Loading...
HomeMy WebLinkAboutSITE PLAN DEVELOPMENT (2) t fUWN OF SOUTH WINDSOR , CONNECTICUT PLANNING AND ZONING COMMISSION APPLICATION FORM Application No. : Date Received ti� :x dNf:� Action/Public Hearing by : ,� ��f � 7 Receipt No. : ,y , 989 1n South ;n APPLICANT: Robert & Linda Delisle l®n;n� �sa�- ADDRESS : 570 Sullivan Ave. , South Windsor, CT 06074 W TELEPHONE: 289-8225 OWNER OF RECORD ON LAND RECORDS : Robert & Linda Delisle ADDRESS : Same COMPLETE LOCATION OF PROPERTY: Lot #10/Kimberly Drive - Charbonneau Resubdivi s ion, South Windsor, CT 06074 ZONE: IP NAME, ADDRESS , & TELEPHONE NUMBER OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED: Peter R. DeMallie, Principal, Design Professionals, Inc. TELEPHONE: 291-8755 THIS APPLICATION IS FOR : (Check one of the following) 1 . Zone Change to (Public Hearing required) . 2 . Subdivision . 3. Open Space Subdivision (Public Hearing required) . 4. Resubdivision (Public Hearing required) . 5. Special Exception to Article (Public Hearing Required) . X___ 6. Site Plan of Development. 7. Earth Filling [Section 101 and/or Earth Removal [Section 91 (Public Hearing Required) . 8 . General Plan of Development . 9. Regulation Amendment : Zoning Subdivision _10. Other (explain in detail) : CONSULT PLANNING DEPARTMENT FOR FEE SCHEDULE. THIS APPLICATION MUST BE SIGNED BY THE APPLICANT AND OWNER OF THE PROPERTY AND SUBMITTED IN TRIPLICATE WITH ALL PS AND DOCUMENTS REQUIRED ON ATTACHED CHECKLIST• Z� - • I. Appli Owner METALS TESTING 1 . Site plan applicatio for an 9,550 sq ft^ tiral building lop-ated on the,.rortherly side of � erly Drive, east side of Sandr6 Drive IP zone.,,.'the size is 1 .38 ac',- with 15 . 9% building coverage; 40%,allowed. Imfervious coverage is 38%; 55% allowed. It appears that all other zoning requirements have been met. � 2 . IWA/CC approval was granted on 10/18 recommending a bond of $5,000 with no other unusual approval conditions. 3. The site will be serviced by public water and public sewers . WPCA approval is not required. The owner must reapply to DEP for a discharge permit and Fred Shaw with Water Pollution Control has requested that the Town be copied on that permit. 4 . The parking requirements for this site based on the uses proposed is 19 spaces. The applicant has provided 22 spaces . 5 . The architecturals indicate that the building will be metal sided building with a dryvit facade and windows along the front. There will be an overhead door on the rear of the building. 6 . The landscaping proposed for the site looks good. The applicant will be trying to perserve some of the existing vegetation along the north and south sides of the site. In addition, the applicant is proposing 10 red maples, 4 white birches in the front of the site, a varitey bushes in front of the building including mountain laurel, rhododendrum, burning bushes and lilacs . There is a row of coccinea bushes proposed along the eastern side of the property. If this application is approved, the planning department requests no modifications . P-625 092 496 7zp p G Sta j7l _J --riA nd TOT,,L P p ,' es�-.Strn a,k Date Mit E w" "4 y r O-P S ?d&U&<>t O � V w(d 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 l�°soR•co�'� AREA CODE 203/644-2511 MEMORANDUM August 1, 1989 TO: Marcia A. Banach, Director of Planni FROM: Jerry C. Iazzetta, Town Engineer RE: Metals Testing Site Plan #89-59 We have reviewed the proposed Metals Testing Site Plan drawings dated 7-21-89 and have the following comments: 1 . Key Map - the stormwater drainage arrows are needed showing direction of flow. Also the Sanitary Sewer laterals need to be labeled. 2. Site Plan/Grading Plans do not indicate handicap ramp onto sidewalk. 