Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Resubdivision Phase 4 wetlands Permit
s i . QQ ut�bw Wthosor IN M0 N► fit AGE !cNstrATl�iAU TOWN OF SOUTH WINDSOR f INLAND WETLAND, WATERCOURSES AND CONSERVATION APPLICATION DATE RECEIVED Q y3 ZONE APPLICATION It �-� INSTRUCTIONS and plans must be submitted iri,triplicate together with the fee i.. The application, map forth in the Inland Wetlands, Watercourses, and Conservation Regulations, Town of South t Windsor. (See Regulations, Section VI). Wetlands, Watercourses` and Conservation Regulatious should be 2. The South Windsor Inla nd reviewed with respect to the and and criteria for application evaluation. (See Regulations, Sections VIII - X)• 3. The applican t understands that this application is to be considered complete only when ai required by ,the'-Agency have been submitted. (See Regulations information and documents Section vII) . Also complete state filing form. A. APPLICANT'S NAME DART HILL REALTY INC 658 ELLINGTON ROAD , SOUTH •WINDSOR. , CT 06074 ADDRESS PHONE: (HOME) 289-9105 (WORK) 282-0628 or 644-8137 B. LE GAL OWNER'S NAME: J PAN-MARC J ACQUES W .M.J . CONST .CO. INC) ADDRESS SAME HOME) 289-9105 (WORK) 282-0628 or 644-8137 PHONE: (List additional owners, addresses, and -phone numbers.on back of application) . C. IF THE APPLICANT IS NOT THE OWNER OF THE SUBJECT PROPERTY, A LETTER BY THE PROPERTY OWNER(S) AUTHORIZING THE PROPOSED REGULATED ACTIVITY SET FORTH IN THE APPLICATION MUST ACCOMPANY THIS FORM AND WILL BE PART OF THE APPLICATION. ) DART HILL ESTATES SUBDIVISION •PHASE#4 D. PROJECT NAME: (if any) 1. Contact Person (if further information is needed)ALL JEANNE HUPPE JEAN MARC JACQUES ( IF NOT AVAILABLE E. THE GEOG RAPHICAL LOCATION OF THE PROPERTY WHICH IS TO BE AFFECTED BY THE PROLOSEDALLC' REGULATED ACTIVITIES INCLUDING A DESCRIPTION OF THE SUFFICIENT TO IDENTIFICATION OF THE PROPERTY ON THE INLAND WETLAND AND WATERCOURSES NORTH OF DART HILL ROAD WP.OIT M7 LAWRENCE RD r'F F. NAMES OF ALL ABUTTING PROPERTY OWNERS: (USE SEPARATE SHEET 'IF NECESSARY) "OUTH WINDSOR SWIM CLUB , J . ALBERT TRUDEAU , FRANK INTINO , THE CICC4GLIONE' S THE ROY ' s , THE HERSEY ' s , DEBBIE LAFONTAINE, THE TOBIN ' s , THE CAMPBELL' s HAVE YOU NOTIFIED ALL ABUTTING PROPERTY OWNERS BY CERTIFIED LETTER- THAT AN APPLICATION PENDING BEFORE THE AGENCY?. YES **(You are required to supply a copy of the letter with. the list of the names o. the abutters) .** H. PURPOSE AND DESCRIPTION OF ALL PROPOSED REGULATED ACTIVITY(S) INCLUDING AMOUNT AND TYPE. OF FILL AND THE TIME ELEMENT INVOLVED: NONE _ . :C. A CLASS A-2 MAP OF THE PROPERTY DRAWN TO 1*"40' , SHOWING THE AREA TO BE DEVELOPED, EXTEN. OF THE WETLANDS AND WATERCOURSES AFFECTED, TOPOGRAPH, -EXISTING AND PROPOSED ACTIVITIES A' NAMES AND LOCATIONS OF ADJACENT PROPERTY OWNERS MUST BE SUBMITTED. J. ACREAGE OF WETLANDS AND WATERCOURSES TO BE ALTERED: NONE {. ACREAGE OF WETLANDS AND WATERCOURSES TO BE CREATED: NONE L. LINEAL FEET OF PROPOSED STREAM ALTERATION NONE M. TOTAL LAND AREA OF PROJECT AND PERCENTAGE WHICH IS WETLANDS: 21 . 5 ( 24%) ;�. IDENTIFY ALL OTHER PERMITS OR APPROVALS THAT HAVE BEEN ISSUED, APPLIED FOR, OR REQUIRED ,� ITH RESPECT TO THE PROPOSED ACTIVITY SET FORTH IN THIS APPLICATION. (These may include but not. be limited to, local Planning & Zoning, Zoning Board of Appeals, D.E.P. , F.E.M.E. D.O.T. , The Army Corps of Engineers, and any -other State, Local or Federal Permits.) P. Z . C. . APPROVAL FOR SUBDIVISION J. THE APPLICANT (OR DESIGNATED REPRESENTATIVE) HEREBY ATTESTS THAT A SIGN WILL BE POSTED r THE FOLLOWING LOCATION/S NORTH SIDE OF DART HILL ROAD AND EAST SIDE OF NIEDWERFER , EAST SIDE Or ELLIN , AND HOAD by J . M . J . CONST . CO . INC NAME JEANNE HUPPE ON OR BEFORE THE FOLLOWING DATE: A P R I L 28 , 1993 S IG14ATURE: UND ERSIGNED HEREBY APPLIES FOR THE REGULATED ACTIVITIES LISTED IN PARAGRAPH H ABOVE, Ff INLAND WETLAND, WATERCOURSES AND CONSERVATION PERMIT FOR THE PROPERTY DESCRIBED HEREINCONFIRMS THAT: HE IS FAMILIAR WITH THE CURRENTLY EFFECTIVE-INLAND WETLAND, WATERCOURSES AND CONSERVATI: REGULATIONS OF THE TOWN OF SOUTH WINDSOR. THE AGENCY MAY REQUIRE THE .