Loading...
HomeMy WebLinkAboutSite Plan of Development (25) TOWN OF SOUTH WINDSOR, CONNECTICUT PLANNING & ZONING COMMISSION Rpm APPLICATION FORM Application No. : FEB z 1997 Date Received: ActionAPtvbs 7—07 Receipt No. South Windsor planning & Zoning Commission APPLICANT: Alice Ford Ferraina, Trustee ADDRESS: C/O Mr. Dan Ferraina, 780 Prospect Hill Road, Windsor, CT 06095 Tel. (860) RECORDS ne 9 y OWNER OF RECORD ON LAND RECOR Daniel P. Etienne and Cynthia G. Etienne ADDRESS: 17 Phelps Road, East Windsor, CT 06088 w COMPLETE LOCATION OF PROPERTY: Lot 24 - John Fitch Industrial Centre, #171 Commerce Way Assessor's Map # 121 Parcel # 24 Zone I NAME, ADDRESS, TEL & FAX # OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED TO: Mr. Wilson M. Alford, Jr. , Alford Associates, Inc. , P.O. Box 484 Windsor, CT 06095 Tel. (860) 688-7288 Fax (860) 688-3485 THIS APPLICATION IS FOR: (Check all that apply) : _1 . Zone Change to (Public Hearing required) _2. Subdivision/Resubdivision, .. a. _ Subdivision _ Minor Major b. _ Resubdivision _ Minor _ Major (Public.Hearing Required) C. _ Conditional Approval d. ' _ Open Space Subdivision (Public Hearing Required) _3. Special Exception to Article (Public Hearing Required) X 4. Site Plan of Development 5. , General ,Plan of Development. c�h _6. Earth Filling [Sec. 10] and/or Earth Removal [Sec. 91 (Public Hearing Required) _7. Regulation Amendment: Zoning Subdivision _8. Amendment to Town Plan of Development 9. Temporary arid-Conditional Permit .10.. Other (explain in ,detail) : Owner Applica (See reverse side f(Yr additional information) ��� c� 7 TOWN OF SOUTH WINDSOR CHECKLIST REQUIRED INFORMATION SITE PLANS FEB APPLICANT b i G E r0 kQ kR.&'444-1 South WhWsor wing & IoaiAg.�oma��siod - PROJECT NAME COT W - -l7/ GO ace kmy This checklist must be signed by plan•preparer (P.E./L.S.) declaring that all required information is provided. Items 1-7 are required for all applications; items 8-11 required where appropriate. Check mark for each item supplied. ✓ 1. On each sheet for plans or maps, title block with the following information: ✓ a. Name, address and telephone of applicant. b. Name, address and telephone number of Land Surveyor or Professional Engineer. ✓ c. Name of Development. d. Date when drawings=were made. ✓ 2. Key Map: An overall map drawn to a scale of 1 inch equals 200 feet, which can be used as an overlay on Metropolitan District Maps. This map will show the overall design of the Development and surrounding property within 500 feet. ✓ a. Date block which gives needed zoning information such as percentage of lot coverage, acreage of tract, number of apartment units, parking requirements, etc. ✓ b. Layout of buildings. c. Layout of streets and parking. ✓ d. Lines indicating proposed drainage system with direction arrows. e. Lines indicating sanitary sewer system with directiQp,arrpws. f. Names of surrounding property owners. g. Proposed open spaces and recreation areas. ✓ h. Driveway cuts on surrounding properties. ✓ 3. Architectural Elevations: See attached checklist for Architecture and Design Review. ✓ 4. Plot Plan: A layout map of the proposed site drawn to a scale of 1 inch equals 40 feet on either of the following size sheets: (1) 24" x 36" with a 3/4" ruled margin; (2), 18" x 24" with.a 1/2" ruled margin, containing the following data: a. Distance and bearings of all boundary lines and acreage of site. Iron pins required at all property angle points and shown on map. ✓ b. Proposed streets and street lines with center line station, curve data, and parking spaces. { I r' 4 `-Building lines in accordance with zoning regulations. d. 'Proposed buildings and other structures, including signs, outside lighting, and dumpsters (on concrete pad and screened). e. Easements, noting grantors, grantees, and purpose. f. Names of abutting property owners. g. Monuments will be indicated at corners and angles of all streets and at all points of curvature and tangency. In areas accessible to Metropolitan District Commission points, or other coordinated points, the monumented points within proposed site shall be coordinated. These coordinates shall appear in tabular form on the plot plan. The accessibility of these MDC points shall be determined by the Town Engineer. h. All open space or other common or public land uses shall be indicated. ✓ i. A-2 certification; P.E./L.S. Seal. V. 5. Topographic Map: A map drawn to a scale of 1 inch to 40 feet on sheets not exceeding 24 inches by 36 inches, including ruled margins-shall in-addition fo the requirements of the plot plans show the following: a. All existing and proposed buildings. b. Curb Lines and pavement width, sidewalks. ✓ c. Existing and proposed sanitary sewers. ✓ d: Existing and proposed water and gas main systems. ✓ e. Present wooded area indicated by foliage lines. Any individual trees to be saved should be shown. f. Existing and proposed contours shall be shown in not less than two-foot intervals, but in cases of relatively level land, the contours shall be one-foot intervals and.spot elevations. ✓ g.