3. Grading, Utility Plan - a) Size and type pipe, and inverts at building, manhole are required for sanitary laterals. Also there is a symbol @s shown after the sampling tank - is this a new manhole? If so top of frame and invert elevations are required as well as a detail of the manhole. b) Roof drain connected to the existing 6" PVC does not indicate the size and type of new pipe. Also it is recommended that the roof drain on the west side of the building (at right angle corner) also be tied into the storm water system. c) The 72 contour at the Kimberly Drive driveway needs to be re-examined. It appears that a minor modification could improve the stormwater drainage in that area of the parking lot. I have given my set of drawings to Mr. Fred Shaw, Supt. of Pollution Control, for his review of the sanitary system proposed (i.e. holding tank and sampling tank) and have asked that he comment separately on this item. JCl/jsv cc: Michael J. Gantick, Director of Public Works �A011N 8E4 4 � ~ O-PSau� ?d&U&ot c � 1540 SULLIVAN AVENUE - SOUTH WINDSOR, CONN. 06074 R-co��� AREA CODE 203/644-2511 August 2, 1989 Mr. Peter DeMallie 1170 Ellington Road South Windsor, CT 06074 Re: Application #89-59, Site Plan of Development, Metals Testing Dear Mr. DeMallie: Attached is a copy of comments from the Planning and Engineering Departments regarding the above-referenced application. Please make the necessary revisions to the plans and submit 6 complete sets (including architectural elevations, landscaping plans, etc. ) to the Planning Department. If you have any questions regarding the comments or the procedure, please contact me. Very truly yours, Marcia A. Banach Director of Planning cc: Jerry Iazzetta, Town Engineer METALS TESTING SITE PLAN - PLANNING DEPT. REVIEW COMMENTS Plot Plan -''North arrow? —Size of new building? - Can garbage truck make necessary maneuvers to empty dumpster (particularly backing up)? - Landscaping needed on east side of building (vacant lot next door won't always be vacant) . Note that if trees to be preserved are actually destroyed during construction, may require additional landscaping. Topographic Map - Pavement, sidewalk widths? Architectural Elevations - Needed; not submitted with application NOTE: For future applications, use of Planning Dept. 's checklist would result in less of the above comments Lt I r LK yr T'HANbM I r i AL OMN sf' .< o PLANNING DEPARTMENT z ,; TOWN OF SOUTH WINDSOR ` 1540 SULLIVAN AVE. SOR•co�'� SOUTH WINDSOR, CT 06074 G,A(203) 644-2511 Date r j AUG 8 �- "Ja 'r +b WE ARE SENDING YOU: P&Z initial plans Q Drainage comps E= P&Z final plans C-1 Bond estimate requests 0 Inland Wetlands plans 0 Bond reduction requests 0 Final plans for filing 0 Change order form =1 Other = Correspondence Copi s App. No. Project J THESE ARE TRANSMITTED as checked below: For review and comment O For your file 0 For your use Returned with revisions C1 As requested 0 Other PLEASE. RETURN/COMMENT BY: COMMENTS: • Copy to: F /`"� �� IS- ■ esig� xAM DET�TVFRFn ,: Fn ofessiona Is, inc. civil engineers • planners • surveyors LETTER OF TRANSMITTAL ■ TO: Marcia Banach, Director of Planning DATE: rt TOWN OF SOUTH WDWOR ' AUG Q 198Q South INLAND WETLA;y- CONSERVATION Cp► ,._. REGARDING: Metals Testing PROJ. NO. 89-413 Kimberly Drive South Windsor, Connecticut WE ARE SENDING YOU: X for your use Xat your request for approval for your files for review and comment THE FOLLOWING: Six (6) sets of site plans. Six (6) sets of building elevations. Plans have been revised per comments in letter dated August 2, 1989. Thank you. Design Professionals, Inc. By: David Ahrens Project Engineer 1170 Ellington Road (Route 30), South Windsor, CT 06074 (203) 291-8755 OF 1 NANZiMl r TA L . 