HomeMy WebLinkAboutResubdivision/Open Space/Conservation TOWN OF SOUTH WINDSOR
INLAND WETLANDS, WATERCOURSES AND CONSERVATIOrAPP�T( A ION
1996
APPLICATION # - 7�( / DATE RECEIVED ��/� d c ZONE AA-330
indsor
INSTRUCTIONS *&*J1tb WETLANDS AGENCY/
CONSL iAUM COMMIssM
1. THE APPLICATION, MAP AND PLANS MUST BE SUBMITTED IN DUPLICATE, TOGETHER WITH THE
FEE SET FORTH IN THE INLAND WETLANDS, WATERCOURSES AND CONSERVATION REGULATIONS,
TOWN OF SOUTH WINDSOR. (SEE REGULATIONS, SECTION VII).
2. THE SOUTH WINDSOR INLAND WETLANDS, WATERCOURSES AND CONSERVATION REGULATIONS
SHOULD BE REVIEWED WITH RESPECT TO THE STANDARDS AND CRITERIA FOR APPLICATION
EVALUATION. (SEE REGULATIONS, SECTIONS VII X).
3. THE APPLICANT UNDERSTANDS THAT THIS APPLICATION IS TO BE CONSIDERED COMPLETE ONLY
WHEN ALL INFORMATION AND DOCUMENTS REQUIRED BY THE AGENCY HAVE BEEN SUBMITTED.
THE APPLICANT SHALL ALSO COMPLETE THE STATE FILING FORM.
APPLICANT'S NAME: JMJ Construction Company, Inc.
ADDRESS: 658 Ellington Road, South Windsor, CT 06074
PHONE: (HOME) (WORK) 282-062A
B. LEGAL OWNER'S NAME: Jean Marc Jacques
ADDRESS: SaTTIE'
PHONE: (HOME) (WORK) 282-0628
(List additional owners, addresses, and phone numbers on back of application)
C. IF THE APPLICANT IS NOT THE OWNER OF THE SUBJECT PROPERTY, A LETTER BY THE PROPERTY
OWNER(S) AUTHORIZING THE PROPOSED REGULATED ACTIVITY SET FORTH IN THE APPLICATION
MUST ACCOMPANY THIS FORM AND WILL BE PART OF THE APPLICATION.
D. PROJECT NAME (if any)
Deming Hill Estates (Sections 1 & 2 / 34 lots)
1. Contact Person (if further information is needed).
860-291-8755
Peter R. DeMallie, Design Professionals, Inc. 165 South Satellite Rd. , S. Windsor, CT
E. THE GEOGRAPHICAL LOCATION OF THE PROPERTY WHICH IS TO BE AFFECTED BY THE PROPOSED
REGULATED ACTIVITIES INCLUDING A DESCRIPTION OF THE LAND IN SUFFICIENT DETAIL TO
ALLOW IDENTIFICATION OF THE PROPERTY ON THE.INLAND WETLAND AND WATERCOURSES MAP.
ASSESSOR'S MAP #28 PARCEL 1 & 2
North of Manchester Town Line, south of Deming Street, east of Ridge Road.
F. NAMES OF ALL ABUTTING PROPERTY OWNERS: (USE SEPARATE SHEET IF NECESSARY)
see attached sheet
G. HAVE YOU NOTIFIED ALL ABUTTING PROPERTY OWNERS BY CERTIFIED LETTER THAT AN
APPLICATION IS PENDING BEFORE THE AGENCY?
Yes ** (You are required to supply a copy of the letter with the list of the names of the abutters).**
copy of letter is attached
H. PURPOSE AND DESCRIPTION OF ALL PROPOSED REGULATED ACTIVITY(S) INCLUDING AMOUNT
AND TYPES OF FILL AND THE TIME ELEMENT INVOLVED:
Requesting inland wetlands and conservation plan approval for a single family open
space subdivision with associated streets, gradiW. ut' j ties, sedimentation basins,
detention in_ homes,, and walking trails Anticipated time element is two or three
cnnstnietion seasons_ PrinnsP to create 7,200_ sq_ ft_ _ 7 a ._) of wetlands (see back):
I. A CLASS A-2 MAP OF THE PROPERTY DRAWN TO 1 " = 40', SHOWING THE AREA TO BE
DEVELOPED, EXTENT OF THE WETLANDS AND WATERCOURSES AFFECTED, TOPOGRAPHY,
EXISTING AND PROPOSED ACTIVITIES AND NAMES AND LOCATIONS OF ADJACENT PROPERTY
OWNERS MUST BE SUBMITTED.
J. ACREAGE OF WETLANDS AND WATERCOURSES TO BE ALTERED: 5 acreF or 6,720 sa. ft.*
K. ACREAGE OF WETLANDS AND WATERCOURSES TO BE CREATED: 0.17 acre f or 7,200 s g. ft.**
L. LINEAL FEET OF PROPOSED STREAM ALTERATION: 68 lineal feet of farmer's ditch, which will
be restored as a ditch.
M. TOTAL LAND AREA OF PROJECT AND PERCENTAGE WHICH IS WETLANDS:
1 Or)_23 acres 12 4 % wetlands
N. IDENTIFY ALL OTHER PERMITS OR APPROVALS THAT HAVE BEEN ISSUED, APPLIED FOR, OR
REQUIRED WITH RESPECT TO THE PROPOSED ACTIVITY SET FORTH IN THIS APPLICATION. (These
may include but not be limited to,-local Planning & Zoning, Zoning Board of Appeals, D.E.P., F.E.M.A.,
D.O.T., The Army Corps of Engineers, and any other State, Local or Federal Permits.)
PZC subdivision; WPCA; Corps; DEP.
0. THE APPLICANT (OR DESIGNATED REPRESENTATIVE) HEREBY ATTESTS THAT A SIGN WILL BE
POSTED AT THE FOLLOWING LOCATION(S)
As directed by Town staff.
by Tl-si= Pro 1s Tn�_ NAME peter DeMallie
ON OR BEFORE TH F LLOWING DATE: As di.r�t�h= Town staff_
SIGNATURE: )
eter R. Delallie
THESE SIGNS MUST BE DISPLAYED CONTINUOUSLY FOR AT LEAST TEN 00) DAYS PRIOR TO
SCHEDULED MEETING (See Regulations, Section 7.3a).
* Most of this area to remain wetlands
** This computation does not include disturbed wetlands which will remain wetlands.
THE UNDERSIGNED HEREBY APPLIES FOR THE REGULATED ACTIVITIES LISTED IN PARAGRAPH H
ABOVE, FOR A INLAND WETLANDS, WATERCOURSES AND CONSERVATION PERMIT FOR THE
PROPERTY DESCRIBED HEREIN AND CONFIRMS THAT;
1. HE IS FAMILIAR WITH THE CURRENTLY EFFECTIVE INLAND WETLAND, WATERCOURSES AND
CONSERVATION REGULATIONS OF THE TOWN OF SOUTH WINDSOR.
2. SHE/HE UNDERSTANDS THAT AT ANY TIME DURING THE REVIEW PERIOD, THE AGENCY MAY
REQUIRE THE APPLICANT TO PROVIDE MORE INFORMATION ABOUT THE WETLANDS AND/OR
WATERCOURSES IN QUESTION AND/OR ANY PROPOSED ACTIVITY.
3. ALL INFORMATION SUBMITTED IN THE APPLICATION FOR REVIEW SHALL BE CONSIDERED
FACTUAL, OR IN THE CASE OF ANTICIPATED ACTIVITY, BINDING. A KNOWING FAILURE OF THE
APPLICANT OR ANY OF HER/HIS AGENTS TO PROVIDE CORRECT INFORMATION, OR PERFORMANCE
EXCEEDING THE LEVELS OF ACTIVITY ANTICIPATED, SHALL BE SUFFICIENT GROUNDS FOR
REVOCATION OF ANY PERMIT UNDER THESE REGULATIONS.
4. BY MAKING THIS APPLICATION, THE APPLICANT GIVES PERMISSION TO THE INLAND WETLAND,
WATERCOURSES AND CONSERVATION COMMISSION MEMBERS AND/OR ITS REPRESENTATIVE TO
ENTER THE PORTIONS OF THE PREMISES WHICH ARE SUBJECT OF THE APPLICATION FOR THE
PURPOSE OF INSPECTION AND INVESTIGATION AND OTHERWISE EVALUATING THE MERITS OF THE
APPLICATION BOTH BEFORE AND AFTER A FINAL DECISION HAS BEEN ISSUED.