• -Regulated wetlands and 100-year floodplain or note that none are present. h. -Proposed storm drainage system, showing all catch basins,`endwalls, manholes, lengths and sizes of pipes. (Maximum distance between catch basins shall be 300 feet and minimum size of storm drain lines shall be 15 inches. ►f i. Connections of all springs into proposed storm drainage=system as needed. j. Location and indications of existing brook channels, and 100-year flood limits. ✓ k. A-2 Certification; P.E./L.S. Seal. ✓ 6. Landscaping plan: iL 7. Drainage calculations: - Zero Runoff Increase per attached guidelines. 8. Traffic Report: . _ - 2 - 9. Plans and Profiles: A plan and profile of the proposed streets drawn on plan/profile paper of scales 1 inch to 40 feet horizontally, and 1 inch to 4 feet vertically on sheets not exceeding 24 inches by 36 inches, including ruled margins and containing the following: a. Layout of streets in sections coordinated by stations with the profile. b. Street plan showing roadways and drainage. c. Sight line at driveway & street intersections. d. Profile of roadway showing existing and finished grades. Roadway profile will show all tangent grade and all vertical curve information. e. Profile will show all catch basins and all dfainage•lines between catch basins with all invert and top of frame elevations. Drainage lines will be shown and described as to material. f. Where any storm drainage line discharges into an existing brook sufficient profile of this brook will be shown to determine conditions. g. Metropolitan District Commission datum shall be used on all sites accessible to,these controls. The Town Engineer shall, based on standard engineering practices, determine the accessibility of these controls. h. Profiles shall show all sanitary sewer lines and manholes, including elevations, sizes, lengths, and slopes of pipes. Top of foundation elevations for building shall be shown. AA- 10. Open Space Site Improvement Plans: For sites which require or include a provision for open spaces, a plan which contains data for site improvement may be required. This map shall be drawn to a scale of 1 inch equals 40 feet. 11A-'11. Sanitary Report: Where individual sanitary sewage disposal systems are proposed, the final plans shall include'a Sanitary Report certified by a Professional Engineer. The report shall demonstrate the feasibility of the proposed individual systems; the report should deal with the area as a whole, discussing the following points: a. General nature and development of surrounding area. b. Topography and natural drainage pattern. _ c. Subsurface conditions as shown by subsurface investigation, including soil absorption characteristics, ground water level conditions, ledge rock, and general nature of soil. d. General description of type of development contemplated. e. Detailed description of proposed sanitary sewage disposal facilities, indicating sizes for various ground conditions, materials to be used, and the general layout pattern to be used, etc. _ f. Special precautions.that may be necessary to provide proper functioning of the proposed disposal systems. g. map of general area with locations of all tests shown on proposed layout. h. Flood heights of any nearby streams, brooks, or rivers. - 3 - _...._.. .... i.- Test results and engineering evaluation per Section 4.13.5. All information required above is included in this application at the time of submission. ear' PLAN PREPARER P.E. L S. DATE May 17, 1995 - 4 - FERRAINO SITE PLAN Planning Department There are no planning modifications requested. Police Services The site plan shows vehicles entering the building through the rear and exiting through the front. The plans do not indicate what type of vehicles will be entering the building. Depending on the size of the vehicles, there could be a problem turning within the parking lot. Also, there could be traffic problems if any large trucks or tractor-trailers enter the parking lot. WPCA WPCA approval is required; monitoring manhole required on building sewer in the right of way. The industrial operation will require a DEP permit. Ferraina Site Plan 1. Application for site plan approval for a industrial building approx. sq ft located on the northerly side of Commerce Way, westerly of Rye Street, I zone. 2. Proposed building coverage is 15.9%;30% allowed. Proposed impervious coverage is 59.2%; 65% allowed. The required number of parking spaces needed is 7; 11 spaces have been provided. 3. There are no regulated wetlands on the site, however the applicant is proposing to disturb over 20,000 sf requiring a conservation approval from the IWA/CC. This was granted on 3/5/97 with the recommendation of a$1,000 bond. They are also requiring that a hood be installed in the catch basin adjacent to Commerce Way to contain storm water borne hydrocarbons. 4. There is public water and sewer available to the site. WPCA LW roval is required. Fred Shaw, Sup't of WPC has reviewed the plans and has ifidieftd that a monitoring manhole is required on the building sewer in the right of way. Also, this industrial operation will require a DEP permit. 5. The Police Services have reviewed the plans and have made the following comments: "The site plan shows vehicles entering the building through the rear and exiting through the front. The plans do not indicate what type of vehicles will be entering the building. Depending on the size of the vehicles, there could be a problem turning within the parking lot . Also, there could be a problem with large trucks or tractor trailers enterint the parking lot". The engineering department has laid a turning radius template on the plans and has indicated that 30 ft trucks and tractor trailers would not be able to make the turning movement, however a truck with a trailer attached would. 