0,0 ~ � p � C PLANNING DEPARTMENT Z TOWN OF SOUTH WINDSOR 4��soR•co���` 1540 SULLIVAN AVE. SOUTH WINDSOR, CT 06074 Date (203) 644-2511 ry �.rr- r 1170 iNn- a-ek �;o J+k cf� oe""q -7 , WE ARE SENDING YOU: Cp P&Z initial plans Q Drainage comps 4 En P&Z final plans 0 Bond estimate requests r--1 Inland Wetlands plans Q Bond reduction requ sts p Final plans for filing 0 Change order form tj�L Other at ce4 P(a n rt LM Correspondence Copi s App. No. Project THESE ARE TRANSMITTED as checked below: [= For review and comment Q For your file - For your use C1 Returned with revisions Cp As requested 0 Other PLEASE- RETURN/COMMENT BY: COMMENTS: Copy to: '�' From: 2 r� zze a ._ _ _.._ .. -s.ter/•at• .. a f • X' . i- r •Y.@R•`ir'�^.✓aPTi a a ��,- i.JCt YL/�Y '�.�n±mil.•i4.i•1 METALS TESTING SITE PLAN - PLANNING DEPT. REVIEW COMMENTS Plot Plan - North arrow? - Size of new building? - Can garbage truck make necessary maneuvers to empty dumpster (particularly backing up)? - Landscaping needed on east side of building (vacant lot next door won't always be vacant) . Note that if trees to be preserved are actually destroyed during construction, may require additional landscaping. Topographic Map - Pavement, sidewalk widths? Architectural Elevations - Needed; not submitted with application NOTE: For future applications, use of Planning Dept. 's checklist would result in less of the above comments SUPERINTENDENT OF POLLUTION CONTROL COMMENTS Owner must reapply to DEP for a discharge permit; town should be copied during this application process. More information required concerning proposed industrial process waste discharge and pretreatment equipment available to control and monitor waste discharge to sewers in order to complete review of this project. 91 ri-A'7 • Ol4 eo esigo rofessionals, inc. SEp j8 1989 civil engineers • planners • surveyors `(`t ndsor � South — & Zoning Comm►sstoll September 15, 1989 Planning Raymond Hallowell , Jr . , Chairman Planning and Zoning Commission 1540 Sullivan Avenue South Windsor , Connecticut 06074 Dear Chairman Hallowell : On behalf of my client , Metals Testing Company, I hereby grant a 65 day extension to the time period for final action by the Commission, as provided by law. Thank you very much. Sincerely, David Ahrens Project Engineer Agent for Robert Delisle 1170 Ellington Road (Route 30), South Windsor, CT 06074 0 (203) 291-8755 PLANNING DEPARTI4ENT IN-HOUSE REFERRAL FORM TO: Jean Zur Ka 1 Reichle, Mike Gantick, Mel Stead, Fred Sh Thomas Hart, Fire Marshall Canning, Snow FROM: Marcia A. Banach, Director of Planning The Planning & Engineering Departments have received. plans for the following project:# oil 11 G�iJ.f T„! r`_-( ��✓`� le d Zone -�- P Acreage r 3 L c. Subdivision Site Plan Residential No. of Lots/units Commercial Industrial__ Location: Zv- vY Project Description: Future Town-owned property involved? Yes No�_ (a)new streets (existing frontage also) (b)new open space/recreation area active passive (c)new detention area Planning Department comments Ly4 �z�d,2 .e I'l Z 2d y4 0 v J' G yL e-nA 1. Please let me know by ? Ids /"ff if you will have comments on this application so that I can follow up with your department when I do a Planning Department report. c ��� > 4, 1'M a�'< �sOCT�� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, COgNpgoM,�dsor �soR.co�'� AREA CODE 203/6Ma -25 & Z0�11� �G ,,'3IOa nn►AJ September 22, 1989 Robert & Linda Delisle 570 Sullivan Avenue South Windsor, CT Dear Mr. & Mrs. Delisle: Re: Application #89-59P - Metals Testing Company At the September 18, 1989 meeting, the Inland Wetlands Agency/Conservation Commission approved with modifications Application #89-59P - IWA/CC permit for the construction of an industrial building on property located at Lot #10, Kimberly Drive, resubdivision of Andre Charbonneau, IP zone as shown on plans prepared by Design Professionals, dated July 21, 1989 and revised September 14, 1989 1. Black and white transparent mylars of sheets #3 of 4 and #4 of 4 with the above modifications, together with two blueprint copies of the entire set of plans, must be submitted to this Commission to be stamped and signed. This must be completed within 65 days of approval prior to any construction activity on the site. 2. Construction activities shall be subject to the approval of the Town Engineer. 