HomeMy WebLinkAboutResubdivision (76) TOWN OF SOUTH WINDSOR, CONNECTICUT
PLANNING & ZONING COMMISSION D ��
APPLICATION FORM
Application No. : 9�7 5-,TP
Date Received: _Y--,� 3—q 7 Jul 15 1991
Action/Public Hearing by:
Receipt No. 101 0 (
South Windsor
APPLICANT: Planning & Zoning Ummis$!ON
ADDRESS: 'T �,-iN cc) It,) A-A) ?[CG C % 06,3-5'7
OWNER OF RECORD ON LAND RECORDS �y
ADDRESS: P (.), 8U 4- (a (-JS
COMPLETE LOCATION OF PROPERTY: v�'? �� A 6,fir R r A fn
Assessor's Map # 13 9 Parcel # 4�)- Zone
NAME, ADDRESS, & TEL & FAX # OF PERSON TO WHOM INQUIRIES SHOULD BE
DIRECTED: �t1N�S +AS�CF1IfM N ��LC, S7 ba,�L`F�3 7'U.A/BrrfR- an C�(oO
THIS APPLICATION IS FOR: (Check all that apply)
_1. Zone Change to (Public Hearing required)
_2. Subdivision/Resubdivision ✓&I-j M s--AJ
a. _ Subdivision Minor _ Major
b. _✓Resubdivision a/ Minor _ Major (Public Hearing Required)
c. _ Conditional Approval
d. _ Open Space Subdivision (Public Hearing Required)
_3 . Special Exception to Article (Public Hearing Required)
_4. Site Plan of Development
_5. General Plan of Development
_6. Earth Filling [Sec. 151 and/or Earth Removal [Sec. 141 (Public Hearing Req)
_7. Regulation Amendment: Zoning Subdivision
_8. Amendment to Town Plan of Development
_9. Temporary and Conditional Permit
_10 . Other (explain in detail) :
Applicant Property Owner _
(See reverse side for additional information)
TOWN OF SOUTH WINDSOR, CONNECTICUT D �
PLANNING AND ZONING COMMISSION
i
APPLICATION FORM
y i
i
Application No. ?(.n
DEC 9 1996 '
Date Received: 1 Z— /b- 1
Action/Public Hearing by: South Windsor
Receipt No. : 1 ► Planning & Zoning Commission
APPLICANT: ,`--ZoG Ou
ADDRESS: 34 Lj Aj ca,x) S -r A114AI Tic- CT 06 5�5-2
OWNER OF RECORD ON LAND RECORDS:
ADDRESS : 0J c
COMPLETE LOCATION OF PROPERTY: CAST S1Ckf A y�C ea,4V,
ASSESSOR'S
MAP# 1316 PARCEL# 4;Z- LOT# ZONE
NAME, ADDRESS, & TELEPHONE NUMBER OF PERSON TO WHOM INQUIRIES SHOULD BE
DIRECTED: SA,vDS f'�cG�'i Li H Ati1
l+s-?a A),!kf ! V TELEPHONE: (A�J 4aV l
THIS APPLICATION IS FOR: (Check all that apply) :
1 . Zone Change to (Public Hearing required) .
2 . Subdivision/Resubdivision. v VC/l/ /VT Al
a. Subdivision Minor Major
b. X Resubdivision .k Minor Major (Public Hearing Req. )
C . Conditional Approval
d. Open Space Subdivision (Public Hearing Required) 1
3 . Special Exception to Article (Public Hearing Required)
4 . Site Plan of Development .
5 . General Plan of Development.
6 . Earth Filling [Sec . 10 ] and/or Earth Removal [Sec . 9 ] (PH Req. )
7 . Regulation Amendment: Zoning Subdivision
8 . Amendment to Town Plan.
9 . Temporary and Conditional permit.
