Loading...
HomeMy WebLinkAboutSite Plan - Conservation (30) 3 TOWN OF SOUTH WINDSOR INLAND WETLANDS, WATERCOURSES AND CONSERVATION APPLICATION Application # Date Received >j INSTRUCTIONS 1. One application (1) with map and plans (2 copies)) shall be submitted together with the fee set forth in the Inland Wetlands, Watercourses and Conservation Regulations, Town of South Windsor. (See Regulations, Section VII - X) 2. The South Windsor Inland Wetlands, Watercourses and Conservation Regulations should be reviewed with respect to the standards and criteria for application Evaluation. (See Regulations, Sections VII - X) 3. The applicant understands that this application is to be considered complete only when all information and documents required by the Agency have been submitted. The applicant shall also complete the state filing form. A. Applicant's Name: Lot 31-32 Commerce Way, LLC c/o Windsor Steel Address: 38 awi n Rnarl� 4n1it-h Windsor.—CT 06074 Phone: (home) (work) 289-1529 (fax) B. Legal owner's name: Lot 31-32 Commerce Way, LLC Address 38 Edwin Road, South Windsor, CT 06074 Phone (home) (work) (fax) (List additional owners, addresses, and phone numbers on back of application) C. If the applicant is not the owner of the subject property; a letter by the owner(s) authorizing the proposed regulated activity set forth in the application must accompany this form and will be part of the application. D. Project Name (if any) Windsor Steel Headquarters 1. Contact Person (if further information is needed) Peter R DeMallie (work) 291-8755 (fax) 291--8757 E. The geographical location of the property which is to be affected by the proposed regulated activities including a description of the land in sufficient detail to allow identification of the property on the Inland Wetland and Watercourse Map. Assessors moray#I,olt2132; 124 Commerce Way p Parcel # 24 Zone I 7 F. Names of all abutting property owners from records in Town Clerk's office. (use separate sheet if necessary) See attached sheet G. Have you notified all abutting property owners (from records in Town Clerk's office) by certified letter that an application is pending before the Agency? Yes ** (you are required to supply a copy of the letter with the list of the names of the abutters).** H. Purpose and description of all proposed regulated activity(s) including amount of disturbance in square feet and types of fill and the time element involved: Propose construction of new headquarters building for Windsor Steel with ARRnri atarl parking., ernsi on control mpagureg., side-walks., drainage facilities, grading and utilities. No wetlands disturbance_ (Just small buffer disturbance) I. A class A-2 map of the property drawn to 1" = 40', showing the area to be developed, extent of the wetlands and watercourses affected, topography, existing and proposed activities and names and locations of adjacent property owners must be submitted. J. Amount of regulated area disturbance and types of fill (including wetlands and regulated buffers). 