Loading...
HomeMy WebLinkAboutWetlands Permit for Senior Residence Dev R4;sTOWN OF SOUTH WINDSOR 1 ' INLAND WETLAND, WATERCOURSES AND CONSERVATION APPLICATION MAY 10 APPLICATION #. -/ -DATE RECEIVED South Windsor INLAND WETLANDS AGENCY/ INSTRUCTIONS CONSERVATION COMMISSION 1. The application, map and plans must be submitted in triplicate, together With the fee set forth in the Inland Wetlands, Watercourses and Conservation Regulations, Town of South Windsor. (See Regulations, Section VI). 2. The South Windsor Inland Wetlands, Watercourses and Conservation Regulations should be reviewed with respect to the standards and criteria for application evaluation. (See. Regulations, Sections VIII - X). 3. The applicant understands that this application W to be considered complete only when all information and documents required by the Agency have been submitted. (See Regulations Section VII). A. APPLICANT•S NAME_ KEUX 0 , ADDRESS 17 61T7E 115OLL-11-1 w1fiDSOA , c-T PHONE: (HOME) (WORK)- B. LEGAL OWNER'S NAME: kC"A?K.TD K r LL r ADDRESS PHONE: (HOME) (WORK)_ (List additional owners, addressee, and phone numbers on back of application). C. IF THE APPLICANT IS NOT THE OWNER OF THE SUBJECT PROPERTY; A LETTER BY THE PROPERTY OWNER(S) AUTHORIZING THE PROPOSED REGULATED ACTIVITY SET FOITH IN THE APPLICATION 1IUST ACCOMPANY THIS FORD AND WILL BE PART OF THE APPLICATION. D. PROJECT NAME: (if any) R 9 l DIFO-TIA L A00745A6 1. Contact Person (if further information is needed). -Jletj- At4la est, c + 6W E ILA. .TA 64k A"!2 E. THE GEOGRAPHICAL LOCATION OF THE PROPERTY WHICH IS TO BE AFFECTEH BY THE PROPOSED REGULATED ACTIVITIES INCLUDING A DESCRIPTION OF THE LAND Its SUFFICIENT DETAIL TO ALLOW IDENTIFICATION OF THE PROPERTY ON THE INLAND WETLAND AND WATERCOURSES MAP. S K 5 MAPS PAGE 1 F. NAMES. OF ALL ABUTTING PROPERTY OWNERSf -(Vd SE#AMtk SHEET IF NECESSARY) 6IA7,A 3CD7 AU nLLQJ .�13� (ri 4/�S�'''i't'.SSCCiAf fS , onS g7P gV /fA/Q R -:56deS. C6A9)1C h ssaaA'fens f �s nl,N'-�'hr_�Ie�.a 5-AMSGL. 5AJC`f Cy. ASeCICa Fob'- SA ajM 4 S 3. HAVE YOU NOTIFIED ALL ABUTTING PROPERTY OWNERS BY CERTIFIED LETTER THAT AN APPLICATION IS Va G BEFORE THE AGENCY?. *(You are required to supply a copy of the ldttdr with the list of the ndmes of butt s),.** Ei. PURPOSE AND DESCRIPTION OF ALL PROPOSED REdULATED ACTIVITY(d) INCLUDING AMOUNT AND"TYPES OF FILL AND THE TIME ELEMENT INVOLVED: 1, R A LA9sN L A nl)2 WbAgb A 6 5-X15MA pCTCAI Y[Ot� 13&)bl 'fin I'Szal,j ne 609-11 vN JAL 1310 C-u a is )?Axvs w)LC Se. rye m avers i N 'r7pz rRoC ess. IS rJ I. A CLASS A-2 MAP OF THE PROPERTY DRAWN TO 1"-40 1 SHOWING THE AREA TO BE DEVELOPED9 EXTENT OF THE WETLANDS AND WATERCOURSES AFFECTEDO TOPOGRAPH, EXISTING AND PROPOSED ACTIVITIES AND NAMES AND LOCATIONS OF ADJACENT PROPERTY OWNERS MUST BE SUBMITTED. J. ACREAGE OF WETLANDS AND WATERCOURSES TO BE ALTERED= 0,+0 AC'__, OACREAGE OF WETLANDS AND WATERCOURSES TO -BE CREATED! L. LINEAL FEET OF PROPOSED STREAM ALTERATION • M. TOTAL LAND AREA OF PROJECT AND PERCENTAGE UHICE IS WETLANDS I `i'MA : 3-P I LIC'. C 3y 'V- c�,�4,.�J N. IDENTIFY ALL OTHER PERMITS OR APPROVALS THAT HAVE 8EEI1 ISSUED. APPLIED FOR, OR REQUIRED WITH RESPECT TO THE PROPOSED ACTIVITY SET FOITH. IN THIS APPLICATION. (These may include but not be limited to, locdl Pldi dif g & ioriffig" iotani ioird of:Appedla# D.$.P. , F.E.M.A. D.0.T. , The Army Corpi of Engineers j !tt(d Ant dthdt' 8tdti j Local of Federal Permits.) Am) Foz gCAL 'PIAN01146 4 2-pt�)A)� Akr)> ZDi IN& f30ARI> �QF Af'�,�LC� 0. THE APPLICANT (OR DESIGNATED REPRESENTATIVE) HEREBY ATTESTS THAT A SIGN WILL BE POSTED AT THE FOLLOWING LOCATIONIS PfZoP&S&0 F- 1j'T/2AAlf'e; by NAME ON OR BEFORE THE FOLLOWING DATEt SIGNATURE: THESE SIGNS 14UST BE DISPLAYED CONTINUOUSLY FOR AT LEAST FIVE DAYS PRIOR TO SCHEDULED MEETING. (See Regulations, Section 6.3a) . PAGE 2 I THE UNDERSIGNED HEREBY APPLIES FOR THE REGULATED ACTIVITIES LISTED IN PARAGRAPH H ABOVE, FOR A INLAND WETLAND, WATERCOURSES AND CONSERVATION PERMIT FOR THE PROPERTY DESCRIBED HEREIN AND CONFIRMS THAT: 1. HE IS FAMILIAR WITH THE CURRENTLY EFFECTIVE INLAND WETLAND+ WATERCOURSES AND CONSERVATION REGULATIONS OF THE TOWN OF SOUTH WINDSOR. 2. HE/SHE UNDERSTANDS THAT AT ANY TIME DURING THE REVIEW PERIOD, THE AGENCY MAY REQUIRE THE APPLICANT TO PROVIDE MORE INFORMATION ABOUT THE WETLANDS AND/OR WATERCOURSES IN QUESTION AND/OR ANY PROPOSED ACTIVITY. 3. ALL INFORMATION SUBMITTED IN THE APPLICATION FOR REVIEW SHALL BE CONSIDERED FACTUAL, OR IN THE CASE OF ANTICIPATED ACTIVITY, BINDING. A kNOUING PAILURB OF THE APPLICANT OR ANY OF HIS/HER AGENTS TO PROVIDE CORRECT INFORMATION, OR PERFORMANCE EXCEEDING THE LEVELS OF ACTIVITY ANTICIPATED, SHALL BE SUFFICIENT GROUNDS FOR REVOCATION OF ANY PERMIT UNDER THESE REGULATIONS . 4. BY MAKING THIS APPLICATION, THE APPLICANT GIVES PERMISSION TO THE INLAND WETLAND, WATERCOURSES AND CONSERVATION COMMISSION MEMBE16 AND/OR ITS REPRESENTATIVE TO ENTER THE PORTIONS OF THE PREMISES WHICH ARZ SUBJECT OF THE APPLICATION FOR THE PURPOSE OF INSPECTION AND INVESTIGATION AND IOTHERViSE EVALUATING THE MERITS OF THE APPLICATION BOTH BEFORE AND AFTER A FINAL ECISION' HAS BEEN ISSUED. f?" - L Signature of Applicant p. � e_Ke Jco ' Date 11 3 pelley Received and filed at the office of the Planning Department this y of 19 4 Zn ure of owner- Date FEE RECEIVED YES NO AMOUNT DATE RECEIVED by HEARING DATE HEARING ADV. (1) (2) PERMIT GRANTED DATE PERMIT DEFIED DATE PAGE 3 u r ' STATEWIDE INLAND WETLAND & . WATERCO(JitS� :fit,a_. , i t REPORTING FORM (See instructions. on back) in accordancewith the requirements of Section 22a-39-14 of the Regulations of Connecticut State Agencies„ this formis to be completed for each action.Completed forms for all reportable actions during a .calendar month shall be mailed to the Commissioner by the' local' agency no later than the 15th day of the month following the month . in which the action was taken. 