Loading...
HomeMy WebLinkAboutSITE PLAN AND SPECIAL EXCEPTION 1.0wN Sf� { 4 (� TOWN OF SOUTH WINDSOR CONNECT ICUZ PLANNING AND ZONING COMMISSION APPLICATION FORM SOR-0 79F 'D , Application No. : f � { Date Rece ' .�3 , 1; Action lic Hearin by : •.z1 • MAY `? 1989 Recei t No. : South Windsor APPLICANT: Sov-rH k)#t4V6oQ CoA.)09-C4ATioy Of' JCJJOV441'5 1✓,T,vFJJj5ning & Zoning Commission C/o 7Qkre#o,uD,M-Acic ADDRESS : S 9 Lova&A. Aur. C7" 06059.5 TELEPHONE: 688- 6l049 OWNER OF RECORD ON LAND RECORDS : SEAv Mos�� 8 L. H F ADDRESS : _ Sox 750 JI ?ockv�lLE C7" 0606 6 COMPLETE LOCATION OF PROPERTY: �/ocry �a _ o� Burnha•" S•f•• 7�00 �' •f• - 4 )/1 w if� cW Z 3 S ZONE: , NAME, ADDRESS , & TELEPHONE NUMBER OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED: Cooiesnof� Deslyn �ardy u"23 6o/O f S-f -awer L'.cve� Mcr��ch CT 064` C% Sank Gran rcc✓� 01 TELEPHONE Zo3 Z37-28 THIS APPLICATION IS FOR ; ' (Check one of the following) 1 . Zone Change to (Public Hearing required) . 2 . Subdivision . 3. Open Space Subdivision (Public Hearing required) . 4. Resubdivision (Public Hearing required) . 5. Special Exception to Article (Public Hearing Required) . _ 6. Site Plan of Development. 7 . Earth Filling [Section 10] and/or Earth Removal [Section 9] (Public Hearing Required) . 8 . General Plan of Development . 9. Regulation Amendment : Zoning- _ Subdivision 10. Other (explain in detail) : CONSULT PLANNING DEPARTMENT FOR FEE SCHEDULE. THIS APPLICATION MUST BE SIGNED BY THE APPLICANT AND OWNER OF THE PROPERTY AND SUBMITTED IN TRIPLICATE WITH ALL MAPS AND DOCUMENTS REQUIRED ON ATTACHED CHECKLIST. A p icant Owner , 4,&PXS Gw�/1 Q1Sel (0,100DESPOT1 DESIGN GROUP1 PC Archltectur /Engin ering LIEUMEM 21-23 Colony St. - Lower Level MERIDEN, CONNECTICUT 06450 OATS JOB NO. May 22 1989 88016 �203) 2374660 ATTENTION ` // -wv Marsha Banach RE: TO own of South Windsor Zonin& Application Planning and Zoning Commission Site Plans for Public Hearin rAfrYh1 WE ARE SENDING YOU ❑ Attached ❑ Under separate cover via the fotlowin v Wing Commissiol ❑ Shop drawings ❑ Prints M Plans ❑ Samples �a10 afli ans ❑ Copy of letter ❑ Change order ❑ COPIES DATE NO. DESCRIPTION 8 3 13 89 1 A licaticun Form 8 2/27/89 4 Check List - Site Plans 3 5/18/89 11 Site Plans and Building Elevations THESE ARE TRANSMITTED as checked below: (I For approval ❑ Approved as submitted ❑ Resubmit copies for approval ❑ For your use ❑ Approved as noted ❑ Submit copies for distribution ❑ As requested ❑ Returned for corrections ❑ Return corrected prints ❑ For review and comment ❑ ❑ FOR BIDS DUE 19 ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS COPY TO — SIGNED: L mmo 202 );7 ac.On"Nm 01411 It and sums ar n t as n t d, kindly n tlly us at nc . LHLCKLibf TFINTFA j;vi.4 � � .,A}~ � .ram,:.• REQUIRED INFORMATION sri SITE PLANS MAY P,0 1�89 outh v1indsor This checklist must be signed by plan preparer (P. E. /h,Ar 0QQftrUwvissio1 that all required information is provided . Items 1-7 are required for all applications ; items 8-11 required where appropriate. Check mark for each item supplies . 1 . On each sheet for plans or maps , title block with the following information : a. Name , address and telephone of applicant . b . Name , address and telephone number of Land Surveyor or Professional Engineer . c. Name of Development. d : ' Date when drawings were made. 2. Key Map : An overall map drawn to a scale of 1 inch equals 200 feet , which can be used as an overlay on Metropolitan District Maps . This map will show the overall design of the Development and surrounding property within 500 feet. a . Data block which gives needed zoning information such as percentage of lot coverage, acreage of tract , number of apartment units, parking requirements , etc. b . Layout of buildings c. Layout of streets and parking . ✓ d . Lines indicating proposed drainage system with direction arrows. ✓ e. Lines indicating sanitary sewer system with direction arrows. d 'f . Names of surrounding property owners . N� g . Proposed open spaces and recreation areas. N �4 h. Driveway cuts on surrounding properties. 3. Architectural Elevations : Plans of the proposed buildings drawn to a scale of 1/8" = 1 ' - 0" showing the elevations of all sides of the proposed buildings in sufficient detail to show architectural styling . Architect ' s seal on elevations for buildings in excess of 5000 square feet (per CGS Chapter 390) . Page 2 (Site Plans) 4 . Plot Plan : A layout map of the proposed site drawn to a scale of 1 inch equals 40 feet on either of the following size sheets: ( 1 ) 24" X 36" with a 3/4" ruled margin ; ( 2) 18" X 24" with a 1/2" ruled margin , containing the following data: a. Distance and bearings of all boundary lines and acreage of site. Iron pins required at all property angle points and shown on map. b . Proposed streets and street lines with center line stations , curve data , and parking spaces . c . Building lines in accordance with zoning regulations. d. Proposed buildings and other structures , including signs , outside lighting , and dumpsters (on concrete pad and screened) Y e. Easements , noting grantors , grantees , and purpose. f . Names of abutting property owners . t� g . Monuments will be indicated at corners and angles of all streets and at all points of curvature and tangency . In areas accessible to Metropolitan District Commission points , or other coordinated points , the monumented points within proposed site shall be coordinated . These coordinates shall appear in tabular form on the plot plan . The accessibility of these MDC points shall be determined by the Town Engineer. N h. All open space or other common or public land uses shall be indicated . ✓ i . A-2 certification ; P . E. A.S . Seal . 5. Topographic Map : A map drawn to a scale of 1 inch to 40 feet on sheets not exceeding 24 inches by 36 inches , including ruled margins shall in addition to the requirements of the plot plans show the following: a. All existing and proposed buildings . b . Curb lines and pavement width, sidewalks. C. Existing and proposed sanitary sewers . d . Existing and proposed water and gas main systems . e. Present wooded area indicated by foliage lines . Any individual trees to be saved should be shown. ✓ f . Existing and proposed contours shall be shown in not less than two-foot intervals , but in cases of relatively level land , the contours shall be one-foot intervals and spot elevations . Regulated g . g wetlands and 100-year floodplain or note that none are present . h. Proposed storm drainage system, showing all catch basins , endaa s� manholes , lengths and sizes of VInpipes . ( distance between catch basins shall be 300 feet and minimum size of storm drain lines shall be 15 inches . ) i . Connections of all springs into proposed storm drainage system as needed. j . Location and indications of existing brook channels , and 100-year flood limits . k. A-2 Certification ; P .E. /L. S , Seal . ✓ 6. Landscaping lan . 7 . Drainage calculations - Zero Runoff Increase per attached guidelines . . A114 - 8. Traffic report . 9. Plans and Profiles : A plan and profile of the proposed streets drawn on plan/profile paper of scales 1 inch to 40 feet horizontally , and 1 inch to 4 feet vertically on sheets not exceeding 24 inches by 36 inches , including ruled margins and containing the following: a. Layout of streets in sections coordinated by stations with the profile . ' b . Street plan showing roadways and drainage. C . Sight line at driveway & street intersections. d . Profile of roadway showing existing and finished grades . Roadway profile will show all tangent grade and all vertical curve information. �v/f1 e. Profile will show all catch basins and all drainage lines between catch basins with all invert and top of frame elevations. Drainage lines will be shown and described as to material . '� f . Where any storm drainage line discharges into an existing brook sufficient profile of this brook will be shown to determine conditions. g . Metropolitan District Commission datum shall be used on all sites accessible to these controls . The Town Engineer shall , based on standard engineering practices, determine the accessibility of these controls.' --- h . Profiles shall show all sanitary sewer lines and manholes , including elevations , sizes , lengths , and slopes of pipes. Top of foundation elevations for building shall be shown . 10. Open Space Site Improvement Plans : For sites which require or include a provision for open spaces , a plan which contains data for site improvement may be required . This map shall be drawn to a scale of 1 inch equals 40 feet . 11 . Sanitary Report: Where individual sanitary sewage disposal systems are proposed , the final plans shall include a Sanitary Report certified by a Professional Engineer . The report shall demonstrate the feasibility of the proposed individual systems; the report should deal with the area as a whole , discussing the following points: N/ a. General nature and development of surrounding area. b. Topography and natural drainage pattern. C . Subsurface conditions as shown by subsurface investigation , including soil absorption characteristics , ground water level conditions, ledge rock , and general nature of soil . d . General description of type of development contemplated . e. Detailed description of proposed sanitary sewage disposal facilities , indicating sizes for various ground conditions , materials to be used , and the general layout pattern to be used , etc . f . Special precautions that may be necessary to pKovide proper functioning of the proposed disposal systems. g . Map of general area with locations of all tests shown on proposed layout . h. Flood heights of any nearby streams , brooks, or rivers . i. Test results and engineering evaluation per Section 4. 13 . 5. All information required above is included in this application at the time of submission PLAN PREP R R P.E. LP November , 1987 CODESPOTI DESIGN GROUP, PC LIEVUEEM OF TURSODUML Architecture/Engineering 21-23 Colony St. - Lower Level MERIDEN, CONNECTICUT 06450 DATE JOB Np O QQ � (203) 237-9860 ATTENTION c .rgr4G TO ^07*4"Of AtZO /y RE 0.4 ae�. a `-' 'Y o 50 u WIAJ dt*r- w..7dio" 4 WE ARE SENDING YOU [IAttached ❑ Under separate cover via MAY "�'� leg P e following items: ❑ Shop drawings ❑ Prints ❑ Plans lS($a0pled.'C-w3or❑ Specifications ❑ Copy of letter ❑ Change order ❑ Planning & Zoning Con.,nrisslorl COPIES DATE NO. DESCRIPTION 3 s /icc �s 3 THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ Approved as submitted ❑ Resubmit copies for approval ❑ For your use ❑ Approved as noted ❑ Submit copies for distribution ❑ As requested ❑ Returned for corrections ❑ Return corrected prints ❑ For review and comment ❑ ❑ FOR BIDS DUE 19 ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS n-g 92101O -e /T•As�.� A0ce .�7 Z eA COPY TO SIGNED: s PRODUcr240-2 Jn e IM,Gmmn,Mm 0 14 71 If encl sures are n t as n ted, kindly notify us at once. CODESPOTI ARCHITECTURE WILLIAM R.JULIANELLE ENGINEERING Architect DESIGN GROUP INTERIOR DESIGN SANTO J.GIANGRAVE A Professional Corporation LAND USE CONSULTING Professional Engineer IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII JOSEPH R.CODESPOTI Land Use Consultant 21-23 COLONY STREET MILTON GREGORY GREW MERIDEN, CONNECTICUT Building Designer 06450 203-237-9860 Interior Designer May 23 , 1989 Planning & Zoning Commission = Town of South Windsor �' '� " ' 1989 1540 Sullivan Avenue South Windsor, CT 06074 - ,i11 A'mdsor Dear Commission Members : Planning & Zoning Commission RE: METHOD OF COMPUTATION FOR AREA OF IMPERVIOUSNESS Kingdom Hall of Jehovah' s Witnesses , South Windsor The method used to arrive at the "area of imperviousness" for this project was by Auto-Cad 10 version digitization. All areas measured appear on the screen and a final check is made by summation of the parts being equal to the whole. This method is more accurate than scaling and computing by hand. Therefore, we can say with confidence that the area of imperviousness is 50% of the total with reasonable accuracy. Very truly your , Santo G ngrav P.E. SJG/hac ARCHITECTURE 'CDESPOT' ENGINEERINGWILLIAM R.JIJUANELLt ArChrtt►C t DESIGN GROUP INTERIOR DESIGN SANTO J.GIANGRAVE A Professional Corporation LAND USE CONSULTING Professiom Enprnebr IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII�IIIIIIIIIIIIII�IIIIII�IIIIIIIII JOSEPH R.CODESPOTI Land Use Consultant 21-23 COLONY STREET MILTON GREGORY GREW MERIDEN, CONNECTICUT eufidmg Dwgner 06450 203-237-9860 Into=DwQnef TRAFFIC REPORT FOR THE SOUTH WINDSOR CONGREGATION OF JEHOVAH'S WITNESSI&� BY SANTO J. GIANGRAVE, P.E. MAY 23 1989 South Windsor The subject project is located on Burhnam St. immediat4P)Wning & Zoning Commissior west of Long Hill Rd. at the town line between South Windsor and East Hartford. The structure and parking lot are located in South Windsor while the driveway Pnters Burhnam St. which is located in East Hartford. The use of the proposed facility is for assembly as church use which will comprise two adjoining meeting rooms each having seating for 220 individuals . Each meeting room will have provisions for 70 parking spaces in the parking lot . The meetings are approximately two hours in length and' are conducted on evenings after 6 : 00 p.m. or on Sunday mornings and/or afternoons . Specific times cannot be stated at this time since the affected congregations would work this out after occupancy. However, be assured that meeting times will fall within the general parameters mentioned. It should also be noted that when both meeting rooms are in use, their meeting schedules will be offset by at least one half hour to provide for easiest entry and exit proceedures from the building and parking facilities . SIGHT DISTANCE: The intersection sight distance required to provide for a safe entry into or exit from the subject project for 30 mph posted speed is 350 L.F. or 8 second time interval . The view to the west of the proposed driveway is unlimited with the near- est intersecting street approximately 1000 feet away. The view to the east is approximately 260 L.F. which appears to be below the minimurn desired. However, the intersection at Long Hill Rd. is a four way stop and one must consider the vehicles starting 2 from a dead stop. Thus if cars accelerate at a rate of 10 ft/sec they would be traveling 44 ft/sec or 30 mph after 4 . 4 seconds and would have traveled 97 L.F. That would leave approximately 163 L.F. to travel at a constant speed of 44 ft/sec (30 mph) which would take 3 . 7 seconds so that the total time frame for sight distance would be equal to approximately 8. 1 seconds which approximates the 8. 0 safe time. It is therefore considered safe for sight distance to the west and to the east. -1- TRAFFIC REPORT: Cont' d In conclusion, the church use traffic will not conflict with commuter peaks since meetings are held after 6 : 00 p.m. or on Sundays . The maXimum traffic brought to bear on Burhnam Street due to the subject project is 70 vehicles per one half hour or 140 V.P.H. The lowest class town aid road per State Standard carries 500 ADT so there is no apparent traffic problem. The site distance meets the minimum intersection site require- ments for the 8 second guide mentioned in State Standards for intersections at grade. There is no apparent sight distance problem. -2- sf+<� r T aps ?d&U&1at �v 1540 SULLIVAN AVENUE - SOUTH WINDSOR, CONN. 06074 l�osoR•co� AREA CODE 203/644-2511 r REGISTERED MAIL June 2, 1989 Town Clerk Town of East Hartford 740 Main Street East Hartford, CT 06108 re: P. A. 87-307 _ Dear Sir/Madam: In accordance with the captioned 1987 legislation concerning notification to municipalities regarding Planning and Zoning Commission applications that could affect the abutting town, we hereby notify you of the application of the South Windsor Congregation of Jehovah's Witnesses for a Site Plan for property on the north side of Burnham Street, west of Long Hill Road, RR Zone. 1 A date has not been set for the public hearing of this application; however, the 65-day time frame for holding the hearing lapses July 27, 1989 . Interested persons are invited to keep apprised of this matter, to attend the public hearing, and to comment. If you have any questions, please feel free to contact the Planning Department at 644-2511. Thank you. Very truly Yours, /yx10Ut C(�, �L,1 Marcia Banach Director of Planning __ PLANNING DEPARTHM4T IN-HOUSE REFERRAL FORK TO: Karl Reichle, Mike Gantick, Mel Stead, Fred Shaw, Richard J. Sartor, Gary Tyler, Fire Marshall Lanning, Jim Snow, FROM: Marcia A. Banach, Director of Planning The Planning & E plans for the following Qaadd:�� PS Form 3800, June !985 U S G P.L7 153 FvO6 Zone F � �,f 3qj� i Subdivision ° ' v ! f j a ct co ! T , Er CO No. of Lots/units L , ► ' i i O + (� ru l`r '= m Un o , � ► 1 , �� � M p Location: j 6 ru Project Description: to Future Town-owned proper dk (a)new streets_ (b)new open spac f active (c)new detentior Planning Department corm Please let me know by comments on this applic2 department when I do a F PLANNING DEPARTMENT IN-HOUSE REFERRAL FORK TO: Karl Reichle, Mike Gantick, Mel Stead, Fred Shaw, Richard J. Sartor, Gary Tyler, Fire Marshall Lanning, Jim Snow, FROM: Marcia A. Banach, Director of Planning The