HomeMy WebLinkAboutSite Plan of Development (24) TOWN OF SOUTH WINDSOR, CONNECTICUT D �� PLANNING & ZONING COMMISSION )•/ APPLICATION FORM Application No. : �7- /a 4 /6 AUG 18 1991 Date Received: (!�9_Q '7--(7 7 Action/ .lL ; - t=i' //--/3-91 $ Receipt No. Pl8n11j South Windsor ng & Zoning Commission APPLICANT: Borghesi Building & Engineering Company, Inc. ADDRESS: 2155 East Main Street. Torrington, Connecticut 06790 OWNER OF RECORD ON LAND RECORDS ABCO Welding & Industrial Supply, Inc. ADDRESS: 130 Cross Road, P.O. Box 296, Waterford, CT. 06385 COMPLETE LOCATION OF PROPERTY: 1608 John Fitch Boulevard, (Route 5) South Windsor, CT. 06074 Assessor's Map # 109 Parcel # 12 Zone I NAME, ADDRESS, & TEL & FAX # OF PERSON TO WHOM INQUIRIES SHOULD BE Jack L. Neubieser, Borghesi Building & Engineering Company, Inc. DIRECTED: 2155 East Main Street, Torrington, CT. 06790 860-482-7613, Fax: 860-482-5082 THIS APPLICATION IS FOR: (Check all that apply) : a(/ / 6 `J_ 1. Zone Change to (Public Hearing required) _2. Subdivision/Resubdivision a. _ Subdivision _ Minor _ Major b. _ Resubdivision Minor _ Major (Public Hearing Required) C. _ Conditional Approval d. _ Open Space Subdivision (Public Hearing Required) _3 . Special Exception to Article (Public Hearing Required) X 4. Site Plan of Development _5. General Plan of Development _6. Earth Filling [Sec. 151 and/or Earth Removal [Sec. 141 (Public Hearing Req) _7. Regulation Amendment: Zoning Subdivision _8. Amendment to Town Plan of Development _9. Temporary and Conditional Permit _10. Other (explain in detail) : Applicant Property Owner (See reverse side for additional information) ABCO WELDING SITE PLAN r— L./bing st-fpr site plan approval for demolition of the existing 1800 square foot d construction of a new 480 square foot building-Misting site8 J "Fitch Boulevard, I zon . xisting,lot size is j t over 3 acres, proposed impervious covera'ge_is %, 65% allo .-e-d_. 2. This site has an existing curb cut on Route 5 and will continue to use that curb cut l�irre-par-king spaces-are required and nine-are proposed. There-are--alsa-5 10 d4 r ca__pr -�] 3. The site will be served by public water and sewer. Water Pollution Control Authority approval is required for the new sewer connection, and the applicant is scheduled to appear before WPCA on Sept. 16. The Supt. of Pollution l Control has indicated that the sewer assessment for this property is outstanding and will have to be calculated. 4. There,Tre-rio regulated-wetlands_on-site. IWA/CC granted conservation approval on September 3 with a bond of$1,000 and no unusual approval conditions. The applicant appeared before the Architectural and Design Review Committee on September 4. ADRC suggested moving the Norway Maple in front to an area outside the drip line of the existing white pines. The applicant noted that they may want to remove two existing white pines in front of the site because they will block the front of the new building, and ADRC agreed. ADRC suggested reconsidering the type of evergreens to be used for screening between site and Atlantic Plywood, as white pines drop lower branches as they mature. ADRC noted new plan is an improvement over existing site. 5. There is a dumpster proposed on a concrete pad. The dumpster pad will need screening. If this application is approved, there are no other Planning Dept. approval modifications requested. STANDARD APPROVAL MODIFICATIONS FOR SITE PLAN PROJECT ��(r�c APPL. # ENGINEER/ARCHITECT PROD. # DWG # DATE REV DATE SUBMIT MYLARS OF SHEETS . . 1 . Prior to commencement of any site work, a meeting must be held with Town Staff. 7ZI—C 2 . No building permit will be issued until the final mylars have been filed in the Town Clerk' s office. —143 . This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission, including a bond in the amount of $ 46 06 4 . An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 8 . 1 . 10 of the Zoning Regulations . 5 . Footing drains are required if the building has a basement . 4L6 . A landscape bond in the amount of $ 16 C) d is required and must be submitted prior to filing of mylars . 7 . All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. Black and white transparent mylars of Sheets # S 101 with the above modifications, together with three blueprint copies of the entire set of plans must be submitted to this Commission within 30 days to be stamped and signed. The letter of approval of this Commission, as well as the Inland Wetlands Agency/Conservation Commission, must be reproduced on the mylars . After the mylars have been signed by the Commission, they will be returned to you for filing in the Office of the Town Clerk within 90 days . After filing these plans, a copy of the receipt must be - submitted to the Planning Department . Su rivef'I 4e 1P�e art ���rse 1, e 4-wee� ,pre Ca__r �- -/-y ABCOWELDING & INDUSTRIAL SUPPLY, INC. 130 Cross Road P.O. Box 296 