Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Subdivision - withdrawn
- r— TE TORRES ENGINEERING, INC. THE HOMESTEAD DRAINAGE CALCULATIONS MAY 219 1993 . 4 �v r► �' 1186 S'o�,I�� r cowT E "6d lw 137 SEYMOUR AVENUE, WEST HARTFORD, CT 06119 (203) 232-9833 f 0- CONTENTS SUMMARY Page SCS METHOD - EXISTING CONDITIONS RUNOFF CALCULATIONS . . . . . . . . . . . 1-13 . v SCS METHOD - PROPOSED CONDITIONS RUNOFF CALCULATIONS 14-27 �. DETENTION BASIN DESIGN . . . . . . . . . . . . 28-36 GRASS LINED SWALE DESIGN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37-40 RIPRAP SPLASH PAD DESIGN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41-42 GUTTER FLOW ANALYSIS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43-47 RATIONAL.- METHOD -STORM SEWER SYSTEM- DESIGN:----, w. ,.-i ;- ._ ._ __., 48 rWATER SURFACE ANALYSIS . . . . . . . . . . . . . . . . . . . : . . . . . . . . . . . . . . . . . . . . 49-51 . . WATERSHED AREA MAPS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52 R t r SUMMARY STORM EXISTING PROPOSED DISCHARGE YEAR CONDITIONS CONDITIONS AFTER RUNOFF (CFS) RUNOFF (CFS) . . DETENTION (CFS) 2 3 4 2 . 2 - 5 - 3 . 5 10 6 6 4. 4 I 25 9 9 - 6 . 1 . 50 11 7 . 6 100 4 14 9 CONCLUSION: THE PEAK RATE OF RUNOFF AFTER DEVELOPMENT WILL BE REDUCED TO VALUES EQUAL TO OR LESS THAN RUNOFF FROM EXISTING CONDITIONS. rTl rl ` a w. �r 2 fr.::FProject DEM I NO M�{: :3:f:s;•f f :f. , I County HARTFORD t a t e "~T C h,e`f•:: d Subtitle: DE-T1 :.X Subarea DEMEXB f COVES DE t."J"N'I PT I 01\4 C� ................................... .......... .___........_........•.._......._..... t FULLY DEVCI._Clf=`ED URBAN AREAS (Veg L-:'stab. ) 4 Open space (Lawns,parks etc: :, 3 Good condition; grass cclvrat" : i r+ I mpey-v i ous Areas Paved parking lots, roofs di...i v e wa y s »» 0„64; `:i.. OTHER. AGRICULTURAL LANDS + Wo0ds fail 2.'3(60) -- _- • l i 'ota1 Area (by Hydro loge c Soil,_CroL p ) FJ.p ww......r...r.r—w--r---www«ww---.rr—wrw.—.—w..__.•.ww.«.««ww........rwr.�w»r•rw..ww_w«r........w.....w.»...o«.»..w«.«»»w.«».«_.....«...«».».».....w««ww.....r.««w»...«wr«.»..w...»•w.w_...«r-.. -,- SUBAREA: SUBAREA: DEME X B TOTAL DRAINAGE -AREA: 8.8 Acres WEIGHTED CURVE NL JMBE-::R:64 �►' .`i�: ..........w......._....................w w.r«w»rw».»..»......�.._.....w_..........».....»......__wr._ .w.....................«r.w_..w..w«._.._.»..�...,...w.»»»....».........._........_,.wr..w...»........_.....wr.»«.»... .5 - (t f�NY 1t 'kr fi•t y As :tTpt F r e rr - tt��3} 4 4 i -- ' TR-55 CURVE N(]MBER COMPUTATION VERSION 1 _~ ( Project : DEMIN8-2 ~� County x HARTFORD State: CT Checked : _... .....-..... -_- Subtitle: DEMEX ' Subarea : DEMEXC ` ' Hydrologic Soil Group COVER DESCRIPTION A B C D Acres (CN) _~ ........................ .............. - ! _ FULLY DEVELOPED URBAN AREAS <Veg Estab ` ) Open space (Lawns,park-s etc ' > _~ Good condition; grass cover > / Impervious Areas ' Paved parking lots, roofs. driveways - 0.23/98> - - x r - --- ----- ' ---�-~-~---`-` - ---'--`-_ -- ' -_� --- � ' ` . . ` - Pasture., g r ass 1 and or range good - 2.6(61 ) - - ' . | ° _'.,Total Area (by Hydrologic Soil Group ) ' 5 L ==== TOTAL DRAINAGE AREA: 5 Acres WEIGHTED CURVE NUMBERu63 |ve ik � ' / ' ' . . ° ~ ' '- ` ' . � . . _ ' , VERSIO� � . 1l Subtitle: DEMEX Subarea DEMEXD ............ __ Log1c SoIl Grsup ' n C ' D cres (CN) _......................................................... OTHER AGRICULTURAL LANDS 1 > - - Total Area (by Hydrologic Scdl Group ) 2.4 ==== ' DRAINAGE AREA: 2.4 Acres WEIGHTED CURVE NUMBERo61 ________________________________________________________________ iv ' ` ' ' ` ° . . ' . . . ' ' ' 'U ' ' r , r Project DE*MING-...2 r-- County HART'FCIF D t.w;t t::r I� t���ef:: il I`a t:C Subtitle: DEME. a Subarea DE.MEXE r ........... —._r...r.._._. _. w»w»w__w _._._w w_w...„_.»..._.__...w...._.»w w............_w w._._....•.•...._.._._... .__..........w _w_ _......_. ........_..._...»...._..... .. .........._........._......................._..........._._......_ _............ ... COVER DEE1.3iCRIPTION r— w__.....»._..............__w w_._-_...».».w.w_w_w_w..w_..._..._....w_._.._......._._..._..._......._..w......__.................. ..._w..._.._...w_w_..........»w.......__................_._................................................_...................................................... FULL`! DEVELOPED URBAkl AREAS 1,Vecr E i,•t,ab d j "Impervious Areas .... Paved park-ing lots, roofs:: ,,. drivewa`;f'"s (,)1: � (9j=` ) w.. OTHER AGRICULTURAL LANDS Pasture a grzissland or range good _ 6.0 C I » �To-tali ,Ar.ea (b H So y~� Y Hydrologic y g Soil Group ) 6. 1 �si r aar rr-_w•bY--wars-w_---wa ----.__-w__w•....•....• »_w.•r_"w_ww•w.•w• •••»w»•_»•w._w w.•ww w_..w.w_r_ _w w_w_w_ww r••.w•__ ���u�AREA: DEMEXL�T•t�TAL DF,AII�f•�C�E. Af•C�.�1}c» �e 1 Acres _a � _ .+..w.»..._....�w.......»..l....,.._._•»--••• �»...._...........,n W E I GI...1T��-I.. C.U t•ZVE N'_.-.1 fC{E:R R CMG.. ��.�����,•:�{ -� �`���.� •w•-- ».. �w_»w w_.w..w...._.w..w. .........._....._.__.....»_........»..._...__.....w»...w....»...»_...__.....w....w.....w».._......_.....»w.............. ► + f c k�'+ref ,� r'�'• � w sfx'i^ r i .+ 1 1 ice, �.S`rt7 t � 3 1 p y:. 1"R• 5 T c T t "i'r-lRU I_JPAV,,'E s CUP-If'i..{"f' T... Jt%f `�: E!"'c: .1 t::1`:i I I. I. r-- Pro Jec:t n D MING---c t.�'...:(:::!. .. �..! �. r.'.1 t:(�: �:.►- E: :.:t.... �- C�0 u n t y H A R T f„O R D G't:i i tC- (:"T C.P h r_�r::�::=-�t::! " �.f i t SUb t i t I e: DEMEX Flow Type 2 Y e t=-k r« L P_i"i 9 t-h G I c-,p e ': u t''f'%?.c r a x.r•r (f t ) • (f t,f.i t ? code .— Sheet 3.2 3(),0 .026 C Sha I Iow Content 'd 350 A IN 0 t..j _. .. t .4 f_ t 1.•5!f Shallow Conc:ent"d 25( .025, Shallow Cc+ncent ' d 6c-*r(::) .025 1J �::? . ►'7:�::•, r- Open Channel z' r.rr.c��;: Caper Chni�e1 __. +� Ty c:�t Ti(Tie 0 s< 13�. Subarea #2 .,Flow Type 2 year Length S I cope Surf ace r1 Ai-eet WTI ,fie 1 car i t v T i.!rr rain (.f't ) (ft/'ft ? code (sq/ft (ft ) (•f't s t-rr_. Sheet 3.2 xc:0 .c.)26 C, ij Shallow Concent 'd 250 it 056 13 Shallow Concent 'd530 wc)3cr Ct 0 �.. T:i.m e d+'f C'.ci 4l c e n't,r"'tilt t i c+r"i -- t.>w 24+ �r L $ ax,.-:0pen Channel 37 5,,(.. 0. 0 en Channe 1 40c_r 6.0 c;r,01. oaf r} Flow Type 2 year Lei- .tFr S 1 c.�f)e rui_ face r7 �1r-era w�r� V�� f c+c i h y T i trig rain (ft) (ft/.ft ) code f"t ? (ft ('ft!;;ec) (h!... a, qk Sheet 3.2 300 w 030 D 0 w 37. x low Cc+ncent 'd ct_ic_r .c.r4�.y U 0.0A. 'Sh a 11 o w C o nc e n t 'd ��;=r w�y C3t�t 1� t�r.c'r�.' Time of Concentration _... 0.42.Y. ,.P. Pen . Channel 40c"r 6 n(-r 0.01 Travel Time "." 0„ 2.s. r _ Generated fc+i` i_c e by "f i+:'UI«..AF`,; method F',;'"",.:f,+ Tc t::=.y,r7*1: I-FIRIJ :, ;E•3 1, [ P� f'r{".+ t c L M D T{1 N1ry-1 { .... j.7... 1.: f 2 i. r,r-�'.. County . HARTFORD >_1 tt:i ifs..! a CT �"rh�_lc P•. +« � �,-:��`�«� _.......... ............. :: Subtitle.: UEMEX ....._..«.»..»" _..._._•..«.»_._.»_ __«"_._ --___-_._"._.."_._.._......_... �.t F.:�a�- �;:� «. T:) .P�1 _.._._......................................... ................ _......._......_................................ Flow Type 2 year 1....e n g t 1'1 11 c;P t? t..t i"'F,TA c.:f--Z 1"1 A 1"i,;;%c::+ c,c «.»,»»_....»».._ ».._.._ ».«_».. .....«.,_�.»..»_...««»_.« ««...«..«...._......_.._ ._.. ._...................«...._....«........_.«..._..».»....." .»«. ..« ......__"...._.....".. ._........_.._....._....................._..............._....................................... ,�ahE?a �_} ) „C)';r't y E r•• T'3. #-5 « D f:::M E X E «................................. "._......_ ..._.. ............._..............._........_....".•......... .......... Flow Type ' year !"e�-�t I"t � 1 + e G;:l t_t t"f-_ :e t"y i`.:;y r:+,::� :1 1.i rain f t ) ;f•t: f t} code f-{_ f_t t, Sheet 3.2 00 .040 B i.. --� Shallow Co»cent 'd c c�yc�f .04 U `Sha l l ow Concent 'd 500 p 085 (.E 'Time of Concentration -" 0. 1 r* �; _...�. Sheep: Flow Surface Codes _....__ i A Smooth Surface t= Ur'ass Devise «»«.«. Shallow Concevitrated. Fallow (No � . ) C f y' E.�1 i a�"m u d a »..""... LA!"•f'w7 ce t-'o d e s ,. C Cultivated < 20 % Res. H Woods. 1....i qh t P Pa v e d D Cultivated > 20 % Res. x WoodsDevise U Unpaved E Grasp Flange, S h o r t I a fi K3 t Generated for use by TABULAR metfic+d k: 3 i �f i r � r " B L(i F"'� i» t f' 1•.;t ..p..,. i i t j.• .r .: ». P"n Project • DElei 1:NG-2County : H A R T F O R D . ::c...� :,n 'T"f _ Subtitle: DEMEw X Totalwc"'t\trfFed arF1 („ » )( {1� ! r!.L�� {« t (�: a �: T .M.__..........___._...»..__..__». .»»».....»,.»...._..... .»......................»_...»_ Lti i..t�:}t:.}L.• a ..................................................... ..............,..................................... Area t s cl m 1 J f_t 7 0 1 f?:l � �w C) Curve number 64* t,':_t* r�4 E'I� f,�:✓.�. Runoff(A vi 0.41P 0.56 0.52 =:} ::4 C:� Tc . (hrs) 0 r 20* 0.24* n 42* (Used ) 0N20 0.20 c}p4I•I} c::}� .::c"; � �,}u20 T i m e To Ou t 1 e t 0.0 r�} c�;F r�}c�} �::}.0 c::} c) I alF' 0.40 o.35 0.3 r, 0.40 0..30 - Time rota.1 -__---__---..........— SEsbarea Contribution to Icital Flow tc:fs. __...».._�._....__.»_..�»_.__. * (hr') E~low DEh'IE XA I Eh�1CXL� L3E.h�EXC DE ME. E::XD DEME:XE 1 0 0 f f* t 4 l µN k 12.2 4 1 F' 2 c; 0 1 12`.3. ep 1 3F' 1 F' t 1 F 2F' , 1 12.4 8 1 3__ _ _i 1 2 12.r 6 1. 2 1. �� l 1 1 s 12*b 5 1. � 1 c f :13.2 2 0 1 1 - o 0 3 U 13.a 1 f_y 1 c_t c») -14.0 1 0 1 0 0 14.3 0 0 t;l 0 i Peak Flow V a !.l..i e si; r n ':t d e d I*) c to T P.....r:i 5 ;_:t lt's t-e p1 r{:-a t i n��r, r T '•. �!L+ !"1��..�I.t�}I 4 D 1,;:JCI...IAI'•';GE ICE C I...IC.'t.f !},::,}.....:i r. ,... Project � DEM I NG•-�.� t..►fi rr i►-• _ ;�.. ... > ... County HARTFt�F+D 6t.a•t(, a C,I Cf=IC:.C,. w.CI Subtitle: DEMEX Total watershed area: 0.'.74" sq fn:i. �'�'.<�1rt�trt.I. 1 t`�r::i�- 1 .1 i F .► �r'{:�I.d�=',{it_:'�•n ......................_..» »... ..»_...» i:a t_t b a i'"p a s _......_._.._.............._........_..._._.._.-....._..._.._.__ _....,............................_ DEME XA DEIvIE XR DEMEXC DEMEXD DEME XE Arpa(sq mi ) 0.01 0.()1 C .0 1* C), .01. Rainfa. 11 ( in) 4. 1 4. 1. 4. 1 _ 4. 1. 4. 1 Curve Number 61.* 1* 62-y- Runoff( in) 0.86 1 .C13 Un97 „86 C)i,92 •- Tc (hrs) 0„2{i* 0.24-m' 0.42* 0n )0 a). 1^� (Used 0.20 0,2{-i {-i.4C) 0 20 0.20 T i.trip T o Out 1 p t C) C)0 C)„c'r C) {"y.0 1.)„0"(.) o„0 C) 1 a/F' 0.31 C).27 C).29 0.31 0.3!_� -'` aJ.i11G L. a .h.•«w.w. l�.la1�" tc \� 1 �•~ b��. .•� l» 1 1« •�. .. F• ..{»t� \1... (hr ) Flaw LEMEXA DEMEXV DEMEXC DEMEXD DEMEXE 11 0 0 cry t i {) 0 0 11 .3 0 0 1 1 11 6 0 0 c:y 0 0 a a�rafi�y 12.2 11 2 4 1 1. 3 r 6 21 4 12. 1 5 5 w F` :I 3 12.6 13 2 4 3 1. 3 1 2.7 11 2 3 3 1 2 ,;f' i 12.8 7 1 2 2 1. 1 .,, 13.0 .`�"i 1 2 1 13.2 4 1 1. 1. C) :I. WOW 4 1. 1 1 0 1 13.6 4 1 1 1 C) 1 13«8 4 1 1 C) 1 4 1 1 1 i i 1 14.3 3 0 1 1 0 1 14.6 2 0 1 C) 0 1 p 15.0 1 01 0 ` 17.5 0 0 0 c_) 0 19 + k Prr u.:- -» Peak Flow � - VaIt..t�r i �arovJ.dt�{:1 f'r•-c,tn' •1 R....,.��� L�•�'�! pcn r�+�.t,�i.i1ST�: /D 1 h• B L J L_(:)F*' i i I »'!«:[A A f,' F: Project a i1£.�� .F f�l i _r7 {..j�=r?f ° �... ! .1 County y e HART[�'�IR S_ .,«.. .: ................................ . Subtitle: DEME X Total watershed r r c- „c.-t .l.'... -::{� �;;7. % �:t i.;«�.,t:t I I type: II €. r... ^� {....,... � � �.:� ~ «...«._ _........_ «_«. _«. "«..:..................!«...._..«...««...«......«.._...«..«_ ,a t_{R:t tz�E'» «....__....._........_.........................«.........._......•.........«.«..........._................... rI� � I I`: `EXEbG}} ph4 DE! y : F)Ep ' » _ Rainf x1 l ( ir7) I+.7 4 _ ,..! ,. 4. Runci ff( i n) 1 . 1 I-F 1 .35 1 . ::32 1. a Iq I „26 T C Mrs) 0„ t_) {_)„t`�«.r'.�* t:?,r'J! i«j n r" i.i s {«'„ I T i meTo C7u 1 0„00 0, i'r c_t t;; 0„0c::; I a J P 0.27 0.24 t;„"%-1 -6 Time Tot a l �{.{b�;���� C�r�n tf r i.b u t i.o n to T o t a 1. F I c::i vj (("f'�.) (htr ) Flow DEMEXA DEMEwXB DEMEXC DE3' EXIa DEMEXE 1 1 b c_; 0 r; c;; C 0 '1 1 9 1 0 1 0 0 12. 1 8 1 3 1 1 2 12.2 15 3 6 1 1 4 12.3 24P w P 9Er` c 2P 6P 12.4 24 5 3 3 2 6 ' 12.5 21 4 7 4 P 2 4 17 3 5 4 1 4 12.7 14 2 4 4 1 3 2 3 3 2 s 13.0 7 1 2 2 1 1 rain 4, s;. 13. 0 # 8 4 �• rK "14.3 4 0 1 15.0 15.5 2 0 1 0, f_) �. f, s, 16.e".) 1 i y 1 c�; 0 0 T 16.5 1 0 1 ;-! 0 t; f • _._._ c«;- - 20 00 t i 0 c'y 22.0 L F Peak Flow v a 1.c e 7 a I----:.I r i(.I r.. �{ � «{ n , . . . ` . TR-55 TABULAR DISCHARGE METHOD VERSIOU.> 1 . 11 ^ - Project : DEMING-2 User : ` County x HARTFORD State: CT Checked : _.....__ \ Subtitle: DEMEX ' Total watershed area: 0.042 sq mi Rainfall type: III Frequency: 25 years --------------........ ---------- Subareas -------------------------- | . DEMEXA DEMEXB DEMEXC DEMEXD DEMEXE | Area(sq mi ) 0.01 0.01* 0.01* 0 .00* 0.01 ' � Rainfall ( in) 5.5 5.5 5.5 5.5 5.5 ' Curve number 61* 6 * 61* 62* � ' Runoff( in) 1 .68 1 .91 1 .83 1 .68 1 .76 | Tc (hrs) 0.20* 0.24* 0.42* 0.20* 0. 17* � 7 (Used ) 0.20 0~20 0.40 0.20 0.20 � . ` TimeToOutlet 0.00 0.00 0.00 0,00 0.00 ` ' %a/P 0.23 0.20 0.21 0.23 0.22 --------------- 'Con�ributior�� to �Total �1ow (cf�) �----'----'--- ^ " DEMEXA DEMEXBDEMEXC DEMEXD DEMEXE `1 11,0 0 0 0 0 0 0 | ` � ' ' ` 11 3 0 0 0 0 0 0 1 % 6 1 0 1 0 0 0 � 1 2 0 0 1 1 3 1 1 2 2 ` 4 1 1 3 5 9 2 2 6 12 7P 13P 3 3P 9P 7 12 5 ' 3 8 ' 12.5 28 ' 5 9 6P 2 6 � 4 ^^ ��� � _ 5 _ 3 5 5 1. 4 ' 4 4 1 3 2 3 ` 3 1 2 7" 1 2 2 5 1 2 1 0 1 . ` 5 1 2 1 ' `\3 1 13.8 5 1 2 1 0 1 5 1 2 1 0 ' 1 ~ 4 1 1 1 0 1 ` 4 ^ � ' 4 4 1 1 1 0 1 16.0 4 1 1 1 0 1 - 2 0 1 0 0 1 1 A 1 0 0 0 ' 47 `' 1 0 1 ' 0 C' 0 ^ 1 0 1 0 0 0 , .A /� 0 0 0 0 0 0 ^ � .Q '` ' 0 ' 0 0 0 0 0 ! ``E2.0 ' {) 0 0 0 0 n | ` 26.() 00 0 0 0 0 | . ~ p - Peak Flow * - value(s) provided from TR�55 system routines -_ | [ ' ..1_R•-»5 :?." .� f l�!_.�::�f D I-E C'f•1 f s f 11::T 1) C_'r;..o jec t : 1JG:.1}1'. •.(�':Y( !�? !C'ou�my a HAR")j!.'1`�! ORD S l.+z- lie a 4»:T Ch ftC-.5.I s Subtitle: DEME X I Total 'watershed c"?r e a: Q.0 4 s.: s m:L »» ._ _.......__... _ _............ _._._...__... .___....... :3!..! r i...tia, { »......._._..._............._....._......................_. ........ _. ............................ DEMEXA DEME XD j_,�'MEYC r)F'.tw11:..XD DES`EXE Area(sq mi ) 0.01 0a01. 1,-).01.:V 0r00yx. 0 Rairifa1 I ( in) 6 r�� 2 Rt_t no f f( i n) 2. 14 2.41 2 14 2 T c (h r s) 0. ''0-* �`�.ram.•.4 :7.0 c) �.- (Used ) 0.2 C). 0.2 0 c"i.4 t f t�s ,,--2(-- 0.20 TimeTt:Outlet 0n00 0„0c_yt<<»� , „0i c � � �� �� � � t ;me .at t �1...1~ 1 t::►1. , . : ` (hr.) F Iow DEI'EXA DE.MEXD, DEMEXC-. DEhll:.XD _DEMEXE 1'.3 1 c:r c.;a { 0 t` 11 .6 2 0 1 0 0 1 1 1 «9 1 2 1 12.0 10 2 4 1 1 2 12. 1 16 3 t 2 1, 4 12.2 33 7 12 3 3 2 12.3 46P lop 16P 1 5 14P 1 IF' 12.4 45 9 15 7 f} 10 12.5 37 r 11 31"' 3 -12.6 29 5 9 87 2 6 12.7 22 4 6 6 2 4 12.3 17 3 5 5 1 13.0 11 2 3 3 :1 2 13.2 10 2 3 2 ! 13.4 8 1 . 2 2 1 2 b 1 2 a,1,3.a 6 � 2 ` f114.0 6 1 2 s .4.3 1 c? 1 0 1. r• `Mi4,b 5 ! 2 ICY 1 S.t„l �4 1w.sR 'i 1 1 t? 1 t 16.0 4 0 1 16.5 4 17.0 2 0 1 try c; 1 1 7.5 2 0 1 0 !::} 8.0 0 c;a 0 19.0 1 0 1 0 t y C) ' 22.0 0 t:y 0 4 - F' "- Peak Flow .ja v a l t-t a '��') pro v ci(:-.rj "f m system r o l..t t i 1-1 e s fr i /3 .. :#, x; ::i *i`) ";I__t:t 1�; I..� 1 �... -�F=�C'ti t E::. 1''I . f f #C.i I« f • T F'ro j ei...t . DE_.1''`1 I NG._ P .1U County w HARTE"ORD L}t a'E� ? t,.1.. i«.1TF :. ►•.�,�., p i':;;. _, r, Sub titIe. DEMEX Total water-shed c::l'"�?�� 0 n R..)c:F Wit? f!!:i. !'�:�,s, «t..�: ..� � i. 1. - . n __....._... _...._........_.. r I D Ew r 1 E X A D E"M E-. F1 i �«f,1E X t f 1 E::.i''1[ X D T)E'.A%1 E X�__ Area(syRain-fa � rfni. ) } `)[.01 !i}w�:)�1 OnO f ;� c,yra�:i]. i� �y£„f-�L:}„; 6.9 6.9 Curve number- 61* 64'm 63 3# 62* 6 3 . n k « 2 a . 2 Tc (h s) 0.20* 244 C)a 42•m. C n f1_?�+»..a r_'..w �:./ Used 0.20 7 0 a 20 �,•i a�}�'1 i..j n C.':��) �«i f„0 • m ' n _ w18 Time :Tt."t I .". R. -- �` t hr) Flow DEMEXA DEMEX8 DEMEXC 1:)E IEXD DEMEXE 2 0 1 0 11 .6 4 11 .9 9 2 3 1 1 2 12.0 13 3 5 1 1. 