Loading...
HomeMy WebLinkAboutSite Plan (183) TOWN OF SOUTH WINDSOR, CONNECTICUT PLANNING AND ZONING COMMISSION n APPLICATION FORM �•. 4 Application No. /d, _ Date Received: ,� 9 APR 12 1995 Action/Public Hearing by: Receipt No. : /� - South Windsor APPLICANT: , �� �� �/,j /,j ,. planning & Zoning Commission ADDRESS: o q /4i i� 5 T �cl OWNER OF RECORD ON LAND RECORDS: ADDRESS: COMPLETE LOCATION OF PROPERTY: ASSESSOR'S MAP# PARCEL# LOT# ZONE NAME, ADDRE , T EP E NUMBER OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED: 1 k) -- -3 5-0/ O (, d 7 TELEPHONE��B THIS APPLICATION IS FOR: (Check all that apply) : 1 . Zone Change to (Public Hearing required) . 2 . Subdivision/Resubdivision. a. Subdivision Minor Major b. Resubdivision _ Minor Major (Public Hearing Req. ) C . Conditional Approval d. Open Space Subdivision (Public Hearing Required) 1 3 . Special Exception to Article (Public Hearing Required) 4 . Site Plan of Development. 5 . General Plan of Development. 6 . Earth Filling [Sec . 10] and/or Earth Removal [Sec . 9 ] (PH Req. ) 7 . Regulation Amendment: Zoning Subdivision 8 . Amendment to Town Plan. 9 . Temporary and Conditional permit. 10 . Other (explain in detail) : CONSULT PLANNING DEPARTMENT FOR FEE SCHEDULE. THIS APPLICATION MUST BE SIGNED BY THE APPLICANT AND OWNER OF THE PROPERTY AND SUBMITTED IN TRIPLICATE WITH ALL MAPS AND DOCUMENTS REQUIRED ON ATTACHED CHECKLIST, ALL CH 70ITUTE THE APPLICATION. plicant er PLANNING AND ZONING COMMISSION APPLICATION, CONT'D. TIME FRAMES AND PROCEDURES FOR SUBMITTING APPLICATIONS/PLANS 1 . All prospective applicants are urged to confer with Town Planning Department and Engineering Department staff prior to submission of any application to the Commission. 2 . Plans are officially received only on the fourth Tuesday of each month at the Regular Meeting of the Planning & Zoning Commission (PZC) . 3 . Three ( 3 ) sets of blueprints are required on the second Tuesday of the month for review by the Town Planning and Engineering Departments . This deadline must be met if you want to ensure that your application is officially received by PZC. These plans must be submitted as complete plans -- which includes application plus all required information contained on checklist. It is the applicant's responsibility to ensure that all information required on the checklist is submitted in one package at the time of submission -- including landscaping plans, architectural elevations, traffic report, etc. 4 . After review, Town staff will notify the applicant of requested/required modifications . 5 . If the applicant makes recommended modifications to plans, six sets of revised plans must be submitted. If a Public Hearing is required (or optional but likely) then seven sets are required. Revised plans should be complete packages (applicant may disassemble previously submitted plans and reuse sheets if so desired) . LETTER OF TRANSMITTAL PLANNING DEPARTMENT TOWN OF SOUTH WINDSOR 1540 SULLIVAN AVENUE SOUTH WINDSOR CT 06074 5I�0 I^ \ ( 203 ) 644-2511 DATE :too I IF T0: 1I AAA,1 � �� r RECEIVED M AY 1 0 1995 SOUTH VANDSM N 7:5.DEPT. e Cv WE ARE SENDING YOU: P & Z initial plans Drainage comps P & Z final plans Bond estimate requests Inland Wetlands plans Bond reduction requests Final plans for filing Change order form Other Correspondence Copies A 1 .. No. Pro ect I S fA---P. THESE ARE TRANSMITTED as checked below: XFor review and comment For your file For your use Returned with revisions As requested Other c PLEASE RETURN/COMMENT BY: COMMENTS: 'h ilJ r v i' Copy to: From: r�- 2> TOWN OF SOUTH WINDSOR ID :203-644-3781 MAY 24 ' 95 10 01 TRRNSM I T C:.ONF I RMRT I OIL REPORT RECEIVER 003 2032829423 TRANSMITTER TOWN OF SOUTH WINDSOR �^tJ DATE MAY 24 '95 10 :01 DURATION 00 '54 (� MODE STD PAGES 02 RESULT OK <0,N Stq O-P s-11:::;W'-1'h vz 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 AREA CODE 203/644-2511 �SOR--C00 FACSIMILE MESSAGE TRANSMITTAL FORM Date: rja3j(j,5 PLEASE DELIVER THE FOLLOWING PAGES TO: NAME: VC [1 ADDRESS : FAX: c - �J MESSAGE FROM: NAME: " La k-VIJ 4--c L ADDRESS : _ MESSAGE hlea )ie �Llj ("mow.