HomeMy WebLinkAboutSite Plan of Development (56) • TOWN OF SOUTH WINDSOR
PLANNING&ZONING COMMISSION
APPLICATION FORM
Application No: f�' 1 �� _ 1 � r,
a' -
Official Receipt Date:
Receipt No:
t 11
Gerber Scientific Inc . f c
APPLICANT:
ADDRESS: 83 Gerber Road West , South Windsor , CT 06�ttav'A',"O
OWNER OF RECORD ON LAND RECORDS: Same as above
ADDRESS:
COMPLETE LOCATION OF PROPERTY: 83 Gerber Road West , South Windsor , CT 06074
ASSESSOR'S MAP # PARCEL # ZONE—industrial
NAME, ADDRESS, TEL& FAX # OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED:
Guy Mitchell , Fuss & O ' Neill , Inc . , 146 Hartford Rd . , Manchester , CT 06040
Phone : 860-646-2469 Fax : 860-643-6313
THIS APPLICATION IS FOR: (Check all that apply):
❑ Zone Change to JPublic Hearing required and Certified letter to abutters required)
❑ Subdivision/Resubdivision ❑ Open Space Subdivision (Public Hearing Required)
❑ Subdivision ❑ Minor ❑ Major
❑ Resubdivision (Public Hearing Required) ❑ Minor ❑ Major
❑ Conditional Approval
❑ Special Exception to Article (Public Hearing, Certified letter to abutters required)
Site Plan of Development
[� General Plan of Development
❑ Earth Filling (Sec. 15) and/or Earth Removal (Sec. 14 - Public Hearing required)
Regulation Amendment: ❑ Zoning Subdivision (Attach proposed amendment)
Temporary and Conditional Permit for
Major Home Occupation for
❑ Other (explain in detail)
An 1-pl licatir:n Pending sign is required to be posted on the property for all applications ten (10) days
prior to being heard by the Commission.
plicant erty weer
(See reverse side for additional info ation)
TOWN OF SOUTH WINDSOR CHECKLIST
REQUIRED INFORMATION SITE PLANS
APPLICANT Gerber Scientific
PROJECT NAME Conference Center
This checklist must be signed by plan preparer (P.E.JL.S.) declaring that all required information
is provided. Items 1-7 are required for all applications, items 8-11 required where appropriate.
Check mark for each item supplied.
X 1. On each sheet for plans or maps, title block with the following information:
X a. Name, address and telephone of applicant.
X b. Name, address and telephone number of Land Surveyor or Professional
Engineer.
X c. Name of Development.
X d. Date when drawings were made.
X 2. Key Map: An overall map drawn to a scale of 1 inch equals either 100 feet or
200 feet. This map will show the overall design of the Development and
surrounding property within 500 feet.
X a. Data block which gives needed zoning information such as percentage of
Tot coverage, acreage of tract, number of apartment units, parking
requirements, etc.
X b. Outline of buildings.
X c. Layout of streets.
X d. Surrounding property boundaries-within 500 feet.
X e. Names of abutting property owners.
N/A f. Proposed open spaces and recreation areas.
eA -
N g, Driveway cuts on abutting properties and any properties across from
proposed site.
X h. Distance to and name of nearest intersection street.
X 3. Architectural Elevations: See attached checklist for Architecture and Design
Review.
X 4. Plot Plan: A layout map of the proposed site drawn to a scale of 1 inch
equals 40 feet on either of the following size sheets: (1) 24" x 36" with a
3/4" ruled margin; (2) 18" x 24" with a 1/2" ruled margin, containing the
following data:
X a. Distance and bearings of all boundary lines and acreage of site. Iron pins
required at all property angle points and shown on map.
N/A !, Proposed streets and street lines with center line station, curve data, and
parking spaces.
X c. Building lines in accordance with zoning regulations.
X d. Proposed buildings and other structures, including signs, outside lighting,
and dumpsters (on concrete pad and screened).
X e. Easements, noting grantors, grantees, and purpose.
X f. Names of abutting property owners.
N/A g. Monuments will be indicated at corners and angles of all streets and at all
points of curvature and tangency. The monumented points within
proposed site shall be coordinated. These coordinates shall appear in
tabular form on the plot plan. The accessibility of these CGS points shall
be determined by the Town Engineer.
X h, All open space or other common or public land uses shall be indicated.
i. A-2 certification; P.E./L.S. Seal.