Waterford. CT 06385 Phone (860)442-0363 Fax (860)447-3347 August 15, 1997 Jack Neubieser Borghesi Building& Engineering Co., Inc. 2155 East Main Street Torrington, CT. 06790 This letter is to confirm that you and your firm are acting as our agents in the matter of construction of a new building at 1608 John Fitch Blvd., South Windsor, Ct. You are authorized to represent us in all matters relating to the filing of plans, obtaining permits, and whatever else is necessary to obtain approval to begin construction. Sincerely, Kent Lacey General Manager TOWN OF SOUTH WINDSOR CHECKLIST REQUIRED INFORMATION SITE PLANS APPLICANT Borghesi Building & Engineering Company. Inc. PROJECT NAME ABCO Welding & Industrial Supply, Inc. This checklist must be signed by plan preparer (P.E./L.S.) declaring that all required information is provided. Items 1-7 are required for all applications; items 8-11 required where appropriate. Check mark for each item supplied. x 1. On each sheet for plans or maps, title block with the following information: a. Name, address and telephone of applicant. x b. Name, address and telephone number of Land Surveyor or Professional Engineer. N/A c. Name of Development. x d. Date when drawings were made. ' x 2. Key Map: An overall map drawn to a scale of 1 inch equals 200 feet, which can be used as an overlay on Metropolitan District Maps. This map will show the overall design of the Development and surrounding property within 500 feet. x a. Date block which gives needed zoning information such as percentage of lot coverage, 1� g Pe g acreage of tract, number of apartment units, parking requirements, etc. x b. Layout of buildings. N/A c. Layout of streets and parking. x d. Lines indicating proposed drainage system with direction arrows. x e. Lines indicating sanitary sewer system with direction arrows. x f. Names of surrounding property owners. N/A g. proposed open spaces and recreation areas. x h. Driveway cuts on surrounding properties. x 3. Architectural Elevations: See attached checklist for Architecture and Design Review. x 4. Plot Plan: A layout map of the proposed site drawn to a scale of 1 inch equals 40 feet on either of the following size sheets: (1) 24" x 36" with a 3/4" ruled margin; (2) 18" x 24" with a 1/2" ruled margin, containing the following data: x a. Distance and bearings of all boundary lines and acreage of site. Iron pins required at all property angle points and shown on map. N/A b. Proposed streets and street lines with center line station, curve data, and parking spaces. r x C. Building lines in accordance with zoning regulations. x d. Proposed buildings and other structures, including signs, outside lighting, and dumpsters (on concrete pad and screened). N/A e. Easements, noting grantors, grantees, and purpose. X f. Names of abutting property owners. N�f} g. Monuments will be indicated at corners and angles of all streets and at all points of curvature and tangency. In areas accessible to Metropolitan District Commission points, or other coordinated points, the monumented points within proposed site shall be coordinated. These coordinates shall appear in tabular form on the plot plan. The accessibility of these MDC points shall be determined by the Town Engineer. N/A h. All open space or other common or public land uses shall be indicated. x i. A-2 certification; P.E./L.S. Seal. x 5. Topographic Map: A map drawn to a scale of 1 inch to 40 feet on sheets not exceeding 24 inches by 36 inches, including ruled margins shall in addition to the requirements of the plot plans show the following: x a. All existing and proposed buildings. x b. Curb Lines and pavement width, sidewalks. x c. Existing and proposed sanitary sewers. x d. Existing and proposed water and gas main systems. x e. Present wooded area indicated by foliage lines. Any individual trees to be saved should be shown. x f. Existing and proposed contours shall be shown in not less than two-foot intervals, but in cases of relatively level land, the contours shall be one-foot intervals and spot elevations. x g. Regulated wetlands and 100-year floodplain or note that none are present. x h. Proposed storm drainage system, showing all catch basins, endwalls, manholes, lengths and sizes of pipes. (Maximum distance between catch basins shall be 300 feet and minimm.u size of storm drain lines shall be 15 inches. N/A i. Connections of all springs into proposed storm drainage system as needed. N/A j. Location and indications of existing brook channels, and 100-year flood limits. X k. A-2 Certification; P.E./L.S. Seal. X 6. Landscaping plan: X 7. Drainage calculations: - Zero Runoff Increase per attached . C► CANL t K-) N/A 8. Traffic Report: - 2 - N/A 9. Plans and Profiles: A plan and profile of the proposed streets drawn on plan/profile paper of scales 1 inch to 40 feet horizontally, and 1 inch to 4 feet vertically on sheets not exceeding 24 inches