2,300 square feet/ grading (topsoil) K. Acreage of wetlands and watercourses in regulated areas to be altered: 0 L. Acreage of wetlands and watercourses to be created: 0 M. Lineal feet of proposed stream alteration: 0 N. Total land area of project and percentage which is wetlands: 124,320 sq ft / S_L2L, or 6.370 sQ. ft_ of wetlands on the parcel O. Identify all other permits or approvals that have been issued, applied for, or required with respect to the proposed activity set forth in this application. (These may include but not be limited to, local Planning & Zoning, Zoning Board of Appeals, D.E.P., F.E.M.A., D.O.T., The Army Corps of Engineers, and any other State, Local or Federal Permits.) WPrA; PZC P. The applicant (or designated .representative) hereby attests that a sign will be posted at the following location(s) A 1 ong strPPt frnnt-agp 8 r By p,21 Name P,.t, R nPMA 1 1 i on or before the following date as directed by Town staff Signature: These signs must be displayed continuously for at least ten (10) days prior to scheduled meeting (see Regulations, Section 7.3a) The undersigned hereby applies for the regulated activities listed in paragraph H above, for a Inland Wetlands, Watercourses and Conservation permit for the property described herein and confirms that: 1. She/he is familiar with the currently effective Inland Wetlands, Watercourses and Conservation Regulations of the Town of South Windsor. 2. She/he understands that at any time during the review period, the Agency may require the applicant to provide more information about the wetlands and/or watercourses in question and/or any proposed activity. 3. All information submitted in the application for review shall be considered factual, or in the case of anticipated activity, binding. A knowing failure of the applicant or any of her/his agents to provide correct information, or performance exceeding the levels of activity anticipated, shall be sufficient grounds for revocation of any permit under these regulations. 4. By making this application, the applicant gives permission to the Inland Wetlands, Watercourses and Conservation Commission members and/or its representative to enter the portions of the premises which are subject of the application for the purpose of inspection and investigation and otherwise evaluating the merits of the application both before and after a final decision has been issued. � 6 - Signatur o Owner of Property Date e6l JZJ R I Signature 6pplicant $1 2 5 5 Date 9 DESIGN PROFESSIONALS, INC. civil engineers . planners . surveyors . gis Abutters List Lot 31-32 Commerce Way,LLC 1.) Bruce A. Maneeley Real Estate, LLC, 65 Rye Street, South Windsor, CT 06074 2.) D &L Caron, LLC, 312 Deming Street, South Windsor, CT 06074 3.) Lot 31-32 Commerce Way, LLC, 38 Edwin Road, South Windsor, CT 06074 4.) Condor Investment, LLC, 350 Chapel Road, South Windsor, CT 06074 5.) Daniel &Marie Onofrio, 48 Commerce Way, South Windsor, CT 06074 6.) JFI Associates, Inc., 75 Commerce Way, South Windsor, CT 06074 165 South Satellite Road, South Windsor, Connecticut 06074 Tel: (860) 291-8755 • Fax: (860) 291-8757 Hydrologic Study for Windsor Steel 124 Commerce Way South Windsor, Connecticut Proj. No. 98-1127 July 23, 1999 Design Professionals, Inc. civil engineers planners surveyors gis 165 South Satellite Road,South Windsor.CT.06074•(860)2918755•Far:(860)291 8757•Email:dpici-Mb&aol.eom Table of Contents Summary and Conclusions ............... ..............................................................................1 Introduction ....................................................................................................................2 Methodology...................................................................................................................3 Existing Drainage Basin Characteristics...........................................................................4 Existing