6 12. 1 21 [} 0 2 5 12.2 41 9 15 3 fi :10 '12.3 57P 1 2P 2;.�P 6 5P 14 P 12.4 54 11. 18 2 5 12 12.5 41 8 14 91~` 4 { 12.6 36 6 11 9 3 7 12.7 28 5 E3 13 2 5 12.8 19 8 5 6 1 '.13.0 14 2 L} 4 :1. 3 ` ' ~13.2 11 .2 3 3 1 2 13.4 10 2 3 2 1 - 2 13.6 10 2 3 2 1 2 2 2 1 2 14.0 7 q1 2 1. 1 {2 14.3 6 1 2 1 1 !. 14.6 5 1 2 1. 15.0 5 1 2 1 ? 1 16.0 4 16.5 4 17.0 4 1 1 1 0 1 17.5 4 1 1. 1 0 1. 0 22 r 26.c_"y 0 c�r 0 t.� `') S E"' "` Peak Flow V}� "_ t�.1.u�a S f 1) .R ! f 5::+ l l � ". .T_.►r.- � �.f.. i" .b' {..;t:..f 1 !" ,f `{._. _t ail i...0l..t »1"► �r> r- 4 • r JOB # 7 w �i "N 4) DATE f _��► '� r' f9 i TORRES ENGINEERING,INC. SHEET NO. l� 137 SEYMOUR AVENUE C 40/V 40/j/OA)5 WEST HARTFORD,CT 06119 BY . {: 203)232-9833 i � CHECKED kk j 1 : i f I i f 1 t t # �I fr {{ t 55 r 11 F t ' ./,`!/N �. � r.^, ....,..,...m...,...... ..,....,.,,..,Yµ w....w.:,�.. ..,.,,..�,....,,.,,,w..,.,..3..:.:...,w:„�,....:..,:.. n.,,........,,. y ... ............ .,..y..,,,wm,.,...m�,.....,... ..,,.�..... ..... ...,...,... ........ .. .. ... .. ' , i f r pp 1 ! k y S f . 111 0 p D j o q -Z_'0 6.7 7 49_. __.. 00, • , O D o Air, ! i Pro w �' ��' ' w. .«,.•w.,. .w...,..w... ...m...,m,�mm .,.m ,,.,,,,., .... ry...,,, m...,., cam.:........,..,a ......f f Q .. 1. ..,.r ..... w.�..w.o .....:,-,.m... .,,.„,.., .........m...w .w+.. .,,,.., �.m..,. ..,,. ........ d............... 47,; '1� y tt 1f ,Y • • i (�� � i • f i , :.a �'rn•. �..wrr.. .-.....•,,. ,..,,..,..m ,....:.-....�.mm..«-.. :..,»,.�t...w..w•,�,«,� f .,m......mm,..Y .._,.»., ,,.., ... w«., .....,_, �...m..,....,. .,,,.. ; � i 4 ., :.....,.,.. ..................... .,.,..m, .......�...a.,.. .,,.:, „,,,„,,,,„„ �..,.„„mya.„w....w„m,. ,,...w.,.j.,.,�m �...,.,.. ._. ...... w....,,.w:me.,..�w..,wm.i_w..,... .,m.... .,am. ..„.w .,....,. � ......_ .��m, ,i ay ...,...swr,.o-..-..m...._.mm..,.,..,..,, ..„,..,..,.„ ....., :,,wmm ...,...... ,... ..,.«.. .................',...•.,....q... ..,�..«.,.,.m..,,,mw.,m..m,... � ...,@.. ., .m.,,...m...... ,.m.,�.,. .,...,,*,:m.. ,.,� „€.. �t } 3 } r �f ' ',. S .r ,..,.,,.,.„.w•.w.. :.....w,•,.m. ,,..w,.... ,,..,w.,ww...ww..,....w..«rye.. .,w �µm ......:m .w.,,,,,W..m..,k.,,..:.,.... ....,..,.m,.. .,. ,.m.„ ,„„,,,„„ „w:...,m .,..,.._ .,,>... ,..,..,. „amwm .......... ...... 1 { T' } i } 3 - f [ ! wa. J-1 It w, r f. j 4 t } ,.., »....a'.'.--n.. ,,._ .,.,,,..w.,w.,»•.w.w..». ......._,.,, ,.. ,.~w�,mm.Nmwm.,........,.y„ ............_ :_":...,..:.....y. ,.....m�....,...,,.,".., ....-. m.._ .. .,.... .."._. _.,,,..., ..,.._. i Y � E i S i S ' .. '..,. ,...,........-0...,.«.,,...r .>"".m,,,...•...,_,. m.....m.,Dm--.,.m.:.m..,.,»....................»..,w..,..... ..,,......«n.,...»........,.: ._.....,,,.....,......, .......mm..,,,.om...,,...m,.m...,. •..,.-.y,,.....,.,.,....,� _.., ._,..... } ..,.,«m,,. ..,......_.j �- t ( ..«.i....,. ................ ......«...,. '...,.....,,. ...,,w:. w..........,....,.:....,..,...,,. ,m-......,,y.,.,,.,,...,..,....,..1.,..,....m, m, .....a m..-,.... m......., .....m...,1..,._ ..,. ..... ... ......,, ....,,... t.. .. t .......... , i t , E 3 -3 ! f s F ! i 1 _ > , i { � € f i j ! i t Project DI::M 1 IWt: . -:' k C O Un t t i 1•..�1.._I i 1 T,IW 1 I is t .. -!.. ,�� „ 'r 1 .t -- f _7 .r' .:? r•1 .k:: l.:. 1 �_ l�=ti R �•:.f..' t "n � � c: ub t i t i.e: DEMPR P Subar"e-?a DEMf'`R i i .............. FULLY DEVELOPED UfIRS 2-IN i=...r•::�':::< i.Vt�a s-L.FjI. Imperviot..cs Areas, �-- F'a v e d p a r"k I n g lots, IW C:►t:, c: r(Y":!.`•d CF?W 8 t r 1 .� -- �..._ i-_ is �• {. .... ..... OTHER AGE'I CULTURAL LAND'.' .I�tc�cad ��o U _ 1. .. „ Total Area (by Hydre,1c,gic S(,i1 Group ............. SUBAREA: D „ _....._..'_,_ .._.__" _".".._._ ._... .�_._....._ ._" ____...ir_. ._.."...G+.__. .:._..._...._.....__.._.. ._ _.__.._." _...__."..w..... E:MF EA TOTAL DRA I 1 ()GE AREA: 5.5 Acres WE 16',FIT'ED C RV r P-,1Ut-:1F{ER a(!,i. :htr Projecty t i County It iARTF01F D SLAhtj i t I : DEMPR Subarea DEMPRFj �-- ...«__ «««_..._«____...._««.._..__.««.«.... .._..«..•««.._..««....._...«... _.....................«..__............... .......................................................,._........._....._...._................. ............ 5 1 .M. t.:.. ... ... F*UL_L...Y DEVEi..-OPED t..IPPAN �• 7.- `.�rx 1;�.•.. l:� „ ? ..f Open space (L_awi--ts,�pay- L:::1 ��►: E ' # 4 Impervious Areas Paved pc-irking lots. roof's- , ar1. e�1-i!F-.1 is ::r,: _ OTHER AGRICULTURAL LANDS Total Are t b y i-i yd sw C�.�Ct 9:t r Sc;i % C «c�t..t F:� 8 f= SUBAREA: DEi�iF'f=B 'TOTAL IRA I i• f.,GE �`iREi=4 u 9.2 Ar_:r es W!i» t�::L'-iTf�Ii t.`:�JF•:VE i'�t..1i�IF;E:i"���,�:� I 4 ' d 4 T E 1 , /7 t�":f...1l•�`.`rr'[�. i:j; Y. .. ... it�f :�`._!'�; :.i..::,' .;_.�' .. i. r C O a t-I t y p H(-%i F T C .- t t..... I Subarea DEMF'R".".' I.. f'.... _.. 1-1 4 »«.»» .� »�w» . ... ._»»._....» .«..__ __......... »».»»...»..._....»....._...._................. ........................... ..................................•... _ FULLY DEVELOPED t RZE-WIN r-F:f= AS" IFi"i aI.:) „ Good condition: Impervious Areas Paved parking lots, r ciofs ,} c.11" 1 vewrt.ji r: n OTHER AGRICULTURAL LANDS TotoI Area tby Hyd.ro1ogi.c S JiI UroUp ? 5 . .SUDAREA: DE'h'PRC TOTAL DRA I N(3GE: AREA: 5 Acres WEIGHTED CURVE h�ll_!i'�fi#F I"� :�.��� i F k _ Subtitle: DEMPR, Subarea DEMF--'-FRI:) Fair condition,-, grasss 7 L Impervious Areas Paved parking 16ts,., OTHER AGRICULTURAL LANDS 617 _.........._......... _____________ DEIIPRD TOTAL DRAINAGE AREA: 2.3 Acres WEIGHTED CURVE NUMBER:71 ` ' ' ` ' , ' , / i 1 . � �, • '•�;;`� ,:�IJ!=�°V i:::. i'':i L.l�•'i T�;t�.:��� ,.�i::i iy'1��''i_i•'r'�;•i'�:-i.::.��•; ' .':.�-�'�•:: .�:':� ' . .. .. ... r Cr0 U1"1V N 1-1A +; rFOR-, �..rT f �i c,: :" Subarea DE`'PRE FULLY DEVELOPED L!f"iPr••N cl Es: t [.._ Open space t L_���t�i�7.�►���...�:��� a•!;c-, 4 ' Impervious Areas Paved parking logs" rc r..► ' __wE, 7'c�ta1 . Area (by Hydrologic Scii i Group ) 6.02 « ...•........................ SUBAREA: DEMPRE TOTAL DRAINAGE AREA% -,.02 Ac-res �•J�:T G�F�IT �I� CURVE h�l!!h'iT� r- L Y { 1 - P I �/� •• ! t �„• "•t ]•t � ���r`.�..� ;.���..�.�::s�"f�••i 1.•..!"'•� �..r i_�#�r]r.... ..�..ifs•1 .. �•f .�, s • Couritv i.•l� fs i �- r4C tr ,....... .( K !.':t 4 r..r r= , ! {'.f•)f�:. i.• 5�"j 'i•�::i t G(«b t:i t l e a D E INIF'1:,, } s r it ) _. .. _...._..._..... Flow Type 2 year t....l-..,rt Iq 1'3 i y...f rii f {? ''l i•'1 s"+: r.;:t r , ?,J r:.:.t. i' :i. (:`, r .«................ ........_....._........ ...... .... Shallow. t..:oric ent I(. L."�t{�f N ��s•:.j.t;l Shal low COVIce)•it 'd ���) h t::}�"'5 Shallow Concent ' d 6001 }, t._) t::►. ::�t`: 4 Open Channel 400 ............._................__.»....»._...._.»»..... _......w_»..»»._».»._«.»_...»r_ �t t_(L )" #2 DF»:.MPR B .ww_»«.......»._...».....w...__.._»...__..«».»..__..«...»».».._.«._.....«.... ...«__.._.... 1 Flow Type ? yeas.. Length w�1r+F:)e �t+)»f•�c�; �") F��"6��:t t�lG� �`��Ir+r.::i fi:'�� "f��c.rr; rain (ft) (ftrf't- ) , code (s( /f't. (ftf ) r, ftr .+... a i r Sheet 3.2 300 a 026 t., Sha11caw Concent 'd ;c=} s{�)5 t! Shal low Cc+ncent 'd 53C .(--)30 U {� .Time c:�f D:+)«)c e ri 0 u c?e�..t:. rt Open Channel 370 5 ORen Channel 40 0 R CZ4 »_ D tM:l''1PRC ».»._.».. ........_«..........»._ .._....._...._........w_...«_...«_«»..«............._.»..».......... Flow Type 2 year L.encith S1(--+.F')e sS�trf•.ice )") (ArC-:�<-_. Wr). Velc,C i•t.r, •Tir:, JI i�.1�w....• ••W W Y•M wM....wi.•+_w•w.••w.wM Mw ww«...r_r.»»•w.wr w»nr_r....._w».«.�.«..._�..._..w•«.»......_w.«.....«...«_.r.ww..w rw._.__w««rw r. ww•...«._«.....«._.•«..w•.«».w«rr._.._r«_..««......_w__•_w.«........_..«.�..........._...r...... Sheet 3.2 300' .030 D 0 3,... Concent 'd 5 i '-Shallow Concent ' d 190 ff 08(:) twt Ppen Channel 40c::) Travel Time 0 E'.�. • -- Generated c:f)w u s e b;/ , �: ;t�G...h�# . ;��c:�'�• �i:. {..� s C::'C-., i c c:l! d •1•t. {:r L J YI f"t P€".!"i 1...�1�.�i'��'i�»!'....,..�,. i i..s• •�'S::.�i.ti .:��t'� .� 'i n '{ f Project n DEMING...2 Subtitle: 1::C:MPR 6. E M P _.... _ _e __.»..».. .»»» rki5 rc+ 41•-. .... �.: R"D .. .. .."."....".......F 1 c+w Ty`� y�:ski'" �....��1"i{l•�: 'i ��� {�+r�c� :�+_+•�...�:� tr..�, �..t � _: •.�..� =f'.::-:�.s. ...: �'.'j:' '��{... i"'c 1.i'l '�: `.I.t%`f'I" -.:sheet 3.2 _. t i DUlfp ^ Flow Tye Lye i". t...e n g t . . S 1 o a E.n. ;)t..t r f�x c-a �"i �r.. i � yL. . 1.: 1 J. . - - _----_.__ ....... --..........-_.. ..._.................._.._.....".._...._...........__ _»..» »__.»...»........._. . .._.... Sheet • 3.2 300 .040 Sha 1 low, ConCent d 200 „04 P U 0 Shal low Concent.+ d 5{,)O - =0' - U- C +•:":3 Time if Sia of C c:+i•'i c::a n t i'"a t i o i"i _.. t..1 u 4 9 ._.......- Sheet Flow St..trf ::ce Code5, (rl Smooth Surface F~ ;i-a���, �?r i..i,»•»? "i a I 1 c,w �;c,i"c a n t r,t t C::'d D Fallow (No Res. ) G G r W -:7).n .9 t_t r fn i..t of a LA I Codes »..."».._. 4 C cultivated 20 % Res-.;.. H VI co(::,d s, i_ i.g h t: P i—I.,;e r D Cultivated 20 % R��� :t i 4���r_►�+d .� 1.)e1��e E t #t 'z�t�7t,c�:I C Grass-Range, Short ! • Generated foi- use by T A B U L A R et;hr_•d r : ;:. i d� �y 4:: i k � t f 4' w . t• if 4 brt Project Subtitle: DE.,111•••R Total oatarsheC Zi -C4�i , ii 2' :j 1 it y, 5e f. !. .' ; #i... .... .. .. I .... »_ »_ _. ..............._„..„__....m.............. „� DV7 Mf``Rpii�C f�'FiC'' I"t1= i �'f�'.J..rfiC::l`'iR Curve number'" 61 •� bbr..F.�_ {��3�c %:1 69� R a n o f f( i rr 0.44 C). f :) r^? i^ „� -"'0 T c (h r s' ) Q.2 is i s n :��••,,.. i�)n 4t 2 !::).2('.' (U a d 0.2(..) t:).2 f)„.1(..) (� c::. :r 0 `;Cr T i meTo Ou t 1 e t 0.�.:){) C) 0 C)M(}C) C}u�)::) �:.)a+.:=0 I a,f`' 0.40 0.35 C)a 37 6 - - - 'T i m e Total ..»...... »....._ _..__._..._ C``t.t b a r e ca L.C:t n t r„ 1 b u t i o n t o r-i t:i��. f .1. -.i•.! c f s) „.„_„........_..._......._...._..._.._.. t hr) Flow I:i„'EMPRA DE MP iB I:)Ef{PfitC DE:MPRD D EMPRC L 12.0 0iw) i�r i`) C) i:;) 12. 1 1 i) 1 c::) 0 0 12.4 12.5 7 1 2 1 1 2 3 f=' q� 12.7 3 1 2 1 1 3 /o Z. 12.2 5 1 1 1 0 2 /08 13.2 3 0 1. 2 i�) 1 C) 13.3 2 x 14.0 2 14.3 1 t„) r.) i_) r._) 1 08 8 14.6 i_r 0 0 (;) C) C) 2 15.5 0 r�) i�) C) 0 16.0 0 0 0 i,) (:r 0 1 b.5 i f i +_r 0 0 17•v 0 ir) 0 Q r) is) N 19.0 {=) 0 0 i t ^ P Peak- aak'. i l C.t Clt .�:. ..„. �{»"'�w�i�: �7� 1�...tit� i. '` f.. S i ""s r.:'Y.::, t::.,' 1 (u � 3 i COU11ty F' ARTF"OR"D ;:it ��� a C�„� C'ht:�c:�:: r1 . . Subtitle: UEhiF`R Total watershed area: 0,0 4 � s q in j. R�::�i�„��a 1 1 t y����� �; :C :r � ,..:_.:::f i...I..**!,- ,c::: j � ,�:,�:; iz: ______.__._ .._..... _.".........."._..................._.............._...".„.„.".............._ ;;,..t t-,r r c ��= ..........._........................... ..............._..................._.............„............... ....... DE•r*P A DE-JIF I DRIr.:rIRD DE.J-IF.-IRE Arec3(sq inl } 0.01 0r2_}.t :.}rc.�1. +.rnt.l..Y 0.0 1. Rainfall ( in) 4. 1 4. 1 ,r•n _t '„}G J. 4. 1 69* r Runoff( i n) 0.2�0 1 ■;..�1 c.:).9:•' 1 .46 L R�3�3 .. (Used) 0.2() c::;■��::0 f)�r.:�c::) c}ft��c"} 0. c�) TimeToOutlet 0.0C, �},'..l�..) �..} s�..�s) '.),.t;i} t'}nt;;)0 I a/F' c„).31 c„). '"; 0.29 r? .i c} 0.22 Time Total _.__. .__.�_._ _..__ _._. �;=...t�}��-e� C c,��-�t�-i f a t c t a.r+y� t c:� �c�t��!. ��� "...„......_..........„.._......_..� _. 1= lc:� (c... (:hr) F 1 ow TlElYIF'FRA DEt°1F'RB IIF:MF %C DEMPR17 DF MF'FrE 0 12.0 2 0 1 0 1 0 p 42. 1 5 1 0 1 1 G� r` 12.2 10 2 ZP 1 2 1 72. 12.3 17P 4 F` 7 F' 1 2 7-0 " 9 12.� 17 ::3 � :�F` �::. 4 ! v .,. 12.7 14 2 5) ,w Z 12.3 10 1 2 2 4 /09 13.2 5 1 1. 1. 0 2 /3Z ..13.4 4 1 1 1. c_) 1 114 4 13 f3 4 1 t 1 0 1 14.0 4 1,4.3 3 0 1 .14.6 2 0 1. 15.0 2 c_) 1 15.5 2 c„) 1 c„) 16.0 2 0 1 0 0 1 700 17.0 0 o 0 c:} t-} 0 18.0 0 c») c) 0. r'' ""' F'e a k Flow � 4 r t.r t..t 4:' -�� P r,s..{ ' , ,r , t:" system r"o t.t t k,..)e..„ 1 6 p�.�i ice■ .■.��■...������. ; 4 , St '..r 7 1..:h Subtitle: DEMPR r- Total watershed are n 01 _ p e ,.. _.. :'. . _»___„„._................"__... "................................................_..._........."..... E?4..tb .........._................................. ......_....._.............._..................... ......_...... D E VIP I-�A r)I~.1'``i r F,I t I: 1=�. r r:.1 _!''f1 P,tom:D t;:.FV M PR E �A r} �s i qt 7 rfT�':/i. }y c�j 40 1. :y.L��r:I. r:y 4t r ;::t K�:y�::, }r.4 4 01 Runoff t in? 1 # 1` 1 .39 1 „1113 R. 1. :1E` Msed } 0.20 0 a 21,i l.1.r}r_) i„j„t»l(-,) 0.r,J0 TimeToOutlet 0.00 0.00 {F�[„���} 1_•}nt..�7�j !,.•}n'„jl_� Time Total -»_�.»_.._ ..»».„.. »._.».__ a t..t h a r e a C c�g t r i b u t:i.o n to 'Total Flow (c: (hr) 'Flaw DEME''RA DEMPRE3 'DEty PRC: L)C::MPRD DEMPRE 11 .9 2 [) 1. 1 0 1. 0 U 12.0 5 2 [„) 12. 1 7 .1. 3 1 1. 1 (�G 12.2 15 3 6 1 11 2 12..3 23P `P 1=' � i.��' :3 12.4 23 i 8 13 3 4 JB e 12.5 23 7 4P 2 6P g!� 1247 17 i� 4 tF :1. 6 to Z 12.3 14 2 3 3 1 5 lot 13.0 10 1 2 2 1 4 13.2 7 i 2 1 1 2 /SZ 13.4 5 1 1 1 [_) 2 /44 13.6 4 1 1 1 t») 13.8 4 1 1 1 4 1 1 14.3 4 14. a 4 1 15.0 4 1 16.0 2 [_) 1 [_) 0 1 � 16.5 2 11.8.0 0 0 0 0 0 I;' Peak C t�A .�{ w !..t ? 5:) fi s!'[r�,%•,_ri +t: f!'"ti{i€� ' 1;„..i y I:i `r't/S-G w?TI I...O L�t i)"1(.-a S i T�•�* f'y:► f- "^j` i E S,'ice` ~ ' ' ' ,•..: .. + ' . t Project E)EM I I+ G---.2 ;.._'...•;:?f �; �-1..f.. l.f+:rt�,.•�::' " '•.. .�• ... �.-. Clo i..i n t v a A R T F O R D S a'i.. - C`' ,..r h E.. ...k e c.i 1 Sub t i t 1 .1.1EII7 I a w Total water-shed _ 1,4 ci fni .n II t I I I � DEMI~`RA D E M R�:{ ' E.,•II~'T--C.% 1:)E M FA. *: "DEMl~:'I.E. ,.Area(sq mi ) 0.01 0cC)1 C)=:C)t. x• s::1nC1() (:).01 ...J a 5 ...J n".5 + ..5 5 i=..t ....i n...! Ranof•f( 1.n 1 .613- 1 .91 !.'na::I E?.5c1 2.;�,':3 �.., Tc (firs) 0.2C)rf 0.2 c).42* 2('-* 0.48* TimeToOutlet . _ . _ .. » , . .. ��„c::1cr I a I:'' 0.23 C) c:.'t,1 4 1..i=?1 t.:i n I 'r 1 me. Total ��.+I.�a i...a a t�r.:+�»i t rw i h u t�c+ -i t c::t T o t�A), I� I c:f�==a (C- :�•�) (hr) Flow DEMF'RA DEMPRF3 i:)EMPRC. DE:.t=°II='I•RD D I'rIPRE 11..0 00 *„1 {) , 11 .6 2 I„1 1 c,t c..? 1 J(o A1 .9 5 1 2 0 12.0 7 1 31 1. 12. 1 11 2 4 1 2 L t - 12.3 Wit of 1 ' 1 3 P 3 5 1 ' 4 i . 12.4 34P 7 12 5 4 6 12.5 31 5 9 6 E.= 113 8 9 G 12.7 23 3 5 5 2 3 /p2 12.8 18 2 4 /o? 14 2 3 3 1 5 /20 3 13.2 9 1 c' 13.4 7 1 2 1 1 2 k J3.6 7 1 2 1 _ 2 13.B 7 1 2 1 1 2 /68 14.0 5 1 2 14.,3 4 .t 1 14.6 4 J. t-~ '15.0 4 1 1 0 1 ` 15.5 4 16.0 4 1 1 a C) 1 2 0 1 C) 1 17 5 2 C) ILL 26.0 0 C" C) 4 [ F+ "" Peal,-.- Flow i.,1...t-t'!ic!i=:'cl arc{frf G i P r-'ci:I e c V a D l..N I N G...»tN.} Total watershed a r a ''' .. .1. 1 _..._...._..... r... DE W"'R 1.F- i E ::=,R=1) 1 1::�t�f�`itt= Cur , e number S..�l•�f• �:}�..}'�. (':L�4'} t.''t� .;p. �.,�.�. Runoff� in) .1 _ �2� 2.97 T e (h r'-t) c::J.2 f r� is},2�a.�. �}.;:.N���;� ►r. :::'C;� {�J r 4 G:.i•� (Used) c-}.20 0. {r 5{:r T i meToOu t:1 e t 0.00 0.00 0t J �:y {"i{J {:'r.Q J 0 2 1:,,,__ _--0.. 1., . _ ._{}._.19 _ . .._is y n•1:3 1t 4 Time Total ��{..{la a�-'e a t::��rJ t}w i.l i�..t t:t.r.�r`r 'to "1( 't ti�1. {hr ) Flow DEMPRA DEMPRB J. =MPRC:: DEMP R i DEMPRE 1110 0 0 0 t:J c J C) b 11 .3 2 {;J 1 0 11 .6 2 {_r 1 0 C) 1 11w9 b 1 2 1 1 1 1 C) 2 1. 2 1 v 12. 1 16 3 6 2 3 2 12.2 30 7 1.2 ;:3 5 3 72 12.3 42 lop 1.6P 5 6P 5 70 12.4 44P 0 Ir15 7 5 Q $ 9 i 12.5 40 7 1. 1. OP 10 q� .12.6 35 5 9 7 11F' 9G 12.7 2 B . 4 � �} 2 to 1 3.2 12 32 1 ':r. /l 2 13w4 1. 2 i 1 3 /4 13.6 7 1 2 1 1. 2 13.8 7 1 2 1 1. 2 14,C) 7 1 2 1__: 1 2 14.3 7 1 2 1 .1. 2 14.4 5 1 0 14 i 15.0 4 1 1. 1 0 1 15.5 4 1 1. .1. i::J 16.0 4 1 1 1 1. G . 16.5 1 1 1. 0 1 17.0 2 0 1 0 {' 1. 17.5 2 0 1 c_r {.} 1. t B.0 2 t_J 1 0 0 1 4?o - �,...� P _. F'e k 1 Gw _ V +1{..iE= . s i P-r-,W� T,t {: � �_� ,� ..J_IR 55 cs s Z 7 ...... t ,r t ,. GE HEIJ.-V Project �.}F7-(��.`y'�.i�'•`G". ,'-:' {+ tl t ��?. r�'/� j�..�t:? }.: County R H 7-J 1 1 T F O RD t�..