCTURE CONTROL DRAINAGE TABLE MOIST TIME ------------------------- RUNOFF ---- ----------------------------------- ID OPERATION AREA # COND INCREM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE (SQ MI) (HR) (HR) (IN) (HR) (IN) (FT) (HR) (CPS) (CSM) ALTERNATE 1 STORM 2 ECTION 1 RUNOFF .00 7 2 .05 .0 3.20 24.00 1.04 --- 12.23 1.87 839.5 XSECTION 2 RUNOFF .00 7 2 .05 .0 3.20 24.00 .75 --- 12.30 .30 546.7 ICTION 3 RUNOFF .03 7 2 .05 .0 3.20 24.00 1.60 12.40 23.21 828.8 UCTURE 1 RESVOR .03 7 2 .05 .0 3.20 24.00 1.21 86.34 12.96 8.41 300.5 XSECTION 101 ADDHYD .03 7 2 .05 .0 3.20 24.00 1.20 --- 12.95 8.47 296.7 I ALTERNATE 1 STORM 10 CTION 1 RUNOFF .00 7 2 .05 .0 4.70 24.00 2.03 --- 12.23 3.35 1506.5 XSECTION 2 RUNOFF .00 7 2 .05 .0 4.70 24.00 1.61 12.25 .61 1103.6 ICTION 3 RUNOFF .03 7 2 .05 .0 4.70 24.00 2.74 12.39 38.18 1363.7 UCTURE 1 RESVOR .03 7 2 .05 .0 4.70 24.00 2.02 87.82 12.84 17.48 624.2 XSECTION 101 ADDHYD .03 7 2 .05 .0 4.70 24.00 2.01 --- 12.84 17.60 616.4 1 ALTERNATE 1 STORM 25 XSECTION 1 RUNOFF .00 7 2 .05 .0 5.50 24.00 2.60 --- 12.23 4.16 1870.3 OEUCTURE CTION 2 RUNOFF .00 7 2 .05 .0 5.50 24.00 2.13 --- 12.25? .79? 1422.8 CTION 3 RUNOFF .03 7 2 .05 .0 5.50 24.00 3.37 12.39 46.17 1648.9 1 RESVOR .03 7 2 .05 .0 5.50 24.00 2.57 88.17 12.71 28.60 1021.6 XSECTION 101 ADDHYD .03 7 2 .05 .0 5.50 24.00 2.56 --- 12.71 28.79 1008.2 ,ALTERNATE 1 STORM 99 XSECTION 1 RUNOFF .00 7 2 .05 .0 6.90 24.00 3.64 --- 12.23 5.58 2510.0 PCTION 2 RUNOFF .00 7 2 .05 .0 6.90 24.00 3.10 12.25 1.11 1997.4 CTION 3 RUNOFF .03 7 2 .05 .0 6.90 24.00 4.49 12.38 60.08 2145.6 UCTURE 1 RESVOR .03 7 2 .05 .0 6.90 24.00 3.59 88.60 12.60 46.95 1676.9 (SECTION 101 ADDHYD .03 7 2 .05 .0 6.90 24.00 3.56 12.60 47.31 1656.7 Pre-Development Watershed #1 CALCULATED BY: SES DATE:3/10/00 CHECKED BY: SES ' Sheet Flow Surface Description lawn Manning's Roughness Coeff(n) 0.011 Flow Length, (L) ft 30 Two-yr 24 hour rainfall, P2 in 3.20 Land slope (s) ft/ft 0.02 Tt= 0.007(nQ0.8 hrs 0.008 it P20.5s0.4 Shallow Concetrated Flow Surface Description (paved or unpaved) paved Flow Length, (L) ft 190 Watercourse slope(s) ft/ft 0.02 Averate velocity, (V) ft/s 3.00 Tt=L/3600V hrs 1 0.02 Channel Flow Cross sectional flow area (a) 0.00 ' Wetted permeter(Pw) ft 0.00 Hydraulic Radius (Hr=a/Pw) 0.00 Channel slope (s) ft/ft 0.000 Mannings roughness coeff. (n) 0.000 V=1.49r^2/3s^1/2/n 0.00 Flow length (L) 0 Tt=L/3600V hrs 0.00 Time of Concetration (Tc) hrs 0.03 SOIL NAME COVER CN AREA PRODUCT AND DESCRIPTION acres OF HYDROLOGIC GROUP sq. mi. CN x AREA 0 IMPERVIOUS IMPERVIOUS 98 24.3 2381.4 GROUP C LAWN,GOOD 74 75.7 5601.8 GROUP D WETLANDS 80 0.0 0.0 TOTALS = 100.0 7983.2 USE CN = 79.8 Watershed Area= 0.002223298 Sq. Miles 61982 Sq. feet r ' Pre-Development Watershed #2 CALCULATED BY: SES DATE:3/10/00 CHECKED BY: SES Sheet Flow Surface Description lawn Manning's Roughness Coeff(n) 0.24 ' Flow Length, (L) ft 70 Two-yr 24 hour rainfall, P2 in 3.20 Land slope (s) ft/ft 0,02 Tt= 0.007(nQ0.8 hrs 0.179 P20.5s0.4 Shallow Concetrated Flow Surface Description (paved or unpaved) lawn Flow Length, (L) ft 150 Watercourse slope (s) ft/ft 0.02 Averate velocity, (V) ft/s 2.50 Tt=L/3600V hrs 1 0.02 Channel Flow Cross sectional flow area (a) 0.00 Wetted permeter(Pw) ft 0.00 Hydraulic Radius (Hr=a/Pw) 0.00 Channel slope (s) ft/ft 0.000 Mannings roughness coeff. (n) 0.010 V=1.49r^2/3s^1/2/n 0.00 Flow length (L) 0 Tt=L/3600V hrs 0.00 Time of Concetration (Tc) hrs 0.20 SOIL NAME COVER CN AREA PRODUCT AND DESCRIPTION acres OF HYDROLOGIC GROUP sq. rn CN x AREA 0 IMPERVIOUS IMPERVIOUS 98 0.0 0.0 GROUP C LAWN,GOOD 74 90.4 6689.E GROUP D WETLANDS 80 9.6 768.0 TOTALS t 100.01 7457.E USE CN = 1 74.6 Watershed Area= 0.000556883 Sq. Miles 15525 Sq. feet 1 Pre-Development Watershed#3 CALCULATED BY: SES DATE:3/10/00 CHECKED BY: SES ' Sheet Flow Surface Description lawn Manning's Roughness Coeff(n) 0.24 Flow Length, (L) ft 210 Two-yr 24 hour rainfall, P2 in 3.20 Land slope (s) ft/ft 0.02 1 1 --d Tt= 0.007(nQ0.8 hrs 0.460 P20.5s0.4 ' Shallow Concetrated Flow Surface Description (paved or unpaved) paved Flow Length, (L) ft 140 Watercourse slope (s) ft/ft 0.02 Averate velocity, (V) ft/s 3.00 Tt=L/3600V h rs 1 0.01 Channel Flow Cross sectional flow area (a) 3.14 ' Wetted permeter(Pw) ft 6.28 Hydraulic Radius (Hr=a/Pw) 0.50 Channel slope(s) ft/ft 0.005 Mannings roughness coeff. (n) 0.010 V=1.49r^2/3s^1/2/n 6.64 Flow length (L) 1030 Tt=L/3600V hrs 0.04 Time of Concetration (Tc) hrs 0.52 SOIL NAME COVER CN AREA PRODUCT AND DESCRIPTION acres OF HYDROLOGIC GROUP sq. mi. CN x AREA IMPERVIOUS IMPERVIOUS 98 61.4 6017.2 GROUP C LAWN,GOOD 74 36.4 2693.6 GROUP D WETLANDS 80 2.2 176.0 TOTALS = 100.0 8886.8 USE CN = 88.9 Watershed Area= 0.027999993 Sq. Miles 780595 Sq.feet i 1 ' PIPE CULVERT ANALYSIS COMPUTATION OF CULVERT PERFORMANCE CURVE May 18, 2000 Stop & Shop Town Shopping Center ' 15" HDPE Pond Outlet ' PROGRAM INPUT DATA: DESCRIPTION VALUE ----------------------------------------------------------------- Culvert Diameter (feet) ................................. 1.25 FHWA Chart Number (1,2 or 3) ............................ 2 e Scale Number on Chart (Type of Culvert Entrance)........ 2 Manning`s Roughness Coefficient (n-value) ............... 0.0100 Entrance Loss Coefficient of Culvert Opening............ 0.50 Culvert Length (feet) ................................... 10.0 Culvert Slope (feet per foot) ........................... 0.0050 ' PROGRAM RESULTS: Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet Rate Depth Inlet Outlet Depth Depth Outlet Velocity ... - (cfs)- (ft) Control Control (ft), (ft) - - -(ft) (fps) -- 1.0 0.00 0.57 0.80 0.36 0.40 0.40 3.06 7.8 0.00 2.80 2.15 1.25 1.10 1.25 6.34 10.5 0.00 4.30 3.02 1.25 , 1.19 1.25 8.52 10.9 0.00 4.60 3.19 1.25 1.20 1.25 8.90 11.9 0.00 5.30 3.58 1.25 1.22 1.25 9.71 ' 12.6 0.00 5.80 3.85 1.25 1.22 1.25 10.24 PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986 ' Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092 (713) 895-8322. All Rights Reserved. 1 ' APPLEDORE ENGINEERING, INC. Stop &Shop Supermarket 600 STATE STREET,SUITE D Town Shopping Center PORTSMO=,NEW HAMPSHIRE 03801 South Windsor, Connecticut ' CALCULATED BY: SES DATE: 5/7/00 STRUCTURE: EXISTING DETENTION BASIN 10'WIDE OULTET WIER WEIR FLOW: ' Q= CWH^3/2 Q= CAPACITY (CFS) C=WEIR DISCHARGE COEFFICIENT B=WIDTH (FT) C= 3 g=32.2 FT/SEC^2 B= 10 FEET H= HEAD (FT) ' ELEVATION (FT) H (FT) Ow (CFS) 87.50 0.0 0.00 88.00 0.5 10.61 88.5 1.0 30.00 89.0 1.5 55.11 Volume Cum Vol ELEV(FT) AREA(SF) h (FT) Volume(ft^3) Vol (ac-ft) (ac- ft) 83.2 0 0 0 0.00 0.00 84 15380 0.8 6152 0.14 0.14 86 19910 2 35290 0.81 0.95 87.5 23390 1.5 32475 0.75 1.70 88 24570 0.5 11990 0.28 1.97 88.5 25950 0.5 12630 0.29 2.26 89 26800 0.5 13188 0.30 2.56 � Post-Development Calculations 1 1 1 1 1 1 1 1 1 * * TR 20 SIN * HMVersion 3.40 TR 20 * Date 6/01/** * * Time 17:05:43 ' Project Formulation Hydrology * Input file 1397p.in * Output file : 1397p.out * * * * # * xxxxxxx xxxxxx xxxxx xxxxx x x x x x x xx x x x x x x x x xxxxxx x x x x x x x x x x x x x x x xx x x x x xxxxxxx xxxxx Full Microcomputer Implementation by Haestad Methods, Inc. ' 37 Brookside Road * Waterbury, Connecticut 06708 * (203) 755-1666 B TR-20 SUMMARY TITLE Stop & Shop, Town Shopping Center TLE Post-DEVELOPMENT CONDITIONS RAINFL (a)- J ftaL1r 8 0.0 .0025 .005 .0075 .010 .0125 .015 .0175 .020 .023 .026 .0285 .031 .034 .037 8 .040 .043 .0465 .050 .0535 .057 .0605 .064 .068 .072 0 .076 .080 .084 .089 .094 .100 .107 .115 .122 .130 6 .139 .148 .157 .167 .178 ' .189 .202 .216 .231 .250 .271 .298 .345 .500 .655 8 .702 .729 .751 .769 .785 .798 .811 .823 .834 .844 0 .853 .862 .870 .878 .886 .893 .900 .906 .911 .916 8 .920 .924 .928 .932 .936 .940 .944 .9475 .951 .954 .957 .960 .963 .966 .969 8 .972 .975 .978 .981 .9835 ' .986 .9885 .991 .9935 .996 .998 1.000 1.00 1.00 1.00 9 ENDTBL �c�2V STRUCT 01 VC)�,S 83.2 0.0 0.00 84.0 1.0 0.22 8 86.0 7.8 1.36 87.5 10.5 2.29 } 88.0 20.5 2.62 8 88.5 38.9 2.96 89.0 62.2 3.32 ENDTBL x_s�- AVX>A (z�y'l r.N J� c- RUNOFF 1 001 1 0.00159029 82.3 0.030 �1 '�� ' 6 RUNOFF 1 002 2 0.00055688 74.6 0.200 W., -�e � RUNOFF 1 003 3 0.02869981 91.8 0.390 RESVOR 2 01 3 5 �-, � +Ysp� �{}� � QCIv't'%Nc5 6 ADDHYD 4 102 2 5 7 ENDATA INCREM 6 .05 i�t'l�U%ph(:.►.�'� 7 COMPUT 7 001 102 0.0 3.2 1.0 7 2 01 2 -^� J p b'L SO�'�� ENDCMP 1 n� COMPUT 7 001 102 0.0 4.7 1.0 7 2 01 10 - 1v ENDCMP 1 7 COMPUT 7 001 102 0.0 5.5 1.0 7 2 01 25 ENDCMP 1 COMPUT 7 001 102 0.0 6.9 1.0 7 2 01 99 ENDCMP 1 ENDJOB 2 T,n-.R_- TR20 XEQ 6/01/** Stop & Shop, Town Shopping Center JOB 1 SUMMARY REV 09/01/83 Post-DEVELOPMENT CONDITIONS PAGE 5 MARY TABLE 1 - SELECTED RESULTS OF STANDARD AND EXECUTIVE CONTROL INSTRUCTIONS IN THE ORDER PERFORMED (A STAR(*) AFTER THE PEAK DISCHARGE TIME AND RATE (CPS) VALUES INDICATES A FLAT TOP HYDROGRAPH A QUESTION MARK(?) INDICATES A HYDROGRAPH WITH PEAK AS LAST POINT.) ICTION/ STANDARD RAIN ANTEC MAIN PRECIPITATION PEAK DISCHARGE STRUCTURE CONTROL DRAINAGE TABLE MOIST TIME ------------------------- RUNOFF ----------------------_----------_---- ' ID OPERATION AREA # COND INCREM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE (SQ MI) (HR) (HR) (IN) (HR) (IN) (FT) (HR) (CFS) (CSM) ALTERNATE 1 STORM 2 ECTION 1 RUNOFF .00 7 2 .05 .0 3.20 24.00 1.18 --- 12.25 1.37 860.7 XSECTION 2 RUNOFF .00 7 2 .05 .0 3.20 24.00 .75 --- 12.30 .30 546.7 ECTION 3 RUNOFF .03 7 2 .05 .0 3.20 24.00 1.85 --- 12.31 28.70 1000.1 RUCTURE 1 RESVOR .03 7 2 .05 .0 3.20 24.00 1.24 86.23 12.87 8.22 286.5 XSECTION 102 ADDHYD .03 7 2 .05 .0 3.20 24.00 1.23 --- 12.85 8.29 283.3 L TERNATE 1 STORM 10 ION 1 RUNOFF .00 7 2 .05 .0 4.70 24.00 2.23 --- 12.23 2.55 1601.4 XSECTION 2 RUNOFF .00 7 2 .05 .0 4.70 24.00 1.61 --- 12.25 .61 1103.6 ICTION 3 RUNOFF .03 7 2 .05 .0 4.70 24.00 3.04 --- 12.31 45.29 1577.9 UCTURE 1 RESVOR .03 7 2 .05 .0 4.70 24.00 1.98 87.73 12.80 15.02 523.5 XSECTION 102 ADDHYD .03 - 7 2 .05 .0 4.70 24.00 1.98 --- 12.80 15.16 518.0 ALTERNATE 1 STORM 25 XSECTION 1 RUNOFF .00 7 2 .05 .0 5.50 24.00 2.82 --- 12.23 3.13 1966.9 XSECTION 2 RUNOFF .00 7 2 .05 .0 5.50 24.00 2.13 12.25? .79? 1422.8 RCTION 3 RUNOFF .03 7 2 .05 .0 5.50 24.00 3.69 --- 12.31 54.06 1883.8 UCTURE 1 RESVOR .03 7 2 .05 .0 5.50 24.00 2.54 88.15 12.66 26.12 910.2 XSECTION 102 ADDHYD .03 7 2 .05 .0 5.50 24.00 2.53 --- 12.66 26.34 900.2 1 ALTERNATE 1 STORM 99 XSECTION 1 RUNOFF .00 7 2 .05 .0 6.90 24.00 3.90 --- 12.23 4.14 2606.1 CTION 2 RUNOFF .00 7 2 .05 .0 6.90 24.00 3.10 --- 12.25 1.11 1997.4 CTION 3 RUNOFF .03 7 2 .05 .0 6.90 24.00 4.84 --- 12.30 69.32 2415.3 UCTURE 1 RESVOR .03 7 2 .05 .0 6.90 24.00 3.58 88.67 12.55 46.75 1628.9 XSECTION 102 ADDHYD .03 7 2 .05 .0 6.90 24.00 3.57 --- 12.54 47.17 1612.3 r Post-Development Watershed#1 r CALCULATED BY: SES r DATE:3/10/00 CHECKED BY: SES r Sheet Flow Surface Description lawn Manning's Roughness Coeff(n) 0.011 ' Flow Length, (L) ft 50 Two-yr 24 hour rainfall, P2 in 3.20 Land slope (s) ft/ft 0.02 r Tt= 0.007(nL)0.8 hrs 0.012 P20.5s0.4 r Shallow Concetrated Flow Surface Description (paved or unpaved) paved Flow Length, (L) ft 240 Watercourse slope (s) ft/ft 0.02 Averate velocity, (V) ft/s 3.00 r Tt=L/3600V hrs 0.02 rChannel Flow Cross sectional flow area (a) 0.00 r Wetted permeter(Pw) ft 0.00 Hydraulic Radius (Hr=a/Pw) 0.00 Channel slope (s) ft/ft 0.000 Mannings roughness coeff. (n) 0.000 ' V=1.49r"2/3s^1/2/n 0.00 Flow length (L) 0 Tt=L/3600V hrs 0.00 Time of Concetration (Tc) hrs 0.03 rSOIL NAME COVER CN AREA PRODUCT AND DESCRIPTION acres OF ' HYDROLOGIC GROUP sq. mi. CN x AREA IMPERVIOUS IMPERVIOUS 98 34.4 3371.2 GROUP C LAWN,GOOD 74 65.6 4854.4 r GROUP D WETLANDS 80 0.0 0.0 TOTALS = 100.0 8225.E i, USE CN = 82.3 Watershed Area= 0.001590299 Sq. Miles 44335 Sq. feet r 1 ' Post-Development Watershed#2 CALCULATED BY: SES ' DATE:3/10/00 CHECKED BY: SES Sheet Flow Surface Description lawn Manning's Roughness Coeff(n) 0.24 Flow Length, (L) ft 70 Two-yr 24 hour rainfall, P2 in 3.20 Land slope (s) ft/ft 0.02 Tt= 0.007(nQ0.8 hrs 0.179 P20.5s0.4 Shallow Concetrated Flow Surface Description (paved or unpaved) lawn Flow Length, (L) ft 150 Watercourse slope (s) ft/ft 0.02 Averate velocity, (V) ft/s 2.50 Tt=L/3600V hrs 0.02 Channel Flow Cross sectional flow area (a) 0.00 Wetted permeter(Pw) ft 0.00 Hydraulic Radius (Hr=a/Pw) 0.00 Channel slope (s) ft/ft 0.000 Mannings roughness coeff. (n) 0.010 V=1.49r^2/3s^1/2/n 0.00 Flow length (L) 0 Tt=L/3600V hrs 0.00 Time of Concetration (Tc) hrs 0.20 SOIL NAME COVER CN AREA PRODUC T AND DESCRIPTION acres OF ' HYDROLOGIC GROUP sq. mi. CN x AREA 0 IMPERVIOUS IMPERVIOUS 98 0.0 0.0 GROUP C LAWN,GOOD 74 90.4 6689.6 GROUP D WETLANDS 80 9.6 768.0 TOTALS = 100.0 7457.6 USE CN = 74.6 Watershed Area= 0.000556883 Sq. Miles ' 15525 Sq. feet Post-Development Watershed #3 CALCULATED BY: SES DATE:3/10/00 CHECKED BY: SES Sheet Flow Surface Description lawn Manning's Roughness Coeff(n) 0.24 Flow Length, (L) ft 100 Two-yr 24 hour rainfall, P2 in 3.20 Land slope (s) ft/ft 0.01 Tt= 0.007(nQ0.8 hrs 1 0.314 P20.5s0.4 Shallow Concetrated Flow Surface Description (paved or unpaved) lawn Flow Length, (L) ft 250 Watercourse slope (s) ft/ft 0.02 Averate velocity, (V) ft/s 2.00 Tt=L/3600V hrs 1 0.03 Channel Flow Cross sectional flow area (a) 3.14 Wetted permeter(Pw) ft 6.28 Hydraulic Radius (Hr=a/Pw) 0.50 Channel slope (s) ft/ft 0.005 Mannings roughness coeff. (n) 0.010 V=1.49r"2/3s^1/2/n 6.64 Flow length (L) 940 Tt=L/3600V hrs 0.04 Time of Concetration (Tc) hrs 0.39 SOIL NAME COVER CN AREA PRODUCT AND DESCRIPTION acres OF HYDROLOGIC GROUP sq. mi. CN x AREA IMPERVIOUS IMPERVIOUS 98 73.5 7203.0 GROUP C LAWN,GOOD 74 23.8 1761.2 GROUP D WETLANDS 80 2.7 216.0 TOTALS = 100.0 9180.2 USE CN = 91.8 Watershed Area= 0.028699818 Sq. Miles 800105 Sq. feet PIPE CULVERT ANALYSIS COMPUTATION OF CULVERT PERFORMANCE CURVE May 18, 2000 Stop & Shop Town Shopping Center 15" HDPE Pond Outlet PROGRAM INPUT DATA: DESCRIPTION ---- ------VALUE ---------------------------------------------------- -- Culvert Diameter (feet) ................................. 