HomeMy WebLinkAboutBeldon Estates Subdivision TOWN OF SOUTH WINDSOR, CONNECTICUT
4 PLANNING AND ZONING COMMISSION
APPLICATION FORM
R•coe�
Application No. : 170,5-C)/0
Date Received :
Action/Public Hearing by : 11 9/asl�a
Receipt No. : jr
APPLICANT: 4—'-,qp q O Ev
ADDRESS : 1_2.75 Q,,m e y��� , 47- 06 0,67 TELEPHONE: 7� -
I LZD
OWNER OF RECORD ON LAND RECORDS : � Z4
ADDRESS : 2 �S o L C T.
.
COMPLETE LOCATION OF PROPERTY: ,/
/7 �6 0 L
B ,q
�vo f ZONE: A -Zd
NAME, ADDRESS, & TELEPHONE NUMBER OF PERSON TO WHOM INQUIRIES SHOULD
DIRECTED: BE
P.gvc CA P� 5 C L
1170 E"/'VCV r0 iv jeo.4 p
S'rEPNCtJ R,d ,.�, n�� nCclGw�nestc1�.,w. �+ 1Nc.' Sri \. (��ncnQ -T,_ TELEPHONE: Zq 1- 8�'SS
THIS APPLICATION IS FOR : (Check one of the following)
I . Zone Change to (Public Hearing required) .
2 . Subdivision .
3. Open Space Subdivision (Public Hearing required) .
4. Resubdivision (Public Hearing required) .
5. Special Exception to Article
(Public Hearing Required) .
6. Site Plan of Development .
7. Earth Filling [Section 101 and/or Earth Removal [Section 9(Public Hearing Required) .
8. General Plan of Development .
9. Regulation Amendment : Zoning Subdivision
10. Other (explain in detail) :
CONSULT PLANNING DEPARTMENT FOR FEE SCHEDULE. THIS APPLICATION MUST B
SIGNED BY THE APPLICANT AND OWNER OF THE PROPERTY AND SUBMITTED IN E
TRIPLICATE WITH ALL MAPS AND DOCUMENTS REQUIRED ON ATTACHED CHECKL
IST.
'eol-419A&I
Applicant Owner
��rN�-rh�crQ 7
TOWN OF SOUTH WINDSOR
APPLICANT L��v.4 ✓o �EVELoi7E� S
PROJECT NAME /JEL-ISO•✓ �a �r3pt V r s o N
CHECKLIST
REQUIRED INFORMATION
SUBDIVISIONS & RESUBDIVISIONS
This checklist must be signed by plan preparer (P.E/L.S) declaring that
all required information is provided. Items 1-5 are required for all
applications; Items 6-9 required where appropriate.
Check mark for each item supplied.
v 1 . On each sheet for plans or maps, title block with the
following information:
a. Name and address of subdivider.
✓ b. Name and address of Land Surveyor or Professional
Engineer.
C. Name of subdivision.
d. Date when drawings were made.
North arrows
2. K a - An overall map drawn to a scale of 1,,Anch- uals
r2'00,jeet, which can be used as an overlay on 'Metropolitan
is R trict Maps. This map will show the overaldesign of
the subdivision and will include:
✓ a. Layout of streets with names
b. Layout of lots and lot numbers
v/ C. Open space land
Arrows indicating general direction of drainage
e. Lines indicating sanitary sewer system flow
f. Total acreage of subdivision Y
g. Total number of lots
h. Nam s of surrounding prop rty-owners, and properties
within 500 feet of the site
Page 2 (Subd. & Resub. )
3 . Plot Plan: A layout map of the proposed subdivision drawn
to a scale of 1 inch equals 40 feet on either of the
following size sheets - (1) 25" X 37" with a 3/4" ruled
margin; (2) 15" X 24" with a 1/2" ruled margin -
containing the following data:
a. Distance and bearings of all boundary lines .
b. Lot layout numbers, square footage of all lots, and
all lot dimensions . Iron pins to be shown at all lot
angle points . Lots should not be fragmented onto
separate sheets except where size is prohibitive.
c. Proposed streets and street lines with center line
stations, and curve data.
✓ d. Building lines in accordance with zoning regulations .
e. Easements, noting grantors, grantees, and purpose.
f . Proposed names of street.
g. Names of abutting property-owners .
h. Monuments will be indicated at corners and angles of
all streets and at all points of curvature and
tangency. In areas accessible to Metropolitan
District Commission points, or other coordinated
points, the monumented points within proposed
subdivision shall be coordinated. These coordinates
shall appear in tabular form on the plot plan. The
accessibility of these MDC points shall be determined
by the Town Engineer.
4
L. All open space reserved for parks, playgrounds, or
other common or public uses shall be indicated.
J . A-2 Certification; P.E./L.S. Seal.
f k. Traffic control signs and pavement markings required
by Traffic Authority.
4 . Topographic Map: A map drawn to a scale of 1 inch to
40 feet on sheets not exceeding 25 inches by 37 inches
including ruled margins and shall, in addition to the
requirements of the plot plans, show the following:
a. All existing and proposed buildings.
V b. Curb lines and pavement width, sidewalks .
Page 3 (Subd. & Resub. )
c. Existing and proposed sanitary and storm sewers, if
any.
d. Existing and proposed water and gas main systems .
e. Present wooded areas indicated by a "foliage line" .
/ Any individual trees to be saved should be shown.
f,. Existing and proposed contours shall be shown at not
y less than two-foot intervals; but in cases of
relatively level land, the contours shall be one-foot
int�e,�xals .
r/ g. Proposed storm drainage system showing all catch
basins, endwl„Ls,, manholes, lengths, and sizes of
pipes (4infimuiidistance between catch basins shall
be 300 feet and minimum size of storm drain lines
shall be 15 inches. )
NAt h. Connections of all springs into proposed storm
drainage system as needed.
i. Location and indications of existing brook channels,
and 100 year flood limits.
J . A-2 Certification; P.E./L.S. Seal
k. Regulated wetlands and 100-year flood plain or note
that site contains none.
5 . Drainage calculations - Zero Runoff Increase per attached
guidelines.
6 . Plans and Profiles: A plan and profile of the proposed
streets drawn on plan/profile paper of scales 1 inch to 40
feet horizontally and 1 inch to 4 feet vertically on
sheets not exceeding 25 inches by 37 inches including
ruled margins and containing the following:
a. Layout of streets in sections coordinated by stations
with the profile.
b. Street plan showing roadways, drainage and partial lot
lines.
fc. Sight line at street intersections.
d. Profile of roadway showing existing and finished
grades . Roadway profile will show all tangent grade
and all vertical curve information.
Page 4 (Subd. & Resub. )
✓ e. Profile will show all catch basins and all drainage
lines between catch basins with all invert and top of
frame elevations. Drainage lines will be shown and
described as to material.
f . Typical/critical cross-sections where grading is
outside street right-of-way or is at street right-of-
way.
g., , Where any storm drainage line discharges into an
-- existing brook, sufficient profile of this brook will
/ be shown to determine conditions.
J h. Metropolitan District Commission datum shall be used
on all subdivisions accessible to controls . The Town
Engineer shall, based on standard engineering
practices, determine the accessibility of these
controls .
✓ i. Profiles shall show all sanitary sewer lines and
manholes, including elevations, sizes, lengths, and
slopes of pipes. Top of foundation elevations for
houses shall be shown.
7 . Traffic Report
, en ace A, B . � 0 S Site Improvement Plan : For subdivisions which
_ p p p
require a provision for open spaces, a plan which contains
data for site improvement may be required. This map shall
be drawn to a scale of 1 inch equals 20 feet.
9 . Sanitary Report: Where individual sanitary sewage
disposal systems are proposed, the final plans shall
include a Sanitary Report certified by a Professional
Engineer. The report shall demonstrate the feasibility of
the proposed individual systems . The report should deal
with the area as a whole, discussing the following points;
AAA a. General nature and development of surrounding area.
A1. b. Topography and natural drainage pattern.
/Q. C. Subsurface conditions as shown by subsurface
investigation, including soil absorption
characteristics, ground water level conditions, ledge
rock, and general nature of soil.
NA d. General description of type of development
contemplated -noting type of house, number of bedrooms
per unit, etc.
Page 5 (Subd. & -Resubd. )
e. Detailed description of proposed sanitary sewage
disposal facilities, indicating sizes for various
ground conditions, materials to be used, and general
layout pattern to be used, etc.
f. Special precautions that may be necessary to provide
proper functioning of the proposed disposal systems.
•�. g. Map of general area with locations of all tests shown
on proposed lot layouts.
r h. Flood heights of any nearby streams, brooks, or
rivers.
�. i. Test results and engineering evaluation per Section
3 . 2.a(6) .
All information required above is included in this application at the
time of submission.
3 a
P P R (P.E. L.S. ) 1DATE
Nove er, 1987
� I!
!�
l
�Allks
=16
Chark Recalty, -111
WNW,I I(UC I I(JN :.I'L(:IAI IA')
I
W)"I t I I If161ON IMAI) I-A)III II WINP,,(,lt, I OGOI-1 1.
(.'03) :tiA,- Ut►:ti lilt 6,14 111 s !+
.. •��+I�•wytrl•f¢�r�-!I��dT�R•!�T•'.vN'v ro�,..r«s�.+w ..�.-v-..�. -_—.�.+�r-..e.-........-..-. --r,. �.
tAA )LA-4 44 r
d J'
OF I
All
s
tilLl
e.. ,
l �
I
I
Dart Hill Realty, Inc.
' CON&TIRUCT1ON SPECIALISTS
658 ELLINgTON NOW SOUTH WINDSOR. CT 06074
( )Z04-06�$OR b44-8136
r
am��bOL4f- k�&
LL
lJg'vY 115'/It 95- ..
@. . '�4 C.►Gat �. ?u.t� �,f t`u '
Aj
a
oj
17
Lj
�.
:1 G r�lC'�`�r� /, ^'"Z'�'��l-l.:L'-•fit-.
• � �./ � ys �j 11
Ll.'✓1�1 /1-l.�ryL�,-✓Y ��l�l.� �� C.1� Yl t�r!^�
'/ c, �.� f��' rt ',, ��..t' C=�•`,`�rat-.
r
' '7� l { �^tK•a�C ^�7r
Dart lifill Realty, Inc.
' CONITOWPON SPECIALISTS
658 ELLINGTON BOAQ SOUTH WINDSOR. CT 06074
(204);12-025 OR 644-8136
-
&4dj
n
i
lid
6-57 VL4-a't 'ALP
73
f7 17
_� L
Dart Hill Realty, Inc.
' COIN$TRUCTION SPECIALISTS
650 ELL.INQMN R040 SOUTH WINDSOR. CT 06074
4204�;140 4 OR 64+8136
Ak
�itccetv,.;s for rucuid irl,y 4, 1937 dt 9;45 A. IA.�Town Clerk.
DhAINA(,E RIGHT OF WAY
KNOW ALL MEN 13Y THE')E ilhESENTS, That We, EDWARD JANSON and EVA JANSON, of thu Towel
of South Windsor, County of Hartford and State of Connecticut, for th, consideration
of One: Dollar, ,•[1d other va.lur,hle considerations received to our full satisfaction u
tht S�nt(- of Cunnecticut, clo give, grant, bargain sell and confirm unto the sf,id Ste e
` of Conntcticut, its successorf; , nd as-signs forever, a full and perpetuH.l right of wa
fur dr;,iiiage purposes over anti across hind of the graiLtors, in the town A South
Windsor, Coaanty of Hartford arLd State ofConnccticut, situated on the west side of
l3c;ldtn Road.
• Said riolit of way being about sixty-five (65) feet northcl ly 1'ro►n ttre East Hart ford-
/� Wapl,1ng Road, and to start from the west side a'f said Belden Road; thence running
wusterly over that area covered by th, natural flow of water from a culvert under sz�. d
OV Bcldon (toad.
`Po, tl,er wrth Liie riLp,ltt to diScriftrge water unto band of --aiti gr<<ntors, with tr,C fur
tliul' rit,ht to tilt. Uxar,te, , its off icers, employees, servants, and agents to enttr on
s;,id pru,aiacs at all times for the purposes of building, cleaming, repairing, repl, c
ii,L, const,acting rand recollstiucting a drain or pipe within staid right ,-if way.
Fur ct ,a,Ul'e J,ft1't1�;alUr lou[atic,n of Lhc above de::cribtd drainage right of way rcfur,,i,c
i t3 auadt- to i, aa;,l, un 1 it c in the office or the State Highway D(,partwent, H;,rt I u d,
C,.,nnt,Cticat, untitled, a' 1'1,ai for consi,ructi„n of Nuaunk River Bridge, and Appi� ua,-hc ,
in thu Towii of South Windsor ttc.aa,
IN '.!ITNES`, VJHr'hEOF, we lea-vc hereunto st.t our th,:nds and seals, t,ds 29th clay of
Apill, A. D. 1937.
Edwr,rd Janson _ (L. S.)
SiL;nud, SUOIL.d tu,d Dt livered i,l
tlit presence of; Eva Janson
i'ct ur 'Poconz s
haymond D.
f
CAPUANO SUBDIVISION PUBLIC HEARING _ �,,� C ca k-?,-
1 . Application for a 30 lot subdivision located on the
westerly side of Beldon Road, southerly side of Governor's
Highway, A-20 zone. This 26.16 acres parcel received a zone
change on from RR to A-20 on 12/05/89 .
2. The proposed lots range in size from just over 1/2 acre to
an acre with one lot 4.5 acres in size. (The large lot is
proposed to have the temple built upon it.
3 . The proposed 30 lots would have frontage on Governor's
Highway, Beldon Road as well as the new road proposed. The three
lots proposed on Beldon Road would have turn-around driveways.
The two lots proposed on Governor's Highway would be serviced by
a common driveway - therefore there would not be any curb cuts
directly on Governor's Highway.
4 . The site is serviced by public water and sewer directly in
Governor's Highway. WPCA approval will be required for this
subdivision.
5 . There is no 100 year f loodplain on the property. The
parcel does contain wetlands and two swales which run through the
middle of the property which are regulated by the IWA/CC. The
applicant has applied to the Zoning Board of Appeals and� has been
granted relief from the 90X90 buildable square requirement in the
80 foot regulated area around the swale.
The applicants have presented thier proposal to the IWA/CC but no
action has been taken on their application.
6 . There are sidewalks proposed for one side of the interior
street (typically we request sidewalks to be placed on both sides
of the streets in new subdivisions. ) The sidewalk plan in the
Town Plan of Development does not specify sidewalks to be placed
on the Governor's Highway or Beldon Road. However, as a possible
trade-off to sidewalks being placed on both sides of the new
streets, the Planning Department suggests that sidewalks be
placed on the the south side of Governor's Highway and the west
side of Beldon Road.
-7,,'W. Open space proposed is 1.77 acres located in the
southwesterly corner of the parcel. The proposed open space is
predominantly wetlands and abuts ftbm&s approximately 10 acres of
land which was set aside under a conservation easement to the
Land Trust with the Governors Square Industrial Park plans. Due
to the environmental nature of this land, it would probably only
be suitable for passive recreation.
If this subdivision is approved, the Planning and
Engineering Departments recommend that the swales be filled in
and not left as open drainage ditches . It hs been our experience
that open drainage swales in close proximity to residences may
serve as a natural breeding ground for mosquitos; may have the
potential to pose a safety hazard for children playing; may at
times contain standing water; and may serve as dumping areas for
residents .
There is a stand of trees which run east-west through the parcel
in an area where one of the swales is proposed to be filled. The
Planning Department requests that specific care be taken in
clearing the trees in these areas to preserve as many of the
trees as possible.
In This application is subject to a buffer requirement along
its boundary with industrially zoned property. The applicant has
shown a buffer located in the rear of lot 28 & 29 . They are
proposing a combination of deciduous trees and shrubs plus
flowering and evergreen trees. There is no buffer is shown in the
open space because it is contiguous to the other wetlands .
The applicant has received approval from the ZBA for
variances to the buffers required for lot #30, in anticipation of
the nonresidential use contemplated at this time. However, for
this subdivision application (and until such time as a site plan
is filed for that lot) a 50 ft buffer should be shown on the
westerly side of lot #30 in the event that it actually ends up
eveloped as a residential lot. If the applicant wants to
include a note on the plan indicating that the buffer is not
applicable if the lot is developed non-residentially, we don't
have a problem with that.
10. A traffic report was prepared as part of the zone change
application in 1989 . This report indicates that the subdivision
will add an average of 308 vehicles in and out of the site a day.
During the am peak they estimate 18 vehicles going out of the
subdivision and 7 vehicles into the site; during the pm peak they
estimate 12 vehicles going out of the site and 21 vehicles coming
into the site. Five existing intersections in the immediate area
were evaluated and it was determined that this subdivision would
have no impact on the current Level of Service for all
intersections except one. The intersection of Route 30 and
Governor's Highway, which will be signalized in the future, will
improve from a LOS of D to C for eastbound traffic during the pm
peak hour and will drop from a LOS of A to B for southbound
traffic during the pm peak.
If this application is approved, in addition to the modifications
requested above, the planning department requests that the
proposed open space be indicated as Town open space.
••{: ::tiff:?:•:{i?%�:%?{?ti? ::?ti%ti:%?{:: �:�ti•.tr{?" %i?••};'•?i::t•'••.•:;•:{(' }}:::?Y;{::'{•:.{{•f'%{?v:{{iti;(:;;?Y:'v:,•`.�'•:i�:?{:
.{i�j:r}}}}}\\};:}}:??}}:}\'•ti?}'•:•S:•?:},,}.,{{ :;{.,T:.}}i}}:}{},a•}.,i;G}?}i:}}TY}#?};}ti}j:.}}'rT}YY}TY}#:!rr,;:.:: ••}:•!.;.}-- -----
'Jig.
- ::.i: ;.}}:ti}:...}.}.\:•Yj•:;S:•fY:•'•f':�A:v>Afr4ti?f}?:•!}i},{S,}}}r:•TT?}?.h•.}};•}y::;•}}}TY:•rY:•:•}i.1}•y;•:• ::•:•:.;.;.<;.�. .;:.}}}
fit} �. �,`ti,�ti.i,,♦y♦„w 0.♦,.t",. .� ..
:rrZ`Ltt s.•i�{r \1?14:1LL}\{{Y .> }`jZ: �•J}{.�{,.y.}.:{{{{���?:,a`•.4•.titi??? '''?{{{'r, -<-4 :X
` ,;} .r..?•1,.})`.?4•.�•:; ,ft:? :;1.}:•.1:1] 4;3,}, {,,;.}}}{�. 4 rr• }4f�::;�>.. a.?. ?:r.;•:•:. .:.
:•:•aj.'{YT${},rfyi}y�::�{:J}i::.$}f{:tijj}}Y}:fjrT}{j:L}::jyy}Sj:•}yy]?:•]::}t:;•r}}f}}r}S:}},.••}t: •:•S::j;:i:}}}};:;.:
•.♦}}h4',• }.???"?};,;,;.:4}{M1:•:hh;,•.y•••.:r?}?}. w•.M;.? :•ahhy,•,�.a w♦h•.}{{M1:♦ •A44„1,•.•.1.y}titi;:;:1:•;•:}•w4•.;•:..,},Y..:.
:\ti{•.}?..h•\,,,4'.• : .1 ,::•.M1•:', S :'�':•� " :� a•,} .4•fVr✓J.•M1 Y•4a;:''•i}'f.••;,•.y,::. J•,J,•;.•..1•,,,.,}�• .{.
:Y ti•.%'•X2. '':{•:.4M1•.he{{•.",.,:{\ {{ \Z{•:, { .ZC•{`.< 4a4•,•'}'{•.. .y. .: •:{•.{{:,,{!,' :i}.,',}}:.{J;,•{:
:::}}}•.,y{}}{'.4yy1•.:}{}}y+ti •h••'' '• •"'.'�....•••'• .}}. 'vl} }}Y; ; j:,jj;•J}jj y�.};: :;:�} ,
:r•:a ::•:;r'r,:}.?;:,4•,i,•'ti��riS"., r�a,1 , ��ti.; R } .2:r:ti'1 J. :•.:Yr.{*!'{ •,;}•{}11TT;i?j}ji{T•'T}';:}�.•{7}':=:::1
:i#}A}y:•j}rT}r.f{}Y w}}:}}}T:i sY }3.::#Y:•f �}Y}}J1t f}1.T:•... .fy aT.T.fr f}}}k}1.{4.1}r..5.: J}{.{:t �fa;:ti�}}
.;}Y}:]f}TT:::•:•}}:}::}}a:•}}}YT}:,}>}:}}YY}};,}yi}}}}}}};. ::}<}}}}}}y;.;.}}f}:•:•YT?},
4}y::L\'.•:::,•:h ".1LM14•:,;•::�. '•',• ••;.;r;:.;J:.J,y4.;rJNy.,}�\ •,•r.\L?i?:•r''r�;�L'',
�. :•{yti:•:• .•}.,\{~•{..ti?"`{•:}}y •.:%�( •. . ~..\•2.::.ti r A.yy};,}r[,.(aj!J.•♦.iti{•::•::;•,y4„•. ... }'?i;:::�:5 r{ ••:•.
122t,,.{.,1•fr:{.;�'•{�'•y1.`,t\,,{:;:}±�::{ Y{\�\{:i{{•:%{ti•i.:±�{%{{�~\{:i{\{,:{{f�%{\••{'j}\•.,ati•'L�'h1♦4:\{ti•{.'::L::•:}L'.~L'{V•.1h\{{•.',.'L{1•:
'rf}};::::•}}}.l:j;,.y{.fF'fY?'ri j}fj}:•Y,T y:.j•:•. .j::jj;,...•. :}.f j;..'•:a.f1:•}.•,j• h•i::\:..j::,{titi:;.;.........,:• ..:•r'•:•:f.M1;.j:•:;:
:.}1}•:•:.•.:,•,;,;,}.:,}••:,,••4..•.:}•.1•.•.;,;.4;,;,•,1;:,41•,'r..•:,,� Y 4{\'::•1\•.y'(L•..}•.\1;r,{'•{•,{:ti.;,4•.4•,;:.,{•.{1•:'a•.ti..•:,:'Y:•.•.14'..••:':•.•
i{2{}'•{;�r{{::z{f{`S 1?.Y}•':{•:L{{i~•}?r{1:4{ ,;•:`.J:Y•'.�'{'",:{?{:,iZ''{yYY ........{,.:ti•\}4:.4L\•:\' y:{?•:,:?:'•'•".•;:'',
.:}.}:}}•:.�•.\}}•.::}}:y}>T•:fv:y}}}:..:}yt}y::};•.•.y}:}:,.•.?STfkT \.r„??'r5#�{}�•:M1•.h.!v.}�4;.\{?�,::}:.,4Jra).. }`{::••1.a:. +{{.1.i,•?
•'•}r?�YffT}f?>}]}}y}y.j.:f}}}}};:.}}}}•.{j':.;:ra}j;.j;;:µ:};.y:•}}, �!f .,\:y,x} 4}\1\} v
:.,f,•: ,w,,.,y,4har;:y w, .. ••��.. .... t"' :•sy4y;s Y.,4. ryy.;:• {}:{i:�'.''�::{5:;:•Y:;:;}Y:�:
M1{l�"::; ':CY~�i•:}tih{#K\4.'''4�:{\{h21{}•'•'J4T#\t:♦%•j•'}>:,\;:{#'::}{>4f6\}`j}•"j;`.}r•{:�•?\%`•'}~•'':\>.••''•,\1;?�{y JM1.{}?4{L\4{:{{:..:{:
4Y.f];::;::trf'• :T}F:f:?};k�f:,•.rSF�3fr3'>:S•?..3}r{.Z.;#?}.::�.��a::{JY,.•}JiS..C�:•Jri}_:,`:rr,}}#�.{;:ri•44?Hrk;:y;}••jTrS:>,:. .1y:y1}:•.}}}:•.,v'
:.}}rr•:;:a;.?jr +y}}}};};.:}}rA�.j}Y}:}y}}#T}}.;yr•.y j•:..•:•..}ff;;.yYrsfr,#:}}}}y%•..}}•.}}}4 1y.:rfA•:;r::4r •f1}rr:Y:•:>fi A:.f:•ff?}};:fy;:
:i�?,4aL::�••..:{:::♦:?ti::{:•♦,:?i:?wti:�,'::`:5,4.f:r:'�{:!��•'��{'{'t`i4{,rv,.L;w4:sy.;:}y�}•}}??.♦�:'":a`�?7,?,:;}�4?ti.4,:{;r.'::;:�::iT%: }M1:;•.4;.ti;.?;.:
�� ::\:{}} \:'�'•:�;Y\ti{�•'1ti`'\4%L:�''�,{4j �';�4%�)1�>.'}`2{: i2\ .. :{.... •.L�}•
•>:}}}$'•... .r.. ]. T:. r. .4a} r. �}. :}�J}f.#.�#}�}}T�7�k#}%:2�}i::};.�..}:•fiJr•�y}u}\yy.}•.ik}Z..:.<}Y.Y}
;.}}))j:•'i»:'}}?j\yY.:,??jfYrr:•Yi%:•}},}w:•?}r':.{n,}:•:•ti4,}T}•'v.''••,}•;Y•.}K}h`�,}„TN{}±ijy}TT:4?::.tij}.�}�.•,1}}:}r}µ Y}'4.•'`}+}\}}•.?y:}}},.L4;.;.{j::ti•:j
:-•} 4? ::M1♦ •w,}}♦•rr.w}. 4,♦•. 4 '4.:•r 1•r.4yr 44}ti�a•4 '"'4+.\Y::{•''':'• •.}.'.::'?::•
�Y::: ..{:i:{�'•.;{•\ a:•. .y\,: }h? '},.} }••♦ti{iti•• S:;�:??ti`'�ti ,$•,•A:.y.•r•+♦4•'y y ♦>•?�~??�.y { \
'•f'•.�j'�•;:"i4}}aT';r::.y:y{}\•.{ x r }} \y} •:.`{:},�:d?,y}}:f::}y:.��••.•.•.}•.{
' ..;'•,�4,'�.T .::��:,4{4•i}•;•r'4• •• ♦ J• ' 4{4 4tia•.ti: ti:{{{•:tirir
''2"'?}•C�::•:{ia?}•:�{yy�1 r Ci?<•.. •., •1•v a ;:??:{ ��'r{a{♦{ 'i• Z�4{•: �•?� 7$y4r{�S}�{''':%:a?:'}% :
'•:}3\{ .y};\<;.f.}�.',� .M1T.Y}}S .#?}}::}<,{,�� �••f iv.� }%•'? j,'•$}}}a.j ;,1{•.y � .,.�f;}i}i}} }4%;:;.}:{}•.}}%;:
:>f]}:}}:•:r}r:•%:•]];r:?Y}S:f}}r•.}{y}})]A:•?}}}M1a';.}.}; .>.:af}{};\}<?}••srfri:• •:•�.'Y};:}}{a,•f�}::•T.J,µ}•{,}•.:„}}}}::•:s}}}titi;.f;.Yf};
}>}:•,4•;.;�`•fi4 r.•� '{4�'n4}•ti•Y:o},w•.}:"'•?ji};: \ '?�•y?} ♦,a•:a� { `a:y:o•:: 4 h: .:.hy':ih.? :2.,{M1;'r'•`.:::{�.
�_ }};•Ny}.;fj{}Tif+'�:•:Y\Sti' }j {•.:ti, } : } f:•?S:}}j}•.:::y:•f'•:•f?:•..{
.yZ,.!.a}ya•.•{y "','•�i.•''r.J'r;y,?.{5:••1{•:. } •{\r;{•}•,'.{}; kj :?J`{ •1 ; }','•••'a,♦i''';i�i:##•`.?:';:t'{'::.;.�,;
11'.•.:L\•,}.}}}}ry{.}1.}.}1':,r ,\.•..}}••}{.''}J,.4•.M1,{}
?:? }. 1.J.}i}:}.•:Z.{'•T#J}.Y'.2 :1<4,{}}\}r} ••}}};•:•S;•;,?{4}::1T:
;.ti.: ]}},Y}}}y '}}}\,4A:•'•Y\ j•.y::•y,,}•:•.{.:1}y•.{u}, tij ;,j";:jY. •.} ;:.:. 1y.♦: •.. '}ya{1\'\•.:}}...Y}L;;:};•}f?f}�• }
a`3:♦M1a •:+, a4 •;z;.. �:s]s, fA4 T A }f A••f. A::Y '.:• .� .::
v{:%:�'L???:i}�??•'•:{7 `h';:Y{i,`.:%%�Lw%`i%}{:.?•:#;;?ti a O]Yr.M1: ♦2 y y>..�ti}}}y!.Y{k�:22,;:{`:::?2?%}?y{��:;{'?�;:5�{:.ti{
•. :•f.• � 2:t:2,1 24YYe aa,l;�ci�Y1.122k:i'2�'{f## f,:••.<;.}•.{•:#} ...wy}}}}, +..}},}A}}.#}♦•.,.y♦.:}}. •.}•r.}a7f4,4} }J1,}yy:•.4}•.1}4 } .{{ y,:M1}},+}�t.\wv.,.1.a}.1..1}
{:..}}}}}},..±}};..?> .. y:}}}.A}f}y.{;....•.::}}{Stii}ti}ff{}cAyJJJf}•.yr.}j$•.t?,4�:}}$;.,:f•:$}.}�t•:r:}f!:}f>;::{{}:•:{fSf.±y.f$•:.yy{•.•:f;:}
:•:1•::1:}':•}.Y�ti•:h}?,•ti\�1:w•,{[};;.N` ,4W+,.M,J'••�4ty((h\4•rwx}ti}4ya':�?�4y4,f1,;y yY•?,:?.x+''1'r,{V•,1},,,•i,\,'S"':•\`''�,�?r h7i}:�'•}:
M1:;i{�i}:,. ..:.vh:•.4•.?•:{{•.}•;LC4`f:?4G{h:},•{Y•'�\~C�i{i{�:.�2�y{y{•�,:\\{\'.:.•.:'{'•"'i{1•.:;;•}kY l{�{{k;.1}\�i�{\ ..:<v.h..:\y{
'?}•.}}}};:iti{:• }•.y}}}}•.•.?•.} r'•f'•>},}•.:.•:}}{}�{}}},{,.#y .}}. f>?T\}:;:•f••}}}:••} •:a: Y#. S. a:•'•a:•... ..
],
:{r}j]?'•aAti}}}jjj;YfTF: f?fr?Tf'r:•°j Yj?}hy{::.y}.:h,+}:.}}?}}ff}:�}S::•jf}tiy 1ti•�}}a{}}};.jf}.••.rj }; .4{j.;: :•:tiv.ij•.•.C}•.:�:.
_ ,i •.:•.}„M1,a}w4♦•.,4.~:•.'y4h,•.y y}4,,....•,ss•: •., ,w4,w4+na, {S.... a4}.
•ti? h•((1} .14:♦,+'.4haya4t:♦1`•: oa:�}•r.:•'.:?•`.h]•:%:_'•)}'fi+4♦`4�a1'{ .4 4.��wtiti'•{:,4,4.;t JyY:.} ♦?•'('}:}2}/';".y4 2}'••*iy,z4•.S;::?•.L}?i:♦y'.
Cy{t.ati�•'::?,S{.\{•:`{\�''1«�?}y�#{{!ti~�:;1y{�?yJ.J;{:;?.•:.�-•Ly}}.�5�{%�%�\�?\�#`}.,%�:;{7J.;{•'�','•,'•,�`14[};:..'\`{r':'4'}��.{{4•:S��T{�41•{..,•\..:i1}
F T,,, •• } }f. }T r. ♦ }T r. YT y� a�:••y., }:r:.
{<:•.v.{{!:..ja}}]}S:.?j:•}.�}}},}r,::}ti1.w+•.,.•.irY4aM::..4.?a4L4�=}...}f}af}yl\•ra9�ti}•J•:t1jA? •1 •W.M,.,/j Y}}T41i•:f:i}}}ryYT'Trwi+:i+.�•::14
prepared for
CAPUANO DEVELOPERS
ROCKY HILL, CONNECTICUT
May 11 , 1990
BELDON ROAD SUBDIVISION 1
STORMWATER RUNOFF ANALYSIS
INTRODUCTION
The Beldon Road Subdivision is located at the
intersection of Governor ' s Highway to the north and Beldon
Road to the east . The parcel is 26. 16 ac . in an A-20 zone.
— The subdivision consists of 30 lots and approximately 2,366
ft: of roadway. All lots will be serviced by local
utilities.
EXISTING CONDITIONS
The drainage area consists of land north of the proposed
subdivision and land easterly to the intersection of Ellington Road and
Governor's Highway and southerly to the Podunk River (see page #13) .
The total drainage area is 131.9 ac.
The land located to the north of Governor's Highway is mainly flat
undeveloped land containing numerous ponding areas. In modeling this
area for runoff conditions three basins were used to simulate the
natural runoff from this area. Basins 1 and 3 are ponding areas where a
— relatively large amount of land drains into. Outflow from these areas
was modeled as a broad crested weir. Basin 2 is the ponding area at
the 18" RCP near Governor's Highway. As runoff water ponds behind the
pipe it eventually rises to a point where it flows west out of the
drainage area through cross section 2. Once water enters the 18" RCP it
travels through the storm sewer system to the Podunk River approximately
29000 ft. away. Refer to sheet 2 of 4 of the drainage area maps.
The triangular drainage area bounded by Beldon Road, Governor 's
Highway, and Ellington Road flows to a 24" pipe in a headwall just
upstream from the Podunk River.
BELDON ROAD SUBDIVISION 2
STORMWATER RUNOFF ANALYSIS
The area lying west of Beldon Road consists of bare soil and some
crop residue. Two flat drainage ditches were dug in the past to drain
the fields and are now intended to carry water into the Beldon Road
storm sewer system. Each of the swales was modeled as a detention
basin. As was the case in basin 2 the water ponds at the outlet of
basin 7 and rises to an elevation where it leaves west from the drainage
area through cross-section 3.
PROPOSED DEVELOPMENT
The proposed development consists of the construction
of 2,366 ft . of roadway and 30 building lots. Also , the
storm sewer system from the existing headwall near the
Podunk River to the subdivision will be upgraded . The two
drainage ditches will be filled in and storm sewer pipe will
be installed to more efficiently carry runoff from offsite
areas and the subdivision itself to the Podunk River .
There are no detention basins proposed for this subdivision.
DRAINAGE ANALYSIS
The drainage analysis performed was done using the SCS TR-20
Computer Program for Project Formulation Hydrology. Storm frequencies
analyzed are 2, 10, 259 50, and 100 year storms. A type III rain
distribution was used in the analysis. Topography was taken from 100
scale South Windsor Topography maps and from field survey, CGS datum.
The roadway storm sewer system has been designed for a 10 year
storm. In order to evaluate impacts of this development downstream the
principal design point is at the Podunk River approximately 100 ft. w st
of Ellington Road.
BELDON ROAD SUBDIVISION 3
STORMWATER RUNOFF ANALYSIS
Three separate runoff conditions were analyzed in this report.
The first alternate is the existing runoff conditions. Alternate 2 is
with the developed subdivision and possible future development in the
Governor's Square Business Center and the development of lot 30 by
Temple Beth Hillel . Site S of the Governor's Square Business Center and
_ half of site T will drain into a detention basin between the two sites.
The remaining land of site T will drain into what remains of the
existing ditch. Temple Beth Hillel also will provide detention as part
of their site improvements. Alternate 3 is with the developed
subdivision and no offsite development.
Table 1 summarizes the results of the drainage analysis.
LOCATION: Outflow to the Podunk River.
Description Storm Frequency
2 10 25 50 100
exist, runoff-Alt. 1 21 .19 40.37 53.07 63.14 71.69
dev. offsite-Alt. 2 18.47 48.99 65.79 79.53 91 .65
change in peak
outflow -12.8% ?�1.4% 24.0% 26.0% 27.8%
dev. subdivis-Alt. 3 18.28 48.75 65.61 79.30 90.84
change in peak
outflow -13.7% 20.8% 23.6% 25.6% 26.7%
TABLE 1 ,
The following graphs show the preceding results graphically.
11?j
CL
re
t
i
4
24 T t r ► t t 1 t i 1 -7
E ' d a S bd vhsior '
e ], i
2 .19 o t ;flo
u Ri e� i
21 I 1 i ► a 8 ar ` ! '
1
Ex sti n g R ndff
�18 471
DeIv. rut,o I s
18 ! }
15
•c12 ► i ! i i �-
0 I 1,9 i
6 }— i
3
i
I
0 0 1 2 3 4 5 6 7 8 9 10 11 12 13141516171819 20 2122 23 24 25 26 27 28 29 30 3132 33 34
Time in Hours
52 t I gig �- - 1 � - &,a�
Runofig t Po uAk ver
} 10 ai of n
0 3 Ex sfi g Runci f
` I - ,De . 'Ru oif-
39 I -
U �
3
_O
L�
13
II I I I ► � i �
0 0 1 2 3 4 5 6 7 8 9 10 11 1213141516171819 20 2122 23 24 25 26 27 28 29 30 3132 33 34
Time in Hours
5
— 68 T I 5 79 T
B113n� Ro b *sion
R ff t o r
i ! -
c i 5 7
53 0 Ex stf g R n f
De Ru o
51
U
•S34 - -
3
o i
17
0 0 1 2 3 4 5 6 7 8 9 10 11 1213141516171819 20 2122 23 24 25 26 27 28 29 30 3132 33 34
Time in Hours
79.53
80
11
B I el n o b i i i n
R off t od r
70 63 14 Ex stii g R in off
De . Ru o f
60 -
u)5040
-
4--
U �
3
0
—LL-30 - -
— 20 -
10 - -
_ 0 0 1 2 3 4 5 6 7 8 9 10 11 1213141516171819 20 2122 23 24 25 26 27 28 29 30 31323334
Time in Hours
6/
91.65
92
� i �-
Bel 0 b i�l- i
+t� Rim"off ti od er
..0 sto
-7 T'.6 Ex'sIg RL noff
Dev. 'Runo f
69
.S46
23
�_ l_ _I_ . l_ _ �_ _ _ - i_ _ _l_ . _ 1-
I-
0 0 1 2 3 4 5 6 7 8 9 10 11 1213141516171819 20 2122 23 24 25 26 27 28 29 30 3132 33 34
Time in Hours
24 T T
21 .19 Mom Road S Sia.-I
RU201f o PCd Rive
21 a e r at
!E ti R n ff
18.2E
S no
18
15 i I �-
-S12
0
LL- 9
6
3
0
0 1 2 3 4 5 6 7 8 9 10 11 1213141516171819 20 2122 23 24 25 26 27 28 29 30 3132 33 34
Time in Hours
52 j 8175
1 Beldon o 'jb i�i1
R fit .o der
�- 10
_ t Ex stiF� Runoff
' 0371
' Sub. o f
39co
-
U f
'.E-26 - ! -
3
0
LL- -
— 13
0 0 1 2 3 4 5 6 7 8 9 10 11 1213141516171819 20 2122 23 24 25 26 27 28 29 30 3132 33 34
Time in Hours
68 -
Beldon Rokal bJILj' i i n
R fit di4 r
25 ym. a torm,
53 0 Ex sti g R n f
— Su . R o f
51 - -- --
in
v
—.S34 - -
3 INS
0
—LL- -
17
0 0 1 2 3 4 5 6 7 8 9 10 11 1213141516171819 20 2122 23 24 25 26 27 28 29 30 3132 33 34
— Time in Hours
8
79.30
80 T T
B'eld8n,, Ito C. lb i *1 n.
i Rani'off t PO rilo r
70 , 0 y - Olma
163i 14
Ex t' I
mg : ru o
if
ISu RUno f
60
cn50
40
1 i ; f
0
U-3 i i I ° I I � r � I � � I + ( `
` ! '
30
20
� s I l l ( { i I I I �
0 1 2 3 4 5 6 7 8 9 10 111213141516171819 20 2122 23 24 25 26 27 28 29 30 3132 33 34
Time in Hours
90.84
921 1 i ! 1 1 1 1 l � I
Bel,d b�i
lon .0 C. b li 1,,;i n
R moff W I o I er
00 3tea r
i I 1 711.69 Ex sti Run ff
69 Sub. l4nol
•S46
0
LL-
23
i � � I_ ! i . I �_
10
0 1 2 3 4 5 6 7 8 9 10 11 1213141516171819 20 2122 23 24 25 26 27 28 29 30 3132 33 34
Time in Hours
9
The following schematic drawings represent the runoff analysis
performed. Refer to sheets 1 through 4 of Drainage Area Maps for
structure locations.
10
O
• 6b.
O•
1 �
2
oo?�e
'•?3 6
0
ye •0?8�r, ��?
79".0 qD?a
ts
'0
o ,
?8 4
u
LEGEND
0.029 Drainage area—*% mL
60.0(1.01) Runoff Curve Number(Tlme f cone)
500 Reach Length — Feet
[0.4] [1.33] [End Area Coeff. X] [EVonent(M)]
6
—`-- Structure Number
---�-- Dlverelon Structure
Refwwce Locatlon Number or
Cross Section Number
ALTRRNATE 1 — RESTING RUNOFF CONDITIONS
11
o �ti
3 p• •
JQ
O
T
�► ! `/ ' •
o � ,
2
8
_ 6
0•CII64
0.
a3 7
0
re 10
0. os�
o•
�o •
' o
.?e 4
u
LEGEND
0.029 Orahage area—sq. mL
60.0(1.01) Runoff Curve Number(lhme of cons)
— 300 Reach Length — Feet
[0.4] [1.33] [End Area Coeff. x] [Exponent(a)]
6
-- -- Structure Number
--�— Dtvrrsion Structure
_ Reference Location Number or
Goss Section Number
ALTERNATE 2 — DLYEWPSD MUM
RUNOFF CONDITIONS
12
s •o
3
o 1
0
. c
DIY
� k
1 1
2
oo�e�
• 6
lei 7
o,
�, ab
3
1
.r g o0 05�
1•
�3
soo. 0•, o.
4
6
u
LEGEND
0.029 Drainage area—sq. ml.
60.0(1.01) Runoff Curve Number(Time of conc.)
500 Reach Length — Feet
0.4] [1.33] [End Area Coeff. X] [Exponent(M)]
6
---�— Structure Number
---♦-- Diversion Structure
Reference Location Number or
3 Cross Section Number
ALTERNATE 3 — DEVELOPED SUBDIVISION
RUNOFF CONDITIONS
04,0
so 0� 13
--90
rick W,
ypo A Ctear tutp clo
• (Hartfo Gr %ate Cen
slat n
S TR
IT
1/1 :m 2 _ , _ , _
ig
%
A :, w r►
3
19
0-
%Ind ioj r,
tu
�OAD
t
7
(30)
o
%
so,
A••//, ,�r7 , 24
i
C _0
)YO
r?
�171
��((-4!
d
0
xcla Ru
I pitu"
17
IC)
T
100—
op
ivef.ln:
h
Z-f
Q
,V. 0% - 1, ,�V
101,
,c ,, \ � ,� '✓G,-:•-;.is?. •• ;. 11l �I ,� /
4%
) f
0
0
.4
N
lr4am
illuit±f 'A •STEr
c
FIRC A r,r 9
0
pop I
96
file old
urs
%
APPENDIX A
TR-20 LISTING AND INPUT DATA
1
# xit t ss at+ft 80-80 LIST OF INPUT DATA FOR TR-20 HYDROLOGY******************
JOB TR.-20 SUMMARY NOPLOTS
TITLE 001 RELDON ROAD RUNOFF ANALYSIS - S. WINDSOR
TITLE EXISTING RUNOFF CONDITIONS
5 RAINFL 7 0.20
9 0.0 0.002 0.004 0.006 0.008
8 0.010 0.012 0.014 0.016 0.018
8 0.020 0.022 0.024 0.027 0.029
9 0.031 0.034 0.036 0.039 0.041
8 0.043 0.046 0.049 0.051 0.054
8 0.057 0.060 0.063 0.066 0.069
9 0.072 0.075 0.079 0.082 0.085
8 0.089 0.093 0.097 0.103 0.109
9 (1.115 0.121 0.127 0.134 0.140
9 0.148 0.155 0.163 0.171 0.190
8 0.199 0.199 0.210 0.222 0.235
_ 9 0.250 0.266 0.297 0.312 0.363
9 0.500 0.638 0.609 0.714 0.734
9 0.751 0.766 0.779 0.790 0.801
8 0.811 0.821 0.929 0.839 0.845
8 n.953 0.860 0.867 0.874 0.890
0 0.896 0.892 0.898 0.903 0.909
9 0.911 0.915 0.919 0.922 0.925
8 0.929 0.932 0.935 0.938 0.941
9 0.944 0.946 0.949 0.952 0.955
9 0.957 0.960 0.962 0.965 0.967
_ 8 0.969 0.972 0.974 0.976 0.978
9 0.991 0.983 0.985 0.997 0.999
9 0.991 0.993 0.995 0.997 0.999
9 1.000 1.000 1.000 1.000 1.000
9 ENDTBL
2 XSECTN 002 1.0 82.0
8 80.4 0.0 0.0
8 81.0 9.62 8.25
8 82.0 64.16 32.00
3 EIIDTPL
_ 2 XSECTN 003 1.0 76.5
8 76.3 0.0 0.0
8 76.4 0.473 1.04
8 76.5 1.524 2.16
9 ENDTBL
3 STRUCI 0l
8 80.3 0.0 0.0
8 80.9 0.001 0.78
8 81.0 7.65 0.99
9 81.1 23.24 1.22
9 81.2 45.63 1.48
8 91.4 110.85 2.06
8 92.0 485.66 4.37
9 ENDTBL
2 STRUCT 02
8 77.53 0.0 0.0
9 78.0 0.9 0.003
8 79.0 6.6 0.165
9 79.5 Q.5 0.596
8 80.0 12.0 1.604
0 011, p1,
2
LIST OF INPUT DATA
8 81.0 15.7 6.651
9 ENPTPL
3 STRUCT 03
8 81.7 0 t).(1
8 82.0 1 0.013
? 92.1 0.002 0.055
? 82.5 0.003 0.796
g 22.6 33.2 1.111
9 ENDTP!
? STRUCT 04
8 51.14 0.0
8 52.0 2.9 0.005
8 54.0 2(l.4 0.039 .
