Loading...
HomeMy WebLinkAbout97-100P Truth Baptist Special Exception TOWN OF SOUTH WINDSOR, CONNECTICUT =#, IV4 PLANNING & ZONING COMMISSION J APPLICATION FORM DEC 12 1997 Application No. : — } Date Received: . /-Co _ South Windsor Action/Public Hearing by: /—/.3-29 Planning & Zoning Com issioa Receipt No. �i \��/rl+ APPLICANT: �,,� In If ADDRESS: L OWNER OF RECORD ON LAND RECORDS (f Z2A z� L ADDRESS: -- COMPLETE LOCATION OF PROPERTY: k) �i 7�§J Assessor's Map #-.L Parcel # q� Zone NAME, ADDRESS, & TEL & AX # OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED: , � d 4. O D� ct3 THIS APPLICATION IS FOR: (ChCA all that apply) : (a _1. Zone Change to (Public Hearing required) 7�0 2 . Subdivision/Resubdivision a. _ Subdivision _ Minor _ Major b. _ Resubdivision Minor _ Major (Public Hearing Required) c. _ Conditional Approval d. _ Open Space Subdivision (Public Hearing Required) 3 . Special Exception to Article l•��i(Public Hearing Required) _4. Site Plan of Development _5. General Plan of Development _6. Earth Filling (Sec. 151 and/or Earth Removal (Sec. 141 (Public Hearing Req) _7.' Regulation Amendment: Zoning Subdivision _8. Amendment to Town Plan of Development _9. Temporary and Conditional Permit _10. Other (expl n i detail) : L Applicant Pr p ty Owner (See r rse side for additional information) TOWN OF SOUTH WINDSOR CHECKLIST REQUIRED INFORMATION SITE PLANS / APPLICANT 'Fy'—A 5 PROJECT NAME o �. This checklist must be signed by plan preparer (P.E./L.S.) declaring that all required information is provided. Items 1-7 are required for all applications; items 8-11 required where appropriate. Check mark for each item supplied. �✓ 1. On each sheet for plans or maps, title block with the following information: a. Name, address and telephone of applicant. b. Name, address and telephone number of Land Surveyor or Professional Engineer. c. Name of Development. rO d. Date when drawings were made. 2. Key Map: An overall map drawn to a scale of 1 inch equals 200 feet, which can be used as an overlay on Metropolitan District Maps. This map will show the overall design of the Development and surrounding property within 500 feet. Vo' a. Date block which'gives needed zoning information such as percentage of lot coverage, / acreage of tract, number of apartment units, parking requirements, etc. b. Layout of buildings. c. Layout of streets and parking. d. Lines indicating proposed drainage system with direction arrows. ✓ e. Lines indicating sanitary sewer system with direction arrows. f. Names of surrounding property owners. g. Proposed open spaces and recreation areas. h. Driveway cuts on surrounding properties. l/ 3. Architectural Elevations: See attached checklist for Architecture and Design Review. 4. Plot Plan: A layout map of the proposed site drawn to a scale of 1 inch equals 40 feet on either of the following size sheets: (1) 24 x 36 with a 3/4 ruled margin; (2) 18 x 24" with a 1/2" ruled margin, containing the following data: ti a. Distance and bearings of all boundary lines and acreage of site. Iron pins required at all property angle points and shown on map. b. Proposed streets and street lines with center line station, curve data, and parking spaces. • c. Building lines in accordance with zoning regulations. i/ d. Proposed buildings and other structures, including signs, outside lighting, and dumpsters (on concrete pad and screened). e. Easements, noting grantors, grantees, and purpose. f. Names of abutting property owners. k-. 4-2 s, ,w o All g. Monuments will be indicated at come rand angles of all streets and at all points of curvature and tangency. In areas accessible to Metropolitan District Commission points, or other coordinated points, the monumented points within proposed site shall be coordinated. These coordinates shall appear in tabular form on the plot plan. The accessibility of these MDC points shall be determined by the Town Engineer. V/ h. All open space or other common or public land uses shall be indicated. i. A-2 certification; P.E./L.S. Seal. -� 5. Topographic Map: A map drawn to a scale of 1 inch to 40 feet on sheets not exceeding 24 inches by 36 inches, including ruled margins shall in addition to the requirements of the plot plans show the following: a. All existing and proposed buildings. -1/ b. Curb Lines and pavement width, sidewalks. c. Existing and proposed sanitary sewers. 