Storm Drainage Hydrographs.........................................................................5-6 Proposed Drainage Basin Map.........................................................................................7 Proposed Storm Drainage Hydrographs......................................................................8-19 Calculations sheet...............................................................................20-23 Drainage Summary Jul-23, 1999 Windsor Steel File no. 99-1127 Existing Proposed Runoff Development 2 year storm 0.7 10 year storm 3.0 12.9 25 year storm 4.6 50 year storm 6.1 100 year storm 7.8 18.5 in C.F.S. A 30-minute time of concentration was used for the runoff calculations for existing conditions. The adjacent Finnegan Electric Property was included in all calculations. This is due to common drainage usage. A 24-minute time of concentration was used for the runoff calculations for the proposed conditions. The calculations include fully developed adjacent lots 31 & 34 draining through drainage easements to rear yard drains. Conclusions More than sufficient capacity will exist in the system to handle a 10 year+ storm. Introduction The Finnegan site is approximately 1.4± acres located on the south west side of Commerce Way in South Windsor, Connecticut. The Windsor Steel site is 2.49±located across from the Finnegan site separated by a common driveway. Under existing conditions, the sites drain to the north west side of the property. The proposed improvements to the Finnegan site include the construction of a Office/warehouse with parking for 16 vehicles, and a storm water management system. The proposed improvements to the Windsor Steel site include office, manufacturing, and warehouse with parking for 32 cars. Collection of storm water will be through a series of catch basins connected to an existing drainage pipe adjacent to the properties. An existing catch basin will be changed to manhole at the rear of the property, a doghouse manhole/catch basin will be added along the common driveway between properties, and a doghouse manhole will added behind the Windsor Steel property. Storm water detention is provided by a common detention area which is part of the Industrial park. The system has been sized to handle additional future runoff when lots 31 & 34 are developed. Methodology Both the Rational & SCS method were used to determine 2, 10, 25, 50 and 100 year storm discharges for pre-existing. The rational method was used proposed conditions. Triangular hydrographs were generated and flood routed through the designed detention basin and storage by the use of the Storage Indication Method of flood routing. awrs�s.a a , Existing Drainagearm 1 ...a ,J..\v '. ..' �• •�, y I :Nit 52 75 sq �, \ ` 4 A c A .,t id r7`, iAI. , ..au Area 62040 eq it �Ai. 1.42 Ac arm ` - � .,.. ,PMA Ttb / ..,. 65 lit �h v� ,L s� r" A. r r E y' t , h . 1 r/ art 4! t:'vti htPlW±;d e r,. J / . N, Ali it / t ..,', fh,i E.A e.. 5 ef tn�ao aFc�� �I �•, � 1 Hydrograph Summary Report Page i Hyd. Hydrograph Peak Time Time to Volume Return Inflow Maximum Maximum Hydrograph No. type flow interval peak period hyd(s) elevation storage description (origin) (cfs) (min) (min) (acft) (yrs) (ft) (cuft) 1 Rational 0.9 1 19 0.03 2 -- ---- --- Existing 2yr 2 Rational 1.5 1 19 0.05 10 -- --- -- Existing 10 yr 3 Rational 1.8 1 19 0.06 25 - Existing 25yr 4 Rational -2.0 1 19 0.07 50 ---- ----- ------ Existing 50yr 5 Rational 2.2 1 19 0.08 100 ---- --- ---- Existing 100 6 SCS Runoff 0.2 2 746 0.04 2 - -- - Existing 7 SCS Runoff 1.0 2 736 0.12 10 ---- ------ ------ Existing 8 SCS Runoff 1.5 2 736 0.17 25 ---- ------ ------ Existing 9 SCS Runoff 2.0 2 734 0.22 50 --- ---- ---- Existing 10 SCS Runoff 2.6 2 734 028 100 -- ---- ----- Existing 11 Rational 1.8 1 30 0.10 2 -- -- --- Windsor 12 Rational 2.8 1 30 0.16 10 -- --- ------ Windsor 13 Rational 3.5 1 30 0.19 25 ---- ------ ------ Windsor 14 Rational 3.9 1 30 0.22 50 ---- ----- ------ Windsor 15 Rational 4.2 1 30 0.23 100 --- --- ------ Windsor 16 SCS Runoff 0.5 2 754 0.10 2 --- --- - Windsor 17 SCS Runoff 2.1 2 746 0.29 10 ---- ------ ------ Windsor 18 SCS Runoff 3.2 2 .744 0.42 25 ---- ------ ------ Windsor 19 SCS Runoff 4.2 2 742 0.55 50 -- -- ------ Windsor 20 SCS Runoff 5.4 2 742 0.68 100 --- ----- --- Windsor 21 Combine 2.4 1 30 0.13 2 1 +11 --_ ____ combine 2yr 22 Combine 3.8 1 30 0.21 10 2+12 ------ ------ combine 10 yr 23 Combine 4.6 1 30 0.26 25 3+13 ------ ------ combine 25 yr 24 Combine 5.2 1 30 0.29 50 4+14 --- ---- combine 50 yr 25 Combine 5.6 1 30 0.31 100 5+15 ---- --- combine 10 yr 26 Combine 0.7 2 750 0.14 2 6+16 ---- - scs combine 2 27 Combine 3.0 2 742 0.41 10 7+17 scs combine 10 28 Combine 4.6 2 I 740 0.59 25 8+18 -- ------ scs combine 25 29 Combine 6.1 2 740 0.77 50 9+19 ---- ------ scs combine 50 30 Combine 7.8 2 740 0.96 100 10+20 - scs combine 10 Proj. file: 1127A.GPW OF file: HARTFORDADF Run date: 07-23-1999 / A 1• Ilse .,3, f w / a . W4 Al 14 / e. " mx Ram 00 :.;. �s ':.rd rX.. JL.�� � ,/ 1A20 w� G G an s ...., �n •, ffi ft aA w .4 cuNmann .na., /� ROPOSED pp� / 4 sir„ J At't�.q �'f°t'1fJtJ Vo f �' .. ., / s f4 aa, ' �rlfYf Af" / rli,- / DRAINAGE_ IppJ i 1 \ , u, r J \ f Plan View 2 3 Proj. file: FRONT.STM OF file: HARTFORD.IDF No. Lines: 4 07-29-1999 Storm Sewer Inventory Report Page ' Line Line ID DnStr Defl Line Line Line Line Drng Runoff Inlet Known Invert Invert N Junction J-Loss Natural Dn # line angle length size type slope area coeff time Q El do El up value type coeff grnd line # (deg) (ft) (in) (%) (ac) (C) (min) (cfs) (ft) (ft) (JLC) (ft) # 1 OUT CB#3 0 0 1 15 Circular 1.00 0.14 .90 5 0.0 74.04 74.05 .010 Curb 1.0 78.40 Off 2 CB#W7CB#3 1 -60 23 15 Circular 1.00 0.25 .88 5 0.0 74.05 74.28 .010 Curb 1.0 78.40 1 3 CB#2CB#3 1 90 18 15 Circular 1.00 0.08 .83 5 0.0 74.28 74.46 .010 Curb 1.0 78.40 1 4 SED#1 CD#2 3 -30 14 15 Circular 1.00 0.18 .87 5 0.0 74.46 74.60 .010 Curb 1.0 78.60 3 PROJECT FILE: FRONT.STM I-D-F FILE: HARTFORD.IDF FTOTAL NUMBER OF LINES: 4 RUN DATE: 07-29-1999 DESIGN CODES: Min.Pipe Size= 12 in; Max.Pipe Size= 96 in; Min.Slope= .2 %; Min.Cover= 4 ft; Inlet N-Values= .016; Average Inlet Throat Height= 6 in Storm Sewer Tabulation Page 1 Line Line ID Incr. Rnoff Incr. sum Tc Rnfal Total Add. Total Capac Line Line Line Veloc. Veloc. NG NG Invert Invert Dns # Area coeff CA CA Inten runoff flow flow @ full size length slope up down up down up down line (ac) (C) (min (in/hr (cfs) (cfs) (cfs) (cfs) (in x in) (ft) (%) (ft/s) (ft/s) (ft) (ft) (ft) (ft) # 1 OUT CB#3 0.14 0.90 0.13 0.57 5.2 6.12 3.5 0.0 3.5 8A 15 c 1 1.00 2.9 2.9 78.40 0.00 74.05 74.04 0 2 C B#W 7C B#3 0.25 0.88 0.22 0.22 5.0 6.19 1.4 0.0 1.4 8.4 15 c 23 1.00 1.2 1.1 78.40 78.40 74.28 74.05 1 3 CB#2CB#3 0.08 0.83 0.07 0.22 5.1 6.16 1.4 0,0 1.4 8.4 15 c 18 1.00 1.4 1.2 78.40 78.40 74.46 74.28 1 4 SED#1 CD#2 0.18 0.87 0.16 0.16 5.0 6.19 1.0 0.0 1.0 8.4 15 c 14 1.00 1.2 1.0 78.60 78.40 74.60 74.46 3 PROJECT FILE: FRONT.STM I-D-F FILE: HARTFORD.IDF TOTAL NUMBER OF LINES: 4 RUN DATE: 07-29-1999 NOTES: c=circular; e=elliptical; b=box; Intensity= 27.15295/(Tc+ 4,699998)^ .6508044; Return period= 10 Yrs. Storm Sewer Tabulation Page ' Line Line ID Incr. Rnoff Incr. Sum Tc Rnfal Total Add. Total Capac Line Line Line Veloc. Veloc. NG NG Invert Invert Dns # Area coeff CA CA Inten runoff flow flow @ full size length slope up down up down up down line (ac) (C) (min (in/hr) (cfs) (cfs) (cfs) (cfs) (in x in) (ft) (%► (ft/s) (ftls) (ft) (ft) (ft) (ft) # 1 OUT CB#3 0.14 0.90 0.13 0.57 5.2 8.32 4.7 0.0 4.7 8.4 15 c 1 1.00 3.9 3.9 78.40 0.00 74.05 74.04 0 2 CB#W7CB#3 0.25 0.88 0.22 0.22 5.0 8.40 1.8 0.0 1.8 8.4 15 c 23 1.00 1.5 1.5 78.40 78.40 74.28 74.05 1 3 CB#2CB#3 0.08 0.83 0.07 0.22 5.1 8.36 1.9 0.0 1.9 8.4 15 c 18 1.00 1.7 1,5 78.40 78.40 74.46 74.28 1 4 S E D#1 C D#2 0.18 0.87 0.16 0.16 5.0 8.40 1.3 0.0 1.3 8.4 15 c 14 1.00 1.3 1.2 78.60 78.40 74.60 74.46 3 PROJECT FILE: FRONT.STM I-D-F FILE: HARTFORD.IDF TOTAL NUMBER OF LINES: 4 RUN DATE: 07-29-1999 NOTES: c=circular; e=elliptical; b=box; Intensity= 72.59437/(Tc+ 10.8)^ .7815695; Return period= 100 Yrs. Plan View 2 3 4 Proj. file: REARSECA.STM IDF file: HARTFORD.IDF No. Lines: 4 07-29-1999 Storm Sewer Inventory Report Page ' Line Line ID DnStr Defl Line Line Line Line Drng Runoff Inlet Known Invert Invert N Junction J-Loss Natural Dn # line angle length size type slope area coeff time Q El do El up value type coeff grnd line # (deg) (ft) (in) (%) (ac) (C) (min) (cfs) (ft) (ft) (JLC) (ft) # 1 CB#6 0 0 1 15 Circular 3.00 0.43 .86 8 0.0 71.30 71.33 .010 Curb 1.0 77.50 Off 2 CB#SCD#6 1 90 21 15 Circular 3.00 0.08 .88 5 0.0 71.33 71.96 .010 Curb 1.0 77.50 1 3 SED#4CB#5 2 -25 39 15 Circular 2.00 0.17 .90 15 0.0 71.96 72.74 .010 Curb 1.0 78.40 2 4 YD#1 SED#2 3 35 38 15 Circular 2.00 0.72 .65 23 0.0 72.74 73.50 .010 Grate 1.0 77.50 3 PROJECT FILE: REARSECA.STM F-D-F FILE: HARTFORD.IDF TOTAL NUMBER OF LINES: 4 RUN DATE: 07-29-1999 DESIGN CODES: Min. Pipe Size= 12 in; Max. Pipe Size= 96 in; Min.Slope= .2 %; Min.Cover= 4 ft; Inlet N-Values= .016; Average Inlet Throat Height= 6 in Storm Sewer Tabulation Page 1 Line Line ID Incr. Rnoff Incr. Sum To Rnfal Total Add. Total Capac Line Line Line V'eloc. Veloc. NG NG Invert Invert Dns # Area coeff CA CA Inten runoff flow flow @ full size length slope up down up down up down line (ac) (C) (min (inlhr (cfs) (cfs) (cfs) (cfs) (in x in) (ft) (%) (ft/s) (ftls) (ft) (ft) (ft) (ft) # 1 CB#6 0.43 0.86 0.37 1.06 23.5 3.09 3.3 0.0 3.3 14.5 15 c 1 3.00 2.7 2.7 77.50 0.00 71.33 71.30 0 2 CB#5CD#6 0.06 0.88 0.07 0.69 23.4 3.10 2.1 0.0 2.1 14.5 15 c 21 3.00 1.7 1.7 77.50 77.50 71.96 71.33 1 3 SED#4CB#5 0.17 0.90 0.15 0.62 23.2 3.11 1.9 0.0 1.9 11.9 15 c 39 2.00 1.6 1.6 78.40 77.50 72.74 71.96 2 4 YD#1 SED#2 0.72 0.65 0.47 0.47 23.0 3.13 1.5 0.0 1.5 11.9 15 c 38 2.00 1.9 1.2 77.50 78.40 73.50 72.74 3 PROJECT FILE: REARSECA.STM I-D-F FILE: HARTFORD.IDF TOTAL NUMBER OF LINES: 4 RUN DATE: 07-29-1999 NOTES: c=circular; e=elliptical; b=box; Intensity= 27.15295/(To+ 4.699998)11 .6508044; Return period= 10 Yrs. Storm Sewer Tabulation Page 1 Line Line 1D Incr. Rnoff Incr. Sum Tc Rnfal Total Add. Total Capac Line Line Line Veloc. Veloc. NG NG Invert Invert Dns # Area coeff CA CA Inten runoff flow flow @ full size length slope up down up down up down line (ac) (C) (min (Inlhr) (cfs) (cfs), (cfs) (cfs) (in x in) (ft) (%) (ftls) (ft/s) (ft) (ft) (ft) (ft) # 1 CB#6 0.43 0.86 0.37 1.06 