Jean Mar acques
Signafiu a of Owner of roperty Date /
Peter R. DeMallie/ Agent for Owner
JMJ C traction Company, Inc.
Signa ure of Applicant Date
Peter R. DeMallie/ Agent for Owner
416VL�e � 96-9zP
�.o bo�o �-�°�--�.�
v tw-t-k�A&
G1
z
Abutters:
Map # Lot# Name
Town of South Windsor
18 4 Kristopher&Kevin Musumano, 65 Dewill Dr., Bristol, CT 06010-671
18 5 Kristopher&Kevin Musumano, 65 Dewill Dr., Bristol, CT 06010-671
27 6 Helmar&Beverly G. Wolf, 99 Ridge Road, South Windsor, CT 06074
27 7 Clark Realty Inc., 658 Ellington Road, South Windsor, CT 06074
27 8 Earl A. &Barbara H. Reichle, 247 Abbe Road, South Windsor, CT 06074
27 9 William J. Krawski, 130 Buckland Road, South Windsor, CT 06074
28 4 Allan D. Thomas, 945 Main Street, Manchester, CT 06040
28 5 Allan D. Thomas, 945 Main Street, Manchester, CT 06040
28 6 Allan D. Thomas, 945 Main Street, Manchester, CT 06040
28 7 Allan D. Thomas, 945 Main Street, Manchester, CT 06040
28 8 Allan D. Thomas, 945 Main Street, Manchester, CT 06040
28 9 Allan D. Thomas, 945 Main Street, Manchester, CT 06040
28 10 Allan D. Thomas, 945 Main Street, Manchester, CT 06040
28 11 Allan D. Thomas, 945 Main Street, Manchester, CT 06040
28 12 Allan D. Thomas, 945 Main Street, Manchester, CT 06040
39 47 Thomas M. &Margaret W. Burgess, 36 Ridge Road, South Windsor, CT 06074
39 48 Thomas M. Burgess, 457 Cricket Circle, Vernon, CT 06066
Town of Manchester
51 465 Avalon Properties, Inc. (465 Buckland Hills Drive), 5904 Richmond Hwy, South
Alexandria, VA 22303
51 429 V Manchester Land Conservation,(429 Buckland Hills Drive), 20 Hartford Rd.
Manchester, CT 06040
51 345 Avalon Properties, Inc. (345 Buckland Hills Drive), 5904 Richmond Hwy, South
Alexandria, VA 22303
143 209V Town of Manchester, (209 Buckland Hills Drive), 41 Center St. Manchester, CT
06040
143 345 Avalon Properties, Inc. (345 Buckland Hills Drive), 5904 Richmond Hwy, South
Alexandria, VA 22303
DESIGN PROFESSIONALS, INC.
planners civil engineers surveyors
Transmitted via certified mail
November 4, 1996
Dear Current Abutting Property Owner:
Re: Application of JMJ Construction Company, Inc.
Inland Wetlands Agency/Conservation Commission
Deming Hi11 Estates (Sections I & 2)
South Windsor, Connecticut
DPI Project No. 90-514
Please be advised that our client, JMJ Construction Company, has made application to the
South Windsor Inland Wetlands Agency/Conservation Commission. For further information,
please contact the South Windsor Planning Department at the South Windsor Town Hall, Tel.
644-2511 ext. 253 or 229. Thank you.
Sincerely,
Design Pro ionals, Inc.
By:
Peter R. DeMallie
Principal
cc: Town of South Windsor Planning Department/J. Folger
Jean Marc Jacques
SOWN SN
O
m fi 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074
�rNdSOR co��,� AREA CODE 860/644-251 1
November 6, 1996
Town Clerk
Town of Manchester
41 Center Street CERTIFIED MAIL
Manchester, CT 06040
Dear Madam/Sir:
Re: Notice to Adjoining Municipalities
In accordance with Connecticut General Statutes concerning notification to municipalities regarding
Inland Wetlands Agency/Conservation Commission applications that could affect the abutting town, we
hereby notify you of application#96-72P, JMJ Construction Co - IWA/CC permit for a single family
open space subdivision with associated streets, grading, utilities, sedimentation basins, detention basins,
homes, and walking trails on± 105 acres to be known as "Deming Hill Estates" and located on the
southerly side of Deming Street and westerly of Slater Street, AA-30 zone.
This application is tentatively scheduled for November 20, 1996.
If you have any questions, please feel free to contact the Planning Department at 644-2511, ext. 253.
Very truly yours,
N �
ie Pfrey H. (' lger
Zoning/Wet ands Enforcement Officer
JHF/pmm
t
MEMORANDUM
To: South Windsor Inland Wetland/Conservation Commission.
From: Jeffi-ey H. Folger-Zoning/Wetland Enforcement Officer
Date: November 13, 1996
Re: Review of the proposed Deming Hill Estates Subdivision, Deming Road. Plans dated
10/10/96.
The project is to create a 34 lot single family subdivision. Proposed regulated activities
include locating sediment and detention basins within the buffer areas and in wetland
areas. Also the enlargement of an existing irrigation pond for the purpose of stormwater
detention, and the construction of a hiking trail system along the perimeter of a wetland
area. The proposed disturbance to wetlands will be approximately 7000 sgft or 0.16 acre.
Wetland created equals approximately 7200 sgft or 0.17 acre.
Site: Approximately 15% of the site is located in the Podunk River watershed. The
remainder site is located in the Hockanum River watershed. Presently, 75% of the site is
being used as an agricultural field with a combination of tilled field and hayland. Relief on
the site is flat to gently sloping to the southeast.
1.
The approximately 23 acre wetland in the southeast portion of the property consists of
very poorly drained soils. This area shows little evidence of recent disturbance, although
there are remnant farm roads through some of the dryer areas in the west and the east.
The vegetation types in this area are forested and shrub/scrub. With some areas of wet
meadows. There is a moderate sized pond in this area(1/4 acre) which provides some
good open water habitat. All in all some good quality wildlife habitat. This wetland
drains into Manchester to the south into the Buckland Mall detention system. The wetland
boundaries appear to be accurate.
Major functions of this wetland area would be flood storage, nutrient and sediment
trapping, wildlife habitat, and some groundwater recharge. The esthetic values in this area
are in my opinion high.
Three proposed stormwater outfalls are planned to discharge into the wetland along the
north and west.
The structures planned are designed more for water quality than water quantity.
Detention and storage are limited with utilization of the large wetland for stormwater
attenuation. Trapping of sediments, and nutrient and heavy metal filtering through the use
of broad flat spreaders is planned outside of the northern boundary of the wetland. It is
proposed to be a dry structure with no long term standing water present. Special attention
must be paid to the grading during installation for this structure to work as planned. The
structure at the west of this wetland is more standard in configuration but with a broad
spreader at the outflow. This is proposed to be a wet bottom with wetland plantings
incorporated in the design.
This area is proposed to be donated as open space. The open space is planning at this
time to be donated to the South Windsor Land Trust. Included in the proposed site plan,
is the installation of a trail system around the 23 acre piece. The trail would be installed
by the developer and ultimately maintained by the Land Trust.
2.
The second wetland area with any proposed disturbance is located along the western
boundary of the property south east of the Ridge Road cul-de-sac. The wetland consists
of a pond approximately 6800 sgft in size. The pond appears to be man made with
earthen piles around its edge, probably from material excavated from the pond. The area
is stable and appears to be functioning as an ecosystem. Aquatic plants are present along
the pond edge and on the bottom and insect larva and adults are present in the water and
outside of the pond. The proposed plan is to enlarge the existing pond and install an
outflow structure to utilize this are as a retention/detention basin. Specifics of the design
would include a rip-rap berm to act as a sediment trap and wetland plantings
3.
The third wetland area is located on the eastern portion of the property which is not
proposed to be developed at this time but long range planning does indicate that there will
be development near it in the future. It is an area that has been cultivated in the past
during dry years. Its low position on the landscape and underlying shallow bedrock holds
water during wet years.
