HomeMy WebLinkAboutSpecial Exception/Site Plan of Developme TOWN OF SOUTH WINDSOR, CONNECTICUT wit
ITT,
n
PLANNING & ZONING COMMISSION �}
APPLICATION FORM
Application No. : -7,6/ NOV $7 1996
Date Received:
Action/Public Hearing by: South WindSor
Receipt No. . ,// I PISANing & .Zoning Corni fission
APPLICANT: C&C Developers, L.L.C. /Marsh Enterprises, L.L.C.
ADDRESS: 55 Sandra Drive
OWNER OF RECORD ON LAND RECORDS Same as above
ADDRESS: Same as above
COMPLETE LOCATION OF PROPERTY: John Fitch Boulevard
Assessor's Map #109 Parcel # 14 Zone DRZ
NAME, ADDRESS, & TEL & FAX # OF PERSON TO WHOM INQUIRIES SHOULD BE
J.R. Russo & Associates Phone: (860) 623-0569
DIRECTED: One Shoham Rd. , E.Windsor, CT Fax: (860) 623-2485
THIS APPLICATION IS FOR: (Check all that apply) :-7 �.
_1 . Zone Change to (Public Hearing required) -7 3 z�
2. Subdivision/Resubdivision
a. _ Subdivision _ Minor _ Major ,
b. _ Resubdivision _ Minor _ Major (Public Hearing Required)
c. _ Conditional Approval
d. _ Open Space Subdivision (Public Hearing Required)
XX3. Special Exception to Article �.� (Public Hearing Required) •,
XX4. Site Plan of Development (MODIFICATION)
5. General Plan of Development
6. Earth Filling [Sec. 10] and/or Earth Removal [Sec. 91 (Public Hearing Req)
7. Regulation Amendment: Zoning Subdivision
8. Amendment to Town Plan of Development
9. Temporary and Conditional Permit
10. Other (explain in detail) :
12
Appl cant Property Owner
(See reverse side for additional information)
t
t" th"A TIME FRAMES AND PROCEDURES FOR SUBMITTING APPLICATIONS/PLANS
1 . Consult Planning Department for fee schedule. This application must be signed
by the applicant and owner of the property and submitted in duplicate with all
maps and documents required on attached checklist.
2. All prospective applicants are urged to confer with Town Planning Department
and Engineering Department staff prior to submission of any application to the
Commission.
3. Plans are officially received only on regular meetings (2nd and 4th Tuesday of
the month) of the Planning & Zoning Commission.
4. Three (3) sets of blueprints are required on submission for review by the Town
Planning and Engineering Departments. This deadline must be met -if you want
to ensure that your application is officially received by PZC.
These plans must be submitted as complete plans -- which includes application
plus all required information contained on checklist. It is the applicant's
responsibility to ensure that all information required on the checklist is
submitted in one package at the time of submission -- including landscaping
plans, architectural elevations, traffic report, etc.
5. After review, Town staff will notify the application of requested/required
modifications.
6. If the applicant makes recommended modifications to plans, six sets revised
plans must be submitted. If a Public Hearing is required (or optional but
likely) then seven sets are required. Revised plans should be complete
packages (applicant may disassemble previously submitted plans and reuse
sheets if so desired) .
TOWN OF SOUTH WINDSOR CHECKLIST
REQUIRED INFORMATION SITE PLANS
APPLICANT C&C Developers, L.L.C./Marsh Enterprises, L.L.C.
PROJECT NAME Fitch Meadow
This checklist must be signed by plan preparer (P.E./L.S.) declaring that all required information is
provided. Items 1-7 are required for all applications; items 8-11 required where appropriate.
Check mark for each item supplied.
x 1. On each sheet for plans or maps, title block with the following information:
x a. Name, address and telephone of applicant.
x b. Name, address and telephone number of Land Surveyor or Professional Engineer.
x c. Name of Development.
x d. Date when drawings were made.
x 2. Key Map: An overall map drawn to a scale of 1 inch equals 200 feet, which can be used
as an overlay on Metropolitan District Maps. This map will show the overall design of
the Development and surrounding property within 500 feet.
x a. Date block which gives needed zoning information such as percentage of lot coverage,
acreage of tract, number of apartment units, parking requirements, etc.
b. Layout of buildings.
c. Layout of streets and parking.
d. Lines indicating proposed drainage system with direction arrows.
e. Lines indicating sanitary sewer system with direction arrows.
f. Names of surrounding property owners.
g. Proposed open spaces and recreation areas.
x h. Driveway cuts on surrounding properties.
3. Architectural Elevations: See attached checklist for Architecture and Design Review.
4. Plot Plan: A layout map of the proposed site drawn to a scale of 1 inch equals 40 feet on
either of the following size sheets: (1) 24" x 36" with a 3/4" ruled margin; (2) 18" x
24" with a 1/2" ruled margin, containing the following data:
X a. Distance and bearings of all boundary lines and acreage of site. Iron pins required at
all property angle points and shown on map.
b. Proposed streets and street lines with center line station, curve data, and parking
spaces.
X c. Building lines in accordance with zoning regulations.
X d. Proposed buildings and other structures, including signs, outside lighting, and
dumpsters (on concrete pad and screened).
X e. Easements, noting grantors, grantees, and purpose.
f. Names of abutting property owners.
X g. Monuments will be indicated at corners and angles of all streets and at all points of
curvature and tangency. In areas accessible to Metropolitan District Commission
points, or other coordinated points, the monumented points within proposed site shall
be coordinated. These coordinates shall appear in tabular form on the plot plan. The
accessibility of these MDC points shall be determined by the Town Engineer.
X h. All open space or other common or public land uses shall be indicated.
X i. A-2 certification; P.E./L.S. Seal.
X 5_ Topographic Map: A main drawn to a scale of 1. inch to 40 feet on sheets not exceeding
24 inches by 36 inches, including ruled margins shall in addition to the requirements of
the plot plans show the following:
X a. All existing and proposed buildings.
X b. Curb Lines and pavement width, sidewalks.
X c. Existing and proposed sanitary sewers.
X d. Existing and proposed water and gas main systems.
X e. Present wooded area indicated by foliage lines. Any individual trees to be saved
should be shown.
X f. Existing and proposed contours shall be shown in not less than two-foot intervals, but
in cases of relatively level land, the contours shall be one-foot intervals and spot
elevations.
X g. Regulated wetlands and 100-year floodplain or note that none are present.
X h. Proposed storm drainage system, showing all catch basins, endwalls, manholes,
lengths and sizes of pipes. (Maximum distance between catch basins shall be 300
it auiti ii7iuriliuii Si1� Uf storm i1r43iYi liii�S Sliail be 15 inC11eS.
X i. Connections of all springs into proposed storm drainage system as needed.
X j. Location and indications of existing brook channels, and 100-year flood limits.
X k. A-2 Certification; P.E./L.S. Seal.
6. Landscaping plan:
7. Drainage calculations: - Zero Runoff Increase per attached guidelines.
8. Traffic Report:
- 2 -
9. Plans and Profiles: A plan and profile of the proposed streets drawn on plan/profile
paper of scales 1 inch to 40 feet horizontally, and 1 inch to 4 feet vertically on sheets not
exceeding 24 inches by 36 inches, including ruled margins and containing the following:
a. Layout of streets in sections coordinated by stations with the profile.
b. Street plan showing roadways and drainage.
c. Sight line at driveway & street intersections.
d. Profile of roadway showing existing and finished grades. Roadway profile will show
all tangent grade and all vertical curve information.
e. Profile will show all catch basins and all drainage lines between catch basins with all
invert and top of frame elevations. Drainage lines will be shown and described as to
material.
f. Where any storm drainage line discharges into an existing brook sufficient profile of
this brook will be shown to determine conditions.
g. Metropolitan District Commission datum shall be used on all sites accessible to these
controls. The Town Engineer shall, based on standard engineering practices,
determine the accessibility of these controls.
h. Profiles shall show all sanitary sewer lines and manholes, including elevations, sizes,
lengths, and slopes of pipes. Top of foundation elevations for building shall be
shown.
10. Open Space Site Improvement Plans: For sites which require or include a provision for
open spaces, a plan which contains data for site improvement may be required. This map
shall be drawn to a scale of 1 inch equals 40 feet.
11. Sanitary Report: Where individual sanitary sewage disposal systems are proposed, the
final plans shall include a Sanitary Report certified by a Professional Engineer. The
report shall demonstrate the feasibility of the proposed individual systems; the report
should deal with the area as a whole, discussing the following points:
a. General nature and development of surrounding area.
b. Topography and natural drainage pattern.
c. Subsurface conditions as shown by subsurface_investigation, including soil absorption
characteristics, ground water level conditions, ledge rock, and general nature of soil.
d. General description of type of development contemplated.
e. Detailed description of proposed sanitary sewage disposal facilities, indicating sizes
for various ground conditions, materials to be used, and the general layout pattern to
be used, etc.
f. Special precautions that may be necessary to provide proper functioning of the
proposed disposal systems.
g. map of general area with locations of all tests shown on proposed layout.
h. Flood heights of any nearby streams, brooks, or rivers.
