HomeMy WebLinkAboutSite Plan of Development (46) TOWN OF SOUTH WINDSOR, CONNECTICUT MV PLANNING & ZONING COMMISSION APPLICATION FORM Application No. : 61--7-2g P DEC 2 1997 -Date Received: C� 7 - /Public Hearing Ul-/3-9� South Windsor Receipt No. Planning & Zoning Commissios APPLICANT: Arturo Guerra & He]mar Wolf ADDRESS: 989 Ellington Road, South Windsor, CT 06074 OWNER OF RECORD ON LAND RECORDS (sue) ADDRESS: COMPLETE LOCATION OF PROPERTY: 970 Ellington Road (Podunk Farm) Assessor's Map # 48 Parcel # 55 Zone A-20, FP I"E, ADDRESS, & TEL & FAX # OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED: Peter R. DeMallie, DPI, 165 S. Satellite Road, S. Windsor, CT 06074 THIS APPLICATION IS FOR: (Check all that apply) : _1. Zone Change to (Public Hearing required) _2. Subdivision/Resubdivision a. Subdivision _ Minor Major b. _ Resubdivision Minor _ Major (Public Hearing Required) c. _ Conditional Approval d. _ Open Space Subdivision (Public Hearing Required) _3. Special Exception to Article (Public Hearing Required) 2�_4 . Site Plan of Development _5. General Plan of Development _6. Earth Filling [Sec. 151 and/or Earth Removal [Sec. 141 (Public Hearing Req) _7. Regulation Amendment: Zoning Subdivision _8. Amendment to Town Plan of Development _9. Temporary and Conditional Permit _10. Other (explain in detail) : Applicant Property Owner (See reverse side for additional information) 1 TOWN OF SOUTH WINDSOR CHECKLIST REQUIRED INFORMATION SITE PLANS APPLICANT ilra tauowz- waL F ATz-7y P-o PROJECT NAME_ .40X t 4.IA& i ,LY `-:' T.. (.:Pv Urk` arm This checklist must be sigma by plan a6-g that.all,required information is provided. Items 1-7 are required for all applications; items..$-1 :.required vyhere appropriate. Check mark for each item supplied. 1. On each sheet for plans or maps, title block with the following information: a. Name, address and telephone of applicant. :. b. Name, address and telephone number of Land Surveyor or Professional Engineer. - C. Name of Development. d. Date when drawings were made. 2. Key Map: An overall map drawn to a scale of 1 inch equals 200 feet, which can be used as an overlay on Metropolitan District Maps. This map will show the overall design of the Development and surrounding property within 500 feet. a. Date block which gives needed zoning information such as-percentage of lot coverage, ,. acreage of tract, number of apartment units, parking requirements, etc.. b. Layout of buildings. c. Layout of streets and parking. 4 d. Lines indicating proposed drainage system with direction arrows. �LA T e. Lines indicating sanitary sewer system with direction arrows. X L Names of surrounding property owners. N g. Proposed open spaces and recreation areas. 110- h. Driveway cuts on surrounding properties. A) I. Architectural Elevations: See attached checklist for Architecture and Design Review. 4. Plot Plan: A layout map of the proposed site drawn to a scale of 1 inch equals 40 feet on either of the following size sheets: (1) 24" x 36" with a 3/4" ruled margin; -(2) 18" x 24" with a 1/2" ruled margin, containing the following data: a. Distance and bearings of all boundary lines and acreage of site. Iron pins required at all property angle points and shown on map. b. Proposed streets and street lines with center line station, curve data, and parking spaces. . _ c. Building lines in accordance with zoning regulations. d. Proposed buildings and other structures, including signs, outside lighting, and dumpsters (on concrete pad and screened). e. Easements, noting grantors, grantees, and purpose. f. Names of abutting property owners. g. Monuments will be indicated at corners and angles of all streets and at all points of curvature and tangency. In areas accessible to Metropolitan District Commission points, or other coordinated points, the monumented points within proposed site shall be coordinated. These coordinates shall appear in tabular form on the plot plan. The accessibility of these MDC points shall be determined by the Town Engineer. h. All open space or other common or public land uses shall be indicated. i. A-2 certification; P.E./L.S. Seal. LC 5. Topographic Map: A map drawn to a scale of 1 inch to 40 feet on sheets not exceeding 24 inches by 36 inches, including ruled margins shall in addition to the requirements of the plot plans show the following: )C a. All existing and proposed buildings. b. Curb Lines and pavement width, sidewalks. c. Existing and proposed sanitary sewers. f d. Existing and proposed water and gas main systems. e. Present wooded area indicated by foliage lines. Any individual trees to be saved should be shown. f. Existing and proposed contours shall be shown in not less than two-foot intervals, but in cases of relatively level land, the contours shall be one-foot intervals and spot elevations. ,ZC g. Regulated wetlands and 100-yeah floodplain or note that none are present. h. Proposed storm drainage system, showing all catch basins, endwalls, manholes, lengths and sizes of pipes. (Maximum distance between catch basins shall be 300 feet and minimum sue of storm drain lines shall be 15 inches. W1.4 i. Connections of all springs into proposed storm drainage system as needed. I j. Location and indications of existing brook channels,and 100-year flood limits. k. A-2 Certification; P.E./L.S. Seal. )C 6. Landscaping plan: - 7. Drainage calculations: -Zero Runoff Increase per attached guidelines. 8. Traffic Report: - 2 - 9. Plans and Profiles: A plan and profile of the proposed streets drawn on plan/profile paper of scales 1 inch to 40 feet horizontally, and 1 inch to 4 feet vertically on sheets not exceeding 24 inches by 36 inches, including ruled margins and containing the following: a. Layout of streets in sections coordinated by stations with the profile. b. Street plan showing roadways and drainage. c. Sight line at driveway & street intersections. d. Profile of roadway showing existing and finished grades. Roadway profile will show all tangent grade and all vertical curve information. e. Profile will show all catch basins and all drainage lines between catch basins with all invert and top of frame elevations. Drainage lines will be shown and described as to material. f. Where any storm drainage line discharges into an existing brook sufficient profile of this brook will be shown to determine conditions. g. Metropolitan District Commission datum shall be used on all sites accessible to these controls. The Town Engineer shall, based on standard engineering practices, determine the accessibility of these controls. h. Profiles shall show all sanitary sewer lines and manholes, including elevations, sizes, lengths, and slopes of pipes. Top of foundation elevations for building shall be shown. �v 10. Open Space Site Improvement Plans: For sites which require or include a provision for open spaces, a plan which contains data for site improvement may be required. This map shall be drawn to a scale of 1 inch equals 40 feet. i� 11. Sanitary Report: Where individual sanitary sewage disposal systems are proposed, the final plans shall include a Sanitary Report certified by a Professional Engineer. The report shall demonstrate the feasibility of the proposed individual systems; the report should deal with the area as a whole, discussing the following points: a. General nature and;development of surrounding area. b. Topography and natural drainage pattern. c. Subsurface conditions as shown by subsurface investigation, including soil absorption characteristics, ground water level conditions, ledge cock, and general nature of soil. _ d. General description of type of development contemplated. e. Detailed description of proposed sanitary sewage disposal facilities, indicating sizes for various ground conditions, materials to be used, and the general layout pattern to be used, etc. f. Special precautions that may be necessary to provide proper functioning of the proposed disposal systems. g. map of general area with locations of all tests shown on proposed layout. h. Flood heights of any nearby streams, brooks, or rivers. - 3 - i. Test results and engineering evaluation per Section 4.13.5. All information required above is included in this application at the time of submission. !Z/z/97 PLANP P.E. L. . � May 17, 1995 -4 - PODUNK FARM PARKING LOT 1. Request for site plan approval for a 75 space parking lot located directly across from the Mill on the River Restaurant, on the westerly side of Ellington Road, A-20, FP zone. 2. Parking on the residentially-zoned premise at 970 Ellington Road had been previously approved through a temporary and conditional permit granted by the Zoning Board of Appeals. It was specifically to allow employee parking for the Mill on the River restaurant across Route 30. ZBA originally granted a one- year T & C for employee parking for 35 employees in November 1989, and renewed the T & C in 1990, 1992 and 1994 for two-year periods. PZC approved it for a two year period suggesting to the applicant that they try to find a permanent solution. 3. The parking regulations states: the Commission may approve off-site parking for a permitted (lawful) non-residential use provided that: 1) adequate vegetative or other screening will be achieved; 2) available sight line meets CDOT minimum standards; 3) such additional off-site parking requirements of the existing non-residential use will be used exclusively for this use; 4) no area presently available on the site of the existing non-residential building to provide additional on-site parking; 5) the residential character of the neighborhood will not be unduly disrupted; 6) the primary site should be able to be accessed without any pedestrian crossing of any public street. This provision may be waived only if the applicant demonstrates to the Commission that there is no other practical and feasible solution, and that the proposed roadway crossing does not create an unsafe condition. 4. The applicant has provided a site plan showing 75 parking spaces and has provided a landscape plan for screening the parking area. They have also designed a lighting plan which was reviewed by the ADRC after the original approval 5. There are regulated wetlands on the site. The applicant is pending with IWA/CC. r 6. This applications was originally approved in 1998, however it was never built and the approval has since expired. At the time of the original approval there were several conditions placed on the approval. The PZC had required the following requirements must be adhered to: a. The new lot will continue to be used solely for employee parking to the maximum extent possible. b. On evenings where patrons are expected to exhaust all available parking in main lots, valet and/or supervised parking will be permitted in the new lot. 