10 . Other (explain in detail) :
CONSULT PLANNING DEPARTMENT FOR FEE SCHEDULE. THIS APPLICATION MUST BE
SIGNED BY THE APPLICANT AND OWNER OF THE PROPERTY AND SUBMITTED IN
TRIPLICATE WITH ALL MAPS AND DOCUMENTS REQUIRED ON ATTACHED CHECKLIST,
ALL OF WHICH CONSTITUTE THE APPLICATION.
RSA---
Applicant
A.- Own!e r •�
i
•
COVEN MOUNTAIN THREE LOT RESUBDIVISION
1. Request for subdivision to create three building lots on an existing parcel
located on the easterly side of Abbe Road, northerly of Maskel Road, A-20
zone. The site acreage is 10.39 ac.. The applicant is proposing three frontage
lots and leaving the remaining 7.5 acres as "not a building lot". It appears that
all zoning requirements have been met.
2. This Commission recently approved this subdivision, however the applicant
has missed the filing deadline of the plans in the Town Clerk's office. This site
has been the subject of many previous applications. When this resubdivision
plan go on file in the Town Clerk's office, then the all previous subdivision
approvals will become null and void.
3. There are two new driveway cuts proposed onto Abbe Road. The two northern
most lots will have a shared driveway. All three driveways show a turnaround
as required in the regulations on a minor collector street.
4. The properties will be serviced by public water and public sewer. WPCA
approval has been received.
5. There are no 100 year flood-plain on the property. There are regulated wetlands
on the property. The applicant has appeared before the IWA/CC and has
received approval. One of the conditions of approval states that this approval
supersedes any previous wetlands approvals on the property.
6. With the previous approval, there was an approval condition placed regarding
the upgrading of drainage in Abbe Road. We would request the same approval
condition be placed on this application. (Existing storm drainage in Abbe
Road is inadequate. Additional stormwater runoff from new subdivision lots
will further overburden the system. Therefore, the applicant is required to
replace approximately 150 linear feet of 18" drainage pipe with 24" pipe. The
estimated cost of this improvement ($13,200) is to be placed by the developer
into an escrow account, to be utilized at such time as additional land behind
this subdivision is developed and more extensive drainage is required. If a
more extensive stormwater system us not installed in five years from the date
of subdivision approval, the escrow account funds shall be utilized to construct
the incremental stormwater improvement.)
If this application is approved, the Planning Dept. has no modifications to request:
Engineering Department is requesting that a drywell be placed with each
driveway.
March 12, 1997
CERTIFIED MAIL
Rene Veilleux
34 Lincoln Street
Niantic, CT 06357
Dear Mr. Veilleux:
Re: Appl #96-83P, Coven Mountain Resubdivision
We are pleased to advise you that the Planning & Zoning Commission voted on March 11, 1997 to
approve with modifications the above-referenced application for a Resubdivision of property to create 3
lots and remaining land to be known as "Coven Mountain" on property located on the easterly side of
Abbe Road and northerly of Maskel Road, A-20 zone as shown on plans prepared by Aeschliman Land
Surveying, Map No. 96055-1 and revised through January 6, 1997. This approval is subject to the
following modifications:
1. This approval is for 3 lots, numbered 1 through 3.
2. Drainage and construction for this subdivision is subject to the approval of the Town Engineer.
3. All lots shall be serviced by the Town of South Windsor sanitary sewer system and are subject to
the approval of the Water Pollution Control Authority.
4. Water shall be supplied to this subdivision by the public water.
5. This application is subject to the conditions of approval of the Inland Wetlands
Agency/Conservation Commission.
6. Prior to commencement of any site work, a preconstruction meeting must be held with Town Staff.
7. All plans used in the field by the developer must bear the stamp and authorized signature of the
Town of South Windsor.
8. All easements for conservation purposes, drainage or utilities, that may be required in connection
with the approval of this subdivision, must be submitted on standard Town easement form where
appropriate, to this Commission prior to filing the mylars and issuance of building permits. All
deeds for open space, public improvements and roadways must be submitted prior to request for
Town acceptance; all deeds must be in accordance with the policy for accepting deeds and must be
approved by the Engineering Department and Town Attorney.