1 . TOWN: 6n1 f7nA 1�311.3 5t7Q 2 . A. LOCATION: (Attach an 81 by 11 inch photocopy at the original scale of the -appropriate US Quad May with the project site- outlined. B. USGS QUAD MAP NAME OR UNIT: _ht,�y,DG�'le��e . 41n"71 Tf - OAA 3 . APPLICANT'S OR VIOLATOR'S NAME: f�S JCE"ed )W,,. 4 . PROJECT NAME (I f any) : S 0s f Nl d S8%p 5d-R*L 11 o 05%,4 6 5 . ACTIVITY TYPE CODE (See list of codes in instructions) : . . . . . . . . . . [ If Type Code is 13 "other," describe the type of ,activity: 6. ACTIVITY PURPOSE CODE (See list of codes in instructions) : . . . . . . . . . . . [ 7 . ACREAGE OF WETLANDS AND WATERCOURSES ALTERED (or proposed to be altered, ( for all agency actions; permits, denials and enforcement)e A• Soil typs) (If Available) . . . . .l. Ajxa) • • .1 . . . . . . . . . . . . . . . . . 0� [ -ACRES, B. Only if soil type is not available specify area altered as follows: Swamp. . . . . . . . . . . [ , ACRES] Marsh. . . . . . . . . . . [ ACRES] Bog• • • • • • • • • • • • • [ .-ACRES] Open water. . . . . . [ ACRES] S . ACREAGE OF WETLANDS OR WATERCOURSES CREATED: . . . . . . . . . . . . . . . . [ ACRES] 9 . LINEAR FEET OF STREAM ALTERATION: . . . . . . . . . . . . . . . . . . . . . . . . . . . [ FEET] t0 . TOTAL ACREAGE OF PROJECT SITE: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . [ 3•$ ACRES] * For Local wetland Aaencv Use Only * For State Use Only * t1 . REPORTING MONTH: * GIS CODE: 12. PUBLIC HEARING HELD: YES. NO 13 . ACTION: (Circle .only one action) * A. permit issued B. permit denied C. permit extension/amendment D. map amendment 'E. enforcement * * F. jUrisdictional ruling t4. AGENT: * DATE RECEIVED USE A SEPARATE FORM FOR REPORTING EACH REPORTABLE ACTION TAKEN BY THE AGENCY 1 . '11(404i Enter the nntne of the municipality for which the, VC,( .and Agencyhas 2. 1,0CATtO N. A. Attach an Rf Xf,l11 :inch photocopy "`" '61 ` jurisdiction. p py of that`po'rtion of the United States Geological :•�icvc�y_I L5g ) uadran le Map with the bounds of the project site outlined (where possible) or (oinpoirirr!d with an arrow. B. In the lower right-hand corner of each USGS 11 idniitlfyin•1 n the- space name, write the name from the corresponding map in the• : Quad Map there is an corresponding number. P provided, or use the 1. ' NAME. Eater the name of the applicant for a permit, petitioner jurisdictional ruling, or recipient of the enforcement action for a map amendment or 4. FROJ ECT NAME. Enter the name which the owner or applicant has given to ttie project or the name by whic:11 the project site is generally known. 5. ACTIVITY TYPE CODE. Eater the activity codes which best characterize the activity being Lnpottnd. where possible, enter only one activity code number. Example: a subdivision road or a driveway crossing of a wetland which involves excavation to remove unsuitable foundation materia Llllin.q cul= vertinq, and channelization of a brook should be coded as 19 "ROADWAY CONSTRUCTION."1, It the )+rOject also involved outlett ng stormwater into a wetland, the activity should be cod 010 for "DRAINAGE IMPROVEMENTS" as well as 1i9. ed as 6. ACTIVITY PURPOSE CODE. Enter the purpose code which best characterizes the activity. Enter only one purpose code letter. purpose of the 7. ACREAGE OF WETLANDS AND WATERCOURSES ALTERED for acreage fLOures should be Proposed to he altered). A. Soil types and provided by the applicant in the application. Enter the soil type symbols from the USDA Soil Survey for your County on the dotted line and give the total acreage. A. in the rare case where the wetland soil type is not available, specify the acreage by the general category of wetland type: swamp, marsh, bog, or open water. TO CONVERT FROM SQUARE FEET TO ACRES, DIVIDE SQUARE FEET aY 43,560. R. ACREAGE OF WETLANDS AND WATERCOURSES CREATED. of watercourse area created directly or indirectly as an result ter eofotal the actionacreaetakenend byatheaAgency. 9. LINEAR FEET OF STREAM ALTERATION. Enter the total length of river, or other perennial watercourse altered directly as a result of the action taken. byrthe Agency. Include an culverting, channel improveme ts, rip rap, relocation or dredging. y 10. TOTAL ACREAGE OF PROJECT ITE. Enter the total acres • of the of wetlands and watercourses nvolved in the Agency Action being reportedly including the acreage 11. PEPORTING MONTH. Enter only the month in which the action being reported. was taken,. 12. PUBLIC HEARING HELD. Was a public hearing held on this action, circle 13. ACTION. Circle the action which is beingreported. Yes or no: • when soispended, a notice of violation has been issued,- Or if ani order ehas rbeennIssued.a permit has been 14. AGENT. For the purpose of this form, "AGENT" means the town a ent secretary . or other commission member responsible for submitting this form. g y• agency chairman MAIL REPORTING FORMS TO: Water Resources Unit Wetlands Management Section State Office Building 165 Capitol Avenue Hartford, Connecticut 06106 QUESTIONS ABOUT COMPLETING OR FILING THIS FORM MAY BE DIRECTED TO THE WATER RESOURCES UNIT'S ,.WETLANDS MANAGEMENT SECTION AT 566-7160. A#A######AA#AAAARA#AAAAAAAAAAAAAAAAAAAAAAAAAA##AA#AAA*AAAAAAAAAAAAAAAAAAAAAAAAAAAAfAAAAAAAA##*#AAA# Code Activity Type Code N Activity Purpose 1 Filling 2 Excavation A Residential Improvement by Homeowner B New Resid. Development for Single Family Units 3 Land clearing/grubbingtheractivity) C New Resid. Development for Multi-family/Condos (no other activity) D Commercial/Industrial Uses 4 Stream channelization E Municipal Improvements 5 Stream stabilization F Utility Company Improvements 6 Stream clearance G Agriculture, .Forestry or Conservation (Removal of debris only) H wetland Creation/Restoration 7 culverting (no roadway)(piping) I Storm Water/Flood Contr^' 8 Underground utilities J Erosion/Sedimentation Control (no other activity) K Recreation/Boating/Navigation 9 Roadway construction L Routine Maintenance 10 Drainage improvements N. State Agency Improvements (For DEP Use Only) 11 Pond dredging/dam construction 12 Activity in buffer/setback area 13 Other Ire 0,��' -•� O o _ � .