1.l d. Existing and proposed water and gas main systems. e. Present wooded area indicated by foliage lines. Any individual trees to be saved should be shown. f. Existing and proposed contours shall be shown in not less than two-foot intervals, but in cases of relatively level land, the contours shall be one-foot intervals and spot elevations. i� g. Regulated wetlands and 100-year floodplain or note that none are present. 1/ h. Proposed storm drainage system, showing all catch basins, endwalls, manholes, lengths and sizes of pipes. (Maximum distance between catch basins shall be 300 feet and minimum size of storm drain lines shall be 15 inches. i. Connections of all springs into proposed storm drainage system as needed. 1� j. Location and indications of existing brook channels, and 100-year flood limits. k. A-2 Certification; P.E./L.S. Seal. i/ 6. Landscaping plan: �7. Drainage calculations: - Zero Runoff Increase per attached guidelines. Traffic Report: 14 - 2 - e r 9. Plans and Profiles: A plan and profile of the proposed streets drawn on plan/profile paper of scales 1 inch to 40 feet horizontally, and 1 inch to 4 feet vertically on sheets not exceeding 24 inches by 36 inches, including ruled margins and containing the following: a. Layout of streets in sections coordinated by stations with the profile. b. Street plan showing roadways and drainage. c. Sight line at driveway & street intersections. _ d. Profile of roadway showing existing and finished grades. Roadway profile will show all tangent grade and all vertical curve information. _ e. Profile will show all catch basins and all drainage lines between catch basins with all invert and top of frame elevations. Drainage lines will be shown and described as to material. f. Where any storm drainage line discharges into an existing brook sufficient profile of this brook will be shown to determine conditions. g. Metropolitan District Commission datum shall be used on all sites accessible to these controls. The Town Engineer shall, based on standard engineering practices, determine the accessibility of these controls. _ h. Profiles shall show all sanitary sewer lines and manholes, including elevations, sizes, lengths, and slopes of pipes. Top of foundation elevations for building shall be shown. _ 10. Open Space Site Improvement Plans: For sites which require or include a provision for open spaces, a plan which contains data for site improvement may be required. This map shall be drawn to a scale of 1 inch equals 40 feet. 11. Sanitary Report: Where individual sanitary sewage disposal systems are proposed, the final plans shall include a Sanitary Report certified by a Professional Engineer. The report shall demonstrate the feasibility of the proposed individual systems; the report should deal with the area as a whole, discussing the following points: a. Gen. ~ail nature and development of surrounding area. b. Topography and natural drainage pattern. _ c. Subsurface conditions as shown by subsurface investigation, including soil absorption characteristics, ground water level conditions, ledge rock, and general nature of soil. d. General description of type of development contemplated. _ e. Detailed description of proposed sanitary sewage disposal facilities, indicating sizes for various ground conditions, materials to be used, and the general layout pattern to be used, etc. f. Special precautions that may be necessary to provide proper functioning of the proposed disposal systems. g. map of general area with locations of all tests shown on proposed layout. h. Flood heights of any nearby streams, brooks, or rivers. - 3 - TRUTH BAPTIST SITE PLAN DRAFT 1. Application for a special exception to Article 4.1.8.b and site plan amendment to construct a 9,500 sq ft multi-use building. This building is proposed adjacent to the existing Truth Baptist Church with an enclosed connection to the church, on property located on the northerly side of Burnham Street, westerly of Route 5, RR zone. 2. Site size is 5+ ac. Proposed building coverage is 6.5%. Proposed impervious coverage is 26%; 50% allowed. The parking provided for this site includes 80 spaces; 60 are required. 