Impacts: The majority of the upland area has up until last year been used for agriculture
purposes. Most recently, the front portion has been in row crops (corn) and the rear
portion has been either fallow or in hay.
The actual work planned to be done in the wetlands themselves should not have long term
negative affects to the wetland areas involved. The ecosystem in the pond will be
disrupted during the enlargement of the pond and the installation of an outflow structure.
The resulting structure should be capable of providing the same habitat as the existing
pond. The installation of the proposed retention basin on the western edge of the large
wetland area will provide a more diverse plant community than what is already there.
The major environmental concern is stormwater quality to the large wetland area in the
south. Long term plans call for a minimum of 96 homes to exist on this site. Stormwater
borne nutrients, heavy metals and pathogens have the potential of negatively impacting the
wetland area.
I feel that the construction of the a trail system will have minimal impact on the wetland
system when weighed against the recreational and educational benefits.
The areas of proposed disturbance are mapped as Narragansett Silt Loam 0-3%, and 3-
8%. This soil type has an erosion potential listed as severe in the Hartford County Soil
Survey. The gently sloping contours reduce the likelihood of sediment impacts during
construction from gross particles. The fine particles and reddish color will not be stopped
by silt fence. Temporary shallow sediment basins will be effective to prevent sediment
migration.
DuBEAU,RYAN,BOYAN& BAKER,P.C.
ATTORNEYS AT LAW
38 Park Street
P.O.Bog 568
Rockville,CT 06066-0568
(860)875-3375
Atherton B.Ryan Fax(860)872-3862
Susan Boyan
George A.Baker
Robert C.DuBeau
November 20, 1996
Elizabeth A. Warren, Chairperson
South Windsor Inland Wetlands Agency/Conservation Commission
South Windsor Town Hall
1540 Sullivan Avenue
South Windsor, CT 06074
RE: JMJ Construction Company, Inc. and Jean-Marc Jacques
Project No. 90-514
Dear Mrs. Warren,
I represent JMJ Construction Company, Inc. and its principal, Jean-Marc Jacques,
in connection with the above application before your Commission. Please accept this
letter as authorization of and appointment by both JMJ Construction Company,Inc and
Jean Marc Jacques, as well as the undersigned, of Mr. Peter DeMallie of Design
Professionals, Inc., 165 South Satellite Road, South Windsor, CT 06074 as their agent for
the purpose of all communications, oral and written, in connection with the processing of
this application.
Very truly yours,
DuBEAU, RYAN, BOYAN&BAKER, P.C.
Atherton B. Zan
ABR/msw
cc: Mr. Jean Marc Jacques
Mr. Peter DeMallie
DocumenU
4
bt'o,,A STEPHEN T CASSANO.MAYOR
Q�\�� �'�s����,. ToW 1` of Manch7estef MARYAJOSEPFt D.NEGRt,SECRETARY
z \��♦ ��y� U 41 Center Street•P.O. Box 191 DIRECTORS
TIAIOTHYH.BECKER
Manchester, Connecticut 06045-0191 ADELINO M.COELHO
JOSH Al.HOWROI'D
l u c75 JOAN E.HUMPHREY
JAMES E.MORANCEY
RICtIARD.l.SAR1'UR,GENERAL MANAGER CLIFTON E.THOAIPSON
December 4, 1996
1V1r. C. Fred Shaw DEC
Assistant Director of Public Works
Town of South Windsor South Windsor
1 540 Sullivan Avenue INLAND WETLANDS AGENCY1
South Windsor, CT 06074 CONSERVATION COMMISSION
RE: Application No. 96-72P
Deming Hill Estates
Deming Street, South Windsor
Connection to Manchester Sanitary Sewer System
Dear Mr. Shaw:
1
We have received notification that the above-referenced application is before the South Windsor
Planning and Zoning Commission. Having reviewed the plans for the project, it appears that it
will be necessary to invoke the Inter-Town Agreement for sanitary sewer service in order to
serve portions of the site. Before we can approve the connection to our system, we will need the
following information:
1. Show the boundary of the area designated by the Agreement to flow to
Manchester. This should be shown on Sheet No. 24.
2. Provide calculations showing projected flows from the area indicated above.
Flow information should include infiltration, average daily flow and peak flow.
3. The flows should be broken down so as to indicate what flows will enter our
system at specific points. The projected flow associated with Sections I and 11
should be identified.
The following comments relate specifically to the plans:
1. A manhole should be located at the Townline. This manhole will be owned and
maintained by South Windsor and represent the southerly-most portion of the
South Windsor system. The sanitary sewer south of this manhole will be owned
and maintained by Manchester.
An Equal Opportunit ,Etnp1Q1,er
2. The above revision can be accomplished either by moving SMH 10 to the
Townline (i.e., new alignment/easement) or by adding an additional manhole.
We have no preference.
The following comments relate to the administrative aspects:
1. All water services, either public or private(i.e., wells) shall be metered. South
Windsor shall be responsible for providing metered consumption figures to
Manchester for purposes of billing sanitary sewer use. These figures shall be
reported in accordance with the currently established procedures.
2. All other procedures relative to plan approval, construction, inspection, collection
and transmittal of outlet charges, etc. shall be in accordance with the Inter-Town
Agreement.
Please contact me at your convenience if you have any questions.
Very truly yours,
Richard A. Staye, Utility Engineer
Water and Sewer Department
RAS:ms:ltrs:demestat
cc: Robert J. Young, Water and Sewer Administrator
Lynne Pike-DiSanto, AICP, Senior Planner
Peter R. DeMallie, Design Professionals
Michele R. Lipe, AICP, Assistant Director of Planning
Jeffrey H. Folger, Zoning/Wetlands Officer
Kurt/File
JAN-08-97 WED 16 :04 DESIGN PROFESSIONALS INC 860 291 8757 P. 02
JIGHLAND SOILS LLC
t
9,
December. 10, 1996
Mr. Peter DeMallie
Design Profesai.onals Inc
165' South OdLellite' Roaci
South Windsor CT 06074
1• 't1;,
{
MILL E i�' � ••' � •;�i'„. °. RE: DEMZNG STA'i'HS • ' •
IDEMIN07 STREET
' �jS:;t" '':;aY•t`;et, SOUTH WINDSOR CT
P"{ 4.4::Dear Peter:
I have reviewed the la �
ak�o n prepared by your office for i .
i yif:n VQ7refer0raced project. used the
:r�.tR..,. trxa my review' T have fothe'
i » .,g ';:,r ',?;;• i pxeaentatioal of and
re the field delineated wetlands to to be , y
s1.1betan i t].$].,�y correct. •.�x:v:.�•:
If you have any questions lease
��3 : �: „ „, •,.,, • P Gall m�► at 74��5$6s. .
Very 'truly Yours,
X hn P. l ann i
' Professional. Soil scientist
�', P.O. Box 337,, Storrs, Connecticut 06268 • (243) 742.5868
t
SOWN Sfq<
Town o-PSouth `11,'
s 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
AREA CODE 860/644-251 1
yOSOR,COS
Date: December 12, 1996
To: Peter DeMallie -Design Professionals
165 South Satellite Road
South Windsor, CT 06074
From: Jeffrey H. Folger
Zoning/Wetland Officer
Town of South Windsor
Re: Review of Deming Hill Estates Subdivision -Plans dated 10/10/96.
I have reviewed the site plans for the proposed Deming Hill Estates subdivision with the following
comments:
1. A map illustrating the drainage areas should be included with the hydrology report. I would like
to know the pre and post development affect stormwater drainage has on the 15" pipe present
in the old farm road in the southeastern section of the site.
2. The cultivated portion of the site does not have a vegetative cover present. Areas not
associated with the present proposal need to be seeded with a permanent grass cover to reduce
potential sediment impacts to proposed structures. The linear sediment basin needs to have silt
fence installed to the north to protect it from unnecessary sediment migration from the open
portion of the site. These soils have a high silt content and a reddish color, turbid water filtering
through the silt fence will be a problem. Excavated temporary sediment structures may be
necessary to prevent suspended sediments from impacting wetland areas.