}�:'µ� R.•r":1 5.�5..�. W h�:'.:'c I l:':C', .Mt .l.�I:'.1 4r�''�:r .. ... ......... Subtitle: DEMPF.' Total watershed in::. F*. k.1"s1;:A.I. 1. t•fpe^ .1. 1 f j:::'; ti".� c..ii "it'.''w'° �.j.''; ,•'.' ;::1f" .... _"..."..................._........."...... .»...._.............""..............."..._"............_..... �{..(b a 1"i' "_ _............. _........................., ......... .................................................... uaf.f( a �} 2.63 ? � � . �r _ + . r- Tc thrs' \ 0.2k��' 3.24* :"f.42* 0.42C, � i:r,_ZI��{T a m T o L3 u t 1 0„c_f t:} C3 r..y Time Total ��.�...�" _ �.�b � G to C z"�t;i"i h t�c t i n��� c- •T o t iA. F: a.€v; (hr ) Flow I�'fF`f"tf I} .1�1 '�; { i.:} :I�I�'F;C I}E`Itilr+`I" D IIC:.'! F` 2 11 .3 2 0 1 0 11 .6 5 1 1. 1. 1 13& 11 9 8 2 3 1 1. - 1 13 3 5 1 2 2 2. 20 4 2 2 12.2 37 9 i5 3 6 4 72 12. 48 8 14 €"T`P 5 12 9U 12.b 42 h 11 9 3 1.3P 96 .12.:7 36 5 0 B. 21 12 !~ 1.2.8 27 3 5 6 2 11 /09 : 13.0 18 2 tj 4 .1 7 . le 4 13.2 14 2 3 3 1 5 /3 13.4 11 2 3 2 .1 3 Hf 13.6 11 2 3 2 1. 3 13.8 8 1 2 2 1 2 /&e 14.0 7 1 2 1. 1. 2 :. 14.3 7 1. 2 1 1 2 14.6 7 1 2 1 1 2 15.0 b 1 2 1 1 15.5 4 1 4 1 1 :3. o 1 T 1.6.5 4 1 1 1 17.0 4 1 1 1 {� 1 1 7. 4 1. 1 E 1 18.0. 2 0 C) .19.aO 2 i;) 1, c) �` "'. `G�c'���: I: { _. �;' �1 .{i? .`w7 I-y'i i t`.`1. 3 I:...i.. 'f t:+(Y1 "I I - r�I r:;J C' �t F �::{t.!'�:} '"i 3 .--- JOB # DATE 51 TORRES ENGINEERING, INC. t SHEET NO. 8 137 SEYMOUR AVENUE -0,6--e/,4� ' -; .�- ►- WEST HARTFORD,CT 06119 - BY E (203)232-9833 CHECKED OZ- t 3 ' < , s .3zo rs ,. YYYL s d Tf , # oo o � i i € 40 } t F .,..,, a ... _,..., .... .,_, ......... ..,: :.. .. .... ? I f t 5 x 4 i e t 3 3 3 i I i < x s s < n 1 j t 3 F i ? t ££ s e < 1 s a , s , r i S i ! i i € S a 1 y x € , € t < s < JOB # o/ 9 DATE G TORRES ENGINEERING, INC. - ' SHEET NO. 9 101 FENN ROAD 7XUC''T'4ee- DEi /4 ' l r NEWINGTON,CONN.06111 BY (203)666-5390 CHECKED 46LL{ s. > 7 �e �q • a j 3 ' f �. � IAI d ' # i { ! } pis t 1 i : M._ k{ ; k € E a ; , t a f t , a 3 i € t , ; : , d , ' Lr/6ito , —; FF i S s ; € 000l 9 ; oul L e7 _.____... ... r.CO fry!,:.. � r ` 43 i yyy I f € t 1 a _ 3 a 4704 10 € F ? { a ` ! k S S F 1 JOB # T%-lle VO/"'l'�: ..� .. DATE ' TORRES ENGINEERING,INC. SHEET NO. k 137 SEYMOUR AVENUE = c lel�k WEST HARTFORD,CT 06119 BY a. (203)232-9833 . CHECKED lz f { # { , # ; 0 ; 1 _ € s i ` , x 5 b f yyg {{ t i 3 € gg TE r { _.. E � � f , f f 5 , r € € , f : 4 € a f e € € { E 3 , { 1 s I , { 3 x { f � t , { : E }} f 4 , c i E { f t < € € ? f : x { i # �. FLOOD ROUTING SUMMARY PRINTOUT S.WI1AD":OR HEADWATER VS D I SC�••!A P+i~• 0 0 .5 1 .2 , 3 1 r:Y HEADWATER VSSTC�I s��C�i=' HW (FT) 8 (CLJ FT) 0 0 I Got.) G 10120 5 222tryQ FLOUTING CURVE G 2S/-f 2 S/T-+,Cam? 6 7464.7 41 .5 5 91 .5 12 19237 1 06.9 1 9.Q 13» 22200 12G»; 136.6 INFLOW DATA 2 YEAR STi::IRH T 0 IN 0 0 84 2 90 2 s 96 8 102 8 .t»12 ? 120 2 132 1 198 1 0 '+INFLOW /' OUTFLOW CURVE'S 2 YEAR 3'I C�C�t1 R TIME 0 I N Q OUT :(PIE �:? �:1'� {:i (�i1.! 1` "1'�'s !£::: ?:? �:I'•. t:� i.?t.,i..�.. 0.Ire 0.10 i 0.2 36.0 48,0 | 54.0 0.7 0.:5 60.0 0.8 0.6 | ^ ' 72.0 90.0 2.0 1 .4 108.0 2.0 2.2 114.0 2.0 2.2 / . 126.0 1 .5 2. 1 1.3,.--:' 1 .* 1 .8 138.0 144.0 1 .0 i .3 150.0 1 .m i .2 156.0 162.0 1 .0 | 180.0 1 .0 1 .0 i86,0 1 .0 1 .0 192.0 [ ' 198.0 ' 216.0 0.0 [ - Q MAk . = 2.2 2 YEAR STORM HW MAX . = 1 ' G MAX . = 1767. 1 | � INFLOW DATA 5 YEAR GTORri 66 ' 1 ' ` 72 1 78 2 84 3 90 4 / ^ 96 5 ' ' [ ' ~ ' 102 5 . . 108 4 ` 120 3 132 3 144 1 300 1 330 0 �zNFLOW OUTFLOW CURVES 5 YEAR STORM ` TIME Q IN Q OUT TIME Q IN Q OUT TIME Q IN Q OUT 234. A 0.0 0. 1 0.0 0.0 0.0 6.0 0. 1 0.0 12.0 0 2 0 � 18 � () 3 0. 1 24.0 0.* 0.2 ' ~ ^ ^ ^ ^ ��~() 0.5 0.3 � 36.0 0.5 0.4 42.0 0.6 0.4 -` 0 0.7 0.5 54.0 0.8 0.6 60.0 - 0.9 0.7 1 - ' 66 0 1 0 0 8 72.0 1 .0 0.9 78.0 2.0 1. 111 ^ ^ ^ ' 84.0 3~0 . 1 .6 ` 90.�) - 4_0 �.2 96.0 5.0 2.6 0 5.0 3. 1 108.0 4 .0 .4 114.0 3.5 120 0 3.0 3.4 126,0 3.0 3.3 132.0 3.0 3.3 ' 138 0 2.0 3 1 14� 0 1 0 2 8 150 0 1 0 2 4 ' . . . . . . . . 156.0 1 .0 2- 1 162.0 1 .0 1 .0 169.0 1 .0 1 .5 174.0 1 .0 1 .3 180.0 1 .0 1 .2 18' .0 1 .0 � ^ 192.0 0 1 .0�) 1 ^ 1 198^0 1 .0 1 . 1 204.0 1 .0 / } 210.0 1 .0 1 .0 216.0 1 .0 1 .0 222.0 1 .0 1 .0 228"0/ 1 .0 1 .0 234.0 1 .0 1 .0 240.0 � 246~0 �' 1 .0 1 .0 252.0 ' 1 .0 1 .0 258.0 1~o 1 .0 i.264.() 1 .0 1 .0 27C).0 1 .0 1 .0 276.0 282.0 1 .0 1 .0 289.0 1 . 294.0 1 .0 1 .0 300.0 .0 1 .0 1 .0 306.0 0.8 1'.0 3 1 2.0 0.6 0.9 318.c) 0.4 0.7 324.0 0 � 336. �).0 0.2 342.o 0.0 0.2 | } S MAX 4 , E 1 NFLOW DATA 1•0 Y E.Pil' c;..}..� T Q I N {,} ty} �-- 60 { ' 66 � 24 4 90 6 f 96 � 102 6 109 '.-. 120 4 . 132 2 144 2 156 i IN1=LOW / OUTFLOW CURVES 10 Yi:--:AF: STOR*J-1 w TIME C� IN Ci OUT I + C.? I to r ,(RI�,1.. �:1�1F: t1 ];1�' t 0 rr _. _ 0. 0 t y 0 c"}r 0 6.c t"}n :i. :1.r? ,... r r 13r0 0.3 0« 1 24»0 t„1.4 0r2 30.0 i"1.5 36.0- 0„6 ciao 42.0 0.7 f, 4[O.c"i 54.0 0. 7 0.7 4:){�'.��w 0 :1, .0 �i_�u t.7 (�f'��t{/�.�?r�..r 4.(.. � y 72r0 2r�_� 1 K 1 c,lC?.�� ti3' ..�_) 1 .6 f C?4 a0 c"4•.( 108.t"• 5.0 4.3 114.0 4.5 4.4 120.0 4 .0 �}. ••T P 126.0 2.0 4.2 132.0 2.0 3.0 138.0 2.0 3.� 2.0 3. 1 150.0 1 .5 2 .cy 156.0 1. .c") 2.5 162.0 1 .0 2.2 1.[6R- .c:f 1 nc� 2n0 1.74.»0 1 13 t"1•�.� 1. .0 1 .4 18 6 w c_} 1, .0 1-.2 192.t_� 1 n�y 1. .2 198.0 1 «t�} 1. . 1 �c tc:4 w t:} 1 ,c i 1. w 1. 21.i i»t.} 1 .t•} t . 1 b r 0 1 r c�� 1 r chi 2 2 2 w t i 1 ,01 .t^} =21=#.01 ,234.0 1 .0 1. .t.i 245B0. car 1{{. .0 246.i� 1 .t:} 52.0 1 .0 1 .t_1 2 .0 � r t.} 1 n 0 P64.0 J. .0 27c.�,t} 1 ,c:} 1 .0 2 r6.0 1 .c} 1 .t} 202.t�r 288.0 1 .c-} 1 .0 294.0 1 .0 1 .0 300 -0 1 r c::} 1. .!:} 206.0 1 .0 1 .0 312.0 1. o 13 1 2.r_i '�' r 0 1 „t:� 1 .0 330.0 1 .c'; :1. .0 336„c�) O 8 342.0 0.6 0.9 348 i i- }r4 {7„7 354.Q C .2 i t e M_+ ! i tat A/� . ..... 4.4 10 'Y E' i"A f 4 7 e O R 15 1 HW MAX . 1 .8 3 MAX. = 5330. 1 .-• x INFLOW DATA 25 YEAR ST'Oi:-( 'i i lK 0 IN Y lam} 0 36 60 66 2 72 2 90 2 102 1 o 2 ,7 120 5 132 3 168 2 13{= 1 390 �. r 420 j 3 4 + INFLOW OUTFLOW + l»af P 215 s r':....4i'", ;.TTt..)1 I'l T I ME Q I N C) OUT � � !"!�:. C 11`] t:f! OUT T 1119E t:, .1.' 1 378.0 0.f_) c„}� 1 f}N f..� r.};�:.y f)a f_� 6.0 C) 1af.l f„}a,'• f�yr 1 cia�'t r}.C. :! f}.f~ Fai} 't t. r� (� ().5 �. 4 3f»}.f} f..}.a f::}.5 ,36.r.. .1, s f..} t.} 7 1F 2.C) .1. �..} 43.0 1 .0 0.19 54 . f. „:} �.}.�? 6 ).f} bps.0. 2_R_Cy 1. .c�'- 72.0 2.0 1 .5 71B.:f:}_. 4 a f:} 2 i..} _. .. » 84 r 6.0 2.6 90.i»} 8•C) 3.5 96.0 =:f r �:.� 14• - I C)2.C) 8.0 5.5 108.0 7 .0 6.c_i 114.0 6.(J , 6� 1. F.1� �/.t / // { N f 120.0 5.0 6.0 126.Cl! 4 a f..} t�'...�.6 132.0 t.l r f..� 5. 1 13e.0 2.8 4.6 144.f_} 2.7 IFs2 11_�0.0 �-tl ,t 3 ►. w 156.c. 2.3 ,.3.5 1.bow.0 2.2 3.3 169,0 2 N r-} '9- 174.0 1 .5 2.8 1.80.0 1. .0 2.5 1e6.0 1 .0 +-a2 192.0 1 .0 1 .9 19B.c} 1 .cl 1 .6 204 0 1ac::z t �.fF 210.t0 .1.1 .0 1 .2 26N0 1 .0 1 . 1 222.0 1. Nr_r In1. . �•0 1 .0 1 . 1 234 r t»� 1 .0 1 .0 240.0 3. rr .1 1. 246.( 1 .0 1. .0 252.0 1 .c„) 1. .!.y 258.0 1 NC) 1 nr} 264.0 1 .0 1 .0 2'.'70.0 1 :1. .o 276.0 292.0 1 .0 1 .0 2+3On .f:} 1 .0 1 .0 294.0 1 .0 1 --• 300.0 1 .0 1 .0 306.C) 1 .f_} 1 ,C) 312.0 1 318.0 1 .0 1 .0 i 324.0 1 .0 1 N r::} 32C}.0 1 r J 1. .,0 F ' 3:36.0 1 .�} 1 .0 342.0 1 .0 1. .r i 3i'F3.c�� 1. . 354.0 1 .0 1 .0 360.0 1 ., .1 .0 366.0 1 372.0 1 .0} 1 .!} 372.0 1 .0 1. „Cr 3�34.0 1 .0 390.0 1 .0 1 .( 3 t r 6.rL} 0.3 1. 402.0 0 c"}.c_ct n "1�...l�}.�.� �.}.4.} f„}r r 4+.a r .C) 0. t 1 �.f 4} C MAX . 6. 1 2a YE::i� 'T'C)1~<;1"9 HW MAX . - 2.4 3 MAX . 7623. 1 INFLOW DATA 50 YEAR STORM t t ' T 0 IN 0 0 60 1 72 3 ' ?C9 5 :90 10 96 1 1 1 Cie 9 - 122 4 144 3 156 2 , . 216 1 420 i 4BO t i INFLOW Ir_OW OUTFLOW F_OW C.oIJ ES' �-tf; 4 i}/rid[ 0 rt t y} _{ 1 i...f R 0 1 . ��yy L i •. i. »_ r r.... 3 6.t_� 1. a 0 t 1.9 ,.��r C*- L , � �n `r `+t:»� 54.0 / R0 {j .0 1n J, If .?t 72• _ 3. 0 3 90.0 10. 4 a ( �f: r, :. S J. 5.9 t y/{� �f7 /� q1 l 126. l�..�4..'R t.�) r•.�tC M�r..t�} r• st C.. .1. .1..t r..F t,• 1 Y -!� s.� a 6 1lf j..♦f�• 1 26 R t..•' +4''.�f B �.�:�R 5 •-1.21 C. ..+»� :»�..�t .�r, {..� .M-.7is i�..• j �'.tr� 3•�..} f'f n 1 .}.�.»fi(»�n�`.. �» a r....t 4.1.n a3 156).t»' f�2Rt=i S 1 .9 3R4 :1.6G:t��7 1 nc-3 3a 1 �.74.f C) .1 tr .0 � f 77, 1 B0.0 1 .6 2.6 .1.`::?6.C.' . 1 .5 2.4 .�9'E a`.f _. :r'•)- rc!.: r,- 198.0 .. ..._ __,.1..R. .A f 2O4.0 1 .2 1. .E3 21.0 t> 234.0 1 .0 1 . 1 240.0 1 .0 1 . 1 246.0 1. R Ca 1 a�•::7 252.0 1 .0 1 .c_ 25B.t? 1 .0 1 .0- 2 6 4.E.a 1 1. .0 4 270.0 1 .0 1 R0 27/6.0 1. A 1 .0 282.0 1. ntI 1 . " 288.0 1 .0 .1 .0 294.0 1 . 1. .t 1 300.0 1 .0} .1 n t»� 306.0 1 .0 1 .0 312.tr 1 A0 1 .0 11318.0 1. 324.0 1 .0 1 .0 330.0 1 .cry 1 . 336.0 1. ' 342.0 1 .0 1 .0 348.Q 1 .0 1 . 354.0 1. A!.} 1. ,t. 360.0 1 .0 1 .tr} 366.0 1 a l:k 1 372.0 1 a t) 372.0 1 .0 1 nc'_i 334n0 1'R0 1. .0 390. 1. ,0 1 n C. 396.0� 1 .0 1 .0 402.�•.�r 0 1 .0 1 .0 40P.{� 1. „ T 1 "+�� f�.� 1 .0 1 .0 �r7...+t"�A}..• 1 .0•� ' 1 R C 426.(_) 0 r 9 1 y :,�•;•� 4 3? �:y 0.8 try R 9 + :3.Q tr)a' t"%tr 9 LF�+ti.t:� 0 a 6 �:�rs CS r � _ � � f2. � e R =450. r r .5 0.7 y.-;6.-�a_ 468.0 0.2 0.4 474.t"�. tr1 a 1 o.3 �+3 try a c:} 0�C) r- Q MAX . �- 7.6 - 5t) YEAR s*r0RJll w HW MAX .�= 2.9 5 MAX . 9650.2 -,,,INFLOW OW DATA 100 YEAR STE::1Rtl 0 try 36 1 7 } 73 6 34 10 90 12 r 96 13 t08 11 120 7 �-- 132 144 3 4. = 168 2 240 1 480 1 w .. 540 C) - INFLOW i OUTFLOW C ARV E3 1 t it�7 `�'1::::r=�i=� i.11 A TIME Q I N � [__f�ri_1.. ..,...1.!'tt:. 1 .1 I'�f:� 486.0 /Cr• a/1_'!y �..�i r«�R j..! r..: k'.`� N!)•i'..' y1 3 ?�. R�r� 10■a `..l.5 L.�:�:, a�.i .� a1�..� {.t.� _',i•� 42 R�::� .. :l .'.1 l••! i. .�} 49.0 2■0 +. .2 ••� i:�t r.� a':- f..}r r'� •+. :s�.• �{.)(�� a l y u ..r .�.�.. T�•.�]5..!n�_) i5 ■ jK •�_.�u�:.t •� �'n t..� { n aJ? r•:•lyt..�u t..i + ry'...j ....'+,: 8 f��'r�� !1().o 4. .1. �(f.�n�+ 1.�':y u t•..� {r.!n(ice ` '(;�`��r.f«j 102.0 .1.2 R 0 F)ei 3 1 C}l:,t �..� :1 :i. u ..� 1�i(� ! 1 �: a{.� t t. 138.0 4.`») 7.2 144 a C) 3.0 i ti 4 1.5C).0 ::. :i:_, t•. :i .�. r } -.1(. u[1'.Y '1 .L! ?.:1•r r••Yr ,i a r f+ jC ?a t G.:? 0 `. r{ / *■ ) ■ T tir t:i• ±' i92.0 1 .7 2.6 1 r!4r [r f..) .} a'•�` 2-t,I..}. 2l-j"•�.'_) �. .. •'.:, i.•••!1 S^. 2 1 0.0 1 .4 2. 1 21.� �! ! 'jj 9 222. C)5 229.fir) 12 :�. �`3 d-l. t� 1 . 1 1. C"?I p �::� R ■ .M.. � V it4 K 246.0 1. .0 1 .2 2 5 2 r. _) f. tt .t 25(3.0 ram' ,[� 1 •� .�r� •1 276.0 •:r•� s G 64.0 1 .�1 1 .0 1. f�..i r. ..) d. u.r! i u'.) 2!•61 ��)a t: 318.0 1 .0 1. .0 324.0 1. ■C) I 33C .0 1. rr") 1 .0 336.0 1 .0 1. .t:) 342.0 1 ._::) . 1. .0 343.0 :1 r Ij 354.0 1 .0 1 .0 36 t 1.C) 1 .0 1 .0 :I6 6 0 1 1 372.0 1. .0 1 .0 318.0 1 :1. .0 384.0 ! 402.0 1 .0 1. .0 41.4:,0 1. ,:0 1 .0 420.0 1 .0 1. tr ) 4 426.0 1 .0 1 .0 432. 1 .0 1 .0 433.0 1. ,t r) 1. .t:) 444.0 1 .0 1. .0 450.0 1. .C) 1. .C) 456.t:) 462.0 1 .0 1 .0 468.0 1 .0 1 .0 474.0 1 48�:).t�) 1 .i:) 1 ai,) 4 h.�! c�).`:p 1. at 4 2.i=) C).a C f 49E3.0 �_).? t_). +f)�4 a t) �.).{ ���R 8 310.0 C .5 --' 516.0 0.4 0.6 522.0 0.3 0.5 52H.c:) iyti2 0.�F O MAX 9 .100 YEAR 3T+:)RM HW MAX . = 3.4 S MAX. 12360.5 i , j i t 4 , JOB # DATE TORRES ENGINEERING,INC. SHEET NO. 3 7 137.SEYMOUR AVENUE �-- WEST HARTFORD,CT 06119 BY G r (203)232-9833 CHECKED • /� s t t , t t z � ; t "T `1 , i t s � ! � � 3 � f i E, f ` f f 1 II t .74 t .rT { !V y . { _ f qg w% { { f E _,.. „. _ ¢ t v. C.lC� N a 1 J{ ( t S i , f F 3 F i < T1T7/ 4_7 r t t F y E ` t ; 4 E F. i f L Coo�rrq Ci t f f 4 ( s t f _ 15, c1 _S i : i , t : JOB # ` T11 V DATE TORRES ENGINEERING,INC. SHEET NO. 38 137 SEYMOUR AVENUE � �r��� �� WEST HARTFORD CT 06119 ��� BY r (203)232-9833 D /� CHECKED 74, , r s � 2 f = 77 a ?1 7 B ; ............. f } { � s ! i [ { t t i I s ' � i F r 0A,e.r" f < i 1 F jf f t` mom,.... .... S i e t , gj 1 ! } s r 4 t t € F : , , € .., ! S i I ' }} e x I€ 33 EE , t r ! P € I i g i i i t f Ai F f f l i 66 s 3 t "NUMMUMMUM 0 Nu 'MM"a' t11111gIlAIzItlRfp1�IN� wo _��� � pfl11111NAAU1p1yMHDM180�9RN11 mumusmY�illi� �0 ��QmY011A0�Y 8�a1i�III�Af�BIB 8A � now= u immumHMO Tim offlum Pulliam EMBRINISES 1111MIN 11 101��� Hip M111IN IMEMN Ulu No aau�ucm�.�a�u�u �unen�sasaaNu�smu At o :oNv � rN�n�saUna amwr .�ra�e�mo aapninnamnp:aem�u1��uNnnnm� �aamrao nNoUamna�anmoio�wo uununn���nuc�uiu�1pmnuwnnnnum� ap�nq�p��em�o Imo i1111171l61!!111 �tgI11111C11� IIIIdAIp�.�.m1q!° �p11U0���18■�IIOICfV1 i I!l111, i�ll�!!i IBiiNlilllNllM RDY�l�ir' .9w"w ' mmBON P1 NMISIR MUMN �re"� li��i�nl�►� : IflU�:�lll����illl��l1�',�I�I�(���l�I�d� ������ ��l9���lill::At! hil,'�1�� �1��1 �+�I��!"" �'i Ili �R.i b ■ q!�li� p 11111 HUI lu IS IN HE!. i-pus e�eees��:��it�ee�e:�e�useitiu.a►a..ceoaneio:.a��:�ise��s:s�nei�irate-same:=m�i9g0�i�OpT%"esmmriuuumoaums . AP HMSIMM 1p OAO ILL ra�aua�mm�c�oee�n���satrnu��l��II/:3RGfIg11t1111t191IU1lWILIi�g6�YmYCIN�CY{iN:la�gWl�lfil/� �aamz�ean��nw��euin�uw:�eea��o:�e��nmmauner�iu�i���ea�nuou�eas,mu��nnmaae�am�m ��o���:am,�i�.parram��n��ICC:'�"IIUf1I111111NlillllilAlilili�l011m11mioa�ooaw��.�ir�wmm�u�i�:��n �IS9i��61D��IIO�i��INlern"dld�r�6�ti�i�6��iAl�l(�I��igf�l�IA'fl�l��l�� � Chart 25 _ 1S 0.2 0.3 0.4 0.6 0.6 0.7 0.8 0.9 1 1.6 2 2.S 3 4 - 10 8 L 7 � cao P Qom' i cry o Vdo 6 y O �y o• 0 "00 0ex •�4 O- y 4 O'� •� i o 3 1 �► L.S 0 2 oti • O, i.S o0 Vi V1 1 4 0.9 t 0.8 � 0.7 0.6 0.6 t0.4 0.3 Its •01 0.3 0.4 0.6 0A 0.7 0.8 0.9 1 1.5 2 2.6 3 4 HYDRAULIC RADIUS,R(ft.) FLOW VELOCITY FOR CHANNELS LINED �C►'`' WITH VEGETATION OF RETARDANCE D Retardance D Includes: . 1 Bermudagnss•••••.♦•••••••••••• Good stand,cut to 2.5•Inch Might T , ! Common laspedeas ............... Excellent stand•uncut laverape 45"1 Bufisla�ass .•..•••••..••.•••.• Good stand,uncut(3 to 6 Inches) Gres-legums mixture—fell,spring , •`` l0rchardprafs,redtop,Italian i rysgrass;-and_common Isspede:al •.• • Good stand,uncut Ir to 5 Inched I Lespedws sericas.................. After cutting to 2-Inch WAL ^•, • Very good stand before cutting. - From"Handbook of Channel Des;9n for • foil and Water Conservation, SCS•TP41, Revised 1954• 50 JOB # fa01Y 75/r�...e. 1 /3 DATE ----�5 TORRES ENGINEERING,INC. SHEET NO. 137 SEYMOUR AVENUE WEST HARTFORD,CT 06119 BY D� (203)232-9833 CHECKED . t _ € 00-1 } • # IZ FRE£u°OA,' .D f ' < ' j < LA w....... ¢_ 7; +1 \r � { /ten � `: � • YJ/ # i � - # /^ � I x } ? i l {#TE x ` E a f 5 A.. s t , 77 Z } # , s fS i III i < t x { i t 5 , i F ' < { , } € i + i _ f { ! ' a 1 > }} x , i x ? i f ' # t s 3 i � f , t 1 T 5 d e 3 i F r € t f l , ' s s i f Figure - - ,y. 8 61 Plan View T Configuration of Conduit Outlet. Protection where there is no well defined channel immediately downstream . r Do 91: Do ' t 3 po 3 Do 9 E 4 W 3D + 0.4L ;. .. W = 3D + L i •'"'f. o a o a Tailwater 0.5 Do Ta i 1 wa to r 0.5 Do Source: Standards for Soil Erosion and Sediment Control in New Jersey, New Jersey Soil Conservation Committee. q / 1 DESIGN EXAMP.L E Given: Do =. 1.5 ft. Find: La,. W,d50 14.5 cfs TW = 0.7 ft. ^' T L = 1.7 + S D 1. + 8(1.5) = 25.4 ft. 7(14.5 cfs •kf'' ' ':a:'��' a 0 1.5 3/2 L 25.4 ft. (answer) a W = 3 Do + La 3(1.5) + 25.4 = 29.9 f t.. say 30 f t. ,r Median stone diamter: 3 d 0 02 2 02 IM .58 f t = 7 inches 4/3 4/ 4, h �, 50 8-106 i -6b- INLET STATION — AND OFFSET r ~o 0 rv` TIME TO INLET b O p :� o c,i -AREA IN ACRES N Qvo 44 _N0 Iv V i o Q �► RUNOFF COEFFICIENT [t-4 Wo U Al a cA • � ° v ° o� SUM OF AI � TOTAL Al RAINFALL INTENSITY N � (A � co Q TO INLET va , I ..J p� o �p o p GRADE OF GUTTER O w W CROSS SLOPE r OF SHOULDER yr DEPTH OF FLOW ro AT GUTTER w WIDTH OF FLOW �i r BYPASSING INLET c� AI BYPASSING INLET c� p 0° a Q _ Al ENTERING N °f CATCH BASIN J oN 133HS Ag 03)133H0 W!!id 133a1S �4c�/-t j 31b0 AG 03NOIS30 133f Odd J'Z wmO.A SISAIVNd MO'IJ a311na uosaNIM H1n0S J0 NMOJL ' ,...rm..kww+!