� . HE/SHE UNDERSTANDS THAT AT ANY TIME DURING THE REVIEW PERIOD•OR WATERCOURSES IN QUESTION APPLICANT TO PROVIDE MORE INFORMATION ABOUT THE WETLANDS ANDI ANDIOR--&�P ROPOSED ACTIVITY. ! . ALL INFORMAT ION SUBMITTED IN THE APPLICATION FOR REVIEW SHALL BE CONSIDERED FACTUAL, OR 1. THE CASE OF ANTICIPATED ACTIVITY, BINDING. A KNOWING FAILURE OFCE THE APPLICANT NG THE OR ANY OF HIS/HER AGENTS TO PROVIDE CORRECT INFORMATION, TGROUNDS FORFREVOCATION OF ANY PERMIT UNDER THE,. ACTIVITY ANTICIPATED, SHALL BE SUFFICIENT REGULATIONS . MAKING THIS APPLICATION, THE APPLICANT GIVES PERMISSION TO THE INLAND WETLANDS BY /OR TE,E ,WATERCOURSES AND CONSERVATION COMMISSION MEMBERS APPLICATION FOR REPRESENTATIVE PURPOSE OF U;JRTIONS OF THE PREMISES WHICH ARE SUBJECT OF THE INSPECTION AND INVESTIGATION AND OTHERWISE EVALUATING THE MERITS OF THE APPLICATION Br,T,. BEFORE AND AFTER A FINAL DECISION HAS BEEN ISSUED. signature of Applicant Date APRIL 16 , 1993 DART HILL REALTY INC BY :J .M.J . CONST. CO Received and filed at the office of the Planning Department this day of signature o Ag n Date 77 FEE RECEIVED YES_ NO AMOUNT DATE RECEIVED by HEARING DATE HEARING ADV. (1)_._(2) PERMIT GRANTED DATE PERMIT DENIED DATE -SOIL SCIENCE SERVICES 968 Coleman Road, Cheshire, Connecticut 06410-- - r r SOIL REPORT =�a . '" 5 C�M TO: J.M.J, construction Co. SSSJobNo. 86-510-CT-SW1- 6 5 8 Ellington Road Client.Job No. Snu _h Windsor, CT 06074 Site Inspection Date 8/2 9/8 6 PROJECT TITLE AND LOCATION J.M.J. Construction Co. , Dart Hill b 1,awrPnne Roads, Smith Wi ndc;or, CT PROJECT DESCRIPTION: Inland wetland identification and classification of soils 'REC.ir► tt 5-to-g3 METHOD FOR IDENTIFICATION OF MAP UNITS Wetlands ® Field marking(flagging) for survey. \`� �?t © Field plotting on Topographic Ma Qhealet,200 ` ' dour: 2 f t ❑ Field plotting on aerial photography. Non Wetland Soils ' ® High intensity field identification by Soil Scientist. ❑ Medium intensity identification from USDA, Soil Conservation Service Soil Maps. METHOD OF SOIL IDENTIFICATION SOIL MOISUTRE CONDITION © Spade and Auger ❑ Dry ❑ Frozen ❑ Deep test pits(backhoe) X❑ Moist ❑ Snow ❑ Other ❑ Wet The classification system of the National Cooperative Soil Survey, USDA,Soil Conservation Service and the County Identification Legend were used in this investigation. The investigation was conducted by the undersigned Certified Soil Scientist. Respectively submitted by SOIL SCIENCE SERVICES Approved by Soil Scientist enneth C. Stevens,Jr. Principal Soil Scientist .See attached page(s) APR g Smith Windsor OXAND WETLANDS AGENCY/ Dart Hill Realty, Inc. QNSERVATION COMMISSION CONSTRUCTION SPECIALISTS 658 ELLINGTON ROAD SOUTH WINDSOR, CT 06074 (203)282-0628 OR 644-8136 March 26 , 1993 CERTIFIED MAIL i Dear Property Owner: Re : Dart Hill Estates Phase#4 In accordance with Section 7 . 3b of the ""Town of South Windsor Inland Wetlands , Watercourses , and Conservation Regulations _" , we are required to notify you that an application has been filed on the property abutting yours and is subject to a hearing by the Inland Wetlands Agency/Conservation Commission. The application and plans are on file with the South Windsor Planning Department. As an abutting property owner you are invited to -the hearing to ask � questions and/or give comments , however, you are not required to attend . You may also submit written comments regarding the application prior to the hearing if you so desire. For further information regarding the specific date this will be heard please contact Phyllis Mann, Recording Secretary or John E. McCahill , Zoning/Wetlands Enforcement Officer at the Planning Department, 644-251 1 . Sin erely 11�,, nc ea arc a. 6 8 Ellingt n Road South Windsor CT . , 06074 • Disi owN 8f4 `� 3-•E•tM Ti Ole slau� �� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 �'►'osoR-CO AREA CODE 203/644-2511 March 29, 1993 TO: Elizabeth A. Warren, Chairman, IWA/CC FROM: John E. McCahill, Zoning/Wetlands Enforcement Officer Re: Application #93-15P, Dart Hill Phase IV DOCUMENTS REVIEWED: Application form and plans for Dart Hill Phase IV (dated 8/25/92) and previously approved applications (#88-53P, #89-94P, #90-60P, and #92-15P) COMMENTS: 1 . Application #88-53P, Dart Hill Phase I was approved by the IWA/CC on April 17, 1989 (expires 4/23/95) . That application presented the total lot layout and drainage for the subdivision. Application #89-94P, Resubdivision for Dart Hill Phase I, for additional lots, was approved on December 18, 1989 (expires 12/19/94) . Application #90-60P, Dart Hill Phase II was approved on October 22, 1990 (expires 10/22/94) and application #92-15P, Dart Hill Phase III was approved on August 17, 1992 (expires 8/17/95) . This application, which includes 21 lots in phase IV, is the last phase of this subdivision. 