► ll-k 5 �+, ro�rj I i v✓�' `Ke 1'v\ Vt ✓V bJ-� C 6r-e,ru c, 6 l lAA - T 0 �� � Y� — YI�+G,C I►wt y� �'l �0 rare� r���%� Number of pages to follow: GRIGORIAN SITE PLAN PLANNING COMMENTS 1. Impervious coverage must be shown on the plans 2. Additional landscaping should be added on the side of the entrance and around the parking area 3. The two dumpster on site must be placed on a concrete pad and screened 4. Temporary storage trailer must be removed from the site once the new storage building is constructed Once the impervious coverage issue has been addressed and we can determine that it is within zoning requirements, the other items can be placed as conditions on the approval letter. There are no engineering comments on the plans. t p.NN St,( Tom Ole Soiam ?A Z ` 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 AREA CODE 203/644-2511 'OSOR-COa� June 5, 1995 Richard Grigorian 369 Main Street South Windsor, CT 06074 Dear Mr. Grigorian: Re: Appl #95-14PX, Grigorian Site Plan Please be advised that the above referenced application for site plan has been approved with modifications. This approval is based on plans prepared by Aeschliman Land Surveying dated May 5, 1995, revised June 2, 1995 with the following modifications: 1. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 2. No building permit will be issued until the final mylars have been filed in the Town Clerk's Office. 3. An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 8.1.10 of the Zoning Regulations. 4. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 5. The compactor on the site must be placed on a concrete pad and screened. 6. Temporary storage container on the southerly side of the site must be removed once the new storage building is constructed. Black and white transparent mylar of Sheet #1 with the above modifications, together with three blueprint copies of the entire set of plans must be submitted to be stamped and signed. The letter of approval must be reproduced on the mylar. Very truly yours, Marcia A. Banach, AICP Director of Planning MAB/pmm cc: Town Engineer Chief Building Official Superintendent of Pollution Control IWA/CC c� -A,,,P •' 4,-19-99 Y 6 7 CERTIFIED MAIL Dear Mr. Qpaka: k a r iq G✓iJoYIan Re: Appl #95-*PX, Tbe avider y Please be advised that the above referenced application for site plan has been approved with modifications. This approval is based on plans prepared by - with the following modifications: /.4 L 615Iq�;' re✓i � �l�Iss� 1. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 2. No building permit will be issued until the final mylars have been filed in the Town Clerk's Office. Thi �P/ n� bject t con ti ns o ro o etlanno missi 2 An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 8.1.10 of the Zoning Regulations. 51 All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. mus e s own S. Black and white transparent mylars of Sheet #J'with the above modifications, together with three blueprint copies of the entire set of plans must be submitted to this Commission within 30 days to be stamped and signed. The letters of approval of this Commission, Agent must be reproduced on the mylars. C� sf� c 4 TOWN OF SOUTH WINDSOR STAFF SITE CHANGE FOR SITE & SUBDIVISION GENERAL: CHANGE ORDER CONTACT PERSON Phone No. ' Address Site Name P&Z No. J"-l!� Owner Phone No. Contractor Signature of Owner - - Date: Signature of Design Engr. Date: CHANGE: (Describe location and nature of change. Include Four (4 ) copies of plan/profile of Change. ) 1.' f Reason for Change: (Why is change required) APPROVALS: (As Required) Dir. Of Planning Date: i Town Engineer )r �- r �' •,:_ Date: 71- C "" Dir. of Publi;� Works Date: Other: Date: STAFF COMMENTS: White - Town Engineer Yellow - Applicant Pink - Director of Planning Goldenrod - Engineering Department