'As indicated by the applicant, the services of a public safety officer will be retained on those evenings when patrons are anticipated to park in the new lot. 7. Staff continues to be concerned about pedestrians crossing Route 30, particularly at night. It should be noted that in the past there were vehicles parking along the grass at the Mill, as well as along Ellington Road and Beldon Road. There have been occasion over the last few years where parking has been occurring across the street without any personnel ensuring the safety of pedestrian crossing. 8 edestrian actuated flashers are shown to be installed as required with the i previous approval. 9. The South Windsor Police Services have reviewed the new proposal and submitted the following memorandum: If this application is approved, the planning department has no further modifications to request. RECEIVED o 270 Amity Road BARQ IF PLANNING Woodbridge,Connecticut 06525 �j \\ I ENGINEERING fE� 1� � Q O Q 4 \ I A N D DESIGN Telephone: (203)397-3600 Telecopier: (203)397-3642 =?j-WMSDR PLANNING DEPT. February 10, 1998 Ms. Marcia Banach Director of Planning Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06040 RE: MILL-ON-THE-RIVER RESTAURANT NEW PARKING LOT ROUTE 30 (ELLINGTON ROAD) SOUTH WINDSOR, CONNECTICUT Dear Ms. Banach: Reference is made to the proposal to construct a 90+ space parking lot on the west side of Route 30 to serve as overflow parking for the restaurant across the street on the east side of Route 30. The site drive serving the new parking lot would be aligned directly opposite the site drive now serving the south parking lot. The proposal calls for relocating the crosswalk, warning signs, and flashing lights which were installed by the Connecticut Department of Transportation (ConnDOT) within the last ten years to provide safe crossings to the unpaved parking area located opposite the restaurant. This lot has provided an overflow parking area during peak restaurant times, and the crosswalk is located north of the site drive serving the south parking lot, or about 135 feet north of the proposed location of the relocated crosswalk. We understand that the existing crosswalk has been monitored by off-duty police personnel during peak restaurant periods, and that there have been no incidents involving patrons as pedestrians or motorists over the last ten years. In reviewing this matter in the field and with Sgt. Tom Field of the Town's Police Traffic Services Unit, we both expressed concern that with vehicular speeds exceeding 45 miles per hour on Route 30 in the vicinity of the restaurant, the accommodation of a crosswalk at this location may not be desirable. However, there are certain facts regarding this matter which should be considered: 1. The area across the street from the restaurant has been used for overflow parking on various occasions over the last ten years. During peak periods of restaurant activity, which are primarily on Friday and Saturday evenings and on about 15 other occasions during the Christmas holiday season, employees as a minimum, and patrons on some evenings, have been parked across the street. On these occasions, an off-duty officer with flashing lights operating 2 on his nearby cruiser, has assisted pedestrians in crossing the street. Sgt. Field informs me that there have been no incidents over the last ten years. 2. The proposed parking lot project intends to formalize this overflow parking situation by providing a paved, well-lighted area, with a relocated crosswalk and sidewalks leading to the crosswalk at each end. The policy of providing an off-duty officer will continue, and the parking lot will be utilized only during peak periods. 3. The provision of a crosswalk, with warning signs and flashing lights, was approved and installed by ConnDOT when first requested by the restaurant within the last ten years. The existing crosswalk was located to provide the most direct route between the restaurant and the parking area that is now being utilized at the north end of the parcel across the street. The proposed location of the relocated crosswalk is the best vantage point to optimize sight distance in either direction, enables the crosswalk to be located so that connecting sidewalk segments can be installed at each end, and although the street lighting is adequate with fixtures on every utility pole, lighting is also proposed in the new parking lot. 4. A recommendation considered by the Police Traffic Services Unit was for the installation of a tunnel under Route 30 to provide pedestrian connections between the two sides of the street. From my own past experience on similar matters, it is very doubtful that the State would allow the construction of a pedestrian tunnel for various liability and maintenance reasons, but primarily because it is doubtful that anyone would use such a tunnel. Pedestrians tend to follow the path of least resistance, and it is very unlikely that they would climb in and out of a tunnel when they can walk across the street much easier if they stay at grade. 5. Conversations with two staff members of the ConnDOT Traffic Division who are both familiar with this restaurant have indicated that they believe that this area may be a good candidate for flashing pedestrian warning signs that are activated only upon demand by the pedestrians themselves. This traffic control treatment is relatively new to Connecticut, and although there are only three approved sites at this time in Connecticut, none have yet to be installed. Both Sgt. Field and I were hoping to observe such an installation for ourselves in order to formulate our own opinions. However, it appears that such an installation would have the advantage of not flashing at all times which eventually goes unnoticed by the approaching driver, but to only flash upon demand which tends to have more target value. Signs would be provided at each end of the crosswalk in proximity to the push-buttons with legend: PUSH BUTTON TO ACTIVATE WARNING FLASHERS—CROSS WITH CAUTION. 3 In conclusion, it is my opinion that the new parking lot across the street, with relocated warning signs and flashers, should not adversely impact either vehicular or pedestrian safety. Since the existing operation has operated in a similar fashion over the last ten years with no adverse consequences, and since the new lot attempts to formalize rather than expand existing conditions, these pedestrian crossings should not have a negative impact. This location may be a good candidate for the installation of pedestrian actuated warning flashers although I, as does Sgt. Field, would like to observe an existing location before I formulate an opinion on this type of traffic control. However, as a minimum, the crosswalk should be relocated as proposed to achieve the best possible crossing location, with improved sight lines over the existing location, and the existing warning signs and full-time flashing units should be relocated as well. Very truly yours, James G. Bubaris, P.E. Principal Bubaris Traffic Associates, Inc. Cc: Peter DeMallie Design Professionals 165 South Satellite Road South Windsor, CT 06074 Arturo Guerra Helmar Wolf Mill-on the-River Restaurant 989 Ellington Road South Windsor, CT 06074 DESIGN PROFESSIONALS,Inc. 165 South Satellite Road South Windsor, Connecticut 06074 Hydrologic Study of 970 Ellington Road South Windsor, Connecticut for Helmar Wolf and Arturo Guerra December 2, 1997 Table of Contents Introduction and Orientation............................................................................................ Drainage Summary................................... ............2 Existing Drainage Basin Map...........................................................................................3 Existing Drainage Basin Characteristics............................................................................4 Proposed Drainage Basin Map.........................................................................................5 Proposed Drainage Basin Characteristics...........................................................................6 Proposed Storm Structure Drainage Basin Map................................................................7 Proposed Storm Structure Drainage Basins......................................................................8 Proposed Storm Pipe Characteristics................................................................................9 Routing for Sedimentation Channel................................................................................11 Cut/Fill Calculations.......................................................................................................14 Chart 2 -Rainfall Intensity Chart Chart 3 - Nomograph for Determining Time of Concentration Chart 6.B -Values of Hydraulic Elements of Circular Section for Various Depths of Flow f Introduction The subject of this drainage study is the eastern portion of the site at 970 Ellington Road. The site is located on the west side of Ellington Road, approximately 200 LF south of the intersection with Beldon Road. Under present conditions, the eastern portion of the site is an open field with three existing small structures. The Podunk River flows southwest within the site. Wetlands were located within the low lying areas of the site near the Podunk River. The proposed improvements to the site involve the construction of an auxiliary parking lot for the Mill on the River Restaurant. The construction of the proposed parking lot involves the removal of the existing barn, landscaping, and the construction of the proposed storm management system, including a sedimentation structure and biochannel. 48-63 DRAINAGE EASEMENT 48-28 48-64 DRAINAGE \\� EASEMENT 48-65 48-55 �. .':' �.'.'.'.'.'.'.'.'.'. ; CONSERVA ON EASEMENT 48-29 48-66 • 2 . •SA . MILL ` " N IR S. . .'.'. .. . q. t- " . . . .'. . . . . .- 48-29 DRAINAGE EASEMENT.-." - • . . . . . . . . . . . . . . . 8-68 47-34 S�wER l<Z 2 �5 SEA t , OA. �p \ O 47-35 �'" " . . . . .' '. . .. . . .�. . �� c^ i + 10 47-36 34-41 \ 35-3 f 34-42 35-1 \\ Orientation Drainage Summary The subject of this drainage study is located on the west side of Ellington Road, approximately 200 LF south of the intersection with Beldon Road. The site contains wetlands within the low lying areas near the Podunk River. The Podunk River flows southwest and meanders from the northeastern corner through the center of the site to the southwestern edge of the site. The eastern upland area of the site is primarily open field with a small portion of wooded area in the southeastern corner. The three existing structures are located within the eastern upland area. Gravel drives are located within the eastern upland area around the existing structures. The western upland area is primarily wooded area. Sanitary sewer easements run through site connecting Hilton Drive and Ellington Road. An auxiliary parking lot is proposed for the Mill on the River Restaurant within the eastern upland area. The proposed parking lot requires the removal of the existing barn. A stormwater management system is-proposed to mitigate the adverse effects of the proposed parking lot. Overland flow will be captured within catchbasins and collected within a sedimentation structure. The sedimentation structure, as well as, the 2' sumps within the catchbasins, will collect sediment to prevent transfer of sediment within the stormwater management system. The sedimentation structure will also aid in the removal of oils from the stormwater. The flow discharge from the sedimentation structure to a manhole which will help dissipate the velocity and energy of the flow. The discharge will eventually flow into a biochannel where vegetation will aid in the removal of pollutants and sediments. The stormwater will permeate through the stone barrier along the western edge of the vegetative channel and eventually discharge into the Podunk River. 