Loading...
HomeMy WebLinkAboutSite Plan - Conservation (9) D sit T N.O S T WINDSOR AV Qv ,�� IN N bOWLANDS, WATERCOUR,�E ,CONSERVATION APPARRJUMW PMMQ South and Of INLAND WETL`NOS A(ENCY1 , S ID� pp0S l4cfl CONSERVATION COMM'S510N o r Appl� N -- r-oy Date Received s�6 -19 Zone INSTRUCTIONS I. One application with map and plans submitted in duplicate, together with the fee set forth in the Inland Wetlands, Watercourses and Conservation Regulations, Town of South Windsor. (see Regulations, Section VII - X) 2. The South Windsor Inland Wetlands, Watercourses and Conservation Regulations should be reviewed with respect to the standards and criteria for application Evaluation. (see Regulations, Sections VII - X) 3. The applicant understands that this application is to be considered complete only when all information and documents required by the Agency have been submitted. The applicant shall also complete the state filing form. Applicant's Name: River Valley Baptist Church Address: P.O. Box 1145 , South Windsor,CT 06074 Phone: (home) (work) 6 4 4-3 4 7 2 (fax B. Legal owner's name: David G. Moulton Address: 11 Beldon Road, South Windsor,CT 06074 Phone (home) 2 8 9-5 018 (work) (fax) (List additional owners, addresses, and phone numbers on back of application) C. If the applicant is not the owner of the subject property, a letter by the owner (s) authorizing the proposed regulated activity set forth in the application must accompany this form and will be part of the application. D. Project Name (if any) River Valley Baptist Church ql � 1. Contact Person (if further information is needed). Peter R. DeMallie (WORK)291-8755 (FAX) 2918757 Design Professionals , Inc. , 165 S. Satellite Rd. ,South Windsor CT 06074 E. The geographical location of the property which is to be affected by the, proposed regulated activities including a description of the land in sufficient detail to allow identification of the property on the Inland Wetland and Watercourses Map. 919 Ellington Road Assessor's map # 35 Parcel 6 & 7 F. Names of all abutting property owners. (use separate sheet if necessary) Susan G. Osborne;Lakewood;Robert & Judith Galaise; Julia R. Johnson; Town of South Windsor. G. Have you notified all abutting property owners by certified letter than an application is pending before the Agency? Yes . Letter attached. x ** (You are required to supply a copy of the letter with the list of the names of the abutters).** H. Purpose and description of all proposed regulated activity (s) including amount and types of fill and the time element involved. Construction of new church, parking lot, access drive, retaining walls;: and associated improvements. Within the wetlands , fill includes : 38± cubic yards of pavement, 76± c .y. of processed stone, 20± c.y. of loam, 35 1 .f . of pipe, and 38 1 .f. of wall . I. A class A-2 map of the property drawn to 1 = 40', showing the area to be developed, extent of the wetlands and watercourses affected, topography, existing and proposed activities and names and locations of adjacent property owners must be submitted. J. Acreage of wetlands and watercourses to be altered: a34 acre K. Acreage of wetlands and watercourses to be created: 0 L. Lineal feet of proposed stream alteration: 0 M. Total land area of project and percentage which is wetlands: 9 acres/2 . 4 o wetlands N. Identify all other permits or approvals that have been issued, applied for, or required with respect to the proposed activity set forth in this application. (These may include but not be limited to, local Planning & Zoning, Zoning Board of Appeals, D.E.P., F.E.M.A., D.O.T., The Army Corps of Engineers, and any other State, Local or Federal Permits.) PZC site plan/special exception; health permit; Corps of Engineers; DEP;DOT 0. The applicant (or designated representative) hereby attests that a sign will be posted-at the following location (s) at street frontage by Design Professiona�rwme Peter DeMallie on or before the following date: as directed by Town staff Signature: j A�/'/ These signs must be displayed continuously for at least ten (10) days prior to scheduled meeting (See Regulations, Section 7.3a). The undersigned hereby applies for the regulated activities listed in paragraph H above, for a Inland Wetlands, Watercourses and Conservation permit for the property described herein and confirms that; 1. She/he is familiar with the currently effective Inland Wetlands, Watercourses and Conservation regulations of the Town of South Windsor. 