Planning & Engineering Departments have received plans for the following project:# Zone�y r�� Acreage Subdivision Site Plan Residential No. of Lots/units Commercial Industrial Location: s Project Description: Future Town-owned property involved? Yes No �C (a)new streets (existing frontage also) (b)new open space/recreation area active passive (c)new detention area Planning Department comments Please let me know by �°�,y if you will have comments on his pplication so that I can follow up with your d partment I o a Planning D partm nt r port. CODESPOTI S�PLANNING JOSEPH R.CODESPOTI LANDSCAPE ARCHITECTURE Land Use Consultant & ASSOCIATES ENGINEERING JEFFREY N.GORDON LAND SURVEYING • Landscape Architect IIIIIIIIIIIIIIIIIIIIIIIIIIII)(IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Site Planner 3060 MAIN STREET ROBERT J.WHEWAY Professional Engineer STRATFORD, CONNECTICUT BARRY L.HAMMONS 06497 203-375-3661 Land Survrevor OTTO THEALL Environmental Scientist DRAINAGE STUDY SUMMARY SOUTH WINDSOR KINGDOM HALL BURNHAM ROAD SOUTH WINDSOR February 23, 1989 Revised June 16, 1989 Design Criteria: SCS method of analysis 100 year design storm predominant soils - (RaB) Rainbow silt loam (Pub) Poquonock sandy loam 24 hr. duration type III storm 6.9 inches Calculation Summary Condition Area CN Tc. Runoff Volume Peak Flow (ac. ) (min. ) (in. ) (cfs. ) Proposed 3.06 88 5 5.38 18 Existing 3.06 82 13 4.82 13 storage required 0.56 = 6220 ft.3 Due to concerns with the depth to bedrock, the proposed storm water management has been revised to reflect those concerns. Field testing has indicated that groundwater is not a problem and the depth to ledge (61 ) will be the determining factor for design purposes. The required storage volume will remain the same. The modified storage system will be shallower and consist of a 350' combination swale and leaching teepee to produce a "french drain" type installation. The total storage provided will be 8550 ft.3 while 6220 ft.3 are required. The discharge pipe and outlet protection from the storage system has been sized to provide for the 10 year proposed design discharge and takes into account a tributary drainage area of 4.2 acres. As a result, the implementation of the above mentioned storm water management system will provide for a zero increase in runoff as required. Sincerely, �2%,Z� 0� -NNF�``i,� Robert Wh ay P.E. Ego w * #15550 % p CENS�� A` J12A J AFA JQ •' 4- VvvA� Wvf, Ahl 40(Tel ♦ ' •.. AgA t, _P `r3� Q� WEB \` �NnA'YPaB :WVB 1 t..r� W En / r WVB • FnB u6 Y r A A' , WvB bA r 9,• �, 1 SZA A fA / ,�i.v r h1 a NnA .X t of P'�. WvA AtA Wd �' • ��' EhB :,'v N ` � r , /G� '/ rr 08 vB �� NrrA LI •. .Yl�R •yam BrB l * AtA i ` -Wvg Fsg� O tAllA ti T�ti( .• r _ E g�•. SL•A% r r WdA Qa6 ; t g 17 AgA r 4"� _\ " • , :��• Ks Y•v 6 Q , �JP M rA dVUA/ 2 '/ v' �� A , CSC SITE LOCATION EsB • e:. y EsA •MYB Ss Q m wuA KM'A" _ IVnA TP '' 3 NnA r r+; RaA ' ✓ A '�r i 4.�" WdA 1 r � c r�ty/' TsA ,•• �•'• ^➢o -�' /�.• •"� �I� - �� r ��',. :tiP• ,-i i i SZA are? uA ♦ ••• r :y ' h uA' Ss /'- r I WVB 5 • EoA MyB BrB ' ^^ NnA • Br8 �1� a R WLA ' n•s' ,t :� .� a Y (�Lo �, EoA C� • i '60uA .s5" ...*• '� ._•t. r .'{� ZA .A` wB- ' rf;1 �'„r.•.' •• L •A ' •.LWvA , i Ij L�r r .7. •' L ' E i fA .N> �; '1NcA ANn PU L - - �-••' ' r, :Pu B o ti • FW VA 1-1 s •r. r�'� WVB �OA rr •'. t: 't• �v��. •+pVvl4�, ••K}- ' f -Nrt . i yB WoA � rm;'l �i' 1 '� di4. •�• -'ter..y�dA-� wv '• ,�~ '� - T -NnA t NnA. En �i EbA EsA �'-- t ';` _ +• .r TSeAs ;".. is +...1 �ti• N.r wv8' �� Vic` •. OL / •M • - �., WdA v + pftD MXq W,66Wan3-' ♦r - _ �� R 1�y1/d,tj p choal ;', EoA I►S WVA. ,r.L. tWY�I •.,;� •• - �. Hf9 ', '•r :uV$ ;t_ ••�- +•• '� t � + — .. .ice •tr - • ,y .� V •-• r� • V' .L .� L ••1:• NnA WnA Vy. r.^ •,; -EoA t` t Q. d ::• t :r.N,CP•.�ad v ',� mAmy Ma � �_ 11�► WdA r.: ` • Jttir. �:+'�.i 3 �i- It'►y��,i.j�'+'• _ �..� BEN ••' . � rF Z -A.I s �;.I ' �..':. Ar►� `• •r .•:i• r A f ?{r _ '4 - WkB -Wk f� 1-1 t,r. ;.,�..t'.•�; 2=::•..•' �• ,u •`.;:`t •. � •,. $ 4. r tai MaLMA MyA . ' a_ Te _t;•'r,. ��,••. P - AfA Lau+ I dark EoA fp - � Ar•: Any - ., wkc JMyA t iOn, :.� _ Ma •MrA RoA !� PoP :' ~ T`;i• ,� ti'•�• ;.i . '?- i .. _ - kB .c . C ' S MAP 44 Yv 1 •.. 1 �'.t YA 1 r �' *, S �7 V NdA J A oe Am •r` rrus,og�' 1 i' 2 �' HARTFORD COUNTY , CT .P s. •... ICC Ma nA ,. t.+iaB sL .� Wu ' �r �iR N ur • r •�. ' / �� � WdA;: �9 - - n/� n In Esq' gC yycA Am P WdA ;, dA Sv,. FrSHEET 3G , ,_ - Te MyA Ns,A w A r1 .i �rSeA yr - • `Hfg A M ti a E � ►. " Ma _WuAi2c c`��PNnA WdA NnA 'F: WdA HtA 'WdA a 5zA ' BR8'• .'� We SsA- 0 5000 Feet Scale 1:20000 TR-55 CURVE NUMBER COMPUTATION VERSION 1.11 Project : KINGDOM HALL Us r: RP Dat : 02-22-89 County : HARTFORD State: CT Check d: Date: Subtitl : EXISTING CONDITIONS Subarea : I ------------------------------------------------------------------------------- Hydrologic Soil Group COVER DESCRIPTION A B C D Acres (CN) ------------------------------------------------------------------------------- OTHER AGRICULTURAL LANDS Woods - grass combination poor - - 3.06(82) - Total Ar a (by Hydrologic Soil Group) 3.06 ------------------------------------------------------------------------------- SUBAREA: I TOTAL DRAINAGE AREA: 3.06 Acres WEIGHTED CURVE NUMBER:82* * - G nerated for use by GRAPHIC method TR-55 Tc and Tt THRU SUBAREA COMPUTATION VERSION 1.11 06 Project : KINGDOM HALL User: RP Date: 02-22-89 County : HARTFORD State: CT Checked: Dat Subtitl : EXISTING CONDITIONS ------------------------------------------------------------------------------- Flow Type 2 year Length Slope Surface n Area Wp Velocity Time rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr) ------------------------------------------------------------------------------- Sheet 3.2 100 .07 H 0.217 Time of Concentration = 0.22* --- Sheet Flow Surface Codes --- A Smooth Surface F Grass, Dense --- Shallow Concentrated --- B Fallow (No Res.) G Grass, Burmuda --- Surface Codes --- C Cultivated < 20 % Res. H Woods, Light P Paved D Cultivated > 20 % Res. I Woods, Dense U Unpaved E Grass-Range, Short * - Generated for use by GRAPHIC method TR-55 GRAPHICAL DISCHARGE METHOD VERSION 1.11 Project : KINGDOM HALL Us r: RP Date: 02-22-89 County : HARTFORD Stat CT Ch cked: Dat Subtitle: EXISTING CONDITIONS Data: Drainage Area 3.06 * Acres Runoff Curve Number 82 * Tim of Concentration: 0.22 * Hours Rainfall Type III Pond and Swamp Area : NONE ss=asas=sasn==s=ass=massssss===sssssscsssasa=sc=asss===sss==========os==s Storm Number 1 2 3 4 5 6 7 ---------------------- ------ ------ ------ ------ ------ ------ ------ Fr qu ncy (yrs) 1 2 5 10 25 50 100 24-Hr Rainfall (in) 2.6 3.2 4.1 4.7 5.5 6.2 6.9 Ia/P Ratio 0.17 0.14 0.11 0.09 0.08 0.07 0.06 Used 0.17 0.14 0.11 0.10 0.10 0.10 0.10 Runoff (in) 1.07 1.54 2.29 2.81 3.53 4.17 4.82 Unit Peak Discharge 10.818 10.837 10.855 10.859 10.859 10.859 10.859 1 (cfs/acre/in) Pond and Swamp Factor 1.00 1 1.00 1 1.00 1 1.00 1 1.00 1 1.00 1 1.00 1 0.0% Ponds Used I I I I I I I I ---------------------- ------ ------ ------ ------ ------ ------ ------ Peak Discharge (cfs) 3 4 6 7 9 11 13 * - Value(s) provided from TR-55 system routines -TR-55 CURVE NUMBER COMPUTATION VERSION 1.11 Project : KINGDOM HALL User: RP Date: 02-23-89 County : HARTFORD State: CT Ch cked: Date: Subtitl : PROPOSED CONDITIONS Subarea : I ------------------------------------------------------------------------------- Hydrologic Soil Group COVER DESCRIPTION A B C D Acres (CN) ------------------------------------------------------------------------------- FULLY DEVELOPED URBAN AREAS (Veg Estab.) Open space (Lawns,parks etc.) Good condition; grass cover > 75% - - .79(74) - Impervious Areas Paved parking lots, roofs, driveways - - 1.67(98) OTHER AGRICULTURAL LANDS Woods - grass combination good - - .6(72) Total Area (by Hydrologic Soil Group) 3.06 ------------------------------------------------------------------------------- SUBAREA: I TOTAL DRAINAGE AREA: 3.06 Acres WEIGHTED CURVE NUMBER:87* ------------------------------------------------------------------------------- * - Generat d for use by GRAPHIC method TR-55 To and Tt THRU SUBAREA COMPUTATION VERSION 1.11 Project : KINGDOM HALL User: RP Date: 02-23-89 County : HARTFORD State: CT Checked: � Date: Subtitle: PROPOSED CONDITIONS ------------------------------------------------------------------------------- Flow Type 2 year Length Slope Surface n Area Wp Velocity Time rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) _(hr) ------------------------------------------------------------------------------- Sheet 3.2 30 .04 F 0.069 Shallow Concent'd 180 .03 P 0.014 Time of Concentration = 0.08* --- Sheet Flow Surface Codes --- A Smooth Surface F Grass, Dense --- Shallow Concentrated --- B Fallow (No Res. ) G Grass, Burmuda --- Surface Codes --- C Cultivated < 20 %, Res. H Woods, Light P Paved D Cultivated > 20 $ Res. I Woods, Dense U Unpaved E Grass-Range, Short * - Gen rated for use by GRAPHIC method TR-55 GRAPHICAL DISCHARGE METHOD VERSION 1.11 Proj ct : KINGDOM HALL User: RP Date: 02-23-89 County : HARTFORD State: CT Checked: 4LI Date: Subtitle: PROPOSED CONDITIONS Data: Drainage Area : 3.06 * Acres Runoff Curve Number 87 * Tim of Concentration: 0.08 * Hours Rainfall Type Pond and Swamp Area NONE ----------------------------------------------- Storm Number 1 2 3 4 5 6 7 ---------------------- ------ ------ ------ ------ ------ ------ ------ Frequency (yr8) l 2 5 10 25 50 100 24-Hr Rainfall (in) 2.6 3.2 4.1 4.7 5.5 6.2 6.9 Ia/P Ratio 0.11 0.09 0.07 0.06 0.05 0.05 0.04 Used 0.11 0.10 0.10 0.10 0.10 0.10 0.10 Runoff (in) 1.40 1.91 2.73 3.29 4.04 4.71 5.38 Unit Peak Discharge 11.065 11.072 11.072 11.072 11.072 11.072 11.072 1 (cfs/acre/in) I I I Pond and Swamp Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.0% Ponds Used I I ---------------------- ------ ------ ------ ------ ------ ------ ------ Peak Discharge (cfs) 5 6 9 11 13 15 18 * - Valu (s) provided from TR-55 system routines SI ID 96 I �I •c � ` IT sc I J o o j ' /-'� 1 Iui •� J 1 „ � i �� { { +ti � I� I Ir ' cm 1 fD 06 OL tot ! to I •N - � O • - \\ �� C ` _—` 77 WA 1 1 i toc i ac _ uc ict •` 1 •'� is• _ r C 1� � � t 1 I �'ULJ 1 It sit 1 ,« got Runoff Coef .( C ) = . 45 all •tc — — O 5 . 5in • TC 10min . 1 0 R A I N A 0 E AREA 4 . 2a 10 . 4cfs . - � so JOB J554 Sov L �i►,dso.. /cJ��dc�►► ^ AJl CODESPOTI & ASSOCIATES 3060 Main St. SHEET NO. OF STRATFORD, CT 06497 CALCULATED BY W DATE— Ph ne 375-3662 CHECKED BY DATE SCALE ............. ;.... ...... ..... . ......... .........:................. p F..t`....r`^........:.SLS` ►�'CV�4��e�.S `,t. 1� �1Y�-�'0� S�rrC� u ... . . ;. r 9 , ,. ... ... ; .. ... 1 ..... j ....; ...: ....... .... ..1...........1............J.................... �.cjR.<.}11n ....... ......:.......:.......... ..... ........: .... .. ... e , a .........:.......... _......4...........,......................;......... .............Is w1e......':. .. ...... _ ...... ..... ..... ...... a_ , 1 : . ...... .. p. .. .. �:,1 Skit; �o eS . .................. .......: . : .... . . .. ..................... :... ... :..... ... .......r. r. p r « .. ..... :...... r i .......E. ......;......;. ... ;..... ... .... 1 ............ .......:. ....1 .. « .. ... f , .. .: .... ........... 1 ... 0....... i ...;...... ........... 1. ..« ..... ...... ........... ..... .............. ............:.......: ......:. .1 ...�,;4.x 1). '+..L4._x.1) . `. ....16 {r ti ..... bG. .... .eleuc l ate'..._. :..loo ...........�..__.............. �� Iv o� oo, :........�....... .:............ .H; ... .. , ............. t.C3�.3..x;.1.,..��..';...1 ;........:...... ,............b� ........r........4,. . 1...�,,;............ 1. ...1..�5.............:..........................i...................._ f .......... ........: .. : ..A -Ave w 1 g..... _i. ..... . :. .. « ..... ....... _......_... ..__.. _.... _...... ....... :.. .............:........ .:....... _.... ........ ................_..:.... ............. .. _. . .. __... _.... ........ ...... ..... Vol'jw-�. �4..;.X g' oo }3... . ............... ..................... .. f ...... ........................... ....... ...... ... ....... ...... ...... a.....................:...... .... ........ ..........'... Q i ;. n .... .... ;.. ....�.. . . ; _. 1 � �j r-oAa. 1 1 a w I*4G o�+�.v Ghd p .... .....I. ... ...p.. ..., p . . {a:;, • t�A) ...........z....._.G. ..... . .. G 4� '- a = «N ............................................................. .......1.... ,....... .... .. .. ... .. . ... .. ...♦.......................................... :....... ............. . .• .....,..........;............_.................................... eA ►oZ 9 i nrooUcr 2041 nr a Mc.WIM wa 01411 JOB— I S S 4 W lhd s or CODESPOTI '& ASSOCIATES 3060 Main St. SHEET NO. OF STRATFORD, CT 06497 CALCULATED BY is w DATE 6//-7/65 Ph ne 375-3661 CHECKED BY DATE SCALE ' � G��12.�-�.1, 111 �1� �r4�.Q� �?'► . ..�Q G►1.11� � Vh►�S .. ... ..:���5.. .. .; �.I: ... .... .................:.... <.t y •rr .T 3 :... J . .6 s 4•tz• : . ....._ . . . ., .... . . ....... ................ ............... ......... .J. ..... '. ........: ........: .... y ! o�-C. C�C .C� ".Q'^fc .•, y- < jet o.°,..'� �S.Z-� ...... 642.0 �� 7 �,o �`� .:.. ..: ......., ., ... ...,. ... ..... , .....1 .......J.........i.l ........ .... .. .... .J ..J .. y. .. , , ... ............... ...... . .. ... , .... .... ..... ....... ...... ..... ... �? p .. ..,. .. a... ►�1 o ;19 � tiSr 1 i(rG '� a�1 4 C4�c--' �.��� 'To' �roG ,, O' 6 . V ti?� O vC.�� 01 L��+S L. ..... ......y... . . T . . _ `� ., 5. . ,. . .. S 1 � 0 T .•. `JG>v�S....... CPe. .. ,c.5; .. �p.a ....._ �s�.�� P ,�+,� . L1.s4 , - :. �. �h..... .tir ; ..... ;11 � �dl.�.y.. .. .. ..._..... : I� �91aS-52)!b 6 92.? rt rl ` ! • ,(/ti o S L -T A plyL ��v3° {......... .......... �blti.►.c.►•�{ �� t l�`-�, C`.G► � v4�� :To."; c..c14 ;C�Pr c.1�., . ?.w�rI1 not �,1440 II-- 1RA 1 ' s�� �e►q , .. . 40.E-O�•y�- . a4�4��4:b ... .....ice..; .. `*-..:..... w�,le. .... .. .i�.�e-I ., . .... .... rout mi W—Cramp,Nm Olgl. JOB 1554 do Iwo/I CODESPOTI & ASSOCIATES 3060 Main St. SHEET NO. OF STRATFORD, CT 06497 CALCULATED BY DATE Ph no 375-3661 CHECKED BY DATE SCALE l e p fi.-iD erc.t Q., cis i v���a . . .; .. �, .J ... .. .. : . C.R. .. ... ..... .....:. ...... ..... . ..... Q =ip . .. -�G111r.r�,TLv � t�M�Cv11k. D�. .��� .. Q,«1Q,tI�►Tlr�. .... ..•. .... J .. \)t\Q t ��y 1rQL @ h �. "14 Gi�' 1,t• o T�`� S�Y�1�Ov n 1>h p ! fl ..........o. .. :.�� I;� �I► ) -� 43Li,o� :tom = �d o ;�►. a� _.. .. . ... a ....:.. ...:.... .... ��� �). J 4 .................... ....... ..... ♦........a .. .. ., .. .. . .. ...+ .. _. ........ ...o. ... .. ...... .. . .............. ... ...._ ...._ ..................... ! ! j 1 ... . .... . .. ......... ....1. .. ...,. J q .. , , ., .. a..... ..... .. ... , .... ♦-..... .... ....... ............ ........... ..... .e 4 ....., , .... v J .. .... .. _. .... ..... p ... .. , ...... r....... .__............. .......a........_♦.....__. ._... ....... W 3 � -} . Ly a..3.0 ,11I: \ ... .......... ... ...... ..... ....... , ! a.... a . .......:. ... .. i d ti,e_d,•,�. .S� �d ! ! i d Q p1 :......... ........ ..... . .. ► .. . .......r................ ...._.. .. ...... d ; , ... .._ q .J. .. , .. .• _ J 4 ..4 ................... .. ......... ............ a J ...... ..... ... ..... ................J.. .. NMI 7041®lc,Gown.film 01471 I b TP � G E Y A C ree ST ALt.t:A-, CS TeST PIT "C3 p IT BLDG. t 404 (� e f . ` i �'A4 YC� �I TP#1 PIT ® i �! T P 1 Z 1�t , F R 1 i T(°*to T 9OUTH tW I ND�>i)R K IN4DOP-t HALLI J.E.*H OV-'A H IT 41.0 ��� S. dal art�,Cpwcy � TE S T P 1 T TEST p rr- 1111 109 l 7"AJV M/F SAND LAY GRAY C'[A-11 W/L I rrL d F, - IT 4 F. wl i rrL,:5' +w/L iTrL E" STot,' ............... T`E S T 7" T-��- T TA N .�..�. 4 • - MOIST 7" Pq MOIST SAND HALL. of TE H4u AH t= W ITNtao`. is a -� r L Til Oj IA L/ff-,4,ov � _ -- - -. _� V ;!:00 ro I PSO TIA 'T A Im7 .2 1 9 cog 4 1.9 'NET re P/71 7 .or 17 ST ltv� -45k i 11 � C IS Its-yax{� ALA - wp �271 � nog• �rc I T n,ca�� OVA; I�c Z. F5 room FE 41 064 771 Rl Ll Lk Toti`!N OF So V Y-1q w I N D S o tZ SOIL TEST Ht?uRT i T�ocatian 13 U R 1�I H-A ^1 s 1 Applidation g 9" 2 P (FOR os(0L-LrIvE Name of omer, KA Y m .v /?f,�} c is _ Naae of Professional oiLrineer SAP-jro,.6tAN 24eh co�or�y sr Late of Tes /z_�Z�_T3me �S' Address of EaLineerine Firm oy d e ot•� ,C 7. o �c ;.'eather & 5oil: Yet ) Dry ) Aver 6e kK) Limiting Factor: A. Depth to 13edrock B• Depth to Ground l;. Final Depth_3 o 50T+ Soil Strata: Description: 1. Tof So ic. 2. SAN c 3. Ti o• 4.____!,___, 5. „ vepth: 1. ? " 2• 3• /2!' 40__- 7. S TA 2+ 1 o 25"1R 97'A 3+ 75* 2 S• 2 Readings: West bole 'hest Hole Depth ■,r..rr..■._ Time r , ■N epth to water min/Inch yenth Time "y" Min Inc ■.rrrr.■rr-■■rr�.■���r.� .�..�. rrr■.■r.r.r w+r _r ■. I ;Z.z /0.07 q.� " 1.7 1.3 10 :29 ?. Za 6,7 r� 2' 4 10, z z �,BN M I t 7 /0:3 7 `I•S !,'7 2. 2 ' Re F1I-•L tfOLt Z.�- l j .o7 1.