2. We are currently holding bonds (to ensure compliance with the Soil Erosion and Sediment Control Plans) in the following amounts: application #88-53P, $15,000.00; application #89- 94P, (no bond) ; application #90-60P, $10,000 .00 and application #92-15P, $10,000. 00. 3. Of the 109 acres total for this application, 5 .83 acres are designated as wetlands. Note #2 (sheet 7 of 18) states, "Location of inland wetlands determined by Soil Science Services, Inc. " . A copy of the report from the Soil Scientist responsible for the flagging should be submitted for this application. 4 . The application form, item G, indicates that abutting property owners have been notified by certified letter that an application is pending before the Agency. A sample copy of the letter with the list of the names should be submitted. Section 7 . 3b of the IWA/CC Regulations requires that this be done, "within seven (7 ) calendar days of the time an application is submitted. . . " . r i Elizabeth A. Warren Page Two March 29, 1993 Application #93-15P 5. The application form, item H, indicates that there is no regulated activity. This is not the case as the plans indicate that a drainage outlet will be placed in the regulated area, as well as excavation adjacent to the pond to enlarge the capacity for stormwater storage. Items J. K, L, and M of the application form have not been completed. This information should be provided. 6 . They are proposing to discharge stormwater into the wetlands adjacent to the pond. This is not desirable. If it is the only way to handle the discharge of the stormwater a biofilter or sedimentation basin should be included on the plans . 7 . The work adjacent to the pond appears to be to allow additional capacity for stormwater storage. Drainage calculation should be provided. 8. The applicant should consider other possible locations for this additional stormwater storage. The proposed location will result in a large amount of regulated activity adjacent to the pond and will result in the removal of a number of trees . If it does get located in the area shown, the trees should be flagged in the field and approved by Town Staff prior to clearing. This should be noted on the plans . 9 . Although it is not desirable; if the additional stormwater storage is to be located adjacent to the pond more information should be provided which specifies how the basin area will be constructed. It would also seem that they should try to "enhance" the basin with the introduction of wetland plantings and the like. 10. A typical erosion and sedimentation control plan for the development of each house lot should be shown on the plans. 11 . I would recommend that an inspection and a report from their Engineers be submitted indicating the status of the ongoing phases. This report should focus on the compliance to, and effectiveness of, the soil erosion and sediment control measures that have been implemented during the ongoing construction of this subdivision up-to-date. 12 . The plans should clearly indicate the current stockpiling of materials . The plans should also address what will be done with the materials as they start developing the lots currently being used as stockpile areas . t Elizabeth A. Warren Page Three March 29, 1993 Application #93-15P 13 . The notes on sheet 16 of 18 indicate that the areas of concern are "wind erosion and siltation of existing proposed storm system. " These areas of concern appear to be adequately addressed in the plans. They should also be addressing the regulated activity associated with the wetlands as an area of concern and should ensure that the plans address the issues associated with the regulated activities. 14 . These comments should be addressed prior to any approval by the Agency. Dart Hill Realty, Inc.Inc CONSTRUCTION SPECIALISTS South windsof 658 ELLINGTON ROAD SOUTH WINDSOR, CT 06074 ,N�Np WETLANDS AGEN 0� (203)282-0628 OR 644-8136 1%.kNO K 00MMI HAND-DELIe' 16MA Town of South Windsor Inland Wetland Agency 1 540 Sullivan Avenue South Windsor . , CT 06074 q. ATTN : Mr. John McCahill RE : Application#93-09 Dear Mr. McCahill : As per our conversation we are requesting to postpone our above referenced application until the first meeting in May which will be on the 10TH. The reason being that we have to make revision to our original map as discussed at the last meeting we had with Ms . Banach, Director of Planning. Sholld you have any questions feel free to contact us . Very truly yours , __.._ J Al-MARC JAC U S, P SIDENT JMJ/jh cc : Marcia A. Banach, Director of Planning Jerry C. Iazzetta, Town Engineer Drsr_ M E M O R A N D U M TO: Elizabeth A. Warren, Chairman, IWA/CC FROM: John E. McCahill, Zoning/Wetlands Enforcement Officer DATE: April 8, 1993 RE: Application #93-09P, Dart Hill Phase IV In my March. 