2. She/he understands that at any time during the review period, the Agency may require the applicant to provide more information about the wetlands and/or watercourses in question and/or any proposed activity. 3. All information submitted in the application for review shall be considered factual, or in the case of anticipated activity, binding. A knowing failure of the applicant or any of her/his agents to provide correct information, or performance exceeding the levels of activity anticipated, shall be sufficient grounds for revocation of any permit under these regulations. 4. By making this application, the applicant'gives permission to the Inland Wetlands, Watercourses and Conservation Commission members and/or its representative to enter the portions of the premises which are subject of the application for the purpose of inspection and investigation and otherwise evaluating the merits of the ap ation both before and after a final decision has been issued. Signature of Owner of Property Date Signature of 4plica& tarbo_ra -U. Hedges -'Yu S+e e Dated D 1_199. S+ C-II u.IcCh CONNECTICUT DEPARTMENT OF ENVIRONMENTAL PROTECTION Statewide Inland Wetlands & Watercourses Activity Reporting Form In accordance with the requirements of Section 22a-39-14 of the Regulations of Connecticut State Agencies,this form is to be completed for each action taken by an inland wetlands agency established pursuant to Section 22a-42 of the Connecticut General Statutes. Use a separate form to report each action taken by the agency. It is recommended that this form be made part of the application package. Inland wetlands agencies are responsible for verifying that the information proyided below is accurate and that it reflects the final action of the agency. 1. TOWN IN WHICH THE ACTION IS OCCURRING: South Windsor Does this project cross municipal boundaries? Yes No X If so,please list the other towns in which the action is occurring: 41072-G5-TF-024 2. LOCATION: USGS Quad Map name: Manchester AND Number: Attach a clean 8'/z "x I I"original scale photocopy of the USGS Quad Map with,in red ink, the boundary of the project site outlined(where possible)or the project site.pinpointed with an arrow. Do not circle the "general vicinity"of the site. In the lower right-hand comer of each USGS Quad Map there is an identifying name,write the name from the corresponding map in the space provided above. Quad numbers are found on the Connecticut Town and Quadrangle Index Map (the directory to all USGS Quad Maps). Please provide the number in the space provided above. Do not attach a copy of the National Wetlands Inventory Map. Do Not attach a copy of the Connecticut Town and Quadrangle Index Map. 3. NAME OF APPLICANT,VIOLATOR OR PETITIONER: River Valley Baptist Church Supply the name of the person applying for a permit,petitioner for a map amendment or jurisdictional ruling,or recipient of the enforcement action. 4. NAME FOR PROJECT SITE: River Valley Baptist Church Supply the name given to the project,or the name by which the project site is generally known. Briefly describe the project: Construction of new church. 5. ACTIVITY TYPE CODE: 1 2 9 12 Provide the code or codes which best characterize the activity being reported. A maximum of 4 codes may be entered. For example, locating a driveway in a buffer/upland review area would be code"9"and code"12" (code "7"is not used). The construction of a house in the buffer/upland review area would most likely be codes "2"for excavation, "9"for driveway construction,and "12"for buffer/upland review area. Construction of a parking lot in a buffer/upland review area may be codes"1","7","10",and "12". I ... Filling 7 . . .. Culverting(not for roadways) 2 ... Excavation 8 . ... Underground Utilities (no other activities) 3 ... Land Clearing/Grubbing(no other activity) 9 . . .. Roadway/Driveway Construction 4 ... Stream Channelization 