X S. Topographic Map: A map drawn to a scale of 1 inch to 40 feet on sheets not
exceeding 24 inches by 36 inches, including ruled margins shall in addition to
the requirements of the plot plans show the following:
X a. All existing and proposed buildings.
X b. Curb Lines and pavement width, sidewalks.
X c. Existing and proposed sanitary sewers.
X d. Existing and proposed water and-all existing utilities.
N/A e. Present wooded area indicated by foliage lines. Any trees to be saved
should be shown.
X f. Existing and proposed contours shall be shown in not less than two-foot
intervals, but in cases of relatively level land, the contours shall be one-
foot intervals and spot elevations.
X g . Regulated wetlands and 100-year floodplain or note that none are
present.
-X h. Proposed storm drainage system, showing all catch basins, endwalis,
manholes, lengths and sizes of pipes and elevations of structures.
(Maximum distance between catch basins shall be 300 feet and minimum
size of storm drain lines shall be 15 inches, within Town ROW.) If
plan/profile sheet is provided all of this does not need to be shown. Only
top of frame elevations and inverts of open discharge pipe shall be shown
on this plan.
N/A L Connections of all springs into proposed storm drainage system as
needed.
N/A j. Location and indications of existing brook channels, and 100-year flood
limits.
X k. A-2 &T-2 Certification; P.E & L.S. Seals.
X 6. Landscaping plan:
X 7. Drainage calculations: - Zero Runoff Increase per attached guidelines.
N1A 8. Traffic Report:
N/A 9. Plans and Profiles: A plan and profile of the proposed streets drawn on
plan/profile paper of scales 1 inch to 40 feet horizontally, and 1 inch to 4 feet
vertically on sheets not exceeding 24 inches by 36 inches, including ruled
margins and containing the following:
N/A a. Layout of streets in sections coordinated by stations with the profile.
N/A b. Street plan showing roadways, drainage, sanitary sewer (including house
sewer), foundation drains, lot lines, buildings including all utilities with
elevations (top frame and inverts), size, type, length, slopes of pipes.
N/A c. Sight line at driveway &street intersections.
N/A d. Profile of roadway showing existing and finished grades. Roadway profile
will show all tangent grade and all vertical curve information.
N/A e. Profile will show all catch basins and all drainage lines between catch
basins with all invert and top of frame elevations, sizes, lengths and
slopes of pipes.
� - s
f. Where any storm drainage line discharges into an existing brook
sufficient profile of this brook will be shown to determine conditions.
g. CGS datum shall be used on all sites accessible to these controls. The
Town Engineer shall, based on standard engineering practices, determine
the accessibility of these controls.
h. Profiles shall show all sanitary sewer lines and manholes, including
elevations, (inverts, top of frame) sizes, lengths, and slopes of pipes.
Top of foundation elevations for building shall be shown.
'A 10. Open Space Site Improvement Plans: For sites which require or include a
provision for open spaces, a plan which contains data for site improvement
may be required. This map shall be drawn to a scale of 1 inch equals 40
feet.
11. Sanitary Report: Where individual sanitary sewage disposal systems are
proposed, the final plans shall include a Sanitary Report certified by a
Professional Engineer. The report shall demonstrate the feasibility of the
proposed individual systems.
PARER (P.E. S.) r DATE
1998
Sent b'j:SO UT-4 IJINDSLR Feb-1 3am
from 200 644 7230-�35? 545 55. ,, �a9 _
i
GERBER SITE PLAN
PL.A 1111,E G COTIVEMENTS
Key Map
1. Driveway cuts on surrounding properties must be shrntiz7
Zoning data table
1. Lmvervious coverage shoulw be given for the lots (maximum allowed is 65o
Parking formula(broken do-.tin by uses) should be sho-vm on the plan.,.
3. Buffer requirements of 10.1 must be addressed
GENERAL COI EMENTS
Applicant may want to install a second row of pine trees behind the existing ones within
the buffer along Kelly Road, The existing ones are at the stage of maturity where they will
Stan becoming less effeedve with Lr m=ing and attrition. Planting a new set of small pine
trees now will ensure that there will still be a viable buffer in that area when the cxiAing
trees are no longer there.
'WWA CO';'.4�VIENTS
1. WPCA approval is required.
2. Please provide the estimated and peak flows from the conference center,
BUILDING EP_ARTMENT C;OMMEN 1'S
1. Parking areas must have 13 accessible spaces with two van spaces included in this
count.