8 56.0 30.3 0.113
8 58.0 37.1 0.329
8 60.0 42.7 0.802
q FNDTBL
3 STRUCT 06
8 74.05 0.0 (i,f►
8 75.0 3.0 0.005
8 75.5 6.1 0.021
8 7E.0 9.1 0.081
8 76.` i1.2 0.202
8 78.0 15.5 0.974
8 78.0 17.3 4.409
9 EWTPL
3 STRUCT 07
8 72.25 0.0 0.(►
8 73.(► 1.7 0.(ifi�
0 73.5 4.0 0.014
? 74.0 6.2 0.057
? 74.5 7.7 0.155
? 76.0 10.6 0.7E5
R 76.3 11.1 1.0`7
8 79.0 13.5 3.017
9 tNDTPL
3 STRUCT 08
8 73.49 0.0 0.'11
8 74.0 0.8 0.002
8 75.5 7.0 0.032
9 ENDTBL
6 RUNOFF 1 01 5 0.022 69.0 0.58
6 RESVOR 2 O1 5 6
6 REACH 3 001 6 7 1400.0 0.4136 1.5069
6 RUNOFF 1 03 5 0.0108 75.0 0.24
6 RESVOR 2 03 5 6
6 REACH 3 001 6 5 1700.0 0.4860 1.5069
6 RUNOFF 1 02 6 0.0719 67.0 1.38
6 ADDHYD 4 02 7 5 4
6 ADDHYD 4 02 4 6 7
6 RESVOR 2 02 7 6
6 DIVERT 6 02 6 7 1 0.072 2.
6 SAVMDV 5 02 7 1
6 RUNOFF 1 06 5 0.0216 73.0 1.23
6 RESVOR 2 06 5 4
6 RUNOFF 1 07 ` 0.0289 76.01 1.32
6 RESVOR 2 07 5 7
6 DIVERT 6 07 7 6 5 0.066 3.
r, ennuvn & Al 4 R a -
3
LIST OF INPUT DATA (CONTINUED)ffff#f#fff#f##f##ff###
6 RUNOFF 1 08 5 0.0025 79.0 0.27
6 RESV9R 2 OB 5 6
-- 6 ADDHYD 4 OB 6 3 2
6 ADDHYD 4 OB 2 1 3
6 RUNOFF 1 04 5 0.0453 59.0 0.49
6 RESVOR 2 04 5 6
6 RUNOFF 1 009 7 0.0031 50.0 0.28
6 ADDHYD 4 OOB 6 7 2
6 ADDHYD 4 00B 2 3 1
ENDATA
7 I NEREM 6 0.1
7 COMPUT 7 01 009 3.2 1.0 7 2 01 02
ENDCMP 1
7 COMPUT 7 01 00B 4.7 1.0 7 2 01 10
ENDCMP 1
7 COMPUT 7 01 OOB 5.5 1.0 7 2 01 25
ENDCMP 1
? COMPUT 7 01 008 6.2 1.0 7 2 01 50
ENDCMP 1
7 COMPUT 7 01 00B 6.9 1.0 7 2 01 99
ENDCMP 1
ENDJOB 2
OF BO-BO LIST#is##fff.#f#Efff.##f####fff*ffff
4
SUMMARY TABLE 1 - SELECTED RESULTS OF STANDARD AND EXECUTIVE CONTROL INSTRUCTIONS IN THE ORDER PERFORMED
(A STAR(*) AFTER THE PEAK, DISCHARGE TIME AND RATE (CFS) VALUES INDICATES A FLAT TOP HYDROGRAPH
A QUESTION MARK(?) INDICATES A HYDROGRAPH WITH PEAK AS LAST POINT.)
SECTION/ STANDARD RAIN ANTEC MAIN PRECIPITATION PEAK DISCHARGE
STRUCTURE CONTROL DRAINAGE TABLE MOIST TIME ------------------------- RUNOFF ------------------------
--------------
ID OPERATION AREA # COND INCREM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE
(99 MI) (HR) (HR) (IN) (HR) (IN) (FT) (HR) (CFS) (CGM)
ALTERNATE 1 STORM 2
STRUCTURE 1 RUNOFF .02 7 2 .10 .0 3.20 24.00 .73 --- 12.49 5.54 251.7
STRUCTURE 1 RESVOR .02 7 2 .10 .0 3.20 24.00 .07 80.90 22.40? .28? 12.6
XSECTION 1 REACH .02 7 2 .10 .0 3.20 24.00 .06 --- 23.20? .25? 11.3
STRUCTURE 3 RUNOFF .01 7 2 .10 .0 3.20 24.00 1.09 --- 12.25 6.12 566.4
STRUCTURE 3 RESVOR .01 7 2 .10 .0 3.20 24.00 .00 --- .ti0 .00 .0
XSECTION I REACH .01 7 2 .1G .0 3.20 24.G0 .OG --- ,r►rt ,Ora
STRUCTURE 2 RUNOFF .07 7 2 .10 .0 3.20 24.00 .69 --- 13.12 9.90 137.7
STRUCTURE 2 ADDHYD .03 7 2 .10 .►"► 3.20 24.00 .04 77.69 23.20? .25? 7.6
STRUCTURE 2 ADDHYD .10 7 2 .10 .0 3.20 24.00 .49 79.58 13.12 9.90 94.6
STRUCTURE 2 RESVOR .10 7 2 .10 .0 3.20 24.00 .49 79.14 13.69 7.40 70.6
STRUCTURE 2 DIVERT .01 7 2 .10 .0 3.20 24.00 6.74 79.14 13.69 7.40 991.2
XSECTION 2 DIVERT .10 7 2 .10 .0 3.20 24.00 .00 --- .00 .00
STRUCTURE 6 RUNOFF .02 7 2 .10 .0 3.20 24.00 .98 --- 12.93 5.11 236.7
STRUCTURE 6 RESVOR .02 7 2 .10 .0 3.20 24.00 .98 75.33 13.00 5.08 23C.
5.0
STRUCTURE 7 RUNOFF .03 7 2 .10 .0 3.20 24.00 1.15 --- 12.98 7.91 273.8
STRUCTURE 7 RESVOR .03 7 2 .10 .0 3.20 24.00 1.15 74.20 13.32 6.81 235.7
STRUCTURE 7 DIVERT .00 7 2 .10 .0 3.20 24.00 17.45 74.20 13.32 6.91 3571.7
XSECTION 3 DIVERT .03 7 2 .10 .0 3.20 24.00 .00 --- .00 .00 .0
STRUCTURE 7 ADDHYD .02 7 2 .10 .0 3.20 24.00 2.32 76.68 13.09 11.64 495.2
STRUCTURE 8 RUNOFF .00 7 2 .10 .0 3.20 24.00 1.34 --- 12.26 1.72 686.2
STRUCTURE 8 RESVOR .00 7 2 .10 .0 3.20 24.00 1.33 74.21 12.31 1.65 659.2
STRUCTURE 8 ADDHYD .03 7 2 .10 .0 3.20 24.00 2.22 76.70 13.07 11.95 459.3
STRUCTURE 8 ADDHYD .03 7 2 .10 .0 3.20 24.00 3.24 79.35 13.17 18.80 560.3
STRUCTURE 4 RUNOFF .05 7 2 .10 .0 3.20 24.00 .37 --- 12.51 4.63 10?.3
STRUCTURE 4 RESVOR .05 7 2 .10 .0 3.20 24.00 .77 52.20 12.53 4.64 102.3
XIECTION 8 RUNOFF .00 7 2 .10 .0 3.20 24.00 .13 --- 13.10 .04 12.5
XSECTION 8 ADDHYD .05 7 2 .10 .0 3.20 24.00 .36 --- 12.53 4.67 96.5
XSECTION 8 ADDHYD .08 7 2 .10 .0 3.20 24.00 1.54 --- 13.05 21.19 258.6
ALTERNATE 1 STORM 10
STRUCTURE 1 RUNOFF .02 7 2 .10 .0 4.70 24.00 1.67 --- 12.45 13.97 636.1
STRUCTURE 1 RESVOR .02 7 2 .10 .0 4.70 24.00 1.00 80.95 13.29 4.11 196.7,
XSECTION 1 REACH .02 7 2 .10 .0 4.70 24.00 1.00 --- 13.72 3.57 162.2
STRUCTURE 3 RUNOFF .�-1 7 2 .10 .0 4.70 24.00 2.21 --- 12.23 12.42 1150.4
STRUCTURE 3 RESVOR .01 7 2 .10 .0 4.70 24.00 .B2 82.50 13.90 1.31 121.0
XSECTION 1 REACH .01 7 2 .10 .0 4.70 24.00 .82 --- 14.60 1.0b 98.5
STRUCTURE 2 RUNOFF .07 7 2 .10 .0 4.70 24.00 1.60 --- 13.04 26.16 363.9
STRUCTURE 2 ADDHYD .03 7 2 .10 .0 4.70 24.00 .94 78.57 13,99 4.13 12`.9
STRUCTURE 2 ADDHYD .10 7 2 .10 .0 4.70 24.00 1.39 84.70 13.14 27.41 261.8
STRUCTURE 2 RESVOR .10 7 2 .10 .0 4.70 24.00 1.39 80.09 14.68 12.38 119.3
STRI!CTIIRF 2 DIVFPT -01 7 10 1 A A 4 76 P4 Ai1 19 Qa PA AQ 1 L kq 17 130 i LhO 0
5
SECTION/ STANDARD RAIN ANTEC MAIN PRECIPITATION PEAK DISCHARGE
STRUCTURE CONTROL DRAINAGE TABLE MOIST TIME ------------------------- RUNOFF --------------------------------------
ID OPERATION AREA # COND INCREM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE
(SB MI) (HR) (HR) (1N) (HR) (1N) (FT) (HR) (CFS) (Csm)
ALTEWTE 1 STORM 10
XSECTION 2 DIVERT .10 7 2 .10 .0 4.70 24.00 .00 --- .00 .00 .0
STRUCTURE 6 RUNOFF .02 7 2 .10 .0 4.71) 24.00 2.05 --- 12.89 11.32 523.9
STRUCTURE 6 RESVDR .02 7 2 .10 .0 4.70 24.00 2.05 76.18 13.19 9.84 455.7
STRUCTURE 7 RUNOFF .03 7 2 .10 .0 4.70 24.00 2.29 --- 12.94 16.37 566.5
STRUCTURE 7 RESVDR .03 7 2 .10 .0 4.70 24.00 2.29 75.52 13.67 9.6B 335.0
STRUCTURE 7 DIVERT .00 7 2 .10 .0 4.70 24.00 34.70 75.52 13.67 9.88 5075.0
XSECTION 3 DIVERT .03 7 2 .10 .0 4.70 24.00 .00 --- .00 .00 .0
STRUCTURE 7 ADDHYD .02 7 2 .10 .0 4.70 24.00 4.70 B2.01 13.33 19.17 B15.3
STRUCTURE 8 RUNOFF .00 7 2 .10 .0 4.70 24.00 2.54 --- 12.25 3.23 1293.9
STRUCTURE 8 RESVDR .00 7 2 .10 .0 4.70 24.00 2.54 74.57 12.29 3.15 1261.1
STRUCTURE B ADDHYD .03 7 2 .10 .0 4.70 24.00 4.49 78.55 13.31 19.62 754.3
STRUCTURE 8 ADDHYD .03 7 2 .10 .0 4.70 24.00 7.92 91.28 13.48 30.87 920.3
STRUCTURE 4 RUNOFF .05 7 2 .10 .0 4.70 24.00 1.07 --- 12.42 1B.27 403.2
STRUCTURE 4 RESVDR .05 7 2 .10 .0 4.70 24.00 1.07 53.75 12.45 18.19 401.E
XSECTION 8 RUNOFF .00 7 2 .10 .0 4.70 24.00 .57 --- 12.30 .62 200.9
XSECTION P ADDHYD .05 7 2 .10 .0 4.70 24.00 1.04 --- 12.44 18.75 387.5
XSECTION 8 ADDHYD .08 7 2 .10 .0 4.70 24.00 3.91 --- 12.52 40.37 492.E
ALTERNATE 1 STORM 25
_ STRUCTURE i RUNOFF .02 7 2 .10 .0 5.50 24.00 2.24 --- 12.44 19.14 870.1
STRUCTURE 1 RESVDR .02 7 2 .10 .0 5.50 24.00 1.59 81.01 12.93 9.37 425.8
XSECTION 1 REACH .02 7 2 .10 .0 5.50 24.00 1.5B --- 13.22 7.93 355.9
STRUCTURE 3 RUNOFF .01 7 2 .10 .0 5.50 24.00 2.86 --- 12.23 16.09 1499.8
- STRUCTURE 3 R,ESVOR .01 7 2 .10 .0 5.50 24.00 1.47 B2.51 12.69 4.52 418.5
XSECTION 1 REACH .01 7 2 .10 .0 5.50 24.00 1.47 --- 13.10 2.97 274.5
- STRUCTURE 2 RUNOFF .07 7 2 .10 .0 5.50 24.00 2.16 --- 13.01 36.27 504.4
STRUCTURE 2 ADDHYD .03 7 2 .10 .0 5.50 24.00 1.54 79.75 13.20 10.73 327.2
STRUCTURE 2 ADDHYD .10 7 2 .10 .0 5.50 24.00 1.97 90.70 13.09 46.42 443.3
STRUCTURE 2 RESVDR .10 7 2 .10 .0 5.50 24.00 1.97 80.52 14.96 14.17 135.3
STRUCTURE 2 DIVERT .01 7 2 .10 .0 5.50 24.00 27.16 BO.42 15.00f 13.86* 1B38.7
XSECTION 2 DIVERT .10 7 2 .10 .0 5.50 24.00 .01 BO.42 15.00? .31? 3.2
- STRUCTURE 6 RUNOFF .02 7 2 .10 .0 5.50 24.00 2.6B --- 12.87 14.96 6T2.8
STRUCTURE 6 RESVDR .02 7 2 .10 .0 5.50 24.00 2.68 76.62 13.31 11.54 534.1
STRUCTURE 7 RUNOFF .03 7 2 .10 .0 5.50 24.00 2.95 --- 12.93 21.24 734.9
STRUCTURE 7 RESVDR .03 7 2 .10 .0 5.50 24.00 2.95 76.1E 13.80 10.90 377.3
STRUCTURE 7 DIVERT .00 7 2 .10 .0 5.50 24.00 44.77 76.18 13.90 10.90 5716.8
XSECTION 3 DIVERT .03 7 2 .10 .0 5.50 24.00 .00 --- .00 .00 .0
`- STRUCTURE 7 ADDHYD .02 7 2 .10 .0 5.50 24.00 6.09 84.21 13.45 22.27 947.5
STRUCTURE 8 RUNOFF .00 7 2 .10 .0 5.50 24.00 3.23 --- 12.24 4.09 1638.0
-STRUCTURE 8 RESVDR .00 7 2 .10 .0 5.50 24.00 3.23 74.77 12.29 3.99 1598.0
STRUCTURE 8 ADDHYD .03 7 2 .10 .0 5.50 24.00 5.92 79.32 13.40 22.79 876.4
STRUCTURE 8 ADDHYD .03 7 2 .10 .0 5.50 24.00 10.61 92.59 13.65 36.31 1082.4
_ STRUCTURE 4 RUNOFF .05 7 2 .10 .0 5.50 24.00 1.53 --- 12.41 27.54 607.9
STRUCTURE 4 RESVDR .05 7 2 .10 .0 5.50 24.00 1.53 55.19 12.49 26.27 580.0
Ycpr T 111N A GImur AA 1 2 IA 11 S c:i► 121. AA o 113 o13 I to one
6
XSECTION 8 ADDHYD .05 7 2 .10 .0 5.50 24.00 1.49 --- 12.40 27.14 560.7
SECTION! STANDARD RAIN ANTEC MAIN PRECIPITATION PEAS; DISCHARGE
STRUCTURE CONTROL DRAINAGE TABLE MOIST TIME ------------------------- RUNOFF --------------------------------------
ID OPERATION AREA # COND INCREM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE
(S9 MI) (HR) (HR) (IN) (HR) (IN) (FT) (HR) (CFE) (CSM)
ALTERNATE 1 STORM 25
XSECTION 8 ADDHYD .08 7 2 .10 .0 5.50 24.00 5.22 --- 12.55 53.07 647.7
ALTERNATE 1 STORM 50
STRUCIURE 1 RUNOFF . .02 7 2 .10 .0 6.20 24.00 2.77 --- 12.43 23.09 1095.7
STRUCTURE 1 RESVOR .02 7 2 .10 .0 6.20 24.00 2.11 81.05 12.77 15.44 701.6
XSECTION 1 REACH .02 7 2 .10 .0 6.20 24.00 2.11 --- 13.03 13.24 601.7
STRUCTURE 3 RUNOFF .01 7 2 .10 .0 6.20 24.00 3.45 --- 12.22 19.36 1792.5
STRUCTURE 3 RESVOR .01 7 2 .10 .0 6.20 24.00 2.05 82.53 12.51 9.96 921.9
XSECTION 1 REACH .01 7 2 .10 .0 6.20 24.00 2.07 --- 12.77 6.64 614.4
STRUCTURE 2 RUNOFF .07 7 2 .10 .0 6.20 24.00 2.68 --- 13.00 45.64 634.7
STRUCTURE 2 ADDHYD .03 7 2 .10 .0 6.20 24.00 2.09 81.97 12.97 18.78 512.5
STRUCTURE 2 ADDHYD .10 7 2 .10 .0 6.20 24.00 2.50 96.37 12.99 64.38 614.9
STRUCTURE 2 RESVOR .10 7 2 .10 .0 6.20 24.00 2.50 80.92 15.20* 15.13f 144.5
STRUCTURE 2 DIVERT .01 7 2 .iO .0 6.20 24.00 33.66 80.47 15.20* 14.02+ 1859.8
XSECTION 2 DIVERT .10 7 2 .10 .tI 6.20 24.00 .09 80.47 15.20* 1.11* 11.5
STRUCTURE 6 RUNOFF .02 7 2 .lip .0 6.20 24.00 3.25 --- 12.86 18.29 946.1
STRUCTURE 6 RESVOR .02 7 2 .10 .0 6.20 24.00 3.25 76.96 13.41 12.53 579.9
STRUCTURE 7 RUNOFF .03 7 2 .10 .0 6.20 24.00 3.55 --- 12.92 25.61 086.3
STRUCTURE 7 RESVOR .03 7 2 .10 .0 6.20 24.00 3.55 '76.54 13.94 11.44 396.0
STRUCTURE 7 DIVERT .00 7 2 .10 .0 6.20 24.00 53.61 76.36 13.90# 11.18* 586t�.44
XSECTION 3 DIVERT .03 7 2 .10 .0 6.20 24.00 .02 76.36 13.90? .267 9.8
STRUCTURE 7 ADDHYD .02 7 2 .10 .0 6.20 24.00 7.34 85.20 13.44 23.67 1006.7
STRUCTURE 8 RUNOFF .00 7 2 .10 .G 6.20 24.00 336 --- 12.24 4.86 1942.6
STRUCTURE 8 RESVOR .00 7 2 .10 .0 6.20 24.00 3.85 74.95 12.29 4.74 18�7.2
STRUCTURE 8 ADDHYD .03 7 2 .10 .0 6.20 24.00 7.00 79.69 13.37 24.29 932.5
STRUCTURE B ADDHYD .03 7 2 .10 .0 6.20 24.00 12.99 83.03 13.41 39.14 1136.9
STRUCTURE 4 RUIIOFF .05 7 2 .10 .G 6.20 24.00 1.97 --- 12.40 36.40 803.5
STRUCTURE 4 RESVOR .05 7 2 .10 .0 6.20 24.00 1.97 56.55 12.53 32.16 709.9
XSECTION 8 RUNOFF .00 7 2 .10 .0 6.20 24.00 1.24 --- 12.30 1.75 563.0
XSECTION 8 ADDHYD .05 7 2 .10 Al 6.20 24.010 1.92 --- 12.50 33.27 607.4
XSECTION 8 ADDHYD .09 7 2 .10 .0 6.20 24.00 6.45 --- 12.64 63.14 770.5
ALTERNATE 1 STORM 99
STRUCTURE 1 RUNOFF .02 7 2 .10 .0 6.90 24.00 3.33 --- 12.43 28.79 1308.7
STRUCTURE 1 RESVOR .02 7 2 .10 .0 6.90 24.00 2.66 B1.09 12.70 21.40 972.5
XSECTION 1 REACH .02 7 2 .10 .0 6.90 24.00 2.66 --- 12.93 19.86 857.3
STRUCTURE 3 RUNOFF .01 7 2 .10 .0 6.90 24.00 4.06 --- 12.22 22.69 2101.0
STRUCTURE 3 RESVOR .01 7 2 .10 .0 6.90 24.00 2.69 B2.55 12.43 15.56 1440.8
XSECTION 1 REACH .()1 7 2 .0 .0 6.90 24.00 2.67 --- 12.66 10.96 1014.6
STRUCTURE 2 RUNOFF .07 7 2 .10 .0 6.90 24.00 3.23 --- 12.99 55.38 770.3
�TRUCTURE 2 ADDHYD .03 7 2 .10 .G 6.90 24,00 2.66 84,76 12.85 27.59 841.2
STRUCTURE 2 ADDHYD .1(1 7 2 .10 .0 6.90 24.00 3.05 101.95 12.92 82.04 793.6
STRUCTURE 2 RESVOR .10 7 2 .10 .0 6.90 24.00 3.05 81.15 15.46 16.17 154.5
STRUCTURE 2 DIVPIRI .01 7 2 J O C. 6.-�fl 24.00 39.29 80.52 15.50* 14.19* 1892.5
Inc Tn" ] "IIrnT i A n n J h n - r Ft.I n, z:. .� •i- •• s
SECTION! STANDARD RAIN ANTEC MAIN PRECIPITATION PEAK DISCHARGE
STRUCTURE CONTROL DRAINAGE TABLE MOIST TIME ------------------------- RUNOFF --------------------------------------
ID OPERATION AREA # COND INCREM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE
(59 MI) (HR) (HR) (IN) (HR) (IN) (FT) (HR) (CFS) (CSM)
ALTERNATE I STORM 99
STRUCTURE 6 RUNOFF .02 7 2 .10 .0 6.90 24.00 3.85 --- 12.96 21.67 1003.1
STRUCTURE 6 RESVOR .02 7 2 .10 .0 6.90 24.00 3.85 77.36 13.49 13.66 632.2
STRUCTURE 7 RUNOFF .03 7 2 .10 .0 6.90 24.00 4.17 --- 12.92 30.06 1040.2
STRUCTURE 7 RESVOR. .03 7 2 .10 .0 6.90 24.00 4.17 76.92 14.06 11.97 414.2
STRUCTURE 7 DIVERT .00 7 2 .10 .0 6.90 24.00 62.13 76.42 14.104 11.27s 5909.4
XSECTION 3 DIVERT .03 7 2 .10 .0 6.90 24.00 .07 76.42 14.10? .70? 25.9
STRUCTURE 7 ADDHYD .02 7 2 .10 .0 6.90 24.00 9.58 86.09 13.50 ?4.90 1059.3
STRUCTURE 8 RUNOFF .00 7 2 .10 .0 6.90 24.00 4.49 --- 12.23 5.63 2251.7
STRUCTURE 8 RESVOR .00 7 2 .10 .0 6.90 24.00 4.49 75.14 12.28 55.50 2198.8
STRUCTURE 8 ADDHYD .03 7 2 .10 .0 6.90 24.00 8.18 79.99 13.43 25.57 983.2
STRUCTURE 8 ADDHYD .03 7 2 .10 .0 6.90 24.00 15.31 83.38 13.47 39.57 1179.5
STRUCTURE 4 RUNOFF .05 7 2 .10 .0 6.90 24.00 2.43 --- 12.39 45.91 1011.3
STRUCTURE 4 RESVOR .05 7 2 .10 .0 6.90 24.00 2.43 58.06 12.57 37.27 822.9
XSECTION 8 RUNOFF .00 7 2 .10 .0 6.90 24.00 1.61 --- 12.29 2.36 761.0
XSECTION 8 ADDHYD .05 7 2 .10 .0 6.90 24.00 2.38 --- 12.54 38.62 798.0
XSECTION 8 ADDHYD .09 7 2 .10 .0 6.90 24.00 7.67 --- 12.67 71.69 074.9
8
SUMMARY TABLE 2 - SELECTED MODIFIED ATT-KIN REACH ROUTINGS IN ORDER OF STANDARD EXECUTIVE CONTROL INSTRUCTIONS
(A STAR(*) AFTER VOLUME ABOVE BASE(IN) INDICATES A HYDROGRAPH TRUNCATED AT A VALUE EXCEEDING BASE -� 10% OF PEAL;
A BUESTION MARK(?) AFTER COEFF.(C) INDICATES PARAMETERS OUTSIDE ACCEPTABLE LIMITS, SEE PREVIOUS WARNINGS)
HYDROGRAPH INFORMATION ROUTING PARAMETERS PEAS:
---------------------------------------------- -----------------------------------------------------------
OUTFLOW+ VOLUME MAIN ITER- O AND A PEAK SID ATT- TRAVEL TIME
XSEC REACH INFLOW OUTFLOW INTERV.AR.EA BASE- ABOVE TIME ATION EQUATION LENGTH RATIO SPEAK K14 STOR- KINE-
----------- ----------- ----------- -----------
ID LENGTH PEAK TIME PEAK TIME PEAK TIME FLOW BASE I4CR � COEFF POWER FACTOR 0/1 (K) COEFF AGE MATIC
(FT) (CFS) (HR) (CFS) (HR) (CFS) (HR) (CFS) (IN) (HR) (X) (M) (Kt) (90 (SEC) (C) (HR) iHR)
ALTERNATE 1 STORM 2
1 1400 0 22.4 0 23.2 --- --- 0 .47 .14 1 .414 1.51 .175 .996 2571 .13 .AA .''3
1 1790 0 ,A 0 ,0 --- --- !► .00 .1(! p .At7p .(!p .pnp .Op(! (, ,r,(! ,(!r, ,fii,
ALTERNATE 1 STORM 10
1 1400 4 13.3 4 13.7 --- --- r, 1.00 .10 l .414 1.51 .fi44 .864 1038 .30 .40 .30
1 1700 1 13.9 1 14.6 --- --- 0 .82 .10 1 .486 1.51 .062 .914 1664 .20 .70 .49
ALTERNATE: 1 STORM 25
1 1400 9 12.9 8 13.2 --- --- 0 1.58 .10 1 .414 1.51 .050 .839 79B .37 .30 .23
1 17AA 5 12.7 3 13.1 --- --- 0 1.47 .10 1 .486 1.51 .090 .656 10911
1 .29 .40 .33
ALTERNATE 1 STORM 59
1 1400 15 12.8 13 12.0 --- --- 0 2.11 .10 1 .414 1.51 .053 .850 666 .43 .20 .19
l 17AO 10 12.5 7 12.9 --- --- 0 2.05 .10 1 .496 1.51 .120 .665 841 .35 .30 .25
ALTERNATE 1 STORM 99
1 1400 21 12.7 19 12.9 --- --- 0 2.66 .10 1 .414 1,51 .052 .878 596 .46 .20 .17
1 1700 15 12.4 11 12.7 --- --- 0 2.69 .10 1 .486 1.51 .123 .708 727 .40 .30 .21
9
SUMMARY TABLE 3 - DISCHARGE (CFS) AT XSECTIONS AND STRUCTURES FOR ALL STORMS AND ALTERNATES
XSECTION/ DRAINAGE
STRUCTURE AREA STORM NUMBERS..........
ID (90 MIl 2 10 25 50 99
STRUCTURE 8 .03
ALTERNATE 1 18.80 30.87 36.31 38.14 39.57
- STRUCTURE 7 .02
ALTERNATE 1 11.64 19.17 22.27 23.67 24.90
- STRUCTURE 6 .02
ALTERNATE 1 5.08 9.84 11.54 12.53 13.66
_ STPUCTURE 4 .05
ALTERNATE 1 4.64 15.19 26.27 32.16 37.27
STRUCTURE 3 .01
- ALIERNATE 1 .00 1.31 4.52 9.96 15.56
STRUCTURE 2 .01
ALTERNATE 1 7.40 12.38 13.86 14.02 14.19
STRUCTURE 1 .02
- ALTERNATE 1 .28 4.11 9.37 15.44 21.40
XSECTIOH 1 .01
ALTERNATE 1 .00 1.06 2.97 6.64 10.96
XSECTION 2 .10
ALTERNATE 1 .00 .00 .31 1.11 1.98
XSECTION 3 .03
ALTERNATE 1 .00 .00 .00 .26 .70
XSECTION 8 .08
ALTERNATE 1 21.19 40.37 53.07 63.14 71.69
- END OF 1 JOBS IN THIS RUN
10
LIST OF INPUT DATA FOR TR-20 HYDRDLOBY***** *****r*t*ff*
JDE TR-20 SUMMARY NOPLOTS
TITLE 001 FELDON ROAD RUNOFF ANALYSIS - S. WINDSOR
TITLE DEVELOPED RUNOFF CONDITIONS
5 RAINFL 7 0.20
8 0.0 0.002 0.004 0.(106 0.008
8 0.010 0.012 0.014 0.016 (!.f)?B
B 0.020 0.022 0.024 0.027 ri,n29
8 0.f31 0.034 0,n36 0,n38 0.041
9 0.043 0.046 0.049 0.051 0.054 .
8 0.057 0.060 0.063 0.066 0.069
8 0.072 t►.075 0.079 0.082 0.085
8 0.09 0.093 0.097 0.103 0.109
B 0.115 0.121 0.127 0.134 t1.140
8 0.14B 0.155 0.163 0.171 0.180
8 0.189 0.199 0.210 0.222 0.235
8 0.250 0.266 0.2B7 0.312 0.363
8 0.500 0.638 0.6B9 0.714 0.734
B 0.751 0.766 0.779 0.790 0.001
B 0.811 0.821 0.829 0.828 0.B45
8 0.953 0.860 0.B67 0.B74 0.BB0
8 0.996 0.992 0.B98 0.903 0.909
8 0.911 0.915 0.919 0.922 0.925
8 t1.929 0.932 0.935 0.938 0.941
B 0.944 0.946 0.949 0.952 0.955
8 0.957 0.960 0.962 0.965 0.967
9 0.969 0.972 0.974 0.976 0.978
B n.781 0.983 0.985 0.907 i1.999
B 0.991 0.993 0,975 0.997 0.999
8 1.000 1.000 1.000 1.000 1.000
9 ENDTBL
2 XSECTN 002 1.(1 82.0
8 B0.4 0.0 t�.0
f? B1.0 9.62 B.25
B B2.0 64.16 32.00
9 ENDTBL
? XSECTN 003 1.0 76.5
B 76.3 0.0 0.0
8 76.4 0.473 1.04
8 76.5 1.524 2.16
9 ENDTBL
3 STRUCT 01
8 91) n.0 A A
B 80.9 0.001 0.7B
9 81.0 7.65 (1.99
B B1.1 23.24 1.22
8 01.2 45.63 1.48
9 B1.4 110.B5 2.06
8 82.0 485.66 4.37
9 ENDTFL
3 STRUCT 02
8 i8.0 0.8 0.003
9 79.0 6.6 0.165
8 79.5 9.5 0.596
A AA 1? 1 A 1) 1 AA4
i!
8 90.4 13.9 3.014
LIST OF INPUT DATA 1CONTINUED)t{F*ffttttttttfttttttt
B B1.0 15.7 6.651
- 9 ENDTBL
3 STRUCT 03
B B1.7 0.0 0.0
- 8 82.0 0.0001 0.013
8 F2.1 0.0002 t+.055
0 B2.5 0.0003 0.796
B 62.6 33.2 1.111
`- G ENDTBL
3 STRUCT 04
8 51.14 0.0 0.0
8 52.0 2.9 0.005 .
8 54.0 20.4 0.039
8 56.0 30.3 0.113
_ B 59.0 37.1 t1.329
8 60.0 42.7 O.BO2
9 ENDTBL
3 STRUCT 06
- 8 74.46 0.0 0.0
B 75.0 0.8 0.046
8 76.0 2.4 0.393
- 8 76.7 3.0 0.857
8 79.0 3.8 1.932
8 79.5 4.1 2.379
_ 9 ENDTBL
3 STRUCT 07
8 73.3 0.0 0.0
8 74,0 0.6 0.016
8 76.0 2.3 0.281
8 78.0 3,B 1.040
9 ENDTBL
3 STRUCT OB
8 74.5 0.0 0.0
B 75.0 0.6 0.036
B 76.0 2.3 0.214
8 77.0 3.2 0.444
8 78.0 3.8 0.705
9 ENDTBL
3 STRUCT 10
B 73.49 0.0 0.0
8 74.0 0.8 0.002
- B 75.5 7.0 0.032
9 FNDTBL
6 RUNOFF 1 01 5 0.022 68.0 0.58
6 RESVOR 2 01 5 6
6 REACH 3 001 6 7 1400.0 0.413E 1.5+069
6 RUNOFF 1 03 5 0.0108 75.0 0.24
6 RESVOR 2 03 5 6
6 REACH 3 001 6 5 1700.0 0.4960 1.5069
6 RUNOFF 1 02 6 0.0719 67.0 1.38
6 ADDHYD 4 02 7 5 4
_ 6 ADDHYD 4 02 4 6 7
6 RESVOR 2 02 7 6
6 DIVERT 6 02 6 7 1 0.072 2.
6 SAVMOV 5 02 7 1
6 RUNOFF 1 06 5 0.0194 77.0 0.26
6 RESVOR 2 06 5 6
6 SAVMOV 5 06 6 2
12
6 RUNOFF 1 07 5 0.0083 13.0 0.90
LIST OF INPUT DATA ICONTIt1UED)+ ?�# fttt; #t+
6 RES%1OR 2 07 5 7
6 RA;,I'll 5 f,7 7 3
6 RUNOFF 1 08 5 0.0036 85.0 0.21
6 RE5VOR 2 08 5 6
6 ADDHYD 4 08 6 2 4
6 RU40FF 1 609 5 A.0253 69.0 0.51
6 ADDHYD 4 009 5 4 7
6 ADDHYD 4 A09 7 3 6
6 RUNOFF 1 10 F A,hoj 3 61.0 (1.18
5RESOR2 105 7
6 ADDHYD 4 A09 6 7 2
6 WHY D 4 009, 2 1 4
6 RUNOFP 1 04 5 0.0453 59.0 0.48
6 RESVnR 2 04 5 6
6 RUNOFF 1 009 7 0.0031 50.0 0.28
6 ADDHYD 4 0(19 4 6 3
6 ADDHYD 4 008 7 3 1
ENDATA
7 INCREM 6 0.1
COMPUT 7 01 Ve 3.2 1.0 7 2 02 02
ENDCMP 1
7 COMPUT 7 01 009 4.7 1.0 7 2 02 10
EMDCMP 1
7 COMPUT 7 01 009 5.5 Mi 7 2 02 25
ENDCMP 1
COMPUT 7 01 008 6.2 1.0 7 2 02 50
ENDCHP 1
7 COMPUT 7 01 Y'S 6.9 1.0 7 2 02 99
ENDCMP 1
ENDJOR 2
+��+s#+sa+fxf*siF �F#!t#E ?Eik+ + t�f#E>vD OF 80-80 LILT+}+ f+ +�tff � +tft + +E�F�t3�F+fst
13
SUMMARY TABLE 1 - SELECTED RESULTS OF STANDARD AND EXECUTIVE CONTROL INSTRUCTIONS IN THE ORDER PERFORMED
(A SIAR(f) AFTER THE PEAK DISCHARGE TIME AND RATE (CFS) VALUES INDICATES A FLAT TOP HYDROGRAPH
A QUESTION MARK(?) INDICATES A HYDROGRAPH WITH PEAK AS LAST POINT.)
SECTION! STANDARD RAIN ANTEC MAIN PRECIPITATION PEAK, DISCHARGE
STRUCTURE CONTROL DRAINAGE IABLE MOIST TIME ------------------------- RUNOFF --------------------------------------
ID OPERATION AREA # COND INCREM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE
(So MI) (HR) (HR) (IN) (HR) (IN) (FT) (HP) (CFS) (CSM)
ALTERNATE 2 STORM 2
STRUCTURE i RUNOFF .02 7 2 .10 .0 3.20 24.00 .73 --- 12.49 5.54 251.7
STRUCTURE 1 RESVOR .02 7 2 .10 .0 3.20 24.00 .07 80.90 22.40? .28? 12.6
XSECTION I REACH .02 7 2 .10 .0 3.20 24.00 .06 --- 23.20? .257 11.3
STRUCTURE 3 RUNOFF .01 7 2 .10 .0 3.20 24.00 1.09 --- 12.25 -6.12 566.4
STRUCTURE 3 RESVOR .01 7 2 .10 .0 3.20 24.00 .00 --- .00 .00 .0
XSECTION 1 REACH .01 7 2 .10 .0 3.20 24.00 .00 --- .00 .00 .0
STRUCTURE 2 RUNOFF .07 7 2 .10 .0 3.20 24.00 .69 --- 13.12 9.90 137.7
STRUCTURE 2 ADDHYD .03 7 2 .10 .0 3.20 24.00 .04 77.68 23.20? .25? 7.6
STRUCTURE 2 ADDHYD .10 7 2 .10 .0 3.20 24.00 .49 79.58 13.12 9.90 94.6
STRUCTURE 2 RESVOR .10 7 2 .10 .0 3.20 24.00 .49 79.14 13.69 7.40 70.6
STRUCTURE 2 DIVERT .01 7 2 .10 .0 3.20 24.00 6.74 79.14 13.69 7.40 981.2
YSECTION 2 DIVERT .10 7 2 .10 .0 3.20 24.00 .00 --- .00 .00 .0
STRUCTURE 6 RUNOFF .02 7 2 .10 .0 3.20 24.00 1.21 --- 12.26 11.50 625.0
STRUCTURE 6 RESVOR .02 7 2 .10 .0 3.20 24.00 1.21 76.06 12.89 2.45 133.1
STRUCTURE 7 RUNOFF .01 7 2 .10 .0 3.20 24.00 .98 --- 12.68 2.40 289.7
STRUCTURE 7 RESVOR .01 7 2 J 0 .0 3.20 24.00 .98 74.64 13.42 1.14 137.7
STRUCTURE 8 RUNOFF .00 7 2 .10 .0 3.20 24.00 1.76 --- 12.20 3.37 936.7
STRUCTURE 8 RESVOR .00 7 2 .10 .0 3.20 24.00 1.75 75.39 12.54 1.26 350.1
STRUCTURE 8 ADDHYD .02 7 2 .10 .0 3.20 24.00 1.30 77.90 12.63 3.69 167.3
XSECTION 9 RUNOFF .03 7 2 .10 3.20 24.00 .78 --- 12.44 7.37 291.5
XSECTION 9 ADDHYD .05 7 2 .10 .0 3.20 24.00 1.02 --- 12.46 10.88 230.0
XSECTION 9 ADDHYD .06 7 2 .10 .0 3.20 24.00 1.01 --- 12.47 11.56 208.0
STRUCT1RE if) RUNOFF .00 7 2 .10 .0 3.20 24.00 .44 --- 12.30 .25 188.9
STRUCTURE 10 RESVOR .00 7 2 .10 .0 3.20 24.00 .44 73.65 12.30 .25 190.8
XSECTION 9 ADDHYD .06 7 2 .10 .0 3.20 24.00 1.00 --- 12.46 11.73 206.1
XSECTION 9 ADDHYD .06 7 2 .10 .0 3.20 24.00 1.67 --- 13.00 14.31 222.1
STRUCTURE b RUNOFF .05 7 2 .10 .0 3.20 24.00 .37 --- 12.51 4.63 102.3
_ STRUCTURE 4 RESVOR .05 7 2 .10 .0 3.20 24.00 .37 52.20 12.53 4.64 102.3
XSECTION 8 RUNOFF .00 7 2 .10 .0 3.20 24.00 .13 --- 13.10 .04 12.5
XSECTION 8 ADDHYD .11 7 2 .10 .0 3.20 24.00 1.14 --- 12.54 1B.44 169.1
XSECTION 8 ADDHYD .11 7 2 .10 .0 3.20 24.00 1.11 --- 12.55 18.47 163.7
ALTERNATE 2 STORM 10
STRUCTURE I RUNOFF .02 7 2 .10 .0 4.70 24.00 1.67 --- 12.45 13.99 636.1
STRUCTURE 1 RESVOR .02 7 2 .10 .0 4.70 24.00 1.00 90.95 13.29 4.11 186.7
XSECTION 1 REACH .02 7 2 .10 .0 4.70 24.00 1.00 --- 13.72 3.57 162.2
STRUCTURE 3 RUNOFF .01 7 2 .10 .0 4.70 24.00 2.21 --- 12.23 12.42 1150.4
STRUCTURE 3 RESVOR .01 7 2 .10 .0 4.70 24.00 .82 92.50 13.90 1.31 121.1
XSECTION 1 REACH .01 7 2 .10 .0 4.70 24.00 .82 --- 14.60 1.07 98.7
- STRUCTURE 2 RUNOFF .07 7 2 .10 .0 4.70 24.00 1.60 --- 13.04 26.16 363.9
STRUCTURE 2 ADDHYD .03 7 2 .10 .0 4.70 24.00 .94 79.57 13.98 4.13 126.1
STRUCTURE 2 ADDHYD .10 7 2 .10 .0 4.70 24.00 1.39 84.70 13.14 27.41 261.9
14
SECTI@!I/ ST►NDARD RAIN ANTEC MAIN PRECIPITATION PEAK DISCHARGE
SIRUCTURE CONTROL DRAINAGE TAPLE MOIST TIME ------------------------- RUNOFF --------------------------------------
ID OPERATION AREA f COND INCREM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE
(99 m!) (HR) (HR) (IN) (HR) (IN) (FT) (HR) (CFS) (CS';►
STRUCTURE 2 RESVOR .10 ? 2 .10 .0 4,70 24.00 1.39 80,0? 14.b8 12.39 118.3
STRUCTURE 2 DIVERT ,(+( 7 a ,10 ,i► 4.70 24.0+j 19.33 80.09 14.68 12.39 1643.('
XSECTION 2 DIVERT .i0 7 2 .10 .0 4.70 24.00 .00 --- ,(+rj .001 ,rr
STRUCTURE 6 RUNOFF .02 7 2 .10 .0 4.70 24.Ai) 2.37 --- 12.24 22.44 12!9.3
STRUCTURE b RESVOR .02 7 2 .1A ,0 4.70 24.00 2.37 76.90 13.30f 3.124 169.9
STRUCTURE 7 RUNOFF .(,1 7 2 .10 .0 4.70 24.00 2.05 --- 12.65 5.31 639.7
STRUCTURE 7 RESVOR, .01 7 2 .10 .0 4.70 24.00 2.05 75.90 13.45 2.21 266.E
STRUCTURE 8 RUNOFF .(+0 7 2 .10 .0 4.70 24.00 12.0 5.83 i620.0
STRUCTURE 8 RESVOR .00 7 2 .10 .t+ 4.70 24.00 3.08 75.8Q 12.54 2.11
STRUCTURE 8 ADDHYD .02 7 2 .10 .0 4.70 24.00 2.49 80.26 12.61 5.16 236.4
XSECTION 9 RUNOFF .03 7 2 .I0 .0 4.70 24.00 1.74 --- 12.60 17.92 708.2
XSECTION 9 ADDHYD .05 7 2 .10 .0 4.70 24.00 2.09 --- 12.42 22.89 483.9
XSECTION 9 ADDHYD .06 7 2 .i0 .!� 4.�0 24.00 2.08 --- 12.42 23.90 429.8
S?R!ICTURE If, RUNOFF .00 7 2 .0 .0 4.70 24.00 i.19 --- 12.20 .81 622.1
STRUCTURE 1(r RESVOR .00 7 2 .10 .0 4.70 24.00 1.19 73.97 12.30 .78 579.8
XSECTION 9 ADDHYD .06 7 2 .10 .0 4.70 24,00 2.06 --- 12.41 24.44 429.