3 . The application shall indemnify and hold harmless the Town of South Windsor against any liability which might result from the proposed operation or use. 4 . We recommend a bond in the amount of $5000.00 to be submitted to Planning and Zoning Commission to ensure compliance with the Erosion and Sedimentation Control Measures. 5. The permit is valid for one year and shall expire on September 18, 1990. 6 . All approvals required must be obtained and submitted prior to any activity on the site. 7 . A contact person shall be identified directly on the plans. 8. Stumps must be woodchipped if possible. The remaining pieces of stumps are to be removed from the site. 9 . Existing stockpile must be removed prior to construction. 10. Department of Environmental Protection approval required. Very truly yours, imeis Lombardi, Acting Chairman Inland Wetlands Agency/ Conservation Commission JL/pmm cc: Jerry C. Iazzetta, Town Engineer Marcia A.Banach, Director of Planning John R. Collins, Chief Building Official Planning & Zoning Commission ►/ Design Professionals 0,0 a ct t y r �S_0� 7()&U&Ot o � ` C U 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 f�osoR-co AREA CODE 203/644-2511 September 22, 1989 Mr. Robert J. Delisle, President Metals Testing Company 570 Sullivan Avenue P.O. Box 213 South Windsor, CT 06074 RE: PROPOSED METALS TESTING FACILITY KIMBERLY DRIVE Dear Mr. Delisle: In regard to your letter of August 23, 1989, I am satisfied that there will be no substantive change in the quantity or the quality of the industrial process wastewater discharge to the Town's sewerage system relative to the existing facility. It is my understanding, as well, that the Town will be copied on any new DEP permit application. Therefore, all of my questions have been answered in regard to the above application. Very truly yours, r . F. Shaw Ass't. Director of Public Works CFS:bmr cc: Marcia Banach, Director of Planning Jerry Iazzetta, Town Engineer tow" aE� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 �f�°soR•co�'� AREA CODE 203/644-2511 26 October 1989 Mr. Peter DeMallie Design Professionals, Inc. 1170 Ellington Road South Windsor, CT 06074 Dear Mr. DeMallie: Appl. #89-59P, Metals Testing Site Plan Lot 10, Kimberly Drive We are pleased to advise that the Planning and Zoning Commission voted on October 24, 1989 to approve the above-referenced site plan of development in accordance with Drawings #1 - 4 of 4 dated 7/21/89 (rev. 8/8/89 ) prepared by Design Professionals, Inc. , Job No. 89-413, and with the following modifications: 1 . Prior to commencement of any site work, a meeting must be held with Town Staff . 2 . No building permits will be issued until the final mylars have been filed in the Town Clerk's Office. 3 . This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission, including a bond in the amount of $5,000 . 4 . An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 4 . 13. 10 of the Zoning Regulations . 5 . Footing drains are required if the building has a basement. 6 . A landscape bond in the amount of $5,000 is required and must be submitted prior to filing of mylars . 7 . All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 8 . Storm water drainage arrows showing direction of flow are needed on plans. 