HomeMy WebLinkAboutSITE PLAN FOR OFFICE CONVERSION TOWN OF' SOUTH WINDSOR, CONNECTICUT
PLANNING AND ZONING COMMISSION
t APPLICATION FORM
~�sar.0
Application No. : ('d
Date Received: ,y v
Action/Public Hearing by:
Receipt No. :
APPLICANT: Jon D. Berman and Frank Wayne Russo
ADDRESS : ;81 Riirkland Road, South Windsor, CT 06074
TELEPHONE: 644-1548
OWNER OF RECORD ON LAND RECORDS : same
ADDRESS:
COMPLETE LOCATION OF PROPERTY: 819 Clark Street (Gustaves Grant Homestead)
ZONE: RC
AME, ADDRESS, & TELEPHONE NUMBER OF PERSON TO WHOM INQUIRIES SHOULD B
DIRECTED: E
Peter DeMallie, Design Professionals,Inc.
1170 Ellington Road, South Windsor, CT 06074
T-ELEPHONE: 291-8755
THIS APPLICATION IS FOR: (Check one of the following)
1 . Zone Change to (Public Hearing required) .
2. Subdivision.
3. Open Space Subdivision (Public Hearing required) .
4. Resubdivision (Public Hearing required) .
S. Special Exception to Article
(Public Hearing Required) .
6. Site Plan of Development. (conversion to office use)
7. Earth Filling [Section 101 and/or Earth Removal [Section(Public Hearing Required) . 9]
__ 8. General Plan of Development .
9. Regulation Amendment : Zoning Subdivision
10. Other
(explain in detail) :
CONSULT PLANNING DEPARTMENT FOR FEE SCHEDULE. THIS APPLICATION
MUST BE
SIGNED BY THE APPLICANT AND OWNER OF THE PROPERTY AND SUBMITTED
TRIPLICATE WITH ALL MAPS AND DOCUMENTS REQUIRED ON ATTACHED IN
CHECKLIST.
JOAA A ("I,
Applicant
Owner
t, -- - -
d
TOWN OF SOUTH N�NDSOR MAY 18
1990
CHECKLIST
REQUIRED INFORMATION South Windsor
SITE PLANS Planning & Zoning Commission
APPLICANT Joy , rAtJ W-
• �u ys�
PROJECT NAME LAW OEFIC�S
This checklist must be signed by plan preparer (P.E. /L.S. ) declaring
that all required information is provided. Items 1-7 are required for
all applications; items 8-11 required where appropriate.
Check mark for each item supplies .
1 . On each sheet for plans or maps, title block with the
following information:
a . Name, address and telephone of applicant.
b. Name, address and telephone number of Land Surveyor or
Professional Engineer.
c. Name of Development.
d. Date when drawings were made.
2 . Key Map: An overall map drawn to a scale of 1 inch equals
200 feet, which can be used as an overlay on Metropolitan
District Maps . This map will show the overall design of
the Development and surrounding property within 500 feet.
a. Data block which gives needed zoning information such
as percentage of lot coverage, acreage of tract,
number of apartment units, parking requirements, etc.
b. Layout of buildings
c. Layout of streets and parking.
d. Lines indicating proposed drainage system with
direction arrows .
e. Lines indicating sanitary sewer system with direction
arrows .
f . Names of surrounding property owners .
g. Propos d op n spaces and r creation areas .
V h. Driveway cuts on surrounding properties .
described as to material .
f . Where any storm drainage line discharges into an
existing brook sufficient profile of this brook will
be shown to determine conditions .
g. Metropolitan District Commission datum shall be used
on all sites accessible to these controls . The Town
Engineer shall, based on standard engineering
practices, determine the accessibility of these
controls .
h. Profiles shall show all sanitary sewer lines and
manholes , including elevations, sizes, lengths, and
slopes of pipes . Top of foundation elevations for
building shall be shown.
10 . Open Space Site Improvement Plans: For sites which
require or include a provision for open spaces, a plan
which contains data for site improvement may be required.
This map shall be drawn to a scale of 1 inch equals 40
feet.
11 . Sanitary Report: Where individual sanitary sewage
disposal systems are proposed, the final plans shall
include a Sanitary Report certified by a Professional
Engineer. The report shall demonstrate the feasibility of
the proposed individual systems; the report should deal
with the area as a whole, discussing the following points :
a. General nature and development of surrounding area.
b. Topography and natural drainage pattern.