3. The detention and sediment structures should be constructed prior to the construction of the
road. The current plan narrative shows the opposite in steps 7 and 8 in section I and steps 5 and
6 in section IL
4. A detail and cross section of the linear sediment basin should be provided on the plans.
5. The division of the individual pages of the plans is such that two of the three proposed
stormwater structures do not appear in their entirety on one page. Please show all proposed
structures as either an entire 20 or 40 scale illustration. By the same token, the proposed trail
system should also appear on a 100 scale single sheet.
6. Erosion controls should be placed at the proposed outfall of the existing irrigation pond
7. The entire road frontage along Deming Road is open to potential access by construction
equipment. Construction fencing should be installed along the frontage except where
equipment is planned to enter. This will minimize the likelihood of sediment being tracked on
the road by exiting equipment.
8. Details of the proposed trails, and proposed plantings associated with the sediment and
retention basins are also needed
cc. Town Engineer
Town Planner
IWA/CC
1OW N SC4
Town ale sotdA Vnd�lat
y 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
�f AFL
tiaSaR Co AREA CODE 860/644-2511
Date: December 18, 1996
To: Peter DeMallie - Design Professionals
165 South Satellite Road
South Windsor, CT 06074
From: Jeffrey H. Folger
Zoning/Wetland Officer
Town of South Windsor
Re: Review of Deming Hill Estates Subdivision -Plans dated 10/10/96.
I have received the drainage area map for the proposed Deming Hill Estates subdivision as discussed with
Jim LeClair earlier today, these are some additional comments:
1. The outlet to the proposed detention basin on lot#13 should have plantings planned in the
existing channel to reduce the likelihood of erosive scour of water exiting the level spreader.
The plantings should start at the spreader and extend to the property line.
2. Site#9 on the drainage area map shows an increase in the velocity of water exiting the pond.
This would require outlet protection to be designed at this point to reduce erosive impacts of
the flowing water. In addition, very little would be required to increase the detention time of
stormwater within the proposed sediment basin adjacent to site#3. This would further reduce
expected flows to the pond.
cc. Town Engineer
Town Planner
IWA/CC
MEMO
From: Elizabeth A. Warren
Chairman, IWA/CC
To: Russell G. Levack, Chairman
PZC
Date: January 6, 1997
Subject: Appl #96-72P, Deming Heights/JMJ Construction Company
The South Windsor Conservation Commission acting in its advisory capacity have the following
comments on the proposed subdivision:
Concern about groundwater protection during and after construction of the proposed 97 home
subdivision located southerly of Deming Street and westerly of Slater Street associated with any
blasting activities.
Concern was also expressed regarding the wildlife that is located in this area. The Conservation
Commission is expecting a report by the applicant's consultant on January 22nd. For this reason'
we would request that the PZC not close its hearing on the 14th so they may receive input from
IWA/CC on the information in that report.
memo....memo....memo....memo....memo....memo....memo....memo....memo
01/07/97 TUE 10:14 FAX 860 242 8587 PDS ENG A CONSTRUCTION Q 001
Connecticut Environmental Engineering Services, LLC
107 (old Windsor Road 0 Bloomfield, CT 06002
Phone: 860-242-6429 * Fax: 860-242-8587
FAX TRANSMISSION
To: PP.ter allie
Je�Faorlcgeriacques
_Je
Fax: 291-8757; 644-3781; 528-7889
From:—Donald Dobay
Date: January 7, 1997 Time:
Number of Pages: This cover + 9 pages.
If there are any problems, please call at 860--242-6429 or 242-8586.
Our FAX number for return transmissions is 860-242-8587.
Report on analysis of water in pond for the Deming Hill Estates
project as requested.
Call if there are any questions.
01/07/97 TUE 10:15 FAX 860 242 8587 PDS ENG.& CONSTRUCTION Q 002
Connecticut Environmental Engineering Services, LLC
107 Old Windsor Road 0 Bloomfield, CT 06002
Phone: 860-242-6429 • Fax: 860-242-858'►
January 6, 1997
Mr. Peter DeMallie
Design Professionals
165 South Satellite Road
South Windsor, Connecticut 06074
Re: Deming Hill Estates
Analysis of Pond Water
Dear Peter:
As requested by you, I sampled water from a small pond east of the
end of Ridge Road and had it tested as suggested kky the Inland
Wetlands Agency for copper and herbicides.
Location
I found the pond by parking just beyond the cul de sac at the end
of Ridge Road and following a small stream a short distance east.
This was south of a Christmas tree farm and a short distance from
the driveway to the house of Helmar Wolf. The eater had no
vegetation growing, however, this situation does not seem unusual
to me at this season. A grab sample was collected ::n containers
supplied by the analytical laboratory. This was delivered directly
to the Phoenix Environmental Laboratory, using Chain of Custody
protocol. See Appendix A.
Analysis
My understanding is that the Inland Wetlands Commi&sion desired
analysis of the copper level and determination of possible
herbicides. Accordingly, the samples were analyzed for total
copper by Inductively Coupled Plasma Method E200.7, and the
chlorinated herbicides by EPA Gas Chromatography Miathod 8150.
Phoenix Labe are certified by the State as qualified to perform
these analyses.
Results
The finding is that no copper is detectable. The test is extremely
sensitive and is capable of determining 1 part per billion.
No herbicide was detectable. Again, the method Is extremely
sensitive. The limit of detection differs with the individual
01/07/97 TUE 10:16 FAX 860 242 8587 PDS ENG.& CONSTRUCTION 11003
herbicide and ranges from 0. 2 parts per billion fo:c 1,4,5-T and
Silvex to 5 parts per billion for Dalapon.
The full report including Quality Control verificaticon is attached
in Appendix B.
These results have been discussed with Jeff Folger. If you have
any questions, please call.
Very truly *ours,
Connecticut Environmen
� ering Services, LLC
Dr. Donald 6. Dobay, ko.104t r
President
cc: Jeffrey. H. Folger - -Windsor Inland Wetlands Agency
Jean Marc Jacques
01/07/97 TUE 10:16 FAX 860 242 8587 PDS ENG.& CONSTRUCTION 2004
Appendix A
Chain of Custody Form
Environmental laabomtorles, lnC. CHAIN OF CUSTODY RECORD o
P HW
Nix . 587 East Middle Turnpike, P.O. Box 418, Manchester. Cr 06040
Tel. (203)645-1102 Fax (203)645-0823 DATE RCYD: v
Customer: , rccl Project P.O.
Address ZD7 Repo tTo: 7r• DOA Phone#: ( ) 2V4 —GYx'J o
I nvoicc To: ZV2-O'S8 7 y
C116fit 5atiiOle - Information - Identificatlon ftnalysls Requested
1
Samplers Signature Date
ry
ca
Item Customers O � PHOENIX
# Sam
le Ident -Matrix Date Time �ti `' ti �'
P G V ti 5A
t fwr tit P/, Y6040
b
d
z
z
c
z
iieua if Reii,nqJuisimd U Acee mu U : l3alC. i HIM. l Ult1I►PC7115:
Standard lab turnaround is 10 working days. Accelerated turnarounds are always
vaillable. Check with office on prevailing surcharge. ACCELERATED TURN-
ROUND TIME REQUESTED: 1 _2 3 �4 S working days. o
0
01/07/97 TUE 10:18 FAX 860 242 8587 PDS ENG.& CONSTRUCTION IM006
Appendix B
Analytical Laboratory Reports
01/07/97 TUE 10:18 FAT 860 242 8587 PDS ENG.& CONSTRUCTION IM007
Environmental Laboratories, Inc.
587 East Middle Turnpike, P0. Box 418, Manchester CT 06040
Tel. (203)645-1102 Fax (203)645-0823
Deceinber 31, .1996
Ct Environmental Engineering Services
107B Old Windsor Rd.
Bloomflield, CT 06002
Attn Dr. Donald Dubay
Sample I.D.# AB26040&AB26041
This laboratory is in compliance with the QAlQC procedure outlined in.EPA 600/4-79-019,
Handbook for Analytical.Quality Control in Water and Waste Water, March 1979. and
SW846 QA/QC requirements of procedures used.
If you have any questions_concerning this testing, please do not hesitate to contact
Phoenix Client Services at ext. 200.
Sincerely yours,
John M. Schreiber
Laboratory Director
CT Lab. Registration.#PH-061.8 ..
