HomeMy WebLinkAboutDETENTION BASIN 1
3tic
Planning and Zoning Commission March 24, 1981 - ►
Regular Meeting South Windsor Town Hall
1
MEMBERS PRESENT: Montana, Evans, Hallowell, Conde, Gay, Gilligan
i
ALTERNATES PRESENT: Morrison (sitting for Norman), Mainelli, Sorenson
y.t
NZEW BUSINESS
1. Savin Brothers, Inc. , Site Development Plan for Lot #4 (Frito Lay) i R
AttorneyLassman reviewed the site development
p t plan with the Commission �
and stated that there will be an extension of Nutmeg Road just north of
Mercury Oil, He noted the detention basin across the street will take ;
care of the entire 46 acre site. He stated the wooded areas will be left !
in their natural state with anything over 6" being retained. i.,.
fj� r
x:
" Mr. Hallowell was concerned that snow trucks do not have sufficient room
to turn around, and Mr. Kaye of Savin Brothers, noted that the pavement '
is 30 feet wide and the Town plows the road now and the drivers do not
appear to have any trouble in turning around. The Commissioners felt that
eventually consideration should be given to a cul-de-sac at the end of the road.
Mr. Russo, of Pa imberg & Russo, Engineers, stated this lot is 2.6 acres;
the building will be 70' x 200' ; lot coverage is 14.4%; and the office will
have 1,443 sq. ft. and the warehouse 14,275 sq. ft. He noted that parking �t
space is in excess of the zoning regulation requirements. He was asked by ;
the Commission why they had so much parking space, and Mr. Russo replied
that Frito Lay wanted that much space. Mr. Russo also noted that there
are sanitary sewers, and water and gas lines are in. �
Mrs. Montana was concerned that lights from the building may shine into
residential areas, and Mr. Russo replied the building would be 22' tall.
Mr. Kaye noted that the lights will be on the building which faces south, !
and the parking area is also to the south and the residential area is to the
east.
Mr. Page, Town Engineer, stated the Engineering Department reviewed the Prlais
and everything was done according to the Town's specifications. Mr. Page
said the detention basin across the street will handle quite a large area,
and there will eventually be another detention basin, probably to the
northeast, which will handle other areas from Governors Highway and will 1i
probably flow into this detention basin. The Commissioners reviewed the plan
detention basin. Mr. Gilligan questioned whether the detention are
could spill over on o e road, and Mr. Page said there is an emergency '
spillway to control this possibility.
Yx. DeMallie, Director of Planning, note _ should be an A-2 certification
on the mylar, and the key map should be modified to reflect employee parking
as well as lighting.
Mrs. Evans was concerned with sanitary conditions since food would be stored
in the warehouse, and Mr. Kaye said it would be a very quick in and out
operation, and all the potato chips and fritos are in plastic bags.
Mr. Conde then moved that the application for a site plan of development for
j Lot #4 on Nutmeg Road, as shown on plans prepared by the Frito Lay Engineering
Department, Dallas, Texas, dated February 2, 1981, be approved, subject to
40
Planning and Zoning Commission -2- 3/24/81
to the following conditions:
1. The plot plan shall be modified to show the following:
a. The number of employee parking spaces;
b. The plan must bear a Class A-2 certification: and
c. All lighting shall be indicated on the plan.
2. A drainage assessment fee in the amount of $350 shall be paid to the
Town of South Windsor.
3. A surety bond in the amount of $12,500 shall be submitted to ensure
completion of the detention area, and a surety bond in the amount of
$305,000 shall be submitted to ensure completion of the road.
4. No certificate of occupancy will be issued until the detention basin
has been completed, subject to the approval of the Town Engineer.
5. A liability insurance policy shall be submitted in the amount of
$250,000 per person; $500,000 per occurrence and $100,000 property
damage, naming the Town of South Windsor as an insured.
6. The Commission is concerned that there may not be adequate room for
snow trucks to turn around, and if this development is not completed before
next winter, the Commission may require that provisions be made for snow t
7. A black and transparent plan of the detention basin area must be signed _
and stamped by this Commission, and filed in the Town Clerk's office.