9. Footing drains are required for each house. Prior to the building of any structure on a lot, a
topographic map, drawn to a scale of 1" = 40', shall be submitted for each lot in the subdivision,
showing proposed contours, elevations and the location of the footing drains. No building permits
will be issued until the proposed contours, floor elevations and location of footing drains have been
approved by the Town Engineer.
10. If, for any reason, finished grading and other individual lot site work is not completed, the Town
Engineer shall determine the amount of a cash bond to ensure final grading and site work. This
cash bond must be submitted prior to issuance of a Certificate of Occupancy.
11. Quantity estimates must be submitted to the Town Engineer (on the enclosed form) for the purpose
of determining subdivision bonding, and all bonds shall be posted prior to filing the plans.
If the developer chooses to submit a Letter of Credit for a one year term, in lieu of a surety bond,
said Letter of Credit must be renewed on a yearly basis until completion of the development. If a
new Letter of Credit has not been received within 30 days before the expiration date, the
Commission may, at its option, call the Letter of Credit it is holding.
12. A drainage assessment fee in the amount of$150 shall be submitted to this Commission.
13. No building permits will be issued until all modifications have been complied with, and the final
plans have been filed in the Town Clerk's office.
14. Existing storm drainage in Abbe Road is inadequate. Additional stormwater runoff from new
subdivision lots will further overburden the system. Therefore, the applicant is required to replace
approximately 150 linear feet of 18" drainage pipe with 24" pipe. The estimated cost of this
improvement ($13,200) is to be placed by the developer into an escrow account, to be utilized at
such time as the additional land behind this subdivision is developed and more extensive
stormwater drainage is required. If a more extensive stormwater system is not installed in five
years from the date of subdivision approval, the escrow account funds shall be utilized to construct
the incremental stormwater improvement.
15. A drywell is required for each driveway.
Black and white transparent mylars of Sheet 2 with the above modifications, together with three blueprint
copies of the entire set of plans must be submitted to this Commission within 30 days to be stamped and
signed. The letter of approval of this Commission, Inland Wetlands Agency/Conservation Commission
as well as WPCA must be reproduced on the mylars.
After the mylars have been signed by the commission, they will be returned to you for filing in the
Office of the Town Clerk by June 28, 1997. After filing these plans, a copy of the receipt must be
submitted to the Planning Department.
Very truly yours,
PLANNING & ZONING COMMISSION
Russell G. Levack, Chairman
FAC/pmm
Enclosures
cc: Town Engineer
Chief Building Official
Assessor
Superintendent of Pollution Control
Registrars
Fire Marshal
Business Manager, Board of Education
Aeschliman Land Surveying
�j
10 Srq
5
Vi a F'
m ` 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074
SOR•CO�r AREA CODE 860/644-2511
April 21, 1997
Mr. Rene Veilleux
34 Lincoln Street
Niantic, CT 06357
RE: Coven Mountain 3-Lot Resubdivision
Abbe Road
SOUTH WINDSOR, CT
Dear Mr. Veilleux:
The South Windsor Water Pollution Control Authority, at its regular meeting of April 15, 1997, gave
approval for the connection to the Town's sewerage system of a 3-lot residential resubdivision at Abbe
Road, as more specifically shown on Drawing entitled "Topographic and Sediment and Erosion
Control Plan - Coven Mountain Resubdivision -prepared for Maple Leaf Construction, South
Windsor, Connecticut" by Aeschliman Land Surveying, Glastonbury, Connecticut, Drawing No. 3 (of
4) dated 10-31-96, revised 12-3-96 and 1-6-97, and subject to the following conditions:
1. Technical approval of the Town Engineering Department.
2. Final Authority approval and acceptance of the sanitary sewerage connection will be given once
the sewer line has been installed and inspected by the Town staff, and based upon the written
verification of the Town staff that said sanitary sewer line was installed in substantial
conformance with the design plans previously approved by the Authority, and meeting all Town
regulations and appropriate technical specifications relating to sanitary sewer construction.