- 3 -
i. Test results and engineering evaluation per Section 4.13.5.
All information required above is included in this application at the time of submission.
.
AN PARER P.E. L.S. A E
May 17, 1995
= 4 -
FITCH MEADOW SPECIAL EXCEPTION AND SITE PLAN MODIFICATIONS
1. Application for a modification to the site plan and special exception that
were approved for this project in 1991 for a property located on the
westerly side of John Fitch Boulevard, northerly of Kimberly Drive, DRZ.
2. The original approval was for 30 units with a daycare center including an
apartment. The applicant is proposing to eliminate the daycare and
apartment and in its place construct two additional units.
3. Phase I of this development is currently under construction. Six of the
units are being dedicated to the Town's Moderate Price Housing Program.
The addition of two units will not require any additional units needing to
be dedicated. It appears that all zoning requirements have been met.
4. There are regulated wetlands in the vicinity of these two additional units,
however, there is currently a wetlands permit in place and this change will
not increase the impact on the wetlands, therefore no IWA/CC action is
required.
5. Public water and sewer currently service the site from Route 5. WPCA
approval will be required for the extension of the sewer to service these
two units.
6. The original road layout had a turnaround area for the proposed daycare.
Portion os this turnaround will be removed and the driveways for the units
will come off of that. This turnaround is required to remain because that is
how the applicant is meeting the 600 foot cul de sac length. The road is
going to be a Town road when the project is completed.
7. The applicant has indicated that the landscaping will be consistent with the
rest of the development.
If this application is approved, the Planning Department is requesting that the
zoning data table for the entire development shown on the map. Also, the
landscaping plan on file should be modified show plantings around the two
additional units.
�5.
a
n C 1
FITCH MEADOW SITE AND SPECIAL EXCEPTION
1 . This is an application for a Special Exception to section
4 .5 .5 .b (formerly 4 . 11 .5 .b) and site plan of development
for the newly created DRZ zone on 14 . 96 ac. parcel of land
located on the westerly side of John Fitch Boulevard,
northerly of Kimberly Drive, DRZ zone. The zone change and
general plan of development was approved 2/26/91 .
2 . The applicant is proposing 31 single famiKay
ousing units;
and one apartment to be located over the care center.
The proposal calls for 20% of the units to be affordable-
totalling six units . These units will be sold and resold
according to the guidelines which were adopted by the Town
Council. The units will count towards South Windsor's 5
year goal of producing 143 units per the capitol region
Fair Housing Compact for Affordable Housing.
3 . The net buildable acreage is 11 . 36 and the density for the
project is 2 . 8 . Our regulations allow up to 4 units per
acre with 20% affordable housing.
4 . The applicant is also proposing a day care approximately
2, 750 sq ft which will have one apartment on the second
floor. There are 11 parking spaces required which have
been provided in the front of the daycare. There is also
adequate room for a bus turnaround at this location. A
proposed play area in the rear of the daycare appears to be
40 feet from the closest unit. Screening has been provided
between the day care and the first unit.
5 . The number of parking spaces r quired is 2 1/2 sp/unit or
80 spaces for the dwelling units in addition to the 11
required for the daycare. In addition, there are four 10 X
30 spaces set aside for recreational vehicles which is
shown enclosed by a wooden fence and screened with
. evergreens and deciduous trees . This area has been
relocated from the original general plan to a location
along the main drive.
6 . The applicant is proposing passive recreation to meet the
recreation requirement. Our regulations require either 600
sq ft of developed recreation area per unit-- about 1/2
acre for this application-- or 3600 square feet of
undeveloped recreation area per unit-- or about 2 .4 acres.
.�. LJ&S, The rear of the property is shown to be a open space and
J the last 300 feet of the property as a conservation area.
The--&pp-l-i cant---h-a-s-pravrded-access-to--th-ks--area--, ia--two
4- stone -.dust--._paths- one-which-o-r-iginates-next--tc--the proposed
day---care-facility and a second path which comes off of one
of the driveways in the rear of the development. After
discussing this location with the applicant, he has agreed
that. -a-bett-�e -glace-to-pitt this path may be along the
driveway to the detention basin coming off of the main
road.
7 . Impervious coverage for the site is 15%; '30% allowed. The
proposed building heights do not exceed the 30 ft maximum.
It appears that all other zoning regulations have been met.
There are regulated '-wetlands and an intermittent
gas watercourse on t-he site. The application has been
submitted to tie IWA/CC and will be heard by the Commission
on"Monday,�eptember 16 .
9 . Public water and sewer are available to the site from Rte
5 . WPCA approval is required. Community Systems
requirements of P.A. 83-133 must be satisfied.
10 . Fred Shaw, Ass't public Works Director has stated for the
purpose of refuse and recyclable collection property owners
must grant to the Town, its agents and employees the right
to enter and reenter harmless from any and all liabilities
that may occur with respect to refuse and recyclable
collection.
11 . The traffic pattern for the site is as two way road that
terminates in a cul de sac. The driveways are off of the
:rain road and there are several drives that serve more than
one unit.
Because this drive comes out onto a state road, the curb
cut will be subject to DOT review and approval. The
applicant has provided P provisions for a left hand turn land
for traffic heading northbound on Route 5 .
12 . A bus shelter has been provided at the entrance of the
development.
13 . Sidewalks are proposed to be constructed along one side of
the main interior road.
14 . There is a good portion of this site which is wooded. The
landscaping plan shows that many of the existing trees will be
saved, particularly along the easterly frontage of the
property.
The is a 25 ' buffer shown around the perimeter of the site
as required in our regulations . The buffer plantings
consisting of norway spruce, eastern white pines and maples
will interspersed among trees that are to be saved. (A
shematic of the buffer in 5 years and at maturity have been
shown on the plans . ) A six foot fence is. shown at the
property corner in the area of the retention basin to
ensure that the screening requirement is met in this area
as discussed during the general plan application.
15 . The landscaping for the interior of the site shows the
streets lined with red oaks and red maples . Typical
planting have been provided for each of the unit types to
include various types of shrubs around the foundations .
2 - - 1 /J
16 . The houses Lposed for this site include y9 -3 bedroom
units and- 3 bedroom units ranging in size from 1150 to
1400 square feet. The affordable units are interspersed in
size and location. The Architecture and Design Review
Board reviewed these plans and were pleased with the
colonial architecture and the layout of the project. They
had no other comments .
17 . There is no phasing proposed for this project at this time.
If this application is approved, the planning department has no
other modifications to request.
STANDARD APPROVAL MODIFICATIONS FOR SITE PLAN (rev. 2/7/89)
PROJECT i 1J �' } c¢ AP L. NO. 9(,-
ENGINEER/ARCHITECT _J , (� SSz) c, PROJ. NO.
DWG. NO. DATE REV. DATE
SUBMIT MYLARS OF SHEETS .
1 . Prior to commencement of any site work, a meeting must be
held with Town Staff.
/2. No building permit will be issued until the final mylars
have been filed in the Town Clerk's Office.
- 3. This application is subject to the conditions 'of approval
of the Inland Wetlands Agency/Conservation Commission,
including a bond in the amount of $
�4 . An as-built plan is required prior to issuance of a
Certificate of Occupancy per Section 4.13. 10 of the Zoning
Regulations.
5. Footing drains are required if the building has a basement.
6 . A landscape bond in the amount of $ is required
and must be submitted prior to filing of mylars .
�7 . All plans used in the field by the developer must bear the
stamp and authorized signature of the Town of South
Windsor.
Black and white transparent mylars of Sheets #
with the above modifications, together with three blueprint copies of
the entire set of plans must be submitted to this Commission within
30 days to be stamped and signed. The letters of approval of this
Commission, as well as the Inland Wetlands Agency/Conservation
Commission, must be reproduced on the mylars.
After the mylars have been signed by the Commission, they will be
returned to you for filing in the Office of the Town Clerk within 90
days . After filing these plans, a copy of the receipt must be
submitted to the Planning Department.
n5
Y1 ( n
l
MEMORANDUM
TO: Marcia A. Banach, Director of Planning
FROM: Jerry C. Iazzetta, Town Engineer
DATE: March 17, 1994
RE: FITCH MEADOW
We have reviewed the bond estimates for Phases I and II at Fitch
Meadow and recommend that the bonds be set as follows:
Phase I $271,000
Phase II $256,000
These recommended bond amounts do not include any landscaping as
it is our understanding that this will be a separate bond.