XSECTION a ADDHYD .06 7 2 .10 .0 4.70 24.00 4.08 --- 12.48 30.41 471.9
STRUCTURE 4 RUNOFF .05 7 ? .10 .0 4.70 24.00 1.07 --- 12.42 18.27 403.2
STW;'TURE 4 RESVOR .05 7 ? .10 .0 4.70 24.00 1.07 53.75 12.45 19.19 401.6
XSECTION 8 RUNOFF .00 7 2 .10 .0 4.70 24.00 .57 --- 1.2,30 .62 200.7
XSECTION 8 ADDHYD .11 7 2 .10 .0 4.70 24.00 2.94 --- 12.46 48.46 441.6
XSECTION 8 ADDHYD .11 7 2 .10 .0 4.70 24.00 2.79 --- 12.46 49.99 434.2
ALTERNATE 2 STORM 25
STRUCTURE 1 RUNOFF .02 7 2 .10 .0 5.50 24.00 2.24 --- 12.44 17.14 870.1
STRUCTURE 1 RESVOR .02 7 2 .0 .0 5.5(+ 24.00 1.58 81.01 12.93 9.37 425.9
XSECTION 1 REACH .02 7 2 .10 .0 5.50 24.00 1.58 --- 13.22 7.83 355.9
STRUCTURE 3 RUNOFF .01 7 2 .10 .0 5.50 24.00 2.96 --- 12.23 i6.0$ 1488.9
STRUCTURE 3 RESVOR .01 7 2 .10 .0 5.50 24.00 1.47 82.51 12.69 4.52 418.9
XSECTION 1 REACH .01 7 2 .10 .0 5.50 24.00 1.47 --- 13.09 2.97 274.9
STRUCTURE 2 RUNOFF .07 7 2 .10 .0 5.50 24.00 2.16 --- 13.01 36.27 504.4
STRUCTURE 2 ADDHYD .03 7 2 .10 .0 5.50 24.00 1.54 79.75 13.20 10.74 321.3
STRUCTURE 2 ADDHYD .10 7 2 .10 .0 5.50 24.00 1.97 90.70 13.09 46.42 443.4
STRUCTURE 2 RESVOR .10 7 2 .If) .0 5.50 24.00 1.97 80.52 14.96 14.17 135.3
STRUCTURE 2 DIVERT .Oi 7 2 .10 .0 5.50 24.00 27.16 80.42 15.00} 13.86* 1838.7
XSEITION 2 DIVERT .10 7 2 .10 .0 5.50 24.00 .01 80.42 15.00? .31? 3.2
STRUCTURE 6 RUNOFF .02 7 2 .10 .0 5.50 24.00 3.05 --- 12.24 28.71 1560.1
STRUF TURE 6 RESVOR .02 7 2 .10 .0 5.50 24.00 3.04 77.36 13.5r1; 3.41* 185.1
STRUCTURE 7 RUNOFF ,01 7 2 .10 .1 5.50 24.00 2.60 --- 12.64 7.01 8411.9
STRUCTURE 7 RESVOR .(+1 7 2 .10 .0 1; 24.00 2.68 76.27 13,56 2.50 301.3
STRUCTURE 8 fif!NOFF .(►n 7 2 .10 .0 5.50 24.00 3.93 --- 12.19 7.16 1909.3
STRUCTURE 8 RESV9R .00 7 2 .lei .0 5.50 24.00 3.83 76.13 12.55 2.42 67,72.2
STRUCTURE 8 ADDHYD .02 7 2 .10 .0 5.50 24.00 3.17 81.22 12.71 5.73 260.6
}SECTION 9 RUNOFF .03 '7 2 .i0 .0 5.50 24.00 2.33 --- 12.0 24.27 959.5
XSECTION 7 ADDHYD .05 7 2 .10 .;+ r, 511 24.00 2.72 -- 12.40 29 M Ain.2
15
SECTION/ STANDARD RAIN ANTEC MAIN PRECIPITATION PEAK, DISCHARGE
STRUCTURE CONTROL DRAINAGE TABLE MOIST TIME ------------------------- RUNOFF --------------------------------------
ID OPERATION AREA # COND INCREM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE
ISO MI) IHR) (HR) (IN) (HR) (IN) (FT) (HR) (CFS) (CSM)
XSECTION 9 ADDHYD .06 7 2 .10 .0 5.50 24.00 2.71 --- 12.41 31.03 552.0
STRUCTURE 10 RUNOFF .00 7 2 .10 .0 5.50 24.00 1.68 --- 12.21 1.18 905.0
STRUCTURE 10 RESVOR .00 7 2 .10 .0 5.50 24.00 1.67 74.07 12.30 1.11 850.F
XSECTION 9 ADDHYD .06 7 2 .10 .0 5.50 24.00 2.69 --- 12.40 31.90 560.7
XSECTION 9 ADDHYD .06 7 2 .10 .0 5.50 24.00 5.55 --- 12.42 38.99 605.1
STRUCTURE 4 RUNOFF. .05 7 2 .10 .0 5.50 24.00 1.53 --- 12.41 27.54 607.9
STRUCTURE 4 RESVOR .05 7 2 .10 .0 5.50 24.00 1.53 55.19 12.49 26.27 580.0
XSECTION 8 RUNOFF .00 7 2 .10 .9 5.50 24.00 .91 --- 12.32 1.19 383.3
XSECTION 9 ADDHYD .11 7 2 .10 .0 5.50 24.00 3.89 --- 12.46 64.72 589.8
XSECTION 8 ADDHYD .11 7 2 .10 .0 5.50 24.00 3.81 --- 12.45 65.79 5B3.1
ALTERNATE 2 STORM 50
STRUCTURE i RUNOFF .02 7 2 .10 .0 6.20 24.00 2.77 --- 12.43 23.88 1085.7
STRUCTURE I RESVOR .02 7 2 .10 .0 6.20 24.00 2.11 81.05 12.77 15.44 701.6
XSECTION I REACH .02 7 2 .10 .0 6.20 24.00 2.11 --- 13.03 13.24 601.7
STRUCTURE 3 RUNOFF .01 7 2 .10 .0 6.20 24.00 3.45 --- 12.22 19.36 1792.5
STRUCTURE 3 RESVOR .01 7 2 .10 .0 6.20 24.00 2.05 82.53 12.51 9.97 922.9
?!SECTION 1 REACH .Ol 7 2 .10 .0 6,20 24.00 2.07 --- 12.77 6.64 615.2
_ STRUCTURE 2 RUNOFF .07 7 2 .10 .0 6.20 24.00 2.68 --- 13.00 45.64 634.7
STRUCTURE 2 ADDHYD .03 7 2 .10 .0 6.20 24.00 2.09 81.97 12.97 18.78 572.E
STRUCTURE 2 ADDHYD .10 7 2 .10 .0 6.20 24.00 2.50 96.37 12.99 b4.39 615.0
STRUCTURE 2 RESVOR .10 7 2 .10 .0 6.20 24.00 2.50 80.82 15.20f 15.13f 144.5
STRUCTURE 2 DIVERT .01 7 2 .10 .0 6.20 24.00 33.66 80.47 15.20f 14.02f 1959.8
XSECTION 2 DIVERT .10 7 2 .10 .0 6.20 24.00 .08 80.47 15.20f l.11f 11.5
STRUCTURE 6 RUNOFF .02 7 2 .10 .0 6.20 24.00 3.65 --- 12.23 34.30 1864.3
STRUCTURE 6 RESVOR .02 7 2 .10 .0 6.20 24.00 3.65 77.78 13.60f 3.67f 199.3
STRUCTURE 7 RUNOFF .01 7 2 .10 .0 6.20 24.00 3.25 --- 12.63 9.56 1030.9
STRUCTURE 7 RESVOR .01 7 2 .10 .0 6.20 24.00 3.25 76.59 13.60f 2.73f 329.1
STRUCTURE 8 RUNOFF .00 7 2 .10 .0 6.20 24.00 4.49 --- 12.19 8.33 2312.9
STRUCTURE 8 RESVOR .00 7 2 .10 .0 6.20 24.00 4.48 76.35 12.57 2.61 725.5
STRUCTURE B ADDHYD .02 7 2 .10 .0 6.20 24.00 3.79 81.94 12.74 6.16 280.1
XSECTION 9 RUNOFF .03 7 2 .10 .0 6.20 24.00 2.97 --- 12.39 30.11 1190.0
- XSECTION 9 ADDHYD .05 7 2 .10 .0 6.20 24.00 3.29 --- 12.40 35.99 761.0
XSECTION 9 ADDHYD .06 7 2 .10 .0 6.20 24.00 3.29 --- 12.40 37.43 673.2
STRUCTURE 10 RUNOFF .00 7 2 .10 .0 6.20 24.00 2.14 --- 12.21 1.52 1167.3
_ STRUCTURE 10 RESVOR .00 7 2 .10 .0 6.20 24.00 2.14 74.16 12.26 1.44 1109.7
XSECTION 9 ADDHYD .06 7 2 .10 .0 6.20 24.00 3.26 --- 12.40 39.56 677.7
%SECTION 9 ADDHYD .06 7 2 .10 .0 6.20 24.00 6.82 --- 12.42 46.36 719.5
- STRUCTURE 4 RUNOFF .05 7 2 .10 .0 6.20 24.00 1.97 --- 12.40 36.40 B03.5
STRUCTURE 4 RESVOR .05 7 2 .10 .0 6.20 24.00 1.97 56.55 12.53 32.16 707.9
XSECTION 8 RUNOFF .00 7 2 .10 .0 6.20 24.00 1.24 --- 12.30 1.75 563.0
XSECTION 8 ADDHYD .11 7 2 .10 .0 6.20 24.00 4.82 --- 12.45 78.17 712.3
XSECTION B ADDHYD .11 7 2 .10 .0 6.20 24,00 4.72 --- 12.44 79.53 7fj4.8
ALTERNATE 2 STORM 99
STRUCTURE 1 RUNOFF .02 7 2 .10 .0 6.90 24.00 3.33 --- 12.43 29.79 1308.7
STRUCTURE 1 RESVOR .02 7 2 .10_ .0 6.90 24.00 R,6,h
16
SECTION! STANDARD RAIN ANTEC HAIN PRECIPITATION PEAK DISCHARGE
STRUCTURE CONTROL DRAINAGE TABLE MOIST TIRE ------------------------- RUNOFF --------------------------------------
ID OPERATION AREA 11 COND INCREM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE
IS8 MI) (HR) (HR) (IN) (HP) (IN) (FT) (HR) (CFS) (CSC+)
XSECTION 1 REACH .02 7 2 .10 .0 6.90 24.0C� 2.66 --- 12.93 18.86 857.3
STRUCTURE 3 RUNOFF .01 7 2 .10 .0 6.9+� 24.00 4.06 --- 12.22 22.69 2101.0
STRUCTURE 3 RESVOR .01 7 2 .10 .0 6.90 24.00 2.69 82.55 12.43 15.57 1441.8
XSECTION 1 REACH .01 7 2 .19 .0 6.90 24.00 2.67 --- 12.66 10.97 1915.4
STRUCTURE 2 RUNOFF .07 7 2 .10 .0 6.90 24.00 3.23 --- 12.99 55.39 77t?.?
STRUCTURE 2 ADDHYD .03 7 2 .10 .0 6.90 24.00 2.66 84.76 12.25 27.60 B41.3
STRUCTURE 2 ADDHYD .10 7 2 .10 .0 6.90 24.00 3.0.5 101.95 12.92 92:04 723.6
STRUCTURE 2 RESVOR .10 7 2 .10 .0 6.90 24.00 3.05 B1.15 15.46 16.17 154.5
STRUCTURE 2 DIVERT .01 7 2 .!0 .0 6.90 24.00 39.99 80.52 15.51)* 14.19f 1882.5
XSECTION 2 DIVERT .10 7 2 .10 .0 6.90 24.00 .19 BO.52 15.46 1.99 20.4
STRUCTURE 6 RUNOFF .02 7 2 .!0 ,[+ 6.90 24.00 4.27 --- 12.23 39.97 2172.1
STRUCTURE 6 RESVOR .02 7 2 .10 .0 6.90 24.00 4.27 78.21 13.904 3.93f 213.4
STRUCTURE 7 RUNOFF .01 7 2 .10 .0 6.90 24.00 3.95 --- 12.63 10.14 1221.2
STRUCTURE 7 RESVOR .01 ? 2 .10 .0 6.90 24.00 3.84 76.91 13.71 2.99 359.0
STRUCTURE 8 RUNOFF .00 7 2 .10 .0 6.90 24.00 5.15 --- 12.10 9.49 2636.2
STRUCTURE B RESVOR .00 7 2 .10 .0 6.90 24.00 5.15 76.57 12.59 2.81 7R0.8
STRUCTURE 9 ADDHYD .62 7 2 .10 .0 6.90 24.00 4.41 82.68 12.75 6.61 300.3
XSECTION 9 RUNOFF .03 7 2 .10 .0 6.90 24.00 3.43 --- 12.39 36.12 1427.8
XSEETION 9 ADDHYD .05 7 2 J O .0 6.90 24.00 3.99 --- 12.39 42.3B B96,0
XSECTION 9 ADDHYD .06 7 2 .10 .0 6.90 24.00 3.8B --- 12.40 44.06 792.4
STRUCTURE 10 RUNOFF .00 7 2 .1�1 .0 6.90 24.00 2.63 --- 12,20 1.89 1443.0
STRUCTURE 10 RESVOR .00 7 2 .10 .0 6.90 24.00 2.62 74.24 12.26 1.70 1373.10
XSECT19M 9 ADDHYD .06 7 2 .10 .0 6.90 24.00 3.05 --- 12.39 45.45 798.9
XSECTION 9 WHYD .06 ? 2 .11) .0 6.90 24.00 8.07 --- 12.42 54.23 841.6
FTRUCTURE 4 RUNOFF .05 7 2 J A .0 6.90 24.00 2.43 --- 12.39 45.91 1(111.3
STRUCTURE 4 RESVOR .05 7 2 .10 .0 6.90 24.00 2.43 58.06 12.57 37.27 BE2.9
XSECTION 8 RUNOFF .00 7 2 .10 .0 6.90 24.00 1.61 --- 12.29 2.36 761.(i
XSECTION 8 ADDHYD .11 7 2 .10 .0 6.90 24.00 5.74 --- 12.46 99.94 819.6
XSECTION 8 ADDHYD .11 7 2 .10 .0 6.90 24.00 5.63 --- 12.45 91.65 812.3
17
SUMMARY TABLE 2 - SELECTED MODIFIED ATT-KIN REACH ROUTINGS IN ORDER OF STANDARD EXECUTIVE CONTROL INSTRUCTIONS
to STAR(*) AFTER VOLUME ABOVE BASE H N) INDICATES A HYDROGRAPH TRUNCATED AT A VALUE EXCEEDI►JG BASE + 10% OF PEAK
A QUESTION MARK(?) AFTER COEFF.(C) INDICATES PARAMETERS OUTSIDE ACCEPTABLE LIMITS, SEE PREVIOUS WARNINGS)
HYDROGRAPH INFORMATION ROUTING PARAMETERS PEAK
---------------------------------------------- -----------------------------------------------------------
DUTFLOWf VOLUME MAIN ITER- B AND A PEAK Sig ATT- TRAVEL TIME
XSEC REACH INFLOW OUTFLOW INTERV.AREA BASE- ABOVE TIME ATION EQUATION LENGTH RATIO @PEAK KIN STOR- KINE-
----------- ----------- ----------- -----------
ID LENGTH PEAK TIME PEAK TIME PEAK TIME FLOW BASE INCR # COEFF POWER FACTOR 0/I (K) COEFF AGE MATIC
(FT) (CFS) tHR) tCFS) (HR) tCFS) (HR) (CFS) tIN) tHR) IX) IN) tKf) (90 (SEC) IC) tHR) IHR)
ALTERNATE 2 STORM 2
1 1400 0 22.4 0 23.2 --- --- 0 .07 .10 1 .414 1.51 .175 .896 2571 .13 .80 .73
1 1700 0 .0 0 .0 --- --- 0 .00 .10 0 .000 .00 .000 .000 0 .00 .00 .00
ALTERNATE 2 STORM 10
_ 1 1400 4 13.3 4 13.7 --- --- 0 1.00 .10 1 .414 1.51 .044 .869 103E .30 .40 .30
1 1700 1 13.9 1 14.6 --- --- 0 .92 .10 1 .486 1.51 .062 .915 1664 .20 .70 .49
ALTERNATE 2 STORM 25
1 1400 9 12.9 8 13.2 --- --- 0 1.58 .10 1 .414 1.51 .050 .837 798 .37 .30 .23
1 17AO 5 12.7 3 13.1 --- --- 0 1.47 .10 1 .486 1.51 .090 .657 1096 .28 .40 .33
_ ALTERNATE 2 STORM 50
1 1400 15 12.8 13 12.0 --- --- 0 2.11 .10 1 .414 1.51 .053 .858 666 .43 .20 .19
1 1700 10 12.5 7 12.9 --- --- 0 2.05 .10 1 .486 1.51 .120 .665 841 .35 .30 .25
ALTERNATE 2 STORM 99
1 1400 21 12.7 19 12.9 --- --- 0 2.66 .10 1 .414 1.51 .052 .978 596 .4b .20 .17
1 1700 15 12.4 11 12.7 --- --- 0 2.b9 .10 1 .486 1.51 .123 .708 727 .40 .30 .21
l E3
SUMMARY TABLE ? - DISCHARGE (CFS) AT XSECT'DN5 AND STRUCTURES FOR ALL STORMS AND ALTERNATES
XSECTIONlr DRAINAGE
STRUCTURE AREA STORM NUMBERS..........
ID (So MI) 2 10 25 50 99
STRUCTURE 10 .00
ALTERNATE 2 .25 .78 1.11 1.44 1.78
STRUCTURE 8 .02
ALTERNATE 2 3.68 5.16 5.73 6.16 6.61
STRUCTURE 7 .01
ALTERNATE 2 1.14 2.21 2.5+0 2.73 2.98
STRUCTURE 6 .02
ALTER4ATE 2 2.45 3.12 3.41 3.67 3.93
STRUCTURE 4 .05
ALTERNATE 2 4.64 19.19 26.27 32.16 37.27
=TRUCTURE ? .01
ALTERNATE 2 .00 1.31 4.52 9.97 15.57
STRUCTURE 2 .01
ALTERNATE 2 7.40 12.39 13.96 14.02 14.19
STRUCTURE 1 .02
ALTERNATE 2 .28 4.11 9.37 15.44 21.40
XSECTIQN 1 .01
ALTERNATE 2 .00 1.07 2.97 6.64 10.97
YSECTION 2 .It,
ALTER.N4TE 2 .00 .00 .31 1.11 1.99
XSECTION 8 .11
ALTERNATE 2 18.47 49.99 65.79 79.53 91.65
KSECTIQM 9 .06
ALTERNATE 2 14.31 30.41 39.99 46.36 54.23
END OF 1 JOBS IN THIS RUN
19
ALTERNATE 3
ifflFf+f�ffffffffff80-80 LIST OF INPUT DATA FOR TR-20 HYDROLOCY4*****ff**}fff*ff*
JOB TR-20 SUMMARY NOPLOTS
TITLE 001 BELDON ROAD RUNOFF ANALYSIS - S. WINDSOR
TITLE DEVELOPED RUNOFF CONDITIONS
5 RAINFL 7 0.20
8 0.0 0.002 0.004 0.006 0.008
8 0.010 0.012 0.014 0.016 0.018
8 0.020 0.022 0.024 0.027 0.029
8 0.031 0.034 0.036 0.038 0.041
8 0.043 0.046 0.049 0.051 0.054
B 0.057 0.060 0.063 0.066 0.069
8 0.072 0.075 0.079 0.082 0.095
8 0.089 0.093 0.097 0.103 0.109
8 0.115 0.121 0.127 0.134 0.140
- 8 0.148 0.155 0.163 0.171 0.180
8 0.189 0.199 0.210 0.222 0.235
B 0.250 0.266 0.287 0.312 0.363
8 0.500 0.638 0.689 0.714 0.734
8 0.751 0.766 0.779 0.790 0.801
B 0.811 0.821 0.829 0.838 0.845
8 0.853 0.860 0.867 0.874 0.880
- 8 0.886 0.892 0.898 0.903 0.908
8 0.911 0.915 0.919 0.922 0.925
8 0.929 0.932 0.935 0.938 0.941
- B 0.944 0.946 0.949 0.952 0.955
8 0.957 0.960 0.962 0.965 0.967
8 0.969 0.972 0.974 0.976 0.978
_ 8 0.9B1 0.983 0.995 0.997 0.989
8 0.991 0.993 0.995 0.997 0.999
8 1.000 1.000 1.000 1.000 1.000
9 ENDTBL
2 XSECTN 002 1.0 82.0
8 80.4 0.0 0.0
8 81.0 9.62 8.25
- 8 82.0 64.16 32.00
9 ENDTBL
2 XSECTN 003 1.0 76.5
8 76.3 0.0 0.0
8 76.4 0.473 1.04
8 76.5 1.524 2.16
9 ENDTBL
3 STRUCT Ol
8 80.3 0.0 0.0
8 80.9 0.001 0.78
- 8 81.0 7.65 0.99
8 81.1 23.24 1.22
8 81.2 45.63 1.49
8 81.4 110.85 2.06
8 82.0 485.66 4.37
9 ENDTBL
3 STRUCT 02
B 77.53 0.0 0.0
8 79.0 0.8 0.003
8 79.0 6.6 0.165
- 8 79.5 9.5 0.586
9 80.0 12.0 1.604
20
f;+}#+'} #f+�ff# *## Br►-BO LIST OF INPUT DATA {CONTINUED!fff ; + ft+► �tf
B 80.4 13.9 3.014
8 91.0 15.7 6.651
9 ENDTBL
3 STRUCT 03
8 91.7 0.0 0.0
8 92.0 0.0001 0.013
8 B2.1 0.0002 0.055
8 82.5 0.0003 0.796
8 B2.6 33.2 1.111
9 ENDTBL
3 STRUCT 04
8 51.14 0.0 0.0
8 52.0 2.9 0.005
8 54.0 20.4 0.039
8 56.0 30.3 0.113
B 5B.0 37.1 0.329
8 60.0 42.7 0.902
9 ENDTBL
3 STRUCT 06
B 74.4 0.0 0.0
B 75.0 0.7 0.005
8 76.0 2.4 0.042
8 7B.0 3.9 0.33B
B 79.5 4.1 1.861
9 ENDTBL
3 STRUCT 07
8 73.3 0.0 0.0
8 74.0 1.0 0.016
8 76.0 3.3 0.2B1
B 76.3 3.5 0.432
8 79.0 4.4 4.349
9 ENDTBL
3 STRUCT 09
8 73.49 0.0 0.0
8 74.0 O.B 0.002
B 75.5 7.0 0.032
9 ENDTBL
6 RUNOFF 1 01 5 0.022 68.0 0.59
6 RESVOR 2 01 5 6
6 REACH 3 001 6 7 1400.0 0.4136 1.5069
6 RUNOFF 1 03 5 0.0109 75.0 0.24
6 RESVOR 2 03 5 6
6 REACH 3 001 6 5 1700.0 0.4960 1.5069
6 RUNOFF 1 02 6 0.0719 67.0 1.38
6 ADDHYD 4 02 7 5 4
6 ADDHYD 4 02 4 6 7
6 RESVOR 2 02 7 6
6 DIVERT 6 02 6 7 1 0.072 2.
6 SAVMOV 5 02 7 1
6 RUNOFF 1 06 5 0.0164 73.0 0.72
6 RESVOR 2 06 5 6
6 RUNOFF 1 07 5 0.0161 76.0 0.90
6 RESVOR 2 07 5 7
6 ADDHYD 4 009 6 7 2
6 RUNOFF 1 009 5 0.0253 69.0 0.51
6 ADDHYD 4 009 5 2 7
6 RUNOFF 1 09 5 0.0013 61.0 0.18
6 RESVOR 2 09 5 6
6 ADDHYD 4 009 7 6 2
21
LIST OF INPUT DATA ICONTINUEDI###f#f#f###ffff###ff#f
6 ADDHYD 4 09 2 1 3
6 RUNOFF 1 04 5 0.0453 59.0 0.4B
6 RESYOR 2 04 5 6
6 RUNOFF 1 00B 7 0.0031 50.0 0.2B
6 ADDHYD 4 OOB 3 6 4
6 ADDHYD 4 008 4 7 1
ENDATA
7 INCREM 6 0.1
7 COMPUT 7 01 008 3.2 1.0 7 2 03 02
ENDCMP i
7 COMPUT 7 01 008 4.7 1.0 7 2 03 10
ENDCMP 1
7 COMPUT 7 01 OOB 5.5 1.0 7 2 03 25
ENDCMP 1
7 COMPUT 7 01 009 6.2 1.0 7 2 03 50
ENDCMP 1
7 COMPUT 7 01 008 6.9 1.0 7 2 03 99
ENDCMP 1
ENDJ08 2
fff.ft##f#f;fffffffffffffffffffEND OF 80-80 LI$Tf#fffffffff#f##ff###f#fff####f#f
22
SUMMARY TABLE I - SELECTED RESULTS OF STANDARD AND EXECUTIVE CONTROL INSTRUCTIONS IN THE ORDER PERFORMED
(A STAR(t) AFTER THE PEAK DISCHARGE TIME AND RATE (CFS) VALUES INDICATES A FLAT TOP HYDROGRAPH
A QUESTION MARK(?) INDICATES A HYDROGRAPH WITH PEAK AS LAST POINT.)
SECIION/ STANDARD RAIN ANTEC MAIN PRECIPITATION PEAK DISCHARGE
STRUCTURE CONTROL DRAINAGE TABLE MOIST TIME ------------------------- RUNOFF --------------------------------------
ID OPERATION AREA # COND INCREM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE
(S9 MI) (HR) (HR) (IN) (HR) (IN) (FT) (HR) (CFS) (CSM)
ALTERNATE 3 STORM 2
STRUCTURE 1 RUNOFF .02 7 2 .10 .0 3.20 24.00 .73 --- 12.49 5.54 251.7
STRUCTURE 1 RESVOR .02 7 2 .10 .0 3.20 24.00 .07 80.90 22.40? .29? 12.6
XSECTION i REACH .02 7 2 .10 .0 3.20 24.00 .06 --- 23.20? .25? 11.3
STRUCTURE 3 RUNOFF .01 7 2 .10 .0 3.20 24.00 1.09 --- 12.25 6.12 566.4
STRUCTURE 3 RESVOR .01 7 2 .10 .0 3.20 24.00 .00 --- .00 .00 .0
XSECTION i REACH .01 7 2 .10 .0 3.20 24.00 .00 --- .00 .00 .0
STRUCTURE 2 RUNOFF .07 7 2 .10 .0 3.20 24.00 .69 --- 13.12 9.90 137.7
STRUCTURE 2 ADDHYD .03 7 2 .10 .0 3.20 24.00 .04 77.6B 23.20? .25? 7.6
STRUCTURE 2 ADDHYD .10 7 2 .10 .0 3.20 24.00 .49 79.58 13.12 9.90 94.6
STRUCTURE 2 RESVOR .10 7 2 .10 .0 3.20 24.00 .49 79.14 13.69 7.40 70.6
STRUCTURE 2 DIVERT .01 7 2 .10 .0 3.20 24.00 6.74 79.14 13.69 7.40 991.2
XSECTION 2 DIVERT .10 7 2 .10 .0 3.20 24.00 .00 --- .00 .00 .0
STRUCTURE 6 RUNOFF .02 7 2 .10 .0 3.20 24.00 .9B --- 12.55 5.37 327.5
STRUCTURE 6 RESVOR .02 7 2 .10 .0 3.20 24.00 .99 76.69 13.07 2.BB 175.9
STRUCTURE 7 RUNOFF .02 7 2 .10 .0 3.20 24.00 1.15 --- 12.67 5.64 350.3
STRUCTURE 7 RESVOR .02 7 2 .10 .0 3.20 24.00 1.15 75.61 13.33 2.B5 176.9
XSECTION 9 ADDHYD .03 7 2 .10 .0 3.20 24.00 1.07 --- 13.24 5.70 175.4
XSECTION 9 RUNOFF .03 7 2 .10 .0 3.20 24.00 .78 --- 12.44 7.37 291.5
XSECTION 9 ADDHYD .06 7 2 .10 .0 3.20 24.00 .94 --- 12.48 11.32 195.8
STRUCTURE 9 RUNOFF .00 7 2 .10 .0 3.20 24.00 .44 --- 12.30 .25 18B.9
STRUCTURE 9 RESVOR .00 7 2 .10 .0 3.20 24.00 .44 73.65 12.30 .25 190.8
XSECTION 9 ADDHYD .06 7 2 .10 .0 3.20 24.00 .93 --- 12.47 11.49 194.2
STRUCTURE 9 ADDHYD .07 7 2 .10 .0 3.20 24.00 1.59 77.50 13.03 15.29 229.4
STRUCTURE 4 RUNOFF .05 7 2 .10 .0 3.20 24.00 .37 --- 12.51 4.63 102.3
STRUCTURE 4 RESVOR .05 7 2 .10 .0 3.20 24.00 .37 52.20 12.53 4.64 102.3
XSECTION B RUNOFF .00 7 2 .10 .0 3.20 24.00 .13 --- 13.10 .04 12.5
XSECTION 8 ADDHYD .11 7 2 .10 .0 3.20 24.00 1.10 --- 12.60 19.24 162.9
XSECTION 8 ADDHYD .12 7 2 .10 .0 3.20 24.00 1.07 --- 12.60 19.28 158.9
ALTERNATE 3 STORM 10
STRUCTURE I RUNOFF .02 7 2 .10 .0 4.70 24.00 1.67 --- 12.45 13.99 636.1
STRUCTURE i RESVOR .02 7 2 .10 .0 4.70 24.00 1.00 80.95 13.29 4.11 186.7
XSECTION i REACH .02 7 2 .10 .0 4.70 24.00 1.00 --- 13.72 3.57 162.2
STRUCTURE 3 RUNOFF .01 7 2 .10 .0 4.70 24.00 2.21 --- 12.23 12.42 1150.4
STRUCTURE 3 RESVOR .01 7 2 .10 .0 4.70 24.00 .92 82.50 13.90 1.31 121.1
XSECTION 1 REACH .01 7 2 .10 .0 4.70 24.00 .82 --- 14.60 1.07 9B.7
STRUCTURE 2 RUNOFF .07 7 2 .10 .0 4.70 24.00 1.60 --- 13.04 26.16 363.9
STRUCTURE 2 ADDHYD .03 7 2 .10 .0 4.70 24.00 .94 79.57 13.9E 4.13 126.1
STRUCTURE 2 ADDHYD .10 7 2 .10 .0 4.70 24.00 1.39 B4.70 13.14 27.41 261.0
STRUCTURE 2 RESVOR .10 7 2 .10 .0 4.70 24.00 1.39 80.09 14.69 12.37 118.3
23
SECIION/ STANDARD RAIN ANTEC MAIN PRECIPITATION PEAK DISCHARGE
STRUCTURE CONTROL DRAINAGE TABLE MOIST TIME ------------------------- RUNOFF --------------------------------------
ID OPERATION AREA t COND INCP,EM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE
(SD MI) (HR) (HR) (IN) (HR) (IN) (FT) (HR) (CFS) (CSM)
ALTERNATE 3 STORM 10
STRUCTURE 2 DIVERT .01 7 2 .10 .0 4.70 24.00 19.33 80.09 14.68 12.39 1643.0
XSECTION 2 DIVERT .10 7 2 .10 .0 4.70 24.00 .00 --- .00 ,04 .0
STRUCTURE 6 RUNOFF .02 7 2 .10 .0 4.70 24.00 2.05 --- 12.52 11.81 720.1
STRUCTURE 6 RESVOR .02 7 2 .10 .0 4.70 24.00 2.05 78.06 13.40* 3.84* 233.9
STRUCTURE 7 RUNOFF .02 7 2 .10 .0 4.70 24.00 2.29 --- 12.64 11.63 722.4
STRUCTURE 7 RESVOR .02 7 2 .10 10 4.70 24.00 2.29 76.39 13.70* 3,55* 220.5
_ XSECTION 9 ADDHYD .03 7 2 .10 .0 4.70 24.00 2.17 --- 13.601 7.381 227.2
XSECTION 9 RUNOFF .03 7 2 .10 ,0 4.70 24.00 1.74 --- 12.40 17.�2 709.2
XSECTION 9 ADDHYD .06 7 2 .10 .0 4.70 24.00 1.99 --- 12.44 23.46 405.9
STRUCTURE 9 RUNOFF .00 7 2 .10 .0 4.70 24.00 1.19 --- 12.20 .81 622.1
STRUCTURE 9 RESVOR .00 7 2 .10 .0 4.70 24.00 1.19 73.99 12.30 .78 599.8
XSECTION 9 ADDHYD .06 7 2 .10 10 4.70 24.00 1.96 --- 12.43 23.97 405.5
STRUCTURE 9 ADDHYD .07 7 2 .10 ,0 4.70 24.00 3.93 B1.13 12.50 30.29 454.3
STRUCTURE 4 RUNOFF .05 7 2 .10 10 4.70 24.00 1.07 --- 12.42 18.27 403.2
STRUCTURE 4 RESVOR .05 7 2 .10 .0 4.70 24.00 1.07 53.75 12.45 19.19 401.6
XSECTION 8 RUNOFF .00 7 2 .10 10 4.70 24.00 .57 --- 12.30 .62 200.9
XSECTION B ADDHYD .11 7 2 .10 .0 4.70 24.00 2.77 --- 12.47 49.23 430.9
XSECTION B ADDHYD .12 7 2 .10 10 4.70 24.00 2.71 --- 12.47 48.75 423.9
ALTERNATE 3 STORM 25
STRUCTURE I RUNOFF .02 7 2 .10 .0 5.50 24.00 2.24 --- 12.44 19.14 870.1
STRUCTURE i RESVOR .02 7 2 .10 ,0 5.50 24.00 1.58 91.01 12.93 9.37 425.8
XSECTION 1 REACH .02 7 2 .10 .0 5.50 24.00 1.58 --- 13.22 7.83 355.9
STRUCTURE 3 RUNOFF .01 7 2 .10 .0 5.50 24.00 2.86 --- 12.23 16.09 1408.8
STRUCTURE 3 RESVOR .01 7 2 .10 .0 5.50 24.00 1.47 92.51 12.69 4.52 418.9
XSECTION 1 REACH .01 7 2 .10 10 5.50 24.00 1.47 --- 13.09 2.97 274.9
STRUCTURE 2 RUNOFF .07 7 2 .10 .0 5.50 24.00 2.16 --- 13.01 36.27 504.4
STRUCTURE 2 ADDHYD .03 7 2 .10 .0 5.50 24.00 1.54 79.75 13.20 i0,74 327.3
STRUCTURE 2 ADDHYD .10 7 2 .10 .0 5.50 24.00 1.97 90.70 13.09 46.42 443.4
STRUCTURE 2 RESVOR .10 7 2 .10 .0 5.50 24.00 1.97 80.52 14.96 14.17 135.3
STRUCTURE 2 DIVERT .01 7 2 .10 .0 5.50 24.00 27.16 BO.42 15.04# 13.86f 183B.7
XSECTION 2 DIVERT .10 7 2 .10 .0 5.50 24.00 .01 BO.42 15.00? .31? 3.2
STRUCTURE 6 RUNOFF .02 7 2 .10 .0 5.50 24.00 2.69 --- 12.52 15.58 950.2
STRUCTURE 6 RESVOR .02 7 2 .10 .0 5.50 24.00 2.67 78.15 13.60f 3,89f 237.3
STRUCTURE 7 RUNOFF .02 7 2 .10 .0 5.50 24.00 2.95 --- 12.63 15.07 936.0
STRUCTURE 7 RESVOR .02 7 2 .10 .0 5.50 24.00 2.95 76.53 13.90f 3.62* 224.9
XSECTION 9 ADDHYD .03 7 2 .10 .0 5.50 .24.00 2.81 --- 13.80f 7.51t 231.1
XSECTION 9 RUNOFF .03 7 2 .10 .0 5.50 24.00 2.33 --- 12.40 24.27 959.5
_ XSECTION 9 ADDHYD .06 7 2 .10 .0 5.50 24.00 2.60 --- 12.42 30.79 532.7
STRUCTURE 9 RUNOFF .00 7 2 .10 .0 5.50 24.00 1.69 --- 12.21 1.18 905.0
STRUCTURE 9 RESVOR .00 7 2 .10 .0 5.50 24.00 1.67 74.07 12.30 1.11 850.8
XSECTION 9 ADDHYD .06 7 2 .10 .0 5.50 24.00 2.58 --- 12.41 31.63 535.2
STRUCTURE 9 ADDHYD .07 7 2 .10 .0 5.50 24.00 5.36 83.20 12.44 38.81 592.4
STRUCTURE 4 RUNOFF .05 7 2 .10 .0 5.50 24.00 1.53 --- 12.41 27.54 607.9
- STRUCTURE 4 RESVOR .05 7 2 .10 .0 5.50 24.00 1.53 55.19 12.49 26.27 580.0
24
SECTION/ STANDARD FAIN ANTEC MAIN PRECIPITATION PEAK DISCHARGE
STRUCTURE CONTROL DRAINAGE TABLE MOIST TIME ------------------------- RUNOFF --------------------------------------
ID OPERATION AREA # COND INCREM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE
(5D MI) lHR) IHR) (IN) (HR) (IN) (FT) (HR) (CFS) (CSM)
ALTERNATE 3 STORM 25
XSECTION 8 RUNOFF .00 7 2 .10 .0 5.50 24.00 .91 --- 12.32 1.19 393.3
XSECTION 8 ADDHYD .11 7 2 .10 .0 5.50 24.00 3.81 --- 12.46 64.68 577.9
XSECTION 8 ADDHYD .12 7 2 .10 .0 5.50 24.00 3.73 --- 12.46 65.61 570.3
ALTERNATE 3 STORM 50
STRUCTURE 1 RUNOFF .02 7 2 .10 .0 6.20 24.00 2.77 --- 12.43 23.B9 1085.7
STRUCTURE 1 RESVOR .02 7 2 .10 .0 6.20 24.00 2.11 B1.05 12.77 15.44 701.6
XSECTION i REACH .02 7 2 .10 .0 6.20 24.00 2.11 --- 13.03 13.24 601.7
STRUCTURE 3 RUNOFF .01 7 2 .10 .0 6.20 24.00 3.45 --- 12.22 19.36 1792.5
STRUCTURE 3 RESVOR .01 7 2 .10 .0 6.20 24.00 2.05 B2.53 12.51 9.97 922.9
XSECTION 1 REACH .01 7 2 .10 .0 6.20 24.00 2.07 --- 12.77 6.64 615.2
STRUCTURE 2 RUNOFF .07 7 2 .10 .0 6.20 24.00 2.6B --- 13.00 45.64 634.7
STRUCTURE 2 ADDHYD .03 7 2 .10 .0 6.20 24.00 2.09 B1.97 12.97 18.78 572.6
STRUCTURE 2 ADDHYD .10 7 2 .10 .0 6.20 24.00 2.50 96.37 12.99 64.39 615.0
STRUCTURE 2 RESVOR .10 7 2 .10 .0 6.20 24.00 2.50 BO.82 15.20* 15.13* 144.5
STRUCTURE 2 DIVERT .01 7 2 .10 .0 6.20 24.00 33.66 80.47 15.20f 14.02; 1859.8
XSECTION 2 DIVERT .10 7 2 .10 .0 6.20 24.00 .08 80.47 15.20f 1.11* 11.5
STRUCTURE 6 RUNOFF .02 7 2 .10 .0 6.20 24.00 3.25 --- 12.51 19.00 1158.6
STRUCTURE 6 RESVOR .02 7 2 .10 .0 6.20 24.00 3.25 78.24 13.804 3.95* 240.6
STRUCTURE 7 RUNOFF .02 7 2 .10 .0 6.20 24.00 3.55 --- 12.63 18.16 1127.7
STRUCTURE 7 RESVOR .02 7 2 .10 .0 6.20 24.00 3.55 76.66 14.10f 3.69* 229.2
XSECTION 9 ADDHYD .03 7 2 .10 .0 6.20 24.00 3.40 --- 14.00* 7.63* 234.9
XSECTION 9 RUNOFF .03 7 2 .10 .0 6.20 24.00 2.87 --- 12.39 30.11 11Q0.0
XSECTION 9 ADDHYD .06 7 2 .10 .0 6.20 24.00 3.17 --- 12.40 37.25 644.4
STRUCTURE 9 RUNOFF .00 7 2 .10 .0 6.20 24.00 2.14 --- 12.21 1.52 1167.3
STRUCTURE 9 RESVOR .00 7 2 .10 .0 6.20 24.00 2.14 74.16 12.26 1.44 1109.7
XSECTION 9 ADDHYD .06 7 2 .10 .0 6.20 24.00 3.14 --- 12.40 38.37 649.3
STRUCTURE 9 ADDHYD .07 7 2 .10 .0 6.20 24.00 6.60 84.99 12.42 46.17 692.9
STRUCTURE 4 RUNOFF .05 7 2 .10 .0 6.20 24.00 1.97 --- 12.40 36.40 903.5
STRUCTURE 4 RESVOR .05 7 2 .10 .0 6.20 24.00 1.97 56.55 12.53 32.16 709.9
XSECTION B RUNOFF .00 7 2 .10 .0 6.20 24.00 1.24 --- 12.30 1.75 563.0
XSECTION 9 ADDHYD .11 7 2 .10 .0 6.20 24.00 4.72 --- 12.44 77.93 696.1
XSECTION 8 ADDHYD .12 7 2 .10 .0 6.20 24.00 4.63 --- 12.44 79.30 689.4
ALTERNATE 3 STORM 99
STRUCTURE 1 RUNOFF .02 7 2 .10 .0 6.90 24.00 3.33 --- 12.43 2B.79 130B.7
STRUCTURE 1 RESVOR .02 7 2 .10 .0 6.90 24.00 2.66 B1.09 12.70 21.40 972.5
XSECTION 1 REACH .02 7 2 .10 .0 6.90 24.00 2.66 --- 12.93 1B.96 857.3
STRUCTURE 3 RUNOFF .01 7 2 .10 .0 6.90 24.00 4.06 --- 12.22 22.69 2101.0
STRUCTURE 3 RESVOR, .01 7 2 .10 .0 6.90 24.00 2.69 82.55 12.43 15.57 1441.B
XSECTION 1 REACH .01 7 2 .10 .0 6.90 24.00 2.67 --- 12.66 10.97 1015.4
STRUCTURE 2 RUNOFF .07 7 2 .10 .0 6.90 24.00 3.23 --- 12.99 55.38 770.3
STRUCTURE 2 ADDHYD .03 7 2 .10 .0 6.90 24.00 2.66 84.76 12.85 27.60 841.3
STRUCTURE 2 ADDHYD .10 7 2 .10 .0 6.90 24.00 3.05 101.95 12.92 82.04 7B3.6
STRUCTURE 2 RESVOR .10 7 2 .10 .0 6.90 24.00 3.05 B1.15 15.46 16.17 154.5
STRUCTURE 2 DIVERT .01 7 2 .10 .A 6.90 24.00 39.99 90.52 15.50* 14.194 1BB2.5
- 2s
SECTION/ STANDARD RAIN ANTEC MAIN PRECIPITATION PEAK. DISCHARGE
STRUCTURE CONTROL DRAINAGE TABLE MOIST TIME ------------------------- RUNOFF --------------------------------------
ID OP€RATION AREA # COND INCREM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE PATE
(SO MI) (HR) (HR) (IN) (HR) (IN) (FT) (HP.) (CFS) (CSM)
ALTERNATE 3 STORM 99
XSECTION 2 DIVERT .10 7 2 .10 .0 6.90 24.00 .19 BO.52 15.46 1.99 20.4
STRUCTURE 6 RUNOFF .02 7 2 .10 .0 6.90 24.00 3.84 --- i2.51 22.50 1371.7
STRUCTURE 6 RESVOR .02 7 2 .10 .0 6.90 24.00 3.84 78.34 13.90* 4.001 244.2
STRUCTURE 7 RUNOFF .02 7 2 .10 .0 6.90 24.00 4.16 --- 12.62 21.29 1322.E
STRUCTURE 7 RESVOR .02 7 2 .10 .0 6.90 24.00 4.16 76.90 14.30* 3.76f 233.8
XSECTION 9 ADDHYD .03 7 2 .10 .0 6.90 24.00 4.00 --- 14.20# 7.77f 239.0
XSECTION 9 RUNOFF .03 7 2 .10 .0 6.90 24.00 3.43 --- 12.39 36.12 1427.9
XSECTION 9 ADDHYD .06 7 2 .10 .0 6.90 24.00 3.75 --- 12.39 43:38 750.6
STRUCTURE 9 RUNOFF .00 7 2 .10 .0 6.90 24.00 2.63 --- 12.20 1.98 1443.0
STRUCTURE 9 RESVOR .00 7 2 .10 .0 6.90 24.00 2.62 74.24 12.26 1.78 1373.0
XSECTION 9 ADDHYD .06 7 2 .10 .0 6.90 24.00 3.73 --- 12.3B 44.82 758.4
STRUCTURE 9 ADDHYD .07 7 2 .10 .0 6.90 24.00 7.82 06.75 12.41 53.49 802.8
STRUCTURE 4 RUNOFF .05 7 2 .10 .0 6.90 24.00 2.43 --- 12.39 45.81 1011.3
STRUCTURE 4 RESVOR .05 7 2 .10 .0 6.90 24.00 2.43 59.06 12.57 37.27 822.B
XSECTIDN 8 RUNOFF .00 7 2 .10 .0 6.90 24.00 1.61 --- 12.29 2.36 761.0
XSECTIDN B ADDHYD .11 7 2 .10 .0 6.90 24.00 5.64 --- 12.45 BB.96 794.7
XSECTION B ADDHYD .12 7 2 .10 .0 6.90 24.00 5.53 --- 12.44 90.84 789.6
26
SUMMARY TABLE 2 - SELECTED MODIFIED ATT-KIN REACH ROUTINGS IN ORDER OF STANDARD EXECUTIVE CONTROL INSTRUCTIONS
(A STAR(*) AFTER VOLUME ABOVE BASE(IN) INDICATES A HYDR06RAPH TRUNCATED AT A VALUE EXCEEDING BASE + 10% OF PEAK
A QUESTION MARK(?) AFTER COEFF.(C) INDICATES PARAMETERS OUTSIDE ACCEPIABLE LIMITS, SEE PREVIOUS WARNINGS)
HYDROGRAPH INFORMATION ROUTING PARAMETERS PEAK.
---------------------------------------------- -----------------------------------------------------------
OUTFLOW+ VOLUME MAIN ITER- 9 AND A PEAL( S/Q ATT- TRAVEL TIME
XSEC REACH INFLOW OUTFLOW INTERV.A.REA BASE- ABOVE TIME ATION EQUATION LENGTH RATIO SPEAK KIN STOR- KINE-
----------- ----------- ----------- -----------
ID LENGTH PEAK TIME PEAK TIME PEAK TIME FLOW BASE INCR # COEFF POWER FACTOR 0/I (K) COEFF AGE MATIC
(FT) (CFS) (MR) (CFS) (MR) (CFS) (MR) (CFS) (IN) (MR) (X) (M) (Kf) (Qf) (SEC) (C) (MR) (MR)
ALTERNATE 3 STORM 2
1 1400 0 22.4 0 23.2 --- --- 0 .07 .10 1 .414 1.51 .175 .896 2571 .13' .80 .73
1 1700 0 .0 0 .0 --- --- 0 .00 .10 0 .000 .00 .000 .000 0 .00 .00 .00
ALTERNATE 3 STORM 10
1 1400 4 13.3 4 13.7 --- --- 0 1.00 .10 1 .414 1.51 .044 .869 1039 .30 .40 .30
1 1700 1 13.9 1 14.6 --- --- 0 .82 .10 1 .486 1.51 .062 .815 1664 .20 .70 .48
ALTERNATE 3 STORM 25
1 1400 9 12.9 8 13.2 --- --- 0 1.58 .10 1 .414 1.51 .050 .839 788 .37 .30 .23
1 1700 5 12.7 3 13.1 --- --- 0 1.47 .10 1 .486 1.51 .090 .657 1096 .28 .40 .33
ALTERNATE 3 STORM 50
1 1400 15 12.9 13 13.0 --- --- 0 2.11 .10 1 .414 1.51 .053 .859 666 .43 .20 .19
1 1700 i0 12.5 7 12.8 --- --- 0 2.05 .10 1 .486 1.51 .120 .665 B41 .35 .30 .25
ALTERNATE 3 STORM 99
1 1400 21 12.7 19 12.9 --- --- 0 2.66 .10 1 .414 1.51 .052 .B78 596 .46 .20 .17
1 1700 15 12.4 11 12.7 --- --- 0 2.69 .10 1 .486 1.51 .123 .709 727 .40 .30 .21
27
SUMMARY TABLE 3 - DISCHARGE ICFS! AT XSECTIONS AND STRUCTURES FOR ALL STORMS AND ALTERNATES
XSECTION/ DRAINAGE
STRUCTURE AREA STORM NUMBERS..........