1.0 ... Drainage Improvements 5 . .. Stream Stabilization 11 . .. Pond Dredging/Dam Construction 6 . . . Stream Clearance (removal of debris only) 12 . ..Activity in Buffer/Upland Review Area 6. ACTIVITY PURPOSE CODE: P Enter only one code letter which best characterizes the activity. ALL STATE AGENCY PROJECTS MUST ONLY CODE"N".' A . . . Residential Improvement by Homeowner I .. . Storm Water/Flood Control B . .. New Residential Development for Single Family Units J . . . Erosion/Sedimentation Control C .. . New Residential Development for Multi-Family/Condos K. .. Recreation/Boating/Navigation D . . . Commercial/Industrial Uses L ... Routine Maintenance E .. . Municipal Project M .. Map Amendment F . .. Utility Company Project •N. .. State Agency Project G .. .Agriculture,Forestry or Conservation P ... Other H ... Wetland Restoration,Enhancement,Creation REVISED 1198 7. AREA OF WETLANDS AND/OR WATERCOURSES ALTERED: Include areas that are altered or are proposed to be altered,temporary or permanent,for all agency permits,denials,amendments, and enforcement actions. Remember,these figures represent only the acreage altered,not the total acreage of wetlands or watercourses-.on the site. Figures should be provided by the applicant in the application. Provide all information in acreage including those areas less than one acre. To convert from square feet to acres,divide square feet by the number 43,560. Enter a zero if there is no alteration. Open water body altered refers to lakes,ponds or similar bodies of water that are filled or dredged. Stream alterations are to be reported in linear feet and include the total length of the river,brook,stream or other watercourse directly altered as a result of the action taken by the agency. Include any culverting(roadway,etc.),channel improvements,rip rap installation,relocation or dredging. A. Wetland Area Altered: . 134 ACRES B. Open Water Body Area Altered: 0 ACRES C. Stream Alteration: 0 LINEAR FEET 8. BUFFER/UPLAND REVIEW AREA ALTERED: . 37 ACRES Buffer or upland review areas are those areas adjacent to wetlands or watercourses where activities are regulated by the local agency. Report the acreage of upland review areas that are altered or are proposed to be altered,temporary or permanent,for all agency permits,denials,amendments,and enforcement actions;or for agent approval pursuant to 22a-42a(c)(2), For example,a 2 acre project site may have an activity occurring in 1 acre of buffer/upland review area and 0.25 acres of wetlands. Therefore.0.25 acres will be reported on line 7A and 1 acre on line S. 9. AREA OF WETLANDS AND/OR WATERCOURSES RESTORED,ENHANCED OR CREATED : 0 ACRES Mitigation measures may be considered as a condition of issuing a permit for an activity. Report areas that are,or are proposed to be,restored,enhanced or created for all agency permits,denials,amendments,and enforcement actions. Restored or enhanced applies to previously existing wetlands or watercourses. For example,a wetland area filled two years ago is proposed to be restored by removing the existing fill. Created applies to an upland area which is converted into wetlands or watercourses. FOR MUNICIPAL AGENCY USE ONLY FOR STATE USE ONLY THE INLAND WETLANDS AGENCY MUST ENSURE THAT THE INFORMATION DATE RECEIVED: PROVIDED BELOW IS ACCURATE AND THAT IT REFLECTS THE FINAL ACTION OF THE AGENCY. COMPLETED FORMS FOR ACTIONS TAKEN DURING A CALENDAR MONTH SHALL BE MAILED BY THE AGENCY TO THE DEP NO LATER THAN THE 15TH DAY OF THE FOLLOWING MONTH. MAIL REPORTING FORMS TO: Inland Water Resources Division,DEP, 79 Elm Street,Hartford, CT. 06106 QUESTIONS MAY BE DIRECTED TO THE WETLANDS MANAGEMENT GIS CODE#: SECTION AT(560) 424-301 9. NAME/TriLE OF PERSON COMPLETING THIS FORM: FILE # (SAME AS QUAD #): (PRINT) (SIGNATURE) FORM COMPLETED: YES NO DATE ACTION WAS TAKEN: MONTH YEAR WAS A PUBLIC HEARING HELD? YEs No IF "NO". DATE MAILED TO TOWN: ACTION TAKEN: ENTrR LETTER DATE RETURNED TO DEP: A. PERMIT GRANTED BY AGENCY B. PERMIT DENIED BY AGENCY C. PERMIT EXTENDED/AMENDED BY AGENCY D. AGENT APPROVAL PURSUANT TO 22a-42a(c)(2) E. APPEAL OF AGENT APPROVAL PURSUANT TO 2 2a-4 2a(c)(2) F. MAP AMENDMENT(AMENDMENT TO THE OFFICIAL TOWN