Attached for your records is a copy of each estimate.
JCl/jsv
Enclosures
Cb
TOWN OF SOUTH WINDSOR
PROJECT: BOND gSTIHATB FORK MAR 1 6 1994
STREET:
P&Z I.D.: SOUTH WImu
ENGINEER: OZtiW 'ro,z"f 1994 CALENDAR YBAR EWC.pEpI
'DATE:
Boa
unit Reduction ction
Item Description Unit OuantitT Price Cost No. 1 No. 2
1gi� -
1. Clearing & Grubbin LS
o�
2. Strip & Stockpile
Topsoil CY / 6 2.00 OoNtr
3. Earth Excavation
(Excluding Roadway
& Trench) CY E3N 10.00
4. Roadway Excavation CY 300 12.00 3 L 00
5. Earth Trench Exc. 0-4 CY 3�' 10.00 4�
a
6. Earth Trench Exc. 0-10 CY B 12.00 e. 01
7. Earth Trench Exc. 0-15 CY 3 Z7 15.00 y 905
8. Earth Trench Exc. 0-20 CY O 18.00 b
9. Roadway Exc. Rock CY L.D 50.00 0 �
10. Rock Trench Exc. 0-4 - CY 0 50.00
n
11. Rock Trench Exc. 0-10 CY 0 75.00 O
12. Rock Trench Exc. 0-15 CY O 100.00
b
13. Rock Trench Exc. 0-20 CY 0 150.00
O '
14. Formation of Sub grade SY Z So 1.50 3 5
15. Subbase Gravel CY ;7 V 20.00 / / Z O
16. Processed Aggregate TONS 5 Z(a 18.00 to 8
17. Common Borrow CY `� 10.00 5 0
18. Gravel Borrow CY 8r1 15.00 Z.8 IS
19. Bit. Concrete
(Class I TONS T 3b 50.00 8 O u
20. Bit. Concrete
Class II TONS ( 3 6 55.00 74 50
21. 6" Asphalt Lip Curbing LF 1300 3.00 ZW 0 u
22. Road Widening Complete I SY 1 71J 1 50.00 1 3 51 S50
11
*varies q s,
Page 1 Sub-Total $ `1 ,1 91-
:3OND ..TSTIMATEa FORM Bond Bond
Reduction Reduction
t
Item.- Descri tion
unit tit Price Cost o. 1 No. 2
. � g y o0
�.
3. Conc Sidewalk 4' Aide LF Z SC 30.00
'TORN DRAINAGE-SYSTEM
:OMPONENTS
4. 60' RCP Class- In Place LF
m 130.00 O
25. 54' RCP class- In Place LF
O 100.00
26. 48' RCP class-In Place LF
O 75.00 O
27. 42' RCP Class_ In Place LF
65.00 0
28. 36' RCP Class- In Place LF
O 60.00 0
29. 30' RCP Class- In Place LF
O 50.00 �
30. 24' RCP Class_ In Place LF
E
y o 42.00
31. 21' RCP Class_In Place LF
to 40.00 C
'2. 18' RCP Class-In Place LF
0 35.00 O
33. 15' RCP Class._In Place LF
3 z4 30.00 9, 7 zv
?OLYETHENE PIPE
34. 8' ADS-N-12 or Equal
C 21.00 0
35. 10' ADS-N-12 or Equal
O 22.50 �
ADS-N-12 or E ual
y 0 24.00 9 bo
0 37. 15' ADS-N-12 or E ual 25.50 0
18' ADS-N-12 or Enual
� 28.00 �
UNDERDRAINS
39. 6' PVC SDR 35 In Place LF
1 0 15.00 1 L, 000
40. 8' PVC SDR 'AS In Place LF
to 20.00 b
RIPRAP
41. Modified Ri ra CY 1.0 45.00 9n
42. Intermediate Ri ra
Cy 4 8 45.00 . 4 I v
43. Standard Ri ra
CY o 45.00 D
Sub-Total S 31 5 70
Page 2.
BOND ESTIMATE FORM
Bond Bond
i Unit Reduction Reduction
Item Description Unitj QuantityPrice . Cost No. 1 No. 2
DRAINAGE STRUCTURES
44. Type "C' Catch Basin EA `� 1500.00
45. Tvpe 'C' Double Grate EA Z 2000.00
46. Type 'C-L" Catch Basin EA 1500.00 I Sao
47. Manhole EA 1500.00
48. Manhole w/DroR Inlet EA 2500.00 O
49. Manhole Over Ten Feet EA 2000.00
50. Headwall EA * O
51. Endwall
EA O
Box Culvert V v
52. X LF
53. 15' Flared End EA O 450.00 v
54. 18" Flared End EA 1 O 500.00 0
55. 24' Flared End EA Z 550.00 ( X C J
56. 360 Flared End EA b 850.00 O
57. S`vv--Tjio GA I t. » Z, SOu
10, Wide INC.
58. Gravel Access Road LF A 4w1 15.00
59. Reset M.H. or C.B. EA
550.00 O
SANITARY SEWER COMPONENTS
60. 12' PVC In Place SDR 35 LF 40.00 °
61. 10' PVC In Place SDR 35 LF `� 37.00 v
62. 8' PVC In Place SDR 35 LF 1 35.00 Z), 1.6 S
63. 6' PVC In Place SDR 35 LF 3 ZS 30.00
* varies
Page 3. Sub-Total $ y 6i S15
BOND ESTIMATE Bond Bond
unit Reduction Reduction
uantit Price Cost No. 1 No. 2
Item Descri tion Unit
SANITARY SEWER STRUCTURES
64. Sanitary Manhole EA 3 1500.00 H Sth�
65. Sanitary Manhole EA ( 2500.00 Z 7c70
w Dro Inlet
66. Sanitary Manhole 1 2000.00 L noo
over 10 FT-
67.
68.
STRUCTURES & MISC. ITEMS .
69. RetainingWall
EA 0
70. Fence EA p
(Type
71. Guide Rail O
(Type:
72. End Anchorage EA
(Type:
100.00
73. Guide Post
1.50 Z 9 7
74. Pavement Markin
LEA
I °16
75.00 �5
75. Street Sins76. Traffic Si ns
� 75.00
77. Street Li hts EA 1000.00
7.8. Furnishing SY 3.7 0 0 2.50 9. Z SU
/Placing Topsoil
79. Fertilizing. Seeding -Al-
80. Trees 2.50 1.Z 50
and Mulchin
EA150.00 .
81. Maintenance/Protection LS * y 9
of Traffic
82. Construction Stakin
LS * Ln0
* varies
Sub-Total $ 7-9,O y
Page 4.
BOND ESTIMATE FORM
+. Bond Bond
Unit Reduction Reduction
Item Description Unit Quantity Price Cost No. 1 No. 2
83. As-Builts LS * S o o
84. Iron Pins EA 5 Z 100.00 57200
85. Concrete Monuments EA 10 250.00 2. G00
86. Landscaping *4 LS *
87. Driveway-Bit. Conc. SY 20.00
88.
89.
90.
DAB' Sub-Total $
_ Sub-Total Page 1 $_ '� �5
Sub-Total Page 2 $ 3 3 i l 0
Sub-Total Page 3 $
Sub-Total Page 4 $
Sub-Total Page 5 $ +_Er&0,V -040
Sub-Total $ '�
z 3�^�
1
251 Contingencies z Sub-Total: $
54,d8�
TOTAL $
�7
* varies
Page 5.
•.,yY h..�; .... . .... �..�.....-.•w`....s3 rw{i:Y.v ty.. _ _r.MW^+MYIJ.MV.wAi•rl.rer.k4v... ... ... _..�_... .�..._�1.....�..._r '...� ...-.....