(0" 1, 10: 3G ■ ' ,V I -1 4 `1 Z II 2,S' 2, Z, /0 1 f ��2 f, lI I --- 3.o j 1 ; 1 o a Minimum state of Seepaze Jr' min/inch Minima n state of 5eepaC,-_, _Min/ Inc Late 'Time 9: 2 o Saturation of hole V/0' Is annotated plot plan included 9 Name of Person performing test /-0 v.C. Name and stamp of Profe3seional Engineer v ertitying Results_ -Fp- I,TS j T E S T W IE --t_ rl. T i T . IE _Sill i _ 1 . �En7 . P!T alp r�7 I�I�� 7 y.N r r� � «,lei I 1 y gy��� IJ MAL 71 L f_ �. T4 ksa L 1- If � q SAND� fXf low 6 6 C96RLe �, �I A WIN ��owN st+4� U T-au� �S V&1� c � � s v 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 gOR CO. � AREA CODE 203 644-2511 . t� June 26, 1989 Mr. Santo Giangrave Codespoti Design Group 21-23 Colony Street Meriden, CT 06450 re: Appl. #89-47P, South Windsor Congregation of Jehovah's Witnesses - Site Plan Burnham Street Gentlemen: Please be advised that the public hearing in the above matter has been scheduled for Tuesday, July -IT, 1989 at 8:00 P.M. in the Council Chambers of the South Windsor Town Hall, 1540 Sullivan Avenue. A sign advertising the hearing must be posted for 10 consecutive days prior to the hearing, and must be clearly visible from the road. Please have it posted by Friday, June 30, 1989 . One sign should be placed on the northerly side of Burnham Street. Signs can be purchased in the Town Hall for $5 . 00 each. Very truly yours, PLANNING AND ZONING COMMISSION T Ra nd F. llowell, Jr. Chairman cc: PZC File Applicant ngineer M. Banach, Dir. of Planning pow N sE4 t.4 � CO) 0 710v�- s � wc� 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 �'►�SOR CO AREA CODE 203/644-2511 TO BE PUBLISHED IN THE JOURNAL INQUIRER THURSDAY, JUNE 29 , 1989 THURSDAY, JULY 6 , 1989 LEGAL NOTICE TOWN OF SOUTH WINDSOR PLANNING AND ZONING COMMISSION Notice is hereby given that there will be a public hearing of the Planning and Zoning Comt2zlon on Tuesday, July 11, 1989 at 8:00 P.M. in the Council .0 ers of , th South Windsor Town Hall to consider the followin 1 . r�, Appl. #89-47P, 40uth Windsor Congregation of Jehovah' s Witnesses for,.-Special Exception under Sect. 4 . 1 . 8 b. of the Zoning--Regulations, property on north side of Burnham Stree esterly of Long Hill Road, RR Zone. 2 . Appl. #89-48P, Culbro Land Resources, Inc. , for a 16-lot subdivision of approximately 105 . 7 acres of property at 199 Rye Street, I Zone. Copies of the applications and/or maps more clearly defining the properties are on file in the office of the Town Clerk and/or the Planning Department of the Town of South Windsor. At this hearing, interested persons may appear and be heard, and written recommendations will be received. PLANNING AND ZONING COMMISSION Raymond F. Hallowell, Jr. , Chairman Marshall Montana, Secretary IA,6 DWYER AND SHERIDAN ATTORNEYS AT LAW 100 SYCAMORE STREET POST OFFICE BOX 537 J.PATRICK DWYER GLASTONBURY, CONNECTICUT 06033-0537 TELEPHONE THOMAS P. SHERIDAN (203) 659-2625 TIMOTHY FITZGERALD KATHLEEN PURTILL PFEFFER June 30, 1989 Town of South Windsor Town Planner's Office 1540 Sullivan Avenue South Windsor, CT 06074 Re: Application #1940-89 Raymond L. Mack Gentlemen: I represented Carmine Napolitano, Jr. before the Planning and Zoning Commission at the public hearing on June 6, 1989 in reference to a proposed amendment to the planning and zoning regulations to allow 50% impervious coverage for permitted non-residential uses in residen- tial zones. It is my understanding that a decision on that hearing has not yet been made. I am enclosing self-addressed, stamped envelopes for you to mail me out copies of your agenda for the next couple of months. Thank you very much for your anticipated cooperation. Very truly yours, Th s P. Sheridan TPS/lu enc. wN aF,`� y r 71aWn 01 �• o � C V 1540 SULLIVAN AVENUE - SOUTH WINDSOR. CONN. 06074 ��osoR•co'� AREA CODE 203/644-2511 June 30, 1989 Mr. Santo Giangrave Codespoti Design Group 21-23 Colony Street Meriden, CT 06450 re: Appl . #89-47P, South Windsor Congregation of Jehovah's Witnesses - Site Plan Burnham Street Gentlemen: Please be advised that the public hearing in the above matter has been scheduled for Tuesday, July 18, 1989 at 8:00 P.M. in the Council Chambers of the South Windsor Town Hall, 1540 Sullivan Avenue. A sign advertising the hearing must be posted for 10 consecutive days prior to the hearing, and must be clearly visible from the road. Please have it posted by Friday, July 7, 1989 . One sign should be placed on the northerly side of Burnham Street. Signs can be purchased in the Town Hall for $5 . 00 each. Very truly yours, PLANNING AND ZONING COMMISSION Raymond F. Hallowell, Jr. Chairman . cc: PZC File Applicant Engineer rjNi. Banach, Dir. of Planning A wM at, C t- T-a ap Saum �• 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 R.coN� AREA CODE 203/644-2511 TO BE PUBLISHED IN THE JOURNAL INQUIRER THURSDAY, JULY 61 1989 THURSDAY, JULY 13, 1989 LEGAL NOTICE TOWN OF SOUTH WINDSOR PLANNING AND ZONING COMMISSION Notice is hereby given that there will be a public hearing of the Planning and Zoning Commission on Tuesday, July 18, 1989 at 8:00 P.M. in the Council Chambers of the South Windsor Town Hall to consider the following: 1 . Appl. #89-42P, Andre L. Charbonneau, for a Zone Change to Industrial for approximately 40,250 sq. feet of property on the easterly side of Long Hill Road south of Chapel Road, RR Zone. 2 . Appl. #89-43P, Burnham Business Park Associates, for a Zoning Regulations Amendment to add a new Section 4 . 11 to create an Office Park (OP) Zone. 3 . \Appl . #k -47P,`, South Windsor Congregation of Jchovah's Witne ses for a Special Exception under Section 4 . 1 . 8 b. of t e Zoning Regulations for property on the north side of Burnham Street westerly of Long Hill Road, RR Zone. 4 . Appl. #89-48P, Culbro Land Resources, Inc. , for a 16-lot subdivision of approximately 105.7 acres of property at 199 Rye Street, I Zone. Copies of the application and/or maps more clearly defining the properties are on file in the office of the Town Clerk and/or the Planning Department of the Town of South Windsor. At this hearing, interested persons may appear and be heard, and written recommendations will be received. PLANNING AND ZONING COMMISSION Raymond F. Hallowell, Jr. , Chairman Marshall Montana, Secretary CODESPOTI DESIGN GROUP, PC [LETTEEM OF URQ SETTYU Architecture/Engineering 21-23 Colony St. - Lower Level MERIDEN, CONNECTICUT 06450 NO QQ DATE — _ JOB S 4 (203) 237-9860 ATTENTION In,, 9A w',^GN _ RE �Y, TO /bwN d O ✓T—W wiAv17S .K PL i4+VA0 N f. fr Illy/�V 61► rYj.rJ• �, No Av.. Sa . 4V4w ASO,rzi outh. Windsor WE ARE SENDING YOU ❑ Attached ❑ Under separate cover via 8�Al�$et 6 ❑ Shop drawings ❑ Prints ❑ Plans ❑ Samples ❑ Specifications ❑ Copy of letter ❑ Change order ❑ COPIES DATE NO. DESCRIPTION TE P4 AA15 W I rH /1"10 CA -1 oN S THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ Approved as submitted ❑ Resubmit copies for approval ❑ For your use ❑ Approved as noted ❑ Submit copies for distribution ❑ As requested ❑ Returned for corrections ❑ Return corrected prints ❑ For review and comment ❑ ❑ FOR BIDS DUE 19 ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS A�'4"C c 1 .4 wArw7 40-A wAF AJ C'a,OC #2,46�-7_E;P 10 Uot o�viytc 2� /7 a 9 �'o 7-.41;op C /�G t/C iH c`s,4.-dt/U scat ®vim or, �X �C°"ST�'r•Vf , �L �/� S� -�C��L 0=�C L' _T'o C/� �—�- • COPY TO N SIGNED: PRODUCT240-2 Ja Inc,ciomo,Mm 01471 If encl sures are n t as noted. kindly n tify us at nce. C � 1540 SULLIVAN AVENUE SOUTH WINDSOR. CONN. 06074 rtiosoR•co a� AREA CODE 203/644-2511 r' July 19, 1989 Mr. Santo Giangrave Codespoti Design Group 21-23 Colony street, Lower Level Meriden, CT 06450 Re: Application #89-47, Special Exception and Site Plan of Development, South Windsor Congregation of Jehovah's witnesses Dear Mr. Giangrave: Attached is a copy of comments from the Planning and Engineering Departments regarding the above-referenced application. Please make the necessary revisions to the plans and submit 6 complete sets (including architectural elevations, landscaping plans, etc. ) to the Planning Department. If you have any questions regarding the comments or the procedure, please contact me. Very truly yours, �MAAt-tLc. 6 Marcia A. Banach Director of Planning cc: Jerry Iazzetta, Town Engineer KINGDOM HALL OF JEHOVAH'S WITNESSES - PLANNING DEPT. REVIEW COMMENTS Key Map _ - Must be completed in-accordance with Section 4 .13. 2.1 of r zoning regulations Plot Plan - Needs A-2 certification - Is dumpster pad accessible given the direction of one-way accessway? Topographic Plan - Needs A-2 certification Planting Plan - Need to show profiles of buffer areas per Section 5.4 .c S NOTE; ENGINEERING DEPT. REVIEW WILL BE MADE UPON RECEIPT OF PLANS SHOWING REVISED DRAINAGE f_- c M y 01 `�• O C V 1540 SULLIVAN AVENUE - SOUTH WINDSOR. CONN. 06074 f�oSOI.Co�� AREA CODE 203/644-2511 JJ Jurre 17, 1989 M E M O R A N D U M TO: Marcia A. Banach, Director of Plan a-.ng FROM: Jerry C. Iazzetta, Town Engineer RE: Jehova,, Witness Site Plan We have reviewed the plans dated July 6, 1989 for the proposed Jehova Witness Site Plan and have the following comments: General r I ' 1 . ft1lt 't` 1e Town of "Remcrtford? They had several concerns when reviewing the initial plans. 2. Applicant proposes an "Infiltration plastic galley" system and has not supplied sufficient information to show how it works . We require additional information as to how water enters into the galley, additional manufacturers cut sheets, infiltration rate of material above galleys, etc. Site Grading and Utility Plan 1 . Slope and length of new 6" sanitary lateral is required. Inverts are also needed. 2 . Spot elevations for bottom swale are needed along length of the swale. 3 . Rip rap is required at outlet from south catch basin and for outlet of paved leakoff .. 4 . Paved leakoff shows a proposed elevation of 102 . 5 both in middle and at outlet in swale. This doesn't seem to be appropriate. 5 . Swale Interceptor Detail shows riprap directly on top of plastic galley. Without sufficient information on this galley, we cannot determine if this is proper. 6 . Maximum slope on swale should be 4 to 1 not 2 to 1 as shown. Marcia A. Banach Page 2 . July 17, 1989 Detail Sheet 1 . Cross section of Private Street/Driveway and concrete walk detail show different pavement configurations . Which is correct? 2 . Concrete walk detail shows 6" of rolled gravel base, the Town Standard is a minimum of 811 . The Engineering Department cannot make a final determination as to whether the storm drainage system designed will be satisfactory until we have received the additional information requested on the drainage system pr Tha Ha rtuni o comment s . JCl/jsv cc: Michael J. Gantick, Director of Public Works y r Tlaa� V/ So� ?d&uaot O C V . ��� 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 I.0 AREA CODE 203/644-2511 TO BE PUBLISHED IN THE JOURNAL INQUIRER SATURDAY, JULY 21, 1990 LEGAL NOTICE TOWN OF SOUTH WINDSOR PLANNING AND ZONING COMMISSION At its July 17, 1990 meeting, the Planning and Zoning Commission voted to take the following action: 1. Approve, with modifications, as a settlement of pending litigation of Jehovah's Witnesses vs. the Planning and Zoning Commission, Application #89-47P, for a Special Exception to Article 4 .1. 8.b of the zoning regulations and site plan of development for property located on the north side of Burnham Street. 2. Approve, with modifications, Application #90-41P, Town Shopping -Center Entrance Site Plan, south side of Ellington Road, west side of Buckland Road, RC zone. 3. Deny, without prejudice, Application #90-07P, Bray Site Plan, Special Exception 4 .7 .2.8, 489 Sullivan Avenue, I zone. 4. Approve, with modifications, Application #90-47P, Town of South Windsor Community Center Site Plan, east side of Nevers Road, RR zone.' PLANNING AND ZONING COMMISSION Louise C. Evans, Chairman Bernard Hart, Secretary CODESPOTI ARCHITECTURE WILLIAM R.JULIANELLE ENGINEERING Architect DESIGN GROUP INTERIOR DESIGN SANTO J.GIANGRAVE A Professional Corporation LAND USE CONSULTING Professional Engineer IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII JOSEPH R.CODESPOT Land Use Consultant 21-23 COLONY STREET MILTON GREGORY GREW MERIDEN, CONNECTICUT Building Designer 06450 203-237-9860 Interior Designer August 18, 1989 Marsha Banach Director of Planning Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 Dear Ms . Banach: As discussed at our meeting with you on August 9, 1989, we are transmitting some overlays to you for study purposes . Each shows some reductions in scope of pro- ject from different vantage points . The advantages and desirables of each is discussed on the "Study Explanation Sheet" . If you have any questions regarding this information, please feel free to contact me at 237-9860 . Very truly yours , Santo Gia grave P.E. SJG/bjm Enclosures CO D ES POT I ARCHITECTURE WILLIAM R.JULIANELLE ENGINEERING Arcnrtect DESIGN GROUP INTERIOR DESIGN SANTO J..GIANGRAVE A Professional Corporation LAND USE CONSULTING Prof algnal Engineer IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII JOSEPH R.CODESPOTI LorxJ Use Consultant 21-23 COLONY STREET MILTON GREGORY GREW MERIDEN, CONNECTICUT 19uii ing Designer Interior Deupner 06450 203-237-9860 August 18, 1989 Michael J. Dayton Town Planner Town of East Hartford 740 Main STreet East Hartford, CT 06108 Dear Mr. Dayton: RE: KINGDOM HALL OF JEHOVAH' S WITNESSES Burhnam Street, East Hartford Enclosed herewith is a set of site plans reflect- ing modifications to drainage as presented to the Zoning Commission of South Windsor on July 18, 1989. In accordance with request made by the Town Eng- ineers of South Windsor, please review the modified plans as they relate to interests of the Town of East Hartford. Please send us a copy of your comments when com- plete. We anticipate a meeting with the Zoning Com- mission sometime in September. Thank you for your consideration of this matter. Very truly you Santo J. an rave .E. SJG/bjm cc: Barry Hammons Files CODESPOTI ARCHITECTURE WILLIAM R,JULIANELLE ENGINEERING Architect DESIGN GROUP INTERIOR DESIGN SANTO J.GIANGRAVE A Professional Corporation LAND USE CONSULTING Professional Engineer IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII JOSEPH R.CODESPOTI Land Use Consultant 21-23 COLONY STREET MILTON GREGORY GREW MERIDEN, CONNECTICUT Building Designer 06450 203-237-9860 Interior Designer September 8, 1989 Ri- CEIVED Ms . Marcia A. Banach SEP 9 1QAQ Director of Planning Town of South Windsor SO. WINDSOR hLNNNING DEPT. 1540 Sullivan Avenue South Windsor, CT 06040 Dear Ms . Banach: RE: Application #89-47 Special Exception/Site Plan South Windsor Congregation of Jehovah' s Witnesses Project #88016 We have modified our plans to include comments made at our public hearing of July 18, 1989, according to your instructions as follows : General 1 . We have forwarded a copy of plans to the Town of East Hartford on August 18, 1989. (Copy of transmittal enclosed. ) 2. The information requested was provided. We are enclosing another copy for your records . Site Grading and Utility Plan 1 . Slope and inverts of sanitary lateral are shown. 2. Spot elevations of swale are shown. 3. Riprap is provided at outlets . 4 . Paved leak off elevation has been corrected. 5. A sand cushion has been provided between stone and galley. The galley is capable of support- ing an 8000 pound wheel load which exceeds any overburden load proposed. -1- 6. The concern of engineering for side slope is maintenance of grass . We have compensated for this by making our swale slopes of stone. Detail Sheet 1 . Pavement has been corrected. 2. We have modified our design to conform to town standard 8" R.G.B. The Planning Department review comments were in- corporated prior to the public hearing. If you have any questions regarding this matter, please feel free to contact me. Very truly yours , ---22 Santo J Giangrave .E. SJG/bjm Enclosures cc: Barry Hammons Files -2- L ARCHITECTUREIv, i �}`� + WILLIAM R.JULIANELLE CODESPOTI ENGINEERING Architect DESIGN GROUP INTERIOR DESIGN 8 lgag SANTO J.GIANGRAVE A Professional Corporation LAND USE CONSULTING SIEp Professional Engineer IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII JOSEPH R.CODESPOTI h Windsor Land Use Consultant 21-23 COLONY STREET SOlrt Zoning commission MILTON GREGORY GREW MERIDEN, CONNECTICUT planning & Building Designer 06450 203-237-9860 Interior Designer September 14 , 1989 Roz Toper South Windsor Town Hall Planning & Zoning Commission 1540 Sullivan Avenue South Windsor, CT 06074 RE: South Windsor Kingdom Hall of Jehovah' s Witnesses c/o Raymond Mack Project No. 88016 Dear Ms . Toper: On behalf of our client, South Windsor build- ing committee, c/o Raymond Mack, we respect- fully request a 65 day extension for our application before the Planning and Zoning Commission. We appreciate your consideration in this matter. Very truly yours , Santo J. Giangrave, P.E. SJG/bjm cc: Raymond Mack Barry Hammons Files ROBERT F.KeNN-'I1' TOWN OF BASTHARTFORD 740 MAIN STREET MAYOR (203)289-2781 East C;,Va%tfozcf, Connecticut o61oS October 11 , 1989 34• •ACT � :�• - 1 Mr. Jerry Iazzetta Town Engineer ' 1540 Sullivan Avenue ' ' South Windsor, Connecticut 06074 Re: South Windsor Kingdom Hall 6 Burnham Street Dear Mr. Iazzetta: We have reviewed the site plan submitted for the above mentioned project dated February 22, 1989. We have the following concerns in regard to the site plans : 1 . Reduce the width of curb cut on Burnham Street to 40 feet. q 2. Revise grading of driveway. The high point should be shifted towards Burnham Street to reduce storm water site run off. 3 . Provide erosion controls along the street line. 4 . Provide soil data. 5 . Provide revised drainage calculations which should include the impacts of development on the culvert beneath Burnham Street. 