1 ; V� — ;\ I 1 � `.� ♦ 1 .� �..._.., , � �' :/ its t % f ij�i �`•��• .• i 1 it t 1 / � :"••�,• •----. w 00 .... • \ it i 1 rww w.....w.w..•r 1 1 i�':is w�;w w ww wwi• RATIONAL METHOD BASIN Area I Description AI Length Elevation Slope Tc Q OR [acres] change [cfs] STRUCTURE q 0 0 0.-4-� 0 . 07 0. I vA D D I Q, 0� civil engineers• plarmers• surveyors•91s ()e�sigr) Project: 1"" (ll t1ti�'i4'i.q iY 1. Proj.No.: 4 ,;. Iq roessionols, Inc. Calc.by: ,� Date:9i�Chkd by: Date: � 165 South SatellitQ Road,South Windsor,CT 06074 (860)291-8755•FAX:291.8.767•e-mail:dpicivileaol.com t ' i i 11•! i I Illy I�P( -•-•-''fit \ 1 \ \i �1'i{'�".�"is. •. .� „GRAMM SAWN ISWW ICif�s AgLIy/Yf(.1OA •rwwsr ww�rwww. wlwrwWW�nw• No�1• �10. PswwrTI Aw JggfW W�tI Il[14RR `""'""'"""•'"""'"'111 tlYl....p. RATIONAL METHOD BASIN Area I Description AI Length Elevation Slope Tc Q OR [acres] change [cfs] STRUCTURE a. �' 0AV 0. gq- ¢7 I 0.0 -3-. ) 4•07 � , l� ►�a•�aod� d. t 4 �.od 4. t Z 0 7 civil engineers• planners• surveyors•gis ()eglgrl Project: l I ✓� ) off Proj.No. 4�"�^ossionals, inc. - j Calc.by: Date:�' Chkd by: Date: 165 South Satellite Road,South Windsor,cT 06074 (860)291-8755•FAX:291-8757•e-mail:dpicivll®aol.com i ■ p`d enOeefs• ptamers • surveyors • gis esig n Pro ect:bil l o„� �.►r�r Proj.No.dZi-16 rofessionals, inc. Descr' tion: ri 165 South Satellite Road,South Ww>dsor,CT 06074 Calc.By:tEt�H Dater `t f hkd By: Date: (860)291-8755•FAX:291-8757•e-mail:dpiciviWad:com IX S.YCK !a r., .M,' ♦ ` ® ix a I� «avAlat sF 42 I UP OW UNE SMET C. Na 2JM i 1 1 , 1 1 1 , r r � 1 1 1 1 ' ♦ ,� ♦ i , f � 1 �` 1 1 ♦ % 1 ♦ 1 ` 1\ 1 I _ 1 ♦ , 1 1 1 ���� ♦ ♦ 1 ♦ 1 1 1 1 1 ♦ 10 -F71Tn) Pro 0�M. `FYI RATIONAL CN15 RATIONAL METHOD BASIN Area I Description Al Length Elevation Slope Tc Q OR [acres] change [cfs] STRUCTURE I ) ' : Q 0.1 Or.;, "5 0. 10 . �� LAW tl 0.04- 0 q I .t? m 0,?;,15 D I< I 0 11i7 D I I �. D• I' 01D ✓e,rYi Cf i 0. I I r2 1 D.0 � 0 8 Db Z- 0130 t . .L. M...__ .. i L. l) b,2- 0,07 0,90 Ail - 0, ( 0 1.r2' 0.0r I D•D 1� 0 .0 , 70 b civil engineers planners•surveyors •gis eSlgrl Project: Proj.No.: �� .�I rofesslona(s, Inc. Calc.by:rL J Date:J �hkd by: Date: i 165 South Satellite Road,South Windsor,CT 06074 (860)291.8755•FAX:291.8757•e-mail:dpicivilQaol.com TOWN OF SOUTH WINDSOR STORM SEWER SYSTEM DESIGN PROJECT STREET CHECKED By NINO Muslim AIIOO13A 39V?J3AV loll IN ALI X 3d1d AO HION31 3ZIS 3dId 7 AIISN31NI 1-1VANIVU 111IM1111111 NINE I Y431SAS NI iv io vins NISVS H31V3 ON183IN3 IV 3d1d NI 3rill : IN3Y493S 3NI-1 STORM PIPE INFORMATION Structure Q in system Pipe Size Slope n Area R Q full Qsys/Qfull Vfull Vave/Vfull* Vave [cfs] [in] [fpf] [sf] [ft] [cfs] [%] {f/s] [%] [f/s] CB#1 1.55 15 . 0.02 0.01 1.23 0.313 11.91 13.0 9.70 80 7.76 CB#2 2.38 15 0.02 0.01 1.23 0.313 11.91 20.0 9.70 86 8.35 CB#3 2.7 15 0.02 0.01 1.23 0.313 11.91 22.7 9.70 105 10.19 CB#4 4.64 15 0.04 0.01 1.23 0.313 16.84 27.6 13.72 113 15.51 MH#1 4.64 15 0.02 0.01 1.23 0.313 11.91 39.0 9.70 103 9.99 FES#1 CB#5 0.86 15 0.03 0.01 1.23 0.313 14.58 5.9 11.88 103 12.24 CB#4 CB#6 0.27 15 0.03 0.01 1.23 0.313 14.58 1.9 11.88 71 8.44 CB#4 *From Chart 6.6-Values of Hydraulic Elements of Circular Section for Various Depths of Flow D:\JOB\88319\STMPIPE.xis ■ Civil engineers • pWnmrs • surveyors • gis esign Project: Pro;!!N, o. 50 rofessionals, inc. Description: OUklrw 0, U1uY)n�� 165 South Satepite Road,South wr>as",CT 06074 Calc.By:FLhL Date:IZ 2 Chkd By: Date: (860)291-8755•FAX:291-8757•e-mail:dpicivoCaol.com (6.0 rt�p� lZWO-rf' 43- GF 2 r S4rrrn ' irnl.�t- -af`i` ttnrl 100, 10' x �� �O CF L w J'-2 0O > �- r in w Hydrograph Report Page 1 Hyd. No. 2 FIRST FLUSH Hydrograph type = SCS Runoff Peak discharge = 0.04 cfs Storm frequency = 2 yrs Time interval = 2 min Drainage area = 2.1 ac Curve number = 78 Basin Slope = 0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 14 min Total precip. = 1.00 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Total Volume=434 cult,0.010 acft Hydrograph Discharge Table Time -- Outflow Time -- Outflow Time -- Outflow Time -- Outflow (hrs cfs) (hrs cfs) (hrs cfs) (hrs cfs) 12.27 0.01 13.40 0.02 14.53 0.02 15.67 0.01 12.30 0.02 13.43 0.02 14.57 0.02 15.70 0.01 12.33 0.02 13.47 0.02 14.60 0.02 15.73 0.01 12.37 0.03 13.50 0.02 14.63 0.02 15.77 0.01 12.40 0.03 13.53 0.02 14.67 0.01 15.80 0.01 12.43 0.03 13.57 0.02 14.70 0.01 15.83 0.01 12.47 0.03 13.60 0.02 14.73 0.01 15.87 0.01 12.50 0.04<< 13.63 0.02 14.77 0.01 15.90 0.01 12.53 0.03 13.67 0.02 14.80 0.01 15.93 0.01 12.57 0.03 13.70 0.02 14.83 0.01 15.97 0.01 12.60 0.03 13.73 0.02 14.87 0.01 16.00 0.01 12.63 0.03 13.77 0.02 14.90 0.01 16.03 0.01 12.67 0.03- 13.80 0.02 14.93 0.01 16.07 0.01 12.70 0.03 13.83 0.02 14.07 0.01 16.10 0.01 12.73 0.02 13.87 0.02 15.00 0.01 16.13 0.01 12.77 0.02 13.90 0.02 15.03 0.01 16.17 0.01 12.80 0.02 13.93 0.02 15.07 0.01 16.20 0.01 12.83 0.02 13.97 0.02 15.10 0.01 16.23 0.01 12.87 0.02 14.00 0.02 15.13 0.01 16.27 0.01 12.90 0.02 14.03 0.02 15.17 0.01 16.30 0.01 12.93 0.02 14.07 0.02 15.20 0.01 16.33 0.01 12.97 0.02 14.10 0.02 15.23 0.01 16.37 0.01 13.00 0.02 14.13 .0.02 15.27 0.01 16.40 0.01 13.03 0.02 14.17 0.02 15.30 0.01 16.43 0.01 13.07 0.02 14.20 0.02 15.33 0.01 16.47 0.01 13.10 0.02 14.23 0.02 15.37 0.01 16.50 0.01 13.13 0.02 14.27 0.02 15.40 0.01 13.17 0.02 14.30 0.02 15.43 0.01 13.20 0.02 14.33 0.02 15.47 0.01 ...End 13.23 0.02 14.37 0.02 15.50 0.01 13.27 0.02 14.40 0.02 15.53 0.01 13.30 0.02 14.43 0.02 15.57 0.01 13.33 0.02 14.47 0.02 15.60 0.01 13.37 0.02 14.50 0.02 15.63 0.01 Hydrograph Summary Report Page 2 Hyd. Hydrograph Peak Time Time to Volume Return Inflow Maximum Maximum Hydrograph No. type now interval peak period hyd(s) elevation storage description (origin) (cfs) (min) (min) (acft) (yrs) (ft) (cuft) 2 SCS Runoff 0.0 2 750 0.01 2 — -- ---- FIRST FLUSH Proj. file: 319.GPW IDF file: SAMPLE OF Run date: 12-02-1997 i civil engineers • planners • surveyors • gis esign rofessionals inc. Project:PIit _n Y,4C- Pr No-9- 0-319 Description.C cL!-/Fi i i .,1 Gu a '1 e,-rI 5 i Ji C 165 South Satellite Road,South Wwdsor,CT 06074 Ca1c.By: Date:l l hkd By: Date: (860)291-8755•FAX:291-8757•e-mail:dpicivil®aol.eom V � 0, • i D fl.�J f D. .. / — � 'OQ --- 1. f 7 / \t `♦ �Q60.0 STOD ` GRA VFL No. .348 t � 5 .5 - - - - - - - ` / 1 \ p \ \ ♦ ♦ 56.5 \` \ \ \ \\ ♦ \ \\ �\ \ 52.2 1 TR. FLOOD LIVE 'E 1 55 s �\ +\ I I CA 1 1 I 1 I 1 54.0 \ 56. 1 1 MH 11 1 \ 1 52.0 56. 1 i 1 � f 54. I I 1 II I CB#5 7S , 1 FLARED END 1 1 52.2 ,, \ 1 1 1 t ` 1 INV*44.5O cn 1 \ 1 1 \\ / PLUNGE POOL 1 . •. fit_.: / I 1 t I O, ` •>?` 0 52. t 55.1 \ \ co CB/3 1 1 1 \ \ 2" CRUSHED STONE 12" HIGH x 6' WIDE X 522 1 I 1 \ \ MIXTURE OF CATTAILS, '•`•.'•\\ 1 1 I I \ \ \ \ FINAL FlO1VER, BULRUSH, BUR—REED AND BLUE \ FLAG IRIS. \\ 1 1 \ \ 1 1 ! XD 18" O.C; RECESSED Y, to \ \ 2 ' 54.5 ♦ \ 1 1 BELOW RIPAAP LEVEL C6/12 ♦ \ 11 11 _ ` ♦ \ 6' LODE PLANTS AEA W VW 52.2 ♦ ` \ \ \ \\ 1 \ 1 • ' - \ I 1 / i ice/ i �i � - - WAI 1 n !ran 11 C� a >�!,► n RAINFALL INTENSITY CHART IN INCHES PER HOUR HARTFORD, CT STORM MINUTES (YRS) 5 6 7 8 9 110 11 12 113 14 15 16 17 18 19 20 21 122 23 124 125 26 27 28 29 130 31 32 2 4.1 3.8 3.6 3.4 3.2 3.1 3.0 2.9 2.8 2.6 2..5 2.4 2.3 2.3 2.2 2.2 2.1 2.1 2.0 2.0 1.9 1.9 1.8 1.8 1.7 1.7 1.7 1.7 10 6.2 5.6 5.4 5.3 5.0 4.7 4.5 4.4 4.3 4.1 4.0 .3.9 3.8 3.7 3.5 3.4 3.3 3.3 3.2 3.2 3.1 3.0 2.9 2.9 2.8 2.7 2.6 2.6 25 7.1 6.7 6.4 6.1 5.7 5.6 5.4 5.2 5.0 4.9 4.7 4.5 4.4 4.3 4.2 4.1 4.0 4.0 3.9 3.8 3.7 3.6 3.5 3.5 3.4 3.3 3.2 3.2 50 7.7 7.4 7.0 6.7 6.5 6.1 6.0 5.8 5.6 5.4 5.2 5.1 5.0 4.9 4.7 4.6 4.5 4.4 4.3 4.3 4.2 4.1 4.0 3.9 3.8 3.7 3.613.6 100 8.4.8.017.6 7'.3 7.0 6.8 6.6 6.4 6.2 6.0 5.8 5.6 5.4 5..2 5.1 5.0 4.9 4.8 4.7 4.6 4.5 4.4 4.3 4.2 4.1 4.0 MINUTES STORM (YRS) 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 •50 51 52 53 54 55 56 57 58 59 60 2 1.6 1.6 1.6 1.5 1.5 1.5 1.4 1.4 1.4 1.3 1.3 1.3 1.3 1.3 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.1 1.1 1.1 1.1 10 2.6 2.5 2.5 2.5 2.4 2.4 2.3 2.3 2.3 2.2 2.2 2.1 2.1 2.1 2.0 2.0 2.0 2.0 1.9 1.9 1.9 1.9 1.8 1.8 1.8 1.8 1.8 1.8 25 3.1 3.1 3.0 3.0 2.9 2.9 2.8 2.8 2.7 2.6 2.5 2.5 2.5 2.5 2.4 2.4 2.4 2.4 2.3 2.3 2.2 2.2 2.2 2.2 2.2 2.1 2.1 2.1 50 3.5 3.4 3.3 3.3 3.2 3.2 3.1 3.1 3.0 3.0 2.9 2.9 2.8 2.8 2.8 2.7 2.7 2.7 2.6 2.6 2.5 2.5 2.4 2.4 2.4 2.4 2.4 2.3 100 3.8 3.7 3.7 3.6 3.6 3.6 3.5 3.5 3.4 3.4 3.3 3.3 3.2 3.2 3.2 3.1 3.1 3.0 2.9 2.9 2.8 2.8 2.7 2.7 2.7 2.7 2.6 2.6 CHART 2 an J uary 1 55 4000 W z_ 3000 50 0 2000 ° 45 40 1000 900 35 800 of T00 W 0 30 600— z 500 •► rn RAVED W _ 400 0.90•ai z 2$ O -"r.JC4 O W 300 0.80 w z ac 0.T0 w 1- a z 200 BARE SOIL 0.60 ,\\ 0 20 0.1 W O (L POOR GRASS 0.45 0 �� 0 z SURFACE W 1.. ��,5 U) O -� 35 z w o= AVERAGE GRASS` . 3< 15 _ SURFACE �\30 L) (.0 F TO DENSE GRASS' 0.15 W W-- J 60 � V� x,M c> > z 50 s,��w �-f 10.0 w N 20.0 w ~� 40 \ t0� 30 9 8 20 T - t 6 W z 5 10 J ' ' > EXAMPLE EXAMPLE A LE '8' LENGTH: 700 FEET a LENGTH: 100 FEET t I PAVED DENSE GRASS ' SLOPE: 1.0 % SLOPE: 6.0% �. TIME: 10 MINUTES TIME : 13 I/E MINUTES TOWN OF SOUTH WINDSOR NOMOGRAPH FOR DETERMINING APPROVED STANDARD DETAIL TIME OF CONCENTRATION JANUARY, 1991 (CHART 3) REVISED: PUBLIC WORKS DIRECT t-c : a a it rc vl 4 is v %`0 e • • _=i t — a s Cross- sectiunc�f FOr pipes full •� = _==X- area of waterway or half-full . we Iled perime ier -a- R ,• D 4 R P Hydroalic radiu3 5CCTION OF ANY OPEN CHANNSL SECTION OF CIRCULAA PIPE =A --craw or meon ve%cily in fecf per sccon,4. = c V-Dischcrge of pipe or chonnc/ in cubic 1•cet per second (C. f-S.). 7 - Coefficient of rouyhr:css of'oipe or chonnc/ svrfoce , see Tob/e A-PS./8-68. S =5/0pe of h/ydrou/ic Grodien/` 61al-V -surface in open ehannols o.-Ptjoe3 not- underPressu�e, Sorst os s/owe of c-honne/ or pipe rover/` an/y when flow /S Vf7ifor"7 in C'0173torf/' SCGf/on. 1G. A- HYDRAULIC ELEMENT5 OF CHANNEL SECTION *. too 90 — So ° ror z �o - -- a — •� - - — 60 — J ., so J L 40 Q8It r 30 -- E J s 20 to O .......`.. ..........(. ,....t.. v to, 3o ao 10 G�' 70 80 90 roo ao r to G (� HYDRAULIC ELEMENTS {. PEA-CENT OF-VALUE FOR FULL SECTION CAPPQOXIMATE) nisr-fiory+e -�/?cfs. Jh,C.►uah o Pipe which hcs eapocify f/curin9 Fii// /S C.1:5. o/ �� ye%-cify r,,r 7.0 ff. r_­ .scc. .E'cy uiicr fc+ l.'i-o' t�fcr Q• /2 c.f s. • Oercnnfc�% of fu.%' c!sc So.-yr�• -- ! " 3,^io fnitr •.��-�f f COY" of AV/GC of f/yc�roti/ic E/err.-e.�1 fi.