C . Subsurface conditions as shown by subsurface
investigation, including soil absorption
characteristics, ground water level conditions, ledge
rock, and general nature of soil .
d. General description of type of development
contemplated.
e. Detailed description of proposed sanitary sewage
disposal facilities, indicating sizes for various
ground conditions, materials to be used, and the
general layout pattern to be used, etc.
f . Special precautions that may be necessary to provide
proper functioning of the proposed disposal systems .
g. Map of general area with locations of all tests shown
on proposed layout.
h. Flood heights of any nearby streams, brooks, or
rivers .
i . Test results and engineering evaluation per Section
4 . 13 . 5 .
All information required above is included in this application at the
time of submission.
LAN PREPARER ( .S. ) DATE
November, 1987
E.J41
�J'
esigQ
9rofessionals inc. APR 26 1991
Kx'k'V �
civil engineers • planners • surveyors South Windsor LETTER OF TRANSMITTAL
Pianning & Zoning Commission
TO: AAPrc f k F=>WACA DATE: A0Z' L 26,)9'90
PL.�)1►JG D C-PA�M�T
CSC cOTN W1&j0.St*_ 1-0 l L�
REGARDING: 6145 u-A?-k :=rr"CT PROJ. NO. (59'414-
WE ARE SENDING YOU:
for your use at your request
for approval for your files
X_ for review and comment
THE FOLLOWING: 77Kefx� C3 L44 EQR AiT CAPIL.-> of 5ME Qu►N SNo"ht.�
PRcgo-'q� R*C> MXD A UU4'Gr_ 0R0�sZ T;0?_h o
'9 XASF GA1� rvu� F--MEN r4RL � g?c 'r1�S c�R Corv� 'rS .
Design Professionals, Inc.
By: :c.E gwAJA
441C Governors Highway, South Windsor, CT 06074 0 (203) 291-8755 FAX: (203) 291-8757
STANDARD APPROVAL MODIFICATIONS FOR SITE PLAN (rev. 2/7/89)
PROJECT k1-ZYUa-gt - Z�_c-S d `7� �L-- APPL. NO. o
ENGINEER/ARCHITECT ,�f_lr ,�1J 1 r �—T PROJ. NO.11
DWG. NO. o 'te�7y DATE v REV. DATE
7
SUBMIT MYLARS OF SHEETS . . . �-
(Z 1 . Prior to commencement of any site work, a meeting must be held
with Town Staff .
� 2. No building permits will be issued until the final mylars have
been filed in the Town Clerk's Office.
3. This application is subject to the conditions of approval of the
Inland Wetlands Agency/Conservation Commission, including a bond
in the amount of $
LX 4 . An as-built plan is required prior to issuance of a Certificate
of Occupancy per Section 4 . 13 . 10 of the Zoning Regulations .
5 . Footing drains are required if the building has a basement_
c,X 6 . A landscape, bond in the amount of $ .S d O U is requir d and
must be submitted prior to filing of mylars.
c/ 7 . All plans used in the field by the developer must bear the stamp
and authorized signature of the Town of South Windsor.
Black and white transparent mylars of Sheets # -4 �---
with the above
modifications, together with three blueprint copies of the entire set of plans
must be submitted to this Commission within 30 days to be stamped and signed.
The letters of approval of this Commission, as well as the Inland Wetlands
Agency/Conservation Commission, must be reproduced on the mylars .
After the mylars have been signed by the Commission, they will be returned to
you for filing in the Office of the Town Clerk within 90 days . After filing
these plans, a copy of the receipt must be submitted to the Planning
Department.
. � P� f� a / I r ✓�� �W Sce-v-�J G�C�-�c w� ��41 N�c�'�z.a�-i c�`7'C
/o
esigp -'
MAY
9
?rofessional inc.
civil engineers • planners surveyors LET�PAMF-vim6 MITTAL
�I�DDiD Zoning
TO: Marcia Banach, Planning Director DATE: 5/17/90
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT 06074
REGARDING: Berman & Russo Site Plan PROJ. NO. 89-414
819 Clark Street
South Windsor, Connecticut
WE ARE SENDING YOU:
for your use at your request
X for approval by PZC for your files
_x_ for review and comment by Town Staff
THE FOLLOWING: Application fee ($50) , application form(3) , drainage
report(3) , site plan checklist (1) , sets of plans (6) . No wetlands
occur on the site, nor is,-any disturbance proposed within the reg-
ulated area, therefore no wetlands permit is required. Also, total
disturbance is under one-half acre, therefore no conservation appli-
cation is required. Please apprise us of any comments. Thank you.