MA Lab. Registration#CT-007
NIA Lab. Registration#11301
RI Lab. Registration 463
NH Lab. Registration 4213693-A,B
ME Lab. Registration#CT007
01:07/97 TUE 10:19 FAX 860 242 8587 PDS ENG.& CONSTRUCTION 121008
PHVWINIX:
Environmental Laboratories, Inc.
587 East Middle Turnpike, P.O. Box 418, Manchester, CT 06040
Tel. (203)645.1102 Fax (203) 645-0823
Analysis Report FOR- Ct.Environmental Eng.Services
December 31, 1996 Attn: Dr.Donald G,Dobay
107 Old Windsor Rd.
Bloomfaeid,CT 06002
Sample Information Custody Information Datc Time
Matrix: WATER Collected by: DD 12/19/96 15:05
Location Code: FEES, Received by: SW 12/19/96 15:45
Project Code: Validated by: LC 12/31/96
P.O.#: DH-1 Analyzed by: see below
Laboratory Data
Page 1 of 1 Client ID: D0IING DILL Phoenix I.D.: AB26040
Parameter Result MDL Units Date by Reference
Sep. Funnel for Herbicide Completed 12/24/96 D/T 8150 Mod.
Copper BDL 0.001 trig/L 12/30/96 EK 6010/E200.7
Total Metals Digest Completed 1.2/20/96 JS SW846 - 3005
****** Chlorinated Herbicides *******
2,4-D ND 1.0 ug/L 11/27/96 JD SW 8150
2,4,5-T ND 0.2 ug/L 12/27/96 JD SW 8150
2,4,5-TP (5ilvex) ND 0.2 ug/L 12/27/96 JD SW 8190
2,4--DB ND 1.0 ug/L 12/27/96 JD SW 8150
Dalapon ND 5.0 ug/L 12/27/96 JD SW 8150
Dicamba ND 0.5 ug/L 12/27/96 JD SW 8150
Dinoseb ND 0.5 ug/L 12/27/96 JD SW 8150
Dichloroprop ND 0.5 ug/L 12/27/96 JD Sw 8150
Comments ND=Not detected MDL=Minimum Detectable Level BDL=Below Detection Limit
If there are any questions regarding this data,please call Phoenix Client Services at extension 200.
John M.Schreiber,Laboratory Director
December 31,1996
01/07/97 TUE 10:20 FAX 860 242 8587 FDS ENG.& CONSTRUCTION C7j009
From: Phoenix Environmental Laboratories Inc.
587 E. Middle Turnpike, Box 418
Manchester, Ct . 06045-0418
(860) 645-1102 Fax 645-0823
December 31, 1996
To: Ct .Environmental Eng. Services
Attn: Dr. Donald G. Dobay
107 Old Windsor Rd.
Bloomfield, CT 06002
The following analytical results have been obtained for the
indicated sample which was submitted to this laboratory:
Sample I.D. AB26041 Location code : CTEES
Project account code: DH-1
Location Description: DEMING HILL QC26040
Sample collector: DD
Sample collection date: 12/19/96 Time: 15 : 05
Lab submittal date: 12/19/96 Time: 15 :45
MATRIX: WATER
Received by: SW Validated by: LC
Parameter: Herbicides (GC) Analysis QC
Method reference: Phoenix QAQC Unit:
Result: see below
Date started: 12/26/96 Date finished: 7.2/27/96
Time started: Analyst: JD
Parameter: IC Metals Analysis QC
Method reference: Unit:
Result : see below
Date started: 12/30/96 Date finished: 12/30/96
Time started: 14 :27 Analyst : EK
Data for Herbicides (GC) Analysis QC:
QC Source: Method QC QC R.P.D.
Sample ID: Blank Spike Spike
Duplicate
Analyse (ppb) Rec. ) (& Rec . )
-------------------------------------------------------------------------
2, 4, 5-TP(Silvex) ND 79%- 75%- 5%-
2, 4, 5-T ND 83%, 75% 1DW
Data for 1CP Metals Analysis QC:
QC Source: ERA 9969 QC Check QC Spike QC Sample
NYSDOH5321 Blank Sample Sample Replicate
01/07/97 TUE 10:21 FAX 860 242 8587 PBS ENG A CONSTRUCTION 010
. Ct.Environmental Eng. Services Sample I .D. AB26041 (continued)
u Page. 2
December 31, 1996
Data for 1CP Metals Analysis QC (continued) :
ERA 9960 (96 Rec. ) ( a Rec. ) (; change)
Analyte
--------Y - ------ -_ __-_---Nc----------__
Ag Silver <001 99 104
Al Aluminum <0 .05 107 96 NC
As Arsenic <0 .05 113 102 NC
B Boron <0 .10 101 100 0. 8
Ba Barium <0. 01 102 106 1> 0
Be Beryllium <0 .01 102 107 NC
Ca Calcium <0 .10 104 92 0 . 9
Cd Cadmium <0 . 01 109 107 NC
Co Cobalt <0 .01 109 98 NC
Cr Chromium <0 . 01 105 108 NC
Cu Copper <0 .01 104 106 Dag
Fe Iron <0 . 01 107 105 0.3
K Potassium <0 .10 90 94 0. 7
Mg Magnesium <0 . 01 105 98 0.9
Mn Manganese <0 . 01 105 104 1.3
Mo Molibdenum <0 . 01 104 107 NC
Na Sodium <0 .10 98 97 0 .5
Ni Nickel <0 .01 110 109 NC
P Phosphorus <0 .01 100 100 6 .0
Pb Lead <0 .01 110 92 1.4
Se Selenium <0 .05 113 101 NC
Si Silicon <0 .05 101 90 0 . 0
Sn Tin <0 .10 102 100 NC
Sr Strontium <0 .01 108 105 0 .5
V Vanadium <0 .01 102 103 NC
Ti Titanium <0 .01 100 101 0 .0
Zn Zinc <0 .01 ill 108 7 .7
Zr Zirconium <0 .05 84 $2 NC
Sb Antimony
T1 Thallium
S Sulfur
Y Yttrium
W Tungsten <0 .10 101 96 8 .1
If there are any questions regarding this data, please call.
John M. Schreiber
Laboratory Director
JAN.08 197 14:32 CUIMINGSandLANZA 8606443347 PAGE 2
JAN-03-1997 13138 PERAK0S-{(16L-z11ZIER AC
203 724 MM P,02/03
Pos,'I{tNb L Zrrs>tR,
COUNAxttoiar 4T L►W-
907!LAIN$T'R19T
il�Ia OOMi141bUr *aloe
(coo)6154-b*15
VAX
(8t30)7ti1�►0�04
JC]ENi.KINTIL
January sravaa M PBRexnx(uaQa-i9e a)
3, 19�7
liar d Cuftings, 9sq• 8 T s7t �'ACSIMYLS
Cu ago I . Lansa 644-3347
161C Ellington goad
p,b BOX 667
South Windsor, CT 06074
Re I Dmi-im gill s to r UbU
vtM1=
Taus Csiwat� QTT xi ' . r Lead conservation ra'Usti Zna.
1[y Ciieatr JA-J. Coss . atiew Calnpsny/Joan Marc Jacques
Dea Attorney Cun"inge:
As w* previau4ly discussed, b'Ur rOMPOCtivs Olionts have
reached an agreement relating to the disposition of an open-apace
parcel containing apprOxim Pbly 23..55 acres and located at the
southeasterly corner of the. abova. xafaxericed subdivision. This
correspondence, therefore, is intefided as a letter of intent for
the purpose of detailing, and Confirming the terms, of this
agreement. It is my understanding that Cie following our clients have agreed to
:
1 My client will Canvey the above' dercribed open s+paoe
parcel to pour client, trea.of anV,. financial encumbrances, and
YQur
client will Accept, title thereto #ad stewardship thereof for public
use and conservation purposoa,
2 . The transfer of this pax¢el to your clients tax-exempt
entity will slot require the payment of any Consideration to mine.
3 , Thi's conveyance shall be .contingent; upon my client
obtaining all necessa Overnm M41 approvals for the development
of this residential su ry d�vision kz;gwn an Doming gill Lpstates.