3. There are no 100 year floodplain nor regulated wetlands on the property, however the applicant will be disturbing more that V2 acre and has received conservation approval from the IWA/CC with no unusual approval conditions and no recommended bond. 4. Public water and a septic system will service the site. 5. The applicant has provided a Dumpster on a concrete pad and screened. The Dumpster is shown in the easterly side yard and should be relocated out of the side yard. 6. The site is an open site with very little existing vegetation. The landscaping proposed includes some arborvitae along the easterly property line, foundation plantings around the building and a variety of clumps of low lying bushes that will compliment the extensive landscaping. 7. The applicant is proposing a new sign that will match the existing sign at the new driveway entrance to the multi-purpose building. The new sign regulations permit 32 sq ft of freestanding signage at the main entrance, and 16 sf of signage for a secondary entrance, provided that the separating distance between the two entrances is greater than 200 feet. The proposed sign conforms to these new regulations. 8. The Architecture and Design Review Committee reviewed these plans and offered the following comments which have been incorporated into the plans: • additional foundation plantings around the perimeter of the building and along the southeasterly property line • evergreens along the easterly property line to provide some screening 9. The Town of East Hartford was notified of this pending application. If this application is approved, the planning department has no additional modifications to request. There are no engineering comments on the plans. STANDARD APPROVAL MODIFICATIONS FOR SITE PLAN PROJECT Truth Baptist Church APPL.#97-100P ENGINEER/ARCHITECT: Bim Rowley PROJ. # Submit mylars of sheets: 1 1. Prior to commencement of any site work, a meeting must be held with Town Staff. 2. No building permit will be issued until the final mylars have been filed in the Town Clerk's office. 3. This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission. 4. An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 8.1.10 of the Zoning Regulations. 5. Footing drains are required if the building has a basement. 6. A landscape bond in the amount of$2,000 is required and must be submitted prior to filing of mylars. 7. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 8. Sanitary Disposal System is subject to approval of the Town Sanitarian. 9. Dumpster should be located out of the side yard. MEMORANDUM TO: Marcia A. Banach, Director of Planning FROM: Jerry C. Iazzetta, Town Engineer DATE: December 24, 1997 (Y' RE: TRUTH BAPTIST CHURCH — 97-100P We have reviewed the drawing dated 9/12/97 for the Truth Baptist Church Site Plan and have the following comments: 1. Calculations are required to show adequacy of dry wells proposed. 2. The contours shown are very confusing — the proposed and existing are hard to tell apart. Also at the new entrance drive, the proposed 52 contour intersects the existing 53 contour but no new 53 contour is shown, etc. 3. Site is very flat, spot grades and top of frame grades for structures should be shown. 4. Construction sequence indicates that the construction entrance pad is placed in "Step Five". This should be installed as part of'"Step One". 5. Detail and location of construction entrance pad should be shown. 6. Detail of parking surface should be shown. JCl/jsv S0*N St" C .4 • �c 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 soR•c0 AREA CODE 860/644-2511 Date: December 26, 1997 To: Bim Rowley 60 Burnham Street South Windsor, CT 06074 From: Jeffrey H. Folger Zonin glWetland Officer Town of South Windsor Re: Review of Truth Baptist Church-Plans dated 9/12/97. I have reviewed the site plans for the proposed church expansion with the following comments: 1. The anti-tracking pad should be shown on the site plan. 2. The sequence of clearingshows the anti-tracking ad to be installed in step#4. In order to gp P reduce possible tracking of soil onto the street during initial clearing and grading the pad should be in place prior to step #2. 3. The proposed stock pile location should be shown on the plans. 