Loading...
HomeMy WebLinkAboutSite Plan - Conservation (32) • TOWN OF SOUTH WINDSOR INLAND WETLANDS, WATERCOURSES AND CONSERVATION APPLI 10 Application # V-5-P -Date Received 07-cJ-7-91 INSTRUCTIONS 1. One application (1) with map and plans (2 copies)) shall be submitted together with the fee set forth in the Inland Wetlands, Watercourses and Conservation Regulations, Town of South Windsor. (See Regulations, Section VII - X) 2. The South Windsor Inland Wetlands, Watercourses and Conservation Regulations should be reviewed with respect to the standards and criteria for application Evaluation. (See Regulations, Sections VII - X) 3. The applicant understands that this application is to be considered complete only when all information and documents required by the Agency have been submitted. The applicant shall also complete the state filing form. A. Applicant's Name: SECA,LLC Address: 400 Chapel Road,Unit 1A, South Windsor,CT 06074 Phone: (home) (work) 282-1922 _(faX) B. Legal owner's name: D&L Caron,LT-C IA Address 312 Deming Street,South Windsor,CT 06074 Phone (home) 644-2197 —(work) 684-8888 _(fax) 684-8884 (List additional owners, addresses, and phone numbers on back of application) C. If the applicant is not the owner of the subject property; a letter by the owner(s) authorizing the proposed regulated activity set forth in the application must accompany this form and will be part of the application. D. Project Name (if any) Finnegan Electric Headquarters 1. Contact Person (if further information is needed) Peter R. Demallie (work) 291-8755 (fax) 291-8757 -E.-The geographical location of the property-which is to be affected by the proposed regulated activities including a description of the land in sufficient detail to allow identification of the property on the Inland Wetland and Watercourse Map. ' Commerce Way Lot 33 Assessor's map # 121 Parcel # 24 Zone I 7 F. Names of all abutting property owners from records in Town Clerk's office. (use separate sheet if necessary) See attached sheet. G. Have you notified all abutting property owners (from records in Town Clerk's office) by certified letter that an application is pending before the Agency? Yes ** (you are required to supply a copy of the letter with the list of the names of the abutters).** H. Purpose and description of all proposed regulated activity(s) including amount of disturbance in square feet and types of fill and the time element involved: Conservation plan approval only. The site does not contain wetlands nor wetlands buffer areas. Propose construction of new headquarters building for Michael Finnegan Electrical Contracting with associated parking, erosion control measures, sidewalks, drainage facilities, grading and utilities. I. A class A-2 map of the property drawn to 1" = 40', showing the area to be developed, extent of the wetlands and watercourses affected, topography, existing and proposed activities and names and locations of adjacent property owners must be submitted. J. Amount of regulated area disturbance and types of fill (including wetlands and regulated buffers). 0 K. Acreage of wetlands and watercourses in regulated areas to be altered: 0 L. Acreage of wetlands and watercourses to be created: 0 M. Lineal feet of proposed stream alteration: 0 N. Total land area of project and percentage which is wetlands: ;O g00 t., O. Identify all other permits or approvals that have been issued, applied for, or required with respect to the proposed activity set forth in this application. (These may include but not be limited to, local Planning & Zoning, Zoning Board of --- - Appeals, -D:E:P. --F:E.M.A. -D.O.T.