29, 1993 comments regarding this application, comment #4 read as follows: The .application form, item G, indicates that abutting property owners have been notified by certified letter that an application is pending before the Agency. A sample copy of the letter with the list of the names should be submitted. Section 7 . 3b of the IWA/CC Regulations requires that this be done, "within seven (7 ) calendar days of the time an application is submitted . . . " . On April 6, 1993 the applicant submitted a sample copy of the letter (see attached) . The letter itself isdated March 26, 1993. The application was submitted on March 15, 1993 . If the letter was mailed out on March 26, 1993 (as it is dated) then they have not complied with Section 7 . 3b of the IWA/CC Regulations. I would therefore suggest that the applicant consider withdrawing this application and resubmit for the May agenda. JEM/pmm cc: Jean Marc Jacques I 1p APR a 2 im Dart Hill Realty, Inc. South' Wi nor. CONSTRUCTION SPECIALISTS INLAND WETLANDS AGENCY/. 658 ELLINGTON ROAD SOUTH WINDSOR,CT 06074 CONSERVAT'1014. C@MMl,%M (203)282-0628 OR 644-8136 April 1 2 , 1 993 HAND-DELIVERED t � RE : APPLICATION 93-09 } Town of South Windsor "{ Inland Wetland, Watercourses and Conservation Application 1540 Sullivan Avenue South Windsor. , CT 06074 ATTN : John McCahill Dear Mr. McCahill : Due to some revision requested to our blueprint for the Dart Hill Estates Phase#419 " we would like to withdraw our current application for the above referenced Phase . Since we will be reapplying for the same phase within the next few days we would greatly appreciate a refund of the check in the amount of One Hundred Ten ( $110 . 00 ) Dollar. Your cooperation in the above referenced matter is greatly appreciated. ery truly yours , ----------------- bART HILL R A TY BY JEAN-MARC JACQUES PRES JMJljh cc : Marcia A. Banach, Director of Planning Jerry C. Iazzetta, Town Engineer �AowNce C r Ole Solum ?d&U&O& c � 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 R•CON AREA CODE 203 644-2511 April 14, 1993 . Mr. Jean Marc Jacques Dart Hill Realty, Inc. 658 Ellington Road South Windsor, CT 06074 Dear Mr. Jacques Re: Appl . #93-09P, Dart Hill Estates Phase IV At the April 12, 1993 regular meeting of the Inland Wetlands Agency/Conservation Commission, the Commission approved a motion to "accept the withdrawal of application #93-09P and to waive the fee for application #93-09R" . This was done with the understanding that you would be resubmitting a new application for the May Agenda . Very truly yours, (;;; li- eth A. Warren Chairman EAW/pmm r LETTER OF TRANSMITTAL TEL. 633.5218 REINO E. HYYPPA& ASSOCIATES Civil Engineers& Land Surveyors 124 Hebron Avenue TO Glastonbury, Connecticut 06033 APR 10 1993 SOUth Windsor INLAND wE'i`Lmos AGENCY, Regarding Dart Hill Ests . Phase 4 Date 4/16/93 To J. McCahi 11 Job 96-86-1 R lown 0f -S . 01ndsor Att. of: WE ARE SENDING YOU: Oat your request O Under separate cover O for approval Q Herewith O for your riles The following. O 3 sets of prints (Shts 8,9,11 ,13 & 14 of 18) REMARKS revised per meeting with Town , If enclosures are not as listed, kindly notify at once. REINO E. HYYTPA A ASSOCIATES by 2? D STY Mr. John E. McCahill APR 21� 1993 April 26, 1993 Zoning/Wetlands Enforcement Town of South Windsor South Windsor 1540 Sullivan Ave. INLAND WETLANDS AGENCY/ South Windsor, CT 06074 CONSERVATION COMMISSION Dear Mr. McCahill; I recently received a letter from Dart Hill Realty, Inc. concerning building and development plans on land abutting my property. The issue will be brought before the Inland Wetlands Agency/Conservation Commission. Presently, whenever there is a heavy rainstorm or continued rain for a few days, water accumulates on one corner of my property, on my adjoining neighbors property and on the property directly behind mine. During the Fall, Winter and Spring there is standing water. I have enclosed a photograph for your reference. I