^d Y-AT. %x7-73 ;rl. per Sec. - `VALUES OF HYDRAULIC ELEMENTS OF CIRCULAR SECTION FOR V ROOv � DEPTHS of rLOW. 0 , OW N SE O � F ? c 9 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 SOR-CO AREA CODE 860/644-2511 Date: December 8 1997 To: Design Professionals 165 So. Satellite Road South Windsor, CT 06074 From: Jeffrey H. Folger Zoning/Wetland Officer Town of South Windsor Re: Review of Podunk Farm Parking Lot plans dated 12/2/97. I have reviewed the site plans for the proposed parking lot expansion with the following comments: 1. Existing and proposed contours should be shown on the E&S plan. 2. The sediment chamber located at PCB#4 should be shown on the table on page 2 of 5. 3. Details and a cross section of the sedimentation channel/biofilter should be shown along with a topsoil detail showing 12' of topsoil that incorporates a 50%compost amendment. Details of the proposed 6 foot planted area east of the biofilter should be shown. 4. Any proposed plantings should also include wildlife shrub plantings to mitigate habitat losses from the proposed activity. 5. The sedimentation channel/biofilter should be completely stable prior to the introduction of stormwater. This should be included in the construction sequence. 6. The applicant should be prepared to demonstrate that the project proposed does not have feasible and prudent alternatives which are less intrusive to the wetland resource(see section 11.2 South Windsor IW/CC regulations). cc. Town Engineer Town Planner IWA/CC PLANNING DEPARTMENT IN-HOUSE REFERRAL FORM TO: Matt Galligan, Fred Shaw, Michael Gantick, Sargent Thomas Field, Fire Marshal Lanning, Ray Favreau, Karl Reichle, Mel Stead FROM: Marcia A. Banach, AICP, Director of Planning The Planning & Engineering Departments have received plans for the following project: Zone�i'� Acreage Commercial Subdiv ' Site Plan Residential # OF Lots/Units Industrial Location: Project Description: 0 Lcoj Future Town-owned property involved? Yes _ No (a) (existing frontage also) (b) new open space/recreation area active passive (c) new detention area - Planning Department comments: / r3 CK05s 0; A1VLL. Ewe. �v li-e cg4 4K- 5t. 1. Please let me know by 'a I `j'� if you will have comments on this app afion so that I can follow up with your department when I do a Planning Department report. Thank you. r MEMORANDUM TO: Marcia A. Banach, Director of P nning FROM: Jerry C. Iazzetta, Town Engineer DATE: December 23, 1997 RE: WOLF/GUERRA SITE PLAN We have reviewed the drawings and drainage calculations dated 12/2/97 for the proposed Wolf/Guerra Site Plan and have the following comments: 1. Entrance drive is not dimensioned. 2. There should be a walkway from parking area to the street and a crosswalk provided. 3. Drainage calculations indicate sedimentation channel is sufficient for a two-year storm. Will it be sufficient for a 10-year storm? 4. Table showing pipe sizes and slopes differs from those shown in storm sewer system design sheet. Which is correct? 5. Does the sight distance shown require removal of trees? J ' 211 ICI J �*N SE4 o7-a� Ole Sou� c u m 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 SOR•co AREA CODE 860/644-2511 CERTIFIED MAIL January 12, 1998 Arturo Guerra & Helmar Wolf 989 Ellington Road South Windsor, CT 06074 Gentlemen: Re: Appl #97-98P, Podunk Farm Parking Lot At the January 7, 1998 regular meeting, the Inland Wetlands Agency/Conservation Commission approved appl #97-98P- IWACC permit for the construction of a 91 space parking lot with associated driveway, storm drainage, landscaping, sedimentation basin/biofilter and associated grading on property located at 970 Ellington Road, A-20 & FP zones (Assessor's map #48, parcel 55) as shown on plans prepared by Design Professionals, Inc., Job No. 88-319 and dated December 2, 1997. This approval is subject to the following conditions: 1. One blueprint copy of the entire set of plans and this letter reproduced thereon, must be submitted to this Commission. This must be completed within 65 days of approval prior to any construction activity on the site. Plans submitted to Planning & Zoning Commission shall be considered having met this requirement. 2. The application shall indemnify and hold harmless the Town of South Windsor against any liability, which might result from the proposed operation or use. 3. The permit is valid for five years and shall expire on January 7, 2003. It has been IWA/CC's policy to notify landowners)/applicant(s) of expiring wetland permits. However, it is the landowner(s)/applicant(s) responsibility to track expiration dates and notify the Commission of a renewal request at least 65 days prior to expiration. 4. All approvals required must be obtained and submitted prior to any activity on the site. 5. A contact person shall be identified on the plans. 6. We recommend a bond in the amount of$5,000 be submitted to the Planning & Zoning Commission to ensure compliance with the Erosion and Sedimentation Control Measures. 7. As builts of basin/biofilter and berm shall be submitted. 8. An earthen perimeter berm is to be installed for additional erosion control included in the site plan. Very truly yours, INLAND WETLANDS AGENCY/ CONSERVATION COMMISSION dL C4 7�1-Lo Elizabeth A. Warren, Chairman EAW/pmm Cc: Chief Building Official Planning 8v Zoning Commission Town Engineer Design Professionals, Inc. January 12, 1998 � Mr. Frank Castro, Chairman South Windsor Planning&Zoning Commission 1540 Sullivan avenue South Windsor, CT 06074 Dear Frank: Re: Podunk Farm Parking The proposed parking lot will serve to alleviate our ongoing parking deficiency at The Mill-on-the-River restaurant. On major event nights, and evenings when a larger number of cars are anticipated(i.e. higher number of single-occupant vehicles), we will continue to have our employees park there, albeit with better lighting, crosswalk, pavement, landscaping and a proper driveway entrance. This will free up more spaces for our patrons. After all, our intent is to have patrons park in the two main lots adjacent to the building. On evenings where patrons are expected to exhaust all available parking in the main lots, we propose valet and/or supervised parking at the Podunk Farm in addition to employee parking. We plan to retain the services of a public safety officer on those evenings when patrons are anticipated to park at the Podunk Farm, as is the case now. Please call if you should have any questions. Sincerely, �40 uerra I MEMORANDUM Town of TO: Michele Lipe South FROM: Sgt. Thomas Field Windsor DATE: 13-Jan-98 Police Services SUBJECT: Mill on the River - Parking area I have reviewed the plans for the additional parking for the Mill on the River Restaurant on the west side of Ellington Road. I do have a concern for the safety of the pedestrians crossing Ellington Road. The area is well lighted and the sightlines for those crossing to the roadway are good. When people enter a crosswalk area they have a tendency to feel protected from motorists. However, Connecticut motorists still haven't accepted the fact those pedestrians have the right of way in a crosswalk. My concern is that motorists will not slow down or stop for the pedestrians even though the area is well signed and lighted. I have also talked to Peter DeMallie, of Design Professionals, of the need for additional Handicapped Parking spaces because of the increase in the total number of available parking spaces. lam? S rg ant -homas Fi Traffic Manager o U o Q Q 0 3 ,10/ PLANNING TU1 AFIRC IN / ENGINEERING / AND DESIGN 270 Amity Road,Suite 130 Woodbridge, CT 06525-2236 Telephone: (203) 397-3600 Telecopier: (203)397-3642 M To: Michele Lipe,Assistant Director of Planning,Town of South Windsor From: James G.Bubaris, P.E. Date: January 13, 1998 Re: MILL-ON-THE-RIVER, NEW PARKING LOT,ROUTE 30,SOUTH WINDSOR,CT CC: File ❑ Urgent ❑ For Review ❑Pllease Comment ❑ For Action ❑As Requested e Comments: Existing number of parking spaces is about 120 to 140. With the addition of the new lot consisting of 90+ spaces,the total number would exceed 200 spaces (i.e., 210 to 230). 1 have confirmed with the State Traffic Commission that, since the total number of spaces would exceed 200 and since this development abuts a State highway, a Certificate of Operations will be required for this project. In addition to a STC Certificate, an Encroachment Permit from the State DOT for the new drive will also be required. There is now a bar-type crosswalk across Route 30 just north of the south lot drive, with crosswalk warning signs at the crosswalk and advance crossing warning signs (i.e., one north of Beldon Road and one north of Lakewood Drive) in advance of the crosswalk. The proposal calls for relocating this crosswalk and related warning signs to the south of the intersection serving the south lot and the new lot, and to install sections of sidewalk leading from each end of the crosswalk to the adjacent parking area. If the existing crosswalk were maintained at its current location, the installation of a sidewalk section would not be possible at its east end due to the existing guide rail at the south end of the Route 30 bridge. Sight lines from the new site drive and from the west end of the proposed crosswalk are adequate for approaching speeds of about 50 mph. Sight lines from the existing south drive and the east end of the proposed crosswalk are adequate for approaching speeds of 45 mph once some minor vegetation is removed on the east side of Route 30 within the restaurant's property. January 13, 1998 Sgt.Tom Field's memo to you today indicates that although this area is well signed,marked and lighted for pedestrian crossings, that motorists may not slow down or stop for pedestrians crossing Route 30. In discussing this condition with both a member of the State's DOT Traffic Division and Sgt. Field, it was suggested by the State that this area may be a good candidate for flashing pedestrian warning signs that are activated only upon demand by the pedestrians themselves. This traffic control treatment is relatively new to Connecticut, and there are now two approved sites(i.e.,Manchester and Bloomfield)with an additional site under review(i.e.,Rockville). However, usage of the new lot across the street by patrons is only expected during peak restaurant periods such as Wednesday, Friday and Saturday evenings, and on about 16 occasions during the Christmas holiday season. On these occasions, the restaurant will continue to hire a police safety officer to heap pedestrians cross the street. 