23.5 4.58 4.9 0.0 4.9 14.5 15 c 1 3.00 4.0 4.0 77.50 0.00 71.33 71.30 0 2 CB#5CD#6 0.08 0.88 0.07 0.69 23.4 4.59 3.2 0.0 3.2 14.5 15 c 21 3.00 2.6 2,6 77.50 77.50 71.96 71,33 1 3 SED#4CB#5 0.17 0.90 0.15 0.62 23.2 4.61 2,9 0.0 2.9 11.9 15 c 39 2,00 2.3 2.3 78.40 77.50 72.74 71.96 2 4 YD#1 SED#2 0.72 0.65 0.47 0.47 23.0 4.63 2.2 0.0 2.2 11.9 15 c 38 2.00 2.0 1.8 77.50 78.40 73.50 72.74 3 PROJECT FILE: REARSECA.STM I-D-F FILE: HARTFORD.IDF TOTAL NUMBER OF LINES: 4 RUN DATE: 07 29-1999 NOTES: c=circular; e=elliptical; b=box; Intensity= 72.594371(Tc+ 10.8)^ .7815695; Return period= 100 Yrs. Plan View 4 5 6 �I Proj. file: BACK.STM OF file: HARTFORD.IDF No. Lines: 6 07-29-1999 Storm Sewer Inventory Report Page , Line Line ID DnStr Defl Line Line Line Line Drng Runoff Inlet Known Invert Invert N Junction J-Loss Natural Dn # line angle length size type slope area coeff time Q El do El up value type coeff grnd line # (deg) (ft) (in) (%) (ac) (C) (min) (cfs) (ft) (ft) (JLC) (ft) # 1 DMH2 0 0 1 15 Circular 2.00 0.00 .00 0 0.0 70.63 70.65 .010 MH 1.0 77.80 Off 2 SED W9 DMI-12 1 0 10 15 Circular 2.00 0.18 .90 7 0.0 70.65 70.85 .010 Curb 1.0 78.30 1 3 W8 SED W9 2 0 105 15 Circular 1.00 0.48 .85 8 O.D 70.85 71.90 .010 Curb 1.0 78.30 2 4 YDW3 W8 3 90 125 15 Circular 1.00 0.69 .80 10 0.0 71.90 73.15 .010 Grate 1.0 78.80 3 5 FD1 YDW3 4 145 18 15 Circular 1.00 0.10 .90 5 0.0 73.32 73.50 .010 Grate 1.0 75.50 4 6 YDW2 YDW3 4 0 145 15 Circular 1.00 0.35 .85 12 0.0 73.35 74.80 .010 Grate 1.0 78.80 4 -T PROJECT FILE: BACK.STM I-D-F FILE: HARTFORD.IDF TOTAL NUMBER OF LINES: 6 RUN DATE: 07-29-1999 DESIGN CODES: Min.Pipe Size= 12 in; Max.Pipe Size= 96 in; Min,Slope= .2 %; Min.Cover= 4 ft; Inlet N-Values= .016; Average Inlet Throat Height= 6 in Storm Sewer Tabulation Page 1 Line Line ID Incr. Rnoff Incr. Sum Tc Rnfal Total Add. Total Capac Line Line Line Veloc. Veloc. NG NG Invert Invert Dns # Area coeff CA CA Inten runoff flow flow @ full size length slope up down up down up down line (ac) (C) (min (in/hr (cfs) (cfs) (cfs) (cfs) (in x In) (ft) (%) (ft/s) (ft/s) (ft) (ft) (ft) (ft) # 1 DMH2 O.00 0.00 0.00 1.51 14.1 4.02 6.1 0.0 6.1 11.9 15 c 1 2.00 9.5 9.5 77.80 0.00 70.65 70.63 0 2 SED W9 DMH2 O.18 0.90 0.16 1.51 14.1 4.03 6.1 0.0 6.1 11.9 15 c 10 2.00 5.0 5.0 78.30 77.80 70.85 70.65 1 3 W8 SED W9 0.48 0.85 0.41 1.35 13.5 4.11 5.5 0.0 5.5 8.4 15 c 105 1.0D 4.5 4.5 78.30 78.30 71.90 70.85 2 4 YDW3 W8 0.69 0.80 0.55 0.94 12.8 4.21 4.0 0.0 4.0 8.4 15 c 125 1.00 3.8 3.2 78.80 78.30 73.15 71.90 3 5 FD1 YDW3 0.10 0.90 0.09 0.09 5.0 6.19 0.6 0.0 0.6 8.4 15 c 18 1.00 0.6 0.5 75.50 78.80 73.50 73.32 4 6 YDW2 YDW3 0.35 0.85 0.30 0.30 12.0 4.35 1.3 0.0 1.3 8.4 15 c 145 1.00 3.2 1.2 78.60 78.80 74.80 73.35 4 PROJECT FILE: BACK.STM I-D-F FILE: HARTFORD.IDF TOTAL NUMBER OF LINES: 6 RUN DATE: 07-29-1999 NOTES: c=circular; e=elliptical; b=box; Intensity= 27.15295/(To+ 4.699998)^ .6508044; Return period= 10 Yrs. Storm Sewer Tabulation Page 1 Line Line ID Incr. Rnoff Incr. Sum Tc Rnfal Total Add. Total Capac Line Line Line Veloc. Veloc. NG NG Invert Invert Dns # Area coeff CA CA Inten runoff flow flow @ full size length slope up down up down up down line (ac) (C) (min (inlhr) (cfs) (cfs) (cfs) (cfs) (in x in) (ft) (°/a) (ftls) (ft/s) (ft) (ft) (ft) (ft) # 1 DMH2 O.00 0.00 0.00 1.51 14.1 5.88 8.9 0,0 8.9 11.9 15 c 1 2.00 10.5 10.5 77.80 0.00 70.65 70.63 0 2 SED W9 DMH2 O.18 0.90 0.16 1.51 14.1 5.89 8.9 0.0 8.9 11.9 15 c 10 2.00 7.2 7.2 78.30 77.80 70.85 70.65 1 3 W8 