am concerned that when development of the property behind mine commences the water accumulation problem will not be resolved and could possibly worsen. I would like to be assured that if the development is approved that resolution of this problem will be guaranteed. I have spoken to the developer in the past about this issue and was advised that it would be taken care of . It has been a year and a half and the condition still exists . I am requesting that this matter be addressed at your earliest convenience . Ver truly yours, Frank A. Intino 65 Perrin Lane South Windsor, CT 06074 0 Wd Dart Hill Realty, Inc. CONSTRUCTION SPECIALISTS 658 ELLINGTON ROAD SOUTH WINDSOR, CT 06074 (20.3)282-0628 OR 644-8136 C April 21 , 1 993 ERTIFIED MAIL T pp, APR 2.3 1993 South Windsor INLAND WErt. A,EWVI Dear Property Owner: comsmars NC&W1&&9#0,V Re : Dart Hill Estates Phase#4 In accordance with Section 7 . 3b of the ""Town of Sough Windsor In Land Wetlands , Watercourses , and Conservation Regulations " , we are required to notify you that an application has been filed on the property abutting yours and is subject to a hearing by the Inland Wetlands Agency/Conservation Commission. The application and pla.is are on file with the South Windsor Planning Department . As an abutting property owner you are invited to the hearing to ask questions and/or give comments , however, you are not required to attend . You may also submit written comments regarding the application prior to the hearing if you so desire . For further information regarding the specific date this will be heard please contact Phyllis Mann , Recording Secretary or John E . McCahill , Zoning/Wetlands Enforcement Officer at the Planning Department , 644-2511 . Sin ere1y t nc i J can-[V,r rc (4�8 Elling tbn Road South Windsor CT . , 06074 ram. COD Tvu0n O-P S-OU& ?40&U1A10& 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074,, 0 AREA CODE 203/644-2511 OR•C May 5, 1993 TO: Elizabeth A. Warren, Chairman, IWA/CC FROM: John E. McCahill, Zoning/Wetlands Enforcement Officer c Re: Application #93-09R, Dart Hill Estates, Phase IV DOCUMENTS REVIEWED: Application form and plans for Dart Hill Phase IV (dated 8/25/92 and revised thru 4/23/93) and previously approved applications (#88-53P, #89-94P, #90-60P, and #92-15P) COMMENTS: 1 . Application #88-53P, Dart Hill Phase I was approved by the IWA/CC on April 17, 1989 (expires 4/23/95) . That application presented the total lot layout and drainage for the subdivision. Application #89-94P, Resubdivision for Dart Hill Phase I, for additional lots, was approved on December 18, 1989 (expires 12/19/94 ) . Application #90-60P, Dart Hill Phase II was approved on October 22, 1990 (expires 10/22/94) and application #92-15P, Dart Hill Phase III was approved on August 17, 1992 (expires 8/17/95) . This application, which includes 21 lots in phase IV, is the last phase of this subdivision. Application #93-09P was recently submitted but was withdrawn by the applicant with the understanding they would be resubmitting. 2 . We are currently holding bonds (to ensure compliance with the Soil Erosion and Sediment Control Plans) in the following amounts: application #88-53P, $15,000 . 00; application #89- 94P, (no bond) ; application #90-60P, $10,000 . 00 and application #92-15P, $10,000 .00 . 3 . Of the 109 acres total for this application, 5.83 acres are designated as wetlands . Note #2 (sheet 7 of 18) states, "Location of inland wetlands determined by Soil Science Services, Inc. " . A copy of the report from the Soil Scientist responsible for the flagging should be submitted for this application. 4 . The application form, item G, indicates that abutting property owners have been notified by certified letter that an application is pending . before the Agency. A sample copy of the letter with the list of the names has been submitted. Section 7 . 3b of the IWA/CC Regulations requires that this be done, "within seven (7 ) calendar days of the time an Elizabeth A. Warren Page Two May 5, 1993 Application #93-09R application is submitted . " . The application was submitted on April 16, 1993 and the letters are dated April 21, 1993 . 5 . The application form, item H, indicates that there is no regulated activity. This is not the case as the plans indicate that a drainage outlet will be placed in the regulated area, as well as a portion of the proposed detention basin. This information should be stated on the application form. They do not appear to be altering any wetlands or watercourses as part of this application. 