Design Prof ionals, Inc.
Adr
By:
Peter R. DeMallie
Principal
cc: Frank Russo, Esq.
Richard Carabillo
1170 Ellington Road (Route 30), South Windsor, CT 06074 (203) 291-8755
Sou Commis+ate
jai & Zoning
HYDROLOGIC STUDY
LAW OFFICES
CLARK STREET
SOUTH WINDSORr CT.
■
esign
rofessionals, inc.
■ civil engineers • planners 9 surveyors 1170 Ellington Road (Route 30), South Windsor, CT 06074 0 (203) 291-8755
STORM DRAINAGE ANALYSIS
THE FOLLOWING IS A STORM DRAINAGE ANALYSIS
FOR THE PROPOSED SITE DEVELOPMENT FOR LAW OFFICES
LOCATED ON THE WEST SHAill OF C LARK STREET IN SOU`ml
WINDSOR, CONNECTICU`I'. THE OBJECTIVE OF' THE 11YDROLOGIC:
STUDY WAS TO SIZE THE PROPOSED S`I'ORMWATER DRAINAGE,
SYSTEM `1'O ADEQUATELY COLLECT AND CONVEY THE STORM--
WA`I'ER RUNOFF FOR A STORM WITH A RETURN FREQUENCY OF
25 YEARS . THE PROPOSED STORMWATER DRAINAGE SYSTEM
IS COMPRISED OF A SWALE ALONG THE NORTHERN PROPERTY
DINE AND A STONE FILTER OUTLET AT THE NORTHWEST
CORNER OF THE PROPERTY. `PHE SWALE WAS SIZED TO HOLD
THE INCREASE IN THE PEAK RATE OF RUNOFF FOR A 25
YEAR STORM, ` HEREBY PROVIDING A 0 o INCREASE IN
THE PEAK RATE OF RUNOFF ACROSS THE NORTHERN L'IMP-
ER`I'Y LINE .
TIIE AXIOM OF DESIGN USED WAS THE RATIONAL
METHOD.. THE D :TERMINAT ION OF THE PEAKRATES Op
STORMWA`I'ER RUNOFF ADHERE TO THE METHODS SUGGESTED
IN THE CONNEC`I'ICUT SOIL EROSION AND SEDIMENT CON-
TROL GUIDELINES .
i c 1
-77
C�2-0 2-9 • 2,V) 07
.dj9c-4ct2![
M�vr 1 p-2
W!—L 0 7 BJA 'H L"9 cr fj
ram,i,•-a►.�cY.��NQ-� �o �yv� C�
S321"d �L'O �d�2i�f �dc'lvf-21(z::T
�i IM-7 /,l:W Zd O�
�rzo�os. 71,A TZA- C, or 7ZUaoF',*- Ae,=o fS
7Co Ae-rLe s
'b) L►oHtPoS�-r� �oEFrle,,E�T oi' RpNbFi
e afS 7�f o Sz o PE C_= O.Z C7 A= 0- 'l ev AC.
/ptperwf 0*.3 AP-4r-^, e-a
L s O,-yg
/ YAc or I-LosJ LENGc�TI-� SLO Pe" V gLOG rry / AMC,
3.N
44)
7.1 ita/mor
c�> rPE AXe I >AT F— or Z,atjo rr
s e. "Z
i: VN 70 7%
TIC J'.
14
t /I
YZ
r
VoL f*,Ct3
Y
Yr. IAo
<12&a A Qv.L 52o
d7L/y •
5
14)
S3da�s
.c,'r18 •^3
w Qh �) :2/,
fly
4zvl�c.�.�, Q.1__ �L gad� -�,�►M�
lh-j _4j x drop -2I P �35�1'� 2 'O Sd Nan I L757 S/
JO 10-412idJ3a;7 ' C�1ph� I-1d-dIYV 214?1 "Yjq? J
7J31�/f .�� ►rl %2-7tveCY3 V-4,ct
I� '�S �j��► a
1py it's. dsZ SLIP
((.�,/) (.sL•� � (�;z.),s =�
_
-a-3-L-7!