�•. • � � . �NppIL c 9/ av i < .mil . • ; tit ' Y S4 __ • - • • • - • V N • /, Qqp •• • •• l92 MIL E c- •, •- \ •a • 264 o � cb . . ...... . . •- --,-Tom Beth 0 � VAN � .• ♦ 90 t rick a �v SC ,,�."'+.. -fir_♦,-ylr AUX .,I. sou - • �TRQN6• - •. 'POgp - _ fit• _4 •`• �.� _ � � y_,,�,. , • 1 ♦ . • • • •. vel \ -i•- Jam_ ` ��� 's-_•t!. _ / \- -�\ -r--r _ O O 19 • . ,� — y -AIM•_ � • • ���, ..• � • ZOA a Is 133 r /GNP _ � ^ � _ --+�` _.,�; _ V • � � • ♦ • •� • • • . «' .ate� : , ••Q• _ - � •�/ ��'.�e t '�� \ / �• �• ...\�, r' Ilk • `/17 w /tJ •Cam. ' •—�,�' \ �. V♦�. ,"'�\i ♦' - l 1 �.- ice••�,1 � •o ���� ////111111fff�fff( �--,,.� �.., 1 - •V % ,.��,� o ) � � �i 252 250 • •. 10 LMweu ,,�..•:: s• loo41 f .•�a•2t• - •O,- � • `•:•..li� � ./,t♦ 'V,4p • I��«tl li � O 1/ '9T• •\' ` `\ � 7 � p '�:{� ,, • , �`�a ji 'O � -►.J 0\ -��, , ° '.ice / , •.1•-•-•'. . •� � ��oj \ � / V1 Y t011 M ,< s 1540 SULLIVAN AVENUE SOUTH WINDSOR, . 06074 oe•co�' AREA CODE 203/64 1 SF- N ED 2 May 20, 1993 :, 1993 TO: Elizabeth A. Warren, Chairman, IWA/CC poi',cof South Widsor 3 L.r:gineering FROM: John E. McCahill, Zoning/Wetlands Enforcemen icer Re: Application #93-14P, Town Center SRD/RSK-Kellco, DOCUMENTS REVIEWED: Application form and Site Development Plans for Proposed Senior Residential Housing dated May 10, 1993 COMMENTS: 1 . The application form, item G, indicates that abutting property owners have been notified by certified mail that an application is pending before the Agency. A copy of the letter should be submitted. Section 7 . 3b states that this must be done "within seven (7 ) calendar days of the time an application is submitted. . " . 2 . On the application form, item H should be more specific with regard to the description of all regulated activity. A large portion of the building construction, paving, and utility work is in regulated areas . 3 . The existing and proposed tree line should be shown, and symbols should be included in the legend. There is a relatively large stand of mixed hardwoods in the center of the property and the southwesterly portion of the property. A note should also be added to the plans stating the limits of clearing shall be flagged in the field and approved by the Town prior to cutting any trees . 4 . A note should be added to the plans stating that stumps are to be chipped or removed from the site, they are not to be buried. 5 . The existing contours, as shown on the plans, do not accurately represent the topography as it currently exists . The plans should reflect existing contours . 6 . The wetland boundary appears to be based on current flagging. (There were some flags in the field. ) The Soil Scientist responsible for establishing the limits of the wetlands should verify the wetland boundary shown and should submit a written report of the findings. Soil types and soils information should also be provided. taw" sE4 C � Tio aps ?d&U14at 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 ���osoe•co�'� AREA CODE 203/644-2511 May 20, 1993 TO: Elizabeth A. Warren, Chairman, IWA/CC FROM: John E. McCahill, Zoning/Wetlands Enforcement Officer Re: Application #93-14P, Town Center SRD/RSK-Kellco, Inc. DOCUMENTS REVIEWED: Application form and Site Development Plans for Proposed Senior Residential Housing dated May 10, 1993 COMMENTS: 1 . The application form, item G, indicates that abutting property owners have been notified by certified mail that an application is pending before the Agency. A copy of the letter should be submitted. Section 7 . 3b states that this must be done "within seven (7 ) calendar days of the time an application is submitted. . " . 2 . On the application form, item H should be more specific with regard to the description of all regulated activity. A large portion of the building construction, paving, and utility work is in regulated areas . 3 . The existing and proposed tree line should be shown, and symbols should be included in the. legend. There is a relatively large stand of mixed hardwoods in the center of the property and the southwesterly portion of the property. A note should also be added to the plans stating the limits of clearing shall be flagged in the field and approved by the Town prior to cutting any trees . 4 . A note should be added to the plans stating that stumps are to be chipped or removed from the site, they are not to be buried. 5 . The existing contours, as shown on the plans, do not accurately represent the topography as it currently exists . The plans should reflect existing contours . 6 . The wetland boundary appears to be based on current f-lagging. (There were some flags in the field. ) The Soil Scientist responsible for establishing the limits of the wetlands should verify the wetland boundary shown and should submit a written report of the findings . Soil types and soils information should also be provided. Elizabeth A. Warren Page Two May 20, 1993 Application #93-14P The map referenced to, "wetland map of Town Shopping Center, Ellington Road, South Windsor, Ct. should be deleted from the plans if the limits are based on current flagging. 7 . The wetland areas shown include the standard symbol for a marsh. I walked the property on May 14, 1993 and all three of the wetland areas had a shallow amount of standing water in them. A marsh is included in the definition of a watercourse in the Regulations and therefore an 80' setback should be shown as the regulated area. 8 . There is an "ex. temp. drainage swale" shown on the plans . It is unclear as to why it is labeled as such. The plans show it being filled and replaced with a 15" subsurface stormwater system. 