6. The Architecture and Design Review Committee reviewed the plans. They met twice with the applicant. At the first meeting they had suggested that he add some additional architectural facade features to the building as well as hire a landscape architect to address create a landscape plan. At the second meeting the committee noted that this plan was much improved containing a good plant variety. ADRC suggested that, since the front door ha been made a focal point, the door itself would be more attractive if it was not just a plain steel door. The applicant indicated that a raised panel door could be used instead. Overall, the committee was satisfied with the revised plan as presented. If this application is approved, there are no planning department modifications requested. 4 SEWER LINE EASEMENT _ ----��ra�aTfL \i suL iiulrVa�!'Si�i V 1TQmDTT/�mTA1T T+Ta�+TavTalTm� KNOW ALL MEN BY THESE PRESENTS, that of !' Axe X"� DOLLAR(S) AND OTHER VALUABLE CON SID TIONS, received to its his/her full satisfaction of THE TOWN OF SOUTH WINDSOR, a municipal corporation chartered under the laws of the State of Connecticut, do give, grant, bargain, sell and confirm unto the said TOWN OF SOUTH WINDSOR, its successors and assigns the right, previlege and authority lime -lj=e- thereto, in, through, upon and over certain piece(s) of land as described in Exhibit A, /,�y ��;� a f �,� y y �;- �ye >/ .4 � Together with the right, privilege and authorit to tre for the purpose of constructing, ping and repairing _ aid sewers, an additio feet outside of, and on eith ide of, t rmanent Easement described in Exhibit A, which ri respass shall terminate upon formal acceptance of sanitary rs by the TOWN OF SOUTH WINDSOR; and bed�' serted only on the occ n and for the duration of subsequent maintenance or repair by the OF SOUTH WINDSOR. Within sa�±d arcel(s) described i rt t A, the Grantee, its successors and a igns, shal a the right to cut trees and bushes as may be conven t necessary and to remove structures thereon, and to pass a e s with men and equipment, to operate equipment install erials incidental to the construction, intenance or repai f said sewer line, and to excavate fill. y " "eel '0�ce' el SURETY ASSOCIATES, LTD 5 Forest Park Drive Farmington,Connecticut 06032 Telephone 860 676-8830 Fax 860 676-1928 Town of South Windsor February 21, 1997 Attn: Joyce,Engineering Department 1540 Sullivan Avenue South Windsor,CT 06074 RE: Principal: Gerber Construction,Inc. Project: Small Misc.drainage projects(Foster Street,Rye Street and Strong Road,Contract No.95-805 Surety : Nobel Insurance Company,Bond No. SAL-201251 Dear Sirs: In our effort to monitor the progress of the project being performed for you by the above mentioned,we are requesting that you complete the status report below. If the project has been completed,please provide us with a completion letter. For your convenience,a sample format to be used is enclosed. We also request that the original bond be returned to us. If you should have any questions or comments,please contact this office at(203)676 8830. Without prejudicing your rights or affecting our liability under this bond(s) we would appreciate information on the status of this contract. Please return this form to the above address or fay If contract has been completed,please advise: If contract is 1. COMPLETION DATE: -711 Z >�I� COMPLETE 2. FINAL CONTRACT PRICE: $ If contract has not been completed,please advise: 1. APPROXIMATE PERCENTAGE COMPLETE: 2. NUMBER OF CONTRACT DAYS REMAINING: 3. AMOUNT PAID TO CONTRACTOR TO DATE: $ If Contract is NOT COMPLETE 4. AMOUNT OF RETAINAGE WITHHELD TO DATE: $ 5. ESTIMATED COMPLETION DATE 6. ESTIMATED FINAL CONTRACT PRICE: $ 7. DO YOU KNOW OF ANY UNPAID OR PAST DUE BILLS FOR LABOR OR MATERIAL? YES NO It is understood that the information contained herein is furnished as a matter of courtesy for the confidential use of the surety and is merely an expression of opinion. COMMENTS: OWNER: l�GC�A-) !tj — `�D �/!1/ $Q Ae DATED: BY: T LE:tp /� FEB-19-1997 16:22 ALFORD ASSOCIATES INC 203 688 3485 P.02 ffYPA d I 9ZIC AffA.TMS ALICE FORD FERRAINA 1 171 COMMERCE WAY 18-Feb-97 ! DETEITr ON BASIN' TO IN FEET ABOVE FLOW LINE EL FLOW LINE O 74.5 FLOW OUT IN CFS _ HEAR FLOW O ELEV. OF CONTOUR VOLUME BELOW CONTOUR 0 0 ... 74.5'... 400 0.1 O.I15 75 550 237 1 0.135 76 8D0 905 1.5 0.155 - 77 1100 1854 2.25 0.175 78 1400 - 3101 4.5 0. 195 so 4400 80 2 " YEAR NTENSI" MAX I13 MAX OUI WX EL. DRAINAGE AREA- '0.23 100 6.8 0.20 0.00 74.50 RLWOFF COEFF= 0.82 _ so 6.1 0.07 0.00 74.50 TIME OF CONCENMI _ t0.. .. 10 4.7 i O.DO 0.00 74.50 ,�INTEATSITY= 6.8 5 4.1 - 0.00 0.00 4.5�ANALYSIS FOR 100 YEAR STORM 2 9.1 0_00 0,00 4.50 PEAR FLOW IN= 1.3 _...• . _ INTENSI 6.8 11011 YEAR aTOF31+I T TOTAL TOTAL ��l I --r WATER TIME Q IN IN OUT S3 ORAO HEAD -0 OUT ELEV 0 0 _ 0 D 0 i 0.0 0.0 1 74.5 2 j 0 0 0 a 0.0 0 0 74.5 4 D 0 0 ( 0 0.0 0.0 74.5 6 j 0 0 0 0 0.0 '0.0 74.5 8 i 0 0 0 0 0.0 0.0 74.5 z0 C"" .201 12 0 12 0.0_ 0.0 1 74.5 12 .0sil 27 12 15 0.0 0.0 74.5 _ 14 0 1 40 - a 0�.0 0.0 74.5 16 0 40 40 � 0 0.0 D.0 1 74.5 18 u 0 40 40 0 0.0 0.0 74.5 _ 20 , 0 40 40 0 0.0 0.0 I 74.5 22 0 40 40 0 0.0 0.0 1 _ 74.5 24 0 40 40 D , 0.0 0.0 _ 74.5 _.. 26 i 0 } ..... 