b 44�
S Sly o br M!/ C�O•cLd V-4 71.d 1201,2115;
14-1 t>v-Awo
j5r e:
ELev
z
SILT
1 ej
G Q•7 d. �� lY`�/F�
a
7-S
13 3- O 443S4►o4:2t Hia i C'7 yvo11�8 73crrdJ�7
'��drv•y�� 'yvs►y,.� .. Vy -2 > Mla M W oil o$ 'f3Nra1r1�
C-6 H)
f UL5 _
3 4Q4-4,Y Q 45 W a.L'>�+.� -� raa?�p1�� '3 i►1 L�,rL3 ��
S.�'7 a• �t.1.'gad tv-- N�'S
hIR.Ob
Ud IM3 3kvCfaa(
(+ *Z2'*
r�fSZJ-0 A��
PLANNING DEPART
IN-HOUSE REFERRAL FORM
TO: Jean Zurbri en Karl Reichle, Mike Gantick, Mel
Stead, re a , Thomas Hart, Fire Marshall
Lanning, im w
FROM: Marcia A. Banach, Director of Planning
The Planning & Engineering De�,partments have received
plans for the following project:# To-go
Zone Acreage
Subdivision Site Plan Residential
No. of Lots/units
Commercial_ Industrial
Location:
Project Description:
Future Town-owned property involved? Yes No V
(a)new streets (existing frontage also)
(b)new open space/recreation area
active passive
(c)new detention area
Planning Department comments
Please let me know by //z- if you will have
comments on this application so that I can follow up with your
d partment when I do a Planning Department report.
�t wN af't�
Ce
w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
~osot•co�'� AREA CODE 203/644-2511
June 14, 1990
M E M O R A N D U M
TO: Marcia A. Banach, Director of P1 nni
FROM: Jerry C. Iazzetta, Town Enginee
RE: Berman-Russo Site - #90-40P
We have reviewed the plans dated 1-31- 0 and 5-17-90 for the
proposed Berman-Russo Site and have the following comments:
1 . The drainage swale shown on Sheet 2 needs clarification.
In the area just past the proposed dumpster, new spot
elevations are shown. Are these the top of bank
elevations or bottom elevations? Also the detail shows
the depth of the ditch as 1 .5 feet but the contours/spot
elevations don't seem to verify this . Please have this
clarified.
2 . A note should be added to indicate that the barn and
stumps should be removed from the site.
3 . The alignment for the proposed reconstruction of Clark
Street, and the intersection with Deming, will require a
revision in the proposed sanitary sewer connection. We
have attached a copy of the proposed alignment for the
applicants use.
JCl/jsv
cc: Michael J. Gantick, Director of Public Works
LETTER OF TRANSMITTAL �►`°~N •�,
O �
PLANNING DEPARTMENT
TOWN OF SOUTH WINDSOR �.
1540 SULLIVAN AVE. ~OSOe'CO
SOUTH WINDSOR, CT 06074
203 644-2511 Date ���5 -
� o
TO:
_ - RECEI V E-6 z
- SUN 2 5 1990 ►
9 Town al Snuth Windsor 1
Engineering
uePL.
WE ARE SENDING YOU: ,A W
5W P&Z initial plans Q Drainage comps
O P&Z final plans 0 Bond estimate requests
0 Inland Wetlands plans Q Bond reduction requests
O Final plans for filing O Change order form
M Other Correspondence
Copies App. No. Project
CM- 0
THESE ARE TRANSMITTED as checked below:
-For review and comment For your file
0 For your use 0 Returned with revisions
EM As requested
0 Other
PLEASE RETURN/COMMENT BY:
COMMENTS:
Ad, 1_ &;r, AR 4X.4�j
Q�
'dQA1W—" g:,�.'00L !111111 l��
Copy to: From:
7"
t rM jE�
Tjaa� 01400s ?d&U&0't
t �v 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
~�so�•co� AREA CODE 203/644-2511
TO BE PUBLISHED IN THE JOURNAL INQUIRER SATURDAY, JUNE 30, 1990
LEGAL NOTICE
TOWN OF SOUTH WINDSOR
PLANNING AND ZONING COMMISSION
At its June 26, 1990 meeting, the Planning and Zoning Commission
voted to take the following action:
1. Approve, with modifications, Appl. #90-32P, Wapping Fair,
T&C Permit, Rye Street Park, RR zone.
2. Approve, with modifications, Appl. #90-30P, Switaj Sp, cial
Exception 4 .1.8.a. , Neiderwerfer Road, RR zone.