--T-he-Arm App The-Army Corpsof Engineers, and any other State, Local or Federal Permits.) WPCA;PZC P. The applicant (or designated representative) hereby attests that a sign will be posted at the following location(s) along street frontage 8 By DPI Name Peter R. DeMallie on or before t following ate as directed by Town staff Signature: These signs must be displayed continuously for at least ten (10) days prior to scheduled meeting (see Regulations, Section 7.3a) The undersigned hereby applies for the regulated activities listed in paragraph H above, for a Inland Wetlands, Watercourses and Conservation permit for the property described herein and confirms that: 1. She/he is familiar with the currently effective Inland Wetlands, Watercourses and Conservation Regulations of the Town of South Windsor. 2. She/he understands that at any time during the review period, the Agency may require the applicant to provide .more information about the wetlands and/or watercourses in question and/or any proposed activity. 3. All information submitted in the application for review shall be considered factual, or in the case of anticipated activity, binding. A knowing failure of the applicant or any of her/his agents to provide correct information, or performance exceeding the levels of activity anticipated, shall be sufficient grounds for revocation of any permit under these regulations. 4. By making this application, the applicant gives permission to the Inland Wetlands, Watercourses and Conservation Commission members and/or its representative to enter the portions of the premises which are subject of the application for the purpose o nspection and investigation and otherwise evaluating the merits of the applicat' both bef re and after a final decision has been issued. Signat e of Owner o Prop Date �r Signature of Applicant , Date 9 DESIGN PROFESSIONALS, INC. civil engineers planners surveyors Transmitted via certified mail Dear Current Abutting Property Owner June 22,1999 Re: SECA, LLC DPI Project No. 99-1228 130 Commerce Way South Windsor, Connecticut In accordance with Section 7.3b of the "Town of South Windsor Inland Wetlands, Watercourses, and Conservation Regulations" and in accordance with regulations of the Planning &Zoning Commission,we are required to notify you that an application has been filed on the property abutting yours and is subject to a hearing by the Inland Wetlands Agency/Conservation Commission. The application and plans are on file with the South Windsor Planning Department in the Town Hall. As an abutting property owner you are invited to the hearing to ask questions and/or give comments, however,you are not required to attend. You may also submit written comments regarding the application prior to the hearings if you so desire. For further information regarding the specific date this application will be heard, please contact Jeff Folger, Zoning/Wetlands Enforcement Officer, at the South Windsor Planning Department at 644-2511, ext. 253. Thank you. Sincerely, Design Pr ssionals, Inc. By: Peter R. DeMallie Principal cc: Town of South Windsor/J. Folger Michael Finnegan Abutters List SECA,LLC 1). Bruce A. Maneeley Real Estate, LLC, 26 Schweir Road, South Windsor, CT 06074 2). J&M Grinding, Inc., 140 Commerce Way, South Windsor, CT 06074 3). D & L Caron, LLC, 312 Deming Street, South Windsor, CT 06074 Hydrologic Study for SECA, L.L.C. 130 Commerce Way South Windsor, Connecticut Proj, No. 99-1228 i June 16, 1999 Design Professionals, Inc. civil engineers planners surveyors-is 165 South Satellite Road,South Windsor,CT.06074•(860)2918755.Fax:(860)291 875 7•Enail:dpieivil(a.aoLwm Table of