1.25 FHWA Chart Number (1,2 or 3)............................ 2 Scale Number on Chart (Type of Culvert Entrance) ........ 2 Manning`s Roughness Coefficient (n-value) ............... 0.0100 Entrance Loss Coefficient of Culvert Opening............ 0.50 Culvert Length (feet) ................................... 10.0 Culvert Slope (feet per foot) ........................... 0.0050 PROGRAM RESULTS: ' Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet Rate Depth Inlet Outlet Depth Depth Outlet Velocity (cfs) (ft) Control Control (ft) (ft) (ft) (fps) 1.0 0.00 0.57 0.80 0.36 0.40 0.40 3.06 7.8 0.00 2.80 2.15 1.25 1.10 1.25 6.34 10.5 0.00 4.30 3.02 1.25 1.19 1.25 8.52 10.9 0.00 4.60 3.19 1.25 1.20 1.25 8.90 11.9 0.00 5.30 3.58 1.25 1.22 1.25 9.71 12.6 0.00 5.80 3.85 1.25 1.22 1.25 10.24 PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986 Dodson & Associates, Inc., 7015 W. Tidwell, 0107, Houston, TX 77092 (713) 895-8322. All Rights Reserved. APPLEDORE ENGINEERING,INC. Stop &Shop Supermarket 600 STATE STREET,SUITE D Town Shopping Center PORTSMOUTH,NEW HAMPSHIRE 03801 South Windsor, Connecticut CALCULATED BY: SES DATE: 5/7/00 STRUCTURE: PROPOSED DETENTION BASIN 9'WIDE OULTET WIER WEIR FLOW: Q= CWH^3/2 Q=CAPACITY(CFS) C=WEIR DISCHARGE COEFFICIENT B=WIDTH (FT) C= 3 g= 32.2 FT/SEC^2 B= 9 FEET H= HEAD (FT) ELEVATION(FT) H (FT) Qw CFS 87.50 0.0 0.00 88.00 0.5 9.55 88.5 1.0 27.00 89.0 1.5 49.60 Volume Cum Vol ELEV(FT) AREA(SF) h (FT) Volume(ft^3) Vol (ac-ft) (ac - ft) 83.2 0 0 0 0.00 0.00 84 23615 0.8 9446 0.22 0.22 86 25980 2 49595 1.14 1.36 87.5 28360 1.5 40755 0.94 2.29 88 29170 0.5 14383 0.33 2.62 88.5 30620 0.5 14948 0.34 2.96 89 31520 0.5 15535 0.36 3.32 Post-Development On-site Structure Analysis W no so i �' as an Appledore DRAINAGE SYSTEM CALCULATIONS Engineering Inc. Project Name:_Stop&Shop,Ellington Road South Windsor,CT Project No. 1397 Sheet No.: 1 of 1 Calculated By: Ses Date: 5/7/00 Checked By: Date: Node From Pipe Inlet To Pie Outlet Storm Fre uenc : 25 YR Sub- Flowline Rim Flowline Rim Flow Pipe Pipe Slope Velocity Length T.W. H.W. H.W. catchment Structure Elevation Elevation Structure Elevation Elevation (CFS) Size Type FT/FT FT/SEC Feet Feet Feet Elevation 113 ECB 1 84.37 89.00 OUTLET 83.84 - 47.04 42 HDPE 0.005 4.89 105 4.31 4.48 88.85 112 ECB2 85.12 92.30 ECB1 84.37 89.00 40.81 42 HDPE 0.005 4.24 165 4.48 4.23 89.35 1 PCB1 87.41 92.00 ECB2 86.90 92.30 2.90 15 HDPE 0.010 2.36 51 2.45 2.13 89.54 110 ECB3 86.08 94.60 ECB2 85.12 92.30 37.16 36 HDPE 0.006 5.26 170 4.23 4.16 90.24 109 ECB4 86.95 93.50 ECB3 86.58 94.6 25.92 30 HDPE 0.005 5.28 76 3.66 4.11 91.06 133 PDMH1 87.71 95.00 ECB4 86.95 93.50 22.03 30 HDPE 0.005 4.49 152 4.11 4.08 91.79 2 PCB2 88.60 93.70 PDMH1 88.32 95.00 2.90 15 HDPE 0.005 2.36 56 3.47 3.39 91.99 3 PCB3 88.63 94.00 PDMH1 88.32 95.00 2.44 15 HDPE 0.005 1.99 63 3.47 3.30 91.93 107 PCB4 88.36 94.00 PDMH1 87.81 95.00 17.39 24 HDPE 0.005 5.54 110 3.98 4.53 92.89 105 PCB5 89.04 94.00 PCB4 88.46 94.0 12.30 24 HDPE 0.005 3.92 116 4.43 4.41 93.45 104 PCB6 90.50 95.1 PCB5 89.14 94.0 6.06 18 HDPE 0.010 3.43 131 4.31 3.53 94.03 7 PCB7 90.98 94.7 PCB6 90.60 95.1 0.46 12 HDPE 0.010 0.59 38 3.43 3.06 94.04 101 PCB8 91.00 96.0 PCB6 90.60 95.1 2.23 15 HDPE 0.010 1.82 40 2.96 2.66 93.66 9 ECB5 92.99 97.4 PCB8 91.10 96.0 1.85 15 HDPE 0.053 10.01 36 2.56 0.77 93.76 9 PDMH2 95.19 100.2 ECB5 92.99 97.4 1.85 15 HDPE 0.011 5.68 201 0.67 0.77 95.96 9 PCB9 95.53 99.4 PDMH2 95.29 100.2 1.85 15 HDPE 0.010 5.49 24 0.67 0.77 96.30 116 PDMH3 84.64 93.5 OUTLET 84.00 - 2.46 15 HDPE 0.004 2.00 160 4.15 3.74 88.38 116 PDMH4 85.79 93.5 PDMH3 84.64 93.5 2.46 15 HDPE 0.004 2.00 284 3.74 2.94 88.73 116 PDMH5 86.70 93.0 PDMH4 85.79 93.5 2.46 15 HDPE 0.004 2.00 227 2.94 2.32 89.02 116 VORT 86.91 - PDMH5 86.70 93.0 2.46 15 HDPE 0.004 2.00 51 2.32 2.25 89.16 116 PCB 10 87.01 90.9 VORT 86.91 - 2.46 15 HDPE 0.010 2.00 10 2.25 2.25 89.26 115 PDMH6 87.27 91.6 PCB 10 87.01 90.9 1.42 12 HDPE 0.004 1.81 63 2.25 2.13 89.40 114 PCB l l 87.74 90.9 PDMH6 87.27 91.6 1.29 12 HDPE 0.004 1.64 116 2.13 1.82 89.56 12 ROOF 87.65 - PDMH6 87.27 91.6 0.12 6 DI 0.010 0.61 1 38 2.13 1.77 89.42 14 PDMH7 88.12 91.9 PCB11 87.74 90.9 0.15 12 HDPE 0.004 0.19 95 1.82 1.44 89.56 14 ROOF 88.63 - PDMH7 88.37 91.4 0.15 6 DI 0.010 0.76 26 1.19 0.95 89.58 ***********k***********************************k*k******#**************x****** * * TR 20 SIN * HMVersion 3.40 TR 20 * Date 6/01/** * * Time 17.27:38 Project Formulation Hydrology * Input file 1397SUB.IN * Output file 1397SUB.OUT * * * * xxxxxxx xxxxxx xxxxx xxxxx x x x x x x xx x x x x x x x x xxxxxx x x x x x x x x x x x x x x x xx x x x x xxxxxxx xxxxx Full Microcomputer Implementation by Haestad Methods, Inc. 37 Brookside Road * Waterbury, Connecticut 06708 * (203) 755-1666 1ETR-20 SUMMARY TITLE Stop & Shop, Town Shopping Center TLE Post-DEVELOPMENT CONDITIONS (SUBCATCHMENTS) RAINFL 7 .25 8 0.0 .0025 .005 .0075 .010 .0125 .015 .0175 .020 .023 .026 .0285 .031 .034 .037 8 .040 .043 .0465 .050 .0535 .057 .0605 .064 .068 .072 .076 .080 .084 .089 .094 .100 .107 .115 .122 .130 8 .139 .148 .157 .167 .178 .189 .202 .216 .231 .250 .271 .298 .345 .500 .655 8 .702 .729 .751 .769 .785 798 .811 .823 .834 .844 .853 .862 .870 .878 .886 .893 .900 .906 .911 .916 8 .920 .924 .928 .932 .936 .940 .944 .9475 .951 .954 .957 .960 .963 .966 .969 8 .972 .975 .978 .981 .9835 .966 .9885 .991 .9935 .996 .998 1.000 1.00 1.00 1.00 9 ENDTBL RUNOFF 1 009 1 0.00082286 94.8 0.068 :RUNOFF 1 008 2 0.00016249 96.4 0.029 ADDHYD 4 101 1 2 7 6 RUNOFF 1 007 1 0.00020912 98.0 0.027 ADDHYD 4 102 1 7 6 RUNOFF 1 006 1 0.00055599 95.2 0.063 6 RUNOFF 1 015 2 0.00104167 98.0 0.078 ADDHYD 4 103 1 2 5 ADDHYD 4 104 5 6 7 RUNOFF 1 005 1 0.00270841 94.5 0.096 6 ADDHYD 4 105 1 7 6 RUNOFF 1 004 1 0.00103539 96.8 0.048 RUNOFF 1 013 2 0.00117044 98.0 0.069 6 ADDHYD 4 106 1 2 5 ADDHYD 4 107 5 6 7 RUNOFF 1 003 1 0.00112646 95.7 0.046 6 RUNOFF 1 002 2 0.00134775 94.7 0.054 ADDHYD 4 108 1 2 5 ADDHYD 4 133 5 7 6 RUNOFF 1 016 2 0.00179853 95.6 0.076 6 ADDHYD 4 109 2 6 4 RUNOFF 1 019 2 0.00523434 87.1 0.190 ADDHYD 4 110 2 4 5 6 RUNOFF 1 017 2 0.00027441 88.9 0.070 RUNOFF 1 001 3 0.00134775 94.7 0.054 ADDHYD 4 Ill 2 3 4 ADDHYD 4 112 4 5 2 6 RUNOFF 1 018 3 0.00330030 85.6 0.167 ADDHYD 4 113 2 3 5\ 5 RUNOFF 1 014 2 0.00007066 98.0 0.037 6 RUNOFF 1 011 3 0.00051976 98.0 0.045 ADDHYD 4 114 2 3 4 RUNOFF 1 012 2 0.00005667 98.0 0.033 6 ADDHYD 4 115 2 4 3 jRUNOFF 1 010 2 0.00047492 98.0 0.035 ADDHYD 4 116 2 3 4 ENDATA INCREM 6 .05 COMPUT 7 009 116 0.0 5.5 1.0 7 2 01 25 ENDCMP 1 ENDJOS 2 �1 TR20 XEQ 6/01/** Stop & Shop, Town Shopping Center JOB 1 SUMMARY REV 09/01/83 Post-DEVELOPMENT CONDITIONS (SUBCATCHMENTS) PAGE 5 1111Y TABLE 1 - SELECTED RESULTS OF STANDARD AND EXECUTIVE CONTROL INSTRUCTIONS IN THE ORDER PERFORMED (A STAR(*) AFTER THE PEAK DISCHARGE TIME AND RATE (CPS) VALUES INDICATES A FLAT TOP HYDROGRAPH A QUESTION MARK(?) INDICATES A HYDROGRAPH WITH PEAK AS LAST POINT.) TION/ STANDARD RAIN ANTEC MAIN PRECIPITATION PEAK DISCHARGE STRUCTURE CONTROL DRAINAGE TABLE MOIST TIME ------------------- RUNOFF -------------------------------------- ID OPERATION AREA # COND INCREM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE (SQ MI) (HR) (HR) (IN) (HR) (IN) (FT) (HR) (CPS) (CSM) ALTERNATE 1 STORM 25 CTION 9 RUNOFF .00 7 2 .05 .0 5.50 24.00 4.06 --- 12.23 1.85 2248.4 XSECTION 8 RUNOFF .00 7 2 .05 .0 5.50 24.00 4.16 --- 12.20 .35 2175.6 ' CTION 101 ADDHYD .00 7 2 .05 .0 5.50 24.00 4.08 --- 12.23 2.23 2266.0 CTION 7 RUNOFF .00 7 2 .05 .0 5.50 24.00 4.39 12.20 .46 2191.5 XSECTION 102 ADDHYD .00 7 2 .05 .0 5.50 24.00 4.13 --- 12.23 2.73 2284.9 #CTION 6 RUNOFF .00 7 2 .05 .0 5.50 24.00 4.10 --- 12.21 1.20 2157.3 XSECTION 15 RUNOFF .00 7 2 .05 .0 5.50 24.00 4.43 --- 12.20 2.28 2190.8 I CTION 103 ADDHYD .00 7 2 .05 .0 5.50 24.00 4.32 --- 12.21 3.48 2179.1 CTION 104 ADDHYD .00 7 2 .05 .0 5.50 24.00 4.24 --- 12.22 6.06 2171.4 CTION 5 RUNOFF .00 7 2 .05 .0 5.50 24.00 4.03 --- 12.23 5.95 2197.6 CTION 105 ADDHYD .01 7 2 .05 .0 5.50 24.00 4.14 --- 12.23 12.30 2237.0 CTION 4 RUNOFF .00 7 2 .05 .0 5.50 24.00 4.29 12.22 2.26 2180.1 XSECTION 13 RUNOFF .00 7 2 .05 .0 5.50 24.00 4.43 --- 12.18 2.56 2191.3 ICTION CTION 106 ADDHYD .00 7 2 .05 .0 5.50 24.00 4.37 --- 12.19 4.82 2185.8 107 ADDHYD .01 7 2 .05 .0 5.50 24.00 4.20 --- 12.23 17.39 2256.3 XSECTION 3 RUNOFF .00 7 2 .05 .0 5.50 24.00 4.17 --- 12.20 2.44 2165.7 " CTION 2 RUNOFF .00 7 2 .05 .0 5.50 24.00 4.06 --- 12.21 2.90 2149.7 CTION 108 ADDHYD .00 7 2 .05 .0 5.50 24.00 4.11 12.21 5.34 2156.9 XSECTION 133 ADDHYD .01 7 2 .05 .0 5.50 24.00 4.18 --- 12.22 22.03 2163.5 CTION 16 RUNOFF .00 7 2 .05 .0 5.50 24.00 4.16 --- 12.23 4.04 2246.0 XSECTION 109 ADDHYD .01 7 2 .05 .0 5.50 24.00 4.18 --- 12.22 25.92 2163.5 ICTION CTION 19 RUNOFF .01 7 2 .05 .0 5.50 24.00 3.25 --- 12.24 10.07 1924.6 CTION 110 ADDHYD .02 7 2 .05 .0 5.50 24.00 3.89 --- 12.23 37.16 2159.0 17 RUNOFF .00 7 2 .05 .0 5.50 24.00 3.41 12.25 .55 2017.0 XSECTION 1 RUNOFF .00 7 2 .05 .0 5.50 24.00 4.06 --- 12.21 2.90 2149.7 #CTION III ADDHYD .00 7 2 .05 .0 5.50 24.00 3.95 --- 12.23 3.65 2247.8 XSECTION 112 ADDHYD .02 7 2 .05 .0 5.50 24.00 3.90 --- 12.23 40.81 2166.6 JECTION 18 RUNOFF .00 7 2 .05 .0 5.50 24.00 3.10 --- 12.24 6.24 1889.6 CTION 113 ADDHYD .02 7 2 .05 .0 5.50 24.00 3.78 --- 12.23 47.04 2125.0 CTION 14 RUNOFF .00 7 2 .05 .0 5.50 24.00 4.10 --- 12.20 .15 2191.3 CTION 11 RUNOFF .00 7 2 .OS .0 5.50 24.00 4.43 --- 12.20 1.14 2191.1 CTION 114 ADDHYD .00 7 2 .05 .0 5.50 24.00 4.39 --- 12.20 1.29 2191.1 TR20 XEQ 6/01/** Stop & Shop, Town Shopping Center JOB 1 SUMMARY REV 09/01/83 Post-DEVELOPMENT CONDITIONS (SUBCATCHMENTS) PAGE 6 MARY TABLE 1 - SELECTED RESULTS OF STANDARD AND EXECUTIVE CONTROL INSTRUCTIONS IN THE ORDER PERFORMED (A STAR(*) AFTER THE PEAK DISCHARGE TIME AND RATE (CFS) VALUES INDICATES A FLAT TOP HYDROGRAPH A QUESTION MARK(?) INDICATES A HYDROGRAPH WITH PEAK AS LAST POINT.) TION/ STANDARD RAIN ANTEC MAIN PRECIPITATION PEAK DISCHARGE STRUCTURE CONTROL DRAINAGE TABLE MOIST TIME ------------------------- RUNOFF -------------------------------------- ID OPERATION AREA # COND INCREM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE (SQ MI) (HR) (HR) (IN) (HR) (IN) (FT) (HR) (CFS) (CSM) ALTERNATE 1 STORM 25 CTION 12 RUNOFF .00 7 2 .05 .0 5.50 24.00 4.07 --- 12.20 .12 2191.5 XSECTION 115 ADDHYD .00 7 2 .05 .0 5.50 24.00 4.36 --- 12.20 1.42 2191.1 CTION 10 RUNOFF .00 7 2 .05 .0 5.50 24.00 4.43 --- 12.20 1.04 2191.2 CTION 116 ADDHYD .00 7 2 .05 .0 5.50 24.00 4.39 --- 12.19 2.46 2191.3 I TR20 XEQ 6/01/** Stop & Shop, Town Shopping Center JOB 1 SUMMARY REV 09/01/83 Post-DEVELOPMENT CONDITIONS (SUBCATCHMENTS) PAGE 5 �Y TABLE 1 - SELECTED RESULTS OF STANDARD AND EXECUTIVE CONTROL INSTRUCTIONS IN THE ORDER PERFORMED (A STAR(*) AFTER THE PEAK DISCHARGE TIME AND RATE (CFS) VALUES INDICATES A FLAT TOP HYDROGRAPH A QUESTION MARK(?) INDICATES A HYDROGRAPH WITH PEAK AS LAST POINT.) TION/ STANDARD RAIN ANTEC MAIN PRECIPITATION PEAK DISCHARGE STRUCTURE CONTROL DRAINAGE TABLE MOIST TIME ------------------------- RUNOFF -------------------------------------- ID OPERATION AREA # CONE, INCREM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE (SQ MI) (HR) (HR) (IN) (HR) (IN) (FT) (HR) (CFS) (CSM) ALTERNATE 1 STORM 25 CTION 9 RUNOFF .00 7 2 .05 .0 5.50 24.00 4.06 --- 12.23 1.85 2248.4 XSECTION 8 RUNOFF .00 7 2 .05 .0 5.50 24.00 4.16 --- 12.20 .35 2175.6 CTION 101 ADDHYD .00 7 2 .05 .0 5.50 24.00 4.08 --- 12.23 2.23 2266.0 CTION 7 RUNOFF .00 7 2 .0s .0 5.50 24.00 4.39 12.20 .46 2191.5 XSECTION 102 ADDHYD .00 7 2 .05 .0 5.50 24.00 4.13 --- 12.23 2.73 2284.9 1 CTION 6 RUNOFF .00 7 2 .05 .0 5.50 24.00 4.10 --- 12.21 1.20 2157.3 XSECTION 15 RUNOFF .00 7 2 .05 .0 5.50 24.00 4.43 --- 12.20 2.28 2190.8 XSECTION 103 ADDHYD .00 7 2 .05 .0 5.50 24.00 4.32 --- 12.21 3.48 2179.1 CTION 104 ADDHYD .00 7 2 .05 .0 5.50 24.00 4.24 --- 12.22 6.06 2171.4 CTION 5 RUNOFF .00 7 2 .05 .0 5.50 24.00 4.03 12.23 5.95 2197.6 �CTION 105 ADDHYD .01 7 2 .05 .0 5.50 24.00 4.14 =-- 12.23 12.30 2237.0 CTION 4 RUNOFF .00 7 2 .05 .0 5.50 24.00 4.29 12.22 2.26 2180.1 XSECTION 13 RUNOFF .00 7 2 .05 .0 5.50 24.00 4.43 --- 12.18 2.56 2191.3 CTION 106 ADDHYD .00 7 2 .05 .0 5.50 24.00 4.37 --- 12.19 4.82 2185.8 CTION 107 ADDHYD .01 7 2 .05 .0 5.50 24.00 4.20 --- 12.23 17.39 2256.3 XSECTION 3 RUNOFF .00 7 2 .05 .0 5.50 24.00 4.17 --- 12.20 2.44 2165.7 ECTION 2 RUNOFF .00 7 2 .05 .0 5.50 24.00 4.06 --- 12.21 2.90 2149.7 CTION 108 ADDHYD .00 7 2 .05 .0 5.50 24.00 4.11 --- 12.21 5.34 2156.9 XSECTION 133 ADDHYD .01 7 2 .05 .0 5.50 24.00 4.18 --- 12.22 22.03 2163.5 itCTION 16 RUNOFF .00 7 2 .05 .0 5.50 24.00 4.16 --- 12.23 4.04 2246.0 XSECTION 109 ADDHYD .01 7 2 .05 .0 5.50 24.00 4.18 --- 12.22 25.92 2163.5 tCTION CTION 19 RUNOFF .01 7 2 .05 .0 5.50 24.00 3.25 --- 12.24 10.07 1924.6 CTION 110 ADDHYD .02 7 2 .05 .0 5.50 24.00 3.89 --- 12.23 37.16 2159.0 17 RUNOFF .00 7 2 .05 .0 5.50 24.00 3.41 12.25 .55 2017.0 XSECTION 1 RUNOFF .00 7 2 .05 .0 5.50 24.00 4.06 --- 12.21 2.90 2149.7 CTION Ill ADDHYD .00 7 2 .05 .0 5.50 24.00 3.95 --- 12.23 3.65 2247.8 XSECTION 112 ADDHYD .02 7 2 .05 .0 5.50 24.00 3.90 --- 12.23 40.81 2166.6 JECTION 18 RUNOFF .00 7 2 .05 .0 5.50 24.00 3.10 --- 12.24 6.24 1889.6 CTION 113 ADDHYD .02 7 2 .05 .0 5.50 24.00 3.78 --- 12.23 47.04 2125.0 CTION 14 RUNOFF .00 7 2 .05 .0 5.50 24.00 4.10 --- 12.20 .15 2191.3 CTION 11 RUNOFF .00 7 2 .05 .0 5.50 24.00 4.43 --- 12.20 1.14 2191.1 It CTION 114 ADDHYD .00 7 2 .05 .0 5.50 24.00 4.39 --- 12.20 1.29 2191.1 TR20 XEQ 6/01/** Stop & Shop, Town Shopping Center JOB 1 SUMMARY REV 09/01/83 Post-DEVELOPMENT CONDITIONS (SUBCATCHMENTS) PAGE 6 MMARY TABLE 1 - SELECTED RESULTS OF STANDARD AND EXECUTIVE CONTROL INSTRUCTIONS IN THE ORDER PERFORMED (A STAR(*) AFTER THE PEAK DISCHARGE TIME AND RATE (CFS) VALUES INDICATES A FLAT TOP HYDROGRAPH A QUESTION MARK(?) INDICATES A HYDROGRAPH WITH PEAK AS LAST POINT.) tTION/ STANDARD RAIN ANTEC MAIN PRECIPITATION PEAK DISCHARGE STRUCTURE CONTROL DRAINAGE TABLE MOIST TIME ------------------------- RUNOFF -------------------------------------- ID OPERATION AREA # COND INCREM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE (SQ MI) (HR) (HR) (IN) (HR) (IN) (FT) (HR) (CFS) (CSM) ALTERNATE 1 STORM 25 CTION 12 RUNOFF .00 7 2 .05 .0 5.50 24.00 4.07 --- 12.20 .12 2191.5 XSECTION 115 ADDHYD .00 7 2 .05 .0 5.50 24.00 4.36 --- 12.20 1.42 2191.1 CTION 10 RUNOFF .00 7 2 .05 .0 5.50 24.00 4.43 --- 12.20 1.04 2191.2 CTION 116 ADDHYD .00 7 2 .05 .0 5.50 24.00 4.39 12.19 2.46 2191.3 Subcatchment#1 CALCULATED BY: SES Tc= 1.67L^0.8 1000/CN - 9 ^0.7 DATE:5/7/00 1900 S^0.5 CHECKED BY: SES SOIL NAME COVER CN AREA PRODUCT AND DESCRIPTION acres OF HYDROLOGIC GROUP d sq. mi. CN x AREA x o IMPERVIOUS IMPERVIOUS 98 90.0 8820.0 GROUP B LAWN,GOOD 74 10.0 740.0 GROUP D WETLANDS 80 0.0 0.0 TOTALS = 100.0 9560.0 USE CN AREA= 0.00053070 Sq. Miles 14795 Sq. Ft CN = 95.6 L = 27070 Ft. S = 1.0 tr/o Tc = 0.101 h rs. Subcatchment#2 CALCULATED BY: SES Tc= 1.67L^0.8((1000/CN)- 9)^0 7 DATE:5/7/00 1900 S^0.5 CHECKED BY: SES SOIL NAME COVER CN AREA PRODUCT AND DESCRIPTION acres OF HYDROLOGIC GROUP sq. mi. CN x AREA x o IMPERVIOUS IMPERVIOUS 98 86.3 8457.4 GROUP B LAWN,GOOD 741 13.7 1013.8 GROUP D WETLANDS 801 0.0 0.0 TOTALS = 100.0 9471.2 USE CN AREA = 0.00134775 Sq. Miles 37573 Sq. Ft CN = 94.7 L= 180 Ft. S = 2.0 % Tc = 0.054 h rs. Subcatchment#3 CALCULATED BY: SES Tc = 1.67L^0.8((1000/CN) - 9)^0.7 DATE:5/7/00 1900 S^0.5 CHECKED BY: SES SOIL NAME COVER CN AREA PRODUCT AND DESCRIPTION acres OF HYDROLOGIC GROUP sq. mi. CN x AREA x o IMPERVIOUS IMPERVIOUS 98 90.6 8878.8 GROUP B LAWN,GOOD 74 9.4 695.6 GROUP D WETLANDS 80 0.0 0.0 TOTALS = 100.0 9574.411 USE CN AREA = 0.00112646 Sq. Miles 31404 Sq. Ft CN = 95.7 L = 130 Ft. S = 1.5 % Tc = 0.046 hrs. 1 1 1 1 1 Subcatchment#7 CALCULATED BY: SES Tc= 1.67L^0.8((1000/CN)- 9)-0.7 DATE:5/7/00 1900 S^0.5 CHECKED BY: SES SOIL NAME COVER CN AREA PRODUCT AND DESCRIPTION acres OF HYDROLOGIC GROUP sq. mi. CN x AREA x o IMPERVIOUS IMPERVIOUS 98 100.0 9800.0 GROUP B LAWN,GOOD 74 0.0 0.0 GROUP D I WETLANDS 1 801 0.0 0.0 TOTALS =1 100.0 9800.0 USE CN = 98.0 AREA = 0.00020912 Sq. Miles 5830 Sq. Ft CN = 98.0 L = 130 Ft. S = 3.3 Tc = 0.027 hrs. Subcatchment#8 CALCULATED BY: SES Tc = 1.671-^0.8((1000/CN)• 9)^0.7 DATE:5/7/00 1900 S^0.5 CHECKED BY: SES SOIL NAME COVER CN AREA PRODUCT AND DESCRIPTION acres OF HYDROLOGIC GROUP sq. mi. CN x AREA x o IMPERVIOUS IMPERVIOUS 98 93.4 9153.2 GROUP B LAWN,GOOD 74 6.6 488.4 GROUP D WETLANDS 801 0.0 0.0 TOTALS = 100.0 9641.E USE CN AREA= 0.00016249 Sq. Miles 4530 Sq. Ft CN = 96.4 L= 125 Ft. S = 3.3 % Tc= 0.029 h rs. Subcatchment#9 CALCULATED BY: SES Tc = 1.67LA0.8((1000/CN)- 9)^0.7 DATE:5/7/00 1900 S^0.5 CHECKED BY: SES SOIL NAME COVER CN AREA PRODUCT AND DESCRIPTION acres OF HYDROLOGIC GROUP sq. mi. CN x AREA x o IMPERVIOUS IMPERVIOUS 98 86.5 8477.0 GROUP B LAWN,GOOD 741 13.51 999.0 GROUP D WETLANDS 1 801 O.Or 0.0 TOTALS =1 100.01 9476.0 USE CN = 94.8 AREA= 0.00082286 Sq. Miles 22940 Sq. Ft CN = 94.8 L= 200 Ft. S = 1.5 Tc = 0.068 hrs. Subcatchment#11 CALCULATED BY: SES Tc= 1.67L^0.8((1000/CN)- 9)^0 7 DATE:5/7/00 1900 S^0.5 CHECKED BY: SES SOIL NAME COVER CN AREA PRODUCT AND DESCRIPTION acres OF HYDROLOGIC GROUP sq. mi. CN x AREA x o IMPERVIOUS IMPERVIOUS 98 100.0 9800.0 GROUP B LAWN,GOOD 74 0.01 0.0 GROUP D WETLANDS 1 801 O.O 0.0 TOTALS = _100.01 9800.0 USE CN = 98.0 AREA= 0.00051976 Sq, Miles 14490 Sq. Ft CN = 98.0 L= 150 Ft. S = 1.5 % Tc = 0.045 hrs. Subcatchment#12 CALCULATED BY: SES Tc = 1.67L^0.8((1000/CN)• 9)^0.7 DATE:5/7/00 1900 S^0.5 CHECKED BY: SES SOIL NAME COVER CN AREA PRODUCT AND DESCRIPTION acres OF HYDROLOGIC GROUP sq. mi. CN x AREA x o IMPERVIOUS IMPERVIOUS 98 100.0 9800.0 GROUP B LAWN,GOOD 741 0.0 0.0 GROUP D WETLANDS 80 0.0 0.0 TOTALS = 100.0 9800.0 USE CN AREA= 0,00005667 Sq. Miles 1580 Sq. Ft CN = 98.0 L = 80 Ft. S = 1.0 /o Tc = 0.033 hrs. t i Subcatchment#13 CALCULATED BY: SES Tc= 1.67L^0.8((1000/CN) • 9)^0.7 DATE:3/10/00 1900 S^0.5 CHECKED BY: SES SOIL NAME COVER CN AREA PRODUCT AND DESCRIPTION acres OF HYDROLOGIC GROUP sq. mi. CN x AREA x o IMPERVIOUS IMPERVIOUS 98 100.0 9800.0 GROUP B LAWN,GOOD 74 0.0 0.0 GROUP D WETLANDS 801 0.0 0.0 TOTALS =1 100.0 9800.0 USE CN = 98.0 AREA = 0.00117044 Sq. Miles 32630 Sq. Ft CN = 98.0 L= 200 Ft. S = 1.0 Tc = 0.069 hrs. II Subcatchment#14 CALCULATED BY: SES Tc= 1.67L^0.8((1000/CN) - 9)^0.7 DATE:3/10/00 1900 S^0.5 CHECKED BY: SES SOIL NAME COVER CN AREA PRODUCT AND DESCRIPTION acres OF HYDROLOGIC GROUP sq. mi. CN x AREA x o IMPERVIOUS IMPERVIOUS 98 100.0 9800.0 GROUP B LAWN,GOOD 74 0.0 0.0 GROUP D WETLANDS 80 0.0 0.0 TOTALS = 100.0 9800.0 USE CN AREA = 0.00007066 Sq. Miles 1970 Sq. Ft CN = 98.0 L = 90 Ft. S = 1.0 /o Tc= 0.037 hrs. i 1 1 1 Subcatchment#15 CALCULATED BY: SES Tc= 1.67L^0.8((1000/CN) - 9)^0.7 DATE:3/10/00 1900 S^0.5 CHECKED BY: SES SOIL NAME COVER CN AREA PRODUCT AND DESCRIPTION acres OF ' HYDROLOGIC GROUP sq. mi. CN x AREA x o IMPERVIOUS IMPERVIOUS 98 100.0 9800.0 GROUP B LAWN,GOOD 74 0.0 0.0 GROUP D WETLANDS 1 801 0.0 0.0 TOTALS =1 100.0 9800.0 USE CN AREA= 0.00104167 Sq. Miles 29040 Sq. Ft CN = 98.0 L= 230 Ft. S = 1.0 Tc = 0.078 hrs. Subcatchment#16 CALCULATED BY: SES Tc= 1.67L^0.8((1000/CN)• 9)^0.7 DATE:3/10/00 1900 S^0.5 CHECKED BY: SES SOIL NAME COVER CN AREA PRODUCT AND DESCRIPTION acres OF HYDROLOGIC GROUP sq. mi. CN x AREA x o IMPERVIOUS IMPERVIOUS 1 98 90.01 8820.0 GROUP B LAWN,GOOD 1 741 10.0 740.0 ' GROUP D I WETLANDS 1 801 0.0 0.0 TOTALS = 100.0 9560.0 ' USE CN AREA = 0.00179853 Sq. Miles 50140 Sq. Ft CN = 95.6 L = 290 Ft. S = 2.0 Tc = 0.076 hrs. Subcatchment*17 CALCULATED BY: SES Tc = 1.67L^0.8((1000/CN)- 9 DATE:3/10/00 1900 S^0.5 CHECKED BY: SES SOIL NAME COVER CN AREA PRODUCT AND DESCRIPTION acres OF HYDROLOGIC GROUP sq. mi. CN x AREA x o IMPERVIOUS IMPERVIOUS 1 98 62.01 6076.0 GROUP B LAWN,GOOD 74 38.0 2812.0 GROUP D WETLANDS 801 0.0 0.0 TOTALS = 100.0 8888.0 USE CN AREA = 0.00027441 Sq. Miles 7650 Sq. Ft CN = 88.9 L = 180 Ft. S = 2.0 % ' Tc = 0.070 hrs. r Subcatchment#18 CALCULATED BY: SES Tc = 1.67L^0.8((1000/CN) - 9)^0.7 DATE:3/10/00 1900 S^0.5 CHECKED BY: SES rSOIL NAME COVER CN AREA PRODUCT AND DESCRIPTION acres OF HYDROLOGIC GROUP sq. mi. CN x AREA x o IMPERVIOUS IMPERVIOUS 98 48.2 4723.6 GROUP B LAWN,GOOD 74 51.8 3833.2 GROUP D WETLANDS 1 801 0.0 0.0 TOTALS = 100.0 8556.8 USE CN AREA= 0.00330030 Sq. Miles 92007 Sq. Ft CN = 85.6 L = 650 Ft. S = 3.5 ' Tc = 0.167 hrs. 1 ' Subcatchment#19 CALCULATED BY: SES Tc= 1.67L^0.8((1000/CN)- 9)^0.7 DATE:3/10/00 1900 S^0.5 CHECKED BY: SES ' SOIL NAME COVER CN AREA PRODUCT AND DESCRIPTION acres OF HYDROLOGIC GROUP sq. mi. CN x AREA x o IMPERVIOUS IMPERVIOUS 1 98 54.51 5341.0 GROUP B LAWN,GOOD 74 45.5 3367.0 GROUP D WETLANDS 8010.0 0.0 TOTALS=L 100.0 8708.0 USE CN = 87.1 AREA = 0.00523434 Sq. Miles 145925 Sq. Ft CN = 87.1 L = 820 Ft. S = 3.5 ' Tc= 0.190 hrs. ' PIPE CULVERT ANALYSIS COMPUTATION OF CULVERT PERFORMANCE CURVE June 2, 2000 Stop & Shop Town Center ECB1 TO OUTLET ' PROGRAM INPUT DATA: DESCRIPTION VALUE -------------------------------—--------------------- ' Culvert Diameter (feet) ................................. 3.50 FHWA Chart Number (1,2 or 3) ............................ 1 Scale Number on Chart (Type of Culvert Entrance) ........ 1 Manning`s Roughness Coefficient In-value)............... 0.0100 Entrance Loss Coefficient of Culvert Opening............ 0.50 Culvert Length (feet) ................................... 105.0 Culvert Slope (feet per foot) ........................... 0.0050 ' PROGRAM RESULTS: Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet Rate Depth Inlet Outlet Depth Depth Outlet Velocity (cfs) (ft) Control Control (ft) (ft) (ft) (fps) 47.0 4.31 3.28 4.48 1.77 2.14 3.50 4.89 PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986 Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092 (713) 895-8322. All Rights Reserved. PIPE CULVERT ANALYSIS COMPUTATION OF CULVERT PERFORMANCE CURVE June 2, 2000 Stop & Shop Town Center ECB2 TO ECB1 -------------------------------------------------------------- PROGRAM INPUT DATA: DESCRIPTION VALUE Culvert Diameter (feet) ................................. 3.50 FHWA Chart Number (1,2 or 3)............................ 1 Scale Number on Chart (Type of Culvert Entrance) ........ 1 Manning`s Roughness Coefficient (n-value) ............... 0.0100 Entrance Loss Coefficient of Culvert Opening............ 0.50 Culvert Length (feet)................................... 165.0 Culvert Slope (feet per foot) ........................... 0.0050 PROGRAM RESULTS: Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet Rate Depth Inlet Outlet Depth Depth Outlet Velocity (cfs) (ft) Control Control (ft) (ft) (ft) (fps) - - -------------------------------------------------- 40.8 4.48 2.98 4.23 1.63 1.99 3.50 4.24 PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986 Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092 (713) 895-8322. All Rights Reserved. PIPE CULVERT ANALYSIS COMPUTATION OF CULVERT PERFORMANCE CURVE ' June 2, 2000 Stop & Shop ' Town Center ECB3 TO ECB2 PROGRAM INPUT DATA: DESCRIPTION VALUE -------------------------------------------------------------------- ' Culvert Diameter (feet) ................................. 3.00 FHWA Chart Number (1,2 or 3) ............................ 1 Scale Number on Chart (Type of Culvert Entrance) ........ 1 Manning`s Roughness Coefficient (n-value)............... 0.0100 Entrance Loss Coefficient of Culvert Opening............ 0.50 Culvert Length (feet) ................................... 170.0 Culvert Slope (feet per foot) ........................... 