by 36 inches, including ruled margins and containing the following: N/A a. Layout of streets in sections coordinated by stations with the profile. N/A b. Street plan showing roadways and drainage. N/A c. Sight line at driveway & street intersections. N/A d. Profile of roadway showing existing and finished grades. Roadway profile will show all tangent grade and all vertical curve information. N/A e. Profile will show all catch basins and all drainage lines between catch basins with all invert and top of frame elevations. Drainage lines will be shown and described as to material. N/A f. Where any storm drainage line discharges into an existing brook sufficient profile of this brook will be shown to determine conditions. N/A g. Metropolitan District Commission datum shall be used on all sites accessible to these controls. The Town Engineer shall, based on standard engineering practices, determine the accessibility of these controls. , N/A h. Profiles shall show all sanitary sewer lines and manholes, including elevations, sizes, lengths, and slopes of pipes. Top of foundation elevations for building shall be shown. N/A 10. Open Space Site Improvement Plans: For sites which require or include a provision for open spaces, a plan which contains data for site improvement may be required. This map shall be drawn to a scale of 1 inch equals 40 feet. N/A 11. Sanitary Report: Where individual sanitary sewage disposal systems are proposed, the final plans shall include a Sanitary Report certified by a Professional Engineer. The report shall demonstrate the feasibility of the proposed individual systems; the report should deal with the area as a whole, discussing the following points: N/A a. General nature and development of surrounding area. N/A b. Topography and natural drainage pattern. N/A c. Subsurface conditions as shown by subsurface investigation, including soil absorption characteristics, ground water level conditions, ledge rock, and general nature of soil. N/A d. General description of type of development contemplated. N/A e. Detailed description of proposed sanitary sewage disposal facilities, indicating sizes for various ground conditions, materials to be used, and the general layout pattern to be used, etc. N/A f. Special precautions that may be necessary to provide proper functioning of the proposed disposal systems. N/A g. map of general area with locations of all tests shown on proposed layout. N/A h. Flood heights of any nearby streams, brooks, or rivers. - 3 - N/A i. Test results and engineering evaluation per Section 4.13.5. All information required above is included in this application at the time of submission. p P c 8 -fig y-, PLY PREPARER P.E. L.S. DATE May 17, 1995 - 4 - ::. ':::: -::isi.:'::.:-:.::.:...::::.:::::::::::::'::::::=ii:::::5:::::=:::-::=:::i:'::'::::::::::::::-::_=:'.'i:::i<:::::-`.:::::=:::: ::..:"::::::::::: <:':::>:'::i::::::ri:::::::-`.:: :.::.::.:.>:.::.....:.:........::...:........:........:.:... :::..................:::>:::::::.::::-. .... ..I.................... ................. ::::::::::::::::::::2:i::::::i::::::i::i::::>::c:i::i:::;::::::ii::::i::ii::::::::::::......:::ii:is::;::::::::::::::::::::>:;::i-`.:::;:::;:;:::., ...::::: .. :... ................................................................................:...............:.........:... .5.::�? .... ...�}� ...- -.-. :::::::::::::::._:::::::::.::::::::.:�::::._::::::::::::.:r:.;:.::.>.::<;::.::::::::::::::: :::: ............3i .:.. ..:::::::::::::::::::::........................................:.:::.:::::::::...................................... ....:................................:..:::::::::::::::::..:.:._::::::::::::::.::::::::._::::::--...... ..`.. �........-.....:::: :::. .::::::.::::::::::::..................-............:::::::::.::::::::::.:::.............................:.:::::::: ::::....::::::.....:.::::.:::.::::.::::::.......................................................::: ::: .. .::::::::::.:.........�... .. ...................::..::::::::::.::_.:._:::::::::-:.....................:.::::::. 11 :;:::iS::::..",.i::::<::::::::::::::2::::::rf::::;:::::::::::i:::;:::;::=:;:::;:ii:..:r::::c::.::::<.;::::::::::::: <:::i:;:.::.::.:: .... ...... ��{.�. .::::. :.. ..:::..:...............................:.:..:.:::.:::::::::::--............................ ::::......:::::.......: :: :: ::::::::::::::::::::::::::::::<:-`.:::;:i::.-:.-}::::s>:>::;:.>::.::.>:.»>:.::.:.>:::.:�`.:>. ... ....... �(� ..... .:.::-:: :>::ci::.:::i::::::::;::::::::;:i:::ri::i.'-::::::::i';::::::::::::::i:::::;:::.::.::.»:::::::::::::::::::::= �T!`!.:............ ...................................-....... ............. ..............................................:.. ..:.::..::.. �. :. *+.................... ..:. .... .................................................... .......................... :-r � .....