440 a�--0.0 0.0 ! 74.5 20 i 0 i 40 40 _ 0 0.0 6". 'a 74.5 30 � 0 1 40 , 40 0 0.0 -ff 0.0 74.5 32 0 40 40 0 0.0 6.0 74.5 34 1 0 40 40 0 0.0 0.0 74.5 35 �D_ 40 _ 40 0 0.0 0.0 74.5 38 0 i 40 40 _ 0 0.0 O.A 74.5 40 0 40 0 0 0.0 0.0 74.5 42 0 40 40 - 0 �0.0 1 0.0 74.5 44 0 40 40 0 0.0 0.0 1 74.5 46 0 40 40 0 0.0 0.0 1 74.5 48 _ 0 40 40 0 0.0 _0.0 74.5 50 0 40 40 0 0.0 0. 74.5 52 0 40 40 " 0 0.0 0.0 74.5 _ _. 54 0 .._ 40 40 _ 0 Y 0.0 0.0 74.5_ 56 it 40 40 0 0.D 0.0 74.5 5��-_.. .. Q. 40� 401 0.0 - 0.0 _ ­74.5 60 ..... . 0 i 40 _ 40 0 9.0 0.0 74.5 62 0 40 40 0 0.0 0.0 _ 74.5 ._. _64 -0�- 40 40 0 � _ 0.0 0..0 74.5 66 0 40 40 .._ 0 0.0 0.0 74.5 B9 0 Y - 40 40 0 0.0 0.0 74.5 FERRAINA.XLS NO \h/A'Ma VVI CNEAr"''`& z/19r97 L7Mt-) RCN 5 1► �yw7y +80.46 64.TJ 00.70 , . + . + 55.29 70.06 12.63 81.04 320,41' ` bi 80.71B 80 ` . `. • EXISk IRON F If 79.5 79.E •. `"` Y'` i lD ` ` J DUMPSTER �} `•'� t PROPOSED B!]UMINOUS CONCRETE PAVEMENT ' ', ,'•• 79 0 ,'7e.sa, 'HIGH ARYWE�L e a o ` +81.49 3 78�8 Q} o O a Ir < e o o � TP'A` � �: i r �f.Q TOP GRATE 78.6 %~� 00 0� ao i i i y`;+83.73 78 8 ; �n n ` ;� o RIP—RAP 70 BE 7ao1 o� PLACED av SLopE lip `' 1 r w (15' IMFDE) 00' :EMERGENCY I1900IR MIL ' o --- , C ;1CS c'(r cmn 81.0 �P iR 7a.64 ---- ' z �+82.39 ------ - - `+ ---60.38 Sf.a •8 42•.,• `t9 F79.3 7a3 + ' +5s.�s + ; s ao.711 79.71 + Y' - F --- - --- 30 ,` ,• _�J .. E1flSt AIM Fmc,j 50.83 , ,• ; 55.71 (D .57 68.17 W +79.54 A 01) GRAM IMIS AREA TO ASSURE '. E77ENNE AND CYNTH/A G. E77ENNE POS"7W FLOW TO DEIENnON AREA LOT 25 . W EGEND - - x 86.0 FX7S7?Nr; qPrnr r Anf- FEB-19-1997 16:24 ALFORD ASSOCIATES INC 203 688 3485 P.04 CIVIL ENGINES L.W-r 1- 4 all wtNnsoR, GQNNE TICUT 1'l1 CM + 1JNf7� it WILSON M.At f Orm, IR,F.F.t I `` SCALE: I IN. FT. DATE: .' .`i�`fa7 I f i I � i � •} + i ! I�' � ����� i i I � � ! I i I � I � i..�.i I I � I I I � I i tI i i I -' i. t. �' i I � I I II I I i ► i I i I +! ' I ' ! { i I i i ` I s � i i ; i { ' � .t. , i `_.L f •!---1-�� 1 , '_ —Jt _�-- It + ILL. ii ! I I , ' r I f....:. ^ I I i I..t � . FLOW NET DIAGRAM FOR DRY_WELLIT I i � lll�p �I� •i'+P �6i' O' .p,¢� b,o� ♦O�' II�1l�l�f (Is .. -�.�_.. / .. Itlilly _ voile a• 1 f111 {ttr�I = I�...+.. Lx ! QWlM �, d v 2.5 CAW Og i e3 o `,, • ,_ ''�. � "\ : � , jj WI I.TIZA`f I Ott RA61 U$ I I l ,it i TOTAL P.04 PLANNING DEPARTMENT IN-HOUSE REFERRAL FORM TO: Town Manager, Michael Gantick, Fred Shaw, Agent Rich Bond, Fire Marshal Lanning, Ray Favreau, Karl Reichle, Mel Stead FROM: Marcia A. Banach, AICP, Director of Planning The Planning & Engineering Departments have received plans for the following project: R-1 - 1 I ? Zone Acreage +QIC Commercial Subdiv Site Plan �_ Residential # of Lots/Units Industrial Location: htMX Project Description: Future Town—owned property involved? Yes No (a) new streets (existing frontage also) (b) new open space/recreation area active passive (c) new detention area Planning Department comments : Please let me know by ���� if you will have comments on this application so that I can follow up with your department when I do a Planning Department report. Thank you. PLANNING DEPARTMENT IN-HOUSE REFERRAL FORM TO: Town Manager, Michael Gantick, Fred Shaw, Agent Rich e,(772r7e--ftUrfe, Fire Marshal Lanning, Ray Favreau, Karl Reichle, Mel Stead FROM: Marcia A. Banach, AICP, Director of Planning The Planning & Engineering Departments have received plans for the following project: Zone Acreage +QIC g � Commercial Subdiv Site Plan �_ Residential # of Lots/Units Industrial Location: � Project Description: S "70 C Future Town—owned property involved? Yes No (a) new streets (existing frontage also) (b) new open space/recreation area active passive (c) new detention area Planning Department comments : S Please let me know by ����} � if you will have comments on this application so that I can follow up with your department when I do a Planning Department report. Thank you. own of South Windsor Police Services In House Referral Comment Sheet 97-11 P Ferraino Site Plan Please note the following concern(s) related to the Ferraino Site Plan. The site plan shows vehicles entering the building through the rear and exiting through the front. The plans do not indicate what type of vehicles will be entering the building. Depending on the size of the vehicles, there could be a problem turning within the parking lot. Also, there could be traffic problems if any large trucks or tractor-trailers enter the parking lot. Sergeant Michael K. Ritter Manager, Traffic Unit PLANNING DEPARTMENT IN-HOUSE REFERRAL FORM TO: Town Manager, Michael Gantick, Fr d Shaw, Agent Rich Bond, Fire Marshal Lanning, Ray Fav , Karl Reichle, Mel Stead FROM: Marcia A. Banach, AICP, Director of Planning The Planning & Engineering Departments have received plans for the following project : Zone Acreage QlC Commercial Subdiv Site Plan _ Residential # of Lots/Units Industrial Location: M/ywrt.td,L_ w Project Description: S. Oro Future Town-owned property involved? Yes No (a) new streets (existing frontage also) (b) new open space/recreation area active passive (c) new detention area Planning Department comments : Please let me know by �� if you will have comments on this application so that I can follow up with your department when I do a Planning Department report. Thank you. �•, !?C• (4, � - �,Cam,j' ,�'-m=`�• �„/e 4OW N Sf44 U Wn OP S dA ?I Z07d6ot 