���y•� ,,u�. � 10 Ij
TOWN OF SOUTH WINDSOB
PROJECT: i trc-N Wem?oW
STREET: 17%ray Vh-eWDaw f-4#VG BOND ESTIMTE FORK MAR 1 6 1994
P&Z I.D. :
ENGINEER: o s rim -ro glZa Z E'-f,,V P&r1Aj 1994 CALENDAR YEAR �UlH W1NOSU,
•DATE: 31•1 6\9!{
Bon
Unit Reducti e' c
Item Description Unit QuantitT Price Cost No. 1 No. 2
1. Clearing & Grubbing LS * Yba
2. Strip & Stockpile _
Topsoil CY -1 UO 2.00 �On
3. Earth Excavation
(Excluding Roadway I6 13 10.00
& Trench) CY 1 3 CO)
4. Roadway Excavation CY 5' 12.00
5. Earth Trench Exc. 0-4 CY -7 GO/ 10.00 7(, 0
6. Earth Trench Exc. 0-10 CY 12.00 6, V Z
7. Earth Trench Exc. 0-15 CY v 15.00 n
8. Earth Trench Exc. 0-20 CY 18.00
9. Roadway Exc. Rock CY 50.00
10. Rock Trench Exc. 0-4 - CY 50.00
11. Rock Trench Exc. 0-10 CY D 75.00 d
12. Rock Trench Exc. 0-15 CY 100.00 v
13. Rock Trench Exc. 0-20 CY v 150.00 d
14. Formation of Sub grade Sy L5 1 1.50 Z-L 9q
15. Subbase Gravel CY 2 20.00 A3 I 0 5�U
16. Processed Aggregate TONS Sq 3 18.00 1 61 L4
17. Common Borrow CY 1 3 55 10.00 3,950
18. Gravel Borrow CY 5 5 15.00 g Z 5
19. Bit. Concrete IZ5
Class I TONS 50.00
20. " Bit. Concrete
Class II TONS S� 55.00 8i y�
21. 6" Asphalt Lip Curbing LF OLO 3.00 A SS 6
22. Road Widening Complete SY 0 50.00
*varies
Page 1 Sub-Total $ 6 3� Slob
BOND ESTIMATE FORM �p ':. . g� Bond
{ � tt Seduction Reductionuni
� 't Price
Cost No. 1>. No. .2
Item Description
Uns.t uanta
23. Cone Sidewalk 4'It�Wide LF 30.00
STORM DRAINAGE SYSTEM
COMPONENTS
24. . 60" RCP Class- In Place LF 1 130.00 d
25. 54" RCP Class- In Place LF
100.00
26. 48" RCP Class-In Place LF U 75.00
27. 42" RCP Class_ In Place LF U 65.00
28. 36" RCP Class- In Place LF 60.00
29. 30" RCP Class_ In Place LF
50.00 O
30. 24" RCP Class- In Place LF
42.00 v
31. 21" RCP Class_In Place LF
U 40.00 v
32. 18" RCP Class-In Place LF 4 35.00 3 640
33. 15" RCP Class-In Place LF ��� 30.00 13, 300
POLYETHENE PIPE
34. 8" ADS-N-12 or Equal
d 21.00
22.50
35-. 10" ADS-N-12 or Equal
36. 12" ADS-N-12 or Equal
� 24.00 �
O
37. 15" ADS-N-12 or E u O al 25.50
38. 18" ADS-N-12 or Equal
b 28.00 �
UNDERDRAINS
39. 6" PVC SDR 35 In Place LF 15.00
40. 8" PVC SDR 35 In Place LF
0 20.00
RIPRAP
41. Modified Riprap
n 45.00
� U
42. Intermediate Riprap CY 45.00
O U
43. Standard Riprap Cy 45.00
Page 2.
Sub-Total $ y 21 5 20
BOND ESTIMATE FORM
`+ Bond Bond
unit Reduction Reduction
Item Description Unitl QuantitvPrice . Cost No. 1 No. 2
DRAINAGE STRUCTURES
44. Type "C" Catch Basin EA 1500.00 &,n o 0
45. Type "C" Double Grate EA 2000.00 v
46. Type "C-L" Catch Basin EA ( 1500.00 SO D
47. Manhole EA 1500.00
48. Manhole w/Drop Inlet EA 2500.00 v
49. Manhole Over Ten Feet EA b 2000.00
50. Headwall EA 0 * O
51. Endwall EA U
Box Culvert
52. X LF O * 0
53. 15" Flared End EA 0 450.00 0
54. 18" Flared End EA 0 500.00 0
55. 24" Flared End EA 0 550.00 0
56. 36" Flared End EA O 850.00 0
57.
10' Wide
58. Gravel Access Road LF 15.00 0
59. Reset M.H. or C.B. EA 550.00 0
SANITARY SEWER COMPONENTS
60. 12" PVC In Place SDR 35 LF 40.00 0
61. 10" PVC In Place SDR 35 LF 37.00 (3
62. 8" PVC In Place SDR 35 LF 3 35.00 3, Z 3 v
63. 6" PVC In Place SDR 35 LF 30.00 12.11 ISO
* varies
Page 3. Sub-Total $ L/G) 3 a 0
r
BOND ESTIMATE Bo Bond '
Unit Reduction Reduction �.
Item Description Unit uantit Price Cost No. 1 No. 2
SANITARY SEWER STRUCTURES
64. Sanitary Manhole EA y 1500.00
65. Sanitary Manhole n v
w Dro Inlet EA 2500.00
66. Sanitary Manhole
over 10 FT. EA 2000.00 b
67.
68.
STRUCTURES & MISC. ITEMS
69. Retaining Wall EA U
70. Fence U
(Type: EA
71. Guide Rail * U
(Type:__ EA
72. End Anchorage p * v
(Type: EA
73. Guide Post EA 100.00
74. Pavement Marking LF O 1.50
75. Street Signs EA O 75.00 C7
76. Traffic Signs EA U 75.00 O
77. Street Lights E.A 1000.00
78. Furnishing
Placin To soil SY 3� 5v 2.50 , Z ZS
79. Fertilizing, Seeding 3, 110 2.50 2 ZS
and MulchingBY
80. Trees EA - 150.00 -
81. Maintenance/Protection O
of Traffic - * (000
LS
82. Construction Staking - LS
* varies
Page 4. Sub-Total $ 3 O 5y
i
• ft, •�
k t"
BOND ESTIMATE FORM
Bond Bond
c � Unit Reduction Reduction
Item Description unit uantit Price Cost No. 1 No. 2
83. As-Builts LS
84. Iron Pins EA 100.00 7, c000
85. Concrete Monuments EA 8 250.00 Z,fl ov
86. Landscaping LS
87. Driveway-Bit. Conc. SY 20.00
88.
89.
90.
-�.,� L�}t,1DSC�p/Nb 1 S UNDO
St'PE7Z��lE' �� Sub-Total $ 00 0
Sub-Total Page 1' $ Q 3, G,
Sub-Total Page 2 $ Al2, SZO
Sub-Total Page 3 $ -/(o, 3 S'O
Sub-Total Page 4 $ 13,0 S y
Sub-Total Page 5 $ q , 000
Sub-Total $ p
25Z Contingencies x Sub-Total: $
TOTAL $ 2 5 S'to y 5
6* �ZSG oov
* varies
Page 5.
TOWN OF SOUTH WINDSOR
1540 Sullivan Avenue
South Windsor, CT 06074
FAX C O V E R S H E E T
DATE: December 2, 1996 TIME: 1:49 PM
TO: Brian Marsh PHONE:
FAX: 644-7328
FROM: Marcia A. Banach PHONE: 644-2511, ext. 253
Director of Planning FAX: 644-3781
RE: Sidewalk Specifications
Number of pages including cover sheet: 5
Message
As requested, copies of Town of South Windsor sidewalk specifications. Any
questions or modifications needed, call Jerry lazzetta at 644-2511 ext. 245.
- ,;MEMORANDUM
TO: Marcia A. Banach, Director of P1 nning
FROM: Jerry C. Iazzetta, Town Engineer
DATE: January 6, 1997
RE: FITCH MEADOW 96-78P
We have reviewed the plans dated 11-14-96 for the proposed Fitch
Meadow Special Exception and Site Plan and have the following
comments :
1 . WPCA approval may be needed for the extension of the sanitary
sewer main.
2 . We have a concern about the proposed "circular driveway" for
lots 32 and 33 .
a. It is recommended that the access onto Fitch Meadow
Drive either be a shared driveway with one curb cut or
both driveway widths should be reduced. (Each are over
20 feet wide. )
b. If this "circular driveway" is to remain, it should be
a private driveway and not part of the town road with
maintenance the responsibility of the lot owners .
C . If driveway is to remain as shown, a right to utilize
this circular driveway needs to be granted to both
lots .
JCl/j sv
JC7W1"MEMOS/f,f1W 116
PLANNING DEPARTMENT
IN-HOUSE REFERRAL FORM
TO: Matt Galligan, Fred Shaw, Michael Gantick, Sargent Mike
Ritter, Fire Mar Wing, Ray Favreau, Karl Reichle, Mel
Stead
FROM: Marcia A. Banach, AICP, Director of Planning
The Planning & Engineeuing�e���ments have received plans for the
following project: --// 11�-
4 Z
Zone 4O L Acreage Commercial
Subdiv Site Plan Residential
# of Lots/Units z Industrial
Location:
Project Description:
Future Town-owned property involved? Yes No
(a) new streets 4 (existing frontage also)
(b) new open space/recreation area
active passive
(c) new detention area
Planning Department comments:
1
Please let me know by if you will have comments on
this application so that I can follow up with your department when I do
a Planning Department report. Thank you.