9 . The size and type of pipe and inverts at building and manhole are required for sanitary laterals. Mr. Peter DeMallie -2- 26 October 1989 Black and white transparent mylars of Sheet #2 with the above modifications, together with three blueprint copies of the entire set of plans, must be submitted to this Commission within 30 days to be stamped and signed. The letters of approval of this Commission, as well as the Inland Wetlands Agency/Conservation Commission, must be reproduced on the mylars. After the mylars have been signed by the Commission, they will be returned to you for filing in the Office of the Town Clerk. After filing these plans, a copy of the receipt must be submitted to the Planning Department. Very truly yours, PLANNING AND ZONING COMMISSION David H. Sorenson Vice Chairman cc: Inland Wetlands Agency/Conservation Commission M. Banach, Planning Director J. Collins, Chief Building Official J. Iazzetta, Town Engineer F. Shaw, Supt. of Pollution Control E. Belleville, Assessor W. Lanning, Fire Marshal Registrar of Voters Engineer Applicant ✓ PZC File <�emo from TOWN OF SOUTH WINDSOR TOWN HALL SOUTH WINDSOR.CONN. 06074 TO Marcia A. Banach DATE 10/26/89 L SUBJECT: PRECONSTRUCTION MEETING FOLD_ METALS TESTING � r Kimberly Drive South Windsor, CT There will be a preconstruction meeting for the above mentioned site on Thursday, November 2 , at 2 :00 PM here at the Town Hall. cc: M. Gantick, B. Davies, Le Braddock, F. Shaw, M. Stead, K. Reichle, B. Lanning, J. Collins, Ja McCahill By 0 a 1540 SULLIVAN AVENUE - SOUTH WINDSOR. CONN. 06074 R•C0 AREA CODE 203/644-2511 TO BE PUBLISHED IN THE JOURNAL INQUIRER SATURDAY, OCT. 28, 1989 LEGAL NOTICE TOWN OF SOUTH WINDSOR PLANNING AND ZONING COMMISSION At its October 24, 1989 meeting, the Planning and Zoning Commission voted to take the following actions: 1. Go into executive session to discuss pending claims and litigation. 2. Go out of executive session. 3. Adopt retyped Zoning Regulations correcting previous grammatical and typing errors, to be effective upon publication of this notice. 4. Reduce certain subdivision bonds. 5. Reduce certain IWA/CC bonds. 6. Go to maintenance level on certai nubdi ' ' Aid s. 7. Approve, with modificati s, Appl. #89-59P, Metals Testing Site PI of #10 Kimberly Drive, IP Zone. 8. Extend the meeting until 11:00 P.M. r 9. Approve, with modifications, Appl. #89-63P, Mark Collins Subdivision, northerly side Strong Road opposite Foster Road, RR Zone. 10. Approve, with modifications, Appl. #89-64P, Richard Szeluga Subdivision, 41 Newmarker Rd., A-30 Zone. 11. Approve, with modifications, Appl. #89-70P, Cameron Subdivision, southerly side Miller Rd., AA-30 Zone. 12. Adjourn. Dated at South Windsor, Connecticut this 25th day of October, 1989. PLANNING AND ZONING COMMISSION Raymond F. Hallowell, Jr., Chairman Marshall Montana, Secretary towN s�� 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 ���soR•co�'� AREA CODE 203/644-2511 RE: Preconstruction Meeting - Application #89-59P Metals Testing Company November 2, 1989 IN ATTENDANCE Name Company/Address Telephone # Jerry C. Iazzetta Town of South Windsor 644-2511 Lest r Braddock Town of South Windsor 644-2511 Michele Lipe Town of South Windsor 644-2511 John E. McCahill Town of South Windsor 644-2511 Richard Martel Design Professionals 1170 Ellington Road 291-8755 Dav Ahrens Design Professionals 1170 Ellington Road 291-8755 Bob Delisle Metals Testing Company 570 Sullivan Avenue 289-8225 Ernie Babineau Orlando Annulli & Sons 644-2427 147 Hale Road, Manchester The following is a brief summary of points discussed during the meeting. Erosion & Sedimentation Control 1 . All erosion and sedimentation control measures are to be in place prior to earth moving operations in each area and maintained/cleaned out durinq construction. Call Zoning Wetlands Enforcement Officer for inspection when measures are in place, prior to commencement of site work 2. All topsoil stockpile areas to be protected (ringed with haybales or equal) . 