6 . An excavation and curb cut permit issued by the Town of East Hartford will be necessary prior to the start of _construction. 7 . The light at the entrance should have a diffuser installed to direct light down instead of across the street. Some of the comments in this letter are the same comments identified in our previous letter. , �• �'W M 4 DATE C_od::spo•t► ,De�i��� �rouP. Mr. Jerry Iazzetta - 2 - October 11 , 1989 Should you have any questions please contact this office at your convenience. Sincerely, Nicholas Casparino Engineering Technician ' NC/ee cc: Michael Dayton T i� 1, , J L t .L- • r r ARCHITECTURE CODESPOTI ENGINEERING Architect R.JULIANELLE Architect DESIGN GROUP INTERIOR DESIGN SANTO J.GIANGRAVE I n c o r p o r a t e d LAND USE CONSULTING Professional Engineer IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII JOSEPH R.CODESPOTI Land Use Consultant 21-23 COLONY STREET MILTON GREGORY GREW MERIDEN, CONNECTICUT Architect 06450 203-237-9860 O C J I ROBERT W.PAUL 2 3 19�9 Professional Engineer REGORY D.GIANGRAVE Architect October 20, �989 Mr. Nicholas CasP arino Town of East Hartford 740 Main Street East Hartford, CT 06108 Dear Mr. Casparino: RE: Town Commentary This letter is in response to your commentary to Mr. Jerry Iazzetta dated October 11 , 1989 and our phone conversation of October 19 , 1989 concerning the subject project. We thank you for your input and respond to your comments as follows : Item 1 : We have been asked to put 25 ' radii on our driveway by the Town of South Windsor which widens the curb cut to 70 ' . We will comply with your request if agreeable to both towns . Item 2 : We will shift the high point of the driveway closer to Burnham Street by means of showing a spot elevation and proper drainage arrow. Item 3 : We will add erosion control along Burnham Street. Item 4 : Attached herewith is the soils information you requested. Item 5 : Attached herewith are the drainage calculations you re- quested. Please note that the system is designed with a zero added runoff feature excluding any seepage provision (our soils data indicates there is substantial natural seepage caspability which is ignored for conservative design) . Item 6 : A curb cut permit will be sought prior to start of con- struction. Item 7 : The light at the entrance is specified with diffuser. We will add a note concerning installation directionality. Mr. Nicholas Casparino/2 October 20 , 1989 If you have any further comments or questions , please feel free to contact me at 237-9860. Very truly yours , Z Santo G angr SJG: lg cc: Jerry Iazzetta John McCahill Barry Hammons Sam Farmer Jehovah 's Witnesses , SOUTH WINDS OR CONGREGATION ,'" a, 647 TOLLAND TURNPIKE MANCHESTER, CT 0 _ Phone: (203) 646-1490 0 C T r 1989 Raymond L. Mack, Jr. SoL11th ;l sclsor 59 Lovell Avenue ,Manning & Zonling Coainiissjory Windsor, CT 06095 October 23, 1989 Mr. Raymond F. Hallowell Planning 6 Zoning Commission Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 RE: PROPOSED CHANGE TO ZONING REGULATIONS FOR IMPERVIOUSNESS SOUTH WINDSOR KINGDOM HALL OF JEHOVAH'S WITNESSES Dear Mr. Hallowell : A public hearing was held on June 6, 1989 concerning a change to the zoning regulations raising the allowable -impervious areas for developments which require off street parking in residential areas as in the case of special exception church use, and other public service facilities. The proposed change is to increase the imperviousness from 15% to 50 The subject change has a direct influence on our proposed church project for the Jehovah's Witnesses Kingdom Hall. The time required to decide on the zoning regulation change has created a serious hardship on our project since our "Site Plan" approval is needed which is contingent cn this decision. We have been working toward zoning approval for the Kingdom Hall since September, 1988, and have recently requested an extension of the "Site Plan" approval process that will take us through November. Since we have contractural obligation to the owners, it is i,=,.-C. +-,..+ +r r+v •.+ f,. be ar rive' at on the h iper'ii;ous .. .}v�,:. ..a.,. .v Ci%A. N.�)t',.... that a decision. ` regulations. We respectfully request that you consider our needs and bring the regulation matter to a decision one way or another so that we can move on with our plans. We are aware that you have many important matters to resolve and that changes in regulations are not always simple matters. We, on the other hand, have limitations and constraints which are becoming more complex with the passage of time. Please consider our needs. Sincerely, Raymond L. Mack, Jr. Elder South Windsor Building Committee R LM/mm v t'Y OCT 26 1989 bout+, VVtndsor, 111 Ellington Road Flannir,E, � ;af,��,R Cornmrssiar Tolland, CT 06084 October 24, 1989 Mr. Raymond F. Hallowell Planning & Zoning Commission Town of South Windsor 1540 Sullivan Avenue South Windsor, L, 06074 RE: PROPOSED CHANGE TO ZONING REGULATIONS FOR IMPERVIOUSNESS SOUTH WINDSOR KINGDOM HALL OF JEHOVAH ' S WITNESSES Dear Mr. Hallowell : Our property on Burnham Street, South Windsor, Connecticut is under a sale contract with South Windsor Kingdom Hall of Jehovah' s Witnesses since September, 1988. We have been unable to close this sale due to numerous zoning and town delays whi:_�h has now imposed a threat to me, the seller. As a taxpayer and business owner of South Windsor, I am asking the town to expedite this matter. Thank you for your considerations. Sincerely, _1 In_ 41�" Emanuel Luginbuhl Seller scg DWYER AND SHERIDAN ATTORNEYS AT LAW 100 SYCAMORE STREET POST OFFICE BOX 537 J.PATRICK DWYER GLASTONBURY, CONNECTICUT 06033-0537 TELEPHONE THOMAS P. SHERIDAN (20z3) 659-26';" TIMOTHY FITZGERALD p KATHLEEN PURTILL PFEFFER October 31, 1989 OCT Town of South Windsor �r,�;,�''.,'0•f SOLIGI M Town Planner's Office lanai 9 t;tr �t��s�SIQO 1540 Sullivan Avenue South Windsor, CT 06074 Re: Application #1940-89 Raymond L. Mack Gentlemen: As you know, I represent Carmine Napolitano, Jr. , who resides at 29 Long Hill Road, South Windsor. My client has an interest in the amendments to the impervious coverage in the residential zone for special permit uses. A public hearing was held on this quite some time ago, and it was my under- standing that a decision was going to be reached by mid September. I am herewith enclosing self-addressed stamped envelopes and I ask that you forward to me copies of the agendas for TP&Z. My client is also interested in the decision concerning the Jehovah Witness application that was heard at a public hearing quite a few months ago. I would also like to be kept apprised of the date upon which that decision will be rendered. Very truly yours, Thomas P. Sheridan TPS/lu enc. cc. Carmine Naplitano, Jr. pow" +�4 r T-0 ale Sau& ?d&&,Aat 1540 SULLIVAN AVENUE . SOUTH WINDSOR. CONN. 06074 R•co AREA CODE 203/644-2511 November 2, 198 9 r � Y ,JPJ South Windsor Congregation of Jehovah's Witness ��b c/o Raymond Mack 1989 59 Lovell Avenue Windsor, CT 06095 SoUcr� Planning Dear Mr. Mack: $ Zus,;,,g Commission Re: Application #89-12P - Kingdom Hall - Burnham Street At the October 30, 1989 meeting, the Inland Wetlands Agency/Conservation Commission approved with modifications Application #89-12P - IWA/CC permit for the construction of a Kingdom Hall located on the northerly side of Burnham Street and easterly side of Long Hill Road, RR zone as shown on plans prepared by Codiespoti & Associates, dated February 22, 1989, project #1554 . 1 . Black and white transparent mylars of sheets # LA3 with the above modifications, together with two blueprint copies of the entire set of plans, must be submitted to this Commission to be stamped and signed. This must be completed within 65 days of approval prior to any construction activity on the site. 2 . Construction activities shall be subject to the approval of the Town Engineer. 3. The application shall indemnify and hold harmless the Town of South Windsor against any liability which might result from the proposed operation or use. 4 . We recommend a bond in the amount of 5000.00 to be submitted to Planning and Zoning Commission to ensure compliance with the Erosion and Sedimentation Control Measures. 5 . The permit is valid for one year and shall expire on October 30, 1990. 6 . All approvals required must be obtained and submitted prior to any activity on the site. s Jehovah's Witness. Page Two Application #89-12P November 2, 1989 7 . A contact person shall be identified directly on the plans. 8. The drainage calculations must substantiate the stormwater storage capacity. This is subject to approve of the Town Engineer 9 . The plans shall indicate stone size proposed on the slopes with appropriate labels (i.e. , "intermediate" or "modified" rip-rap) . 10 . Provide erosion and sedimentation controls along the street line. This shall be shown on the final plans. 11 . Hooded grease traps shall be included on the final plans for the two catch basins which discharge into the swale interceptor. Very truly yours, James A. Lombardi, Chairman Inland Wetlands Agency/ Conservation Commission JAL/pmm cc: Jerry C. Iazzetta, Town Engineer Marcia A.Banach, Director of Planning John R. Collins, Chief Building Official Planning & Zoning Commission Lw-a ' Codispoti Design Group, 21-23 Colony Street, Meriden 06450 c/o Santo J. Giangrave pow N BE4< U 01 � s 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 I-co AREA CODE 203/644-2511 November 21, 1989 M E M O R A N D U M TO: Marcia A. Banach, Director of Plann' g FROM: Jerry C. Iazzetta, Town Engineer RE: Jehovah's Witnesses Site Plan We have reviewed the revised drawings for Jehovah's Witnesses Site Plan and have the following comment: 1 . Applicant still does not have sufficient information shown to indicate how the proposed "infiltration plastic galley" will work. There is no information as to how water enters the galley. We have called the engineer and find the only person who can answer the question on how this functions, is on vacation. Also some spot elevations are still required along the bottom of the proposed swale. We cannot determine, at this time, whether the proposed detention will or will not work. Until additional information is received we cannot make a recommendation on this system. JCl/jsv cc: Michael J. Gantick, Director of Public Works 0 w r 7-am O-P Saum ?d&U140t C � w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 r'I'oSOR.03 AREA CODE 203/644-2511 TO BE PUBLISHED IN THE JOURNAL INQUIRER SATURDAY, NOV. 25, 1989 LEGAL NOTICE TOWN OF SOUTH WINDSOR PLANNING AND ZONING COMMISSION At its Nov. 21, 1989 meeting, the Planning and Zoning Commission voted to take the following action: 1. Approve the release/reduction of certain site/subdivision bonds. 2. Approve the setting of Lakewood Phase III IWA/CC bond. 3 . Approve, with modifications, the application of the Planning and Zoning Commission for an amendment to the Zoning Regulations to add Impervious Coverage guidelines in the Rural Residential zone. 4 . Approve, with modifications, the application of the Planning and Zoning Commission for an amendment to the Zoning Regulations to add Impervious Coverage guidelines in the A and AA Residential zones. 5. Deny, without prejudice,--`Ap . #89-47P, uth Windsor Congregation of Jehovah's itnesses, r a Special Exception and Site Plan of Develo nt for property on the northerly side of Burnham S et westerly of Long Hill Road, RR Zone. Dated at South Windsor, Connecticut this 22nd day of November, 1989 . PLANNING AND ZONING COMMISSION Louise C. Evans, Chairman Bernard Hart, Secretary Lf� fA Y 7_0�� OYC soa� ?Ae_� C U s 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 R•co AREA CODE 203/644-2511 28 November 1989 Mr. Santo Giangrave Codespoti Design Group 21-23 Colony Street Meriden, CT 06450 Dear Mr. Giangrave: Appl. #89-47P, Jehovah's Witnesses Special Exception Burnham Street Please be advised that the Planning and Zoning Commission voted on November 21, 1989 to deny, without prejudice, the above-referenced application for a Special Exception and Site Plan of Development. The reasons for denial include: 1 . Proximity of the facility to the eastern property line lacks sensitivity to the residents; need for greater buffering between the church and the residents . 2 . Negative traffic impacts on the neighborhood due to the driveway location and number of parking spaces proposed. Please feel free to contact us if you have any questions regarding the above. Very truly yours, PLANNING AND ZONING COMMISSION 474� Louise C. Evans Chairman :rt cc: M. Banach, Director of Planning Applicant PZC File i SENDER: Complete Items 1 and 2 when additional services are desired, and complete Items 3 and 4. Put your address in the"RETURN TO"Space on the reverse side. Failure to do this will prevent this 1 card fr m being returned to you. Thil return recsIDS fee will provide you the name of the person delivered to ming the date of ) or additional en the following services are available.C nsult postmaster or fees and checkbox(m) for additional servlce(s)requested. 1. ❑ Show to whom delivered,date,and addressee's address. 2. ❑ Restricted Delivery t(Extr+a charge)t t(Extra charge)t 3. Article Addressed to: 4. Article Number T/ D G-S(U d Type of ice: ❑ R Certi ied ❑ Insured C.rO tV y '�l � ❑ COD � /mil C���/1�fvV G 7— �tP V Ep ❑ Express Mail �,. Always obtain signature of addressee t90 or agent and DATE DELIVERED. 5. Signature—Addressee 8. Addressee's Address(ONL Y i x requested and fee paid) i91W1019—Agent . Date of /ry o PS Form 3811, Mar.1987 MSALRO.1aa7-17e-Zee DOMESTIC RETURN RECEIP' UNITED STATES POSTAL SERVICE OFFICIAL BUSINESS lin DER INSTRUCTIONS ur name, address, and ZIP the space below. lete items 1,2, 3,and 4 on verse. h to front of article if space Permits, otherwise affix to back u�® cle. se article "Return Receipt sted"adjacent to number. PENALTY FOR PRIVATE � USE,g30p TO Print Sender's name,address,and ZIP Code in the s Pace below. r�lPtn'' r �0(1T MNr IS l 96,974 Co i DEC T M tA.# Q TOWN CLERK ii I} 1� RETURN DATE: January 2, 1990 SOUTH WINDSOR CONGREGATION OF SUPERIOR COURT JEHOVAH'S WITNESSES JUDICIAL DISTRICT OF it VS. HARTFORD/NEW BRITAIN f; AT HARTFORD SOUTH WINDSOR PLANNING & ZONING COMMISSION DECEMBER 61 1989 CITATION TO ANY PROPER OFFICER: BY THE AUTHORITY OF THE STATE OF CONNECTICUT, you are hereby commanded to summon the South Windsor Planning & Zoning Commission to appear before the Superior Court for the Judicial District of Hartford-New Britain at Hartford on the return date of January 2, 1990, then and there to answer unto the attached appeal of the , + by leaving a true and attested copy of this Citation �! and of the attached A ppeal with or at the usual place of abode ! of the Chairman or Clerk of the Commission, and also with the I� ii Town Clerk of the Town of South Windsor. Such appearance shall not be made in person, but shall be made by filing a written statement of appearance with the Clerk of the Court, whose address is 95 Washington Street, Hartford, Connecticut 06106, on or before the second day following the return date. i, �I i; I; The South Windsor Congregation of Jehovah•s Witnesses (Raymond L. Mack, Jr. , Elder) , as principal, and Santo J. Giangrave, as surety, are hereby recognized in the penal sum of I i $250.00 to prosecute this appeal to effect and to comply with the orders and decrees of the Court. Hereof fail not, but of this writ with your actions thereon, make due service and return according to law. Dated at Hartford, Connecticut this 6th day of December, 1989 . Michael A: Zizk Commissioner of�-�ti a Superior Court 704 :MAZ/lt S26751-2 I' A it ��Opr � PEIFM K DE i -2- r , �I RETURN DATE: January 2, 1990 �I SOUTH WINDSOR CONGREGATION OF SUPERIOR COURT JEHOVAH'S WITNESSES : JUDICIAL DISTRICT OF I, VS. HARTFORD/NEW BRITAIN AT HARTFORD SOUTH WINDSOR PLANNING & ZONING COMMISSION DECE4BER 6, 1989 APPEAL To the Superior Court for the Judicial District of Hartford-New Britain at Hartford, on the first Tuesday of January, 1990, comes the South Windsor Congregation of Jehovah' s Witnesses ("Congregation") appealing from a decision of the South Windsor Planning & Zoning Commission (the "Commission") denying site plan approval and a special exception for the construction of a Kingdom Hall on certain property located within the town of South Windsor. The plaintiff complains and says: !i 1. On or about March 13, 1989, the Congregation applied i� to the Commission for site plan approval and a special i exception to construct a Kingdom Hall on certain property (the i i "Property") located on the north side of Burnham Street and �I west of Long Hill Road in the town of South Windsor. II 2 . The Congregation has a valid option to purchase the Property from its present owners. 3 . The purpose of the Kingdom Hall is to serve as a i; house of worship for Jehovah's Witnesses who reside in and i i, around the town of South Windsor. 4 . The Commission held a public hearing on the application on July 18, 1989 . 