8. A 24" x 36" black and transparent plan, printed on polyester film,
shall be submitted to the Commission to be stamped and signed. The
plan shall be stamped in accordance with the "Rules and Regulations
of the State Board of Registra-ion for Professional Engineers rand Lanc?
Surveyors." The technical portions of this final plan shall be
certified by either a land surveyor or professional engineer licensed
to practice in Connecticut. This approval letter, as well as the
approval letter from the Inland Wetlands Agency, shall be reproduced,
on and made part of the final plans.
Mr. Gay seconded the motion. It was unanimously voted, and so ordered.
2. Savin Brothers, Inc. ,. Site Development Plan for Lot V5, tallied Pl,,mood
y
Attorney Edwin Lassman stated that this lot is 3.08 acres and is an extension,
of Satellite Road. The railroad siding will continue up and eventually
cross this area. The proposed building is 27,120 sq. ft. and eventually
they hope to further expand with another 25,960 sq. ft. building. Allied
Plr,good is purchasing the site and will construct the building.
Mr. Russo of Palinberg & Russo, Engineers, stated sewers and water are from
South Satellite Road, and only trees necessary for construction will be cut.
Drainage will be into the same detention basin as discussed in the previous
N 301 HARTFORD AVENUE P.O. BOX 11446 . NEWINGTON, CT 06111 (203) 549-3200
BR066
INC.
May 4, 1982
Ms. Marshall Montana, Chairperson
Planning and Zoning Commission
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT 06074
Dear Ms. Montana:
I thought you might find it interesting to know that this spring
we have planted several hundred White Pine and Larch seedlings around
the borders and on the slopes of Detention Basin Nos. One and Three,
which were constructed in Parkcentre last year.
The trees were obtained through the State D.E.P. seedling program,
and we have utilized them for several years in planting large disturbed
areas. The survival rate has been extremely high, and they seem to do
very well in sandy soils.
I discussed the planting with Mr. Page and Mr. Davies prior to
performing same, and both agreed that it would be most beneficial to
the area.
Very truly yours,
SAVIN BROTHERS, INC.
R. G. Kaye
Director of Development
RGK/dsk
N 301 HARTFORD AVENUE • P.O. BOX 11446 • NEWINGTON, CT 06111 (203) 549-3200
BROS.
INC.
March 3, 1983
Ms, Marshall Montana, Chairperson
Planning and Zoning Commission
Town of South Windsor
1S40 Sullivan Avenue
South Windsor, CT. 06074
Dear Ms. Montana:
It is my understanding that the Planning and Zoning
Commission has recommended --to'- the Town Council that
it accept the deed to Detention Basin #1 located off
Nutmeg Road South in Parkcentre.
In light of this recommendation, we respectfully request
that the Commission release our Bond #7SB 087292 in the
amount of $251000,00 which it is presently holding to
cover the completion of this Basin.
Your cooperation in this matter will, as always, be
deeply appreciated,
- , Very truly yours,
SAVIN BROTHERS, INC.
c
R. G. Kaye
Director of Development
RG K/lg e l►
Le400
l�
�v 1
N 301 HARTFORD AVENUE . P.O. BOX 11446 . NEWINGTON, CT 06111 (203) 549-3200
BROS.
INC•
March 21, 1983
Mr, J. E. Page, Town Engineer
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT. 06074
Dear Mr, Page:
Enclosed please find a mylar and two prints representing
the "As-Built" condition of Detention Basin #39 south
of Governor's Highway in Parkeentre.
We respectfully request the release of our Bond #7SB
087499 in the amount of $30,000.00 covering the com-
pletion of this work.
Please advise if you require any further information
regarding this matter. Your cooperation is, as always,
deeply appreciated.
Very truly yours,
SAVIN BROTHERS, INC.
R. G. Kaye
Director of Development
RGK/lgc
Enclosure
�� 4 u
0*1
l
rn
1540 SULLIVAN AVENUE . SOUTH WINDSOR, CONN. 06074
SOR•C0�
AREA CODE 203/644-2511
March 25 , 1983
Mr . R. G. Kaye
Savin Brothers , Inc .