Contents Summaryand Conclusions ............... ..............................................................................1 Introduction ....................................................................................................................2 Methodology...................................................................................................................s Existing Drainage Basin Characteristics............................................................................4 Existing Storm Drainage Hydrographs............................................................................5 Proposed Drainage Basin Map................................................................................... 6 Proposed Storm Drainage Hydrographs......................................................................7-14 Calculations sheet...............................................................................15-17 Drainage Summary June 8, 1999 SECA L.L.C. File no. 99-1228 Existing Proposed Runoff Development 2 year storm 0.2 10 year storm 1.0 4.0 25 year storm 1.5 50 year storm 2.0 100 year storm 2.6 5.7 in C.F.S. A 19-minute time of concentration was used for the runoff calculations for existing conditions. A 23-minute time of concentration was used for the runoff calculations for the proposed conditions. The calculations include a fully developed adjacent lot draining through a drainage easement to the rear yard drain. Conclusions More than sufficient capacity will exist in the system to handle a 10 year+ storm. Introduction The subject of this drainage study is approximately 1.4± acres located on the south west side of Commerce Way in South Windsor, Connecticut. Under existing conditions, the site drains to the north west side of the property. The proposed improvements to the site include the construction of a Office/warehouse with parking for 16 vehicles, and a storm water management system. Collection of storm water will be through a series of catch basins to be connected to an existing drainage pipe adjacent to the property. An existing catchbasin will be changed to manhole at the rear of the property and a doghouse manhole will be added along the common driveway between properties. Storm water detention is provided by a common detention area which is part of the Industrial park. Methodology Both the Rational & SCS method were used to determine 2, 10, 25, 50 and 100 year storm discharges for pre-existing. The rational method was used proposed conditions. Triangular hydrographs were generated and flood routed through the designed detention basin and storage by the use of the Storage Indication Method of flood routing. � IN rA TWE BASIN jr:. "✓ / Tp < OMH Ar f. r° 4P 1A2 e"Ac � 1 - � 4 �� I Hydrograph �ummary Report Page 1 Hyd. Hydrograph Peak Time Time to Volume Return Inflow Maximum Maximum Hydrograph No, type flow interval peak period hyd(s) elevation storage description (origin) (cfs) (min) (min) (acft) (yrs) (ft) (cult) 1 Rational 1.1 1 15 0.03 2 ---- ------ ------ Existing 2yr 2 Rational 1.7 1 15 0.05 10 ---- ------ ------ Existing 10 yr 3 Rational 2.0 1 15 0.06 25 ---- ------ ------ Existing 25yr 4 Rational 2.3 1 15 0.06 50 ---- ------ ------ Existing 50yr 5 Rational 2.4 1 15 0.07 100 ---- ------ ------ Existing 100 6 SCS Runoff 1 0.2 2 746 0.04 2 ---- ------ ------ Existing 7 SCS Runoff 1.0 2 736 0.12 10 ---- ------ ------ Existing 8 SCS Runoff 1.5 2 736 0.17 25 ---- ------ ------ Existing 9 SCS Runoff 2.0 2 734 0.22 50 ------ ------ Existing 10 SCS Runoff 2.6 2 734 0.28 100 ---- ------ ------ Existing Proj. file: 1228.GPW OF file: HARTFORD.IDF Run date: 06-16-1999 