ID (Se Ml) 2 10 25 50 99
STRUCTURE 9 .07
ALTERNATE 3 15.29 30.29 38.81 46.17 53.49
STRUCTURE 7 .02
ALTERNATE 3 2.85 3.55 3.62 3.69 3.76
STRUCTURE 6 .02
ALTERNATE 3 2.88 3.84 3.89 3.95 4.00
STRUCTURE 4 .05
ALTERNATE 3 4.64 19.19 26.27 32.16 37.27
STRUCTURE 3 .01
ALTERNATE 3 .00 1.31 4.52 9.97 15.57
STRUCTURE 2 .01
ALTERNATE 3 7.40 12.39 13.B6 14.02 14.19
STRUCTURE 1 .02
ALTERNATE 3 .29 4.11 9.37 15.44 21.40
%SECTION 1 .01
ALTERNATE 3 .00 1.07 2.97 6.64 10.97
XSECTION 2 .10
ALTERNATE 3 .00 .00 .31 1.11 1.98
XSECTION 8 .12
ALTERNATE 3 18.2B 48.75 65.61 79.30 90.84
XSECTION 9 .06
ALTERNATE 3 11.49 23.97 31.63 38.37 44.82
END OF I JOBS IN THIS RUN
APPENDIX B
ALTERNATE i CALCULATIONS
1
DETENTION BASIN i
STAGE-STORAGE CALCULATIONS BY AVERAGE END AREA
Elev. Area Height Volume Sum volume
ft. sf ft. cf cf Ac. ft.
80.3 259900 0.0 0.0 0.0
0.6
80.9 869641 339762 339762 0.78
0.1
81.0 96,765 429933 429933 0.99
0.1
81.1 1069888 109183 539115 1.22
0.1
81.2 1179012 119195 64,310 1.48
- 0.2
81 .4 1379259 259427 89,738 2.06
0.6
- 82.0 1989000 1009578 1909316 4.37
STAGE-DISCHARGE CALCULATIONS
Basin 1 structures
1 > Trapezoidal Broad Crested Weir
FL = 80.9
Elev. Head Outflow
ft. ft. cfs
80.9 0.0 0.0
81.0 0.1 7.65
-' 81.1 0.2 23.24
81 .2 0.3 45.63
81.4 0.5 110.85
82.0 1 .1 485.66
Discharge calculations:
Q = 3.2 x W x H1.5 + 2.558 x H2.5 x Z
WHERE: W = width of spillway = 70 ft.
H = head
Z = side slope = 70.0
2
DETENTION BASIN 2
STAGE-STORAGE CALCULATIONS BY AVERAGE END AREA
Elev. Area Height Volume Sum volume
ft. sf ft. cf cf Ac. ft.
77.53 0 0.0 0.0 0.0
0.47
78.0 600 141 141 0.003
1 .0
79.0 14,100 79050 79191 0.115
0.5
79.5 599300 18,350 259541 0.586
0.5
80.0 1189000 449325 699866 1 .604
0.4
80.4 1899200 61 ,440 1319306 3.014
0.6
81 .0 3389900 1589430 289,736 6.651
STAGE-DISCHARGE CALCULATIONS
Basin 2 structures
1 ) 18" RCP, Groove end projecting
FL = 77.53
Elev. Head Outflow
ft. ft. cfs
77.53 0.0 0.0
78.0 0.47 0.8
79.0 1 .47 6.6
79.5 1 .97 9.5
80.0 2.47 12.0
80.4 2.87 13.8
81 .0 3.47 15.7
CROSS SECTION 2 DATA
Overflow section located at western edge of basin 2.
Elev. Discharge End Area
ft. cfs sf
80.4 0.0 0.0
81 .0 9.62 8.25.
82.0 64. 16 32.00
cross section calculations
use Manning's equation with:
n = 0.05 B = 10'
s = 0.0042
z = 6.25
3
DETENTION BASIN 3
— STAGE-STORAGE CALCULATIONS BY AVERAGE END AREA
Elev. Area Height Volume Sum volume
ft. sf ft. cf cf Ac. ft.
81 .7 0 0.0 0.0 0.0
0.3
82.0 39800 570 570 0.013
0.1
82.1 339000 19840 29410 0.055
0.4
82.5 1289400 329280 349690 0.796
0.1
82.6 1459500 13,695 489385 1.111
STAGE-DISCHARGE CALCULATIONS
Basin 3 structures
1) Trapezoidal Broad Crested Weir
FL = 82.5
Elev. Head Outflow
ft. ft. cfs
82.5 0.0 0.0
82.6 0.1 33.18
Discharge calculations:
Q = 3.2 x W x H1.5 + 2.558 x H2.5 x Z
WHERE: W = width of spillway = 200 ft.
H = head
Z = side slope = 1600
4
DETENTION BASIN 4
STAGE-STORAGE CALCULATIONS BY AVERAGE END AREA
Elev. Area Height Volume Sum volume
ft. sf ft. cf cf Ac. ft.
51 .14 0 0.0 0.0 0.0
0.86
52.0 500 215 215 0.005
2.0
54.0 1,000 19500 19715 0.039
2.0
56.0 29200 39200 41915 0.113
2.0
58.0 79200 99400 149315 0.329
2.0
60.0 13,400 20,600 349915 0.802
STAGE-DISCHARGE CALCULATIONS
Basin 4 structures
1 ) 24" RCP, Square edge headwall
FL = 51 .14
Elev. Head Outflow
ft. ft. cfs
51 .14 0.0 0.0
52.0 0.86 2.92
54.0 2.86 20.39
56.0 4.86 30.28
58.0 6.86 37.10
60.0 8.86 42.67
5
DETENTION BASIN 6
STAGE-STORAGE CALCULATIONS BY AVERAGE END AREA
Elev. Area Height Volume Sum volume
ft. sf ft. cf cf Ac. ft.
74.05 0 0.0 0.0 0.0
0.95
75.0 469 223 223 0.005
0.5
75.5 29270 685 908 0.021
0.5
76.0 89248 29630 39538 0.081
0.5
76.5 129730 59245 89782 0.202
1.5
78.0 329100 339623 429405 0.974
0.8
78.8 3429000 1499640 1929045 4.409
STAGE-DISCHARGE CALCULATIONS
Basin 6 structures
1 ) 18" CMP, Groove end projecting
FL = 74.05
Elev. Head Outflow
ft. ft. cfs
74.05 0.0 0.0
75.0 0.95 3.0
75.5 1.45 6.1
76.0 1.95 9.1
76.5 2.45 11 .2
78.0 3.95 15.5
78.8 4.75 17.3
6
DETENTION BASIN 7
STAGE-STORAGE CALCULATIONS BY AVERAGE END AREA
Elev. Area Height Volume Sum volume
ft. sf ft. cf cf Ac. ft.
72.25 0 0.0 0.0 0.0
0.75
73.0 343 223 129 0.003
0.5
73.5 19526 685 467 0.014
0.5
74.0 69057 29630 19896 0.057
0.5
74.5 109919 59245 49244 0.155
1 .5
76.0 25,666 339623 279439 0.785
0.3
76.3 539564 1499640 11 ,885 1 .057
1.7
78.0 1899920 1499640 2069961 5.809
STAGE-DISCHARGE CALCULATIONS
Basin 7 structures
1 ) 15" CMP, Square edge in headwall
FL = 72.25
Elev. Head Outflow
ft. ft. cfs
72.25 0.0 0.0
73.0 0.75 1.70
73.5 1.25 4.01
74.0 1.75 6.20
74.5 2.25 7.65
76.0 3.75 10.62
76.3 4.05 11 .10
78.0 5.75 13.45
CROSS SECTION 3 DATA
Overflow section located at western edge of basin 7.
Elev. Discharge End Area
ft. cfs sf
76.3 0.0 0.0
76.4 0.47 1 .04
76.5 1 .52 2. 16
cross section calculations
use Manning's equation with:
n = 0.05 B = 10'
s = 0.0053 z = 4.0
7
DETENTION BASIN e
STAGE-STORAGE CALCULATIONS BY AVERAGE END AREA
Elev. Area Height Volume Sum volume
ft. sf ft. cf cf Ac. ft.
73.49 0 0.0 0.0 0.0
0.51
— 74.0 250 64 64 0.002
1.5
75.5 19500 19313 19376 0.032
STAGE--DISCHARGE CALCULATIONS
— Basin 8 structures
1) 15" RCP, Groove end projecting
FL = 73.49
Elev. Head Outflow
ft. ft. cfs
— 73.49 0.0 0.0
74.0 0.51 0.8
75.5 2.01 7.0
8
TR-55 CURVE NUMBER COMPUTATION VERSION 1 .11
Project : Beldon Road User: DA Date: 02-06-90
County : Hartford State: CT Checked: ---- Date: --------
Subtitle: Existing runoff conditions
Subarea : 1
-------------------------------------------------------------------------------
Hydrologic Soil Group
COVER DESCRIPTION A B C D
Acres (CN)
-------------------------------------------------------------------------------
FULLY DEVELOPED URBAN AREAS (Veg Estab. )
Open space (Lawns,parks etc. )
Good condition; grass cover > 75% 0.7(39) - -
Impervious Areas
Paved parking lots, roofs, driveways 0.5(98) - - -
OTHER AGRICULTURAL LANDS
Brush - brush, weed, grass mix good 0.8(30) 1 .0(48) - 3.3(73)
Woods good 0.3(30) 0.8(55) - 6.7(77)
Total Area (by Hydrologic Soil Group) 2.3 1 .8 10
-------------------------------------------------------------------------------
SUBAREA: 1 TOTAL DRAINAGE AREA: 14.1 Acres WEIGHTED CURVE NUMBER:68
-------------------------------------------------------------------------------
TR-55 Tc and Tt THRU SUBAREA COMPUTATION VERSION 1 .11
-------------------------------- Subarea #1 - 1 ---------------------------
Flow Type 2 year Length Slope Surface n Area Wp Velocity Time
rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr)
-------------------------------------------------------------------------------
Sheet 3.2 100 .02 f 0.238
Shallow Concent'd 100 .005 u 0.024
Open Channel 950 .0024 .05 3.5 8.24 0.320
Time of Concentration = 0.58*
Open Channel 1400 .0021 .05 3.75 9. 16 0.517
Travel Time = 0.52*
--- Sheet Flow Surface Codes ---
A Smooth Surface F Grass, Dense --- Shallow Concentrated ---
B Fallow (No Res. ) G Grass, Burmuda --- Surface Codes ---
C Cultivated < 20 % Res. H Woods, Light P Paved
D Cultivat d > 20 % Res. I Woods, Dense U Unpaved
E Grass-Range, Short
9
TR-55 CURVE NUMBER COMPUTATION VERSION 1 .11
Project : Beldon Road User: DA Date: 02-06-90
County : Hartford State: CT Checked: ---- Date:
Subtitle: Existing runoff conditions
Subarea : 2
-------------------------------------------------------------------------------
Hydrologic Soil Group
COVER DESCRIPTION A B C D
Acres (CN)
-------------------------------------------------------------------------------
FULLY DEVELOPED URBAN AREAS (Veg Estab. )
Open space (Lawns,parks etc. )
— Good condition; grass cover > 75% 3.3(39) - 0.8(74)
Impervious Areas
— Paved parking lots, roofs, driveways 1.4(98) - - -
OTHER AGRICULTURAL LANDS
Brush - brush, weed, grass mix good 4.5(30) - 1.3(65) 7.6(73)
Woods good 1.2(30) 0.6(55) 3.5(70) 21 .8(77)
Total Area (by Hydrologic Soil Group) 10.4 .6 5.6 29.4
_ -------------------------------------------------------------------------------
SUBAREA: 2 TOTAL DRAINAGE AREA: 46 Acres WEIGHTED CURVE NUMBER:67
-------------------------------------------------------------------------------
TR-55 Tc and Tt THRU SUBAREA COMPUTATION VERSION 1.11
-------------------------------- Subarea #2 - 2 -------------------------------
Flow Type 2 year Length Slope Surface n Area Wp Velocity Time
rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr)
-------------------------------------------------------------------------------
Sheet 3.2 100 .011 h 0.455
Op n Channel 2450 .0019 .05 3.5 8.24 0.927
Time of Concentration = 1.38*
--- Sheet Flow Surface Codes ---
A Smooth Surface F Grass, Dense --- Shallow Concentrated ---
B Fallow (No Res. ) G Grass, Burmuda --- Surface Codes ---
_ C Cultivated < 20 % Res. H Woods, Light P Paved
D Cultivated > 20 % Res. I Woods, Dense U Unpaved
E Grass-Range, Short
10
TR-55 CURVE NUMBER COMPUTATION VERSION 1 . 11
Project : Beldon Road User: DA Date: 02-06-90
County : Hartford State: CT Checked: ---- Date:
Subtitle: Existing runoff conditions
Subarea : 3
-------------------------------------------------------------------------------
Hydrologic Soil Group
COVER DESCRIPTION A B C D
Acres (CN)
-------------------------------------------------------------------------------
OTHER AGRICULTURAL LANDS
Brush - brush, weed, grass mix good - - - 0.5(73)
Woods good 0.3(30) - - 6. 107)
Total Area (by Hydrologic Soil Group) .3 6.6
-------------------------------------------------------------------------------
SUBAREA: 3 TOTAL DRAINAGE AREA: 6.9 Acres WEIGHTED CURVE NUMBER:75
-------------------------------------------------------------------------------
TR-55 Tc and Tt THRU SUBAREA COMPUTATION VERSION 1 . 11
-------------------------------- Subarea #3 - 3 -------------------------------
Flow Type 2 year Length Slope Surface n Area Wp Velocity Time
rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr)
-------------------------------------------------------------------------------
Sheet 3.2 50 .064 h 0. 129
Shallow Concent'd 600 .008 u 0. 115
Time of Concentration = 0.24*
Open Channel 1700 .0029 .05 3.75 9. 16 0.534
Travel Time = 0.53
--- Sheet Flow Surface Codes ---
A Smooth Surface F Grass, Dense --- Shallow Concentrated ---
B Fallow (No Res. ) G Grass, Burmuda --- Surface Codes ---
C Cultivated < 20 % Res. H Woods, Light P Paved
D Cultivated > 20 % Res. I Woods, Dense U Unpaved
E Grass-Range, Short
it
TR-55 CURVE NUMBER COMPUTATION VERSION 1 .11
Project : Beldon Road User: DA Date: 02-06-90
County : Hartford State: CT Checked: Date:
---- --------
Subtitle: Existing runoff conditions
Subarea : 4
-------------------------------------------------------------------------------
Hydrologic Soil Group
COVER DESCRIPTION A B C D
Acres (CN)
-------------------------------------------------------------------------------
FULLY DEVELOPED URBAN AREAS (Veg Estab. )
Op n space (Lawns,parks etc. )
Good condition; grass cover > 75% 5.0(39) 5.0(61 ) 2.0(74) - '
Imp rvious Areas
Paved parking lots, roofs, driveways 2.6(98) - - -
OTHER AGRICULTURAL LANDS
Brush - brush, weed, grass mix good - 4.0(48) 1.2(65) -
Woods good 1 .0(30) 5.3(55) 2.9(70) -
Total Area (by Hydrologic Soil Group) 8.6 14.3 6.1
-------------------------------------------------------------------------------
SUBAREA: 4 TOTAL DRAINAGE AREA: 29 Acres WEIGHTED CURVE NUMBER:59
-------------------------------------------------------------------------------
TR-55 Tc and Tt THRU SUBAREA COMPUTATION VERSION 1.11
-------------------------------- Subarea #4 - 4 -------------------------------
Flow Type 2 year Length Slope Surface n Area Wp Velocity Time
rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr)
-------------------------------------------------------------------------------
Sheet 3.2 150 .055 f 0.219
Shallow Concent'd 1400 .011 u 0.230
Open Channel 500 .03 .05 8 11 .3 0.034
Time of Concentration = 0.48*
--- Sheet Flow Surface Codes ---
A Smooth Surface F Grass, Dense --- Shallow Concentrated ---
_ B Fallow (No Res. ) G Grass, Burmuda --- Surface Codes ---
C Cultivated < 20 % Res. H Woods, Light. P Paved
D Cultivated > 20 % Res. I Woods, Dense U Unpaved
E Grass-Range, Short
12
TR-55 CURVE NUMBER COMPUTATION VERSION 1 . 11
Project : Beldon Road User: DA Date: 02-06-90
County : Hartford State: CT Checked: ---- Date: --------
Subtitle: Existing runoff conditions
Subarea : 5
-------------------------------------------------------------------------------
Hydrologic Soil Group
COVER DESCRIPTION A B C D
Acres (CN)
-------------------------------------------------------------------------------
FULLY DEVELOPED URBAN AREAS (Veg Estab. )
Open space (Lawns,parks etc. )
Good condition; grass cover > 75% 1 .0(39) - 0.1 (74)
Impervious Areas
Paved parking lots, roofs, driveways 0.3(98) - - -
OTHER AGRICULTURAL LANDS
Brush - brush, weed, grass mix good - 0.1 (48) - -
Woods good 0.3(30) 0.2(55) - -
Total Area (by Hydrologic Soil Group) 1 .6 .3 .1
-------------------------------------------------------------------------------
SUBAREA: 5 TOTAL DRAINAGE AREA: 2 Acres WEIGHTED CURVE NUMBER:50
-------------------------------------------------------------------------------
TR-55 Tc and Tt THRU SUBAREA COMPUTATION VERSION 1 .11
-------------------------------- Subarea #5 - 5 -------------------------------
Flow Type 2 year Length Slope Surface n Area Wp Velocity Time
rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr)
-------------------------------------------------------------------------------
Sheet 3.2 100 .017 f 0.254
Shallow Concent 'd 120 .048 u 0.009
Open Channel 410 .047 .0136.3 12.6 0.007
Open Channel 200 .031 .03 8 11 .3 0.008
Time of Concentration = 0.28*
--- Sheet Flow Surface Codes ---
A Smooth Surface F Grass, Dense --- Shallow Concentrated ---
B Fallow (No Res. ) G Grass, Burmuda --- Surface Codes ---
C Cultivated < 20 % Res. H Woods, Light P Paved
D Cultivated > 20 % Res. I Woods, Dense U Unpaved
E Grass-Range, Short
13
TR-55 CURVE NUMBER COMPUTATION VERSION 1 . 11
Proi ct : Beldon Road User: DA Date: 02-06-90
County : Hartford State: CT Checked: ---- Date: --------
Subtitle: Existing runoff conditions
Subar a : 6
-------------------------------------------------------------------------------
Hydrologic Soil Group
COVER DESCRIPTION A B C D
Acres (CN)
-------------------------------------------------------------------------------
FULLY DEVELOPED URBAN AREAS (Veg Estab. )
Open space (Lawns,parks etc. )
Good condition; grass cover > 75% 0.9(39) - 0.4(74) -
Imp rvious Areas
Paved parking lots, roofs, driveways 0.1(98) - - -
CULTIVATED AGRICULTURAL LANDS
Fallow Crop residue (CR) poor 1 .0(76) 1.5(85) 4.5(90) -
OTHER AGRICULTURAL LANDS
Wo ds good 0.6(30) 1.6(55) 3.2(70) -
Total Area (by Hydrologic Soil Group) 2.6 3.1 8.09
-------------------------------------------------------------------------------
SUBAREA: 6 TOTAL DRAINAGE AREA: 13.8 Acres WEIGHTED CURVE NUMBER:73
-------------------------------------------------------------------------------
TR-55 Tc and Tt THRU SUBAREA COMPUTATION VERSION 1.11
-------------------------------- Subarea #6 - 6 -------------------------------
Flow Type 2 year Length Slope Surface n Area Wp Velocity Time
rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr)
-------------------------------------------------------------------------------
_ She t 3.2 100 .006 h 0.579
Shallow Concent'd 200 .0165 u 0.027
Open Channel 1400 .0007 .05 8 11.3 0.621
Time of Concentration = 1 .23*
--- Sheet Flow Surface Codes ---
A Smooth Surface F Grass, Dense --- Shallow Concentrated ---
B Fallow (No Res. ) G Grass, Burmuda --- Surface Codes ---
C Cultivated < 20 % Res. H Woods, Light P Paved
_ D Cultivated > 20 % Res. I Woods, Dense U Unpaved
E Grass-Range, Short
14
TR-55 CURVE NUMBER COMPUTATION VERSION 1 .11
Project : Beldon Road User: DA Date: 02-06-90
County : Hartford State: CT Checked: ---- Date:
Subtitle: Existing runoff conditions
Subarea : 7
-------------------------------------------------------------------------------
Hydrologic Soil Group
COVER DESCRIPTION A B C D
Acres (CN)
-------------------------------------------------------------------------------
FULLY DEVELOPED URBAN AREAS (Veg Estab. )
Open space (Lawns,parks etc. )
Good condition; grass cover > 75% - 0.3(61 ) -
Impervious Areas
Paved parking lots, roofs, driveways 0.2(98) - - -
CULTIVATED AGRICULTURAL LANDS
Fallow Bare soil ---- 0.4(77) 7.0(86) 1 .5(91 ) -
Crop residue (CR) poor - 1 .7(85) 0.5(90) -
OTHER AGRICULTURAL LANDS
Brush - brush, weed, grass mix good - - - 0.1 (73)
Woods good 0.4(30) 4.4(55) 1 .9(70) 0. 1 (77)
Total Area (by Hydrologic Soil Group) 1 13.4 3.9 .2
-------------------------------------------------------------------------------
SUBAREA: 7 TOTAL DRAINAGE AREA: 18.5 Acres WEIGHTED CURVE NUMBER:76
-------------------------------------------------------------------------------
TR-55 Tc and Tt THRU SUBAREA COMPUTATION VERSION 1 .11
-------------------------------- Subarea #7 - 7 -------------------------------
Flow Type 2 year Length Slope Surface n Area Wp Velocity Time
rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr)
-------------------------------------------------------------------------------
Sheet 3.2 50 .002 h 0.516
Shallow Concent'd 230 .0017 u 0.096
Open Channel 1700 .0008 .05 8 11 .3 0.705
Time of Concentration = 1 .32*
--- Sheet Flow Surface Codes ---
A Smooth Surface F Grass, Dense --- Shallow Concentrated ---
B Fallow (No Res. ) G Grass, Burmuda --- Surface Codes ---
C Cultivated < 20 % Res. H Woods, Light P Paved
D Cultivated > 20 % R s. I Woods, Dense U Unpaved
E Grass-Range, Short
15
TR-55 CURVE NUMBER COMPUTATION VERSION 1 . 11
Project : Beldon Road User: DA Date: 02-06-90
County : Hartford State: CT Checked: ---- Date:
Subtitle: Existing runoff conditions
Subarea : 8
-------------------------------------------------------------------------------
Hydrologic Soil Group
COVER DESCRIPTION A B C D
Acres (CN)
-------------------------------------------------------------------------------
FULLY DEVELOPED URBAN AREAS (Veg Estab. )
Op n space (Lawns,parks etc. )
Good condition; grass cover > 75% - 0.2(61 ) -
CULTIVATED AGRICULTURAL LANDS
Fallow Bare soil ---- - 1 .2(86) - -
OTHER AGRICULTURAL LANDS
Woods good - 0.2(55) - -
Total Area (by Hydrologic Soil Group) 1.6
-------------------------------------------------------------------------------
_ SUBAREA: 8 TOTAL DRAINAGE AREA: 1 .6 Acres WEIGHTED CURVE NUMBER:79
-------------------------------------------------------------------------------
TR-55 Tc and Tt THRU SUBAREA COMPUTATION VERSION 1.11
-------------------------------- Subarea #8 - 8 -------------------------------
Flow Type 2 year Length Slope Surface n Area Wp Velocity Time
rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr)
-------------------------------------------------------------------------------
Sh et 3.2 50 0.018 h 0.214
Shallow Concent'd 400 0.016 u 0.054
Time of Concentration = 0.27*
--- Sheet Flow Surface Codes ---
A Smooth Surface F Grass, Dense --- Shallow Concentrated ---
B Fallow (No Res. ) G Grass, Burmuda --- Surface Codes ---
C Cultivated < 20 % Res. H Woods, Light P Paved
D Cultivated > 20 % Res. I Woods, Dense U Unpaved
E Grass-Range, Short
APPENDIX C
ALTERNATE 2 CALCULATIONS
1
DETENTION BASIN 6
-- STAGE-STORAGE CALCULATIONS BY AVERAGE END AREA
Elev. Area Height Volume Sum volume
ft. sf ft. cf cf Ac. ft.
74.46 0 0.0 0.0 0.0
0.54
75.0 79370 29211 19990 0.046
1.0
76.0 229910 159140 179130 0.393
0.7
76.7 349785 20,193 379322 0.857
1.3
78.0 37,296 469853 849175 1.932
0.5
78.5 409500 199449 1039624 2.379
STAGE-DISCHARGE CALCULATIONS
Basin 6 structures
1) 9" Circular orifice
FL = 74.4
Elev. Head Outflow
ft. ft. cfs
74.4 0.0 0.0
75.0 0.6 0.8
76.0 1 .6 2.4
76.7 2.3 3.0
78.0 3.6 3.8
78.5 4.1 4.1
Discharge calculations:
For H < 1 .2 * D
Q = 5.269 x Cd x D2•5 x (H / 1 .2 x D)1.5
For H > 1.2 * D
Q = pi / 4 x Cd x D2 x [2 x g x (H - D / 2)]1.5
WHERE: Cd = coefficient of discharge = 0.6
H = head above f l owl i ne (ft. )
D = diameter of orifice (ft. )
g = gravity = 32.16 ft./sec2
2
DETENTION BASIN 7
STAGE-STORAGE CALCULATIONS BY AVERAGE END AREA
Elev. Area Height Volume Sum volume
ft. sf ft. cf cf Ac. ft.
73.3 0 0.0 0.0 0.0
0.7
74.0 19950 683 683 0.016
2.0
76.0 99610 119560 129243 0.281
2.0
78.0 239450 339060 459303 1.040
STAGE-DISCHAR(3E CALCULATIONS
Basin 7 structures
1 ) 9" Circular orifice
FL = 73.30
Elev. Head Outflow
ft. ft. cfs
73.3 0.0 0.0
74.0 0.7 0.6
76.0 2.7 2.3
78.0 4.7 3.8
Discharge calculations:
For H < 1 .2 * D
Q = 5.269 x Cd x D2.5 x (H / 1 .2 x D)1.5
For H > 1 .2 * D
Q = pi / 4 x Cd x D2 x C2 x g x (H - D / 2)11.5
WHERE: Cd = coefficient of discharge = 0.6
H = head above flowline (ft. )
D = diameter of orifice (ft. )
g = gravity = 32.16 ft./sec2
- 3
DETENTION BASIN 8
STAGE-STORAGE CALCULATIONS BY AVERAGE END AREA
Elev. Area Height Volume Sum volume
ft. sf ft. cf cf Ac. ft.
74.5 0 0.0 0.0 0.0
0.5
75.0 69200 19550 19550 0.036
1.0
76.0 99384 79792 99342 0.214
1.0
77.0 109656 109020 199362 0.444
1.0
78.0 129000 119328 309690 0.705
STAGE-DISCHARGE CALCULATIONS
Basin 8 structures
1) 9" Circular orifice
FL' = 74.5
_ Elev. Head Outflow
ft. ft. cfs
74.5 0.0 0.0
75.0 0.5 0.6
76.0 1.5 2.3
77.0 2.5 3.2
78.0 3.5 3.8
Discharge calculations:
_ For H < 1 .2 * D
Q = 5.269 x Cd x D2.5 x (H / 1.2 x D)1.5
For H > 1 .2 * D
Q = pi / 4 x Cd x D2 x 12 x g x (H - D / 2)31.5
WHERE: Cd = coefficient of discharge = 0.6
H = head above flowline (ft. )
D = diameter of orifice (ft. )
g = gravity = 32.16 ft./sec2
4
TR-55 CURVE NUMBER COMPUTATION VERSION 1. 11
Project : Beldon Road Subdivision User: DA Date: 02-26-90
County : Hartford State: CT Checked: ---- Date:
Subtitle: Developed subareas
Subarea : 6
-------------------------------------------------------------------------------
Hydrologic Soil Group
COVER DESCRIPTION A B C D
Acres (CN)
-------------------------------------------------------------------------------
FULLY DEVELOPED URBAN AREAS (Veg Estab. )
Open space (Lawns,parks etc. )
Good condition; grass cover > 75% 0.6(39) 0.8(61 ) 2.3(74) -
Impervious Areas
Paved parking lots, roofs, driveways 4.0(98) - - -
CULTIVATED AGRICULTURAL LANDS
Fallow Crop residue (CR) poor - - 0.9(90) -
OTHER AGRICULTURAL LANDS
Brush - brush, weed, grass mix good - - 1 .5(65) -
Woods good 0.5(30) 0.6(55) 0.6(70) -
Total Area (by Hydrologic Soil Group) 5.1 1 .4 5.3
-------------------------------------------------------------------------------
SUBAREA: 6 TOTAL DRAINAGE AREA: 11 .8 Acres WEIGHTED CURVE NUMBER:77
-------------------------------------------------------------------------------
TR-55 Tc and Tt THRU SUBAREA COMPUTATION VERSION 1 . 11
-------------------------------- Subarea #6 - 6 ------------------------
Flow Type 2 year Length Slope Surface n Area Wp Velocity Time
rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr)
-------------------------------------------------------------------------------
Sheet 3.2 50 .01 f 0.180
Shallow Concent'd 170 .024 u 0.019
Open Channel 450 .005 .03 2 4.5 0.061
Time of Concentration = 0.26*
--- Sheet Flow Surface Codes ---
A Smooth Surface F Grass, Dense --- Shallow Concentrated ---
B Fallow (No Res. ) G Grass, Burmuda --- Surface Codes ---
C Cultivated < 20 % Res. H Woods, Light P Paved
D Cultivated > 20 % Res. I Woods, D nse U Unpaved
E Grass-Range, Short
5
TR-55 CURVE NUMBER COMPUTATION VERSION 1.11
Project : Beldon Road Subdivision User: DA Date: 02-26-90
County : Hartford State: CT Checked: Date:
---- --------
Subtitle: Developed subareas
Subarea : 7
-------------------------------------------------------------------------------
Hydrologic Soil Group
COVER DESCRIPTION A B C D
Acres (CN)
-------------------------------------------------------------------------------
FULLY DEVELOPED URBAN AREAS (Veg Estab. )
Open space (Lawns,parks etc. )
Good condition; grass cover > 75% 0.2(39) 0.4(61) 0.7(74) -
Impervious Areas
Paved parking lots, roofs, driveways 1.6(98) - - -
OTHER AGRICULTURAL LANDS
Woods good 0.2(30) 0.9(55) 1.1(70) 0.2(77)
Total Area (by Hydrologic Soil Group) 2 1.3 1 .8 .2
_ -------------------------------------------------------------------------------
SUBAREA: 7 TOTAL DRAINAGE AREA: 5.3 Acres WEIGHTED CURVE NUMBER:73
-------------------------------------------------------------------------------
TR-55 Tc and Tt THRU SUBAREA COMPUTATION VERSION 1 .11
-------------------------------- Subarea #7 - 7 -------------------------------
Flow Type 2 year Length Slope Surface n Area Wp Velocity Tim
rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr)
-------------------------------------------------------------------------------
Sheet 3.2 50 .002 h 0.516
Shallow Concent'd 230 .0017 u 0.096
Open Channel 700 .0008 .05 8 11.3 0.290
Time of Concentration = 0.90*
--- Sheet Flow Surface Codes ---
A Smooth Surface F Grass, Dense --- Shallow Concentrated ---
_ B Fallow (No Res. ) G Grass, Burmuda --- Surface Codes ---
C Cultivated < 20 % Res. H Woods, Light P Paved
D Cultivated > 20 % Res. I Woods, Dense U Unpaved
E Grass-Range, Short
6
TR-55 CURVE NUMBER COMPUTATION VERSION 1 .11
Project : Beldon Road Subdivision User: DA Date: 02-26-90
County : Hartford State: CT Checked: ---- Date:
Subtitle: Developed subareas
Subarea : 8
-------------------------------------------------------------------------------
Hydrologic Soil Group
COVER DESCRIPTION A B C D
Acres (CN)
-------------------------------------------------------------------------------
FULLY DEVELOPED URBAN AREAS (Veg Estab. )
Open space (Lawns,parks etc. )
Good condition; grass cover > 75% - - 0.8(74) -
Impervious Areas
Paved parking lots, roofs, driveways 1.2(98) - - -
OTHER AGRICULTURAL LANDS
Woods good - 0.2(55) 0.1 (70) -
Total Area (by Hydrologic Soil Group) 1 .2 .2 .9
-------------------------------------------------------------------------------
SUBAREA: 8 TOTAL DRAINAGE AREA: 2.3 Acres WEIGHTED CURVE NUMBER:85
-------------------------------------------------------------------------------
TR-55 Tc and Tt THRU SUBAREA COMPUTATION VERSION 1. 11
-------------------------------- Subarea #8 - 8 --------
-----------------------
Flow Type 2 year Length Slope Surface n Area Wp Velocity Time
rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr)
-------------------------------------------------------------------------------
Sheet 3.2 50 .01 f 0. 180
Shallow Concent'd 70 .01 u 0.012
Open Channel 250 .005 .0136.3 12.6 0.014
Time of Concentration = 0.21*
--- Sheet Flow Surface Codes ---
A Smooth Surface F Grass, Dense --- Shallow Concentrated ---
B Fallow (No Res. ) G Grass, Burmuda --- Surface Codes ---
C Cultivated < 20 % Res. H Woods, Light P Paved
D Cultivated > 20 % Res. I Woods, Dense U Unpaved
E Grass-Range, Short
— TR-55 CURVE NUMBER COMPUTATION VERSION 1.11
Project : Beldon Road Subdivision User: DA Date: 02-26-90
County : Hartford State: CT Checked: ---- Date:
Subtitle: Developed subareas
Subarea : 9
-------------------------------------------------------------------------------
Hydrologic Soil Group
COVER DESCRIPTION A B C D
Acres (CN)
-------------------------------------------------------------------------------
FULLY DEVELOPED URBAN AREAS (Veg Estab. )
Op n space (Lawns,parks etc. )
Good condition; grass cover > 75% 0.5(39) 9.1 (61) 0.5(74) -
- Imp rvious Areas
Paved parking lots, roofs, driveways 4.1(98) - - -
OTHER AGRICULTURAL LANDS
Woods good - 2.0(55) - -
Total Area (by Hydrologic Soil Group) 4.6 11.1 .5
-------------------------------------------------------------------------------
- SUBAREA: 9 TOTAL DRAINAGE AREA: 16.2 Acres WEIGHTED CURVE NUMBER:69
-------------------------------------------------------------------------------
TR-55 Tc and Tt THRU SUBAREA COMPUTATION VERSION 1.11
-------------------------------- Subarea #9 - 9 -------------------------------
Flow Type 2 year Length Slope Surface n Area Wp Velocity Time
rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr)
-------------------------------------------------------------------------------
She t 3.2 160 .013 f 0.412
Shallow Concent'd 30 .02 u 0.004
Shallow Concent'd 115 .01 p 0.016
Open Channel 1535 .005 .0133.14 6.28 0.084
Time of Concentration = 0.51*
--- Sheet Flow Surface Codes ---
A Smooth Surface F Grass, Dense --- Shallow Concentrated ---
B Fallow (No Res. ) G Grass, Burmuda --- Surface Codes ---
C Cultivated < 20 % Res. H Woods, Light P Paved
D Cultivated > 20 % Res. I Woods, Dense U Unpaved
E Grass-Range, Short
8
TR-55 CURVE NUMBER COMPUTATION VERSION 1 .11
Proj ct : Beldon Road Subdivision User: DA Date: 02-26-90
County : Hartford State: CT Checked: ---- Date:
Subtitle: Developed subareas
Subar a : 10
pause
--------------------------------------------------------------------------------
Hydrologic Soil Group
COVER DESCRIPTION A B C D
Acres (CN)
-------------------------------------------------------------------------------
FULLY DEVELOPED URBAN AREAS (Veg Estab. )
Open space (Lawns,parks etc. )
Good condition; grass cover > 75% - 0.8(61 ) - -
Total Area (by Hydrologic Soil Group) .8
-------------------------------------------------------------------------------
SUBAREA: 10 TOTAL DRAINAGE AREA: .8 Acres WEIGHTED CURVE NUMBER:61
-------------------------------------------------------------------------------
TR-55 Tc and Tt THRU SUBAREA COMPUTATION VERSION 1 .11
------------------------------- Subarea #5 - 10 -----------------------
Flow Type 2 year Length Slope Surface n Area Wp Velocity Time
rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr)
-------------------------------------------------------------------------------
Sheet 3.2 50 .016 f 0.149
Shallow Concent'd 230 .016 u 0.031
Time of Concentration = 0.18*
--- Sheet Flow Surface Codes ---
A Smooth Surface F Grass, Dense --- Shallow Concentrated ---
B Fallow (No Res. ) G Grass, Burmuda --- Surface Codes ---
C Cultivated < 20 % Res. H Woods, Light P Paved
D Cultivated > 20 % Res. I Woods, Dense U Unpaved
E Grass-Range, Short
APPENDIX D
ALTERNATE 3 CALCULATIONS
- i
_- DETENTION BASIN 6
STAGE-STORAGE CALCULATIONS BY AVERAGE END AREA
_ Elev. Area Height Volume Sum volume
ft. sf ft. cf cf Ac. ft.
74.46 0 0.0 0.0 0.0
- 0.54
75.0 790 213 213 0.005
1 .0
76.0 29450 1 ,620 19833 0.042
2.0
78.0 109420 12,870 14,703 0.338
0.5
78.5 2559000 669355 819058 1.861
STAGE-DISCHARGE CALCULATIONS
_ Basin 6 structures
1) 9" Circular orifice
Elev. Head Outflow
ft. ft. cfs
74.43 0.0 0.0
75.0 0.57 0.7
76.0 1 .57 2.4
78.0 3.57 3.8
78.5 4.07 4.1
Discharge calculations:
For H < 1 .2 * D
0 = 5.269 x Cd x D2.5 x (H / 1.2 x D)1.5
For H > 1 .2 * D
0 = p i / 4 x Cd x D2 x 12 x g x (H - D / 2)]1.5
WHERE: Cd = coefficient of discharge = 0.6
H = head above flowline (ft. )
_ D = diameter of orifice (ft. )
g = gravity = 32.16 ft./sec2
2
DETENTION BASIN 7
STAGE-STORAGE CALCULATIONS BY AVERAGE END AREA
Elev. Area Height Volume Sum volume
ft. sf ft. cf cf Ac. ft.
73.3 0 0.0 0.0 0.0
0.7
74.0 19950 683 683 0.016
2.0
76.0 99610 119560 129243 0.281
0.3
76.3 349244 69578 189821 0.432
1 .7
78.0 1669420 1709564 1899385 4.348
STAGE-DISCHARGE CALCULATIONS
Basin 7 structures
1 ) 9" Circular orifice
FL = 73.30
Elev. Head Outflow
ft. ft. cfs
73.3 0.0 0.0
74.0 0.7 1 .0
76.0 2.7 3.3
76.3 3.0 3.5
78.0 4.7 4.4
Discharge calculations:
For H < 1 .2 * D
Q = 5.269 x Cd x D2.5 x (H ! 1.2 x D)1.5
For H > 1 .2 * D
Q = pi / 4 x Cd x D2 x C2 x g x (H - D / 2)11•5
WHERE: Cd = coefficient of discharge = 0.6
H = head above flowline (ft. )
D = diameter of orifice (ft. )
g = gravity = 32.16 ft./sec2
3
TR-55 CURVE NUMBER COMPUTATION VERSION 1 .11
Project : Beldon Road Subdivision User: DA Date: 02-26-90
County : Hartford State: CT Checked: ---- Date:
Subtitle: Proposed drainage conditions with undeveloped offsite areas
Subarea : 6
-------------------------------------------------------------------------------
Hydrologic Soil Group
COVER DESCRIPTION A B C D
Acres (CN)
-------- L----------------------------------------------------------------------
FULLY DEVELOPED URBAN AREAS (Veg Estab. )
Open space (Lawns,parks etc. )
Good condition; grass cover > 75% 0.7(39) - 0.4(74) -
Impervious Areas
Paved parking lots, roofs, driveways 0.1(98) - - -
CULTIVATED AGRICULTURAL LANDS
Fallow Crop residue (CR) poor 0.3(76) 0.2(85) 4.0(90) -
_ OTHER AGRICULTURAL LANDS
Woods good 0.6(30) 1 .0(55) 3.2(70) -
Total Area (by Hydrologic Soil Group) 1 .7 1.2 7.6
-------------------------------------------------------------------------------
SUBAREA: 6 TOTAL DRAINAGE AREA: 10.5 Acres WEIGHTED CURVE NUMBER:73
-------------------------------------------------------------------------------
TR-55 Tc and Tt THRU SUBAREA COMPUTATION VERSION 1.11
— -------------------------------- Subarea #6 - 6 -------------------------------
Flow Type 2 year Length Slope Surface n Area Wp Velocity Time
rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr)
_ -------------------------------------------------------------------------------
Sheet 3.2 100 .006 h 0.579
Shallow Concent'd 200 .0165 u 0.027
Open Channel 450 .0022 .05 8 11 .3 0.113
Time of Concentration = 0.72*
--- Sheet Flow Surface Codes ---
A Smooth Surface F Grass, Dense --- Shallow Concentrated ---
B Fallow (No Res. ) G Grass, Burmuda --- Surface Codes ---
C Cultivated < 20 % Res. H Woods, Light P Paved
D Cultivated > 20 % Res. I Woods, Dense U Unpaved
E Grass-Range, Short
4
TR-55 CURVE NUMBER COMPUTATION VERSION 1 .11
Project : Beldon Road Subdivision User: DA Date: 02-26-90
County : Hartford State: CT Checked: ____ Date: ________
Subtitle: Proposed drainage conditions with undeveloped offsite areas
Subar a : 7
-------------------------------------------------------------------------------
Hydrologic Soil Group
COVER DESCRIPTION A B C D
Acres (CN)
-------------------------------------------------------------------------------
CULTIVATED AGRICULTURAL LANDS
Fallow Bare soil ---- 0.4(77) 2.8(86) 1.5(91 ) -
Crop residue (CR) poor - 0.8(85) 0.5(90) -
OTHER AGRICULTURAL LANDS
Brush - brush, weed, grass mix good - - - 0.1 (73)
Woods good 0.4(30) 1 .8(55) 1 .9(70) 0.1 (77)
Total Area (by Hydrologic Soil Group) .8 5.4 3.9 .2
-------------------------------------------------------------------------------
SUBAREA: 7 TOTAL DRAINAGE AREA: 10.3 Acres WEIGHTED CURVE NUMBER:76
-------------------------------------------------------------------------------
TR-55 Tc and Tt THRU SUBAREA COMPUTATION VERSION 1 .11
--------------------------------
Subarea #7 - 7 -------------------------------
Flow Type 2 year Length Slope Surface n Area Wp Velocity Time
rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr)
-------------------------------------------------------------------------------
Sheet 3.2 50 .002 h 0.516
Shallow Concent'd 230 .0017 u 0.096
Open Channel 700 .0008 .05 8 11.3 0.290
Time of Concentration = 0.90*
--- Sheet Flow Surface Codes ---
A Smooth Surface F Grass, Dense --- Shallow Concentrated ---
B Fallow (No Res. ) G Grass, Burmuda --- Surface Codes ---
C Cultivated < 20 % Res. H Woods, Light P Paved
D Cultivated > 20 % Res. I Woods, Dense U Unpaved
E Grass-Range, Short
5
_ TR-55 CURVE NUMBER COMPUTATION VERSION 1 .11
Proi ct : Beldon Road Subdivision User: DA Date: 02-26-90
County : Hartford State: CT Checked: ---- Date: --------
Subtitle: Proposed drainage conditions with undeveloped offsite areas
— Subarea : 8
-------------------------------------------------------------------------------
Hydrologic Soil Group
COVER DESCRIPTION A B C D
Acres (CN)
-------------------------------------------------------------------------------
FULLY DEVELOPED URBAN AREAS (Veg Estab. )
Open space (Lawns,parks etc. )
Good condition; grass cover > 75% 0.5(39) 9.1(61) 0.5(74) -
Imp rvious Areas
Paved parking lots, roofs, driveways 4.1(98) - - -
OTHER AGRICULTURAL LANDS
Woods good - 2.0(55) - -
Total Area (by Hydrologic Soil Group) 4.6 11 .1 .5
-------------------------------------------------------------------------------
- SUBAREA: 8 TOTAL DRAINAGE AREA: 16.2 Acres WEIGHTED CURVE NUMBER:69
-------------------------------------------------------------------------------
TR-55 Tc and Tt THRU SUBAREA COMPUTATION VERSION 1.11
— -------------------------------- Subarea #8 - 8 -------------------------------
Flow Type 2 year Length Slope Surface n Area Wp Velocity Time
rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr)
— -------------------------------------------------------------------------------
Sheet 3.2 160 .013 f 0.412
Shallow Concent'd 30 .026 u 0.003
Shallow Concent'd 115 .01 p 0.016
Open Channel 1535 .005 .0133.14 6.28 0.084
Time of Concentration = 0.51*
--- Sheet Flow Surface Codes ---
A Smooth Surface F Grass, Dense --- Shallow Concentrated ---
- B Fallow (No Res. ) G Grass, Burmuda --- Surface Codes ---
C Cultivated < 20 % Res. H Woods, Light P Paved
D Cultivated > 20 % Res. I Woods, Dense U Unpaved
— E Grass-Range, Short
6
TR-55 CURVE NUMBER COMPUTATION VERSION 1 . 11
Project : Beldon Road Subdivision User: DA Date: 02-26-90
County : Hartford State: CT Checked: ---- Date:
Subtitle: Proposed drainage conditions with undeveloped offsite areas
Subarea : 9
-------------------------------------------------------------------------------
Hydrologic Soil Group
COVER DESCRIPTION A B C D
Acres (CN)
-------------------------------------------------------------------------------
FULLY DEVELOPED URBAN AREAS (Veg Estab. )
Op n space (Lawns,parks etc. )
Good condition; grass cover > 75% - 0.8(61 ) - -
Total Area (by Hydrologic Soil Group) .8
-------------------------------------------------------------------------------
SUBAREA: 9 TOTAL DRAINAGE AREA: .8 Acres WEIGHTED CURVE NUMBER:61
-------------------------------------------------------------------------------
TR-55 Tc and Tt THRU SUBAREA COMPUTATION VERSION 1.11
-------------------------------- Subarea #9 - 9 --------------------
Flow Type 2 year Length Slope Surface n Area Wp Velocity Time
rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr)
-------------------------------------------------------------------------------
Sheet 3.2 50 .016 f 0.149
Shallow Concent'd 230 .016 u 0.031
Time of Concentration = 0.18*
--- Sheet Flow Surface Codes ---
A Smooth Surface F Grass, Dense --- Shallow Concentrated ---
B Fallow (No Res. ) G Grass, Burmuda --- Surface Codes ---
t Cultivated < 20 % Res. H Woods, Light P Paved
D Cultivated > 20 % Res. I Woods, Dense U Unpaved
E Grass-Range, Short
PLANNING DEPART
IN-HOUSE REFERRAL FORK
TO: Jean Zur ri Karl Reichle, Mike Gantick, Mel
Stead, Fred Shaw Thomas Hart, Fire Marshall
Canning, Jim Snow
FROM: Marcia A. Banach, Director of Planning
The Planning & Engineering Departments have received
plans for the following project:#
Zone Acreage
Subdivision ✓ Site Plan Residential ✓
No. of Lots/units
Commercial Industrial
Location:
Project Description: �L
Future Town-owned property involved? Yes ✓ No
(a)new streets__Z(existing frontage also)
(b)new open space/recreation area_
active passive
(c)new detention area
Planning Department comments
/o
Please let me- know by /7/y" if you will have
comments on this application so that I can follow up with your
department when I do a Planning Department report.