WETLANDS MAP. NOT A PROJECT SITE MAP) G. ENFORCEMENT NOTICE/ORDER H. JURISDICTIONAL RULING (I.E.: ACTIVITIES "PERMITTED AS OF RIGHT" OR ACTIVITIES CONSIDERED NON-REGULATED) -REVISED 1198 DESIGN PROFESSIONALS, INC. planners civil engineers surveyors gis Transmitted via certified mail April 14, 1998. Dear Property Owner: Re: Application River Valley Baptist Church, South Windsor, Connecticut DPI Project No. 97-1048 Please be advised that our client, River Valley Baptist Church, has filed applications on the property abutting yours and is subject to a hearing by the Inland Wetlands Agency/ Conservation Commission and the Planning&Zoning Commission. The application and plans are on file with the South Windsor Planning Department. As an abutting property owner,you are invited to the hearing to ask questions and/or give comments, however,you are not required to attend. You may also submit written comments regarding the application prior to the hearing, if you so desire. For further information regarding the specific date this will be heard,please contact Phyllis Mann,Recording Secretary, or Jeff Folger, the Zoning/Wetlands Enforcement Officer at the Planning Department, 644-2511, ext. 253. Thank you. Sincerely, Design Pro sionals, Inc. By: Peter R. DeMallie Principal cc: Town of South Windsor Planning Department/J. Folger Phyllis Mann Michele Lipe David Knapton 165 South Satellite Road South Windsor, CT 06074 tel. 860 291-8755 fax. 860 291-8757 MEMORANDUM To: South Windsor Inland Wetland/Conservation Commission. From: Jeffrey H. Folger-Zoning/Wetland Enforcement Officer Date: April 23, 1998 Re: App. #98-22P -Review of the proposed River Valley Baptist Church-Plans dated 4/14/98. The project is to build a 7800sgft church and 40,000sgft parking lot on approximately 9 acres. Proposed regulated activities include filling approximately 28,000sgft of wetland and regulated area. Site: The site is located in the Podunk River watershed. The site is mostly wooded with the eastern '/4 of the site used as an agricultural field. Relief on the site is a gently sloping sidehill with the peak elevation on the southern boundary mid-site. The structure and parking lots are proposed to be located on the western half of the property. The total site is comprised of approximately 9 acres, approximately 3/4 of an acre is mapped as wetlands. Two areas of wetlands are present on the site, one located in the middle of the property(5/8t' of an acre),the other located at the eastern end of the property(1/8fl'of an acre). Land uses abutting the parcel are high density residential to the north, agricultural to the south, town owned open space to the east, and two residential houses and Ellington Road to the west. The wetland proposed to be disturbed would be characterized as a forested wetland pocket. The wetland occurs on the top and the bottom of a small terrace located in the middle of the property. Source of water to this wetland is probably surface runoff,with some contribution from groundwater. Major functions of this wetland area would be groundwater recharge, and some wildlife habitat. The value of the functions are limited due to the relatively small size and isolation to other wetland areas. Impacts: Three quarters of the area of proposed disturbance is currently maintained as a plowed Ag field. No cover crop was present. The soils are mapped as Rainbow silt loam 3 to 8% slope (RaB) , erosion hazard moderate and Broadbrook silt loam 3 to 8% slope(BrB) erosion hazard high. I have not received the soils report yet but I suspect that the Broadbrook(BrB) is not present; the material I examined is sandier than a Broadbrook and I suspect less erosive. E&S controls proposed should adequately prevent the migration of sediments offsite. The stormwater system is proposed to be contained onsite with a number of drywells. Engineering is reviewing the capacity and expected permeability of the system. Runoff borne pollutants from the proposed parking area is a concern. Pre-treatment of stormwater prior to entering the drywell system is recommended. The wetland area is proposed to be filled and graded to accommodate the eastern most parking lot. No mitigation is