• 11110 vim - , 3 INLET STATION ` AND OFFSET ro TIME TO INLET 1 o c p � J IN, ° �'� w AREA IN ACRES IN. RUNOFF COEFFICIENT Q o 0 0 o a Al of SUM OF Al -TOTAL Al ,J P13 w RAINFALL INTENSITY TO INLET . C — GRADE OF GUTTER ' o Vn 0 �. C 4 e o _ CROSS SLOPE w W OF SHOULDER -- DEPTH OF FLOW � l W ,� ro AT GUTTER �. \A -41 toWIDTH OF FLOW Q O • ~ � p Q BYPASSING INLET 0 0 v o AI BYPASSING INLET -• N � Al ENTERING -- N PI � CATCH BASINLL� ON 133HS AG03�33H* Wai.4 133a1S 1 f r��/ 31V0 AG 03NJIS30 133f O?►r! 1 J'Z WuOzj SISAlVNV MOIJ unins uosaNIM Hinos J0 NMO,I ,..,, aka JOB # 0 �9 DATE r SHEET NO. TORRES ENGINEERING,INC. 137 SEYMOUR AVENUE �y j�--� ECG„�G� /�/ , WEST HARTFORD,CT 06119 BY (203)232-9833 CHECKED D € a r � , 5 fC� x , 3 i } 3 1{ , , r t ± p. ; a i 1! � 5 r £ � 5 i 5 r..• x x , I # f} F E f , f { 1 , k F a � b e s e �F , Ir i E t , , i , , i y .� x_: 123.�. . F e a F/ t t F , I 3, �Vr _ 4 � f r f 3 gg b 4 1 � ;` ` } F € i X , O0 D� X F , y at , a a , F � t O•, f , a } ,{ a , i f s > 3 € F f fln� 5". V t , All 1 E , a � 02 —� 2 3 JOB w 9'0 o/ 1 DATE TORRES ENGINEERING, INC. SHEET NO. 137 SEYMOUR AVENUE � � WEST HARTFORD CT 06119 �i�-- ,GCGuJ BY � (203)232-9833 CHECKED 0►7. . F , t { f � ............ .......... e 1 = 3 i b.,. E t li S s, $F "' I t t r i F GU 5 i } s F F I > ff £ b o ri �5 � 6�i y € { g i 7 j } # n " _ , _ . t ir TE _ r J � s F ° F 3 i JOB # 90 o / DATE#0 "A�ror4'0 1 TORRES ENGINEERING,INC. SHEET NO. 17 4 137 SEYMOUR AVENUE M CCU T7 .'- ,�o 40 BY /- r.. WEST HARTFORD,CT 06119 (203)232-9833 _.. CHECKED < 4 s � , 4 i , 6.4 ........... ...... 4t ///h/ I� �.�, //^ �(J) /yam/■�'T///(�' '.. 1( 7 _/./'� Ch 3 t4 t j, E I 4 3 a a > I ' R 4 i t < t ff t p� t.. d . i{ 1 a 3 v o { { z ca c I 7 I s o ; t � < _ F , O , O z3' i Al___ 4, ....... . i i } , TE } .... , 7 I F f TOWN OF SOUTH WINDSOR STORM SEWER SYSTEM DESIGN FORM 2.2 a PROJECT r DESIGNED BY DATE k STREET FIRM •�-- CHECKED BY SHEET•N° a31VMOd3H d; oo q M M TIN � , o M o AIIDO13A 39dtl3Ad � • VIA 3d0"1S = o Do 4 0 o o O 3did d0 H1JN3'1 O N d' N N �I ~ ` N 3 Z I S 3d 1 d W31SAS NI 0 aD A \fj v ` Jl11SN31NI 11ddNIVU �`- 1431SAS NI lo ' id .4 o w n s `� '� o NISdB HDldO M t�l �. N 13 ONI831N3 Id O % r i •* 3wI1031Vinrmotf `�' � q- k • 3did NI 3W11 � r tN 13'1N1 013M411 o 1 N 3 W J 3 S 3 N 1 I :- I �" �" V- 1. � e -52- ,..__T.......� �.--____."'" —._.—'1 ♦ __._., _ ..ter �_.,.._7►_•.e.•_.. .�.— T._,.. ... STATION OFFSET STATION?t_?2�OFFSET � STRUCTURE TYPE C"G`'� 7 x 0 . aof o C . TOP OF GRATE ELEV. sa Y � OUTLET STA. �i�S/I� -� 167, 31 DESIGN W.S.ELEV. Z '�4 _ ,jL h c `R O i OUTLET T.W.EL. V OUTLET EL. Q= / IFS El. �� EL. �G6.3D = S L°Fs Q _ LENGTH LENGTH 38! EL. l8�53 EL.�a�Z O`1 Z SLOPE 4•vu S SLOPE ¢ o t_ Q INLET OUTLET CONTROL ' MW •M+ INLET 0 SIZE CONTROL �� L"s�` ; SIZE -.CONTROL OUTLET CONTROL MW Mf w•-Ls• TYPE n o HW Ke H do 2 TW ho LS HW o = TYPE n HW X. H do d°� TW ho LS HW M �ass' ,93 z/4 o. p.Z 1,0 1113 'Q,.B ,)3 ,07 *1.Zb ,Z6 . a .0S •31 e., � 1 R P 1 t t 3 a.s 63 2.195 as sz3 —►! � •3� _ m w - - STATION 4'�5b OFFSET ��t� STATION Gfo3 OFFSET 4Z�L I� ' C� 3 STRUCTURE TYPE 3 ly O: .,� )q 4. 2 8 [ TOP OFGRATE ELEV. c A o Y �- DESIGN W.S. ELEV. ��G• S 1L �" � A _ o Q� r � > r ¢e'FS EL. l� •�4t EL. 9v `r�9t 0= C EL. 9S 7 EL. LENGTH S LENGTH-- 5_4 SLOPE SLOPE O.U35t% INLET fl INLET SIZE CONTROL. OUTLETCONTROL. Mw■M+ 1�•-L!• SI ZF CONTROL. OUTLET CONTROL Mw• M+ A.-LS•TYPE n >iw HW K �H d i° TW h LS MW TYPE n Mw .o '' 3 = - -- o e c 2 0 o HW Ke H do N— TW ho LS HW o = m �� •ors .bq _eva !�•2 D,`j 0,7 ,48 o•Zs' .16 7•1s -5.97 0►8� ,�c� .ols o.35 p, p,Z t i t 0.7 �98 .$!� 1 ( 5',3 3,1 0.�4 2 -n "V W STATION T 92 OFFSET 13 2e STATION 1tSt-- 8 OFFSET_ i2 STRUCTURE TYPE 04�J o O 0 �$ m z TOP OF GRATE ELEV. O n.7, �OUTLET STA. OESIG N W.S.ELEV. � OOUTLET T.W.EL. COUTLETEL. EL. 3 EL.LENGTH LENGTH /a2 Z SLOPE D 005" EL. EL./ p INLET SLOPE INLET O SIZE CONTROL OUTLET CONTROL N1M ■N+ h• •Lse111", 9 3 SIZE CONTROL OUTLET CONTROL NW = N f he-I.So 0 � TYPE n n HW Ke H do Z TW ho LS HW = TYPE n _.tl .. HW Ka H d °� TW h Z = � 0 C 2 o LS HW o .76 • Z b,!o o.5 .99 1.3t 1.31 0.51hol /,�' t W a! STATION �'�8g•ggOFFSET G STATION OFFSET 1 C STRUCTURE TYPE 1�3G.is f-► �, TOP OF GRATE ELEV. c A �, !8 3.7 It DESIGN W.S. ELEV. ,Il, m /8Z./� EL. E L. _ - -� �� h 0= � El. EL. p= -< LENGTH LENGTH (A i a SLOPE _f>.00S� SLOPE INLET INLET SIZE CONTROL OUTLET CONTROL NW e N+ he-LSe J 3 rlE CONTROL OUTLET CONTROL NW* N♦ he-LSe 0 3 = D TYPE n 0 HW Ke IH do °-�'2°- TW ho LS HW __ n o Hyy K H d ♦c TW = _ �S s c ho LS HW o rn o.S o.Z 0.5 6.4 ,8� �•� 1.4 , tt 1,571 1.59 � Z � O p 3 �'�l W ..ii..._:.s...•. .._-. .. _ _ •_ .,._`ar l'i:iL1`fila�.".wwi:all. .r t.� `.l. - - * .8.•+rlr.-.. A+1•:a.-S v'.=••VYitiw•h' '-'.J . ✓..._.-.. - `:. ..t;- •Y• .a ...+.-.- STAtiON 2�z:—OFFSET :!3 2 STATION-?.7-'Fz OFFSET '/Z c� t �C O 7 STRUCTURE TYPE C-CB �P m p 0 L � 7,48 z .TOPOFGRATE ELEV. 1 S7. 4 8 Y �L DESIGN W.S.ELEV. 164,7 5 .jL z " co OUTLET STA. t OUTLET T.W.EL. a� OUTLET EL. _ 0= EL. /8/•S� EL. $3•�.Z 02 �. D LENGTH ; �- LENGTH 22 EL. $3.7.3 Z SLOPE � � EL. 4 _ ' SLOPE O.00.S7, t 0 INLET OUTLET CONTROL Mw.•N + bo Lse INLET pUTLET CONTROL Mw • M t ho-L!s SIZE ZE CONTROL 4 3 SIZE CONTROL 3 TYPE TYPE n D HW K' H dC Z TW ha LS HW o= n 0W HW K� H do Z TW ho LS HW o = ' .ois .42 ,53 .2 a..3 .4- •83 178 �83 .11 ),oz 1,0 co L 1 771 — - STATION OFFSETS�'� STATION 44'''� OFFSET f 3 L c # G�sS �'� 3� STRUCTURE TYPE TOP OFGRATE ELEV. n e n _ m x 4. 1 R 1 . 3 ° DESIGN W.S. ELEV. cc A I�N�m LAD v m ~ 0= EL. q0'�4 EL. f 0 ��' '� EL. •�f EL._ �� � < d 0 1 LENGTH LENGTH Z 2 SLOPE SLOPEINLET SIZE CONTROL OUTLET CONTROL. Mw=M+ h•-L3* INLET #.3 SIZE CONTROL OUTLET CONTROL NW N♦ h•-Ls• s 3 OD TYPE Nw o : = TYPE Nw ►- _ f1 p HW Ke �H dC TW ho LS HW r1 o HW We H do =`moo- TW ho LS IHW o = t i •o/ 1 Sy •lo 2 .Z7 .9 A'v q •11 I'o(o 1,v� z -n 0 tV w W t00M s�1� LETTER OF TRANSMITTAL PLANNING DEPARTMENT TOWN OF SOUTH WINDSOR 1540 SULLIVAN AVENUE SOUTH WINDSOR CT 06074- �677 ( 203) 644-2511 DATE iq3 TO: oo, r WE ARE SENDING YOU: P & Z initial plans Drainage comps P & Z final plans Bond estimate requests Inland Wetlands plans Bond reduction requests Final plans for filing Change order form Other _ Correspondence Co 'es APP19 No. Pro ect THESE ARE TRANSMITTED as checked below: For review and coment For your file For your use Returned with revisions As requested. Other PLEASE RETURN/COMMENT BY: COMMENTS: IVt n v---x t "'a of L �99 Copy .s 0 4 From: � tAeTMy �^ � ap s . 1540 SULLIVAN AVENUE • SOUTH WIN , CO �1. 074 � OR•C0� AREA CODE 64� 1 �S /Y 1 June % 19s9;► n �f� ,� T0. Elizabeth A. Warren, Chairman, IWA/CC • ei FROM: John E. McCahill, Zoning/Wetlands Enforcement ff * Y L Re: Application #93-19P, The Homestead DOCUMENTS REVIEWED: Application form and subdivision plans for The Homestead (dated 5/21/93 ) COMMENTS: 1 . The property shown as lot 1, in the northeasterly corner of the entire piece, is under separate ownership. As stated in item C of the application form, "if the applicant is not the owner of the subject property, a letter by the property owner(s ) authorizing the proposed regulated activity set forth in the application must accompany this form and will be part of the application' 2 . The application form, item G, indicates that abutting property owners have been notified by certified mail that an application is pending before the Agency. A sample copy of the letter should be submitted. Section 7 . 3b of the Regulations states that this must be done "within seven (7 ) calendar days of the time an application is submitted. . " . 3 . The existing and proposed tree line should be shown and symbols should be included in the legend. It appears that the proposed development will take place within the existing tree line; some clearing will take place for the proposed road. A note should be added to the plans stating the limits of clearing shall be flagged in the field and approve by the Town prior to cutting trees . 4 . The plans are indicating a "flagged wetlands line" . The Soil Scientist responsible for establishing the limits of the wetlands should verify the flagged wetlands line as shown and should submit a written report for this site. The legend should include a symbol which clearly distinguishes the wetland limits and this symbol should be used throughout the plans . (The symbol used for wetlands is the same symbol used for hay bales and silt fences . ) 5 . The plans are showing intermittent watercourses utilizing the standard mapping symbol. This symbol should be included in the legend. It appears that there is an intermittent watercourse along the roadway in front of the proposed lot 1 . The 80 ' Elizabeth A. Warren Page Two June 1 , 1993 Application #93-19P setback should be shown representing the regulated area. There also appears to be an intermittent watercourse along the rear of the proposed lot 5 . The 80 ' setback should be shown representing the regulated area. 6 . The plans appear to be showing 90' x 90 ' buildable squares (per section 10 . 1a of the Zoning Regulations ) , although they are not identified as such. The 90' x 90 ' areas shown for lot 1 and lot 2 are not free of the regulated areas associated with the intermittent watercourses . 7 . The application form, item J, indicates that the acreage of wetlands and watercourses to be altered is 0 . 30 acres . Item K of the application form indicates that 0 . 10 acre of wetlands or watercourses will be created. It is not clear what is being considered as "created" wetlands or watercourses . 8 . The plans should identify the scale. This has been left blank throughout the plans . 9 . The plans indicate a 114 ' wide grass swale" . This would appear to be the bottom width. A detail should be provided and the plans should be more specific with regard to the width. 10 . The plans should clearly depict a construction entrance is to be installed at the proposed Sele Drive, as well as the entrance/exit to the proposed lot 1 . A detail should be provided on the plans . Construction entrances should also be shown for each of the lots . 11 . Details should be provided showing the proper installation of siltation control fences and hay bales . 12 . On sheet 7 of 11 the sedimentation and erosion control measures briefly discuss the need to divert the water in the brook to install the culvert. More detail should be provided to indicate how the water will be diverted for the proposed work. 13 . On sheet 7 of 11 the sedimentation and erosion control measures note #5 states, "Commence excavation of the detention basin. All excess material is to be removed from the site to a pre-approved location" . The general note #12 states, "excavated detention basin material will be used for the construction of the basin berm. Additional material if required will be obtained from on- site excavation" . This should be clarified. Elizabeth A. Warren Page Three June 1, 1993 Application #93-19P 14 . There is no access to the lots (excluding lot 1 ) without the installation of the roadway. On sheet 7 of 11 the sequence of construction indicates building construction can start with installation of sedimentation control measures & detention basin. This is not the best approach to ensure a stable site. The notes under the sedimentation and erosion control measures indicate house construction may begin with installation of underground utilities . This would be more appropriate. 15 . Sheets 6 , 7 and 8 of 11 should identify the length and size of the pipe at the outlet of the proposed detention basin. 16 . They are proposing to install 17F x 24, modified rip-rap at the outlet of the basin. This should be evaluated to ensure that it provides adequate protection based on the expected discharges . A detail should be provided which includes gravel bedding and filter fabric under the rip-rap. 17 . These comments should be addressed prior to consideration of approval by the Agency. JEM/pmm f i Memo to JCI From DTE 6-04-93 Re: The Homestead Subdivision --- 93-19 This past Tuesday, in the meeting with Mike, I expressed some concern about the system currently being employed with respect to how a subdivision makes it through the process . The proposed Homestead Subdivision is a typical example. The proposal is to divide a 22 . 1 acre parcel into 9 lots . The parcel has approximately 1,700 lf. frontage on existing Town streets and they are proposing to build a 600 lf. cul de sac. Supposedly a super simple routine. The Regulations, under Chapter 3, Procedures, Pre-Application Conference with Town Staff, offers the applicant the option of a pre-submittal review. If this were done, it could have and should have been very straight forward. Attached are five pages of my preliminary review comments and three pages from John McCahill. Nothing from you, Fred or Mel. Most of my comments relate to lack of or incomplete information expected to be on the plans . Some of the observations or recom- mendations will have a financial impact on the construction of the site. Based on past experience, if it isn't specifically on the plans at the time of approval, it difficult if not imposs- ible to get it done later. I believe that it is the Staff s responsibility to have the applicant submit for approval, by the PZC, the most complete and accurate set of drawings . Any of the deletions, modifications or minor changes should be limited to a very minor number of items, not eight pages . This application is scheduled by PZC for a Public Hearing on 7-13-93 . Considering that the applicant has been building in Town for years, under the same regulations and standards, it appears that they would prefer to ignore, negotiate after the approval or plead for a waiver or acceptance of a substandard product. Without the Drainage Calculations and input from others, it would appear that the application is incomplete and premature to be even heard. It would be my recommendation, similar to John's, 'These comments should be addressed, the plans modified and resubmitted prior to consideration of approval by the' Planning and Zoning Commission. Memo to JCI From DTE 6-04-93 Re: The Homestead Subdivision --- 93-19P Plan Review, Date Submitted 5-27-93 Sheet 1 : Key Map This plan should include the `Grandview Subdivision' and its owners . They are within the 500, area. H. 1 .A. 3 Sheet 2: Boundary Map How was the new street line of Buckland Road and Deming Street established? Was it 25, from the apparent centerline or from the surveys referenced? If so, then the ties and relationship should be shown. Were there any bounds found on the abutting properties from which this boundary was established? Are there any encroach- ments? On sheet 5, there appears to be one. What horizontal datum was used, MDC or CGS? List coordinates and show monumentation. They are establishing the Street Line of both streets . Subd. Regs . C.3. 6 . (a) The Proposed Lot 1, N/F RSK-KELLCO, is excluded from the Boundary Survey. The Boundary Survey indicates a 22 . 1 acre parcel, which on subsequent sheets are 8 Lots. On these later sheets, the 9 lots cover 22 . 1 acres . Which plan is correct? This plan does not appear to be consistent with the minimum A-2 standard requirments . Sheet 3 : Plot Plan The drawings for the subdivision covers two sheets, show the matching marks and the Sheet reference. Horizontal Datum. Show the coordinates for the Buckland and Deming bounds . Show that the Right of Way will be 50F minimum. Note # 9 . The roof drains will NOT be discharged on the lawn with out protection. Note # 12 . The soils taken fromn the detention basin will not be used in the creation of the detention basin .berm without a suitable soils evaluation and design approval. Why the angle points in the proposed street line? Normally it is tangents and appropriate curves . Not angle points . What scale is the drawing? The Homestead Subdivision -- 93i-19P Page 2 . The plans were revised to 5-26-93 to a check list. Was it the Town's? By whom? Can we have a copy? Sheet 4 . Plot Plan What scale? The Street Line of Deming and Buckland will be monumented & deeded to the Town. Show monuments . Subd. Regs . C. 3 .a. (6 ) On this sheet, Lot 1 is a part of the subdivision. Later comments on sheet 6, it would seem more advantageous for this lot to have frontage on Sele Drive, with the driveway on Sele Drive. With the traffic now and expected and the indicated driveway location, it would seem to be to the best interest to the homeowner or the Town to have acess from Sele Drive. Sheet 5: Topographic Plan What is the vertical datum being used? What is the source of the topo? To what accuracy? 