The proposed handicap spaces do not conform to the requirements for shared
spaces.
Post-it'Fax Note 7671 Date pages►
70 Fr W.
Co./Oept. Co.
Phone a Phone c
Fax ?�b� Fax1
PREPARED DATE CHECKED DATE PROJECT NO.
O
DO Fuss&O'Neill Inc. Consulting Engineers BY INir
BY
SHEET NO.
of
c9{0.t
T3 7 - to (J Zv .Z- Z.oS.0 0t..-r
r�`c!
FO-#110
-6b-
* (.J _ INLET STATION
AND OFFSET
ri n� TIME TO INLET
w — W LA AREA IN ACRES
N � O -! �" a W ` wN �,g
.4 RUNOFF COEFFICIENT
a AI
a� SUM OF Al
• ;_ '� ,� t ® �, ,I TOTAL AI
r r
w RAINFALL INTENSITY
O
co Q TO INLET
S
p GRADE OF GUTTER
'7a _ b
^' F
_ CROSS SLOPE
4 s -� '; z � � _ OF SHOULDER
DEPTH OF FLOW
AT GUTTER
;c s
kill IT-
- WIDTH OF FLOW w
Q BYPASSING INLET
AIBYPASSING INLET
s
•Y _ AI ENTERING
IVt3 i. CATCH BASIN
oN 133HS AS 03>103H0 ` "14 133HIS
31d0 A8 03NOIS3 1 M' ld
�'Z W2J0� SISAIVNV MOIJ a3iinE) 80SONIM HinoS A0 NMO-L
PREPARED DATE CHECKED DATE PROJECT NO.
Fuss&O'Neill Inc. Consulting Engineers .yB BY 3 HI I A !0
t3' QQ r .E of ET O.
oe
17
,.'A®
FO-#110
O l l# O.J
5 >°r Zvi 1 d S1'b
io
r
'I a o u1 �'., t �i',.`a`�'..�f x ia,�•� � t s�:o�:°f. ..��`.
A*A,.40 ► �. 1 Z %I'uqy
p % s y ► -� `-tom
l4 J
jo
ON 19HHS
lb 1. 'z)Uj Ia ssn c 1 'ka r Ag it. u,o cofrr-
IDRfOlid givci C19NDRHD RIVCI GgUVdgHd
PREPARED DATE CHECKED DATE PROJECT NO.
Q Fuss&O'Neill Inc. Con,ulti g Engineers BY ys BY
q
SHEET NO.
of
414 - ��
Li
FO-# 110
TOWN OF SOUTH WINDSOR STORM SEWER SYSTEM DESIGN FORM 2.2
PROJECT �Le4l-
SIGNED BY DATE
0&Q�ER- )A, 6 1-31 -q3
STREET FIRM CHECKED BY SHEET No
,u, O
� r
Z13IVMOV31-1
AliDVdVD "tend N N N �'
M
Jl l I D 0'13 3 J V Zd 3 n V aloll
3d01S
3dld d0 HION3n M T M j. ni O
r' r1 yo r
W31SAS NI 0 m 1=� b� '
r r
Q M
Jl11SN31Nl '1lVdNiV8 ti f� �� �.: 10
4
10431SAS NI , rJ III ri
IV d 0 W n S
NISVB H0lV3 � _� O � I
ON1831N3 IV S J
31AIIi 031V-Inwnood ° . °
3did NI 31AI11
13lN1 0131AI11 c4
f>
v
1 N 3 W J 3 S 3 N I-I — rJ -'' tA '-
I
-s?-
PREPARED DATE CHECKED DATE PROJECT NO.
1
fQo
1
FUSS&O'Neill Inc. Corrsultirrg Engineers 6 �BY 1 n i n
III � BY
r
SHEET NO.