5 . During the course of the Commission' s proceedings on this matter, the Congregation submitted testimony and written evidence demonstrating that the proposed Kingdom Hall and appurtenant improvements fully complied with all of the applicable zoning regulations of the Town of South Windsor. 6 . Among the evidence submitted by the Congregation was a traffic report prepared by a professional engineer concluding that the completed project would have no adverse impact on traffic safety. No credible evidence to the contrary was ;! offered to or by the Commission. 7. Subsequent to the public hearing, the Congregation worked with town staff to resolve any concerns or issues regarding the details of the proposal and offered to j -2- I i �i I, i. accommodate any reasonable changes or modifications the staff might recommend to the Commission. 8. On November 21, 1989, the Commission denied the I application, listing as grounds for the denial (i) a desire to i move the building westward, ii) a desire for greater buffering ,I 9 ( g between the proposed building and neighboring residential property, (iii) traffic and "traffic impact, " and (iv) "parking/impervious coverage. " 9 . Notice of the Commission' s decision was duly published on November 25, 1989 in a newspaper having a general circulation in the town of South Windsor. 10. The Commission' s denial of the application was arbitrary, illegal and in abuse of its discretion in the following respects: I I a. The Congregation submitted ample and adequate i! testimony and evidence, not contradicted by credible countervailing evidence, to demonstrate that it met all of the applicable requirements of the South Windsor Zoning Regulations; b. The record does not support the reasons given by ;I I; the Commission for the denial; li -3- I� i f; it I c. One or more of the reasons given for denial would I� require the Congregation to violate the existing zoning �I II present. regulations, as an example, the zoning regulations ►j actually preclude the Congregation from moving the I I building westward, although the Congregation has stated I; that it would have no objection to moving the building �! westward if the zoning regulations allowed it. 10. The Congregation is aggrieved by the actions of the Commission in denying the application in that it holds a valid option to purchase the Property and also in that the decision precludes the Congregation from constructing a building on the Property to serve the Congregation' s principal purpose of worship. I I; it ii I �I II' if I I �1 I I I Il i, f i I. !I I' -4- I 14 ii I, I �I � DEMAND FOR RELIEF i y The plaintiff claims the following relief: i� ji 1. That the Court sustain this appeal and issue an order �i directing the Commission to approve the application. , I� 2. That the plaintiff be awarded the costs of this action; and 3 . That the Court award such other relief as may be appropriate. PLAINTIFF: SOUTH WINDSOR CONGREGATION OF JEHOVAH'S WITNESSES By- Michael -A. Zizka; ; Pepe & Hazard Goodwin Square Hartford, CT 06103-4302 (203) 522-5175 I; Juris No. 101812 PLEASE ENTER OUR APPE ON BEHAL ,' THE PLAI �NCE FFS A Lift Michael A. Z i ! AT? �► Pepe & Hazard` ` i Goodwin Square t Hartford, CT 06103-4302 (203) 522-5175 Juris No. 101812 705 :MAZ/lt S26751-2 -5- 2 January 1990 Mrs. Louise Evans, Chairman Planning and Zoning Commission Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 Dear Mrs. Evans: re: ��✓ S GG ; rU�fssEJ S With reference to our meeting on c during which we plan to discuss possible changes in t e above-referenced application, or the filing of a new application with the Planning and Zoning Commission, I understand and agree as follows: 1 . This is an informal meeting for discussion purposes only. 2. This is not a meeting of the Commission and you are not speaking on behalf o/f// the Commission. 3. Anything you say at this meeting shall not be construed as a commitment or a binding representation by you or the �.r-• L�"` Commission; and 4 . I will not rely upon any statements made or any part of the discussion. Date-0 at South Windsor, Connecticut this �� day of r Signed c STUDY EXPLANATION SHEET SKETCH NO. 1 : This study shows a reduction in the parking lot from 141 spaces to 105 spaces by the elmination of the row of parking spaces nearest the abutting residents to the east and nearest Burnham Street to the south. This reduces impervious- ness from 50% to 45% . This area could be left grass cover and utilized as overflow during special events . This sketch also shows a smaller structure footprint which is discussed in sub- sequent studies . This should be desirable to abutters since the buffer increases from 20 feet to 38 feet for the parking lot. SKETCH NO. 2: This study shows a reduction in the front portion of the building of 77 by cutting the entry back 8 feet. This should be desirable to abutters since it increases building distance to the easterly property line from 67 feet to 75 feet. SKETCH NO. 3 : This study shows a reduction in the rear portion of the building' s main level of 5% by reducing auditorium width by 4 feet on each side. This reduces seating capacity in the auditorium from 220 seats to 182 seats . This has little effect to abutters but does reduce the footprint slightly. SKETCH NO. 4 : This study shows a reduction in the front portion of the building' s lower level of 31% by eliminating auxiliary areas . This has no effect to abutters or main footprint. SKETCH NO. 5 : This study shows a reduction in the rear portion -1- of of the building lower level Vf 5/ by reducing the multi-purpose room. This has little effect to abutters but does reduce the footprint slightly. -2- KINGDOM HALLS OF JEHOVAH'S WITNESSES AROUND SOUTH WINDSOR TOWNSHIP TOWN OF, LOCATION APPROXIMATE BUILDING FOOTPRINT SIZE MANCHESTER 4100 S.F. ROCKVILLE 5500 S.F. WILLIMANTIC 2700 S.F. WE THE RS FIELD 4100 S.F. HARTFORD CENTRAL 3660 S.F. HARTFORD WEST 2000 S.F. BLOOMFIELD 2900 S.F. WAREHOUSE POINT 3300 S.F. GRANBY 5100 S.F. BRIEF REVIEW OF JEHOVAH' S WITNESSES ORGANIZATION AND ACTIVITIES KINGDOM HALLS AROUND SOUTH WINDSOR Rockville - 2 Groups Manchester - 2 Groups Wethersfield - 2 Groups Hartford Central - 2 Groups Bloomfield - 2 Groups Hartford West - 2 Groups Warehouse Point - 1 Group Willimantic - 2 Groups All these groups are referred to as congregations by Jehovah' s Witnesses . However, our congregations are purposely kept small, having membership of 100 or less . Our 1989 Yearbook indicates we have 3 , 430, 926 members worldwide with 57 , 670 congregations . This averages 59 . 5 members per congregation. In the United States , we have a larger average being 762, 960/8, 754 or 87 members per congregation. Our area closely matches the national average with memberships locally amounting to approximately 90 . We anticipate between 360 to 400 member usage in our proposed Kingdom Hall in South Windsor for four group use. Jehovah' s Witnesses are organized into circuits and districts for assemblies and conventions . Our circuit contains 10 congrega- tions and numbers less than 1000 members . We hold circuit assem- blies in larger buildings such as Natick, Mass . and Monroe, NY called Assembly Halls twice a year. We hold district conventions which comprise six to eight circuits once a year at larger stadiums such as New Haven Coliseum and Springfield Civic Center. Our interests in South Windsor are very local from an organizational point of view. As our numbers increase, we continue to split off into smaller groups , building additional Kingdom Halls with one or two auditoriums such as is proposed in South Windsor. We current- ly are using the quick-build technique which reduces the building time of the building superstructure to a few days . At the same time we use quality tradesmen and quality materials . One of our Kingdom Halls was recently constructed this way in Granby, CT. 1988 Ratio, 198E 96Inc. 1987 2988 Av. Av. Memorial Peak One Pub- Av. Over Av. No. Pio. No. of Total Bible Atten- Country or Territory Population 'Pubs. lisher to: Pubs. 1987 Pubs. Bptzd. Pubs. Congs. Hours Studies dance Sao Tome(L-7) 105,000 43 2,442 35 52 23 15 2 1 61900 86 151 Senegal()-4) 7AW,000 539 11,987 521 8 481 66 134 14 228,832 11096 1,489 Seychelles(L-13) 66,000 80 825 76 17y 65 5 7 1 15,649 101 257 63l -1 � 639 38 128 30 215,094 I,081 3,745 'Sierra Leone(K-4) 3,517,530 694 5,068 Solomon islands(M-26) 285,796 729 392 708 4 681 33 76 32 149,104 719 3,831 f i South Africa(P-9) 34,722,104 44,328 783 42,385 5 40,456 3,325 5,143 1,014 9,748,788 41,725 114,612 South-West Africa(0-8) 1,261,000 509 2,477 464 12 416 32 64 13 109,I29 527 1,269 Spain(F-5) 38,996,156 73,309 332 71,471 6 67,427 5,432 9,637 1,008 17,501,I40 50,704 153,519 Sri Lanka(K-16) 16,500,000 1,138 14,499 11100 6 1,040 107 189 31 331,601 1,475 4,223 Suriname(K-43) 400,000 1,348 297 1,278 5 1,116 87 196 18 331,031 1,697 4,874 Swaziland(0-10) 676,089 1,057 640 11018 10 926 128 233 45 346,750 1,372 3,848 Sweden(A-8) 8,442,324 21,587 391 21,212 2 20,787 $93 2,495 331 4,071,727 10,399 36,801 Switzerland(E-7) 6,566,800 15,058 436 14,656 5 13,917 864 1,032 268 2,744,917 9,499 26,978 Tahiti(N-32) 178,022 894 199 853 11 768 83 85 11 203,184 11169 2,779 Taiwan(H-20) 20AW,000 1,454 13,755 1,381 9 1,266 102 360 22 494,342 1,776 4,030 Tanzania(M-10) 24,529,000 3,005 8,163 21820 7 2,646 293 361 87 913,746 3,077 9,767 Thailand()-18) 53,397,745 1,042 51,245 989 8 913 64 188 33 294,744 11088 2,607 i Togo(K-6) 3,282,156 3,893 $43 3,463 15 3,023 44 378 65 $21,845 7,322 12,696 Tokelau Islands(M-29) 1,692 6 282 4 4 1 185 4 31 Tonga(N-29) 94,535 68 11390 57 10 52 2 12 2 18,815 71 175 Trinidad(K-43) 1,233,231 5,262 234 5A84 9 4,682 523 967 55 1,381AH 7,762 17,431 Truk(K-24) 50,229 SS 913 43 13* 38 1 9 3 13,302 134 426 Tunisia(G-7) 7AW,000 48 158,333 39 .11 44 3 3 1 6,944 34 82 Turkey(F-30) 52,000,000 836 62,201 824 823 20 68 10 173,336 621 1,682 + 1 i Turks do Caicos Ills.(H-41) 81000 37 216 35 -S` 38 11 1 16,114 97 190 �1 i � � Tuvalu(h'I-28) 91000 42 214 33 74 19 2 7 1 8,676 55 287 ! Uganda(L-10) 16,000,000 468 34,188 443 20 369 73 118 17 176,740 1,115 2,249 U.S.of America(F-38) 242,803,000 797,104 305 Cf62,936i 4 734,378 43,415 96,947 7541. 161,478,732 529,495 1,822,607 Uruguay(P-43) 2,921,000 6,810 429 �IbSI 9 5,956 516 829 �"-96 1,5I4,412 9,266 19,053 Vanuatu(N-27) 145,000 93 1,559 84 1 83 12 12 2 25,237 231 790 t Venezuela(IC-42) 19,200,000 42,911 "7 40,328 12 36,035 4,133 6,930 438 11,670,970 66,758 154,881 'Virgin Isis.(Brit.)0-42) 12,000 107 112 101 7 ' 94 1 10 3 21,495 133 479 Virgin Isis.(U.S.)(1-42) 96,000 510 1S8 468 4 467 6 45 8 94,031 496 1,775 }Wallis dr Futuna Isis.(N-28) 14,000 1 14,000 I -50� >` 2 176 Western Samoa(M-29) 1581000 180 878 160 5 i IS2 12 27 4 49,264 !66 754 Yap(K-23) 91320 25 373 23 -18 28 1 8 1 10,791 67 141 Zaire(L-9) 35,000,000 37,747 927 35,864 7 33,430 1,705 5,321 1,087 9,6881801 59,105 89,290 7,400,000 65,870 112 64,733 211 63,281 3,595 6,819 1,725 12,749,118 79,022 305,841 Zambia M-9) 14,726 I,242 1,567 527 3,246,390 15,6M 45,772 Zimbabwe(N-9) 8,743,455 16,154 541 15,606 6 2,970,453 221,863 440,017 52,758 744,072,379 3,017,030 8,637,729 274 Countries 3,291,006 3,148,646 6.0 � ! #38 Other Countries 301A" 292,280 5.6 267,298 17,405 15,544 4,912 41,449,318 220,130 563,342 t GRAND TOTAL(212 countries) 3,592,654 3,430,9 6.0 3,237,751 239,268 455,561 57,670 783,521,697 3,237,160 9,201,071 _ During the 1988 service year the Watch Tower Society`spent MEMORIAL PARTAKERS WORLDWIDE:S,685 S29,834,676.97 in caring for special pioneers,missionaries, • Percentage of decrease and traveling overseers in their field service assignments. #Work banned and reports are incomplete . _.vim:,,• - ,,. , AN INVITATION TO A SPECIAL EVENT , n. We are pleased to announce the construction of our new place of worship - the Kingdom Hall. You are personally invited to come and see a rather unusual event that will take place at our property at 121 North Granby Road, Granby. Approximately 1,000 volunteers from the New England area will combine their skills and energies to construct in just one weekend, a house of worship. Construction will begin on Friday, July 28 and by Sunday, July 30 the building will be ready for public meetings; carpeted, wallpapered and landscaped! We regret any inconvenience the temporary influx of people and traffic that may occur in town and we thank our neighbors and the community for their understanding and support. The Granby Congregation of Jehovah's Witnesses extends a warm welcome to you and your family to come view this Quick-Build Project any time during the construction weekend, or any time thereafter. Guided tours will be available all day for your convenience. GRANBY CONGREGATION OF J EHOVAH 'S WITNESSES IMPERVIOUS AREAS FOR LARGER CHURCHES IN SOUTH WINDSOR CHURCH & ADDRESS PARKING AREA (S.F. ) BUILDING AREA (S.F. ) IMPERVIOUSNESS (7) 1 . Calvary Church 20, 000 29808 26 240 Demming St. 2. Saint Francis of 359000 59652 64 i Assisi, R.C. 643 Ellington Rd. 3 . St. Margarette 145, 000 119195 57 Mary, R.C. 80 Hayes Rd. 4 . Temple Beth Hillel 249000 29800 56 1001 Foster 5 . Wapping Community 409000 69324 64 Cong. Church (Prior to addition) 1790 Ellington Rd. I 6. Our Savior Lutheran 269000 69892 18 Church 239 Graham R. d i January 11 , 1990 To Whomever It May Concern: I have: seen the Plan prepared by Codespoti & Associates, dated January 9, 1990, where the church parking lot is shown a distance of 40 feet from my rear property line. I do not object to or oppose the church construction and parking lot as proposed on this plan. ELVA KIBBE 10 Long Hall Road South Windsor, CT 06074 ,8 POTI DESIGN GROUP TEL :203-237-9860 Jan 15s90 15 : 17 No .002 P .02 CODESPOTI ARCIVEc:AJRE WILLIAM R,JUU/1NI:LLI: ENGINEERING Atc:hitcmt DESIGN GROUP INTERIOR DESM SANTO J.CIANUI Abt I n G o r p o r a t c d lawn UIF c ONSAH MNG Pwiff"kxuu FnpuM*r IlllllfllllilllllffllllllllllllllllllllllllllillllillililllgllllllllllllllllNNillliliflillf IIIINIIIINiII JOSEIH R.CODESPOTI Lond Uw Cornueont 21.23 COLM STRMS MILTON GwGORY G tI;W MWIDEN, CCNNECTICUT Ard'ilkfO 0 460 203-237-9W ROBERT W.PAUL Itat"wm,c,l r,xji,vxx GRFr;0RY D,GINVGTtAVE Anahllix:l January 11 , 1990 To Whomever It May Concern: I have seen the Plan prepared by Codes''3poti & Associates, dated January 9, 1990, where the church parking lot is shown a distance of 40 feet from my rear property line. I do not object to or oppose the church construction and parking lot as proposed on this plan. f ELVA KIBBE 10 Long Hill Road South Windsor, CT 06074 DWYER, SHERIDAN AND FITZGERALD ATTORNEYS AT LAW 100 SYCAMORE STREET POST OFFICE BOX 537 J.PATRICK DWYER GLASTONBURY,CONNECTICUT 0r1033-;)537 TE7 ,EPHONE THOMAS P.SHERIDAN (203) 359-2625 TIMOTHY FITZGERALD FAX 657-9338 February 27, 1990 Richard M. Rittenband, Esq. RECE ,IVED 1750 Ellington Road MAR ;D 1990 South Windsor, CT 06074 Re: South Windsor Congregation of Jehovah's Witnesses vs. 90. wiMDSOR PLANNING DEPT. South Windsor Planning & Zoning Commission " l Dear Dick: As you know, I represent Carmine Napolitano, Jr. , who is an abutting property owner to the premises upon which the Jehovah's Witnesses have filed an application for a special exception to construct a house of worship on Burnham Street. My client has informed me that he would object to any agreement reached by the Town which would allow the construction of the Jehovah's Witnesses structure on the Burnham Street parcel without first having an additional public hearing. It seems to me that inasmuch as this matter was denied by the Planning and Zoning Commission, a new hearing should be held before the Planning and Zoning Commission. It is my understanding that some commissioners may have expressed some concern 3h, the size of the proposed development, and I believe that a new hearing wouiJ be appropriate under the circumstances. Very truly yours, V Thomas P. Sheridan TPS/lu CC. Carmine Napolitano, Jr. I � 9 CODESPOTI DESIGN GROUP, PC LEUVEN OF VIQ[MSOM OV ; [lam Architecture/Engineering 21-23 Colony St. - Lower Level MERIDEN, CONNECTICUT 06450 DATE JOB NO. 2/28/90 88016 ATTENTION (203) 237-9860 Marsha B an a c h RE TO Town of South Windsor South Windsor Kingdom Hall 1540 Sullivan Ave. South Windsor, CT 06074 MAR 9 1990 WE ARE SENDING YOU M Attached ❑ Under separate cover via the following items: ❑ Shop drawings ❑ Prints ❑ Plans ❑ Samples ❑ Specifications ❑ Copy of letter ❑ Change order ❑ COPIES DATE NO. DESCRIPTION 10 Proposed revision - legal settlement THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ Approved as submitted ❑ Resubmit copies for approval IN For your use ❑ Approved as noted ❑ Submit copies for distribution X As requested ❑ Returned for corrections ❑ Return corrected prints ❑ For review and comment ❑ ❑ FOR BIDS DUE 19 ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS Marsha, As per our meeting of 2/27/90 we arp transmitting the Droposed settlement plan for the subject project. If you have any questions or need additional information, please feel free to contact me. COPY TO Mike Z i ska SIGNED: Santo J. Giangrave, P.E. PRODUCT24a2 Ja Im,Won,Mm 01471 It enclosures are not as noted, kindly notify us at nce. towM a�� T_a 0-1s �- C V 1540 SULLIVAN AVENUE - SOUTH WINDSOR. CONN. 06074 R,co�' AREA CODE 203/644-2511 May 24, 1990 Mr. Santo Giangrave Codespoti Design Group 21-23 Colony Street Meriden, CT 06450 Re: Application 189-47P Jehovah Witnesses Spacial Exception Dear Mr. Giangrave: Attached is a copy of comments from the Planning Department regarding the above-referenced application. Please make the necessary revisions to the plans and submit 7 complete sets (including architectural elevations, landscaping plans, etc. ) to the Planning Department. If you have any questions regarding the comments or the procedure, please contact me. Very truly yours, -Ttk < < Marcia A. Banach Director of Planning cc: Jerry Iazzetta, Town Engineer JEHOVAH WITNESSES SITE PLAN Planning Comments 1 . key map must be provided in accordance with Sec. 4 . 