'Topographic Map shall be at the same scale as the plot plan containing all the data included on the plot plan, plus the following. ' Subd. Regs . II . 0 . ALL of the interior lot lines shall have bearings and distances as shown on the plot plan. Encroachment of the building, Gagliardo,247 Deming Street? Show the existing street improvements along Deming, i.e.. water, storm sewer, driveways, etc. , specifically the 24" storm sewer. Extend the topo the 200' beyond the boundary. Subd. Regs . H.II . 2 . Show the proposed improvement per the Buckland Road Reconstruct- ion Drawings . The plan submitted is dated 5-26-93 . This inform- ation is available and the drawings submitted should be current. Show their subdivision improvements along the 800 lf . of frontage of Deming Street.. The widening, the drainage, the pole relocation, etc. At four random locations, the existing pave- ment of Deming is 18' 18' 20' & 21' . It should complement the Buckland Road Reconstruction Project. Continue the Drainage Easement across Lot 9, from the detention basin to the inlet at Deming. It is carrying street drainage. I did not look for the Drainage Area Plan or the Drainage Calculations . The drainage area is from Buckland to Deming to Ridge Road and southerly, could be, approximately, a forty acre water shed. The design of the piping for the subdivision has not M The Homestead Subdivision --- 93-19P Page 3 . been verified. What is the disposition of the existing buildings on Lot 9 . H. I .B. 6 . requires that it be shown. Where will the new house be? Where will the water & sanitary hook up for Lot 9 be in Deming Street? These laterals should be extended, by the Subdivider, at least to the Deming Street line, prior to the paving of Deming by Spazz . This is not a Town expense. To do it after the street is paved would be inconsiderate. This is a standard requirement. What is the source of the topo? What datum. Subd. Regs . H. I .B. 2. What is the source of the Wetlands delineation? Where is the certification by a Soils Scientist? What is the source of the soils delineation? Note # 12, to assume that the excavated material from the detention basin is suitable for the detention basin berm is not an acceptable assumption. A detail and specifications of the berm , construction and the soil makeup of the berm will be required. The existing drainage problem created by Mr. Sele or others, along the southerly boundary should be corrected, at this time. Sheet 6 : Topographic Plan Match Sheet, Scale, Applicable notes from Sheet 5 . Continue the 40' & 80' Wetlands and Watercourse buffer lines, through the boundary. At the proposed culvert under Sele Drive, show inlet and outlet stream bed protection. What is the 90' X ,90' box at 1+50 on Sele Drive? Address the existing 24" storm drain at the intersection of Sele Drive with Deming Street. Per TA, they own to the pavt. There is no reference to it on the plans . Show the existing drainage system for the site. Subd. Regs . H. II .5 & 6 As with 'Sheet 5, show the proposed improvements along Deming St. Show the sight line triangle at the proposed driveway entrance to Lot 1 . Subd. Regs. H. III. 11 . The Homestead Subdivision --- 93-19P Page 4 . For Lot 1, for the benefit of the proposed home owner, it would seem that having frontage on Sele Drive would simplify the drive- way and sewer access. With the traffic on Deming, access to Sele would be preferable All of the houses below Sele will have hung plumbing. Show the tenative elevations of the Sanitary Laterals at street line. Show the pedestrian ramp at Deming. Sheet 7 : Conservation Plan Scale? Don't stock pile below the houses on the westerly side of Sele Drive. It only makes for more disturbed area to be protected and restored. Regs . encourage a minimum of disturbed areas. It appears that approximately 3/4's of Lot 9 is a wetlands and subject to drainage rights . It would seem appropriate for a conservation easement across this parcel would help to preserve it's pristine present condition. Sheet 8: Conservation Plan Scale? Source of the Soils delineation? Sheet 9, Plan & Profile: Show the pedestrian ramp, at Deming Street. Show the intersecting profile of Deming Street with Sele Drive. It appears to be approximately 10%. This would appear to create an 8' difference in grade from the ends of the flares of Sele Drive. The grading of this intersection, together with the drainage isnrt something that should be worked out in the field. It should be included in their submittal. Considering the amount of ground water that comes out from the ridge from Deming to the Manchester Mall, it would seem appropriate to install both the storm drain and an underdrain on the easterly side of Sele Drive from, approximately 2+0 to 6+50 . The deepest cuts for the road cross-section will be along the The Homestead Subdivision --- 93-19P Page 5 . easterly side of the road and the potential to intercept the ground water would be greater. Clean up the scale. The storm sewer at 4+0 will not have 2' of cover over the bells, in the gutter line. Town Specs . 2 . 3 . O .h. Show the foundation drain connections, with elevations . Show the gravel road to the detention basin. Due to time constraints, I did not review the Standard Sheets. NEW SHEET, Deming Street & Buckland Road Plan and Profile Will need a new sheet to show the widening, drainage pipes and structures, monumentation, etc. for the entire frontage of the subdivision, including the frontage along the Gagliardo parcel. Show a single drive for Lot 9 onto Buckland Road. General Observation ----- I would prefer the detention basin to be adjacent to Sele Drive on Lot 8 . It would require less piping, would affect one lot not two and its functioning could be observed from the pavement. Due toa sheet by sheet review, there will be some duplication of observations . This collection of comments represents only a cursory review of their submittal . It is not intended to be the final review. r •• T. VIA 4 . 0607 1540 SULLIVAN AVENUE SOUTH WINDSOR. CONN 9 AREA CODE 203/644-2511 ' ,��SOR•C0�2 June 1, 1993 TO: Elizabeth A. Warren, Chairman, IWA/CC t Officer ahill Zoning/Wetlands Enforcemen FROM: John E. McC , Re: Application #93-19P► The Homestead ' ation form and subdivision plan Ho (dated for The DOCUMENTS REVIEWED: Application dated 5/21/93 ) COMMENTS: 1 • The property shown as lot 1 in the .northeasterly corner of the entire piece, is under separate ownership As stated in item • ,if the applicant is not the owner of of the application form, ro ert owner(s) the subject property, a letter by the pr ,. Set forth in the regulated activity authorizing the proposed art of the applicat ion must accompany this form and will be p application" . indicates that abutting .property 2 . The applicationitem G aa application form, � . have been notified by certified mail thatthe letter should owners ha A sample copy of ending before the Agency. is... p 7 • 3b of the Regulations states that this be submitted. Section must be done ,within seven (7 ) calendar days of the time an application is submitted. • " • ed tree line should be shown and symbols 3 . The existing and propos ears that the proposed should be included in the legend. It app tree line; some will take place within the existingA note should' be development r the proposed road. clearing will take place fo e limits of clearing shalCuttin be added to the plans stating th b the Town prior to g flagged in the field and approve y trees . d • a "flagge wetlands line" . The Soil 4 . The plans are indicating r establishing the limits of the wetlands Scientist responsible fo • flagged wetlands line as shown and should Jude should verify the flagg The legend should inc submit a written report fot nguthi Sesethe wetland limits and this a symbol which clearly distinguishes the plans . (The symbol used for symbol should be used throughoed for hay bales and silt fences . ) wetlands is the same symbol used intermittent watercourses utilizing tht 5 . The plans are showing symbol. This symbol should be include in the standard mapping Y legend. It appears that there is an intermittent watercourse y along the roadway in front of the proposed lot 1 . The 8 o Elizabeth A. June 1 199 3 Warren Pa a Tw Application #93-19P ' the regulated area. There resenting the rear of setback should be shown rep i also appears to be an intermittent watercourse along representing ' the proposed lot 5 . The SO' setback should be s the regulated area. (per showin 90' x 90' buildable squares not � 6 . The plans .appedr to be in Regulations) , although they are and lot section l0 . la of the The 90' x 90' areas shown for lot identified as sucho elated areas associated with the 2 are not free of the s . intermittent watersourse indicates that the acreage of K of application form► Item 7 . The app item altered is 0 . 30 acresands or wetlands and watercourses for ur is being • indicates that 0 . 10 acre of wetlands the application form watercourses will be created. It is not clear what as ,created" wetlands or watercourses . considered sale. This has been left blank 8 ' i The plans should dentify the s plans *throughout the p to �� � wide grass Swale" . This would appear 9 . . The plans indicate a 4 -provided and the plans ottom width. A detail should bt width. be the b specific with regard to should be more sp depict a construction entrance is to be 10 . The plans should clearly P as ,Well as the be rovided stalled at the proposed Sele Drive, in proposed lot 1 . A detail should p for entrance/exit to the prtpon entrances should also be shown on the plans . Construc P each of the lots . in of 11 . Details should be provided showing the proper silta tion control fences and hay bales . sedimentation and erosion control measures 12. on sheet 7 of 11 the sedito divert the water in the brook to briefly discuss the need t provided to i install the culvert. More detail should beosed work. how the water will be diverted for the prop sedimentation and erosion control measures 13 . on sheet 7 of 11 the commence pre-approved note #5 states, C to ornmence excavation of the detentionbasin* • is to be .removed from the sit detention excess material "excavated location The general note #12 states, loc for the construction of the basnnon- basin material will be used if required will be obtained from berm. Additional material . n�� . This should be clarified. site excavation" . Y r 1993 �_ Pa e Three .June 1 Elizabeth A. Warren Application #93-19P in lot 1) without the exclud g sequence of • s no access to the lots n sheet 7 of 11 the seq with 14 . There 0 installation of the roadwaldin construction can Star ins indicates building measures & detention basin. construction ind The notes • of sedimentation controur a stable site. installation to ens • of the best approach • on control measures indicate ate This is n the sedimentation and erosi r with installation of underground under begin house construction may begmore appropriate. utilities . This would • the length and size of d g of 11 should identify 15 . Sheets 6 7 an detention basin. at the outlet of the proposed _rap at the the pipe ' . stall 17 ' x 24' modifiedo ensure -that it are proposing to in 16 . They This should be evalueXeected discharges . A outlet of the basin the P • adequate protection.based oth gravel bedding and provides adld be provided which includes detail should under the rip-rap' filter fabric ed prior to consideration o 17 . address P. comments should be These c t approval by the Agency' JEx/pmm JOB # 9e-go 9 3 DATE zI-`� TORRES ENGINEERING,INC. SHEET NO. / 137 SEYMOUR AVENUE WEST HARTFORD,CT 06119 BY , 77 (203)232-9833 CHECKED O . 7. 000, <47 £ �.Y► < S t .,p. q.....,.., y £ I - (... ......�,....(,..o mow............. .v........... � , ol zn 104!$7�47_A-i- _Z4 ........... p. ., ._...,.....,. .,,,.« ,.w..w. .I.AD r S q i i r r £ ? ' E � � r " i s ; 3 £ i f� s < e It : S ,r } F .. � ...y,., ,.,w.. a _..._. ...... .......... _....._.. ..,,,,,_ _ _.. ... ... v. nn 1 tt SI ;. : i J t � s i , } JOB # 90 D / DATE 62`Z/ ?3 '�- TORRES ENGINEERING9 INC. '� CD�p_5' SHEET NO. loz— 137 SEYMOUR AVENUE WEST HARTFORD,CT 06119 BY 40.7;' (203)232-9833 CHECKED ©- T E 40# f { S _ i t � r 1 E 3 S ! { # E .„ f q: 40 , « i t s a r 3 € a10= cj2Z _ w, ice ilrz } f , A �:r S { i ;... �!: d r ... ,:,,....y.. .......,,,,...... .. ...,..: ....,..... .y.,. ,.. ice! ............. . ... r : if a : } } S # F 3 t. �. x s F # ti 6 r r i E t ! E F v 4000 55 Oro Q w .4000 3006_ . _ ..1 ., 50 2000 d �a f'n. 45 40 1000 900 35 Boo .30 Soo ►Avto w = .. _ 400 0.9,0 w 0.90 0 •; IL > a _ 0.70 W o: IL 00 •ARt•olL 0.60 w 20 - _ 0.1 y� Z C rOO !RAS$ 0:4 0 Ilk IL0 W !U ACE 04d �` J 4, 0.3l1 Z AVIRAOR • • w w =URFACt 0.30 �_ 1.0 w I S 80 70 DENSE ORA$ OW Z �.w . w l J 60 •.� 1# 5. _ .O d 40 I� 1 ` 30 0 9 20 , .; 7 w 10 J EXAMPLE �A' > EXAMPLE B. LENGTH: 700 FEET a. LENGTH: 100 BEET PAVED DENSE ORA$$ SLOPE:1.0 % 'LOPE: 6.0% TIME: 10 MINUTES TIME: 13 1/1 MINUTES ot TOWN OF SOUTH. WINDSOR NOMOGRAPH',FOR DETERMINING APPROVE D STANDARD DETAIL TIME '0V CONCENTRATION JANUARYg 1991 w (CHART 3) RlVI!!D: rU�LIC K� OIn CTOR eo-100.; 55 4000 ��►��S / t� 3000 - �=� ' �/--sir h� 50 2000 _ d 45 40 1000 900 33 Soo 1 w 600 .30 Soo 400 �Avso' .� i - z � 0• w♦ oz 2-5 W o.so �� a 0.70 d a 900 @ARE SOIL 0.60 S �� w 20 V _ 0.1 z W w ACE J IL 0 AVERASE on w 90.�_ SURFACE 0.30 <� 1.0 I,y IS 80 - 0.20 2.0 1- 70 DENSE ell As .15 w z `♦ ���I jam'' Lit s0 ,A� •+ •- I 0 W - 0.0 d `� 40 30 10 9 8 20 6 w - z ` 10 , J EXAMPLE �A' > EXAMPLE �a' LENGTH: 700 FEET d LENGTH: 106 FEET PAYED DENSE GRASS SLOPE:1.0 % SLOPE: 6.0% TIME: 10 MINUTES TI ME: 13 MINUTES TOWN OF SOUTH WINDSOR NOMOGRAPH FOR DETERMINING AF'ROVto STANDARD DETAIL TIME OF CONCENTRATION JANUARY, 1991 (CHART 3) REYi SEo: PUB L I C WWlts DIRECTOR 45- ws 4000 / W • 2 3000 j re 50 • > f1 fn! 2000 d 45 1$"/ 40 1000 "` 900 35 Soo 0`0 W Soo ` Z .30 860 �'�• . 400 paver Z - 2 2 25 W o 300 .eo "� P IL > • �► � a: : 0.70 d 200 •ARE l011. 0.60 W 20 z 0.1 W a .. room $RA!! 0.50 0 ILW SURFACE 0.45 �� 1 IL Avg !! 0.30 W Wsuit f�' so ��'`� 0 I 2.0 �� ~ TO o[N![ •RA! 0. I" �•� ~doom 60 5.0 50 •�.r► ft — ' 40 20.0 30 - - 10 90 :,.. W r z p Io ` . ..J EXAMPLE A > EXAMPLE �9 LENGTH: 700 FEET a. LENGTH. 100 FEET ' PAVED DENSE GRASS :. SLOPE.:1.0 % SLOPE: 0.0% TIME: 10 MINUTES. TIME: 13 1/S,MINUTES TOWN OF SOUTH WINDSOR NOMOGRAPH. FOR DETERMINING APPROV90 STANDARD DETAIL TIME OF CONCENTRATION JANUARYg 1991 (CHART 3) Rsv�sto: — U�L 1 C K! DIRECT- on A°w N st4( ' e � 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 tiesoR.co AREA CODE 203 644-2511 June 22, 1993 CffitTIFI$D MAIL Richard S. Kelley RSK-Kellco, Inc. 1744 Ellington Road South Windsor, CT 06074 Dear Mr. Kelley: ,. Re: Application #93-19P, The Homestead At the June 21, 1993 regular meeting, the Inland Wetlands Agency/Conservation Commission approved with conditions application #93-19P - IWA/CC permit for the construction of an 8 lot subdivision on property located southerly of Deming Street and easterly of Buckland Road, AA-30 zone as shown on plans prepared by Torres Engineering, Inc. , dated May 21, 1993 and revised through June 17, 1993 . This approval is subject to the following conditions: 1 . Two blueprint copies of the entire set of plans and this letter reproduced thereon, must be submitted to this Commission . This must be completed within 65 days of approval prior to any construction activity on the site. 2 . Construction activities shall be subject to the approval of the Town Engineer. 