3. Approve, with modifications, Appl. #90-31P, N.
Lombardo/Resource Renewal Site Plan, easterly side of
Nutmeg Road, North, I zone.
4. Deny, Appl. #90-34P, Services Development/Roadway Packaging
Site Plan, north side of Sullivan Avenue, east side Kenn dy
Road, I zone.
5. Approve, with modifications, Appl. #90-39P, Raymond
Subdivision, west side of Main Street, A-40 zone.
6. Approve, with modifications, Appl. #90-40P, Berman/Russo
Site Plan, 819 Clark Street, RC zone.
PLANNING AND ZONING COMMISSION
Louise C. Evans, Chairman
Bernard Hart, Secretary
� JiMa�,
v� 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074
~osot•co�` AREA CODE 203/644-2511
July 3, 1990
Mr. Peter DeMallie
Design Professionals, Inc.
1170 Ellington Road
South Windsor, CT 06074
Dear Mr. DeMallie:
Re: Application #90-40P, Berman-Russo Site Plan
We are pleased to advise that the Planning and Zoning Commission
voted on June 26, 1990 to approve the above-referenced
application for a Site Plan in accordance with Drawing No. 1, 21
4 of 4, 3, 3A, dated May 17, 1990 (revised June 5, 1990) prepared
by Design Professionals, Inc. , Project No. 90063.00, and with the
following modifications:
1 . Prior to commencement of any site work, a meeting must be
held with Town Staff.
2. No building permits will be issued until the final mylars
have been filed in the Town Clerk's Office.
3. An as-built plan is required prior to issuance of a
Certificate of Occupancy per Section 4 .13.10 of the Zoning
Regulations.
4. A landscape bond in the amount of $5,000 is required and
must be submitted prior to filing of mylars.
5. All plans used in the field by the developer must bear the
stamp and authorized signature of the Town of South
Windsor.
6 . WPCA approval required for sewer extension. Construction
of sewer to be coordinated with Clark Street reconstruction
through Town Engineer. Utility profile required.
Black and white transparent mylars of Sheet #2 with the above
modifications, together with three blueprint copies of the entire
set of plans must be submitted to this Commission within 30 days
to be stamped and signed. The letter of approval of this
Commission must be reproduced on the mylars.
LD
y r T-awn aps ?d&U140t
O �
G
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
R•CO� /
AREA CODE 203 644-2511
'�OSO
July 17, 1990
Mr. James LeClair
Design Professionals, Inc.
1170 Ellington Road
South Windsor, CT 06074
RE: PROPOSED LAW OFFICES FOR JON D. BERMAN & FRANK W. RUSSO
819 CLARK STREET
Dear Mr. LeClair:
The Town of South Windsor Water Pollution Control Authority, at
the meeting of July 10, 1990, reviewed and approved the above
referenced application to extend sewers to serve a proposed site
development in accordance with plans prepared by Design
Professionals titled "Law Offices Prepared for Jon D. Berman &
Frank W. Russo, " dated 5/21/901, and subject to the following
conditions :
1 . Subject to Town staff technical approval.
2 . Location of sewer and manhole shall be in
accordance with the Town's plans to reconstruct
Clark Street.
3 . Sanitary sewer manhole shall be located in the
center of the proposed reconstructed Clark Street.
4 . This approval letter shall be affixed to the final
set of mylars and filed with the Town of South
Windsor.
Very truly yours,
seph Carino, 9hairman
own of South Windsor --
Water Pollution Control Authority
cc: Jerry Iazzetta, Town Engineer
Louise Evans, Chairman, P & Z
Marcia Banach, Director of Planning
John Collins, Chief Building Inspector
John McCahill, Zoning Enforcement Officer
4-'Nemo from U
TOWN OF SOUTH WINDSOR
TOWN HALL
SOUTH WINDSOR,CONN. 06074
F
TO Marcia A. Banach DATE April 5, 1991
Director of Planning
L
SUBJECT: Berman/Russo Site Plan
FOLD- 819 Clark Street
There will be a preconstruction meeting for the above
mentioned site plan at 2 :30 PM, April 12 , 1991 here at
the Town Hall.
