HomeMy WebLinkAboutSite Plan for Portable Classrooms l vrw vc JUul 1 Al '4u0UK, I,UNNtLTiLU
R;v:JVzJ
PLANNING AND ZONING COMMISSION
APPLICATION FORM
Application No. ���} - 0�
Date Received: FEB 22 1995
Action/Public Hearing by:
Receipt No. : South WindsorPlanning & Zoning Commissiop
APPLICANT: Town of South Windsor/Board of Education/Dr. Joseph Wood, Superintendent
ADDRESS : 1737 Main Street _ South Windsor, CT 06074
OWNER OF RECORD ON LAND RECORDS: Town of South Windsor/Board of Education
ADDRESS : 1737 Main Street South Windsor, CT 06074
COMPLETE LOCATION OF PROPERTY: 100 Arnold Way
ASSESSOR'S
MAP# 67 PARCEL# 78 LOT# - ZONEA-30
NAME, ADDRESS, & TELEPHONE NUMBER OF PERSON TO WHOM, -INQUIRIES SHOULD BE
DIRECTED:—Dr. Joseph Wood, Superintendent of Schools
TELEPHONE: 291-1205
THIS APPLICATION IS FOR: (Check all that apply) :
1. Zone Change to (Public Hearing required) .
2. Subdivision/Resubdivision. - -
a. Subdivision 'Minor Major
b. Resubdivision _ Minor Major (Public Hearing Req. )
C. Conditional Approval
d. Open Space Subdivision (Public Hearing Required)l
J 3 . Special Exception to Article �.3 / f. (Public Hearing Required)
X 4 . Site Plan of Development. IVJ, g"b.c
5 . General Plan of Development.
6 . Earth Filling (Sec. 10] and/or Earth Removal (Sec. 9 ] (PH Req. )
7 . Regulation Amendment: Zoning Subdivision
8 . Amendment to Town Plan.
9 . Temporary and Conditional permit.
10 . Other (explain in detail) :
CONSULT PLANNING DEPARTMENT FOR FEE SCHEDULE. THIS APPLICATION MUST BE
SIGNED BY THE APPLICANT AND OWNER OF THE PROPERTY AND SUBMITTED IN
TRIPLICATE WITH ALL MAPS AND DOCUMENTS REQUIRED ON ATTACHED CHECKLIST,
ALL OF WHICH CONSTITUTE THE APPLICATION.
aj_4_.,0,0L / �,Zaa 1z 4
Ap, 1i c4ftnt I Owner
zw
3 Ile?
4,46
6y
31
ed,
ILI-
"Ir
17 1
64--e
Vf
/ _ -
-�,� � �'
F} ,.�
/ .._ ��_�
STANDARD APPROVAL MODIFICATIONS FOR SITE PLAN (rev. 2/7/89) (/
PROJECT APPL. NO.
ENGINEER/ARCHITECT La Lf f 16ed s' PROJ. NO.
DWG. NO. DATE REV. DATE
SUBMIT MYLARS OF SHEETS . .
�1 . Prior to commencement of any site work, a meeting must be
held with Town Staff.
2. No building permit will be issued until the final mylars
have been filed in the Town Clerk's Office.
3 . This application is subject to the conditions of approval
of the Inland Wetlands Agency/Conservation Commission,
including a bond in the amount of $
sY.• An as-built plan is required prior to issuance of a
Certificate of Occupancy per Section 4. 13.10 of the Zoning
Regulations .
5 . Footing drains are required if the building has a basement.
6 . A landscape bond in the amount of $ is required
and must be submitted prior to filing of mylars .
All plans used in the field by the developer must bear the
stamp and authorized signature of the Town of South
Windsor.
Black and white transparent mylars of Sheets #
with the above modifications, together with three blueprint copies of
the entire set of plans must be submitted to this Commission within
30 days to be stamped and signed. The letters of approval of this
Commission, as well as the Inland Wetlands Agency/Conservation
Commission, must be reproduced on the mylars.
After the mylars have been signed by the Commission, they will be
returned to you for filing in the Office of the Town Clerk within 90
days . After filing these plans, a copy of the receipt must be
submitted to the Planning Department.