.i
PLAIMNG DEPARTN31N'1'
IN-HOUSE REFERRAL FORK
TO: Jean Zurbrigen, Karl Reichle, Mike Gantick, Mel
Stead, Fred Shaw, Thomas Hart, Fire Marshall
Lanning, Jim Snow
FROM: Marcia A. Banach, Director of Planning
The Planning & Engineering Dep rtments have received
plans for the following project:# � "Jr�
a
Zone� Acreage
Subdivision ✓ Site Plan Residential ✓
No. of Lots/units
Commercial Industrial
Location: A=
Project Description:�`��
Future Town-owned property involved? Yes ✓ No
(a)new streets__Z(existing frontage also)
(b)new open space/recreation area
active passive
(c)new detention area
Planning Department comments
/o
Pl ase let me- know by /7/y" if you will have
• comments on this application so hat I can follow up with your
partment when I do a Planning ep tment report.
WENTZELL ASSOCIATES
ENGINEERING CONSULTANTS
630 GOVERNOR'S HIGHWAY RECEIVED
S. WINDSOR, CT. 06074
(203) 289-2296 OCT 29 M0
S0. W1IVDS0R PLANNING.p �,
October 26, _l_090
Ms. Louise Evans
Chairman
Planning and Zoning Commission
Town of South Windsor
1540 Sullivan Ave.
South Windsor, CT 06074
RE: Beldon Road Subdivision
Dear Louise,
I regret that I will not be able to attend the public
hearing on the 30th. I wish to take this opportunity to
offer suggestions for improvements to the Beldon Road
Subdivision Plan. One problem I foresee is that the
location of the street from the subdivision onto Governor's
Hwy. is in an area which has extensive flooding on the north
side during every rain. I would like to request that the
drainage lines which run to this intersection be extended
across Governors Hwy. to pick up this excess water. The
drains near this area are approximately 11 feet below the
existing Governor's Hwy. grade. If they could be run across
Governor's Hwy. at this approximate elevation, further
drainage in this area could be accommodated. This should be
a minor expense, as the drains are located at the edge of
Governor-s Hwy_ and to extend them across Governor's Hwy. to
pick up this drainage would solve a long outstanding problem
in this area.
Additionally, as you all well know, Governor's Hwy, has
a very high level of both automobile and truck traffic.
I would like to request that the sidewalks for this
subdivision also extend in front of the new houses fronting
on Governor's Hwy. and the synagogue site in order to tie in
with the South Windsor sidewalk plan. I believe the present
plan calls for upgrades to Governor's Hwy. , including the
installation of sidewalks, at some time in the future.
It appears to be more beneficial to install the sidewalks at
this time in front of these new residences and the
synagogue.
As you all well know, the residents of Governor's Hwy.
have long been concerned with the high level of automobile
and truck traffic in this area. One way to allow an area
u
•
1540 SULLIVAN AVENUE . SOUTH WINDSOR. CONN. 06074
��osoR•ca AREA CODE 203/644-2511
October 30, 1990
M E M O R A N D U M
TO: Marcia A. Banach, Director of Planning
FROM: Jerry C. Iazzetta, Town Engineer
RE: Beldon Road Subdivision #90-59P
Submitted 9-21-90
We have reviewed the drainage calculations and drawings for the
proposed Beldon Road Subdivision and have the following comments:
Drainage Calculations
Effects of no detention on site should be analyzed and presented.
Sheet 1 of 18
1 . On the location plan, the portion of Newberry that
doesn't exist should be removed - Nutmeg Road South,
Connecticut Avenue, etc. should be shown.
Sheets 4 & 5 - Plot Plan 3.2.a.2
1 . Match line should be put on these sheets .
2 . It is recommended that the applicant improve the
existing radius of Hilton Drive, at intersection with
Beldon Road to a 25' radius . (Corner of Lot #20)
3 . The 20' wide drainage easement has incomplete dimensions
& bearings .
4 . Between lots 27 & 28, the open space bounds should be
monumented per Town standards .
5 . Easement across Lot 30 - Town feels that this should not
belong to the Town of South Windsor.
Ms . Marcia A. Banach October 30, 1990
Re: Beldon Road Subdivision
Page 2 .
Sheet 6 & 7 - Topographic Map 3.2.a.3
1 . Since this site is so flat, one (1) foot contours should
be shown.
2. At the intersection of Cook with Beldon the applicant
may wish to connect the 36" STM between CB'S 14 & 27
which would seem more appropriate than between CB's 14
& CB 15.
3 . Are there any basements in the proposed houses? If so,
the houses need foundation drains.
4 . Finish floor for building on lot 12 shown as 823.0.
What is correct elevation?
5. Drainage easement along lot 30 should be centered on
pipe.
6 . Consideration should be made to eliminate the existing
drainage problem on Governors Highway near Baker Lane.
Sheets 8 & 9 - Street Profiles
1 . A 4" underdrain is too small - Town Standards are for
6" minimum pipe size. It is recommended that both sides
of the street have underdrains .
2 . Drawing shows underdrain laterals connected to water
line.
3 . The roof drains should be connected to structures in all
cases. (Where feasible. )
Sheet 10 - Beldon Road Profile
1 . The right of way for Beldon Road has not been
established as of this time. Without an established
street line, any work off the pavement would be on
private property. The applicant should provide street
line and/or rights along the abutters from Hilton Drive
to the outfall to the Podunk River.
2. The plan lacks sufficient details on Beldon Road from
0+0 to 7+0 such as driveways , walks, trees, landscaped
areas, etc. that may be affected. Outf all protection
isn't indicated.
Ms . Marcia A. Banach October 30, 1990
Re: Beldon Road
Page 3 .
3 . It is recommended that CB #13 be moved from the middle
of the lot frontage to ease driveway placement.
4 . Show tentative sanitary laterals for the existing
residences on the east side of Beldon Road. Show the
houses, flow lines, etc.
Sheet 16 & 17 - Construction Details
1 . There are a number of sanitary manholes over 10' deep
that should be addressed in the detail. Also standard
manhole should be changed to provide 3'-0" opening.
2 . Manhole cover does not meet Town standards.
3. 4" underdrain should be 6" minimum.
4 . Sanitary sewer trench detail needed.
5 . Soil analysis and pavement design will be required prior
to construction if application is approved.
Sheet 18 - E & S Notes
Construction sequence - Roadway Construction Notes
1 . Note #1 states "prior to construction -- construction
meeting with Building Dept"? Should read Town of South
Windsor staff.
2 . Items 8 & 9 should be reversed.
General Notes
1 . Note #15 maximum slope of a fill within a subdivision
should be no greater than 3:1 to permit maintenance by
conventional equipment.
JCl/jsv
cc: Michael J. Gantick, Director of Public Works
i
December 3, 1990
M E M O R A N D U M
TO: Marcia A. Banach, Director of Plann' g
FROM: Jerry C. Iazzetta, Town Engineer
RE: Beldon Road Subdivision #90-59P
We have reviewed the revised drainage calculations and drawings for
the proposed Beldon Road Subdivision dated 11/26/90 . The following
comments are still outstanding from our October 30, 1990 memo.
Sheets 4 & 5 - Plot Plan 3. 2.a. 2
1 . It is recommended that the applicant improve the
existing radius of Hilton Drive, at intersection with
Beldon Road to a 25' radius . (Corner of Lot #20) A
proposed easement has been shown, but no roadwork
indicated.
2 . The 20' wide drainage easement has incomplete dimensions
& bearings .
Sheet 6 & 7 - Topographic Map 3.2.a.3
f1 . Since this site is so flat, one (1) foot contours should
- be shown.
At the intersection of Cook with Beldon the applicant
may wish to connect the 36" STM between CB'S 14 & 27
which would seem more appropriate than between CB's 14
& 15 .
�3 . Are there any basements in the proposed houses? If so,
the houses need foundation drains .
Drainage easement along lot 30 should be centered on
pipe. This was done, however easement is not defined
with bearings and distances.
,5. Consideration should be made to eliminate the existing
drainage problem on Governors Highway near Baker Lane.
Ms . Marcia A. Banach December 3, 1990
Re: Beldon Road
Page 2 .
Sheet 10 - Beldon Road Profile
1 . The right of way for Beldon Road has not been
established as of this time. Without an established
street line, any work off the pavement would be on
private property-(i)The applicant should provide street
line and/or rights along the abutters from Hilton Drive
to the outfall to the Podunk River.
2. Outfall protection isn't indicated.
3'. Show tentative sanitary laterals ," for the existing
residences on the east side of Beldon Road. Show the
houses, flow lines, etc. Laterals shown, but no
indication as to whether house connections will work.
Sheet 16 & 17 - Construction Details
1 . Manhole cover does not meet Town standards.
2 . Soil analysis and pavement design will be required prior
to construction of application is approved.
3 . An additional comment that is noteworthy is that
sidewalk details are required.
Sheet 18 - E & S Notes
General Notes
1 . Note #15 maximum slope of a fill within a subdivision
should be no greater than 3:1 to permit maintenance by
conventional equipment. Pavement detail shows 2:1 even
though this note has been corrected.
JCl/jsv
cc: Michael J. Gantick, Director of Public Works
Jim i&,�
W Tio�� C-! � •
e P
s v 1540 SULLIVAN AVENUE • SOUTH WINDSOM CONN. 06074
,CoN�� AREA CODE 203/644-25H
TO BE PUBLISHED IN THE JOURNAL INQUIRER
SATURDAY, DEC. 81 1990
LEGAL NOTICE
TOWN OF SOUTH WINDSOR
PLANNING AND ZONING COMMISSION
At its December 4, 1990 meeting, the Planning and Zoning
Commission voted to take the following action:
1 . Approve, Application #90-59P, Capuano Developers for 30
lot subdivision south side of Governors Highway, west side
of Beldon Road, A-20 zone.
2. Approve the reduction of certain bonds.
PLANNING AND ZONING COMMISSION
Marshall Montana, Vice Chairman
Bernard Hart, Secretary
V �S rM •t,`
r Tio 0740Sau� ?d&U&1at u
s " 1540 SULLIVAN AVENUE • SOUTH WINOSOR. CONN. 06074
e-co� AREA CODE 203/644-2511
y✓ I
December 10, 1990 CERTIFIED LETTER
Mr. Paul Capuano 11
Capuano Developers
1275 Cromwell Avenue P'
Rocky Hill, CT 06067 lV
Dear Mr. Capuano:
re: Appl. #90-59P, Beldon Road Subdivision
We are pleased to advise that the Planning and Zoning Commission
voted on December 41 1990 to approve the above-referenced application
for a 30 lot subdivision in accordance with Drawings 1-18 dated 2-1-
90 revised through 11-19-90 prepared by Design Professionals, Project
No. 87-188, and with the following modifications:
1. This approval is for 30 lots, numbered 1-30.
2. All deeds for open space and roadways; and Easements for
conservation purposes, drainage or utilities, that may be
required in connection with the approval of this
subdivision, must be submitted to this Commission prior to
filing the mylars and issuance of building permits. All
deeds must be in accordance with the policy for accepting
deeds and easements and must be approved by the Engineering
Department and Town Attorney. The deeds for the roadways
and open space will be held in escrow until completion of
the subdivision and then referred to the Town Council for
acceptance.
3. Concrete sidewalks, built to Town specifications, shall be
installed on one side of all new streets, and on the
southerly side of Governor's Highway and the westerly side
of Beldon Road.
4 . Footing drains are required for each house. Prior to the
building of any structure on a lot, a topographic map,
drawn to a scale of 1" = 40' , shall be submitted for each
lot in the subdivision, showing proposed contours;
elevations and the location of the footing drains. No
building permits will be issued until the proposed
contours, floor elevations and 'location of footing drains
have be n approved by the Town Engineer.
Mr. Paul Capuano
December 10, 1990
Page 2
5. Drainage for this subdivision is subject to the approval of
the Town Engineer.
• 6 . If, for any reason, finished grading and other site work is
not completed, the Town Engineer shall determine the amount
of a cash bond to ensure final grading and site work. This
cash bond must be submitted prior to issuance of a
Certificate of Occupancy.
7 . All lots shall be serviced by the Town of South Windsor
sanitary sewer system and are subject to the approval of
the Water Pollution Control Authority.
8 . Water shall be supplied to this subdivision by Metropolitan
District Commission.
9 . Street lighting shall be installed on streets, at
intersections, and on cul-de-sacs in accordance with th
policy established by the Town Manager. Street lighting is
to be coordinated with the Chief of Police.
10. Street names and locations of fire hydrants are subject to
the approval of the Fire Marshal of the Town of South
Windsor. Street names and supporting posts shall be
installed by the developer in conformance with the
standards of the Town of South Windsor, at no expense to
the Town.
11. Quantity estimates must be submitted to the Town Engineer
(on the enclosed form) for the purpose of determining
subdivision bonding, and all bonds shall be posted prior to
filing the plans.
If the developer chooses to submit a Letter of Credit for a
one year term, in lieu of a surety bond, said Letter of
Credit must be renewed on a yearly basis until completion
of the development. If a new Letter of Credit has not been
received within 30 days before the expiration date, th
Commission may, at its option, call the Letter of Cr dit it
is holding.
12. A drainage assessment fee in the amount of $1500 shall be
submitted to this Commission.
Mr. Paul Capuano
December 10, 1990
i
Page 3
i
A liability insurance policy shall be submitted a dn insured,
this
13
Commission naming the Town of South Windsor a
with a combined single limit for bodily injury and/or i
property damage in the amount of $1,000,000.
14 .
This application is subject to the conditions of
approval
of the Inland Wetlands Agency/Conservation ion Commission,
including a bond in the amounto $OOO
15. Prior to commencement of any site work, a meeting must be
held with Town Staff.
16
All plans used in the field by the developer must bear the
stamp and authorized signature of the Town o
f South
Windsor.
17 . No building permits will be issued until all modifications
have been complied with, and the final plans
have been
filed in the Town Clerk's Office.
18 . Beldon Road must be improved to Town specifications along
the site frontage, to a width of 13 feet from
nter
line of the existing road pavement.
19 . Trees to be preserved must be tagged and inspected by The
Zoning/Wetlands Enforcement Officer prior to
cutting.u
intention is to preserve the screening of
f the
existing hedgerow.
20 . Add note to plans that if Lot 30 is developed
residentially, it must meet buffer requirements of zoning
regulations.
21. Provide right-of-way and engineering to accommodate
realignment of Hilton Drive to a T-intersection with Beldon
Road.
22. Indicate open space as Town open space on maps.
23. Distances and bearings must be given for all easements.
24 . Spot elevations (or one foot contours) must be shown in
areas where only two foot contours exist.
Mr. Paul Capuano
December 10, 1990
Page 4
25 . Easement must be obtained from property owner for rights to
reconstruct the outfall at the Podunk River.
26 . Outfall protection to the Podunk River must be shown.
27 . Soil analysis and pavement design must be provided prior to
construction of the road.
28. Sidewalk detail must be shown.
29 . Pavement detail must show 3:1 slope.
30. Turnaround driveways are required on lots 6, 7, and 8.
Black and white transparent mylars of Sheets #2,4,5 with the above
modifications, together with three blueprint copies of the entire set
of plans, must be submitted to this Commission within 30 days to be
stamped and signed. The letters of approval of this Commission, as
well as the Inland Wetlands Agency/Conservation Commission, must be
reproduced on the mylars.
After the mylars have been signed by the Commission, they will be
returned to you for filing in the Office of the Town Clerk within 90
days of the date of approval. After filing these plans, a copy of
the receipt must be submitted to the Planning Department.
Very truly yours,
PLANNING AND ZONING COMMISSION
Louise C. Evans
Chairman
LCE/gcm
cc: Inland Wetlands Agency/Conservation Commission
,/M. Banach, Planning Director
J. Collins, Chief Building Official
J. Iazzetta, Town Engineer
F. Shaw, Supt. of Pollution Control
E. Belleville, Assessor
W. Lanning, -Fire Marshal
,Design Professionals, Inc.
e �
`v to
1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
R•co� AREA CODE 203/644-2511
January 14, 1991
R;9
Mr. Steven Colbath T-1
Design Professionals, Inc.
1170 Ellington Road
South Windsor, CT 06074
,JAN 15 1 aqi
RE: BELDON ROAD SUBDIVISION South Windsor
SOUTH WINDSOR, CT Planning & Zoning Commissioe
Dear Mr. Colbath:
The South Windsor Water Pollution Control Authority, at their
regular meeting of December 18, 1990, reviewed and approved those
plans submitted for the extension of sanitary sewers for the
Beldon Road Subdivision as shown on plans prepared by Design
Professionals, Inc. entitled, "Capuano Builders and Developers
Beldon Road Subdivision South Windsor Connecticut, " dated 2/1/90,
revised 12/17/90, sheets 2 of 18, 6 of 18 through 17 of 18
inclusive. Said approval subject to the following conditions:
1. Town staff technical approval.
2. Provide laterals for properties on Beldon Road--numbers
50, 60, 70 80 and 90 at locations to be selected by
property owners .
3. Town to be provided with as-builts showing horizontal and
vertical location of all sanitary sewer structures and
sewer laterals.
4 . That this approval letter appear on the final set of
mylars and filed with the Town.
Very truly yours,
ICIA
�, o✓�.c-v�cT
J seph Carino, C airman
Town of South Windsor
Water Pollution Control Authority
cc: Jerry Iazzetta, Town Engineer
Louise Evans, Chairman P & Z
Marcia Banach, Director of Planning
John Collins, Chief Building Inspector
John McCahill, Zoning Enforcement Officer
yeslg .n
r, fessionals, inc.
civil engineers • planners • surveyors
■
May 14,1991
Michele Lipe, Assistant Planner
1540 Sullivan Avenue
South Windsor, CT 06074
Dear Michele:
Re: Beldon Road Subdivision
Beldon Road
South Windsor, Connecticut
Project No. 87-188
As per your telephone request, Elio Capuano of Capuano Developers
hereby requests a 90 day extension of the timeframe to file mylars for the
above-referenced project. Moreover, please schedule a pre-construction meeting
in the near term, and apprise us of the date when all parties are available.
Thank you.
Sincerely,
Peter R. DeMallie
Agent for Elio Capuano
cc: Elio Capuano
Edwin Lassman, Esq.
Irwin Hausman, Esq.
■
?esigg
fessionals,o inc.
civil engineers • planners • surveyors
■
b s�� _ PA3
-,1991 ,
Michele Lipe, Assistant Planner
1540 Sullivan Avenue
South Windsor, CT 06074
Dear Michele:
Re: Beldon Road Subdivision
Beldon Road
South Windsor, Connecticut
Project No. 87-188
fn
—As-.peLa l r , Elio Capuano of Capuano Developers
hereby requests a 90 day extension of the timeframe to file mylars for the
above-referenced project. fgb
in the near te=, mV ise us or tne as a en ail p lable—
Thank you.
Sincerely,
i
Peter R. DeMallie
Agent for Elio Capuano
t
cc: Elio Capuano
Edwin Lassman, Esq. •
Irwin Hausman, Esq.
l%?
�1t
� r
K
r
�� �M sf♦t� •
r apS �.
O �
U
1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
���`
t•co AREA CODE 203/644-2511
�so
July 11, 1991
Ms . Laura O'Donnell
Cohn & Birnbaum
100 Pearl Street
Hartford, CT 06103-4500
Dear Ms . O'Donnell:
Per your request, I have enclosed information regarding the
status of application #90-59P, Beldon Road Subdivision. The
timeframe for the filing of the mylars has been extended until
October 1 , 1991 . (This date is the net result of two 90 day
extensions which have been requested by the developer as provided
for in the state statutes . )
Prior to the filing of mylars, the following approval conditions
have to be satisfied (please refer to the enclosed approval
letter) : #2, 11, 12, 13, 14, and 15 . Approval conditions #18-30
are in reference to changes which must be made on the finals
plans which have not yet been submitted to this office for
review. After the plans have incorporated all modifications
requested, mylars of sheets 2, 4 and 5 must be submitted for
signing by the Planning & Zoning Commission.
If you have any questions regarding the above, please contact me.
Very Truly Yours,
MiLhele R. Lipe
Assistant Planner/Analyst
Adikk July 12, 1991'
pas i
rot sons, Mc.
e 01 "gisers • 'lasers • srrvews
Louise C. Evans �Tr
Chairman, Planning and Zoning Commission
T vn of South Windsor .JUL Is 1991
1540 Sullivan Avenue
South Windsor, CT 06074
South Windsor
RE: Appl. 90-59P, Beldon Road Subdivision Planning & Zoning Commissim
(PZC approval Dec. 10, 1990)
PHASING PLAN
D ar Mrs Evans:
On behalf of Capuano Development Inc. ve are requesting that
the Planning and Zoning Commission alloy phased development
of the Beldon Road Subdivision. This phasing would be in tvo
parts. The first phase vould alloy the development of three
house lots and the transfer of the parcel known as lot 30 to
T mple Beth Hillel. The second phase would be the remaining
lots and improvements for the development.
Establishment of phasing will:
o permit the transfer of Lot 30 to Temple Beth Hillel;
o enable bond phasing, making the project more
affordable in today's difficult economic environment;
o permit immediate construction of model homes;
o facilitate advance sales of homes, making it possible
to finance second phase development and off-site
improvements.
Unfortunately, ve discovered that it is not possible to
construct Baker Lane as proposed without extraordinary
expenditures for off-site improvements of the storm severs.
After discussion with town staff, ve have come to the
conclusion that a private road or driveway could be
constructed that would service lots 11 2, and 3. There would
also be made available a design for a street constructed to
Town public improvement standards to serve these lots. If
the Commission desires, the first phase bonding could
include the cost of constructing a road to town standards in
the location of Baker Lane.
The temporary road proposed would not only service lots 1
through 3 but also would serve as the construction entrance
for the second phase. This road would be 18 feet vide and
300 feet long, and follow the right of vay of the proposed
Baker Lane. All utilities with the exception of storm severs
would be constructed as for the future Baker Lane. As part
of th second phase, the road will be rec nstructed to town
standards as originally propos d for Baker Lan .
441a gom@•r's rigknl, s•etb •!•is•r, at IM4 T•1. (213)M-iTU
July 129 1991
Pa` 2
As part of the first phase, a design for the compl tion of
Baker Lane vould be submitt d for approval by town staff.
This design vould consider Baker Lane as an independent cul-
de-sac street, constructed to tovn standards. If for some
r ason development of the second phase did not move forvard,
Baker Lane could be constructed as a permanent roadvay. This
is the road design that could be bonded along vith phase
one.
Note that the lots in phase one have full frontage on
Governor's Highvay, but they have drivevay access via Baker
Lane. Utility connections for lots 2 and 3 are also from
Governor's Hvy. Fire protection for these houses vould be
furnished by the fire hydrant located near the end of the
proposed private roadvay.
Upon the completion of phase one and the start of phase tvo,
the bond for Baker Lane could be combined vith the overall
bonding for the site improvements as originally proposed.
In the second phase of development, the off-site storm and
sanitary severs vould need to be constructed first. Then,
the storm severs could be installed in Baker Lane in
conJunction vith the rebuilding of the temporary road to
t vn specifications. The temporary road vould remain open to
the residents throughout the reconstruction process.
Due to the need for expensive off-site improvements to serve
the balance of the site, it does not appear likely that
there would be more than tvo phases for this subdivision. A
map shoving the location of phases one and tvo and the
proposed temporary road is supplied with this letter.
We thank you for your consideration in this matter.
S c ely,
�q
Steven R. Colbath, P.E.
Engineering Manager
cc: M. Banach, Planning Director
Capuano Developers
enc: 2
441c taeraw's ki9buls seetl wisiser, at IM4 Tel. (2#1)211-$TU
RECEIVED
JUL 16, 1991
SO- WINDSOR PLANNING DEFT,
July 16, 1991
M E M O R A N D U M
TO: Marcia Banach, Director of Pla ning
FROM: Jerry Iazzetta, Town Engineer
RE: Beldon Road Subdivision - Pha in
We have reviewed the proposed phasing plan dated July, 1991 for
the Beldon Road Subdivision and have the following comments:
1 . Detail of temporary gravel drive required.
2 . The proposed temporary gravel drive should be bitumous
pavement within the Town R.O.W.
3 . Sanitary Sewer shall be installed as shown on the
approved subdivision plans .
JCl/kt
wM it,<�
y r T-am Ole S-0 ?d&U&Ot
C �
4 yv 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
�'►'p .0 AREA CODE 203/644-2511
August 1 , 1991' CERTIFIED LETTER
Mr. Paul Capuano
Capuano Developers
1275 Cromwell Avenue
Rocky Hill, CT 06067
Dear Mr. Capuano:
re: Appl . #90-59P, Beldon Road Subdivision
We are pleased to advise that the Planning and Zoning Commission
voted on July 30, 1991 to approve the phasing plan presented for the
30 lot subdivision in accordance with Drawings 1-2 dated 2-1-90
revised through 7-11-91 prepared by Design Professionals, Project No.
87-188, and with the following modifications:
1 . This approval is 4 lots in Phase I- 1, 21 3, and 30 and the
remainder of the lots in Phase II .
2 . Detail of temporary gravel drive required.
3 . The proposed temporary gravel drive should be bituminous
pavement within the Town R.O.W.
4 . Sanitary sewer shall be installed as shown on the approved
subdivision plans.
5 . Quantity estimates must be submitted to the Town Engineer
(on the enclosed form) for the purpose of determining
subdivision bonding for the individual phases, and Phase I
bonds shall be posted prior to filing the plans .
If the developer chooses to submit a Letter of Credit for a
one year term, in lieu of a surety bond, said Letter of
Credit must be renewed on a yearly basis until completion
of the development. If a new Letter of Credit has not been
received within 30 days before the expiration date, the
Commission may, at its option, call the Letter of Credit it
is holding.
Mr. Paul Capuano Page Two August 1, 1991
Application #90-59P
6 . Building permits for Phase II can not be issued until such
time as the bonding for Phase II is posted and the permits
are released by this Commission.
7 . All original approval conditions of the 12/04/90 approval
apply.
Black and white transparent mylar of Sheets #1 in addition to the
mylars required with the original approval, together with three
blueprint copies of the entire set of plans, must be submitted to
this Commission within 30 days to be stamped and signed. The letters
of approval of this Commission, as well as the Inland Wetlands
Agency/Conservation Commission, must be reproduced on the mylars .
After the mylars have been signed by the Commission, they will be
returned to you for filing in the Office of the Town Clerk within 90
days of the date of approval . After filing these plans, a copy of
the receipt must be submitted to the Planning Department.
Very truly yours,
PLANNING AND ZONING COMMISSION
x �
Loui a C. Evans
Chairman
LCE/mrl
cc: Inland Wetlands Agency/Conservation Commission
Planning Director
Chief Building Official
Town Engineer
Supt. of Pollution Control
Assessor
Fire Marshal
SENDER: Complete Items 1 and Z when additional services are desired, and complete itemg3
and 4.
Put your address in the"RETURN TO" Space on the reverse side. Failure to do this will prev nt this
card from being returned to you.
dwIX03d to gag the"of For additions fees thefollowing services are ava neu t available.G
postmaster or fees and check box «�for additional service(s)requested.
1. O Sh w to whom delivered,date,and addresses's address. Z. O Restricted Delivery
t(Hum charge)t t(Extra charge t
. Article Addressed to: 4. Article Number
P 094 595 369
i Type of Service:
'M PAUL CAPUANO 0 Registered 0 Inured
I CAPUANO DEVELOPERS KRCC9rtlfWd 0 COD
1275 CROMWELL.AVENUE 0 Express Mail
ROCKY HILL CT- 06067 Always obtain signature of addresses
or agent and DATE DELIVERED.
8. Signature—Addressee S. Addressee's Address(ONL Y if
X requested and fee paid)
8. h
7. L
20s f Delivery
c.�
PS Form 3811, f15137 *QLQ. 0.1gn-17e-26e DOMESTIC RETURN RECEIPT
UNITED STATES POSTAL SERVICF•'` �
OFFICIAL BUSINESS y
SENDER INSTRUCTIONS { ✓!� e.
Print your name, address, and ZIP
C de in tf,a space below.
• Complete items 1
the reverse. ,2, 3,and 4 on
• Attach to front of article if space
LM
permits, otherwise affix to back ,�
of article. �T
Endorse article "Return Receipt PENALTY FOR PRIVATE$` '"'�
Requested"adjacent to number. USE,$30o
RETURN Print Sender's name,address,and ZIP Code in the space below.
TO
P & Z — TOWN OF SOUTH WINDSOR
1540 SULLIVAN AVENUE
90-59P SOUTH WINDSOR CT 06074
i: ::I::i:I�:::Il::i::i1::11:::1
M E M O R A N D U M
September 4, 1991
TO: Marcia A. Banach, Director of Planning
FROM: Jerry C. Iazzetta, Town Engineer
RE: Beldon Road Subdivision
I\j
We have reviewed the bond estimate quantities submitted by Design
Professionals for Phase I of the Beldon Road Subdivision. We
recommend that a bond in the amount of $185,000 be set for Phase
I only. Attached is a copy of our bond estimate for your
information.
JCl/jsv
cc: Michael J. Gantick, Director of Public .Works
/v C�v�orBOND ESTIMATE FORM
PROJECT. gB�Do
1991 CALENDAR YEAR
STREET:
P&Z I.D. : G'GOf51AJFV Z-S77.*Whl2`__
ENGINEER:
DATE: 3 Unit
Item Description Unit QuantitV Price Cost
1. Clearing & drubbing LS
�' * Z 006
2. Strip & Stockpile Topsoil CY 2.00 3OO
3. Earth Excavation 10.00
(ExcludingRoadway & Trench CY
4. RoadwaV Excavation CY 12.00
5. Earth Trench Excavation 0-4 CY 10.00
6 . Earth Trench Excavation 0-10 CY 12.00
7 . Earth Trench Excavation 0-15 CY 15.00
8. Earth Trench Excavation 0-20 CY 18.00
9 . Roadway Excavation Rock CY 50.00
10. Rock Trench Excavation 0-4 CY 50.00
11 . Rock Trench Excavation 0-10 CY 75 .00
12. Rock Trench Excavation 0-15 CY 100.00
13. Rock Trench Excavation 0-20 CY 150.00
14 . Formation of Sub grade SY 1.50 ZS� -
15. Subbase Gravel CY 15.0 0 7 7J_t..
16 . Pr
ocessed Aggregate TONS -7 16 .00
17 . Common Borrow CY 10.00
18. Gravel Borrow
CY 3 8� 15.00
19 . 71 of Bituminous Concrete
Class I TONS 45 .00
20. _�" Bituminous Concrete
Clas
s s I I TONS � 5 0.0 0
21. Six inch Asphalt Lip Curbing LF 3.00 4"3.1�.
22. Road Wideninq Complete SY 20.00 4-000 .
* Vari s Sub-Total $
I BOND ESTIMATE FORM
Unit
Item Description Unit uantit Price Cost
23. Concrete Sidewalk 4 Wide LF 21C) 2.9.00 ZZj
STORM DRAINAGE SYSTEM COMPONENTS
24. 60" RCP Class In Place LF 130.00
25. 54" RCP Class In Place LF • 100.00
26. 48" RCP Class In Place LF 75.00
27. 42" RCP Class In Place LF 65.00
28. 36" RCP Class In Place LF 60.00
29. 30" RCP Class In Place LF 50.00
30. 24" RCP Class In Place LF 42.00
31. 21" RCP Class In Place LF 40.00
32. 18" RCP Class In Place LF Z 35.00 4-¢10
33. 15" RCP Class In Place LF 4 ZZ 30.00 l Z 660
POLYETHENE PIPE
34. 8" ADS-N-12 or Equal 21.00
35. 10" ADS-N-12 or Equal 22.50
36. 12" ADS-N-12 or Equal 24.00
37. 15" ADS-N-12 or Equal 25.50
38. 18" ADS-N-12 or Equal 28.00
UNDERDRAINS
39. 6" PVC SDR 35 In Place LF 4-?.7 15.00 �0 3 OCR
40. 8" PVC SDR 35 In Place LF 20.00
RIPRAP
41. Modified Ri ra CY 0 45.00
42. Intermediate Riprap CY 45.00
43. Standard Riprap CY 45.00
Page 2. Sub-Total 070
BOND ESTIMATE FORM
Unit
Item Description Unit Quantitv Price Cost
DRAINAGE STRUCTURES
44. Type C Catch
Basin EA 1500.00 16>00
45. TVpe "C" Double Grate EA 2000.00
46 . TVpe "C-L" Catch Basin EA 1500.00 /SZ)d
47 . Manhole EA 1500.00
48. Manhole With Drop Inlet EA 2500.00
49 . Manhole Over Ten Feet EA 2000.00
50. Headwall EA
51 . Endwall EA
52. ' X Box Culvert LF
53. 15" Flared End EA 350.00
54. 1811
8 Flared End EA 400.00 $'DD
"
55. 24" Flared End EA 500.00
56 . 36" Flared End EA 850.00
57 .
58.
59 .
SANITARY SEWER COMPONENTS
60. 12" PVC In Place SDR 35 LF 40.00
61. 10" PVC In Place SDR 35 LF 37 .00
62 8" PVC In Place SDR 35 LF 2 ?Z 35.00 �rZo
63. 6" PVC In Place SDR 35 LF ga 30.00 Z64-o r
* Vari s
ub-Total
Pag 3 S $
r
BOND ESTIMATE
Unit
Item Description Unit Ouantitv Price Cost
SANITARY SEWER STRUCTURES
64. SanitarV Manhole EA 1500.00
65. Sanitary Manhole w/Drop Inlet EA 2500.00
66. Sanitary4&60oo
Manhole over 10 FT. EA 2000.00
V_
67.
68.
69.
70.
STRUCTURES & MISC. ITEMS
71. Retaining Wall EA
72. Fence e: EA
73. Guide Rail e: EA
74. End Anchorage e: EA
75. Guide Post EA 100.00
76 . Pavement Marking LF �� 1.50 Z Z
77. Street Signs EA / 75.00 737
78. Traffic Si ns EA 75.00 ZZ.r'-
79 . Street Li hts EA Z 1000.00 6 06
80. Furnishinq/Placing Topsoil SY 2.50 67,¢i r
81. Fertilizing, Seeding and
Mulching SY 7i!$D 2.50 S
82. Trees EA 150.00
83. Maintenance/Protection
of Traffic IS * Zoo 0
* Varies
Pag 4. Sub-Total $ / ZZZ
BOND ESTIMATE FORM
Unit
Item Description Unit Quantitv Price Cost
84 . Construction Staking LS r---- * Z-3�0 v
85. As-Builts LS � * Z� v
86 . Iron Pins
` EA S 100.00 g'00
87 .
Concrete Monuments EA d 250.00 zs��
EROSION CONTROL
88. Ha bales/Silt Fencing LF 4. 00
89 . Calcium for Dust Control TON 600.00
90. Sedimentation Ponds CY 50.00
91. Maintenance of Erosion
and Sedimentation LS
92.
93.
Sub-Total Page 1 $ 5-01
Sub-Total Page 2 $= 070 —
Sub-Total Page 3 $
Sub-Total Page 4 $ / zZZ
Sub-Total Page 5 $ W, y
1471647
25% Contingencies x Sub-Total: $
TOTAL
� QV '
J� 1
* Varies
Page 5.
a
wN a
CA
o �
1540 SULLIVAN AVENUE - SOUTH WINDSOR. CONN. 06074
R,co�' AREA CODE 203/644-2511
September 13, 1991
Mr. Paul Capuano
Capuano Developers
1275 Cromwell Avenue
Rocky Hill, CT 06067
Dear Mr. Capuano:
RE: Appl . #90-59P, Beldon Road Subdivision Bond Setting
Please be advised that the Planning and Zoning Commission voted
on September 10, 1991 to establish the subdivision bond for the
Beldon Road Subdivision in the amount of $185,000 for Phase I.
If you have any questions regarding the posting of the bond,
please contact the Planning Department at 644-2511 .
Very truly yours,
PLANNING AND ZONING COMMISSION
Louise C. Evans
Chairman
ml
cc: Jerry Iazzetta, Town Engineer
Marcia Banach, Director of Planning
Cph
9zBirnbaumPc. Robert E.Cohn* Joseph K.Fortier Randall J.Sabia
Attorneys at Law Robert J.Birnbaum* Michael F.Mulpeter* Steven M.Basche
Peter S.Sorokin Robert B.Cox Jennifer Ventres Filler
Robert B.Shapiro* Thomas W.Witherington Thomas F.Morgan
100 Pearl Street Thomas M.Divine+ William R.Crowe* Gisele M.Molloy
Hartford, Connecticut 06103-4500 Leslie Inrig Olear Holly Jean Bray William J.O'Sullivan
Richard J.Shea,Jr. Mark J.Lavoie Leah A.Martin
Telephone David B.Losee
(203)549-7230
Telecopier
(203)727-0361 September 17, 1991 `A&%&e in CT and NY
+ in CT
Mr. Edwin A. Lassman 'gip
Rogin, Nassau, Caplan, Lassman, & Hirtle c;outh W irTul--or
City Place
Hartford CT 06103-3460 i��ann�n� & Zoning
Re: CNB-Capuano: Beldon Road Subdivision, South Windsor, Connecticut
Dear Ed:
Notwithstanding our telephone conversation of yesterday, the various deeds and
easements required by the Town will be executed by Elio Capuano, not the Bank's
OREO subsidiary. We are not taking back the subdivision by deed in lieu of foreclosure,
but rather by strict foreclosure.
We have advised Michele Lipe, the Assistant Town Planner, that you will be
sending said documents to the Town Planner for approval. As we intened to have the
same executed by Mr. Capuano at our September 24 closing and delivered to the Town
immediately thereafter, it is imperative that the Town Planner approve the same as soon
as possible.
Please be advised the following maps are awaiting an additional signature before
being recorded:
1. "Sheet 1 of 2 Key Map prepared for Capuano Developers Design
Professionals, Inc. 441-C Governor's Highway South Windsor, CT Scale:
1" = 100' Dated 2-1-90 Revised through 8-30-91." (This is the Phasing
Map)
2. "Sheet 2 of 18 Key Map prepared for Capuano Developers Design
Professionals, Inc. 441-C Governor's Highway South Windsor, CT Scale:
1" = 100' Class D Dated 2-1-90"
Cs)hQL
Birnbaum pc
September 17, 1991
Page 2
3. "Sheet 4 of 18 Plot Plan for Capuano Developers Design Professionals, Inc.
1170 Ellington Road South Windsor, CT, Scale: 1" = 40' Class A-2 Dated
2-1-90, Revised through 12-7-90."
4. "Sheet 5 of 18 Plot Plan for Capuano Developers Design Professionals, Inc.
1170 Ellington Road South Windsor, CT, Scale: 1" = 40' Class A-2 Dated
2-1-90 Revised through 12-7-90."
Please contact me with any questions.
Sincerely,
q�� bE��
Joseph K. Fortier
,KFilwiM"
cc: Michele Lipe
t
G)hqv
irnbaum pC.
Robert E.Cohn Joseph Fortier Randall J.Sabia
K.
Attorneys at Law Robert J.Birnbaum* Michael F.Mulpeter* Steven M.Basche
Peter S.Sorokin Robert B.Cox Jennifer Ventres Filler
Robert B.Shapiro* Thomas W.Witherington Thomas F.Morgan
100 Pearl Street Thomas M.Divine+ William R.Crowe* Gisele M.Molloy
Hartford,Connecticut 06103-4500 Leslie Inrig Olear Holly Jean Bray William J.O'Sullivan
Richard J.Shea,Jr. Mark J.Lavoie Leah A.Martin
Telephone David B.Losee
(203)549-7230
Telecopier
(203)727-0361 September 17, 1991 +*Ada"Adnucu m �►ed m CT"'d M
d Cr u,d M+
Mr. Bradford H. Wainman
Vice President SEP I a 1991
Connecticut National Bank
777 Main Street South Windsor
Hartford, Connecticut 06115 'fiaoning & Zoning Cnmrnissinp
Re: Belden Road/Capuano Subdivision, South Windsor
Our Client No. 12603-256
Dear Brad:
Pursuant to my conversation with Michele Lipe, South Windsor's Assistant Zoning
Official, I have confirmed that the bonds on the project are in the following amounts:
The subdivision bond is held in the amount of $185,000.00 and runs to the Town of
South Windsor/Planning and Zoning Commission the second bond is for $7,000.00 and
runs to the Town of South Windsor/Inland Wetlands Agency/Conservation Commission.
The letters of credit must reference the following maps which are being recorded
and must also reference the following approval dates:
MAPS
1. "Sheet 1 of 2 Key Map prepared for Capuano Developers Design
Professionals, Inc. 441-C Governor's Highway South Windsor, CT Scale:
1" = 100' Dated 2-1-90 Revised through 8-30-91."
2. "Sheet 2 of 18 Key Map prepared for Capuano Developers Design
Professionals, Inc. 441-C Governor's Highway South Windsor, CT Scale:
1" = 100' Class D Dated 2-1-90"
3. "Sheet 4 of 18 Plot Plan for Capuano Developers Design Professionals, Inc.
1170 Ellington Road South Windsor, CT, Scale: 1" = 40' Class A-2 Dated
2-1-90, Revised through 12-7-90."
Birnbaum pC.
September 17, 1991
Page 2
4. "Sheet 5 of 18 Plot Plan for Capuano Developers Design Professionals, Inc.
1170 Ellington Road South Windsor, CT, Scale: 1" = 40' Class A-2 Dated
2-1-90 Revised through 12-7-90."
APPROVAL DATES
1. Subdivision - December 4, 1990
2. Wetlands - November 26, 1990
Please feed free to cq-11 Joe or me if you have any questions. Please send us copies
of the letters of credit so that we can obtain approval by the Town of the same. Thank
you.
Sincerely,
Laura O'Donnell
Paralegal
cc: Michele Lipe
_ LETTER OF TRANSMITTAL ova
se.4<
� r
G �
PLANNING DEPARTMENT to
TOWN OF SOUTH WINDSOR
1540 SULLIVAN AVE.
1
SOUTH WINDSOR, CT 06074 Date
A/
( 203) 644-2511
TO:
RECEI V -z
EIS
WE ARE SENDING YOU:
C7 P&Z initial plans Q Drainage comps
0 P&Z final plans 0 Bond estimate requests
O Inland Wetlands plans C--3 Bond reduction requests
O Final plans for filin 0 Change order form
Other O Correspondence
Copies App. No. Project
THESE ARE TRANSMITTED as checked below:
* For review and comment 0 For your file
CO For your use 0 Returned with revisions
0 As requested
C3 Other
PLEASE RETURN/COMMEM BY: Lf
COMMENTS:
Copy to: From: ��r.r
LETTER OF TRANSMITTAL � •• �
H 1.
PLANNING DEPARTMENT _
TOXIN OF SOUTH WINDSOR
4 0 SULLIVAN AVE. . ��°soe•co`�`�
�5
SOUTH WINDSOR, CT 06074 Date
(203) 644-2511
Cs\
,e
� S
- a'
WE ARE SENDING YOU:
p P&Z initial plans Q Drainage comps
A?:FP&Z final plans 0 Bond estimate requests
O Inland wetlands plans 0 Bond reduction requests
O Final plans for filing 0 Change order form
C3 Oth r 0 Correspondence
Copi s App. No. Project
z
THESE ARE TRANSMITTED as checked below:
4W For review and comment 0 R®twcne�d with revisions
ile
M For your use
L7 As requested
C3 Other
PLEASE RETURN/COMENT BY:
COK KENTS:
* 24
z Ape,co,o -0 -,� IKcC*"-
Copy to:�4)- APtlsue- IFrom:
,,C AJP*f R) --Lor. 6 AJEcpS 'ru2�v tov,�p l7 ,q�y I
4PO c, c.-0 N� �z-& — F,�r8FZWOAJ
6,A)Cy Sya w,�
1 E c - '
'n
Imo" A.