3. Approval is granted for the frontage of three building lots only, with action on all other lots to
be deferred until such time as the remaining property is developed.
4. Sewer assessments will be recalculated for the 3 lots.
5. This approval letter must be superimposed on the final approval plans.
Very truly yours,
r'
6
Joseph J. Carino, Chairman
Water Pollution Control Authority
JJC:rt
cc: Matthew Galligan, Town Manager
Michael J. Gantick, Director of Public Works
Jerry Iazzetta, Town Engineer
Marcia Banach,Director of Planning
John Collins, Chief Building Inspector
(OWN Sf4
. Town a)�e SotdA vf)u�
� v
mIC7 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
V sox-co�' AREA CODE 860/644-2511
August 14, 1997
Rene Veilleux CERTIFIED MAIL
P O. Box 613
South Windsor, CT 06074
Dear Mr. Veilleux:
Re: Appl #97-55P, Coven Mountain Resubdivision
We are pleased to advise you that the Planning &. Zoning Commission voted on August
14, 1997 to approve with modifications the above-referenced application for a
Resubdivision of property to create 3 lots and remaining land to be known as "Coven
Mountain" on property located on the easterly side of Abbe Road and northerly of
Maskel Road, A-20 zone as shown on plans prepared by Aeschliman Land Surveying,
Map. No. 96055-1 and revised through January 6, 1997. This approval is subject to
the following modifications:
1. This approval is for three (3) lots, number 1 through 3.
2. Drainage and construction for this subdivision is subject to the approval of the
Town Engineer.
3. All lots shall be served by the Town of South Windsor sanitary sewer system and
are subject to the approval of the Water Pollution Control Authority.
4. Water shall be supplied to this subdivision by public water.
5. This application is subject to the conditions of approval of the Inland Wetlands
Agency/Conservation Commission.
6. Prior to commencement of any site work, a preconstruction meeting must be held
with Town Staff.
7. All plans used in the field by the developer must bear the stamp and authorized
signature of the Town of South Windsor.
8. All easements for conservation purposes, drainage or utilities, that may be
required in connection with the approval of this subdivision, must be submitted
on standard Town easement form where appropriate, to this Commission prior to
filing the mylars and issuance of building permits. All deeds for open space,
public improvements and roadways must be submitted prior to request for Town
acceptance; all deeds must be in accordance with the policy for accepting deeds
and must be approved by the Engineering Department and Town Attorney.
9. Footing drains are required for each house. Prior to the building of any structure
on a lot, a topographic map, drawn to a scale of 1" = 40', shall be submitted for
each lot in the subdivision, showing proposed contours, elevations and the
location of the footing drains. No building permits will be issued until the
proposed contours, floor elevations and location of footing drains have been
approved by the Town Engineer.
10. If, for any reason, finished grading and other individual lot site work is not
completed, the Town Engineering shall determine the amount c a cash bond to
ensure final grading and site work. This cash bond must be submitted prior to
issuance of a Certificate of Occupancy.
11. Quantity estimates must be submitted to the Town Engineer (on the enclosed
form) for the purpose of determining subdivision bonding, and all bonds shall be
posted prior to filing the plans.
If the developer chooses to submit a Letter of Credit for a one year term, in lieu of
a surety bond, said Letter of Credit must be renewed on a yearly basis until
completion of the development. If a new Letter of Credit has not been received
within 30 days before the expiration date, the Commission may, at its option, call
the Letter of Credit it is holding.
12. No building �)ermits will be issued until all modifications have been complied with,
and the final plans have been filed in the Town Clerk's office.