0.0060 ' PROGRAM RESULTS: Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet Rate Depth Inlet Outlet Depth Depth Outlet Velocity (cfs) ---(ft) Control Control (ft) (ft) (ft) (fps) --- -- ---------------------------------------------- 37.2 4.23 3.13 4.16 1.55 1.98 3.00 5.26 ' PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986 Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092 ' (713) 895-8322. All Rights Reserved. r r ' PIPE CULVERT ANALYSIS COMPUTATION OF CULVERT PERFORMANCE CURVE rJune 2, 2000 Stop & Shop Town Center rPCB1 TO ECB2 rPROGRAM INPUT DATA: DESCRIPTION VALUE -------------------------------------------------------------------- Culvert Diameter (feet)................................. 1.25 FHWA Chart Number (1,2 or 3) ............................ 1 Scale Number on Chart (Type of Culvert Entrance)........ 1 ' Manning`s Roughness Coefficient (n-value) ............... 0.0100 Entrance Loss Coefficient of Culvert Opening......... 0.50 Culvert Length (feet) ................................... 51.0 Culvert Slope (feet per foot) ........................... 0.0100 r ' PROGRAM RESULTS: Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet Rate Depth Inlet Outlet Depth Depth Outlet Velocity ' (cfs) (ft) Control Control (ft) (ft) (ft) (fps) -- -- --------------------------------------------- 2.9 2.45 1.02 2.13 0.51 0.68 1.25 2.36 PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986 Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092 r (713) 895-8322. All Rights Reserved. r r r r r ' PIPE CULVERT ANALYSIS COMPUTATION OF CULVERT PERFORMANCE CURVE ' June 2, 2000 Stop & Shop Town Center ECB4 TO ECB3 -------------------- ' PROGRAM INPUT DATA: DESCRIPTION VALUE Culvert Diameter (feet)................................. 2.50 FHWA Chart Number (1,2 or 3) ............................ 1 Scale Number on Chart (Type of Culvert Entrance) ........ I ' Manning`s Roughness Coefficient (n-value) ............... 0.0100 Entrance Loss Coefficient of Culvert Opening....... 0.50 Culvert Length (feet) ................................... 76.0 Culvert Slope (feet per foot) ........................... 0.0050 ' PROGRAM RESULTS: Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet Rate Depth Inlet Outlet Depth Depth Outlet Velocity (cfs) --(ft) Control Control (ft) (ft) (ft) (fps) -- -- ------------------------------------------- 25.9 3.66 2.80 4.11 1.50 1.74 2.50 5.28 PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1966 Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092 ' (713) 895-8322. All Rights Reserved. i PIPE CULVERT ANALYSIS COMPUTATION OF CULVERT PERFORMANCE CURVE ' June 2, 2000 Stop & Shop Town Center ' PDMH1 TO ECB4 ' PROGRAM INPUT DATA: DESCRIPTION VALUE -----------------------------------—------------------------------- Culvert Diameter (feet)................................. 2.50 FHWA Chart Number (1,2 or 3) ............................ 1 Scale Number on Chart (Type of Culvert Entrance) ........ 1 ' Manning`s Roughness Coefficient (n-value)............... 0.0100 Entrance Loss Coefficient of Culvert Opening............ 0.50 Culvert Length (feet) ................................... 152.0 Culvert Slope (feet per foot)........................... 0.0050 ' PROGRAM RESULTS: Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet Rate Depth Inlet Outlet Depth Depth Outlet Velocity ' --(cfs) (ft) Control Control (ft) (ft) (ft) (fps) 22.0 4.11 2.48 4.08 1.37 1.60 2.50 4.49 PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986 Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092 ' (713) 895-8322. All Rights Reserved. i ' PIPE CULVERT ANALYSIS COMPUTATION OF CULVERT PERFORMANCE CURVE ' June 2, 2000 Stop & Shop Town Center PCB2 TO PMDH1 PROGRAM INPUT DATA: DESCRIPTION VALUE -------------------------------------------------------------------- ' Culvert Diameter (feet) ................................. 1.25 FHWA Chart Number (1,2 or 3) ............................ 1 Scale Number on Chart (Type of Culvert Entrance) ........ 1 Manning`s Roughness Coefficient (n-value) ............... 0.0100 Entrance Loss Coefficient of Culvert Opening........ 0.50 Culvert Length (feet)................................... 56.0 ' Culvert Slope (feet per foot) ........................... 0.0050 ' PROGRAM RESULTS: Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet Rate Depth Inlet Outlet Depth Depth Outlet Velocity (cfs) (ft) Control Control (ft) (ft) (ft) (fps) 2.9 3.47 1.02 3.39 0.62 0.68 1.25 2.36 PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986 Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092 (713) 895-8322. All Rights Reserved. PIPE CULVERT ANALYSIS COMPUTATION OF CULVERT PERFORMANCE CURVE June 2, 2000 Stop & Shop Town Center PCB3 TO PDMH1 PROGRAM INPUT DATA: DESCRIPTION VALUE -------------------------------------------------------------------- Culvert Diameter (feet) ................................. 1.25 FHWA Chart Number (1,2 or 3) ............................ 1 Scale Number on Chart (Type of Culvert Entrance) ........ 1 Manning`s Roughness Coefficient (n-value) ............... 0.0100 Entrance Loss Coefficient of Culvert Opening............ 0.50 Culvert Length (feet) .....................I............. 63.0 Culvert Slope (feet per foot) ........................... 0.0050 ' PROGRAM RESULTS: Flow Tailwater Headwater (ft) Normal Critical Depth at Outlet Rate Depth Inlet Outlet Depth Depth Outlet Velocity (cfs) (ft) Control Control (ft) (ft) (ft) (fps) ------------------------------------------------------------ 2.4 3.47 1.43 3.30 0.56 0.94 1.25 1.99 PIPE CULVERT ANALYSIS COMPUTER PROGRAM Version 1.7 Copyright (c)1986 Dodson & Associates, Inc., 7015 W. Tidwell, #107, Houston, TX 77092 (713) 895-8322. All Rights Reserved. w RICHARD S. KELLEY 1744 Ellington Road South Windsor, CT 06074 June 29, 2000 THE SAVINGS BANK OF ROCKVILLE c/o,J seph F.Jeamcl 25 P irk Street Vcni on,CT 06066 Re: 2A i Acres. Deming Street South Windsor.CT Dear Mr. Jeamcl: As you know,The Savings Bank of Rockville("SBW)and i entered into an Option Agreement datcc May 25,2000 in connection with that certain piece or parcel of land consisting of approximately 2.98 icres situated on the northerly side of Deming Street in South Windsor,CT(the"Property"). In the course of my review and examination of the Property, l was advised by the Town of South Wint sor that,as condition to SBR's approvals to construct its new facility in South Windsor, SOR was required to make certain wetland enhancements and improvements on and to the Property,including certain plantings. The specific enhancements and improvements are more particularly detailed on a map or pl n entitled"Wetlands Mitigation Plan Prepared for The Savings Bank of Rockville, 1645 Ellington Road South Windsor Connecticut,Dated Feb. 199911,which has been recorded on the South Windsor Land Records. This is to confirm that SBK will remain responsible for all enhancements and improvements on or to I he Property as identified on the aforesaid plan,or otherwise agreed by SBR as condition to SBR's approvals to construct its new facility. SBR will complete all such enhancements and improvements on or be ore the date each is required to be completed,and shall indemnify and hold me,and my assigns, harm css from and against any liability,cost or expense, including attorneys tees,suffered or incurred as a rest it of S13R's failure to timely complete such enhancements and improvements. If you should have any questions, please call me. Please indicate your acceptance of the terms of thi letter by signing where indicated below and return a copy to me. Thank you for your cooperation in this matter. Very truly yours, d�klk �a. �.. Richard S. Kelley Agreci I to and accepted this I-a)0.4h day of June,2000. T14E SAVINGS BANK OF ROCKVILLE By: Ck J4- h, F..1game-1,41ts =a-�-14 Z0 'd 099S Vt,9 098 ONI 03113A ASN W" VV: 0i 00-6Z-Nnr Appledore 600 State Street,Suite D Portsmouth, NH 03801 ll Engineering Inc. tel 603.433.89 8 fax 603.433.888 aei@nh.ultranet.com June 30, 2000 Mr. Jeff Folger Town of South Windsor 1540 Sullivan Avenue Town Hall South Windsor, Connecticut 06074-2786 Re: Proposed Stop & Shop Town Center Ellington Road South Windsor, Connecticut Dear Jeff: In response to our meeting this past Wednesday regarding the Inland\Wetland Conservation Appplication for the referenced project, I have enclosed the following information: • Four (4) sets of Site Development/Conservation Plans (revised 6/29/00) • Letter dated June 29, 2000 to the Savings Bank of Rockville from Richard S. Kelley. Following is a summary of the changes that have been completed to the plans: • Additional detention basin seeding and planting information has been added to Sheet C-5. • A note regarding parking area and drainage structure maintenance was added to Sheet C-5. • A note on Sheet C-9 was revised to indicate the construction area will be limited to three access points, each will be protected by a stabilized construction entrance. Additionally, the enclosed letter to the Savings Bank of Rockville outlines that they will remain responsible for implementation of the mitigation plan on the three (3) acre parcel that is being acquired as a part of this project. Proposed Stop & Shop Town Center Ellington Road South Windsor, Connecticut Page - 2 Thank you for your input and advice you have provided to date and if you have any other questions please feel free to contact me. Very truly yours, Steven Sarg t, P.E. Project Engineer SES/vc (1397-051.doc) Enclosures cc: Tom Cody Bruce Kelley Appledore mM Engineering Inc. �i tO•M M Sf,t� Tawn 1, , Wt;idi�qt s ` 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 �Gy�soR co�'�� AREA CODE 860/644-2511 July 18, 2000 Certified #P462498107 Robinson & Cole Attn: Attorney Tom Cody 280 Trumbull Street Hartford, CT 06103-3597 RE: Appl. #00-23P, Stop & Shop, 1725 Ellington Road, RC zone To Whom It May Concern: At the July 5, 2000 regular meeting, the Inland Wetlands . Agency/Conservation Commission approved application #00-23P - Stop Ss Shop Supermarket, Inland Wetland/Conservation Commission application for the construction of a retail facility, drainage structures and associated improvements on 1725 Ellington Road (Assessor's map #51, Parcel #'s 2, 3, 4, 5, 6, 8b, 8d, 9 and a portion of lot #16, on Map #50 formerly known as a portion of lot #17 on Map #50 and a portion of lot #48 on Map #51), RC zone. This approval is subject to the following conditions: 1. One blueprint copy of the entire set of plans and this letter reproduced thereon, must be submitted to this Commission. This must be completed within 65 days of approval prior to any construction activity on the site. Plans submitted to Planning 8s Zoning Commission shall be considered having met this requirement. 2. The application shall indemnify and hold harmless the Town of South Windsor against any liability, which might result from the proposed operation or use. 3. The permit is valid for five years and shall expire on July 5, 2005. It is the landowner(s)/applicant(s) responsibility to track expiration dates and no the Commission of a renewal request at least 65 days prior to expiration. t r � Stop & Shop Supermarket July 18, 2000 Page 2 4. All approvals required must be obtained and submitted prior to any activity on the site. 5. A contact person shall be identified on the plans. 6. We recommend a bond in the amount of$5,000 be submitted to the Planning & Zoning Commission to ensure compliance with the erosion and sedimentation control measures. 7. We recommend a bond in the amount of$5,000 be submitted to the Planning & Zoning Commission to ensure the growth of the basin plantings. 8. Incorporate the long-term wetland mitigation plan as specified on the plan entitled "Wetlands mitigation plan" prepared for The Savings Bank of Rockville dated 10/20/99. 9. Yearly maintenance of invasive plantings. Will entail the physical annual inspection and removal of invasive plants including purple lovstrife and phragmites. Very truly yours, INLAND WETLANDS AGENCY/ CONSERVATION COMMISSION 6.