301 Hartford Avenue
Newington , Ct . 06111
Dear Bob :
Re : Detention Basin #1
Please be advised that the Planning and Zoning Commission
voted to reduce the bond covering detention basin #1 from
$25 , 000 to $2 , 500 . The $2 , 500 bond should specify that it
is for an indefinite period of time .
Upon receipt of the new bond, we will return the $25 , 000
bond to you for cancellation.
Yours very truly ,
PLANNING AND ZONING COMMISSION
vg By :
Marshall Montana , Chairperson
[C'41 N SE,<
�v 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
soR•co� AREA CODE 203/644-2511
April 14, 1983
Mr. R. G. Kaye, Director of Development
Savin Bros. , Inc.
P. 0. Box 11446
Newington, Ct. 06111
Dear Bob:
Re: Detention Basin #3
This will acknowledge receipt of your letter of March 21st
requesting release of the $30, 000 bond covering Detention Basin #3.
This request was tabled since the area in question is unsightly
and filled with weeds and does not appear to be properly seeded.
I would suggest you meet with the Town Engineer to try to
reach an agreement on how this situation can be rectified.
Yours very truly,
PLANNING AND ZONING COMMISSION
vg By:
Marshall Montana, Chairperson
CC: J. Page, Town Engineer
P. DeMallie, Planning Director
N 301 HARTFORD AVENUE - P.O. BOX 11446 - NEWINGTON, CT 06111 (203) 549-3200
BROS-
IMC
August 15, 1983
Ms, Marshall Montana, Chairperson
Planning & Zoning Commission
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT- 06074
Dear Ms, Montana:
I have previously requested Bond releases covering the
construction of Detention Basin #3 and the tree planting
of the area west of Edgewood Drive in Parkcentre. I
am enclosing copies of the related correspondence.
We have been placed on the agenda with our landscape
architect, Alan Viets,for the meeting of September 20,
1983, and I respectfully request that the above two
items also be placed on the same agenda for discussion.
Your cooperation in these matters will be greatly
appreciated.
Very truly yours,
SAVIN BROTHERS INC.
R- G. Kaye
Director of Development
RGMlgc
Enclosures
TO
Ms. Virginia Grainey SAVIN BROTHERS, INC.
Flarming 62 Zoning Comission R 301 HARTFORD AVE.
Town of South Windsor o P.O. BOX 11903
Van IrVenue M NEWINGTON, CT 061 1 1-0903
South Windsor, CT. 06074 TEL. (203) 549-3200
SUBJECT DATE 8 /JL5 /83
MESSAGE Dear Ginny:
This will confirm our conversation of this date regarding placing Savin Bros. &
our landscape architect, Alan Viets, on the P & Z agenda for the meeting of
September 20, 1983. I am also enclosing a letter to Marshall requesting that the
Detent #3 and Tree Planting West of Ed.gewood (Bond Releases For Both) be placed on
the same agenda. Your cooperation is greatly appreciated.
SIGNED
REPLY
SIGNED DATE /
' ♦ �• ' .. i.ec'.. :>., .. . .s > ...y..3Y' ., r .s:,3^.°fL`". 1.gaJ: E;...�:T[m. �` -et.. f> Ye e . ' "'
RED FORM. 4S 472 SEND PARTS 1 AND 3 WITH CARBON INTACT-
PART 3 WILL BE RETURNED WITH REPLY. POLY PAK(SO SETS)4P474
y ��n, 0-leS �•
O �
a '
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
oe•ca AREA CODE 203/644-2511
September 28 , 1983
Mr . R. G. Kaye
Savin Brothers, Inc.
P. 0. Box 11446
Newington, Ct . 06111
Dear Mr. Kaye:
Re: Detention Basin #3
Please be advised that the Planning and Zoning Commission
voted last night to reduce the $30, 000 bond is it holding
on Detention Basin #3 , to a $5, 000, one year , maintenance
bond .
The `Commission further voted to recommend acceptance of
the detention basin by the Town Council , and we are advising
them so by copy of this letter .