�y .....................................:::.:....................... :::.:e. -::-: - :::::;:ii::::::::::::::::i::i:'::::::`::::::i':::ii::ii::'::::::::::':::::::'::::::i::::=:::=:i::ii::-`:::= :::::::::::i:::::::::'::i:: .::s:::::' :;:<::::::::::::::::+:5;:::.::::::::_::: :y:::::?:::- ... ............... '::::Z:::i::: ;;;;:.:::.-::- :-::::a:::::- :::::::::.;.::: ,.; :G: S: ,y •: .: w. .....................................................................::.�::::::.::�::::.�:::::::::::::::::.:.. ..::::. :::::::.�::.::::::::::::::::::::.::-.:.:......................:::::::::::.::::.�:::::::.:.::.......................::::. :..::::.# .:::.:kia: .::: .......................:::..::::::::::.:::::::::::::.....................:.:..:.::::::::::::::.::::.: :::::.::::::::::::::::::::::::::::•:::.::::.:.:.................:.:::::::::.::.::.::.::::::mi w.....::::::::::::::::::::::: .................................... ..........................:.:::::::::::::::::::.,.....r........................- :::::::::._:::::::::::::::...........................::...:.. :::: .-..:::: ::>....%::;':.-:::: .:->:..::::>::::::::.:>.:::>:<:;.;:;<:.:-::.::.:;-:-;::-::-::-::-::-;:.::-;;;:.;:<.;;:::.::>:.:.::.;::.::.;:.:::.::.::;;.::-::;.;::-. . ...... ......................................:.:::::::::::::.: :::.:._:::::::::::::::::..:::: ......... ........:.:::.::::::::::::.::. =- ................ ' :::::::::::::::::::::::............:........................::::: TABLE OF CONTENTS SUMMARY APPENDIX A: DRAINAGE CALCULATIONS APPENDIX B: WATERSHED MAP APPENDIX C: DETENTION BASIN CALCULATIONS BORGHESI BUILDING& ENGINEERING CO. 8/18/97 SUMMARY The applicant proposes to construct a new 4,784 SF industrial supply distribution building at the existing Abco Welding site at 1608 John Fitch Boulevard (Route 5), in South Windsor. The proposed drainage system is designed to convey the estimated 100-year runoff from the site with zero increase in runoff rates from pre-development to post-development. The existing 3.08 acre site is approximately 40% wooded with gentle grades of approximately 0.5 to 1 percent. The site is not within any regulated floodplain. The Hartford County Soil Survey identifies the site soils as Sudbury fine sandy loam. SCS classifies these soils in Hydrologic Soil Group B. Soils in this group have moderate infiltration rates. Runoff from the site presently drains overland into the John Fitch Boulevard drainage system The proposed drainage system will collect runoff using catch basins and discharge to an on-site detention basin. The detention basin will outlet to the existing drainage system in Route 5. Watershed areas are determined using site plans prepared by Borghesi Building & Engineering Co. (BBE) based on actual field topographic mapping, and Town of South Windsor topographic mapping. A watershed map is presented in Appendix B. The proposed drainage system is designed for a 100-year storm. The rational method is used to estimate rates of runoff from the watershed. Detention basin volume is calculated using TR-55. "Hydraflow" software is used to evaluate the proposed drainage system. The software uses the Rational Method for hydrologic calculations and basic hydraulic principals to evaluate selected pipe sizes and inverts. The system is designed using a starting water surface elevation (WSE) of 77.25. The starting WSE corresponds to the crown of the existing pipe in the catch basin where the proposed system connects to the existing system. Drainage calculations for the proposed system are found in Appendix A. BORGHESI BUILDING& ENGINEERING CO. 8/18/97 APPENDIX A: DRAINAGE CALCULATIONS WATERSHED AREAS RUNOFF COEFFICIENTS TIME OF CONCENTRATION HYDRAFLOW CALCULATIONS BORGHESI BUILDING& ENGINEERING CO. ABCO WELDING 1608 JOHN FITCH BOULEVARD (RTE. 5) SOUTH WINDSOR, CT GENERAL NOTES 1) RUNOFF COEFFICIENTS FROM CONNDOT"DRAINAGE MANUAL" (1986) &"CONNECTICUT GUIDELINES FOR SOIL EROSION AND SEDIMENT CONTROL" (1985) 2) TIME OF CONCENTRATION CALCULATED USING CONNDOT NOMOGRAPH ON PAGE 126 (OVERLAND FLOW ONLY) WATERSHED AREA CALCULATIONS LINE AREA METHOD (SF) (ACRE) 1 48,961 1.12 FROM AUTOCAD 2 10,387 0.24 FROM AUTOCAD 8/18/97 BORGHESI BUILDING+ENGINEERING CO. SHEET 1 OF 2 ABCO WELDING 1608 JOHN FITCH BOULEVARD (RTE. 5) SOUTH WINDSOR, CT RUNOFF COEFFICIENTS LINE AREA DESCRIPTION AREA TC (ACRE) C CA (MIN) 1 PAVED, BLDG. 0.56 0.90 0.50 LAWN/GRASS 0.42 0.25 0.11 GRAVEL 0.14 0.60 0.08 TOTAL 1.12 0.62 0.69 5 2 PAVED, BLDG. 0.00 0.90 0.00 LAWN/GRASS 0.24 0.25 0.06 TOTAL 0.24 0.25 0.06 5 NOTE: ALL TIME OF CONCENTRATIONS ASSUMED TO BE 5 MINS. 8/18/97 BORGHESI BUILDING+ENGINEERING CO. SHEET 2 OF 2 Plan View 2 I 1 Proj. file: ABCO.STM OF file: HARTFORD.IDF No. Lines: 2 08-15-1997 Storm Sewer Summary Report Page 1 Line Line ID Flow Line Line Invert Invert Line HGL HGL Minor Dns No. rate size length EL Dn EL Up slope down up loss line (cfs) (in) (ft) (ft) (ft) N (ft) (ft) (ft) No. 1 6.13 15 c 197.0 76.00 77.10 0.558 77.25* 78.76* 0.39 End 2 5.83 15 c 130.0 77.15 77.82 0.515 79.15* 80.05* 0.35 1 PROJECT FILE: ABCO.STM I-D-F FILE: HARTFORD.IDF TOTAL NO.LINES: 2 RUN DATE: 08-18-1997 NOTES: c=circular; e=elliptical; b=box; Return period= 100 Yrs.; *Indicates surcharge condition. Line 1 Q =6.13 Size= 15 x 15 (Cir) Nv = 0.012 Len = 197.0 JLC = 1.00 /Outfall Invert Depth HGL EGL Area Vel T-Wid Cover Dnstrm 76.00 15 77.25 77.64 1.23 5.00 0.00 N/A Upstrm 77.10 15 78.76 79.15 1.23 4.99 0.00 1.65 Drainage area (ac) = 0.24 Slope of invert (%) = 0.558 Runoff coefficient (C) = 0.25 Slope energy grade line (%) = 0.768 Time of conc. (min) = 5.72 Critical depth (in) = 12 Inlet Time (min) = 5.00 Natural ground elev. (ft) = 80.00 Intensity @ 100 yr (in/hr) = 8.25 Upstream surcharge (ft) = 0.41 Cumulative C x A = 0.74 Additional Q (cfs) = 0.00 Q = CA x I (cfs) = 6.13 Full-flow capacity (cfs) = 5.23 -------------------------------------------- ---------------------------------------------------- Q Catchment (cfs) = 0.51 Inlet Type = ME Q Carryover (cfs) = 5.83 Gutter slope (ft/ft) = 0.00 Q Captured (cfs) = 0.00 Cross slope (ft/ft) = 0.00 Q Bypassed to offsite = 6.34 Width of Flow (ft) = 0.00 ---------------------------------------------------------------------------------------------------------------- Line 2 Q = 5.83 Size = 15 x 15 (Cir) Nv = 0.012 Len = 130.0 JLC = 1.00 /Downstream line= 1 Invert Depth HGL EGL Area Vel T-Wid Cover Dnstrm 77.15 15 79.15 79.50 1.23 4.75 0.00 1.60 Upstrm 77.82 15 80.05 80.40 1.23 4.75 0.00 1.25 Drainage area (ac) = 1.12 Slope of invert (%) = 0.515 Runoff coefficient (C) = 0.61 Slope energy grade line (%) = 0.695 Time of conc. (min) = 5.00 Critical depth (in) = 12 Inlet Time (min) = 5.00 Natural ground elev. (ft) = 80.32 Intensity @ 100 yr (inlhr) = 8.54 Upstream surcharge (ft) = 0.98 Cumulative C x A = 0.68 Additional Q (cfs) = 0.00 Q = CA x I (cfs) = 5.83 Full-flow capacity (cfs) = 5.02 -------------------------------------------- ---------------------------------------------------- Q Catchment (cfs) = 5.83 Inlet Type = MH Q Carryover (cfs) = 0.00 Gutter slope (ft/ft) = 0.00 Q Captured (cfs) = 0.00 Cross slope (ft/ft) = 0.00 Q Bypassed to 1 (cfs) = 5.83 Width of Flow (ft) = 0.00 ---------------------------------------------------------------------------------------------------------------- APPENDIX B: WATERSHED MAP BORGHESI BUILDING& ENGINEERING CO. APPENDIX C: DETENTION BASIN CALCULATIONS Jj BORGHESI BUILDING& ENGINEERING CO. BORGHESI BUILDING & ENGINEERING CO. ABCO WELDING & INDUSTRIAL SUPPLY 2155 EAST MAIN ST., TORRINGTON, CT 1608 JOHN FITCH BOULEVARD (RTE.5) S. WINDSOR, CT DETENTION BASIN CALCULATIONS VOLUME PROVIDED ELEV. AREA AVE. AZ AV EV AREA (FT) (SF) (SF) (FT) (CF) (CF) 77.15 567 0 1,837 2.8 5,234 80.0 3,106 5,234 VOLUME REQUIRED WATERSHED AREA DRAINING TO DETENTION BASIN 1.36 ACRE DEPTH OF RUNOFF 0.84 INCHES FROM TR-55 CALCULATIONS VOLUME REQUIRED 1.36 43,560 0.84 / 12 4,147 CF DEPTH OF RUNOFF CONTAINED AT SPILLWAY ELEV. 80.0 5,234 / 1.36 43,560 x 12 1.06 INCH ABCOVOL.xis SHEET 1 OF 1 8/18/97 RUNOFF CURVE NUMBER COMPUTATION Version 2 . 00 Project : ABCO WELDING PRE DEVEL User: MLC Date : 08-05-97 County : HARTFORD State: CT Checked: Date: Subtitle: --- ---------------------------------------------------------------------------- Hydrologic Soil Group COVER DESCRIPTION A B C D Acres (CN) ------------------------------------------------------------------------------- FULLY DEVELOPED URBAN AREAS (Veg Estab. ) Open space (Lawns,parks etc. ) Good condition; grass cover > 750 - . 86 (61) - - Impervious Areas Paved parking lots, roofs, driveways - . 32 (98) - - Streets and roads Gravel (w/ right-of-way) - . 10 (85) - - Total Area (by Hydrologic Soil Group) 1 .28 ------------------------------------------------------------------------------- TOTAL DRAINAGE AREA: 1 .28 Acres WEIGHTED CURVE NUMBER: 72* ------------------------------------------------------------------------------- * - Generated for use by GRAPHIC method TIME OF CONCENTRATION AND TRAVEL TIME Version 2 . 00 Project : ABCO WELDING PRE DEVEL User: MLC Date: 08-05-97 County : HARTFORD State : CT Checked: Date: Subtitle: ------------------------------------------------------------------------------- Flow Type 2 year Length Slope Surface n Area Wp Velocity Time rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr) ------------------------------------------------------------------------------- Sheet 3 .2 50 . 01 F 0 .180 Shallow Concent'd 222 . 01 U 0 . 038 Open Channel 115 . 015 . 013 .2 1 .57 0 . 009 Time of Concentration = 0 .23* --- Sheet Flow Surface Codes --- A Smooth Surface F Grass, Dense --- Shallow Concentrated --- B Fallow (No Res . ) G Grass, Burmuda --- Surface Codes --- C Cultivated < 20 o Res . H Woods, Light P Paved D Cultivated > 20 °s Res . I Woods, Dense U Unpaved E Grass-Range, Short J Range, Natural * - Generated for use by GRAPHIC method GRAPHICAL PEAK DISCHARGE METHOD Version 2 . 