0 Page 2 MEMORANDUM �N TO: Marcia A. Banach, Director of Planning FROM: Jerry C. Iazzetta, Town Engineer DATE: January 21, 1998 RE: MILL ON THE RIVER PARKING LO — 97-98 Following up on my comment at the January 13, 1998 Public Hearing, we would request that the applicant's engineer provide a 20 scale drawing of the driveway entrance to show that the Town of South Windsor Standards for driveways are met. The drawing provided does not clearly show this. JCl/jsv MEMORANDUM Town of TO: Planning and Zoning Commission South FROM: Sergeant E. Thomas Field Windsor DATE: 10-Feb-98 Police Services SUBJECT: Mill on the River Parking area A traffic count was conducted on 06 Feb 98 at 1533 hours until 07 Feb 98 at 1125 hours on Ellington Road (Route 30) near the west parking area of the Mill on the River Restaurant, 06 Feb 98 from 1533 to 2400 hours 3840 vehicles traveled by the restaurant, 1505 vehicles westbound 2337 vehicles eastbound 07 Feb 98 from 0000 to 1125 hours 2192 vehicles traveled by the restaurant, 1090 vehicles westbound 1102 vehicles eastbound Total vehicles in the 20-hour period were 6032 with an 85% speed of 46.5 mph. 2593 vehicles westbound 3439 vehicles eastbound 1 From: field To: lipe Date: 3/3/98 11:18AM Subject: Mill on the River New Parking lot Michele, I talked to Joe Ouellette from the CT DOT. There is no name for the sign other than a PEDESTRAIN ACTUATED FLASHERS ON A WARNING SIGN. There still are none of these types of signs installed. The Mill on the River must get a permit from the State DOT District Office,George Payne @ 258-4540. RUSSELL O DAWSON ARCHITECTURE &ENGINEERING 330 ROBERTS STREET (EXIT 58,I-84)EAST HARTFORD,CONNECTICUT 06108-3654 PHONE(860)289-1100 FAX(860)289-3272 March 27, 1998 RECEIVED Ms.Michele Lipe MAR 301998 Assistant Town Planner Town of South Windsor 1540 Sullivan Avenue SOUTH WINDSOR PLAWNG DEPT. South Windsor, Connecticut 06074 Re. Auxiliary Parking Mill on the River South Windsor, CT Pile:97.200 Dear Ms.Lipe: At the Review Board meeting at the Town Hall on March 19, 1998, the Board requested an isofootcandle layout for the proposed parking lot lighting layout. We herewith enclose copies of the layout for your use. We also have reviewed the existing lighting on the west side of Ellington Road adjacent to the proposed parking area. The existing HPS floodlight on the northwest corner of the existing barn will be rotated approximately 45 degrees to direct the light towards the rear of the existing house. This should provide safe lighting for the area without directing the light source to adjacent properties. We trust this information is helpful. Very truly yours, Aert VD o awson,III Consulting Engineer Enclosure RMD/lddk cc: Erica Hansen,DPI w/encl. File 97200L.doe DAN LYMAN RUSSELL,ARCHITECT• ROBERT M. DAWSON,III,PROFESSIONAL ENGINEER •SUDHAKAR V.NAGARDEOLEKAR,ARCHITECT i PLANE : PARKINGLOT POINT SPACING LEFT-TO-RIGHT + 10 ft POINT SPACING TOP-TO-BOTTOM . 10 ft LOWER LEFTHAND CORNER OF PLANE: X . 14.5 T . 0.S Z . 0 UPPER RIGHTHAND CORNER OF PLANE: X . 357.5 V . 150 Z . 0 LIGHT METER 15 NORMAL TO PLANE AVERAGE to . 1.74 MAX 1 MUM t o . 5.02 MINIMUM to + .$1 s L.0 > 01 AVERAGE/MINIMUM : 3.41 MAXIMUM/MI NI MUM a 11.02 00 TOTAL NUMBER OF POINTS . 287 G 2 42 .99 2 0 00 0 ^ j L.B 1. 6 1 9 L. 1 _. 6 L. =i4(24 1.11 8 1. 1.70 1.39 1.29 1.49 1.81 L.7971'43 1.48 1.39 L.24 _ 6 3 1 • i .19 .40 1.25 .13 24 L.S3 1.22 1.02 1.03 1.20 1 1�37 .0 9I1.26 .61 1.00 1.00 1. 0 1 1 1.79 L.S4 2 4. 1.32 L 0.92 0 4 1.0 .83 0. 0. 1 1 ` i 0.68 2 2.00 . 2 1 04 65 48 .01 L .0 .19 2 0.89 1.60 .04 1.8 0.92 0.83 0.88 G.77 0.83 0.73 0� S. .D 1. . 1.08 2 .43 1.57 L 91 .4 1.02 .02 0.871 0 0.57 ? 3. I .16 1 0 � 10 1 80 .46 �` .98 L. 0.8 L 0 4. G 66 4 1.60 7 L 3.34 _ i �.82 =.66 G.56 0.57 0 1- 1.3o B 0.75 2 0 �1 .18 4 .1 3 r 3 0.79 p.77 0,75 0.77 0.80 0.89 3 L, 0.96 Q. 0.73 1.0 1 _ 13Q 00 1 OC . . . . 1 0.81 0.96A 0.90 084 p.e40.85 ' S L.12 1.34 1.23 t.13 L.1 9 ,46 2 6 .3 .9 26 1.4 0 L.1 1.28 1.19 1.15 ' .63 .22j L.4I _.B r 2-i. 3 ��' 2 `1=/�r.63 a a 6 3, 0.40 2 3. 2 2. 9 .C4 L. t.2 1 2 Zd. 2 0 .56 19.6 J 1, 0 f EDCO- PATTON C M1l1 On the River South Windsor, CT RUSSELL & DAWSON (��►�.y{ Arcnitect-e L Engineerfny 2:m Z O` on zr LETTER OF TRANSMITTAL O � PLANNING DEPARTMENT s o~ TOWN OF SOUTH WINDSOR ♦�� `'� 1 540 SULLIVAN AVENUE SOUTH WINDSOR, CT 06074 DATE To: A- lJl WE ARE SENDING YOU: P & Z initial plans Drainage comps P & Z final plans Bond estimate requests Bond reduction requests IWA/CC plans Change order form Final plans for filing Correspondence Other Copies Appl. No. Project ��v. THES ARE TRANSMITTED as checked below: �� and comment For your file i For review Returned with revisions For your use As requested 8 9 Other ' r PLEASE RETURN/COMMENTS BY: ECEI s wt COMMENTS : 7 2 1998 ice, APR r DEPT..&A jDvI70- -2 � v / ND r ro- 42/ AAW ------------- From: Copy to: 45si (� 'J 3 ld-� tOwN aft O � u 1540 SULLIVAN AVENUE•SOUTH WINDSOR,CT 06074-2786 ��OsoR-CO � AREA CODE 860/644-2511 FAX 860/644-3781 November 22, 1999 Helmar Wolf and Arturo Guerra 989 Ellington Rd. South Windsor, CT 06074 Gentlemen: Re:Preconstruction Meeting—Appl 97-89P,Podunk Farm Parking Lot IN ATTENDANCE Helmar Wolf Mill on the River 989 Ellington Rd. 289-7929 Peter DeMallie Design Professionals 165 S. Satellite Rd. 289-8755 Jim Slater J&H Slater 75 Commerce Way 528-5252 Arturo Guerra Mill Inc. 989 Ellington Rd. 289-7929 Sgt. Tom Field . South Windsor Police 648-6211 Karen Isherwood Design Professionals 165 S. Satellite Rd. 289-8755 Tracy LaPiene Town of South Windsor 1540 Sullivan Ave. 644-2511 Michele Lipe The following is a brief summary of points discussed during the meeting: Erosion and Sedimentation Control 1. All erosion and sedimentation control measures are to be in place prior to earth moving operations in each area and maintained/cleaned out during construction. Call Jeffrey Folger, Zoning/Wetlands Enforcement Officer for inspection when measures are in place, prior to commencement of site work or if any problems/concerns arise during construction. 2. All topsoil stockpile areas to be protected(ringed with haybales or equal). 3. During construction of the road/driveway a crushed stone tracking pad is to be installed and maintained to minimize tracking of dirt/gravel on to Ellington Rd. Calcium chloride or water is to be used for dust control as required. Public Works 1. Three complete sets of approved/revised plans to be provided to Town prior to start of construction. They will be stamped by the Planning Department along with plans developer needs. Only approved plans are to be used on the job site. 2. As built plans are to include horizontal and vertical location of all underdrains, footing drains, and sanitary sewers and house service laterals located as per revised as-built checklist. 3. All pipe and structures to be backfilled with free draining material, compacted in maximum one foot lifts with approved compaction equipment or approved equal if deep trench is encountered. Any pipe or structure work requires inspection prior to backfilling. 4. Any problems and/or questions regarding construction of this project will be directed to Helmur Wolf in the field at phone#289-7929. 5. All filling to be done in accordance with Department of Transportation specifications. To be compacted in maximum lifts and tested as necessary. 6. Job meetings will be held as needed, and can be called by the developer or Town. 7. Any proposed changes are to be presented to the Engineering or Planning Department prior to implementation on change order form in quadruplicate with 4-copies of the drawing. Town will attempt to turn around within 24 hours. 8. Normal hours of operation 7:00 a.m.—5:00 p.m., no work on Sunday. 9. DOT permit needed for all work within state road. Copy must be given to the Engineering Department. 10. No paving after October 15 without written approval from Director of Public Works. 11. Signage indicating"construction ahead"on both sides of the road. 12. Contact Town Traffic Authority prior to any placement of traffic control or construction activity within roadway. Planning Department 1. Landscaping is to be installed in accordance with the approved landscaping plan. If there are changes required, contact the Planning Dept. Additional landscaping installed on one part of a site will not preclude planting all of the remaining items shown on the landscaping plan. SNET/NU 1. Contact utilities for coordination of utilities connection. Fire Marshal 1. Blasting(if required) to be coordinated with the Fire Marshal. Police Services 1. Emergency phone numbers for the duration of the construction must be provided to Police Services on a company letterhead. If the developer occupies or owns the building after construction emergency numbers must be provided to Police Services. 2. All buildings located on property that abuts a public highway must be numbered and visible from the street. All numbering shall comply with Town Ordinance 6-800 thru 6-802. Barns, garages, and outbuildings, which are located on the same premises as a numbered structure, are excluded. 3. Erect temporary sign on the site during construction identifying the project. 4. If an alarm is to be installed contact Police Services. Building ftartment I. Plan review with Building Official/Fire Marshal required prior to application for building permit. Coordinate with Chief Building Official. Sincerely, Michele R. Lipe,AICP Assistant Director of Planning MRL/dlw cc: Jerry C. Iazzetta, Town Engineer Karl Reichle,Public Works Mel Stead, Public Works Tom Ludwig, CL&P Minh V. Le, SNET John R. Collins, Chief Building Official Fred Shaw, Superintendent of Pollution Control Peter DeMallie, Design Professionals Jim Slater -own 0-Ye SoaA 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 ��OsoR.CO � TELEPHONE (860) 644-2511 July 24, 2001 Helmar Wolf Mill on the River Restaurant 989 Ellington Road South Windsor, CT 06074 Dear Mr. Wolf: Re: Appl #97-98P, Mill on the River Parking lotr This is to advise you that the Planning and Zoning Commission voted on July 17, 2001 to release the landscaping and erosion/ sedimentation bond for the above- referenced project. The bonds will be required to be posted at the time the work for the project is initiated. Very truly yours, PLANNING & ZONING COMMISSION Walter Mealy, Chairman WWM/mmrl Cc: Town Engineer tow" s'4 y } ~ �� 0 �• 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 SOR.Co TELEPHONE (860) 644-2511 June 18, 2002 Helmar Wolf Mill on the River Restaurant 989 Ellington Road South Windsor, CT 06074 Dear Mr. Wolf- Re: Appl#97-98P, Mill on the River Parking lot This is to advise you the Town recently received notice from your surety company that the two surety bonds posted for work at the above referenced site are no longer valid. Please note that new bonds must be posted. A copy of the Town's current surety policy indicating the types of bonds, which are acceptable, has been enclosed. These bonds will be required to be posted at the time the work for the project is initiated. Very truly yours, PLANNING &ZONING COMMISSION f Michele R. Lipe, AICP Assistant Director of Planning mmrl Cc: Town Engineer Connecticut Surety Corporation The Connecticut Surety Company CO N N E CT I CU T Connecticut Surety Insurance Agency, Inc. Su nim vir CxRow p Funds Management Inc. Bond No.CSC3035111 SITE PLAN BOND KNOW ALL MEN BY THESE PRESENTS,that we Arturo A. Guerra and Helmar A. Wolf, as Principals, and The Connecticut Surety Company, a corporation organized under the laws of the State of Connecticut, and duly authorized to transact business in the State of Louisiana, as