9 . Groundwater information should be provided for this site. It would appear, based on the presence of standing water in the marshy areas, that groundwater is very close to the surface. 10 . The southerly cluster of buildings will result in units which are less than ten feet away from the marshy area in the southwesterly portion of the site. As indicated in a previous comment, there is standing water in this area. 11 . Drainage calculations should be provided with this - application. They are proposing to enlarge the capacity of the existing detention basin. 12 . A note should be added to the plans indicating that the parking lot shall be swept as often as necessary to help control the tracking of material beyond the site. 13 . The construction schedule, as provided on sheet 7 , does not specifically address the work to be done to enlarge the detention basin. This should be done and stabilized as early as possible in the schedule. It should precede the rough grading of the project site. 14 . On the application form, item J indicates they will alter 0 .40 acre of wetlands and watercourses. There does not appear to be any attempt to mitigate or compensate for this impact. 15 . The proposed location for the temporary loam stockpile area appears to interfere with existing trees which are to remain; particularly the northerly end of the proposed stockpile. The stockpile should be relocated. Elizabeth A. Warren Page Three May 20, 1993 Application #93-14P 16 . There are two existing dumpsters and four existing underground propane tanks that should be shown consistently throughout the plans . They appear on some sheets and not on others . Silt fence and grading is proposed in close proximity to the existing propane tanks . 17 . The plans indicate conventional catch basins with standard sumps . They should consider the need for utilizing a sediment structure and/or a hooded grease trap to help prevent unwanted materials from entering the detention basin. 18 . These comments should be addressed prior to any consideration of approval by the Agency. JEM/pmm SOIL SCIENCE AND ENVIRONMENTAL SERVICES, INC. Soil Science . Ecological Studies . Hazardous Waste Assessments . Project Planning . Soil & Water Testing KENNETH C.STEVENS,JR.,PRESIDENT June 10, 1993 Attn: Bruce Kelley R.S.K. Kellco 1744 Ellington Road South Windsor, CT 06074 Re: Elderly Housing Development, West of Town Shopping Center, Ellington Road, South Windsor, CT Dear Mr. Kelley: In accordance with your request I inspected the wetland boundaries previously established by Thomas W. Pietras, Soil Scientist on December 15, 1989. There has been no changes of wetland boundaries or soil types since Mr. Pietras' mapping of the wetlands, Therefore, the Soil Repo that was previously p e aced by Mr. Pietras remains valid for this present permit application. • A ditch was dug to convey water discharging from down spouts. The ditch commences in a disturbed (Made Land) upland soil, passes through a wetland depression (Sz) and discharges to the detention basin (MaW) . The ditch has not significantly altered the wetland system and has served as a source of clean storm water. Sincerely, SOI SC NCE AND ENVIRONMENTAL SER -CES, INC. i M Kenneth C. Stevens, Jr. Registered Professional Soil Scientist Corporate Headquarters . 104 Elm Steet * Cheshire . Connecticut 0 06410 (203)272-7837 • Fax (203)272-6698 Dmay RESPONSE TO COMMENTS AN 17 BY sma 110 hkbff FUSS & O'NEML OLAM win + t ��tID�ctrib�lmt4+ PROJECT: Senior Residence Housing at the Town Shopping Center DATE OF RESPONSE: June 17, 1993 COMMENTS MADE BY: John E. McCahill, Zoning Wetlands Enforcement Officer ----------------------------------------------------------------------------------------------------------------- Comment # Response 1. All abutters were notified by certified mail that an application is pending on May 12, 1993, and a copy of the letter was submitted to the Town on that same day. 2. The following description of work is added as an amendment to Item H on the application. The following work will be performed in a wetland and/or a wetland regulated area: A. Soil erosion and sediment control protection will be installed. B. Unsuitable material will be removed and stockpiled as necessary. C. Detention pond will be regraded and enlarged removing 1,390± cubic yards of material. D. Plantings will be installed in detention pond to stabilize banks. E. Suitable material will be placed for pavement and building slab subgrade. F. Sanitary sewer, storm sewer, water service, concrete walks and bituminous pavement will be constructed in a made wetland area. G. Three buildings will be constructed, portions of which are within the 40 foot regulated area. H. Final grades will be established, planting will be placed and final seeding will be performed. 3. Existing treelines have been updated per field survey and have been added to the appropriate plans. A note has been added to the plans stating that the limits of the clearing shall be flagged in the field and approved by the Town prior to cutting any trees. 4. A note has been added to the plans stating that stumps are to be chipped and removed from the site. 85489\A1\SJA0614A.wp Corres. RESPONSE TO COMMENTS JUKE 171, 1993 PAGE 2 5. Topography has been updated per field survey. 6. Kenneth Stevens of Soil Science and Environmental Services has certified the plans and a copy of his report is attached. Also, soil types and soils information have been added to the plans based on this report. The map reference has been deleted. 