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 f�dSOR•CO AREA CODE 860/644-2511 24 February 1997 Planning Department Town of South Windsor Attn: Marcia Banach Subject: Appl. #97-11P,Alice Ford Ferraina After reviewing the site plan and landscaping sketch of the above application with the applicant's representatives last Thursday,the-Architectural&Design Review Committee engaged in a protracted discussion which resulted in the following recommendations: The applicant should review the building design and make an attempt to include more architectural details such as: a false soffit around three sides,windows, gables over the doors, or recessed wall panels-which will break up the monotony by causing shadows along the 100 foot sides. We have also asked that a professionally designed landscape plan be brought to a future meeting of the ADRC. We made general suggestions to improve the plan presented but did not get into recommending specific plants and trees as the applicant wished. While we recognize that the building is to be in Industrial zone, and that there are some very poorly designed structures which exist on Commerce Way,it is our mandate that we make every effort to improve future building at all sites in South Windsor. Many of the existing buildings on Commerce Way would not exist in their present form if there was an oversight committee reviewing plans at the time. The current application will house a drive through garden supply facility which will result in the large overhead doors being open most of the time. Its design is basically a blockhouse that looks like a stand- alone "U-Store-It" facility. At peak business hours during the-warmer months there could be a number of trucks aid trailers of various sizes waiting to enter the facility. The ARDC feels that this building would have a detrimental effect on the surrounding businesses and the business community at large. It is our hope that the applicant will revise its architectural plans,and work-with us to make South Windsor a more attractive atmosphere for residents and businesses alike. Sincerely, Ronald P. Johnson Chairman,ADRC MEMORANDUM TO: Marcia A. Banach, Director of P an ing FROM: Jerry C. Iazzetta, Town Enginee DATE: March 6, 1997 RE: FERRAINA SITE PLAN We have reviewed the drawings dated February 6, 1997 for the proposed Ferraina Site Plan and have the following comments : 1 . The A-2 certification must comply with the latest standards . 2 . Sheet 1 a. The proposed dry well in the parking lot should p p y p g u d be eliminated to avoid pollutants such as oil and gasoline from entering the subsurface. b. Stormwater runoff from driveways should be caught before it enters Commerce Way and piped to the existing storm system. 3 . Sheet 3 a. Construction entrance pad detail indicates "Pascone Place" , it should indicate Commerce Way. b. Note 18 should indicate town of South Windsor Public Improvement Specifications not Town of Newington. 4 . Sheet 4 - detail of drywell in detention basin should have dimensions shown for the structure JCl/j sv JC197/MABMEMOS/ferrai na �0* Town 0-le S-0� Sfq o G U y* 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 �OSox coy' AREA CODE 860/644-251 1 March 6, 1997 CERTIFIED MAIL Alice Ford Ferraina, Trustee c/o Daniel Ferraina 780 Prospect Hill Road Windsor, CT 06095 Dear Madam/Sir: Re: Appl #97-11P, Ferraina Industrial Building/171 Commerce Way At the March 5, 1997 regular meeting, the Inland Wetlands Agency/Conservation Commission approved application#97-11P, Conservation Plan Approval for the construction of an 5,000 sf industrial building on property located at 171 Commerce Way, I zone (Assessor's map #121, parcel 24) as shown on plans prepared by Alford Associates, Inc., and dated February 6, 1997. This approval is subject to the following conditions: 1. One blueprint copy of the entire set of plans and this letter reproduced thereon, must be submitted to this Commission. This must be completed within 65 days of approval prior to any construction activity on the site. 2. Construction activities shall be subject to the approval of the Town Engineer. 3. The application shall indemnify and hold harmless the Town of South Windsor against any liability which might result from the proposed operation or use. 4. The permit is valid for five years and shall expire on March 4, 2002. It has been IWA/CC's policy to notify landowner(s)/applicant(s) of expiring wetland permits. However, it is the landowner(s)/applicant(s) responsibility to track expiration dates and notify the Commission of a renewal request at least 65 days prior to expiration. 5. All approvals required must be obtained and submitted prior to any activity on the site. 6. A contact person shall be identified on the plans. 7. We recommend a bond in the amount of$1,000 to be submitted to the Planning and Zoning Commission to ensure compliance with the Erosion and Sedimentation Control Measures. 