4. The catchbasin tops of the ells should show temporary erosion controls. Vegetation p dryw p ary around the drywells should be fully established prior to the introduction of stormwater. cc. Town Engineer Town Planner IWA/CC Planning Department Town of • • • Memo To: Bim Rowley p From: Michele R. Lipe,AICP Date: 12/29/97 Re: Appl. #97-100P, Truth Baptist Church Site Plan Enclosed is copy of the Engineering Department's comments on the above application. The Planning Department comments include: showing all properties within 500 feet of the property (on the key map); showing any existing or proposed dumpsters (on concrete pad and screened), parking requirement broken down by uses in the building and a landscaping table showing sizes and quantities of the landscaping proposed. After revisions have been made, please submit 6 copies of the revised plan (including the architectural of the outside of the building). Our office should receive the plans at least 10 days prior of the public hearing scheduled on February 10, 1998. If you have any further questions, contact me at 644-2511, ext. 252. 0 Page 1 t�W N Sf4 + F a o-"e S-oum W)Z m 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 SOR-CO AREA CODE 860/644-2511 CERTIFIED MAIL January 20, 1998 Pastor Bim Rowley 60 Burnham Street South Windsor, CT 06074 Dear Pastor Rowley: Re: Appl #97-100P, Truth Baptist Church Addition At the January 7, 1998 regular meeting, the Inland Wetlands Agency/Conservation Commission approved appl #97-100P- Conservation Plan Approval for the construction of a 9,500 sq. ft. addition on property located at 60 Burnham Street, RR zone as shown on plans prepared by Richard Walton, Dubiel Associates and dated September 12, 1997. This approval is subject to the following conditions: 1. One blueprint copy of the entire set of plans and this letter reproduced thereon, must be submitted to this Commission. This must be completed within 65 days of approval prior to any construction activity on the site. Plans submitted to Planning & Zoning Commission shall be considered having met this requirement. 2. The application shall indemnify and hold harmless the Town of South Windsor against any liability, which might result from the proposed operation or use. 3. The permit is valid for five years and shall expire on January 7, 2003. It has been IWA/CC's policy to notify landowner(s)/applicant(s) of expiring wetland permits. However, it is the landowner(s)/applicant(s) responsibility to track expiration dates and notify the Commission of a renewal request at least 65 days prior to expiration. 4. All approvals required must be obtained and submitted prior to any activity on the site. 5. A contact person shall be identified on the plans. Very truly yours, INLAND WETLANDS AGENCY/ CONSERVATION COMMISSION Elizabeth A. Warren, Chairman EAW/pmm Cc: Chief Building Official Planning 8v Zoning Commission Town Engineer SOW N SC4 C� y 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 soe•co AREA CODE 860/644-2511 January 30, 1998 CERTIFIED MAIL Town Clerk Town of East Hartford 740 Main Street East Hartford, CT 06.118 Dear Madam/Sir: Re: Notice to Adjoining Municipalities In accordance with Connecticut General Statutes concerning notification to municipalities regarding Planning & Zoning Commission applications that could affect the abutting town, we hereby notify you of the application submitted by Truth Baptist Church, 60 Burnham Street, South Windsor, CT 06074. The applicant requests a Special Exception to Article 4.1.8.6 of the Zoning Regulations and Site Plan of Development for the construction of a 9,500 sq. ft. all purpose building on property located at 60 Burnham Street, RR zone. This application is tentatively scheduled to be heard by the Planning & Zoning Commission February 10, 1998 at 7:30 p.m. in the Council Chambers of the Town Hall. If you have any question, please feel free to contact the Planning Department at 644-2511, ext. 252. Very truly yours, Michele R. Li AIP p e� Assistant Director of Planning MRL/pmm tCNN 8r 0-lesou� ?& 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 SOR-CO AREA CODE 860/644-2511 February 25, 1998 Certified Mail Bim Rowley Truth Baptist Church 60 Burnham Street South Windsor, CT 06074 Dear Mr. Rowley: Re: Appl #97-1OOP, Truth Baptist Church Special Exception and Site Plan We are pleased to advise you that the Planning & Zoning Commission voted on February 24, 1998 to approve with modifications the above referenced application for a Special Exception to Article 4.1.8.6 of the Zoning Regulations and Site Plan of Development for the construction of a 9,500 sq. ft. all purpose building on property located at 60 Burnham Street, RR zone as shown on plans prepared by Richard Walton Dubiel Associates and dated January 26, 1998. This approval is subject to the following modifications: 1. Prior to commencement of any site work, a meeting must be held with Town Staff. 