CT' of
20 5 . � �t'ti' `�a °'p 0 f 7`
11
i 1 r ® r
C t3
FO-#110
-6b-
.... -0 09 VJ jJ _ INLET STATION
AND OFFSET
Q CAI ro TIME TO INLET
N n, c,+ AREA IN ACRES
;y
�J ° Y RUNOFF COEFFICIENT
--� s A x� x r ! ♦ a
AI
m SUM OF Al
TOTAL AI
tj
7 q- tz1 ao RAINFALL INTENSITY
w i1v
d co Q TO INLET
4
I
p GRADE OF GUTTER
v- � °-
CROSS SLOPE
OF SHOULDER
DEPTH OF FLOW
AT GUTTER
WIDTH OF FLOW
0 BYPASSING INLET
AI BYPASSING INLET
r► X, + •
Al ENTERING
c tj IV p CATCH BASIN
1 —rI- f'r ' 550=J
oN �1^33HS AB 03NO3H0 Wbid 133a1S
31d0 AS 03NJIS3 1 f`Oad
z wao� SISA"IVNV MOIJ 83iinE) 80SONIM Hinos J0 NMO-L
PREPARED �DjATE CHECKED DATE PROJECT NO.
foo Fuss&O'Neill Inc. Consulting Engineers �+ BY �j�f BY
�spar.P, of�'. ET NO.
- tZ Orly
j"/ 2-9
e _
" �=
Arc �r-wu�5 �C , •t IZ
FO-# 110
PREPARED DATE CHECKED DATE PROJECT NO.
�V
FUSS& Nelll Inc. Consulting Engineers BY � ! BY T ��� q1 4 1,.•,�
SHEET NO.
of $^
4i
C 94-�' I
� rod �,.� � ��3�d •`lam: �
114
�Ly '' � Erl•"��a ,�'`✓ �f�°�� � a �p./fit �`in�
r:��•l �.r�,� �s a s�� M. .t-���a�s �iw� R.�:s o t ►nG l��s
FO-# 110
1
\ PREPARED DATE CHECKED DATE PRpO�JiEpCT NO.
Q Fuss&O'Neill Inc. Consulting Engineers BY vsl-iq
SY�3l`�
P` &k SHEET NO.
of
tiy
r
FO-#i 110
TOWN OF SOUTH WINDSOR STORM SEWER SYSTEM DESIGN FORM 2.2
PROJECT DESIGNED BY DATE
G�P-9ER j eti �, )A, t 1--31 -qY
STREET FIRM CHECKED BY SHEET No
r
831dMOd3H
A1I0ddd0 iifld !2 �" M
N Nii N 9n tn N Bosoms so'
A1100-1 3 A 3 J d a 3 A d N N r� tst T tiI c S .
40
3did d0 H1JN3-1
rjow
.s t
3 Z I S 3 d I d m ;' -ri t3 d� _t '
� --( Ci ?
W 31 S A S NI 0 CID
a .m• rn.
A11SN31N1 -11ddNIV>1
W31SAS NI e
Id d0 WfiS ,, ,� S o- -
NISVe HOIVO
JNI831N3 Id
3dld NI 3W11 0 S, 0 0 R
s
13-INI 01310411 c\j \n r Q
1N3W03S 3N I-1 - ?' tA -
-52-
PLANNING DEPARTMENT
IN-HOUSE REFERRAL FORM
TO: Matt Galligan, Fred Shaw, Michael Gantick Thomas Field Bill Lan ning, John
Bond, Ray Favreau, Karl Reichle, Mel Stead, John Collins, Bob Deptula
FROM: Marcia A. Banach, AICP, Director of Planning
The Planning & Engineering Departments have received 63 42plans for the followigProJ
n project:
Location: �i c, , `� l .,le�
C Site Plan Subdiv # Acres y d. Zone T—
O�Industrial ❑ Commercial ❑ Residential # Lots/Units _
Water: E�Public ❑ Private Well Sewerage: 136Public ❑ Septic system(s)
Project Description: ate - ?, q�
Future Town-owned property involved? ❑ Yes 1;rNo
❑ new street(s) ❑ new detention area
❑ new open space/recreation area ❑ active ❑ passive
Planning Department notes:
Please comment b �/ZS�5 B
Y (feel free to use this form); return to Planning
Department. Thank you.