� J� izab Warren, Chairperson EW:dr cc: Chief Building Official Town Engineer Stop & Shop Supermarket a Hesketh EOi 6 Creamery Brook• East Granby, CT 06026 F. A. Hesketh bt Associates, Inc. August 15,2000 Mr.Tom Cody Robinson&Cole 280 Trumbull Street Hartford,CT 06103-3597 RE: Stop & Shop-Town Center Route 30 at Buckland Road South Windsor,CT Our File: 00104 Mr. Cody: Pursuant to your request our office has reviewed the Report of Findings—Traffic Impacts prepared by F.Andrew Wolfe,Ph.D.,P.E. and presented to the South Windsor Planning and Zoning Commission on July 25,2000. Traffic Concerns A. Queuing General Response- It is certainly true that the anticipated queue lengths at several locations will be increased over the existing conditions. The introduction of additional traffic volumes requires this. The queuing analysis provided in the report is based on the AusiQ method as revised by Mr. John Vivari of ConnDOT. This revised AusiQ method calculates the back of Queue and then doubles that queue to ensure that the provided storage length is capable of accommodating 95%of the peak hour queues at that intersection. This is indeed a very conservative analysis. Based on this very conservative analysis,and based on our experience,it is our opinion that the anticipated increase in queues is not significant and can be accommodated on the existing roadway network. Ellington Road& Clark Road- It is true that the queues will increase for the northbound approach under combined traffic volume conditions. However,the queues will be significantly reduced when compared with the background conditions under stop sign control. Although the applicant is not proposing signalization at this location,the DOT is,the provision of that signal greatly enhances both operations and queuing conditions. Ellington Road& Site Drive- The queues identified by Mr.Wolfe as being too long at this location are queues internal to the site. The distance from the stop bar to the Summerville driveway is approximately 225 feet. The queuing analysis indicates that the queue during the peak hour will extend a distance of 204 feet. Assuming that the right turn lane and left turn lane queues will overlap occasionally it is possible for the combined queue to extend to or passed the Summerville Driveway. Such occasions would be infrequent and not of a significantly long duration. Emergency vehicles typically employ sirens and flashing lights to advise motorists of an emergency. Should a queue exist at such a time it is likely that motorists would yield the right of way. Civil &Traffic Engineers • Surveyors • Planners • Landscape Architects Tel 860.653.8000 9 Fax 860.844.8600 • email hesketh@snet.net Mr. Tom Cody August 15, 2000 Page 2 Ellington Road&Buckland Road- There are five instances where the anticipated queue decreases at this intersection during the Saturday peak hour. The anticipated decreases are less than two vehicles in each instance. This decrease in anticipated queues is due to changes in the signal timing,which provides additional time to the northbound,eastbound and westbound approaches. Sullivan Road&Route 74- The Sullivan Avenue northbound approach to Route 74 provides two travel lanes from the intersection of Buckland Road and Oakland Street north. The 500-foot storage length capacity was included in the Table to indicate that there is significant available capacity. The storage length greatly exceeds the anticipated right turn queue. The trough queue will not impede right turn traffic from executing a turn. B. Unsignalized Intersection Queuing An analysis of the unsignalized intersection queuing was provided to the Town in our response dated July 22, 2000. This analysis was based on the two times the"two minute arrival rate"as suggested by the Town's consultant. The analysis indicates that queues will be increased by three vehicles or less at each location with the following exceptions. CVS Driveway at Buckland Road- The queues on the site driveway are anticipated to increase by four vehicles during the p.m.peak hour and three vehicles during the Saturday peak hour. In our opinion,this analysis method is not applicable to this location since all movements at this location are right turns,which operate at a LOS C with less than 20 seconds of delay per vehicle, during peak hours. Terry Office Park at Buckland Road- This intersection is proposed to be signalized under combined traffic volume conditions. Town Center Driveway at Terry Office Park Driveway- The anticipated queue on the Town Center Driveway is anticipated to increase by eight during the Saturday peak hour and by ten during the p.m.peak hour utilizing the two time the two minute arrival rate. The intersection is anticipated to operate at a LOS A or B during peak hours with an average vehicular delay of 10 seconds or less on the Town Center Driveway approach. It is therefore our opinion that the anticipated queues at this location will be significantly less than those predicted by the two times two minute approach rate methodology. However,if the queue were to extend to the anticipated length of 16 vehicles,the queue would block the service drive around the rear of the building, which is used infrequently during peak hours. C. Additional Intersections Impacted The assertion that the study should have been expanded to include capacity analysis at all locations with an increase in traffic of 100 vehicles is incorrect. The DOT policy is that capacity analysis should be submitted for all locations that have an increase of 200 trips during the peak hour. The DOT requests that turning movement diagrams be submitted for all intersections where the increase in traffic is 100 vehicles during the peak hour. After a review of that information they may request additional intersections be included in the study. Mr. Tom Cody August 15, 2000 Page 3 The Town's consultant has requested that an additional three intersections be added to the study and those intersections were included in our analysis presented on July 22,2000. D. SYNCHRO Analysis The analysis and opinions presented in the report are based upon the LOS results as derived from the Highway Capacity Manual(HCM)analysis. The SYNCHRO results have been presented to demonstrate that the intersection levels of service within the study are can be improved over those calculated by use of the HCM software. Calibration of the SYNCHRO model was not completed as part of this study nor is it required for the limited purposes for which the model was used. Site Concerns A. Buckland Road& Site Driveway Intersection This is an existing site driveway,which currently allows entering right and left turn movements and exiting right turn movements. The current proposal is to maintain this driveway in its current configuration. It is our opinion that right turn movements do not present a significant disruption to traffic flow or safety. Northbound left turn movements are provided with an exclusive left turn lane,which is in place to serve the intersection of Buckland Road and Ellington Road. The left turn lane is adequate to accommodate two vehicles at the existing site driveway. B. Truck Route A truck route has been identified on the proposed site plans by way of proposed signing. A "Truck Route Plan"has not been provided. Trucks servicing the proposed Stop&Shop are to enter from Ellington Road and pass to the south of the existing office buildings fronting to Ellington Road. Trucks will then turn south and pass to the west of the existing CVS to the rear of the proposed Stop&Shop. After unloading the trucks will continue around the rear of the building and exit to Ellington Road. Trucks servicing the existing retail establishments will enter from Ellington Road and can either follow the above described route or can choose to circumnavigate the building in a counter clockwise direction and exit to Ellington Road. The pavement widths to the rear of the building have been designed to accommodate two-way truck traffic. The proposed Stop&Shop supermarket anticipates approximately 6 to 8 tractor-trailer trucks and 25 to 30 vendor delivery trucks per day. There are five proposed loading docks,which is more than adequate to accommodate the anticipated 8 deliveries per day. Smaller vendor trucks typically do not utilize the loading docks. Mr. Tom Cody August 15,2000 Page 4 C. Pedestrian Walkways An extensive network of sidewalks has been provided on site. The applicant is committed to working with the Town staff and adjacent property owners to develop a plan to connect to adjacent properties and provide an integrated network of sidewalks. Other Concerns Intersection of Ellington Road and Buckland Road Mr.Wolfe is correct in noting that the southbound left turns from Ellington Road to Oakland Street will see an increase in delay as a result of a reallocation of time at the intersection. The intersection, overall,will operate at virtually the same LOS and average vehicular delay under the combined traffic volume conditions as under the background traffic volume conditions. Conclusions The traffic impact report has been submitted to the Town and the Department of Transportation for review. The report has been prepared utilizing recognized and accepted procedures and methodologies. I have every confidence that this report will be found acceptable to the Town of South Windsor Engineering Department,its consultant and the Connecticut Department of Transportation. As always we will be happy to respond to any requests for additional information from those agencies. We trust that this information adequately address all of the comments included in Mr. Wolfe's report. If additional information is required,please feel free to contact our office. Very truly yours, ;F.A. h ss t , C. cott F.Hesk h, Traffic Engineer CC: Mr.Larry Wagner Mr. Anthony Colavolpe Mr.Bruce Kelley Mr. James G.Bubaris Y:\pf\00104\tcod8150.1t 1 • STATE OF CONNECTICUT MEMBERS STATE TRAFFIC COMMISSION Commissioner of Transportation DEPARTMENT OF TRANSPORTATION Commissioner of Public Safety +'••++•<,:""� 2800 BERLIN TURNPIKE, P.O. BOX 317546 Commissioner of Motor vehicles NEWINGTON, CT 06131-7546 Phone(8 60) 594-3020 August 24, 2000 VIA FACSIMILE Mr. Scott F. Hesketh, P.E. Traffic Engineer F.A. Hesketh & Associates, Inc. 6 Creamery Brook East Granby, CT 06026 STC# 132-0007-01 Dear Mr. Hesketh: Subject: Town of South Windsor Town Shopping Center Certificate Application As a result of the review of the Application for Certificate, the enclosed comments, which were faxed to you on August 23, 2000, detail the additional data required in order for the review to be continued. Eight (8) copies of the data should be forwarded to this office. Should you have any questions with regard to the requested data, you may contact Mr. Vincent A. Avino, P.E. , (860) 594-2740, at the Division of Traffic Engineering. Very truly yours, c ® Joseph Santaniello, P.E. Executive Director Enclosure cc: Chief Gary Tyler Mr- John R C"nl 1 ins Mr. Richard Kelley An Equal Opportunity Employer Printed on recycled or recovered paper r s , i MAJOR TRAFFIC GENERATOR REVIEW OF DATA SUMBITTED STC NO. STC No. 132-0007-01 NAME: Town Shopping Center COMMENTS Buckland Road at Terry Office Park Drive: 1. It appears from the data submitted that a traffic signal is warranted at the intersection. This driveway is owned by others. Please provide documentation indicating that the owner has no objection to signalization and the proposed widening on the site drive. The town may require an easement for maintenance of traffic signal appurtenances on private property. The signal should also be included in the signal system on Buckland Road. 2. It is unclear whether a raised island is proposed on Buckland Road, north of the Terry Office Park Drive. Due to the speeds, a painted island is preferred. 3. The easterly drive to First Federal Bank/DeWolfe Real Estate/etc. is limited to entering only vehicles. Signing should be installed to discourage wrong-way maneuvers. Buckland Road at Site Drive(CVS Drive): 4. The submitted report indicates that the number of left turns into the site will nearly double during the Saturday peak hour. The existing striping provides enough stacking room outside the through lanes for only a few vehicles. Additional stacking should be provided for left-turns. Please provide plans. 5. Numerous motorists have been observed make illegal left turns from this drive. The proposed parking layout is such that motorists may be tempted to turn left from the drive. It is recommended that this drive be limited to entering traffic only. Please provide plans illustrating the required signing and removal of the raised island. Route 194 at Route 30 and Buckland Road: 6. Currently,the eastbound left-turning traffic spills out in the adjacent through lane because the turning lane is too short. The site will be adding more turning vehicles to this movement. Plans should be submitted illustrating at least a 500-foot long turning lane. It appears that this could be accomplished by re-striping Route 30. Route 30 at Site Drive: 7. Although there is reserve capacity at the intersection, the signal would operate more efficiently if it were disconnected from the system and operate full actuated at all times. o o Q Q Q 270 Amity Road • \ / PLANNING Woodbridge,Connecticut 06525 OFAND ENGINEERING DESIGN Telephone: (203)397-3600 o Telecopier: (203)397-3642 July 25, 2000 Ms. Marcia A. Banach Director of Planning Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06040 RE: STOP AND SHOP REVIEW TOWN CENTER SOUTH WINDSOR, CONNECTICUT Dear Ms. Banach: We have reviewed the various items submitted for the subject project, including the site plan revised to June 23, 2000, the traffic impact report revised to July 10, 2000, and the follow-up data dated July 22, 2000. We offer the following comments relative to our review: 1. The traffic study was conducted utilizing recognized and accepted procedures and methodologies. 