6 . They are proposing to discharge stormwater into the wetlands adjacent to the pond in an overgrown area. Although it will result in the removal of additional trees, they should provide a more defined channel to the pond. 7 . They are proposing to create additional capacity for stormwater storage. Drainage calculation should be provided. 8 . The trees should be flagged in the field and approved by Town Staff prior to clearing. This should be noted on the plans . 9 . A typical erosion and sedimentation control plan for the development of each house lot should be shown on the plans . 10 . I would recommend that an inspection and a report from their Engineers be submitted indicating the status of the ongoing phases . This report should focus on the compliance to, and effectiveness of, the soil erosion and sediment control measures that have been implemented during the ongoing construction of this subdivision up-to-date. 11 . The plans should clearly indicate the current stockpiling of materials . The plans should also address what will be done with the materials as they start developing the lots currently being used as stockpile areas. 12. The notes (on sheet 16 of 18) indicate that the areas of concern are "wind erosion and siltation of existing proposed storm system. " These areas of concern appear to be adequately addressed in the plans . They should also be addressing the regulated activity associated with the wetlands as an area of concern and should ensure that the plans address the issues associated with the regulated activities . z Elizabeth A. Warren Page Three May 5, 1993 Application #93-09R 13. A biofilter system should be provided at the outlet end of the detention basin; or in the swale system (that should be added as previously stated) from the outlet of the detention basin to the pond. 14 . The detail provided for the rip rap spillway (on sheet 8 of 18 ) should identify the type of rip rap that will be used. It should also show gravel bedding and filter fabric being placed under the rip rap. 15 . An access drive should be provided to ensure that maintenance can be provided for the outlet from the detention basin and the emergency spillway. 16 . The proposed topography and emergency spillway are not shown on sheet 9 of 18 . These should be added. 17 . The silt fence (as shown on sheet 13 of 18) should be shown surrounding the area where rip rap will be placed at the proposed outlet from the detention basin. 18 . The detail provided for the rip rap outlet (on sheet 15 of 18) should identify the type of rip rap that will be used. It should also show gravel bedding and filter fabric under the rip rap. 19 . Groundwater information should be provided for the area of the proposed detention basin. Will the basin be a wet or dry basin? Positive drainage, from the inlet towards the outlet, should also be considered. 20 . These comments should be addressed prior to any approval by the Agency. JEM/pmm LETTER OF TRANSMITTAL TEL. 633-5218 REINO E. HYYPPA& ASSOCIATES Civil Engineers& Land Surveyors 124 Hebron Avenue Glastonbury, Connecticut 06033 Regarding Dart Hill Phase IV Date 5/10/93 To .=.Mrahi l l Job 96-86 Town of S. Windsor Att. of: WE ARE SENDING YOU: O at your request O Under separate cover C7 for approval th Herewith O for your files The following: O One copy drainage computations One copy Soils report (Soil Science Services) dtd 8/29/86 REMARKS If enclosures are not as listed, kindly notify at once. REINO E. HYYPPA A AMMIAM b Y i tow C � „a V 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 OR-CO AREA CODE 203/644-2511 June 22, 1993 CERTIFIED MAIL Jean Marc Jacques Dart Hill Realty, Inc. 658 Ellington Road South Windsor, CT 06074 Dear Mr. Jacques: Re: Application #93-09R, Dart Hill Estates, Phase IV At the June 21, 1993 regular meeting, the Inland Wetlands Agency/Conservation Commission approved with conditions application #93-09R - IWA/CC permit for the construction of a 21 lot subdivision on property located westerly of Lawrence Road and northerly of Dart Hill Road, RR open space as shown on plans prepared by Reino E. Hyyppa & Assocciates, Map No. 96-86-IR, dated August 25, 1992 and as revised for the June 21, 1993 meeting. This approval is subject to the following conditions: 1 . Two blueprint copies of the entire set of plans and this letter reproduced thereon, must be submitted to this Commission . This must be completed within 65 days of approval prior to any construction activity on the site. 2 . Construction activities shall be subject to the approval of the Town Engineer. 