7. The symbol used to signify the wetland area was not chosen, nor did the plans ever state that this symbol meant these areas were a marsh. It was meant to help the viewer distinguish the areas that were wetlands. It has been removed from the plans because of the confusion it has caused. Furthermore, there are more requirements such as soil type and plant life which distinguish whether a wet area is a marsh or not. The soil scientist's report clearly shows no areas designated as a marsh, therefore an 80' setback is not necessary. 8. The drainage swale shown was installed to reduce the cost of construction in the original Town shopping center. The pipe which discharges into the southern end of the swale conveys roof leader water from the adjacent retail building to the detention pond. We now wish to replace the swale with a 15" subsurface pipe. 9. Groundwater was located by field survey and has been established as approximately elevation 83.7. 10. The standing water which is located in the wetland area approximately ten feet from the proposed southwesterly building is being entrapped in a low spot in the wetland. Since this proposed building is slab on grade, it should not pose any potential threat on the building. It would be possible to regrade this low spot out of the wetland to release the entrapped water, but is the opinion of this office that regrading will be more detrimental to the wetland. 11. Three sets of drainage calculations were provided with the application, as well as a TR-20 run for the proposed detention basin. Another copy is attached for the Wetlands Commission. 12. Note No. 2 on sheet 7 already states that the adjacent roadway shall be swept daily to remove any material that may be tracked onto pavement. 13. The construction schedule has been revised, see Sheet 7. 85489\A1\SJA0614A.wp Corres. RESPONSE TO COMNffiNTS JUKE 17, 1993 PAGE 3 14. To compensate for the wetlands which is being altered the detention and P g � P is being deepened, and suitable plantings are being installed thereby creating a much more established wetland. Currently, the majority of the detention pond area is mostly dry with grass cover. These modifications will greatly enhance the character of the wetlands on the site. 15. The loam stockpile area�was shown as an approximate location and size. The clearing limit lines wi�l be established per Town requirements prior to construction and the exact location will be field adjusted to adhere to these limits. 16. The Town regulations do not say that all dumpsters and all underground utilities shall be shown on all plans. The plans were prepared to meet the requirements. The dum sters and underground tanks have been added to all plans for clarity. more adequate in handling the amount 17. Conventional sumps should be o than q g of sediment which will be generated from the small amount of pavement which is on this site. To further prevent unwanted materials from entering the detention basin, a trapped hood has been added to catch basin C. See Detail Sheet. 85489\Al\SJA0614A.wp Corres. ovi Ns y r T-0��L �� ?d&U&10t o � 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 �osoIt-co r' AREA CODE 203/644 2511 June 22, 1993 CERTIFIED MAIL Richard S. Kelley RSK-Kellco, Inc. 1744 Ellington Road South Windsor, CT 06074 Dear Mr. Kelley: Re: Application #93-14P, Town Center SRD At the June 21, 1993 regular meeting of the South Windsor Inland Wetlands Agency/Conservati n Commission, the approval motion for this application did not carry and the motion failed. You may, at your convenien e, reapply to the Commission with additional information and or changes . Very truly yours, E1' abeth A. Warren, Chairman Inland Wetlands Agency/ Conservation Commission EAW/pmm cc: Planning & Zoning Commission Town Engineer I . R5K KE:.LLEII INC. • Developers 1744 Ellington Road • Builders South Windsor, CT 06074 • Property Managers Tel: 203-644-8761 / 644-8140 Fax: 203-644-5650 August 20, 1993 CERTIFIED MAIL 9y 7 y2-7 Elizabeth Molloy 50 Deming Street South Windsor, CT 06074 Dear Property Owner: In accordance with Section 7 . 3b of the "Town of South Windsor Inland Wetlands, Watercourses, and Conservation Regulations" , we are required to notify you hat an application has been filed on the property abutting yours and is subject to a hearing by the Inland Wetlands Agency/Cons ervation Commission. The application and plans are on file with the South Windsor Planning Department. As an abutting property owner you are invited to the hearing to ask questions and/or give comments, however, you are not required to attend. You may also submit written comments regarding the application prior to the hearing if you so desire. For further information regarding the specific date this will be heard, please contact Phyllis Mann, Recording Secretary or John E. McCahill, Zoning/Wetlands Enforcement Officer at the Planning Department, 644-2511. Sincerely, Richard S. Kell y (OTHER NAMES & ADDRESSES ON BACK) We Rtjild Our Reputation ABBY ROAD ASSOCIATES 1 CHRISTINE LANE SOUTH WINDSOR JOSEPH R BERTRAND 68 DEMING STREET SOUTH WINDSOR ROBERT A JONES 76 DEMING STREET SOUTH WINDSOR SOCIETY FOR SAVINGS REAL ESTATE DIVISION P 0 BOX 2200 HARTFORD, CT 06145-2200 CLARK ASSOCIATES c/o SAMSEL PROPERTIES 152 DEMING STREET SOUTH WINDSOR SNET SUPERINTENDENT OF ACCOUNTS 227 CHURCH STREET NEW HAVEN, CT JOHN & THERESA SAMSEL c/o SAMSEL PROPERTIES 152 DEMING STREET SOUTHWINDSOR Foss&O'Neill Inc. D A1;0 RESPONSE TO COMMENTS AUG 20 i"S BYF1J South Windsor SS & O'NEILL Planning & Zoning Commissiod PROJECT: Senior Residence Housing at the Town Shopping Center DATE OF RESPONSE: August 20, 1993 COMMENTS MADE BY: Jerry C. Iazzetta, To Engineer--Dated July 30, 1993 ---------------------------- -------------------------------------- Comment Response PLOT PLAN 1. Iron pins to be set have been added to this sheet. 