J+pvc ,v� �v 7AoT,710
oDL
Cam' Af -
3
t
�hr
m��
LETTER OF TRANSMITTAL � �-• ••,<
PLANNING DEPARTMENT i A-
TOWN OF SOUTH WINDSOR �`
1540 SULLIVAN AVE-
SOUTH WINDSOR, CT 06074
(203) 644-2511 Date /
co
TO: J,'
RECEIVED �2
_ OCT 0 3 19991 0. -i
Town of South Windsor
Eagineering
ueui. 2
WE ARE SENDING YOU: W
-P
0 P&Z initial plans Q Drainage comps �\�l
P&Z final plans C:3 Bond estimate requests
C:3 Inland Wetlands plans 0 Bond reduction requests
p Final plans for filing 0 Change order form
C3 Other C] Correspondence
Copi s App. No. Project
o--5-cl P u4d�T:
THESE ARE TRANSMITTED as checked below:
For review and comment 0 For your file
0 For your use AM Returned with revisions
p As requested
0 Other
PLEASE RETURN/COMKMIT BY:
COMMENTS:
s Ca
4wwAsd 1#3 ?Alph/ 04
Copy to: 9 From:
Ou.-A-Up Mt*
�-
� 3
g
�'tor1M ii,,c
CO) to
s v 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
4�hoSOR.Co��,w AREA CODE 203/644-2511
October 4, 1991
Paul Capuano
Capuano Developers
1275 Cromwell Avenue
Rocky Hill, CT 06067
Dear Mr. Capuano:
re: Appl. #90-59P, Expiring Letters of Credit
The Planning and Zoning Commission is holding the following Letter(s) of
Credit:
Project(s) Bank Amount Expiration
BELDON ROAD SUBDIVISION CNB $185,000. 9/25/92
BELDON ROAD SUBDIVISION CNB $ 71000. 9/25/92
In accordance with our policy for accepting Letters of Credit in lieu of
surety bonds, we must have an amendment to each expiring Letter of Credit
well in advance, extending the term for a one year period from the expiration
date. Will you please forward us the amendment promptly.
Very truly yours,
J/�V� '��u 61
Marcia A. Banach
Director of Planning
MAB/pmm
cc: Assistant Town Planner
•
-ftB
um pCRobert E.Cohn* Michael F.Mulpeter• Thomas F.Morgan
• •
Robert J.Birnbaum* Robert B.Cox Maura H.Horan
Attorneys at Law Peter S.Sorokin Thomas W.Witherington William J.O'Sullivan
Robert B.Shapiro- William R.Crowe* Leah A.Martin
100 Pearl Street Thom M.Divme+ John D.Newman All Hartley++
Leslie Luis olear Holly Jean Bray Robert G.Skelton
Hartford, Connecticut 06103-4500
Richard J.Shea,Jr. Mark J.Lavoie Elizabeth Conway
David B.Losee Randall J.Sabia
Telephone Joseph K.Fortier Jennifer Ventres Filler William H.Ethier,Of Counsel"
(203) 493-2200
• Admitted in CT and NY
Fax No. ••Admitted in D.C.only
(203) 727-0361 August 19, 1992 +Admitted in CT and MA
++Admitted in Tx only
Mr. Jerry Iazetta
Town Engineer
Town of South Windsor
1840 Sullivan Avenue
South Windsor, Connecticut 06704
Re: Belden Road Subdivision
Dear Mr. Iazetta:
Enclosed herewith please find a draft of a Drainage Easement which is a condition of
approval of the captioned subdivision. A previous draft has been reviewed by Mr. Davies, and
the enclosure has been revised to incorporate his comments and to update the legal description
of the easement parcels, which update was necessary based on additional information Design
Professionals obtained regarding the Ellington Road and Belden Road street lines. A black-
lined copy of the easement indicating the changes made from the previous draft is enclosed for
your convenience.
It is a condition of approval of a Purchase Agreement for the captioned subdivision
between my client, GTT Corp., as Trustee of Onyx Properties Realty Trust, the owner of the
captioned subdivision, and the prospective purchaser, that we obtain your approval of the
enclosure. For your convenience I have enclosed a copy of the map referred to in the draft
easement agreement.
If the enclosed draft easement is acceptable, please confirm the same by sign'
duplicate original and returning the same to me at your earliest convenience. Ple not
s RECEIVED
1 1992 2
;. ..�.� h Windsor
;"-un 3�of South
r,�;nQering
. Q
-ftBimbaumpc.
August 19, 1992
Page 2
hesitate to contact me with any questions.
Thank you for your time and cooperation.
Sincerely,
Joseph K. Fortier
Approved this day of
1992
Jerry Iazetta
Town Engineer
JKF/lkf/0013312
Enckwures
oc Ms.Patricia Dellriomo(Via Fwaimik#5483162)
ti r T-awn 01
e �
.a
wQ 1540 SULLIVAN AVENUE - SOUTH WINDSOR. CONN. 06074
'►'osol,CoN
AREA CODE 203/644-2511
August 24, 1992
Joseph K. Fortier, Esquire
Cohn & Birnbaum, P. C.
100 Pearl Street _
Hartford, CT 06103-4500
Dear Attorney Fortier:
Re: Beldon Road Subdivision
We have reviewed the draft Drainage Easement for the Beldon Road
Subdivision, submitted with your August 19, 1992 letter. We
have found a discrepancy in the description given on Exhibit A.
The first distance given on Exhibit A is shown as 34.87 feet,
however that distance is shown on the map to be 2.58 feet.
Currently, the storm water runoff from the Beldon Road area,
including the proposed and approved Beldon Road Subdivision
discharges through this area, as described in Drainage Easement
document. It provides the Town and the Grantee's the appropriate
rights, including the improvements to be installed as a part of
the Beldon Road Subdivision. Those proposed improvements are not
being installed by the Town of South Windsor. It will be the
obligation of the developer to obtain and file in the Town
records the appropriate rights for that installation from the
Grantee's, prior to construction. I have enclosed a copy of our
standard Temporary Construction Easement form for your
information and use.
The closing line in the Exhibit A description is along the
westerly line of Beldon Road. Prior to the filing of this plan,
this westerly Street Line of Beldon Road had not been
established. The Town will require a Quit Claim deed from the
Grantee's to establish the street line along this frontage.
Joseph K. Fortier, Esquire
August 24, 1992
Page 2.
a
You should also be aware that the street line of Governors
Highway and Beldon Road, as it abuts the subdivision, also has
not been established. The Town will require a similar deed from
the Developer when the subdivision is constructed.
If you have any questions I can be contacted at 644-2511; Ext.
240 .
Very truly yours,
A. Bowen Davies
Deputy Town Engineer
ABD/jsv
cc: Marcia A. Banach, Director of Planning
Jerry C. Iazzetta, Town Engineer
a
�M if,t�
ce
�- OPs ?d&U1460t
v 1540 SULLIVAN AVENUE - SOUTH WINDSOR, CONN. 06074
4�~as0e.coe�� AREA CODE 203/644-2511
August 27, 1992
Paul Capuano
Capuano Developers
1275 Cromwell Avenue
Rocky Hill, CT 06067
Dear Mr. Capuano:
re: Appl. #90-59P, Beldon Road - Expiring Letters of Credit
We have not as yet received any renewals of the letters of credit which
expires on September 25, 1992 as noted in our previous renewal request of
July 1, 1992. Please be advised that discussion of this matter will be
placed on the September 22, 1992 agenda of the Planning and Zoning
Commission, and calling of the letter of credit will be initiated at that
time if we have not received a renewal.
Thank you for your attention to this matter.
Very truly yours,
Marcia A. Banach
Director of Planning
MAB/pmm
cc: Assistant Town Planner
• t
TOWN OF SOUTH WINDSOR
STAFF SITE CHANGE
FOR SITE & SUBDIVISION
GENERAL:
CHANGE ORDER CONTACT PERSON ,: �,r.� ( ' � ��. i z 1 U..Phone No.
Address 1- Caovtx :�� it J
Site Name P&Z No.
Owner 0&-no&j� 5E>,vNc: Phone No.
Contractor 716 IF4E
X,
Signature of OwnerZA Date: i0(v.!�194.
Signature of Design Engr. Date: 4
CHANGE: (Describe location and na of change. Include
three (3) copies of plan/profile of Change. )
��/�� (,,cG�►►�� � CSC �ToRrn 'r..�L�I�- Ar.,) �P��s�� `� /�
Reason for Change: (Why is change required) )
APPROVALS: (As Required)
Dir.. Of Planning °h • r Date:
Town Engineer Date:
Dir. of Public Works Date:
Other: Date:
STAFF COMMENTS:
jz
,r
J
White - Town Engineer
Pink - Director of Planning
Yellow - Applicant
John M. Casey, Attorney at Law
475 Buckland Road
South Windsor, CT 06074
Tel, (203)644-7204
FAX(203)644-7196
May 26, 1993
Mr. A. Bowen Davies
Deputy Town Engineer
Town of South Windsor
1540 Sullivan Avenue
South Windsor, Conn. 06074
RE: DRAINAGE EASEMENT - BELDEN ROAD - PODUNK RIVER
Dear Sir:
I have reviewed the Temporary Construction Easement and the
Drainage Easement for the above project. I approve the legal
form and effect of both documents and have so notified you and the
Attorney for Wolf & Guerra.
Per our discussion I have not considered the descriptions as
they have been already approved by you, nor have I considered
Exhibit B which deals with the repairs to the Sluice Gate
since I am advised that the Town is not a party to the repairs,
nor have I concerned myself with the sum of $7,500.00 mentioned
in the document since I am informed that that sum is not to be
the expense of the Town of South Windsor.
However, the contents of the Documents are approved as to their
legal effect. Please feel free to notify the parties to
execute the Documents whenever they see fit.
/eese
,`�� �►
cc: Michael H. Clinton, Esq.
� �®
9
i F
�4owM sEq�
re fe,
e �
U
s 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
SoR.Cp AREA CODE 203/644-2511
Np �
July 6, 1993
Mr. Paul Capuano
Capuano Developers
1275 Cromwell Avenue
Rocky Hill , CT 06067
Dear Mr. Capuano:
re: Appl. #90-59P, Expiring Letters of Credit
The Planning and Zoning Commission is holding the following Letter(s) of
Credit:
Project(s) Bank Amount Expiration
BELDON ROAD SUBDIVISION CNB $185,000.00 09/25/93
BELDON ROAD SUBDIVISION CNB $ 7,000.00 09/25/93
In accordance with our policy for accepting Letters of Credit in lieu of
surety bonds, we must have an amendment to each expiring Letter of Credit
well in advance, extending the term for a one year period from the expiration
date. Will you please forward us the amendment promptly.
Very truly yours,
i
Marcia A. Banach
Director of Planning
MAB/pmm
%.XBMEMNON
1mbaum .c a Robert E.Cohn* Michael F.Mulpetee Thomas F.Morgan
Robert J.Birnbaum* Robert B.Cox Maum H.Horan
Attorneys at Law Peter S.Sorokin Thomas W.Witherington William J.O'Sullivan
Robert B.Shapiro- William R.Ctowe- Jill Hartley++
100 Pearl Street Thomas M.Divine+ John D.Newman Robert G.Skelton
Hartford, Connecticut 06103-4500 Leslie Lmg olear Holly Jean Bray Elizabeth Conway
Richard J.Shea,Jr. Mark J.Lavoie Sharon P.Churchill
David B.Losee Randall J.Sabia David M.Barry,Jr.
Telephone Joseph K.Fortier Jednifer Ventres Filler
(203) 493-2200 William H.Ethier,Of Counsel—
Fax .
NO. �-
(203) 727-0361 ��J Admitted in CT and NY
y
7 1993 Admitted in CT and D.C.
+Admitted in CT and MA
++Admitted in CT and TX
VIA OVERNIGHT COURIER
Mr. A. Bowen Davies
Deputy Town Engineer
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT 06074
Re: Drainage Easement from Arturo Guerra and Helmar Wolf to The Town of South
Windsor - Mill on the River property, South Windsor, Connecticut
Dear Mr. Davies:
Enclosed please find a revision of the captioned Drainage Easement, which does not
include the "sluice gate " condition to which you objected. Also enclosed please find a black-
lined draft of the same, showing the changes from thr draft I sent to you with my June 7 letter.
If the enclosured Drainage Easement is acceptable, please confirm by signing below and
returning this letter to me at your earliest convenience.
Thank you for your time and cooperation.
Si cerely,
Joseph K. Fortier
ACKNOWLEDGED THIS . -0 DAY OF JULY, 1993
vt_�- t .ro lid
A. Bowen Davies 44t't c"�
Deputy Engineer u tY Town En 'Weer -r f('L
Town of South Windsor d `." w'I `L 46 0,?
K
JKF/ssm/16232 12603-369
Enclosures -
cc: Michael H.Clinton,Esq.(Via Facsimile#291-9282)
Mr.Michael Hussey(Via Facsimile#526.3288)
Ms.Patricia A.DelGiornio(Via Facsimile#548-3162)
C U Tia o-Ps ?d&U&&t
G �
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
SOR•C� AREA CODE 203 644-2511
�
September 20, 1993
JMJ Construction Company
658 Ellington Road
South Windsor, CT 06074
Dear Madam/Sir:
Re: Preconstruction Meeting - Appl. #90-59P, Beldon Road Subdivision
Friday, September 17, 1993
IN ATTENDANCE
NAME COMPANY/ADDRESS TELEPHONE
Jean Marc Jacques JMJ Construction Company 282-0678
Ronald S. Day JMJ Construction Company
Peter B. Brown Shawmut Bank 7229793
777 Main Street, Hartford 644-2511
exxtt.. 245
Jerry C. Iazzetta Town of South Windsor 45
A. B. Davies Town of South Windsor 644-2511
ext. 240
Joe Perna Design Professionals, Inc. 291-8755
441C Governor's Hwy, S.W.
Hal Clisby CUP 627-1334
POBox 1232, Enfield
Rich Tardif Yankee Gas 292-2229
POBox 1194, Enfield
229
Doug Faraday Yankee Gas 644-2511
exxtt.. 252
Michele Lipe Town of South Windsor 52
Sgt. Jerry Lewis TOSW Police Services 644-2551
John McCahill Town of South Windsor 644-2511
ext. 229
The following is a brief summary of points discussed during the
meeting.
Erosion and Sedimentation Control
1 . All erosion and sedimentation control measures are to be in place
prior to earth moving operations in each area and
maintained/cleaned out during construction. Call Zoning/Wetlands
Enforcement Officer for inspection when measures are in place,
prior to commencement of site work.
JMJ Construction Company - 2 - September 20, 1993
Application #90-59P, Beldon Road Subdivision
2 . All topsoil stockpile areas to be protected (ringed with haybales
or equal) .
3 . During construction of the road/driveway a crushed stone tracking
pad is to be installed and maintained to minimize tracking of
dirt/gravel onto Beldon Road. Calcium chloride or water is to be
used for dust control as required.
Public Works
1 . Four complete sets of approved/revised plans to be provided to
Town prior to start of construction. They will be stamped by
Planning Department along with plans developer needs . Only
approved plans are to be used on jobsite.
2 . The Public Works Department is to be notified forty-eight (48)
hours prior to the start of major construction work with
inspections and testing per Developers Checklist requested for
the following:
a) After site is staked out
b) All drainage work
c) Preparation of subgrade, compaction tests as requested by the
Town
d) Preparation of subbase, six (6 ) inch lifts
e) Placement of bituminous concrete, 2 inch layers
3 . Certification of gravel used as subbase will be required by an
approved testing company.
4 . No subgrade formation/base in frozen ground/snow. Same for
pipe/structure installation.
5 . As built plans are to include horizontal and vertical location of
all underdrains, footing drains, and sanitary sewers located as
per revised as-built checklist.
6 . All pipe and structures to be backfilled with free draining
material, compacted in maximum one foot lifts with approved
compaction equipment or approved equal if deep trench is
encountered. Any pipe or structure work requires inspection
prior to backfilling.
7 . Any problems and/or questions regarding construction of this
project will be directed to Jean Marc Jacques in the field.
8 . All filling to be done in accordance with Department of
Transportation specifications . To be compacted in maximum lifts
and tested as necessary.
JMJ Construction Company - 3 - September 20, 1993
Application #90-59P, Beldon Road Subdivision
9 . Job meetings will be held as needed, and can be called by the
developer or Town.
10 . Forty-eight (48) hours notice needed for certificate of occupancy
inspection. Two week review period ( 10 working days) needed for
all individual site (lot) plans prior to issuance of building
permit (may be longer if application is incomplete) . See general
guidelines for certificate of occupancy and building permit
procedures .
11 . Any proposed changes are to be presented to the Engineering or
Planning Department prior to implementation on -change order form
in triplicate with 4 copies of the drawing. Town will attempt to
turn around within 24 hours.
12. No paving after October 15 or before April 15 without written
approval from Director of Public Works .
13 . Normal hours of operation 7:00 A.M. - 5:00 P.M. , no work on
Sunday.
14 . General Stormwater Discharge Permit from State of Connecticut is
required.
15 . State Permit and Drainlayers Permit are required.
16 . Quantity estimates for entire project must be submitted to
establish bond amount.
17 Soil analysis and pavement design must be provided prior to
construction of the road.
Planning Department
1 . Landscaping is to be installed in accordance with the approved
landscaping plan. If there are changes required, contact the
Planning Department. Additional landscaping installed on one
part of a site will not preclude planting all of the remaining
items shown on the landscaping plan.
2. Liability Policy must be submitted.
3 . Trees to be preserved must be tagged and inspected by
Zoning/Wetlands Enforcement Officer prior to cutting. The
intention is to preserve the screening effect of the existing
hedgerow.
W.P.C.A.
1.. Provide laterals for #50, 60, 70, 80, & 90 Beldon Road.
JMJ Construction Company - 4 - September 20, 1993
Application #90-59P, Beldon Road Subdivision
SNET/NU
1 . Contact utilities for coordination of utilities connection.
Fire Marshall
1 . Blasting (if required) to be coordinated with the Fire Marshal .
Police Department
1 . Emergency phone numbers for the duration of the construction must
be provided to the Police Department on a company letterhead. If
the developer occupies or owns the building(s) after construction
emergency numbers must be provided to the Police Department.
2. All buildings located on property which abuts a public highway
must be numbered. Such number(s) (address) shall be visible from
the street. All numbering shall comply with Town Ordinance 6-800
thru 6-802 .
3 . Erect temporary sign on the site during construction identifying
the project.
4 . Construction trucks should avoid using Governor's Highway.
Building Department
1 . Plan review with Building Official/Fire Marshal required prior to
application for building permit. Coordinate with Chief Building
Official .
Very truly yours,
Idtxh
Michele R. Lipe
Assistant Planner/Analyst
MRL/pmm
cc: Jerry C. Iazzetta, Town Engineer
Karl Reichle, Public Works
Mel Stead, Public Works
Minh V. Le, SNET
John R. Collins, Chief Building Official
Fred Shaw, Superintendent of Pollution Control
.. `OEM •t��
LETTER OF TRANSMITTAL
PLANNING DEPARTMENT
TOWN OF SOUTH WINDSOR
1540 SULLIVAN AVENUE
SOUTH WINDSOR CT 06074 DATE oc.ro6c12 'f 1993
( 203) 644-2511
TO: 9 g--rew, OGrAALLzC
t>SE N �.ZC F�SS�o,►1J1 t_S 2vV C-
LIyI C Uov- H�SNwgv
Sc,;cb Wvtiosoz - c--r 0607�r
WE ARE SENDING YOU:
P & Z initial plans Drainage comps
- P & Z final plans Bond estimate requests
Inland Wetlands plans Bond reduction requests
Final plans for filing Change order form
Other ��s O�N - S%a�°z� Correspondence
Copies A 1 . No. Project
5�4��vrsrv'N
THESE ARE TRANSMITTED as checked below:
For review and comment ✓ For your file For your use
Returned with revisions
As requested
Other
PLEASE RETURN/COMMENT BY:
COMMENTS:
Tidy t N
C CSEO PLAN C Sfttt'T l`{ cF �FS� Rr�RrJcN:'LYt1C 'ft2" P ^EbS��
N F T �` L KcTL 2n.t�u
-
AS T .^.CA ZS /VCT DES ABI ` TI+E �S "Oferi
10EA S o�,�,r/
SP/}CE " AS weLL As SE v6 2 C.�uiR�t� hrUc"rL fls A ACA < q0�-te7" AQ—
A s 5 +:)v -
Copy to: t-zur -#j 90-SSP (wcT(.1WVf From.
As
zW A
W �
v� o � l
5
LIMIT OF INLAND WETLANDS AS
FIELD DELINEATED BY JOHN IANNI,
CERTIFIED SOIL SCIENTIST, 4-5-89
I
X 79.1
t
W.F. #1 W.F.
AA � �
P4
37
-� W.F. #2 i �P
• W.F. #3 J
w A w 40
.,,, U
z �
A � � ■
I
1 X 7 J
0
c11
W /
00,
S J
O
WAS I
w p4 R 5
zw Z
E--4 NnA
o �
s10 PC a 9+12.D3
R
7-7
TOWN OF SOUTH WINDSOR
STAFF SITE CHANGE
FOR SITE & SUBDIVISION
GENERAL:
CHANGE ORDER CONTACT PERSOXtX,---.,"Qac :k .+ � , ���, Phone No.
Address 441-C. Cy � � �c��w� r'r �T w �k a.�;� C-F,
Site Name P&Z No. Id LJC2
Owner Atj ,A aP(- Phone No.
Contractor -�SM-">
Signature of Owner �'�,'�: ;�,� ,%�� ' .�.. ; :'' Date:
Signature of Design Engr. ' �. Date: ) f
CHANGE: (Describe location and at,� ' of change. Include
three VA ) copies of plan/profiler of Change. )
-t> .tit 7.R44
k �
Reason for Change: (Why is change required)
APPROVALS: (As Required)
Dir.. Of Plannin Date:
t
Town Engineer r ` Date:
"Y Dir.. of Public Works r' ' ` �9 ; �,'r_f Date
Other: Date:
STAFF COMMENTS:
ram"
r
i
White - Town Engineer
Pink - Director of Planning
Yellow - Applicant
` TOWN OF SOUTH WINDSOR
all
STAFF SITE CHANGE " " `' '
FOR SITE & SUBDIVISION
GENERAL:
CHANGE ORDER CONTACT PERSON' Phone No.
Address "i ¢�t s►� Ly�`rr =�C a ,. L� Nam- c_
Site Name_ P&Z No.
Owner ^SSAkj Phone No. ?5Z-z::6
Contractor
Signature of Owner Date:
Signature of Design Engr. Date: Av /?,3
CHANGE: (Describe location an n e of° hange. Include
three �,a') copies of plan/profile of Change. )
4-
ZSL. VCATF .�`//+T�k- M�,►r J K�F,. ! C�IV V=-r3� J Y_oA(:;> '°i"=n ?;�z:rr
Reason for Change: (Why is change required)
J kif ,�.JGr -.�+ J �� i s!J' I► ""�1 r A] ram.] •. 1 ! C r.� l .: Q.1Jw'C.oll�i�CTI `� ✓� �1,0�'a� G.T' /' •/. e
APPROVALS: (As Required)
Dir.. Of Planning i. i ., ( Date:
Town Engineer _ �-�- �`���' Date: 1
Dir.. of PublicJWorks Date
Other: Date:
STAFF COMMENTS ..
White - Town Engineer
Pink - Director of Planning
Yellow - Applicant
TOWN OF SOUTH WINDSOR � � `44
STAFF SITE CHANGE
FOR SITE & SUBDIVISION
GENERAL:
CHANGE ORDER CONTACT PERSON , tr;�U �: � - ,. ,Phone No. 291- ?5�5
Address 441- C CaoyExsjo'�> :►nuTI. 1 IA C4� .,
Site Name_ loop., P&Z No.
Owner Phone No. vSz, . off►
ContractorM3 �✓��rs:r�::,TicuJ�.
r / '
Signature of Owner lr ; t Date:
s
Signature of Design Engr.. Date:
f
CHANGE: (Describe location andre Q change. Include
three (X) copies of plan/profile of Change. )
4
1�. �' e..•� !� 17 "`�.....= ALA E J�1 i 7 j��` i f(i 14►>�s/AJ-I Z
q nJr.> �]�,—",��T� ���L"�c'sFJ k..�,�7� . .....'�="�; �`1`� _: '��•cv;,F�°+4 f t�':: �h� �i T�
�f�^�l�hJ i'.C.,*'r Jr:>I "..f/'`` ate')..� L.�Lv i a'1� ♦./ri r L i i w" ,4✓`l�' S L::Yr..W f�Y��� P�.-r�l".-'� �Gr �i'•�.' t�i I'_
'��.�i/� ,: �Js.�. �•-' �.1�1�1(r►;. /r�'`� l..+'�ii�i i�e -,J� :..r.��(� Y� i`�r t 1 �=*°"'�-�
Reason for Change: (Why is change required)
APPROVALS: (As Required)
Dir. Of Planning Date:
Town Engineer Date:
Dir. of Public Works Date:
Other• Date:
STAFF COMMENTS: "' IJ IN
White - Town Engineer
Pink - Director of Planning
Yellow - Applicant
TOWN OF SOUTH WINDSOR
STAFF SITE CHANGE C IAWCmr.- Criz 5
FOR SITE & SUBDIVISION
GENERAL:
CHANGE ORDER CONTACT PERSON G si �'=AX-Phone No. 'Z9f-&'7':�
Address A41-C GOVLRtiK� H)69 6),
Site Nameec,.z,o�.� � `a � �yisi �l P&Z No.
Owner '"Nc.Quas> Phone No. 2.&2--0616
Contractor A A
Signature of Owner '; "� '� Date: P,../.
Signature of Design Engr. fa
�` r. Date: /� • -X ►
CHANGE: (Describe location and of /dhange. Include
three ( ) copies of plan/profile of Change. )
k. Vl R'.r. iLe -- ap CiRCL4 t 11+00 -To 14+'75 •
Reason for Change: (Why is change required)
APPROVALS: (As Required)
Dir. Of Planning Date:
Town Engineer Date:
Dir. of Public Works Date:
Other: Date:
STAFF COMMENTS:
•
White - Town Engineer
Pink - Director of Planning
Yellow - Applicant
---
TOWN OF SOUTH WINDSOR
STAFF SITE CHANGE
FOR SITE & SUBDIVISION
GENERAL:
CHANGE ORDER CONTACT PERSONI -sig,}j ,r .:tal •Phone No.. Z91-b-7 5S
Address 441-C Gc>VF-j?j.kge-.�
Site Name P&Z No.
Owner AkL4, Phone No. Z.5-z-<x6Z.&
Contractor
n
s a
a
Signature of Owner �,� ''? �,� Date:
• ,.'-�'`- d��'�,. ' _ Date:-
CHANGE: `L:' � r�• �%'�.�
Signature of Design Engr. v_,• - -�=—
CHANGE: Describe location and n tu-te, change. Include
three) copies of plan/profile of Change. )
4--
'0-Z
ran r)m A C& •
Reason for Change: (Why is change required)
APPROVALS: (As Required)
Dir.. Of Planning 1a� ►' Date
Town Engineer Date
Dir. of Public Works Date:
Other: Date:
STAFF COMMENTS:
White - Town Engineer
Pink - Director of Planning
Yellow - Applicant
irs. ,
i
40W N 8E4(
1540 SULLIVAN AVENUE SOUTH WINDSOR. CONN. 06074
AREA CODE 203/644-2511
OR•CO�
January 25, 1994
Jean Marc Jacques
JMJ Construction Company
658 Ellington Road
South Windsor, CT 06074
Dear Mr. Jacques:
Expiring Letters of Credit
Re: Appl . #90-60P, Dart Hill Estates, Phase II
Appl . #91-39P, Redfield II
Appl . #91-39P, Redfield III
Appl . #87-43P, Partridge Meadow
Appl . #90-59P, Beldon Road Subdivision
The Planning and Zoning Commission is holding the following Letter(s) of
Credit:
Project(s) Bank Amount Expiration
Dart Hill Estates SHAWMUT $155,000 04/01/94
Phase II
Redfield II SHAWMUT $200,000 04/01/94
Redfield Phase III SHAWMUT $168,000 04/05/94
Partridge Meadow NATWD $153,000 04/14/94
Beldon Road Subdiv SHAWMUT $185,000 04/01/94
In accordance with our policy for accepting Letters of Credit in lieu of
surety bonds, we must have an amendment to each expiring Letter of Credit
well in advance, extending the term for a one year period from the expiration
date. Will you please forward us the amendment promptly.
Very truly yours,
Marcia A. Banach
Director of Planning
riAB/pmm
O�N SEA
y s W&U14at
o
G U
a
1540 SULLIVAN AVENUE - SOUTH WINDSOR, CONN. 06074
SOR-co�'�w AREA CODE 203/644-2511
March 2, 1994
Jean Marc Jacques
JMJ Construction Company
658 Ellington Road
South Windsor, CT 06074
Dear Mr. Jacques:
re: Expiring Letters of Credit
Application #90-60P, Dart Hill Estates, Phase II
#91-39P, Redfield II
#91-39P, Redfield III
#87-43P, Partridge Meadow
#90-59P, Beldon Road Subdivision
We have not as yet received any renewals of the letters of credit which
expire on April 1, 1994, April 5, 1994, and April 14, 1994 as noted in our
previous renewal request of January 25, 1994. Please be advised that
discussion of this matter will be placed on the March 22, 1994 agenda of the
Planning and Zoning Commission, and calling of the letter of credit will be
initiated at that time if we have not received a renewal .
Thank you for your attention to this matter.
Very truly yours,
Marcia A. Banach
Director of Planning
MAB/pmm
cc: Attorney John Kindl
RECEIVED 'I
APR 11 W4
Clark Realty, Inc. 74• WINDSOR PLANNING DEPT.
g
CONSTRUCTION SPECIALISTS ���S /
658 ELLINGTON ROAD SOUTH WINDSOR, CT 06074
(203)282-0628 OR 644-3113
April 5, 1994
Planning & Zoning COmmission
Town of South Windsor
1540 Sullivan Avenue
South Windsor, Ct. 06074
RE: BELDON ROAD SUBDIVISION
Mr. Thomas A. Murrin, Chairman:
We would like to be able to build some model homes on lot # 17, 18, 19
and 20 on the Beldon Rd. Subdivision.
We hope to be on your agenda for the next meeting on April 12, 1994.
Thank you for all your help.
Sincerely,
Jean-Marc Jacques
President
V
<ow" sE�
o r
a s ?40•
1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
1,t,OSO$'C°���+ AREA CODE 203/644-25U
April 15, 1994
Jean Marc Jacques
Clark Realty, Inc.
658 Ellington Road
South Windsor, CT 06074
Dear Mr. Jacques :
Re: Appl . #90-59P, Beldon Road Subdivision
Please be advised that the Planning & Zoning Commission voted on
April 12, 1994, to approve your request to construct four model
homes at the Beldon Road subdivision, on lots 17, 18, -19, and 20.
This approval is subject to the following conditions :
1 . No certificates of occupancy will be granted, and the model
homes cannot be sold, until the subdivision bond is posted
and subdivision plans have been filed in the Town Clerk's
office.
2 . The model homes are subject to the customary building
department procedures for issuing building permits .
If we may be of further assistance please contact me.
Very truly yours,
a-,/ - at A 4? c I
lX.
r •
Marcia A. Banach �
Director of Planning
MAB/pmm
cc: Chief Building Official
Town Engineer
Supt. of Pollution Control
Fire Marshal
TOWN OF SOUTH WXNDSOR
PROJECT:��-�^'� �vgclvisio� � 1
BOND UTIMTB FORK SIC OXW OS S 0;f E94D FA
STPIEET
P&2 I.D. t _� 1994 CALWAR 7CM y
ENGINEER:
1 DATE: S// q4" - , Bond Bond
Unit Reduction Reduction
Item Description
Unit uantit Price Cost No. 1 No. 2
I * �51�•00
1. Clearin & Grubbin LS
2. Strip & Stockpile 6700 � �I oo �, V
Topsoil
CY 2.00 �
3. Earth Excavation
(Excluding Roadway CY 10.00
� Trench) �, vc ,l '
,SO60 12.00 �i7Z0. - V
4.. Roadway Excavation CY
-70 10.00 700. ZZO
S. Earth Trench Exc. 0-4 CY oo v
616o 12.00 �4,160• Z617Z0
6. Earth Trench Exc. 0-10 CY 41,4.00.0' 4 2�60 1S.00 /70
• 7. Earth Trench Exc. 0-15 CY
18.oa
8. Earth Trench Exc. 0-20 CY
?�S
9. Roadway Exc.
Rock CY 50.00
10. Rock Trench Exc. 0-4 CY _- -
50.00
Exc .
0-10 CY 75.00
11. Rock Trench
12. Rock Trench Exc. 0-15 CY
100.00
150.00
13. Rock Trench Exc. 0-20 CY
6500 1.30 �s9�� m �-?80
14. Formation of Sub rada SY zr
2 0.0 0
6o4d
CY 1
108 0 ZI�C-�o.�c V
15. Subbase Gravel -
16. Processed A re ate TONS
Z50o 18.00 �'45,��� �.�' OQ�
17. Common Borrow
CY 10.00
18. Gravel Borrow
CY 15.00
19. 2 " Bit. Concrete 1750 50.00 3-�500.
Class I TONS
• to 7 � Z5. �jfo�J
20• Bit. Concrete
37 ZD�b
(Class II 55.00 TONS .._._.-
21. 6" As halt Li Curbin LF
S98o 3.00 i-7"94000
22. Road Widening Complete. I SY
50.00
*varies
Sub-Total
Page 1-
$ 363 ��•��
z 7 1 T M-V V9-2OZ:a T mnsaN T M H I nns 4n Nfgn 1
BOUD ESTIM B FORM _• VI-101"W /0- 7-y¢
.', Bond •
unit Reducti n eduction �
Item Description Unit Quantitj price Cost No. 3. No. 2
t 121,07000.Cp
23. Conc Sidewalk 4' Tide LF .340'� 30.007
STORM DgAYNAGE SYSTIIi
COMPONENTS
24. 600 RCP Class_ In Place LF 130.00
25. 54" RCP Class-- In Place LF 100.00
26. 48" RCP Class--In Place LF 75.00
27. 42" RCP Class, In Place LF 65.00
0
28. 36" RCP Class_ In Place LF 30 60.00 ���'°
29. 30" RCP Class, In Place LF 9"79 30.00
Z
30. 24" RCP Class_ In Place LF 11526 42.00 a-76,69-L°' ZO/ 3 8
31. 21" RCP Class-..In Place LF 40.00
32. 18" RCP Class_In Place LF 3Zo 33.00 11.,Z00.00
33. 15 RCP Class-In Place LF 621P 30.00 Z4,810• 16,17,0
POLYETHENE PIPE
6" ��. ��a 5
34. • ADS-N-12 or Equal
`.�50 ZI.00
35. 10" ADS-N-12 or Equal ZZ.50
36. 12" ADS-N-12 or Equal 24 .00 _
37. 15" ADS-N-12 or Equal 46 25.50 ZLT 1,173.°"
38. 18" ADS-N-12 or Equal `'p0 28.00 �►13"160'00 13,11600
UNDERDRAINS
08' 3Y44 Z75 O° 4Z/Z7,>'
39. 6" PVC SDR 35 In Place LF 3 15.00
40. 8" PVC SDR 33 In Place .LF 20.00
RIPRAP Gj
41. Modified Riprap CY
42. Intermediate Ri ra CY
60 45.00 V=°O00
43. Standard Ri ra CY
a, .� Z�� 1 C�
Page 2. Sub-Total. $ 540� bo �
M d 800 0 oN ZZ: S T d6. Z T JINW T 8z2-bb9-£OZ:Q I SOON I M Hinos 30 NMOI
RON ESTIMATE FORM •f'. �PIZd EqA� I��/7
• Bond Bond
Unit Reducti n Reduction
item Descri ti n Unitl guantitvPrice C et No. 1 Ba, 2
-DRAINAGE STRUCTURES
44. TyRe 'C" Catch Basin EA_. 2A- 1500.00 �2%pco•°� Z8,l�a
45. Typs "C" Double Grate EA 8 2000.00 V16�coo. o ¢ DD U O
0
46. Type "C-L" Catch Basin FA '.S 1500.00 �� •° 3� �D D
o
47. Manhole EA 4 1500.00 ar6.6,.a o0v.
48. Manhole wjDro2 Inlet EA 2500.00
49. Manhole Over Ten Feet EA S 2000.00 °����•
50. Headwall EA * .
a&J)4p * �ZSGt�.Ocp
51. Endwall EA -"
Box Culvert
32. X LF
53. 15" Flared End EA 450.00
54. 18" Flared End EA 500.00
33. 24" Flared End EA 550.00
56. 36" Flared End EA 850.00
37. 5ED(mcTA;I-A) tr'_e.vc'_1uM cA 3 Zc.YO.00 2r °V
10' Wide
58. Gravel Access Road LF 15.00
59. Reset M.H. or C.B. EA 550.00 2rIJ6504co
SANITARY SEWER COMPONENTS
60. 12" PVC In Place SDR 35 LF 40.00
61. 10" PVC In Place SDR 33 LF 37.00
62. 8" PVC In Place SDR 35 LF ZSF'S 35.00
63. 6" PVC In Place 35 LF 6-70 30.00 � oo^
Zo,ioo. 9600
* varies
Page 3. Sub-Total $
193 zz5.� � t
80ND ESTIMATE
• land 8oad
Unit Reduction Isduction S
Item 'Description Uni • uantit Price Cost No. 1 go.
SANITARY SEWER STRUCTURES
64. Sanitary Manhole EA 1500.00 �.-`'�•
55. Sanitary Manhole
w/Drop Inlet EA 2500.00
66. Sanitary Manhole COover 10 FT. EA Z 2000.00 4de
�•
67.
68.
STRUCTURES & MISC. ITEMS
69. Retaining Wall EA
70. Fence
T e: EA
71. Guide Rail
(Tyee: EA
72, End Anchorage
(Type: ) EA
73• Guide Post EA 100.00
74 . Pavement Markin LF 136 1.50 ZC4 00 Z10¢• ZD
,r
75. Street Si ns EA Z 75.00
76. Traffic Signs EA 75.00
77. Street Lights EA �Z 1000.00 � •� �zi�� 12,404
78. Furnishing Z` � S°� /jr,
/FlacinK Topsail SY 6 2.50
79. Fertilizing, Seeding ZSp
and Mulchin SY 6 2.50
80. Trees EA 150.00
81. Maintenance/Protection
of Traffic LS
aj oo �ADD 7.Sv
82. Construction Staking LS
* varies
°O
Page 4. Sub-Total
sg���
Y ��� •
80ND ESTIMATE FORM - - 0//7/74.
Bond Bond
unit Seduction Reduction
Item Descri tion IInit qHntitT Price Cost N 1 No,
Leo 0
• 83. AA-Bu1I,.s L5 * `0- Zs"Vb Z sOO
84. Iron Pins EA so 100,00 s. •oo �i �� S'o 0,0
85. Concrete Monuments EA 230.00 '� o� !0,71V /01 71
86. Landscaping- LS
620 IZ,am� f Z,400 /a/ 3 too87. Driveway-Bit. Conc. SY
,y 20.00 00 3 —
88.D .er ocJTcf-r s�R.vcT�C,E Ell 2 �' 1p�1�00 O D pj
89.,
90.
Sub-Total S
Sub-Total Page 1' $ 363,6o5.'� 2! , ! ✓ //69(�
Sub-Total Page 2 $ 2) 0, 460.a' z�ZIGZ D
Sub-Total Page 3 $ �93, z25." Z9 4XJ �7 9
Sub-Total Page 4 $ 73,9Z9. ->
Sub-Total Page 5 $ joo �6 9
3 L G1y J o
Sub-Total $ �� /Z$ 3 4 /
6!! s'3J
i
Zs
231 Contingencies x Sub-Total.. $ Zj Z
wl•T•1 r.■ •
P7&4 44
TOTAL S
�� 26p�ppp
Q�
IfR4
//7/4
* varies _
1�-o De Tb DO 1&o J44
41, Pow
Page 5. ? /4-41
y�$ �Q'►���
S/4 y
AA• I AA�►• ALI n"•I`T "e, TT $ tell tom •.. • • .. .—. ..— •.�� ....—« .—
yC4< r O-Ps
1540 SULLIVAN AVENUE SOUTH WINDSOR. CONN. 06074
4r • �w� AREA CODE 203/644-2511
May 31, 1994
Jean Marc Jacques
JMJ Construction Company
658 Ellington Road
South Windsor, CT 06074
Dear Mr. Jacques:
Expiring Letters of Credit
Re: Appl . #91-39P, Redfield IV
Appl . #91_39P, BeldonlRoadlSubdivision
Appl . #90 59P,
We have not as yet received any renewals of the letters of credit
ofwhich
May 3,
expire on July 1, 1994 as noted in our previous renewal request st placed 3, the
1994. Please be advised that discussion Zonin this
Comomission, and calling of
June 28, 1994 agenda of the Planning 9
the le
tters of credit will be initiated at that time if we have not received
a renewal .
Thank you for your attention to this m".tter.
Very truly yours,
'lack-
Marcia A. Banach
Director of planning
MAB/pttmt
RECEIVED
Clark Realty, Inc. JUN 7 1994
CONSTRUCTION SPECIALISTS
658 ELLINGTON ROAD SOUTH WINDSOR, CT 06074 IL WINDSOR PLANNING DEPT.
(203)282-0628 OR 644-3113
June 6, 1994
Planning & Zoning Commission
Town of South Windsor
1540 Sullivan Ave
South Windsor, Ct. 06074
RE: BELDON ROAD SUBDIVISION
Mr. Thomas Murrin, Chairman:
We are requesting to be place on your next agenda for a Bond reduction
at Beldon Rd. Subdivision.
If you have any questions, please do not hesitate to contact us at 282-0628
Thank you.
Sincerely,
Jean-Marc Jacques
President
j '1
l/
MEMORANDUM
TO: Marcia A. Banach, Director of Pl ning
FROM: Jerry C. Iazzetta, Town Engineer
DATE: June 15, 1994
RE: BELDON ROAD SUBDIVISION
Nadf
We have reviewed the bond estimate submitted for the Beldon Road
Subdivision and recommend that the bond be set for $1, 260,000 . 00
JCl/jsv
i
i
MEMORANDUM
TO: Marcia A. Banach, Director of Planning
FROM: Jerry C. Iazzetta, Town Engineer
DATE: June 21, 1994
RE: BELDON ROAD SUBDIVISION i
We have reviewed the request for a bond reduction for the Beldon
Road Subdivision. The current subdivision regulations state that
"requests for bond reductions will be accepted only at the
following stages of project completion: ( 1 ) Completion of
utilities installation. . . . "
The utility installation is not complete, storm and sanitary
sewers are not completely installed nor are electric, telephone,
etc. However, recognizing the need for a bond reduction and the
amount of work complete, we would like to recommend that the bond
be reduced to $814,000 . 00.
Attached for your records is a copy of the bond estimate.
i
I
JCl/jsv
Attachment
tOWN Sf,
PA Q F T-0�� 01 �
1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
f�4) OR•co AREA CODE 203/644.2511
June 29 , 1994
Jean Marc Jacques
JMJ Construction Company
658 Ellington Road
South Windsor, CT 06074
Dear Mr. Jacques:
Re: Appl . #90-59P, Beldon Road Subdivision
Please be advised that the Planning and Zoning Commission voted
on June 28, 1994 to establish a bond in the amount of $1 , 260, 000
for the subject application. A bond or letter of credit in this
amount must be posted prior to issuance of building permits .
Very truly yours,
PLANNING & ZONING COMMISSION
Frank A. Castro
Vice Chairman
FAC/pmm
cc: Town Engineer
TOWN OF SOUTH WINDSOR
STAFF SITE CHANGE
FOR SITE & SUBDIVISION
GENERAL:
CHANGE ORDER CONTACT PERSONI e. cxk) rr ace a► >�v.=�, taJ�• Phone No. Z91-6155
Address 44(-G -,c�w�-�.
y
Site Name P&Z No.
Owner Phone No. 25Z-o? :Zz
Contractor A�Jc•
.j
Signature of Owner ram' Date: 3 t1 it
Signature of Design Engr. Date:
CHANGE: (Describe location and n t e of d'hange. Include
three copies of plan/profile of Change. )
S L r+ -� �'=,c�'�
Reason for Change: (Why is change required)
/'�ue;0 ✓s-hp
-�-
APPROVALS: (As Required)
Dir.. Of Planning r �._ Date:
Tpwn Engineer n �:-;'{. -° Date:
f y
�r�Dir.. of Public Works �' '° .a t4 f'' Date: !�
Other: W Date: r7 rj
STAFF COMMENTS: f
.• /t F^''� rr ... t y'4., `.i L- ,� - a _ r. '{�, I � r s: � !d_ .^,' Y� _ .�" L. •7 1
M r
White - Town Engineer
Pink - Director of Planning
Yellow - Applicant
p0 At
r ET
1 Ali
� � 5p0•
► h 1 /RO/. /IGN 7- W2
►, , Q+
r ► ►.► X78.4
_ PsH►w 9 I / � /p /
IN=66.39 I r ' 32 n
. . �, / /IC# l/ f
TF a 75.65 p = 17'20'33'
►► ► FL m 71.96 15 - 3
' - 71.71 18 R 25.00
I
L a 98.37 \ h
CB 3 ► h ' //
. ' 77 TF _ .14 �
► l
6 � ► �ry 106 co
FL = 73.50 � �
' 4 S 41 b�, 0_ 90,00:00�
r r ► r +00 1 50 R 25.00 5,�
lS RCp W L = 39.27' ' V Q7/
► ► I HYD a 34'00 /IT?
1
s SIGN - R -1 4.
s �i A ' .o�ll
s r
• 2
1 8 ,�?
%2 N L = 50 28' 0
+ rO OZ 290 14y.62 0
t ►. `v L = 3 . •6 N 41 b7'S �9 a II / TF = 82.89
t / 9 3 16 0 f �'O X 8►4. = 78.64
I ►^ �.. 8.74,
4 / � P .H 8
,°' aD / / r 4 TO 8 A
► t B bp 900
/ �
ppia82S ` < �\R = 39.00, co ► T 0,pF
�► 3too / 27 / ► CB 28
r I / 79. // / TF = 83.80
to r X 79 / TF 82.82 X FL = 75.72
r ► / FL 79.00
2 WIDE D GE ASEM LOT # 1
► r IN A E 25,04 sq. ft. ,► PROF'/ DG OF PAVEMENT
� OWN MBSQR 0.5t7 acres EXIS EDG OF PAVEMENT
Exist. SMH
Ssi9.o \ 10, ,mf r X 84.
TF = 84.92
6s.9s B��'P�o o / � � FL = 65.76
N 41.0�•
IMI`F�OF RIGH TRAWL 9 S t , AR �F OADWAY WIDENING
' VE T 3 A 18 •40, f SE ETA SHEET 16
MA TCH b
/ o �.
LOT / X e
/r
so 20,441/s ./ft. �I ►r v
I 17 � � � 0.46/ �es , � /i
z
I 0 2 ' WID ' RIA�GE EASE T✓` , r
► ► r IN VO OF , �Q./
i ► i g LOT / SNET , t' Q.