2. The estimated trip generation was derived utilizing recognized data and procedures. 3. The trip distributions are consistent with what we would expect given the nature of the development and its location with respect to the surrounding roadway network. 4. The analyses include weekday PM and Saturday midday peak analyses that are consistent with the peaks typically evaluated for retail developments. 5. The study area has now been expanded to include all major intersections from Ellington Road at Governor's Highway (i.e., to the west) to Oakland Road at Foster Street/Slater Road (i.e., to the east), and from Buckland Road at Deming Street/Deming Road (i.e., to the south) to Sullivan Avenue at Sand Hill Road (i.e., to the north). 2 6. A growth factor of 1 percent per year was utilized to expand 1999 count data to 2000 when it is anticipated the store will be open for use, for a total expansion of only 1 percent. This 1 percent growth factor may not be realistic since such would not include major known developments such as the new Target and Lowe's stores in Manchester. In addition, a year-of-opening of 2000 is not realistic since the subject development will not be in place, at best, until 2001. However, although as much as a 20 percent by-pass credit is allowed for major traffic generators, no credit was taken in the analyses, thereby representing a high-side estimate. Therefore, although the application of an additional 4 to 5 percent growth factor appears warranted, such was apparently offset by not electing to take the allowed pass-by credit. 7. A review of the capacity analyses shows that all intersections will operate at acceptable levels of service ranging from overall LOS A to LOS C, with the exception of Ellington Road at Buckland Road which will continue to operate at overall LOS D during the PM peak. 8. The revised signalized intersection queuing analyses now have the available storage capacities shown so that a comparison can be made to determine if adequate storage exists. A review of this information shows that adequate storage does, in fact, exist to accommodate the proposed project. 9. However, although unsignalized intersection queuing analyses have now been provided; the available storage capacities have not been provided to facilitate a determination on whether adequate storage exists at these intersections. 10. The developer has complied with our recommendation in agreeing to install a traffic control signal at the intersection of Buckland Road and Terry Office Park drive to serve as the primary access/egress at Buckland Road. The developer has also agreed to the provision of a five-lane section on Buckland Road, with 12-foot lanes and 2-foot shoulders, and to transition the widened section to and from normal section at the rate of 60-to-1 (i.e., over a distance of 360 feet north and south of the widened section) in response to the apparent design speed of the road (i.e., 60 miles per hour). However, the developer continues to maintain usage of the Town Center drive on Buckland Road in his plans and traffic report. 11. The Town Center drive at Buckland Road intersection should be closed altogether unless efforts are made to. resolve the inherent problems with both the pharmacy and bank properties located to the south and north, respectively, of this drive, which if left open will result in undue congestion and operational problems, particularly with the addition of the subject development's traffic. 3 12. If the Town Center drive at Buckland Road intersection is kept open, the drive should be operated as right-turn in / right-turn out only, with the construction of a large triangular raised median to assure that the inbound and outbound lefts are curtailed. If Town Center drive is kept open, the bank's drive on Town Center drive should be closed, or moved west away from its proximity to Buckland Road, and the pharmacy's drive on Town Center drive should be closed altogether. The foregoing represent our comments to date regarding our review. We will be present at the public hearing for this project, scheduled for the evening of July 25, to present our findings. Please let us know if you have any questions or comments. Very truly yours, James G. Bubaris, P.E. Principal Bubaris Traffic Associates SUMMONS — CIVIL PATECh' &' NECTI� - � XU.� "X" ONE OF THE FOLLOWING-(Exceo:Family Actions) S UT Amount, legal interest or JD-CV-' Rev.6-97 SUPERIOR COURT property in demand. exclusive of C.G.S c"E1-346.51.347.51-349.5--350.52-45a interest and costs is: 52-46..52-259, P.B.Sec 49.63.6E INSTRUCTIONS 1.Type cr print legibly.sign onome:summons and conform all copies of the summons. I less than $2.500 2.Prepare or photocopy conformer summons for each defendant. L_i $2,500 through $14,999.99 3.Attacr me original summons to the original complaint,and attach a copy of the summons to each copy of the complaint. Also.if ❑ $15,000 or more there a e more than 2 plaintiffs e,-1 defendants prepare form JD-CV-2 and attach it to the original and all copies of the complain. 4.After service has been made by officer,file original papers and officer's return with the clerk of court. 1 ('X°if applicable.) 5.The parry recognized to pay costs must appear personally before the authority taking the recognizance. Claiming other relief in 6.Do nc:use this form for actions in which an attachment,garnishment or replevy is being sought. See Practice Book Section 49 r addition to or in lieu of money for caner exceptions. j __ or damages. TO:Any proper officer: BY AUTHORITY OF THE STATE OF CONNECTICUT,you are hereby RETURN DATE(Mo..day,yr.) commanded to make due and legal service of this Summons and attached Complaint. I NnvemhPr 7 , _2000 L� JUDICIAL DISTRICT AT(Town in which writ�r�etuma�ble)�(CG51-346,51-349) CASE TYPE(From case type list-seeoack HOUSING SESSION J G.A.NO. Hartf-Ord Ma'or A Minor 00 ADDRESS OF COURT CLERK WHERE VARIT AND OTHER PAPERS SHALL BE FILED(No.,street,town and Zip Code)(C.G.S 51-346.51-350) TELEPHONE NUMBER 95 Washin ton Street , Hartford, CT 06106 � 860) 548-2700 NAME AND ADDRESS OF EACH PARTY NOTE:Individuals'Names: PTY i PARTIES (No.. street, town and zip code) Last, First, Middle Initial ❑ Form JD-CV-2 attached NO. FIRST NAMED The Stop & Shop Supermarket Company, 153 Washington Avenue, 01 PLAINTIFF Additional Richard S. Kelley, 1744 Ellington Road, South Windsor, CT 06074 02 Plaintiff FIRST NAMED planning and Zoning Commission of the Town of South Windsor, 50 DEFENDANT I Additional 51 Defendant Additional 52 Defendant Additional 53 Defendant NOTICE TO EACH DEFENDANT 1. You are being sued. 6. The"Appearance"form may be obtained at the above 2. This paper is a Summons in a lawsuit. Court address. 3. The Complaint attached to these papers states the claims that each 7. If you believe that you have insurance that may cover the Plaintiff is making against you in this lawsuit. claim that is being made against you in this lawsuit, you 4. To respond to this Summons, or to be informed of further proceedings, should immediately take the Summons and Complaint to ,you or your attorney must file a form called an"Appearance"with the your insurance representative. Clerk of the above-named Court at the above Court address on or 8. If you have questions about the Summons and Complaint, before the second day after the above Return Date. you should consult an attorney promptly. The Clerk of 5. If you or your attorney do not file a written"Appearance"form on time, a Court is not permitted to give advice on legal questions. judgment may be entered against you by default. DATE SIG ( nand' erbo Comm.of Superior Court TYPE IN NAME OF PERSON SIGNING AT LEFT Oct. 5 , 2 0 0 il-r.� i� ❑ Assistant Clerk Robert A. Fuller FOR THE PLAINTIFF(S) PLEASE ENTER THE APPEARANCE OF: NAME AND ADDRESS OF ATTORNEY,LAW FIRM OR PLAINTIFF IF PRO SE (No.,street,town and zip code) TELEPHONE NUMBER JURIS NO.(if ally or law firm) Robert A: Duller, 75 East Meadow Road,Wilton,CT 06897 ( 203)762-: 8 021145 NAME AND ADDRESS OF PERSON RECOGNIZED TO PROSECUTE IN THE AMOUNT OF$250(No.,street,town and zip code) SIGNATURE OF PLAINTIFF IF PRO SE Karen A. Stansbury 75 East Meadow Road, Wilton,CT 06897 #PLFS. #DEFEFCNTSSIG�E�D(Oricial taking reypgniza ",X pr perbox) ®Comm.of Superior Court For Court Use Vnly 2 1 ❑ Assistant Clerk FILE DATE i IF THIS SUMMONS IS SIGNED BY A CLERK: a.The signing has been done so that the Plaintiff(s)will not be denied access to the courts. b.It is the responsibility of the Plaintiff(s)to see that service is made in the manner provided by law. c.The Clerk is not permitted to give any legal advice in connection with any lawsuit. d.The Clerk signing this Summons at the request of the Plaintiff(s)is not responsible inany way for any errors or omissions in the Summons,any allegations contained in the Complaint,or the service thereof. I hereby certify I have read SIGNED(Pro Se Plaintiff) DATE SIGNED DOCKET NO. and understand the above: RETURN DATE: NOVEMBER 7, 2000 SUPERIOR COURT THE STOP & SHOP SUPERMARKET COMPANY JUDICIAL DISTRICT OF AND RICHARD S. KELLEY HARTFORD VS. AT HARTFORD PLANNING AND ZONING COMMISSION THE TOWN OF SOUTH WINDSOR OCTOBER 5, 2000 TO THE SHERIFF OF THE COUNTY OF HARTFORD OR HIS DEPUTY WITHIN SAID COUNTY, GREETING: BY AUTHORITY OF THE STATE OF CONNECTICUT, You are hereby commanded to summon the Planning and Zoning Commission of the Town of South Windsor, Connecticut, to appear before the Superior Court for the Judicial District of Hartford to be held at Hartford on November 7, 2000, said appearance to be made by the Planning and Zoning Commission of the Town of South Windsor or its attorney by entering a written statement of appearance with the Clerk of said Court on or before the second day following the return day, then and there to answer unto the following complaint and appeal of The Stop & Shop Supermarket Company, a Connecticut corporation with an office at 153 Washington Avenue, North Haven, Connecticut, and Richard S. Kelley of South Windsor, Connecticut, by leaving with or at the usual place of abode of the Chairman or Secretary of the Planning and Zoning Commission of the Town of South Windsor, and with the Town Clerk of the Town of South Windsor, 1540 Sullivan Avenue, South Windsor, Connecticut, a true and attested copy of the complaint and appeal and of this citation and summons at least twelve days before the return day, in the manner provided by law for the service of civil process. I hereby certify that I have personal knowledge of the financial responsibility of the plaintiffs and deem it sufficient to pay the costs of this action. Hereof fail not but of this writ with your doings thereon, make due service and return. Dated at Wilton, Connecticut this 5th day of October, 2000. f Robert A. Fuller Commissioner of the Superior Court RETURN DATE: NOVEMBER 7, 2000 SUPERIOR COURT THE STOP& SHOP SUPERMARKET COMPANY JUDICIAL DISTRICT OF AND RICHARD S. KELLEY HARTFORD VS. AT HARTFORD PLANNING AND ZONING CONMSSION OF THE TOWN OF SOUTH WINDSOR OCTOBER 5, 2000 APPEAL TO THE SUPERIOR COURT FOR THE HARTFORD JUDICIAL DISTRICT TO BE HELD AT.HARTFORD on November 7, 2000, comes The Stop & Shop Supermarket Company of North Haven, Connecticut, and Richard S. Kelley of South Windsor, Connecticut, appealing from the denial by the Planning and Zoning Commission of the Town of South Windsor of a site plan application, and the plaintiffs complain and say: 1. The plaintiff Richard S. Kelley. is the owner of a parcel of land at the southwest corner of Ellington Road and Buckland Road in South Windsor, known as the Town Center. 2. The plaintiff Stop & Shop Supermarket Company(hereafter called Stop & Shop) is a lessee of the Town Center property. 3. The Town Center contains 21.8 acres and has 162,465 square feet of existing building area. The plaintiff Richard S. Kelley is the holder of an option to purchase an additional 2.9 acres adjacent to the Town Center(collectively with the Town Center called the "property"). 