C(ice^ G� �.Gt✓ �l� �� ��-� �'Y�--4
rfl� Lid
PLANNING DEPARTMENT
IN-HOUSE REFERRAL FORM
TO: Matt Galligan, Fred Shaw, Michael Gantick, Thomas Field, Bill Lanning, John
Bond, Ray Favreau, Karl Reichle, Mel Stead ohn Collin Bob Deptula
FROM: Marcia A. Banach, AICP, Director of Planning
The Planning & Engineering Departments have received plans for the following project:
4 91t-431` - " --�
Location:
14 Site Plan Subdiv # Acres y �, Zone _
L"Industrial ❑ Commercial ❑ Residential # Lots/Units _
Water: Lf Public ❑ Private Well Sewerage: 2'�Iubhc ❑ Septic system(s)
Project Description: o7-b
Future Town-owned property involved? ❑ Yes 90 No
❑ new street(s) ❑ new detention area
❑ new open space/recreation area ❑ active ❑ passive
Planning Department notes:
Please comment b ly5l y 8
Y (feel free to use this form); return to Planning
Department. Thank you.
rTF- N c f-:a c PrCC �sC r�cr SP -s t,j t(t, Z V nw,
-((-rcy cdo
PLANNING DEPARTMENT
IN-HOUSE REFERRAL FORM
TO: Matt Galligan, Fred Shaw, Gantick, Thomas Field, Bill Lanning, John
Bond, Ray Favreau, Karl Reichle, Mel Stead, John Collins, Bob DeP tula
FROM: Marcia A. Banach, AICP, Director of Planning
The Planning & Engineering Departments have received plans for the following project:
Location: , `� ,� ..fie 2,4'
Site Plan Subdiv # Acres yam, Zone _
C]"'Industrial ❑ Commercial ❑ Residential # Lots/Units
Water: C(Public ❑ Private Well Sewerage: 0"Public ❑ Septic system(s)
Project Description: T?t cl�
Future Town-owned property involved? ❑ Yes d`No
❑ new street(s) ❑ new detention area
❑ new open space/recreation area ❑ active ❑ passive
Planning Department notes:
Please comment b f�'5m$
y (feel free to use this form); return to Planning
Department. Thank you.
0
by :3OWry WINJ50R Jan-26-33 . . :a6a,,, fron 6 723ai36a_ 6S ay� � 1
Ci u
�� • ��c` 1540 SULLIVAN AVENUE•SOUTH WINDSOR,CT 06074-2786
�oA-co AREA CODE 860/644.2511
FAX 860/64 -3781
Date: January 25, 1999
To: Fuss & O'Neill Tic.
146 Hartford Road
Manchester; CT 06040
Attn: Jim Cerbanowiez
From: Jeffrey. H. Folger
Zordng.-Wetlands Enforcement Off eer
Totitin of South Windsor
Re: Review of the Gerber Conference Center Facility, Kelly Road. plaits dated 1'12'99.
I have revie`ved the site plans for the proposed Gerber Conference Center Mth the Following
comments:
1. The plan should include notes detailing permanent and temporary seedL--i� type_•, rates. and
dates.
2. The existing storrn%vater system consists of concrete pipes discharging to a rip-rap channel
adjacent to the highway. This channel crosses the highway and discharges directly into the
m-
Hockanum River. There is very little area available to impound stor -ater for the time
necessary to provide adequate water quality renovation. I would reco.-r lend Lhat the
existing area be examined to determine how the stormwater system car be improved to
provide more efficient pollutant removal. Sedimentation structures should be incorporated
in the plan to minimize the migration of road sands and sediment generated from storm
events. Also trap hoods should be placed on the outlets of the proposed catchbasins to
minimize migration of hydrocarbons generated from automobile traffic.
3. The detail sheet shows a grassed Swale, This structure does not appear to be present on the
plans.
cc, Town En,,in-..
Tout Planner
IWAJCC
MEMORANDUM
TO: Marcia A. Banach, Director of Planning
FROM: Jerry C. Iazzetta, Town Engineer
DATE: February 1, 1999
RE: Gerber Site Plan 99-03
We have reviewed the drawings dated 1/12/99 for the proposed Gerber Site Plan
and have the following comments:
1. Traffic analysis should be submitted.
2. WPCA approval is required.
3. Grading of the existing "loam pile"to the north of the proposed building is
not complete.
JCl/sfg
ENGINEER\Prof.-P&z wetlands Applications\Gerber\Review Feb i.doc
MEMORANDUM
TO: Jeffrey H. Folger, Zoning/Wetlands Enforcement Officer
FROM: Jerry C. Iazzetta, Town Engineer
DATE: February 1, 1999
RE: Gerber Site Plan 99-03
We have reviewed the drawings dated 1/12/99 for the proposed Gerber Site Plan
and have the following comments:
1. Grading of the existing "loam pile"to the north of the proposed building is
not complete.
