Loading...
HomeMy WebLinkAboutSite Plan of Development (31) TOWN OF SOUTH WINDSOR ID :860-644-3781 RUG 25 '97 11 :29 No .003 -P .01 TOWN OF SOUTH WINDSOR, CONNECTICUT PLANNING :& ZONING COMMISSION D APPLICATION .I'ORM Application No. : — 70 PX AUG 26 1997 Date Received: Action/Public Hearing by: South Windsor Receipt No. Planning & Zoning Commission APPLICANT: ADDRESS:! %1?ci �Y�YD7b %�>7 LS// Gclrts �✓ i�, !J�OaiyyY"7t lel r C OWNER OF RECORD ON LAND RECORDS v Luc p ADDRESS t 5� �'rera/SOr Z 6 �Se h�e'�'_!h Rd COMPLETE LOCATION OF PROPERTY: Z� LiLr9PlY^ K-G Assessor's Map #kf'' Parcel # ZO Zone_ NAME, ADDRESS, & TEL '& FAX # OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED: THIS APPLICATION IS FOR: (Check all that apply) : I. Zone Change to I (Public Hearing required) 2. Subdivision/Res€ubdivision a, _ Subdivision Minor Major b. _ Resubdivision-_ Minor Major ,(Public Hearing Required) C. _ Conditional Approval d. Open Space Subdivision (Public Hearing Required) T33. Special Exception to Article (public Hearing Required) i/4 . Site Plan of Development _5. General Plan of Development z 6. Earth Filling [Sea. 151 and/or Earth' Removal [Sec. . 14-1 (Public Hearing Req) _7 . Regulation Amendment: zonings Subdivision _ —8, Amendment to Town Plan of Development _9. Temporary and Conditional Permit lo. Other (explain in detail) : r_ r' Applicant Property Owner (See reverse aide for additional information) 08/25/97 ' MON 11:31 [TX/RX NO 77781 5O%q N Se �I (� J C Y k' ,0�C � . U y 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 `!tioSOR co�r AREA CODE 860/644-2511 CERTIFIED MAIL September 8, 1997 Chris Eseppi PDS Engineering 8v Construction Company 107 Old Windsor Road Bloomfield, CT 06002 Dear Mr. Eseppi: Re: Appl #97-70PX, Site Plan of Approval/Maneeley's Catering We are pleased to advise you that the Planning & Zoning Commission voted to approve with modifications the above referenced application for a Site Plan of Development modification for the construction of a 2,000 sq. ft. addition on property located at 26 Schweir Road, South Windsor as shown on plans prepared by PDS Engineering 8s Construction, Inc. and dated August 6, 1997. This approval is subject to the following modifications: 1. No building permit will be issued until the final mylars have been filed in the Town Clerk's office. 2. An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 8.1.10 of the Zoning Regulations. 3. Footing drains are required if the building has a basement. 4. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. Black and white transparent mylars of Sheet #S-2 with the above modifications, together with three blueprint copies of the entire set of plans must be submitted to this Commission within 30 days to be stamped and signed. The letter of approval of this Commission must be reproduced on the mylars. After the mylars have been signed by the Commission, they will be returned to you for filing in the Office of the Town Clerk within 90 days. After filing these plans, a copy of the receipt must be submitted to the Planning Department. Very truly yours, PLANNING & ZONING COMMISSION b � Marcia A. Banach, AICP Director of Planning MAB/pmm Cc: Town Engineer Chief Building Official Assessor Superintendent of Pollution Control Fire Marshal Maneeley's Catering