8. A hood should be installed in the catchbasin adjacent to Commerce Way to contain stormwater borne hydrocarbons. Very truly yours, INLAND WETLAND AGENCY/ CONSERVATI N COMMISSION Susan Smith Vice Chairman SS/pmm cc: Planning & Zoning Commission Chief Building Official Town Engineer Alford Associates MEMORANDUM TO: Marcia A. Banach, Director of Planning FROM: Jerry C. Iazzetta, Town Engineer DATE: March 18, 1997 RE: FERRAINA SITE PLAN We have reviewed the revised drawings dated March 11, 1997 for the proposed Ferraina Site Plan and have the following comment : 1 . A catch basin should be placed in the driveway from the overhead door along the west curb in line with the proposed 12 " pipe . JCl/j sv JC1971MAEMEMOSfferraiw3-18 SO.NN seq yTfUrA 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 O-SOR•CO AREA CODE 860/644-251 1 March 19, 1997 CERTIFIED MAIL Alice Ford Ferraina, Trustee c/o Daniel Ferraina 780 Prospect Hill Road Windsor, CT 06095 Dear Ms. Ferraina: Re: Appl 97-11P, Ferraina Industrial Building/171 Commerce Way We are pleased to advise you that the Planning & Zoning Commission voted on March 18, 1997 to approve with modifications the above-referenced application for a Site Plan of Development for the construction of an 5,000 sf industrial building on property located at 171 Commerce Way, I zone as shown on plans prepared by Alford Associates, Inc. and revised through March 11, 1997. This approval is subject to the following modifications: 1. Prior to commencement of any site work, a meeting must be held with Town Staff. 2. No building permit will be issued until the final mylars have been filed in the Town Clerk's Office. 3. This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission, including a bond in the amount of$1,000. 4. An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 4.13.10 of the Zoning Regulations. 5. Footing drains are required if the building has a basement. 6. A landscape bond in the amount of$1,000 is required and must be submitted prior to filing of mylars. 7. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 8. Architectural elevations approved by the ADRC must be submitted with the final plans. Black and white transparent mylars of Sheet#1 with the above modifications, together with three blueprint copies of the entire set of plans must be submitted to this Commission within 30 days to be stamped and signed. The letters of approval of this Commission must be reproduced on the mylars. After the mylars have been signed by the Commission, they will be returned to you for filing in the Office of the Town Clerk within 90 days. After filing these plans, a copy of the receipt must be submitted to the Planning Department. Very truly yours, PLANNING & ZONING COMMISSION IV,t,I'l-c- Le 11�'/- Russell G. Levack, Chairman RGL/pmm cc: Town Engineer Chief Building Official Assessor Superintendent of Pollution Control Fire Marshal Alford Associates, Inc. ZOWN Sfq y 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 o � SOR•CO AREA CODE 860/644-251 1 April 15, 1997 Mr. Jay Capuano 780 Prospect Hill Road Windsor, CT 06095 RE: 171 Commerce Way SOUTH WINDSOR, CT Dear Mr. Capuano: The South Windsor Water Pollution Control Authority, at its regular meeting of April 1, 1997, gave approval for the connection to the Town's sewerage system of a commercial building at 171 Commerce Way, as more specifically shown on plans entitled "Topographic Map and Conservation Plan, prepared for Alice Ford Ferraina, Trustee, Improvement Location Survey, Lot 24, 171 Commerce Way, South Windsor, Connecticut," Drawing No. 1 of 4 as prepared by Alford Associates, Inc., Windsor, CT, dated Feb. 6, 1997, revised 3-11-97 and 3-26-97, and subject to the following conditions: 1. Technical approval of the Town Engineering Department. 2. Final Authority approval and acceptance of the sanitary sewerage connection will be given once the sewer line has been installed and inspected by the Town staff, and based upon the written verification of the Town staff that said sanitary sewer line was installed in substantial conformance with the design plans previously approved by the Authority, and meeting all Town regulations and appropriate technical specifications relating to sanitary sewer construction. 3. Installation of a monitoring manhole will be required. 4. This approval letter must be superimposed on the final approval plans. Very truly yours, Jo4eph J. Carino, Chairman Water Pollution Control Authority JJC:rt cc: Matthew Galligan,Town Manager Michael J. Gantick, Director of Public Works Jerry Iazzetta, Town Engineer Marcia Banach, Director of Planning John Collins, Chief Building Inspector e 10W N Se m* 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 �OSoe•corc AREA CODE 860/644-2511 April 25, 1997 Jay Capuano 780 Prospect Hill Road Windsor, CT 06095 Dear Mr. Capuano: Re: Preconstruction Meeting - Appl #97-11P, Ferraina Building IN ATTENDANCE Jeff Folger Town of South Windsor 644-2511 ext 229 Robert Donahue Town of South Windsor 644-2411 ext 240 Jay Capuano Ferraina 688-7519 780 Prospect Hill Rd Windsor, CT 06095 Sgt. Michael Ritter South Windsor Police Sery 644-2551 Tracy Lapiene Town of South Windsor 644-2511 ext 257 The following is a brief summary of points discussed during the meeting. Erosion and Sedimentation Control 1. All erosion and sedimentation control measures are to be in place prior to earth moving_operations in each area and maintained/cleaned out each area and maintained/cleaned out duringconstruction. Call the Zoning/Wetlands Enforcement Officer for inspection when measures are in place, prior to commencement of site work. 2. All topsoil stockpile areas to be protected (ringed with haybales or equal). 