surety, are held and firmly bound unto The Town of South Windsor in the penal sum of Five Thousand and NO/100ths Dollars($5,000.00),lawful money of the United States, to the payment of which well and truly to be made we hereby bind ourselves and our heirs, administrators, successors, and assigns,jointly and severally, firmly by these presents. WHEREAS,the Principals have submitted to the Planning and Zoning Commission of the Town of South Windsor, CT,for its approval, a site plan entitled Podunk Farm Parking Lot-Erosion Control Application#97-98P whose terms and conditions are hereby incorporated by reference in this bond and is hereinafter referred to as Site Plan. WHEREAS, The Planning and Zoning Commission of the Town of South Windsor, CT,has approved said plan on condition that said Principals file with the Town of South Windsor a surety bond in the amount of Five Thousand and NO/100ths Dollars($5,000.00)with the Surety and in form approved by the Town of South Windsor, securing to the Town of South Windsor actual completion within two years of the work and installations required by the Site Plan. NOW,THEREFORE,the condition of this obligation is such that, if the above named Principals shall promptly and faithfully complete such Site Plan,then this obligation shall be void, otherwise to remain in full force and effect. In no event shall the liability of the Surety exceed Five Thousand and NO/100ths Dollars($5,000.00). IN WITNESS WHEREOF,the Principal and Surety have hereunto set their hands and seals this 4th day of December 1998. Witness - Artu A. Guerroa,.,- WitnessC— �X1 He mar A.Wolf Witness THE NNECTICUT SURETY COMPANY By Ant ony raft,Attorne in-Fact - - L r ti } r�a4 1� �'j r�( J} f�h'6�S 1 ..1 b ✓„ l r = - � � � ' �:��Y�y-wra-a.aura=.+:.ra.y-ate.+'�..-.:-a_,'-o=r+�-sir+-n-sde=-a�r..-,i.-.-�+.s-.-...re- "+-a-++-y=.�Li�-.-�=�-ics-.�--...-.. a-s-a�r�+s-s-.e-..d..=...o..a.-...o-+.rr.•w-a=:7-�sw +-+�I�� >l `y $ THE CONNECTICUT SURETY COMPANY f f ` POWER OF ATTORNEY CSC 3035111 I N *" KNOW ALL MEN BY THESE PRESENTS,THAT THE CONNECTICUT SURETY COMPANY does hereby make,constitute and appoint ti { ts.•1 > I' ANTHONY B.CRAFT OF HARTFORD,CONNECTICUT I� ,r its true and lawful Attorney-in-Fact,to make,execute and deliver on its behalf Surety bonds,undertakings and other instruments of similar nature as follows: b t WITHOUT LIMITATIONS AS TO TYPE AND AMOUNT FIR This Power of Attorney is granted and sealed under and by;the authority of the following Resolution adopted by the Board of :. Directors of the Company on the 8th day of March,1994. , , "RESOLVED,that the Chairman of the Board,the President,an Executive Vice President or a°Vice President be,and that each U of them is,authorized to execute Powers of Attorney,qualifying the Attorney-in-Fact named in the given Power of Attorney to ; execute in behalf of the Company,bonds,undertakings and other instruments of similar nature,and said officers may rename anyj'� � such Attorney-in-Fact or agent and revoke an Power of Attorney previous anted to such person. Y- g Y Y Pr Y granted y. FURTHER RESOLVED,that a Secretary be and that each or any of them hereby is,authorized to attest the execution of any t such Power of Attorney,and to attach thereto the seal of the Company. d r FURTHER RESOLVED,that the signatures of such officers and the seal of the Company may:be affixed to any such Power of .r. Attorney or to any certificate relating thereto by facsimile,and any such Power of Attorney or certificate bearing such facsimile signatures or facsimile seal shall be binding upon the Company when so affixed and in the future with respect to any bond, r <; undertaking or instruments of similar nature to which it is attached." a> r , l ; , IN WITNESS WHEREOF,THE CONNECTICUT SURETY COMPANY has caused its official seal to be hereunto affixed,and ( y these presents to be signed by its President this 8th day of March,1994. r, ap•GUT SV� ' $ THE CONNECTICUT SURETY COMPANY o`G� ••,.,._:9�c� r� ' r 2 r.9 Attest:: BY z; A L =n= *? O * p: a ONNECT103 i b . t { RICHARD W.ALLEN,III CRAIG H. KRAHL r� 4 Secretary President STATE OF CONNECTICUT } ' s.s.: Hartford COUNTY OF HARTFORD ( 4I" On this 8th day of March,1994,before me personally came Craig H.Krahl,to me known,who being by me duly sworn,did depose and say that he is President of THE CONNECTICUT SURETY COMPANY the corporation described in and which executed " ' the above instrument;that he knows the seal of the said corporation,that the seal affixed to the said instrument is such corporate , b seal;that it was so affixed by order of the Board of Directors of said corporation and that he signed his name thereto by like order. N01Aq ° CAROL ANDRE.WS � . NOTARY PUBLIC _ My.Commission Expires November 30,1998 I,the undersigned,Vice President of THE CONNECTICUT SURETY COMPANY a corporation,DO HEREBY CERTIFY that $ { I; the foregoing and attached Power of Attorney remains in full force and has not been revoked;and furthermore that th�Resolution ; + of the Board of.Directors,set forth in the said Power of Attorney,is now in force. Signed and sealed at the City of Hartford,in the State of Connecticut;'dated the 4th day of December ,19 .98 k z CAROL L.FRITZ '� Vice President THIS DOCUMENT IS NOT VALID UNLESS PRINTED ON GREY SHADED BACKGROUND WITH A RED SERIAL NUMBER IN THE UPPER i} RIGHT HAND CORNER.THE BACK OF THIS DOCUMENT'CONTAINS AN ARTIFICIAL WATERMARK-HOLD AT AN ANGLE TO VIEW. IF YOU HAVE ANY QUESTIONS CONCERNING THE AUTHENTICITY OF THIS DOCUMENT YOU ARE URGED TO CONTACT THE N CONNECTICUTSURETY COMPANY AT CIO 80 OLD STATE HOUSE SQUARE,P.O.BOX 2314%,HARTFORD,CONNECTICUT 06123-1496 OR 1 a CALL OUR POWER OF ATTORNEY CUSTODIAN AT 1.800-394-7806, t)34� A 300/POA/REV.2/96 \� ;�,� L r � ._ ewe-►a._ ��w-_+,�.7�a-ie;+,, .e-e-+fie::• r-x+-m-s�-ro-e.a-wp_r;.w�y s�s.�y .s-a-raw _ __ �I{ tlrt"`•I d!} k' i etc �{ hy, ' ' . _ •.,r' P'i"- �.'M.' Rl �,�df• '�hi+¢ +Y'' y. !},...�Hbt yN F.-. l.� �.f}.,�giN• af!;F:' :::� �fq'.C! 9� 0.,- J t Connecticut Surety Corporation The Connecticut Surety Company CO N N E CT I CU T Connecticut Surety Insurance Agency, Inc. SURETY GROUP Funds Management Inc. Bond No.CSC3035110 SITE PLAN BOND KNOW ALL MEN BY THESE PRESENTS,that we Arturo A. Guerra and Helmar A. Wolf, as Principals, and The Connecticut Surety Company, a corporation organized under the laws of the State of Connecticut, and duly authorized to transact business in the State of Louisiana, as surety, are held and firmly bound unto The Town of South Windsor in the penal sum of Two Thousand and NO/100ths Dollars($2,000.00), lawful money of the United States, to the payment of which well and truly to be made we hereby bind ourselves and our heirs, administrators, successors, and assigns,jointly and severally, firmly by these presents. WHEREAS,the Principals have submitted to the Planning and Zoning Commission of the Town of South Windsor, CT, for its approval,a site plan entitled Podunk Farm Parking Lot- Landscaping Application#97-98P whose terms and conditions are hereby incorporated by reference in this bond and is hereinafter referred to as Site Plan. WHEREAS,The Planning and Zoning Commission of the Town of South Windsor, CT,has approved said plan on condition that said Principals file with the Town of South Windsor a surety bond in the amount of Two Thousand and NO/100ths Dollars($2,000.00)with the Surety and in form approved by the Town of South Windsor, securing to the Town of South Windsor actual completion within two years of the work and installations required by the Site Plan. NOW,THEREFORE,the condition of this obligation is such that, if the above named Principals shall promptly and faithfully complete such Site Plan,then this obligation shall be void, otherwise to remain in full force and effect. In no event shall the liability of the Surety exceed Two Thousand and NO/100ths Dollars($2,000.00). IN WITNESS WHEREOF,the Principal and Surety have hereunto set their hands and seals this 4th day of December 1998. Witness r uro A. Guerr Witness u 4 Helmaar A.Wolf Witness THE NNECTICUT SURETY COMPANY By Antho y B.Cra t;Attorn in-Fact -A�'A MR? THE CONNECTICUT SURETY:COMPANY 1 POWER OF ATTORNEY CSC 3 035110 KNOW ALL MIEN BY THESE PRESENTS,THAT THE CONNECTICUT SURETY COMPANY does hereby make,constitute and appoint ANTHONY B.CRAFT OF HARTFORD,.CONNECTICUT its true and lawful Attorney-in-Fact,to make,execute and deliver on its behalf Surety bonds,undertakings and other instruments of similar nature as follows: WITHOUT LIMITATIONS AS TO]TYPE AND AMOUNT jF This Power of Attorney is granted,and sealed under and by the authority of the following Resolution adopted by the Board of Directors of the:Company on the 8th day of March,1994. Vice President or a Vice President be;and that each "RESOLVED,that the Chairman of the Board,the President,an Executive of them is authorized to execute Powers of Attorney qualifying the Attorney-in-Fact named given in the Power of Attorney to Y . execute in behalf of.the•Company,bonds,undertakings an other instruments of similar nature,and said officers may rename any such Attorney4n-Fact or agent and revoke any Power of Attorney previouSly granted to such person. FURTHER RESOLVED,that a Secretary be,and that each or any of them hereby is,authorized to attest the execution of any such Power of Attorney,and to attach thereto the seal of the Company., A FURTHER RESOLVED,that the signatures of such officers and the seal of the Company may be affixed to any.such Power of Attorney or to any certificate relating thereto by facsimile,and any such Power of Attorney or certificate bearing such facsimile signatures or facsimile seal shall be binding upon the Company when so affixed and in the future with respect to any bond, ,Lf undertaking or instruments of similar nature to which it is attached.i IN " WITNESS WHEREOF,THE CONNECTICUT SURETY COMPANY has caused its official seal to be hereunto affixed,and these presents to be signed by.its President this 8th day of March,1994. 4.n THE CONNECTICUT,SURETY COMPANY C' Attest.- t . N E C T 103.0.,"0 OF. RICHARD W.ALLEN,III CRAIG H.KRAHL Secretary President :STATE OF CONNECTICUT s.s.: Hartford COUNTY OF HARTFORD On this 8th day of March,1994,before me personally came Craig H.Krahl,to me known,who beh b me duly sworn,did depose and say that he is President of THE CONNECTICUT SURETY COMPANY the corporation descHulin and which executed. the above instrument;that:he knows the seal of the said corporation,that the seal affixed to the said instrument is such corporate xe seal, that it was so affixed by order of Board of Directors of said corporation and that,he,.signed-his name thereto,by like order. AND, FQ11 T Ap 0 140 TA U CAROL:ANDREWS My.Commission Expires November 30,1998 L the undersigned,Vice President of THE CONNECTICUT SURETY COMPANY a corporation,DO HEREBY CERTIFY that the foregoing and attached Power of Attorney remains in full force and has not been revoked;,and furthermore that theyResolution of the Board of Directors,set,forth,in the said Power of Attorney,is now in force Signed and sealed at the.City of Hartford,in the State of Connecticut,dated the 4th day OfD e c emb e r 19 98 CAROL L.TRITZ Vice President THIS DOCUMENT IS NOT VALID UNLESS PRINTED ON GREY SHADED BACKGROUND WITH A RED SERIAL NUMBER IN THE UPPER RIGHT HAND CORNEIL.THE BACK OF THIS DOCUMENT CONTAINSAN ARTIFICIAL WATERMARK-HOLD AT AN ANGLE TO VIEW. IF YOU HAVE ANY AUTHENTICITY QUESTIONS CONCERNING THE OF THIS DOCUMENT.YOU ARE URGED TO CONTACT THE CONNECTICUT SURETY COMPANY AT CIO 80 OLD STATE HOUSE SQUARE,P.O.BOX 231496,HARTFORD,CONNECTICUT 06123-1496 OR CALL OUR POWER OF ATTORNEY CUSTODIAN AT I-800-394-7806. POA REV.2/96: low 4 I IN 11 TIA TfimbleMous I . A-0 pp PRO sum ON momvow u IRMW. BENNO 4658 S. Old Peachfrec Rd 0 Narcross GA 3DD71 8 Toll l ree 1 Bllu•Zi l 4317 a o Nl ddd i 97. i.ir +r�x --7 d'?1,` A1 i CSr:I � � •A' +K ,�•A I,7.