Loading...
HomeMy WebLinkAboutSITE PLAN (130) G TOWN OF SOUTH WINDSOR fj PLANNING AND ZONING COMMISSI01� �i 96 The Commission vill officially receive applicati ns pplication NO. at either Special or Regular meetings pr vided they eceived Dat ` ?i were submitted t the C mmission Chairpers n, Secretar- ction or Public Hearing by: or agent, at least fourteen (14) days pri r t the meeting at vhi � pVjiff ly r ceived. No application f c jally re ds, v9 Special Meetin., ece ip t No.— /I b will be acted o i ' t"that melt4g. JUN 16 1985 APPLICANT: Bissell Commons, Inc. ADDRESS : 1744 Ellington Road, South Windsor C tannin gT oath Windsor 4-8448 16 nmis oft OWNER OF RECORD ON LAND RECORDS : Bissell Commons, Inc. ADDRESS : 1744 Ellington Road, South Windsor, CT 06074 COMPLETE LOCATION OF PROPERTY: Chapel Road, South Windsor (See copy of map attached) ZONE I NAME, ADDRESS & TELEPHONE NUMBER OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED : William E. Grace, Esa. , 25 Oakland Road, South Windsor CT 06074 . TELEPHONE 644-1528 THIS APPLICATION IS FOR: (CHECK ONE OF THE FOLLOWING) 1 . Zone Change to _(public hearing required) 2 . Filing for Subdivision 3 . Filing for Open Space Subdivision (public hearing required) 4 . Filing for Resubdivision (public hearing required) 5. Special Exception to Article (public hearing required) X 6 . Site Plan of Development 7. Removal of Sand , Gravel , Clay or Quarry Stone & Ore (public hearing required) 8 . Other (explain in detail) THIS APPLICATION MUST BE SIGNED BY THE APPLICANT AND OWNER OF THE PROPERTY AND SUBMITTED WITH 6 SETS OF PLANS ( 7 sets if public hearing is required) BEFORE IT IS RECEIVED BY THE PLANNING & ZONING COMMISSION. B SS L CO'� INC. IS E COMMO , NC. B BY mm Y WILLIAM E.Ag ,� anfTS ATTORNEY WILLIAM E. GR%t 'er ITS ATTORNEY 12/84 pow" 44 7-OWI-2, al'S-011tiA 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 f��SOR•co AREA CODE 203/644-2511 TO BE PUBLISHED IN THE JOURNAL INQUIRER SATURDAY, JUNE 273, 1985 LEGAL NOTICE TOWN OF SOUTH WINDSOR PLANNING AND ZONING COMMISSION At the July 23, 1985 meeting, the Planning & Zoning Commission voted to take the following action : 1 . Approve, for Andover Equities, Inc . , Phases III and IV of Strawbridge Condominiums, consisting of 40 units in Buildings 8, 9 , 10 and 11 in Phase III , and 30 units in Buildings 12 , 13 and 14 in Phase IV, located on the south side of Ellington Road, MF-A zone . 2 . Approve, with modifications , the application of Bissell Commons , Inc . , for a site plan of development for property located on the north side of Chapel Road, west of Ellington Road , being Phase III of Bissell Commons , I zone . 3. Approve , - with modifications, the application of Wapping Fair Association, Inc . , for use of Rye Street Park for the fair , to be held on September 6 , 7 and 8, 1985 . 4. Approve, with modifications, an amended resubdivision plan for 21 . 12 acres located on the east side of Nutmeg Road North, into 2 lots as shown on a plan prepared by Hodge Engineering Associates , Inc . , dated 2/20/85 , revised to 7/11/85, I zone . Dated at South Windsor, Connecticut this 24th day of July , 1985 . PLANNING AND ZONING COMMISSION Robert F. Gilligan, Chairman David H. Sorenson , Secretary �.1 ap SIOU& ?d&uaot C � U �� 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN pT..4 fS t.CO�'� AREA CODE 203/644-2511 ',� July 17, 1985 p V Mr. R. Kelley Jvt22 1965 Bissell Commons, Inc. Chapel Roadth W� South Windsor, CT 06074 44* CERTIFIED MAIL cftmissiolt Dear Mr. Kelley: At the July 15, 1985 meeting, the South Windsor Inland Wetlands Agency/ Conservation Commission approved with conditions, Application No. 340 for the purpose of construction of Phase III of Bissell Commons, Inc. , on property located at Chapel Rd. , South Windsor. The permit is based on the plans entitled "Bissell Commons an Industrial Condominium" for Bissell Commons, Inc. , Chapel Road, South Windsor, Connecticut, by consulting engineers of Lucek Engineering Assoc. Inc. Such plans are dated 10-2-82, being revised 11-5-83, 11-22-83, and 6-19-85; sheet 1 of 4. The permit is also based on Topographic Plan for property of Bissell Commons, Inc. by Lucek Engineering Assoc. Inc. dated 3-27-85, there being no revisions; sheet 2 of 2. The following conditions must be adhered to for this permit to be valid: 1. Construction activities shall be subject to the approval of the Town Engineer. 