4. The property is located within the Restricted Commercial (RC) zoning i district, which allows retail stores as a permitted use subject to site development plan approval under section VIII of the South Windsor Zoning Regulations. 5. The defendant Planning and Zoning Commission of the Town of South Windsor(hereafter called the Commission) is the agency empowered under Chapter 124 of the General Statutes to perform the function of a zoning commission within the town. The Commission has the authority to approve site development plans. 6. On or about June 20, 2000 the plaintiffs, acting by their agent, filed a site plan application with the defendant Planning and Zoning Commission for the property. The application was for theconstruction of a 64,067 square foot retail grocery store or t ' supermarket with a 12,504 square foot mezzanine on the property, along with other modifications to the property resulting in about 47,435 square feet of net new building area. 7. The plaintiffs submitted plans and other documentation for the site plan, including information under section 9.1 of the Zoning Regulations which provides for architectural and design review, and responded to comments and requests for additional information by the Commission's staff and the Architectural Design Review Committee. The site plan conformed to all specific provisions of the Zoning Regulations and the site development plan provisions in section VIII for the proposed use of the.property. 8. A public hearing was held on the application on July 25, 2000, and was continued to and concluded on August 15, 2000. 9. The Commission voted to deny the application on September 19, 2000. 10. The only reasons for denial were based on.aesthetics and general provisions in t section 9.1 in the architectural and design review section of the Zoning Regulations, 11. A legal notice of the decision was published in the Journal Inquirer, a newspaper having circulation in South Windsor, on September 28, 2000. 12. The plaintiff Richard S. Kelley as the owner of the property and The Stop & Shop Supermarket Company as a lessee and as an applicant to the Commission are aggrieved under section 8-8 of the General Statutes by the denial of the application. 13. In denying the site plan application, the defendant acted illegally, arbitrarily and in abuse of its discretion in that: (a)the regulations for architectural and design review are only intended to be advisory; (b) the changes suggested by the Design Review Committee were made by the applicant; (c) the reasons assigned for denial of the application are not based on the substantial evidence in the administrative record (d) the reasons given for denial are vague and general in their terms and are not based on noncompliance with specific existing provisions of the zoning regulations, and provide no information to the plaintiffs on how the site plan fails to meet the regulations and can be brought into compliance with them; tl (e) the application conformed to all valid and specific zoning regulations; (f) the zoning statute stating the powers of a zoning commission, section 8-2 of the General Statutes, does not allow a municipal zoning commission to engage in architectural review of zoning applications, and section 9.1 (IX) of the Zoning Regulations is illegal and exceeds the Commission's statutory authority; (g) the zoning statutes do not allow the denial of a zoning application for aesthetic reasons; (h) section 8-3(g) of the General Statutes, which governs site plans, allows a zoning commission to consider only whether a building, use or structure complies with . specific provisions in the zoning regulations, and a site plan cannot be denied for failure to meet general nonspecific standards. t Wherefore, the Plaintiffs request:that: 1. The appeal be sustained. 2. The Commission be directed to approve the site plan. Dated at Wilton, Connecticut, this 5th day of October, 2000. The Plaintiffs, Richard S. Kelley and Stop & Shop Supermarket Company, Robert A. Fuller, Esq. 75:East Meadow Road'-r-. _ Wilton, CTI 06897. (203) 762-5888 Juris#021145 P,M� e enter an appearance -the Plaintiffs of: Hobert A. Fuller 75 East Meadow Road Wilton, CT 06897 Juris#021145 t t 'c C� i.) T 4 SUMMONS - CIVIL ' loi j X" ONE OF THE F3g, llN SfOONNECT8UT (Excec:Family Actions) ount. legal interest Or JD-CV =ev 6.97 SUPERIOR COURT property in demanc' exclusiv,- c 51-347 51-34a c' _ 52-452; I Interest and COSTS IS. 52-4E 52-259 P-B Sc: 49 63 e= INSTRUCTIONS I ; less than 52.5;^�_', 1 Tyoe c-print legibry sign ongina summons arc conform all copies of the summons 2.Prepare orpnorocoay conformec summons for each defendant $2.500 through 5,14.999.9 3 Attac�me onorna;summons to tre anginal complaint.and attach a copy of the summons to each copy of the complain` Aiso.d 1 `i $15,000 or more re there are more trig;,2 plaintiffs e z pefendans ppare form JD-CV-2 and attach it to the original ano all copies of the comclarn' 4_After service has been made by officer.file orrg;nal paoers and officers return with the clerk of court ("X"if applicable) 5.The party recognized to pay costs must appear personally before the authority taking the recognizance. Claiming other relief in 6.Do ncr use this form for actions tr winch an attachment,garnishment or replevy is being sought See Practice Book Secno^49 ;X addition to or in lieu of money tore:^er exceotions or damages. TO: Any proper officer. BY.AUTHORITY OF THE STATE OF CONNECTICUT,you are hereby RETURN DATE(M,c gay.yr, commanded to make due and legal service of this Summons and attached Complaint. JUDI IAL DISTRICT AT(Town in which writ is returnable)(C.G.S.51-346.51-349i CASE TYPE r=rom case type,v-see oa0 0 GA No I Hartford Major A Minor I I H^ SING SESSION --j 5 o TELEPHONE NUMBER ADDRESS OF COURT CLERK WHERE WRIT AND OTHER PAPERS SHALL BE FILED(No..street town and Zip code)! G 5 346 5J � 860)PH 5 4 8 B 2 7 0 0 95 Washin ton Street , Hartford, CT 06106 F'`' PARTIES NAME AND ADDRESS OF EACH PARTY NOTE:Individuals'Names: ❑ NO. (Ne.. street. town and zip code) Last, First, Middle Initial I Form JD-CV-2 attached FIRST NAMED I The Stop & Shop Supermarket Company, 153 Washington Avenue, 0-1 PLAINTIFF T - Additional i Richard S. Kelley, 1744 Ellington Road, South Windsor, CT 06074 02 Plaintiff FIRST NAMED ! Planning and Zoning Commission of the Town of South Windsor, 50 DEFENDANT 4 Additional 5 Defendant j 52 AaditionaI Defendant Additional 1 53 Defendant NOTICE TO EACH DEFENDANT You are being sued. 6. The"Appearance"form may be obtained at the above 2 This pacer is a Summons In a lawsuit. Court address. 3. The Complaint attached to these papers states the claims that each 7. If you believe that you have insurance that may cover the Plaintiff is making against you in this lawsuit. claim that is being made against you in this lawsuit, you 4. To respond to this Summons, or to be informed of further proceedings, should immediately take the Summons and Complaint to you or your attorney must file a form called an "Appearance"with the your insurance representative. Clerk of the above-named Court at the above Court address on or 8. ifyouh have uld questions about the attorney promptly.Summons The Clerk olf int, before the second day after the above Return Date. you 5. If you or your attorney do not file a written"Appearance"form on time, a Court is not permitted to give advice on legal questions. Judgment may be entered against you by default. p T i SICa ( �717 terbo Comm.of Superior Court TYPE IN NAME OF PERSON SIGNING AT LEFT Oct. 5 , 200 � fK L— ❑ Assistant Clerk Robert A. Fuller FOR THE PLAINTIFF(S) PLEASE ENTER THE APPEARANCE OF: TTORNEY.LAW FIRM OR PLAINTIFF IF PRO SE (No.street,town and zio c)de) TELEPHONE NUMBER JURIS No (catty oriawfrrm) ilton,CT 06897 ( 203)762-5888 Robert A: Duller, 75 E 021145 NAME AND ADDRESS OF A ast Meadow Road,W N"ME AND ADDRESS OF PERSON RECOGNIZED TO PROSECUTE REas SMeadOWE AMOUNT Road OF W1 ltOtn,tCTn and zip c r SIGNATURE OF PLAINTIFF IF PRO SE ( Karen A. Stansbury $t C g n/za "X pr per» Comm.of Superior Court I For Court Use Only r PLFS DEFS NTS l SIG6CD(ppcial taking reppg I 2 I 1 1 %� �'i w J1� `��� ❑ Assistant Clerk FILE DATE 1 IF THIS SUMMONS IS SIGNED BY A CLERK: a.The signing has been done so that the Plaintiff(s)will not be denied access to the courts. b. It is the responsibility of the Plaintiff(s)to see that service is made in the manner provided by law. i c.The Clerk is not permitted to give any legal advice in connection with any lawsuit. d.The Clerk signing this Summons at the request of the Plaintiff(s)is not responsible inany way for any errors or�ra" omissions In the Summons, any allegations contained in the Complaint,or the service thereof. DATE SIGNED DOCKET NO I hereby certify I have read SIGNED(Pic Se Plaintiff/ I and understand the above: RETURN DATE: NOVEMBER 7, 2000 SUPERIOR COURT THE STOP & SHOP SUPERMARKET COMPANY JUDICIAL DISTRICT OF AND RICHARD S. KELLEY HARTFORD vs. AT HARTFORD PLANNING AND ZONING COMMISSION THE TOWN OF SOUTH WINDSOR OCTOBER 5, 2000 TO THE SHERIFF OF THE COUNTY OF HARTFORD OR HIS DEPUTY WITHIN SAID COUNTY, GREETING: BY AUTHORITY OF THE STATE OF CONNECTICUT, You are hereby commanded to summon the Planning and Zoning Commission of the Town of South Windsor, Connecticut, to appear before the Superior Court for the Judicial District of Hartford to be held at Hartford on November 7, 2000, said appearance to be made by the Planning and Zoning Commission of the Town of South Windsor or its attorney by entering a written statement of appearance with the Clerk of said Court on or before the second day following the return day, then and there to answer unto the following complaint and appeal of The Stop & Shop Supermarket Company, a Connecticut corporation with an office at 153 Washington Avenue, North Haven, Connecticut, and Richard S. Kelley of South Windsor, Connecticut, by leaving with or at the usual place of abode of the Chairman or Secretary of the Planning and Zoning Commission of the Town of South Windsor, and with the Town Clerk of the Town of South Windsor, 1540 Sullivan Avenue, South Windsor, Connecticut, a true and attested copy of the complaint and appeal and of this citation and summons at least twelve days before the return day, in the manner provided by law for the service of civil process. I hereby certify that I have personal knowledge of the financial responsibility of the plaintiffs and deem it sufficient to pay the costs of this action. Hereof fail not but of this writ with your doings thereon, make due service and return. Dated at Wilton, Connecticut this 5th day of October, 2000. Robert A. Fuller Commissioner of the Superior Court Y t RETURN DATE: NOVEMBER 7, 2000 SUPERIOR COURT THE STOP & SHOP SUPERMARKET COMPANY JUDICIAL DISTRICT OF AND RICHARD S. KELLEY HARTFORD VS. AT HARTFORD PLANNING AND ZONING COMMISSION OF THE TOWN OF SOUTH WINDSOR OCTOBER 5, 2000 APPEAL TO THE SUPERIOR COURT FOR THE HARTFORD JUDICIAL DISTRICT TO BE HELD AT HARTFORD on November 7, 2000, comes The Stop & Shop Supermarket Company of North Haven, Connecticut, and Richard S. Kelley of South Windsor, Connecticut, appealing from the denial by the Planning and Zoning Commission of the Town of South Windsor of a site plan application, and the plaintiffs complain and say: 1. The plaintiff Richard S. Kelley. is the owner of a parcel of land at the southwest corner of Ellington Road and Buckland Road in South Windsor, known as the Town Center. 2. The plaintiff Stop & Shop Supermarket Company(hereafter called Stop & Shop) is a lessee of the Town Center property. 3. The Town Center contains 21.8 acres and has 162,465 square feet of existing building area. The plaintiff Richard S. Kelley is the holder of an option to purchase an additional 2.9 acres adjacent to the Town Center (collectively with the Town Center called the "property"). 4. The property is located within the Restricted Commercial (RC) zoning � r r district, which allows retail stores as a permitted use subject to site development plan approval under section VIII of the South Windsor Zoning Regulations. 5. The defendant Planning and Zoning Commission of the Town of South Windsor(hereafter called the Commission) is the agency empowered under Chapter 124 of the General Statutes to perform the function of a zoning commission within the town. The Commission has the authority to approve site development plans. 