� 6-"AL, 4�'nyl
- ( j --
Ll
(o veo-
la-ecel-e
PROJECT NA.`2E/LOCATION f-- i�"� •`�`1'�` /�
APPLICATION
-----------------
DdTE
NOTE TO THE F=s
Re.
-P4Ar.
-----------------
S' e
KAESTLE BOOS ASSOCIATES, INC. LETTER OF TRANSMITTAL
ARCHITECTS
416 Slater Road
E BOOS
P.O. Box 2590 aAssoOc ATE
New Britain, CT 06050-2590 ARCH IT E C T S
(203) 229-0361 FAX (203) 229-5303
TO: Town of South Windsor T. Edwards Relocatables
Project
Planning Dept South Windsor, CT
1540 Sullivan Avenue
Marcia Banach February 21, 1995
Attention of: Date
We are sending you the following:
P & Z Commission Application Form and v4
Three (3) prints of Site Plan FFR �1. 1995
South Windsor
Planning & Zoning Commission
These are transmitted as checked below:
For approval ❑ Approved ❑ Revise and Resubmit
❑ For your use ❑ Approved as corrected ❑ For Review and Comment
❑ As requested ❑ Not Approved ❑
Remarks:
❑ As previous delivered under separate cover
cc: Howard Fitts (trans only)
Dr. Joseph Wood (w/ application form)
Very truly yours, y
Mark-'Weisman
LETTER OF TRANSMITTAL
PLANNING DEPARTMENT
TOWN OF SOUTH WINDSOR
1540 SULLIVAN AVENUE
SOUTH WINDSOR CT 06074
( 203 ) 644-2511 DATED
TO: JeV7ti
WE ARE SENDING YOU:
P & Z initial plans Drainage comps
P & Z final plans Bond estimate requests
Inland Wetlands plans Bond reduction requests
Final plans for filing Change order form
Other Correspondence
-Copies Appl . No. Project
c J �6,
THESE ARE TRANSMITTED as checked below:
For review and comment For your file
For your use Returned with revisions
As requested
Other
PLEASE RETURN/COMMENT BY:
COMMENTS:
�✓1 s GiM Z d- y _ /i '� S //. t f mn �r t LA J /r 4 c1'f
J —
CAopy to: From: 4c( -C_
w�a V - ~ 1
MAR 13 '95 16:24 A-N CONSULTING ENG. P.2
�elzli<«Cni� o�ti /Cf�� „ li�ieiurrs�a%
.� J ��
CONSULTING
ENGINEERS x
March 13 , 1995
Mr. Mark Weisman
Kaestle Boos Associates, Inc.
416 Slater Road
P.O. Box 2590
New Britain, CT 06050-2590
REF: Timothy Edwards Middle School - South Windsor
Drainage
Dear Mr. Weisman:
In response to your request for a review of the drainage
associated with the referenced project, and more specifically as
shown on the Site Plan, drawing No. L-1, we offer the
following. Due to the small size of the project and the amount
of information on the plans, we felt the need to contact the
town planning and engineering offices to determine in more
detail what they were looking for. We talked to the Town
Engineer, the Town Planner and Mr. Bo Davies - we were informed
that the concern was not the potential for an increase in the
flow rate, because most of the new building is being built in
areas that are already paved and the existing storm drainage
system has adequate capacity. The concern is the means by which
stormwater will get to the existing catch basins .
Our understanding is that the new addition is to be built on
piers . The existing ground will be disturbed as little as
possible and the existing grades will be maintained following
construction. The drainage patterns would then be the same as
they are today with the exception of the roof drains . The roof
drains would tend to concentrate the flow, but the areas are
small and the water will be outlet on the ground to follow the
exisitng drainage pattern.
Y trust this information is what you require . If you have any
questions or need additional information please give me a call .
Very truly yours,
A- ONSULTING ENGINEERS, INC.
A '' a /nt
P.E.
Vice Presid
kbtimed
505 Willard Avenue • Newington. Connecticut 061 1 1 (203) 666.3366 Fax: (203) 666-5163
An Equal Oppornutuv Employer
KAESTLE BOOS
ASSOCIATES,INC.