PLANNING DEPARTMENT
IN-HOUSE REFERRAL FORM
TO: Matt Galligan, Fred Shaw, Michael Gantick, Sargent Mike
Ritter, Fire Marshal Lanning, Ray Favreau, Karl Reichle, Mel
Stead
FROM: Marcia A. Banach, AICP, Director of Planning
The Planning & Engineeuin�e,ptments have received plans for the
following project:
(� Z -
Zone n L Acreage Commercial
Subdiv Site Plan Residential
# of Lots/Units Industrial
Location:
G
Project Description: Z
Future Town-owned property involved? Yes , No
(a) new streets (existing frontage also)
(b) new open space/recreation area
active passive
(c) new detention area
Planning Department comments:
Please let me know by II (o if you will have comments on
this application so that I can follow up with your department when I do
a Planning Department report. Thank you.
OWN Srq
m 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074
6SOR CO��� AREA CODE 860/644-2511
January 9, 1997
CERTIFIED MAIL
Bryan Marsh
C&C Developers, LLC/Marsh Enterprises, LLC
55 Sandra Drive
South Windsor, CT 06074
Dear Mr. Marsh:
Re: Appl 96-78P, Fitch Meadow Special Exception
We are pleased to advise you that the Planning & Zoning Commission voted on January 7, 1997 to
approve with modifications the above-referenced application for a Special Exception to Article 4.5.2 of
the Zoning Regulations and Modification to the Site Plan of Development on property located on the
westerlyside of John Fitch Boulevard and northerly of Kimberly Drive DRZ as shown on plans
Y Y
prepared by J R Russo & Associates, No. 96080 and dated November 14, 1996. This apprval is
subject to the following modifications:
1. No building permit will be issued until the final mylars have been filed in the Town Clerk's Office.
2. An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 4.13.10 of
the Zoning Regulations.
3. Footing drains are required if the building has a basement.
4. All plans used in the field by the developer must bear the stamp and authorized signature of the
Town of South Windsor.
5: Zoning data table must address the entire property.
6 Landscaping plan must be revised and submitted.
C� WPCA approval is required.
08.
The circular drive will be private and rights to utilize this circular driveway needs to be granted for
both lots.
Black and white transparent mylars of Sheet 2 with the above modifications, together with three-
blueprint copies of the entire set of plans must be submitted to this Commission within 30 days to be
stamped and signed. The letters of approval of this Commission must be reproduced on the mylars_
After the mylars have been signed by the Commission, they will be returned to you for filing in the
Office of the Town Clerk within 90 days. After filing these plans, a copy of the receipt must be
submitted to the Planning Department.
Very truly yours,
PLA ING & ZQNING COMMISSION
l� �
R sell G. Levack, Chairman
RGL/pmm
cc: Town Engineer
Chief Building Official
Assessor
Superintendent of Pollution Control
Fire Marshal
J R Russo & Associates
Sue Rosenthal, AA School Bus Company
I, Russell G. Levack, Chairman of the South Windsor Planning & Zoning Commission, hereby certify
that on January 7, 1997 the Planning and Zoning Commission granted to C/C Developers, LLC/Marsh
Enterprises, LLC a Special Exception to Article 4.5.2 of the Zoning Regulations to the elimination of the
daycare with apartment and allow for two additional units as shown on plans prepared by J. R. Russo
Associates, Inc., No. 96080 and dated November 14, 1996.
Assessor's Map and Parcel Number: Map 109, Parcel #14
More particularly bounded and described as follows: (legal description from Deed or Mortgage)
Commencing at a point in the westerly line of John Fitch Boulevard,
which point is marked by a merestone and which point marks the
southeast corner of land now or formerly of Donna Mangene; thence
N 67° 36' 44" W along the southerly line of land now or formerly of
Donna Mangene, 916.21 feet to a point marked by a brownstone;
thence S 24. 07A' 10" W along land now or formerly of David L.
Evans, et 61, 283.43 feet. to a point marked by a brownstone; thence
S 20. 221 15" W along land now or formerly of Robert W. Lavey, et
al, 349.78 feet to a merestone; thence S 67* 45' 23" E along land
now or formerly of Joseph M. Bouffard, 921.99 feet to an iron pipe;
thence N 22. 321 27" E along land now or formerly of Hartford
Associates, 144.03 feet to a point; thence S 670 271 33" E along
land now or formerly of Hartford Associates, 248.17 feet to a
point; thence along an arc to the right having a radius of 30.00
feet, a distance of 33.14 feet to the westerly line of John Fitch
Boulevard; thence northerly along the westerly line of John Fitch
Boulevard, 578.67 feet to the point or place of beginning.
OWNER OF RECORD: C & C Development LLC/Marsh Enterprises LLC/J.V.
Dated at South Windsor, Connecticut this loth day of January, 1997
In accordance with CGS Section 8-3d
Russell G. Levack, Chairman
Planning & Zoning Commission
Received for record this day of , 19 ,at
South Windsor, Connecticut
ATTEST:
Town Clerk
JAN 8 1997
a_ LEGAL NOTICE
TO BE PUBLISHED IN THE JOURNAL INQUIRER
SATURDAY, JANUARY 11, 1997
SOUTH WINDSOR - PLANNING & ZONING COMMISSION
At its January 7, 1997 Special Meeting, the Commission voted to take the following actions:
1. Deny the Bed and Breakfast Proposed Zoning Amendment - Proposed by PZC to allow bed and
breakfast establishments in older single family houses on Main Street and other arterial streets,
subject to certain requirements
2. Deny appl #96-71P, Mannarino Builders - Zone Change from RR to A-20 on± 35 acres located
on the easterly side of Avery Street and northerly side of Pine Knob Drive
3. Approve with modifications appl #96-81P, John J Lawrence -Reapplication for a subdivision to
create 7 lots (to be known as Fairfield Homes) on property located on Clark Street across from the
intersection of Clark Street and Smith Street, A-20 zone
4. Approve with modifications appl #96-78P, Fitch Meadow - Special Exception to Article 4.5.2 of
the Zoning Regulations and Modification to the Site Plan of Development on property located on
the westerly side of John Fitch Boulevard and northerly of Kimberly Drive, DRZ
Russell G Levack, Chairman
TV�
1� lit
TOWN OF SOUTH WINDSOR "'� ��
STAFF SITE CHANGE MAY 1991
FOR SITE & SUBDIVISION SOLULh V I�i,dsOr
GENERAL: Planning & ZoninJ C9�r
CHANGE ORDER CONTACT PERSON Bryan Marsh Phone No.644-�81TT�L8826
Address 55 Sandra Drive, South Windsor
Site Name Fitch Meadow P&Z No.
Owner C&C Developers, LLC/Marsh Enterprises, Ifi)f7ene No.Same as above
Contractor
Signature of Owner �'✓�-a Date:
Signature of Design Eng Dater
CHANGE: (Describe location a nature of cha"age. Include
Four (4 ) copies of plan/profile of Change. )
Chancre style of units on lots #13 . Unit 013 will change from a
atYl - "A" unit to a style "D" unit. Also, the location and orien-
tation of the units will change slightly.
Reason for Change: (Why is change required)
To provide additional diversity among unit layouts and to move
the units further away from the 65 ' side bldg. line. This will
give future unit owners the option of adding a porch to the rear
of their unit.
APPROVALS : (As Required
Dir.. Of Planning /' t Date•
Town Engineer Date: 5 `
Dir. of Pub is orks Date:
Other: Date:
STAFF COMME
White - Town Engineer Yellow - Applicant
Pink - Director of Planning Goldenrod - Engineering Department
C&C DEVELOPMENT LLc/MARSH[ ENTERPRISES LLc
55 Sandra Drive, South Windsor, CT 06074
528-8826 or 644-2815 Fax: 644-7328
June16, 1997
MEMO TO: Marcia Banach
FROM: Bryan H. Marsh
RE: Fitch Meadow
Affordable Housing
Attached is a copy of the price list for all houses in Phase 1.
Lot 29 is an E Model house that has already been designated as an affordable unit. It is priced$3,000.00
less than the identical E Model house on Lot 7 that is not an affordable unit.
Lot 3 is a B Model house and the unit that we recently requested Town approval as the second
affordable in Phase 1. Lot 3 is priced$4,000.00 less that an identical B Model house on Lot 4.
Affordable units have not been designated for Phase 2 of the project. We are currently working with the
engineer on lot layouts for Phase 2. As soon as that layout is complete we will be able to submit our
request for the Phase 2 affordable units.