JCl/sfg
ENGINEER\Proj.-P&Z WedandsApplications\Gerber\Review Feb i.doc
r --
SITE DEVELOPMENT -
GERBER CONFERENCE CENTER
The construction of approximately 46,960 SF of building with required access drives,
parking lot, drainage, water, sewer, gas, power, landscaping, erosion control and
miscellaneous work to complete the project.
The area of site disturbance is approximately 4.8 acres. Erosion control devices to be
installed and properly maintained as required. Refer to Erosion Control notes and the
sequence of construction as indicated on sheet number 8 of 9 on the Site Development
Plans. All catch basins located within the paved areas have trap hoods with a 4°
minimum sump. These structures will act as a sedimentation chamber to minimize the
migration of road sands and sediment generated from storm events. Also,the trap hoods
on the outlets of the catch basins will minimize migration of hydrocarbons generated
from automobile traffic.
The drainage systems are split into three small separate areas within the site and will
then connect to the existing drainage system at structure numbers 5, 12 & 10.
The total site drainage discharge to an existing 36" RCP at structure number 12 which
runs to a catch basin within the State right-of-way. This catch basin turns 90 degrees
which will act as a energy dissipator. The final outlet pipe flows north to a relatively flat
area which appears well established with grass and other plant growth. This area should
act as a natural bio-filter which will help to remove additional pollutants.
Post Construction Stormwater Management:
Control measures include catch basins with trap hoods and sumps. The owner shall be
responsible for maintaining these control devices and removing sediment and debris
from them at a minimum of once a year or as required for unusual circumstances. These
maintenance procedures will be utilized to help reduce the transmission of solids from
the site. Other procedures include,but are not limited to, sweeping of parking areas and
the proper use of fertilizers.
All disturbed areas will be stabilized with grass, landscaping or pavement. As a result,
the proposed vegetative cover and pavement should be sufficient to control erosion&
sedimentation, if properly maintained.
81191\A 10\GBM0216A.W PD
Corres.
GERBER SITE PLAN 2-16-99
1. Request for site plan approval for a new 47,000 sq ft building on Lot*at
Gerber's existing site on Gerber Road West, I zone. Lot size is 12 acres, V2 acre
required. Proposed impervious coverage is 23%; 65% allowed . Proposed
building height is 37.5 feet, 40 feet allowed.
2. Public water & sewer are provided. Water Pollution Control Authority approval
is required.
3. There are no regulated wetlands on the site. This application is pending with
IWA/CC for conservation plan approval.
4. The entire Gerber complex currently has 609 existing parking spaces; the new
construction will rearrange some of the existing parking, with an end result of
63 5 spaces for the complex after construction. STC review is required, since the
site has an existing STC permit.
5. There is a 50' buffer requirement on Lot 4 where the I zone abuts the A-20 zone
along Kelly Road and Gerber Road West. There is a buffer of mature pines
along both Kelly Road and �erber o d West. taff s est that Gerb
consider addirrg-,,*nn ew �4t4ft ro�
�`�
Kr. dk in anticipation of future trimming and attrition as the mature pines
age. The Director of Public Works has indicated that the close proximity of the
existing pines to Kelly Road results in ie�nc ec fo trfin�iir-�Cg-pr pdss&ke,-,�
wintertime roadway icing resulting from the shade of the
mature trees. Pjihlf�,4oAu�t ,ff-Auggdstsrtti4t-qew�es-be-plaAted 80-1-00'-
, ay`fr6r1Y el R-dano-Wproblt7"9 ot)r .
6. ADRC reviewed this plan on February 4 and was completely satisfied with the
design and landscaping.
GERBER SITE PLAN 2-16-99
1. Request for site plan approval for a new 47,000 sq ft building on Lot 4 at
Gerber's existing site on Gerber Road West, I zone. Lot size is 18 acres, V2 acre
required. Proposed impervious coverage is 23%; 65% allowed . Proposed
building height is 37.5 feet, 40 feet allowed.
2. Public water & sewer are provided. Water Pollution Control Authority approval
is required.
3. There are no regulated wetlands on the site. This application is pending with
IWA/CC for conservation plan approval.
4. The entire Gerber complex currently has 609 existing parking spaces; the new
construction will rearrange some of the existing parking, with an end result of
635 spaces for the complex after construction. STC review is required, since the
site has an existing STC permit.