3. During construction of the road/driveway a crushed stone tracking pad is to be installed and maintained to minimize tracking of dirt/gravel onto Commerce Way. Calcium chloride or water is to be used for dust control as required. Public Works 1. Three complete sets of approved/revised plans to be provided to Town prior to start of construction. They will be stamped by the Planning Department along with plans developer needs. Only approved plans are to be used on the job site. 2. The Public Works Department is to be notified forty-eight (48) hours prior to the start of major construction work with inspections and testing per Developers Checklist required for the following: a. After site is staked out b. All drainage work C. Preparation of subgrade, compaction tests as per Developer's checklist P d. Preparation of subbase, six (6) inch lifts e. Placement of bituminous concrete, 2 inch layers maximum 3. Certification of gravel used as subbase will be required from an approved testing company. 4. Certification of all products used -- storm pipe, structures, pavement, etc., shall be presented to the Town Engineer prior to installation. 5. Two (2) weeks notice must be given prior to placing the finish pavement course. This is to allow for inspection and correction measures (if necessary) of the infrastructure, prior to final pavement. 6. Applicant/developer should be aware that the inspection of the infrastructure improvements may result in the replacement of structure tops and/or structures prior to final paving if found to be deficient. 7. No subgrade formation/base in frozen ground/snow. Same for pipe/structure installation. 8. As built plans are to include horizontal and vertical location of all underdrains, footing drains, and sanitary sewers located as per revised as-built checklist and infiltration basin. 9. All pipe and structures to be backfilled with free draining material, compacted in maximum one foot lifts with approved compaction equipment or approved equal if deep trench is encountered. Any pipe or structure work requires inspection prior to backfilling. 10. Any problems and/or questions regarding construction of this project will be directed to Jay Capuano, 839-0476 in the field. 11. All filling to be done in accordance with Department of Transportation specifications. To be compacted in maximum lifts and tested as necessary. 12. Job meetings will be held as needed, and can be called by the developer or Town. 13. Forty-eight (48) hours notice needed for certificate of occupancy inspection. Two week review period (10 working days) needed for all individual site (lot) plans prior to issuance of building permit (may be longer if application is incomplete). See general guidelines for certificate of occupancy and building permit procedures. 14. Any proposed changes are to be presented to the Engineering or Planning Department prior to implementation on change order form in quadruplicate with 4 copies of the drawing. Town will attempt to turn around within 24 hours. 15. No paving after October 15 or before April 15 without written approval from Director of Public Works. 16. Normal hours of operation 7:00 a.m. - 5:00 p.m., no work on Sunday. 17. Permits required for street excavation and for sanitary installation. Planning Department 1. Landscaping is to be installed in accordance with the approved landscaping plan. If there are changes required, contact the Planning Dept. Additional landscaping installed on one part of a site will not preclude planting all of the remaining items shown on the landscaping plan. 2. $1,000 E & S bond and $1,000 landscaping bond to be submitted. SNET/NU 1. Contact utilities for coordination of utilities connection. Fire Marshal 1. Blasting (if required) to be coordinated with the Fire Marshal. Police Services 1. Emergency phone numbers for the duration of the construction must be provided to Police Services on a company letterhead. If the developer occupies or owns the building(s) after construction emergency numbers must be provided to Police Services. 2. All buildings located on property which abuts a public highway must be numbered. Such number(s) (address) shall be visible from the street. All numbering shall comply with Town Ordinance 6-800 thru 6-802. Barns, garages, and outbuildings which are located on the same premises as a numbered structure are excluded. 3. Erect temporary sign on the site during construction identifying the project. 4. If an alarm is to be installed contact Police Services. Building Department 1. Plan review with Building Official/Fire Marshal required prior to application for building permit. Coordinate with Chief Building Official. Very truly yours, �1� effrey H. Fo er Zoning/Wetlands Enforcement Officer JHF/pmm cc: Jerry C. Iazzetta, Town Engineer Karl Reichle, Public Works Mel Stead, Public Works Bob Berubt, CL&P Minh V. Le, SNET John R. Collins, Chief Building Official Fred Shaw, Superintendent of Pollution Control OWN Sf4 t � a . ` .✓`.-.:/'/ v �.-'3� --:-ti,..' ✓ ,�.:,L.. :� � :i ,....+ter ... :r m 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 SOR-Co AREA CODE 860/644-2511 June 5, 1997 Mr. Jay Capuano IPLLC 689 Hall Hill Road Somers, CT 06071 RE: 171 Commerce Way SOUTH WINDSOR, CT Dear Mr. Capuano: The South Windsor Water Pollution Control Authority, at its regular meeting of June 3, 1997, gave approval for revisions to the connection to the Town's sewerage system of a commercial building at 171 Commerce Way, as shown on a partial plan (Attachment A to the June 3, 1997 WPCA minutes; copy attached to this letter) submitted by the applicant to the Authority at the meeting, and subject to the following conditions: 1. Technical approval of the Town Engineering Department. 