ARCHITECTS
March 14, 1995
John A.Kaestle Ms. Marcia Banach
Charles W.Boos Town Planner
David W.King Town of South Windsor
Mark J.Weisman 1540 Sullivan Avenue
Brian W.Humes South Windsor, CT 06074
Michael J.Blessing
Am'r Rusty Malik Re: Music Facility Addition
Michael J.McKeon Timothy Edwards School
South Windsor, CT
Brian A.Solywoda KB #94026
Jeffery R.McElravy
Laura Gilliam-Piersall Dear Ms. Banach:
Jamie L.DiPinto
Vincent R.Amrhein Enclosed is correspondence from A/N Consulting Engineers, Inc. regarding this
John J.Krezel,Jr. project's impact on drainage, and the specific concerns of Town staff in this
Christopher M.Roof matter.
Please let me know if anything additional is required.
Very truly yours,
r
IWe' man
BOOS ASSOCIATES, INC.
MJW:lk
Enclosure
cc: Howard Fitts (w/enc.)
416 Slater Road
P.O.Box 2590
New Britain,CT
06050-2590
(203)229-0361
Fax(203)229-5303
TIMOTHY EDWARDS RELOCATABLE CLASSROOMS - 3/14/95
1 . Request by the Public Building Commission for addition of
7300 square feet of relocatable classrooms to Timothy Edwards
School, in the vicinity of the existing relocatable
classrooms . It appears from the plans that about half of the
new building will be placed on existing pavement, and half
will extend onto existing lawn area, at the edge of a slope.
The PZC, at its February 28 meeting, agreed to accept the
submitted plans without requiring either an engineer' s or a
surveyor' s seal .
2 . This application was reviewed by the Architectural & Design
Review Committee on March 9 . The Committee had strong
concerns regarding the purely institutional appearance of the
relocatable classrooms , and voiced their opinions that
architectural features are possible for the building but have
not been explored by the applicant. Recommendations included
foundation plantings around the portable classrooms, plus
variable height plantings close to the building to break up
the appearance. It was recommended that the proposed white
pines be moved to the rear of the property ( southern
boundary) , to begin establishing a screen between the school
and the abutting residences . The Committee noted that the
proposed placement of the pines would not be an effective
landscaping element due to the higher elevation at which the
pines would be viewed from drivers approaching the school .
The Committee strongly recommended that in the future,
relocatable classrooms need to have architectural features
designed into them so that they will be more aesthetically
pleasing as is required of all other buildings reviewed by
the Committee.
The Architectural & Design Review Committee wants the
applicant to return to the Committee for review of modified
landscaping plans .
3 . Drainage and grading for the new classrooms will need to be
coordinated with the Engineering Dept. The Engineering Dept.
has also asked that the applicant be made aware that
submission of as-builts is required prior to issuance of a
Certificate of Occupancy; and notes that amendment of the
previous as-built is acceptable .
4 . Superintendent of Parks and Grounds Karl Reichle has the
following requested modifications to the tree planting
specifications :
a . Exact placement of trees to be field located with Mr.
Reichle;
b. Planting pit shall not be dug any deeper than the height of
the root ball;
c . Root ball shall have all wire baskets removed, strings shall
LETTER OF TRANSMITTAL
PLANNING DEPARTMENT
TOWN OF SOUTH WINDSOR 9 , s
1540 SULLIVAN AVENUE
SOUTH WINDSOR CT 06074 I
( 203 ) 644-2511 DATE
TO:
k 1
(MAR
10CE VED
1 5 1996TH VONLOSOR
WE ARE SENDING YOU: c.c
P & Z initial plans - Drainage
P & Z final plans Bond estimate requests
Inland Wetlands plans Bond reduction requests
Final plans for filing Change order. form
Other Correspondence
-Copies Appl . NO. Pro 'ect
THESE ARE TRANSMITTED as checked below:
For review and comment For your file
For your use Returned with revisions
As requested
Other
PLEASE RETURN/COMMENT BY:
CO ENTS:
/S� S 3 •� ,Or T
AQ2 1*1 8 D 12 t, r �,u pi�s� 4.vat g:10 , -er-AA�e 6 ��
Copy to: From:
tO�NN Se
7own. o-P South Vzolu&at
y ` 1540 SULLIVAN AVENUE . SOUTH WINDSOR, CONN. 06074
SOR C�� AREA CODE 203 644-2511
March 17 , 1995
CERTIFIED MAIL
Dr. Joseph Wood, Superintendent of Schools
Town of South Windsor/Board of Education
1737 Main Street
South Windsor, CT 06074
Dear Dr. Wood:
Re: Appl #95-08P, Timothy Edwards Portable Classrooms
We are pleased to advise you that the Planning & Zoning Commission
voted on March 14 , 1995 to approve with modifications the
above-referenced application for a Site Plan of Development on property
located at 100 Arnold Way A-30 zone as shown on plans prepared by
Kaestle Boos Associates , Inc . , State Project #132-062, dated February
14 , 1995 . This approval is subject to the following modifications :
1 . Prior to commencement of any site work, a meeting must be held with
Town Staff .