proposed. Spur N se4 m• ` 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 SOR-CO AREA CODE 860/644-2511 Date: April 281998 To: Design Professionals 165 So. Satellite Road South Windsor, CT 06074 From: Jeffrey H. Folger Zoning/Wetland Officer Town of South Windsor Re: Review of River Valley Baptist Church dated 4/14/98. I have reviewed the site plans for the proposed church and parking lot with the following comments: 1. There is a concern about hydrocarbons and other automotive fluids entering the groundwater through the drywell system. Pre treatment of stormwater generated from the parking lots should be considered prior to entering the drywell system. 2. I have not received the soils report yet. 3. The applicant should be prepared to demonstrate that the project proposed does not have feasible and prudent alternatives which are less intrusive to the wetland resource (see section 11.2 South Windsor IW/CC regulations). cc. Town Engineer Town Planner IWA/CC HIGHLAND SOILS LLC WETLAND REPORT RIVER VALLEY BAPTIST CHURCH ELLINGTON ROAD SOUTH WINDSOR, CONNECTICUT PREPARED FOR DESIGN PROFESSIONALS, INC BY JOHN P. IANNI PROFESSIONAL SOIL SCIENTIST MAY 1998 P.O. Box 337, Storrs, Connecticut 06268 • (860) 742-5868 [ i The inland wetland boundaries on the property of the proposed River Valley Baptist Church, Ellington Road, South Windsor were field delineated on January 21, 1998. The wetlands were field delineated in accordance with the standards of the National Cooperative Soil Survey and the definition of wetlands as found in the Connecticut General Statutes, Chapter 440, Section 22A-38. I have reviewed the plans prepared Design Professionals, Inc. (dated 4-14-98) and have found the representation of the field delineated wetlands to be substantially correct. The property contains a mix of open agricultural field in the front and mixed hardwood forest to the rear. Two areas of wetlands were identified on the property. A small intermittent watercourse and associated wetland soils were identified to the rear of the property. The wetland originates a small seep along the southern property line. The intermittent watercourse flows in a northerly direction and terminates in the rear yard of the Lakewood Subdivision. The surface water enters a yard drain and is piped into the closed catch basin system serving the subdivision. No activity is proposed within the wetland or within close proximity to the wetland. The second wetland was identified near the open field - woodline at the top of an existing slope. The wetland consists of a small isolated pocket. This wetland is the result of a seasonally perched watertable on a compact layer of glacial till. This wetland does not exhibit any wetland functional values. The interesting aspect of this isolated wetland is that it sits on top of a deposit of unsaturated sand and gravel . The existence of the wetland soils is caused by a layer of compact till which lies on top of the sand and gravel. If not for the compact till and localized micro topography (which forms a small concave area) the wetland would not exist. The vegetation within the wetland consists mainly of upland species with some ground cover plants providing the only indicator of wetness. The wetland area is very seasonal and the hydrology to support wetland soils lasts into the early spring before evapotranspiration dries the wetland. As stated earlier the compact glacial till overlays unsaturated deposits of sand and gravel. In my opinion the small wetland does not exhibit wetland functional values and its elimination during the construction project will not have a significant impact to the environment. MEMORANDUM TO: Jeff Folger, Zoning/Wetlands Enforcement Officer FROM: Jerry C. Iazzetta, Town Enginee DATE: May 26, 1998 RE: RIVER VALLEY BAPTIST CHURC — 98-22P We have reviewed the revised drawings dated 5-19-98, received 5-26-98, for the proposed River Valley Baptist Church and have the following comments: 1. The proposed drainage swale: (a) Yard drains #15 and #20 are shown higher than the bottom of the Swale. (b) A typical cross section of the swale should be shown. (c) The grading seems a little confusing, but conversation with