2. Final Authority approval and acceptance of the sanitary sewerage connection will be given once the sewer line has been installed and inspected by the Town staff, and based upon the written verification of the Town staff that said sanitary sewer line was installed in substantial conformance with the design plans previously approved by the Authority (Attachment A as referenced above), and meeting all Town regulations and appropriate technical specifications relating to sanitary sewer construction. 3. Applicant must provide the correct reference number identifying the drawing from which the partial plan copy (Attachment A as referenced above) was taken. 4. This approval letter must be superimposed on the final approval plans. Very truly yours, Joseph J. Carino, Chairman Water Pollution Control Authority JJC:rt cc: Matthew Galligan,Town Manager Michael J. Gantick,Director of Public Works Jerry Iazzetta, Town Engineer Marcia Banach,Director of Planning John Collins, Chief Building Inspector ENGINEERING Memo To: Fred Shaw From:Tracy A. LaPiene CC: Jerry C. lazzetta Date: O � Re: Ferraina 97-11 P 171 COMMERCE WAY On 6-4-97 1 made an inspection at 171 Commerce Way for the sanitary lateral installation. The lateral way laid a straight run from M.H. to a 45 at about 8' from building. However, the utilities between the curb and the property line were surrounded with concrete so they placed the M.H. about 1' inside the property line. The invert was not built yet and the top and frame needs to be set. I spoke to Brett Ferraina and told him that he would have to file an easement prior to us issuing a C.O.. 0 Page 1 tOW N Sir, 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 SOR-CO AREA CODE 860/644-2511 January 8, 1998 Jay Capuano 780 Prospect Hill Road Windsor, CT 06095 Dear Mr. Capuano: Re: Appl#97-11 P, Ferraina Building The Planning and Zoning Commission is holding the following Letters of Credit: Projects Bank Amount Expiration Appl #97-1lp Ferraina Building NEB $1,000 March 28, 1998 In accordance with out policy for accepting Letters of Credit in lieu of surety bonds, we must have an amendment to expiring Letters of Credit well in advance, extending the term for a one year period from the expiration date. Will you please forward us the amendment promptly. Very truly yours, 11-2 Michele R. Lipe Assistant Director of Planning MRL/pmm yJ tOWN Sf� c =' m 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 '4osoR-CO AREA CODE 860/644-2511 February 23, 1998 Jay Capuano 780 Prospect Hill Road Windsor, CT 06095 Dear Mr. Capuano: Re: Appl #97-11P, Ferraina Building We have not as yet received any renewals of the letters of credit, which expire March 28, 1998 as noted in our previous renewal request of January 8, 1998. Please be advised that discussion of this matter will be placed on the March 10, 1998 agenda of the Planning 8s Zoning Commission. Calling of the letters of credit will be initiated at that time if we have not received a renewal. Very truly yours, &4- ,� J 4� Michele R. Lipe, AICP Assistant Director of Planning MRL/pmm C E I V NAY 8 The Ferraina Companies S TN YUBLU PLANNiN LI;L MAY 6, 1998 MICHELE R. LIPE, AICP ASSISTANT DIRECTOR OF PLANNING TOWN OF SOUTH WINDSOR 1540 SULLIVAN AVE. SOUTH WINDSOR, CONNECTICUT 06074 DEAR MICHELE: PLEASE EXCEPT THIS LETTER AS A FORYAT REQUEST TO RELEASE THE TWO (2) BONDS WE PRESENTLY HAVE IN PLACE FROM LAST YEAR, ON A BUILDING OWNED BY US AT 171 COMMERCE WAY, SOUTH WINDSOR, CONNECTICUT. SINCERELY, DAN J. FERRAINA THE FERRAINA COMPANIES 780 Prospect Hill Road Windsor,Connecticut 06095 860 688 7519 860 683 8531 FAX SSW N Sf4 G U m 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 SOR•co AREA CODE 860/644-2511 May 13, 1998 Jay Capuano 780 Prospect Hill Road Windsor, CT 06095 Dear Mr. Capuano: Re: Appl#97-I IP, Ferraina Site Plan Landscape Bond This is to advise you that the Planning and Zoning Commission voted on May 12, 1998 to release the landscaping bond for the above-referenced project in the amount of $1,000. Advance arrangements should be made to pick up the bond to ensure that the necessary contact person(s) will be available. If you have any further questions contact the Planning Department at 644-2511, ext. 252. Thank you. Very truly yours, PLANNING 8s ZONING COMMISSION C . 0 Frank A. Castro, Chairman FAC/pmm Cc: Town Engineer SO.pN Sfq * F 7own ai �• ;J m 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 SOR-Co�'�� AREA CODE 860/644-2511 May 27, 1998 Dan J. Ferraina The Ferraina Companies 780 Prospect Hill Road Windsor, CT _06095 Dear Mr. Ferraina: Re: Appl#97-02P, Ferraina Site This is to advise you that the Planning and Zoning Commission voted on May 26, 1998 to release the IWA/CC bond for the above-referenced project in the amount of$1,000. Advance arrangements should be made to pick up the bond to ensure that the necessary contact person(s) will be available. If you have any further questions contact the Planning Department at 644-2511, ext. 252. Thank you. Very truly yours, PLANNING & ZONING COMMISSION Frank A. Castro, Chairman FAC/pmm