00 Project ABCO WELDING PRE DEVEL User: MLC Date: 08-05-97 County HARTFORD State : CT Checked: Date : Subtitle : Data: Drainage Area 1 .28 * Acres Runoff Curve Number 72 * Time of Concentration: 0 . 23 * Hours Rainfall Type III Pond and Swamp Area NONE Storm Number 1 2 3 4 5 6 7 ---------------------- ------ ------ ------ ------ ------ ------ ------ Frequency (yrs) 1 2 5 10 25 50 100 24-Hr Rainfall (in) 2 . 6 3 .2 4 . 1 4 . 7 5 . 5 6 .2 6 . 9 Ia/P Ratio 0 .30 0 .24 0 .19 0 . 17 0 . 14 0 . 13 0 . 11 Runoff (in) 0 .58 0 . 93 1 .53 1 . 97 2 . 59 3 . 16 3 . 74 Unit Peak Discharge 0 . 730 0 . 763 0 . 795 0 . 809 0 . 823 0 . 833 0 . 840 (cfs/acre/in) Pond and Swamp Factor 1 . 00 1 . 00 1 .00 1 . 00 1 . 00 1 .00 1 . 00 0 . 00-. Ponds Used Peak Discharge (cfs) 1 1 2 2 3 3 4 * - Value (s) provided from TR-55 system routines RUNOFF CURVE NUMBER COMPUTATION Version 2 . 00 Project : ABCO WELDING POST DEVEL User: MLC Date : 08-05-97 County : HARTFORD State : CT Checked: Date: Subtitle: --------------------------------------- Hydrologic Soil Group COVER DESCRIPTION A B C D Acres (CN) -------------------------------------------- FULLY DEVELOPED URBAN AREAS (Veg Estab. ) Open space (Lawns,parks etc. ) Good condition; grass cover > 75% - . 66 (61) Impervious Areas Paved parking lots, roofs, driveways - 56 (98) Streets and roads Gravel (w/ right-of-way) - . 14 (85) Total Area (by Hydrologic Soil Group) 1 .36 -------------------------------------------- ---------------- TOTAL DRAINAGE AREA: 1 . 36 Acres WEIGHTED CURVE NUMBER: 79 ----------------------------------------------- * - Generated for use by GRAPHIC method TIME OF CONCENTRATION AND TRAVEL TIME Version 2 . 00 Project : ABCO WELDING POST DEVEL User: MLC Date : 08-05-97 County : HARTFORD State: CT Checked: Date: Subtitle : --- ---------------------------------------------------------------------------- Flow Type 2 year Length Slope Surface n Area Wp Velocity Time rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr) ------------------------------------------------------------------------------- Sheet 3 .2 50 . 01 F 0 . 180 Shallow Concent'd 90 . 01 U 0 . 015 Shallow Concent'd 45 . 01 P 0 .006 Open Channel 366 . 005 . 012 . 785 3 . 14 0 . 029 Time of Concentration = 0 .23* --- Sheet Flow Surface Codes --- A Smooth Surface F Grass, Dense r-� --- Shallow Concentrated --- B Fallow (No Res . ) G Grass, Burmuda --- Surface Codes --- C Cultivated < 20 o Res . H Woods, Light P Paved D Cultivated > 20 o Res . I Woods, Dense U Unpaved E Grass-Range, Short J Range, Natural * - Generated for use by GRAPHIC method GRAPHICAL PEAK DISCHARGE METHOD Version 2 . 00 Project : ABCO WELDING POST DEVEL User: MLC Date : 08-05-97 County : HARTFORD State: CT Checked: Date: Subtitle : Data: Drainage Area 1 .36 * Acres Runoff Curve Number 79 * Time of Concentration: 0 .23 * Hours Rainfall Type III Pond and Swamp Area NONE Storm Number 1 2 3 4 5 6 7 -- -------------------- ------ ------ ------ ------ ------ ------ ------ Frequency (yrs) 1 2 5 10 25 50 100 24-Hr Rainfall (in) 2 . 6 3 . 2 4 . 1 4 . 7 5 .5 6 .2 6 . 9 Ia/P Ratio 0 .20 0 . 17 0 . 13 0 . 11 0 . 10 0 . 09 0 . 08 Used 0 . 20 0 . 17 0 . 13 0 . 11 0 . 10 0 .10 0 . 10 Runoff (in) 0 . 91 1 .34 2 . 04 2 . 55 3 . 24 3 . 86 4 .49 Unit Peak Discharge 0 . 786 0 . 809 0 . 830 0 .840 0 . 848 0 . 848 0 . 848 (cfs/acre/in) Pond and Swamp Factor 1 . 00 1 . 00 1 . 00 1 . 00 1 . 00 1 .00 1 . 00 0 . 00-o Ponds Used Peak Discharge (cfs) 1 1 2 3 4 4 5 * - Value (s) provided from TR-55 system routines STORAGE VOLUME FOR DETENTION BASINS Version 2 . 00 Project : ABCO WELDING POST DEVEL User: MLC Date: 08-05-97 County : HARTFORD State: CT Checked: Date: Subtitle : Drainage Area: 1 .36 Acres Rainfall Frequency: 10 years Rainfall-Type: III Runoff : 2 .5 inches Peak Inflow: 2 . 90799 cfs Peak Outflow: 2 cfs Detention Basin Storage Volume: 0 .54 inches or 0 . 1 acre feet STORAGE VOLUME FOR DETENTION BASINS Version 2 . 00 Project : ABCO WELDING POST DEVEL User: MLC Date : 08-05-97 County : HARTFORD State: CT Checked: Date: Subtitle : Drainage Area: 1 .36 Acres Rainfall Frequency: 25 years Rainfall-Type: III Runoff : 3 .2 inches Peak Inflow: 3 . 732166 cfs Peak Outflow: 2 . 92 cfs Detention Basin Storage Volume: 0 . 59 inches or 0 . 1 acre feet STORAGE VOLUME FOR DETENTION BASINS Version 2 . 00 Project : ABCO WELDING POST DEVEL User: MLC Date: 08-05-97 County : HARTFORD State: CT Checked: Date : Subtitle: Drainage Area: 1 .36 Acres Rainfall Frequency: 50 years Rainfall-Type: III Runoff : 3 . 9 inches Peak Inflow: 4 .449518 cfs Peak Outflow: 3 cfs Detention Basin Storage Volume: 0 . 84 inches or 0 .1 acre feet STORAGE VOLUME FOR DETENTION BASINS Version 2 . 00 Project ABCO WELDING POST DEVEL User: MLC Date: 08-05-97 County HARTFORD State : CT Checked: Date: Subtitle: Drainage Area: 1 .36 Acres Rainfall Frequency: 100 years Rainfall-Type: III Runoff : 4 .5 inches Peak Inflow: 5 . 