SED W9 0.48 0,85 0.41 1.35 13.5 6.00 8.1 0.0 8.1 8.4 15 c 105 1.00 6.6 6.6 78.30 78.30 71.90 70.85 2 4 YDW3 W8 0.69 0.80 0.55 0.94 12.8 6.13 5.8 0.0 5.8 8.4 15 c 125 1.00 4.7 4.7 78.80 78.30 73.15 71.90 3 5 FD1 YDW3 0.10 0.90 0.09 0.09 5.0 8.40 0.8 0.0 0.8 8.4 15 c 18 1.00 0.6 0.6 75.50 78.80 73.50 73.32 4 6 YDW2 YDW3 0.35 0.85 0.30 0.30 12.0 6.30 1.9 0.0 1.9 8.4 15 c 145 1.00 1.5 1.5 78.80 78.80 74.80 73.35 4 PROJECT FILE: BACK.STM I-D-F FILE: HARTFORD,IDF TOTAL NUMBER OF LINES: 6 RUN DATE: 07-29-1999 NOTES: c=circular; e=elliptical; b=box; Intensity= 72,59437/(Tc+ 10.8)^ .7815695; Return period= 100 Yrs. Drainage Study A x I Calculations Existing Conditions Area 1 Acres I A x I ScS Method for Drainage Tc= 19 minutes CN Impervious 0.000 0.900 0.00 Pervious 1.420 0.300 0.43 58 0.43 C= 0.3 Area 2 Tc= 30 minutes CN Impervious 0.000 0.900 0.00 Pervious 3.490 0.300 1.05 58 1.05 C= 0.3 Proposed Conditions Acres I A x I CN A*CN Composite ScS "CN" SED#1 Impervoius 0.130 0.900 0.12 98 12.74 Pervious 0.050 0.300 0.02 58 2.9 0.13 15.64 86.9 CB#2 Impervious 0.050 0.900 0.05 98 4.9 Pervious 0.030 0.300 0.01 58 1.74 0.05 6.64 83.0 CB#3 Impervious 0.045 0.900 0.04 98 4.41 Pervious 0.095 0.300 0.03 58 5.51 0.07 9.92 70.9 YD#1 * Impervious 0.470 0.900 0.42 98 46.06 Pervious 0.250 0.300 0.08 58 14.5 0.50 60.56 84.1 SED#4 Impervious 0.170 0.900 0.15 98 16.66 Pervious 0.000 0.300 0.00 58 0 0.15 16.66 98.0 CB#5 Impervious 0.060 0.900 0.05 98 5.88 Pervious 0.020 0.300 0.01 58 1.16 0.06 7.04 88.0 CB#6 Impervious 0.300 0.900 0.27 98 29.4 Pervious 0.130 0.300 0.04 58 7.54 0.31 36.94 85.9 YD W2* Impervious 0.230 0.900 0.21 98 22.54 Pervious 0.120 0.300 0.04 58 6.96 0.24 29.5 84.3 YD W3* Impervious 0.510 0.900 0.46 98 49.98 Pervious 0.180 0.300 0.05 58 10.44 0.51 60.42 87.6 FD W1 Impervious 0.010 0.900 0.01 98 0.98 7/20/99 R. A. Drainage Study A x I Calculations Pervious 0.000 0.300 0.00 58 0 0.01 0.98 98.0 SED W7 Impervious 0.200 0.900 0.18 98 19.6 Pervious 0.050 0.300 0.02 58 2.9 0.20 22.5 90.0 CB W8 Impervious 0.410 0.900 0.37 98 40.18 Pervious 0.070 0.300 0.02 58 4.06 0.39 44.24 92.2 SED W9 Impervious 0.180 0.900 0.16 98 17.64 Pervious 0.000 0.300 0.00 58 0 0.16 17.64 98.0 Total Area 3.760 Weighted 328.68 *Yard drain drainage easement for adjacent Composite "CN" 87.41 lot 7/20/99 R. A. Soils and Drainage Calculations Windsor Steel file no. 98-1127 Existing Drainage Areas Soil Types: - AfA Agawam 0-3% `S" - SsA Sudbury 0-3% `S" CN meadow in good condition type"B" CN= 58 Area 1 62,040 SF (Finnegan Electric) 1.42 Ac Area 1 slope (81.3-75.5)/350 1.7% Time of Concentration from Tc chart 3 Area 1 Tc= 19 minutes Proposed Conditions Slope (81.3-77.8)/285 = 1.2% Time of Concentration from Tc chart 3 Area 1 Tc= 23 minutes Area 2 152,175 SF (Windsor Steel) 3.5 Ac Area 2 slope 1 (82-75)/475 1.5% slope 2 (75-66)/75 12% Time of Concentration from Tc chart 3 slope 1 Tc= 19 minutes slope 2 Tc= 11 minutes total 30 minutes Proposed Conditions Time of Concentration from longest Tc for runoff Area 2 Tc= 24 minutes o.i Sedimentation Structure Design Sedimentation Structure: For a two inch rainfall first flush From A x I calculations: area x weighted "C"=2.79 Ac. Vol. =2.79 Ac. x 43560 ft2 x 7.48 gal/ft3 2 in. x 1/12 Win x 1/60 =2525 gal. 337.0 ft3 5 catch basin with a four foot sump, provides 2' x 4' x 4' = 160 ft3 4 sedimentation chamber 6 x 3.8' x 4' x 2 =728 ft3 888 ft3 total sufficient capacity for first flush sedimentation control. DESIGN PROFESSIONALS, INC. civil