Plan View 2 3 4 FRmj0Proj. file: FRONT.STM OF file: HARTFORD.IDF No. Lines: 4 6-16-1999 Storm Sew r Inventory Report Page 1 Line Line ID DnStr Defl Line Line Line Line Drng Runoff Inlet Known Invert Invert N Junction J-Loss Natural Dn # line angle length size type slope area coeff time Q El do El up value type coeff grnd line # (deg) (ft) (in) (%) (ac) (C) (min) (cfs) (ft) (ft) (JLC) (ft) # 1 OUT DMH1 0 0 1 15 Circular 23.00 0.00 .00 0 0.0 74.00 74.23 .010 MH 1.0 78.40 Off 2 CB#3DMH1 1 -60 8 15 Circular 1.00 0.06 .88 5 0.0 74.23 74.31 .010 Curb 1.0 78.40 1 3 CB#2DMH#1 1 75 23 15 Circular 1.00 0.08 .83 5 0.0 74.23 74.46 .010 Curb 1.0 78.40 1 4 SED#1 CD#2 i 3 10 14 15 Circular 1.00 0.18 .87 5 0.0 74.46 74.60 .010 Curb 1.0 78.60 3 PROJECT FILE: FRONT.STM I-D-F FILE: HARTFORD.IDF TOTAL NUMBER OF LINES: 4 RUN DATE: 06-16-1999 DESIGN CODES: Min.Pipe Size= 12 in; Max.Pipe Size= 96 in; Min.Slope= .2 %; Min.Cover= 4 ft; Inlet N-Values= .016; Average Inlet Throat Height= 6 in Storm Sewer Tabulation Page 1 Line Line ID Incr. Rnoff Incr. Sum Tc Rnfal Total Add. Total Capac Line Line Line Veloc. Veloc. NG NG Invert Invert Dns # Area coeff CA CA Inten runoff flow flow @ full size length slope up down up down up down line (ac) (C) (min (in/hr (cfs) (cfs) (cfs) (cfs) (in x In) (ft) (%) (ft/s) (ft/s) (ft) (ft) (ft) (ft) # 1 OUT DMH1 0.00 0.00 0.00 0.28 5.2 6.11 1.7 0.0 1.7 40.3 15 c 1 23.00 1.6 1.4 78.40 0.00. 74.23 74.00 0 2 C B#3DMH 1 0.06 0.88 0.05 0.05 5.0 6.19 0.3 0.0 0.3 8.4 15 c 8 1.00 0.3 0.3 78.40 78.40 74.31 74.23 1 3 CB#2DMH#1 0.08 0.83 0.07 0.22 5.1 6.16 1.4 0.0 1.4 8.4 15 c 23 1.00 1.6 1.3 78.40 78.40 74.46 74.23 1 4 SED#1CD#2 0.18 0.87 0.16 0.16 5.0 6.19 1.0 0.0 1.0 8.4 15 c 14 1.00 1.4 1,.1 78.60 78.40 74.60 74.46 3 PROJECT FILE: FRONT.STM I-D-F FILE: HARTFORD.IDF TOTAL NUMBER OF LINES: 4 RUN DATE: 06-16-1999 NOTES: c=circular; e=elliptical; b=box; Intensity= 27.15295/(Tc+ 4.699998)^ .6508044; Return period= 10 Yrs. Storm Sewer Tabulation Page 1 Line - Line ID Incr. Rnoff Incr. Sum Tc Rnfal Total Add. Total Capac Line Line Line Veloc. Veloc. NG NG invert Invert Dns # Area coeff CA CA Inten runoff flow flow @ full size length slope up down up down up down line (ac) (C) (min, (Infhr (cfs) (cfs) (cfs) (cfs) (in x In) (ft) (%) (ftls) (ft/s) (ft) (ft) (ft) (ft) # 1 OUT DMH1 0.00 0.00 0.00 0:28 5.2 8.31 2.3 0.0 2.3 40.3 15 c 1 23.00 2.2 1.9 78.40 0.00 74.23 74.00 0 2 CB#3DMH1 10.06 0.88 0.05 0:05 5.0 8.40 0.4 0.0 0.4 8.4 15 c 8 1.00 0.4 0.4 78.40 78.40 74.31 74.23 1 3 CB#2DMH#1 0.08 0.83 0.07 0:22 5.1 8.36 1.9 0.0 1.9 8.4 15 c 23 1.00 2.2 1.7 78.40 78.40 74.46 74.23 1 4 SED#1 CD#2 0.18 0.87 0.116 0:16 6.0 8.40 1.3 0.0 1.3 8.4 15 c 14 1,00 1.7 1.4 78.60 78.40 74.60 74.46 3 i i i i t i PROJECT FILE: FRONT.ISTM I-D-F FILE_: HARTPORD.10F TOTAL NUMBER OF LINES: 4 RUN DATE: 06-16-1999 NOTES: c=circular; e=elliptical; b=box; Intensity= 72.594371(Tc+ 10.8)11 .7815695; Return period= 100 Yrs. Plan Vi6w 2 3 4 I' S Proj, file: REAR.STM OF file: HARTFORD.IDF No. Lines: 5 06-16-1999 Storm Sewer Inventory Report Page ' Line Line.ID DnStr Defl Line Line Line Line Drng Runoff Inlet Known Invert Invert N Junction J-Loss Natural Dn # Mine angle length size type slope area coeff time Q El do El up value type Coeff grnd line # (deg) (ft) _ (in) _ (%) (ac) (C) (min) (cfs) (ft) (ft) _ (JL.C) (it) # 1 DMH#2 0 0 1 15 Circular 1.00 0.00 .00 0 0.0 71.85 71.86 .010 MH 1.0 77.50 Off 2 CB#6dMH#2 1 1 -60 6 15 Circular 1.00 0.06 .88 5 0.0 73.82 73.88 .010 Curb 1.0 77.50 1 3 CB#5DMH#2 1 60 21 15 Circular 3.00 0.08 .88 5 0.0 71.33 71.96 .010 Curb 1.0 77.50 1 4 SE'.D#4CB#5 3 -5 39 15 Circular 2.00 0.17 .90 15 0.0 71.96 72.74 .010 Curb 1.0 78.40 3 5 YD#1 SED#2 -4 35 38 15 Circular 2.00 0.72 .65 23 0.0 72.74 73.50 .010 Grate 1.0 77.50 4 PROJECT FIL-E: REAR !TM ----�---- I-D-F FILE: HA-RTFORD-.IDF-----__---_---- TO-TAL NUMBER OF LINES. 