39 The application shall indemnify and hold harmless the Town of South Windsor against any liability which might result from the proposed operation or use. 4 . We recommend a bond in the amount of $10,000.00 to be submitted to Planning and Zoning Commission to ensure compliance with the Erosion and Sedimentation Control Measures . 5 . The permit is valid for three years and shall expire on June 21, 1996 . 6 . All approvals required must be obtained and submitted prior to any activity on the site. 7 . A contact person shall be identified directly on the plans . r PLANNING DEPAR72UM IN-HOUSE REFERRAL FORM TO: Jean Zurbrigen, Ake Michael Gantick, Mel Stead Fred Shaw, Sgt Gerald Lewis, Ore Marshall' Lanning, James Snow Marcia A. Banach, Director of Planning The Planning & Engineering De artments h ve re eived plans for the following project: # irKe :i Zone -3 6' Acreage Subdivision_ Site Plan Residential No. of Lots/Units Commercial_ Industrial Location: t • 6,64,d NA AA ..�T�S Project Description: t : , Future Town-owned property involved? Yes No — •(a) new streets (existing frontage also) (b) new open space/recreation area ai .active passive (c) new detention area eaj,ew.P-:tp�' Planning Department commentsJV/ 0j f� fil0�r r Please let me know b � Y ►:r~t. .3 if you will have vmmen t s on this application so that l can follow up with your depa ent when I do a Planning Department report. rv� �Dtve W. LETTER OF TRANSMITTAL PLANNING DEPARTMENT TOWN OF SOUTH WINDSOR 1540 SULLIVAN AVENUE SOUTH WINDSOR CT 06074 ( 203) 644-2511 DATE T0: t RECEIVED JUL011993 ► Town of South Windsor 2 Engineering Dept. WE ARE SENDING ts,�a i4i- P & Z plans lans Drainage comps _. P & Z final plans Bond estimate requests Inland Wetlands plans Bond reduction requests Final plans for filing Change order form Other Correspondence Copies A 1. No. I.Pro ec i THESE ARE TRANSMITTED as checked below: i For review and continent For your file For your use Returned with revisions As requested- Other PLEASE RETURN/COMMENT BY: COMMENTS: i Copy to: From: TOWN Of SOUTH WINDSOR, PUBLIC WORKS D Priority ty REQUEST FOR INVESTIGATION ❑ WORK REQUEST ❑ Date 7-06-93 No. To Mel Stead r Jr, (individual,Division, Bursa , epartme" Requested by Encrineerincr Dept. F Caller i Address Phone Instructions we have .had a request from Planning to review two projects that willbe d �. hhear bY-Ae Planning and Zoninq Commissions early in Jul Radfiel eld Acceptance f he street im rovements in Sections I &divini on swan -Tt Is a II d vi ion of the ormerly Sele REPORT Streat. The D1 ns are available Date Completed Bureau Chief or Department Head -j7 25 14 )EMING STREET 10 I CONNECTICUT 10 3z 1993 9 ��,� L"X�STiN6 L oT All O O r 7 J / r SELI ID N O 8 a 14 i Ort/E.t Davos of 12 o ❑ tt 7 . 13 APPLICANT ----� BUCKLAND ROAD RSK-KELLCO, 15 15 1 1744 ELLINGTON QnT T'T'[T lATT'KTnQnA U IHLR LAIJU Uf JEAN MARC JACQUES '+' t77.9.' i POND - _ llftpAAr trtE I�� •o c . ,-EDGE Of POND14 -•__- . ^V 400 OM SPACE r 'i ' EN SPACE / 1 iASIN BASIN \� •• •AS • \ \ I ' / \..• I rff 101./1.tt I/ / TT •• , 1 �` `�•\ OPEN SPACE ( , ACTIVE 1.4 AA.! .� I '! 11EGItE/�tNN1 AREA , / 4.4 AsA , L LF 9. OPEN SPACE \ I ' •r ruN�ss It rt tw" + ACTIVE 1 ' ..... rul or►uf t. SCCR[ATION EA .::.:. ---�" ------- -J I_--- ---- ---- ------ - --- I --at"SPACE ; \ I --------- ----------------^-------------------------- •--- I�NIsMV---------- ------- !!�- - - - -. SMI TH STREET i MEMORANDUM July 15, 1993 TO: Marcia Banach, Director of Planning FROM: J ry C. Iazzetta, Town Engineer RE: �Q�STLAD SUBDIVISION 93-19 We have reviewed the revised drawin dated 6-30-93 for the proposed. The Homestead Subdivision and have the following comments: Key Map 1 . Revision date should be shown. 2 . Grandview Terrace should be labeled. 3 . Driveway to church should be shown. Boundary Survey 1 . Plan indicates that there are 22.1 acres excluding lot #1 . The Rey Map indicates 22. 1 acres including lot #1 . Which is correct? 2. Lot #1 is not fully described--distances along bearings S65009 '46" & S03037 '52"E -are not shown. 3 . Revision date required. 4 . Datum for coordinates should be indicated. Plot Plan - Sheet 3 1 . Monuments should be numbered and coordinates listed. Plot Plan - Sheet 4 1. Drainage easements to be granted to the Town should be shown with bearings and distance. 2 . Along Deming Street drawing has bearing and distance "N24 50' 14"E, 17-00" shown. What is this describing? Topographic Map - Sheet 5 1. The proposed Buckland Road and Deming Street improvements under construction, including pavement, drainage, etc. should be shown. 2 . State of Connecticut Drainage Right-of-Way should be shown. 3 . Existing storm pipe and ditch along Deming. Street should be shown. 4 . Deming Street should be widened along frontage of property. Present pavement is very narrow. (18' in some areas) . 5 . Driveway to the church should be shown. . 6 . Existing tobacco barn should be shown. 7 . Contours for adjacent properties for 200, beyond project should be shown. Memorandum To: Marcia Banach, Director of Planning From: Jerry C. Iazzetta, Town Engineer Re: The Homestead Subdivision 93-19 July 15, 1993 Page 2 . Topographic 4ap - Sheet 6 1 . Deming Street should be widened along frontage of property. Present pavement is very narrow (18 ' in some areas) 2. What is the design speed of Deming Street? 3 . Test pits should be taken to determine' the level of groundwater in area of roadway and, results submitted. 4 . Sight line for Lot #1 driveway should be shown. 5 . Existing storm pipes and drainage ditches should be shown--including pipe from Grandview. 6 . Grandview Terrace should be shown. 7 . Lot #1 shows a sanitary . lateral going across Deming Street, but. does not show what it is connected into. 8 . Size and type of pipe for sanitary laterals and footing drains should be shown. 9 . Access road to storm pipe should be labeled. 10 . Town will require a right to drain across lot #8 and other land of RSR-RELLCO, Inc. 11 . Replace storm manhole at station 1+15+ with a catch basin in street. - 12 . 1140' off wetlands" and 1180' off wetlands" lines need better definition--they look like contour lines . 13 . There may be a conflict with a fire hydrant in the area of Sele Drive. Please have applicant investigate. 14 . Same comment as comment #2, Sheet 4 above. 15 . Same comment as comment #7, Sheet 5 above. 16 . Lot numbers should be shown. Plan and Profile - Sheet 9 1 . Plan shows pipe going west from CB #7 without connection. This appears to be an error. 2 . Plan shows underdrain on east side of Sele Road. The topographic plan does not show this underdrain. Which is correct? If underdrain is . to be installed, it should be shown on profile. 3 . Existing grade on profile at Station 0+00 to edge of existing pavement and a little beyond, appears to be in . error. Details - Sheet 11 1 . Typical roadway section detail should indicate that the pavement design shall be approved by the ' Town Engineer prior to construction. JCI :bmr MEMORANDUM July 15, 1993 TO: Marcia Banach, Director of Planning FROM: Jerry C. Iazzetta, Town Engineer RE: THE HOMESTEAD SUBDIVISION 93-19 We have. reviewed the revised drawin Jdated 6-30-93 for the proposed, The Homestead Subdivision and have the following comments: Rey Map 1 . Revision date should be shown. 2 . Grandview Terrace should be labeled. 3 . Driveway to church should be shown. Boundary Survey 1 . Plan indicates that there are 22 . 1 acres excluding lot #1 . The Key Map indicates 22 . 1 acres including lot #1 . Which is correct? 2 . Lot #1 is not fully described--distances along bearings S650091'46" & S030371'5211E are not shown. 3 . Revision date required. 4 . Datum for coordinates should be indicated. Plot Plan - Sheet 3 1 . Monuments should be numbered and coordinates listed. Plot Plan - Sheet 4 1 . Drainage easements to be granted to the Town should be shown with bearings and distance. 2 . Along Deming Street drawing has bearing and distance 11N24` 50114"E, 17-00" shown. What is this describing? Topographic Ma - Sheet 5 1 . The proposed Buckland Road and Deming Street improvements under construction, including pavement, drainage, etc. should be shown. 2 . State of Connecticut Drainage Right-of-Way should be shown. 3 . Existing storm pipe and ditch along Deming. Street should be shown. 4 . Deming Street should be widened along frontage of property. Present pavement is very narrow. (18' in some areas) . 5 . Driveway to the church should be shown. 6 . Existing tobacco barn should be shown. 7 . Contours for adjacent properties for 200' beyond project should be shown. r Memorandum ' To: Marcia Banach, Director of Planning From: Jerry C. Iazzetta, Town Engineer Re: The Homestead Subdivision 93-19 July 15, 1993 Page 2 . Topographic Xav - Sheet 6 1 . Deming Street should be widened along frontage of property. Present pavement is very narrow (18' in some areas) 2 . What is the design speed of Deming Street? 3 . Test pits should be taken to determine* the level of groundwater in area of roadway and results submitted. 4 . Sight line for Lot #1 driveway should be shown. 5 . Existing storm pipes and drainage ditches should be shown--including pipe from Grandview. 6 . Grandview Terrace should be shown. 7 . Lot #1 shows a sanitary . lateral going across Deming Street, but does not show what it is connected into. 8 . Size and type of pipe for sanitary laterals and footing drains should be shown. 9 . Access road to storm pipe should be labeled. 10 . Town will require a right to drain across lot #8 and other land of RSK-KELLCO, Inc. - 11 . Replace storm manhole at station 1+15+ with a catch basin in street. 12 . "40' off wetlands" and 1180" off wetlands". lines need better definition--they look like contour lines. 13 . There may be a conflict with a fire hydrant in the area of Sele Drive. Please have applicant investigate. 14 . - Same comment as comment #2, Sheet 4 above. 15 . Same comment as comment V. Sheet 5 above. 16 . Lot numbers should be shown. Plan and Profile - Sheet 9 1 . Plan shows pipe going west from CB #7 without connection. This appears to be an error. 2 . Plan shows underdrain on east side of Sele Road. The topographic plan does not show this underdrain. Which is correct? If underdrain is . to be installed, it should be shown on profile. 3 . Existing grade on profile at Station 0+00 to edge of existing pavement and a little beyond, appears to be in error. Details- Sheet 11 1 . Typical roadway section detail should indicate that the pavement design shall be approved by the ' Town Engineer Prior to construction. JCI:bmr • Memo to JCI From DTE 7-09-93 Re: The Homestead Subdivision 93-19P Plan Review Request from Planning on 6-30-93 On 6-04-93, I prepared a preliminary review of the plams dated 5-21-93 for The Homestead Subdivision. Attached is a copy,. with comments . It would appear that the applicant met with the Planning Staff, apparently with my review comments, and the 6-30-93 plans have been modified to include only a selective few of my observations and/or recommendations. The `Town' has generated a number of standards, used the applicable conventional standards and check lists for the Developers and Consulting Engineers, for their use in the preparation of plans for presentation to the Town Boards . It is supposed to give each of them, a consistent approach by which each proposal will be reviewed, where one will not be asked to do more than another. I believe that it is important that the Engineering reviews and the recommendations should also be as consistent, based on those standards. It is an effort to eliminate interpretations. It is my opinion that these plans are incomplete, inconsistent with the Standards and not ready for review by any Board, at this time. Sheet 1 . KEY MAP This plan indicates this is a 9 Lot Subdivision on a 22. 1 acre parcel of land. This is consistent on every sheet but Sheet 2 From the TSW Required Information Subdivision Check List, Dated 5-26-93, by Torres, #l .b. the address of the Surveyor is NOT on the plans. This sheet has been revised. The current plans under review, do not have a revision date. Sheet 2. BOUNDARY MAP This sheet has been modified and does not have a revision date. It is important that, if and when there is an approval that the Boundary Survey be filed with the Subdivision Plans . It appears that the 22 . 1 acre Subdivision includes the `Existing Lot 11 . Those dimensions and bearings should be shown. The Homestead Subdivision 7-09-93 Page 2. Sheet 3 . PLOT PLAN From the Subdivision Regulations H. I.B.1 & the checklist, 3.h. , - Monuments --- etc. 'THESE COORDINATES SHALL APPEAR IN TABULAR FORM ON THE PLOT PLAN' . This was checked as done, by the consultant. They are not on this sheet, for this sheet. Sheet 4 . PLOT PLAN In the 6-04-93 review, for sheet 3, I indicated that they should show the matching sheet numbers . I presumed that they would continue this practice throughout the submittal. This requirement comes from the State of Connecticut CALS Standards, that they have been referencing. i.e. `WHENEVER MORE THAN ONE SHEET IS USED, EACH SHEET MUST SHOW ---, ,AND CONTAIN CLEARLY LABELED MATCH- LINES. ' This would apply to Sheets 4, 5, 6, 7 & 8. There is a N 24-50-14 E bearing and a 17 . 00, distance on this sheet and on sheets 6 & 8 that seems out of place. This sheet should also have the coordinates shown in a tabular form, Subd. Regs . H. I .B.I . p The checklist, as submitted by the consultant, Item 3.k. , indicates that the traffic controls are not applicable. I presume that the applicant can submit verification, for our files . On Sheet 6, they show two undimensioned `Drainage Easements to be Deeded to the Town of South Windsor' . Per the Subdivision Regulations H. I.B.5. Easements, noting grantors, grantees and purposes are to be put on the Plot Plans. This has not been done. This information should be put on Sheets 6 & 8, also. It is my feeling that there should be a dedicated drainage easement along existing watercourse from the end of the 24" pipe, a on Lot 8, across Other Lands of RSK-KELLCO to where it discharges into the 36" pipe being installed with the Buckland Road Reconstruction Project. This sheet neglects to -show the proximity of the Grandview Terrace to the site. It is required on the later sheets. c� v� �!�vf�i�� � G s >� �`" �� 9 3 c�ov,3'�3, Sheet 5. TOPOGRAPHIC PLAN Off'�r,�,,vir�► �.- ,,a,,,�G,, Section H. II . 