4. My client.will assume responsibility for the Construction
of all required improvements AfIGCOillg this open space parcel
including the Construction -of a grAval access drive, small parking
area, trail eys.tern, landscaping arA public improvements including
drainage, sanitory.,sewer' and, storm -sewer facilities. Obviously, my
client will als'Q be rorsponsibl e- fox. any other improvements relating
to this parcel which maybe ,xequ�,xe 1 by the Town of South Windsor.
5. In -addit ion to ',the above,: mY client Will install some
type of posts approved by the Town .around the perimeter of this
JAN 8 '97 15:26 8606443347 PAGE.002
MEMORANDUM
TO: Marcia A. Banach, Director of Planning
FROM: Jerry C. Iazzetta, Town Engineer
DATE : January 8, 1997
RE : DEMING HILL ESTATES SUBDIVISION
SECTIONS I & II
We have reviewed the Hydrologic Study for the proposed Deming Hill
Estates Subdivision and have the following comments :
1 . The proposed sedimentation basin in the rear of future lots
68 to 66 is shown as a long narrow flat basin with a
"spillway" along the long south side of the basin. Applicant
should look at providing the "spillway" as far from the inlet
pipe as possible.
2 . The Hydrologic Study identifies Sedimentation Basins 1 and 2
and Detention Basins 1 and 2 . However, there is no reference
on the plans to identify which basins are number 1 or 2 .
3 . The Sedimentation Basins are designed for only a 10 year
storm event .
4 . The existing 15" pipe identified as location 12 to 13 in
Hydrologic Study should be replaced with a detention outlet
type structure with a one foot freeboard at the 100 year
storm. The area upstream of this pipe is being used as
detention with the 100 year water elevation equal to that of
the dirt road over the pipe.
5 . Gutter flow analysis for CB#2 indicates that the width of
water at that point is 8 feet . This should be reduced to a
maximum of 6 1/2 feet .
6 . The Town of Manchester has asked that the applicant review
areas ld and 3 . They feel that the runoff curve numbers
should be different than those used - this will change the
quantities of runoff shown. We would recommend that a
meeting with ourselves, Manchester Engineering and the
applicant ' s engineer be held to discuss this .
7 . To date we have not received the traffic study for this
application.
JCI/jsv
cc : ✓/Jeffrey Folger, Zoning/Wetlands Enforcement Officer
vd1ez/JC1971MABMEM0&de=nghi11
CNInc.
LAND PLANNERS
LANDSCAPE ARCHITECTS 571 HOPMEADOW STREET SIMSBURY, CT 06070 203-658-1988
S'-0"MIN.
FINISH GRADE
S"DEEP MIN.-CRUSHED STONE
GEOTEXTILE FABRIC-SET ON
���((++ tI:rr ;T `I;a I� { ) UNDISTURBED SOIL
UNDISTURBED 501L
Crushed Stone Path
Scale: 1" = 1'-0"
Project - Drawing No.
DEMMINC ROAD SUBDIVISION South Windsor, CT
NA
Scale Date Revisions / Subject Revisions To Protect No. S K.1
Inc.
LAND PLANNERS
LANDSCAPE ARCHITECTS 571 HOPMEADOW STREET SIMSBURY, CT 06070 203-658-1988
I
i
i
! 2xb DEGKIN6 F7-
FFkE5Wf;M TfREATW-TYP.
i
bxb .6 PRC-5abM TREATED
TO-6'LON&
I
i
i
i
2" 2„
i
i
Plan
i
3
W-O"MAX.
i
i
2x6 DECKING-
TREATED
FIN15H&BADE-
f
UNP15TURBRA 501L
i
i
3" 6x6 .6 PRE58URE TREATED
TIE-6'LONG
I f l IEIIIN 111=1111(,1-=1fNf l- �111111�i1111ll�fl((I
Illlll fllll ;IIIIIII 1111111 1111110 UNDISTUROW SOIL
Section
NOTI=:
ALL HAIRV HARE TO BE INOT DIPPED GALVANIZED.
i
i
., Wood Decking on Ground
Scale: 1" = 1'-0'
Project - Drawing No.
DEMMINC ROAD SUBDIVISION South Windsor, CT
Scale Date Revisions/ Subject Revisions To Project No. C K"2
CN:—,
Inc.
LAND PLANNERS
LANDSCAPE ARCHITECTS 571 HOPMEADOW STREET SIMSBURY, CT 06070 203-658-1988
2x4 RAIL SUPPORT-
PR -55URE TREATED
2x6 DEOKIN6-
2,�„ PRE551JRE TREATED -TYP.
2x8- .6 PRESSURE
TREATED -T^t'P.
2, 2"
Plan
4'-0"MAX.
2x4 RAIL-
PRE55URE TREATED .
2x4 RAIL SUPPORT-
2'-8" PRE°.fr.+t1RE TREATED
2x&DEGKIN6 -
PRESSURE TREATED
2x8- b PRESSURE
TnATEP-TYP.
FINISH GRADE-
UNDISTURBRD 501E 6x6- .6 PRE55URE
TREATED TIE
I __ =11111I101lNll 111 Illll r11N.
L-1
I Illlfil 11lNII 1 T„ND,S-,,,ReED 50,E
I
Section
NOTE:
ALL HARDWARE TO BE HOT DIPPED GALVANIZED.
Wood Decking Above Ground
Scale: 1" = T-0"
Project - Drawing No.
DEMMINC ROAD SUBDIVISION South Windsor, CT Scale Date Revisions / Subject Revisions To Project No. C K"^J
JAN- 8-97 WED ?3!26 TQWN OF MANOHESTIR FAX NO, 860 b/i 11%l r, U1�
,TF.PHrN T.(7ASSAN0.MAYOR
-o VL i nJl/� /�{/j/// /yam/ jf/�/� /`� P Y MARYA.NNHA.NDUY,DEPa;TYMAYOR
z4.0e �C�� wn y J i •i a c V e te/ Jp.ti1:1'H D.,V!'(:k/.5rc'kriT.4kY
To`�� •r� 4I Center Street•A0. Box 191 Dra�ecrvres
e�z TWOTHYH.DECKER
ADCUNO A COELHO
jWanchesfer, Connecticut 06045'-0191
. Jnnt.'F.tluMruRCY
¢T} r C OR.00N R.I,NNO W
JAMES E.MORANC EY
CLIFTON E.T110AMSON
ML HAXLP J.SAAMIC,GENPRAL MANe arlt
January 8, 1997
Mr. Jerry Iametta, Town Engineer
1540 Sullivan Avenue
South Windsor, CT 06074
RE. Deming Hill Estates Subdivision
Deming Street
South Windsor, UT
Dear Mr. Iazzetta:
The proposed Deming Hill Estates Subdivision located in South Windsor abuts the South
Windsor/Manchester Town Linc. Ilic Town of Mancbostcr Engineering Division has reviewed
the drainage calculations associated with the Hydrologic Study submitted to South Windsor for
the 87 acres which drains into Manchester.
The calculations show that for the developed condition,the 100 year storm will be at or above
the elevation of the existing earthen berm shown on the dviinagty area mar as site 11. The'town
of Manchester is concerned that unless this earthen beam is replaced with a structure specifically
dc�iZ;iicd with adequate fi]ceboard mid an emergency spillway for the proposed flow, the
development of this site could result in adverse impacts to private property and the wetland area
in Manchester due to system failure.
There is also a question-regarding the curve numbers used for the TR-20 analysis for drainage
areas I and 3. The post-development condition uses euxve.numbers of 66 and 59 for rtrr;9!a 1 d
and 3 respectively. Based upon the information presented,these numbers should be closer to 70,
which will significancy aiwr laic pi-uix)sed peak flow values.
An Eycaul Opportultlty C++4710ver'
BAN- 6-97 WED 13:26 I'QWN OF MANCHEST ER FAX NO. 360 6117 3 ,11I
lvrm Jerry lazzetta
Auiutuy 8, 1997
Page 2
The Town of Manchester requests that these concerns be presented to the developer together with
any comments the South Windsor Engineering Department may have. If you have any questions,
please feel tree to contact me at 647-3158.
Sincerely, '7
ark F, Carlino, P.E.