cc: M. Gantick, A.B. Davies, L. Braddock, F. Shaw, M. Stead,
K. Reichle, J. McCahill, J. Collins, B. Lanning
By
s
�4 jiN at,`�
co
e �
u
s 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
R.CO 644-2511
N AREA CODE 203/
April 15, 1991
John D. Berman
Frank Wayne Russo
481 Buckland Road
South Windsor, CT 06074
RE: Preconstruction Meeting - Application #90-40P
Berman/Russo Site Plan
April 12, 1991
IN ATTENDANCE
NAME COMPANY/ADDRESS TELEPHONE
Michele R. Lipe Town of South Windsor 644-2511
Jon Berman Berman & Russo
481 Buckland Road 644-1548
Bob Lenane 17 Laurel Trail
Glastonbury, CT 657-8997
Ken Boucher Dover Builders
P.O. Box 53
Andover, CT 643-6661
Joe Perna Design Professionals
441-C Governor's Highway
South Windsor, CT 291-8755
Peter DeMallie Design Professionals 291-8755
John McCahill Town of South Windsor 644-2511
Jerry Iazzetta Town of South Windsor 644-2511
The following is a brief summary of points discussed during the
meeting.
Erosion and Sedimentation Control
1 . All erosion and sedimentation control measures are to be in
place prior to earth moving operations in each area and
maintained/cleaned out during construction. Call
Zoning/Wetlands Enforcement Officer for inspection when
measures are in place, prior to commencement of site work.
2 . All topsoil stockpile areas to be protected (ringed with
haybales or equal) .
3 . During construction of the driveway a crushed stone
tracking pad is to be installed and maintained to minimize
tracking of dirt/gravel onto Clark Street. Calcium
chloride or water is to be used for dust control as
required.
Public Works
1 . Four complete sets of approved/revised plans have been
provided to the Town. They will be stamped by Planning
Department along with plans developer needs . Only approved
plans are to be used on jobsite.
2 . The Public Works Department is to be notified forty-eight
(48 ) hours prior to the start of major construction work
with inspections and testing per Developers Checklist
requested for the following:
a) After site is staked out
b) All drainage work
c) Preparation of subgrade, compaction tests as
requested by the Town
d) Preparation of subbase, six (6 ) inch lifts
e) Placement of bituminous concrete, 2 inch layers
3 . Certification of gravel used as subbase will be required by
an approved testing company.
4 . No subgrade formation/base in frozen ground/snow. Same for
pipe/structure installation.
5 . As built plans are to include horizontal and vertical
location of all underdrains, footing drains, and sanitary
sewers located as per revised as-built checklist.
6 . All pipe and structures to be backfilled with free draining
material, compacted in maximum one foot lifts with approved
compaction equipment or approved equal if deep trench is
encountered. Any pipe or structure work requires
inspection prior to backfilling.
7 . Any problems and/or questions regarding construction of
this project will be directed to Ken Boucher in the field.
8 . All filling to be done in accordance with Department of
Transportation specifications . To be compacted in maximum
lifts and tested as necessary.
9 . Job meetings will be held as needed, and can be called by
the developer or Town.
d
f
10 . Forty-eight (48 ) hours notice needed for certificate of
occupancy inspection. Two week review period ( 10 working
days) needed for all individual site (lot) plans prior to
issuance of building permit (may be longer if application
is incomplete) . See general guidelines for certificate of
occupancy and building permit procedures .
11 . Any proposed changes are to be presented to the Engineering
or Planning Department prior to implementation on change
order form in triplicate. Town will attempt to turn around
within 24 hours .
12 . No paving after October 15 without written approval from
Director of Public Works .
13 . Normal hours of operation 7 :00 A.M. - 5:00 P.M. , no work on
Sunday.
14 . There is an existing well along the southerly property
line. The adjacent owner, RSK-Kellco, Inc. should be
contacted prior to working in this area. Bob Deptula, Town
Sanitarian, should also be contacted.
15 . The sanitary sewer connection and new main are to be
coordinated with Clark Street Reconstruction project. No
work will be allowed after new road pavement is in place.
Planning Department
1 . Landscaping is to be installed in accordance with the
approved landscaping plan. If there are changes required,
contact the Planning Department. Additional landscaping
installed on one part of a site will not preclude planting
all of the remaining items shown on the landscaping plan.
2 . $5,000 . 00 landscaping bond required.
3 . Mylar must go on file prior to issuance of building permit.
SNET/NU
1 . Contact utilities for coordination of utilities connection.
Fire Marshall
1 . Blasting (if required) to be coordinated with the Fire
Marshal .