applicant's engineer has cleared up the intent of the grading. (d) The swale will satisfy my previous concerns about treatment of the stormwater. A 10 V4 Sfq G 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 ftiaSOR CO� AREA CODE 860/644-2511 June 5, 1998 Certified Mail River Valley Baptist Church P O Box 1145 South Windsor, CT 06074 Dear Madam/Sir: Re: Appl #98-22P, River Valley Baptist Church At the June 3, 1998 regular meeting, the Inland Wetlands Agency/Conservation Commission approved appl #98-22P, River Valley Baptist Church - IWA/CC permit to fill wetlands for the construction of a church building, parking lot, access drive, retaining wall, and associated improvements on property located at 919 Ellington Road, RR & A029 zones (Assessor's map #35, parcel 6 & 7 as shown on plans prepared by Design Professionals, Inc., Job No. 97-1048 and revised through May 19, 1998. This approval is subject to the following conditions: 1. One blueprint copy of the entire set of plans and this letter reproduced thereon, must be submitted to this Commission. This must be completed within 65 days of approval prior to any construction activity on the site. Plans submitted to Planning & Zoning Commission shall be considered having met this requirement. 2. The application shall indemnify and hold harmless the Town of South Windsor against any liability, which might result from the proposed operation or use. 3. The permit is valid for five years and shall expire on June 3, 2003. It has been IWA/CC's policy to notify landowner(s)/applicant(s) of expiring wetland permits. However, it is the landowner(s)/applicant(s) responsibility to track expiration dates and notify the Commission of a renewal request at least 65 days prior to expiration. 4. All approvals required must be obtained and submitted prior to any activity on the site. 5. A contact person shall be identified on the plans. 6. We recommend a bond in the amount of $2,000 be submitted to the Planning & Zoning Commission to ensure compliance with the Erosion and Sedimentation Control Measures. 7. Conveyance of a strip of land (10' wide, 113 feet along the northerly boundary and approximately 500' along the easterly boundary) which bisects two pieces of open space shall be deeded to the Town of South Windsor as open space upon approval from the Town Council. Very truly yours, INLAND WETLANDS AGENCY/ CONSERVATION COMMISSION yj r Elizabeth A. Warren, Chairman EAW/pmm Cc: Chief Building Official Planning & Zoning Commission Town Engineer Design Professionals, Inc. • ricky�a -� (` RQ of - - - -_ ', •�. �.,- \ ''" � _i I __ claypi glean rtfo�d Gr mate Cen - i��` ,` �B _ - - _- _ „/.. \> 0� i i �•l statl n _�i STRif 00 o el ; o • , _ 9Q_j p i \l 19 \/ t -W� I _ x83 - - 0 AW AN oROAD 77. /•1. r /•�4j �\Cer 30 10 -10 00 i X Ia/pit ` / I o o Z kV off• o •� (1• yl •', i e I 'Q��� =�==, \ i� � vc l l 1 - 1 ' /• ° ,' ...1 :\1'STREET• - - --- o � a � ,�I `.i ERC 9 Course \x ti •Ok- \ 11 I DESIGN PROFESSIONALS, INC. civil engineers ♦ planners ♦ surveyors gis ♦ gps ♦ landscape architects RECEIVED April 28, 2003 APR 2 9 2003 South Windsor Jeffrey Folger, Environmental Planner CONSERVATION o AGENCY oN Town of South Windsor 1540 Sullivan Ave. South Windsor, CT 06074 RE: Unity Church DPI Proj.No. 01-1452 Ellington Road South Windsor, Connecticut Dear Jeff- On behalf of my client,Unity Church, I hereby request a 5-year extension of the Inland Wetlands Agency/Conservation Commission approval for Application No. 98-22P,which was approved on June 3, 1998. The original applicant was River Valley Baptist Church,however, Unity Church(730 Farmington Avenue, West Hartford, Connecticut)has purchased the property and is pursuing development of a house of worship and related improvements,consistent with the three recently-approved change orders. We are thus also requesting a change in the applicant/owner name to Unity Church. Thank you. Sincerely, DESIGN PROFESSIONALS, INC. By: / Peter R. DeMallie Principal cc: Robert Smith,Unity Church Dan Russell,Russell&Dawson Galen B. Semprebon,P.E. Karen M. Isherwood,P.E. 165 South Satellite Road,South Windsor,Connecticut 06074 Tel:(860)291-8755•Fax:(860)291-8757 Email:dpicivil@aol.com