3 . During construction of the road/driveway a crushed stone tracking pad is to be installed and maintained to minimize tracking of dirt/gravel onto Kimberly and Sandra Drive. Calcium chloride or water is to be used for dust control as required. 4 . Trees are to be flagged prior to clearing. Call Zoning/Wetlands Enforcement Officer for inspection prior to cutting. Public Works 1 . Four complete sets of approved/revised plans to be provided to Town prior to start of construction. They will be stamped by Planning Department along with plans developer needs . 2. The Public Works Department is to be notified forty-eight (48) hours prior to the start of major construction work with inspections and testing per Developers Checklist required for the following: a) after site is staked out b) all drainage work c) Preparation of subgrade, compaction tests as required by the Town. d) Preparation of subbase, six (6) inch lifts e) Placement of bituminous concrete, 1 1/2 inch layers . 3 . Certification of gravel used as subbase will be requir d by an approved testing company. 4 . No subgrade formation/base in frozen ground/snow. Same for pipe/structure installation. 5. As built plans are to include horizontal and vertical location of all underdrains, footing drains, and sanitary sewers located by a certified land surveyor. 6 . All pipe and structures to be backfilled with free draining material, compacted in maximum one foot lifts with approved compaction equipment. Any pipe or structure work requires inspection prior to backfilling. 7 . Any problems and/or questions regarding construction of this project will be directed to Ernie Babineau in the field. 8. All filling to be done in accordance with Department of Transportation specifications. To be compacted in maximum lifts and tested as necessary. 9 . Job meetings will be held as needed, and can be called by the developer or Town. 10 . Forty-eight (48) hours notic n ded for Certificate of Occupancy inspection. Two week review period (10 working days) needed for all individual site (lot) plans prior to issuance of building permit (may be longer if application is incomplete) . See General Guidelines for Certificate of Occupancy and Building Permit. 11 . Only approved copies of lot site plans to be used on job site. Any proposed changes are to be presented to Engineering/Planning Department prior to implementation on change sheet. Town will attempt to turn around within 24 hours. 12. No paving after October 15 without written approval from Director of Public Works. 13 . Normal hours of operation 7:00 A.M. - 5:00 P.M. , no work on Sunday. Planning Department: 1 . Final plans needed. 2. Bonds to be posted prior to mylar filing SNET/NU 1. Contact utilities for coordination of utilities connection. IWA/CC 1 . A bond in the amount of $5000.00 is required for ensuring erosion and sedimentation measures. Fire Marshal 1. Blasting (if required) to be coordinated with the Fire Marshal. Police Department: 1. Emergency phone numbers for the duration of the construction must be provided to the Police Department on a company letterhead. If the developer occupies or owns the building/s after construction emergency numbers must be provided to the Police Department. 2. All buildings located on property which abutts a public highway must be numbered. Such number/s (address) shall be visible from the street. All numbering shall comply with Town Ordinance 6-800 thru 6-802. 3. Erect temporary sign on the site during construction identifying the project. 