2 . No building permit will be issued until the final mylars have been
filed in the Town Clerk' s Office .
3 . An as-built plan is required prior to issuance of a Certificate of
Occupancy per Section 4 . 13 . 10 of the Zoning Regulations .
4 . All plans used in the field by the developer must bear the stamp and
authorized signature of the Town of South Windsor.
5 . Grading and stormwater management must be shown, and are subject to
approval by the Town Engineer.
6 . A new landscaping plan must be reviewed by the Architectural &
Design Review Committee.
7 . Planting details must conform to specifications provided by the
Superintendent of Parks and Grounds .
Black and white transparent mylars of Sheet #1 with the above
modifications, together with three blueprint copies of the entire set
of plans (including architectural elevations) must be submitted to this
Commission within 30 days to be stamped and signed. The letters of
approval of this Commission must be reproduced on the mylars .
After the mylars have been signed by the Commission, they will be
returned to you for filing in the Office of the Town Clerk within 90
Dr. Joseph Wood - 2 - March 17 , 1995
Application #95-08P
days . After filing these plans, a copy of the receipt must be
submitted to the Planning Department.
Very truly yours,
P NG & ZONING COMMISSION
4 "�
ssell G. Levack, Chairman
RGL/pmm
cc: Chief Building Official
Town Engineer
Assessor
Superintendent of Pollution Control
Fire Marshal
Kaestle Boos & Associates, Inc.
i
i
i
SENDER: I also wish to receive the
to • Complete items 1 and/or 2 for additional services.
• Complete items 3,and 4a&b. following services (for an extra
H • Print your name and address on the reverse of this form so that we can fee) >
� N return this card to you.
> • Attach this form to the front of the mailpiece,or on the back if space 1. ❑ Addressee's Address y
m
does not permit. r
• Write"Return Receipt Requested"on the mailpiece below the article number. a
r 2. El Delivery •�
• The Return Receipt will show to whom the article was delivered and the date v
c delivered. Consult postmaster for fee.
m 3. Article Addressed to: 4a. Article Number
m P 389 188 758
o, DR JOSEPH WOOD, SUPERINTENDENT 4b. Service Type
c OF SCHOOLS ❑ Registered ❑ Insured
N TOWN OF SOUTH WINDSOR
Certified ❑ COD A 6
H 1737 MAIN STREET ❑ Express Mail ❑ Return Receipt for 5
W
Merchandise c
p SOUTH WINDSORCT 06074 7. Date of elivery
5. Signature (Addressee) 8. Addressee's Address(Only if requested Y
and fee is paid) W
LLI
OCI 6. $ t t) ~
r
PS Form J$1 1, December 1991 *U.S.GPO:1993-352-714 DOMESTIC RETURN RECEIPT
N
UNITED STATES POSTAL SERVICE
Official Business PENALTY FOR PRIVATE
USE TO AVOID PAYMENT '
OF POSTAGE, $300
95-08P
Print your name, address and ZIP Code here
, �
PZC - TOWN OF SOUTH WINDSOR
1540 SULLIVAN AVENUE
SOUTH WINDSOR CT 06074
SOWN Sf9
0
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
soe co AREA CODE 203/644-2511
July 28, 1995
Patrick Hankard
Board of Education
1737 Main Street
South Windsor, Ct 06074
Dear Mr. Hankard:
Re: Preconstruction Meeting - Appl #95-08P, Timothy Edwards School
IN ATTENDANCE
Michele R. Lipe Town of South Windsor 644-2511, ext. 253
Jeff Folger Town of South Windsor 644-2511, ext. 229
A.B. Davies Town of South Windsor 644-2511, ext. 240
Jerry Iazzetta Town of South Windsor 644-2511, ext. 245
Patrick Hankard Public School Board 291-1220
David Pernal Arthur Building Systems Bristol, CT 06010 800-692-1234
ext. 2090
Dick Oswald Conn Light & Power Co 48 Tolland Stage Rd 871-3432
Tolland, CT 06084
Mark Weisman Kaestle Boos Assoc, Inc.416 Slater St 229-0361
P O Box 2590
New Britain, CT 06050-2590
The following is a brief summary of points discussed during the meeting.