5. There is a 50' buffer requirement on Lot 4 where the I zone abuts the A-20 zone
along Kelly Road and Gerber Road West. There is a buffer of mature pines
along both Kelly Road and GerberRoad West. Staff suggest that Gerber
consider adding a second row of new small pines behind the existing row on
Kelly Road, in anticipation of future trimming and attrition as the mature pines
age. The Director of Public Works has indicated that the close proximity of the
existing pines to Kelly Road results in the need for trimming or possible
removal due to the wintertime roadway icing resulting from the shade of the
mature trees. Public works staff suggests that new trees be planted 80-100'
away from Kelly Road so this problem does not recur.
6. ADRC reviewed this plan on February 4 and was completely satisfied with the
design and landscaping.
40*M 8e4
0.1
1540 SULLIVAN AVENUE• SOUTH WINDSOR,CT 06074-2786
It-co�' AREA CODE 860/644-2511
FAX 860/644-3781
February 26, 1999
Certified Mail
Gerber Scientific, Inc.
83 Gerber Road West
South Windsor, CT 06074
Dear Madam/Sir:
Re: Appl #99-03P, Gerber Scientific, Inc./Gerber Conference Center
At the February 17, 1999 regular meeting, the Inland Wetlands Agency/Conservation
Commission approved appl #99-03P, Gerber Scientific, Inc., IWA/CC conservation
permit for the construction of a 46,960 sq. ft. office building, parking area, storm
water structures and associated improvements on property located on the southerly
side of Kelly Road and easterly of Gerber Road West, westerly of Gerber Road East, I
zone (Assessor's map #55, parcels 71 and 72) as shown on plans prepared by Fuss &
O'Neill, Inc., Job Number 81191A10, Phase 8000 and revised through January 12,
1999. This approval is subject to the following conditions:
1. One blueprint copy of the entire set of plans and this letter reproduced thereon,
must be submitted to this Commission. This must be completed within 65 days
of approval prior to any construction activity on the site. Plans submitted to
Planning & Zoning Commission shall be considered having met this requirement.
2. The application shall indemnify and hold harmless the Town of South Windsor
against any liability, which might result from the proposed operation or use.
3. The permit is valid for five years and shall expire on February 17, 2004. It is the
landowner(s)/applicant(s) responsibility to track expiration dates and notify the
Commission of a renewal request at least 65 days prior to expiration.
4. All approvals required must be obtained and submitted prior to any activity on
the site.
5. A contact person shall be identified on the plans.
6. We recommend a bond in the amount of $2,000 be submitted to the Planning &
Zoning Commission to ensure compliance with the Erosion and Sedimentation
Control Measures.
7. The applicant shall inspect the drainage system a minimum of two, times of year
and cleaned accordingly.
Very truly yours,
INLAND WETLANDS AGENCY/
CONSERVATION COMMISSION
Elizabeth A. Warren, Chairman
EAW/pmm
Cc: Chief Building Official
Planning & Zoning Commission
Town Engineer
Fuss & O'Neill, Inc.
taw M aft
a '
1540 SULLIVAN AVENUE•SOUTH WINDSOR,CT 06074-2786
Soe co�' AREA CODE 860/644-2511
FAX 860/644-3781
CERTIFIED MAIL
February 26, 1999
Mr. Guy Mitchell
Fuss &. O'Neill, Inc.
146 Hartford Rd.
Manchester, CT 06040
Dear Mr. Mitchell:
Re: Appl #99-03P, Gerber Scientific Site Plan
We are pleased to advise you that the Planning & Zoning Commission voted on February
16, 1999, to approve with modifications the above referenced application for a Site Plan of
Development.
This approval is for the construction of a 47,000 sq. ft. conference center on property
located at 83 Gerber Road West, I-zone, as shown on plans prepared by Fuss 8a ONeill, Job
No. 81191 A 10, dated 1/12/99, as revised. This approval is subject to the following
modifications:
1. Prior to commencement of any site work, a meeting must be held with Town Staff.
2. No building permit will be issued until the final mylars have been filed in the Town
Clerk's office.
3. This application is subject to the conditions of approval of the Inland Wetlands
Agency/Conservation Commission, including a bond in the amount of$2,000.
4. An as-built plan is required prior to issuance of a Certificate of Occupancy per Section
8.1.10 of the Zoning Regulations.
5. Footing drains are required if the building has a basement.
6. All plans used in the field by the developer must bear the stamp and authorized
signature of the Town of South Windsor.