2. of the Subdivision Regulations requires the existing and proposed contours to extend at least 200' beyond subject property. This would show the proxinity of the Grandview Terrace site. This has not been done by the applicant. y The Homestead Subdivision 93-19P 7-09-93 Page 3 . There appears to be some reluctance in supplying the basic information on the plans of the existing Deming Street & Buck- land Road pavement and utilities, adjacent to the site. Subd. Checklist, 4 .a. All existing and proposed buildings, are to be shown. Somehow a 100' long tobacco barn on the RSK-KELLCO property isn't shown. This is checked as done. Subd, checklist 4 .b. , asks that the curb lines and pavement widths be shown. I would presume that this would include the existing and proposed. This is checked as done. Subd. checklist 4 .c. , Existing and proposed sanitary and storm sewers are to be shown. The plans are void of the existing or � proposed storm sewer details along the Deming Street and Buckland Road frontage. This is checked as done. Subd. checklist 4 .d. , Existing and proposed gas and water mains are to be shown. Based on a field inspection, it appears that the water main isn't as shown. The plans should identify the hydrant location. It appears that it is in Sele Drive. The cost of the relocation will not be a TSW expense. This is checked as done. On 10-23-91, the Town Attorney established the Street Line owner- ship criteria in which, without an established and dedicated Street Line, the abutter owns to the edge of the pavement. With that in mind, Items from the check list, 4 .a. , 4 .b. , 4 .c. , and 4 .d. , on Buckland Road and Deming Street, as it affects this parcel should be shown. Subd. Regs, Section H.II.4. requires that the existing system of drainage of the subject site be shown. This would show the contributing water from further up Deming and from the Grandview Terrace system. These comments would be applicable on Sheet 6, also. From the Buckland Road Reconstruction Project, Sheet 55 of 140, at Station 23 + 30, the plans propose a 29' wide pavement to match the existing pavement. The area is marked and from curb to curb, the existing pavement is approximately 18' wide. In Section E, of the Subdivision Regulations, it goes into 'Off-Tract Improvements' which addresses the safe and adequate access to the site and the remedies available. Per the Subd. Checklist 4.b. , the pavements widths are to be shown. I am presuming that the minimum width for Deming Street is intended to be at least 261 . The regulations provide for this condition. This is not an unique situation in Town, other developers have improved their frontages along existing streets. The plans do not show the existing substandard conditions. The Commision has no way of knowing this. In the earlier review, I expressed a concern that the sanitary and water connection for the 9 .94 acre parcel or Lot be shown and that the installation be made prior to the paving of Deming Street by the Buckland Road Reconstruction Project. It is in the The Homestead Subdivision 93-19P 7-09-93 Page 4 . Town's best interests to have it done, at this time. Show the matching sheet lines and label appropriately. Sheet 6 TOPOGRAPHIC PLAN Show the matching sheet lines and label appropriately. Extend the Drainage Easement to Deming Street, including all dimensions and bearings. A number of the notes from Sheet 5, where applicable on this sheet, should be done. At the intersection of Sele Drive with Deming Street, it appears that the profile of Deming uphill is approximately 5% and down- hill is approximately 10%, based on this sheet. It is important, both for the placement of the drainage structures and the grading of the intersection that a more detailed plan be included on the drawings . There shouldn't be any storm water sheet flow across or through the intersection. From an onsite inspection, it appears that there could be some conflict with the water main and hydrant. This should be shown, in more detail. Subdiv. Regs . H. II . 4 . & Checklist 4 .c. & 6 .f. Sight line triangle for Lot 1 is to be shown. Subd. Regs . H. III. 11 Sheet 7 . CONSERVATION PLAN Show clearly labeled match lines E & S Control Measures, Note # 2, refers to installing a temporary entrance tracking mat at the northeasterly corner of Lot 1 -for the construction of the 24" cross culvert under Sele Drive. This is over 200 feet to the upstream end of the culvert. Noote # 31 is installing the main entrance tracking mat. Note # 4, or the installation of the cross culvert. The culvert is less than 100' from the main entrance pad. Note # 61 indicates that the land disturbance shall be kept to the minimum. This is in conflict with and inconsistent with Note # 2. Show the Drainage Easement, noting Grantors, Grantees and purpose. The Homestead Subdivision 93-19P 7-09-93 Page 5 . Sheet 8 CONSERVATION PLAN Show clearly labeled match lines . Show the dimensions and bearings of the Drainage Easements . Subd. Regs . H. I .5. & Checklist 3.e. Sheet 9 PLAN AND PROFILE I would question the placement of the pedestrian ramp. I 'prefer that they exit on Sele Drive. In the TSW Public Improvement Specifications, Revised to 5-92, Sheet 15, the Minimum Tangent between Compound and Reverse Curves for a Local Residential Road is 100' . This plan is not in 14? compliance with that standard. ��vS In the Subdivision Checklist, Item # 7, Traffic Report, the Consultant indicates that it is NA. It would seem that this should come from the TSW Traffic Authority, not from the applicant. With the exception of the Sanitary connection of the 9+ acre parcel and the Drainage Easement across this same parcel I believe that all of the items requested to be shown on. the plans are from the Regulations and Standards and would be consistent with recent Subdivision approvals . Most of the concerns expressed relate to the improvements along Deming Street. They propose none. To be consistent with other recent subdivisions in Town, the entire frontage will be improved. As far as I know, there has been no contact by the Applicant or the Consultant with the Engineering Department since the 6-04-93 preliminary review to resolve or discuss these comments. When these were generated, we all knew that it was scheduled for a Public Hearing on 7-13-93. As indicated on this review, `THESE COMMENTS SHOULD BE ADDRESSED, THE PLANS MODIFIED AND RESUBMITTED PRIOR TO CONSIDERATION OF APPROVAL BY THE PLANNING AND ZONING COMMISSION. The submittal 'is still lacking too much. The submittal is incomplete and should not be heard. Still nothing from Fred or Mel. Memo to JCI From DTE 6-04-93 Re: The Homestead Subdivision --- 93-19P Plan Review, Date Submitted 5-27-93 Sheet 1: Key Map This plan should include the 'Grandview Subdivision' and its owners. They are within the 5001 'area. H.1.A.3 Sheet� 2: Boundary Map . B„ y c- ,-�--'" Lf so, then the ties and relationship should be shown. Were there any bounds found on the abutting properties from which this boundary was established? Are there any encroach- ments? On sheet 5, there appears to be one. �. .j4h horizontal datum CGS? List coordinates and f)O�L show monumentation. They are establishing the Street Line of both Aorl ©•70 A v streets. Subd. Regs. C.3 6. (a) The Proposed Lot 1, N/F RSK-KELLCO, is excluded from the Boundary 3 � •�Z Survey. The Boundary Survey indicates a 22.1 acre parcel, which on subsequent sheets are 8 Lots. On these later sheets, the 9 y J . 9 7 lots cover 22.1 acres. Which plan is correct? �► -#,N A-2 Qr � T 7 Sheet 3: Plot Plan 0 � The drawings for the subdivision covers two sheets, show the C� • g►Al matching marks and the Sheet reference. = $ Horizontal Datum. Show the coordinates for the Buckland and 70 4� Deming bounds. Show that the Right of Way will be 50' minimum. Tip'• /�vG� ischarge o h 2 ��E •, • Note # 12. The soils taken fromn the detention basin will not be used in the creation of the detention basin berm without a suitable soils evaluation and design approval. G Why the angle- points in the proposed street line? Normally it is tangents and appropriate curves. Not angle points. what scale is the drawing? The Homestead Subdivision --- 93-19P Page 2. L+ � plan were ' 'sed to 5- t�oa ck 'st. it the Pown s? om. Ca ave a cot Sheet 4. Plot Plan What scale? The Street Line of Deming and Buckland will be monumented & �►jUieeded to the Town. Show monuments. Subd. Regs. C.3.a.(6) On this sheet, Lot 1 is a part of the subdivision. Later comments on sheet 6, it would seem more advantageous for this lot to have frontage on Sele Drive, with the driveway on Sele Drive. With the traffic now and expected and the indicated driveway location, it would seem to be to the best interest to the homeowner or the Town to have acess from Sele Drive. Sheet 5: Topographic Plan What is the vertical datum being used? What is the source of the topo? To what accuracy? 'Topographic Map shall be at the same scale as the plot plan containing all the data included on the plot plan, plus the following. ' Subd: Regs. II.0. ALL of the interior lot lines shall have bearings and distances as shown on the plot plan. Encroachment of the building, Gagliardo,247 Deming Street? N Show the existing street improvements along Deming, i.e. water, Np /V storm sewer, driveways, etc., specifically the 24" storm sewer. � A0V"� Extend the topo the 200' beyond the boundary. Subd. Regs. H.II.2. Show the proposed improvement per the Buckland Road Reconstruct- ion Drawings. The plan submitted is dated 5-26-93. This inform- ation is available and the drawings submitted should be current. Show their subdivision improvements along the 800 lf. of frontage Vd� X""of Deming Street. The widening, the drainage, the pole relocation, etc. At four random locations, the existing pave- ment of Deming is 18' 18' 20' & 211 . It should complement the Buckland Road Reconstruction Project. Continue the Drainage Easement across Lot 9, from the.detention pof� basin to the inlet at Deming. It is carrying street drainage. I did not look for the Drainage Area Plan or the Drainage 0� � Calculations. The drainage area is from Buckland to Deming to /C,.1 Ridge Road and southerly, could be, approximately, a forty acre water shed. The design of the piping for the subdivision has not The Homestead Subdivision --- 93-19P Page 3. been verified. Nod �O c�l�hat is the disposition of the existing buildings on Lot 9. a H.I.B.6. requires that it be shown. Where will the new house be? Where will the water & sanitary hook up for Lot 9 be in Deming Street? These laterals should be,extended, by the Subdivider, at least to the Deming Street line, prior to the paving of Deming by Spazz. This is not a Town expense. To do it after the street is paved would be inconsiderate. This is a standard requirement. Auvr p6 AAAW" cdo$ What is the source of the topo? What datum. Subd. Regs. H.I.B.2. What is the source of the Wetlands delineation? Where is the certification by a Soils Scientist? What is the source of the soils delineation? e # 12, to assume that the excavated material from the Np r/00 � N� etention basin is suitable for the detention basin berm is not Aot1w an acceptable assumption. A detail and specifications of the berm construction and the soil makeup of the berm will be required. The existing drainage problem created by Mr. Sele or others, 1uvT1�1 along the southerly boundary should be corrected, at this time. Sheet 6: Topographic Plan N,r;;W4r Match Sheet, 9zzZgr Applicable notes from Sheet 5. Continue the 40, & 80' Wetlands and Watercourse buffer lines, Alor;P'V'4-VI through the boundary. �i At the proposed culvert under Sele Drive, show inlet and outlet D stream bed protection. What is the 90, X 90' box at 1+50 on Sele Drive? Address the existing 241, storm drain at the intersection of Sele f�oI, ,-J j Drive with Deming Street. Per TA, they own to the pavt. There is no reference to it on the plans. Show the existing drainage system for the site. Subd. Regs. H.II.5 & 6 �OWAo4 As with Sheet 5, show the proposed improvements along Deming St. Show the sight line triangle at the proposed driveway entrance to �V 0 T11'�1 Lot 1. Subd. Regs. H.I I I.11. M S The Homestead Subdivision --- 93-19P Page 4. For Lot 1, for the benefit of the proposed home owner, it would seem that having frontage on Sele Drive would simplify the drive- way and sewer access. With the traffic on Deming, access to Sele would be preferable , ` All of the houses below Sele will have hung plumbing. Show the tenative elevations of the Sanitary Laterals at street "r*A i line. •re�� Show the pedestrian ramp at Deming. Sheet 7: Conservation Plan Scale? Don't stock pile below the houses on the westerly side of Sele Npt��''/ Drive. It only makes for more disturbed area to be protected and restored. Regs. encourage a minimum of disturbed areas. It appears that approximately 3/4's of Lot 9 is a wetlands and subject to drainage rights. It would seem appropriate for a conservation easement across this parcel would help to preserve it's pristine present condition. Sheet 8: Conservation Plan Scale? Source of the Soils delineation? Sheet 9, Plan & Profile: � Show the pedestrian ramp, at Deming Street. pQ�� Show the intersecting profile of Deming Street with Sele Drive. It appears to be approximately 10%. This would appear to create No7%l7iV an 8' difference in grade from the ends of the flares of Sele Drive. The grading of this intersection, together with the drainage isn't something that should be worked out in the field. It should be included in their submittal. Dg.,P Considering the amount of ground water that comes out from the /VDcv V D ridge from Deming to the Manchester Mall, it would seem . appropriate to install both the storm drain and an underdrain on the easterly side of Sele Drive from, approximately 2+0 to 6+50. The deepest cuts for the road cross-section will be along the The Homestead Subdivision --- 93-19P Page 5. easterly side of the road and the potential to intercept the ground water would be greater. Clean up the scale. C .t, The storm sewer at 4+0 will not have 2' of cover over the bells, in the gutter line. Town Specs. 2.3.0.h. O / Show the foundation drain connections, with elevations. Show the gravel road to the Due to time constraints, I did not review the Standard Sheets. NEW SHEET, Deming Street & Buckland Road Plan and Profile Will need a new sheet to show the widening, drainage pipes and r7 structures, monumentation, etc. for the entire frontage of the subdivision, including the frontage along the Gagliardo parcel. Show a single drive for Lot 9 onto Buckland Road. General Observation ----- I would prefer the detention basin to be adjacent to Sele Drive on Lot 8. It would require less piping, would affect one lot not two and its functioning could be observed from the pavement. Due to a sheet by sheet review, there will be some duplication of observations. This collection of comments represents only a cursory review of their submittal. It is not intended to be the final review. J ~ t A Memo to JCI From DTE 6-04-93 Re: The Homestead Subdivision --- 93-19 This past Tuesday, in the meeting with Mike, I expressed some concern about the system currently being employed with respect to how a subdivision makes it through the process. The proposed- Homestead Subdivision is a typical example. The proposal is to divide a 22.1 acre parcel into 9 lots. The parcel has approximately 11700 lf frontage on existing Town streets and they are proposing to build a 600 lf. cul de sac. Supposedly a super simple routine. gwith1onst under Town Staff, off 3, Procedures, Pre-Application Conference the applicant the option should pre-submittal veryreview. straight forward. done, it could have Attached are five pages of my preliminary review comments and three pages from John McCahill. Nothing from you, Fred or Mel. Most of my comments relate to lack of or incomplete information expected to be on the plans. Some of the observations or recom- mendations will have a financial impact on the construction of the site. Based on past experience, if it isn't specifically on the plans at the time of approval, it difficult if not imposs- ible to get it done later. I believe that it is the Staff's responsibility to have the applicant submit for approval, by the PZC, the most complete and accurate set of drawings. Any of the deletions, modifications or minor changes should be limited to a very minor number of items, not eight pages. This application is scheduled by PZC for a Public Hearing on 7-13-93. Considering that the applicant has been building in Town for years, under the same regulations and standards, it appears that they would prefer to ignore, negotiate after the approval or plead for a waiver or acceptance of a substandard product. Without the Drainage Calculations and input from others, it would appear that the application is incomplete and premature to be even heard. It would be my recommendation, similar to John's, %These comments should be addressed, the plans modified and resubmitted prior to consideration of approval by the, Planning and Zoning Commission. Field and Office Notes 3. Perimeter distances shall be shown to the nearest hundredth of Survey notes and compilations shall be retained by the surveyor as a foot. All directions shall be shown to the nearest ten seconds a permanent record. of arc for A-2 surveys, and to the nearest one second of arc Land Record Examination for AA and A-1 surveys. Directions shall be shown by bearings and/or angles, except where such a line is an irregular or con- All boundary and baseline surveys shall include an appropriate ex- stantly changing course, as along a body of water. In such case, amination of the land records for the subject and adjoining tracts. a meander or closing line shall be shown to provide a mathe- matical closure of the survey. 