2. Iron pins to be set have been added to this sheet. 3. Coordinates for this line have been added to the sheets. 4.. Four units are within the 50' buffer region, but the minimum buffer distance provided is 0.07 feet and per regulation 4.1.12g, this buffer may be reduced to 25 feet at the discretion of the commission. TOPOGRAPHIC MAP 1. Since the SRD line is not a proposed property line, the existing propane tanks remain on one continuous parcel, and this poses no problems. 2. Side slopes of the d tention basin have been adjusted to 3:1. 3. The requested notes have been added. DETAILS (Sheet 7) 1. The construction schedule has been modified as requested. 85489\AIWA0820A.WP Corres. ® recycled paper ' Fuss&O'Neill Inc. RESPONSE TO COMMENTS AUGUST 20, 1993 PAGE 2 COMMENTS MADE BY: John E. McCahill, ning/Wetlands Enforcement Officer Dated August 4, 1993 Comment # Response 1. The responsible party is Kennith Stevens and his certification has been added to the plans. 2. & 3. See letter by John I ni of Highland Soils. 4. Side slopes of the'detention basin have been adjusted to 3:1. 5. Groundwater is-at elevation 83.7± which was shown on the plans. See' Sheets 3 or 6 (detention pond area). A copy of the drainage calculations originally submitted are attached. /ndt 8548MASM0820AMP Correa. ® recycled paper ' FVSS&O NEILL PREPARED DATE CHECKED DATE PROJECT NO. consulting engineers BY .5` BY ALI SHEET NO Of fi fi E E _ . i 7_, fi i { ! 1 1 1 i 3� fi 1 3 I i , ! i A t �x/ I , .._....... _}— f{ i ; � I E e I i 3E 1 i f i I •� j ` f , fi i i � , , y i2no (41 17 4- a ' low- _ ' __ , q&i _ I y , : r . i f , . p...�.�....._ � ._ _.._.�� .•»ram .. n.. ._,z;s..,�a mow._.,,,. Mi,..>, �.�..t....,—..�. ..,.. ,_,.«„ Fn.*lin , INLET STATION : AND OFFSET 11111 long Ill"oll AREA IN ACRES RUNOFF COEFFICIENT RAINFALL INTENSITY 111111111111111����9GRADE OF GUTTER 111111111111111�� TO INLET �0AT GUTTER WIDTH .OF FLOW DEPTH OF FLOWiCROSS SLOPE 11111111111111111110Q BYPASSING INLET AI ENTERING CATCH BASIN 11111111111111111111 1111111111111110��00 TOWN OF SOUTH WINDSOR STORM SEWER SYSTEM DESIGN FORM 2.2 PROJECT DESIGNED BY DATE STREET FIRM CHECKED 8Y SHEET No A 831VMad3H �1i�ddd� ��nd !2 b� ' A110013A 30V83AV — 6 � � 3d0 S• S. 3dld d0 HION31 321S 3dld tj b� N31SAS NI 0 CD nM r'1 IA AIISN31NI '11d3NIV8 I� M �. N31SAS NI M Id d0 NnS NISd6 H31VO 10 ONI831N3 Id , M 31411 a31d-inWnood v 60 -Now r1i 3did NI 3N11 M M 4 13"lN1 01 3N11 60 P 1N3N93S 3N1-1 — V � a w -52— . t •t) STATION OFFSET STATION OFFSET N --i Gg STRUCTURE TYPE C,g �� 0 O - m rn Z m TOPOFGRATE ELEV. �R'1 m . -4 O � OESIGN W.S.ELEV. o�° JL Q OUTLET STA. 0 rn OC OUTLET T.W.EL�4 •O OUTLET EL. a Q Q= Z LENGTH L LENGTH << EL: 8s' EL SS p 01 SLOPE +D11 cn 16 SLOPE O INLET OUTLET CONTROL MW ■H + ho - L8o 3 SIZE CONTROL OUTLET CONTROL MW ! HINLET ♦ ho-L8o ; C SIZE CONTROL TYPE n HW HW K H d °� TW ho LS HW = TYPE n �iW HW K H d� °� TW ho LS HW zo = o e t o e >t o .orb 1-3'7 1,7 -S a •1 I.o Igo ►� 1;, .oe 1, �.1 .g , Itu �'► v► a a. rn ch STATION OFFSET STATION OFFSET- Ca-STRUCTURE TYPE �t D TOP OFGRATE ELEV. n v n = m JL DESIGN W.S. ELEV. -� m (�� cc X Z D Q m m Z v v D $� 7 I EL. EL. a Q= EL. ` EL. Q= CA LENGTH 14 A LENGTH a SLOPE 1( SLOPE J INLETINLET J , SIZE CONTROL OUTLET CONTROL HW •H+ ho-LSo h; SIZE CONTROL OUTLET CONTROL HW• H + ho-Lso H 3 = v "[ D TYPE Il HOw HW Ke H dC d2D TW ho LS HW = = TYPE n oW HW Ke H dC TW ho LS HW o 5' .0 (o z N W FUSS&O NEILL PREPARED BY CHECKED DATE PROJECT NO. consulting engineers BY �� Y 4-1 S� SHEET NO. S- Of • j f 1 t i i t ' i , e , ' < , -i• $� '3 Li t b. IT Aw a • ..... ' t .......�___� t t ' 1 i, ff • F - , � 1 r S � 3 !€ 1 ) i{ , 3333 w . I _ 1 1� , 1 I ...._ ........ ...may.,..-._... -- ............ .... .._.. ........ 177 i i , t _ 1 1 ! e i 3 � ! It � t i i i 1 r 1 , ! ` { i _ ,k. , , I 1 i C -awn V- S_au� ?d&U&at 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 �l��soe•co�'� AREA CODE 203/644-2511 August 31, 1993 TO: Elizabeth A. Warren, Chairman, IWA/CC FROM: John E. McCahill, Zoning/Wetlands Enforcement Officer C Re: Application #93-14R, Town Center SRD/RSK-Kellco, Inc. DOCUMENTS REVIEWED: Application form, Site Development Plans for Proposed Senior Residential Housing (dated May 10, 1993, rev. August 18, 1993) and previous application #93-14P COMMENTS: ,- 1 . This site was the subject of application #93-14P which was submitted on May 10, 1993 . At the June 21, 1993 meeting the approval motion for application #93-14P did not carry and the motion failed. The applicant was told he could reapply to the Commission with additional information and/or changes . 2 . The application form, item G, does not indicate that abutting property owners have been notified by certified mail that an application is pending before the Agency. The application was submitted on August 20, 1993 and copies of the letters (dated August 20, 1993) have been submitted. 3 . The wetland limits have been established by Soil Science and Environmental Services, Inc. A copy of the Soil Report (dated December 15, 1989 ) has been included on sheet 6 of 10 . 4 . The layout of the proposed buildings has been modified and moved in the northerly direction away from the two wetland areas in the southwesterly portion of the site. 5 . The application form, item J, indicates they will alter 0 .40 acre of wetlands . Mitigation of the wetlands impacts should be considered. This could possibly include enhancing the detention basin and/or improving the quality of the two southerly wetland areas . 