13 . 2. 1 of the zoning regulations 2 . permitted impervious coverage changed on 11/29/89- zoning table should reflect 50% impervious coverge permitted 3 . a waiver to the parking regulations must be requested on the plan for the parking spaces to be 9 X 18 Engineering Comments Jerry Iazzetta, Town Engineer is still awaiting plans in response to verbal comments made to the applicant's engineer regarding the infiltration system. �0%VM Cq U Tio aps ?d&U140t w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 �'►'osoe•co� AREA CODE 203/644-2511 TO BE PUBLISHED IN THE JOURNAL INQUIRER THURSDAY, MAY 31, 1990 THURSDAY, JUNE 7, 1990 LEGAL NOTICE TOWN OF SOUTH WINDSOR PLANNING AND ZONING COMMISSION Notice is hereby given that there will be a public hearing of the Planning and Zoning Commission on Tuesda June 12, 1990 at 8:30 P.M. in the Council Chambers of the South Windsor Town Hal to onsider the following: 1. Appl. 89-47P,' South Windsor Congregation of Jehovah's Witnesses for a Special Exce0tion under Section 4.1.8b of the Zoning Regulations for property on the north side of Burnham Street westerly of Long Hill Road, RR Zone - proposed settlement of litigation. 2. Appl. 190-24P, Town of South Windsor Board of Education - South Windsor High School, intersection of Nevers and Ayers Roads, Special Exception, A-20 Zone. 3. Proposal of the Planning and Zoning Commission to amend the Zoning Regulations to eliminate specific special interest uses in the Industrial Zone. Copies of the application are on file in the office of the Town Clerk and/or the Planning Department of the Town of South Windsor. At this hearing, interested persons may appear and be heard, and written recommendations will be received. PLANNING AND ZONING COMMISSION Louise C. Evans, Chairman Bernard Hart, Secretary LETTER OF TRANSMITTAL �s�w~ •f,< • o � c PLANNING DEPARTMENT TOWN OF SOUTH WINDSOR '�•ti �� 1540 SULLIVAN AVE. °son-C SOUTH WINDSOR, CT 06074 (203) 644-2511 Date TO: o .I VED c-f � r U�� � t q or2n ct so 90 4 uth Wir�dsnr WE ARE SENDING YOU: v 6' OR P&Z initial plans Q Drainage ps 0 P&Z final plans = Bond estimate requests O Inland Wetlands plans 0 Bond reduction requests G7 Final plans for filing 0 Change order form 0 Other O Correspondence Copies App. No. Project THESE ARE TRANSMITTED as checked below: 4=- For review and comment O For your file p For your use = Returned with revisions EZI As requested 0 Other PLEASE RETURN/COMMENT BY: COMMENTS: ,G`L���. r Copy to: From: - CODESPOTI SITE PLANNING JOSEPH R CODESPOTI LANDSCAPE ARCHITECTURE Land Use Consultant ENGINEERING JEFFREY N.GORDON & ASSOCIATES P.C. LAND SURVEYING Landscape Architect IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Site Planner 3060 MAIN STREET ROBERT J.WHEWAY STRATFORD, CONNECTICUT Professional Engineer 06497 203-375-3661 BARRY L.HAMMONS Land Surveyor OTTO THEALL Environmental/Sod Scientist DRAINAGE SUMMARY REVISED SUBMISSION SOUTH WINDSOR KINGDOM HALL June 8, 1990 The submission drawings revised through May 8, 1990 reflect a development, that from an engineering perspective, will result in less runoff (both rate and quantity) over that which was originally designed. The reductions will occur from the reduced building footprint and fewer number of parking spaces. In spite of the reduced impervious area, the stormwater management system has not been decreased in size, thereby providing additional benefit on increased storage and reduced runoff. All concerns of the Town Engineer have been addressed and in addition, hooded outlets will be installed on the two catch basins which will provide additional environmental protection. CO IV Sincerely, •�: a.s,m 15 50 i Robert Whewa � ' cE N ` I rt JUL 12 190 14:40 DOW S?r CONDON P.1 4 OW JOHN G.GUNNING,&0A Preldanf REALTORS JAMES M.09MUNQ.SIOR CONDON IntluitflCll * Commercief . Office * investments Tamura+ 207 Main St., HaMord, CT 06106 NICHt��►s .Mae} o,$laR (203)249-6521 --FAX(203)247.4067 Secretory f R ASIT E.HILER,GF1 vw•�ra�i�t PETER VAN STRUK'SIOR . Vlco Pr�legnf # . , } July 12, 1990 i I Mr. Sam Giangrave Codespoti Design Group 21--23 Colony Street Meriden CT 06450 FAX:# 237-9860 RE. July 6, 1990 Parking Plan Jehovah' s Witnesses Burnham Street, South Windsor CT Dear Sam: Thank you for sharing your parking plan regarding the Now � Kingdom Hall to be built in South Windsor. - As You of courze are aware , We ar® under contract to purchase' the adjacent 10 acres to the proposed Kingdom Fall site . We plan to develop a small industrial park on this tern acre site . j We have no problem a000mmodating any over flow parking your Kingdom Dull may generate during the evening after 5 :00 or oni the weekends. ' Our parking needs��xp�?�w�.l! bi�lnimum on these o9f hours . I # personally am in . � of your efforts to build this Kingdom Hall ,C "" hys 1Qcat�.on. Yours tru..y, �r' 4 �r Peter D Addeo', CCIM P 1� gmb cc Bert Andrews Antonio D 'Addeo } c O ' d ZOO * ON V�: 91 06 ' ZT Inf 0986-Z2Z-20Z: �31 dnO0 9 N9IS3G IlOdS390D CAl tom/ r '!�'f/�v - �� �e`.'` �"� � �.'si*� I�'.� �D _S��` "f'�f`_ �j l '4^�,� '"d f'•�;y 2 ,p �j JEHOVAH WITNESS SITE PLAN 1 . ppl ioni/i," a chur�i under Sion 4.1 .b propo on the ortY�s ide onham ,8'treet, west of Lon i 11 Road g z e. 0 1/10/8 "`deceived a zone change and resubdivsion on this :► Subsequently, they applied for special exception approval and were denied by the Planning & Zoning Commission on 11/21/89 . The concerns expressed in the denial were proximity of the facility to the eastern property line and the need for more buffering between the church and the residential areas; and also the negative impacts on the neighborhood due to the driveway location and the number of parking spaces proposed. This public hearing is part of a possible settlement negotiation between the Commission and Jehovah's Witnesses. It is not a new application. 2 . Th site is approximately 3 .06 acres . Th -building proposed s 17,830 s ft and will cover 6 .7�; allowed. The imperv'ous covers proposed is_"-43%; 50% al wed. The to lion of a building ,nd parking eas have be shifted w as far r� aN'/ as possible t minimize im cts on the sidential ighborhood. 1; ere are t constraint to shifting a project ny further west: the lope and the project drainage system. 3 . "ePli t is oposing 4 p�cing sp4.e6s (tlw' p vioui tion d 14`1 s ces . Our arkin standards ) parking require 74 spaces. They are requesting these spaces to be 9X18 in size. 3 . There are no regulated wetlands on the site. The applicant received IWA/CC approval on 10/30/89 . This approval was for conservation approval and discharge into the wetlands on the adjacent lot. The conditions of approval included a $5,000 bond, additional erosion and sedimentation measure to be shown along the street line, and hooded grease traps on the catch basins which discharge into the swale interceptor. 4 . The site will be serviced by( water and sewers currently in Burnham Street. The Supt. of Pollution Control has commented that WPCA approval is required. This application involves the excercise of Town/MDC Sewer Agreement- which will require MDC review and approval. 5 . The curb cut has been shifted westerly as far as possible from its location in the previous application to minimize its impact on the residential neighborhood. The applicant has indicated that he will provide the Town with enough land to establish a 25' streetline from the existina center of the street on Burnham Street vex = �' e_ �, G�.e��_�L� J?� ��✓`� h �C-44 t r , .L,iC� -64cr . � I 6 . e applic has providd`a traffic ,study which indicates that here is equate sit ,�istance tq "ie t� west of the � .Profert y j a - �� a efir way stq��o the east of Jlt-te property (at Long Hill and Burnham) -_' adecfate site distance to the east. The r ort also-states that ,the church traffic will, not conflict wit commuter,-'peaks since ieetings ark 'field after:00 PM,�`r on S days . ,i 7 . There is a dumpster shown on a concrete pad on the west side of the property. 8 . The site as it exists today is wooded. The landscaping plan as proposed is quite aggressive proposing a number of plantings and trees including white pines, pin oak, flowering crabapple, magnolia and also a variety of bushes and shrubs . Under the new buffer requirements adopted 2/20/90, the applicant would be required to have a 50 ft buffer adjacent to the residential areas. In this settlement proposal, the applicant has been able to meet the buffer criteria along the eastern property boundary except in the area of the front parking lot, where a 40, buffer is proposed. he re?is pr osal, the a of ment the area o bu' dins ft/an' pro ty li The losest rt o th buil nowfeet way fr the�4e#�Cern operty ine in th ious that di s c e was. 1 f e 9�Th rch' ctura or the i ding .' ated that the ldlilg wi be a o story,_- ood strum r�e'4 This application PP was not subject to Architecture and Design Review as it is a settlement proposal of a plan that was submitted prior to initiation of the Design review process . 10 . East Hartford had been contacted regarding this application and thier comments have been incorporated into these plans . It will be necessary that a curb cut permit is obtained from East Hartford for this project. If this application is approved the Planning Department requebfto Ya._Y­ re e t a e;be added} that y l' ing�'wfl 1 Le e�.de � t re i ntia L_ae�f hbc rs sign not to exceed the 12 sq ft requirement for a non-residential use in a residential zone (or ZBA variance must be obtained) PETITION TO SOUTH WINDSOR PLANNING AND ZONING COMMISSION The undersigned do hereby give their consent to have a religious group known as Jehovah' s Witnesses enjoy a house of worship in the Town of South Windsor on Burnham Street immediately west of Long Hill Road. NAME ADDRESS ate qq � r 376dk o� j � PETITION TO SOUTH WINDSOR PLANNING AND ZONING COMMISSION The undersigned do hereby give their consent to have a religious group known as Jehovah's Witnesses enjoy a house of worship in the Town of South Windsor on Burnham Street immediately west of Long Hill Road. NAME ADDRESS Pima 4�k �- '�`� �"-©�o n74 �. .�,•3 ��' ��� . City. Ste. did f y �c �?Q• . w RO 13 PETITION TO SOUTH WINDSOR PLANNING AND ZONING COMMISSION The undersigned do hereby give their consent to have a religious group known as Jehovah's Witnesses enjoy a house of worship in the Town of South Windsor on Burnham Street immediately west of Long Hill Road. NAME ADDRESS ---� �i 3d k L/ . V 4D. 64 PLC=�5 R )v7 U L,T K,17 f!1 PETITION TO SOUTH WINDSOR PLANNING AND ZONING COMMISSION The undersigned do hereby give their consent to have a religious group known as Jehovah' s Witnesses enjoy a house of worship in the Town of South Windsor on Burnham Street immediately west of Long Hill Road. NAME AD PRESS, //, /� , �� G� S��� ✓ v.� ti 6-q e �w �o PETITION TO SOUTH WINDSOR PLANNING AND ZONING COMMISSION The undersigned do hereby give their consent to have a religious group known as Jehovah's Witnesses enjoy a house of worship in the Town of South Windsor on Burnham Street immediately west of Long Hill Road. NAME ADDRESS / 1 All q i PETITION TO SOUTH WINDSOR PLANNING AND ZONING COMMISSION The undersigned do hereby give their consent to have a religious group known as Jehovah' s Witnesses enjoy a house of worship in the Town of South Windsor on Burnham Street immediately west of Long Hill Road. NAME ADDRESS Af10 U��nr/� r on J -95 L d g PETITION TO SOUTH WINDSOR PLANNING AND ZONING COMMISSION The undersigned do hereby give their consent to have a religious group known as Jehovah's Witnesses enjoy a house of worship in the Town of South Windsor on Burnham Street immediately west of Long Hill Road. NAME ADDRESS 0 U.,q htoh � D W11''45c r u<<��. Fkm i So , wt`hdso NNn r4 674. e PETITION TO SOUTH WINDSOR PLANNING AND ZONING COMMISSION The undersigned do hereby give their consent to have a religious group known as Jehovah' s Witnesses enjoy a house of worship in the Town of South Windsor on Burnham Street immediately west of Long Hill Road. NAME ADDRESS so j)Ql-� fir. . S-a - � NAME ADDRESS PETITION TO SOUTH WINDSOR PLANNING AND ZONING COMMISSION The undersigned do hereby give their consent to have a religious group known as Jehovah's Witnesses enjoy a house of worship in the Town of South Windsor on Burnham Street immediately west of Long Hill Road. NAME ADDRESS U aAZ NAME ADDRESS l r ' C s�,t y Ole ?d&U&10t 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 f��SOR•Co AREA CODE 203/644-2511 July 18, 1990 Attorney Richard Rittenband 1734 Ellington Road South Windsor, CT 06074 Dear Attorney Rittenband: Re: Application #89-47P, Kingdom Hall of Jehovah's Witnesses Please be advised that the Planning and Zoning Commission voted to approve, with modifications, as a settlement of pending litigation of Jehovah's Witnesses versus the Planning and Zoning Commission, Application #89-47P for a Special Exception to Article 4 . 1 . 8 .b of the Zoning regulations and site plan of development for property located on the north side of Burnham Street (copy of approval letter attached) . You are hereby authorized and directed to enter into a stipulation that this settlement be approved by the Superior Court. Very truly yours, THE PLANNING AND ZONING COMMISSION Lou se C. Evans Chairman cc: Inland Wetlands Agency/Conservation Commission M. Banach, Planning Director J. Collins, Chief Building Official J. Iazzetta, Town Engineer F. Shaw, Supt. of Pollution Control E. Belleville, Assessor W. Lanning, Fire Marshal Registrar of Voters Contact Person I Louise Evans Chairman of the South Windsor Planning and Zoning Commission, hereby certify that on July 17, 1990 the Planning and Zoning Commission granted to South Windsor Congregation— of Jphovah's Witnesses a Special Exception to Section 4.1.8.b of the Zoning Regulations to allow: the construction of a 'church in accordance with Approval Letter dated July 19, 1990 Property Identification: Assessor 's Map and Parcel Number: Address : More particularly bounded and described as follows : (legal description from Deed or Mortgage) OWNER OF RECORD: Dated at South Windsor, Connecticut this day of 19 CGS Section 8-3d 4f0-Uu.e Ir �ULti1Z�l A m Chairman, PLANNING & ZONING COMMISSION Received for record this day of 19 at South Windsor, Connecticut . ATTEST: Town Clerk <0wM 3C4 SCHEDULE I O 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 SOR-CO AREA CODE 203/644-2511 July 19 , 1990 Mr. Santo Giangrave Codespoti Design Group 21-23 Colony Street Meriden, CT 0645C Dear Mr. Giangrave: Re: Application #89-47P, Jehovah' s Witnesses, Special Exception to Article 4 . 1 . 8 -b and Site Plan We are pleased to advise that the Planning and Zoning Commission voted to approve, as a settlement of pending litigation of Jehovah' s Witnesses versus the Planning and Zoning Commission, Application #89-47P for a Special Exception to Article 4 . 1 . 8 .b and site plan of development for property located on the north side of Burnham Street. This approval is based on plans prepared by Codespoti and Associates, Sheets SV, Al-A3, LA1-LA5 revised through May 8, 1990, and is subject to the following modifications : 1 . Prior to commencement of any site work, a meeting must be held with Town Staff . 2 . No building permits will be issued until the final mylars , have been filed in the Town Clerk's Office. 3 . This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission, including a bond in the amount of $5,000 . 4 . An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 4 . 13 . 10 of the Zoning Regulations . 5 . Footing drains are required if the building has a basement. 6 . A landscape bond in the amount of $5,000 is required and must be submitted prior to filing of mylars . 