4. Curved lines are to be described with the central angle, radius, MAP STANDARDS and length of arc. Curves which are not tangent shall be so marked and the information required to reproduce them so For All Maps: noted. 1. The surveyor shall use map making materials which are of a 5. The area of the tract of land shall be shown in acres and/or durable nature. square feet. 2. The 60 guide "LeRoy" or 1/16 inch hand lettering shall be acceptable as a minimum size, unless lettering is typewritten in MAP CERTIFICATIONS capitals. 3. Whenever more than one sheet is used, each sheet must show A. All survey maps, except Class "D" shall be certified with the the number of the sheet, the total number of sheets included following statement: in the set, and contain clearly labeled matehlines. I hereby declare that this map is substantially correct. This map 4. All maps shall have both a word scale and a graphic scale. 5. A north arrow shall be shown on every sheet. The reference to and survey were prepared in accordance with the standards of a true, grid, or magnetic north, or other relationship to other Class survey as defined in the"Recommended Standards for maps, shall be noted. If magnetic, the date of the magnetic Surveys and Maps in the State of Connecticut'' as prepared and reading shall be noted. adopted by the Connecticut Association of Land Surveyors, Inc., 6. All adjoining properties on boundary surveys shall be identified on September 13, 1984. by recent property owners' names and/or by lot numbers. W 7. Each map prepared for filing shall show the seal of the land here topographic detail is also shown, the above certification shall be followed by: surveyor. 8. Where applicable, horizontal and vertical datums shall be noted. Topographic features, shown hereon, were prepared in accordance 9. Current owner of record of surveyed premises shall be noted. with Class T- For All "A" Class Surveys B. All Class D maps shall have the following statement: 1. All monuments, set, found, or not found, shall be shown and I hereby declare that this map is substantially correct in accord- adequately described,with discrepancies noted. When reference ance with the standard of a Class D map as defined in the"Reeom- ' monumentation has been used, the geometric relationship of mended Standards for Surveys and Maps in the State of Conneeti- the reference monuments to the actual boundary shall be noted. cut" as prepared and adopted by the Connecticut Association of 2. Sufficient survey data shall be shown to clearly define the deed Land Surveyors, Inc., on September 13, 1984. This map is com- lines and lines of occupation affecting the property being piled from other maps,deed dimensions,and/or other sources of surveyed. Easements and encroachments apparent from an in- information and subject to change as a field survey may disclose. spection of the land records and the subject premises shall be shown. 4 5 r July 23, 1991 M E M O R A N D U M Marcia A. Banach, Director of P , ni T0: ng FROM: Jerry C. Iazzetta, Town Engine RE: Grandview Terrace - Torres Eng nee 3/91 Letter I have received a Fax letter dated 7/23/91 from Torres Engineering the intersection sight distance for Grandview Terrace. concerning comments: have the following is utilizing the State of Connecticut 1, Torres Engineering that the 290' sight guidelines as his reference source stato gginal comments were our distance provided is sufficient. MY on oviHTO guidelines which the Town indicates yi other based up requirements standards is the source for our Director of Public Works guidelines are to be utilize , d should give his approval* r ineering indicates that the proposed town road is a �yyC GU 70 2. Torres Eng imp_ It n my use road and if the Church decides iDeming Street it in e �'��- 7]1�� low the Church s future d plan exist for a church to utilize a! -�f- � future, //�1/�I�-� ,.. 7 opinion that since p he proper improvements should be ��/1�j/L*" `��' this proposed town road, G�--� / .- determined (and possibly built) at this time. being reviewed by Church has a subdivision plan currently The Calvary Zoning which includes the parcel of land that the proposed Planning & occupy. This would be an appropriate time to will be necessary and whose r ndview Estates rovementon Deming —f' termine what imp rovements. M&I responsibility it will be to implement those imp 7714Vr JCl/jsv M cc: Michael J. Gantick, Director of Public Works TE_ TORRES ERiNG, INC. Mr. Jerry C. lazzetta Town Engineer Towns-of South Windsor 1540 Sullivan Avenue South Windsor, Ct 06074 Re: Grandview Terrace File No. 90016 Dear Mr. Iazzetta: This letter is submitted to you in answer to your questions regarding adequate intersection sight distance at the proposed intersection of Grandview Terrace and Deming Street. As you know, our plans show that sight distance to the east is more than acceptable. The distance to the west has been field measured at 290 feet. We feel that the 294 feet available is adequate intersection sight distance for the following reasons: 1. The posted speed limit is 25 MPH and a reasonable design speed is 30 to 35 MPH. Using 35 MPH the minimum intersection sight distance required by the State of Conn. D.O.T. is 285 feet. 2. The intersection itself is at a slope of 5.5 The approaching roadway ( Deming Street) has even steeper slopes than the 5.5 slope at the intersection. This means that a vehicle travelling easterly on Deming Street sill not need the desired stopping distance because the steepness of the road will slow the vehicle down as it approaches the intersection. Calculations submitted earlier show that the r®quired stopping distance for a vehicle travelling at 35 MH at a slope of 5.5 % is equal to 232 feet. 3 . The proposed 7 lot subdivision will be a low traffic generator and Will not present the sight distance problem very often since most of the traffic leaving the subdivision will turn right or to the west onto Deming Street headed toward the center of Town, the Mall or Hartford. Any future development, such as the construction of a new church which may use Grandview Terrace to exit onto Deming Street, will require that the new developer obtain Planning' and Zoning approval and may subsequently need to improve Deming Street at that future time. We feel this answers your concerns and will be happy to discuss any further questions you may have at your convenience, very truly yours, c RECEI 9 JUL � VED Ozzie Torres, P.E. , President, Tow 3 199, � 1Z Torres Engineering, Inc. n of S la Inndsor r Englneer- cc: Richard Kelley Dept 101 FENN ROAD,NEWINGTON* CT 06111-2249 (203)666-53 JUL 23 191 10:53 203 667 2283 PAGE.002 t' • PROJECT MANN TOWN or SOUTH WINDSOR CHI IST RIQUIRED IWORMATION SUBDIVISION is RBSUBDIVISIONS This checklist must be sig ed by plan preparer (P.E./L.S.) declaring j that a_ required information is provided. Items 1-5 are required for all applications; Items 6-9 required where appropriate. 1 i Check mark for each item supplied. 3 ✓ 1. On each sheet for plans or maps, title block with the `—" following informations a. Name and address of subdivider. ✓ b. Name and address o and Surveyor r Professional Engineer. c. Name of subdivision. ate when drawin s were made. v� ✓ d. D g e. North. arrows 2. Key Map - An overall map drawn to a scale of. l inch equals 200 feet, which. can be used as an overlay on Metropolitan District Maps. This map will show the overall design of the subdivision and will includes a. Layout of streets with names. b. Layout of lots and lot numbers. IVA c., Open space land. d. Arrows indicating general direction of drainage. e. Linea indicating sanitary sewer system flow. / f. Total acreage of subdivision. g. Total number of lots. r _ ✓ h. Names of surrounding property-owners and properties within 500 feet of the site. �i ✓ 3. Plot Plan: A layout map of the proposed subdivision drawn to a scale of 1 inch equals 40 feet on either of the following size sheets - (1) 25" x 37" with a 3/4" ruled margin; (2) 15" x 24" with a 1/2" ruled margin containing the following data: ✓ a. Distance and bearings of all boundary lines. b. Lot layout numbers,. square footage of all lots, and all. ___.. lot dimensions. iron pins to be shown at all lot angle points. Lots should not be fragmented onto separate sheets except where size is prohibitive. ✓ c. Proposed streets and street lines with center line stdtions+ and curve data. d. Building lines in accordance with zoning regulations. e. Easements, notinggrantors, g , grantees, and purpose. f. Proposed names of streets. g. Namea of abutting property owners. Qh. Monuments will be indicated at corners and angles of all streets and at all points of curvature and tangency, In areas accessible to Metropolitan District Commission points, or other coordinated points, the moaumented points within proposed subdivision shall be coordinated. The rdinat all * ear in tabulax form on the plot an a access y o ese MDC y p snall Se aetermined by the Town Engineer. i. All open space reserved for parks, playgrounds, or other common or public uses shall be indicated. ✓ j. .-2 Certif icatiosl;' P.E./L.S. Seal. '' ,¢ k. Traffic control signs and pavement markings required b Tra f i g p 9 q Y •. f c Au thori ty Y. �✓ 4. Topographic Mapt A map drawn to a scale of 1 inch to 40 feet on sheets not exceeding 25 inches by 37 inches including ruled margins and shall, in addition to the requirements of the plot plan, show the following: r a. All existing and proposed buildings. b. Curb lines and pavement width, sidewalks. 4C X. ✓ C.c Existing and proposed sanitary and storm sewers, if any. d. Existing . and proposed water and gas main systems. e. Present wooded areas indicated by a "foliage line,,. Any individual trees to be saved should beshown. f. Existing and proposed contours shall be shown at not less than two-foot internals; but in cases of relatively level, land, the contours shall be one-foot intervals. g• Proposed storm drainage system showing all catch basins, endwalls, manholes, lengths, and sizes of Pipes. (Minimum distance between catch basins shall be 300 feet and minimum size of storm drain lines shall be 15 inches. ) h. Connections of all springs into proposed storm drainage System as needed. i. Location and indications of existing brook channels and 100 year flood limits. tif --2 Certification; P.E./L.S. J. ASeal k. Regulated wetlands and 100-year flood plain, or note that site contains none. V/ 5. Drainacre calculations: - Zero Runoff Incr guidelines, ease per attached 6. Plans and Profiles: A plan and profile of the proposed streets drawn on plan/profile paper of scales I inch to 40 feet horizontally and 1 inch to 4 feet vertically on sheets not exceeding 25 inches by 37 inches including ruled margins and, containing the following: A. Layout of streets in sections coordinated b •� y stations with the profile. b. Street plan 'showing roadways, drainage. and partial lines. P l lot ✓ c. Sight line at street intersections. d. Profile of roadway showing existing and finished grades. Roadway profile will show all tangent grade and all vertical curve information. ✓ e. Profile will show*all catch basins and all drainage lines between catch basins with all invert and top of frame elevations. Drainage lines will be shown and described as to material.. ✓ f. Typical/critical cross-sections where grading is outside street right-of-way or is at street right-of- way, ' ✓ g. Where any storm drainage line discharges into an existing brook, sufficient profile of this brook will be shown to determine conditions. h. Metropolitan District Commission datum shall be used on all subdivision accessible to controls. The Town Engineer shall, based on standard engineering practices, determine the accessibility of these controls. i. Profiles shall show all sanitary sewer lines and manholes, including elevations, sizes, lengths, and slopes of pipes. Top of foundation elevations for houses shall be shown. �4 Traffic Report A1,* 8. Open Space Site Improvement Plans:, For subdivision which require aeprovision for open spaces, a plan which contains data for site improvement may be required. This map shall be drawn to a scale of 1 inch equals 20 feet. N 9. Sanitary Re rtt Where individual; sanitary sewage disposal systems are proposed, the final plans shall include a Sanitary Report certified by a Professional Engineer. The ' report shall demonstrate the feasibility of the proposed individual systems. The report should deal with the area as a whole, discussing the following points; - �" a. General nature'and development of surrounding area. ,6 b. Topography and natural drainage pattern. ALA c. Subsurface conditions as shown by subsurface Ir investigation, including soil absorption characteristics, ground water level conditions, ledge rock, and general nature of soil. 1 d. General description of type of development contemplated noting type of house, number of bedrooms per unit, etc. /VA- e. Detailed description of proposed sanitary sewage disposal facilities, indicating sixes for various ground conditions, materials to be used, and general layout pattern to be used, etc. Ni4 f. Special precautions, that may be necessary to provide proper functioning of the proposed disposal systems. g. Map of general area with locations of all tests shown on proposed lot layouts. h. Flood heights of any nearby steams, brooks, or rivers, r✓r¢ i. Test results and engineering evaluation per Section 3.2.a(6) . .All information required above is included in this application at the time of submission. P PREPARE R (P.E. L.S. ) r ATE March, 1990 HAY 8 . MAY BALE F;..." OR SILT. MON. 0 MONUMENT OR IRON PIN TO 9E�° EXISTING TREE LINE PROPOSED TREE LINE INTERMITTENT WATERCOURSE 1 WETLANDS LIMIT LINE '✓ do ¢ 17goloss N 24 50'14" yrt 17.00i 00 0 7 42 08 - �14,.,,���, f gym' ol = 6 00.00' -,67/ o '�.� 98.46 4�g0" lb 25 0' �.� ?p•pR ✓ R TfR� (•00 F O� / F • D � �80 031 I \ y s N 76•�3. / l M ® ?4- 4 RcP q r R MON. 2 ��i ose 0 �5,� / Sy cp \ 100, • w 08 1 oz_. lot ' /)v o /` �►7 f OFT.��� ��ss/p 0 \ Il / \ `� ` ffr F .44' _ �( LOT 8 FD�IN V pill o 3 / / •' 66� / 176.67'- 1 s�.,ft. o - i