5 - R- UNAE: 18-1999 -- - DESIGN CODES: Min.Pipe Size= 12 in; Max. Pipe Size= 96 in; Min.Slope= .2 %; Min.Cover= .4 ft; Inlet N-Values= .016; Average Inlet Throat Height= 6 in Storm Sewer Tabulation Page Line Line ID Incr. Rnoff Incr. sum Tc Rnfal Total Add. Total Capac Line Line Line Veloc. Veloc. NG NG Invert Invert Dns # Area coeff CA CA Inten runoff flow flow @ full size length slope up down up down up down line (ac) (C) (min (inlhr (cfs) (cfs) (cfs) (cfs) (In x in) {ft) ("/,) (ft/s) (ftls) (ft) (ft) (ft) (ft) # 1 DMH#2 0.00 1 0.00 0.00 0.74 23.5 3.09 2.3 0.0 2.3 8.4 15 c 1 1.00 1.9 1.9 77.50 0.00 71.86 71.85 0 2 CB#6dMH#2 0.06 0.88 0.05 0.05 5.0 6.19 0.3 0.0 0.3 8.4 15 c 6 1.00 2.1 1.7 77.50 77.50 73.88 73.82 1 3 CB#5DMH#2 0.08 0.88 0.07 0.69 23.4 3.10 2.1 0.0 2.1 14.5 15 c 21 3.00 1.7 1.7 77.50 77.50 71.96 71.33 1 4 S E D#4C B#5 10.17 0.90 0.15 0.62 23.2 3.11 1.9 0.0 1.9 11.9 15 c 39 2.00 1.6 1.6 78.40 77.50 72.74 71.96 3 5 YD#1SED#2 I0.72 0.65 0.47 0.47 23.0 3.13 1.5 0.0 1.5 11.9 15 c 38 2.00 2.2 1.2 77.50 78.40 73.50 72.74 4 PROJECT FILE: REAR.STM I-D-F FILE: HARTFORD.IDF TOTAL NUMBER OF LINES: 5 RUN DATE: 06-18-1999 NOTES: c=circular; e=elliptical; b=box; Intensity= 27.15295/(Tc+ 4.699998)1 .6508044; Return period= 10 Yrs. Storm Sewer Tabulation Page 1 Line Line ID Incr. Rnoff Incr. Sum Tc Rnfal Total Add, Total Capac Line Line Line Veloc. Veloc. NG NG Invert Invert Dns # Area coeff CA CA Inten runoff flow flow @ full size length slope up down up down up down line iac) (C) (min (in/hr (cfs) (cfs) (cfs) (cfs) (in x in) (it) (%) (ft/s) (ftls) (ft) (ft) (ft) (ft) # 1 DMH#2 0.00 0.00 0.00 0.74 23.5 4.58 3.4 0.0 3.4 8.4 15 c 1 1.00 2.8 2.8 77.50 0.00 71.86 71.85 0 2 CB#6dMH#2 Q.06 0.88 0.05 0.05 5.0 8.40 0.4 0.0 0.4 8.4 15 c 6 1.00 2.3 1.7 77.50 77.50 73.88 73.82 1 3 CB#5DMH#2 0.08 0.88 0.07 0.69 23.4 459 3.2 0.0 3.2 14.5 15 c 21 3.00 2.6 2.6 77.50 77.50 71.96 71.33 1 4 SED#4C8#5 6.17 0.90 0.15 0.62 23.2 4.61 2.9 0.0 2.9 11.9 15 c 39 2.00 2.3 2.3 78.40 77.50 72.74 71.96 3 5 YD#1 SED#2 0.72 0.65 0.47 0.47 23.0 4.63 2.2 0.0 2.2 11.9 15 c 38 2.00 2.3 1.8 77.50 78.40 '73.50 72.74 4 PROJECT FILE: REAR.STM I-D-F FILE: HARTFORD.IDF TOTAL NUMBER OF LINES: 5 RUN DATE: 06-18-1999 NOTES: c=circular; e=e liptical; b=box; Intensity= 72.59437/(Tc+ 10.8)^ .7815695; Return period= 100 Yrs. Drainage Study A x I Calculations Existing Conditions Area 1 Acres I A x I ScS Method for Drainage Tc= 19 minutes CN Impervious 0.000 0.900 0.00 Pervious 1.420 0.300 0.43 58 0.43 C= 0.3 Proposed Conditions Acres I A x I CN A *CN Composite ScS "CN" SED#1 Impervoius 0.130 0.900 0.12 98 12.74 Pervious 0.050 0.300 0.02 58 2.9 0.13 15.64 86.9 CB#2 Impervious 0.050 0.900 0.05 98 4.9 Pervious 0.030 0.300 0.01 58 1.74 0.05 6.64 83.0 CB#3 Impervious 0.045 0.900 0.04 98 4.41 Pervious 0.015 0.300 0.00 58 0.87 0.05 5.28 88.0 YD#1 * Impervious 0.470 0.900 0.42 98 46.06 Pervious 0.250 0.300 0.08 58 14.5 0.50 60.56 84.1 SED#4 Impervious 0.170 0.900 0.15 98 16.66 Pervious 0.000 0.300 0.00 58 0 0.15 16.66 98.0 CB#5 Impervious 0.060 0.900 0.05 98 5.88 Pervious 0.020 0.300 0.01 58 1.16 0.06 7.04 88.0 CB#6 Impervious 0.045 0.900 0.04 98 4.41 Pervious 0.015 0.300 0.00 58 0.87 0.05 5.28 88.0 Total Area 1.350 Weighted 117.1 *Yard drain drainage easement for adjacent Composite "CN" 86.74 lot 6/17/99 R. A. Soils and Drainage Calculations SECA LLC file no. 99-1228 Existing Drainage Area Soil Types: - AfA Agawam 0-3% "B" - Ss.A