180801 cfs Peak Outflow: 4 cfs Detention Basin Storage Volume: 0 . 83 inches or 0 . 1 acre feet �' i►.�`'. ti * �f Y �;+• � '�Nr �r eR � ,`""'�7YL'�. .. t •ry *,_. ,� � t.°w'cm Ate'. °!} '.. ...,r. Y' +ti 1. •�(•� e•+:�� + t.[. , 1� STY Y•.. i .1"I�'� �t:'�;"7r' 'Cvr.lay •p� ANN i #�„� yam,� •�,�«• / ji�ji••�- U^ �� ,fir +�, ;f``, «,:.1:`_ wit 4 � 's' h!V v'r. ��,'7�P'6; i�•f�+,� •'w f^• rT �j,� y�'��"C�[T �IC'�li ��'" nip►. 4�� �.``,*•.", ,•*1''w i;ftr �e ��A�' ;'+�}'o- � ," j,,, aw: wa .•F ~�• 41J:� .y h ".•: ,` r.. � :, 3+' :�,,f. v'e -.i. .4.7+ %!1 jr"'�'' ±.'lr:�y;• - � �,.. ,.�- `,�' `+. �� ..1` c`�'^i'�'.i°C "•�zr.....� � y r�,�st e,,,l�,�� ":?'�' a^("�•,'.{~.^:y@ v � i1 � /� „� � l�. S �►�. J �`'�, �! ,4" �:,T•1��+ ,+.;., .,,4 �iqi:'' r - / '1..e�. :j,y)Y�,,. `o�� Ji, .`✓ '. �'��7�.. ��q �y E r:. El 50 +�� `i:�.vw � ,1.� �� \�"���' W� R�\� ��t�'`,.hw.,,'Fy� '" '�""� ��. <vi ��� ~�� .�� P �"'• k1 r i s ;1 �.y�='�� ��a�ygt��t�r r:�r7/• �ye� .4;• ✓� '�[' I `���' � � �'�`"� �i14Riyd '�, �''` d tI ' �. 'd�)� l ga ai Mn [ � ��`'` r. *v';';r..�-s :�JR''(;J� .:1� r ;`F�a.L;'���� ��( 'i.. "3'f� r`*�• ! '� ,.�r mac. `�,�� �y� +y?. t� _\ � / 'c• :'r, ,. g� E a��k•Lr w 1 � •:}5,.y��g`�)t��� �,�r, �� �e �,.y � ��`'� � N`JIr611 f"�' � '✓[• �\t+4. �{�„� � y�•� .�'� ? �� �� frN,}. r�f��Rti i;iJ' I+. �1" ;� � \a�� �WNY �. �w .,.s�.ti .suet•,, � "+� .: � {�. 1 la '� S' :4r-� t�'�r4�`�"�t Mi k-�•4�)7J�/j,�► ��'.," P�- �•--�o T'�� �y�{.. af IA .,. /1/Y.�y',*,.'+K 4• , rr yp[R:1 4 trt Wi 1;,,_T�f ,/ •W `•�1 e•t„�,+5+1".t / _ 1. r�', ,� •o" y1 /rL:. .� .Fl � � Jr�1) r�P �k�.i?'�V t .4� +ht� :+ > `,y � J± .tSrY � +I. .¢fir "",,.r1 d' � 7r ;'$; 1 �,.y � �v,� h• � � `��� MEMORANDUM TO: Marcia A. Banach, Director of Plannin FROM: Jerry C. Iazzetta, Town Engineer DATE: September 3, 1997 RE: ABCO WELDING SITE PLAN — 97-66p We have reviewed the drawings dated 8/17/97 for the proposed Abco Welding Site Plan and have the following comments: Sheet SP1 should have an A-2 Certification. Detail for catch basins should show concrete brick leveling courses between precast top and precast riser sections to allow for adjustments. JCl/jsv SONN Se44 C � ti 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 Soe•ca AREA CODE 860/644-2511 CERTIFIED MAIL September 11, 1997 Jack L. Neubieser Borghesi Building 8s Engineering Company, Inc. 2155 East Main Street Torrington, CT 06790 Dear Mr. Neubieser: Re: Appl #97-66P, ABCO Welding 8v Industrial Supply Company We are pleased to advise you that the Planning & Zoning Commission voted on September 9, 1997 to approve with modifications the above referenced application for a Site Plan of Development for the construction of a 4,784 sq. ft. building on property located at 1608 John Fitch Boulevard, I zone as shown on plans prepared by Borghesi Building & Engineering Co., Inc. and dated August 18, 1997. This approval is subject to the following modifications: 1. Prior to commencement of any site work, a meeting must be held with Town Staff. 2. No building permits will be issued until the final mylars have been filed in the Town Clerk's office. 3. This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission, including a bond in the amount of$1,000. 4. An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 8.1.10 of the Zoning Regulations. 5. Footing drains are required if the building has a basement. 6. A landscape bond in the amount of$1,000 is required and must be submitted prior to filing of mylars. 7. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 8. Screening required for dumpster. 9. An A2 boundary survey must be filed on the land records. 10. Detail for catch basins should show concrete brick leveling courses between precast top and precast riser sections to allow for adjustments. Black and white transparent mylars of Sheet #SP-1 with the above modifications, together with three blueprint copies of the entire set of plans must be submitted to this Commission within 30 days to be stamped and signed.. The letters of approval of this Commission as well as the Inland Wetlands Agency/Conservation Commission must be reproduced on the mylars. After the mylars have been signed by the Commission, they will be returned to you for filing in the Office of the Town Clerk by December 27, 1997. After filing these plans, a copy of the receipt must be submitted to the Planning Department. Very truly yours, PLANNING & ZONING COMMISSION ussell G. ,/evack, Chairma� RGL/pmm Cc: Town Engineer Chief Building Official Assessor Superintendent of Pollution Control Fire Marshal ABCO Welding 8s Industrial Supply, Inc., 130 Cross Road, P. O. Box 296, Waterford, CT, 06385 PLANNING DEPARTMENT IN-HOUSE REFERRAL FORM TO: Matt Galligan, Fred Shaw, Michael Gantick, Sargent Thomas Field, Fire Marshal Lanning, Ray Favreau, Karl Reichle, Mel Stead FROM: Marcia A. Banach, AICP, Director of Planning