•• rv\. 11.v,,DL3n ` - RTAOB -E POLE rKF •nHl_rusrrna PK" SfERIES -- -, SPECIFICATIONS: I - —IT�3. s;• -Mast Aluminum Base, 319 Material, with Large s' •V" ._ N;,;. i TuRE Door opening for anchorage and wiring assembly. ` Tx125-sH 16 flute tapered extruded tempered atuvimum 1xr • so*pg.14 for +'"�•l ''` ' details shaft, 11 gauge. All hardware except anchor bolts are stainless steel. A ground lug is Installed inside the base apposite the access door. I�. -All castings S shafts are pretreated before the vinyl butal primer is applieid. Finished coat, when required is applied under strict environmentally 3 1 2"o.D. controlled conditions. Top coat Is minimum 2.5 i mills. -A 31 o.d. tenon is standard with all poles. -optional equipment, other than list8d, Is available upon request. `1 -Standard color is semi-gloss Black 'BK" Other } colors available on request. I, RTAOB-E 9'0' 1 RTAOES•E 12'0' RTA08-E 16'0" { 1�,l GUIDE FAIR ORDERING: BASE A POLE D(TRUOE0 14 MAES 16' O.O. WKV4 OPTIONS FINISH !' STYL E SHAFT BASE I 1 I RTAOB E 16 18" 12' 8K ' :t OPTIONS: �:• Duplex Receptacle-weathertight indoor - "RECPTD" as• Duplex Receptacle-in top of Pole - "gECPTDT" DOOR Single Banner Arm - 4S8A" r•HIGH x Double Banner Arm - "DBA"WIDE s JI:•, .8 Flute shaft - E8 .12 Flute shaft - "E12" is.0.0, --� l t2• x 19' GALVANIZED Custom Logo - "LD" ANCHOR 9OLT9 See Other options, arm sizes and stow in this catalog. , F 0 0 1r8,C. i '• DOOR I LOCATION OPENINO PINCKN YVII Ri t� � S UAGIHvTING1� 144wAND ARRD]SS Tflmblehus iiM b 4658 S. Old Peeachtrse Rd, {Pinckneyville, Goorgia 30071 404-449.197Z 00.241•4317 FAX 404-447-9260 1: t� r ak'�A �. ' y ! , � �ic �✓'W << y ;1M1 Lc y. l�"� 6t? K �.�I. ° ,Lq, r � { JX rr FINIAL-AF- is -REPLNOTOR-W FOR W%•EFFMENCY WITH SOME TOPOLOW t: Or } •MULTI•TIERED NEPLECYOR �} ) WTM 2 P.C. 1111�� GLOBE-•M"* <• -GLASS_REPRACTOR TYPE 11,no,4w V , ) P%F.28-MAX.180 WATT AF-22-MAX.2W WATT i - GLOBE NECK Il . f° BALLAST t 1 + _ BUTTON PHOTO CELL"Pllr ,7 ON'SH"HOLDER SLIPFITS a'O.C.TENOIN - RUSSELL tf D,AIIW'SON wwc«trtcryaf •ena�Mct��na rimMeNouse WFQRNIAN 17t'(-ii'1CA1ions, / A very high performance type li of Vf Pr►s►r stp Vmorlpn Acarrl s",40 r complement architectual desigrfs the m y rinds. 1V TPI*TOCN Prismarrc polycarbonars globe is Me result rover 25 yeers 01 NV ieenhg excellence 8nd globe manufaCturinp O MPGAICe, It used in s rerrorit appl►carmn,the rRiM-TEC-Prismatic Acorn Globe. using a t 50W HPS lamp. can replete a sisadard Acorn that uses a 175W MH or a 250W MV lamp. This urrrr is very cost effective because of Its high r ofbctenCV and use of levier fixtures and poles i MA48LiHOUSf TRIM•-TEC",Series ornvtdes fu/t light Control Wnnout sacrifrcrng the;urn or the cemury dppelranre V � �• "S E. d1 t11't . CPrr>;frucfi 0rt Heavy duty cast aluminum acorn notaor With temperature controlicd acrylic enamel 4 mil coating ovor etching primer, 4-114 x 20$101038 WASHINOMN styfelt stoat MORI bob 100 acorn 00 holder.$*s outer 31/"ODD+feniar+. Elacrrl col ETC fisted roviure will?UL listed electrical romponents. Pulse ralea porcetarn mC+gut socket.spring toaded coaracr in a nicker plated scretiv si�el: Acorn Body U V. stsoi►ized polycarbonars viilh prismatic retracted globe for type II or type V rype tit Jv8018bie e�rrasr � I CWA•HPF tirlh mimmum rated srarring ternperaw�[of•217R-29-C All electrical components are L/L listed ballast is convOniendy fowled tar easy remov7l and field wrong tlpNvnS Pncto Cell- -pe, grass Filigree Ring for Washington Acorn- "M" i finial- ..�" Pier Mount- "P.V" "ALIFORNIAN TX120 I Stp/M TXtpS WASHNUON rXIAL t " OIA. , fd" 1 111, _ 1 4658 S. t�i( 8" t ii + RECEIVEDMEMORANDUM Town of sEP o 8 2003 TO: Marcia Banach, Director of Plannin SOUTH WINDSOR PLANNING DEPT. South FROM: Gary K Tyler, Chief of Police Windsor DATE: 5 Sept 03 Police. Services SUBJECT: In-pavement lighting for crosswalk It is my understanding that plans have been submitted to construct an additional parking area across from the Mill on the River restaurant. I am concerned about pedestrians crossing the Ellington roadway to get to the restaurant. I would suggest two items to consider before we grant approval. • Relocating the crosswalk across Ellington Road so that it terminates closer to the entrance of the restaurant. • Installing a device called "In-pavement lighting"at the crosswalk. These amber lights are embedded in the pavement on both sides of the crosswalk and oriented to face oncoming traffic. When the pedestrian activates the system the lights begin to flash warning the motorist that a pedestrian is in the vicinity of the crosswalk ahead. If you have further questions or would like to discuss this further please let me know. VIN Sf4 e a s 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 sox•co AREA CODE 860/644-2511 December 12,2005 Ms.Karen M Isherwood,P.E. Design Professionals Inc. 165 South Satellite Road South Windsor, CT 06074 Dear Karen: RE:MILL ON THE RIVER PARKING LOT LIGHTING I received your correspondence dated December 7 regarding the new parking lot lighting at Mill on the River. The glare created by the use of fixtures that are not full cutoff (or nearly-full cutoff) has created a serious safety hazard for both drivers and pedestrians crossing in the new pedestrian crosswalk (as well as a zoning violation). Staff did not knowingly approve a change order that included fixtures that do not meet the zoning regulations; it was my understanding that the fixtures met zoning regulations. Similar decorative full-cutoff fixtures have been installed elsewhere in South Windsor(for example,on Evergreen Way at Evergreen Wall. We recognize that the holiday season is an important one for the Mill on the River Restaurant, and that use of the new parking lot is very important for the large number of patrons. Therefore Police Chief Gary Tyler and I will be working directly with Helmar Wolf immediately following the holiday season to ensure that the safety hazard is resolved, either by retrofitting the existing (very attractive) fixtures with full cut-off features or by replacing the fixture heads with full cutoff fixtures. Sincerely, Marcia A.Banach,AICP Director of Planning MB/sf Cc:Helmar Wolf,Mill on the River Matthew B. Galligan,Town Manager Gary Tyler,Police Chief Jeffrey Doolittle, Town Engineer Robinson&Cole, Town Attorney Peter DeMallie,Design Professionals Dec 08 05 12: 17p Design Professionals 860-291 -8757 p, 1 DESIGN PROFESSIONALS, INC. civil engineers ♦ planners ♦ surveyors December 7,2005 gis ♦ gps ♦ landscape archittxts Marcia Banach,.Director of Planning Town of South Windsor 1540 Ellington Road South Windsor,CT 06074 Re: Approved lighting for Mill on the River The invoice sent was in response to your phone call on November 29di with questions pertaining to the light poles that were installed at the Mill on the River parking lot.The change order for the lighting was approved on July 17. 2005,requiring the decorative light fixture on poles no higher than 15'_The required decorative fixtures do not provide for full cut-off as discussed when we met with Peter DeMallic,Matthew Galligan and Helmar Wolf on June 17,2005. You may recall our initial attempt to revise the previously approved lighting fixtures in an attempt to bring the lighting plan for the site into compliance with the lighting regulation adapted after the application was originally approved. We submitted a change order proposing a"shoe-box"fixture commonly used in similar environments, which complied with the full cut-off requirement. We were informed that this was unaccepted and told to provide a decorative fixture similar to the original approved fixture.At ilie meeting;in the Town Manager's office,we discussed the inability of the decorative fixtures to comply with the regulations.Town staff clearly represented their requirement for us to provide a fixture similar in decorative nature; if not full cut-off,then nearly full cut-off would be acceptable.No additional information clarifying the actual;amount of"nearly"was presented by town staff. After continued deliberation,the applicant,Mr.Helmar Wolf agreed to provide the decorative fixtures on poles to be no greater than 15'high. Another change order application was submitted providing the required information from the local lighting distributor,Langlais Group, including the photometric data and an isolux plan identifying the various levels of light distribution on the site. The fixtures were installed upon receipt of the approved change order.The approved fixtures were"Grosse Point"3177.BP by Hanover Lantern,Inc. The invoice indicates 317313P. Upon fiirther investigation,Michael Micelli from Langlais Group,informed me that the difference between the two fixtures is aesthetic in nature,involving the actual height of the solid top of the fixture. It is my understanding,after inquiring about the lighting levels,that there is no discernable difference in lighting levels between the two fixtures. The installed lighting agrees with the approved plans,therefore the corre:t fixtures are in place. I hope this resolves any confusion regarding the lighting at the Mill on the River parking lot. Thank you. Sincer,GIy, Karen M. Isherwood,P.E. Project Manager CC:Helmar Wolf Peter DeMallie Jeffrey Doolittle,P.E. Matthew Galligan,Town Manager Chief Gary Tyler 165 South Satellite Road, South Windsor,COn:iecticut 06074 Tel: (860)291-8755•Fax: (860)291-8757 Email:dpicivil@aol.com PLANE : PARKINGLOT ------------------ POINT SPACING LEFT-TO-RIGHT a 10 ft POINT SPACING TOP-TO-SOTTOM . 10 It LOITER LEFTNANO CORNER OF PLANE: X . 1 4.5 T - S.S Z - 0 UPPER RIGHTHAND CORNER OF PLANE: X . 357.5 y - 160 Z - 0 LIGHT METER 18 NORMAL TO PLANE AVERAGE f o 1.74 MAX I MUM I o 3.32 MINIMUM fo . .St A 1.07Z 81 AVERAGE/MINIMUM a 3.41 MAXIMUM/MINIMUM . 11.02 DO TOTAL NUMBER OF POINTS . 297 `` 0 2 L 2 2 42 .99 .21 2 1. 6 .00.. 0 2.00 2. 0 0 .04 .53 .10 4.0 2.3 1.8 1. 6 1. 9 L. 1 .06 1.1621004 1.11 39 .58 1. 0 8 1 85 1.70 .39 1.29 1.49 L.81 1.7971g9/3 1.48 1.39 1.24 1. 2.26 4.34 3. 1 2 0 3.13 .40 1.25 2.19 2 24 L.53 1.22 1.02 1.03 1.20 L 1 2.71 3.71 2.71^92 1.26 1.61 1.4 .S9 Qj 1.0 1,Do 2 1.. .00 1 1 L.79 L.54 .62 4.86 1.32 1 0.92 0. 