13. Existing storm drainage in Abbe Road in inadequate. Additional stormwater
runoff from new subdivision lots will further overburden the system. Therefore,
the applicant is required to replace approximately 150 linear feet of 18" drainage
pipe with 24" pipe. The estimated cost of this improvement ($13,200) is to be
placed by the developer into an escrow account, to be utilized at such time as the
additional land behind this subdivision is developed and more extensive
stormwater drainage is required. If a more extensive stormwater system is not
installed in five years from the date of subdivision approval, the escrow account
funds shall be utilized to construct the incremental stormwater improvement.
14. A drywell is required for each driveway.
Black and white transparent mylars of sheet #2 with the above modifications, together
with three blueprint copies of the entire set of plans must be submitted to this
Commission within 30 days to be stamped and signed. The letter of approval of this
r
Commission , Inland Wetlands Agency/Conservation Commission as well as WPCA
must be reproduced on the mylars.
After the mylars have been signed by the Commission, they will be returned to you for
filing in the office of the Town Clerk by November 29, 1997. After filing these plans, a
copy of the receipt must be submitted to the Planning Department.
Very truly yours,
P ING & ZONING COMMISSION
R ssell G. Levack, Chairman
RGL/pmm
Enclosures
Cc: Town Engineer
Chief Building Official
Assessor
Superintendent of Pollution Control
Registrars
Fire Marshal
Business Manager, Board of Education
Aeschliman Land Surveying
V n
CE
LAW OFFICES I YL L-1
CUMMINGS AND LANZA,L.L.C. e
1610 ELLINGTON ROAD AUG 1998
POST OFFICE BOX 667
SOUTH WINDSOR,CONN.06074-0667 S � �' aR ��Bi►�ita ,;.
(860)644-3473 J 8 Bi
FAX(860)644-3347
HAROLD R.CUMMINGS EDWARD R.KUEHN
MICHAEL J.LANZA OF COUNSEL
VINCENT J.PURNHAGEN
August 10, 1998
Michelle Liepe,Assistant Town Planner
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT 06074
RE: Rene Veilleux Subdivision Abbe Road
Dear Michelle:
In accordance with your recent telephone conversation with Attorney Richard Sellman enclosed
please find a duly executed deed from Rene Veilleux to the Town of South Windsor of all his
interest in that portion of Abbe Road which fronts the Lots on the Coven Mountain
Resubdivision plan.
I'm transmitting this deed for you to hold in escrow in accordance with theTown of South
Windsor,Planning and Zoning Subdivision Regulations.
Please give me a call if you have any questions with regards to the enclosed.
Sincere yours,
Harol ummingS Q�v
HRCImf
Enclosure �\
cc: Richard Sellman,Esq.
a f:
i h ?`
c
TOWN OF SOUTH WINDSOR )
STAFF SITE CHANGE
E FOR SITE & SUBDIVISIONY�
G`E,NERAL: /
CHANGE ORDER CONTACT PERSON Phone No '3 --
Address 339 Abbm kd,
Site Name Covej f nutuTp 1 pt) P&Z No.
Owner_y1 A Y2.,Sj kJ Phone No. 4qj(/
Contractor
Signature of Owner ` ' Date YL10 19 g
Signature of Design Engr. Dater
CHAMdE: (Describe location and nature of change. - Include
Four (4f copies of plan/profile of Change. )
1"�r4t a 1P' jf)W ggc )11ouL2 3 r-6& ScjKtjiuja+ L3fl=f.P1e. )ik!er St r
' b as) ^J!k I•kJn ha t je —i Le-a &
Reason for Change: (Why is change required) ,.
APPROVALS: (As Required)
Dir.. Of Planning ftAtAtl 644 Date° '
s Town Engineer Date: 1'. •'
Dir. of Public r Date:
Other: Date:- t7 44I .
STIFF 0 E : t
White - Town Engineer Yellow - Applicant `
Pink Director of Planning Goldenrod Engineering Department