Please advise if there is any additional information needed.
ry H. Marsh
FITCH MEADOW IS A REALITY
AND YOU CAN NOW ENJOY THE SOUTH WINDSOR LIFE STYLE
PRICES SEDUCED
PHASE 1 CLOSEOUT
FROM $99,900.0o to $127,900.00
M IEA ® �
FITCH MEADOW- PHASE ONE SELLING PRICE
LOT MODEL SELLING PRICE COMMENTS
2 C $122,900 3BR, 1 1/2 BATH
3 B $117,900 3BR, 2 BATH (MBR on 1st fl)
4 B $121,900 3BR, 2 BATH (MBR on 1st fl)
5 D $125,900 3BR, 2 1/2 BATH
6 D $127,900 3BR, 2 1/2 BATH
7 E $102,900 3BR, 1 1/2 BATH
27 C $124,900 3BR, 1 1/2 BATH
28 A $114,900 3BR, 1 1/2 BATH
29 E $99,900 3BR, 1 1/2 BATH
30 A $116,900 3BR, 1 1/2 BATH
31 C $104,900 3BR, 1 1/2 BATH
LOTS 3 & 29 HAVE BEEN DESIGNATED AS "AFFORDABLE UNITS"
LOTS 28 & 31 HAVE ORIGINAL DEVELOPER LAYOUT
ALL HOUSES CARRY BUILDERS STANDARD ONE YEAR WARRANTEE
.. r.._.. ' rc'b� -r;; y.�•:.,� %,yj „{ifs; i st*5�, .�•5 v -road.fir '1
TOWN OF SOUTH WINDSOR
STAFF SI.TE CHANGE
FOR SITE & SUBDIVISION
GENERAL: 1 ,r
CHANGE ORDER CONTACT PERSON [ rJtS �= 'hone .No. d t �{
Addresss.3-►., '� � "1 f E"' Y� C,�
Site Name , #�rn{ a► P&Z No.
Owner ( C 0 i .-A"y r n Phone No.:
Contractor
Signature of Owner ntl Date`s .
Signature of Design .Engr.>` Dater
CHANGE: (Describe location and nature of change. Include
Fou (4 ) co ies of plan/profile of Change. ).
Reason for Change: (Why, is change required)
APPROVALS: (As. Required)
Dii:. Of Plannin Date Cs
Town Engineer Date:' fi
Dr. of Public s Dates
Other: Date:
STAFF- COMMENTS,:'
White - Town Engineer Ye11ow - Applicant
Pink Director of Planning . ' Go]denrod .Engineering Department'
TOWN OF SOUTH WINDSOR
STAFF SITE CHANGE
FOR SITE & SUBDIVISION
GENERAL:
CHANGE ORDER,, � ' ra 1'''�CONTACT PERSON R y R A s tit Phone No. t�'14 _ 2 ,F/. '
Address 247 W t�t hodQp L.rA m d°' �„r'�' . t r-,.ml 0 OL
Site Name r- t tc. M a A e4 a -,r P&Z No. ` /�►'i� '9
Owner C 4 C Ze✓e-{a igC R x , J`-9,y ne r ar GA.)t+^too t c s Phone No. �; •• 3 t t.S"
Contractor A "
Signature of Owner .,. ,� X""`'1 ► �. Date:
Signature of Design Engl. Date:*
CHANGE: (Descrf-be location and nature of change. Include
Four (4 ) copies of plan/profile of Change. )
- e!�f A"q e- G 10 A0%N, a.+os 4:Aq ,✓a.w '4 a Ca.q J-a t, !3"i 14 . -to S r-4 A e A 7t.4
GR1 4. L.a yS ! o tAL sfat —a- f. Move Netej d a ► vC- woy to Lot �4
�t�is.1 I�fit,� � t! � •• ++�t -.S�.1�. / f� I+�1�,S �.��6. � �*�1.5 I �
TO M t N c h t z Gum �y "�"� 6e t L% Gf A i v e.w 4 y s1 tea' // �4. r� u c.a of
e Z ' t � (,.3 i C1 , o �i c1 e� i'�t f3,-r A + +t2 +b' c tr '� 3 w ► 1 1
Reason for Change: (Why is change required)
df bct� lets
4Z#%7 1 r4 e.t jZ 1 J j P (-ft pJ w t k l 64 A T+e R A P P rt o Vf�► `
APPROVALS: (As Requir d)
Dir. Of Planning Date: r
Town Engineer Date:
Dir. of Public r s Date:
Other: Date:
STAFF COMMENTS:
t
White - Town Engineer Yellow - Applicant
Pink - Director of Planning Goldenrod - Engineering Department
I to
to
77xo *.74. R N _-V of `\
V
6.
Lot 14 �
9• —
, y , p _
MH
I 77F=7$.27
�� lI FL--70.60 \\
\\ j L=10.99' 1 /h 'C\
4,��y ��� 0 - 266U'"17' CI.LOt 13 �? ��. — 24 34'06' / R = 55.00'
�:71.01 — 38.00' L = 257.3B' (Total)
s�J• F 78.3 = 16.29' (Total) / /
O `
PROR
07, \ Phase 11 71.0
4, oat, G % \ y 12EMOVE Ear. ce3 TGP
M\OC Al R 38 00'
/ �L = 42.15' (Total)
t acres /N I Z�'01
acres
t acres
acres �ti`4, — — — —
E acres Lot 12 1�o b Q � CS — —din
7F=77.3 2,tl Building
yy Cz \i /
J
Ay d
.`OW N Sf4
O C ate l e Soa&
U
sfi 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
4f a�
tidSOR•Co AREA CODE 860/644-2511
September 10, 1997
Mr. Bryan H. Marsh
C & C Development LLC/Marsh Enterprises LLC
55 Sandra Drive
South Windsor, CT 06074
Dear Bryan:
Re: Fitch Meadow, Lots 13 & 14 Driveways
This will confirm the Planning &Zoning Commission approval for the separation of the shared
driveway for Lots 13 and 14 at Fitch Meadow. This approval includes the following conditions:
1. The driveway for Lot 14 must be moved away from the catch basin and electrical
service box. (We acknowledge that it will probably have to infringe somewhat on the
cul-de-sac.)
2. The driveways for both Lot 13 and Lot 14 should be reduced to 12 feet in width.
3. There will be no additional curb cuts created by future separation of shared
driveways.
If we may be of further assistance,please do not hesitate to contact me.
Very truly yours,
Marcia A. Banach, AICP
Director of Planning
cc: Jerry Iazzetta, Town Engineer
Mel Stead, Superintendent of Streets
i
L
1540 Sullivan Avenue,South Windsor,CT
9(860)644-2511,ext.253 Town of • • •
Fax(860)644-3781
Planning Department
Fcaix
To: Andre Charbonneau From: Marcia A. Banach, Director of Planning
Fax: 291-8191 Pages: 2
Phone: Date: 01/05/98
Re: Fitch Meadow Detention Basin Proposal CC: Jerry lazzetta,Town Engineer; Mel Stead,
Supt.of Streets
❑ Urgent ❑ For Review ❑Please Comment ❑ Please Reply ❑Please Recycle
• Comments:
Town staff agree that there is potential to use the driveway at Maneely's to access the Fitch Meadow
detention basin. There are some items that need to be worked out to make the detention basin fully
accessible from Maneely's parking lot; these items are listed on the attachment from Mel Stead,
Superintendent of Streets. Also, instead of dimensioning an easement, we suggest that a "right to
access"format be used. (It is unlikely that Town trucks and equipment accessing the basin would be
able to stay within the confines of a dimensioned easement.)A hold harmless agreement would also be
needed.
Please feel free to work directly with Jerry lazzetta and Mel Stead to address the items attached
Date• �, N Of
_.- Pages
To: From: d rZ
Co./Dept. Co./Dept.
Fax: - -7 Fax:
Phone: Phone:
` Note: E-Mail:
1
.. j
OBSERVATIONS --- FITCH MEADOW
DETENTION POND PROPOSAL
12/3/97 — M. Stead
■ Maneely's plan appears out dated. Pavement extends out to rear property line and to the left
to rear of building.
■ There is a concrete dumpster pad with dumpster at southwest corner of lot.
■ There is an earth berm with spruce plantings between the pavement and the detention pond.
This adds 3 or 4 feet to the slope down to the flowline of the splash pads.
■ Berm would have to be negotiated in 2 places, as equipment travel would not be possible
along the edge of pond parallel with parking area.
■ Access along the west property line on Fitch Meadow property is possible but two 6-inch
diameter trees would have to be removed (orange ribbons on them). One dead 16"dia. tree
needs to be removed; one 4" dia. tree needs to be removed.
■ Even with trees removed, access would be narrow but passable to get to outlet structure.
■ The access to outlet structure should have the loam removed, gravel placed then reloamed
and seeded.