Police Department
1 . Emergency phone numbers for the duration of the
construction must be provided to the Police Department on a
company letterhead. If the developer occupies or owns the
building(s) after construction emergency numbers must be
provided to the Police Department.
2 . Erect temporary sign on the site during construction
identifying the project.
3 . If an alarm is to be installed contact the Police
Department .
Building Department
1 . Plan review with Building Official/Fire Marshal required
prior to application for building permit. Coordinate with
Chief Building Official.
Very truly your ,
Michele R. Lipe
Assistant Planner/Analyst
MRL/pmm
cc: Thomas Hart, SWPD
Karl Reichle, Public Works
Mel Stead, Public Works
Hal Clisby, CL&P
Minh V. Le, SNET
John R. Collins, Chief Building Official
Fred Shaw, Superintendent of Pollution Control
TOWN OF SOUTH WINDSOR
STAFF SITE CHANGE
FOR SITE & SUBDIVISION
GENERAL:
CHANGE ORDER CONTACT PERSON W40'!�s® Phone No. 644-1548
Address 461
Site Name P&Z No. 9o-,4.o
Owner v.4 ► LA,,j Phone No. 644, j5>4�
Contractor-
Signature of Owner Date: tl/z 6 71
Signature of Design Engr. Date:
CHANGE: (Describe location and/ nAture of change. Include
three (3) copies of plan/profile of Change. )
A
H t4 L 5,
�3) :> % bs
Reason for Change: (Why is change required)
A%LL -T I C,
APPROVALS: (As Required)
Dir. Of Planning Date:
Town Engineer Date:
Dir. of Public Works Date:
Other: Date:
STAFF COMMENTS:
White - Town Engineer
Pink - Director of Planning
Yellow - Applicant
■
?esign
fessionals,o inc. MAY 13 ma
■ civil engineers • planners • surveyors LETTER OF TRANSMITTAL
■ SGUth WindW
TO: AxAr e Lips DATE: AAw13 1991
WAU0)1j4 '�>rZPA&Z-rMaQy
REGARDING: 819 c4AeK ELT PROJ. NO. 69-414-
-r=.rtE Plki> gr_-Vta%oNS
WE ARE SENDING YOU:
for your use at your request
for approval Xfor your files
for review and comment
THE FOLLOWING: Z!->X 4!f67 Ew�.PR►A.JT cap►FS ^&_9> c n&)e 6) M LAr_ copy
of sr t p(,W "Tb 8&- �1G, D qNo �ar�PF..o . �u� 4LAOS -,SAow ?-=_Vin*.S>
SAN)'rAR! E-W A,Vo -AfZ -A1-rECr0 9&L PtcC�dr-I A'TWQS AS A KoVP_r1>
$r►! "'�'`�w� STAFF' •
4c .sF t_jEr% us K�-AJ wtAGN i�1�5*= AM ?_5_AC_t so ,mA.r -We:
pw.-je S nnAH f9-t, '-We rn4LA2. A&-)D 7we co,� -roe_ cA^j Acr_ UP i gt,es -ne—ts
Design Professionals, Inc.
GG= ZER MAA
By: i5;Dps We NA
441C Governors Highway, South Windsor, CT 06074 (203) 291-8755 0 FAX: (203) 291-8757
TOWN OF SOUTH WINDSOR
STAFF SITE CHANGE
FOR SITE & SUBDIVISION
GENERAL:
CHANGE ORDER CONTACT PERSON c4 Phone No. I- f_
Address j 4Y1 L W V
Site Name
R&Z No. 0
jti,\ v Ir"o
Owner Phone No.
\,1 41 i
Contractor
Signature of Owner Date:
Signature of Design Engr. r Date: i
CHANGE: (Describe location and lnatur4' of cAange. Include
three (3) copies of plan/profile of Change. )
kv A A
1A
If Z4 t 0 V if I ��nt, j26 i e 41
j ( � + ,AID 64 re A
k 1,2 pi ii
t I
Reason for Change: (Why is change required)
A
APPROVALS: (As Required)
Dir. Of Planning Date:
'17
Town Engineer Date:
Dir. of Public Tor Date:
Other: Date:
STAFF COMMENTS:
White - Town Engineer
Pink - Director of Planning
VP" Low - Applicant
CERTIFICATE OF OCCUPANCY CHECK LIST
jApplicant Berman/Russo Certificate of Occupancy
I Address 819 Clark ;Street Bldg. Permit No.