3 . The application shall indemnify and hold harmless the Town of South Windsor against any liability which might result from the proposed operation or use. 4 . We recommend a bond in the amount of $10,000.00 to be submitted to Planning and Zoning Commission to ensure compliance with the Erosion and Sedimentation Control Measures . 5 . The permit is valid for three years and shall expire on June 21, 1996 . 6 . All approvals required must be obtained and submitted prior to any activity on the site. 7 . A contact person shall be identified directly on the plans . Jean Marc Jacques Page Two June 22, 1993 Application #93-09R 8 . The plot plans and the deeds for lots #87, 88, and 89 shall indicate that there are regulated wetlands located in the rear of the lots . The deeds shall indicate that the prospective buyers have been informed as to the location of the regulated areas . Very truly yours, / �1L Elizabeth A. Warren Chairman EAW/pmm cc: Town Engineer Planning & Zoning, Commission Design Professionals, Inc. qqtt REINO E. HYYPPA&ASSOCIATES Civil Engineers&Land Surveyors •x:">&I - 124 Hebron Avenue Glastonbury,Connecticut 06033 Kenneth B.Smith,P.E. Telephone(203)633-5218 William F.Klock,L.S. 7 June 7, 1993t Mr. John McCahi 1 1 -JUN 1. 1 1993 Town of South Windsor 1540 Sullivan Avenue South Windsor South Windsor, CT 06074 INLAND WETLANDS AGENCY1 CONSERVATION WUly{lr.40 j Re: Dart Hill Estates Phase IV Review Comments dated 5/5/93 Dear Mr. McCahill : We have reviewed your design comments dated 5/5/93 and we offer the following response to your like-numbered com- ments: 1. No response necessary. 2. No response necessary. 3. Copy submitted on 5/10/93. 4. No response necessary. 5. Information forwarded with this letter. 6. Would respectfully suggest that this not be done for reasons stated at the meeting of 5/10/93. 7. Provided on 5/10/93. 8. Will note. 9. Will provide. 10. Will provide. 11. Will comply. 12. Will comply. 13. Will provide in outlet end of basin. 14. Will provide. 15. Will provide. 16. This was shown on Sheet 9 for reference purpose only. Will clarify so that there is no confusion. 17. Will revise. 18. Will revise. 19. Will do test pit. 20. Will comply. Very truly yours, REINO E. HYYPPA & ASSOCIATES KBS/cb enneth B. Smith enc. An Equal Opportunity Employer S.B.E.Certified H. The activity proposed is to construct a portion of a stormwater detention basin and its outlet within a regulated area. Approximately 400 c. y. of clean earth fill will be placed for the berm along with 20 c. y. of riprap and gravel bedding. It is estimated that this work will be done within a 10-day period. LETTER OF TRANSMITTAL TEL. 633-5218 REINO E. HYYPPA& ASSOCIATES D �Civil Engineers& Land Surveyors 124 Hebron Avenue Glastonbury, Connecticut 06033 JUN 11 1993 South Windsor INLAND WETLANDS AGENCY/ CONSERVATION COMMISSION Regarding Dart Hill 4 Date 6/10/93 To Mr. J. McCahill Job N 96-86-1R own of S. winasor Att. of: WE ARE SENDING YOU: O at your request O Under separate cover O for approval 9 Herewith O for your riles The following: O 3 sets of plans revised per Town review comments rev 4/23/93 (1 ) orig. letter to you responding to your comments of 5/5/93 One copy E & S Control Report Stockpile Areas Report REMARKS cc: Mr. J . M. Jacques, JMJ Const. Go. If enclosures are not as listed, kindly notify at once. REINO E. HYYTPA A ASSOCIATES by D � JUN It 1991 DART HILL ESTATES South Windsor E & S CONTROL REPORT INLAND WaLANOS AGENCY/ CONWAVATION COMMI"16" On 6-8-93, a field inspection of Dart Hill Estates was done to evaluate the status of the Erosion and Sedimentation Control measures. For all practical purposes, Phases 1 and 2 are substan- tially complete. There are a couple of lots in both phases yet to be built on or are in the process of being completed. However, the land disturbance in these areas appears to be under control . With summer coming on, the only area of con- cern would be the ability to establish ground cover at this time of year and the potential for wind erosion. If this becomes a problem, it will be necessary to use a significant amount of water to either establish the grass or keep the dust down. The