Yours very truly ,
PLANNING AND ZONING COMMISSION
vg By: �f
Marshall Montana, Chairperson
CC: E. Jalet , Clerk of the Council
Wayne C. Gerlt , Town Attorney
R. Arsenault , Public Works Director
P . DeMallie , Planning Director
SowN a
co
OP Soum ?d&1d44-at
�P 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
OR-Co� AREA CODE 203/644-2511
TO BE PUBLISHED IN THE JOURNAL INQUIRER SATURDAY, OCTOBER 19 1983
LEGAL NOTICE
TOWN OF SOUTH WINDSOR
PLANNING AND ZONING COMMISSION
At the September 27, 1983 meeting, the Planning and Zoning Commission
voted to take the following action:
1. Approve a modified site plan for Phase II of Burr Meadow
Condominiums , as shown on a plan prepared by Palmberg &
Russo, dated 8-4-839 MF-A zone .
2 . Approve with modifications a landscape plan for
Savin Brothers, Inc . for Parkcentre, as shown on plans
prepared by Alan Viets Associates , dated September 6 , 8
and 9, 1983 , IP zone .
3 . Recommended acceptance of Detention Basin #3 at Parkcentre
to t-he Town Council .
4 . Approved the improvements to the intersection of Ellington
and Buckland Roads , in front of Society for Savings , as
shown on plans prepared by Town of South Windsor , Bureau of
Engineering, dated 5/16/83 .
5 . Approved a temporary and conditional permit for J . M. J .
Construction Company for filling on property located on the
the west side of Clark Street, north of Smith Street , as
shown on a plan prepared by Reino E. Hyyppa & Associates ,
dated 9/26/83, Map No. 43-80-1 .
Dated at South Windsor , Connecticut this 28th day of September ,
1983 .
PLANNING AND ZONING COMMISSION
Marshall Montana, Chairperson
Raymond F . Hallowell , Jr. , Secretary
1o~ 8�4
c u
n O-PsamtA V&U&ot
_ �0, 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
)SOR•coN� AREA CODE 203/644-2511
October 4, 1983
Mr. Richard J. Sartor, Town Manager
South Windsor Town Hall
1540 Sullivan Avenue
South Windsor, CT 06074
Dear Mr. Sartor:
At a Regular Meeting held October 3, 1983, the South Windsor Town Council
approved the following Resolution:
BE IT RESOLVED that the South Windsor Town Council hereby
gives approval to accept Detention Basin Number 1 comprised
of 4.31 acres, located in Parkcentre on the South side of
Newberry Road since the Town Engineer has completed an
inspection of same and certified that it has been built
according to the plan and is functioning correctly.
BE IT FURTHER RESOLVED that any bonds being held for such
Detention Basin can be released.
Sincerely,
Eileen G. Jalet
Clerk of the Council
egj
cc: Mr. Wayne Gerlt, Town Attorney
Mr. Robert Arsenault, Director of Public Works
Engineering Department
Mrs. Marshall Montana, Chairman - Planning & Zoning Commission
Mr. Robert Kaye, Savin Brothers, Inc.,
y T-0 0-14?Sou� vt�-�
o �
c �
e w� 1540 SULLIVAN AVENUE - SOUTH WINDSOR, CONN. 06074
f�'SO e•C0 AREA CODE 203/644-2511
October 4, 1983
Mr. Richard J. Sartor, Town Manager
South Windsor Town Hall
1540 Sullivan Avenue
South Windsor, CT 06074
Dear Mr. Sartor:
At a Regular Meeting held October 3, 1983, the South Windsor Town Council
approved the following Resolution:
BE IT RESOLVED that the South Windsor Town Council hereby
gives approval to accept Detention Basin Number 1 comprised
of 4.31 acres, located in Parkcentre on the South side of
Newberry Road since the Town Engineer has completed an
inspection of same and certified that it has been built
according to the plan and is functioning correctly.
BE IT FURTHER RESOLVED that any bonds being held for such
Detention Basin can be released.
Sincerely,
nnI �I
I.v
Eileen G. Jalet
C
Clerk of the Council
egj
cc: Mr. Wayne Gerlt, Town Attorney
Mr. Robert Arsenault, Director of Public Works
Engineering Department
Mrs. Marshall Montana, Chairman - Planning & Zoning Commissionc-�
Mr. Robert Kaye, Savin Brothers, Inc.