/
► s= -
► r _n-E W N 267 6'52' E
I •alb tr 151.12'
C.Q. 0° ! it, ``f/ / PROP. SIGN -
r 7 0 -
\ W2-2
I r 2 WAD N SEMENT
+► o IN AV E
OWN OR
CO
00
rr /
' 7
84
' 43,214 s ft.
\\ 0.99 a s/
N n
I EXIST. 6' STEEL
= 56'03'00' / " GAS LINE
J •' �� R = 162.87' „t // f'
L - 159.33 GN
I EXIS PIPE & WALL 100' "E�xis -2 Exist. SMH
�TO BEOVED ,' 1 c / TF = 83.25
SNET IL Ar FL = 66.17
-►r' S NET 2216
EXISTING r► /LI HT
r •a 0PAVfMENT it ll
�6�pp 8"IatX' c
B4.9 °. i f)LjQ'=RCP
= = = = - - - - - - - - - -FL_ 77.53
RELOCATE 0 , ' 9 �-�'
6' - T► I� It
,. = 4 nil It Ex. CB l
Clark Realty, Inc.
CONSTRUCTION SPECIALISTS
658 ELLINGTON ROAD SOUTH WINDSOR, CT 06074
(203)282-0628 OR 644-3113
July 13, 1994
Michele Lippe
Town of South Windsor, Planning Dept.
1540 Sullivan Ave.
South Windsor, CT 06074
RE: Beldon Road Subdivision
Please be advised that there will be no phasing of the Beldon road Subdivision,
and that we would appreciate release of building permits for the entire subdivision,
as submitted. If required we would like to be place on your next Planning & Zoning
Commission agenda.
� 1
� fr
RECIE11VEG
JUL 14 1994
0 So.Windsor
Planning Crt.
� y
eo
Sincerely,
Nancy Harri
Clark Realty Inc.
Clark Realty, Inc.
CONSTRUCTION SPECIALISTS
658 ELLINGTON ROAD SOUTH W1Nng0R, CT 06074
(203)282-0628,
MRS. MICHELE LIPE RECEIVED
ASSISTANT TOWN PLANNER JUL 14 1994
TOWN OF SOUTH WINDSOR
1540 SILLIVAN AVENUE % WINDSOR PLANNING DEPT.
SOUTH WINDSOR, CT. 06074
RE: BELDON ROAD SUBDIVISION �J .
OUR INTENTION IS TO PAVE THE ENTIRE SUBDIVISION BY OCTOBER 1, 1994.
IN THE EVENT WE ARE NOT FINISH BY THAT DATE WE AGREE TO CONSTRUCT A
CUL-DE-SAC PRIOR TO OCTOBER 15, 1994. THE CUL-DE-SAC WOULD BE
CONSTRUCT IN THE VACINITY OF LOT 14.
INCIDENTALLY THERE IS NO PROPOSE PHASING OF THE DEVELOPMENT AT THIS
TIME.
THANK YOU FOR ALL YOUR HELP.
SINCERELY,
Muriel Ja ques,
Vice-President
W N SE*
o
� 1540 SULLIVAN AVENUE SOUTH WINDSOR. CONN. 06074
w
r��soR.CO AREA CODE 203/644-2511
July 21 , 1994
Jean Marc Jacques
JMJ Construction Company
658 Ellington Road
South Windsor, CT 06074
Dear Mr. Jacques :
Re: Appl . #90-59P, Beldon Road Subdivision
This is to advise that the Planning and Zoning Commission voted
on July 19 , 1994 to reduce the subdivision/site bond for the
above-referenced project from $1 , 260, 000 to $800, 000 .
Please forward an amendment to the bond we are currently holding
showing this reduction at your earliest convenience. Thank you.
Very truly yours,
PLANNING & ZONING COMMISSION
Frank A. Castro, Vice Chairman
FAC/pmm
cc: Town Engineer
I
o
a
w
1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
r�dsOR•co� AREA CODE 203/644-2511
July 22, 1994
Jean Marc Jacques
JMJ Construction Company
658 Ellington Road
South Windsor, CT 06074
Dear Mr. Jacques :
Re: Appl . #90-59P, Beldon Road Subdivision
The Planning & Zoning Commission voted at its July 19 , 1994
meeting to approve the release of building permits for Phase II
of the Beldon Road Subdivision.
Very truly yours,
PLANNING & ZONING COMMISSION
Frank A. Castro, Vice rhairman
FAC/pmm
cc: Chief Building Official
Town Engineer
'0*N SE,
Ca
T'OW� 01 W&U1460t
Cd 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
SOR-co AREA CODE 203/644-2511
August 2, 1994
Mr. Jean Marc Jacques
Clark Realty, Inc .
658 Ellington Road
South Windsor, CT 06074
Dear Mr. Jacques :
Appl . #90-59P, Beldon Road Subdivision
Please be advised that the Planing & Zoning Commission voted on
July 18, 1994 to release the building permits for the remainder
of the above referenced subdivision upon the posting of the
required security bond.
Very Truly Yours ,
PLANNING & ZONING COMMISSION
Frank A. Castro
Vice-Chairman
cc : Marcia A. Banach, Director of Planning
Jerry C . Iazzetta, Town Engineer
John Collins , Chief Building Official
t0,$
CIO
1540 SULLIVAN AVENUE - SOUTH WINDSOR. CONN. 06074
SOR•c AREA CODE 203/644-2511
August 9, 1994
Jean Marc Jacques
JMJ Construction Company
658 Ellington Road
South Windsor, CT 06074
Dear Mr. Jacques:
Expiring Letters of Credit
Re: Appl . #91-39P, Redfield IV
Appl . #91-39P, Redfield III
Appl . #90-59P, Beldon Road Subdivision
The Planning and Zoning Commission is holding the following Letter(s) of
Credit:
Project(s) Bank Amount Expiration
Redfield Phase III SHAWMUT $168,000. 10/01/94
Redfield Phase IV SHAWMUT $ 67,000. 10/01/94
Beldon Road Subdiv SHAWMUT $185,000. 10/01/94
In accordance with our policy for accepting Letters of Credit in lieu of
surety bonds, we must have an amendment to each expiring Letter of Credit
well in advance, extending the term for a one year period from the expiration
date. Will you please forward us the amendment promptly.
Very truly yours,
Marcia A. Banach
Director of Planning
MAB/pmm
tCw N $E�
ca
U
1540 SULLIVAN AVENUE SOUTH WINDSOR. CONN. 06074
SOR-Co�'`�w AREA CODE 203/644-2511
August 10, 1994
Mr. Robert Arsenault
Design Professionals
441C Governors Highway
South Windsor CT 06074
RE: APPROVAL OF ALTERNATIVE CONNECTION ON BELDON ROAD
Dear Mr. Arsenault:
The South Windsor Water Pollution Control Authority, at a special
meeting on July 5, 1994 , approved the change in configuration of
the previously approved sanitary sewerage system for the Beldon
Road Subdivision as detailed on the map entitled Sewer Design Map
Change Order #7 for Beldon Road Subdivision, Job #87-188, Revised
7/8/94 , prepared by Design Professionals , Inc . and subject to the
following conditions .
1 . Town Engineering technical approval obtained .
2 . Easement paperwork meets all Town requirements and a
copy of that easement is placed on file in the Town
Clerk' s office.
3 . Final Authority approval and acceptance of the
sanitary sewerage connection will be given once the
sewer has been installed and inspected by the Town
staff , and based upon the written verification of the
town staff that said sanitary sewer was installed by
the developer in substantial conformance with the
design plans previously approved by the Authority, and
meeting all Town regulations and appropriate technical
specifications relating to sanitary sewer
construction.
Mr. Robert Arsenault
August 10, 1994
Page 2 .
4 . This approval letter must be superimposed into the
final approval plans .
Very truly yours ,
sep Carino, Chairman
Water Pollution Control Authority
JC/jsv
cc: Jean E. Zurbrigen, Town Manager
Michael J. Gantick, Director of Public Works
Jerry C. Iazzetta, Town Engineer
Marcia A. Banach, Director of Planning✓
John Collins, Chief Building Inspector
John McCahill, Zoning/Wetlands Enforcement Officer
t
Aow N sE,44
o
�- O-Ps ?d&U&10t G V
9 ` 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
G SO It.co�' AREA CODE 203/644-2511
August 29, 1994
Mr. Jean Marc Jacques
Clark Realty Co., Inc.
658 Ellington Road
South Windsor, CT 06074
RE: BELDON ROAD SUBDIVISION
LOT TO LOT GRADING & STORM WATER CONTROL
Dear Mr. Jacques:
On August 16, 1994, John Jacques and I had a conversation about the grading of the lots within the Beldon Road
Subdivision and the potential surface and ground water difficulties. Our primary concern was the rear yards of lots
21 through 27, where they abut the residences on Edgewood Drive, however, it would also apply to the rest of the
lots in the subdivision.
The properties adjacent to, and the subdivision itself, is in an area that is flat and subject to poor or slow surface
runoff. From the submitted plans there is approximately three feet of slope in one thousand feet across the rear of
these lots.
With the construction of the houses, the filling of the lots and the potential adverse affect on the abutters, John and
I agreed that there may be a need for provisions for additional drainage or some method of directing the surface
runoff into the existing drainage system. This must be monitored and if warranted the additional work must be
provided.
The Town is concerned that as each lot is completed the grading does not create any ponding or affect the
ncighbor. The finished grading and seeding must be completed prior to Certificate of Occupancy request and must
be shown accurately on the as-built drawing. This would provide us with documentation that the finish product was
constructed properly and was functioning at the time it was accepted by the Town.
If you have any questions or wish to discuss this further, I can be contacted at 644-2511, Extension 240.
Very truly yours,
A. Bowen Davies
Dep. Town Engineer
cc: Jerry C. larzetta, Town Engineer
J Marcia A. Banach, Director of Planning
John McCahill, Zoning/Wetlands Enforcement Officer
pow"
``qt
r oie S-au� W&zd6at C �
a �
1540 SULLIVAN AVENUE - SOUTH WINDSOR, CONN. 06074
soR ca�'�� AREA CODE 203/644-2511
September 8, 1994
Jean Marc Jacques
JMJ Construction Company .
658 Ellington Road
South Windsor, CT 06074
Dear Mr. Jacques :
Re: Expiring Letters of Credit
Application #90-59P, Beldon Road Subdivision
We have not as yet received any renewals of the letters of credit
which expire October 1 , 1994 as noted in our previous renewal request
of August 9 , 1994 . Please be advised that discussion of this matter
will be placed on the September 20 , 1994 agenda of the Planning and
Zoning Commission, and calling of the letters of credit will be
initiated at that time if we have not received a renewal .
Thank you for your attention to this matter.
Very truly yours ,
�
ct
Marcia A. Banach
Director of Planning
MAB/pmm
� cof e'a' Z�`•
tow N ss,
e � -
9 ` 1540 SULLIVAN AVENUE SOUTH WINDSOR. CONN. 06074
s �' AREA CODE 203/644-2511
September 14 , 1994
Mr. Jean Marc Jacques
JMJ Construction Co .
658 Ellington Road
South Windsor, CT 06074
RE: BELDON ROAD SUBDIVISION
Dear Mr. Jacques :
The intersection of Hilton Drive and Beldon Road was to have been
reconstructed as per the approved subdivision plans . The work done
at this intersection by your crews is not acceptable and not in
accordance with the plans .
We have made several requests that this intersection be corrected to
the alignment shown on your approved plans . To date this has not been
corrected . We ask that this intersection be corrected in accordance
with the plans .
As we have been trying for months to get this corrected, certain
measures may be necessary - including not issuing Certificates of
Occupancy - if this work is not completed by September 30 , 1994 .
If you have any questions , please call me at 644-2511 , Ext . 245 .
Very truly ours ,
J rry C Iaz tl, P . E .
own ETh4ineer
JCl/jsv
cc: John Collins , Chief Building Inspector
John McCahill, Zoning/Wetlands Enforcement Officer
A. Bowen Davies , Deputy Town Engineer
Lester A. Braddock, Engineering Assistant
Project File
Exis tin g 6' St el
Gas Main �►
♦ fit♦
Connect n w sanitar s w
♦ existing yy
♦ ca NOTE: Install Type 'CL' catch bas(n, g San MH Sta. 2
�♦ 4 o A remove exist. pipe and
R build invert of MH.
♦ ` 5 C- Construct leakoff to CB. n
\% `\ CPS
."
Q 0 RELOCATE ROAD SIGN Il
'\♦� �� ° e3 0 Construct 30' radius pavemant return ^�
`♦ \ with curbing at intersection.
♦ ° rn
SNET 2659 d '"I
to c > /
WAIGHT \
ILT DRIVE2+00
0
00
Bit. ♦< SnetCo 3647 f�
Drive \\V — — — __ w/ Ught
PROP. DMH 'C'
ANGLE POINT 0 rn
STA 7+21.18 �, �� O T 2 P LOT
� o
CONVERT EXIST. CB 5 `\ \ O
TO MANHOLE NOTE: New Pavement and
` Curbing for this alignment
not to be installed at this
\ time.
PLAN - HILTON DRI VE STA 0
� 00 TO 2+ 50
SCALE: 1 inch = 40 feet
VTT I.
TOWN OF SOUTH WINDSOR 46
STAFF SITE CHANGE
FOR SITE & SUBDIVISION
GENERAL:
CHANGE ORDER CONTACT PERSON Phone No. z-�i - 37
Address Ive A-.O,' Z&=
P&Z No.
Site Name u i i e—i t,
Phone 4�
Owner A Q
Contractor
j V e-r-7ce
Date: --
Signature of Owner_4'�,--".,
Date:
Signature of Design Engr-
CHANGE: (Describe location and/r �re of change. Include
three �,26 copies of plan/profile of Change. )
-Z 7
Reason for Change: (Why is change required)
APPROVALS: (As Required)
Dir. Of Planning Date:
xll
Town Engineer Date:
:
Dir. of Public ors Date
Other: Date:
STAFF COMMENTS:
-7-
_77/
White - Town Engineer
Pink - Director of Planning
Yellow - Applicant
DRAINAGE GRATES
R4030 Series Heavy Duty Grates ;
R-4040 Series Light Duty Grates ed�s
D signed to fit in bell end of standard sewer pipe.
Bell and spigot vitrified clay and concrete pipe are made under many
specifications and dimensions vary. Check the grate sizes in the table R-4030 Type Grate"
* R-4030 Typ Grate$
to be sure they will fit the pipe you are using.
If specified,special setback lug arrangement is available on R-4040
series which modifies grate to fit corrugated metal pipe in sizes ",A ''
indicated. Not available on R-4030 reries Showing grate . C9 ell
placed in bell of 'o. 'r�.•
Weight in Pounds standard vitrified
Heavy Duty Light Duty D sewer pipe. b
R-4030 R-4040 Pipe Grate - Grate
Size Dia Thickness'
6 --— 51/e 1�----
13t 8 6 8 2
25t 0 3 2,/4
25# --- - - i -- 2 7 r.• u
38# 32 12 143/4 2
70# 55 15 181/. _2'4
115t**0 75 -- 18—- 22 ---2I/a-- r
200t**0 100 21 251/2 3 T`
210t** 140 24 29 31/;
290** 155 27 3 2 iT___r3'"', $ ecif R-4040 300**0 180 30 36 3, Specify: Type Grate with Legs
*For light duty series this figure includes legs. **Slotted openings. 1. Catalog number.
tSlight Crown. $Square openings. oNot recommended for bicycle traffic. 2. Pipe size.
For safety standards see pages 88 to 93. 3. Setback lugs on R-4040 for corrugated pipe if required.
r
R-4044 Series Manhole
Lids to Fit Over Pipe Bell
M dium Duty
Bell and spigot vitrified clay and concrete pipe is
mad under many specifications and dimensions
vary. Check the lid size in the table to be sure For Dimensions
they will fit th pipe you are using. Catalog Pipe in inches Wt.
Specify:
No. Size A F3 C D Lbs.
1. Catalog number. R-4044-A 4 7% % 1%4 5411 7
2. Lettered as shown or without letterinq. R-4044-B 6 9%2 %2 1%2 73/4 13
e R-4044-D 10 143/ %2 2%4 123/ 30
JII ----- ° -- - 1 R-4044-E 12 17%4 5/e 2%4 14%2 50
L R-4044-F 15 21%4 Sib 2%4 17 53
R-4044-G 18 25%2 5/e 2%2 213/4 11 1
^ R-4044-J 21 29%2 34 2%2 24%8 150
?' R-4044-K 24 1 33%4 34 2%2 29%4 185
R-4055 Series Covers to
Catalog Pipe in ruches
Wt
Fit in Sewer Pipe Bell No. _Size —A _B_ Lbs
R-4055-4 4 51/. I', 5
R-4055-6 6 8 2 8
Medium Duty R-4055-8 8_ 10'/e _2'/, 15
R-4055-10 10 121/e 2'/7_ 22
Supplied with 1" lift hole as standard. Available R-4055-12 12 143/. 2'/7 30
without lift hole if so specified. R-4055-15 15 181/4 2114 45
Wh n ordering, advise pipe size. Remember, bell R-4055-18 18 22 2I 50 �—A -"
and spigot vitrified clay and concrete pipe is R-4055-21 21 25'/2 3 110
mad under many specifications and dimensions R-4055-24 24 29 31•'4 140
R-4055-27 27 32'/. 3''� 170
vary. Check the cover size in the table to be sure
th y will fit the pipe you are using. R-4055-30 30 36 3'a 240 4
° 4
b �
N EENAH
IN
2108 FOUNDRY COMPANY �
j
Maw
S EP 3 0 1994
N
J.M.J. CONSTRUCTION CO. , C.
658 ELLINGTON ROAD SOUTH WINDSOR, CT 06074
(203) 282-0628
9 �
September 29, 1994.. . HAND-DELIVERED
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT 06074
ATTN : Louise C . Evans , Chairwoman
Planning & Zoning Commission
Dear Ms . Evans :
RE: Bond reduction for Beldon Rd Subdivision
Since we have completed a tremendous amount of work in the
past three weeks on the above referenced subdivision we would
like to request to be on the agenda for the earliest meeting
in order to request a substantiel bond reduction . Should you
need an estimated quantity of the work completed we will be
happy to have Mr. Peter De Malle of Design Professionals Inc
provide you with it.
Should you have any questions feel free to contact us
at the following phone# 644-8137 .
Very truly yours ,
OJJ AN-MARC JACQ PR DENT
JMJ/jh
cc : Jerry C. Iazzetta
Marcia A. Banach
lk
NL Aqi
Ile
SOW
GO
s 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
AREA CODE 203/644-2511
pSOR•Cpt�
October 13 , 1994
Jean Marc Jacques
JMJ Construction Company
658 Ellington Road
South Windsor, CT 06074
Dear Mr. Jacques :
Re: Appl #90-59P, Beldon Road Subdivision
At the Planning & Zoning meeting of October 11 , 1994 , the Commission
voted to allow the preservation of the swale and hedgerow
vegetation/trees and require private drainage easements and allowing
the right to drain from one property to another .
They also stated that the outlet structure on lot #20 should be
maintained by the Town .
Please provide the Planning Department the maps showing the changes
and easements that were approved .
Thank you for your attention to this matter.
Very truly yours ,
PLANNING & ZONING COMMISSION
Frank A. Castro, Vice Ch rirman
FAC/pmm
cc: Town Engineer
JMJ CONSTRUCTION COMPANY
658 ELLINGTON ROAD
SOUTH WINDSOR, CT 06074
October 7, 19
Mr. Frank Castro, Vice Chairman to
Planning&Zoning Commission OCT 1 1 1994
1540 Sullivan Avenue
South Windsor, CT 06074
A
Dear Mr. Castro: !
At the end of 1993 our firm purchased a 29 lot development known as the Beldon Road
Subdivision from Shawmut Bank. The subdivision had been approved several years earlier on an
application of Elio Capuano, and we had not been involved in its original design. That design
called for completely filling in a drainage channel, removing all trees on either side of the channel,
and raising the ground elevation in that vicinity.
The channel previously drained a large area, including part of Governors Square business
center(the land now owned by the French Club).
In an effort to preserve the mature trees on either side of the channel along the rear lot
lines of lots 14-20, we have raised the channel's depth to a level which minimizes impact on the
trees, and this area has been stabilized with new grass. It has effectively been made into a shallow
swale, which satisfactorily drains the rear yards. The construction of Cody Circle and its drainage
system has completely cut off the flow from the west.
We are asking for you and members of the Commission to walk this area to see its natural
beauty, and then to allow us to preserve it as it now exists. The alternative is to have every tree
removed and fill brought in, which will be very disruptive.
In considering this request, please consider that lots 17 and 20 are already occupied, and
the homeowners are emphatic that the trees should not be removed. Certificates of occupancy
were issued by the Town for both. The trees offer privacy, natural views, and form an
appropriate definition of their rear lot lines.
Our engineers have reviewed our proposal. They are of the opinion that the lot to lot
drainage is working and will continue to work, and that the swale drains a relatively modest area,
minimizing the amount of water that will flow down the swale into the drainage system in Beldon
Road.
You should be aware that our first action in this matter was to request a change order
from the Town Engineer, which was denied on Thursday for the stated reason- "lot to lot
drainage problem is created". The application form and a copy of the change order map are
attached for your consideration.
In conclusion, we would appreciate a prompt decision, for the two families residing there
need to know at the earliest possible moment, and we would also need to inform home buyers
under contract of your decision.
Sincerely,
Marc Jacq es
president
M E M O R A N D U M
TO: Marcia A. Banach, Director of Planning
FROM: Jerry C. Iazzetta, Town Engineer
RE: BELDON ROAD SUBDIVISION
DATE: October 17 , 1994
We have reviewed the October 12, 1994 request for a bond reduction
at the Beldon Road Subdivision and recommend that it be reduced to
$270 , 000 . 00 .
Attached is a copy of the bond estimate for your files .
JCl/jsv
Attachment
MEhf'ORANDUM
TO: PLANNING & ZONING COMMISSION
FROM: Marcia A. Banach, Director of Planning
RE: BOND SETTINGS/REDUCTIONS/RELEASES
DATE: October 18, 1994
Below please find recommended bond settings, reductions and releases.
SUBDIVISION BOND
PRESENT BOND RECOMMENDED REMAINING
SITE U AMOUNT BOND REDUCTION BOND
Beldon Road Subdivision $800,000 $5301000 $270,000
cc: Engineering-Project File
l
C '
a V
1540 SULLIVAN AVENUE SOUTH WINDSOR. CONN. 06074
soR coy AREA CODE 203/644-2511
October 20 , 1994
Jean Marc Jacques
JMJ Construction Company
658 Ellington Road
South Windsor, CT 06074
Dear Mr. Jacques :
Re: Appl #90-59P, Beldon Road Subdivision
This is to advise you that the Planning and Zoning Commission voted on
October 18 , 1994 to reduce the subdivision bond for the
above-referenced project from $800 , 000 to $270, 000 .
Please forward an amendment to the bond we are currently holding
showing this reduction at your earliest convenience . Thank you.
Very truly yours ,
PLANNING & ZONING COMMISSION
Frank A. Castro,
Vice Chairman
FAC/pmm
cc: Town Engineer
1{�[ TOWN OF SOUTH WINDSOR GRAWE p'P-rw-L, d 10
STAFF SITE CHANGE
FOR SITE & SUBDIVISION
GENERAL:
CHANGE ORDER CONTACT PERSON Phone No.- 9i eR63_
Address
Site Name ,l P&Z No.
Owner Phone No.
Contractor
Signature of Owner Date: i 1
414
Signature of Design ngr. _ Date:
CHANGE: (Describe location and fia r of ',, hange. Include `
three -copies of plan/profile of Change. )
a
too mjxoft:
— ° i P
Reason for Change: (Why is change required)
t
APPROVALS: (As Required)
Dir.. Of Planning = Date: ;
Town Engineer t Date: ,�_ 4/'
Dir.. of Public *;r1is �, Date
Other: Date:
STAFF COMMENTS:
1
i
White - Town Engineer
Pink - Director of Planning
Yellow - Applicant
a ..�-...-r..•..di-_. _. _. ,..._.»,. ... .. v k..! .a_ __ e.'---_!' nr a u-,Liyv ..Md-._ uwG;i� .'i'.�:.+_..i iu�i._!;ice :kw_Ji '� 'iN_iL# `ram' ,.dAMML I
TOWN OF SOUTH WINDSOR
STAFF SITE CHANGE
FOR SITE & SUBDIVISION
GENERAL:
CHANGE ORDER CONTACT PERSON i �� �a �` � = -�r - `- Ick. Phone No. Z-)f•
Address } , r;�. .TS("T �4.�
Site Name P&Z No.
Owner Phone No. -Zs t.- Lam.
Contractor
Signature of Owner -1'l � Date: f
--- Date:
Signature of Design Engr. ;��,._d_f• ' ..- -
CHANGE: (Describe location and nature 'ot-lafrange. Include
three (3) copies of plan/profile of Change. )
�-?,.A N T
Reason for Change: (Why is change required) j
;;J .1,/7L. _�t - `.i_��4 �.g. �1• 1 I n,�Z, b 1�� f-.�'.��u "� �►.��G� �l.w/-i.� is�!�i 3'..'.'l t-,°..`.✓
�a. f � ` "..L.. ?4 .� •:.0 J" .iw. t'"?'i:-..I�'�' ...n I-.1.'. �r-...3., _rt r.,t.J�> J '
APPROVALS: (As Required)
Dir. Of Planning Date:
Town Engineer _ , ' Date: L �'
Dir. of Public Works Date:
Other: Date:
STAFF COMMENTS:
White - Town Engineer
Pink - Director of Planning
Yellow - Applicant
NOV-29-1994 16:09 PERAKOS—KINDL—ZITZER, PC 203 724 0505 P.02/07
RRR A W OS, KIN I)L Sc ZI7s1aA, P.Ca.
GGUNSELLORS AT T,A W
,^wQ7 MwTN STR}C3:T
HART707M,CONNULUICUT WIC)i
(200)SGO.01550
FAX
ff3CX11 7'Lt4.-L A0G
Ji�llti J.li.TWTiT. HT1W.UN L.kl;II KO-Sf1M-10-IM1111
NOV mbar 29, 1994
Mr. Jerry Iassetta
Town Engineer
Town of South Windsor SENT BY FACSIMILE
1540 Sullivan Avenue 644--3781
South Windsor, CT 06074
Re: Baldon Estates - Private Drainage Easement
D ar Mr. lazzetta:
Enclosed please find copy of the proposed Private Drainage
Easement Agreement which I have prepared with reference to the
above. Upon your review of this document, I would appreciate your
contacting me with any comments or questions you may have- in this
r gard. I expect that you now have in your possession the revised
Plot Plan prepared by Design Professionals which, subject to your
approval and the approval of the Planning and Zoning Commission, we
intend to file at the office of the Torn Clerk
Thank you for your attention to this matter.
since.rely,
J. Eindl
JJK f dre
Enclosures
NOV-29-1994 16:10 PERAKOS-KINDL-ZITZER, PC 203 724 0805 P.03/07
PRIVATE
DRAINAGE EASEMENT ACRSENENT
THIS AGREXja=,made and effective as of the day of
November, 1994, by and between CLARK REALTY, INC. , a Connecticut
corporation with its-principal office located in the Town of South
Windsor, Connecticut, IRVIN J. BOSCO and DIANE E. BOSCO, both of
the Town of South Windsor, Connecticut, and PAUL H. N'ARTINS and
LAURA L. X RTINS, both of the Town of South Windsor, Connecticut.
WITNES SET H
the undersigned are the record owners of certain
pr mises described 'as Lots # 8, 9, 10, 11, 12, 13, 14, 15, 16, 171'
18, 19 and 20 (hereinafter . "Lots") in the Beldon Estates Sub-
division situated on the northerly side of Beldon Road ' in South
Windsor, Connecticut and more particularly described in Schedule A
attached hereto; and
WHEREAS, the parties hereto desire to set . forth their
respective rights and obligations relating to the drainage of storm
water from and over 'their said properties and to establish a
perpetual' easement therefor.
NOW THEREFORE, in consideration of the mutual promises and
covenants hereinafter set. forth, the parties hereto hereby agree as
follows:
1. Creation of Easement.
A perpetual easement is hereby created for storm wat r
drainage in favor of each of said Lots over that portion of those
of said Lots located within the twenty foot (201 ) wide area
extending southeasterly from Cody Circle to the easterly boundary
of Lot #8 and within the area extending from the easterly boundary
of said Lot #8 to Beldon Road, all as more particularly shown on
th map described in Schedule A hereto.
2 , Definition of Easement Area.
Within the area of the easement herein created'and as shown on
th above referenced map is located an existing drainage swal
which extends southeasterly from Dots #13 and #14 to a headwall and
drainage discharge pipe located at the northeasterly boundary of
Lot #20.
NOV-29-1994 16: 10 PERAKOS-KINDL-ZITZER, PC 203 724 oeo5 P.04/07
3. Limitation as to Use.
The easement herein created shall be limited in use solely for
purposes of storm water drainage within the easement area defined
above too as to allow for surface water drainage from the Lots 'to
the drainage discharge pipe located on Lot #20. No structures of
any kind shall be erected within said easement area, no change
shall be made to the existing topography within said easement area,
no obstructions shall be placed therein and no condition shall b
allowed on the easement area which would in any way interfere with
the purpose of this easement.
4. Non-Exclusive Use.
The area of the easement herein created is solely for th
benefit of the' Lot owners for use in common with the other Lot
owners, but only to the extent necessary to allow for the storm
water drainage as defined in this Agreement and for the benefit of
those sots as described on the map referred to in Schedule A
h r to, and nothing herein contained shall allow the' owner(s) of
any of said Lots to interfere with the use thereof by the other.
5. ' Repair and Maintenance.
Each Lot owner shall be responsible for keeping the easement
ar a and the drainage swale situated on that Lot owner's property
fr of all debris and vegetation so as to allow for th
uninterrupted flow of storm water through the easement area.
Exc pt as aforesaid, the costs and expenses of maintaining the
above-described easement area in good repair and function, and th
cost of maintenance and repair to the headwall and pipe located on
Lot #20 shall be shared equally by all the Lot owners.
6. Governing Law.
This Private Drainage Easement Agreement shall be construed,
nforced and governed in all respects by the laws of the State of
Connecticut.
7. Binding Effect.
The easement herein created shall run with the land and shall
be binding upon, and shall inure to the benefit of the owners of
said Lots #8 through #20, their heirs, administrators, successors
and assigns,
NOV-29-1994 1E:11 PERAKOS-KINDL-ZITtER, PC 203 724 0805 P.05/07
IN WITNESS VURROF, the and rsigned hav duly executed this
Agreem nt.
CLUX REALTY, INC.
. $y-
JEAN NARC JACQUES
Its President
Duly Authorised
DIANE E. BOSCO
PAUL a. JMTINS
LAURA L. MARTINS
STATE OF CONNECTICUT)
as: South Windsor
COUNTY OF HARTFORD
on- this _ day of , 1994, before me, th
undersigned officer, personally appeared, JEAN NARC JACQUES, who
cknowledged himself to be the President of Clark Realty, Inc. , a
corporation, and that he as such President, being authorized so to
do, executed the foregoing instrument for the purposes therein
contained, by signing the name of the corporation by himself as
President.
John J. Kindl, Commissioner
of the Sup rior Court
NOU-29-1994 16:11 PERAVOS-KINDL-ZITZER, PC 20,E 724 0805 P.06/07
STATE OF CONNECTICUT)
66: South Windsor
COUNTY OF HARTFORD )
on this day of , 1994, before me, the
and reigned, personally appeared, TWIN J. BOSCO and DIANE E.
BOSCO, ]mown to me or satisfactorily proven to be the persons whos
names are subscribed to the within instrument and acknowledged that
they executed the same for the purposes therein contained.
Notary Public Commissioner
of the Superior Court
STATE OF COMECT I CDT)
a s: south Windsor
COUNTY OF HARTFORD )
On this —__ day of 1994, before me, the
and reigned, personally appeased, PAOL H. MARTINS and LA'pRA L.
MARTINS, known to me or satisfactorily proven to be the persons
whos names are subscribed to the within instrument and
acknowledged that they executed the same for the purposes therein
contained.
Notary Public Commissioner
of the Superior Court
NOV-29-1994 16:12 PERAKOS-KINDL-ZITZER, PC 203 724 0805 P.07/07
SCHEDULE A
Those certain pieces or parcels of land known and designated
as Lots 81 91 10, 11, 12, 13, 14-1 15, 16, .17, 1$, 19, and 20 as
shown on a certain map or plan entitled "Plot plan Prepared for
Jean Marc Jacques Beldon Road South Windsor, Connecticut design
professionals, inc. civil engineers - planners - surveyors 1 inch
40 ft. Job No: 87-188 Date: 2-1-90 Drawing No. :
C:\JOB\Beldon\188TP-R Sheet 4 of 18 Revisions 11-19-90 12-17-90 10-
28-92 11-16-92 10-25-93 11-12-93 11-28--94 and Sheet 5 of 18
R visions 11-19-90 12-17-90 10--25-93 7-8-94 11-28-94" which map is
on file or to be filed at the Office of the South Windsor Town
Clerk to- which reference may be had.
TOTAL P.07
ItowN Srq
CIO
r Tiow� apsio� ?d&U&Ot
C
s A. 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
4r-bSOR-CO��v AREA CODE 203/644-2511
December 1 , 1994
Jean Marc Jacques •
JMJ Construction Company
658 Ellington Road
South Windsor, CT 06074
Dear Mr. Jacques :
Re: Appl #90-59P, Beldon Road Subdivision Expiring Letter of Credit
We have not as yet received any renewals of the letters of credit which
expire January 1, 1995 as noted in our previous renewal request of
October 28, 1994 . Please be advised that discussion of this matter
will be placed on the December 13, 1994 agenda of the Planning and
Zoning Commission, and calling of the letters of credit will be
initiated at that time if we have not received a renewal .
Thank you for your attention to this matter.
Very truly yours,
co
Marcia A. Banach
Director of Planning
MAB/pmm
tOV N SF,(
O
c u
1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
AREA CODE 203 644-2511
SOR•CO�
January 4, 1995
Jean Marc Jacques
JMJ Construction Company
658 Ellington Road
South Windsor, CT 06074
Dear Mr. Jacques:
Re: Appl #90-59P, Beldon Road Subdivision Expiring Performance Bond
We have not as yet received any renewal of the bond which expires
January 20, 1995 . Please be advised that discussion of this matter
will be placed on the January 17, 1995 agenda of the Planning and
Zoning Commission, and calling of the bond will be initiated at that
time if we have not received a renewal.
Thank you for your attention to this matter.
Very truly yours,
1141/ u A-
Marcia A. Banach, AICP
Director of Planning
MAB/pmm
�94.1
Clark Realty, Inc.
CONSTRUCTION SPECIALISTS
658 ELLINGTON ROAD SOUTH WINDSOR, CT 06074
(203)282-0628 OR 644-3113
March 14, 1995
Planning & Zoning Commission
Town Of South Windsor
1540 Sullivan Avenue
South Windsor, CT. 06074
Attn: Mr. Russell Levack, Chairman
We would like to go on Maintenance at Beldon Estates. There is tree planting
left and one basin on Beldon Road.
If you have any questions, please let us know as soon as possible.
Thank You.
Sincerely,
Muriel Jacques, �''"�''
Vice-President <" fL
"t0f- -#� %Z.
L o-r F
TOWN OF SOUTH WINDSOR
STAFF SITE CHANGE
FOR SITE & SUBDIVISION
GENERAL: r
CHANGE ORDER CONTACT PERSON *.,,,.Phone No.- Z:91 -g75,57
Address 11v5 ��o��+ �111 T'E LLt T� �Co«m-'7 �r�►,n-� L.t},ra% _�rl�_i l 1"
Site Name �F �r-�o►� t�u�-� �,,,�>r,,�,► .,c,►� P&Z No.
Owner =A ;., Phone No. ZAZ
Contractor ---16A
Signature of Owner ,. Date: t�
Signature of Design Engr. Date: - e,-
CHANGE: (Describe location and n toe of change. Include
Four (4 ) copies of plan/profile of Change. )
L_&r'tz�-�.-�. Tea c=e)�j...4 G-r Tc�
L r---A+..) 10 )'T- -r �T.-r ""C U U TT 4 yj
L-e-)T *� 1
Reason for Change: (Why is change required)
Q.* 4.0. I � pg
APPROVALS: (As Re rt"'
ired)
Dir.. Of Planning Date:
Town Engineer ��� Date:
Dir. of Publi4p Works s Date:
Other \ Date•
STAFF COMMENTS:
White - Town Engineer Yellow - Applicant
Pink - Director of Planning Goldenrod - Engineering Department
I N T E R
MO
O F F I C E
To: Sgt. Gerald Lewis, Police Services
From: Ron Asselin, Street Services Specialist( �
Subject: Sub-Standard Signs
Date: April 20, 1995
Per our phone conversation pertaining to problems with sub-standard traffic signs and
street signs in new sub-divisions. Hopefully, we can eliminate these problems with contractors
before we accept the streets. It may also be a good idea to contact Jerry Iazzetta. Maybe he can
incorporate our specifications in the subdivision standards.
Here are the specifications for our street and traffic signs in South Windsor. If you have
any questions, don't hesitate to call. If I'm unavailable, please leave a detailed message with
Ginger and I'll get back to you as soon as possible.
Traffic and Street Signs to South Windsor Standards
TRAFFIC
Pole: 12 foot galvanized-`crib bak" or flanged equivalent steel u-channel posts with tapered-end.
Three pounds per foot, 10 gauge.
Fastening Hardware: 5/16 inch 18 x 3 tap bolts, course, all thread zinc plated. 5/16 inch flat
washers, zinc plated, 5/16 inch nuts, zinc plated.
Traffic Signs: Engineering grade sign face_on .080 gauge aluminum. Size per Traffic Authority.
Placement: Pole installed minimum of two feet from curb with a minimum sign height of six
feet. Locations per Traffic Authority.
STREET
Pole: 12 feet x 2 3/8 inches O.D. Round Aluminum poles .120 gauge.
Fastening Hardware: Extruded steel sign post cap-and cross separator(where specified) each
extruded sign bracket to be designed as follows:
Sgt. Gerald Lewis, Police Services
Page 2
April 20, 1995
Shall have holes drilled and tapped to accept 5/16 inch vandal proof set
screws(standard set screws with pin), to lock in extruded sign blanks into
position.
Street Signs: 6 inches wide extruded aluminum sign blank covered with engineering grade green
sheeting. 4 inch white engineering grade letters to be used in street name. 2 inch
white engineering grade to be used in street abbreviation RD, DR, ST, LA, etc.
Placement: Pole to be located on left side of intersection. Pole to be installed a minimum three
feet from curb and positioned as close as possible to the intersection. Sign height
to be approximately 8 '/z feet. Sign length should be long enough to reasonably
accommodate name of street.
cc: Mike Gantick, Director of Public Works
- 6 y lazietta"�'.TowA Engines,✓
Scott Lappen, Street Service Specialist
MEMORANDUM
TO: Marcia A. Banach, Director of Planning
FROM: Jerry C. lazzetta, Town Engineer
DA TE: May 1, 1995
RE: BELDON ROAD SUBDIVISION
------------------------------------------------------------------------------------------------------------------------------------------------------
We have reviewed the request to reduce the bond to maintenance level and acceptance of the infrastructure
work for the Beldon Road Subdivision. The following items are still outstanding.
1. Baker& Cody-in front of lot 4 the gutter grade appears to be less than the 1% minimum slope. This
should be checked by a surveyor.
2. Broken sidewalk slab in front of lot 5.
3. The trench patch on Hilton Drive needs to be replaced.
4. There is a 45'±long puddle along the northerly side of Hilton Drive that must be addressed. This has
been mentioned to JMJ in several verbal conversations.
5. The temporary patches at catch basins in front of lots 5, 6 and 8 must be replaced.
6. There is a large puddle area on Beldon Road in front of lot 6 that must be addressed.
7. The sidewalk in front of lot 6 is depressed around the manhole. The manhole top should be raised and the
sidewalk should be replaced.
8. The sedimentation structure manhole on Cody Circle in front of the Open Space is too low. It should be
about the same elevation as the sidewalk.
9. Grading in back of the sidewalk in front of lot 30 should not exceed our maximum of 3.1 slope.
10. Two (2)gas trenches on Governors Highway must be restored to Town Standards.
11. SNET pole #2217 on Governors Highway is in the curb line. It should be removed.
12. There is a puddle area along Governors Highway between Baker Lane and SNET pole 2217.
13. The curbing west of Baker lane should be extended about 20'and tapered to a void sno w plo w problems.
14. Loam and seeding needs to be completed in areas between curb and sidewalk.
15. All iron pins and monuments must be installed.
16. As-built drawings are required.
17. Traffic signs do not meet Town Standards and must be replaced(see attached memo from Ron Asselin).
18. Street signs are not placed correctly and must be relocated- Street Services representative should be
contacted.
JCl/jsv
to.1
Dart Hill Realty, Inc.
CONSTRUCTION SPECIALISTS
658 ELLINGTON ROAD SOUTH WINDSOR, CT 06074
(203)282-0628 OR 644-8136
Hand De'liverad
may C, 199-5
D M..a.�3^.tG.,. �� w��•av�yn���
awn Ock : ° I. A.
.34() Sullivan &"04#1YJe
�outh windaor,
Rom: Tov.*n ord. -rjance raquiring 'T Wo t?-:6*45 be ""IMIttd in the
yards of newly constructed, homa$-
Dp,ar Marcia:
Enclosed p;�� �ir..c n siat of people in t!be Dam HL"' Estaw 8 �
t?r, 1'�on RO&u SU'-1 i'%rifmions wncc- alr--,;P. ta):on czed ,t for is e-it' trues and have
e lier raqueet,&d (verbally or in perm4.og on to have this
ordinarc e wajvtr,� or the options �1^�ti►•+�t �
1) 9-lab t huts they type, Of 4--t-c9eii; t1hat need to be planted
2) .l .ow thle tt �: to :t)e planted either In back Or on e !�i_de of thei.r.
hc.x-.38 (vsr. +.n the front yardr
T'h nke in. -1V'1ArX-6. €or youx~
Very truly yours,
/1..nn�eHUPPn
Dart Hill Realt,r
Ow N SEA
Go
* � T10 01 �
_ 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
°soR•co AREA CODE 203/644-2511
May 15, 1995
Jean Marc Jacques
JMJ Construction Company
658 Ellington Road
South Windsor, CT 06074
Dear Mr. Jacques:
Re: Appl #90-59P, Beldon Estates
This is to advise you that the Planning and Zoning Commission voted on May 9, 1995 to deny your
request for the reduction of the site bond for the above-referenced project.
Enclosed is a copy of the memorandum from Town Engineer, Jerry C. Iazzetta and Sgt. Lewis,
Police Services, outlining the outstanding items in this subdivision. Once these items have been
addressed, please notify the Planning Department in writing and we will arrange for another
inspection.
Very truly yours,
Tsefl
G & ZONING COMMISSION
r
Levack, Chairman
RGL/pmm
Enclosure
cc: Town Engineer
t 9�
N� Z-1
if ,
MAY g 1995
Sduth Windsor`
Planning & Zoning Cftmissf6h
MAY 16, 1996
140 CODY CIRCLE
SOUTH WINDSOR, CT 06074
MICHELE M. LIPE
DEPARTMENT OF PLANNING
TOWN OF SOUTH WINDSOR
1640 SULLIVAN AVENUE
SOUTH WINDSOR, CT 06074
DEAR MS LIPE;
PLEASE BE ADVISED THAT I DO NOT WANT JMJ CONSTRUCTION TO PLANT
ANY TREES ON MY PROPERTY AT 140 CODY CIRCLE.
SHOULD YOU HAVE ANY FURTHER QUESTIONS OR CONCERNS, PLEASE FEEL
FREE TO CONTACT ME AT(203-)290-8836.
RESP ,
r`
SE M ON
CC: JMJ CONSTRUCTION
�na aH i995"
a,6 6,�-
M
(� U �
/�y-c.�
i
Tu�� of so��G�//nclso.-- �af/o2s /49s
�ju� �U.ila�sor CT O�a07f1
911-19
C�/e �iaye k;w
rloz�--
��C
y
Bc�./ dG�Clress � 5 , 17
Sou.�� ll���ce�sa r
i
TOWN OF SOUTH WINDSOR
STAFF SITE CHANGE
FOR SITE & SUBDIVISION
GENERAL:
CHANGE ORDER CONTACT PERSONDE- =�.:i,�r ,.�..,�,1 .Phone No. Z71.45'7 55
Address 14,EC.-�-
Site Name "-„ -�;, .�., �p„k,�;�,;._!� P&Z No.
Owner Phone No. Z2-naZ�
Contractor
Signature of Owner '4,;�K., ate: (, �.�
Signature of Design Engr. Date: ne
-h'!""
CHANGE: (Describe location anW niti7e of change. Include
Four (4 ) copies of plan/profile of Change. )
F'1�`' �,/•TC.1ti Fjlr�1►..) a-,r'J' �'��t.,i+��+V �7I.`;� C� 1.....�'7r..J '`�c^t"•J'"j' t,�.? F�>r�r'�'
Reason for Change: (Why is change required)
'�,..(�1 t n r���=. ���}"i"1►J.'`a �1�� �= ?li '� ��VTT�`r:.. +�t=1�. ��S'��L.T 1�rJ
APPROVALS: (As Requiripd)
Dir.. Of Planning ', � ; �, �'t_ Date:
_r
Town Engineer Date:
Dir.. of Public k0jks Date:
Other: Date:
STAFF COMM TS:
XO�r- E C'A i76 ti �4 U Y 13C r3/ 0o V&-V C'.#-6:ZV
`v w v,O K -- 7V 4FvsL.;,ec-~ r . jr-
White - Town Engineer Yellow - Applicant
Pink - Director of Planning Goldenrod - Engineering Department
MEMORANDUM
TO: Marcia A. Banach, Director of Planning
FROM: Jerry C. Iazzetta, Town Engineer
DATE: August 15, 1995
RE: BELDON ROAD SUBDIVISION
-------------------------------------------------------------------
We have reviewed the August 14, 1995 request to reduce the bond to
maintenance level and acceptance of the infrastructure work for the
Beldon Road Subdivision. The following items are still outstanding:
1 . Baker & Cody - in front of lot 4 the gutter grade appears to be
less than the 1 % minimum slope. This should be checked by a
surveyor.
2 . Broken sidewalk slab in front of lot 8 .