DtiMly Ta
DEC 4 1997
South Windsor
bNDCeB .A toning Commission
F _
C&C DEVELOPERS LLC/MARS HI ENTERPRISES LLC
55 Sandra Drive, South Windsor, CF 06074
528-8826 or 644-2815 Fax: 644-7328
June 29, 1998 RECEIVEU
Marcia A. Banach, Director of Planning JUN so 19%4
Town of South Windsor
1540 Sullivan Avenue
South Windsor, Ct. 06074 Sam W= m" K"•
FITCH MEADOW
ROUTE 5, SOUTH WINDSOR
MODERATE HOUSING PROGRAM
We are becoming increasingly concerned about our inability to comply with the requirements of
the Moderate Housing Program. The Fitch Meadow project was set up originally with a
requirement to include six Moderate Housing units. We were successful in selling two units in
Phase 1 to buyers that qualified under the program guidelines. With the exception of these two
units, we have not been able to arouse any interest from over one hundred potential buyers..
We agree that the program had tremendous value and necessity at the time it was introduced. Real
estate prices were at an all time high and builders could afford to offer sizable reductions in price
to approved buyers under the program. Buyers did not worry about the negatives because it was
the only way they were going to be able to purchase a new home. Those conditions do not exist
in todays real estate market and buyers see no reason to take on the very real encumbrances of the
program when they do not have to in order to buy a house.
Please consider the following points that summarize almost two years of unsuccessful effort to
comply with the program:
• The program allows for the sale of three bedroom homes at a maximum price of$159,000.
We have sold 20 houses at prices ranging from $100,000 to $134,900. Every house has
been $24,000 to $59,000 below that maximum figure. If the primary objective of the
program was to give buyer an opportunity to buy within the price structure of the program,
it could be said that we are selling 100% within the guidelines, not 20%.
• When we are selling houses at $100,000 to $134,900 it is impossible to offer a reduction in
price that makes it irresistible regardless of the negatives. We are currently offering a
$6,000 reduction in price on any house sold under the program.
• Buyers will not accept the requirement that all future buyers must qualify under the plan. On
a resale, the owner must find someone that likes the house, accepts the price, accepts the
neighborhood and also qualifies. That buyer may never be found and the house may remain
on the market as unsaleable.
• Most important, because prices are so low buyers do not need the program.
• Even if a buyer is interested, they may not qualify because of salary or assets.
��t `�ererztuve
55 Sandra Drive, South Windsor, CT 06074
528-8826 or 644-2815 Fax: 644-7328
Article VII of the program states that the program may be amended or terminated at any time by
the Town Council. We are not recommending that the program be canceled. However, in the best
interest of the people that the program is intended to serve; there should be a way of interpreting
the plan based on the availability of housing within the program pricing structure or have a
moratorium on the plan until economic conditions require that it be activated to provide moderate
priced housing. One possible interpretation could be to exempt any project where every house is
being sold below the guideline of two and one half times the medium income for a family of five.
We have asked our Realtor, Cile Decker Associates, to provide us with information as to why
they have not been able to sell the number of houses required under the plan. We are attaching a
memo from Cile Decker dated June 25, 1998 for your review.
Several of our buyers have stated that they did not think it was possible to purchase a house of the
quality we are offering in a neighborhood like Fitch Meadow for such a low price. These
comments confirm that we are providing an opportunity for people with limited financial means to
purchase a new home. We are proud of what we have been able to provide and we need a
common sense evaluation by the Town on what can be done regarding the Moderate Housing
program so that we can complete a project that has already provided housing for numerous
borderline buyers.
We are prepared and willing to meet at any level that is appropriate to resolve this issue.
Thank you for your time and attention to this request.
Bry n H. Marsh
Partner
1741 ELLINGTONROADCIIpE( KER SOUTH ,CT
ASSOCIATES BUS.(860)644-4701
06074
RESIDENTIAL REAL ESTATE FAX(860)644-8670
MEMO TO: Bryan Marsh
FROM: Cile Decker
SUBJECT: MODERATE HOUSING AT FITCH MEADOW
DATE: June 25, 1998
As the party responsible for the marketing of the Fitch Meadow subdivision and having
a good understanding of the Town of South Windsor's requirements regarding
compliance with the existing Moderate Housing regulations, I feel that I must share with
you my observations and my concerns.
We find that the buyers for Fitch Meadow are reluctant to pursue purchasing under the
Moderate Housing Program for the following reasons:
• It is very difficult for most to meet the guidelines due to the required income
restrictions and asset limitations.
• The property prices in the subdivision all fall below those required for Moderate
Housing when the plan was put into place. Most people do not wish to consider an
affiliation with Fitch Meadow as a Moderate Housing connection, but rather as a
normal purchase.
• The fact that the properties must remain in the program even upon resale will
greatly limit any current buyers abilities to market homes for resale, since
subsequent buyer's must meet current guidelines.
• All owners must be occupants of the units they purchase, thereby eliminating the
ability to rent, if necessary, due to unforeseen circumstances.
• The $6000.00 reduction incentive is very substantial but, still, buyers are
uncomfortable with the Moderate Housing Guidelines and tend not to take
advantage of the opportunity.
An Independently Owned and Operated Member of Coldwell Banker Residential Affiliates,Inc.
-2-
The program was initiated several years ago when prices of residential homes were
escalating in excess of 1 1/2% per month. It was virtually impossible to purchase a
home for less than $150,000 in South Windsor. Currently, there are many
residential properties being offered in a much lower price range, some below
$100,000. The need for such a program has greatly diminished and the potential
participants are difficult to attract.
I have advertised Moderate Housing opportunities at Fitch Meadow in the
newspapers and have received no response. We have offered Moderate Housing
opportunities at our weekly "Sunday Open House" held at the property and find
them to be less than attractive to buyers.
My concern is that, at Fitch Meadow, we must sell another four units under this
program. I know that this will be very difficult to accomplish. I feel that the Town of
South Windsor should consider some adjustments to the program. I understand the
ramifications of the Housing Compact that this community has entered into, along
with other communities, committing to the Moderate Price Housing Program. The
program filled many needs years ago when it was implemented. Economic
conditions have modified substantially since that time and certainly the "Housing
Market" has endured and survived very significant changes.
I believe these facts indicate an urgent need to review the program as it currently
exists and to seek such appropriate modifications that would be beneficial to all
parties. At least an effort should be made with significant persistence! Change is
inevitable, and programs must be reviewed in order to assure that they continually
meet the needs of those for whom they were created.
KIMBERLEE J. AUSTIN
11 FITCH MEADOW LANE ono �ra I
SOUTH WINDSOR CT 06074
June 6, 1999 �
TOWN PLANNING / ZONING RE (
TOWN OF SOUTH WINDSOR JUN a 1999
SULLIVAN AVE
S WINDSOR CT 06074 SOUTH WNDSOR pulln OEM
To Whom It May Concern.
I have been recently informed that the owners/association of the Fitch
Meadow Development plan to put the entrance to a walking trail directly
across my back yard. It is a few short feet between the rear of my house
and this proposed trail entrance.
The association's representative informed me that I signed something in my
homeowner's book when I bought the house that said it was to be. I can find
no such document or verbiage in my book.
I have twice written the Developers ( C & C)and, while I have received a
reply, I am not satisfied in the least.
I respectfully request that the powers that be in the government of the
town of South Windsor re-examine this proposed walking trail entrance's
location. I find it hard to believe that it would be an "approved" location for
such, especially when alternatives are readily available nearby. I am also
wondering if it would be possible to halt the construction of this trail
entrance until the matter is thoroughly investigated.
Thank you,
jimber�lee J. Austin
Pc: C & C Developers
2 m6erree-7 Austin
11 Fitch Meadow Lane
South Windsor, C7 06074
May 19, 1999
Andr6 Charbonneau
Bryan Marsh
C &C Developers
55 Sandra Drive
South Windsor, CT 06074
Dear Andre and Bryan:
As you know, I have been a happy resident of Fitch Meadow since "the beginning".
I must, however, voice my protest against the walking trail entrance. Have you actually seen,
in person, where that is planned to go? It is dreadful! Cannot this be moved to the RV parking
area ... or somewhere not to infringe on anyone's privacy?
I saw the petition, everyone said "yes" to it, but as I recall, when a gazebo was planned at the
other end of the street, the resident whose privacy would have been compromised were very
vocal, and everyone else supported their rights as such.
Please reconsider where this entry point will be, and let me know you thoughts.
I am prepared to take further steps, if necessary, to block this action.
Best regards,
Kimberlee J. Aust
C&C DEVELOPERS LLc/MARSH ENTERPRISES LLB:
55 Sandra Drive, South Windsor, CT 06074
528-8826 or 644-2815 Fax: 644-7328
May 24, 1999
Kimberlee J. Austin
I 1 Fitch Meadow Lane
South Windsor, Ct. 06074
WALKING TRAIL ENTRANCE
We have received your letter of May 19, 1999 and are sorry to hear that you feel the walking trail
location compromises your privacy. Let us give you some of the background that has brought us
to this point.