6 . Additional information should be provided with regard to the "existing temp. drainage swale" , the two wetland areas in the southerly portion of the site; and the wetland areas (adjacent to the existing detention basin) that will be impacted. M Elizabeth A. Warren - 2 - August 31, 1993 Application #93-14R 7 . Drainage calculations should be submitted for this application. They are proposing to enlarge the capacity of the existing detention basin. 8 . Groundwater information is indicated on sheet 3 of 10 . Within the area of the existing basin it is shown as 83 . 7 . 9 . I have no additional suggested approval conditions at this time. JEM/pmm I Y HIGHLANDSOILS SEP 9 September 7, 1993 South Windsor INLAND WETLANDS AGENCYI Mr. John McCahill CONSERVATION COMMISSION Wetland Agent 1540 Sullivan Avenue South Windsor, CT 06074 RE: SENIOR RESIDENTIAL HOUSING ELLING` W ROAD, SOUTH WINDSOR Dear John: I have been asked by the applicant to present information with regard to the above-referenced project. As you are aware, the wetland boundaries on the site were field delineated by a representative of Soil Science and Environmental Services, Inc. A letter dated June 10, 1993 from Kenneth C. Stevens indicates that as a registered professional soil scientist, his review of the wetland boundaries is in agreement with the wetland boundaries as presented on the plans. Mr. Stevens also has inspected the "temporary drainage swale and has indicated it was dug in upland soil types. The purpose of this swale is to convey storm waters that collect in the rain gutter system for the adjacent building towards the wetlands. In my opinion this swale does not warrant classification as a water course. Your letter dated August 4, 1993 also indicates additional information should be provided on the two southerly wetland areas and mitigation of wetland impacts should be considered. The two southerly wetland areas contain soils of the Swanton Series. These soils developed from water-laid or wind blown deposits that overlay glaciolacustrine deposits of silt and clay and are classified as poorly drained. The entire southerly portion, including the P.O. Box 337, Storrs, Connecticut 06268 a (203) 742-5868 PAGE TWO MR. JOHN McCAHILL SEPTEMBER 7, 1993 wetlands are forested. The proposal plan will maintain the existing vegetation in the wetlands and in some of the nonwetland areas. Since the wetlands have established vegetative communities that include a developed canopy, shrub and herbacious layer, any enhancement of the wetland should occur in the buffer area. A minimal amount of vegetation is proposed to be removed from around the southerly buildings and enhancement within the buffer area may not be feasible. If enhancement is proposed, it should include plantings of berry producing shrubs to attract birds to the site. The existing detention basin is proposed to be expanded. The vegetation in the existing basin is well established and consists of relatively aggressive colonizers. I would hypothesize that once the basin is constructed, the same wetland plant species that currently occupy the basin will also colonize the disturbed areas. I would recommend that a seed mixture containing wetland species such as Red Top, Switchgrass, Typha (cattails) or Reed Canary Grass be used as an initial treatment for stabilization of the basin. Seed mixtures that contain these and other species are commercially available. Beyond the initial stabilization of the detention basin, I do not forsee the opportunity for enhancing the functional value of the wetlands on the site. Very truly yours, John P. Ianni Professional Soil Scientist cc: RSK sow N 1540 SULLIVAN AVENUE - SOUTH WINDSOR. CONN. 06074 �tiosoR.co�� AREA CODE 203[644-2511 September 14, 1993 CERTIFIED MAIL Richard S. Kelley RSK-Kellco, Inc. 1744 Ellington Road South Windsor, CT 06074 Dear Mr. Kelley: Re: Application #93-14R, Town Center SRD At the September 13, 1993 regular meeting, the Inland Wetlands Agency/Conservation Commission approved with conditions application #93-14R - IWA/CC permit for the construction of a 20 lot Senior Housing Development on property located at 1715 Ellington Road, RC zone as shown on plans prepared by Fuss & O'Neill Inc. , Project 85- 489A1, dated May 10, 1993 and revised through August 18, 1993 . This approval is subject to the following conditions: 1 . Two blueprint copies of the entire set of plans and this letter reproduced thereon, must be submitted to this Commission . This must be completed within 65 days of approval prior to any construction activity on the site. 2 . Construction activities shall be subject to the approval of the Town Engineer. 3 . The application shall indemnify and hold harmless the Town of South Windsor against any liability which might result from the proposed operation or use. 4 . We recommend a bond in the amount of $10,000 .00 to be submitted to Planning and Zoning Commission to ensure compliance with the Erosion and Sedimentation Control Measures . 5 . The permit is valid for three years and shall expire on September 13, 1996 . 6 . All approvals required must be obtained and submitted prior to any activity on the site. 7 . A contact person shall be identified directly on the plans . Richard S. Kelley Page Two September 14, 1993 Application #93-14R 8 . Berry producing shrubs shall be planted along the southerly tree boundary. 9 . When constructing the detention basin, the topsoil is to be removed, stockpiled then reused in the bottom of the constructed basin. 