The Planning & Engineering Departments havereceived plans for the following project: l - 61�e Zone _ Acreage Commercial Subdiv Site Plan �_ Residential # OF Lots/Units Industrial _ Location: Mti Project Description: h 4 C, �4tk' Future Town-owned property involved? Yes _ No (a) (existing frontage also) (b) new open space/recreation area active passive (c) new detention area _ Planning Department comments: Please let me know by — if you will have comments on this application so that I can follow up with your department when I do a Planning Department report. Thank you. PLANNING DEPARTMENT IN-HOUSE REFERRAL FORM TO: Matt Galligan, Fred Shaw, Michael Gantick, Sargent Thomas Field, Fire Marshal Lanning, Ray Favreau, Karl Reichle, Mel Stead FROM: Marcia A. Banach, AICP, Director of Planning The Planning & Engineering Departments hav received plans for the following project: 4L Zone T Acreage Commercial Subdiv Site Plan �_ Residential # OF Lots/Units Industrial _ Location: ti " k__7 lit,361 �A' Project Description: � 0 Future Town-owned property involved? Yes _ No/ (a) (existing frontage also) (b) new open space/recreation area active passive (c) new detention area - Planning Department comments: Please let me know by �Z l�� if you will have comments on this application so that I can follow up with your department when I.do a Planning Department report. Thank you. 10NN SF4 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 sox•c AREA CODE 860/644-2511 October 1, 1997 Mr. Jack Neubieser Borghesi Building &Engineering Company,Inc. 2155 East Main Street Torrington, CT 06790 RE: ABCO Welding &Industrial Supply,Inc. 1608 John Fitch Boulevard SOUTH WINDSOR,CT Dear Mr. Neubieser: The South Windsor Water Pollution Control Authority, at its regular meeting of September 16, 1997, gave approval for the connection to the Town's sewerage system of a commercial building at 1608 John Fitch Boulevard, as more specifically shown on plans entitled"Project-ABCO Welding &Industrial Supply, Inc. - 1608 John Fitch Boulevard(Rt. 5) -South Windsor,Connecticut" prepared by Borghesi Building& Engineering Co.,Inc.,Torrington,Connecticut, Drawing No.SPI dated 8-6-97, revised 8-13-97 and 8-18- 97, and subject to the following conditions: 1. Technical approval of the Town Engineering Department. 2. Final Authority approval and acceptance of the sanitary sewerage connection will be given once the sewer line has been installed and inspected by the Town staff, and based upon the written verification of the Town staff that said sanitary sewer line was installed in substantial conformance with the design plans previously approved by the Authority, and meeting all Town regulations and appropriate technical specifications relating to sanitary sewer construction. 3. This approval letter must be superimposed on the final approval plans. Very truly yours, oseph J. Carino, Chairman Water Pollution Control Authority cc: Matthew Galligan,Town Manager Michael J. Gantick,Director of Public Works Jerry Iazzetta, Town Engineer Marcia Banach,Director of Planning ✓` John Collins, Chief Building Inspector FILE No. 898 02/02 '98 13:18 ID:ABCO WELDING SUPPLY 860 447 3347 PAGE 2 2-26--199S 1 -OSPM FROM BORGHESS BLDGIENGR 860 482 5082 P• t n4I't• �k CL E • k m i,��\ I �r1 rt° E 1 �Q ca I t •' r s�'„S' ' P + �O 1 t ur ! �z r r.n`A.. mil. ra 1n f-c- U J - r ._ - _ N ,i -..��,."'�•.y ._^. L�r �L�. - •^�.'F' F:t^' r.•-. r''_"�er�-'~�` ', Y"'v`YY^+' �n�he, .:� _ `...ram'�-R;..T_ FLJ_::: %��1----:-•'�'--`'�( F' ` ` ar .. � l,i i� u� —_`�----�"w...._gF.-..-..p------•�h?c•--....._ �.{i��- (y t1F,t�u v,. .. 'v, 134,225 S.F. i t V < Ms t \ i K.* i f M iAL I i> x s a 4lr 4- ' SC:Xr WALL c_ _ EXIS > Nop 'n 2Y 7 y i r•`'� PRE-DEVELOPMENT ``: WATERSHED MAP - N`.. `xf'. ABCO WELDING de INDUSTRIAL SUPPLY, INC. 1608 JOHN FITCH BOULEVARD (RT. 5) SOUTH NANDSOR CT sckx DATE 1"=50' 1 8/18/97 BORGHESI BUILDING & ENGINEERING CO. INC. 2]36 EAST VAIN STREET TONW&TEK CT.067% 960-102-7&3 o PC: 2 X 12' C OR N 'PA D —PROP. 12' x 25' CONC. PAD _--s" METAL MOVE: EXIST. BLOCK BUILDING, (TO BE RELOCATED STONE RAMP & CONC WALLS 13Y OWNER) PROP. 6' x 8' CONC. DUMPSTER PAD v PROP. 'C-L' CB NTH HOOD d, TF 80.32 INV 77.82 N 81 84 r --Pvc 81 92' PROP. �';�Y . AREA 134,225 S.F. _� co BLDG. _04 L W'N'. 4784 S.F. F.F.=85;25 loe HATCHING INDICATESp TCYMIER GRAVEL AREAx,-­ PRO�- ramel N' X ra-1.70 PROP. RIPRAP'--,� 00 'KS c*4 GO C7 V& PROP. DETENTIO"ASIN DA-1 BOX < 16V vtE PA H 0- v AZ 197", BOT. EL 77.15 TF RE 82 1 8 . - ——— ——- ING- -IT. TO BE RELOCATED L(8') 8- P\vc \\�—FLARED END &Y OWNER) 1 NU F L 7. 5 INV. 77.15 MAO 5- -0 w PROP. 'C-L' C8 TYPE 'B' GRATE TF 80.0 'v. INV 77.10 POST-DEVELOPMENT OST WATERSHED MAP INDUSTRIAL W%lPNpG & LY, INC. 1608 JOHN FITCH BOULEVARD RT. 5) SOUTH WNDSOR, CT SCALE DATE -50'l' 8/18/97 \iF,'�R BORGHES1 BUILDING & ENGINEERING CO. INC. 2=EAST NAM STREET TOMMMN.CT 067% 860-482-7W ---------------