4 . If an alarm is to be installed contact the Police Department. Building Department: 1 . Plan review with Building Official/Fire Marshall required prior to application for building permit. Coordinate with Chief Building Official. Very truly yours, Mic ele R. Lipe Assistant Planner/Analyst MRL/pmm cc: Jerry C. Iazzetta, Town Engineer Lester A. Braddock, Sr. Engr. Inspector Thomas Hart, SWPD Karl Reichle, Public Works Mel Stead, Public Works Minh V. Le, SNET Hal Clisby, CL&P John R. Collins, Chief Building Official Fred Shaw, Superintendent of Pollution Control John E. McCahill, Zoning Enforcement Officer Richard Martel, Design Professionals Dave Ahrens, Design Professionals Ernie Babineau, O.Annulli & Sons s � �9 Pre-Mylar Filing Checklist Site Plan Landscape bond 4 IWA/CC bond 5, Alf Deeds/easements if required Pre-construction meeting date Plans filed date Other : ■ esigo HAND DELIVERED? nc.ofessionals, i civil engineers • planners • surveyors LETTER OF TRANSMITTAL ■ TO: Marcia Banach DATE: 11/17/89 R C REGARDING: Metals Testing Company PROJ. NO. 89-413 Sandra Drive rr-A �� t•8� yam`r South Windsor, Connecticut NOV 1989 WE ARE SENDING YOU: c0{liii X Pla ping & Zoning for your use at your requgi for approval for your files for review and comment THE FOLLOWING: Fifteen (15) sets of site plans, mylars of sheets 2, 3 and 4 . Thank you. Design Professionals, Inc. By: David Ahrens Project Engineer 1170 Ellington Road (Route 30), South Windsor, CT 06074 (203) 291-8755 'q"MEULS TESTING COMPANY DELISLE INC., D/B/A, METALS TESTING COMPANY 570 Sullivan Ave.,P.O.Box 213,South Windsor,Conn.06074 TEL:(203)289-8225 July 10, 1990 JUL 1 South Windsor JNLAW WETLANDS AGENCY � CONSERVATION CONIMISSION Town of South Windsor Inlands/Wetlands Commission Subject: $5000.00 bond on Lot #10, Kimberly Drive, (Metals Testing Company) for sedimentation and errosion control Dear Board Members: At this time, we would like to inform you that the grass and shrubs have been planted and are growing on the site and request the release of the bond. Thank you. Robert 4tf. Delisle President C 71au apV ?d&"61at 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 • �'�' .�o�'� AREA CODE 203/644-2511 July 17, 1990 Planning & Zoning Commission 1540 Sullivan Avenue South Windsor, CT 06074 D ar Madam/Sir: Re: Bonds At the July 16, l99G--meati1A.g of the Inland Wetlands Agency/ConAerRvation Commissio . it was voted to release the following bonds:/. Application #88-76P, MetalA Testing in the amount of $5,000.00. A - -46P, Utility Development Corporation in the amount of $2,000.00. Application #89-77P, JFI Associates, Inc. in the amount of $5,000.00. Very truly yours, 12am s A. Lombardi, Chairman Inland Wetlands Agency/Conservation Commission JAL/pmm cc: Marcia A. Banach, Director of Planning Jerry Iazzetta, Town Engineer Michele Lipe, Ass't Planner/Analyst �0aN sC4t p w� 1540 SULLIVAN AVENUE SOUTH WINDSOR. CONN. 01 074 OR•co AREA CODE 203/644-2511 26 July 1990 Mr. Robert Delisle Metals Testing 570 Sullivan Ave. South Windsor, CT 06074 Dear Mr. Delisle: re: Metals Testin $5 1-0 0 0 Bond This is to advise that the Planning and Zoning Commission voted on 24 July 1990 to release the IWA/CC Bond. Advance arrangements should be made to pick up the bond to ensure that the necessary contact person(s) will be available. If you have any further questions contact the Planning Department at 644-2511, Ext. 251. Thank'.you. Very truly yours, . PLANNING & ZONING COMMISSION Louise C. Evans Chairman cc: J. Iazzetta, Town Engineer M. Banach, Director of Planning PZC File G -- dy a ME TESTING COMPANY DELISLE INC., D/B/A, METALS TESTING COMPANY 570 Sullivan Ave.,P.O.Box 213,South Windsor,Conn.06074 TEL:(203)289-8225 NOV �tiS 'D October 31 , 1990 Town of South Windsor Dept. of Planning & Zoning Subject: $5000.00 bond on Lot # 10, Kimberly Drive, (Metals Testing Company) for ensuring