Erosion and Sedimentation Control
1. All erosion and sedimentation control measures are to be in place prior to earth moving
operations in each area and maintained/cleaned out during construction. Call the
Zoning/Wetlands Enforcement Officer for inspection when measures are in place, prior to
commencement of site work.
2. All topsoil stockpile areas to be protected (ringed with haybales or equal).
3. During construction a crushed stone tracking pad is to be installed and maintained to minimize
tracking of dirt/gravel onto Arnold Way. Calcium chloride or water is to be used for dust
control as required.
Public Works
1. Three complete sets of approved/revised plans to be provided to Town prior to start of
construction. They will be stamped by the Planning Department along with plans developer
needs. Only approved plans are to be used on the job site.
2. Any problems and/or questions regarding construction of this project will be directed to David
Pernal in the field.
3. Job meetings will be held as needed, and can be called by the developer or Town.
4. Forty-eight (48) hours notice needed for certificate of occupancy inspection. Two week review
period (10 working days) needed for all individual site (lot) plans prior to issuance of building
permit (may be longer if application is incomplete). See general guidelines for certificate of
occupancy and building permit procedures.
5. Any proposed changes are to be presented to the Engineering or Planning Department prior to
implementation on change order form in quadruplicate with 4 copies of the drawing. Town
will attempt to turn around within 24 hours.
6. No paving after October 15 or before April 15 without written approval from Director of
Public Works.
7. Normal hours of operation 7:00 a.m. - 5:00 p.m., no work on Sunday.
8. Concern expressed about skirts around buildings - screens will be placed at bottom to keep
animals out and allow storm water to flow under building.
Planning Department
1. Landscaping is to be installed in accordance with the approved landscaping plan. If there are
changes required, contact the Planning Dept. Additional landscaping installed on one part of a
site will not preclude planting all of the remaining items shown on the landscaping plan.
2. Landscaping to be installed during the month of September. Karl Reichle, Superintendent of
Parks and Grounds should be contacted prior to installation.
SNET/NU
1. Contact utilities for coordination of utilities connection.
Fire Marshal
1. Blasting (if required) to be coordinated with the Fire Marshal.
Police Services
1. Emergency phone numbers for the duration of the construction must be provided to Police
Services on a company letterhead. If the developer occupies or owns the building(s) after
construction emergency numbers must be provided to Police Services.
2. If an alarm is to be installed contact Police Services.
Building Department
1. Plan review with Building Official/Fire Marshal required prior to application for building
permit. Coordinate with Chief Building Official.
Very truly yours,
Aa44
Michele R. Lipe AICP
Assistant Planner/Analyst
MRL/pmm
cc:
Gerald Lewis, SWPS
Karl Reichle, Public Works
Mel Stead, Public Works
George Parkhurst, CL&P
Minh V. Le, SNET
John R. Collins, Chief Building Official
Fred Shaw, Superintendent of Pollution Control
SOW N SEq`
0
G U
9* 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
sox•co AREA CODE 203/644-2511
August 30, 1995
Howard E. Fitts
239 Oak Street
South Windsor, Ct. 06045
Dear Mr. Fitts:
Please be advised that beneficial occ cy is hereby granteesfor
the New Modular Music Room, erected a Timothy Edwards Midd
School under Building Permits #22396 ae
cafeteria and computer room renovations at Timothy Edwards Middle
School performed under Building Permit #22367 , as allowed by
Connecticut General Statute 29-252-1b-119 . 5 . 1 .
The permanent Certificate of Occupancy will be issued upon
receipt and approval of an as-built site plan.
Please be advised that any changes in the building which
constitutes a violation of the conditions of the permit will
result in revocation of this approval .
Sincerel
ohn R. Collins,
Chief Building Official
cc: lliam Lanning, Fire Marshal
rcia Banach, Director of Planning