Lot No. Date Reviewed
Project Revi d By C
Date Submitted 5-21-92 �Prove /Deni =2,7- -z,
Ap��• q0-Nb P
As required in the Zoning Regulations, no Certificate-of-Occupancy shall be
issued until grading plans have been complied with and approved by the Town
Engineer. The minimum requirements shall include:
' Approved Denied N/A
i - 1. Approved building permit plan.
2. Finish grading per approved
building permit plan. s
3. Site work; i.e. trees, shrubs,
dumpsters, required parking.
4 . Utility location
a. Sanitary sewer
0/1 U,1-4�
AI-IA b. foundation dra, CI �
C. electrical & telephone
d. water
e. other
5 . Sewer connection charge paid.
6 . Appropriate certification
7 . Bonding
8 .� Planning Z/ g & Zoning
Sewer Permit No. (O
Pavement Excavation No. AlA
COMMENTS:
\-b SccC�e�l
t
;f(1,��Ccc, b�� e c I��tc_�:�� W 1't�C�. �,;�� �•Z �►G�� }a �.J1S. ;e. T�^elt
D �
44
BERMAN & Russo 10
JON 3 4
ATTORNEYS AT LAW
819 CLARK STREET SOUth Wine x
SOUTH WINDSOR,CONNECTICUT 06074
TELEPHONE(203)644-1548 Planning & Zpp� r Commazim
(800)352-8157
FAX(203)644-6285
51 WEST MAIN STREET
JON D. BERMAN ROCKVILLE.CONNECTICUT 06066
TELEPHONE(20:3)872-7505
PRANK W. RUSSO
BRIAN S.KARPE 406 FARMINGTON AVENUE
GERALD M.BEAUDOIN FARMINGTON.CONNECTICUT 060:32
REPLY TO:SOUTH
/WINDSOR
June 2, 1993
Marcia Banach
Town Planner
South Windsor Town Hall
1540 Sullivan Avenue
South Windsor, CT. 06074
RE: Landscape Bond - 819 Clark Street
Owners: Jon D. Berman & Frank Wayne Russo
Dear Ms. Banach:
This is to confirm our telephone conversation concerning th
above matter. Berman & Russo occupied the above property in June of
1992 . At that time, the amount of our landscape bond was reduced
from $5,000.00 to $1,000.00. We were told that the remaining portion
of the bond would have to be held by the Town until one year had
passed to ensure that the plantings on our site were alive and
growing in the spring of 1993.
This is to confirm that after one year the plantings on our site
are doing well. I would appreciate it if you would accept this
letter as our request for the return of our $1, 000.00 landscaping
bond.
Thank you for your cooperation.
Very truly yours,
Frank W. usso
FWR:ak
o•NM SF,`�
~ o-PS �•
O
C U
y 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
SOR•COCA
AREA CODE 203 644-2511
June 16 , 1993
Frank W. Russo
Berman & Russo, Attorneys at Law
819 Clark Street
South Windsor, CT 06074
Dear Mr. Russo:
Re: Application #90-40P, Berman/Russo Landscaping Bond
This is to advise you that the Planning and Zoning Commission voted
on June 15, 1993 to release the $1, 000 landscaping bond.
Advance arrangements should be made to pick up the bond to ensure
that the necessary contact person(s ) will be available. If you have
any further questions contact the Planning Department at 644-2511,
Ext. 253 . Thank you.
Very truly yours,
- • /ram
Louise C. Evans, Chairma
Planning & Zoning Commission
LCE/pmm
cc: Town Engineer
�( Received certified check $1,000 on ., -2-2, (date)
(signature)
C h c4-Y'LS CC�(Jl�JlVj-
0415 r ��f`s 4 1 +A
4
.
��t
�N N DJa
f�r9� KtN ��
till
I
�I nee'
PAO
gp,2 v c-r, sr us o
-� foN� 4C ,� VIA
5�'�G�� ,• -FEZ
i
?E
o�� � mow;es• 2`��
—�- '
i�c. fi Lk.- Tt w46.
� i � DUI � � � - •
I I I
U FR b Rl� Sf'R EKG 'T %5 I D E
�l FR b loll ST RAC- 16 I 0 E
I FR b l� `5T RAC"T S I bE.
Nt
4 /
Nc
AP
lr, t t
` I
i I Y
,
A `
rb i
/ ( f
rb
r
� 1
S� r•
i
r
�� 14) l