Assistant Town Engineer
MFC:Itb
c: Peter P. Loris,Jr., P.E.,Director of Public Works
Mark Pellegrini, DirMor nfPlanning
Mark J. Witek,P.E., Town Engineer
0...lin&97%deming.02
J AN- 8-y, OLD 1 b:�b i vwN Ul NhNt HES:E,' r HA Nu. bbu bill 6.1111 V. u2
.Srrr»r..v r.CAS5.'ANO,Af i VOR
NANO
Lim.. O Manc.Weste-rbhtRYAJ05CP111).,Y,jr%I S CRrTARR
ll
w� JOSEPIrn.NrGRI.Sr:CRBT.�Rv
41 Center Street•P.O. BOX 191 DnacToms
TAVOYHYH.BCII(bK
o • ; Munche.Yler, C'onnecdcut 06045-0191 ADELLNO,N.COELHO
JOAN E.HUMPHREY
00RDOAM.1,a550w
JAMBS E.MORANCEY
RICH-aROJ..SARTYIR,C,ENERA!_MANAGER Gl.rr��ih r,.�xuxrauw
January S, 1997
Elizabeth Warren, Chairman
South Windsor Inland Wetland Commission
494 Abbe Road
South Windsor,CT 06074
RR: Deming I•Iill Estates Subdivision
Deming Street-South Windsor, CT
Dear Ms. Warren:
The proposed Deming Hill Estates Subdivision located in South Windsor abuts the South
WindiorlManchester Town Line. Approximately half of the parcel and half of the abutting Pond Estates
Subdivision(87 acres total)discharges southerly into a watercourse which Rows to the Golf Course
Detention Basin in Manchester.
The Town of Manchester Engineering Division has reviewed the drainage calculations associated with
the Hydrologic Study submitted to South Windsor for the 87 acres which flows into Manchester. The
calculations show that for the developed condition,the 100 year storm will be at or above the elevation
ol`the existing earthen bens shown on the drainage area map as site 13.
The Town of Manchester is concerned that unless this earthen berm is replaced with a structure
specifically designed with adequate freeboard and an emergency spillway for the proposed flow,the
development of this site could result in adverse impacts to private property and the wetland area in
Manchester due to system failure.
The Town of Manchester requests that the South Windsor inland Wetland Commission continue the
Public Hearing until the developer has addressed these concerns and the Manchester Engineering;
Division has an opportunity to complete its review of the entire drainage system.
Sincere ,
Peter P.Lo s,J .,P. .
Director of is orks
MFC:Ifh
c: Richard J. Sartor,General Manager
Mark Pcllegrini, Director of!Manning
Mark J.Witek,P.E.,Town Engineer
Jerry lazzetta,Town Engineer,South Windsor
C,1,,,�sn FCy7\�ning.01
An Equal UPpartmityEmployer
i
HIGHLANDSOILS
January 8, 1997
Mr. Peter DeMallie
Design Professionals, Inc.
165 South Satellite Road
s South Windsor, CT 06074
RE: DEMING HILL ESTATES
DEMIN6 STREET
SOUTH WINDSOR, CT
Dear Peter:
i
It has come to my attention that an area of upland soil
types on the above-referenced project may have some wetland
indicator species. it is my understanding that the wetland agent
has inspected this area and has concluded that no wetland soils
i
were present. It is not uncommon to fired wetland indicator
plants in 'upland areas. I would like to reiterate that the
1 wetland map prepared by your office has been reviewed and the
representation of the field delineated wetland boundaries has
been found to be substantially correct.
if you have any questions please call me at 742 586$ .
Very truly yours,
CrL
John P. Ianni
Professional Soil Scientist
P.O. !lox 117 Storr-i. Conn-crictot 04168 • (203) 7r4x•5868
MEMORANDUM
TO: Marcia A. Banach, Director of Planning
FROM: Jerry C. Iazzetta, Town Engineer
DATE : January 8, 1997
RE: DEMING HILL ESTATES SUBDIVISION
SECTIONS I & II
We have reviewed the Hydrologic Study for the proposed Deming Hill
Estates Subdivision and have the following comments :
1 . The proposed sedimentation basin in the rear of future lots
68 to 66 is shown as a long narrow flat basin with a
"spillway" along the long south side of the basin. Applicant
should look at providing the "spillway" as far from the inlet
pipe as possible.
2 . The Hydrologic Study identifies Sedimentation Basins 1 and 2
and Detention Basins 1 and 2 . However, there is no reference
on the plans to identify which basins are number 1 or 2 .
3 . The Sedimentation Basins are designed for only a 10 year
storm event .
4 . The existing 15" pipe identified as location 12 to 13 in
Hydrologic Study should be replaced with a detention outlet
type structure with a one foot freeboard at the 100 year
storm. The area upstream of this pipe is being used as
detention with the 100 year water elevation equal to that of
the dirt road over the pipe.
5 . Gutter flow analysis for CB#2 indicates that the width of
water at that point is 8 feet . This should be reduced to a
maximum of 6 1/2 feet .
6 . The Town of Manchester has asked that the applicant review
areas id and 3 . They feel that the runoff curve numbers
should be different than those used - this will change the
quantities of runoff shown. We would recommend that a
meeting with ourselves, Manchester Engineering and the
applicant ' s engineer be held to discuss this .
7 . To date we have not received the traffic study for this
application.
JCI/jsv/
CC : ✓Jeffrey Folger, Zoning/Wetlands Enforcement Officer
vdleWC/97/MABMEMOS/den inglill
JAN- 8-97 WED 13:26 TOWN OF MANCHESTER FAX N0, 860 6t17 3144 P, 01
Town. Of Manchester, Connecticut
Fam Cover Letter
Fax Ldumber (860) 647-3144
Transmi5sion sent to: V�
Name: Y ,Q G 7 TT Jr
Company: ! o wJri 5C04 (w)r.r .9ot-
Location: ,A-4 .,.. -3P—tn=Y
Fax Number:- �J
Transmiyoion acnt from:
Nam`: Mark F.Cat 14m,P.E.,Assistant Town Englneer
Town Depai tiiivnt: public Works/Engineering Division
Offhm Tcicphunc Number-, (860)647-3153
Total Number of paves(including cover letter): _
Date: f $1'? 7 Time:
PLEASE NOTIFY US PROMPTLY IF YOU DO NOT RECEIVE THE INDICATED NUMBER Of PAGES.
THANK YOU.
aw�r,�*r+#s###e#s�#:s»r*rr*,�w.s*�*#s###»*aw*»r»»»+�w****##}##.s»»w�+M*rw»#s##s#•*sr»*�r»w.�rrr»*#
The Information Contained In And Attached To This Facsimile Message Contains Confidential And privileged
infhmarion From The Above Referenced Sender,And Is To Be Delivered To And R*4d By y Onl The Person Or
Persons To Whom It Is,addressed above. This Information Is Intended For Use By Solely The Individual(s)Named
Can This Transmission Shear, If You Are Not the Intended Rccipicnt,You Should Not Read Fast This Page,Aird
Any Disclosure,Copying, Distribution Or Use Of The Contents Of This Information Is Prohibited,
4M'M#s#Y#i###»»70Mr�*####i##*#*####7�##i#t*7Y Y�rxar�sssset*seas##sr.*wWw•rr*wirr.•�..#sa■xw++++++*•
wpw1n6Qtwpdpts,nw 961fu1brm.02
MEMORANDUM
TO: Marcia A. Banach, Director of Planning
FROM: Jerry C. Iazzetta, Town Engineer
DATE : January 14 , 1997
RE: DEMING HILL ESTATES SUBDIVISION
I have met this morning with Mr. Mark Carlino, Assistant Town
Engineer, Manchester, and Messrs . Bob Arsenault and Jim LeClair of
Design Professionals, concerning the drainage situation for the
proposed Deming Hill Estates . The concerns expressed by
Mr. Carlino and myself about the 15" pipe (identified as location
12 ands 13 on hydrologic study) and the difference in runoff curve
numbers was rectified. Design Professionals will propose a weir
at this location which would address the concerns . This will be
designed and submitted prior to the next Inland Wetland Commission
meeting.
JCl/j sv /
cc: Jeffrey Folger, Zoning/Wetlands Enforcement Officer \'r
1C1971MABMEMOS1den inghi111-19
MEMORANDUM
To: South Windsor Inland Wetland/Conservation Commission.