4 1.0 .83 0. 0.63 0. 00 2 00 .82 9 1 04 .65 .49 .III 1 1- .01 L 2 0 1.19 1. 2 0.89 .89 1.60 2.C4 1.8 0.92 0.83 0.89 0.77 0.8 0.73 0 .78• 5. .00 1 1.OB L. .12 .43 L.3 1.57 1.91 1.4 1.02 .02 0.871.❑0 0.57 3. 7 .16 ®® A g 1 0 AzL&0 1.so .a6 7 .99 1.27 0.8 L 07 4.2 0 96 .64 2. 3 1.60 7 1. 2 3.34 0 .82 0.66 C.56 C.57 C. 1.16 1.3 .Ca ^_A5 2 2 1.00 .19 3.24 .17 2.4 8 g 0.79 0.77 0.75 0.77 0.8C 0.89 3 1. 0.96 0.79 0.73 1.06 1. 10 1.00 .00 ❑ 3.49 3. 1 4 1. 2.58 2.55 2.6 I.5 0.91 0.73 0.81 0.81 0.961 AS 0.90 0.e4 0.84 0.851 1.12 1.34 L.44 1.29 i.13 1.13 .as�.97 .92 .46 2 00 1 C1Q r ,71 3.67 4.4 2.36 2.3• -.95 1.51 L.a 26 L.a- 0 1.13 1.31 i.2g 1.19 1.15 1.60 1.63 .22�:.a2, :.4� :.g a .g.2 a. 9 2,_ 63 p0 65 3.S op 62 .2 t.40 1. 7 2 3.11 +O69 .Oa 1.L 1.2 1. C I 2 }.p � A 9z?o� �s 1. 0 L. 03 .18 8 EDCO-PATTON r••,«•,M i I I on the R i ver South Windsor, CT RUSSELL 6 DAWSON et> Ohrchitsctwe s E,3ineerley Z 111..�....../��I C� ts.�..1•.0 •. w.�«.r 22 j.�Tn m n'y«C.rrryyyiii CD . L ISO F CQJ1�-n� naa--C d ot O MILL ON THE RIVER PARKING EXPANSION PH 1/13/98 1. Request for site plan approval for a space parking lot located directly across from the Mill on the River Restaurant, on the westerly side of Ellington Road, A-20, FP zone. 2. Parking on the residentially-zoned premise at 970 Ellington Road had been previously approved through a temporary and conditional permit granted by the Zoning Board of Appeals. It was specifically to allow employee parking for the Mill on the River restaurant across Route 30. ZBA originally granted a one-year T & C for employee parking for 35 employees in November 1989, and renewed the T & C in 1990, 1992 and 1994 for two-year periods. PZC approved it for a two year period suggesting to the applicant that they try to find a permanent solution. The Commission may recall that the applicant submitted an amendment to the parking regulations to allow for ancillary parking and is now applying for permanent approval of a parking area under that amendment. 3. The parking regulations states: the Commission may approve off-site parking for a permitted (lawful) non-residential use provided that: 1) adequate vegetative or other screening will be achieved; 2) available sight line meets CDOT minimum standards; 3) such additional off-site parking requirements of the existing non-residential use will be used exclusively for this use; 4) no area presently available on the site of the existing non-residential building to provide additional on-site parking; 5) the residential character of the neighborhood will not be unduly disrupted; . 6) the primary site should be able to be accessed without any pedestrian crossing of any public street. This provision may be waived only if the applicant demonstrates to the Commission that there is no other practical and feasible solution, and that the proposed roadway crossing does not create an unsafe condition. 4. In the past the applicant has indicated that they have corresponded with the DOT regarding other options to crossing Ellington Road , such as a walkway SLtJ d ae r h Cv -�. -�' �/ � �.�� ham, �� �� t�0�dl. �- .��� �' �� �1 �� � �� > *r under the road. Has the applicant received any correspondence from DOT regarding DOT's position? 5. The applicant has provided a site plan showing 91 parking spaces and has provided a landscape plan for screening the parking area. 6. There are regulated wetlands on the site. The applicant has received IWA/CC approval for this are with the following approval conditions: recommend a bond in the amount of$2,000; require an as-built be done on the bio-filter to ensure proper grading. 7. While we agree that the parking situation has to be Cesovled�, taff continue to be concerned about pedestrians crossing Route 30, particularly at night. We would note that, during the busiest times such as at Christmas time, the Mill recently had their own vehicle stationed at the parking area across the street with caution lights on. We have also observed on occasion patrol car with caution lights flashing and a uniformed traffic officer assisting with the pedestrian crossing. It should be noted that in the past there were vehicles parking along the grass at the Mill, as well as along Ellington Road and Beldon Road. 8. The South Windsor Police Services have reviewed the proposed and submitted the following memorandum: 9. Lighting of the parking area is a concern to ensure: adequate lighting at the intersection of the parking area and Ellington Road; adequate lighting within the confines of the new parking area; and that no lighting is directed off-site and affecting the surrounding residential properties. If this application is approved, the planning department requests that some sort of guidelines be established by the applicant regarding how the parking lot will be used, i.e., whether actual parking is done by employees or customers, and whether there should be additional safety measures employed. 04, — L W /,, ,.' cal'(/ AffI(C " 1✓d�(1Y� �s '� w�"' �l•t(./ Y a hu t�9 Ecf7-GL�S' f t�Gi t'M�i. _ DO f s d i- 6,1CGrp � c r S y �( w � 12 ' Zoning Amendment(South Windsor)—effective Saturday, October 4, 1997 Section XIII: Off-Street Parking and Loading Section 13.2 Modify as follows: "Required parking facilities may be provided on the same lot as the building they serve, or on a lot within 600 feet from such building. All off-site parking facilities are subject to the approval of the Commission. A public hearing may be required if deemed necessary by the Commission. Any off-site parking facility serving a permitted(or lawful)non- residential use in a residential zone shall be approved only if the Commission determines: 1) adequate vegetative or other screening will be achieved. 2) available sight line meets Connecticut Department of Transportation minimum standards; 3) such additional off- site parking is needed to meet the parking requirements of the existing non-residential use and will be used exclusively for this use; 4)no area is presently available on the site of the non-residential building to provide additional on-site parking; 5) the residential character of the neighborhood will not be unduly disrupted; and 6) the primary site should be able to be accessed without pedestrian crossing of any public street. This provision may be waived only if the applicant demonstrates to the Commission that there is no other practical and feasible solution, and that the proposed roadway crossing does not create an unsafe condition. The waiver provision shall not be available to sites located on Sullivan Avenue(Route 194), or Buckland Road, nor to any other four-lane roadway. Two or more parking facilities on adjoining lots, if designed for use as a single parking area,may use the same means of access. Except in the case of dwellings,rooftop or indoor parking, exclusive of access ramps, may be included in the required area. { s r t0WN Sf, rzi 7�a" 2 0-P scwm G s 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 f�OSOR-CO AREA CODE 860/644-2511 March 13, 1998 Certified Mail Arturo Guerra 8. Helmar Wolf 989 Ellington Road South Windsor, CT 06074 Gentlemen: Re: Appl #97-98P, Podunk Farm Parking Lot We are pleased to advise you that the Planning 8s Zoning Commission voted on February 24, 1998 to approve with modifications the above referenced application for a Site Plan of Development for the construction of a 75 space parking lot for the Mill On The River Restaurant on property located at 970 Ellington Road, A-20 & FP zones as shown on plans prepared by Design Professionals, Inc., Job No. 88-319 and revised through January 13, 1998. This approval is subject to the following modifications: 1. Prior to commencement of any site work, a meeting must be held with Town Staff. 2. No building permits will be issued until the final mylars have been filed in the Town Clerk's office. 3. This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission, including a bond in the amount of$5,000. 4. An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 8.1.10 of the Zoning Regulations. 6. A landscape bond in the amount of $2,000 is required and must be submitted prior to filing of mylars. 7. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 8. White pines are to be added to provide screening on the westerly end of the parking lot to effectively screen the residential areas and are subject to Architecture Design & Review Committee. 9. A Lighting plan is to be submitted for the entire site and is to be reviewed by the Architecture Design & Review Committee. 1 10. A 1"=20' scale drawing of the driveway entrance is to be submitted to show that the Town standards for driveways are met. 11. Pedestrian Actuated Flashers on a Warning Sign are required in both directions. This is subject to the approval of the Connecticut Department of Transportation. 12. The following requirements must be adhered to: q a. The new lot will continue to be used solely for employee parking to the maximum extent possible. b. On evenings where patrons are expected to exhaust all available parking in main lots, valet and/or supervised parking will be permitted in the new lot. As indicated by the applicant, the services of a public safety officer will be retained on those evenings when patrons are anticipated to park in the new lot. 13. The number of parking spaces allowed is seventy-five (75). 14. A waiver in accordance with Section 13.2.f has been granted Black and white transparent mylars of Sheet 2 with the above modifications, together with three blueprint copies of the entire set of plans must be submitted to this Commission within 30 days to be stamped and signed. The letters of approval of this Commission as well as the Inland Wetlands Agency/Conservation Commission must be reproduced on the mylars. After the Commission has signed the mylars, they will be returned to you for filing in the Office of the Town Clerk. After filing these plans, a copy of the receipt must be submitted to the Planning Department. Very truly yours, PLANNING 8v ZONING COMMISSION Frank A. Castro, Chairman DESIGN PROFESSIONALS, INC. civil engineers ♦ planners ♦ surveyors gis ♦ gps ♦ landscape architects June 10, 2003 RECEIVED Ms. Marcia Banach, Director of Planning JUN 12 2003 Town of South Windsor SOUTH WINDSOR PLANNPNG DEPT. 1540 Sullivan Avenue South Windsor, CT 06074 RE: Podunk Farm Parking Lot/Site Plan The Mill on the River Restaurant Ellington Road South Windsor, Connecticut DPI Project No. 88-319 Dear Marcia: On behalf of my clients, Helmar Wolf and Arturo Guerra of the Mill on the River restaurant, I hereby request a permit extension for the above-referenced project in order to continue with site construction(clean fill is now available from Summerwood; bonds have been posted). Thank YOU. Sincerely, Design Professionals, Inc. By: Peter if. be 0ie President&Principal cc: Messrs. Guerra&Wolf Karen M. Isherwood, P.E. �A L ll 165 South Satellite Road, South Windsor, Connecticut 06074 Tel: (860)291-8755•Fax: (860)291-8757 Email:dpicivil@aol.com