2. No building permits will be issued until the final mylars have been filed in the Town Clerk's office. 3. This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission. 4. An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 8.1.10 of the Zoning Regulations. 5. Footing drains are required if the building has a basement. 6. A landscape bond in the amount of $2,000 is required and must be submitted prior to filing of mylars. 7. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 8. Sanitary Disposal System is subject to approval of the Town Sanitarian. 9. Dumpster should be located out of the side yard. Black and white transparent mylars of Sheet 1 with the above modifications, together with three blueprint copies of the entire set of plans (including landscaping and architecturals) must be submitted to this Commission within 30 days to be stamped and signed. The letters of approval of this Commission as well as the Inland Wetlands Agency/Conservation Commission must be reproduced on the mylars. After the Commission has signed the mylars, they will be returned to you for filing in the Office of the Town Clerk. After filing these plans, a copy of the receipt must be submitted to the Planning Department. Very truly yours, PLANNING & ZONING COMMISSION Frank A. Castro, Chairman FAC/pmm Cc: Town Engineer Chief Building Official Assessor Superintendent of Pollution Control Fire Marshal I, Frank A. Castro Chairman of the South Windsor Planning & Zoning Commission, hereby certify that on February 24, 1998 the Planning and Zoning Commission granted to Truth Baptist Church a Special Exception to Article 4.1.8.6 of the Zoning Regulations to allow an all purpose building associated with the Church as shown on plans prepared by Richard Walton Dubiel Associates Assessor's Map and Parcel Number: Map 5, Parcel #45 More particularly bounded and described as follows: (legal description from Deed or Mortgage) A certain piece or parcel of land, together with the buildings thereon located in the Town of South Windsor, County of Hartford, and State of Connecticut, as shown on a "Plot Plan for Truth Baptist Church 60 Burnham Street & King Street South Windsor, Connecticut Scale 1" = 401. December 11, 1996 Dubiel Associates - East Hartford, Connecticut Project No. 96-59-132 Sheet 1 of 1" which map is on file in the South Windsor Town Clerk's Office and more particularly bounded and described as follows: Beginning at a point in the Southerly line of King Street, which point marks the Northwesterly corner of the land herein described and the Northeasterly corner of land now or formerly of Dwight Burnham; thence running Southwesterly along land now or formerly of said Dwight Burnham, One Hundred Sixty-two and Thirty- One One Hundredths (162.31) feet to a point; thence turning and running Easterly along land now or formerly of Arthur Spielman, One Hundred Ninety-Eight and Eight One Hundredths (198.8) feet to a point, thence turning and running Southwesterly along land now or formerly of said Arthur Spielman Four Hundred Forty-Two and Seven One Hundredths (442.7) feet more or less to a point in the Northerly line of Burnham Street; thence turning and running Easterly along the Northerly line of Burnham Street, One Hundred Eight-Nine and Eighty-Five One Hundredths (189.85) more or less feet to a point; thence turning and running Northeasterly along land now or formerly of Robert L. Murray, Six Hundred Nine and Twenty-Five One-Hundredths (609.25) feet more or less to a point in the Southerly line of land nor or formerly of Cecil and Gladys Brooks; thence turning and running Westerly along land now or formerly of Cecil and Gladys Brooks, One Hundred Fifty-Nine and Eight One-Hundredths (159.08) feet to a point; thence turning and running Southwesterly along land now or formerly of Hector and Florence Beaupre, and along land now or formerly of John C. and Helen A. Gildner, partly by each a distance of One Hundred Forty- Four and Forty-Three one Hundredths (144.43) feet to a point; thence turning and running Northwesterly along land now or formerly of said John C. and Helen A. Gildner One Hundred Seventy-Seven and One One-Hundredths (177.01) feet to a point on the Southerly line of King Street Fifty and Two One-Hundredths (50.02) feet to the point or place of beginning. OWNER OF RECORD: Truth Baptist Church Dated at South Windsor, Connecticut this 25th day of February, 1998 In accordance with CGS Section 8-3d Frank A. Castro, Chairman Planning & Zoning Commission Received for record this day of , 19 , at South Windsor, Connecticut ATTEST: Town Clerk �pWN Sfq o X F 7own ate slotdA Vzq&ot a . u 9 . 