7. WPCA approval is required.
Black and white transparent mylars of Sheet #3 with the above modifications, together with
three (3) blueprint copies of the entire set of plans must be submitted to this Commission
within 30 days to be stamped and signed. The letters of approval of this Commission as
well as the Inland Wetlands Agency/Conservation Commission must be reproduced on the
mylars.
After the mylars have been signed by the Commission, they will be returned to you for filing
in the Office of the Town Clerk. After filing these plans, a copy of the receipt must be
submitted to the Planning Department.
Very truly yours,
PLANNING & ZONING COMMISSION
AL-
Frank A. Castro, Chairman
FAC/dlw
cc: Town Engineer
Chief Building Official
Assessor
Superintendent of Pollution Control
Fire Marshal
��.NN SFq
7W
1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074
�llosoR.co AREA CODE 203/644-2511
March 10, 1999
Mr.Anthony Pagliuco E C U12
V E D
Gerber Scientific Inc.
83 Gerber Road West � ;5 - , 1999
South Windsor,CT 06074
RE: Gerber Conference Center �1►s9 ° �"3 J_ Uet.s�o
83 Gerber Road West
SOUTH WINDSOR,CT
Dear Mr.Pagliuco:
The South Windsor Water Pollution Control Authority,at its regular meeting of March 2, 1999,gave approval for
the connection to the Town's sewerage system of a commercial building at 83 Gerber Road West,as more
specifically shown on plans entitled"Proposed Site Development Plans-Gerber Conference Center-83 Gerber
Road West South Windsor,CT"prepared by Fuss&O'Neill,Inc.,Manchester,CT,Job No. 81-191.A10,drawing
4 of 9(Topographic Plan)dated 1/12/99,no revisions,and subject to the following conditions:
1. Technical approval of the Town Engineering Department.
2. Final Authority approval and acceptance of the sanitary sewerage connection will be given once the sewer
line has been installed and inspected by the Town staff,and based upon the written verification of the
Town staff that said sanitary sewer line was installed in substantial conformance with the design plans
previously approved by the Authority,and meeting all Town regulations and appropriate technical
specifications relating to sanitary sewer construction.
3. A connection charge,due at the time the drain layer's permit is applied for,will be$10,750.00
(approximately 4.3 acres at$2,500/acre).
4. This approval letter must be superimposed on the final approval plans.
Very tr yours,
Thomas ds ,Chairman
Water P llution Control Authority
TH:rt
cc: Matthew Galligan,Town Manager
Michael J. Gantick,Director of Public Works
Jerry Iazzetta,Town Engineer
Marcia Banach,Director of Planning
John Collins,Chief Building Inspector
Guy Mitchell,Fuss &O'Neill
Gerber Scientific, Inc.
83 Gerber Road
South Windsor, CT 06074
Y
April 29,2002 AM u NO2
Town of South Windsor SOUTH WINDSOR PLANNING DPT,
Kevin McCann
Planning and Zoning Dept.
1540 Sullivan Avenue
South Windsor,CT 06074
Dear Mr. McCann:
The following letter is in reference to Bond #1 1 1 27400205, Gerber Scientific as Principal and The
American Insurance Company as Surety for Erosion and Sedimentation Control, Gerber Conference
Center—83 Gerber Road,South Windsor.
At this time Gerber Scientific is asking for a release of the above bond as we are not planning
construction of the Conference Center in the near future.
In addition if we plan construction before the 2004 permit expiration we will once again have a site plan
bond in place.
Sincerely,
k7�'�C' (Xe �
John C. Champ
Facilities Supervisor
l�wN 8�1
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074
SOR.Co TELEPHONE (860) 644-2511
July 3, 2002
Mr. John Champ
Gerber Scientific, Inc.
83 Gerber Road West
South Windsor, CT 06074
Dear Mr. Champ:
Re: Appl #99-03P, Gerber Scientific, Inc.
This is to advise you that the Planning and Zoning Commission voted on June 25, 2002, to release the
erosion and sediment bond for the above-referenced project in the amount of$2,000.00.
Advance arrangements should be made to pick up the bond to ensure that the necessary contact person(s)
will be available. If you have any further questions contact the Planning Department at 644-2511, ext.
253. Thank you.
Sincerely,
Kevin McCann
Planning and Zoning Commission
KMcC/kah
cc: Town Engineer
Chief Building Official