Sudbury 0-3% `B" CN meadow in good condition type`B" CN= 58 Area 1 62,040 SF 1.42 Ac Area 1 slope (81.3-75.5)/350 1.7% Time of Concentration from Tc chart 3 Area 1 Tc= 19 minutes Proposed Conditions Slope (81.3-77.8)/285 = 1.2% Time of Concentration from Tc chart 3 Area 1 Tc=23 minutes o.i Sedimentation Structure Design Sedimentation Structure: For a two inch rainfall first flush From A x I calculations: area x weighted"C"=0.81 Ac. Vol. =0.91 Ac. x 43560 ft2 x 7.48 gal/ft3 2 in. x 1/12 Win x 1/60 = 733.1 gal. = 98.0 ft3 4 catch basin with a four foot sump, provides 2' x 4' x 4' = 128 ft3 2 sedimentation chamber 6 x 3.8' x 4' x 2 =364 ft3 492 ft3 total sufficient capacity for first flush sedimentation control. �t0*1N seAt� /J To� slau& 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 a w AREA CODE 860 / 644-2511 SOR•Co July 8, 1999 Certified #P462498013 SECA, L.L.C. 400 Chapel Road Unit lA South Windsor, CT 06074 Dear Madam/Sir: At the July 8, 1999 regular meeting, the Inland Wetlands Agency/Conservation Commission approved application #99-45P - Finnegan Electric - Conservation plan for the construction of a 6,600 square foot industrial building on 30,000 square feet, located on Commerce Way lot #33, 1 zone. (Assessor's Map #121, parcel #24). This approval is subject to the following conditions: 1. One blueprint co f o the entire set of plans and this letter p copy reproduced thereon, must be submitted to this Commission. This must be completed within 65 days of approval prior to any construction activity on the site. Plans submitted to Planning & Zoning Commission shall be considered having met this requirement. 2. The application shall indemnify and hold harmless the Town of South Windsor against any liability, which might result from the proposed operation or use. 3. The permit is valid for five years and shall expire on July 8, 2004. It is the landowner(s)/applicant(s) responsibility to track expiration dates and notify the Commission of a renewal request at least 65 days prior to expiration. Finnegan Electric July 8, 1999 Page 2 4. All approvals required must be obtained and submitted prior to any activity on the site. 5. A contact person shall be identified on the plans. 6. A bond in the amount of$1,000.00 be submitted to the Planning 8s Zoning Commission to ensure compliance with the Erosion and Sedimentation Control Measures. Very truly yours, INLAND WETLANDS AGENCY/ CONSERVATION COMMISSION �'f��� ( alual n c/-r Elizabeth A. Warren, Chairperson EAW: r d cc: Chief Building Official Planning 8v Zoning Commission Town Engineer MEMORANDUM To: South Windsor Inland Wetland/Conservation Commission. From: Jeffrey H. Folger-Zoning/Wetland Enforcement Officer Date: April 13, 1999 Re: Appl#99-45P E&S Review of the proposed Finnegan Electric Inc. industrial site, Plans dated 6/16/99. The project is to construct an 6600sgft industrial building on 30,000sgft located at Commerce Way. Site: The site is located in the Scantic River watershed. The parcel is comprised of 1.5 acres. Currently the site is open and grassed. There are no wetlands on the site or 40 feet from the property boundaries. The site is comprised of medium and fine sands overlaying silts and clays. Erosion potential is expected to be low because the site is level. Planned erosion controls appear to be adequate for the project. Stormwater is planned to be controlled by catchbasins and pipes to an existing drainage pipe into the existing detention basin serving the entire street. Two sediment chambers are planned to capture sediment and floatables. The two catchbasins located in the driveway are proposed to have 4' sumps.