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 �dSOe COS AREA CODE 860/644-2511 May 5, 1998 Bim Rowley Truth Baptist Church 60 Burnham Street South Windsor, CT 06074 Dear Mr. Rowley: Re: Preconstruction Meeting —Appl #97-100P, Truth Baptist Church IN ATTENDANCE Tracy LaPiene Town of South Windsor 644-2511 ext 257 Jeffrey Folger Town of South Windsor 644-2511 ext 229 Bim Rowley Truth Baptist Church 289-8976 Melvin Stead Jr. Town of South Windsor 644-2531 The following is a brief summary of points discussed during the meeting. Erosion and Sedimentation Control 1. All erosion and sedimentation control measures are to be in place prior to earth moving operations in each area and maintained/cleaned out during construction. Call Jeffrey Folger, Zoning/Wetlands Enforcement Officer for inspection when measures are in place, prior to commencement of site work or if any problems/concerns arise during construction. 2. All topsoil stockpile areas to be protected (ringed with haybales or equal). 3. During construction of the road/driveway a crushed stone tracking pad is to be installed and maintained to minimize tracking of dirt/gravel on to Water is to be used for dust control as required. Calcium chloride or water is to be used for dust control as required. Public Works 1. Three complete sets of-approved/revised plans to be provided to Town prior to start of construction. They will be stamped by the Planning Department along with plans developer needs. Only approved plans are to be used on the job site. 2. The Public Works Department is to be notified forty-eight (48) hours prior to the start of major construction work with inspections and testing per Developers Checklist requested for the following: a. After site is staked out b. All drainage work c. Preparation of subgrade ' compaction tests as per Developer's checklist d. Preparation of subbase, six (6) inch lifts e. Placement of bituminous concrete, two (2) inch layers maximum I Certification of gravel used as subbase and processed stone for base will be required from an approved testing company. 4. Certification of all products used -- storm pipe, structures, pavement, etc., shall be presented to the Town Engineer prior to installation. 5. Two (2) weeks' notice must be given prior to placing the finish pavement course. This is to allow for inspection and correction measures (if necessary) of the infrastructure, prior to final pavement. 6. Applicant/developer should' be aware that the inspection of the infrastructure improvements may result in the replacement of structure tops and/or structures prior to final paving if found to be deficient. 7. No subgrade formation/base in frozen ground/snow. Same for pipe/structure installation. M 8. As built plans are to include horizontal and vertical location of all underdrains, footing drains, and sanitary sewers and house service laterals located as per revised as-built checklist. 9. All-pipe and structures to be backfilled with free draining material, compacted in maximum one foot lifts with approved compaction equipment or approved equal if deep trench is encountered. Any pipe or structure work requires inspection prior to backfilling. 10. Any problems and/or questions regarding construction of this project will be directed to Bim Rowley in the field at phone #282-0804. 11. All filling to be done in accordance with Department of Transportation specifications. To be compacted in maximum lifts and tested as necessary. 12. Job meetings will be held as needed, and can be called by the developer or Town 13 Forty-eight (48) hours' notice needed for certificate of occupancy inspection. 14. Any proposed changes are to be presented to the Engineering or Planning Department prior to implementation on change order form in quadruplicate with 4 copies of the drawing. Town will attempt to turn around within 24 hours. 15. Normal hours of operation 7:00 a.m. — 5:00 p.m., no work on Sunday. 