developer had been experiencing some problem behind Lots 39-42 with water erosion but has solved that with liberal use of straw matting. Phase 3 is under construction and the roads are fairly well along. Again, the only major concern here is the poten- tial for wind erosion. Phase 4 has yet to be approved but there are some areas that are being used to stockpile surplus material . Most of them appear to be fairly well stabilized with little or no erosion. We did note some minor erosion caused by water following a "haul" road that runs downhill on Lot 99 to the stockpile on Lots 87-88. The developer should keep his eye on this and, if it gets any worse, should take measures to stop it such as installing diversion ditches for berms) to divert the water sideways into the field which is well established with grass. At the bottom of this haul road, the developer should install another row of hay bales. The existing ones are doing an adequate job, but would function much better if there was another row to help. There is a row of silt fence further downhill to protect the wetlands and none of the silt seems to be getting to this fence. In general , the site seems to be in good shape as far as erosion and sedimentation control is concerned and the only problem will probably be wind erosion which can be controlled with liberal use of water and rapid establishment of ground cover. R DART HILL ESTATES STOCKPILE AREAS On 6-8-93, a site inspection was made with Mr. Jacques to evaluate the state of the various stockpiles. Following is a summary of that inspection: i ) The stockpile areas that are shown on Lots 85-92 will remain. These lots are on the "low" side of the roadway and this material will allow the houses to be built slightly above the proposed roadway grade. 2) There is topsoil stockpiles in the vicinity of Lots 80 and 94-97. This material is to be used to establish the lawns on the unfinished lots. If there is any excess material , it will be used on other projects. 3) There is some excess fill stockpiled at the rear of Lots 94-97. Most of this material will be moved off of this site. 4) A small amount of material has been temporarily stockpiled on Lots 73 and 74. This is material that was excavated during the construction of the roadway in Phase 3 and is being used as fill in that section. �-It owN sF,<� �- 014Cs W&U14at s . 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 AREA CODE 203/644-2511 June 22, 1993 CERTIFIED MAIL Jean Marc Jacques Dart Hill Realty, Inc. 658 Ellington Road South Windsor, CT 06074 Dear Mr. Jacques: Re: Application #93-09R, Dart Hill Estates, Phase IV At the June 21, 1993 regular meeting, the Inland Wetlands Agency/Conservation Commission approved with conditions application #93-09R - IWA/CC permit for the construction of a 21 lot subdivision on property located westerly of Lawrence Road and northerly of Dart Hill Road, RR open space as shown on plans prepared by Reino E. Hyyppa & Assocciates, Map No. 96-86-IR, dated August 25, 1992 and as revised for the June 21, 1993 meeting. This approval is subject to the following conditions: 1 . Two blueprint copies of the entire set of plans and this letter reproduced thereon, must be submitted to this Commission . This must be completed within 65 days of approval prior to any construction activity on the site. 2 . Construction activities shall be subject to the approval of the Town Engineer. 3 . The application shall indemnify and hold harmless the Town of South Windsor against any liability which might result from the proposed operation or use. 4 . We recommend a bond in the amount of $10,000 . 00 to be submitted to Planning and Zoning Commission to ensure compliance with the Erosion and Sedimentation Control Measures . 5 . The permit is valid for three years and shall expire on June 21, 1996 . 6 . All approvals required must be obtained and submitted prior to any activity on the site. 7 . A contact person shall be identified directly on the plans . Jean Marc Jacques Page Two June 22, 1993 Application #93-09R 8 . The plot plans and the deeds for lots #87 , 88, and 89 shall indicate that there are regulated wetlands located in the rear of the lots . The deeds shall indicate that the prospective buyers have been informed as to the location of the regulated areas . Very truly yours, t -1L Elizabeth A. Warren Chairman EAW/pmm cc: Town Engineer Planning & Zoning Commission Reino Hyyppa & Associates