completion of property landscaping. Dear Board Members: At this time, we would like to inform you that the grass and the scrubs we planted on site are doing very good and we are requesting release of bond. Thank you, Robe J. Delisle President jmg/RJD It Jim 4( r s 70 a 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 4��oSOR.co�� AREA CODE 203/644-2511 M E M O R A N D U M November 13, 1990 TO: PLANNING & ZONING COMMISSION MEMBERS FROM: Marcia A. Banach, Director of Planning RE: BOND REDUCTIONS/RELEASES Below please find recommended bond reductions . LANDSCAPING BONDS PRESENT BOND RECOMMENDED REMAINING SITE AMOUNT BOND REDUCTION BOND BALANCE \Metals Testing $ 51000 $ 51000 -0- Nutmeg Lot #3 $10,000 $10,000 -0- SUBDIVISION BONDS PRESENT BOND RECOMMENDED REMAINING SITE AMOUNT BOND REDUCTION BOND BALANCE Partridge Meadow 595,000 165,000 430,000 Cambridge Estates 146,000 66,000 80,000 Oxford Estates 120,000 50,000 70,000 Pleasant Valley Homes Section I 65,000 15,000 50,000 Section II 65, 000 25,000 40, 000 Linda Lane Estates 274,000 -0- 274,000 Clifford Estates 1,0101000 ml cc: Engineering-Project File Jim s!4 ca r T_O O-PS ?d&&46at e � 4 �� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 �'4sok.co�'� AREA CODE 203/644-2511 14 November 1990 Mr. Robert J. Delisle, President Metals Testing Company 570 Sullivan Avenue P.O. Box 213 South Windsor, CT 06074 Dear Mr. Delisle: Re: Lot #10, Kimberly Drive South Windsor, CT 06074 $5,000 Landscaping Bond This is to advise that the Planning and Zoning Commission voted on November 13, 1990 to release the above-referenced bond. Advance arrangements should be made to pick up the bond to ensure that the necessary contact person(s) will be available. Please call or write the Planning Department office at the South Windsor Town Hall ( [203] 644-2511, Ext. 251) to make these arrangements. Thank you. Very truly yours, PLANNING AND ZONING COMMISSION Louise C. Evans Chairman cc: M. Banach, Director of Planning T 114 f�F TOWN OF SOUTH WINDSOR IP , STAFF SITE CHANGE APR 25 1991 FOR SITE & SUBDIVISION South Windsor GENERAL: Planning & Zoning Commissior+ r?a��.R'i D ce�.�s c,1z CHANGE ORDER CONTACT PERSON J?c jva`%, ; p�L ►s�� s,2 Phone No. >.� Address IV r�/N j3 !2 l i/t Site Name M-r �S7—,-4 s ZiA)d, C`n P&Z No. pq-,,"I' Owner, ci f2 Phone No. Z f q. f X-L j-- Contractor G4� [ 13 v j L-D)';I&, s C c. c s C 3, Signature of Owner ( Date: q —7—T Signature of Design Engr Date: CHANGE: (Describe location and nature of change. Include three (3) copies of plan/profile of Change. ) x z S ,, - �' ---T24 he 5 t:4- 5 ,1 T,E 11-LAd ey. Reason for Change: (Why is change required) s!�/'•'�lx-� �S�P�-G� /�� D�l 1 l2 L� /c�'� ���.✓�c1 %��c i ca �� SN z t�.( c�r�2 La z� A/ f W® L y G C� -W Al / D e L S Z�j G� APPROVALS: (As Required) Dir. Of Planning Date: Town Engineer 'F;�MDate: Dir. of Public T01-F Date: Other: Date: STAFF COMMENTS: White - Town Engineer Pink - Director of Planning Yellow - Applicant LAND TO BE DEEDED TO RECORD OWNER UPON O REMOVAL OF CUL-DE-SAC TURNAROUND AREA OUTSIDE OF THE NORMAL 50' RIGHT OF WAY. 10,/ O = 51*19'04" S\` EXISTING TREES AND = 25.00' � 6)22 S � WHERE POSSIBLE = 12.01' %� E = 22.39' ' �. . . . . . . . . . . . . • O •� 10' IGH STOCKADE FENCE / p - •n - 7 x' 1 Z' DUMPSTER• PAD 24' t�ES� ir,,% BCLC(typ - 10' x g0' STORAGE RQOM i 3' DOOR 10• 6 HIGH'CONCRETEBERM 10' WIDE / 0 E 00 �� Ci V 5' NO �2 / * / s� 1 / CIV .} 24. 3'L DOOR L 7 � TOT 10 • J` Cy PROPOSED / Y G HEMLOCK . • /LIGHT(typ.) 0 cv PROPOSED BUILDING 9550 Sq.Ft. / �► O b o/ r y O 0) N O # �4`„y� ,�vD,^ e�• EXISTING TREES WHERE POSSIBL S 6 'Q7'43 80. 0 . . . . . . . . . . . . . . . . . .�� S 86° 39' O7" E 116 92 �-WATEER EASEMENT� � T � 1 O O = 19.58'47 DRIVE f1 = 351.15' = 61.85' = 1 22.45' - lg° 12' 25' - 0 -