3 . The sedimentation structure manhole on Cody Circle in front of
the Open Space is too low. It should be about the same elevation
as the sidewalk.
4. SNET pole #2217 on Governors Highway is in the curb line. It
should be removed.
5 . There is a puddle area along Governors Highway between Baker Lane
and SNET pole 2217 .
6 . All iron pins and monuments must be installed and so noted on
as-built drawings .
7 . As-built drawings are required.
8 . Easements are required for those areas where sidewalk encroaches
onto private property.
We recommend that this bond be reduced to maintenance level with the
provision that all of the above items are addressed prior to October
31 , 1995 .
JCl/jsv
Attachment
Ivalkz/JCIREVIEWS95/BONDRIDUC77ONS/beldonrd
OwN Sf,
y y T_au� 0-Ye sioum V&U&C�t
C
1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
4r'►'�SOR-CO AREA CODE 203/644-2511
August 16, 1995
Jean Marc Jacques
JMJ Construction Company
658 Ellington Road
South Windsor, CT 06074
Dear Mr.
Re: /Appl #90-59P, $k1don Road Estates Subdivision
This is to advise you that the Planning and Zoning Commission voted on August 15, 1995 to
reduce the site bond for the above-referenced project from $270,000 to $126,000. This is now at
maintenance level and will expire on August 15, 1996.
Enclosed is a copy of the memorandum from Tow Engineer, Jerry C. Iazzetta, outlining the
outstanding items in this subdivision. Once these items have been addressed, please notify the
Planning Department in writing and we will arrange for another inspection.
Very truly yours,
iu
NING & ZONING COMMISSION
ssell G. Levack
Chairman
RGL/pmm
Enclosure
cc: Town Engineer
�OV1 N SF,
y W&&J'at
O
C G
1540 SULLIVAN AVENUE - SOUTH WINDSOR. CONN. 06074
SOR•cor� AREA CODE 203/644-2511
September 27, 1995
Jean Marc Jacques
JMJ Construction Company
658 Ellington Road
South Windsor, CT 06074
Dear Mr. Jacques:
Re: Expiring Letters of Credit
Appl #91-39P, Redfield III
Appl #91-39P, Redfield IV
Appl #90-59P, Beldon Road Subdivision
Appl #92-15P, Dart Hill Estates, Phase III
Appi #93-09P, Dart Hill Estates, Phase IV
The Planning and Zoning Commission is holding the following Letters of Credit:
Project Bank Amount Expiration
Redfield Ph III Shawmut $1589000 12/01/95
Redfield Ph IV Shawmut $ 67,000 12/01/95
Beldon Road Sub Shawmut $185,000 12/01/95
Dart Hill Ph III Shawmut $105,000 12/10/95
Dart Hill Ph IV Shawmut $141,000 12/31/95
In accordance with our policy for accepting Letters of Credit in lieu of surety bonds, we must
have an amendment to each expiring Letter of Credit well in advance, extending the term for a
one year period from the expiration date. Will you please forward us the amendment promptly.
Very truly yours,
cf.
� lur..0
Marcia A. Banach, AICP
Director of Planning
MAB/pmm
if
Clark Realty, Inc.
CONSTRUCTION SPECIALISTS
658 ELLINGTON ROAD SOUTH WINDSOR, CT 06074
(203)282-0628 OR 644-3113
IMID-DELIVERED
Octobor 19, 1995 J
Pro,
fir. Jerry C. lazzatta OCT 19 1995
Town EngineRr
1540 Sullivan Avenve South Windsor
South Windsor, CT 06074 planning & Zoning Commission
Re: RE zorl OF BOND TO MAINTENANCE LEVEL
BELVON ESTAT SUBDIVISION
Dear Mr. lazzettn:
since we now have complat*d all open items o t
on your
he latout
maintenance leve
mluml wr
arty requesting for our bond to be reduced t
Thank you for your anticipated cooporation.
VQry truly yours,
� 1
{•_ icy, i, <<
Jrimnne 111appe
for Beldon Estates
cc: Marcia A. Danach - Director of Planning
Mel stead
SON N SE,
C
r Tla
074eSOUM
?d&U&Cjjt
c �
.� u
_ . 1540 SULLIVAN AVENUE - SOUTH WINDSOR, CONN. 06074
soR c AREA CODE 203/644-2511
October 30, 1995
Jean Marc Jacques
JMJ Construction Company
658 Ellington Road
South Windsor, CT 06074
Dear Mr. Jacques:
Re: Appl#90-59P, Beldon Road Subdivision
We have not as yet received any renewals of the letters of credit which expire December 1, 1995
as noted in our previous renewal request of September 27, 1995. Please be advised that
discussion of this matter will be placed on the November 28, 1995 agenda of the Planning and
Zoning Commission, and calling of the bond will be initiated at that time if we have not received
a renewal.
Thank you for your attention to this matter.
Very truly yours,
dAA r
i
Marcia A. Banach, AICP
Director of Planning
MAB/pmm
044 N SF,
_ 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
°sOR-CO AREA CODE 860/644-2511
December 11, 1995
Jean Marc Jacques
JMJ Construction Company
658 Ellington Road
South Windsor, CT 06074
Dear Mr. Jacques:
Re: Appl#90-59P, Beldon Road Subdivision
We have not as yet received any renewals of the letters of credit which expire December 31,
1995 as noted in our previous renewal request of October 27, 1995. Please be advised that
discussion of this matter will be placed on the December 12, 1995 agenda of the Planning and
Zoning Commission, and calling of the bond will be initiated at that time if we have not received
a renewal.
Thank you for your attention to this matter.
Very truly yours,
'44" (.X .
Marcia A. Banach, AICP
Director of Planning
MAB/pmm
LETTER OF TRANSMITTAL
4 �M •�+t
h
C
PLANNING DEPARTMENT
TOWN OF SOUTH WINDSOR -,
1540 SULLIVAN AVENUE �-1
SOUTH WINDSOR, CT 06074 DATE I
TO :
� l0
RECEIVED
JUL 311997
WE ARE SENDING YOU :
SOUTH VYINDSOR
Drainage comps EN.o�
Bond estimate req
P & Z initial plans � s ~
P & Z final plans IWA/CC plans Bond reduction req q,
S
Final plans for filing Change order form
Other Correspondence
Copies Appl . No . Project
THESE ARE TRANSMITTED as checked below:
For review and comment For your file
For your use Returned with revisions
_ As requested
Other
PLEASE RETURN/COMMENTS BY:
COMMENTS : 0000 AIL
_
jj
W, lk-- '0% r
o to:
rom•
AfT77
9�C/
� � 7
One Coilmrate Center 130 Hopmeadow Street 2360 plain Street
Hartford Simshury P.O.Box 159
Cunnrcticul 06103-3291 Connecticut 06070 Rocky Hill
Rho 525-6045 860 651-934R Connecti(ut 0606
FAX 860 522-1781 860 563-9305
.OROKfN SOROKIN GROSS HYDE&WILLIAMS PC FAX 860 525-9099 FAX 860 529-6931
ATTORNEYS .AT LAW
Reply To:
One Corporate Center
Direct Dial (860) 541-3307
August 5, 1997
` ra' ;
r
Honorable William Aman, Mayor
Town of South Windsor AUG 6
1540 Sullivan Avenue
South Windsor, CT 06074 South Windsor
Planning & Zoning Commission
RE: Beldon Estates Subdivision 1.78 acre open space parcel
Dear Mayor Aman:
Please be advised that this firm represents Clark Realty, Inc. and JMJ
Construction Company, Inc., the owner and developer of the above-referenced
subdivision.
As you may be aware, this subdivision received final approval of the Planning and
Zoning Commission of the Town of South Windsor on December 10, 1990. Under the
terms of the subdivision approval, the owner/developer was required to convey to the
Town of South Windsor the above referenced parcel of open space land situated on the
westerly side of Cody Circle.
Quite some time ago, the maintenance bond for this project was released.
Accordingly, my client was prepared to convey to the town, as required by the terms of
the subdivision approval, the interior roads and open space parcel located within this
project. Deeds in final form were submitted to the Town on February 12, 1997 for this
purpose. Since that date, my client and I have requested that this matter be acted upon by
the Town Council so that this final aspect of the subdivision project could be completed.
I am advised that, at a recent meeting of the Town Council, however, although the
interior roads at the subdivision were accepted for conveyance, a determination has been
made not to accept the open space parcel.
Kindly be advised that, as noted above,the conveyance of this open space parcel
was specifically required by the Town Planning and Zoning Commission as a condition
to its approval. In accordance therewith, my client has tendered these conveyance
documents to the Town for its approval and acceptance. Nevertheless, the recent action
by the Town Council has prevented my client from satisfying its obligations under the
terms of this subdivision approval and, in effect, has unilaterally amended the terms of
Sorokin,Sorokin, Gross Hyde & Williams,P.C.
Mr. Aman
Page 2
that approval. As a result of the foregoing, I have instructed my client to refrain from the
further payment of any real estate taxes to the Town of South Windsor relating to this
open space parcel.
Upon receipt of this correspondence, I would respectfully request your careful
review of this matter, and its legal implications, so that these issues can be resolved
expeditiously to the satisfaction of all parties concerned. Thank you for your anticipated
prompt attention and cooperation in this matter.
S' cer ly,
d
n J. Kindl
JJK/elt
cc: Marsha Banach, Town Planner
Barry Juliano, Esq., Town Attorney
Assessor, Town of South Windsor
Clark Realty, Inc.
Design Professionals, Inc.
V0!. � PAGE 233
WARRANTY DEED n 0 4 5 3 0
KNOW YE THAT CLARK REALTY, INC. , a Connecticut Corporation
having an office and principal place of business in the Town
of South Windsor, County of Hartford and State of
Connecticut, (hereinafter referred to as "Grantor")
For consideration paid, received to its full satisfaction of
the TOWN OF SOUTH WINDSOR, a municipal corporation chartered
under the Laws of the State of Connecticut, (hereinafter
referred to as "Grantee") does give, grant, bargain, sell and
confirm unto the said Grantee, its successors and assigns
forever with WARRANTY COVENANTS, the following described real
property:
Those certain pieces or parcels of land situated on the
southerly side of Governors Highway and the westerly side of
Beldon Road located in the Town of South Windsor, County of
Hartford and State of Connecticut and being known and
designated as "Cody Circle" and "Bakers Lane", all as more
fully described on Schedule A attached hereto.
IN WITNESS WHEREOF, CLARK RE4LTYj INC. has hereunto set
its hand and seal this 204 day of t,1,S 1997 .
Signed and Sealed in the CLARK REALTY, INC.
presence of :
JeOh Marc Ja ue , Pkesj. e. t,�
• .1
STATE OF CONNECTICUT )
) ss. South Windsor August 2q9 1997
COUNTY OF HARTFORD )
Personally appeared, JEAN MARC JACQUES, President of
CLARK REALTY, INC. , Signer of the foregoing instrument and
acknowledged the same to be his free act and deed as such
President, and the free act and deed of said Corporation
before me.
CONVEYANCE TAX RECEIVED
Notary Publi
My Commission Expires:
^TATE 8------ - ��'�� h----- -NO-L. , MURIEL M. JACQUES
-�--- NOTARY PUBLIC
TOWN CLERK of sourH wins MY Commission expires Apr.30, 2001
VOL. 9 �33 PAGE 23 4
FIRST PIECE - BAKER LANE
That certain oiece or Parcel of land being designated as "Bake_
Lane'! as shown on that certain map or of ail enci tled "Plot Plan
Preoared for Jean Marc Jacques Beldon Road South Windsor,
Connecticut design professionals, inc . civil engineers - planners -
surveyors 1 inch = 40 -t . Job No : 8 7-18 8 Date : 2 -1-90 Drawing No. .
C: \J03\Beldon\188TP-R Sheet 5 of 18 Revisions 11-19-90 12-17-90 10-
25-93 7-8-94 11-28-94 which mao is on file as Mao No . 22833 at the
Orrice of the South Windsor Town Clerk to which reference may be
had.
Said oiece or parcel or land is more fully described as follows :
Becinning at a concrete monument in the southerly street line of Governors Hichway, said
monument being the northeasterly corner of Lot 30; thence along a curve to the right having a
central angle of 90° 00' 00" and a radius of 25.00 feet, aloncy Lot 30, a distance of 39.27 feet to a
concrete monument; thence S 41° 07' 50" W, along Lot 30, a distance of 165.74 feet to a concrete
monument; thence aloncr a curve to the left having a central angle of 17° 20' 33" and a radius of
325.00 feet along Lot 30, a distance of 98.37 feet to a concrete monument; thence
S 23 °47` 17" W, alonc, Lot 30, a distance of 127.55 feet to a concrete monument; thence along a
curve to the right having a central angle of 90° 00' 00" and a radius of 25.00, along Lot 30, a
distance of 39.27 feet to a concrete monument; thence S 66" 12' 43" E, along Cody Circle, a
distance of 100.00 feet to a concrete monument; thence alonsz a curve to the right having a central
angle of 90° 00' 00" and a radius of 25.00 feet, along Lot 4, a distance of 39.27 feet to a concrete
monument; thence N 23° 47' 17" E, along Lot 4 a distance of 127 >j feet to a concrete
monument; thence along a curve to the right having a central angle of 17° 20' 33" and a radius of
273.00 feet, along lots 1 & 3, partly by each, in all a distance of 53.24 feet to a concrete
monument; thence N 41° 07' 50" E, along lot 1, a distance of 168.74 feet to a concrete monument,
thence along a curve to the right having a central angle of 90° 00' 00" and a radius of 25.00 feet,
along Lot 1, a distance of 39.27 feet to a concrete monument; thence N 4S° 52' 10" W, along the
southerly street line of Governors Highway, a distance of 100.00 feet to a concrete monument
being the point and place of beginning.
VOL. 9 G 3 PAGE 2 3 q-)
SECOND PIECE - CODY CIRCLE
That certain piece or parcel of land being designated as "Cody
Circle" as shown on that Cent:_ ? map or plat? entic.led "Plot Plan
Preoared -for Jean Marc Jacaues 3eldon Road South Windsor,
Connecticut design oro_^essionals, inc . civil engineers - planners _
surveyors 1 inch = =0 Eft . Job No . 87-188 Date . 2-1-90 Drawing No . .
C : \JO3\Beldon\188TP-R Sheet a o= 18 and Sheet 5 or 18 Revisions 11-
19-90 12-17-90 10-25-93 7-8-94- 11-28-94 " which mao is on rile as
Mao No. 22833 at the Office of the South Windsor Town Clem: co
which reference may be had.
Said piece or parcel of land is more -fully described as -follows .
Beginning at a concrete monument in the westerly street line of Beldon Road; thence along a
curve to the left having a central angle of 87' 52' 40" and a radius of 25.00 feet along the
southerly street line of Cody Circle and the northerly property line of Lot 21, a distance of 3 S.34
feet to a concrete monument; thence S 87' 58' 10" `t' , along said Lot 21 a distance of 46.22 feet
to a concrete monument; thence along a curve to the right having a central angle of 25'49' 07"
and a radius of 325.00 feet, along Lot 21 and Lot 22, partly by each, in all 146.46 feet to a
concrete monument; thence N 66' 12'43" W, along lots 22,23 24,25 & 26 , ;partly by each, in all
60S.02 feet to a concrete monument; thence along a curve to the right having a central angle of
180' 00' 00" and a radius of 230.00, along Lot 27, Open Space, Lots 28, 29 & 30, partly by each,
in ail 722.56 feet to a concrete monument; thence S 60" 12' 43" E along Lots 30, 4 and Baker
Lane, partly by each, in all, 242.57 feet to a concrete monument; thence along a curve to the left
having a central angle of 510 19, (W and a•radius b't'` .d0 feet, af6ng Lot 4, a distance of 22.39
feet to a concrete monument; thence along a curve to the right having a central angle of
RA" 1. .
2S2" 3S' 08" and a radius of 55.00 feet,.. . Lots 4,a,9 & 10, partly by each, in all a distance of
271.31 feet to a concrete monument-,thence along a curve to the left having a central angle of
5 P 19' 04" and a radius of 25.00 feet, along Lot I0,"S distance of 22.39 feet to a concrete
monument; thence N 66' 12' 43" W along Lots 10, 11, & 12, partly by each, in all a distance of
242.57 feet to a concrete monument; thence along a curve to the left having a central angle of n
180' 00' 00" and a radius of 180.00 feet, along Lots 12,13,14 & 15, partly by each, in all a o
distance of 565.48 feet to a concrete monument; thence S 66' 12' 43" E, along lots 15,16,17,IS & o
19, partly by each, in all a distance of 608.02 feet to a concrete monument; thence along a curve o
to the left having a central angle of 25' 49' 08" and a radius of 275.00 feet, along Lots 19 & 20, Q o �
0
partly by each, in all a distance of 123.93 feet to a concrete monument; thence N 87' 58' 10" E o v
along Lot 20 a.distance of 44.72 feet to a concrete monument; thence along a curve to the left z
having a central angle of 89' 04' 57" and a radius of 25.00 feet, along Lot 20, a distance of 38.87 o
feet to a concrete monument, thence along a curve to the left having a central angle of 3° 02' 23" - G
and a radius of 1536.70 feet along the westerly street line of Beldon Road, a distance of 81.53
cn
feet to a point; thence S 04 ° 09' 10" E along the westerly street line of Beldon Road a distance of 70
17.17 feet to a concrete monument - being the point and place of beginning.
voL. 972 PAGE 260
QUIT CLAIM DEED 005493
KNOW YE THAT CLARK REALTY,INC.,a Connecticut Corporation having an office
and principal place of business in the Town of South Windsor,County of Hartford and State
of Connecticut,(hereinafter referred to as "Grantor")
For consideration paid, received to its full satisfaction of the TOWN OF SOUTH
WINDSOR, a municipal corporation chartered under the Laws of the State of Connecticut,
(hereinafter referred to as "Grantee")does give, grant, bargain, sell and confirm unto the
said Grantee, its successors and assigns forever with QUIT CLAIM COVENANTS, the
following described real property:
Those certain pieces or parcels of land being shown and designated as "Beldon
Road" and "Governors Highway" on two certain maps or plans entitled, "Plot Plan
Prepared for Jean Marc Jacques Beldon Road South Windsor, Connecticut design
professionals,inc civil engineers• planners• surveyors 1 in = 40 ft. Job No: 87-188 Date:
2-1-90 Drawing No.: C:\JOB\Beldon\188TP-R Sheet 4 of 18 Revisions 11-19-94 12-17-90
10-28-92 11-16-92 10-25-93 11-12-93 11-28-94 and Sheet 5 of 18 Revisions 11-19-90 12-
17-90 10-25-93 7-8-9411-28-94"which maps are on file as Map No. 2283A and Map No.
2283B at he Office of the South Windsor Town Clerk to which reference may be had.
IN WITNESS WHEREOF, CLARK REALTY, INC. has hereunto set its hand
and seal this-�?day of October, 1997.
Signed and Sealed in the CLARK REALTY,INC.
presence of. -
an Marc Jacques resid = ,
CONNIFYAWF TAX RECEIVED
TOWN CLERIC OF SOUTH WINDSOR
STATE OF CONNECTICUT )
ss. South Windsor 0ctober,) 1997
COUNTY OF HARTFORD )
kJ
Personally appeared, JEAN MARC JACQUES, President of CLARK REALTY,
INC.,Signer of the foregoing instrument and acknowledged the same to be his free act and
deed as such President,and the free act and deed of said Corporation before me.
ECEIVED FOR RECORD 19 9 74� -
TR
IN SOUTH WINDSO�
AND RECORDS VOL PAGE_ __._
Y N CLERK Notary Public � ado
. My Commission Expires: G%� ,
° 7-
TOWN fie.
One Corporate Center 730 Hopmeadow Street 2360 Main Street
Hartford Simsbury P.O.Box 159
Connecticut 06103-3291 Connecticut 06070 Rocky Hill
860 525-6645 860 651-9348 Connecticut 06067
FAX 860 522-1781 860 563-9305
SOROKIN SOROKIN GROSS HYDE&WILLIAMS PC FAX 860 525-9099 FAX 860 529-6931
ATTORNEYS AT LAW
Reply To:
One Corporate Center
Direct Dial (860) 541-3307
October 31, 1997
Michelle Lipe
Town Planning and Zoning Commission Ist t
Town of South Windsor �jr
150 Sullivan Avenue
South Windsor, CT 06074 NOV 3 1997
RE: Beldon Estates Subdivision South Windsor
Quit Claim Deed to Beldon Road and Governors Highway planing & Zoning Commission
Dear Michelle:
As discussed, enclosed please find an original Quit Claim Deed from Clark
Realty, Inc. to the Town of South Windsor with respect to the above-referenced public
roads. Also enclosed is a state conveyance tax form for filing at the time of recording of
this deed. As I had previously informed you, Jerry Iazetta confirmed that he would not
require a running description of these roads in this deed.
Should you have any questions regarding this correspondence,please do not
hesitate to contact me.
Sin ly,
Jo . Kindl
JJK/elt
VOL. 1073PAGE 7 8
WARRANTY DEED 2303
KNOW YE THAT CLARK REALTY,INC.,a Connecticut Corporation having an office
and principal place of business in the Town of South Windsor,County of Hartford and State
of Connecticut,(hereinafter referred to as "Grantor")
For consideration paid, received to its full satisfaction of the TOWN OF SOUTH
WINDSOR, a municipal corporation chartered under the Laws of the State of Connecticut,
(hereinafter referred to as "Grantee")does give, grant, bargain, sell and confirm unto the
said Grantee, its successors and assigns forever with WARRANTY COVENANTS, the
following described real property:
That certain piece or parcel of land situated on the southerly side of Governors
Hiahway and the westerly side of Bc13on :oad located in the Town of South Windsor,
County of Hartford and State of Connecticut and being known and designated as "Open
Space", all as more fully described on Schedule A attached hereto.
IN WITNESS WHEREOF, CLARK REALTY, INC. has hereunto set its hand
and seal this 1JZ� day of December, 1997.
Signed and Sealed in the CLARK REALTY,INC.
,Y
presence of: A,
By `• p,,
JeafMarc Jacques,P side c�
/ 1
STATE OF CONNECTICUT )
)ss. South Windsor December f ,1997
COUNTY OF HARTFORD )
Personally appeared, JEAN MARC JACQUES, President of CLARK REALTY,
INC., Signer of the foregoing instrument and acknowledged the same to be his free act and
deed as such President,and the free act and deed of said Corporation before me.
COW4WANM TAX PXCVVW 4ntz�_
STATE$ .....�LOG�• �� Notary Public 11AURIEL M.JACQUES
My Commission Expir%TpWY PUBLIC
•
00AME Atmhx4m My commission expires Apr.30, 200
T"CLM OF WjM VWmXN
' M
VOL. 107 3 FACE 79
SCHEDULE A
OPEN SPACE PARCEL
That certain piece br parcel of land being designated as "Town of
South Windsor Open Space 77, 642 sq. ft . 1 . 78 acres" as shown on
that certain map or plan entitled "Plot Plan Prepared for Jean Marc
Jacques Beldon Road South Windsor, Connecticut design
professionals, inc . civil engineers - planners - surveyors 1 inch
40 ft . Job No : 87-188 Date : 2-1-90 Drawing No. :
C: \JOB\Beldon\188TP-R Sheet 5 of 18 Revisions 11-19-90 12-17-90 10-
25-93 7-8-94 11-28-94" which map is on file as Map No. 22833 at the
Office of the South Windsor Town Clerk to which reference may be
had.
Said piece or parcel of land is more fully described as follows :
Beginning at a concrete monument in the northwest corner of Lot 27; thence
S 51° 35' 48" W. along Lot 27, a distance of 199.62 feet to a concrete monument; thence
N 660 12' 43" W, along properties now or formerly of Willard G. &Janice M. Blowers and
property now or formerly of Fred S. &Joan M. DeGiacomo and property now or formerly of
Victor I. Jr.,.&Marilyn M. Senger, partly by each, in all a distance of 179.75 feet to a concrete
monument; thence N 23°48' 51" E, along property now or formerly of G.T.T. Corp. trustee of
Onyx Properties Realty Trust, a distance of 380.00 feet to a concrete monument; thence
S 660 12'43 ' E, along Lot 28, a distance of 150.00 feet to a concrete monument; thence along a
curve to the left having a central angle of 62° 11' 29" and a radius of 230.00 feet along the
westerly street line of Cody Circle, a distance of 249.65 feet to a concrete monument being the
point and place of beginning.
RECEIVED FOR RECORD APR - 1959
AT I a`.�Yb '�m
RECORDED IN SOUTH WINDSOR�
LAND RECORDS VOL h PAGE.__ ___
gy AD ej TOWN CLER
*TOWN CLERK
STATUTORY FORM WARRANTY DEED
ELIO CAPUANO of Stonington, Connecticut, for valuable
consideration grants to THE TOWN OF SOUTH WINDSOR, a municipal
corporaiton located in Hartford County in the State of Connecticut,
with WARRANTY COVENANTS, three certain pieces or parcels of land
located in said Town of South Windsor, County of Hartford and State
of Connecticut being bounded and described as follows:
FIRST PIECE:
Known as Cook Circle and running westerly from the
westerly line of Beldon Road between Lots 21 and 20 on a map of
plan entitled, "Plot Plan Capuano Developers Beldon Road South
Windsor, Connecticut Job No. 87-188 Date: 2-1-90 Design
Professional, Inc. , Civil Engineers, Planners, Surveyors Revised
11-19-90, 12-17-90 Sheets 4/18 and 5/18. " The southerly line of (�
said land westerly along the northerly line running westerly along 1
the northerly line of Lots 21, 22, 23, 24, 25, 26, and 27 to the N northwesterly corner of Lot 27; thence northwesterly along land
designated as "Town of South Windsor Open Space, " northwesterly
along Lots 28 and 29 and easterly along Lot 30, Baker Lane and Lot
4, on said map to Lot 5; thence southeasterly, southerly and
westerly and northwesterly along Lot 5, 9 and 10 to a point where
the line then runs parallel to the above-described line to Beldon
Road.
SECOND PIECE: 1�
Known and designated as Baker Lane on the above-mentioned
maps, and being 50 feet in width and running southerly from the
southerly line of Governors Highway to the above-described parcel.
THIRD PIECE:
Containing 2,237 square feet and being located on the
westerly side of Beldon Road between the northerly line of Hilton
Drive and southerly line of Lot 21 as shown on the above-mentioned
maps.
Said premises are bounded:
NORTHERLY: by Lot 21, 140.58 feet;
EASTERLY: by Beldon Road; and
SOUTHERLY: by Hilton Drive.
-1-
EAL:378
Said premises are conveyed subject to any and all provisions of any
ordinance, municipal regulation or public or private law, and taxes
on the list of October 1 immediately preceding the date of this
deed.
Signed this day of September, 1991.
Witnessed by:
ELIO CAPUANO
STATE OF CONNECTICUT:
: SS.
COUNTY OF
Personally appeared ELIO CAPUANO, as aforesaid, signer of
the foregoing instrument, and acknowledged the same to be his free
act and deed, before me, this day of September, 1991.
Commissioner of the Superior Court
Notary Public
My Commission Expires:
-2-
EAL:378
a
STATUTORY FORM WARRANTY DEED
ELIO CAPUANO of Stonington, Connecticut, for valuable
consideration grants to THE TOWN OF SOUTH WINDSOR, a municipal
corporaiton located in Hartford County in the State of Connecticut,
with WARRANTY COVENANTS, a certain piece or parcel of land located
in said Town of South Windsor, County of Hartford and State of
Connecticut designated, "Town of South Windsor Open Space 77.642
sq. ft. 1.78 acres, " on a map or plan entitled, "Plot Plan Capuano
Developers Beldon Road South Windsor, Connecticut Job No. 87-188
Date: 2-1-90 Design Professional, Inc. , Civil Engineers,
Planners, Surveyors Revised 11-19-90, 12-17-90 Sheet 5/18. "
Said premises are bounded and described as follows:
NORTHERLY: by Lot 28 on said map , 150 feet;
EASTERLY: by Cook Circle as shown on said
map, 249. 65 feet;
SOUTHEASTERLY: b Lot 27 on said ma 199.62
Y P►
feet;
SOUTHERLY: �( by land now or formerly of Fred
r� DeGiacomo, et al. and by land now
v or formerly of Victor I. Senger,
et al. , partly by each, 179.75
feet; and
WESTERLY: by land now or formerly of Elio
Capuano, et al. , 380.00 feet.
Said premises are conveyed subject to any and all provisions of any
ordinance, municipal regulation or public or private law, and taxes
on the list of October 1 immediately preceding the date of this
deed.
Signed this day of September, 1991.
Witnessed by:
ELIO CAPUANO
-1-
EAL: 379
STATE OF CONNECTICUT:
SS.
COUNTY OF
Personally appeared ELIO CAPUANO, as aforesaid, signer of
the foregoing instrument, and acknowledged the same to be his free
act and deed, before me, this day of September, 1991.
Commissioner of the Superior Court
Notary Public
My Commission Expires:
-2-
EAL:379
• II
*� L, 1 \
\rz \ J �S
ago
• � r � _ •1��— a► •� •IZ i w
0 6 = \ cn 4D/
Vag
O o og 1 Aq I� •11
asso \ , O
}+s o :
\ 7uo •Pe` ° ,
7 k s
I J 04
d000
/N
O \
!r
o "
O � •ice,� I� � �J
1 1
Co
• ��•1• `fir � �, ��;J � •__ - :� b � � ' .,'A���'
\, I 111 ,� ,, s, 194
,.0 hvro+�' tom• , �a SITE .�. i� '., e
Ait
low
met
• :South -. •.�: •;� _ r a �, j
.. �`indsor �• �
AL
A.
--�.' � •�' '�; 'ruder
LOCAT H PLAH SCaLF.- ?p o 2000'
DRAINAGE EASEMENT
KNOW ALL MEN BY THESE PRESENTS,that HELMAR WOLF and ARTURO GUERRA,both of the
Town of South Windsor, Connecticut (collectively referred to herein as the "Grantor"), for good and
valuable consideration received to their full satisfaction of THE TOWN OF SOUTH WINDSOR (referred to
herein as "Grantee"), a municipal corporation chartered under the laws of the State of Connecticut, do
give, grant, bargain, sell and confirm unto the Grantee, its successors and assigns forever, a perpetual
right to lay, install, maintain, inspect, operate, construct, use, alter, repair, replace and remove storm
water or storm drainage systems and appurtenances thereto, including the right to drain and maintain
channel to the Podunk River, together with temporary access for construction purposes through, upon
and over certain parcels of land described in Exhibit A annexed hereto and made a part hereof.
Within said parcels described in Exhibit A. the Grantee, its successors and assigns, shall have
the right to cut trees and bushes as may be convenient or necessary and to remove structures thereon,
and to pass and repass with men and equipment, to operate equipment and install materials incidental
to the construction of said storm water or storm sewer lines, storm water or storm sewer pipes, or
storm water or storm drainage systems and to excavate and fill, and, if necessary, to alter existing
water courses or form embankments over said storm water or storm sewer lines, storm water or storm
sewer pipes, or storm water or storm sewer drainage systems.
The Grantor herein, for itself, its successors and assigns, shall not erect or allow to be erected
any immobile structures on said easements or rights-of-way and shall not plant or allow to be planted
or grown any trees thereon or perform any work thereon within said easements or rights-of-way which
may endanger or interfere with said line, pipe or drainage systems.
The Grantor herein for itself, its successors and assigns, reserves the right to itself, its
successors and assigns,to continue to use the land within which the aforesaid easements or rights-of-
way have been granted for any uses and purposes which shall not in any way interfere with the use
thereof by the Grantee, its successors and assigns, in fulfilling the purpose for which these easements
or rights-of-way are granted.
The Grantee herein, for itself, its successors and assigns, agrees to restore and maintain said
premises in their original condition as nearly as possible commensurate with the above use upon the
completion of any maintenance, operation, construction, replacement or repair work in said easement
or right-of-way areas.
The Grantee agrees to hold the Grantor, their heirs and assigns,harmless from and against any
and all damage to property or person caused by the construction and/or maintenance and repair of said
storm water or storm sewer lines, storm water or storm sewer pipes, and storm water or storm sewer
drainage systems.
IN WITNESS WHEREOF,the Grantor has hereunto set its hand and seal this day of
1993.
Signed, Sealed, and Delivered
in the Presence of: GRANTOR:
Helmar Wolf
Arturo Guerra
JKF/img/19303 12603-369
STATE OF CONNECTICUT
ss.
COUNTY OF
On this day of , 1993, personally appeared HELMAR WOLF, signer
and sealer of the foregoing instrument, and acknowledged the same to be his free act and deed, before
me.
Notary Public/Commissioner of
the Superior Court
STATE OF CONNECTICUT
ss.
COUNTY OF
On this day of , 1993, personally appeared ARTURO GUERRA,
signer and sealer of the foregoing instrument, and acknowledged the same to be his free act and deed,
before me.
Notary Public/Commissioner of
the Superior Court
TOWN HALL USE ONLY
Approved by Town Engineer: ATE Date:
Approved by Town Manager: Date:
TKF/ung/19303 12603-369 2
EXHIBIT A
PARCEL I:
A parcel of land located at the intersection of the westerly line of Beldon Road with the
westerly line of Ellington Road containing a pipe and headwall and drainage easement described in a
Drainage Right-of-Way from Edward Janson, et al., to the State of Connecticut dated April 29, 1937
and recorded in Volume 34, Page 129, and shown on a map or plan entitled "Drainage Easement from
Helmar Wolf and Arturo Guerra to the Town of South Windsor Job No. 88-319 Date: February 27,
1992 Revised 8-6-92, Revised 11-24-92 Design Professionals, Inc. Civil Engineers Planners Surveyors
Sheet 1 of V (referred to herein as the "Map"),to be filed with the Town Clerk's office in said Town
of South Windsor and being more particularly bounded and described as follows:
Commencing at a point at the intersection of the westerly line of Beldon Road with the westerly
line of Ellington Road which point marks the point or place of beginning; thence along a curve to the
left having a radius of 831.84 feet, a distance of 2.58 feet along the westerly line of Ellington Road to
a point; thence S 3 3" 54' 40" E, 11 feet along the westerly line of Ellington Road to a point; thence
along a curve to the left having a radius of 821.84 feet, a distance of 57.51 feet along the westerly line
of Ellington Road to a point; thence N 62° 35' 24" W, 30.97 feet into property now or formerly
owned by Helmar Wolf and Arturo Guerra to a point; thence along a curve to the right having a radius
of 852.81, a distance of 92.47 feet to a point in the westerly street line of Beldon Road;thence S 07°
09' 08" E, 32.68 feet to the point or place of beginning.
PARCEL 2:
The area shown on the Map as "Right to Drain and Maintain Channel in Favor of the Town of
South Windsor," which area extends from the southwesterly end of Parcel 1 to the Podunk River along
existing channels, as the same may be diverted or changed over time by the natural effect of the
elements.
TKF/img/19303 12603-369
REDLINED (0 m/93)
1
2 DRAINAGE EASEMENT
3
4
5
6 KNOW ALL MEN BY THESE PRESENTS,that HELMAR WOLF and ARTURO
7 GUERRA, both of the Town of South Windsor, Connecticut (collectively referred to herein as the
s "Grantor"), for good and valuable consideration received to their full satisfaction of THE TOWN OF
9 SOUTH WINDSOR (referred to herein as "Grantee"), a municipal corporation chartered under the
10 laws of the State of Connecticut, do give, grant, bargain, sell and confirm unto the Grantee, its
11 successors and assigns forever, a perpetual right to lay, install, maintain, inspect, operate, construct,
12 use, alter, repair, replace and remove storm water or storm drainage systems and appurtenances
13 thereto, including the right to drain and maintain channel to the Podunk River, together with
14 temporary access for construction purposes through, upon and over certain parcels of land described in
15 Exhibit A annexed hereto and made a part hereof.
16
17 Within said parcels described in Exhibit A, the Grantee, its successors and assigns, shall have
18 the right to cut trees and bushes as may be convenient or necessary and to remove structures thereon,
19 and to pass and repass with men and equipment, to operate equipment and install materials incidental
20 to the construction of said storm water or storm sewer lines, storm water or storm sewer pipes, or
21 storm water or storm drainage systems and to excavate and fill, and, if necessary, to alter existing
22 water courses or form embankments over said storm water or storm sewer lines, storm water or storm
23 sewer pipes, or storm water or storm sewer drainage systems.
24
25 heenserl Pfe ;.,na F ;near /Y., el.. eeafi..�.e+ie be feeef ea if 41. S +1, �i7',,dse f- T fi
V Vn f� VV \�♦ V 1 Wllllllllµ{.iVZl Zi
26 V `die sluiee gate (the "Sluiee 11
27 eemmenly kneyva as the
"Mill I I pf;epeity has been fepaifed and feeenfigw-ed in
28 1 " " shall
29 odLLzt�fking ardor I +lie a efft the
eest o f s ..1.. rep
V��l Vili Tj�'prr��TiP�p'��-pl--�'�pj
30
31 ,
32 shall beeeme effiaegve upeff,
33 ,
34
35 The Grantor herein, for itself, its successors and assigns, shall not erect or allow to be erected
36 any immobile structures on said easements or rights-of-way and shall not plant or allow to be planted
37 or grown any trees thereon or perform any work thereon within said easements or rights-of-way which
38 may endanger or interfere with said line, pipe or drainage systems.
39
40 The Grantor herein for itself, its successors and assigns,reserves the right to itself, its
41 successors and assigns,to continue to use the land within which the aforesaid easements or rights-of-
42 way have been granted for any uses and purposes which shall not in any way interfere with the use
43 thereof by the Grantee, its successors and assigns,in fulfilling the purpose for which these easements
44 or rights-of-way are granted.
45
46 The Grantee herein, for itself, its successors and assigns, agrees to restore and maintain said
47 premises in their original condition as nearly as possible commensurate with the above use upon the
48 completion of any maintenance, operation, construction, replacement or repair work in said easement
49 or right-of-way areas.
50
51 The Grantee agrees to hold the Grantor, their heirs and assigns,harmless from and against any
52 and all damage to property or person caused by the construction and/or maintenance and repair of said
53 storm water or storm sewer lines, storm water or storm sewer pipes, and storm water or storm sewer
54 drainage systems.
55
7KF/ung/19303 12603-369
REDLINED (owv,93)
1 IN WITNESS WHEREOF,the Grantor has hereunto set its hand and seal this day of
2 , 1993.
3
4 Signed, Sealed, and Delivered
5 in the Presence of: GRANTOR:
6
7
8
9 Helmar Wolf
10
11
12
13
14
15 Arturo Guerra
16
17
18
19
20 STATE OF CONNECTICUT
21 ss.
22 COUNTY OF
23
24 On this day of , 1993, personally appeared HELMAR WOLF, signer
25 and sealer of the foregoing instrument, and acknowledged the same to be his free act and deed, before
26 me.
27
28
29
30
31 Notary Public/Commissioner of
32 the Superior Court
33
34
35 STATE OF CONNECTICUT
36 ss.
37 COUNTY OF
38
39 On this day of , 1993, personally appeared ARTURO GUERRA,
40 signer and sealer of the foregoing instrument, and acknowledged the same to be his free act and deed,
41 before me.
42
43
44
45
46 Notary Public/Commissioner of
47 the Superior Court
48
19
51
52 TOWN HALL USE ONLY
53
54 Approved by Town Engineer: ATE Date:
55
56
57 Approved by Town Manager: Date:
58
59
7KF/img/19303 12603-369 2
REDLINED (07/07/93)
1 EXHIBIT A
2
3
4
5 PARCEL 1:
6
7 A parcel of land located at the intersection of the westerly line of Beldon Road with the
8 westerly line of Ellington Road containing a pipe and headwall and drainage easement described in a
9 Drainage Right-of-Way from Edward Janson, et al., to the State of Connecticut dated April 29, 1937
10 and recorded in Volume 34, Page 129, and shown on a map or plan entitled "Drainage Easement from
11 Helmar Wolf and Arturo Guerra to the Town of South Windsor Job No. 88-319 Date: February 27,
12 1992 Revised 8-6-92, Revised 11-24-92 Design Professionals, Inc. Civil Engineers Planners Surveyors
13 Sheet 1 of V (referred to herein as the "Map"),to be filed with the Town Clerk's office in said Town
14 of South Windsor and being more particularly bounded and described as follows:
15
16 Commencing at a point at the intersection of the westerly line of Beldon Road with the westerly
17 line of Ellington Road which point marks the point or place of beginning; thence along a curve to the
18 left having a radius of 831.84 feet, a distance of 2.58 feet along the westerly line of Ellington Road to
19 a point; thence S 33° 54' 40" E, 11 feet along the westerly line of Ellington Road to a point; thence
20 along a curve to the left having a radius of 821.84 feet, a distance of 57.51 feet along the westerly line
21 of Ellington Road to a point; thence N 62° 35' 24" W, 30.97 feet into property now or formerly
22 owned by Helmar Wolf and Arturo Guerra to a point; thence along a curve to the right having a radius
23 of 852.81, a distance of 92.47 feet to a point in the westerly street line of Beldon Road; thence S 07'
24 09' 08" E, 32.68 feet to the point or place of beginning.
25
26 PARCEL 2:
27
28 The area shown on the Map as "Right to Drain and Maintain Channel in Favor of the Town of
29 South Windsor," which area extends from the southwesterly end of Parcel 1 to the Podunk River along
30 existing channels, as the same may be diverted or changed over time by the natural effect of the
31 elements.
32
TKF/ung/19303 12603-369
I 17 sW wuArct ltYPl
t Z I
I. l
I N J
I 'I r ► 4,5� I �� � q ��
I I., Co '�7 16
I 1 1 fa�
I III l N, , I
1 .I.
I r•I o I I \ / •i �� 1 -84
1 43,214 s ft IV,�, J / '
1 ICn ,33�9 I \ I 0.99 s/ n
I 1•o Cr. /
1 1 .ir- 1 o 0
7 0 I 2>r434 f
2 69' '1 \ q, \ 1 y n
1 34. � � � I /0 n
I I OM le �C \ .49 a res I - 56'03'00' •'/
I , I 07 5 x / X 9.4 I ' 1 R - 162.87'
BE BL C \ \ L - 159.33' n r
0.
I r LOT -
\ to �' �\ `� >► I EXI PIPE, HF.A �-� 100' +2 Exist SMH
\ •0"— . CB TO REM0 TF= 83.25
20,099 sq. ft. - b SNET + FL66.17
0.46 acres \ \ ' �/ -r ET 2216
i G n Sr N T
\ \ \ '�' ��� i� ENT n
I
LOT \ Nth \ � •o i ,st, x$4 � -
20,201 sq. f o i" \ \ \ 0 LF —0i 4".RCP i 6 8 gate
s -
r 0.46 acre \ `��, \ -0. / --®u; ►►
6 TF A37 ao -
68. � ' - � - n � '�� rr TF = 82.03
ST S ,► ,r FL 77.03 150
79.2 \ \� -- ,5} 13 0 00 i RCP - ' - ,► ,r FL = 75.36 18". 2
- 00 24 R, - ►► ►►'CL
83 It
vv
Irv-
ool CUP 0-1 ilk
s - - •� o � ' I It
s - ' Ex CB 2 00 Hy�d. nrN (►
FL 94 Ex 240 TF = 80.35
= 67.80 30" '
NG PIPS'H D � - 'D � 1
CB TO B
v /
PROP. - ' ���—80
NET 3 15
80.80 ZF-Mvlf 4" AWL
i FL = 66.49 $Low f4EDUCEg.
0 = 11'20'00*
R 1536.70'
L = 303.97'
NOTE: SEE SHEET NOS 8- 12 FOR
REVISED STORM SEWER & OTHrER
UTILITIES ON BELDON ROAD .
-SIC)
c,�•?.� z.D Gas •'
N/F
CAPANO, N/F N/F N/F
C PAS QU & NIF N/F CANCEL, THO RPE, BLOWERS,
RA WINTER, J AND REW, ROSE WILFRED 0 R & RO S ALIE B & WILLARD G &
6 *16 2'43" E tl S O NIA FRED S JANICE M 1306.04'
1.114 1 m -L
AREA &ZXL
Qsl 0.87 IFS.
x - �. �3.9 T,F..
lco
N �
N 0 i2o �c 44P V#- .S ra
I t-' Asze�a t c.4�All c�� �>z�a.=� a,'S�4�►c. � ,..� I
I o 0 = o.t�9 0> Iti i o"ePyyUG. r I I N .51 G F co I //ry ` � co
A �ID �.5/O N Q C Z d Ui O
O_ I V� OI CD O
m cn .1Ln
0 co I � o �--� I m 0 �f I � ZV
rr p I v Ln � O r O v :+ V
41 m
IA
..i =+FF=81.0 ,I II � I
�
�
FF=81.0 = �
II40' BL (TYP) 81,0
cn 000
`� OG m �'�.
�
- C''x
Q,0 ; r
139.00' �E. 150.00' o rn _6 II II II
N N rn
V•a
27.,5._I..E �4 RL p Ste. tJmirl (A N
cn
cn N cn N 275 LF — 24 S=0.005
EWER 5+00 o rn. 6+ 0 0 0� 8+00 9 078 — 18' RCP _ 11 q 'moo,
A
8' WA R MAIN Ps 5 7+00 W p a —0 137 8p U col
psi 4F am r
7 -
8 �
608.0 ' n S 66'12'43 E 608.02' II N ` 10 1 ~RCA II tl II 9�
.r V� F
(A �' -012.05' N 8 2' o o Sip N t�V •9
135.00' 135.18 1 o � I n r 78 \ ppS N(A sF�
N-v I 6
ul ;U(n cn * v� p II II II it
•� Z O 0 -4coOOD N
I 40' + .o N
I I W s O I
I FF=81.0 I I FF=81.0 I .i II I `s'A
Yr FF= 1.0 0 (AV CA .o
I I I
_ z ( OS z cn I PREPARED FOR
p I:. iCA
JEAN MARCJACQUES
( �.�, R�A>z ago �a,,�n�E
in(ay I c ILq N Design Professionals, Inc. LaT0. Z417-S,. ZL �' Z7
�_ =�0 BELDON ROAD
- � 441C Governors Highway AL` yA�o ��,,�� ,�„�
South VVindsor,CT 06074 ?t pl"t. Arm To ;d c aw lvlo e
91�`119� VA"r►%moo Dy -roL LOT owNfa-s. SOUTH WINDSOR, CONNECTICUT (203) 282-0628