O �
led
C VO-P S-0� qdbu&ot
1540 SULLIVAN AVENUE - SOUTH WINDSOR, CONN. 06074
SOR•Co�� AREA CODE 203/644-2511
October 4, 1983
Mr. Richard J. Sartor, Town Manager
South Windsor Town Hall
1540 Sullivan Avenue
South Windsor, CT 06074
Dear Mr. Sartor:
At a Regular Meeting held October 3, 1983, the South Windsor Town Council
approved the following Resolution:
BE IT RESOLVED that the South Windsor Town Council hereby
gives approval to accept a parcel of land, including storm
drainage Detention Basin Number 3 and drainage easement
located in Parkcentre on the South side of Governors
Highway since the Town Engineer has completed an inspection
of same and certified that it has been built according to
the plan and is functioning correctly.
Sincerely,
� A t-�t-
Eileen G. Jalet
Clerk of the Council
egj
cc: Mr. Wayne Gerlt, Town Attorney
Mr. Robert Arsenault, Director of Public Works
Engineering Department
Mrs. Marshall Montana, Chairman -- Planning & Zoning Commission
Mr. Robert Kaye, Savin Brothers, Inc.
,Ow N Sf4
y T-o O-P S-Oum
•
O
o
C V
w` 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
SOR•CO�� AREA CODE 203/644-2511
September 15 , 1982
MEMORANDUM TO : Wayne C . Gerlt , Esq . , Town Attorney
FROM: Planning & Zoning Commission
Re : Savin Bros . , Inc . - Parkcentre- Dentention Basin #1
Enclosed is a copy of the Warranty Deed from Savin Brothers , Inc .
to the Town of South Windsor , covering 4 . 31 acres . The
Engineering Department has approved the legal description .
Would you please advise us as soon as possible if the deed is
in proper form so we can arrange to have it placed on the
Town Council ' s agenda for acceptance?
vg
enc .
CC : B. Davies , Deputy Town Engineer
P . DeMallie, Planning Director
f
Y
f
301 HARTFORD AVENUE
P.O.BOX 11903
NEWINGTON,CT 06111-0903
203/549-3200
97AVIIW
INC Ctl
Him March 6, 198714t�
Ms, Marcia Banach, Town Planner
Town of South Windsor
p
1540 Sullivan Avenue •
South Windsor, CT. 06074
Dear Marcia:
On March 3, 19831) I wrote to the Planning and Zoning
Commission requesting the release of our $25,000. 00
bond covering the completion of Detention Basin 41
in Parkcentre, since the basin had been satisfactorily
and the Commission had recommended that the Town
Council accept same on behalf of the Town, (Copy Enclosed) ,
On March 259 19831) I received a letter from the Commission
advising that they would reduce the bond to $2,500.00
and that said bond be for an indefinite period of time,
On October 3, 19831 the Town Council passed a resolution
accepting Detention Basin #1 and stated that "any bonds
being held for such Detention Basin be released. " (Copy
Enclosed) ,
My records indicate that the $2,500.00 bond is still
being held by the Town, and I respectfully request
that this bond be released and returned to me at this
time.
Your cooperation in this matter will be greatly appreciated.
Very truly yours,
SAVIN BROTHERS_ INC,
R. G a Kaye
Director of Development
RG K/rk
Enclosures
cc: Parkcentre Bond File
AN EQUAL OPPORTUNITY EMPLOYER
M/F
1%0'1" SE,
rr � 3
s 1-0 `tl 0-f
mac, 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074
r�osoR-CO AREA CODE 203/644-2511
March 25 , 1987
Mr. R. G. Kaye
Savin Brothers, Inc.
301 Hartford Avenue
P.O. Box 11903
Newington, CT 06111
Dear Sir:
RE: Release of $2 ,500 bond
Please be advised that on March 24 , 1987 , the Planning and Zoning
Commission voted to release the bond of $2 ,500 being held for the
completion of Detention Basin #1 in Park Centre.
The bond is enclosed as you requested.
Very truly yours,
PLANNING & ZONING COMMISSION
By: Louise C. Evans
Chairman
MR/jsv
Enclosure