16. Street Excavation Permits will be required for activity within the street right-of-way. Septic Permit will be required for installation of septic system. Planning Department 1. Landscaping is to be installed in accordance with the approved landscaping plan. If there are changes required, contact the Planning Dept. Additional landscaping installed on one part of a site will not preclude planting all of the remaining items shown on the landscaping plan. 2. $2,000 Landscaping bond needed prior to filing of mylars. SNET NU 1. Contact utilities for coordination of utilities connection. Fire Marshal 1. Blasting (if required) to be coordinated with the Fire Marshal. Police Services 1. Emergency phone numbers for the duration of the construction must be provided to Police Services on a company letterhead. If the developer occupies or owns the building after construction emergency numbers must be provided to Police Services. 2. All buildings located on property, which abuts a public highway, must be numbered. Such number(s) (address) shall be visible from the street. All numbering shall comply with Town Ordinance 6-800 thru 6-802. Barns, garages, and outbuildings, which are located on the same premises as a numbered structure, are excluded. 3. Erect temporary sign on the site during construction identifying the project. 4. If an alarm is to be installed contact Police Services. Building Department 1. Plan review with Building Official/Fire Marshal required prior to application for building permit. Coordinate with Chief Building Official. Very truly yours, Jeffrey H. Folger Zoning/Wetlands Enforcement Officer JHF/pmm cc: Jerry C. Iazzetta, Town Engineer Karl Reichle, Public Works Mel Stead, Public Works Tom Ludwig, CL&P Minh V. Le, SNET John R. Collins, Chief Building Official Fred Shaw, Superintendent of Pollution Control l • �, r'-�-€ fir; l ct _. TRUTH BAPTIST CHURCH MULTIPURPOSE BUILDING HE THAT BELIEVETH ON THE SON HATH EVERLASTING LIFE j"s3o A\I li /A 11% /A I li /A I /A I It A I It/A I It /A I It /A I /A I /A I /A I III/A 111 /A 111 /A 111 /1 NOTES: SIGN AREA SHALL BE LESS THAN 12 S.F. SIGN DESIGN PATTERNED ACCORDING TO EXISTING SIGN SIGN STRUCTURE SHALL BE BROWN ANODIZED ALUMINUM SIGN SHALL BE DOUBLE—SIDED WITH LOW INTENSITY INTERIOR FLOURSCENT LIGHTING SIGN DIMENSIONS SHALL BE 7' X 1.7' SIGN PEDASTAL SHALL BE 5' X 2.5' OF BROWN ANODIZED ALUMINUM 2 1 0-2 WI . F( t M TRU 9 olusC?. B `4 'A s ' w.•' .Sts h Wt�tds►r,C'T 06074 FiC36U,t t'3�!}1J43 w, uyf:," �• 4i' i �il?1Ct1f'G�� 1d�Lt>Y u Ch CIO 2003 40 _ W/NpsOR chWe Lim. 1GYdy ' } 06th vV4o towb lit 540 std A►vea ve Y *'. ' �� { Wt�w r6q oog 4 of 18�Sc,3 A� �f�uu hake SOPS oaf lfd0a infq �t��x 1 - µf�e�'colaate�tamle � �] o$ Stow"OiM1 ' t,(ty s ., f��a �• " Ls}s,� 'i - '�5�._; .t - ,. y it xx '[ e: ! f §s wy z - vF * t $ rr u SOW N SF4 F Town O-P s-oa-ZA ?A:Orlzd� m 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 SOR•CO AREA CODE 860/644-2511 July 1, 2003 Pastor Bim Rowley 60 Burrnham Street South Windsor, CT 06074 Re: Appl#97-100P, Truth Baptist Church Landscaping Bond Dear Pastor Rowley: This is to advise you at its June 24, 2003 meeting the Planning and Zoning Commission released the landscaping bond for the above-referenced project in the amount of$2,000.00. Advance arrangements should be made to pick up the bond to ensure that the necessary contact person(s) will be available. If you have any further questions contact the Planning Department at 644-2511, ext. 252. Thank you. Sincerely, Kevin McCann, Chairman Planning&Zoning Commission KMcC/kah cc: Town Engineer TOWN OF SOUTH WINDSOR STAFF SITE CHANGE FOR SITE & SUBDIVISION GENERAL: CHANGE ORDER CONTACT PERSON v►1 Phone No..�9& Address 3 Site Name T �, � � P&Z No. Owner J � ,� �, Phone No. n 2917 e''7 7/, Contractor Si nature of Owner Date: Signature of Design Engr. ' / Date: 1 CHANGE: (Describe location and nature of 4ange. Include Four (4) copies of plan/profile of Change. ) v 14 +yA 4 1 vo Reason for Change: (Why is change required) } 4i , v✓, f� ` ill ¢� fr �1� �,j . APPROVALS: (As Required) Dir. Of Planning / / Date: -_ /Z-)//& Town Engineer Date: Dir. of Public Works Date: Other: Date: STAFF COMMENTS: White - Town Engineer Yellow - Applicant Pink - Director of Planning s '+ems"e 4a3 w Ir 3 Proposed Storage Room N C 3 0 s e9'3518"W H now e"Aft, 155.07' r rrr 'r'^• C :S w Proposed Storage Rm 225sf Existing Bldg Area 15860sf Educational Total Bldg Area 16085sf Multipurpose Existing Impervious Area 60380sf Church Facility New Total Impervious Area 60605sf Total Impervious Coverage 26.5% m Contact: Sim Rowley Phone: 860-989-9321 Fa:c 904-686-8012 .�� A-2 8urvery by Richard Walton CT Uc.Land Surveyor No 16103 Date: December 199 �.�«.�. Proposed Gym Storage Room S 86'27'16" W • for 388.96' � t 'h1N ice'