10 . The detention basin is to be seeded with a conservation mix. Very truly yours, 2Elizab h A. Warren Chairman EAW/*pmm cc: Town Engineer Planning & Zoning Commission • Complete items 1 and/or 2 for additional services. i also wish to receive the Cem►Piete items 3,and 4a&b. • Print Your name and address on the reverse of this form so that we can following services (for an extra fee):return this card to you. • Attach#*form to the front of the mailploce,or on the back If space 1: ❑Addressee's Address does not permit. , 3 • Write"Return Receipt Requested"on the mailpisp below the artiPk number fi • The Return Receipt will show to whom tie article wYes delivered and the dais Z' ❑ Restricted Delivery delivered. Consult Dostmaster for fee. 3. Article Addressed 10: 4a• 349 4b. Servioe Type RSK-KELLCO INC. ❑ Registered ❑ Insured 1744 ELLI96TON ROAD X KE Certified ❑ COD SOUTH WINDSOR CT 06074 ❑ Express Mail ❑ p Return Receipt for P Merchandise7. Date of beilvery 6. Signature (Addressee) 8. Addressee's Address(Only if requested and fee is paid) 6. Signature gent) sit PS in ,December 1 u.S.o.P.o.:iM.307-m DOMESTIC RETURN RECEIPT i UNITED STATES POSTAL SERVICE Official Business PENALTY FOR PRIVATE USE TO AVOID PAYMENT OF POSTAGE,$300 Print your name, address and ZIP Code here 93-14R IWA/CC, TOWN OF SOUTH WINDSOR 1540 SULLIVAN AVENUE SOUTH WINDSOR CT 06074 SEP 15 1993 SIST. T T111' LEGAL NOTICE TO BE PUBLISHED IN THE JOURNAL INQUIRER MONDAY, SEPTEMBER 20, 1993 SOUTH WINDSOR - IWA/CC At the September 13, 1993 regular meeting the Commission voted to take the following action: 1 . Approve with conditions appl. #93-14R, Town Center SRD/RSK- Kellco, Inc. - IWA/CC permit for the construction of a 20 unit Senior Housing Development on property located at 1715 Ellington Road, RC zone 2 . Approve with conditions appl. #93-34P, Ben & Linda Cloutier - IWA/CC permit to construct a driveway within the regulated area on property located at 178 Abbe Road, A-30 zone 3 . Approve with conditions appl. #93-35P, Tolland Bank/Ridge Road - Conservation plan approval for the construction of one house on property located westerly of Ridge Road and easterly of Buckland Road, AA-30 zone 4 . Approve with conditions appl. #93-36P, JMJ Construction Co. - Conservation plan approval for the construction of an office/industrial building on property located at 400 Governor's Highway, I zone Dated at South Windsor, CT this 14th day of September, 1993 Elizabeth A. Warren, Chair J RSK�KELLEU INC. • Developers 1744 Ellington Road • Builders South Windsor, CT 06074 • Property Managers Tel: 203-644-8761 / 644-8140 Fax: 203-644-5650 May 9, 1994 REC '; VED L 9 MAY V B94 Planning and Zoning Commission Town of South Windsor WINDSOR PLANNING DAP?. 1540 Sullivan Avenue South Windsor, CT 06074 RE: SRD @ Town Center, I.W. Application # 93-14R Dear Commissioners: The approval received for the above project requires the posting of an E & S Bond in the amount of $10,000. You are currently holding a bond for Town Center in the amount of $5,000. Therefore, we respectfully request that the current bond be endorsed to the amount of $10,000 and amended to include the Senior Residence. There currently is no other construction in progress nor planned for this site so it would seem that one bond in the amount of $10,000 should adequately protect the Town of South Windsor. If there are any questions regarding this, please contact me at the above number. Thank you in advance for your consideration. Yours truly, s Carol S. Kelley We Build Our Reputation �pyl Cn Y W&U&O-t O C V 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 r�4D co�'`� AREA CODE 203/644-2511 OR. May 16 , 1994 Carol Kelley RSK-Kellco, Inc . 1744 Ellington Road South Windsor, CT 06074 - Dear Mrs . Kelley: Re: Appl . #93-14R, Town Center SRD Appl . #87-436, Town Center At the May 11, 1994 regular meeting of the South Windsor Inland Wetlands Agency/Conservation Commission, the Commission discussed your May 9, 1994 letter regarding the bond amounts for the applications listed above. The Commission approved a motion to "set a $10, 000 bond, to ensure compliance with the Erosion and Sedimentation Control Measures, for the entire site at Town Center" . Please be advised that this will require concurrence by the Planning & Zoning Commission. A copy of this letter has been forwarded to them for that purpose. Very truly yours, INLAND WETLANDS AGENCY/ CONSERVATION COMMISSION ��e Eliz eth A. Warren, Chairma EAW/pmm cc: Chairman, Planning & Zoning Commission F?SK�KB I INC. • r- Developers ® ` i J 1744 Ellington Road • Builders �'� /7• Property th Windsor CT 06074 Managers 3-644-8761 / 644-8140 JUL (:°9 ��� � Fax: 203-644-5650 South Windsor INLAND WEI LANDS AGENCY/ July 18, 1996 OONSERVATA014 Comhossiom Elizabeth A. Warren, Chairman Inland Wetlands Agency/Conservation Commission 1540 Sullivan Avenue South Windsor, Connecticut 06074 Re: Application #93-14R, Town Center SRD Dear Mrs. Warren: Please extend the permit. for the above project., The current expiration date is September 13, 1996. To date, no work has been started under this permit. Therefore, I. believe you will not require a report from the project engineers at this time. If there is anything further needed, please contact me. Thanks in advance for your attention to this matter. Yours truly, Carol S. Kelle Secretary. srdiwx We Build Our Reputation SCW N SC 4 -OW� Ole S-OU� ?d&&460t _ 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 f�oSOR-CO AREA CODE 860/644-2511 September 6, 1996 Bruce Kelley RSK-Kellco, Inc. 1744 Ellington Road South Windsor, CT 06074 Dear Mr. Kelley: Re: Application#93-14R, Town Center SRD At the September 4, 1996 meeting, the South Windsor Inland Wetlands Agency/Conservation Commission approved a three year extension of application #93-14R with all original and standard conditions. Application #93-14R expires on September 13, 1999. It has been IWA/CC's policy to notify landowners)/applicant(s) of expiring wetland permits. However, it is the landowners)/applicant(s) responsibility to track expiration dates and notify the Commission of a renewal request at least 65 days prior to expiration. Very truly yours, INLAND WETLANDS AGENCY/ CONSERVATION COMMISSION Eliza A. Warren, Chairman EAW/pmm cc: Town Engineer