7 . All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. D OAT,= I C,rOu?. ot� pes;�n CodesP - Mr. Santo Giangrave July 19, 1990 Page Two 8 . No on-street parking is permitted. A sidewalk from the site driveway west to the property line is required along the Burnham Street frontage (built to Town specifications) to connect to adjacent parking (when available) . Black and white transparent mylars of Sheets #Sv and LA1 with the above modifications , together with three blueprint copies of the entire set of plans must be submitted to this Commission within 30 days to be stamped and signed. The letters of approval of this Commission, as well as the Inland Wetlands Agency/Conservation Commission, must be reproduced on the mylars . After the mylars have been signed by the Commission, they will be returned to you for filing in the Office of the Town Clerk within 90 days . After filing these plans, a copy of the receipt must be submitted to the Planning Department. Very truly yours, THE PLANNING AND ZONING COMMISSION Louise C. Evans Chairman cc: Inland Wetlands Agency/Conservation Commission M. Banach, Planning Director J. Collins, Chief Building Official J. Iazzetta, Town Engineer F. Shaw, Supt. of Pollution Control E. Belleville, Assessor W. Lanning, Fire Marshal Registrar of Voters Contact Person Qodes Y . poits peS�gn fro ttp UNITED STATES POSTAL SERVICE ' OFFICIAL BUSINESS 1 f SENDER INSTRUCTIONS Print y ur name, address, and ZIP Code in the space below. C mplete items 1,2,3,and 4 on um the rev rse. Attach t front of article if space permits, otherwise affix to back f article. PENALTY FOR PRIVATE End rse article "Return Receipt USE,$300 Requested"adjacent to number. RETURN Print Sender's name,address,and ZIP Code in the space below. TO / 1NG MD ZONING TOWN OF nr �nTu � ►Il►InenD 1540 Sullivan Avenue South Vy'!ndsur, „i + ti :) 1,74 I i SENDER: Complete items 1 and 2 when additional services are desired, and complete items 3 and 4. Put your address in the "RETURN TO" Space on the reverse side. Failure to do this will prevent this card from being returned to you. The return receipt fee will provide you the name of the person delivered to and the date of delivery. For additional fees the following services are available. Consult postmaster for fees and check box(es)for additional service(s)requested. 1. ❑ Show to whom delivered,date,and addressee's address. 2. ❑ Restricted Delivery t(Extra charge)? T(Extra charge)T 3. Article Addressed to: 4. Article Number P 007 587 014 I,ir. Santo'G_i�.narave Type of Service: Cb'i 6pb*1"R*B4�!n Group ❑ Registered ❑ Insured 21-23 Colony Street $] Certified ❑ COD Meriden, CT 06450 ❑ Express Mail Always obtain signature of addressee or agent and DATE DELIVERED. 5. Signature—Addressee 8. Addressee's Address(ONLY if X requested and fee paid) 6. Sig t re— e t u gg.,qj 7. Date of De every PS Form 3811, Mar.1987 * U.S.G.RO.1987-178-268 DOMESTIC RETURN RECEIPT \ I �emo rom TOWN OF SOUTH WINDSOR i TOWN HALL SOUTH WINDSOR, CONN. 06074 I I f F TO Sam Giangrave DATE July 26, 1990 I I L i SUBJECT: Jehovah's Witnesses, Application #89-47 l FOLD- Per our discussion, enclosed is a standard specification and construction details for a town sidewalk. Any questions about the specs, call our Engineering Dept. (Bo Davies or Steve Groves) . Any other questions, call me. I I i i I I i i i By_ Atnrni� Ror►on} RICHARD M. RITTENBAND RECEIVED ATTORNEY AT LAW •1 tP_ 3 1750 ELLINGTON ROAD �1�N SOUTH WINDSOR,CONNECTICUT 06074 YVlMOR PANNING DOM (203)644-2456 August 2, 1990 Ms. Marcia Banach Director of Planning Town of South Windsor 1540 Sullivan Avenue South Windsor , CT 06074 Re: Application 89-47P Jehovah' s Witnesses v. South Windsor Planning and Zoning Dear Marcia: Enclosed is copy of Motion for Approval of Settlement , Stipulation, etc. with the signature of Judge Gill granting the Motion for Approval on July 31 , 1990. It is my opinion that you are free to consider the appli- cation approved for both a special exception and the site plans and proceed accordingly. Thank you. Ver tr,t1 y yczu , Richard M. Rittenband RMR: ds cc : M. Zizka, Pepe & Hazard Enclosure I NO. CV-90-0370843-S SUPERIOR COURT l • SOUTH WINDSOR CONGREGATION JUDICIAL DISTRICT OF OF JEHOVAH'S WITNESSES HARTFORD/NEW BRITAIN AT HARTFORD V. SOUTH WINDSOR PLANNING & ! ZONING COMMISSION JULY , 1990 MOTION FOR APPROVAL OF SETTLEMENT Pursuant to Conn. Gen. Stat. § 8-8 (n) , the parties to this administrative appeal hereby jointly move this court to approve the settlement of this case in accordance with the Stipulation for Settlement attached hereto as Exhibit A and made a part hereof. DEFENDANT - SOUTH WINDSOR PLAINTIFF - SOUTH WINDSOR i PLANNING & ZONING CONGREGATION OF JEHOVAH'S COMMISSION WITNESSES i By: By: ' 'chard M Rittenband, Esq. Michael Z z , Esq. 1750 Ellington Road Pepe & Haza South Windsor, CT 06074 Goodwin Square ; (203) 6�44-2456 Hartford, CT 06103-4302 Juris No. 50412 (203) 522-5175 Juris No. 101812 l ' I i I �... ORDER The foregoing motion is hereby GRANTS / DATED: BY THE COU D Judge/ lerk L: \MAZ\26751\2-007 .PLD i i NO. CV-90-0370843-S SUPERIOR COURT SOUTH WINDSOR CONGREGATION JUDICIAL DISTRICT OF OF JEHOVAH' S WITNESSES HARTFORD/NEW BRITAIN AT HARTFORD V. SOUTH WINDSOR PLANNING & ZONING COMMISSION JULY , 1990 STIPULATION FOR SETTLEMENT i The parties to this administrative appeal hereby , stipulate that, in settlement of this case, judgment may enter 11forthe plaintiff to the following extent and under the I following terms and conditions: 1. The special exception requested by the plaintiff (application no. 89-47P) for the construction of a Kingdom Hall for its property located on the northern side of Burnham ( Street and west of Long Hill Road is approved. 2 . The plaintiff' s alternative site plans (Sheets SV, Al-A3 , and LA1-LA5, prepared by Codespoti & Associates, revised through May 8, 1990) are approved subject to the terms and conditions set forth in the letter dated July 19, 1990 from Louise C. Evans, Chairman of the Commission, to Santo Giangrave, a copy of which letter is attached hereto as j Schedule I and made a part hereof. I =BIT A i �J 3 . Each party shall bear its own costs in this action. DEFENDANT - SOUTH WINDSOR PLAINTIFF - SOUTH WINDSOR PLANNING & ZONING CONGREGATION OF JEHOVAH'S COMMISSION WITNESSES n By: ` By: ZizRittenband, Esq. Michael sq. 1750 E11 ngton Road Pepe & Hazard '%- I South Windsor, CT 06074 Goodwin Square (203) 644-2456 Hartford, CT 06103-4302 Juris No. 50412 (203) 522-5175 Juris No. 101812 L: \maz\26751\2-008 .PLD i ' . >...t:� i5:i�14` -�'l�s'.I.°43°�!•-�q%+"�g•r;4.dt�3V3.i<A�� _ 'F-:-�_�i-'r:, .. . .-�� -. - ` 1 - .'airsjQ. '"�sFr`'.'S�Crel�.�.•=__.. ii . yC' ._—. ♦ e — SOUTH WINDSOR LONG VS. SOUTH WINDSOR PCZ CV-90-0370843—S TO ALL COUNSEL AND PARTIES OF RECORD JUDGMENT ENTERED IN ACCORDANCE WITH THE STIPULATION PRESENTED TO THE COURTs PER ORDER OF GILLS J. JULY 319 1990 VERONICA ZIGMONT ASSISTANT CLERK 1 RICHARD M RITTENBAND SUPERIOR COURT 1750 ELLINGTON ROAD 95 WASHINGTON STREET P 0• DRAWER Ds STATION A HARTFORD* CONNECTICUT 06106 SOUTH WINDSOR CT 06074 DATED JUL 319 1990 HHO I _T­ 5� WR 66R f oumPSTER ON CONCREW PAD— WR At 25 r.f VA K' PAPKINQ AREA W 60 CARS J i 126 26 32110 37 24' 4N 47 44*N -4 138 44"446 AREA 0 REMAIN C 2a'R c L,R a V T YADTH Raj TO *0' EAST HAF(YrOP TOWN 04"ll"INUR'S OATrD 10/112769, — — a— — i . I__ • _ i_ _ _ _ — _ _1 I_ I—j I— {) I— 11, yF`� i i r_e �� f —� —E i—i a � 99 tt I i ty _ � i • i_R.— - 5 r Y OUT Lu _ �►-+�—' r it t 06-7.0 _ �,:_ - coRb T�D ' �# Itp 4./ emo from TOWN OF SOUTH WINDSOR TOWN HALL SOUTH WINDSOR.CONN. 06074 F TO Marcia A. Banach DATE 8/7/90 L SUBJECT: JEHOVAHAS WITNESS - #89-47P FOLD- Burnham Street There will be a preconstruction meeting for the above mentioned site plan on August 21, 1990, here at the Town Hall. (10 :00 A.M. ) cc: Michael Gantick, A. B. Davies, Lester Braddock, Fred Shaw, Mel Stead, Karl Reichle, John McCahill, John Collins, Bill Lanning By 4Olen a rA 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 ~�soe•co� AREA CODE 203/644-2511 August 21, 1990 RE: Preconstruction Meeting - Application #89-47P Jehovah's Witnesses Site Plan IN ATTENDANCE NAME COMPANY/ADDRESS TELEPHONE Lester Braddock Town of South Windsor 644-2511 Mich le R. Lipe Town of South Windsor 644-2511 Santo J. Giangrave Codespoti Design Group 21-23 Colony Street Meriden, CT 06450 237-9860 Michael J. Gantick Town of South Windsor 644-2511 John E. McCahill Town of South Windsor 644-2511 Steve Groves Town of South Windsor 644-2511 Thomas Mason, Jr. 30 Rene Court East Hartford, CT, 06108 291-8556 Th following is a brief summary of points discussed during the meeting. Erosion and Sedimentation Control 1. All erosion and sedimentation control measures are to be in lace prior to earth moving operations in each area and maintained cleaned out during construction. Call Zoning/Wetlands Enforcement Officer for inspection when measures are in place, prior to commencement of site work. 2 . All topsoil stockpile areas to be protected (ringed with haybales or equal) . 3. During construction of the driveway a crushed stone tracking pad is to be installed and maintained to minimize tracking of dirt/gravel onto Burnham Street. Calcium chloride or water is to be used for dust control as required. Application No. 89-47P Page 2 August 21, 1990 Public Works 1. Four complete sets of approved/revised plans to be provided to Town prior to start of construction. They will be stamped by Planning Department along with plans developer needs . Only approved plans are to be used on jobsite. 2. The Public Works Department is to be notified forty-eight (48) hours prior to the start of major construction work with inspections and testing per Developers Checklist requested for the following: a) After site is staked out b) All drainage work c) Preparation of subgrade, compaction tests as requested by the Town d) Preparation of subbase, six (6) inch lifts e) Placement of bituminous concrete, 2 inch layers 3. No subgrade formation/base in frozen ground/snow. Same for pipe/structure installation. 4 . As built plans are to include horizontal and vertical location of all underdrains, footing drains, and sanitary sewers located as per revised as-built checklist. 5 . All pipe and structures to be backfilled with free draining material, compacted in maximum one foot lifts with approved compaction equipment or approved equal if deep trench is encountered. Any pipe or structure work requires inspection prior to backfilling. 6 . Any problems and/or questions regarding construction of this project will be directed to Santo Giangrave, 237-9860 in the field. 7 . All filling to be done in accordance with Department of Transportation specifications . To be compacted in maximum lifts and tested as necessary. 8. Job meetings will be held as needed, and can be called by the developer or Town. 9 . Forty-eight (48) hours notice needed for Certificate of Occupancy inspection. Two week review period (10 working days) needed for all individual site (lot) plans prior to issuance of building permit (may be longer if application is incomplete) . See General Guidelines for Certificate of Occupancy and Building Permit. 0 Application No. 89-47P Page 3 August 21, 1990 10. Any proposed changes are to be presented to the Engineering or Planning Department prior to implementation on change sheet in triplicate. Town will attempt to turn around within 24 hours. 11. Town of East Hartford Permit needed for all work within Burnham Street. Copy to the Planning Department. 12 . Normal hours of operation 7:00 A.M. - 5:00 P.M. , no work on Sunday. Planning Department 1 . Mylars to go on file prior to issuance of the building permit. SNET/NU 1. Contact utilities for coordination of utilities connection. IWA/CC 1. Silt fence maintenance along the westerly property line will be critical. 2 . Hood grease traps must be installed in the two catch basins which discharge into the swale interceptor. Fire Marshall 1. Blasting (if required) to be coordinated with the Fire Marshal. Police Department 1. Emergency phone numbers for the duration of the construction must be provided to the Police Department on a company letterhead. If the developer occupies or owns the building(s) after construction emergency numbers must be provided to the Police Department. 2. All buildings located on property which abuts a public highway must be numbered. Such number(s) (address) shall be visible from the street. All numbering shall comply with Town Ordinance 6-800 thru 6-802. 3 . Barns, garages and outbuildings which are located on the same premises as a numbered structure are excluded. 4 . Erect temporary sign on the site during construction Application No. 89-47P Page 4 August 21, 1990 identifying the project. 5 . If an alarm is to be installed contact the Police Department. Building Department 1 . Plan review with Building Official/Fire Marshal required prior to application for building permit. Coordinate with Chief Building Official. Very truly yours, +dJ �4 �' "��(4yy Michele R. Lipe Assistant Planner/Analyst MRL/pmm cc: Jerry C. Iazzetta, Town Engineer Thomas Hart, SWPD Karl Reichle, Public Works Mel Stead, Public Works Hal Clisby, CL&P Minh V. Le, SNET John R. Collins, Chief Building Official Fred Shaw, Superintendent of Pollution Control John E. McCahill, Zoning/Wetlands Enforcement Officer C r o-PS-IOU& ?d&U&olt c � 4 `v 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 AREA CODE 203/644.2511 September 11, 1990 Raymond Mack 59 Lovell Avenue Windsor, CT 06095 Dear Mr. Mack: Re: Application 89-12P - Jehovah's Witnesses At the September 10, 1990 meeting, the South Windsor Inland Wetlands Agency/Conservation Commission approved a one year extension of Application #89-12P with all original conditions. Application #89-12P becomes effective October 30, 1990 and expires on October 30, 1991 . Very truly yours, dames A. Lombardi, Chairma Inland Wetlands Agency/ Conservation Commission JAL/pmm cc: Marcia A. Banach, Director of Planning John R. Collins, Chief Building Official Planning & Zoning Commission Jerry Iazzetta, Town Engineer Enclosure CODESPOTI ,ARCHITECTURE WILLIAM R.JULIANELLE ENGINEERING Architect DESIGN GROUP INTERIOR DESIGN SANTO J.GIANGRAVE I Inc o r p o r a t e d IAND USE CONSULTINGRECEIVED P''Ofwl10^°I E"o"'ew OCT 17 M JosEPH R.CODESPI.orx�Um Conw UmC4nwOTI ltont 21-23 COLONY STREET MILTON GREGORY GREW MERIDEN, CONNECTICUT T Architect 06450 203-237-9860 W VANWR P.LMNING DEcP li ROBERT W.PAUL Profenrorwt Erpirmw GREGORY D.GIANGRAVE Arcrwlect October 11 , 1990 Property Owners Vicinity of Burnham Street South Windsor, CT 06074 Dear Property Owners : Theresa M. Warren Stephen C. & Marie M. Dussault Elva Kibb Carmine J. Napolitano RE: South Windsor Kingdom Hall of Jehovah' s Witnesses Burnham St. , South Windsor Project No. 88016 -"� As you know, we received our approval from the Planning & Zoning Commission and are proceeding with construction. Let us assure you that we are making every effort to satisfy all concerns of our abbutting neighbors . The buffer zone will remain natural where possible and where it has to be built-up transplantation of suitable trees will take place. Once again we would like to have your imput as respects any additional concerns you may have. Perhaps certain type trees in the buffer are preferred and you may wish to assist us in the tagging and marking stage. Perhaps there is a footing drain or drainage swale that has heretofore not been identified that we can work with you to resolve. Whatever your concerns or questions , please- feel free to contact myself or our construction supervisor Mr. Thomas Mason Jr. in writing or by phone. My number is 237-9860 (day) and 644-2907 (evenings) and Mr. Mason' s number is 291-8556 (evenings) . We are confident that our building, meeting program, and conduct will be an asset to the community and look forward to a satisfying neighbor relationship. Very truly our_000 , Santo J. Giangrave, .Y. CC: Sam Farmer Files January 8, 1991 M E M O R A N D U M TO: Marcia A. Banach, Director of Pl nning FROM: Jerry C. Iazzetta, Town Enginee RE: Jehovah Witness Resubdivision - and ease We have reviewed the January 3, 1991 request for the release of the $5, 000 bond being held for the Jehovah Witness Resubdivision. Based upon Mr. Barry L. Hammons, L.S. , certification, we feel it is appropriate to release the bond. The monuments should be shown on the as-built drawings as set. JCl/jsv cc: Michael J. Gantick, Director of Public Works t CODESPOTI ARCHITECTURE WILLIAM R.JULIANELLE SANTO J.GIANGRAVE ENGINEERING Architect Prof sslonal Engin r DESIGN GROUP INTERIOR DESIGN I n II c o r p o II r I a t o I d I LAND USECONSULTING GREGORY D.GIANGRAVE ROBERT W.PAUL III��IIIII�IIIIIIIII���II�II�IIlIIII�IIIII�IIIIIIIIIIIIIIIIIII�IIII�IIIII�I�IIII��IIII4IIII�IIIIIIIII�II�III�I�tI Architect Prof ssionol Enpin r 21-23 COLONY STREET 203-237-9860 JOSEPH R.CODESPOTI MERIDEN,CT 06450-3269 FAX EXT. 18 Land Us Consultant September 11 , 1991 Marcia Banach .