2. The application shall indemnify and hold harmless the Town of South Windsor against any liability which might result from the proposed operation or use. 3. The permit is valid for one year and shall expire July 15, 1986 if not initiated and completed within one year from the date of approval. Very truly yours, John Moran, Jr. , hairman INLAND WETLANDS AGENCY/ CONSERVATION COMMISSION CC: Wm. E. Grace, Esq. Lucek Engineering Assoc. A. B. Davies, Deputy Town Engineer Jacqueline J. Smith, Town Clerk Richard J. Sartor, Town Manager Richard Ryan, Deputy Mayor Robert F. Gilligan, Chairman PZC Thomas D'Auria, Building Official Peter DeMallie, Director of Planning Kenneth Brill, Chairman EDC John Shemo, Coordinator EDC r C! O'k 1&.�-OUM ce 0 -id W)z; t�a)t 1540 SULLIVAN AVENUE . SOUTH WINDSOR. CONN. 06074 R•co� AREA CODE 203/644.2511 July 26 , 1985 William E. Grace , Esq . 25 Oakland Road South Windsor, Ct. 06074 Dear Bill : Re : App . #1096 - Bissell Commons, Phase III Please be advised that the Planning & Zoning Commission voted to approve the site plan of development for Phase III of Bissell Commons, for property located on the north side of Chapel Road, in an I zone, as shown on plans prepared by Lucek Engineering Associates, dated 10-2-82 , revised to 7-23-85 , subject to the following modifications: 1 . A waiver for 13 parking spaces is granted in accordance with Section 8. 4. 1 . 2 . Dumpsters shall be located on concrete pads and be adequately screened with stockade fences . 3. No outside storage will be permitted on these premises . 4. Landscaping at the southwest corner shall be modified to show plantings around the corner of the building. 5 . No building permit will be issued until the final mylars have been filed in the Town Clerk' s Office. 6 . Prior to commencement of site work, a meeting must be held with Town Staff . 7. This approval is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission. Within 90 days of the date of approval (by October 21 , 1985) black and white transparent mylars of sheets 1 and 2, together with three paper prints, must be submitted to this Commission to be stamped and signed . The letters of approval of this Commission as well as the Inland Wetlands Agency/Conservation Commission, must be reproduced on the mylar .. Yours very truly, PLANNING AND ZONING COMMISSION 9 vg By: obert F. i7lilligan, hai man CC: E. Belleville, Assessor R. Martel , Town Engineer P . DeMallie, Planning Director IWA/CC T. D 'Auria, Building Official �.10'0N T_awn0 vzn� �! . O 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 ��SOR•ca� AREA CODE 203/644-2511 July 15, 1986 William E. Grace, Esquire CERTIFIED MAIL 25 Oakland Rd. South Windsor, Ct 06074 RE: Permit Extension - Application #340, Bissell Commons Phase III, located on Chapel Road Dear Attorney Grace: At the July 14, 1986 meeting, the South Windsor Inland Wetlands Agency/Conservation Commission approved a one-year extension for the above mentioned application. The extension becomes effective July 15 , 1986 with an expiration date of July 15, 1987 . All original conditions of this permit still apply. Very truly yours, John M. Moran, Jr. , airman Inland Wetlands Agency/ Conservation Commission Town of South Windsor JMM:dlb CC: A. B. Davies , Deputy Town Engineer Richard Martel, Town Engineer Planning & Zoning Commission Thomas D'Auria, Building Official Marcia Banach, Director of Planning John Shemo, Economic Development Coordinator e � u 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 ~�soa•co�'� AREA CODE 203/644-2511 June 1 , 1987 Mr. Richard Kelley RSK-Kellco 1744 Ellington R.d South Windsor, Ct 06074 RE: Application #340 - Bissell Commons Inc. Dear Sir: This is a reminder that Application # 340for permit and one year ex- tension will expire on July 15 , 1987. A new application will be required if you plan to extend your project beyond the above expiration date, along with a fee of $25 . 00 . This should be submitted at least 30 days prior to the expiration date of the permit. If work has been completed or will be completed by the expiration date , we would appreciate you contacting the Inland Wetlands Agency/Conservation Commission' s secretary, Debbie Bellizzi at 644-2511 Ext. 253 to advise her of work status . If you have any questions , please don' t hesitate to contact Debbie or Mr. Davies , Deputy Town Engineer . Very truly yours , Kevin Rennie , Chairman Inland Wetlands Agency/ Conservation Commission Town of South Windsor CC: Marcia A. Banach, Director of Planning A. B. Davies , Deputy Town Engineer Richard Martel, Town Engineer Louise Evans , Chairman, PZC