engineers . planners • surveyors . gis Transmitted via certified mail Dear Current Abutting Property Owner August 31, 1999 Re: Lot 31-32 Commerce Way, LLC DPI Project No. 98-1127 124 Commerce Way South Windsor, Connecticut In accordance with Section 7.3b of the "Town of South Windsor Inland Wetlands, Watercourses, and Conservation Regulations"and in accordance with regulations of the Planning&Zoning Commission, we are required to notify you that applications have, been filed on the property abutting yours and are subject to hearings by the Inland Wetlands Agency/Conservation Commission and the Planning&Zoning Commission. The applications and plans are on file with the South Windsor Planning Department in the Town Hall. As an abutting property owner you are invited to the hearing to ask questions and/ or give comments, however, you are not required to attend. You may also submit written comments regarding the application prior to the hearings if you so desire. For further information regarding the specific date this application will be heard,please contact Debbie Wark, Recording Secretary, Michele Lipe, Deputy Planning Director or Jeff Folger, Zoning/ Wetlands Enforcement Officer, at the South Windsor Planning Department at 644-2511, ext. 252 or 253. Thank you. Sincerely, Design Proi�ssionals, nc. By: Peter R. eMallie Principal cc: Town of South Windsor/J. Folger, M. Banach Joanne Patnaude Richard Lawrence Rosemary Aldridge 165 South Satellite Road, South Windsor, Connecticut 06074 Tel: (860) 291-8755 • Fax: (860) 291-8757 G P s ` 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 soe•co�'�� AREA CODE 860 / 644-2511 October 12, 1999 Certified #P462498031 Design Professionals, Inc. Attn: Peter DeMallie 165 South Satellite Road South Windsor, CT 06074 RE: Windsor Steel Dear Madam/Sir: At the October 6, 1999 regular meeting, the Inland Wetlands Agency/Conservation Commission approved application #99-59P - Windsor Steel - IWA/CC permit for the construction of a 21,490 square foot industrial building, parking and storage area, and stormwater system on 2.9 acres located on the southerly side of Commerce Way, I zone (Assessor's map #121, parcel #24). This approval is subject to the following conditions: 1. One blueprint copy of the entire set of plans and this letter reproduced thereon, must be submitted to this Commission. This must be completed within 65 days of approval prior to any construction activity on the site. Plans submitted to Planning & Zoning Commission shall be considered having met this requirement. 2. The application shall indemnify and hold harmless the Town of South Windsor against any liability, which might result from the proposed operation or use. 3. The permit is valid for five years and shall expire on October 6, 2004. It is the landowners)/applicant(s) responsibility to track expiration dates and notify the Commission of a renewal request at least 65 days prior to expiration. Windsor Steel October 12, 1999 Page 2 4. All approvals required must be obtained and submitted activity on the site. prior to any 5. A contact person shall be identified on the plans. 6. A bond in the amount of$1,000.00 be submitted to the Planning & Zoning Commission to ensure compliance with the Erosion and Sedimentation Control Measures. Very truly yours, INLAND WETLANDS AGENCY/ CONSERVATION COMMISSION Elizabeth Warren, Chairperson EW:dr cc: Chief Building Official Planning & Zoning Commission Town Engineer Windsor Steel