„ Town Planner Town of South Windsor ECEIVE 1540 Sullivan Avenue South Windsor, CT 06024 SEP 13 1991 Dear Ms . Banach: S0.WtNOSOR PLANNING DFPT, RE: South Windsor Kingdom. Hall Sidewalk Requirement - Project 88016 Application No. 89-47P This is a follow up to my meeting with Michelle Lipe on August 28 , 1991 regarding sidewalks for the subject project. The Kingdom Hall Building Committee has informed me that the sale and associated development of the adjacent parcel which was considered by the Zoning Commission as a parking overflow facility has been delayed due the the poor economic climate. You may recall that sidewalk options were discussed depending upon how the site would be developed. For example, an alternate location for a side- walk could be a mid-point connection in lieu of a street walk connection. Since this delay of development was not forseeable by either the Building Committee or the Zoning Commission, we are requesting that you consider a deferral of any connecting type sidewalk until such time as the development of the adjacent industrial parcel takes place. We would like to take this opportunity to thank the Zoning Commission for the patience and fairness to all parties involved in our project during the review and approval process . Very truly yours Santo J. Giangrave, P.E. SJG/clk cc: Sam Farmer Files tow" 8E� o w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 SoR-co AREA CODE 203/644-2511 September 18, 1991 Santo J. Giangrave Codespoti Design Group 21-23 Colony Street Meriden, CT 06450-3269 Dear Mr. Giangrave: Re: Application #89-12P - Jehovah's Witnesses At the September 16, 1991 meeting, the South Windsor Inland Wetlands Agency/Conservation Commission approved a three year extension of Application #89-12P with all original and standard conditions. Application #89-12P becomes effective October 30, 1991 and expires on October 30, 1994. Very truly yours, Eliza eth A. Warren, Chairman Inland Wetlands Agency/ Conservation Commission EAW/pmm cc: Director of Planning Planning & Zoning Commission Town Engineer Enclosure t0'M N 8E4 r T-a o-P s ?d&U141at 1540 SULLIVAN AVENUE - SOUTH WINDSOR, CONN. 06074 it.CO � AREA CODE 203/644-2511 October 31, 1991 Santo J. Giangrave, P.E. Codespoti Design Group 21-23 Colony Street Meriden, CT 06450-3269 Dear Mr. Giangrave: Re: Application #89-47P - Jehovah' s Witnesses Site Plan At their special meeting held October 29, 1991 the Planning and Zoning voted in favor of your request to defer the construction of the required sidewalk to the adjacent individual parcel until such time as a site plan is proposed for that site. The Commission did vote to require a bond of $2,000 . 00 to ensure that construction of a sidewalk does take place. Very truly yours, Louise C. Evans, Chairman Planning & Zoning Commis ion LCE/pmm cc: Town Engineer Director of Planning IWA/CC The Ban of Ha rtfD r November 11 1991 Dear Depositor: As a valued Bank of Hartford depositor, you are probably aware that for many years we have followed a policy of paying the highest possible rate of interest on deposits consistent with sound banking practices. During the past few months, rates have declined dramatically. In order to maintain a prudent policy with respect to the current rate environment, we find it necessary to lower rates on certain products. Beginning December 1, 1991, interest paid on passbook and statement savings accounts will be adjusted to 5% per annum compounded monthly (effective annual yield 5. 116%) . Additionally, our N.O.W. Account rates will be adjusted to provide an annual interest rate with monthly compounding of 4 .25% (effective annual yield 4. 334%) on balances of $500 or more and 4 .50% (effective annual yield 4 . 594%) for balances of $10,000 or greater. Our rate surveys indicate that these new rates compare favorably with those offered by many of our competitor banks. We will continue to monitor the financial investment market to provide you with the fairest return on your deposited funds in the future. We believe that these changes will help us to remain competitive in our product offerings including an on-going standard of service excellence. We sincerely appreciate your confidence in us and look forward to the continued opportunity to satisfy your banking needs. If you have questions about your account, please contact any member of our customer service staff. Very truly you s, obin H. Dunfo Vice President Retail Banking /jjl 108 Farmington Ave.,Hartford,CT 06105(203)525-6631 Offices:•Avon•Bloomfield•Cromwell•Hartford•Rocky Hill•West Hartford CODESPOTI ARCHITECTURE WILLIAM R.JULIANELLE SANTO J.GIANGRAVE ENGINEERING Architect Professional Engineer DESIGN GROUP INTERIOR DESIGN I n c o r p o r a t e d LAND USE CONSULTING GREGORY D.GIANGRAVE ROBERT W.PAUL IIIIIIIIIIII IIIIIl1IIIIIIIIIIIIIIlIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIlIIII Architect Prof ssional Engineer 21-23 COLONY STREET 203-237-9860 JOSEPH R.CODESPOTI MERIDEN,CT 06450-3269 FAX EXT. 18 Land Us Consultant May 26, 1992 RECEIVED Ms . Marcia Banach Director of Planning MAY 27 19Q2 Town of South Windsor 1540 Sullivan Ave. SO. WINDSOR PLANNING 4IE','T. South Windsor, CT 06074 Dear Ms . Banach: RE: SOUTH WINDSOR KINGDOM HALL Project No. 88016 This is to inform you that plantings for site and screens have been installed and appear to be healthy. The Building Committee does hereby request release of planting bond monies at this time. As mentioned in the letter of 10/31/91 by Louise C. Evans , Chairman PZC, $2 , 000 . 00 will be retained out of the original $5 , 000 . 00 for sidewalk bond. Mr. Raymond Mack, Jr. , auditor for the Kingdom Hall Building Committee will visit your office when paperwork is in order to accomplish the passbook withdrawal. We have also completed some site corrective work described in my letter of 4/28/92 to Mr. Iazzetta. We are in the process of having this confirmed by a surveyor and plotted on the as-built plan for record. The west berm of the stone ditch has been raised, the overflow catch basin lowered, the east buffer swale formed and a dumpster pad constructed as discussed. We are also aware that Mr. Collins , Building Official, requires an adjustment to the original permit fees based on final costs . This too will be accomplished by Mr. Raymond Mack, Jr. when a visit is arranged for collecting planting bond. All these things having been put in order, the Building Committee requests a permanent Certificate of Occupancy. If you have any questions regarding the above, please feel free to contact me at 237-9860. Very truly yours , Santo Giangra P.E. cc: Samuel Farmer Raymond Mack, Jr. Jerry Iazzetta-Town Engineer John Collins-Building Official Files 30 � rM •t,� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 AREA CODE 203/644-2511 June 10, 1992 Santo Giangrave, P.E. Codespoti Design Group Inc. 21-23 Colony Street Meriden, CT 06450-3269 Dear Santo: Re: Appl. #89-47P, Jehovah Witnesses Site Plan Landscaping Bond This is to advise that the Planning and Zoning Commission voted on June 91 1992 to reduce the landscaping bond for t he referenced project from $5,000 .00 to $2,000 .00 . The remaining funds will be used to ensure the placement of a sidewalk r area (location to be determined) , the screening of the and planting of four purple ash trees in the front parking lot islands . Please forward us a bond in this amount to replace the bond we are currently holding. Very truly yours, ;Z� e. Louise C. Evans(- Chairman LCE/pmm cc: Director of Planning Town Engineer TOWN OF SOUTH WINDSOR RECEIVEDv. STAFF SITE CHANGE ap'sarM FOR SITE & SUBDIVISION aA GENERAL: &WINDSOR PLANNING DEM CHANGE ORDER CONTACT PERSON Santo J. Giangrave Phone No. 237-9860 , Address 640 Burnham St. Site Name Kingdom Hall P&Z No. 89-47P Owner Jehovah' s Witnesses Phone No. 242-0867 Contact - Wtnthxop HuvAue Signature of Owner Date: Signature of Design Engr. Date: 1;12 CHANGE: (Describe location and nat a of OF ch ge. Include three (3) copies of plan/profile of Change. ) (a) Revised A/C & Pad Location (b) Added Transformer & Pad (c) Added 6" PVC Roof Drains to Ditch (d) Revised Dumpster Pad Location Reason for Change: (Why is change required) (a) Due to gravity drain of A/C chiller, pad relocated to higher ground. (b) Transformer & Pad installed per Electric Co. design. (c) 6 PVC Roof Drains installed to minimize flow accross drive. (d) Dumpster Pad location revised to reduce visibility from street. APPROVALS: (As Require ) Dir. Of Planni Date: -A 2-, Town Engineer Date: /OAMP Z. Dir. of Pub c Work Date: Other: Date: STAFF OMME S: White - Town Engineer Pink - Director of Planning Yellow - Applicant C O D E S POTI SITE PLANNING JOSEPH R.CODESPOTI LANDSCAPE ARCHITECTURE Land Use Consultant ENGeVor & ASSOCIATES P.C. LAND SURVEYING ERING Land Su" JEFFREY N.GORDON 11 u 111 I I I I I I I�I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I II I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I Landscc a Architect Site Planner 3060 MAIN STREET ROBERT J.WHEWAY STRATFORD,CONNECTICUT Professional Engineer 06497 203-375-3661 July 30, 1992 OTTO R,THEALL Sod Scientist Mr. Jerry Iazzetta ,� Environmental Scientist o -- KSON Town Engineer ��, SEPH Mana Fieldd Mana e ger 1540 Sullivan Avenue 6` South Windsor, CT. 06074 RECEI VED `N r RE: South Windsor Kingdom Hall $ JUL .3 1 1992 ► 1 Storm Water Management Town of South Windsor 2 Storage Volume Calculations L Engineering Dept. Dear Mr. Iazzetta: pj U Q I have reviewed the as-built drawings for the rainage swale along the northwest property line of the Kingdom Hall site. The drawings have been previously sent to you and are titled "Kingdom Hall of Jehovah's Witness As-Built Supplement" sheets 2 of 3 and 3 of 3, dated 7/22/92. Based upon the cross sections provided, approximately 4200 cubic feet of storage volume is provided in the swale, which is 700 cubic feet less than the original design calculations. This is primarily due to the catch basin grate being lowered from elevation 102.0 to 101.6 . The original design provided an extra 2300 cubic feet of storage over which was required to provide for a zero increase in runoff for the 100 year design storm. With the present configuration of the swale, there will still be 1600 cubic feet of excess storage provided. Upon further review of sheet 2 of 3, it would be recommended that the berm be widened to achieve the four foot design width from station 0+0 to the southerly terminus. The remaining portions of the begin appear to be adequate for the the design flows. Based upon this analogy, the storm water management system as constructed, will provide a zero increase in runoff for all storms up to the 100 year design storm. I trust that these conclusions and recommendations will meet with your satisfaction. If there is any additional information that may be iway7, , please feel free to contact me. Sincere RobertP.E. enc: cc: Santo Giangrave SOUTH WINDSOR KINGDOM HALL SWALE VOLUME CALULATIONS STATION END AREA AVE AREA VOLUME SQ.FT. SQ.FT. CU.FT. 0-50 10.8 0+0 10.8 10.8 537 .5 0+50 9 .8 10.3 513.0 1+0 11.6 10.7 534.0 1+50 9 .3 10.5 523.0 2+0 13.5 11.4 571.5 2+50 15.9 14.7 734.5 3+0 17 .2 16 .5 826.8 4240.3 STORAGE VOLUME TO ELEVATION 101.6 ACTUAL 0-50 14.4 0+0 14.4 14.4 720.5 0+50 14.0 14.2 711.3 1+0 15.5 14 .8 739 .0 1+50 13.3 14.4 719 .8 2+0 18.5 15.9 794.0 2+50 20.0 19 .2 962 .3 3+0 20.3 20.2 1008.5 5655.3 STORAGE VOLUME TO ELEVATION 102 .0 (with CB raised to 102 .0) t� . w 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 ~�soR•co�'� AREA CODE 203/644-2511 August 3, 1992 Mr. Robert Wheway, P.E. Codespoti & Associates P.C. 3060 Main Street Stratford, CT 06497 RE: o ✓S Windsor Kingdom Hall - Jehovas Witness Dear Mr. Wheway: We have reviewed your July 30, 1992 letter concerning the storage volume of the constructed detention swale versus the designed swale. It is Town policy to require detention basins (swales) to contain a 100 year storm with one foot of freeboard. Your letter does not indicate what freeboard is available in the constructed swale. Please provide that information. Your letter also recommends that the berm be widened from Station 0+00 to the southerly terminus, however, it does not indicate when the work will be done. Please advise. If you have any questions, please call me at 644-2551, Ext. 245, or Mr. Bo Davies at Ext. 240 . Very truly yours, jowerr]X( Iaz a a, P.E. n ineer JCl/jsv cc: Michael J. Gantick, Director of Public Works A. Bowen Davies, Deputy Town Engineer ,OVA Sf, O rr ^ � � s • s � C �U � 1540 SULLIVAN AVENUE SOUTH WINDSOR. CONN. 06074 Soe•co AREA CODE 203 /644-2511 September 16, 1994 Santo J. Giangrave, P. E. 280 Sand Hill Road South Windsor, CT 06074 Dear Mr. Giangrave: Re: Appl #89-12P, Jehovah ' s Witnesses Kingdom Hall At the September 14 , 1994 meeting of the South Windsor Inland Wet Agency/Conservation Commission, the extension of application #89-lands was denied. 12P The concerns expressed by the Agency were: 1 • The present application has been completed . 2 • The proposed work was not included in the present a licati and must be submitted in a new application . pp on Very truly yours , INLAND WETLANDS AGENCY/ CONSERVATION COMMISSION Elizabeth A. Warren, Chairman EAW/pmm CC: Planning & Zoning Commission Town Engineer t �7 l / -- Santo J. Giangrave, P.E. 280 Sand Hill Road South Windsor, Ct . 06074 Ms . Elizabeth A. Warren, Chairman Inland Wetlands Agency/Conservation Commission NIT Town of South Windsor 1540 Sullivan Avenue South Windsor, Ct. 06074 FEB 14 1995 South Windsor Dear Ms . War_re� Planning & Zoning Commission Re : Ap `l #89--12P, ehovah' s Witnesses Kingdom Hall This is responce to your letter of September 16 , 1994 . I respectfully reinin&- the,Oommissidn that the reasons for your re j ectior- of our wetlands Permit are not totall,7 accurate. You must be aware that in our out-of-court settlement between Jehovah' s Witnesses and the Town of South Windsor, the Planning and Zoning Commission required that we build a sidewalk along the front of our property to accomodate addition- al parking below. The plan that I submitted to you showed the proposed sidewalk and parking. To insure that we build this sidewalk to parking below the Town recieved from us a bond of $2000 . 00 . Since the Town has now refused us the right to build a sidewalk which it itself legally required us to buId, we respectfully request that we have our bond funds returned to us at your earliest convenience. The reason I have not re^ponded to you earlier is do to a -rather lengthY- process we undertook whereby it was decided that we would not make out a new application at great bother to J7ou and our neighbors at this tine. Very truly your r cc : Marsha Banach, Tn Plr_r Santo J—Giangrave, P.E. ;iRr•4„ 3"" '►`.fVM@wlMe.+►1e, ate.w.i.,•AyOt,raY�•. rr TOWN OF SOUTH WINDSOR STAFF SITE CHANGE FOR SITE & SUBDIVISION GENERAL: CHANGE ORDER CONTACT PERSON ,�,, Phone No.Aft Address , MR&6m Site Name P&Z No. Owner Phone No. Contractor Signature of Owner L41. Date: Signature of Design Engr Date: CHANGE: (Describe location and nature of change. Include Four (4 ) copies of plan/profile of Change. ) Reason for Change: (Why is change required) 7 APPROVALS: (As Required) � .. Dir.. Of Planning ' _��{ ' � '!� _--s_�' Date: Town Engineer Date: Dir. of Public Works Date: Other: Date: STAFF COMMENTS: White - Town Engineer Yellow - Applicant Pink - Director of Planning Goldenrod - Engineering Department Jehovah 's Witnesses SOUTH WINDSOR CONGREGATION 640 BURNHAM STREET SOUTH WINDSOR, CT 06074 PHONE: (203) 528-2717 F. �� .� .gym Director of Planning&Zoning r Town of South Windsor 1540 Sullivan Ave., APR 20 1005 South Windsor, CT. 06074 SOuth Win so April 12, I995 Plannin 8 & Z00ing Commissje, Dear Chairman, Re: Appl. 489 -47P Jehovah's Witnesses Kingdom Hall Landscaping Bonds In checking our records, we find that we have two passbook accounts that were retained by the Town as bonds for the following: • $2,000.00 for construction of sidewalk and certain plantings • $5,000.00 for inland wetlands. Regarding the first accout, we submitted a plan to construct the sidewalk but was denied by the Wetlands Cornrnission. We are therefore requesting that our bond for$2000.00 be returned with all posted interest in our favor. As regards the second account, we have completed all necessary soil and erosion control work shown on our plans and have occupied the facility for approximately 2 1/2 years. We are also requesting that the$5,000.00 also be returned with all posted interest. We like to thank you for the consideration you give to our request. Sincerely, Xa Ra mond L. Mack, Jr. Secretary South Windsor Congregation Jehovah's Witnesses, Incorporated �0,$N SE,( s V&U/4&at C V s 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 AREA CODE 203/644-2511 SOR•CO�� June 15, 1995 Raymond L. Mack, Jr. , Secretary South Windsor Congregation Jehovah's Witnesses, Incorporated 640 Burnham Street South Windsor, CT 06074 Dear Mr. Mack: Re: Application #89-47P, Jehovah's Witnesses This is to advise you that the Planning and Zoning Commission otediontJune13, 1995 to release the sidewalk bond for the above-referenced project amount of $2,000. Advance arrangements should be made to pick up the bond to ensure that the necessary contact person(s) will be available. If you have any further questions contact the Planning Department at 644-2511 , ext 253. Thank you. Very truly yours, pLAMq�NG & ZONING COMMISSION �J f� Rdssell G. Levack, Chairman RGL/pmm n � cc: Town Engineer a g L.L a 'Su 8 SETBACK (TYP" rAPPRO,< C X 0 N 1,4'L I If low PA pq- ......... Rr I IF C A""I CKY 41' 5 B y lkT XL W-1305r. accord'InC.',e W I as dle-f Of epared SOR 'TOWN' VVINDS n A," c t,4 1 LI 1 Tdr,vp yo LLJ 4 NOTE. Wait' r required for 9'x18' parking spac etripli 6�I-A //AM ( fta.y , �jj� r.i•r � . ...,.',�: t,• t ► �, � � ►sit,�,✓:��, Shed , ': • ,,. '• � i���Viy /� 15 r r . I n/t 7.5 R I THERESA (M 1 28 14 1 7. OR I 2 4•R I 92'R OR — I 1 1.5'R 48 I 47 1 I • . l I I I I 1 24' 219 8' - 24' 8• 50) I 5'R 5'R I 40 59 57 ' S6 I 4'R 4'R 4' 4'R 1PA D CARMINE J.DNA 40.12 3� PARKING AREA "Er 1.75' 1.5'R 64 CARS I 5'R 4'R I + I 30 80 84 15'R OUrLET , 85' I 'rjr, e i, 'p. n/ 1 I STEPHEN C.tae•'MARIt 5001 36.83' I ' 24 61.18 le ' bur LET I I , -w 1 rc I{ 115411 WR to l-3` I 60'R N ' DUMP ON I 4 5'R CONC PAD I '2 I r . E I 80 19 °.°. 14 g•R i ''6 , 1 13 20 25 ELVA KIO I PARKING AREA 'A' a 60 CARS 31 26 lit., r • 32 37 '