6. On or about June 20, 2000 the plaintiffs, acting by their agent, filed a site plan application with the defendant Planning and Zoning Commission for the property. The application was for theconstruction of a 64,067 square foot retail grocery store or supermarket with a 12,504 square foot mezzanine on the property, along with other modifications to the property resulting in about 47,435 square feet of net new building area. 7. The plaintiffs submitted plans and other documentation for the site plan, including information under section 9.1 of the Zoning Regulations which provides for architectural and design review, and responded to comments and requests for additional information by the Commission's staff and the Architectural Design Review Committee. The site plan conformed to all specific provisions of the Zoning Regulations and the site development plan provisions in section VIII for the proposed use of the.property. 8. A public hearing was held on the application on July 25, 2000, and was continued to and concluded on August 15, 2000. 9. The Commission voted to deny the application on September 19, 2000. 10. The only reasons for denial were based on.aesthetics and general provisions in f section 9.1 in the architectural and design review section of the Zoning Regulations, 11. A legal notice of the decision was published in the Journal Inquirer, a newspaper having circulation in South Windsor, on September 28, 2000. 12. The plaintiff Richard S. Kelley as the owner of the property and The Stop & Shop Supermarket Company as a lessee and as an applicant to the Commission are j aggrieved under section 8-8 of the General Statutes by the denial of the application. 13. In denying the site plan application, the defendant acted illegally, arbitrarily and in abuse of its discretion in that: (a) the regulations for architectural and design review are only intended to be advisory; (b) the changes suggested by the Design Review Committee were made by the applicant; (c) the reasons assigned for denial of the application are not based on the substantial evidence in the administrative record (d) the reasons given for denial are vague and general in their terms and are not based on noncompliance with specific existing provisions of the zoning regulations, and provide no information to the plaintiffs on how the site plan fails to'meet the regulations and can be brought into compliance with them; (e) the application conformed to all valid and specific zoning regulations; (f) the zoning statute stating the powers of a zoning commission, section 8-2 of the General Statutes, does not allow a municipal zoning commission to engage in architectural review of zoning applications, and section 9.1 (IX) of the Zoning Regulations is illegal and exceeds the Commission's statutory authority; (g)the zoning statutes do not allow the denial of a zoning application for aesthetic reasons; (h) section 8-3(g) of the General Statutes, which governs site plans, allows a zoning commission to consider only whether a building, use or structure complies with . specific provisions in the zoning regulations, and a site plan cannot be denied for failure to meet general nonspecific standards. T Wherefore, the Plaintiffs request that: 1. The appeal be sustained. 2. The Commission be directed to approve the site plan. Dated at Wilton, Connecticut, this 5th day of October, 2000. The Plaintiffs, Richard S. Kelley and Stop & Shop Supermarket Company, Robert A. Fuller, Esq. 75,East Meadow Road' Wilton, C'1C.. 06897. (203) 762-5888 Juris #021145 Pl,epse enter an appearance r the Plaintiffs of Hobert A. Fuller 75 East Meadow Road Wilton, CT 06897 Juris#021145 RECEIVED TOWN OF SOUTH WINDSOR NOV 12 2003 STAFF SITE CHANGE SOUTH WINDSOR PLI;;< !ING DECK, FOR SITE & SUBDIVISION GENERAL: CHANGE ORDER CONTACT PERSON 4 j``I Pet2ir`lk- Phone No. Address_JM 4LX11'` 740ro i7dj-C , Site Name _, �if�C�JOY �j �.ch0 P&Z No. Owners /�0' .i��i'I?�(ii�2 Phone No.JV9 Contractor Q . Signature of Owne Zial5 Date: jjh3k,:3 Signature of Design Engr. Date: CHANGE: (Describe location and nature of change. Include Four (4 ) copies of plan`/profile of Change. ) Zns�ra �� o f i(o hok l U y c at -E-YbyrV of to s v es*bui k_ Reason for Change: (Why is change required) APPROVALS: (As Required) Dir. Of Planning Date: Town Engineer Date: Dir. of Public Works Date: Other: Date: STAFF COMMENTS: " ,t e- rLA, r I-M4,j Imo White - Town Engineer Yellow - Applicant Pink - Director of Planning Goldenrod - Engineering Department 6/00 Size: 12"Dia, x 36"H. Weight: 330 ibs, Material Reinforced Concrete, Reinforcing: 114"Dia.rebar. Features: Smooth top cap w/Exposed aggregate bollard &Weatherstone cap w/Weatherstone bollard: (Unless specified), Hardware: (4) 112" Dia,threaded inserts, (3) - 112"Dii anchor bolts provided: Anchoring: Method A or B. Maintenance: Rinse with water&mild detergent. 0 f Annual re-sealing recommended. Note:Options may change without notice, Packaging: Banded to pallet, Call to confirm current options. Weatherstone: _5aad.-dray- Brown-Buff- Cream Light Charcoal -French Gray-Brick Red SmoothlStained Concrete: Sand`Gray-Brown - Light Charcoal Red-Yellow-Orange-Cream- Buff- Brick Red Grani x GTX 2078F,4028F, 6208F, 1168F, 2098F x o ed A re te: ray Tan wlGMatrix an w/Brown Matrix . Tan wlSand Matrix Misty Gray w/Gray Custom Options Available .J. n r TERRA-FORM DIVISION PO Box 1520,WAusnu, WI 54402-1520 (800) 388-8728 ,e j��tq ash s 1 �Z` 3 E r is y 4 �L�}lr�k3 ���r..�,..���Ska,, 1.1 SUMMARY A. Section includes: Furnish Precast Concrete Bollard indicated on drawings or specified herein. rill 1.2 REFERENCES �� A. American Society for Testing&Material 1.ASTM C33 2. ASTM C150 3. ASTM C31 .� 1.5 SUBMITTALS A. Submit product data,shop drawings and samples. 1. Product Data: Manufacturer's specifications and technical data edited TOP VIEW specifically for proposed system,including the following specific information: a.Detailed specification of construction fabrication. A b.Manufacturer's installation instructions c.Maintenance literature d.Product warranty 2. Shop Drawings: Indicate pertinent dimensions,general construction, component connections anchoring methods,hardware and installation procedures. 3.Samples as requested by Architect. 36" 1.6 QUALITY ASSURANCE A. Qualifications of Manufacturer: Manufacturer to be prequalified by specifier prior to bidding, Failure to comply will result in disqualification of bid.Manufacturer to have at least five years experience in the manufacturer of precast concrete bollards field proven for at least five years, A 1.10 WARRANTY - 12"_ PI Manufacturer shall submit a written warranty for precast products for the period of two years upon acceptance of products, SIDE VIEW 2.1 MANUFACTURERS A. Acceptable manufacturer for Precast Concrete Bollards to be known as Wausau Tile,Inc. Terra-Form Division, P.O.Box 1520 Wausau,WI 54402-1520. (800)388-8728 (715)359.3121 FAX(715)355-4627 B. Clarification Note: Drawings and installation specification are based on .25"DIA STEEL REBAR manufacturers proprietary literature from Wausau Tile,Inc. Other manufacturers shall comply with minimum levels of material and detailing indicated on drawings or specified herein. C. All Precast products for this project shall be of one manufacturer. 4-.50"DIA THREADED INSERTS 2•2 MATERIALS A. Portland Cement: ASTM C150 specifications for Portland Cement, SECTION A•A B. Aggregates: All aggregates to meet ASTM C33 specifications,to be cleaned of foreign matter and properly graded to size, C. Coloring: Pigments used shall be inorganic,resistant to alkalinity and used as per manufacturers recommendations. TERRA-FORM DIVISION PO Box 1520,WAUSAU,WI 54402-1520 (800) 388-8728 � w A a e a 4 p A 4 f � �,• �. i n 4 ° y I SAFtT MATS AS FAUIRED- II A j� i' a p 4 >a f T'1_rT-1—f T-i—T I II I + ' I I I I ! I II i e TP► EAtTE i 4 L1J L. _LJ �LJ p 14 I If f OF BALLARD t<i'b L�JL_JI- 4 RAP 61_3A TP GENT D f T l—rT`1— 7-i'7` S 1 I 1 I 1 1 I I I I ! L1_I_L1J_L1J_Li 4 a a a J ° LINE of t, RE ESSEp All: Z i REAT rn ra.. . RAMP A p Ca71 m { 4 r^__4 a � 4 ' ` . ra CW RAMP ° DOWJ�' ° W15ED NEW BOLLARDS LOCATIONS ((a-27-03) 51pE 2W" TFIE STOP 1 9HW COM!"ANIES INC, NEW 6oLLAR0.S LOCATIONS Orr WALE sTGp! ELLINGT 1fH 4JlN�;g ROAD PBT I/Br•('-0' ��w ol�Vo� Appledore Pease International Tradeport 15 Rye Street, Suite 305 Engineering Inc. Portsmouth, NH 03801 tel 603.433.8.8818 fax 603.433.8988 aei@appledoreeng.com www.appledoreeng.com RECEIVED MAR 2 8 2002 March 27, 2002 SOUTH WINDSOR PLANNING DEPT Ms. Marcia Banach Town of South Windsor 1540 Sullivan Avenue PO Box 1157 South Windsor, Connecticut 06074 Re: Proposed Stop & Shop Town Center South Windsor, Connecticut AEI/1397 Dear Marcia: Enclosed are final drafts of the two (2) sheets that will ultimately be recorded. These are the Plot Plan and Key Map with approval notes. The Plot Plan has been revised to reflect our last discussion. The revisions have been highlighted on the plan. Please let me know if you have any final comments so I can incorporate them into the final construction set. Very truly yours, Lawrence Wagner, P.E. President LJW/vc (1397-098.doc) Enclosure "%Air RSK-KELLE[11NC. • Developers 1744 Ellington Road • Builders • Property South Windsor, CT 06074 Managers Tel: 860-644-8761 /644-8140 Fax: 860-644-5650 ` h February 25, 2002 MAR 6 2002 SOUTH lVINDSCR r'L.ANi�!iNG DART. Michelle Lipe, Asst. Planner Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 RE: Town Center Paving Bond Dear Ms. Lipe: Based on the terms of the Planning and Zoning Commission approval of February 5, 2002 , I am hereby requesting release of the current Paving Bond being held by the Town of South Windsor in the amount of $100,814. 01 at 01-31-02 . This bond is currently held in the form of a regular passbook saving account #150003099 from New England Bank (now Webster Bank) . If you have any questions, please do not hesitate to call. Sincerely, � �/4r� Carol S. Kelley c/TCPaving Bond We Build Our Reputation 1 I ' I ■ T ■ t >> zzD I ■ I/ `0 � � f�t] � \ \ /\ D = D it \ '__«`Q� "— > .O C / `"v 0 my s30Yas of C D 0 I I I \ s30Yas 4 ■ r W Z I I / D / /�\ ♦ son oI♦1 JID/ � \ j $ / // i / x3*g F^"t fit✓ � if 10 I. t__— _ �� \ �' III111 Y\\` — �!H•�1�-�—EIH_ 1�t�. \ M. Jill tit I % \ \ till \\ ot I " ,•a � 41 ! i I I I t/ !1! \\ \\ / 1 1 \ � t �Jy ', '• ---------------- F Z \, h os— +ram , '•/ /,� r- i s t 00 / Y; Appledere TOWN CENTER DATE. JUKE G.2000 ELLINGTON ROAD/BUCKLAND ROAD SCALE: AS SOWN Engineering Inc. SOUTH WINDSOR, CONNECTICUT DESIGNED BY: sES DRAWN BY: JFO .� 600 State Streak SuiteHam D ApplicanVOwner.Richard S.Keliy Applicant:Stop&Shop Supermarkets PROVED BY Portsmouth,New Hampshire 03801 PROJECT NO: 1397 (ea3)433aate &.OWPMd�� Sout Ellington Road P.O.Box 1942 1397BASEJ)WG No. Description Appd Date South Windsor,Ct.06074 Boston,Ma.02105 FILE NO: REVISIONS r w on wso on mom w Mw e" M Mw N M010 M M I 1 1 I 4 I I ' ■ 1 ■ I 1 ■ A ■ 1 0 Im O ' ■ I ' I ■ / —� I s3avds of ■ :D D I / r SMvdS s _ S • I I I� • I \\ f. i y • a i1 z D ° CD `Y h t r► " CD z m 0 / I .i■.. .♦ ;0 D M I\ , t to ! I I - tA 0 b I , PACES 41 41 I , _ \ \' rtm�liiiu , ro I p g / 1 Flo ;> 1 II `\ �J <I'• , I �1 —.1 I .1�J �1" \\ /�, El TI f-illl� I I I 1 m ,PPcgs C;j g �cJJ s T I to t O 1 niil 1n -IL,fl1i y 1' ' Iq 'p- — ••---- 6 _J t go NVQ `> 1µl) II'j \ (R�� � O �—• �� 1 Appiedore TOWN CENTER DATE: JUNE 6,2000 ELLINGTON ROAD/BUCKLAND ROAD SCALE: AS SHOWN i Engineering Inc. SOUTH WINDSOR, CONNECTICUT DRAWN EBY- JFO 600 State Street,Suite D APPROVED BN ' Portsmouth,New Hampshire 03801 Applicent/Owner,Richard S.Kelly Applicant:Stop&Shop Supermarkets (W3)433-e818 ee*ePpMdOeefQ,c,,,, 1744 Ellington Road P.O.Box 1942 PROJECT NO: 1397 South Windsor,Ct.06074 Boston,Me.02105 FILE NO: 139713ASF—DWG No. Descri lion Appd Date REVISIONS I I 1 4 I I �J � I I i I � t �-7 DD UI i II 0z, I v J 4 Cal > --I � I f�^ — ♦ I I I ♦ wards at I A = surds s I " = m I I ♦ mo Z ♦ 1 '8 � o 4 I D < 10, to �� I I . Iq I � _•-_....1 I al100 `u)SrACEs~ lilt I I I O/ /AI' njc% 1 \ \ I 1 -11✓ III I iPrCfs r �� r °•, �' I f ,/ \ \ 1 �o.,. r,6 _�� I I 1 I � /� � -�.i r --gg I ! J!' ��I� � I1j, ni I r � _. ��`-(.cis r a� OI, 1 / � / ••. f � 06 \ I 1 Jj \ 1 y I: j -- M i 1 F I 1 / a ^ - 1� \ \ r — — Appledore TOWN CENTER DATE: DUNE 6,2000 • ELLINGTON ROADIBUCKLAND ROAD SCALE: AS SHOWN t DESIGNED BY. SES Engineering g Inc SOUTH WINDSOR, CONNECTICUT DRAWN Bn JF0 W Portsmouth, State Street Suite D Appllcent/Owner.Richard S.Kelly Applicant:Stop&Shop Supermarkets APPROVED BY 139 Portsmouth,New Hampshire 03801 PROJECT NO: 1397 (am)4s3eels de[Cappl da" .0w 1744 Ellington Road P.O.Box 1942 No. Description APPd Date South Windsor,CL 08074 Boston,Ms.02106 FILE NO: 1397BASE.DWG REVISIONS