• A walking trail has always been on the original engineers plans that were approved by the
Town and that trail was in the area of the Day Care center. Approximately the same
location presently planned for the trail.
• The Day Care center with a fenced in play yard would have been immediately adjacent to
your property. We were successful in getting the Town to agree to eliminate the Day Care
center and a second floor apartment in favor of two single family homes.
• It is our intention to put a split rail fence on both sides of the trail to the back property line
of your property with a gravel path to the edge of the woods.
• The original approved engineers drawings showed the R/V storage area between Lots 26 &
27 or right in the middle of the project. We were successful in getting the Town to approve
moving the R/V storage area to its current location near Route 5. It was our suggestion that
a gazebo be located in the old R/V storage location. We believe the relocation of the RN
storage greatly improved the overall appearance of Fitch Meadow. At a meeting of home
owners we were asked to eliminate the gazebo and landscape that common area.
Landscaping for that area has been professionally designed and will be done shortly.
We believe that all of the changes that have been made have been in the best interest of all home
owners and helped create a successful and highly praised neighborhood.
It is out intention to proceed with the walking trail as currently approved by the Town. We hope
this information confirms that we have improved not hindered your privacy and that we have
always proceeded with the home owners interest in mind.
ry�H.. Marsh
l I Fitch Meadow Lane
S. Windsor CT 06074
June 2, 1999
C&C Developers
55 Sandra Dr.
S. Windsor CT 06074
Attn: Mr.Bryan H. Marsh
RE; WALKING TRAIL ENTRANCE,FITCH MEADOW
Dear Bryan:
Thank you for your quick response to my recent letter expressing concern over the location of the entrance
to the walking trail.
I understand that the trail has always been part of the plans.....however,as your letter so clearly illustrates,
these plans evolved,and continue to evolve as does the development itself. I also can appreciate the point
made as the walking trail entrance being a lesser evil than a day care center.
That being said,I still would request that you revisit this issue. I still don't understand why the entrance
cannot be off the RV storage area. It seems to me a very awkward place,between two private homes,to
locate this entrance. I wonder if the town official who approved this plan had his wits about him/herself
that day. Perhaps that is the place that I should be voicing my concerns.
Your kind attention,as always,is most appreciated.
Best regards,
KIMBERLEE J. AUSTIN
Bond No. 7082
�� p
,— CSTA� RECEIVED ORIGINAL BOND BACK o d (date)
� INSURANCE COMPANY
233 MAIN STREET . P.O. BOX 2350
NEW BRITAIN,CT 06050-2350 (signature) PERFORMANCE
7
(203)224-2000 nYA I', H- ILIA BOND
BOND
(Print Name)
C&C Developers, LLC/Marsh Enterprises, LLC
KNOW ALL MEN BY THESE PRESENTS, that We Joint Venture
55 Sandra Drive, S. Windsor, CT 06074 , as Principal, and ACSTAR INSURANCE COMPANY,
233 Main Street, P.O. Box 2350, New Britain, CT 06050-2350, as Surety, are held and firmly bound unto
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT 06074
as Obligee, hereinafter called the Obligee, in the penal sum of Five thousand and 00/100-------------
---------------------------------Dollars $ 5,000.00
( for which payment
well and truly to be made we do bind ourselves, our heirs, executors, administrators and assigns, firmly by these
presents.
THE CONDITION OF THIS OBLIGATION IS SUCH, that:
WHEREAS, the Principal entered into a certain contract with the Obligee, dated
for Fitch Meadow, A Planned Community John Fitch Blvd. , South Windsor, CT. Coverage for
unsatisfactory performance in the completion of landscaping required by the Town of South
Windsor pertaining to Fitch Meadow (Application #91-29P) as approved by Plainning & Zoning
on 12/3/91 and 4/13/93 and as referenced by dwgs 6-1 and 6-2 prepared by Raymond Jefferson*
which contract and the specifications therefore shall be deemed a part hereof as fully as if set out herein.
NOW, THEREFORE, if the said Principal shall well and truly perform all the work specified in said contract, then
this obligation to be void; otherwise to remain in full force and effect.
The foregoing obligation is subject to the condition that no suit or action shall be commenced hereunder after the
expiration date of one year following the date on which Principal ceased work on said contract or the date on which
final payment under the contract falls due, or the date on which goods or services were received by principal,
whichever occurs first. The Surety shall have no obligation to claimants who do not have a direct contract with the
Principal.
IN WITNESS WHEREOF, the above bounden parties have executed this instrument under their several seals
this 11th day of April , 19 97 the name and corporate seal of each corporate parry
being affixed hereto and these presents duly signed by its undersigned representatives, pursuant to authority of its
governing body.
ATTEST:
Principal (Seal)
BY
*dated 8/30/91 and revised 10/28/96 for L-2 and 11/6/96 for L-1.
ATTEST: ACSTAR INSURANCE COMPANY (Seal)
By
a 'e"Ad1vrJ W. Nozko, JR.
Tite president
0130(1/94)
FITCH MEADOW IS a REALITY
AND YOU CAN NOW ENJOY THE SOUTH WINDSOR LIFE STYLE
PRICES EDUCED
PHASE 1 CLOSEOUT
FROM $99,900.00 to $127,900.00
F 1E4.4lk6m ® w
FITCH MEADOW- PHASE ONE SELLING PRICE
LOT MODEL SELLING PRICE COMMENTS
$122p900 3BR, 1 1/2 BATH
so � 7t -�� �vv 3BR, 2 BATH (MBR on 1 st fl)
4 B $121,900 3BR, 2 BATH (MBR on 1st fl)
5 D $125,900 3BR9 2 1/2 BATH
$127,900 3BR, 21/2 BATH
7 E $102,900 3BR, 1 1/2 BATH
S o� 3BR 1 1/2 BATH
tj6�� 7Q �7 7 A nnn
A
v 3BR, 1 1/2 BATH
29 _ E _- $99,900 3BR, 1 1/2 BATH
31111, 1 1/2 BATH
S°��--3 ------r 3BR, 1 1/2 BATH
LOTS 3 & 29 HAVE BEEN DESIGNATED AS "AFFORDABLE UNITS"
LOTS 28 & 31 HAVE ORIGINAL DEVELOPER LAYOUT
ALL HOUSES CARRY BUILDERS STANDARD ONE YEAR WARRANTEE
Nft
SENDER:
■Complete items 1 and/or 2 for additional services. I also Wish to receive the
r/► ■Complete items 3,4a,and 4b. following services(for an
d ■Print your name and address on the reverse of this form so that we can return this extra
card to you. ra fee): ai
Attach this form to the front of the mailpiece,or on the back if space does not 1. ❑ Addressee's Address 2
d permit.y ■Write'Retum Receipt Requested`on the mailpiece below the article number. 2. ❑ d
Restricted Delivery rn
■The Return Receipt will show to whom the article was delivered and the date
c A.
delivered. Consult postmaster for fee.
3.Article Addressed to: 4a.Article Number d
d
Z 262 395 777 C
a E
E 4b.Service Type
BRYAN MARSH ❑ Registered EkCertified 0
of
C&C DEVPRS/MARSH ENTERPRISES LLC ❑ Express Mail ❑ Insured c
c 55 SAN DRI ❑ Return Receipt for Merchandise ❑ COD
a SOUTH dI DSO 4 7.Dat o P�� � � w
3
5.R111d By:(Print Name) 8.Addressee's Address(Only if requested
w and fee is paid) s
6.Si re: (Addressee or Agent)
w
X IN
PS Form 3811, December 1994 Domestic Return Receipt
ai SENDER: 1 also wish to receive the
"a ■Complete items 1 and/or 2 for additional services.
■Complete items 3,4a,and 4b. following services(for an
d ■Print your name and address on the reverse of this form so that we can return this extra fee):
card to you.
■Attach this form to the front of the mailpiece,or on the back if space does not 1. ❑ Addressee's Address
i permit. d
y ■Write"Return Receipt Requested"on the mailpiece below the article number. 2. ❑ Restricted Delivery N
Jr ■The Return Receipt will show to whom the article was delivered and the date .+
delivered. Consult postmaster for fee.
V 3.Article Addressed to: 4a.Article Number
P 259 184 752 `
M BRYAN MARSH 4b.Service Type
cc C&C DEVELOPERSLLC/:MARSH ENTERPRS ❑ Registered Certified ¢
55 SANDI:A DRIVE
rn ❑ Express Mail ❑ Insured c
0
cc SOUTH WINDSOR CT 06074
❑ Return Receipt for Merchandise [:1 COD
a7.Date of Delivery