From: Jeffrey H. Folger-Zoning/Wetland Enforcement Officer
Date: January 16, 1997
Re: Additional comments on of the proposed Deming Hill Estates Subdivision, Deming
Road. Plans dated 10/10/96.
A possible recommendation to PZC that would somewhat address wildlife concerns on the
property would be the creation of linear conservation easements along rear property
boundaries to provide wildlife corridors. By extending the easement to the 50 foot rear
lot setback the corridors could potentially be up to 100 ` wide. Unfortunately, the way the
roads and house lots are aligned (north to south), this arraingement is less valuable than an
east to west alignment, which appears to be the most often used travel direction by wildlife
passing through the site.
The proposed sedimentation basin east of lot#25 should have a modification that would
increase the travel time of water from inlet to outlet.
- i
S0W N Se.,
46
s 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074
�`!1oSaR Corr AREA CODE 860/644-2511
January 23, 1997
Jean Marc Jacques CERTIFIED MAIL
JMJ Construction Company
658 Ellington Road
South Windsor, CT 06074
Dear Mr. Jacques:
Re: Appl #96-72P, Deming Hill Estates (Sections 1 & 2/34 lots)
At the January 22, 1997 regular meeting, the Inland Wetlands Agency/Conservation Commission
approved Appl #96-72P, JMJ Construction -IWA/CC permit for the construction of a single family open
space subdivision with associated streets, grading, utilities, stormwater structures, and walking trails on
property located on the westerly side of Slater Street and southerly side of Deming Street, AA-30 zone
(Assessor's map #28, parcel 1 & 2) as shown on plans prepared by Design Professionals, Inc., Job
#90-514 and dated October 10, 1996. This approval is subject to the following conditions:
1. One blueprint copy of the entire set of plans and this letter reproduced thereon, must be submitted
to this Commission. This must be completed within 65 days of approval prior to any construction
activity on the site.
2. Construction activities shall be subject to the approval of the Town Engineer.
3. The application shall indemnify and hold harmless the Town of South Windsor against any liability
which might result from the proposed operation or use.
4. The permit is valid for five years and shall expire on January 22, 2002. It has been IWA/CC's
policy to notify landowner(s)/applicant(s) of expiring wetland permits. However, it is the
landowner(s)/applicant(s) responsibility to track expiration dates and notify the Commission of a
renewal request at least 65 days prior to expiration.
5. All approvals required must be obtained and submitted prior to any activity on the site.
6. A contact person shall be identified on the plans.
7. We recommend a bond in the amount of$10,000 to be submitted to the Planning and Zoning
Commission to ensure compliance with the Erosion and Sedimentation Control Measures.
8. The largest practical contiguous area excluding areas with future construction planned and, not less
than ten (10) acres shall be deeded to the Land Trust prior to acceptance of the roads.
9. The Design Engineer is responsible for supervision of the installation of both sediment structures to
insure proper installation due to critical grading requirements.
10. Limits of clearing must be delineated in the field prior to clearing and approved by the
Zoning/Wetlands Enforcement Officer.
11. The existing specimen tree (willow tree located north of large pond) is to be preserved.
12. Markers will be placed by the applicant to define the open space boundary.
12. The plot plans and deeds shall indicate that there are regulated wetlands located on lots #13, #26,
and #27.
13. The construction of the loop trail shall take place in the dry season. Detailed site plan of the trail
system, showing actual locations and materials/methods used, will be submitted for approval by
Town Staff.
Very truly yours,
INLAND WETLANDS AGENCY/
CONSERVATION COMMISSION
Elizab A. Warren, Chairman
EAW/pmm
cc: Chief Building Official
Planning & Zoning Commission
Town Engineer
Design Professionals, Inc.
JAN 2 3
LEGAL NOTICE
TO BE PUBLISHED IN THE JOURNAL INQUIRER
WEDNESDAY, JANUARY 29, 1997
SOUTH WINDSOR - IWA/CC
At the January 22, 1997 regular meeting the Commission voted to take the following action:
1. Approve with conditions appl #96-83P, Rene Veilleux - Resubdivision of property to create 3 lots
and 1 parcel to be known as "Coven Mountain" on 10.39 acres located on the easterly side of Abbe
Road and northerly of Maskel Road, A-20 zone (Assessor's map #138, parcel #42)
2. " Approve with conditions appl #96-72P, JMJ Construction - IWA/CC permit for the construction of
a 34 lot single family open space subdivision with associated streets, grading, utilities, stormwater
structures, and walking trails on property located on the westerly side of Slater Street and southerly
side of Deming Street, AA-30 zone (Assessor's map #28, parcel 1 & 2)
Dated at South Windsor, CT this 23rd day of January, 1997
Elizabeth A. Warren, Chairman
S 0.N N Sf4
x 7own o-PSatdA ?40t;qdo,��t
s 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
'�ftiosox CO
AREA CODE 860/644-2511
April 30, 1998
Jean Marc Jacques
JMJ Construction Company
658 Ellington Road
South Windsor, CT 06074
Dear Mr. Jacques:
Re: Appl #96-72P, Deming Hill Estates
We are pleased to advise you that the Planning 8s Zoning Commission voted on April
28, 1998 to approve your request to move Lot #27 from Phase II into Phase I.
If you have any questions feel free to call the Planning Department at 644-2511, ext.
253.
Very truly yours,
PLANNING & ZONING COMMISSION
Frank A. Castro, Chairman
FAC/pmm
Cc: Chief Building Official
Town Engineer
Superintendent of Pollution Control
Fire Marshal
Zoning/Wetlands Enforcement Officer
l
I �� (� G/o \
Zo
A3
co
cj
4� •
F LA3�}HILI
SI TE
TO WN Ofi' MA NCNES TA' R
\�F
t
{..also wish to receive the
..DER fohowmg services tfol an extra
•6 implete items 1 and/ r &b add services. feet:
. Complete items 3, the reverse of this form so that we can Addressee's Address
' • Print your name and address Q� +
Bturn this card tq,yoU+ or on the b8ck rf space peliverY �.
• Attach this term to the front of the mailpiece, bar. (]Restr-Cted
ermit. m8ilpiece below the article num. Z+ er jot feeIV
does not p red and dots Stmast.
Write'perm,nFieceiptRequested""onihe COnSUtt: Q
;+ • The Return Receipt will show'to whom the article was del- 4a Artlele Nurnl�f9r .:
y M
delivered. P 40 $p(F 17
3. Article Addressed to:
_ 4b,-Service Type 0 {nsure,0
❑ Reglstej9dCLE GOD
TOWN O MAN c1c�Gertifted'`
Ret, rn Rece{ t for .
TOWN 0 Express Mait � Me chandis
41 CENTER STREET
06040 (� o
MANCHESTER, CT 7, Date of De{ivery �.
$. Addresse ise's Addres (0niy' requested '
{ and-fe paid) :
( 5, Signet re (Add(essee}
(A
$. Sign tur en;Q R TUfIN RECEIPT
Decg,filer 1� 1 ft U.g.G,P.O i 19i-307-5a!
a► PS Form. ! ,f{ t f
• •• • • •
ai SENDER: I also wish to receive the
:Complete items t and/or 2 for additional services. following services(for an
rn ■Complete items 3,4a,and 4b. extra fee):
ry ■Print your name and address on the reverse of this form so that we can return this Z
card to you. d
d Attach this form to the front of the mailpiece.or on the back if space does not 1. ❑ Addressee's Address
ivery 0
permit. o.
d .The Return ReceiptwR show to whom the article wasldeli delivered and the date Consult postmaster fo Restricted lr fee.
rs delivered. d
le Number oC
Vaoi 3.Article Addressed to: E
P 259 184 758 r
m 4b.Service Type ry
En Certified lx
C JEAN MARC JACQUES ❑ Registered or
JMJ CONSTRUCTION ANY ❑ Express all [I Insured U)
658 ELLINGTON ROAD ❑ RetumReceiptforMerchandise ❑ COD 00
SOUTH WINDSOR CT 06074 7.Date of Delivery, 3� r o
c
a
cc8.Addressee's A ress(Only if requested s
t-
5.:Received By: (Print Name) and fee is paid)
W
6.Signat : (Address or Agent)
T X Domestic Return Receipt
H ecember 1994
PS Form 11,